Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
16 service requests in the last three years. Most common: Mold (3) · Illegal Posting (3) · Sidewalk Condition (2) · Scaffold Safety (1) · Street Sign (1) · Consumer Complaint (1).
Filed construction activity
$2,580,400 in permitted construction work filed since
2016 (20 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$6,607,000
$2,973,150
2026
$6,703,000
$3,016,350
2027
$7,019,000
$3,158,550
The city's market estimate has risen
6% between tax years 2025 and 2027.
1 food-poisoning report to 311 at this address in the last three years (1 with three or more people sick) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2011 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
South Ferry — 1 R W · 350 ft straight-line (about a 2-minute walk) · station accessibility: partial Bowling Green — 4 5 · 450 ft straight-line (about a 2-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Broadway / Morris St — M55 SIM1 SIM1C SIM4 +1 more · 600 ft
Citi Bike
Broad St & Bridge St · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
16 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $10,000,000 on
2024-03-22 (lender: Metropolitan Commercial Bank), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-03-22
AL&R $10,000,000 — from 134 BROADWAY NR,. LLC; 74 BROAD NR, LLC to METROPOLITAN COMMERCIAL BANK
$10,000,000
2024-03-22
Mortgage $10,000,000 — from 134 BROADWAY NR,. LLC; 74 BROAD NR, LLC to METROPOLITAN COMMERCIAL BANK
$10,000,000
2024-01-08
Deed $19,613,468 — from 74 BROAD OWNERS LP to 74 BROAD NR, LLC
$19,613,468
2023-12-28
Sold for $19,613,468
$19,613,468
$3,922,694
2018-09-10
Agreement $14,756,073 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$14,756,073
2018-09-10
Mortgage $11,939,049 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$11,939,049
2018-09-10
Mortgage $2,306,334 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$2,306,334
2018-09-10
Mortgage $510,690 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$510,690
2018-09-10
Agreement $11,939,049 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$11,939,049
2018-09-10
Agreement $1,516,140 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$1,516,140
2018-09-10
Mortgage $1,388,477 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$1,388,477
2018-09-10
Mortgage $1,005,450 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$1,005,450
2018-09-10
Agreement $3,694,811 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK
$3,694,811
2016-02-02
Agreement $15,800,000 — from ECC SPE LLC to BOFI FEDERAL BANK
$15,800,000
2015-12-02
Mortgage $13,473,085 — from SKS BROAD STREET LLC to EMERALD CREEK CAPITAL LLC
$13,473,085
Ten-year activity
50250
2017
2018
42
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
1
5
0
15
21
2018
3
3
2
14
3
25
2019
37
2
3
0
0
42
2020
13
1
0
0
0
14
2021
3
1
2
0
4
10
2022
3
0
4
0
1
8
2023
0
0
4
1
1
6
2024
0
6
5
7
1
19
2025
2
1
8
0
1
12
2026
0
0
1
0
2
3
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-05-14Restaurant inspection: TACOMBI — grade A
2024-04-26311: Street Sign - Dangling — St Name - Attached to Pole
2024-03-22SUBM — from 134 BROADWAY NR,. LLC; METROPOLITAN COMMERCIAL BANK; 74 BROAD NR, LLC to BROADWAY BROAD ASSUMPTION, LLC
2024-03-22AL&R $10,000,000 — from 134 BROADWAY NR,. LLC; 74 BROAD NR, LLC to METROPOLITAN COMMERCIAL BANK$10,000,000
2024-03-22Mortgage $10,000,000 — from 134 BROADWAY NR,. LLC; 74 BROAD NR, LLC to METROPOLITAN COMMERCIAL BANK$10,000,000
2024-03-04311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2024-03-04DOB complaint, category ?
2024-01-19311: Mold — Public Complaint - Comm Location
2024-01-08Deed $19,613,468 — from 74 BROAD OWNERS LP to 74 BROAD NR, LLC$19,613,468
2024-01-08Mortgage assigned — from PACIFIC WESTERN BANK; BANC OF CALIFORNIA to BROADWAY BROAD ASSUMPTION, LLC
2024-01-08Mortgage assigned — from PACIFIC WESTERN BANK; BANC OF CALIFORNIA to BROADWAY BROAD ASSUMPTION, LLC
2024-01-08Mortgage assigned — from BANC OF CALIFORNIA; PACIFIC WESTERN BANK to BROADWAY BROAD ASSUMPTION, LLC
2023
2023-12-28Sold for $19,613,468$19,613,468
2023-12-22311: Mold — Public Complaint - Comm Location
2023-12-11311: Mold — Public Complaint - Comm Location
2023-09-05311: Homeless Person Assistance
2023-08-17Cooling tower inspection
2023-03-22311: Illegal Posting — Poster or Sign
2022
2022-12-13311: Dirty Condition — Trash
2022-11-28311: Illegal Posting — Poster or Sign
2022-11-22311: Illegal Posting — Poster or Sign
2022-11-18311: Food Poisoning — 1 or 2
2022-08-29Cooling tower inspection
2022-06-09Job filed: Tmobile - Relocation of antennas, RRUs, and TMA units on new mounts on the roof. All work is in compliance with TPPN5/98. No change in use egress, or $31,000
2022-01-25Certificate of occupancy Final
2022-01-25Certificate of occupancy Final
2021
2021-09-29Certificate of occupancy Renewal Without Change
2021-09-23311: Illegal Posting — Poster or Sign
2021-06-15311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2021-02-19Job filed: FILING TO OBTAIN CERTIFICATE OF COMPLIANCE FOR 6 OUTDOOR CONDENSING UNITS. ALL MECHANICAL EQUIPMENT AND WORK HAS BEEN INSTALLED UNDER APPLICATION #$1,000
2021-01-14DOB violation E:
2020
2020-12-23Certificate of occupancy Temporary
2020-12-15Permit EW — ISSUED
2020-12-14Permit EW — ISSUED
2020-10-07Permit EW — ISSUED
2020-10-07Permit EW — ISSUED
2020-10-07Permit EW — ISSUED
2020-10-07Permit EW — ISSUED
2020-09-22Certificate of occupancy Temporary
2020-06-24Certificate of occupancy Temporary
2020-04-06Certificate of occupancy Temporary
2020-03-31Job filed: INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF $10,000
2020-03-10Permit PL — ISSUED
2020-01-31DOB violation E:
2020-01-09Certificate of occupancy Temporary
2019
2019-12-16Permit Sidewalk Shed — Signed-off
2019-12-16Permit Supported Scaffold — Signed-off
2019-12-13Job filed: INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 201$10,000
2019-11-14Job filed: plumbing work for tacombi space on the first floor as per plans filed herewith. General construction filed under application number 123709166$35,000
2019-11-05Job filed: plumbing work for tacombi space on the first floor as per plans filed herewith. General construction filed under application number 123709166$35,000
2019-10-17Permit Structural — Signed-off
2019-10-16Job filed: filing for structural work for eating and drinking establishment on the first floor as per plans filed herewith.$30,000
2019-10-15Permit AL — ISSUED
2019-10-12Permit Sidewalk Shed — Signed-off
2019-10-12Permit Supported Scaffold — Signed-off
2019-10-08Permit Supported Scaffold — Signed-off
2019-10-08Permit Sidewalk Shed — Signed-off
2019-10-04Permit EW — ISSUED
2019-10-04Permit EW — ISSUED
2019-10-04Permit EW — ISSUED
2019-10-03Permit EW — ISSUED
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-05Permit Plumbing — Signed-off
2019-08-23Permit Mechanical Systems — Signed-off
2019-08-20Job filed: Installation of mechanical system which includes heating system, ventilation system, air conditioning system and associated ducts and piping as per pl$55,000
2019-08-20Job filed: plumbing work for tacombi space on the first floor as per plans filed herewith. General construction filed under application number 123709166$35,000
2019-08-20Job filed: No Work
2019-08-20Job filed: ALTERATION TYPE ONE FOR MINOR WORK TO CONVERT USE OF FIRST FLOOR FROM STORE AND LUNCHEONETTE TO EATING AND DRINKING ESTABLISHMENT. GENERAL CONSTRUCTIO$10,000
2019-08-12Permit Construction Fence — Signed-off
2019-08-08Job filed: installation of temporary 8ft construction fence$5,000
2019-07-26Permit EW — ISSUED
2019-07-19Permit EW — ISSUED
2019-07-18Job filed: INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$190,000
2019-07-12Permit Sidewalk Shed — Signed-off
2019-07-12Permit Supported Scaffold — Signed-off
2019-06-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-06-22DOB complaint, category ?
2019-06-19Job filed: INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF $10,000
2019-02-15311: DOF Property - Payment Issue — Payment Not Posted
2019-02-08Job filed: INSTALLATION OF A MANUAL & AUTOMATIC SMOKE/HEAT DETECTION ALARM SYSTEM. NO CHANGE TO USE EGRESS OR OCCUPANCY.$10,000
2019-02-08Job filed: INSTALLATION OF A MANUAL & AUTOMATIC SMOKE/HEAT DETECTION ALARM SYSTEM. NO CHANGE TO USE EGRESS OR OCCUPANCY.$10,000
2019-02-08Job filed: STRUCTURAL WORK FOR INTERIOR RENOVATION AT 1ST FL LOBBY AND FROM FLOORS 2ND TO 6TH FL AND ROOF .$30,000
2019-02-08Job filed: MECHANICAL AND PLUMBING WORK FOR INTERIOR RENOVATION AT 1ST FL LOBBY AND FROM FLOORS 2ND TO 6TH FL.$130,000
2018
2018-10-18Permit EW — ISSUED
2018-09-27Job filed: INTERIOR RENOVATION AT 1ST FL LOBBY AND FROM FLOORS FROM 2ND TO 6TH FL. WORK INCLUDES NEW PARTITIONS, FLOOR FINISH, LIGHTING AND ARCHITECTURAL FINISHE$951,700
2018-09-27Job filed: INTERIOR RENOVATION AT 1ST FL LOBBY AND FROM FLOORS FROM 2ND TO 6TH FL. WORK INCLUDES NEW PARTITIONS, FLOOR FINISH, LIGHTING AND ARCHITECTURAL FINISHE$951,700
2018-09-12TL&R — from ECC SPE LLC to SKS BROAD STREET LLC
2018-09-10Mortgage assigned — from BOFI FEDERAL BANK to ECC SPE LLC
2018-09-10Mortgage assigned — from ECC SPE LLC to PACIFIC WESTERN BANK
2018-09-10Agreement $14,756,073 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$14,756,073
2018-09-10Mortgage $11,939,049 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$11,939,049
2018-09-10Mortgage $2,306,334 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$2,306,334
2018-09-10Mortgage $510,690 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$510,690
2018-09-10Agreement $11,939,049 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$11,939,049
2018-09-10Agreement $1,516,140 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$1,516,140
2018-09-10Mortgage $1,388,477 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$1,388,477
2018-09-10Mortgage $1,005,450 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$1,005,450
2018-09-10Deed — from SKS BROAD STREET LLC to 74 BROAD OWNERS LP
2018-09-10Agreement $3,694,811 — from 74 BROAD OWNERS LP to PACIFIC WESTERN BANK$3,694,811
2018-08-31Deed transfer (nominal price)
2018-08-07Asbestos abatement: Removal — Tristate Cleaning Solutions Inc.
2018-08-07FDNY inspection (RISK)
2018-08-07Asbestos abatement: Removal — Tristate Cleaning Solutions Inc.
2018-07-25Rodent inspection: Passed
2018-07-06311: Street Light Condition — Lamppost Base Door/Cover Open
2018-03-23311: General Construction/Plumbing — Structural Stability Impacted - New Building Under Construction
2018-03-23DOB complaint, category ?
2018-01-17DOB violation E:
2017
2017-12-15311: Water System — Leak (Use Comments) (WA2)
2015-05-19Job filed: REMOVAL OF EXISTING ANTENNA SECTORS ON THE ROOF. REMOVAL OF EXISTING EQUIPMENT PLATFORM ON THE ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/98. NO CHANGE $20,000
2015-04-21FDNY inspection (RISK)
2015-03-18Job filed: MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. REPLACEMENT OF ANTENNAS AND REPLACEMENT OF EQUIPMENT CABINET ON ROOF. ALL IN CONFORMANCE WITH TPPN 5$7,800
2014
2014-09-19Permit EW — ISSUED
2014-09-17MLEA $4,974,842 — from 74 BROAD LLC to SKS BROAD STREET LLC$4,974,842
2014-08-26FDNY inspection (RISK)
2014-08-04Job filed: FILING FOR DEMOLITION AND RENOVATION OF EXISTING LOBBY; NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$50,000
2014-04-29Job filed: MANUAL AND AUTOMATIC SMOKE / HEAT DETECTION FA SYSTEM. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2014-02-24Rodent inspection: Passed
2013
2013-07-16311: Vending — In Prohibited Area
2013-07-09RPTT $1,810,281 — from METROPCS COMMUNICATIONS, INC.; METROPCS COMMUNICATIONS, INC to T-MOBILE HOLDING GMBH; T-MOBILE HOLDING GMBH$1,810,281
2013-07-09RPTT $1,810,281 — from METROPCS COMMUNICATIONS, INC.; METROPCS COMMUNICATIONS, INC to T-MOBILE HOLDING GMBH; T-MOBILE HOLDING GMBH$1,810,281
2013-07-08Permit EW — ISSUED
2013-06-06Job filed: CONSTRUCTION OF NEW ELEVATOR BULKHEAD TO HOUSE RELOCATED ELEVATOR EQUIPMENT.$60,000
2013-06-06Job filed: CONSTRUCTION OF NEW ELEVATOR BULKHEAD TO HOUSE RELOCATED ELEVATOR EQUIPMENT.$60,000
2013-02-27Rodent inspection: Passed
2013-01-30311: Noise — Noise: air condition/ventilation equipment (NV1)
2012
2012-12-05TL&R — from PEOPLE'S UNITED BANK to OSCAR GRUSS & SON
2012-12-05AL&R $2,500,000 — from 74 BROAD LLC to VALLEY NATIONAL BANK$2,500,000
2012-12-05Agreement $2,500,000 — from 74 BROAD LLC to VALLEY NATIONAL BANK$2,500,000
2012-12-05Mortgage $1,148,292 — from 74 BROAD LLC to VALLEY NATIONAL BANK$1,148,292
2012-12-05Mortgage assigned — from PEOPLE'S UNITED BANK to VALLEY NATIONAL BANK
2012-12-05Deed — from 74 BROAD LLC, SUCCESSOR IN INTEREST to 74 BROAD LLC
2012-10-26MLEA — from OSCAR GRUSS & SON to METROPCS NEW YORK, LLC
2012-06-26DOB violation E:
2012-03-08SUBM — from BANK OF SMITHTOWN; OSCAR GRUSS & SON to METROPCS NEW YORK, LLC
2012-03-07Rodent inspection: Passed
2011
2011-12-08Permit PL — ISSUED
2011-12-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2011-09-21Job filed: INSTALL TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE & RELATED ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN #5/98. NO CHANGE IN USE, EGRESS OR OCCUPA$120,000
2011-08-22Job filed: INSTALLATION OF 148 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2011-08-22Permit EQ — ISSUED
2011-02-15Rodent inspection: Passed
2010
2010-12-19DOB violation E:
2010-09-16Permit EW — ISSUED
2010-08-24Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,000
2010-08-20Permit PL — ISSUED
2010-08-17Job filed: INTERIOR ALTERATION. INSTALLATION OF NEW PLUMBING FIXTURES AND RELATED WATER AND SANITARY PIPING. INSTALLATION OF NEW GAS-FIRED GAS GRIDDLE AND HOT W$30,120
2010-07-15Permit EW — ISSUED
2010-07-14Job filed: INTERIOR ALTERATION. INSTALLATION OF NEW INTERIOR PARTITIONS AND FINISHES. INSTALLATION OF NEW FOOD DISPLAY AND PREPARATION EQUIPMENT AND RELATED MIL$25,500
2010-01-21Rodent inspection: Passed
2009
2009-02-04DOB violation E:
2008
2008-01-21DOB violation E:
2006
2006-12-12DOB violation E:
2006-04-10DOB violation E:
2005
2005-01-31DOB violation E:
2004
2004-04-23DOB violation E:
2003
2003-08-25DOB violation E:
2002
2002-09-13DOB violation E: 1P14097
2002-02-19DOB violation LL1081:
2001
2001-12-20DOB violation E:
2001-08-22Permit EW — ISSUED
2001-08-14Job filed: INSTALLING ADDITIONAL COMMUNICATION CABINETS AND ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN #5/98. INITIAL INSTALLATION APPROVED UNDER APPLICATION #10$15,000
2001-08-14Job filed: INSTALLING ADDITIONAL COMMUNICATION CABINETS AND ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN #5/98. INITIAL INSTALLATION APPROVED UNDER APPLICATION #10$15,000
1999
1999-11-24SAGE — from NORTH FORK BANK
1999-11-24Agreement — from OSCAR GRUSS & SON to BANK OF SMITHTOWN
1999-11-24Mortgage assigned — from OSCAR GRUSS & SON to BANK OF SMITHTOWN
1999-11-24Mortgage assigned — from WEST HALBERT ROAD LLC to BANK OF SMITHTOWN
1999-11-24Mortgage $181,117 — from OSCAR GRUSS & SON to BANK OF SMITHTOWN$181,117
1999-11-24SAGE — from WEST HALBERT ROAD LLC
1999-04-08DOB violation E: 1P14097
1999-01-20DOB violation LL1081:
1997
1997-10-27Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION to WEST HALBERT ROAD LLC
1997-10-27Mortgage assigned — from WEST HALBERT ROAD LLC to HOME FEDERAL SAVINGSBANK
1997-10-27Mortgage assigned — from FEDERAL DEPOSIT INSURANCE to WEST HALBERT ROAD LLC
1996
1996-08-13Permit EW — ISSUED
1995
1995-03-16Permit EQ — ISSUED
1994
1994-11-10Mortgage $194,178 — from OSCAR GRUSS & SON to FEDERAL DEPOSIT INSURANCE CORP.$194,178
1994-11-10PAT — from FEDERAL DEPOSIT INSURANCE CORPORATION to MOSELEY, JON
1991-02-25ECB Non-Hazardous violation: 74M 74A11 35Q 15C 57M 40T 74B# 46# PROVIDE AN CRYSIDE COMMUNICATION SYSTEM 74A FILE THE NECESSARY PAPERWORK WITH THIS DEPARTMENT F$500
1991-02-25DOB violation E: DEVICE #1P14097
1990
1990-12-21ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYING TO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. RE$250
1990-03-02DOB violation E:
1989
1989-04-05DOB violation E: (51)REMOVE LOCK HOISTWAY DOORS (52)PROVIDE MOTOR ROOM DOOR (53)SECURE MOTOR ROOM LADDER(54)PROVIDE PIT LADDER (55)REPAI
1988
1988-10-05DOB violation E: (27)COUNTERWEIGHT PROVIDE (51)PROVIDE PROPER OUTSIDE COMMUNICATION (52)FILE NESCESSARY PAPER WORK WITH THIS DEPT
1987
1987-03-06Agreement — from OSCAR GRUSS & SON to AMERICAN SAVINGS BANK
1986
1986-12-08Mortgage assigned — from OSCAR GRUSS & SON to AMERICAN SAVINGS BANK
1986-12-08Mortgage assigned — from BROAD STREET COMPANY to AMERICAN SAVINGS BK
1986-12-08Mortgage $2,275,000 — from OSCAR GRUSS & SON to AMERICAN SAVGS BANK,FSB$2,275,000
1986-12-08PAT — from GELFENBEIN, HARVEY; GRUSS, EMANUEL; OSCAR GRUSS & SON BEN/; ANREDER, JULIUS; HELFENBEIN, A to CHURCHILL, ROBERT S.
1979
1979-01-05MISC — from EAST RIVER SAVINGS BANK
1978
1978-12-20Mortgage — from OSCAR GRUSS & SON to BROAD ST CO
1978-12-20Deed — from HOFFMAN, ASHLEY; HOFFMAN, JEROME J to OSCAR TUSS & SON
1974
1974-07-16Mortgage assigned — from BRUNER, RUDY DECD EXTR to ROME REALTY CORP
1971
1971-07-12Deed — from ROME REALTY CORP to HOFFMAN, ASHLEY; BROAD STREET CO DBA; HOFFMAN, JEROME J
1971-07-12Mortgage — from ROME REALTY CORP to BRUNER, RUDY
1971-07-12Deed — from BROAD STREET CO to ROME REALTY CORP