Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

50 Trinity Place · Manhattan · BBL 1000190024 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

17 service requests in the last three years. Most common: Lost Property (5) · Illegal Parking (3) · Taxi Complaint (2) · Street Sign (2) · Rodent (1) · Noise (1).

Filed construction activity

$245,775 in permitted construction work filed since 2016 (27 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$38,319,000 $17,243,550
2026$38,589,000 $17,365,050
2027$38,945,000 $17,525,250

The city's market estimate has risen 2% between tax years 2025 and 2027.

Restaurants in this building

RestaurantCuisineGradeNotes
Half MoonAmericanA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayRector St — R W · 50 ft straight-line (under a minute) · station accessibility: none
Rector St — 1 · 100 ft straight-line (about a 1-minute walk) · station accessibility: none
BusNearest boarding stop: Trinity Pl / Rector St — M55 SIM15 · 150 ft
Citi BikeGreenwich St & Rector St · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: Battery Park City School
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

50 Trinity Place

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

17 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $16,000,000 on 2019-02-05 (lender: Taiwan Cooperative Bank, Ltd). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2022-12-27Agreement $24,891,532 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD $24,891,532
2022-12-27AL&R $24,891,532 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD $24,891,532
2019-02-05Mortgage $16,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD $16,000,000
2019-02-05AL&R $16,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD $16,000,000
2013-03-14Mortgage $3,300,000 — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT CORPORATION $3,300,000
2013-03-14AL&R $9,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK $9,000,000
2013-03-14Agreement $9,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK $9,000,000
2013-03-14Mortgage $9,000,000 — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT, INC.; FORMOSTAR INVESTMENT CORPORATION $9,000,000
2013-03-14Agreement $12,300,000 — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT, INC.; FORMOSTAR INVESTMENT CORPORATION $12,300,000
2012-11-08Agreement $12,300,000 — from METRO NINE HOTEL, LLC to THE NATIONAL REPUBLIC BANK OF CHICAGO $12,300,000
2012-05-22Mortgage $300,000 — from METRO NINE HOTEL, LLC to NATIONAL REPUBLIC BANK OF CHICAGO $300,000
2012-02-07Deed $15,000,000 — from METRO NINE HOTEL, LLC to TRINITY NYC HOTEL, LLC $15,000,000
2007-11-07AL&R $17,600,000 — from METRO NINE HOTEL, L.L.C. to MUTUAL BANK $17,600,000
2007-11-07Agreement $17,600,000 — from METRO NINE HOTEL, L.L.C. to MUTUAL BANK $17,600,000
2007-11-07Mortgage $8,000,000 — from METRO NINE HOTEL, L.L.C. to MUTUAL BANK $8,000,000

Ten-year activity

100500
2017
2018
2019
2020
67
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20171213310
201810780530
2019181033135
20202414100149
2021332280467
2022376135667
20234590422
20244640822
20253490521
2026004059
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 17 records

DateRecord
2026-05-08311: Lost Property — Bag/Wallet
2026-04-23311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-03-05Restaurant inspection: HALF MOON — grade A
2026-03-04311: Street Sign - Damaged — No Parking, Standing, Stopping
2026-03-03311: Street Sign - Dangling — No Parking, Standing, Stopping
2026-01-27Boiler inspection
2026-01-27Boiler inspection
2026-01-27Boiler inspection
2026-01-27Boiler inspection
2025-12-18Cooling tower inspection
2025-12-06311: Homeless Person Assistance — Chronic
2025-11-29311: Lost Property — Bag/Wallet
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking

The full timeline

2026
2026-05-08311: Lost Property — Bag/Wallet
2026-04-23311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2026-03-05Restaurant inspection: HALF MOON — grade A
2026-03-04311: Street Sign - Damaged — No Parking, Standing, Stopping
2026-03-03311: Street Sign - Dangling — No Parking, Standing, Stopping
2026-01-27Boiler inspection
2026-01-27Boiler inspection
2026-01-27Boiler inspection
2026-01-27Boiler inspection
2025
2025-12-18Cooling tower inspection
2025-12-06311: Homeless Person Assistance — Chronic
2025-11-29311: Lost Property — Bag/Wallet
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-11-14DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-09-15311: Taxi Complaint — Driver Complaint - Passenger
2025-07-24311: Lost Property — Bag/Wallet
2025-07-11311: Illegal Parking — Posted Parking Sign Violation
2025-06-02311: Lost Property — Other
2025-04-07311: Taxi Complaint — Driver Complaint - Passenger
2025-04-07Certificate of occupancy Final
2025-04-07Certificate of occupancy Final
2025-01-30311: Lost Property — Bag/Wallet
2025-01-23Certificate of occupancy Renewal Without Change
2025-01-13Boiler inspection
2025-01-13Boiler inspection
2025-01-13Boiler inspection
2025-01-13Boiler inspection
2024
2024-11-22Restaurant inspection: HALF MOON — grade A
2024-11-01Certificate of occupancy Renewal Without Change
2024-10-16311: Illegal Parking — Paper License Plates
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-09-23DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2024-08-28Rodent inspection: Passed
2024-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-08-01311: Noise - Street/Sidewalk — Loud Music/Party
2024-08-01Certificate of occupancy Renewal Without Change
2024-06-21Rodent inspection: Failed for Rat Activity
2024-06-16311: Rodent — Rat Sighting
2024-06-06Restaurant inspection: HALF MOON
2024-05-28Cooling tower inspection — violation AH8C
2024-05-28Cooling tower inspection — violation AH8D
2024-05-28Cooling tower inspection — violation AH8S
2024-05-28Cooling tower inspection — violation AH8R
2024-05-13Certificate of occupancy Renewal Without Change
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-03-06311: Illegal Parking — Posted Parking Sign Violation
2024-02-15Certificate of occupancy Renewal Without Change
2023
2023-11-22Certificate of occupancy Renewal Without Change
2023-08-22Certificate of occupancy Renewal Without Change
2023-08-11Restaurant inspection: HALF MOON — grade A
2023-07-28Restaurant inspection: HALF MOON
2023-07-18311: Illegal Parking — Blocked Hydrant
2023-06-20Certificate of occupancy Renewal Without Change
2023-06-07311: Illegal Parking — Blocked Hydrant
2023-06-07311: Illegal Parking — Blocked Hydrant
2023-05-09311: Noise — Noise: Construction Before/After Hours (NM1)
2023-04-26311: Lost Property — Bag/Wallet
2023-04-24311: Lost Property — Bag/Wallet
2023-04-07Cooling tower inspection
2023-04-06311: Consumer Complaint — Ticket Broker
2023-04-06DOB complaint, category ?
2023-03-24311: Illegal Parking — Blocked Hydrant
2023-03-23311: Illegal Parking — Blocked Hydrant
2023-03-22Certificate of occupancy Renewal Without Change
2023-01-25Rodent inspection: Failed for Other Reason
2023-01-04FDNY inspection (COM_OCPCY)
2023-01-04FDNY inspection (COM_OCPCY)
2023-01-04FDNY inspection (CONSTR)
2023-01-04FDNY inspection (RISK)
2022
2022-12-27TL&R — from TAIWAN COOPERATIVE BANK, LTD
2022-12-27Agreement $24,891,532 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD$24,891,532
2022-12-27AL&R $24,891,532 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD$24,891,532
2022-12-27TL&R — from TAIWAN COOPERATIVE BANK, LTD
2022-12-27Certificate of occupancy Renewal With Change
2022-12-20FDNY inspection (CDA-90-DRILL)
2022-12-20FDNY inspection (SPECIAL-OTH)
2022-12-08Certificate of occupancy Initial
2022-09-30Permit NB — ISSUED
2022-09-30Permit EQ — ISSUED
2022-09-28Permit Construction Fence — Signed-off
2022-09-23Job filed: HEREWITH FILING FUEL STORAGE FOR EMERGENCY GENERATOR TO BE INSTALLED.-DAY TANK-PAA FILED TO REVISE SHEET M-501$1,500
2022-09-13Permit Boiler Equipment — Signed-off
2022-09-09Rodent inspection: Failed for Rat Activity and Other Reason
2022-09-08Job filed: HEREWITH FILING FUEL STORAGE FOR EMERGENCY GENERATOR TO BE INSTALLED.-DAY TANK-PAA FILED TO REVISE SHEET M-501$1,500
2022-09-02FDNY inspection (CDA-90-DRILL)
2022-08-10Permit FO — ISSUED
2022-08-10Permit NB — ISSUED
2022-08-10Permit FO — ISSUED
2022-08-09Job filed: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $40,000
2022-07-29Elevator permit: Two New 1:1 Roped Overhead Traction Passenger Elevator per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. Perform necessary t$850,000
2022-07-18311: Dirty Condition — Trash
2022-07-15311: Rodent — Rat Sighting
2022-07-15Permit FO — RE-ISSUED
2022-07-15Permit FO — ISSUED
2022-07-15Permit NB — ISSUED
2022-06-25311: Homeless Person Assistance
2022-06-22311: Rodent — Rat Sighting
2022-06-22311: Sidewalk Condition — Blocked - Construction
2022-06-22311: Rodent — Rat Sighting
2022-06-21Rodent inspection: Failed for Rat Activity
2022-06-16311: Dirty Condition — Trash
2022-06-10Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$20,000
2022-05-31Permit NB — ISSUED
2022-05-31Permit FO — ISSUED
2022-05-25Rodent inspection: Failed for Rat Activity
2022-05-23311: Rodent — Rat Sighting
2022-05-18311: Noise — Noise: Construction Before/After Hours (NM1)
2022-05-18Permit FO — ISSUED
2022-05-05Permit Mechanical Systems — Signed-off
2022-05-04311: Lost Property — Electronics/Phones
2022-05-03311: Rodent — Rat Sighting
2022-04-13FDNY inspection (CDA-90-DRILL)
2022-03-31Permit FO — ISSUED
2022-03-31Permit FO — ISSUED
2022-03-31Permit NB — ISSUED
2022-03-23DECL — from TRINITY NYC HOTEL, LLC
2022-03-22Rodent inspection: Failed for Rat Activity
2022-03-01Permit Sign — Signed-off
2022-03-01Permit Sign — Signed-off
2022-03-01Permit Sign — Signed-off
2022-03-01Permit EQ — ISSUED
2022-02-26Permit Sidewalk Shed — Signed-off
2022-02-24Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN ON EXISTING CANOPY - 50 TRINITY PLACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$275
2022-02-24Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - HOTEL INDIGO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$1,275
2022-02-24Job filed: NON ILLUMINATED NON ADVERTISING DOUBLE FACE PROJECTING ACCESSORY SIGN - HOTEL INDIGO. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$225
2022-02-24Permit Boiler Equipment — Signed-off
2022-02-16Permit PL — ISSUED
2022-02-11Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$20,000
2022-02-10311: Taxi Complaint — Driver Complaint - Non Passenger
2022-02-10Permit EW — ISSUED
2022-02-09Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$1,000
2022-02-07DOB complaint, category ?
2022-02-07ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSON&PROPERTY NOTE:ATOI IN RESPONSE TO INCIDENT WHERE PC OF ALUMINUM FRAMING FELL FROM SUPPORTED SCF ON$10,000
2022-01-27Rodent inspection: Failed for Rat Activity
2022-01-18Permit EW — ISSUED
2022-01-01311: Rodent — Rat Sighting
2021
2021-12-16Permit EW — ISSUED
2021-12-16Permit EW — ISSUED
2021-11-30Elevator permit: INSTALL NEW DUAL JACK HOLELESS HYDRAULIC PASSENGER ELEVATOR WITH ASME A17.1-2000/03, PART 3, CHAPTER 30, APPENDIX K. PERFORM NECES$240,000
2021-11-17Job filed: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $40,000
2021-11-17Permit Supported Scaffold — Signed-off
2021-11-16Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$20,000
2021-11-13DOB complaint, category ?
2021-11-12311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-11-12DOB complaint, category ?
2021-10-27Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$1,000
2021-10-20Permit EQ — ISSUED
2021-10-12Permit EW — ISSUED
2021-10-04311: Taxi Complaint — Driver Complaint - Non Passenger
2021-10-04Permit Construction Fence — Signed-off
2021-09-29Permit NB — ISSUED
2021-09-29Permit NB — ISSUED
2021-09-29Permit EQ — ISSUED
2021-09-29Permit FO — ISSUED
2021-09-29Permit FO — ISSUED
2021-09-20DOB complaint, category ?
2021-09-17Job filed: HEREWITH FILING FUEL STORAGE FOR EMERGENCY GENERATOR TO BE INSTALLED.$1,500
2021-09-17Job filed: HEREWITH FILED FOR EMERGENCY GENERATOR$1,500
2021-09-16DOB violation C: ADDITIONAL INFORMATION REQUIRED. OBSERVED AT CELLAR LEVEL IN MTA ROOM CONCRETE SLAB FLOORING HAS BEEN CHIPPED AND STEEL REBAR REIN
2021-09-15Permit Supported Scaffold — Signed-off
2021-09-09Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$1,000
2021-08-23DOB complaint, category ?
2021-08-18Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$1,000
2021-08-18Permit Supported Scaffold — Signed-off
2021-08-13FDNY inspection (CDA-90-DRILL)
2021-07-14Permit FO — ISSUED
2021-07-14Permit EQ — ISSUED
2021-07-13Permit FO — ISSUED
2021-07-13Permit NB — ISSUED
2021-07-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-07-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-07-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-06-23Elevator permit: Installation of a Dual 6000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tests$20,000
2021-06-11311: Noise — Noise: Construction Before/After Hours (NM1)
2021-06-08Elevator permit: Two New 1:1 Roped Overhead Traction Passenger Elevator per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. Perform necessary t$850,000
2021-06-07311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-06-07DOB complaint, category ?
2021-05-30311: Lost Property — Electronics/Phones
2021-05-21Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$20,000
2021-05-03ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION OBSERVED A NEW BUILDING UNDER CONSTRUCTION UPON GOING THROUGH THE INSPECTION I OBSERVED A TEMPORARY S
2021-05-03DOB complaint, category ?
2021-04-14ECB CLASS - 1 violation: BC3301.2-HOLES IN FLOOR LARGER THAN 2.NOTE AT THE TIME OF MY SINEPCTION AT NEW 19 STORY BUILDING ACTIVE JOBSITE CURRENTLY AT 26 ST
2021-04-14ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING NOTE AT THE TIME OF MY INSPECTION AT NEW 29 STORY BUILDING ACTIEV JOBSITE CURRENTLY AT 2$2,500
2021-04-14ECB CLASS - 1 violation: FAIURE TO COMPLY WITH MANUFACTURERS SPECIFICATIONS.NOTE:IN RESPONSE TOINCIDENT WHERE A WORKER FELL AND GOT INJURED UPOM MY INSPECT$2,500
2021-04-14ECB CLASS - 1 violation: BC3308.5-FAILURE TO MAINTAIN VERTICAL NETTING (ZERO CABLE) NOTE AT THE TIME OF MY INSPECTION AT NEW 29 STORY BUILDING ACTIV JOBSIT$2,530
2021-04-14ECB CLASS - 1 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES AT THE TIME OF MY SINEPCTION AT NEW 29 STORY BUILDING ACTIVE JOBSITE CURRENT 2$10,000
2021-04-14DOB complaint, category ?
2021-04-10FDNY inspection (CDA-90-DRILL)
2021-03-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-03-22DOB complaint, category ?
2021-03-17311: Noise — Noise: Construction Before/After Hours (NM1)
2021-03-12311: Noise — Noise: Construction Before/After Hours (NM1)
2021-03-11Permit PL — ISSUED
2021-03-03Permit Sidewalk Shed — Signed-off
2021-03-03Permit EQ — ISSUED
2021-02-17Elevator permit: Two New 1:1 Roped Overhead Traction Passenger Elevator per ASME A17.1-2000/03, Part 2, Chapter 30, Appendix K. Perform necessary t$850,000
2021-02-10DOB complaint, category ?
2021-02-10DOB violation C: DUE TO VEHICLE STRIKING FENCE AND SHED. APPROXIMATELY 32 LINEAR FEET OF SHED AND FENCE DISPLACED AS A RESULT
2021-01-21Permit EW — ISSUED
2021-01-19Permit FO — ISSUED
2021-01-19Permit FO — RE-ISSUED
2021-01-19Permit NB — ISSUED
2021-01-19Permit FO — ISSUED
2020
2020-12-23Permit EW — ISSUED
2020-12-23Permit EW — ISSUED
2020-12-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-12-10DOB complaint, category ?
2020-11-25311: General Construction/Plumbing — Fence - None/Inadequate
2020-11-25DOB complaint, category ?
2020-11-16311: Noise — Noise: Construction Before/After Hours (NM1)
2020-11-09Permit EQ — ISSUED
2020-10-19Permit FO — ISSUED
2020-10-19Permit NB — ISSUED
2020-10-19Permit FO — ISSUED
2020-10-11311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-10-11DOB complaint, category ?
2020-10-09Permit EQ — ISSUED
2020-10-08Job filed: INSTALLATION OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-10-08Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR E$30,000
2020-10-08Job filed: INSTALLATION OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-10-08Permit Construction Fence — Signed-off
2020-09-28ECB CLASS - 2 violation: SEC. BC 3307.6.5.8 INSPECTION LETTER FOR SHED. NOTE: AT TIME OF MY INSPECTION OF A PROPOSED 29 STY'S NEW BLDG INDER CONSTRUCTION A
2020-09-25311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-09-25DOB complaint, category ?
2020-09-17DOB complaint, category ?
2020-09-02Permit EQ — ISSUED
2020-08-28Job filed: INSTALLATION AND USE OF WORK PLATFORM AS PER PLANS SUBMITTED.WORK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF NEW YORK CITY BUILDING CODE. THIS APPLIC
2020-08-26Permit NB — ISSUED
2020-08-11Permit FO — ISSUED
2020-08-11Permit FO — ISSUED
2020-07-23Permit NB — ISSUED
2020-07-23Permit EQ — ISSUED
2020-06-26311: Noise — Noise: Jack Hammering (NC2)
2020-06-19DOB violation C: BOROUGH COMMISSIONER ISSUED SWO TO APPLICATION # 121191995 DUE TO SITE SAFETY MANAGER ASWELL AS CONTRACTOR WITHDRAW. STOP ALL WORK
2020-06-19DOB complaint, category ?
2020-03-30311: Noise — Noise: Construction Equipment (NC1)
2020-03-27DOB complaint, category ?
2020-03-13FDNY inspection (CDA-90-DRILL)
2020-03-11311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-03-11311: Noise — Noise: Construction Before/After Hours (NM1)
2020-03-11DOB complaint, category ?
2020-03-11Permit Sidewalk Shed — Signed-off
2020-03-04Permit EQ — ISSUED
2020-03-03Job filed: INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AS PER DRAWINGS AT ADJACENT PROPERTIES. TEMPORARY ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH
2020-03-03Job filed: INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AS PER DRAWINGS AT ADJACENT PROPERTIES. TEMPORARY ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH
2020-03-02DOB complaint, category ?
2020-02-28ECB CLASS - 1 violation: FAILURE TO DISPLAY/MAINTAIN DOCUMENTS REQUIRED BY CHAPTER 33.AT TIME OF INSPECTION ON AN NB 29 STORIES BUILDING I OBSERVED ACTIVE $625
2020-02-28ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT THE TIME OF INSPECTION ON AN NB 29 STORIES FOR TRANSIENT.NOT$625
2020-02-18Elevator permit: Installation of a Dual 6000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tests$20,000
2020-02-07311: Panhandling — N/A
2020-01-24Permit EW — ISSUED
2020-01-03Permit NB — ISSUED
2019
2019-12-30311: General Construction/Plumbing — Building Permit - None
2019-12-30DOB complaint, category ?
2019-12-27Permit EW — ISSUED
2019-12-27Permit EW — ISSUED
2019-12-02FDNY inspection (CDA-90-DRILL)
2019-11-22Permit EW — ISSUED
2019-11-13Permit EQ — ISSUED
2019-11-12Job filed: INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL HOISTS SHALL COMPLY WITH CHA
2019-11-12Job filed: INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL HOISTS SHALL COMPLY WITH CHA
2019-10-24Rodent inspection: Failed for Rat Activity
2019-10-15Permit EQ — ISSUED
2019-10-11Job filed: INSTALLATION AND USE OF MINI CRANE AND GANTRY SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-09-23Permit EQ — ISSUED
2019-09-19Permit FO — ISSUED
2019-09-19Permit FO — ISSUED
2019-09-09311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-05Permit PL — ISSUED
2019-09-05Permit PL — ISSUED
2019-09-04FDNY inspection (CDA-90-DRILL)
2019-08-30DOB complaint, category ?
2019-07-18DOB complaint, category ?
2019-07-17ECB CLASS - 1 violation: FAILURE TO PROVIDE PROTECTION AT SIDE OF EXCAVATION.AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,I OBSEREVD AN EXCAVATION PIT @EXP#2$5,000
2019-06-10FDNY inspection (CDA-90-DRILL)
2019-04-30Permit Sidewalk Shed — Signed-off
2019-04-26Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$20,000
2019-04-17Job filed: HEREWITH FILING FUEL STORAGE AND MECHANICAL WORK FOR EMERGENCY GENERATOR TO BE INSTALLED. THIS APPLICATION IS BEING FILED IN CONJUNCTION WITH A NEW BU$3,000
2019-04-17Job filed: HEREWITH FILING FOR THE INSTALLATION OF THREE (4) BOILERS IN CONJUNCTION WITH A NEW BUILDING.$3,000
2019-03-13FDNY inspection (CDA-90-DRILL)
2019-02-05Mortgage $16,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD$16,000,000
2019-02-05AL&R $16,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK, LTD$16,000,000
2019-01-25Mortgage satisfied — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT CORPORATION; FORMOSTAR INVESTMENT INC.
2019-01-25DOB complaint, category ?
2019-01-11Job filed: INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH PASSIVE DISTRIBUTED ANTENNA SYSTEM.$3,000
2019-01-07311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2019-01-07DOB complaint, category ?
2018
2018-12-27Permit NB — ISSUED
2018-12-22FDNY inspection (CDA-90-DRILL)
2018-12-13Permit EW — ISSUED
2018-11-06311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2018-11-06DOB complaint, category ?
2018-11-05311: Noise — Noise: Construction Equipment (NC1)
2018-11-03311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-03311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-02311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2018-11-02DOB complaint, category ?
2018-10-15DOB complaint, category ?
2018-09-25FDNY inspection (CONSTR)
2018-09-25FDNY inspection (STRUC_INT_6)
2018-09-22FDNY inspection (OTHER)
2018-09-14Permit FO — ISSUED
2018-09-14Permit FO — ISSUED
2018-09-13Permit EQ — ISSUED
2018-08-07Rodent inspection: Failed for Rat Activity
2018-07-09Rodent inspection: Failed for Rat Activity
2018-06-25311: Homeless Person Assistance
2018-05-30Job filed: HEREWITH FILING FOR A TEMPORARY STANDPIPE AND TEMPORARY AIR PRESSURIZED ALARM SYSTEM. THIS APPLICATION IS BEING FILED IN CONJUNCTION WITH NEW BUILDING$3,000
2018-05-30Job filed: HEREWITH FILING FOR A TEMPORARY STANDPIPE AND TEMPORARY AIR PRESSURIZED ALARM SYSTEM. THIS APPLICATION IS BEING FILED IN CONJUNCTION WITH NEW BUILDING$3,000
2018-05-16Rodent inspection: Bait applied
2018-05-08311: Sidewalk Condition — Sidewalk Violation
2018-04-18Job filed: HEREWITH FILING UNDERGROUND PLUMBING IN CONJUNCTION WITH NEW BUILDING.
2018-04-18Job filed: HEREWITH FILING UNDERGROUND PLUMBING IN CONJUNCTION WITH NEW BUILDING.
2018-04-06Job filed: HEREWITH FILING SUPPORT OF EXCAVATION WORK IN CONJUNCTION WITH NEW BUILDING.
2018-03-09311: Illegal Parking — Double Parked Blocking Traffic
2018-02-15Rodent inspection: Bait applied
2018-01-24Rodent inspection: Bait applied
2017
2017-12-19Agreement — from FORMOSTAR INVESTMENT, INC to FORMOSTAR INVESTMENT, INC
2017-12-19Agreement — from TAIWAN COOPERATIVE BANK to TAIWAN COOPERATIVE BANK
2017-12-19EASE — from TRINITY NYC HOTEL LLC to NEW YORK CITY TRANSIT AUTHORITY
2017-08-28Rodent inspection: Failed for Rat Activity
2017-08-02Permit EQ — ISSUED
2017-07-13Rodent inspection: Failed for Rat Activity
2017-05-09Rodent inspection: Bait applied
2017-03-14311: General Construction/Plumbing — Failure To Maintain
2017-03-14DOB complaint, category ?
2017-03-14ECB CLASS - 2 violation: JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION DEFECT NOTED. AT TIME OF INSPECTION OBSERVE CONSTRUCTION WOO$400
2016
2016-12-12Rodent inspection: Failed for Rat Activity
2016-11-01Rodent inspection: Failed for Rat Activity
2016-10-26Rodent inspection: Failed for Rat Activity
2016-09-26Rodent inspection: Failed for Rat Activity
2016-08-16Permit EQ — ISSUED
2016-06-09Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE AL ARM SYSTEM WITH VOICE COMMUNICATION SYSTEM AND PURGE SYSTEM &am$3,000
2016-06-03Job filed: HEREWITH FILING NEW INSTALLATION OF SPRINKLER STANDPIPE APPLICATION IN CONJUNCTION WITH NEW BUILDING.$3,000
2016-06-03Job filed: HEREWITH FILING NEW INSTALLATION OF SPRINKLER STANDPIPE APPLICATION IN CONJUNCTION WITH NEW BUILDING.$3,000
2016-04-13AALR — from TAIWAN COOPERATIVE BANK, LOS ANGELES BRA to TAIWAN COOPERATIVE BANK, LTD., NEW YORK
2016-04-13Mortgage assigned — from TAIWAN COOPERATIVE BANK, LOS ANGELES BRA to TAIWAN COOPERATIVE BANK, LTD, NEW YORK B
2015
2015-12-31311: Homeless Person Assistance — Status Call
2015-11-24Rodent inspection: Passed
2015-11-13DOB violation C: BORO-COMM
2015-11-13DOB complaint, category ?
2015-11-09Rodent inspection: Failed for Rat Activity
2015-10-06Rodent inspection: Failed for Rat Activity
2015-09-25Rodent inspection: Failed for Rat Activity
2015-09-18Rodent inspection: Failed for Rat Activity and Other Reason
2015-07-31Permit EQ — ISSUED
2015-06-19EASE — from TRINITY NYC HOTEL, LLC to NYC TRANSIT AUTHORITY
2015-06-19SUBM — from FORMOSTAR INVESTMENT, INC to TRINITY NYC HOTEL, LLC; NYC TRANSIT AUTHORITY
2015-06-19SUBM — from TAIWAN COOPERATIVE BANK to NYC TRANSIT AUTHORITY; TRINITY NYC HOTEL, LLC
2015-06-16Rodent inspection: Bait applied
2015-06-12ZONE — from TRINITY NYC HOTEL, LLC
2015-06-12CERT — from KENSINGTON VANGUARD NATIONAL LAND SERVIC
2015-06-02Rodent inspection: Passed
2015-05-13Rodent inspection: Bait applied
2015-04-29Rodent inspection: Passed
2015-04-14Job filed: HEREWITH FILING MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING JOB #121191995
2015-04-14Job filed: HEREWITH FILING STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING JOB #121191995
2015-04-14Job filed: HEREWITH FILING MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING JOB #121191995
2015-04-14Job filed: HEREWITH FILING STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING JOB #121191995
2015-04-14Job filed: HEREWITH FILING FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING JOB #121191995
2015-04-14Job filed: HEREWITH FILING FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING JOB #121191995
2015-04-10Rodent inspection: Failed for Rat Activity
2015-04-07Rodent inspection: Bait applied
2015-03-13Job filed: HEREWITH FILING FOR BUILDING PAVEMENT PLANS IN CONJUNCTION WITH NEW BUILIDNG APPLICATION # 121191995.
2015-03-13Job filed: HEREWITH FILING FOR BUILDING PAVEMENT PLANS IN CONJUNCTION WITH NEW BUILIDNG APPLICATION # 121191995.
2015-03-12Rodent inspection: Bait applied
2015-03-12Rodent inspection: Bait applied
2015-03-03Rodent inspection: Bait applied
2015-01-26Rodent inspection: Failed for Rat Activity
2015-01-23Rodent inspection: Bait applied
2015-01-07311: Rodent — Rat Sighting
2015-01-02Rodent inspection: Failed for Rat Activity
2014
2014-12-18Rodent inspection: Bait applied
2014-11-16311: Sidewalk Condition — Broken Sidewalk
2014-11-13Job filed: NB
2014-11-13Job filed: NB
2014-10-24Rodent inspection: Failed for Rat Activity
2014-09-10Rodent inspection: Failed for Rat Activity
2014-08-21Permit EQ — ISSUED
2014-07-02Rodent inspection: Failed for Rat Activity
2014-06-02Rodent inspection: Failed for Rat Activity
2013
2013-11-12311: General Construction/Plumbing — Fence - None/Inadequate
2013-11-12DOB complaint, category ?
2013-11-09ECB CLASS - 2 violation: JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. DEFECT NOTED: THE GATE INSTALLED TO THE CONSTRUCTION FENCE ALONG RECTOR ST
2013-09-23Job filed: FILING FOR TEST PITS$10,000
2013-09-23Job filed: FILING FOR TEST PITS$10,000
2013-09-23Permit EW — ISSUED
2013-08-29Permit EQ — ISSUED
2013-06-11FDNY inspection (SPECIAL-OTH)
2013-06-07FDNY inspection (DEMO)
2013-05-21FDNY inspection (DEMO)
2013-03-14Mortgage assigned — from THE NATIONAL REPUBLIC BANK OF CHICAGO to FORMOSTAR INVESTMENT CORPORATION
2013-03-14Mortgage $3,300,000 — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT CORPORATION$3,300,000
2013-03-14AL&R $9,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK$9,000,000
2013-03-14Agreement $9,000,000 — from TRINITY NYC HOTEL, LLC to TAIWAN COOPERATIVE BANK$9,000,000
2013-03-14Mortgage assigned — from FORMOSTAR INVESTMENT CORPORATION; FORMOSTAR INVESTMENT, INC. to TAIWAN COOPERATIVE BANK
2013-03-14Mortgage $9,000,000 — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT, INC.; FORMOSTAR INVESTMENT CORPORATION$9,000,000
2013-03-14Agreement $12,300,000 — from TRINITY NYC HOTEL, LLC to FORMOSTAR INVESTMENT, INC.; FORMOSTAR INVESTMENT CORPORATION$12,300,000
2013-03-05Rodent inspection: Passed
2013-02-20Rodent inspection: Failed for Rat Activity
2012
2012-11-08TL&R — from UNITED CENTRAL BANK
2012-11-08AALR — from FEDERAL DEPOSIT INSURANCE CORPORATION, A to UNITED CENTRAL BANK
2012-11-08Agreement $12,300,000 — from METRO NINE HOTEL, LLC to THE NATIONAL REPUBLIC BANK OF CHICAGO$12,300,000
2012-11-08Mortgage assigned — from UNITED CENTRAL BANK to THE NATIONAL REPUBLIC BANK OF CHICAGO
2012-11-08Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION, A to UNITED CENTRAL BANK
2012-11-08PAT — from FEDERAL DEPOSIT INSURANCE CORPORATION to UNITED CENTRAL BANK
2012-09-18Permit EQ — ISSUED
2012-05-25Rodent inspection: Bait applied
2012-05-22Mortgage $300,000 — from METRO NINE HOTEL, LLC to NATIONAL REPUBLIC BANK OF CHICAGO$300,000
2012-05-14Rodent inspection: Bait applied
2012-04-24Rodent inspection: Bait applied
2012-04-18Permit EQ — ISSUED
2012-04-11Job filed: A3
2012-04-10Rodent inspection: Bait applied
2012-04-03Rodent inspection: Failed for Rat Activity
2012-03-23DTL — from THE BANK OF NEW YORK MELLON
2012-03-17ECB CLASS - 3 violation: WORK W/O A PERMIT. AN 8' HIGH PLYWOOD CONSTRUCTION FENCE HAS BEEN ERECTED & MAINTAINED ON THE TRINITY PLACE AND RECTOR ST SIDES OF
2012-03-06Rodent inspection: Failed for Rat Activity
2012-02-07Deed $15,000,000 — from METRO NINE HOTEL, LLC to TRINITY NYC HOTEL, LLC$15,000,000
2011
2011-12-06DOB complaint, category ?
2011-11-23TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2011-10-24DOB complaint, category ?
2011-10-24ECB CLASS - 2 violation: EXPIRED PERMIT FOR TEMPORARY CONSTRUCTION EQUIPMENT - FENCE. NOTED AT TIME OF INSPECTION FENCE PERMIT #104935714 EXPIRED 1.1.10. D$800
2011-09-01311: General Construction/Plumbing — Failure To Maintain
2011-09-01DOB complaint, category ?
2011-08-31ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANES.NOTED DEFECT:NOTED A STRUCTURE HAS BEEN COMPLETLY DEMOLISHED TO GRADE.SITE IS FENCE$500
2011-04-23Rodent inspection: Bait applied
2011-04-02Rodent inspection: Bait applied
2011-03-27Rodent inspection: Bait applied
2011-03-22311: Sidewalk Condition — Broken Sidewalk
2011-03-15311: Sidewalk Condition — Defective Hardware
2011-03-01Rodent inspection: Failed for Rat Activity
2011-02-10Rodent inspection: Failed for Rat Activity
2010
2010-08-25311: Sidewalk Condition — Broken Sidewalk
2010-08-16Rodent inspection: Bait applied
2010-08-04Rodent inspection: Bait applied
2010-07-20Rodent inspection: Bait applied
2010-07-09Rodent inspection: Bait applied
2010-02-24311: Street Sign - Damaged — No Parking, Standing, Stopping
2010-02-02Rodent inspection: Failed for Rat Activity
2010-01-14Rodent inspection: Failed for Rat Activity
2010-01-11ECB CLASS - 2 violation: WORK W/O A PERMIT. EXPIRED PERMIT. PERMIT #104935714 FOR CONSTRUCTION FENCE EXPIRED ON 1.1.10 8' HIGH FENCE REMAINS UP AT VACANT L$4,000
2010-01-07DOB violation E:
2009
2009-12-07ECB CLASS - 2 violation: FAIL TO POST PERMIT FOR WRK @ PREMISES A 8'HIGH CONSTRUCTION FENCE HASBEEN ERECTED & MAINTAINED @ NORTH & EAST SIDES OF LOT & NO P
2009-07-22DOB complaint, category ?
2009-07-22DOB complaint, category ?
2009-05-05Job filed: INSTALLATION OF SPRINKLER STANDPIPE COMBINATION SYSTEM WITH NEW FIRE SERVICE F OR NEW HOTEL BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE_IN$1,000
2009-05-05Job filed: INSTALLATION OF SPRINKLER STANDPIPE COMBINATION SYSTEM WITH NEW FIRE SERVICE F OR NEW HOTEL BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE_IN$1,000
2009-03-17DOB complaint, category ?
2009-02-11DOB complaint, category ?
2009-01-20ZONE — from METRO NINE HOTEL LLC; VELIKA LLC
2009-01-20Permit EQ — ISSUED
2009-01-20Permit DM — ISSUED
2008
2008-12-11ECB CLASS - 3 violation: PERMIT NOT POSTED.NOTED:BLDG AT ABOVE LOCATION DEMO TO GRADE SITE NOT GRADED.DEBRIS & POST OF FOUNDATION WALL ON SITE.NO SITE PERM$150
2008-07-17ECB CLASS - 2 violation: SEC 28-05.11 PERMIT NOT POSTED. NOTED: BLDG ON ABOVE ADDRESS DOWN, PART OF FOUNDATION WALLS AND DEBRIS ON SITE. NO PERMIT POSTED. $400
2008-05-22DOB complaint, category ?
2008-05-21ECB Hazardous violation: 27-1034A3. FAILURE TO PROVIDE WEATHERPROOFING. ON INSPECTION BLUE TARPWAS PROVIDED FOR WEATHERPROOFING AT ADJ PROPERTY ON WEST SID
2008-04-28DOB complaint, category ?
2008-04-25ECB Hazardous violation: FAILURE TO CARRY OUT DEMOLITION OPERATION IN A SAFE AND PROPER MANNER.AT DEMO SITE SKID LOADER WAS LEFT ON ANGLE OF REPOSE BRACED
2008-04-25DOB complaint, category ?
2008-04-25ECB Hazardous violation: JOB SITE FENCE DEFECTIVE JOB SITE FENCE IS INADEQUATELY SUPPORTED BY EXTENSION CORD & MISSING ADEQUATE BRACING FOR 40' OF FENCE. R$500
2008-04-25ECB Hazardous violation: FAILURE TO SAFELY REMOVE MATERIAL IN A SAFE AND PROPER MANNER FROM DEMO SITE. DEMO DEBRIS HAS BEEN ALLOWED TO ACCUMULATE TO 10' &
2008-03-04CERT — from FIRST AMERICAN TITLE INSURANCE CO OF NY
2008-02-22Permit EQ — ISSUED
2008-02-20Job filed: APPLICATION FILED TO INSTALL CONSTRUCTION CHUTE. FILED IN CONJUNCTION WITH DEMO 104935714. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-02-20Job filed: APPLICATION FILED TO INSTALL CONSTRUCTION CHUTE. FILED IN CONJUNCTION WITH DEMO 104935714. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-01-31ECB Non-Hazardous violation: NO PERMIT FOR SIDE WALK CHUTE ERECTED THRU SIDEWALK SHED. 2ND FLOOR FOR THE REMOVED OF CONSTRUCTION DEBRIS. "DISCONTINUE USE" REME$200
2008-01-31DOB complaint, category ?
2008-01-31Job filed: INSTALL NEW STANDPIPE SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH NB # 104594137$1,000
2008-01-24Permit EQ — ISSUED
2008-01-23Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2008-01-23Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2008-01-14Permit EQ — ISSUED
2008-01-12Permit EQ — ISSUED
2008-01-12Permit EQ — ISSUED
2008-01-09Job filed: INSTALLATION OF 150 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BLDG DEMOLITION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH LL 33/91. NO CHANGE
2007
2007-11-28Permit DM — ISSUED
2007-11-28Permit EQ — ISSUED
2007-11-28Permit EQ — ISSUED
2007-11-07TL&R — from MANUFACTURERS AND TRADERS TRUST COMPANY to METRO NINE HOTEL, L.L.C.
2007-11-07AL&R $17,600,000 — from METRO NINE HOTEL, L.L.C. to MUTUAL BANK$17,600,000
2007-11-07Agreement $17,600,000 — from METRO NINE HOTEL, L.L.C. to MUTUAL BANK$17,600,000
2007-11-07Mortgage $8,000,000 — from METRO NINE HOTEL, L.L.C. to MUTUAL BANK$8,000,000
2007-11-07Mortgage assigned — from MANUFACTURERS AND TRADERS TRUST COMPANY to MUTUAL BANK
2007-11-07Mortgage assigned — from MANUFACTURERS AND TRADERS TRUST COMPANY to MUTUAL BANK
2007-11-07TL&R — from MANUFACTURERS AND TRADERS TRUST COMPANY to METRO NINE HOTEL, L.L.C.
2007-11-05Job filed: DM
2007-11-05Job filed: OFF SITE FILL
2007-11-05Job filed: DM
2007-11-05Job filed: OFF SITE FILL
2007-10-30Job filed: NB
2007-10-24Job filed: Filing herewith fire protection plan as shown on drawings. In conjunction with NB #104594137.$1,000
2007-10-24Job filed: Filing herewith fire protection plan as shown on drawings. In conjunction with NB #104594137.$1,000
2007-10-22Job filed: INSTALLATION OF SPRINKLER SYSTEM WITH NEW FIRE SERVICE for new hotel building as shown on drawings filed herewith. In conjunction with NB #104594137$3,000
2007-10-15Job filed: Install new fire alarm system to new hotel building as shown on drawings filed herewith. No change in use, egress or occupancy. In conjunction with $1,000
2007-10-03Job filed: Install new boiler on roof for new hotel building as shown on drawings filed herewith. No change in use, egress or occupancy. In conjunction with NB$1,000
2007-10-03Job filed: Install new emergency generator for new hotel building with one fuel storage located on cellar with a gas diesel 275 gallon and generator on roof as s$2,000
2007-10-03Job filed: Filing herewith builders pavement plan of 158' linear footage as shown on drawings. In conjunction with NB #104594137.
2007-10-03Job filed: Install new emergency generator for new hotel building with one fuel storage located on cellar with a gas diesel 275 gallon and generator on roof as s$2,000
2007-02-20Job filed: DM
2007-01-10Job filed: NB
2006
2006-11-13Job filed: NB
2006-08-04DEVR $2,266,550 — from VELIKA LLC to METRO NINE HOTEL, LLC$2,266,550
2006-08-04AL&R $1,100,000 — from MANUFACTURERS AND TRADERS TRUST COMPANY to METRO NINE HOTEL, LLC$1,100,000
2006-08-04Mortgage $1,100,000 — from METRO NINE HOTEL, LLC to MANUFACTURERS AND TRADERS TRUST COMPANY$1,100,000
2006-08-04DECL — from METRO NINE HOTEL LLC to VELIKA, LLC
2006-07-19Permit EQ — ISSUED
2006-07-19Permit EW — ISSUED
2006-07-14Job filed: Propose to demolish portion of the buildings exterior wall as shown on drawings. No change in use, egress or occupancy.$40,000
2005
2005-11-04TL&R — from HSBC REALTY CREDIT CORPORATION (USA) to 50 TRINITY, LLC
2005-11-04Mortgage satisfied — from 50 TRINITY, LLC to HSBC REALTY CREDIT CORPORATION (USA)
2005-10-17Deed $13,500,000 — from 4B'S REALTY TRINITY PLACE, LLC to METRO NINE HOTEL, LLC$13,500,000
2005-10-17AL&R $8,500,000 — from MANUFACTURERS AND TRADERS TRUST COMPANY, to METRO NINE HOTEL, LLC$8,500,000
2005-10-17Mortgage $8,500,000 — from METRO NINE HOTEL, LLC to MANUFACTURERS AND TRADERS TRUST COMPANY,$8,500,000
2005-03-22DEEDO $11,000,000 — from 50 TRINITY, LLC to 4 B'S REALTY TRINITY PLACE$11,000,000
2004
2004-08-09TL&R — from BANK OF NEW YORK to 50 TRINITY LLC
2004-08-09Mortgage assigned — from BANK OF NEW YORK to HSBC (USA)
2004-08-09AL&R $300,000 — from HSBC REALTY CREDIT CORP (USA) to 50 TRINITY LLC$300,000
2004-08-09Agreement $3,000,000 — from 50 TRINITY LLC to HSBC REALTY CREDIT CORP (USA)$3,000,000
2004-08-09Mortgage $1,315,963 — from 50 TRINITY LLC to HSBC REALTY CREDIT CORP (USA)$1,315,963
2002
2002-09-19DOB violation E: 1P12113
1998
1998-12-11Mortgage $1,169,824 — from 50 TRINITY, LLC to BANK OF NEW YORK$1,169,824
1998-12-11Mortgage $830,176 — from 50 TRINITY, LLC to BANK OF NEW YORK$830,176
1998-12-11Mortgage assigned — from 50 TRINITY, LLC to BANK OF NEW YORK
1998-12-09Permit EW — ISSUED
1998-09-30Permit PL — ISSUED
1998-09-22Permit EW — ISSUED
1998-09-22Permit EQ — ISSUED
1998-09-22Permit EW — ISSUED
1998-08-17Deed — from NEW YORK REALTY INC. to 50 TRINITY, LLC
1996
1996-03-08DOB violation LL1081:
1995
1995-04-17DOB violation LL1081:
1991
1991-11-26Permit PL — ISSUED
1991-11-26Permit EW — ISSUED
1988
1988-12-09Deed — from NEW YORK REALTY INC to NEW YORK REALTY INC
1985
1985-03-14Deed — from 71 BROADWAY COMPANY to NEW YORK REALTY INC
1982
1982-01-05REL — from CHASE MANHATTAN BK,NA to REALOPCO, INC.
1981
1981-06-23Agreement — from 71 BROADWAY CO to TWO RECTOR CO
1981-04-26MISC — from CHASE MANHATTN BNK
1980
1980-02-19Agreement — from REALOPCO INC to CHASE MANHTTN BNK
1980-02-19Deed — from 71 BROADWAY CO to REALOPCO INC
1980-02-19Deed — from REALOPCO INC to 71 BROADWAY CO
1980-02-01Agreement — from CHASE MANHATTAN BNKNA to REALOPCO INC
1980-02-01Agreement — from CHASE MANHATTAN BNKNA to REALOPCO INC
1980-01-31Deed — from REALOPCO INC to 71 BROADWAY CO
1980-01-31Deed — from 71 BRAODWAY CO to REALOPCO INC
1979
1979-07-31Agreement — from TWO RECTOR CO to GAVAS, NICHOLAS
1977
1977-12-22Deed — from REALOPCO INC to 71 BROADWAY CO
1977-12-12Agreement — from REALAPCO INC to CHASE MANHATTAN BK NA
1977-12-05Deed — from 71 BROADWAY CO to REALOPCO INC
1976
1976-05-26Deed — from 71 BROADWAY CO to REALOPCO INC
1976-05-26Deed — from REALOPCO INC to 71 BROADWAY CO
1976-05-26Agreement — from REALOPCO INC to CHASE MANHATTAN BANKNA
1975
1975-04-24Mortgage — from REALOPCO INC to CHASE MANHATTAN BANKNA
1975-04-21Mortgage — from REALOPCO INC to CHASE MANHATTAN BANKNA
1975-04-21Deed — from 71 BROADWAY CO to REALOPCO INC
1975-04-21Deed — from REALOPCO INC to 71 BROADWAY CO
1973
1973-12-11Deed — from REALOPCO INC to 71 BROADWAY CO
1973-12-11Deed — from UNITED STATES STEELCORP to REALOPCO INC

Support this site Back to the building page