Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

145-125 White Street · Manhattan · BBL 1001670001 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

6 heat or hot-water complaints in the last three years (winter 2024–25: 4 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.

4
’24–25
2
’25–26

No bedbug-infested units reported in the last three years of filings.

$36,250 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

105 service requests in the last three years. Most common: Noise (27) · Illegal Parking (22) · General Construction/Plumbing (11) · Homeless Person Assistance (6) · Air Quality (4) · Lost Property (3).

Filed construction activity

$105,551,087 in permitted construction work filed since 2016 (153 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$223,685,000 $100,658,250
2026$230,396,000 $103,678,200
2027$237,308,000 $106,788,600

The city's market estimate has risen 6% between tax years 2025 and 2027.

Tax exemptions on the roll: DEPT REAL EST (DCAS)

Building systems

Heating fuelNO2FUEL
Facade (Local Law 11)UNSAFE — unsafe conditions reported (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
Criminal Court Bldg CafeteriaAmericanBMice evidence

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 1 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (1 with three or more people sick) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

3 street-flooding or sewer-backup complaints at this address since 2014 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayCanal St — 6 J N Q R W Z · 550 ft straight-line (about a 3-minute walk) · station accessibility: partial
Brooklyn Bridge-City Hall — 4 5 6 J Z · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: full
BusNearest boarding stop: Worth St / Centre St — M22 · 650 ft
Citi BikeBayard St & Baxter St · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 124 Yung Wing
Middle: M.S. 131. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

145-125 White Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

105 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Ten-year activity

5002500
2017
2018
2019
2020
2021
2022
382
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017314119039130
2018223527043127
201910171104179
20208321401468
20217311513488
2022741059015158
20239320630206382
20246318390128248
202531172302293
2026441139122117
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 145 records

DateRecord
2026-10-15Facade (LL11) filing, cycle 9: UNSAFE
2026-10-13311: Noise — Construction
2026-10-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-10-08311: Noise — Construction
2026-10-06Permit Plumbing — Permit Issued
2026-09-22311: Noise — Construction
2026-09-22311: Noise — Construction
2026-09-22311: Noise — Jackhammer
2026-09-22311: Noise — Construction
2026-09-16Permit Construction Fence — Permit Issued
2026-09-14Boiler inspection
2026-09-14Boiler inspection
2026-09-14Boiler inspection
2026-09-14Boiler inspection
2026-09-14Job filed: Curb Cut #2 Centre Street Parking Garage entrance
2026-09-14Job filed: Curb Cut #3 Centre Street Sally port vehicular entrance
2026-09-14Job filed: Curb Cut #1 on Baxter Street- sallyport exit to Baxter Street
2026-09-11311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-09-11DOB complaint, category ?
2026-09-02DOB complaint, category ?
2026-09-01Permit Support of Excavation — Permit Issued
2026-08-26DOB complaint, category ?
2026-08-21311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-08-21DOB complaint, category ?
2026-08-18311: Noise — Construction
2026-08-17Job filed: CONSTRUCTION FENCE AS PER DRAWINGS DURING NEW BLDG CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCU
2026-08-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2026-08-12DOB complaint, category ?
2026-08-12Job filed: Interior renovation of Men's and Women's bathrooms at the Manhattan Criminal courthouse. No change of use, egress or occupancy.
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-07-30311: For Hire Vehicle Complaint — Car Service Company Complaint
2026-07-28311: Noise — Construction Equipment
2026-07-27311: Noise — Construction
2026-07-23Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA — grade B · mice evidence
2026-07-17Permit Mechanical Systems — Permit Issued
2026-07-16Permit Structural — Permit Issued
2026-07-16Permit General Construction — Permit Issued
2026-07-15Job filed: Foundation for the new high rise jail building.
2026-07-15Job filed: CONSTRUCTION FENCE AS PER DRAWINGS DURING NEW BLDG CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCU
2026-07-15Permit Construction Fence — Permit Issued
2026-07-15Permit Construction Fence — Permit Issued
2026-07-14311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-07-04DOB complaint, category ?
2026-07-01Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA · mice evidence
2026-06-29Job filed: Interior renovation of Men's and Women's bathrooms at the Manhattan Criminal courthouse. No change of use, egress or occupancy.
2026-06-12Job filed: Support of Excavation to accommodate construction of the new high rise building as per plans filed herewith.
2026-06-11Job filed: Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
2026-06-05311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-06-03ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE. UPON INSPECTING PERIMETER NOTICED AT EXP. 1 AND 3 CONSTRUCTION FENCE VIEW
2026-06-03DOB complaint, category ?
2026-05-28Job filed: Modifications of HVAC equipment to accommodate revised layout as per plans
2026-05-27Permit General Construction — Permit Issued
2026-05-27Permit Support of Excavation — Permit Issued
2026-05-27Permit Earth Work — Permit Issued
2026-05-21311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-05-21DOB complaint, category ?
2026-05-14311: Water System — Hydrant Leaking (WC1)
2026-05-14Permit Foundation — Permit Issued
2026-05-14Permit Support of Excavation — Permit Issued
2026-05-13311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-05-13Permit Earth Work — Permit Issued
2026-05-12Rodent inspection: Passed
2026-05-08311: Asbestos — N/A
2026-05-07Job filed: Relocate the 1st floor exit door as per plans. All work as per plans filed herewith only.
2026-05-05Job filed: Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.
2026-05-02311: Noise — Noise: Construction Before/After Hours (NM1)
2026-05-01311: Water System — Hydrant Running Full (WA4)
2026-04-28Permit General Construction — Permit Issued
2026-04-28Permit Earth Work — Permit Issued
2026-04-23Permit Mechanical Systems — Permit Issued
2026-04-20311: Noise — Noise: Construction Equipment (NC1)
2026-04-19311: Homeless Person Assistance — Non-Chronic
2026-04-16311: Street Condition — Defective Hardware
2026-04-08Permit Support of Excavation — Permit Issued
2026-04-06311: Illegal Parking — Blocked Crosswalk
2026-04-03Job filed: HUB RELATED APPLICATION: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH THE NEW BUILDING (REFER TO M01294322-I1 FOR THE NEW BUILDING.)

showing the 80 most recent

The full timeline

showing the 2,000 most recent of 2,599 events

2026
2026-10-15Facade (LL11) filing, cycle 9: UNSAFE
2026-10-13311: Noise — Construction
2026-10-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-10-08311: Noise — Construction
2026-10-06Permit Plumbing — Permit Issued
2026-09-22311: Noise — Construction
2026-09-22311: Noise — Construction
2026-09-22311: Noise — Jackhammer
2026-09-22311: Noise — Construction
2026-09-16Permit Construction Fence — Permit Issued
2026-09-14Boiler inspection
2026-09-14Boiler inspection
2026-09-14Boiler inspection
2026-09-14Boiler inspection
2026-09-14Job filed: Curb Cut #2 Centre Street Parking Garage entrance
2026-09-14Job filed: Curb Cut #3 Centre Street Sally port vehicular entrance
2026-09-14Job filed: Curb Cut #1 on Baxter Street- sallyport exit to Baxter Street
2026-09-11311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-09-11DOB complaint, category ?
2026-09-02DOB complaint, category ?
2026-09-01Permit Support of Excavation — Permit Issued
2026-08-26DOB complaint, category ?
2026-08-21311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-08-21DOB complaint, category ?
2026-08-18311: Noise — Construction
2026-08-17Job filed: CONSTRUCTION FENCE AS PER DRAWINGS DURING NEW BLDG CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCU$5,000
2026-08-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2026-08-12DOB complaint, category ?
2026-08-12Job filed: Interior renovation of Men's and Women's bathrooms at the Manhattan Criminal courthouse. No change of use, egress or occupancy.$1,146,623
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-08-06311: Illegal Parking — Blocked Crosswalk
2026-07-30311: For Hire Vehicle Complaint — Car Service Company Complaint
2026-07-28311: Noise — Construction Equipment
2026-07-27311: Noise — Construction
2026-07-23Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA — grade B · mice evidence
2026-07-17Permit Mechanical Systems — Permit Issued
2026-07-16Permit Structural — Permit Issued
2026-07-16Permit General Construction — Permit Issued
2026-07-15Job filed: Foundation for the new high rise jail building.
2026-07-15Job filed: CONSTRUCTION FENCE AS PER DRAWINGS DURING NEW BLDG CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCU$5,000
2026-07-15Permit Construction Fence — Permit Issued
2026-07-15Permit Construction Fence — Permit Issued
2026-07-14311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-07-04DOB complaint, category ?
2026-07-01Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA · mice evidence
2026-06-29Job filed: Interior renovation of Men's and Women's bathrooms at the Manhattan Criminal courthouse. No change of use, egress or occupancy.$1,146,623
2026-06-12Job filed: Support of Excavation to accommodate construction of the new high rise building as per plans filed herewith.
2026-06-11Job filed: Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.$2,777,993
2026-06-05311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-06-03ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE. UPON INSPECTING PERIMETER NOTICED AT EXP. 1 AND 3 CONSTRUCTION FENCE VIEW
2026-06-03DOB complaint, category ?
2026-05-28Job filed: Modifications of HVAC equipment to accommodate revised layout as per plans$50,000
2026-05-27Permit General Construction — Permit Issued
2026-05-27Permit Support of Excavation — Permit Issued
2026-05-27Permit Earth Work — Permit Issued
2026-05-21311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-05-21DOB complaint, category ?
2026-05-14311: Water System — Hydrant Leaking (WC1)
2026-05-14Permit Foundation — Permit Issued
2026-05-14Permit Support of Excavation — Permit Issued
2026-05-13311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-05-13Permit Earth Work — Permit Issued
2026-05-12Rodent inspection: Passed
2026-05-08311: Asbestos — N/A
2026-05-07Job filed: Relocate the 1st floor exit door as per plans. All work as per plans filed herewith only.$200,000
2026-05-05Job filed: Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.$2,777,993
2026-05-02311: Noise — Noise: Construction Before/After Hours (NM1)
2026-05-01311: Water System — Hydrant Running Full (WA4)
2026-04-28Permit General Construction — Permit Issued
2026-04-28Permit Earth Work — Permit Issued
2026-04-23Permit Mechanical Systems — Permit Issued
2026-04-20311: Noise — Noise: Construction Equipment (NC1)
2026-04-19311: Homeless Person Assistance — Non-Chronic
2026-04-16311: Street Condition — Defective Hardware
2026-04-08Permit Support of Excavation — Permit Issued
2026-04-06311: Illegal Parking — Blocked Crosswalk
2026-04-03Job filed: HUB RELATED APPLICATION: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH THE NEW BUILDING (REFER TO M01294322-I1 FOR THE NEW BUILDING.)
2026-03-27311: Illegal Parking — Parking Permit Improper Use
2026-03-27Job filed: HUB RELATED APPLICATION: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH THE NEW BUILDING (REFER TO M01294322-I1 FOR THE NEW BUILDING.)
2026-03-24311: Illegal Parking — Posted Parking Sign Violation
2026-03-20ZONE — from NYC DEPARTMENT OF CORRECTIONS
2026-03-04311: Indoor Air Quality — Dust from Construction
2026-02-24DOB complaint, category ?
2026-02-23ECB CLASS - 2 violation: 3307.7.8.2 DISCOVERY OF DEFECTS NOTE: AT TIME OF INSPECTION, I OBSERVED AT EXPO# 3 CONSTRUCTION FENCE MADE FROM YODOCKS BARRIERS A$5,000
2026-02-03311: Snow or Ice — Sidewalk
2026-02-03Job filed: Site work including removal of sections of remnant foundation walls, slab on grade and piles. Refer to M01340266-S1 for SOE.$997,000
2026-02-03Job filed: Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.$2,777,993
2026-01-29311: HEAT/HOT WATER — APARTMENT ONLY
2026-01-29Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-01-27311: Illegal Parking — Double Parked Blocking Vehicle
2026-01-27311: Snow or Ice — Sidewalk
2026-01-27Permit EW — ISSUED
2026-01-27Permit EW — ISSUED
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-23Asbestos abatement: Removal — Upper Restoration, Inc.
2026-01-22Permit General Construction — Permit Issued
2026-01-21Job filed: ROOF REPLACEMENT ON 1ST, 2ND, 3RD, 4TH, 17TH, LOWER PENTHOUSE, UPPER PENTHOUSE, TOWER A, B, C, D, E, & F. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER$11,174,400
2026-01-08Permit Standpipe — Signed-off
2026-01-08Permit Standpipe — Signed-off
2026-01-08Permit Sprinklers — Signed-off
2026-01-08Permit Sprinklers — Signed-off
2026-01-07Job filed: Manhattan Criminal Court, Bulkhead Stair Roofing & Metal Wall Panel: Removal and replacement of the existing roof membrane, flashings, etc., gutter, i$200,005
2025
2025-12-24Permit Construction Fence — Permit Issued
2025-12-24Permit Construction Fence — Permit Issued
2025-12-19Job filed: CONSTRUCTION FENCE AS PER DRAWINGS DURING NEW BLDG CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCU$5,000
2025-12-16Boiler inspection
2025-12-16Boiler inspection
2025-12-16Boiler inspection
2025-12-16Boiler inspection
2025-12-12Job filed: EA
2025-12-11Job filed: Sprinkler and Standpipe in conjunction with House Tank Replacement. The system will remain active through construction. No change to use egress or o$200,000
2025-12-10311: Noise — Noise: Construction Equipment (NC1)
2025-12-10311: Noise — Noise: Construction Equipment (NC1)
2025-12-08ECB CLASS - 1 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION OBSERVED AT ROOF LEVEL. LOOSE AND $5,000
2025-11-26Facade (LL11) filing, cycle 9: UNSAFE
2025-11-20311: Illegal Parking — Blocked Crosswalk
2025-11-20311: Illegal Parking — Blocked Crosswalk
2025-11-17311: Illegal Parking — Posted Parking Sign Violation
2025-11-14311: Illegal Parking — Parking Permit Improper Use
2025-11-07311: Illegal Parking — Blocked Hydrant
2025-10-31Rodent inspection: Passed
2025-10-31311: Illegal Parking — License Plate Obscured
2025-10-29311: Illegal Parking — Blocked Crosswalk
2025-10-27Job filed: Sprinkler and Standpipe in conjunction with House Tank Replacement. The system will remain active through construction. No change to use egress or o$200,000
2025-10-23Asbestos abatement: Removal — J & N Construction Group Corp.
2025-10-23Asbestos abatement: Removal — J & N Construction Group Corp.
2025-10-23Asbestos abatement: Removal — J & N Construction Group Corp.
2025-10-23Asbestos abatement: Removal — J & N Construction Group Corp.
2025-10-23Asbestos abatement: Removal — J & N Construction Group Corp.
2025-10-23Asbestos abatement: Removal — J & N Construction Group Corp.
2025-10-14Job filed: Support of Excavation to accommodate construction of the new high rise building as per plans filed herewith.
2025-10-14Job filed: Foundation for the new high rise jail building.
2025-10-13Job filed: Construct a new 16 story jail facility, with community facility and retail at grade levels.
2025-10-01Permit Plumbing — Permit Issued
2025-09-30Job filed: Modifications of the plumbing fixtures for the Men's and Women's Bathrooms, No change of egress, use or occupancy.$2,304,893
2025-09-30Job filed: Modification to the existing Mechanical system in the Men's & Women's bathroom. No change of use, egress or occupancy.$36,747
2025-09-22Permit Mechanical Systems — Permit Issued
2025-09-21311: Illegal Parking — Blocked Crosswalk
2025-09-17311: Illegal Parking — Paper License Plates
2025-09-16311: Taxi Complaint — Driver Complaint - Passenger
2025-09-15Permit General Construction — Permit Issued
2025-09-14311: Illegal Parking — Parking Permit Improper Use
2025-09-12311: Indoor Air Quality — Dust from Construction
2025-09-02Cooling tower inspection
2025-08-26Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA — grade A
2025-08-20311: Mold — Public Complaint - Comm Location
2025-08-01Job filed: Manhattan Criminal Court, Exterior facade repairs as per the plans filed including: Sill replacement. Crack/spalled/shifted stone repair & pinning. Gr$1,440,990
2025-07-31311: Illegal Parking — Posted Parking Sign Violation
2025-07-05311: Taxi Complaint — Driver Complaint - Passenger
2025-06-26Job filed: Infills for windows, doors, and bridges, interior non load bearing removals in cellar as shown on drawings filed herewith. No change in use, egres$400,000
2025-06-25Permit Construction Fence — Signed-off
2025-06-24Permit Construction Fence — Signed-off
2025-06-09311: Indoor Air Quality — Other (Explain Below)
2025-05-05Rodent inspection: Passed
2025-05-02Permit Standpipe — Signed-off
2025-05-02Permit Sprinklers — Signed-off
2025-04-25311: Elevator — Elevator - Multiple Devices On Property
2025-04-25DOB complaint, category ?
2025-04-25ECB CLASS - 2 violation: 56-I-10/11. (56)CONSTRUCTION DAMAGE. BOX OR CONSTRUCTION SHORTED, REPAIR/REPLACE.$625
2025-04-11Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA · mice evidence
2025-04-09FDNY inspection (COM_OCPCY)
2025-04-09FDNY inspection (COM_OCPCY)
2025-04-09FDNY inspection (COM_OCPCY)
2025-04-09FDNY inspection (COM_OCPCY)
2025-04-09FDNY inspection (COM_OCPCY)
2025-04-09FDNY inspection (AGED_OUT)
2025-04-09FDNY inspection (AGED_OUT)
2025-04-09FDNY inspection (RISK)
2025-04-09FDNY inspection (AGED_OUT)
2025-04-09FDNY inspection (COM_OCPCY)
2025-04-09FDNY inspection (RISK)
2025-04-09FDNY inspection (AGED_OUT)
2025-04-09FDNY inspection (AGED_OUT)
2025-04-09FDNY inspection (AGED_OUT)
2025-04-02311: Taxi Complaint — Vehicle Complaint
2025-03-31311: Lost Property — Electronics/Phones
2025-03-19311: Homeless Person Assistance
2025-03-14Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2025-03-14Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2025-03-14Job filed: SOE - Berming and Bracing work as shown on plan set filed herewith. No change in use, egress, or occupancy under this application. In conjunction wit$250,000
2025-03-04Elevator permit: MODIFICATION TO EXISTING CONTROLLER TO INSTALL DOOR POSITION MONITORING SYSTEM AS PER REQUIRMENTS OF ASME A17.3-2015. AS MODIFIED $20,000
2025-03-04Elevator permit: MODIFICATION TO EXISTING CONTROLLER TO INSTALL DOOR POSITION MONITORING SYSTEM AS PER REQUIRMENTS OF ASME A17.3-2015. AS MODIFIED $20,000
2025-03-04Elevator permit: MODIFICATION TO EXISTING CONTROLLER TO INSTALL DOOR POSITION MONITORING SYSTEM AS PER REQUIRMENTS OF ASME A17.3-2015. AS MODIFIED $20,000
2025-03-04Elevator permit: MODIFICATION TO EXISTING CONTROLLER TO INSTALL DOOR POSITION MONITORING SYSTEM AS PER REQUIRMENTS OF ASME A17.3-2015. AS MODIFIED $20,000
2025-02-22Asbestos abatement: Removal — New York Environmental Systems, Inc.
2025-02-18Job filed: Removal, relocation and installation of associated piping in order to extend the Siamese connection to accommodate interim sally port as shown on draw$125,000
2025-01-31Permit EW — ISSUED
2025-01-31Permit EW — ISSUED
2025-01-14Permit Standpipe — Signed-off
2025-01-14Permit Plumbing — Signed-off
2025-01-14Permit Sprinklers — Signed-off
2025-01-13Permit Sprinklers — Signed-off
2025-01-13Permit Standpipe — Signed-off
2025-01-10311: Non-Residential Heat — Inadequate or No Heat
2025-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024
2024-12-18311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2024-12-14Boiler inspection
2024-12-14Boiler inspection
2024-12-14Boiler inspection
2024-12-14Boiler inspection
2024-12-12Asbestos abatement: Cleanup — Gramercy Group, Inc.
2024-12-12Asbestos abatement: Removal — Gramercy Group, Inc.
2024-12-09Rodent inspection: Failed for Rat Activity
2024-12-06Job filed: South Tower Shoring/Bracing as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$250,000
2024-12-04Permit Sidewalk Shed — Signed-off
2024-12-04Permit Sidewalk Shed — Signed-off
2024-12-03Rodent inspection: Passed
2024-12-03Asbestos abatement: Removal — Gramercy Group, Inc.
2024-12-03Asbestos abatement: Removal — Gramercy Group, Inc.
2024-12-03311: Noise — Noise: Construction Before/After Hours (NM1)
2024-12-02Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-11-25311: General Construction/Plumbing — Site Conditions Endangering Workers
2024-11-25DOB complaint, category ?
2024-11-15311: HEAT/HOT WATER — ENTIRE BUILDING
2024-11-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-11-08Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-11-08Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-11-06Permit Sprinklers — Signed-off
2024-11-04311: Noise — Noise: Construction Equipment (NC1)
2024-10-25311: Homeless Person Assistance
2024-10-25Job filed: South Tower Shoring/Bracing as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$250,000
2024-10-23311: Homeless Person Assistance
2024-10-22Permit Standpipe — Signed-off
2024-10-15311: Non-Residential Heat — Inadequate or No Heat
2024-10-11311: Rodent — Rat Sighting
2024-10-09Job filed: Removal, relocation and installation of associated piping in order to extend the Siamese connection to accommodate interim sally port as shown on draw$125,000
2024-10-04DOB complaint, category ?
2024-10-03DOB complaint, category ?
2024-09-27Permit Support of Excavation — Signed-off
2024-09-26311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-09-26DOB complaint, category ?
2024-09-25Job filed: SOE - Berming and Bracing work as shown on plan set filed herewith. No change in use, egress, or occupancy under this application. In conjunction wit$250,000
2024-09-24311: Illegal Parking — Blocked Hydrant
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-23DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2024-09-21Asbestos abatement: Cleanup — New York Environmental Systems, Inc.
2024-09-20311: Encampment — N/A
2024-09-20311: Encampment — N/A
2024-09-17311: Mold — Public Complaint - Comm Location
2024-09-16311: Illegal Parking — License Plate Obscured
2024-09-12Boiler inspection
2024-09-12Boiler inspection
2024-09-12Boiler inspection
2024-09-12Boiler inspection
2024-09-10311: Dirty Condition — Trash
2024-09-06311: Homeless Person Assistance
2024-09-04311: Noise — Noise: Construction Equipment (NC1)
2024-08-21311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2024-08-09Cooling tower inspection
2024-08-09Permit Construction Fence — Permit Issued
2024-08-07Permit Structural — Signed-off
2024-08-06Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2024-08-02311: Lost Property — Electronics/Phones
2024-08-02Permit Standpipe — Signed-off
2024-07-31Job filed: Filing for scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$80,000
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-24Asbestos abatement: Removal — Gramercy Group, Inc.
2024-07-17311: Consumer Complaint — Bail Bond Agent
2024-07-16311: Lost Property — Bag/Wallet
2024-07-12Permit General Construction — Signed-off
2024-07-09Job filed: Infills for windows, doors, and bridges, interior non load bearing removals in cellar as shown on drawings filed herewith. No change in use, egres$400,000
2024-07-01311: Homeless Person Assistance
2024-07-01Permit Standpipe — Signed-off
2024-07-01Permit Plumbing — Signed-off
2024-07-01Permit Standpipe — Signed-off
2024-06-26Permit DM — ISSUED
2024-06-26Permit DM — ISSUED
2024-06-22Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-06-21Permit Construction Fence — Signed-off
2024-06-21Permit Supported Scaffold — Signed-off
2024-06-21Permit Structural — Signed-off
2024-06-21Permit Construction Fence — Signed-off
2024-06-21Permit Support of Excavation — Signed-off
2024-06-21Permit Protection and Mechanical Methods — Signed-off
2024-06-21Permit Structural — Signed-off
2024-06-21Permit Protection and Mechanical Methods — Signed-off
2024-06-21Permit Protection and Mechanical Methods — Signed-off
2024-06-14Job filed: South Tower Shoring/Bracing as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$250,000
2024-06-06Job filed: INSTALLATION OF AN ALIMAK SCANDO 650 PERSONNEL/MATERIAL CONSTRUCTION HOIST @ SOUTH TOWER AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRE$10,000
2024-06-05Rodent inspection: Passed
2024-06-05311: Noise — Noise: Construction Equipment (NC1)
2024-05-30Permit Supported Scaffold — Signed-off
2024-05-29Job filed: INSTALLATION OF AN ALIMAK SCANDO 650 PERSONNEL/MATERIAL CONSTRUCTION HOIST @ SOUTH TOWER AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRE$10,000
2024-05-28311: Noise — Noise: Alarms (NR3)
2024-05-28Permit Standpipe — Permit Issued
2024-05-28Permit Standpipe — Permit Issued
2024-05-28Permit Sprinklers — Permit Issued
2024-05-28Permit Sprinklers — Permit Issued
2024-05-23Job filed: Filing for scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$80,000
2024-05-21311: Noise - Street/Sidewalk — Loud Music/Party
2024-05-21Job filed: GC work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$1,250,000
2024-05-20Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2024-05-17FDNY inspection (E-CIDS)
2024-05-08Job filed: Installation of supportive scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$3,500,000
2024-05-06Rodent inspection: Passed
2024-05-03Permit Supported Scaffold — Signed-off
2024-05-01Job filed: Infills for windows, doors, and bridges, interior non load bearing removals in cellar as shown on drawings filed herewith. No change in use, egres$400,000
2024-04-30311: Noise - Vehicle — Car/Truck Music
2024-04-23Permit Sidewalk Shed — Permit Issued
2024-04-22Elevator permit: INSTALLATION OF ALIMAK SCANDO 650FC32/39II SINGLE CAGE PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH BUIL$10,000
2024-04-18Job filed: INSTALLATION OF AN ALIMAK SCANDO 650 PERSONNEL/MATERIAL CONSTRUCTION HOIST @ SOUTH TOWER AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRE$10,000
2024-04-11ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 7B,8B,AND 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL $1,250
2024-04-11ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B AND 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND$1,250
2024-04-02Permit DM — ISSUED
2024-03-28311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-27Permit DM — ISSUED
2024-03-17311: Asbestos — N/A
2024-03-16Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-03-16Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-03-16311: Food Poisoning — 3 or More
2024-03-15Permit Structural — Signed-off
2024-03-13311: Noise — Noise: Construction Equipment (NC1)
2024-03-13311: Dirty Condition — Trash
2024-03-12ECB CLASS - 2 violation: CONTRACTOR FAIL TO PROTECT ADJACENT PROPERTY 96 BAXTER STREET DUE TO CONSTRUCTION DEMO OPERATION VERTICAL CRACKS TO WALL WERE OB
2024-03-12ECB CLASS - 1 violation: SSM FAIL NOTIFIED DEPARTMENT OF DAMAGES TO ADJACENT PROPETY DUE TO DEMO OPERATION VERTICAL CRACKS TO WALL WERE OBSERVED AT ADJAC
2024-03-11ECB CLASS - 2 violation: RESPONDENT FAILED TO FILE CERTIFICATE OF CORRECTION FOR OPEN ECB VIOLATION # 39524624Z ISSUED ON 1/9/2024 FOR AN INCIDENT THAT RES$625
2024-03-08Job filed: South Tower Shoring/Bracing as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$250,000
2024-03-07Permit Mechanical Systems — Signed-off
2024-03-07Permit Mechanical Systems — Signed-off
2024-03-04Permit Plumbing — Signed-off
2024-02-29Permit EW — ISSUED
2024-02-29Permit EW — ISSUED
2024-02-28Permit Sprinklers — Signed-off
2024-02-28Permit Standpipe — Signed-off
2024-02-24Asbestos abatement: Removal — New York Environmental Systems, Inc.
2024-02-23311: Street Sign - Damaged — Other/Unknown
2024-02-20311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2024-02-15311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2024-02-13Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2024-02-08311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2024-02-06311: General Construction/Plumbing — Failure To Maintain
2024-02-06DOB complaint, category ?
2024-02-02Restaurant inspection: CRIMINAL COURT BLDG CAFETERIA — grade A
2024-01-30Permit Structural — Signed-off
2024-01-25311: Noise — Noise: Construction Equipment (NC1)
2024-01-18Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2024-01-18Job filed: Removal and installation of plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under thi$175,000
2024-01-18Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2024-01-16ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7B, 8B, AND 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FAC$1,250
2024-01-12Air permit (WORK PERMIT), fuel: NO2FUEL
2024-01-12Air permit (WORK PERMIT), fuel: NATURALGAS
2024-01-09ECB CLASS - 1 violation: ON 12/9/23 A WORKER CUT HIS FINGER WHILE REMOVING PIPE SCAFFOLD CROSS BRACE, UPON REVIEW THE DEPARTMENT RECORDS ON 1/9/24, OBSERVE$10,000
2024-01-08ECB CLASS - 1 violation: A WORKER WAS INJURED TOE & NAIL DURING REMOTE ROBOTIC DEMOLITION .JOB#123916487 PERMIT HOLDER, FAILED TO SUBMIT REPORT WITHIN 3 BU$10,000
2024-01-08Job filed: Removal and installation of plumbing fixtures and related piping for interim sally port as shown on drawings filed herewith. No change in use, egress $250,000
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2024-01-02Asbestos abatement: Removal — Gramercy Group, Inc.
2023
2023-12-31FDNY inspection (E-CIDS)
2023-12-29Boiler inspection
2023-12-29Boiler inspection
2023-12-29Boiler inspection
2023-12-29Boiler inspection
2023-12-22311: Noise — Noise: Construction Equipment (NC1)
2023-12-22Job filed: Remove, relocate and install new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy under t$100,000
2023-12-21Job filed: Removal and installation of non-load bearing partition walls, doors, etc. for court house improvement work as shown on drawings filed herewith. No cha$1,200,000
2023-12-21Job filed: GC work for interim sally port and infill of 3rd and 12th floor bridges once removed as shown on drawings filed herewith. No change in use, egress or $1,250,000
2023-12-20Boiler inspection
2023-12-20Boiler inspection
2023-12-20Boiler inspection
2023-12-20Boiler inspection
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Asbestos abatement: Removal — Gramercy Group, Inc.
2023-12-19Permit General Construction — Signed-off
2023-12-18Job filed: Installation of mechanical equipment, related piping and related ductwork. Removal of heating pipes, radiators as shown on drawings filed herewith. No$200,000
2023-12-15Job filed: Soft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as shown on drawi$700,000
2023-12-13311: Noise — Noise: Construction Equipment (NC1)
2023-12-12Permit Sidewalk Shed — Signed-off
2023-12-11Job filed: INSTALLATION OF AN ALIMAK SCANDO 650 PERSONNEL/MATERIAL CONSTRUCTION HOIST @ SOUTH TOWER AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRE$10,000
2023-12-08Cooling tower inspection
2023-12-08Permit Boiler Equipment — Signed-off
2023-12-06Permit Sidewalk Shed — Signed-off
2023-12-06Permit Structural — Signed-off
2023-12-05Job filed: INSTALL TEMPORARY MOBILE TRAILER PER PLANS$100,000
2023-12-04Rodent inspection: Passed
2023-11-28Job filed: Foundation work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$750,000
2023-11-27Job filed: Removal and installation of HVAC system for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this a$250,000
2023-11-27Job filed: Removal, relocation and installation of associated piping in order to extend the Siamese connection to accommodate interim sally port as shown on draw$250,000
2023-11-27Job filed: Remove, relocate and install new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy under t$100,000
2023-11-22FDNY inspection (E-CIDS)
2023-11-08ECB CLASS - 1 violation: AT TIME OF INSPECTION RESPOND TO AN INCIDENT WHERE A WORKER INJURED TOE NAIL DURING REMOTE ROBOTIC DEMOLITION. INSPECTOR REVEAL TH$1,250
2023-11-03Rodent inspection: Failed for Rat Activity
2023-11-03Job filed: Temp bracing and vertical shoring work as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$475,000
2023-11-03Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2023-10-31Job filed: Partial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2023-10-30311: Emergency Response Team (ERT) — After Hours Work - Illegal
2023-10-30311: Noise — Noise: Construction Equipment (NC1)
2023-10-28311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2023-10-28311: Noise — Noise: Construction Before/After Hours (NM1)
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-25Asbestos abatement: Removal — J & N Construction Group Corp.
2023-10-19311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2023-10-19DOB complaint, category ?
2023-10-14311: Non-Residential Heat — Inadequate or No Heat
2023-10-08311: Illegal Parking — Parking Permit Improper Use
2023-10-03Job filed: Installation of supportive scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$3,500,000
2023-09-29Elevator permit: INSTALLATION OF ALIMAK SCANDO 650FC32/39II SINGLE CAGE PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH BUIL$10,000
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Asbestos abatement: Removal — J & N Construction Group Corp.
2023-09-27Permit Standpipe — Permit Issued
2023-09-27Permit Sprinklers — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Sprinklers — Signed-off
2023-09-26Job filed: INSTALLATION OF AN ALIMAK SCANDO 650 PERSONNEL/MATERIAL CONSTRUCTION HOIST @ SOUTH TOWER AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRE$10,000
2023-09-22Rodent inspection: Failed for Rat Activity
2023-09-20Elevator permit: Remove 5 passenger elevators and 1 freight elevator#1P20786, 1P20787, 1P20788, 1P20789, 1P20796 and, 1F830 per Section 8.11.1.4.1.$35,000
2023-09-19DOB complaint, category ?
2023-09-18Permit General Construction — Permit Issued
2023-09-11Boiler inspection
2023-09-11Boiler inspection
2023-09-11Boiler inspection
2023-09-11Boiler inspection
2023-09-05311: Rodent — Rat Sighting
2023-08-30Permit Plumbing — Signed-off
2023-08-30Permit Sprinklers — Signed-off
2023-08-30Permit Standpipe — Signed-off
2023-08-18311: Homeless Person Assistance
2023-08-17311: Homeless Person Assistance
2023-08-16Job filed: SOE work as shown on drawing filed herewith. No change in use, egress, or occupancy under this application. Filed in conjunction with full demo number$225,000
2023-08-09311: Noise - Street/Sidewalk — Loud Music/Party
2023-08-09Job filed: INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE$15,000
2023-08-09Permit Construction Fence — Permit Issued
2023-08-06311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2023-08-06DOB complaint, category ?
2023-08-05311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2023-08-05DOB complaint, category ?
2023-08-03Job filed: Structural Work for the removal and replacement of water towers as per the plans filed herewith. No change to use egress or occupancy.$50,000
2023-07-29311: Noise — Noise: Construction Equipment (NC1)
2023-07-28311: Encampment — N/A
2023-07-28311: Encampment — N/A
2023-07-18FDNY inspection (E-CIDS)
2023-07-18311: Illegal Parking — License Plate Obscured
2023-07-18Job filed: SOE work as shown on drawing filed herewith. No change in use, egress, or occupancy under this application. Filed in conjunction with full demo number$225,000
2023-07-14Permit Plumbing — Signed-off
2023-07-14Permit Standpipe — Signed-off
2023-07-14Permit Plumbing — Signed-off
2023-07-14Permit Standpipe — Signed-off
2023-07-13Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2023-07-02311: Noise - Commercial — Loud Television
2023-06-29Asbestos abatement: Removal — Gramercy Group, Inc.
2023-06-29311: Homeless Person Assistance
2023-06-29311: Encampment — N/A
2023-06-24Asbestos abatement: Removal — Barros Construction Corp.
2023-06-24Permit Construction Fence — Signed-off
2023-06-23311: Street Condition — Defective Hardware
2023-06-23Permit DM — ISSUED
2023-06-22Permit Structural — Signed-off
2023-06-22Permit Supported Scaffold — Signed-off
2023-06-22Permit Foundation — Signed-off
2023-06-22Permit Structural — Signed-off
2023-06-22Permit Structural — Signed-off
2023-06-22Permit Protection and Mechanical Methods — Signed-off
2023-06-22Permit General Construction — Signed-off
2023-06-22Permit Protection and Mechanical Methods — Signed-off
2023-06-22Permit Construction Fence — Signed-off
2023-06-22Permit General Construction — Signed-off
2023-06-22Permit General Construction — Signed-off
2023-06-22Permit Structural — Signed-off
2023-06-22Permit Support of Excavation — Signed-off
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
2023-06-20DOB violation HBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
2023-06-19Elevator permit: INSTALLATION OF A PERSONNEL/MATERIAL SINGLE CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH BUILDING DEMO BIS# 123916478. INST$10,000
2023-06-18311: Panhandling — N/A
2023-06-15Job filed: SOE work as shown on drawing filed herewith. No change in use, egress, or occupancy under this application. Filed in conjunction with full demo number$225,000
2023-06-15Permit Protection and Mechanical Methods — Signed-off
2023-06-14Job filed: INSTALLATION OF TEMPORARY PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUC$10,000
2023-06-09311: Street Condition — Defective Hardware
2023-06-08Job filed: Sprinkler and Standpipe in conjunction with House Tank Replacement. The system will remain active through construction. No change to use egress or o$200,000
2023-06-08Job filed: Plumbing work to replacement House Tank and associated piping as per plans filed herewith. No change to use egress or occupancy.$1,178,774
2023-06-05Rodent inspection: Passed
2023-06-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-02ECB CLASS - 2 violation: PERMITHOLDER FAILED TO IMMEDIATE NOTIFY THE DEPARTMENT OF INCIDENT RESULTED IN INJURY, THE ACT IN CONTRARY WITH CODES. THE INCIDEN
2023-05-23311: Electrical — Electrical Wiring Defective/Exposed
2023-05-23DOB complaint, category ?
2023-05-19311: Illegal Parking — Posted Parking Sign Violation
2023-05-17Rodent inspection: Passed
2023-05-08Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2023-05-05311: Rodent — Rat Sighting
2023-05-04Rodent inspection: Failed for Rat Activity
2023-05-04Permit Supported Scaffold — Signed-off
2023-05-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-03Job filed: Installation of sidewalk shed as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$400,000
2023-05-03Job filed: Installation of supportive scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$3,500,000
2023-05-02311: Rodent — Rat Sighting
2023-05-01Job filed: Filing for AES scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$5,000,000
2023-04-28DOB complaint, category ?
2023-04-25311: Noise — Noise: Construction Equipment (NC1)
2023-04-20311: Noise — Noise: Construction Equipment (NC1)
2023-04-17ECB CLASS - 2 violation: AT THE TIME OF INSPECTION OBSERVED AN ERECTED SIDEWALK SHED AT THE BUILDINGS EXPOSURE 2.4. NOT PAINTED HUNTER GREEN AS THE CODE RE$1,280
2023-04-17Job filed: Temp bracing and vertical shoring work as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$475,000
2023-04-17Permit DM — ISSUED
2023-04-16311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-04-11Rodent inspection: Failed for Other Reason
2023-04-08Asbestos abatement: Removal — Barros Construction Corp.
2023-04-05Elevator permit: Remove and permanently discontinue of an wheelchair lift Device # 1W304. All work to comply with ASME A18.1-2017, Section 2 (Publi$5,000
2023-04-04Job filed: INSTALLATION OF A PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOI$10,000
2023-04-03Elevator permit: INSTALLATION OF A PERSONNEL/MATERIAL SINGLE CAR CONSTRUCTION HOIST ALIMAK SCANDO 450 AS PER PLANS IN CONJUNCTION WITH DEMO. INSTAL$10,000
2023-03-31Elevator permit: Remove 6 passenger elevators and 1 freight elevator#1P35817, 1P35350, 1P35349, 1P35348, 1P35347, 1P35346 and 1F5602 per Section 8.$35,000
2023-03-30311: Noise — Noise: Construction Before/After Hours (NM1)
2023-03-27DOB complaint, category ?
2023-03-27Job filed: Manhattan Criminal Court, Exterior facade repairs as per the plans filed including: Sill replacement. Crack/spalled/shifted stone repair & pinning. Gr$1,440,990
2023-03-23Permit Support of Excavation — Signed-off
2023-03-22311: New Tree Request — For One Address
2023-03-22311: New Tree Request — For One Address
2023-03-21Permit General Construction — Signed-off
2023-03-17Job filed: Modifications of the plumbing fixtures for the Men's and Women's Bathrooms, No change of egress, use or occupancy.$2,304,893
2023-03-17Permit Mechanical Systems — Signed-off
2023-03-17Permit Mechanical Systems — Signed-off
2023-03-16Job filed: INSTALLATION OF A PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOI$10,000
2023-03-15311: Water System — Hydrant Running (WC3)
2023-03-15Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2023-03-14311: Non-Residential Heat — Inadequate or No Heat
2023-03-13Job filed: SOE work as shown on drawing filed herewith. No change in use, egress, or occupancy under this application. Filed in conjunction with full demo number$225,000
2023-03-13Permit Sprinklers — Signed-off
2023-03-13Permit Sprinklers — Permit Issued
2023-03-13Permit Standpipe — Permit Issued
2023-03-11Asbestos abatement: Removal — Barros Construction Corp.
2023-03-11Asbestos abatement: Removal — Barros Construction Corp.
2023-03-08311: General Construction/Plumbing — Building Permit - None
2023-03-08311: BEST/Site Safety — Demolition - Unsafe
2023-03-08DOB complaint, category ?
2023-03-08DOB complaint, category ?
2023-03-05311: Noise — Noise: Construction Before/After Hours (NM1)
2023-03-02Job filed: Modification to the existing Mechanical system in the Men's & Women's bathroom. No change of use, egress or occupancy.$36,747
2023-03-02Job filed: Interior renovation of Men's and Women's bathrooms at the Manhattan Criminal courthouse. No change of use, egress or occupancy.$1,146,623
2023-03-01311: Homeless Person Assistance
2023-02-27Permit EW — ISSUED
2023-02-27Permit EW — ISSUED
2023-02-25311: Illegal Parking — Blocked Sidewalk
2023-02-23311: Noise - Residential — Banging/Pounding
2023-02-23311: Noise — Noise: Construction Before/After Hours (NM1)
2023-02-23311: Noise — Noise: Construction Before/After Hours (NM1)
2023-02-22311: Rodent — Mouse Sighting
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2023-02-21311: Noise — Noise: Construction Equipment (NC1)
2023-02-21311: Noise — Noise: Construction Before/After Hours (NM1)
2023-02-18311: Noise — Noise: Construction Equipment (NC1)
2023-02-10Facade (LL11) filing, cycle 9: UNSAFE
2023-02-10DOB violation FISPHAZ: CYCLE 9B UNSAFE REPORT FILED
2023-02-10Permit Construction Fence — Signed-off
2023-02-10Permit Construction Fence — Signed-off
2023-02-10Permit Construction Fence — Signed-off
2023-02-06Elevator permit: INSTALLATION OF A PERSONNEL/MATERIAL SINGLE CAR CONSTRUCTION HOIST ALIMAK SCANDO 450 AS PER PLANS IN CONJUNCTION WITH DEMO. INSTAL$10,000
2023-02-03Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRE$281,600
2023-02-03Permit Sidewalk Shed — Permit Issued
2023-02-02Permit Protection and Mechanical Methods — Signed-off
2023-02-01Job filed: INSTALLATION OF A PERSONNEL/MATERIAL CONSTRUCTION HOIST AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOI$10,000
2023-01-26311: Noise - Residential — Loud Talking
2023-01-25Permit Structural — Signed-off
2023-01-25Permit Structural — Signed-off
2023-01-19311: New Tree Request — For One Address
2023-01-12311: Illegal Parking — Posted Parking Sign Violation
2023-01-11Permit Structural — Signed-off
2023-01-08311: New Tree Request — For One Address
2023-01-08311: New Tree Request — For One Address
2023-01-08311: New Tree Request — For One Address
2023-01-08311: Overgrown Tree/Branches — Dead Branches in Tree
2023-01-06311: Illegal Parking — Posted Parking Sign Violation
2023-01-05311: Illegal Parking — Posted Parking Sign Violation
2023-01-03311: New Tree Request — For One Address
2022
2022-12-28311: Non-Residential Heat — Inadequate or No Heat
2022-12-28311: Non-Residential Heat — Inadequate or No Heat
2022-12-28Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2022-12-28Job filed: Temp bracing and vertical shoring work as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$475,000
2022-12-25311: Non-Residential Heat — Inadequate or No Heat
2022-12-25311: New Tree Request — For One Address
2022-12-24311: Non-Residential Heat — Inadequate or No Heat
2022-12-23311: New Tree Request — For One Address
2022-12-23311: New Tree Request — For One Address
2022-12-20Permit Protection and Mechanical Methods — Signed-off
2022-12-19311: New Tree Request — For One Address
2022-12-17311: New Tree Request — For One Address
2022-12-15Permit Sidewalk Shed — Signed-off
2022-12-14Job filed: Soft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as shown on drawi$800,000
2022-12-14Permit Supported Scaffold — Signed-off
2022-12-12Job filed: ST filing required for Partial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work t$1,000
2022-12-12Job filed: Filing for AES scaffold as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$5,000,000
2022-12-12Job filed: ST filing required for Partial dismantle of the north tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work t$1,000
2022-12-09Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2022-12-09Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2022-12-09Job filed: Partial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2022-12-09Job filed: Partial dismantle of the north tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2022-12-08311: New Tree Request — For One Address
2022-12-08Permit General Construction — Signed-off
2022-12-06Boiler inspection
2022-12-06Boiler inspection — defects found
2022-12-06Boiler inspection — defects found
2022-12-06Boiler inspection
2022-12-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-12-06Permit Protection and Mechanical Methods — Signed-off
2022-12-05Rodent inspection: Passed
2022-11-30Job filed: Soft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as shown on drawi$800,000
2022-11-28311: New Tree Request — For One Address
2022-11-25311: New Tree Request — For One Address
2022-11-25311: New Tree Request — For One Address
2022-11-22Job filed: PMM application for filing use of Bobcat Skid Steer Loaders with Buckets or Hammers, Boom Lift, Brokk robotic demo machine with hammers, Telehandlers,$800,000
2022-11-21311: New Tree Request — For One Address
2022-11-19Permit Sidewalk Shed — Signed-off
2022-11-17Job filed: Installation of sidewalk shed as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$400,000
2022-11-17Job filed: Partial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2022-11-17Job filed: Partial dismantle of the north tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2022-11-17Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2022-11-17Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2022-11-07Rodent inspection: Failed for Rat Activity and Other Reason
2022-11-07311: Encampment — N/A
2022-11-03311: Illegal Parking — Parking Permit Improper Use
2022-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-11-01311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-25311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-24Elevator permit: ALL work to comply w/ASME A17.1-2000/03, Chapter 30, Appendix K and K3. Perform necessary test/inspection in the presence of city $446,000
2022-10-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-12Cooling tower inspection
2022-10-11Job filed: DM
2022-10-07311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-07ECB CLASS - 1 violation: CLASS 1: 8.V.1 ELEVATOR NOT LEVEL WITH LANDING SILL CREATING TRIPPING HAZZARD. REPAIR & CALL NYCDOB FOR REINSPECTION$1,250
2022-10-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-06311: Elevator — Elevator - Multiple Devices On Property
2022-10-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-06DOB complaint, category ?
2022-10-05311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-05311: Noise - Residential — Loud Music/Party
2022-09-27Job filed: DM
2022-09-24311: Noise — Noise: Jack Hammering (NC2)
2022-09-14Permit Foundation — Signed-off
2022-09-12Job filed: Foundation work for support of temporary sidewalk shed as shown on drawings filed herewith. No change in use, egress, or occupancy under this applicat$160,000
2022-09-04311: Illegal Parking — Blocked Bike Lane
2022-09-04311: Illegal Parking — Blocked Bike Lane
2022-09-04311: Illegal Parking — Blocked Bike Lane
2022-08-31Job filed: Installation of sidewalk shed as shown on drawings filed herewith. No change in use, egress, or occupancy under this application.$500,000
2022-08-25Job filed: FULL DEMOLITION OF FOURTEEN STORY BUILDING, USING HAND HELD AND MECHANICAL MEANS TO ASSIST. FENCE FILED VIA DOB NOW: M00672650-I1. SHED FILED VIA DOB
2022-08-23311: SAFETY — FIRE ESCAPE
2022-08-23311: Food Establishment — Handwashing
2022-08-23Tenant complaint: SAFETY — FIRE ESCAPE
2022-08-17Permit Mechanical Systems — Signed-off
2022-08-16311: Illegal Parking — Blocked Bike Lane
2022-08-15311: Illegal Parking — Blocked Bike Lane
2022-08-15Job filed: Foundation work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$750,000
2022-08-15Permit Sprinklers — Signed-off
2022-08-15Permit Plumbing — Signed-off
2022-08-15Permit Structural — Signed-off
2022-08-15Permit Plumbing — Signed-off
2022-08-14Permit Standpipe — Permit Issued
2022-08-14Permit Sprinklers — Permit Issued
2022-08-14Permit Mechanical Systems — Signed-off
2022-08-11Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2022-08-11Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2022-08-09Job filed: Structural work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$1,000,000
2022-08-05Permit Foundation — Permit Issued
2022-08-01Cooling tower inspection
2022-07-28Permit Standpipe — Signed-off
2022-07-28Permit Standpipe — Signed-off
2022-07-26Boiler inspection — defects found
2022-07-26Boiler inspection — defects found
2022-07-26Boiler inspection — defects found
2022-07-26Boiler inspection
2022-07-25311: Elevator — Elevator - Multiple Devices On Property
2022-07-25DOB complaint, category ?
2022-07-25ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC THIS IS A CONTROLLER $1,250
2022-07-20Permit General Construction — Signed-off
2022-07-20Permit General Construction — Signed-off
2022-07-20Permit General Construction — Signed-off
2022-07-20Permit Foundation — Signed-off
2022-06-29311: Lost Property — Other
2022-06-22Job filed: Partial dismantle of the north tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2022-06-22Job filed: Partial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-str$100,000
2022-06-21Job filed: Removal, relocation and installation of associated piping in order to extend the Siamese connection to accommodate interim sally port as shown on draw$250,000
2022-06-20Job filed: Installation of mechanical equipment, related piping and related ductwork. Removal of heating pipes, radiators as shown on drawings filed herewith. No$200,000
2022-06-20Job filed: Removal and installation of plumbing fixtures and related piping for interim sally port as shown on drawings filed herewith. No change in use, egress $250,000
2022-06-20Job filed: Removal and installation of HVAC system for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this a$250,000
2022-06-17311: Taxi Complaint — Driver Complaint - Non Passenger
2022-06-17Job filed: Structural work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$1,000,000
2022-06-17Job filed: Foundation work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$750,000
2022-06-13Job filed: Removal and installation of plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress, or occupancy under thi$175,000
2022-06-13Job filed: Remove, relocate and install new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy under t$100,000
2022-06-03Job filed: FULL DEMOLITION OF FOURTEEN STORY BUILDING, USING HAND HELD AND MECHANICAL MEANS TO ASSIST. FENCE FILED VIA DOB NOW: M00672697-I1.
2022-06-01Rodent inspection: Passed
2022-06-01Job filed: GC work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$1,250,000
2022-05-03Rodent inspection: Passed
2022-04-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-21311: Noise — Noise: Construction Equipment (NC1)
2022-04-13311: General Construction/Plumbing — Building Permit - None
2022-04-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-04-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-13311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2022-04-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-04-13311: General Construction/Plumbing — Building Permit - None
2022-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-13DOB complaint, category ?
2022-04-13DOB complaint, category ?
2022-04-13DOB complaint, category ?
2022-04-13DOB complaint, category ?
2022-04-13DOB complaint, category ?
2022-03-28Permit Standpipe — Signed-off
2022-03-25Permit Standpipe — Signed-off
2022-03-24Permit Sprinklers — Signed-off
2022-03-23311: Street Light Condition — Street Light Out
2022-03-23Permit General Construction — Signed-off
2022-03-22Job filed: new sprinkler heads at cellar with related sprinkler work. connect to existing riser. no change to use, egress or occupancy.$31,000
2022-03-22Job filed: Install temporary standpipe. no change to use egress or occupancy.$30,000
2022-03-22Job filed: installation of temporary standpipe. no change to use egress or occupancy.$30,000
2022-03-18Job filed: Removal and installation of non-load bearing partition walls, doors, etc. for court house improvement work as shown on drawings filed herewith. No cha$1,200,000
2022-02-11311: General Construction/Plumbing — Building Permit - None
2022-02-11DOB complaint, category ?
2022-02-10Permit Construction Fence — Signed-off
2022-02-10Permit Construction Fence — Signed-off
2022-02-07311: Face Covering Violation — Mandate Not Enforced
2022-02-03311: Face Covering Violation — Mandate Not Enforced
2022-02-03Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2022-02-03Job filed: Temporary Plywood Construction Fence with Rolling Gates & Doors, Temporary Plywood Fence with Jersey Barrier and Temporary Chain link Fence with Jerse$1,000
2022-02-01Permit EW — ISSUED
2022-02-01Permit EW — ISSUED
2022-01-16311: Non-Residential Heat — Inadequate or No Heat
2022-01-12311: Noise — Noise: air condition/ventilation equipment (NV1)
2021
2021-12-30Boiler inspection
2021-12-30Boiler inspection
2021-12-30Boiler inspection
2021-12-30Boiler inspection
2021-12-20311: Face Covering Violation — Mandate Not Enforced
2021-12-17DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2021-12-07Rodent inspection: Bait applied
2021-12-07Rodent inspection: Bait applied
2021-11-29Rodent inspection: Bait applied
2021-11-29Rodent inspection: Bait applied
2021-11-22Rodent inspection: Bait applied
2021-11-22Rodent inspection: Bait applied
2021-10-18MAPS — from NYC DEPARTMENT OF CITY PLANNING
2021-10-15311: General Construction/Plumbing — Failure To Maintain
2021-10-15DOB complaint, category ?
2021-09-30Cooling tower inspection
2021-09-11Asbestos abatement: Removal — Barros Construction Corp.
2021-09-09Boiler inspection
2021-09-09Boiler inspection — defects found
2021-09-09Boiler inspection
2021-09-09Boiler inspection
2021-07-19311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2021-07-08Cooling tower inspection — violation AH8W
2021-07-08Cooling tower inspection — violation AH8E
2021-07-08Cooling tower inspection — violation AH8X
2021-07-08Cooling tower inspection — violation AH8Q
2021-07-08Cooling tower inspection — violation AH8D
2021-07-08Cooling tower inspection — violation AH8R
2021-07-08Cooling tower inspection — violation AH8T
2021-07-08Cooling tower inspection — violation AH8S
2021-07-08Cooling tower inspection — violation AH8F
2021-07-08Cooling tower inspection — violation AH8L
2021-07-08Cooling tower inspection — violation AH8M
2021-07-08Cooling tower inspection — violation AH8C
2021-06-30311: Homeless Person Assistance
2021-06-25FDNY inspection (SPECIAL-OTH)
2021-06-24Job filed: Replacement of burner on boiler for more efficient dual fuel burner.$550,000
2021-06-12311: Illegal Fireworks — N/A
2021-06-04Rodent inspection: Failed for Rat Activity
2021-05-19Rodent inspection: Passed
2021-05-19Rodent inspection: Passed
2021-05-13311: NonCompliance with Phased Reopening — Business not in compliance
2021-05-10Rodent inspection: Passed
2021-05-08ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS FACADE AND APPURTENANCES.NOTE:AT THE TIME OF INSPECTIONS VIEW AT EXPOSURE 1:STEEL CORR$1,250
2021-05-06311: Rodent — Rat Sighting
2021-04-17311: Illegal Parking — Blocked Sidewalk
2021-04-02Permit EW — ISSUED
2021-03-22311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-17DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-16DOB violation E:
2021-03-02Permit EW — ISSUED
2021-03-02Permit EW — ISSUED
2021-03-02Permit EW — ISSUED
2021-02-28311: Food Establishment — Food Spoiled
2021-02-24Rodent inspection: Passed
2021-02-24311: Maintenance or Facility — Rodent Sighting
2021-02-24Permit PL — ISSUED
2021-02-15311: Rodent — Rat Sighting
2021-02-13311: Mass Gathering Complaint — Mass Gathering
2021-02-11Permit EW — ISSUED
2021-01-27311: Noise - Helicopter — Other
2021-01-11311: Street Condition — Pothole
2021-01-05Cooling tower inspection
2020
2020-12-22311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-08Job filed: INSTALLATION OF 10 HELICAL PILES TO SUPPORT TRASH COMPACTOR FILED IN CONJUNCTION WITH APPLICATION # 122644219$20,000
2020-12-08Job filed: INSTALLATION OF 10 HELICAL PILES TO SUPPORT TRASH COMPACTOR FILED IN CONJUNCTION WITH APPLICATION # 122644219$20,000
2020-12-07311: Water System — Excessive Water In Basement (WEFB)
2020-11-25311: Food Establishment — Food Spoiled
2020-11-17Cooling tower inspection — violation AH8S
2020-11-17Cooling tower inspection — violation AH8S
2020-10-30311: Food Establishment — Food Protection
2020-09-30Boiler inspection
2020-09-30Boiler inspection
2020-09-30Boiler inspection
2020-09-30Boiler inspection
2020-09-25311: NonCompliance with Phased Reopening — Business not in compliance
2020-09-01Rodent inspection: Failed for Other Reason
2020-09-01Rodent inspection: Passed
2020-09-01Job filed: CONSTRUCTION OF NONE LOAD BEARING PARTITIONS$15,000
2020-09-01Job filed: CONSTRUCTION OF NONE LOAD BEARING PARTITIONS$15,000
2020-08-23311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-05Permit Mechanical Systems — Signed-off
2020-06-25311: Noise - Commercial — Banging/Pounding
2020-06-23Boiler inspection
2020-06-23Boiler inspection
2020-06-23Boiler inspection — defects found
2020-06-23Boiler inspection
2020-06-06Asbestos abatement: Removal — Barros Construction Corp.
2020-06-06Asbestos abatement: Removal — Barros Construction Corp.
2020-06-03ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C AND 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADE R$1,250
2020-06-02311: Non-Emergency Police Matter — Face Covering Violation
2020-06-02311: Non-Emergency Police Matter — Social Distancing
2020-05-28311: Consumer Complaint — Employment Agency
2020-05-19311: Non-Emergency Police Matter — Face Covering Violation
2020-05-05Job filed: Installation of (4) heating oil metering systems for existing storage tanks at cellar meter vault.$125,000
2020-04-22311: Noise - Street/Sidewalk — Loud Talking
2020-04-21311: Noise - Street/Sidewalk — Loud Talking
2020-03-30Permit EW — ISSUED
2020-03-30Permit EW — ISSUED
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
2020-03-09DOB violation E:
2020-03-09DOB violation E:
2020-03-09DOB violation E:
2020-03-09DOB violation E:
2020-03-09DOB violation E:
2020-03-09DOB violation E:
2020-03-09DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-06DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-03-05DOB violation E:
2020-02-05311: Smoking — Smoking Violation
2020-01-08DOB complaint, category ?
2019
2019-12-13Permit EW — ISSUED
2019-12-13Permit EW — ISSUED
2019-12-06311: Taxi Complaint — Driver Complaint - Non Passenger
2019-12-03Cooling tower inspection — violation AH8L
2019-12-03Cooling tower inspection — violation AH8S
2019-11-15ECB CLASS - 2 violation: SEC. 27-929.1 A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS& FILE A FINAL SPRINKLER R$1,250
2019-11-14Rodent inspection: Passed
2019-11-14Elevator permit: PROVIDE NEW DOOR LOCK MONITORING SYSTEM PER SECTION 3.10.12 OF CHAPTER K3 OF APPENDIX K OF THE NEW YORK CITY BUILDING CODE. ALL W$16,000
2019-11-14Elevator permit: PROVIDE NEW DOOR LOCK MONITORING SYSTEM PER SECTION 3.10.12 OF CHAPTER K3 OF APPENDIX K OF THE NEW YORK CITY BUILDING CODE. ALL W$16,000
2019-11-11Boiler inspection
2019-11-11Boiler inspection — defects found
2019-11-04Permit Plumbing — Signed-off
2019-10-31Boiler inspection — defects found
2019-10-12Rodent inspection: Bait applied
2019-10-05Rodent inspection: Bait applied
2019-10-04311: Taxi Complaint — Driver Complaint - Non Passenger
2019-09-28Rodent inspection: Bait applied
2019-09-26Permit EW — ISSUED
2019-09-19Permit PL — ISSUED
2019-09-14Rodent inspection: Bait applied
2019-09-13Boiler inspection
2019-09-13Boiler inspection
2019-09-12Permit EW — ISSUED
2019-09-07Rodent inspection: Bait applied
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-29Job filed: INSTALLATION OF NEW GAS LINE FOR TEMPORARY ON-STREET BOILER SYSTEM. NO CHANGE TO USE OCCUPANCY OR EGRESS.$175,000
2019-08-15Cooling tower inspection — violation AH8E
2019-08-15Cooling tower inspection — violation AH8M
2019-08-15Cooling tower inspection — violation AH8L
2019-08-15Cooling tower inspection — violation AH8E
2019-08-15Cooling tower inspection — violation AH8M
2019-08-15Cooling tower inspection — violation AH8L
2019-08-15Cooling tower inspection — violation AH8X
2019-08-15Cooling tower inspection — violation AH8X
2019-08-14Elevator permit: Door Lock Monitoring.$80,000
2019-08-05Elevator permit: Door Lock Monitoring.$14,000
2019-08-05Elevator permit: Door Lock Monitoring.$14,000
2019-08-05Elevator permit: Door Lock Monitoring.$20,000
2019-08-05Elevator permit: Door Lock Monitoring.$80,000
2019-08-05Elevator permit: Door Lock Monitoring.$14,000
2019-07-12Rodent inspection: Bait applied
2019-07-09311: Dirty Conditions — E2 Receptacle Violation
2019-06-29Rodent inspection: Bait applied
2019-06-27Job filed: WORK ON 1ST FLOOR, REMOVE PARTIAL PARTITION,CEILING GRID TO REMAIN, REPLACE GYP.BD. CEILING TILES AND REPLACE STORE FRONT AS PER PLAN. NO CHANGE IN US$27,200
2019-06-22Rodent inspection: Bait applied
2019-06-15Rodent inspection: Bait applied
2019-06-08Rodent inspection: Bait applied
2019-06-01Rodent inspection: Bait applied
2019-05-31Asbestos abatement: Removal — D & S Abatement, Inc.
2019-05-28311: Illegal Parking — Blocked Sidewalk
2019-05-25Rodent inspection: Bait applied
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-03Rodent inspection: Failed for Rat Activity
2019-04-20311: Illegal Parking — Double Parked Blocking Vehicle
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-31311: Homeless Person Assistance
2019-03-26DOB violation E:
2019-03-26DOB violation E:
2019-03-25DOB violation E:
2019-03-23Permit EW — ISSUED
2019-03-23Permit EW — ISSUED
2019-03-22311: Graffiti — Graffiti
2019-03-01ECB CLASS - 1 violation: BC3314.15.5 FAILURE TO PROVIDE LETTER FOR THIRD PERSON ON SUSPENDED SCAFFOLD. (NUMBER OF WORKERS). NOTE: AT TIME OF INPSECTION I O$2,500
2019-02-26Boiler inspection
2019-02-26Boiler inspection
2019-02-26Boiler inspection
2019-02-11311: Street Condition — Defective Hardware
2019-02-01311: Illegal Parking — Double Parked Blocking Vehicle
2019-01-22311: Illegal Parking — Double Parked Blocking Traffic
2019-01-02311: Illegal Parking — Blocked Sidewalk
2018
2018-12-28Rodent inspection: Passed
2018-12-15311: Illegal Parking — Blocked Sidewalk
2018-12-03311: Illegal Parking — Double Parked Blocking Traffic
2018-11-28311: Elevator — Elevator - Multiple Devices On Property
2018-11-28DOB complaint, category ?
2018-11-28DOB violation E: CEASE USE PENDING THE OUTCOME OF ACCIDENT
2018-11-27311: Homeless Person Assistance
2018-11-13Boiler inspection — defects found
2018-11-13Boiler inspection — defects found
2018-11-13Boiler inspection — defects found
2018-11-08311: Homeless Person Assistance
2018-11-05Rodent inspection: Passed
2018-11-05311: Elevator — Elevator - Single Device On Property/No Alternate Service
2018-11-05311: Elevator — Elevator - Single Device On Property/No Alternate Service
2018-11-05ECB CLASS - 1 violation: 97X10,59B07-97X10)CEASE USE ITEM, ELEVATOR NOT OPERATIONAL, REPAIR ELEVATOR IN ORDER FOR THIS DEPARTMENT TO CONDUCT AN ACCIDENT IN
2018-11-05DOB complaint, category ?
2018-11-05DOB complaint, category ?
2018-10-30311: Illegal Parking — Double Parked Blocking Vehicle
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQU
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQU
2018-10-12311: Street Light Condition — Lamppost Leaning
2018-10-10ECB CLASS - 2 violation: 10H11,17H11,60Q4,70O2. 10H11,17H11,60Q3,70O2. 10H11-REPLACE WORN CAR DOOR GIBBS; 17H11-REPLACE WORN HOISTWAY DOOR GIBBS.
2018-10-10ECB CLASS - 2 violation: 52B14,10H11,17H11,70O2. 52B14-SHORTEN HOIST ROPES; 10H11-REPLACE WORNCAR DOOR GIBBS; 17H11-REPLACE WORN HOISTWAY DOOR GIBBS.
2018-10-10ECB CLASS - 2 violation: 16H11,17H11,10H11,70O2. 17H11-REPLACE WORN HOISTWAY DOOR GIBBS; 10H11-REPLACE WORN CAR DOOR GIBBS.
2018-10-10ECB CLASS - 2 violation: 100A10=BOTTOM TERMINAL FLOOR OUTSIDE HOISTWAY PELLE PULL CHIN BOX HANGING OFF WALL.
2018-10-10ECB CLASS - 2 violation: 17H11,10H11,70O02. 17H11-REPLACE HOISTWAY DOOR GIBBS WHERE NEEDED; 10H11-CAR DOOR GIBBS.
2018-10-04Facade (LL11) filing, cycle 8: UNSAFE
2018-10-04DOB violation FISP:
2018-10-02Cooling tower inspection — violation AH8H
2018-10-02Cooling tower inspection — violation AH8R
2018-10-02Cooling tower inspection — violation AH8M
2018-10-02Cooling tower inspection — violation AH8L
2018-10-02Cooling tower inspection — violation AH8T
2018-10-02Cooling tower inspection — violation AH8D
2018-10-02Cooling tower inspection — violation AH8C
2018-10-02Cooling tower inspection — violation AH8H
2018-10-02Cooling tower inspection — violation AH8B
2018-10-02Cooling tower inspection — violation AH8E
2018-10-02Cooling tower inspection — violation AH8G
2018-10-02Cooling tower inspection — violation AH8Q
2018-10-02Cooling tower inspection — violation AH8U
2018-10-02Cooling tower inspection — violation AH8R
2018-10-02Cooling tower inspection — violation AH8T
2018-10-02Cooling tower inspection — violation AH8C
2018-10-02Cooling tower inspection — violation AH8E
2018-10-02Cooling tower inspection — violation AH8Q
2018-10-02Cooling tower inspection — violation AH8G
2018-10-02Cooling tower inspection — violation AH8U
2018-10-02Cooling tower inspection — violation AH8B
2018-10-02Cooling tower inspection — violation AH8M
2018-10-02Cooling tower inspection — violation AH8D
2018-10-02Cooling tower inspection — violation AH8L
2018-10-02Cooling tower inspection — violation AH8S
2018-10-02Cooling tower inspection — violation AH8X
2018-10-02Cooling tower inspection — violation AH8S
2018-09-28Permit EW — ISSUED
2018-09-26311: Street Condition — Pothole
2018-09-26Permit PL — ISSUED
2018-09-20Rodent inspection: Failed for Rat Activity
2018-09-19311: Non-Emergency Police Matter — Ticket Scalping
2018-09-07DOB complaint, category ?
2018-08-27311: Taxi Complaint — Driver Complaint
2018-08-24311: Illegal Parking — Blocked Hydrant
2018-08-08Rodent inspection: Passed
2018-08-08311: Elevator — Elevator - Multiple Devices On Property
2018-08-08DOB complaint, category ?
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-27Job filed: FILING HEREWITH FOR INSTALLATION OF TEN HELICAL PILES TO SUPPORT TRASH COMPACTOR. FILED IN CONJUNCTION WITH ALT 2# 122644219.$20,000
2018-07-27Job filed: FILING HEREWITH FOR INSTALLATION OF TEN HELICAL PILES TO SUPPORT TRASH COMPACTOR. FILED IN CONJUNCTION WITH ALT 2# 122644219.$20,000
2018-07-27Job filed: FILING HEREWITH FOR INSTALLATION OF TEN HELICAL PILES TO SUPPORT TRASH COMPACTOR. FILED IN CONJUNCTION WITH ALT 2# 122644219.$20,000
2018-07-24Cooling tower inspection
2018-07-16Asbestos abatement: Removal — B&N&K Restoration Co., Inc
2018-07-16Asbestos abatement: Removal — B&N&K Restoration Co., Inc
2018-07-16Asbestos abatement: Removal — B&N&K Restoration Co., Inc
2018-06-27311: Elevator — Elevator - Multiple Devices On Property
2018-06-27DOB complaint, category ?
2018-06-20Permit EW — ISSUED
2018-06-08Asbestos abatement: Removal — B&N&K Restoration Co., Inc
2018-06-07Permit EW — ISSUED
2018-06-05311: Illegal Parking — Double Parked Blocking Vehicle
2018-05-25311: Rodent — Signs of Rodents
2018-05-19311: Illegal Parking — Blocked Sidewalk
2018-05-10Rodent inspection: Failed for Rat Activity
2018-05-10311: Elevator — Elevator - Multiple Devices On Property
2018-05-10311: Rodent — Rat Sighting
2018-05-10DOB complaint, category ?
2018-04-30Permit Sidewalk Shed — Permit Issued
2018-04-18311: Homeless Person Assistance
2018-04-17Permit Supported Scaffold — Permit Issued
2018-04-17Permit Supported Scaffold — Permit Issued
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-16311: Noise - Street/Sidewalk — Loud Talking
2018-04-13311: Noise - Street/Sidewalk — Loud Talking
2018-04-07311: Homeless Person Assistance
2018-03-22Job filed: INSTALLATION OF PIPE SCAFFOLD (+/-)134'-0" LONG AND 13'-0" / 25'-" HIGH ON ROOF AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR $10,000
2018-03-22Permit Supported Scaffold — Permit Issued
2018-03-20Permit EW — ISSUED
2018-03-15DOB violation E:
2018-03-14DOB violation E:
2018-03-14DOB violation E:
2018-03-14DOB violation E:
2018-03-14DOB violation E:
2018-03-14DOB violation E:
2018-03-14DOB violation E:
2018-03-12311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-12311: Noise — Noise: Construction Equipment (NC1)
2018-03-08Job filed: OBTAIN EQUIPMENT USE PERMIT CARDS FOR ROOF TOP AC UNIT INSTALLED UNDER 103579398. NO WORK TO BE DONE UNDER THIS APPLICATION. NO CHANGE TO USE EGRESS$100
2018-02-23Asbestos abatement: Removal — D & S Abatement, Inc.
2018-02-01Permit Sidewalk Shed — Permit Issued
2018-01-31Permit EQ — ISSUED
2018-01-29Job filed: INSTALLATION OF (+/-)1126 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATIO$10,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-18Permit Supported Scaffold — Permit Issued
2018-01-17Job filed: INSTALLATION OF PIPE SCAFFOLD (+/-)134'-0" LONG AND 13'-0" / 25'-" HIGH ON ROOF AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR $10,000
2018-01-17Job filed: INSTALLATION OF PIPE SCAFFOLD (+/-)126'-0" LONG AND 10'-0" / 22'-0" / 25'-" HIGH ON ROOF AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EG$10,000
2018-01-12Asbestos abatement: Removal — D & S Abatement, Inc.
2018-01-10311: Illegal Parking — Parking Permit Improper Use
2017
2017-12-19Boiler inspection
2017-12-19Boiler inspection
2017-12-19Boiler inspection
2017-12-07DOB complaint, category ?
2017-12-05311: Elevator — Elevator Not Inspected/Illegal/No Permit
2017-12-05DOB complaint, category ?
2017-12-01311: Sidewalk Condition — Broken Sidewalk
2017-11-27Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.140690802. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2017-11-27Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.140690786. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2017-11-15Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.140690786. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2017-11-15Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.140690802. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2017-11-15Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.140690786. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$388,000
2017-11-15Job filed: FACADE SSP FILLED IN CONJUNCTION WITH THE APPLICATION NO.140690802. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2017-11-13Permit EW — ISSUED
2017-11-09Permit EW — ISSUED
2017-11-09Permit EW — ISSUED
2017-11-03FDNY inspection (COMPLAINT)
2017-11-01311: General Construction/Plumbing — Failure To Maintain
2017-11-01DOB complaint, category ?
2017-10-27311: Food Poisoning — 3 or More
2017-10-19311: Water System — Possible Water Main Break (Use Comments) (WA1)
2017-10-15311: Food Poisoning — 1 or 2
2017-10-13311: Elevator — Elevator - Defective/Not Working
2017-10-13DOB complaint, category ?
2017-10-10ECB CLASS - 1 violation: CEASE USE. 50A,51. CLEAVER BROOKS,WATER,TUBE,HP STEAM BOILER. (50A)EXTENSIVE THERMAL DEFORMATION OF MEMBRANE WATERWALL HEATING SUR
2017-10-05Permit EW — ISSUED
2017-10-04311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2017-10-04311: Hazardous Materials — Chemical Odor (HD1)
2017-09-29Permit EW — ISSUED
2017-09-28ECB CLASS - 2 violation: 60Q3;02L10:INSTALL LIGHT GUARDS ON ALL LIGHTS IN MOTOR ROOM.REPAIR PHONE.
2017-09-26ECB CLASS - 2 violation: 40I10;61K11;60Q3;57M07:REPAIR DOOR MISSING DOOR KNOB;REPLACE MACHINE DISCONNECT BOX;INSTALL LIGHT GUARDS;PROVIDE FIRE EXTINGUISHE
2017-09-25311: Indoor Air Quality — Other (Explain Below)
2017-09-23311: Sidewalk Condition — Broken Sidewalk
2017-09-18Boiler inspection
2017-09-18Boiler inspection
2017-09-18Boiler inspection
2017-09-14ECB CLASS - 1 violation: THE RESPONDENT FAILED TO MEET THE MINIMUM REQS SEP 4TH IN AC 28-105.1.AC 28-105.1 STATES THAT IT SHALL BE UNLAWFUL TO ENLARGE,ALTE$1,000
2017-09-06Job filed: MANHATTAN DETENTION CENTER, SOUTH TOWER EXTERIOR REPAIRS AS PER THE PLANS FILED.$717,000
2017-09-06Job filed: MANHATTAN DETENTION CENTER, NORTH TOWER EXTERIOR REPAIRS AS PER THE PLANS FILED.$388,000
2017-08-04311: General Construction/Plumbing — Failure To Maintain
2017-08-04DOB complaint, category ?
2017-07-21Rodent inspection: Passed
2017-07-12311: Sidewalk Condition — Broken Sidewalk
2017-07-11Permit EW — ISSUED
2017-07-09311: Illegal Parking — Blocked Sidewalk
2017-06-28Permit EQ — ISSUED
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-23DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
2017-06-21311: Taxi Report — Vehicle Report
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000000319 HAS BEEN INSPECTED,TESTED, & DISINFECTED, & THAT A MAINTENANCE PLAN HAS
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000005932 HAS BEEN INSPECTED,TESTED, & DISINFECTED, & THAT A MAINTENANCE PLAN HAS
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000005934 HAS BEEN INSPECTED,TESTED, & DISINFECTED, & THAT A MAINTENANCE PLAN HAS
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000005933 HAS BEEN INSPECTED,TESTED, & DISINFECTED, & THAT A MAINTENANCE PLAN HAS
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000000318 HAS BEEN INSPECTED,TESTED, & DISINFECTED, & THAT A MAINTENANCE PLAN HAS
2017-06-16Permit EW — ISSUED
2017-06-16Permit EW — ISSUED
2017-06-16Permit EW — ISSUED
2017-06-08Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2017-06-07Cooling tower inspection — violation AH8B
2017-06-07Cooling tower inspection — violation AH8M
2017-06-07Cooling tower inspection — violation AH8S
2017-06-07Cooling tower inspection — violation AH8L
2017-06-07Cooling tower inspection — violation AH8X
2017-06-07Cooling tower inspection — violation AH8T
2017-06-07Job filed: INSTALLATION OF SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO C
2017-05-23311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2017-05-23DOB complaint, category ?
2017-05-18Cooling tower inspection — violation AH8M
2017-05-18Cooling tower inspection — violation AH8L
2017-05-18Cooling tower inspection — violation AH8R
2017-05-18Cooling tower inspection — violation AH8Q
2017-05-18Cooling tower inspection — violation AH8C
2017-05-18Cooling tower inspection — violation AH8K
2017-05-18Cooling tower inspection — violation AH8G
2017-05-18Cooling tower inspection — violation AH8F
2017-05-18Cooling tower inspection — violation AH8K
2017-05-18Cooling tower inspection — violation AH8D
2017-05-18Cooling tower inspection — violation AH8C
2017-05-18Cooling tower inspection — violation AH8G
2017-05-18Cooling tower inspection — violation AH8M
2017-05-18Cooling tower inspection — violation AH8D
2017-05-18Cooling tower inspection — violation AH8E
2017-05-18Cooling tower inspection — violation AH8S
2017-05-18Cooling tower inspection — violation AH8B
2017-05-18Cooling tower inspection — violation AH8R
2017-05-18Cooling tower inspection — violation AH8B
2017-05-18Cooling tower inspection — violation AH8S
2017-05-18Cooling tower inspection — violation AH8L
2017-05-18Cooling tower inspection — violation AH8F
2017-05-18Cooling tower inspection — violation AH8E
2017-05-18Cooling tower inspection — violation AH8V
2017-05-18Cooling tower inspection — violation AH8Q
2017-05-18Cooling tower inspection — violation AH8V
2017-05-05Permit PL — ISSUED
2017-05-05Permit EW — ISSUED
2017-03-15DOB violation E:
2017-03-15DOB violation E:
2017-03-15DOB violation E:
2017-03-15DOB violation E:
2017-03-15DOB violation E:
2017-03-15DOB violation E:
2017-03-15DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-13DOB violation E:
2017-03-09311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2017-03-08Permit EW — ISSUED
2017-03-08Permit EW — ISSUED
2017-03-06DOB violation E:
2017-02-10311: Non-Residential Heat — Inadequate or No Heat
2017-01-27Permit PL — ISSUED
2017-01-20Job filed: REMOVE EXISTING AND INSTALL NEW STEAM TO HOT WATER HEAT EXCHANGER, PUMPS, SUPPLY AND RETURN PIPING, HOUSING AREA RADIATORS AND ASSOCIATED CONTROLS.REM$13,500,000
2017-01-19Permit EW — ISSUED
2017-01-19Permit EW — ISSUED
2017-01-16Job filed: INSTALL TRAILER MOUNTED PREFAB BOILER/BURNER UNIT TO PROVIDE STEAM TO BUILDING DURING UPGRADE OF EXISTING HOUSE BOILERS.
2017-01-12Job filed: REPLACEMENT OF EXISTING ROOF MEMBRANE NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,175,000
2017-01-12Job filed: REPLACEMENT OF EXISTING ROOF MEMBRANE NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,175,000
2017-01-11311: Illegal Parking — Posted Parking Sign Violation
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-23Permit EW — ISSUED
2016-12-20311: Illegal Parking — Double Parked Blocking Vehicle
2016-12-14311: Homeless Person Assistance — N/A
2016-12-08Job filed: ROOF REPLACEMENT WORK FOR GYMNASIUM ROOF, BRIDGE ROOF CONNECTING NORTH & SOUTH TOWERS AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE$85,000
2016-12-08Job filed: ROOF REPLACEMENT WORK FOR GYMNASIUM ROOF, BRIDGE ROOF CONNECTING NORTH & SOUTH TOWERS AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE$85,000
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-04311: Sidewalk Condition — Blocked - Construction
2016-10-29311: Noise - Street/Sidewalk — Loud Music/Party
2016-10-28Rodent inspection: Passed
2016-10-28ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG SOUTH ELEV EXP1 PLAZA COLUMNS/PLAZA JOINT MISSING MORTAR PLAZA STONE AND STONE STEPS DISLODGED A
2016-10-12311: Homeless Person Assistance — N/A
2016-09-11311: Illegal Animal Kept as Pet — Snake
2016-08-12311: Curb Condition — Broken Curb
2016-08-07311: HEAT/HOT WATER — ENTIRE BUILDING
2016-08-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-07-22311: Homeless Person Assistance — N/A
2016-07-22311: Sidewalk Condition — Broken Sidewalk
2016-07-22311: Dirty Conditions — E4 18" Law
2016-07-17311: Taxi Complaint — Driver Complaint
2016-07-08Permit EQ — ISSUED
2016-07-01311: New Tree Request — For One Address
2016-06-30311: Homeless Person Assistance — N/A
2016-06-30Permit EW — ISSUED
2016-06-30Permit EW — ISSUED
2016-06-30Permit EW — ISSUED
2016-06-27311: Sidewalk Condition — Broken Sidewalk
2016-06-23311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2016-06-23DOB complaint, category ?
2016-06-21311: Standing Water — Other - Explain Below
2016-06-19311: Homeless Person Assistance — N/A
2016-06-17Permit EW — ISSUED
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-05-20311: Standing Water — Fountain - Over 5 Gallons
2016-05-20Permit EW — ISSUED
2016-05-14311: Noise - Street/Sidewalk — Loud Music/Party
2016-04-20311: Taxi Report — Driver Report
2016-04-18311: Illegal Parking — Blocked Sidewalk
2016-03-28Permit EW — ISSUED
2016-03-16Permit EW — ISSUED
2016-03-16Permit EW — ISSUED
2016-03-15311: Homeless Person Assistance — No Status Call
2016-03-15311: Homeless Person Assistance — No Status Call
2016-03-07ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE W. CODE PROVIDIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & AP
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-03-01DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-29DOB violation E:
2016-02-26Rodent inspection: Passed
2016-02-22311: Homeless Person Assistance — No Status Call
2016-02-22311: Homeless Person Assistance — No Status Call
2016-02-14311: Non-Residential Heat — Inadequate or No Heat
2016-01-15311: Homeless Person Assistance — No Status Call
2016-01-15311: Homeless Person Assistance — No Status Call
2016-01-15311: Homeless Person Assistance — No Status Call
2016-01-15311: Homeless Person Assistance — No Status Call
2016-01-15311: Homeless Person Assistance — No Status Call
2016-01-15311: Homeless Person Assistance — No Status Call
2016-01-14311: Homeless Person Assistance — No Status Call
2016-01-14311: Homeless Person Assistance — No Status Call
2016-01-13311: Homeless Person Assistance — No Status Call
2016-01-13311: Homeless Person Assistance — Status Call
2016-01-13Permit EW — ISSUED
2016-01-13Permit EW — ISSUED
2015
2015-12-23Job filed: REMOVE AND REPLACE SIDEWALK AND PORTION OF EXISTING CURB
2015-12-23Job filed: SIDEWALK REPLACEMENT AND STABILIZATION, MODIFICATIONS TO ACCESSIBILITY COMPONENTS, INSTALLATION OF TRASH COMPACTOR AND ENCLOSURE, AND MISCELLANEOUS SI$2,755,917
2015-12-23Job filed: REPLACEMENT AND ADDITION OF HOSEBIBS AT EXTERIOR WALL. NO CHANGE TO OCCUPANCY OR EGRESS.$67,435
2015-12-23Job filed: REMOVE AND REPLACE SIDEWALK AND PORTION OF EXISTING CURB
2015-11-29311: Smoking — Smoking Violation
2015-11-21311: General Construction/Plumbing — Failure To Maintain
2015-11-21DOB complaint, category ?
2015-11-16ECB CLASS - 1 violation: FAILURE TO TAKE REQUIRED ACTIONS TO SECURE PUBLIC SAFETY-UNSAFE FACADE NOTED:ON 9/17/2015 A QEWI SUBMITTED A (F1SP 3) TO THE DEPT
2015-11-15311: Taxi Complaint — Driver Complaint
2015-11-09311: Homeless Person Assistance — No Status Call
2015-11-09ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG WEST 2 SOUTH ELEV EXP1 FRONT PLAZA AND STEPS DISLODGED MORTAR ERODED-GROUND LEVEL STONE PANELS B
2015-11-06311: Sidewalk Condition — Cellar Door Open/Unprotected
2015-11-01311: Sidewalk Condition — Broken Sidewalk
2015-10-21ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS
2015-10-21ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE TECHNICAL EPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS R
2015-10-21Permit EW — ISSUED
2015-10-13311: Graffiti — Graffiti
2015-09-21311: Noise - Street/Sidewalk — Loud Music/Party
2015-09-18311: Facades — Facade (LL11/98)- Unsafe Notification
2015-09-17311: Taxi Complaint — Driver Complaint
2015-08-24311: Dirty Conditions — E3 Dirty Sidewalk
2015-08-12311: General Construction/Plumbing — Failure To Maintain
2015-08-12DOB complaint, category ?
2015-08-04ECB CLASS - 1 violation: FAILURE TO TAKE AND PROVIDE SAFETY MEASSURES (SIDEWALK SHED) WHERE REQUIRED TO PROTECT ABD SECURE PUBLIC SAFETY.DOCUMENTED UNSAFE
2015-08-04Job filed: INSTALL STRUCTURAL STEEL DUNNAGE FOR SUPPORTING ROOFTOP CHILLER UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2015-08-04Job filed: INSTALL STRUCTURAL STEEL DUNNAGE FOR SUPPORTING ROOFTOP CHILLER UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2015-07-24311: Noise - Street/Sidewalk — Loud Music/Party
2015-07-13311: Noise - Street/Sidewalk — Loud Music/Party
2015-06-24Permit EW — ISSUED
2015-06-22311: Noise - Street/Sidewalk — Loud Music/Party
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-05-30311: Noise - Street/Sidewalk — Loud Music/Party
2015-05-29ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE AMENDED CYCLE 7 REPORT TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL
2015-05-24311: Noise - Street/Sidewalk — Loud Music/Party
2015-05-15Job filed: INSTALLATION OF 485 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33
2015-05-15Permit EQ — ISSUED
2015-05-08311: Noise - Street/Sidewalk — Loud Music/Party
2015-05-07311: Elevator — Accident - Elevator
2015-05-07DOB complaint, category ?
2015-04-22311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2015-03-24Permit EW — ISSUED
2015-03-23311: Noise - Commercial — Car/Truck Horn
2015-03-06311: Street Condition — Pothole
2015-03-05Permit EW — ISSUED
2015-03-05Permit EW — ISSUED
2015-02-28311: Noise - Street/Sidewalk — Loud Music/Party
2015-02-27311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2015-02-26DOB violation E:
2015-02-26DOB violation E:
2015-02-24311: Noise - Street/Sidewalk — Loud Music/Party
2015-02-21311: Noise - Street/Sidewalk — Loud Music/Party
2015-02-07311: Street Condition — Pothole
2015-02-03ECB CLASS - 2 violation: /97X10/98M05/99M05/56Y13/59Y02/ 59Y02-CLEAN DRUM.
2015-02-03ECB CLASS - 2 violation: /59V01/56Y13/98M05/99M05/60Q03/68B07/05X10/ 59V01-DISC BRAKE MONITOR. 56Y13-SEAL LEAKS. 68B07-NOT UP TO DATE. 05X10-ZONE LOCK RES
2015-02-03ECB CLASS - 2 violation: /98BB05/99M05/60Q03/16Q03/ (16Q03) SIGHT GUARDS WHERE NEEDED.
2015-02-03ECB CLASS - 2 violation: /98BB05/99BB05/ 98BB05-CAT 1 EXPIRED. 99BB05-CAT 5 EXPIRED.
2015-02-03ECB CLASS - 2 violation: /59V01/98M05/99M05/56Y13/52K11/05X10/39Q03/16Q03/70O02/70Q07/ 59V01-DISC BRAKE MONITOR. 52K11-ROUGE DEVELOPING. 05X10-ZONE LOCK RE
2015-02-03ECB CLASS - 1 violation: /01L10/02L10/67X10/98BB05/99M05/37Q03/60Q03/16Q03/ CEASE USE ITEMS: (01L10,02L10,67X10) INAUDIBLE PHONE/ALARM SYSTEM. (37Q03,60Q03
2015-02-03ECB CLASS - 2 violation: /53H11/98BB05/99BB05/ 53H11-WORN GOVERNOR ROPE. 98BB05-CAT 1 EXPIRED. 99BB05-CAT 5 EXPIRED.
2015-02-03ECB CLASS - 2 violation: /98BB05/99BB05/ 98BB05-CAT 1 EXPIRED. 99BB05-CAT 5 EXPIRED.
2015-01-07Job filed: INTERIOR RENOVATION OF EXISTING COMMERICAL AREA. REPLACE TILE AND PAINTING. NO CHANGE IS USE, EGRESS OR OCCUPANCY.$8,500
2014
2014-12-22Job filed: MECHANICAL CHANGES ON THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$594,000
2014-12-22Job filed: MECHANICAL CHANGES ON THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$594,000
2014-12-18311: Noise — Noise: air condition/ventilation equipment (NV1)
2014-12-02ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &
2014-12-02ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &
2014-11-20Permit EW — ISSUED
2014-11-07311: Non-Residential Heat — Inadequate or No Heat
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-09-02Facade (LL11) filing, cycle 7: UNSAFE
2014-09-02DOB violation LL11/98:
2014-08-01311: Sewer — Sewer Backup (Use Comments) (SA)
2014-08-01311: Sewer — Sewer Backup (Use Comments) (SA)
2014-08-01311: Sewer — Sewer Backup (Use Comments) (SA)
2014-07-29Permit PL — ISSUED
2014-07-29Permit EW — ISSUED
2014-07-18311: Sidewalk Condition — Broken Sidewalk
2014-07-01Permit EW — ISSUED
2014-06-17Permit EW — ISSUED
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-04-01311: Sidewalk Condition — Sidewalk Grating - Defective
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-14Permit EW — ISSUED
2014-03-14Permit EW — ISSUED
2014-02-27DOB violation E: NYC DEPARTMENT OF CITYWIDE SERVICES
2014-02-26DOB violation E: NYC DEPARTMENT OF CITYWIDE SERVICE
2014-01-10311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2014-01-10DOB complaint, category ?
2014-01-05FDNY inspection (RISK)
2014-01-05FDNY inspection (RISK)
2014-01-03Job filed: COOLING TOWER REPLACEMENT. RELATED MECHANICAL IN CELLAR, 3RD AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,200,000
2013
2013-12-11311: Indoor Air Quality — Ventilation
2013-12-03DOB violation E:
2013-12-03DOB violation E:
2013-12-03DOB violation E:
2013-12-03DOB violation E:
2013-12-03DOB violation E:
2013-12-03DOB violation E:
2013-11-27Permit EW — ISSUED
2013-11-08Rodent inspection: Passed
2013-10-18311: Rodent — Condition Attracting Rodents
2013-10-17Rodent inspection: Failed for Other Reason
2013-10-07311: General Construction/Plumbing — Failure To Maintain
2013-10-07DOB complaint, category ?
2013-09-30Rodent inspection: Failed for Rat Activity
2013-09-24311: Rodent — Condition Attracting Rodents
2013-09-17311: Noise - Street/Sidewalk — Loud Talking
2013-08-31311: Public Payphone Complaint — Damaged Telephone
2013-08-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
2013-08-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
2013-08-07Job filed: SIDEWALK REPLACEMENT AND STABILIZATION.
2013-08-07Job filed: SIDEWALK REPLACEMENT AND STABILIZATION.
2013-07-17Permit EW — ISSUED
2013-07-13311: Taxi Complaint — Driver Complaint
2013-07-10Permit PL — ISSUED
2013-07-10Permit EW — ISSUED
2013-07-05Permit EW — ISSUED
2013-06-26Job filed: MANUAL & AUTOMATIC SMOKE/HEAT DETECTION/SPRINKLER ARLAM/EMERGENCY VOICE ALARM COMMUNICATION/SMOKE PURGE/STAIR PRESSURIZATION (NORTH TOWER) FOR EXI$500,000
2013-06-17311: Sidewalk Condition — Broken Sidewalk
2013-06-12311: Street Condition — Defective Hardware
2013-03-27Permit EW — ISSUED
2013-03-27Permit EW — ISSUED
2013-03-11Rodent inspection: Passed
2013-03-06311: Dirty Conditions — E2 Receptacle Violation
2013-02-21311: Street Sign - Missing — St Name - Attached to Pole
2013-02-15Job filed: SIDEWALK REPLACEMENT AND STABILIZATION, MODIFICATIONS TO ACCESSIBILITY COMPONENTS,INSTALLATION OF TRASH COMPACTOR, AND MISCELLANEOUS SITE FIXTURES. BU$2,823,352
2013-02-14DOB violation E:
2013-02-14DOB violation E:
2013-02-14DOB violation E:
2013-02-14DOB violation E:
2013-02-07311: Noise - Park — Loud Music/Party
2013-01-17Job filed: COOLING TOWER REPLACEMENT CONSISTING OF MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. APPLICATION F$2,245,402
2013-01-17Job filed: COOLING TOWER REPLACEMENT CONSISTING OF MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. APPLICATION F$2,245,402
2013-01-14Rodent inspection: Passed
2013-01-07Job filed: INSTALLATION OF A MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM AND PURGE SYSTEM AND STAIR$500,000
2012
2012-12-27311: Rodent — Rat Sighting
2012-12-07Job filed: SUBSEQUENT APPLICATION FOR STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$671,450
2012-12-07Job filed: SUBSEQUENT APPLICATION FOR STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$602,867
2012-11-25311: Non-Residential Heat — Inadequate or No Heat
2012-10-19DOB violation E:
2012-10-19DOB violation E:
2012-10-19DOB violation E:
2012-10-19DOB violation E:
2012-10-19DOB violation E:
2012-10-19DOB violation E:
2012-10-17311: Water System — Leak (Use Comments) (WA2)
2012-10-17DOB violation E:
2012-10-17DOB violation E:
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-27311: Illegal Parking — Double Parked Blocking Vehicle
2012-09-27311: Illegal Parking — Double Parked Blocking Vehicle
2012-08-15DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2010 CAT 1 INSP/TST
2012-08-12311: Other Enforcement — E10 Obstruction (Street/Sidewalk)
2012-07-27311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2012-07-27DOB complaint, category ?
2012-07-18311: Sidewalk Condition — Broken Sidewalk
2012-06-18311: Noise — Noise: Jack Hammering (NC2)
2012-06-11311: Sidewalk Condition — Broken Sidewalk
2012-06-01Job filed: SD WORK TYPE FILINED INCONJUCTION WITH DOCUMENT 01 (SP) (COMBINNATION SPRINKLER AND STANDPIPE SYSTEM)$10,000
2012-05-18311: Elevator — Accident - Elevator
2012-05-18DOB complaint, category ?
2012-04-12Job filed: REMOVE AND REPLACE ALL STANDPIPE AND SPRINKLER FLOW AND VALVE TAMPER SWICHES (COMBINATION SPRINKLER AND STANDPIPE SYSTEM).REPLACMENT OF THE 12TH FL RI$128,275
2012-03-20311: Water System — Possible Water Main Break (Use Comments) (WA1)
2012-02-29Rodent inspection: Failed for Rat Activity
2012-01-10Job filed: INSTALL SIDEWALK SHED FOR OVERHEAD PEDESTRIAN PROTECTION. SHED TO COMPLY WITH BC SECTION 33. NO CHANGE TO USE, OCCUPANCY OR MEANS OF EGRESS.
2012-01-04311: Sidewalk Condition — Broken Sidewalk
2011
2011-12-22311: Taxi Complaint — Driver Complaint
2011-12-19DOB violation E:
2011-12-19DOB violation E:
2011-12-19DOB violation E:
2011-12-19DOB violation E:
2011-12-19DOB violation E:
2011-12-19DOB violation E:
2011-12-16DOB violation E:
2011-12-16DOB violation E:
2011-12-16DOB violation E:
2011-12-15DOB violation E:
2011-12-15DOB violation E:
2011-12-15DOB violation E:
2011-12-15DOB violation E:
2011-12-14Job filed: REPLACE (2) MODULAR GAS BOILERS WITH (2) BOILERS AND (2) GAS BURNERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$232,000
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-12-11Rodent inspection: Bait applied
2011-11-07311: Taxi Complaint — Driver Complaint
2011-11-05Rodent inspection: Monitoring visit
2011-11-05Rodent inspection: Bait applied
2011-10-30311: Taxi Complaint — Driver Complaint
2011-10-28Job filed: MODIFICATION OF EXISTING MECHANICAL SYSTEMS AS PER PLANS SUBMITTED HEREWITH. MODIFICATION OF EXISTING PLUMBING SYSTEMS AS PER PLANS SUBMITTED HEREWITH$1,786,827
2011-10-02Rodent inspection: Bait applied
2011-10-02Rodent inspection: Bait applied
2011-09-30Rodent inspection: Monitoring visit
2011-09-25Rodent inspection: Monitoring visit
2011-09-25Rodent inspection: Bait applied
2011-09-18Rodent inspection: Bait applied
2011-09-09Rodent inspection: Bait applied
2011-09-04Rodent inspection: Bait applied
2011-08-16311: Water System — Hydrant Defective (WC2)
2011-07-31Rodent inspection: Bait applied
2011-07-29Rodent inspection: Monitoring visit
2011-07-19Rodent inspection: Failed for Rat Activity
2011-07-17Rodent inspection: Monitoring visit
2011-07-17Rodent inspection: Monitoring visit
2011-07-10311: Taxi Complaint — Driver Complaint
2011-06-26Rodent inspection: Bait applied
2011-06-26Rodent inspection: Bait applied
2011-06-21311: Rodent — Condition Attracting Rodents
2011-06-11Rodent inspection: Monitoring visit
2011-06-07Rodent inspection: Failed for Rat Activity
2011-06-04Rodent inspection: Bait applied
2011-06-03Rodent inspection: Failed for Rat Activity
2011-05-31311: Sidewalk Condition — Broken Sidewalk
2011-05-28Rodent inspection: Bait applied
2011-05-24Job filed: INTERIOR PARTITIONS ON SUBCELLAR,CELLAR, 1ST AND 2ND FLOORS RELATED MECHANICAL PLUMBING ANS SPRINKLER NO CHANGE IN USE EGRESS OR OCCUPANCY$744,000
2011-05-24Job filed: INTERIOR PARTITIONS ON SUBCELLAR,CELLAR, 1ST AND 2ND FLOORS RELATED MECHANICAL PLUMBING ANS SPRINKLER NO CHANGE IN USE EGRESS OR OCCUPANCY$744,000
2011-05-19311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2011-05-18311: Illegal Parking — Posted Parking Sign Violation
2011-05-06311: Sidewalk Condition — Broken Sidewalk
2011-05-06311: Street Sign - Damaged — No Parking, Standing, Stopping
2011-04-12311: Violation of Park Rules — Unlicensed Vendors
2011-03-09Permit EW — ISSUED
2011-03-03311: Smoking — Smoking Violation
2011-03-02311: Street Condition — Defective Hardware
2011-03-02311: Street Condition — Plate Condition - Open
2011-02-17311: Water Conservation — Wasting Faucets,Sinks,Flushometer,Urinal,Etc. - Other (CWO)
2011-02-10Rodent inspection: Failed for Rat Activity
2011-02-02Job filed: INTERIOR ALTERATIONS AS PER PLANS SUBMITTED HEREWITH AT CELLAR LEVEL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$14,160
2011-01-18311: Broken Muni Meter — Coin or Card Did Not Register
2011-01-04311: Taxi Complaint — Driver Complaint
2010
2010-12-30311: Smoking — Smoking Violation
2010-12-16311: Traffic — Congestion/Gridlock
2010-12-14Permit PL — ISSUED
2010-12-07311: Street Sign - Dangling — No Parking, Standing, Stopping
2010-12-03Rodent inspection: Failed for Rat Activity
2010-12-01311: General Construction/Plumbing — Facade - Defective/Cracking (Ll11/98)
2010-12-01DOB complaint, category ?
2010-11-23311: Broken Muni Meter — No Receipt
2010-11-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTED @ TIME OF INSPECTION ENTRY,STAIRS @ NORTH ENTRANCE & ENTRANCE @ SOUTH ENTR
2010-11-17311: General Construction/Plumbing — Failure To Maintain
2010-11-17DOB complaint, category ?
2010-10-20Permit EW — ISSUED
2010-10-20Permit EW — ISSUED
2010-10-14311: Rodent — Rat Sighting
2010-10-08DOB violation VCAT1:
2010-10-08DOB violation VCAT1:
2010-10-06Job filed: REPAIR FRONT STEPS$52,635
2010-09-29Job filed: PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH FOR HOUSE TANK MODIFICATION AND REFURBISHMENT AT ROOF LEVEL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$50,000
2010-09-29Job filed: PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH FOR HOUSE TANK MODIFICATION AND REFURBISHMENT AT ROOF LEVEL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$50,000
2010-09-08Job filed: SPRINKLER MODIFICATIONS TO FIRST FLOOR SPACE IN EXISTING COURT BUILDING. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, $11,000
2010-08-31Permit EW — ISSUED
2010-07-21Rodent inspection: Failed for Rat Activity
2010-07-13311: Taxi Complaint — Driver Complaint
2010-07-10311: Broken Muni Meter — Coin or Card Did Not Register
2010-06-09311: Food Establishment — Rodents/Insects/Garbage
2010-06-03311: Rodent — Rat Sighting
2010-06-02311: Rodent — Rat Sighting
2010-05-29311: Rodent — Rat Sighting
2010-05-07Permit EW — ISSUED
2010-05-07Permit EW — ISSUED
2010-05-03311: Broken Muni Meter — Missing/Stump
2010-04-26311: Broken Muni Meter — No Receipt
2010-04-20ECB CLASS - 3 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPT RECORDS. NOTED: TEMP C OF O #85287 HAS EXPIRED
2010-03-22Permit EW — ISSUED
2010-03-18Job filed: SPRINKLER WORK AS PER PLANS SUBMITTED HEREWITH AT CELLAR LEVEL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$12,500
2010-03-18Permit EW — ISSUED
2010-03-15Job filed: NEW ACOUSTICAL TILE SUSPENDED CEILING ON PORTION OF NINTH FLOOR.$60,000
2010-03-15Job filed: NEW ACOUSTICAL TILE SUSPENDED CEILING ON PORTION OF NINTH FLOOR.$60,000
2010-03-15Job filed: NEW ACOUSTICAL TILE SUSPENDED CEILING ON PORTION OF NINTH FLOOR.$60,000
2010-03-12311: Asbestos — Asbestos Complaint (B1)
2010-03-12311: Indoor Air Quality — Other (Explain Below)
2010-03-12311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2010-03-09311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2010-03-09DOB complaint, category ?
2010-03-05311: Broken Muni Meter — No Receipt
2010-03-05311: Street Condition — Failed Street Repair
2010-03-05311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2010-03-05DOB complaint, category ?
2010-03-05ECB CLASS - 1 violation: WORK W/O A PERMIT.FOUND SPRINKLER & GAS WORK BEING DONE BY DCAS & OTHER EMPLOYEES.WORK FOR SPRINKLER BEING DONE IN CELLAR, & GAS W
2010-03-03ECB CLASS - 1 violation: FAIL MAINTAIN BLDG IN COMPLIANT MANNER:LACK OFA SYSTEM OF AUTOMATIC S PRINKLERS WHERE REQUIRED PER BC 903.2:27-954 IN CELLAR OF 10
2010-03-02311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2010-03-02DOB complaint, category ?
2010-02-18311: Traffic/Illegal Parking — Posted Parking Sign Violation
2010-02-17311: Snow — E9 Snow / Icy Sidewalk
2010-02-05DOB violation E:
2010-02-05DOB violation E:
2010-02-05DOB violation E:
2010-02-05DOB violation E:
2010-02-05DOB violation E:
2010-02-05DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-04DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-03DOB violation E:
2010-02-02DOB violation E:
2010-02-02DOB violation E:
2010-02-02DOB violation E:
2010-02-02DOB violation E:
2010-02-02DOB violation E:
2010-02-02DOB violation E:
2010-01-26Rodent inspection: Failed for Rat Activity
2009
2009-12-16Permit EW — ISSUED
2009-12-16Permit EW — ISSUED
2009-11-05Rodent inspection: Passed
2009-10-21DOB complaint, category ?
2009-10-21DOB complaint, category ?
2009-10-21DOB complaint, category ?
2009-10-16Job filed: REPLACEMENT OF EXISTING CHILLERS IN CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,360,000
2009-09-30Job filed: INSTALLATION OF FM-200 SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$15,000
2009-09-30Job filed: INSTALLATION OF FM-200 SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$15,000
2009-09-29ECB CLASS - 1 violation: 50, 51.CLEANER BROOKS W.T. BLR HIGH PRESSURE STEAM.50-BOILER IN OPERATION ON 9/26/09 EXPERIENCED PLANE FAILURE AND AUTOMATICALLY S
2009-09-28Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$9,000
2009-09-28Job filed: WALL REPAIR, CEILING REPAIR, AND FIRE STOPPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$24,000
2009-09-28Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$9,000
2009-08-14Permit EW — ISSUED
2009-08-11Permit EW — ISSUED
2009-08-11Permit EW — ISSUED
2009-06-30Job filed: REMOVE 4 PEACTION SYSTEM AND CONVERT TO WET SYSTEM AS PER PLANS.$12,000
2009-06-08Facade (LL11) filing, cycle 6: SAFE
2009-05-13DOB complaint, category ?
2009-05-13ECB CLASS - 1 violation: 29B1.29B1 ADJUST CLOSING SPEED OF BI-PARTING CAR DOORS
2009-03-19DOB violation C:
2009-03-17DOB violation E:
2009-03-17DOB violation E:
2009-03-17DOB violation E:
2009-03-17DOB complaint, category ?
2009-03-16DOB violation E:
2009-03-16DOB violation E:
2009-02-27DOB violation LL1081:
2009-02-27DOB violation LL1081:
2009-01-09ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED FIFTH ROUND REPORT ACCEPTABLE TO THIS DEPTINDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT
2008
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-27DOB violation E:
2008-10-23DOB violation E:
2008-10-23DOB violation E:
2008-10-23DOB violation E:
2008-10-23DOB violation E:
2008-10-23DOB violation E:
2008-10-23DOB violation E:
2008-10-23DOB violation E:
2008-09-10Job filed: DEEP CONCRETE SPALL REPAIR & CRACKED STONE REPLACEMENT. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$110,000
2008-08-13Job filed: UPGRADE EXISTING KITCHEN FIRE SUPPRESSION SYSTEM, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$3,000
2008-08-07DOB complaint, category ?
2008-06-04DOB complaint, category ?
2008-06-04ECB Non-Hazardous violation: SEC 27-1015 1. NO PERMIT FOR SIDEWALK SHED 2. DESIGN DRAWING FOR SIDEWALK SHED NOT KEPT ON SITE. REMEDY: OBTAIN PERMIT FOR SIDEWAL$800
2008-05-09Permit EQ — ISSUED
2008-05-09Permit EW — ISSUED
2008-04-24Permit PL — ISSUED
2008-04-21DOB violation E:
2008-04-18DOB violation E:
2008-04-18DOB violation E:
2008-04-18DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-17DOB violation E:
2008-04-02Permit EW — ISSUED
2008-03-28Permit EW — ISSUED
2008-03-28Permit EW — ISSUED
2008-02-29Job filed: PA
2008-02-29Job filed: PA
2008-02-27Job filed: INSTALLATION OF MODFIED CLASS E SYSTEM, TO INCLUDE NEW SMOKE DETECTORS, MANUAL PULL STATIONS, SPEAKERS/STROBES, STROBE LIGHT, ADDRESSABLE MONITOR AND $2,750,000
2008-01-23Job filed: INSTALLING TELECOMMUNICATIONS CABINETSRELATED DUNNAGE & RELATED ANTENN AS ON ROOF IN CONFORMANCE WITH TPPN #5/98. NO CHANGE IN USE, EGRESS OR OCCU$25,000
2007
2007-12-06Permit EW — ISSUED
2007-12-06Permit PL — ISSUED
2007-11-30DOB violation LL1198:
2007-11-20Job filed: REMOVAL OF OLD SPRINKLER PIPING HEADS IN COURT ROOM 1300-1301, JUDGES RO OM, JURY ROOM, AND RE-INSTALL NEW PIPING AND HEADS. ADD SPRINKLER HEADS IN BA$60,000
2007-11-20Job filed: REMOVAL & REPLACEMENT OF ALL INTERIOR FINISHES IN ROOMS 1308 AND 1310. R ELOCATE EXISTING TOILETS INTO NEW LOCATION, AS SHOWN ON PLANS. NO CHANGE $26,000
2007-11-09Facade (LL11) filing, cycle 6: SAFE
2007-10-30DOB violation E:

Support this site Back to the building page