6 Harrison Street · Manhattan · BBL 1001817503
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$2,500 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
12 service requests in the last three years. Most common: Illegal Parking (3) · New Tree Request (2) · Street Sign (1) · Obstruction (1) · Taxi Complaint (1) · Illegal Dumping (1).
Filed construction activity
$5,084,200 in permitted construction work filed since
2016 (24 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$0
$0
2026
$4,651,093
$2,092,992
2027
$4,769,093
$2,146,092
Tax exemptions on the roll: SENIOR CITIZEN HOMEOWNER
Building systems
Energy grade (LL33)
D — ENERGY STAR score 24/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 10)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Franklin St — 1 · 550 ft straight-line (about a 3-minute walk) · station accessibility: none Chambers St — 1 2 3 · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Harrison St / Hudson St — M20 · 100 ft
Citi Bike
Harrison St & Hudson St · 50 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
12 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
$17,226,974
2022-01-14
Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK
$18,375,000
2022-01-14
Mortgage $2,400,000 — from 6H CCC OWNER LLC to HANMI BANK
$2,400,000
2022-01-14
Mortgage $225,000 — from 6H CCC OWNER LLC to HANMI BANK
$225,000
2022-01-14
AL&R $21,000,000 — from 6H CCC OWNER LLC to HANMI BANK
$21,000,000
2022-01-14
Mortgage $2,400,000 — from 6H CCC OWNER LLC to HANMI BANK
$2,400,000
2022-01-14
Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK
$18,375,000
2022-01-14
Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK
$18,375,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
2024
52
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
3
1
0
0
18
22
2018
5
1
1
0
10
17
2019
2
1
4
0
8
15
2020
7
3
7
0
4
21
2021
3
1
4
8
3
19
2022
2
2
1
22
2
29
2023
4
1
5
0
2
12
2024
4
3
3
0
4
14
2025
17
2
6
24
3
52
2026
14
1
2
0
2
19
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Elevator permit: Furnish and install one (1) Limited Use Limited Application (LULA) type elevator as detailed in the attached drawings. All work to
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04
TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-11-06
Permit Plumbing — Permit Issued
2025-10-31
Facade (LL11) filing, cycle 10: SWARMP
The full timeline
2026
2026-10-14311: Street Condition — Blocked - Construction
2026-07-16DOB complaint, category ?
2026-06-12Permit Mechanical Systems — Permit Issued
2026-06-12Permit Structural — Permit Issued
2026-06-09Permit General Construction — Permit Issued
2026-06-02Restaurant inspection: JUNGSIK — grade A
2026-05-29Job filed: General construction work associated with the combination of a combined commercial space. There is no proposed change to use or occupancy.$1,149,150
2026-05-29Permit Mechanical Systems — Permit Issued
2026-05-29Permit Structural — Permit Issued
2026-05-29Permit General Construction — Permit Issued
2026-05-21Permit Sprinklers — Permit Issued
2026-05-21Permit Sprinklers — Permit Issued
2026-05-21Permit Plumbing — Permit Issued
2026-05-21Permit Plumbing — Permit Issued
2026-05-02Permit Sprinklers — Permit Issued
2026-04-27Permit Mechanical Systems — Permit Issued
2025-12-09Elevator permit: Furnish and install one (1) Limited Use Limited Application (LULA) type elevator as detailed in the attached drawings. All work to$64,291
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Mortgage satisfied — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04Agreement $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04AL&R $17,226,974 — from 6H CCC OWNER LLC to HANMI BANK$17,226,974
2025-12-04TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-12-04TL&R — from 6H CCC OWNER LLC to HANMI BANK
2025-11-06Permit Plumbing — Permit Issued
2025-10-31Facade (LL11) filing, cycle 10: SWARMP
2025-10-15311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2025-10-15DOB complaint, category ?
2025-10-14Job filed: Sprinkler work associated with the renovation of a combined commercial space. No change to use, egress, or occupancy.$97,800
2025-10-10Permit General Construction — Permit Issued
2025-10-10Permit Structural — Permit Issued
2025-10-08Job filed: Plumbing work associated with the combination of a commercial space. No change to use, egress, or occupancy.$154,850
2025-10-07Job filed: Mechanical work associated with the renovation of a combined commercial space. No change to use, egress, or occupancy.$97,800
2025-07-23Job filed: Structural work associated with the installation of new communicating stairs in a combined commercial space.$448,250
2025-07-21Job filed: General construction work associated with the combination of a combined commercial space. There is no proposed change to use or occupancy.$1,149,150
2025-07-08311: Illegal Dumping — Removal Request
2025-07-07311: Taxi Complaint — Driver Complaint - Non Passenger
2025-05-12Permit Structural — Permit Issued
2025-05-11Job filed: INSTALL SPRINKLER BRANCH LINES TO ADD NEW SPRINKLER HEADS AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$7,200
2025-05-09Permit Mechanical Systems — Permit Issued
2025-05-09Permit General Construction — Permit Issued
2025-05-01Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY$10,000
2025-05-01Job filed: SUPPORT FOR NEW ADA LIFT FROM 1ST TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY$100,000
2025-05-01Job filed: REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, FLOOR SLAB AND CEILINGS. RENOVATION WORK TO EXTERIOR STOREFRONT AND REAR WALL OPENING FOR NE$10,000
2025-05-01Job filed: REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNITS AND RELATED MECHANICAL PIPING, INCLUDING NEW LOUVER AT EXTETIOR REAR WALL. NO CHANGE$200,000
2025-05-01Job filed: REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY$10,000
2025-04-18311: Illegal Parking — Blocked Hydrant
2025-04-08ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT$2,500
2025-03-27Boiler inspection
2025-01-17Agreement — from HANMI BANK to DFSTRIBECA LLC
2025-01-17Agreement — from HANMI BANK to DFSTRIBECA LLC
2025-01-17Agreement — from HANMI BANK to DFSTRIBECA LLC
2025-01-17Agreement — from HANMI BANK to DFSTRIBECA LLC
2024
2024-10-22Restaurant inspection: JUNGSIK — grade A
2024-08-30Job filed: Fashion show and accessory backstage.
2023-08-20311: Illegal Parking — Paper License Plates
2023-07-17Job filed: REPLACEMENT OF AIR-HANDLING UNIT AT EXISTING RESTAURANT (1ST FLOOR CEILING LEVEL). NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.$10,000
2023-06-23Permit Mechanical Systems — Signed-off
2023-06-22Job filed: REPLACEMENT OF AIR-HANDLING UNIT AT EXISTING RESTAURANT (1ST FLOOR CEILING LEVEL). NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.$10,000
2023-06-15311: Street Sweeping Complaint — Inadequate Sweeping
2022-04-01ECB CLASS - 2 violation: FRESH AIR LOUVERS DIRTY, BOILER JACKET CORROADED, AND NO REMOTE DOOR SWITCH. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE $312
2022-03-02Permit General Construction — Signed-off
2022-02-25Job filed: REMOVAL OF INTERIOR PARTITIONS AS SHOWN ON DRAWINGS FILED HEREWITH.$15,000
2022-02-08SAGE — from CWA LOCAL 1180 ADMINISTRATIVE FUND; HAMNI BANK to 6H CCC OWNER LLC
2022-02-08SAGE — from CWA LOCAL 1180 ADMINISTRATIVE FUND; HAMNI BANK to 6H CCC OWNER LLC
2022-01-14Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK$18,375,000
2022-01-14Mortgage $2,400,000 — from 6H CCC OWNER LLC to HANMI BANK$2,400,000
2022-01-14Mortgage $225,000 — from 6H CCC OWNER LLC to HANMI BANK$225,000
2022-01-14AL&R $21,000,000 — from 6H CCC OWNER LLC to HANMI BANK$21,000,000
2022-01-14Mortgage $2,400,000 — from 6H CCC OWNER LLC to HANMI BANK$2,400,000
2022-01-14Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK$18,375,000
2022-01-14Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK$18,375,000
2022-01-14AL&R $21,000,000 — from 6H CCC OWNER LLC to HANMI BANK$21,000,000
2022-01-14Mortgage $225,000 — from 6H CCC OWNER LLC to HANMI BANK$225,000
2022-01-14Mortgage $2,400,000 — from 6H CCC OWNER LLC to HANMI BANK$2,400,000
2022-01-14AL&R $21,000,000 — from 6H CCC OWNER LLC to HANMI BANK$21,000,000
2022-01-14AL&R $21,000,000 — from 6H CCC OWNER LLC to HANMI BANK$21,000,000
2022-01-14Mortgage $225,000 — from 6H CCC OWNER LLC to HANMI BANK$225,000
2022-01-14Mortgage $18,375,000 — from 6H CCC OWNER LLC to HANMI BANK$18,375,000
2022-01-14Mortgage $225,000 — from 6H CCC OWNER LLC to HANMI BANK$225,000
2022-01-14Mortgage $2,400,000 — from 6H CCC OWNER LLC to HANMI BANK$2,400,000
2022-01-06PAT — from 6H CCC OWNER LLC to BD OF MGRS OF NY MERCANTILE EXCHANGE BLD
2022-01-06PAT — from 6H CCC OWNER LLC to BD OF MGRS OF NY MERCANTILE EXCHANGE BLD
2022-01-06PAT — from 6H CCC OWNER LLC to BD OF MGRS OF NY MERCANTILE EXCHANGE BLD
2022-01-06PAT — from 6H CCC OWNER LLC to BD OF MGRS OF NY MERCANTILE EXCHANGE BLD
2021-12-03Deed $8,500,000 — from SECURITY BENEFITS FUND; MUNICIPAL MANAGEMENT SOCIETY LOCAL 1180 to 6H CCC OWNER LLC$8,500,000
2021-12-03Deed $14,000,000 — from MEMBERS ANNUITY FUND; CWA LOCAL 1180 MEMBERS' ANNUITY FUND; COMMUNICATIONS WORKERS OF AMER to 6H CCC OWNER LLC$14,000,000
2021-12-02Deed $8,500,000 — from SECURITY BENEFITS FUND; MUNICIPAL MANAGEMENT SOCIETY LOCAL 1180 to 6H CCC OWNER LLC$8,500,000
2021-12-01Deed $4,000,000 — from RETIREES BENEFIT TRUST; COMMUNICATION WORKERS OF AMERICA LOCAL; 1180 RETIREES BENEFITS FUN to 6H CCC OWNER LLC$4,000,000
2021-11-19Sold for $8,500,000$8,500,000
2021-11-19Sold for $4,000,000$4,000,000
2021-11-19Sold for $14,000,000$14,000,000
2021-11-19Sold for $8,500,000$8,500,000
2021-07-14Job filed: Remove and install units, duct work, piping and related components. No change to use, egress or occupancy.$190,000
2021-06-16Cooling tower inspection
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-03-18311: Non-Residential Heat — Inadequate or No Heat
2021-03-18Permit Mechanical Systems — Signed-off
2021-01-13Boiler inspection — defects found
2021-01-13Boiler inspection
2021-01-13Permit Mechanical Systems — Signed-off
2021-01-08311: Outdoor Dining — Sidewalk Zone Blocked
2021-01-08311: Outdoor Dining — Sidewalk Zone Blocked
2020
2020-12-13311: Street Condition — Blocked - Construction
2020-12-08Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2020-12-06311: Outdoor Dining — Sidewalk Zone Blocked
2020-10-20311: General Construction/Plumbing — Building Permit - None
2020-10-20DOB complaint, category ?
2020-10-14Permit Mechanical Systems — Signed-off
2020-10-09Permit Sprinklers — Signed-off
2020-10-09Permit Plumbing — Signed-off
2020-09-30Permit EW — RE-ISSUED
2020-09-29Job filed: Remove and install units, duct work, piping and related components. No change to use, egress or occupancy.$190,000
2020-09-29Job filed: Remove, replace and install plumbing fixtures and related piping. Remove and install new sprinkler heads and a temporary loop. No change to use, egres$85,000
2020-09-24311: Street Condition — Defective Hardware
2020-09-11Job filed: INTERIOR RENOVATIONS TO THIRD AND FOURTH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$675,000
2020-07-23DOB violation E:
2020-07-23DOB violation E:
2020-05-08311: Street Condition — Defective Hardware
2020-04-15311: Homeless Street Condition — N/A
2020-04-14311: Homeless Person Assistance — N/A
2020-03-13Boiler inspection
2020-03-13Boiler inspection
2020-02-20Cooling tower inspection
2019
2019-12-11311: Mold — Public Complaint - Comm Location
2019-12-11311: Mold — Public Complaint - Comm Location
2019-09-30Facade (LL11) filing, cycle 8: SAFE
2019-08-24311: Food Poisoning — 1 or 2
2019-08-02Elevator permit: Modernize 2 (two) devices. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1-2000/2003 code section 2.16$285,605
2019-07-17Elevator permit: Modernize 2 (two) devices. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1-2000/2003 code section 2.16$285,605
2019-06-25Permit EW — ISSUED
2019-06-25Permit EW — ISSUED
2019-04-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
2019-04-23Elevator permit: Modernize 2 (two) devices. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1-2000/2003 code section 2.16$285,605
2017-06-22ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000004386 HAS BEEN INSPECTED,TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HA$5,000
2017-02-15Job filed: REMOVAL OF PARTITIONS, CEILINGS AND DOORS. PATCHING AND PAINTING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2016
2016-12-21Deed $10,850,000 — from PAMBASSAB, LTD to CWA LOCAL 1180 MEMBERS' ANNUITY FUND$10,850,000
2016-12-14TOLCC — from THE BOARD OF MANAGERS AT THE NEW YORK ME to PAMBASSAH, LTD
2016-12-07Sold for $10,850,000$10,850,000
2016-12-04311: Illegal Parking — Blocked Bike Lane
2016-11-03Rodent inspection: Passed
2015
2015-09-21311: Curb Condition — Broken Curb
2015-09-19311: Noise — Noise: Construction Before/After Hours (NM1)
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-06-21Permit EQ — ISSUED
2013-05-05311: Taxi Complaint — Driver Complaint
2013-04-01Permit EW — ISSUED
2013-03-29Permit AL — ISSUED
2013-03-29Permit EQ — ISSUED
2013-03-26Permit EQ — ISSUED
2013-03-26Permit EQ — ISSUED
2013-03-20Permit EQ — ISSUED
2013-02-07Rodent inspection: Passed
2013-02-01311: Water System — Dirty Water (WE)
2012
2012-09-25311: General Construction/Plumbing — Accident - Construction/Plumbing
2012-09-25DOB complaint, category ?
2012-09-05311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2012-08-23311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2012-08-21AL&R $3,550,000 — from FRANKLIN CREDIT MANAGEMENT CORPORATION to COMMUNICATIONS WORKERS OF AMERICA LOCAL $3,550,000
2012-08-21Mortgage $3,000,000 — from FRANKLIN CREDIT MANAGEMENT CORPORATION to COMMUNICATIONS WORKERS OF AMERICA LOCAL $3,000,000
2012-08-14Permit AL — ISSUED
2012-07-20ADEC — from THE NEW YORK MERCANTILE EXCHANGE BUILDIN
2012-07-20ADEC — from THE NEW YORK MERCANTILE EXCHANGE BUILDIN
2012-07-20ADEC — from THE NEW YORK MERCANTILE EXCHANGE BUILDIN
2012-07-20ADEC — from THE NEW YORK MERCANTILE EXCHANGE BUILDIN
2012-07-20ADEC — from THE NEW YORK MERCANTILE EXCHANGE BUILDIN
2012-07-20ADEC — from THE NEW YORK MERCANTILE EXCHANGE BUILDIN
2012-07-20Permit EQ — ISSUED
2012-07-19Job filed: PROPOSED INSTALLATION OF DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-19Job filed: PROPOSED INSTALLATION OF DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-07-18DOB complaint, category ?
2012-07-18Permit EQ — ISSUED
2012-06-28Permit EQ — ISSUED
2012-06-27Job filed: INSTALLATION OF 1,000 LBS MATERIAL HOIST AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-06-19Permit EW — ISSUED
2012-06-12Permit EW — ISSUED
2012-06-05AL&R $3,550,000 — from JAMES THOMAS REALTY LLC to COMMUNICATIONS WORKERS OF AMERICA LOCAL $3,550,000
2012-06-05Mortgage $3,000,000 — from JAMES THOMAS REALTY LLC to COMMUNICATIONS WORKERS OF AMERICA LOCAL $3,000,000
2012-06-05CORRD — from AXON ASSOCIATES, INC to FRANKLIN CREDIT MANAGEMENT CORPORATION
2012-06-05CORRD — from RMTS ASSOCIATES, INC. to FRANKLIN CREDIT MANAGEMENT CORPORATION
2012-06-05Agreement $3,550,000 — from JAMES THOMAS REALTY LLC to COMMUNICATIONS WORKERS OF AMERICA LOCAL $3,550,000
2012-06-05Mortgage assigned — from COMMUNICATIONS WORKERS OF AMERICA LOCAL to COMMUNICATIONS WORKERS OF AMERICA LOCAL
2012-05-23DOB complaint, category ?
2012-05-17Job filed: INSTALLATION OF TEMPORARY SHORING AS PER PLANS. DURING REMEDIAL REPAIR, WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE 2008,CHAPTER 33.NO CHANGES IN $6,500
2012-04-25Permit EQ — ISSUED
2012-04-18Job filed: INSTALLATION OF HEAVY DUTY STEEL PIPE SCAFFOLD AS PER PLANS. DURING REMEDIAL REPAIR, WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE 2008,CHAPTER 33.N
2012-04-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED APPROXIMATELY 210 L.F AS PER PLANS. DURING REMEDIAL REPAIR, WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE 2
2012-03-29Rodent inspection: Passed
2012-03-20Permit EQ — ISSUED
2012-03-09Permit EQ — ISSUED
2012-01-03DOB violation E:
2012-01-03DOB violation E:
2012-01-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011
2011-12-22ECB CLASS - 2 violation: FAILURE TO PAINT DEDICATED SPRINKLER & STANDPIPE PIPING/VALVES IN ACCORDANCE W/SECTION. IN THE SIX STYS COMMERCIAL BLDG DEDICATED $800
2011-09-20Job filed: EXTERIOR MASONRY RESTORATION FOR LL REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$425,650
2011-09-20Job filed: EXTERIOR MASONRY RESTORATION FOR LL REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$425,650
2011-05-20Permit EW — ISSUED
2011-05-04Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120569198 . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2011-05-04Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120569198 . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2011-04-04PREL — from JAMES THOMAS REALTY LLC to THE HUNTINGTON NATIONAL BANK
2011-04-04PREL — from FRANKLIN CREDIT MANAGEMENT CORPORATION to THE HUNTINGTON NATIOAL BANK
2011-03-31Permit EQ — ISSUED
2011-03-25Permit EQ — ISSUED
2011-03-17Permit EW — ISSUED
2011-03-17Permit EW — ISSUED
2011-02-10Rodent inspection: Passed
2011-02-07Permit PL — ISSUED
2011-01-06Permit EW — ISSUED
2011-01-06Permit EW — ISSUED
2010
2010-12-30Job filed: INTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT. WORK INCLUDING MINOR PARTITION, PLUMBING AND MECHANICAL WORKS. NO CHANGE IN USE, EG$97,000
2010-12-17ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT.INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT$1,000
2010-11-13311: Illegal Parking — Blocked Sidewalk
2010-09-17ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT$4,000
2010-08-18Deed $2,100,000 — from GIROLLE INC. to SEONG JI AMERICA, INC.$2,100,000
2010-05-12Rodent inspection: Passed
2010-04-28Job filed: INSTALLATION OF SCAFFOLDING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY GROUP OR EGRESS.
2010-04-28Permit EQ — ISSUED
2010-04-06311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-04-06DOB complaint, category ?
2010-04-06Job filed: INSTALLATION OF 210 FOOT LONG SIDEWALK SHED AS PER PLANS SUBMITTED HEREWITH. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE I
2010-04-06Job filed: INSTALLATION OF 210 FOOT LONG SIDEWALK SHED AS PER PLANS SUBMITTED HEREWITH. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE I
2010-04-06Job filed: INSTALLATION OF 210 FOOT LONG SIDEWALK SHED AS PER PLANS SUBMITTED HEREWITH. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2008 CODE. NO CHANGE I
2010-04-06Permit EQ — ISSUED
2010-03-10Permit EQ — ISSUED
2010-02-22311: Street Light Condition — Street Light Out
2010-02-08311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-02-08DOB complaint, category ?
2010-01-26ECB CLASS - 2 violation: B206BC3301.9.5 FAILURE TO PROVIDE CONTRACTORS SOGN ON SIDEWALK SHED WITH PERMIT INFORMATION ON ALL FRONTS NOTED SHED AT EXP#1,4 UN
2010-01-17311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-01-17DOB complaint, category ?
2009
2009-11-06ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT$4,000
2009-08-11Mortgage satisfied — from AXON ASSOCIATES INC to CITIBANK NA
2009-06-05Agreement $7,500,000 — from FRANKLIN CREDIT MANAGEMENT CORPORATION to THE HUNTINGTON NATIONAL BANK$7,500,000
2009-05-22ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT$4,000
2009-04-16Mortgage $3,000,000 — from JAMES THOMAS REALTY CORP. to THE HUNTINGTON NATIONAL BANK$3,000,000
2009-03-25DOB violation E:
2009-03-25DOB violation E:
2009-03-14Permit EQ — ISSUED
2009-01-30DOB complaint, category ?
2009-01-20ECB CLASS - 2 violation: FAILURE TO PROVIDE REQUIRED SIGNAGE AND INFORMATION ON SIDEWALK SHED. NOTED: MISSING PERMIT NUMBER AND EXPIRATION DATE ON SIGN. RE
2009-01-09ECB CLASS - 2 violation: FAILURE TO FILE TO AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITION DESCRIBED IN IN$4,000
2008
2008-11-10Mortgage satisfied — from AXON ASSOCIATES, INC. to EUROPEAN AMERICAN BANK; OLYMPIAN BANK; CITIBANK, N.A., SUCCESSOR IN INTEREST
2008-10-02Mortgage satisfied — from FRANKLIN CREDIT MANAGEMENT CORPORATION to CITIBANK, N.A.
2008-09-25ECB CLASS - 1 violation: FAILURE TO FILE AFFIDAVITS AND/OR COMPLY WITH OTHER REQUIREMENTS SET FORTH FOR PHOTO LUMINESCENT EXIT PATH MARKING. REMEDY: COMPLY$2,400
2008-08-25Mortgage $7,500,000 — from FRANKLIN CREDIT MANAGMENT CORPORATION to THE HUNTINGTON NATIONAL BANK$7,500,000
2008-04-15DOB violation E:
2008-04-15DOB violation E:
2008-04-08Permit EQ — ISSUED
2008-03-28ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIA$2,500
2008-03-07DOB complaint, category ?
2008-01-03DOB violation LL6291:
2007
2007-06-27Permit EQ — ISSUED
2007-06-25DOB violation L1198:
2007-06-20Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 210' DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2007-06-20Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 210' DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2007-02-21Facade (LL11) filing, cycle 6: SAFE
2007-01-19DOB violation LL6291:
2006
2006-11-01DOB violation LL2604:
2006-03-17Permit AL — ISSUED
2006-01-06DOB violation LL6291:
2005
2005-10-28Permit PL — ISSUED
2005-10-28Permit EW — ISSUED
2005-10-24Job filed: DISCONNECT TWO (2) MODULES FROM EXISTING SIX (6) MODULE SLANT FIN BOILER. REPLACE ONE OF THE REMAINING MODULES. WORK TO CORRECT ECB VIOLATION #320481$4,500
2005-05-25ECB Non-Hazardous violation: B4B/4A/19B/32A/50A 50 NEED METAL COVER ON BREECHING OPENINGS$800
2005-05-25ECB Non-Hazardous violation: B4A/32A/50A/50B 50A-BACK FLOW PREVENTOR IS LEAKING WATER 50B-NEED METAL COVER ON BREAKING OPENINGS$350
2005-01-31DOB violation LL6291:
2004
2004-12-20ECB Non-Hazardous violation: 58M7/17I10/38M07/71M07/64Q03/52M07/84A15 58- MISSING BRAKE COVER 17- HOIST WAY DOOR GIBS DAMAGED ON 6TH FLOOR. 38- CAR TOP LIGHT U$180
2004-12-20ECB Non-Hazardous violation: 58M7/#Q06/*D06/38Q07/52U07/35M07/64X10/64Q3/84A15 58- MISSING BRAKE COVER- # OPEN THROUGH COVERS IN MACHINE ROOM, CLOSE. *-MACHINE$180
2004-11-15LOCC — from PAMBASSAH, LTD. to THE NEW YORK MERCANTILE EXCHANGE
2001-05-16ECB Non-Hazardous violation: 13M07,37G12,50F11,46B01,40O02,74M01. 13- PROVIDE MIRRIOR IN CAB. 37- USE PROPER FUSES. 50- MAIN MACHINE SHEAVE ROCKS AT FLOORS ST$350
2000-03-21ECB Hazardous violation: FAILURE TO INSTALL AN ACCEPTABLE TWO WY VOICE COMMUNICATION SYSTEM WITH CENTRAL STATION CONNECTION . REMEDY: PROVIDE EITHER TR-1 F$1,000
2000-03-08Job filed: TO RENOVATE EXISTING OFFICE SPACE. NO CHANGE IN USE, EGRESS, OR OCCPANCY.$100,000
2000-03-08Job filed: TO RENOVATE EXISTING OFFICE SPACE. NO CHANGE IN USE, EGRESS, OR OCCPANCY.$40,000
2000-03-08Job filed: TO RENOVATE EXISTING OFFICE SPACE. NO CHANGE IN USE, EGRESS, OR OCCPANCY.$40,000
2000-03-08Job filed: TO RENOVATE EXISTING OFFICE SPACE. NO CHANGE IN USE, EGRESS, OR OCCPANCY.$100,000
2000-02-07DOB violation LL6291:
1999
1999-12-29Permit EW — ISSUED
1999-11-30Permit EW — ISSUED
1999-09-23Permit EW — ISSUED
1999-07-26ECB Hazardous violation: FAILURE TO INSTALL AN ACCEPTABLE 2-WAY VOICE COMMUNICATION SYSTEM WITHCENTRAL STATION CONNECTION. REMEDY: PROVIDE EITHER TR-1 FOR$5,000
1999-03-16DOB violation LL6291:
1999-02-12Permit EW — ISSUED
1999-02-12Permit AL — ISSUED
1999-02-11Permit PL — ISSUED
1999-02-02Mortgage $150,000 — from FRANKLIN CREDIT MANAGEMENT CORPORATION to OLYMPIAN BANK$150,000
1999-01-08ECB Hazardous violation: FAILURE TO INSTALL ACCEPTABLE TWO-WAY VOICE COMMUNCATION SYSTEM WITH CENTRAL STATION CONNECTION. PROVIDE TR-1 FORM WITH BUILDINGD$1,000
1998
1998-07-16Permit AL — ISSUED
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-29DECL — from NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-06-12Permit EW — ISSUED
1998-03-19ECB Hazardous violation: FAILURE TO INSTALL AN ACCEPTABLE TWO-WAY VOICE COMMUNICATION SYSTEM WITH CENTRAL STATION CONNECTION.REMEDY PROVIDE EITHER TR-1 FOR$400
1998-01-30PAT — from COMMUNICATIONS WORKERS OF AMERICA ETC. to NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-01-30REL — from CITY OF NEW YORK to NEW YORK MERCANTILEEXCHANGE CONDOMINIUM
1998-01-30Deed — from KRM HOLDING CORP. to COMMUNICATION WORKERS OF AMERICA ETC.
1998-01-30REL — from KRM HOLDING CORP. to NEW YORK MERCANTILEEXCHANGE CONDOMINIUM
1998-01-30WSAT — from KRM HOLDING CORP. to ENSIGN FEDERAL SAVINGS BANK
1998-01-28PAT to NEW YORK MERCANTILEEXCHANGE BUILDING CON
1998-01-28Deed — from COMMUNICATIONS WORKERS/AMERICA to JAMES THOMAS REALTY,LLC
1998-01-28Mortgage $550,000 — from JAMES THOMAS REALTYLLC to COMMUNICATIONS WORKERS/AMERICA$550,000
1996
1996-11-25VAC — from COMMISSIONER OF FINANCE to CITY OF NEW YORK
1996-10-17DTL — from BANK OF NEW YORK
1996-10-10VAC — from COMMISSIONER OF FINANCE
1996-09-12VAC — from COMMISSONER OF FINANCE CTY OF NEW YORK to CITY OF NEW YORK
1996-07-22Mortgage assigned — from FRANKLIN CREDIT MANAGMEENT CORPORATION to OLYMPIAN BANK
1996-07-22Mortgage $90,000 — from FRANKLIN CREDIT MANAGEMENT CORPORATION to OLYMPIA BANK$90,000
1996-07-22Agreement — from FRANKLIN CREDIT MANAGEMENT CORPORATION to OLYMPIAN BANK
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1996-01-04SAGE — from MERCANTILE EXCHANGEBUILDING CONDOMINIUM
1995
1995-12-28Deed — from AXON ASSOCIATES INC. to FRANKLIN CREDIT MANAGEMENT CORPORATION
1995-12-28Deed — from RMTS ASSOCIATES INC. to FRANKLIN CREDIT MANAGEMENT CORPORATION
1995-12-13Mortgage satisfied — from GIROLLE, INC. to NATIONAL WESTMINSTERBANK USA
1995-12-13SAGE — from NATWEST BANK, NA
1995-11-08ECB Non-Hazardous violation: ALTERED BLDG OCCUPIED WITHOUT A VALID C OF O AS REQUIRED UNDER ALT 1634/85.LOCATION RESTAURAN,FLOORS 1 THRU 8.REMEDY:OBTAIN A VALI
1995-10-23Deed — from AXON ASSOCIATES INC. to FRANKLIN CREDIT MANAGEMENT CORPORATION; AXON ASSOCIATES INC.; RMTS ASSOCIATES INC.
1995-08-29DOB violation LL6291:
1995-08-14ECB Non-Hazardous violation: 37R,35O,50O,74R,40R,74R.37-REMOVE JUMPERS OFF OF CONTROLLER.74-REMOVE EXSPOSED WIRE RUNING IN HOISTWAY AND PROPERTY ENCLOSE.40-REM
1995-01-06ECB Non-Hazardous violation: ALTERED BLDG OCCUPIED WITHOUT A VALID C OF O ALT.1634/85.RESTAURANT-COMMERCIAL ENTIRE.REMEDY;OBTAIN A VALID C OF O,DISCONTINUE ILL
1994
1994-09-01DOB violation LL6291:
1994-07-25SAGE — from NEW YORK MERCANTILEEXCHANGE CONDO
1994-07-25PAT — from PAMBASSAB, LTD to NEW YORK MERCANTILEEXCHANGE BUILDING CON
1994-07-25Mortgage satisfied — from RPI 6 HARRISON STREET LIMITED PARNERSHIP to ENSIGN BANK
1994-07-25Mortgage satisfied — from RPI 6 HARRISON STREET LIMITED PARNERSHIP to ENSIGN BANK
1994-07-25Deed — from RPI 6 HARRISON STREET LIMITED PARTNERSHI to PAMBASSAB, LTD
1994-07-25Mortgage satisfied — from RPI 6 HARRISON STREET LIMITED PARNERSHIP to ENSIGN BANK
1994-06-06SAGE — from RESOLUTION TRUST CORPORATION
1994-06-06Mortgage assigned — from RESOLUTION TRUST CORPORATION RCVR. to PAMBASSAB, LTD
1994-06-06Mortgage assigned — from RESOLUTION TRUST CORPORATION RCVR. to PAMBASSAB, LTD
1994-06-06Mortgage assigned — from RESOLUTION TRUST CORPORATION RCVR. to PAMBASSAB, LTD
1994-06-06Mortgage assigned — from RESOLUTION TRUST CORPORATION RCVR. to PAMBASSAB, LTD
1994-05-13Mortgage satisfied — from COMTRAD INC. to ENSIGN BANK FSB
1994-05-13Mortgage satisfied — from COMTRAD INC. to ENSIGN BANK, FSB
1994-05-13Mortgage satisfied — from COMTRAD INC. to ENSIGN BANK FSB
1994-05-13Mortgage satisfied — from COMTRAD INC. to ENSIGN BANK, FSB
1994-05-12DOB violation C:
1994-05-12DOB violation C:
1994-05-09Deed — from COMTRAD, INC. to MUNICIPAL MGMT SOCIETY LOCAL 1180 ETC.
1994-05-09PAT — from COMTRAD INC. to MELKONIAN, VAHE M.
1994-05-09PAT — from COMTRAD INC. to MELKONIAN, VAHE M.
1994-05-09PAT — from COMMUNICATIONS WORKERS OF AMERICA ETC. to NEW YORK MERCANTILEEXCHANGE BLDG CONDO
1994-05-09Deed — from COMTRAD, INC. to COMMUNICATIONS WORKERS OF AMERICA ETC.
1994-05-09PAT — from MUNICIPAL MGMT SOCIETY LOCAL ETC. to NEW YORK MERCANTILEEXCHANGE BLDG CONDO
1994-04-21CERT — from ABI ASSET PARTNEWR L.P., VIII
1993
1993-08-10Permit EW — ISSUED
1993-08-10Permit PL — ISSUED
1993-08-10Permit EW — ISSUED
1993-06-25Mortgage $325,000 — from AXON ASSOCIATES INC to OLYMPIAN BANK$325,000
1993-06-25Mortgage assigned — from AXON ASSOCIATES INC to OLYMPIAN BANK
1993-05-28Permit EW — ISSUED
1993-05-28Permit EW — ISSUED
1993-03-25REL — from RESOLUTION TRUST CORP to KRM HOLDING CORP
1993-03-25REL — from RESOLUTION TRUST CORP to KRM HOLDING CORP
1993-03-25REL — from RESOLUTION TRUST CORP to KRM HOLDING CORP
1993-03-25REL — from RESOLUTION TRUST CORP to KRM HOLDING CORP
1993-03-25REL — from RESOLUTION TRUST CORP to KRM HOLDING CORP
1993-02-17MISC — from NEW YORK MERCANTILEETC
1993-02-17SMIS — from FRM HOLDING CORP to AXON ASSOCIATES INC.
1993-02-05Deed — from COMMISSIONER/FINANCE to CITY OF NEW YORK
1992
1992-12-03Deed — from FRM HOLDING CORP to AXON ASSOCIATES INC
1992-12-03PAT — from AXON ASSOCIATES INC to NEW YORK MERCANTILEETC
1992-12-03SAGE — from NEW YORK MERCANTILEETC
1992-07-24Mortgage assigned — from RESOLUTION TRUST CORP to ABI ASSET PARTNERS LP
1992-07-24Mortgage assigned — from RESOLUTION TRUST CORP to ABI ASSET PARTNERS LP
1991
1991-07-19Mortgage $294,319 — from KRM HOLDING CORP to ENSIGN FED SAVINGS BK$294,319
1991-07-19Mortgage $294,319 — from KRM HOLDING CORP to ENSIGN FED SAVINGS BK$294,319
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-07-16SAGE — from LANDMARKS PRSRVTN CMMSSN
1991-01-30ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. ALTERATION#1634/85. LOCATION: RESTAURANT-FLOORS ENTIRE 1 TH$1,000
1991-01-28ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYINGTO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. RED$500
1990
1990-11-16DOB violation E: #40-PERFORM 5 YR SAFETY TEST,DATE & TAG FOR SAME #74-REPAIR SHACKLE ROD AT COUNTERWEIGHT
1990-11-16DOB violation E: #15-BASEMENT HOISTWAY DOOR #40-PERFORM 5YR SAFETY TEST
1990-11-13SAGE — from NEW YORK MERCANTILEETC
1990-11-13SAGE — from NEW YORK MERCANTILEETC
1990-11-13SAGE — from NEW YORK MERCANTILEETC
1990-06-29DOB violation LL1081: 2
1989
1989-10-31REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LP
1989-10-31REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LP
1989-10-31REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LP
1989-09-20SAGE — from NEW YORK MERCANTILEETAL
1989-09-20Deed — from RPI 6 HARRISON ST LTD PS to KRM HOLDING CORP
1989-09-20SAGE — from NEW YORK MERCANTILEETAL
1989-09-20Deed — from RPI 6 HARRISON ST LTD PS to KRM HOLDING CORP
1989-09-20SAGE — from NEW YORK MERCANTILEETAL
1989-05-24MISC — from NEW YORK MRCHNTL/EXC/BLD
1989-05-24MISC — from NEW YORK MRCHNTL/EXC/BLD
1989-05-24MISC — from NEW YORK MRCHNTL/EXC/BLD
1988
1988-08-25REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LP
1988-08-25REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PT
1988-08-25REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PT
1988-08-25Mortgage assigned — from GIROLLE INC to NATIONAL WESTMINSTERBK
1988-08-25Mortgage $1,000,000 — from GIROLLE INC to NATIONAL WESTMINSTERBK$1,000,000
1988-08-25Deed — from RPI 6 HARRISON ST LP to GIROLLE INC
1988-08-25REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PT
1988-08-25REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PT
1988-08-25PAT — from GIROLLE INC to NEW YORK MERCANTILEETAL
1988-08-12MAPS — from NEW YORK MERCANTILEEXCH
1988-08-12DECL — from NY MERCANTLE EXCH BLD CD
1988-08-12DECL — from NY MERCANTLE EXCH BLD CD
1988-08-12MAPS — from NEW YORK MERCANTILEEXCH
1988-07-27EASE — from MUNICIPAL MANAGEMNTETAL; RPI 6 HARRISON ST LP; COMTRAD INC to NEW YORK MERCANTILEETAL
1988-07-27EASE — from MUNICIPAL MANAGEMNTETAL; RPI 6 HARRISON ST LP; COMTRAD INC to NEW YORK MERCANTILEETAL
1987
1987-12-28PAT — from CHELIOTES, ARTHUR TR to NY MERCANTILE EXCH CD/BD
1987-12-28Deed — from RPI 6 HARRISON ST LP to MUNICIPAL MGMT ETAL
1987-12-10Mortgage $490,000 — from RPI 6 HARRISON ST LP to ENSIGN BANK$490,000
1987-12-10Mortgage $490,000 — from RPI 6 HARRISON ST LP to ENSIGN BANK$490,000
1987-12-10Mortgage $490,000 — from RPI 6 HARRISON ST LP to ENSIGN BANK$490,000
1987-12-08Mortgage assigned — from COMTRAD INC to ENSIGN BANK FSB
1987-12-08Mortgage $400,000 — from COMTRAD INC to ENSIGN BANK FSB$400,000
1987-12-08Mortgage $1,800,000 — from COMTRAD INC to ENSIGN BANK FSB$1,800,000
1987-12-08PAT — from COMTRAD INC to MERCANTILE EXCHANGECD B
1987-12-08Agreement — from ENSIGN BANK FSB to RPI 6 HARRISON ST PRTNRS
1987-12-08REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PR
1987-12-08REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PR
1987-12-08Mortgage $400,000 — from COMTRAD INC to ENSIGN BANK FSB$400,000
1987-12-08PAT — from COMTRAD INC to MERCANTILE EXCHANGECD B
1987-12-08Mortgage assigned — from COMTRAD INC to ENSIGN BANK FSB
1987-12-08REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PR
1987-12-08REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PR
1987-12-08Agreement — from ENSIGN BANK FSB to RPI 6 HARRISON ST PRTNRS
1987-12-08Mortgage $1,800,000 — from COMTRAD INC to ENSIGN BANK FSB$1,800,000
1987-12-08REL — from ENSIGN BANK FSB to RPI 6 HARRISON ST LTD PR
1987-10-28Deed — from RPI 6 HARRISON ST LP to COMTRAD INC
1987-10-28Deed — from RPI 6 HARRISON ST LP to COMTRAD INC
1987-10-27Agreement — from ENSIGN BANK to RPI 6 HARRISON ST ETAL
1987-10-27Agreement — from ENSIGN BANK to RPI 6 HARRISON ST ETAL