Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
17 service requests in the last three years. Most common: Noise (6) · General Construction/Plumbing (3) · Water System (3) · Illegal Parking (2) · Air Quality (1) · Obstruction (1).
Filed construction activity
$317,000 in permitted construction work filed since
2016 (14 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$500,867
$225,390
2026
$2,037,399
$916,830
2027
$522,600
$235,170
The city's market estimate has risen
4% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 1/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Canal St — 6 J N Q R W Z · 750 ft straight-line (about a 4-minute walk) · station accessibility: partial Grand St — B D · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Bowery / Canal St — M103 · 650 ft
Citi Bike
Walker St & Baxter St · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
17 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2019-10-30
Agreement $650,000 — from SYSTEM REALTY INC. to FLUSHING BANK
$650,000
2019-10-30
AL&R $650,000 — from SYSTEM REALTY INC. to FLUSHING BANK
$650,000
2019-10-30
Mortgage $42,856 — from SYSTEM REALTY INC. to FLUSHING BANK
$42,856
2016-08-15
Agreement $900,000 — from UNITED ORIENT BANK to SYSTEM REALTY INC.
$900,000
2016-08-15
Mortgage $600,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK
$600,000
2016-08-15
AL&R $900,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK
$900,000
2004-12-20
Agreement $500,000 — from UNITED ORIENT BANK to SYSTEM REALTY INC.
$500,000
2004-12-20
Mortgage $300,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK
$300,000
2004-12-20
AL&R $500,000 — from UNITED ORIENT BANK to SYSTEM REALTY INC.
$500,000
2003-03-10
Mortgage $102,711 — from C.L.K. CORP ., to EASTBANK , N.A.,
$102,711
2001-07-05
Mortgage $200,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK
$200,000
2000-09-14
Mortgage $330,000 — from KEE YIP REALTY 1037LLC to CHINESE AMERICAN BANK
$330,000
2000-07-19
Mortgage $95,259 — from KEE YIP REALTY CORP to CHINESE AMERICAN BANK
$95,259
1999-10-29
Mortgage $983,912 — from KEE YIP REALTY CORP. to GREAT EASTERN BANK
$983,912
1999-10-29
Mortgage $983,912 — from KEE YIP REALTY CORP. to GREAT EASTERN BANK
$983,912
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
37
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
6
3
3
1
23
36
2018
5
7
8
0
6
26
2019
7
2
11
5
7
32
2020
0
4
12
0
3
19
2021
6
1
10
0
6
23
2022
2
1
4
0
8
15
2023
0
23
11
0
3
37
2024
0
7
5
0
4
16
2025
0
10
11
0
2
23
2026
0
4
1
0
5
10
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-03-23Job filed: INSTALL NEW SPLIT A/C SYSTEM AT 6TH FLOOR OF EXISTING 7 STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPA$10,000
2022-03-23Job filed: INSTALL NEW SPLIT A/C SYSTEM AT 5TH FLOOR OF EXISTING 7 STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPA$10,000
2022-03-01Rodent inspection: Passed
2022-02-18Facade (LL11) filing, cycle 9: SWARMP
2022-01-21311: Water System — Hydrant Running (WC3)
2021
2021-12-06Boiler inspection
2021-12-06Permit Mechanical Systems — Signed-off
2021-12-03Permit Mechanical Systems — Signed-off
2021-11-30Job filed: INSTALL NEW SPLIT A/C SYSTEM AT 6TH FLOOR OF EXISTING 7 STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPA$10,000
2021-11-29Job filed: INSTALL NEW SPLIT A/C SYSTEM AT 5TH FLOOR OF EXISTING 7 STORY BUILDING AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPA$10,000
2021-11-01311: Noise — Noise: Construction Before/After Hours (NM1)
2021-10-22311: Food Poisoning — 1 or 2
2021-10-17311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-10-08Permit Support of Excavation — Signed-off
2019-09-09Rodent inspection: Failed for Other Reason
2019-09-01Boiler inspection
2019-07-09311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2019-07-09DOB complaint, category ?
2019-07-01311: Non-Emergency Police Matter — Other (complaint details)
2019-06-26Job filed: INSTALL NEW AIR CONDITIONER IN EXISTING SEVEN STORIES BUILDING ONLY AT ROOF WITH MECHANICAL & GENERAL CONSTRUCTION WORK. NO WORK IN OTHERS FLOOR. $48,000
2019-06-26Permit EW — ISSUED
2019-06-26Permit EW — ISSUED
2019-05-10Job filed: TO INSTALL NEW METAL FLUE PIPE TO CONNECT EXISTING FLUE PIPE WITH MECHANICAL WORK AS PER PLAN FILED HERE WITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2018-07-13311: Street Light Condition — Street Light Out
2018-06-22DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
2018-06-08Permit PL — ISSUED
2018-06-05Rodent inspection: Passed
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-07Job filed: REPLACE PLUMBING FIXTURES ON THE CELLAR AND 1ST FLOOR IN ORDER TO REMOVE ECB VIOLATION# 353-061-10K. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$30,000
2018-04-30FDNY inspection (RISK)
2018-03-15Rodent inspection: Passed
2018-03-12311: Building Marshals office — Unlicensed/Illegal/Improper Work In Progress
2018-03-12311: Building Marshals office — Unlicensed/Illegal/Improper Work In Progress
2018-03-12DOB complaint, category ?
2018-03-12DOB complaint, category ?
2018-03-12ECB CLASS - 1 violation: WORK W/O PERMIT.WORK NOTED:AT TIME OF INSPECTION I OBSERVED THE REMOVE& CAPPING OF PLUMBING FIXTURES THROUGHOUT CELLAR LEVEL.THIS $1,250
2018-03-12ECB CLASS - 1 violation: ELECTRICAL WORK W/O PERMIT.WORK NOTED:AT TIME OF INSPECTION I OBSERVED AT THROUGHOUTH 1ST FL&CELLAR LEVEL,DEMO WORK IN PROGRESS RE$1,600
2018-02-21Permit EW — ISSUED
2018-02-12311: Noise - Commercial — Car/Truck Music
2018-02-08Job filed: REPLACE EXISTING CARPET FLOORING AND CEILING & LIGHTING FIXTURES; REPLACE WALLPAPER ON THE 1ST FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$46,000
2018-02-08Job filed: REPLACE EXISTING CARPET FLOORING AND CEILING & LIGHTING FIXTURES; REPLACE WALLPAPER ON THE 1ST FLOOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$46,000
2017-09-16Job filed: TO REPAIR THE FACADE OF THE BUILDING. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$25,000
2017-08-30Job filed: TO REPAIR THE FACADE OF THE BUILDING AS PER THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2017-08-03Rodent inspection: Passed
2017-07-28Mortgage satisfied — from C.L.K. CORP. to EASTBANK, N.A.
2017-06-29311: Broken Muni Meter — No Receipt
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004962 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$10,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000004972 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$10,000
2017-06-05Boiler inspection
2017-06-05Boiler inspection
2017-06-05Boiler inspection
2017-04-03Facade (LL11) filing, cycle 8: SWARMP
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2017-02-04311: Food Establishment — Food Spoiled
2017-01-05Permit EQ — ISSUED
2017-01-03Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2017-01-03Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2016
2016-12-30Permit EQ — ISSUED
2016-12-27Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2016-12-27Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2016-12-16DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
2016-12-16DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
2016-12-16DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
2016-11-22Rodent inspection: Passed
2016-08-15Agreement $900,000 — from UNITED ORIENT BANK to SYSTEM REALTY INC.$900,000
2016-08-15Mortgage $600,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK$600,000
2016-08-15AL&R $900,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK$900,000
2016-08-15TL&R — from UNITED ORIENT BANK to SYSTEM REALTY INC.
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-12DOB violation E:
2014-03-11311: Noise - Vehicle — Engine Idling
2014-02-11Facade (LL11) filing, cycle 7: SAFE
2014-02-06311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2013
2013-11-03311: Graffiti — Graffiti
2013-10-30DOB violation E:
2013-10-30DOB violation E:
2013-10-30DOB violation E:
2013-10-03311: Food Poisoning — 3 or More
2013-10-02311: Food Poisoning — 3 or More
2013-10-02311: Food Poisoning — 3 or More
2013-10-02311: Food Poisoning — 3 or More
2013-10-02311: Food Poisoning — 3 or More
2013-10-01311: Food Poisoning — 3 or More
2013-10-01311: Food Poisoning — 3 or More
2013-08-07Job filed: PROPOSED REPAIR EXIST. FACADES FROM 2ND FLOOR THRU ROOF, PATCHING, POINTING AND CAULKING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$34,750
2013-08-07Permit EW — ISSUED
2013-06-25Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY W
2013-06-25Permit EQ — ISSUED
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2012
2012-12-28Permit EW — ISSUED
2012-12-21Job filed: INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2012-04-10Rodent inspection: Passed
2012-03-28311: Food Establishment — Food Spoiled
2012-01-13311: Food Poisoning — 1 or 2
2012-01-04DOB violation E:
2012-01-04DOB violation E:
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-09-22311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2011-08-26311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2010-06-28311: Air Quality — Air: Other Air Problem (Use Comments) (AZZ)
2010-03-09DOB violation E:
2010-03-01311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2010-02-26311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2010-02-21311: Consumer Complaint — Overcharge
2010-02-05Rodent inspection: Passed
2009
2009-12-31DOB violation LBLVIO:
2009-08-13ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDOR PER
2009-08-05ECB CLASS - 2 violation: ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1-28-118.3.2. NOTED: THE FOLLOWING CONDITIONS: FINAL C/O #96798 DATE$500
2009-04-29DOB complaint, category ?
2009-04-18DOB complaint, category ?
2009-03-31DOB violation E:
2009-01-01DOB violation LL6291:
2008
2008-07-02DOB violation E:
2008-03-11Permit EW — ISSUED
2008-01-03DOB violation LL6291:
2007
2007-12-28ECB Hazardous violation: 18B,50A.50A-REPAIR HOLE IN BOILER ROOM WALL TO COMPLY W/2 HOUR FIRE RATING AS PER CODE.
2007-12-28ECB Hazardous violation: 50A,38,48B,50B.50A-ENCLOSED BOILER ROOM NOT A 2 HOUR FIRE RATTED AS PER CODE FOR HIGH PRESSURE BOILERS.50B-BOILER ROOM BEING USED $400
2007-10-01Job filed: PROPOSED STRUCTURAL & PARTITION WORKS AT 4TH, 5TH, 6TH & 7TH FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2007-06-19DOB violation E:
2007-02-16Facade (LL11) filing, cycle 6: SAFE
2007-01-19DOB violation LL6291:
2006
2006-08-31DOB violation E:
2006-06-07ECB Non-Hazardous violation: 50A,50B,18A & B. FUCTON V.T BOILER 15HP,NB57280,GAS 1989.50A BOILER ENCLOSURE INCOMPLETE. MISSING FRONT & SIDE WALL PANELS. 50B)NO
2006-03-27Job filed: PA
2006-03-27Job filed: PA
2006-01-06DOB violation LL6291:
2005
2005-11-21DOB violation E:
2005-11-15Permit PL — ISSUED
2005-11-03Permit EW — ISSUED
2005-10-27Job filed: INTERIOR RENOVATION AT EXIST. 3rd FLOOR. CEILING, FLOORING, PARTITION AND PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$45,000
2005-09-08DOB complaint, category ?
2005-01-31DOB violation LL6291:
2004
2004-12-20Agreement $500,000 — from UNITED ORIENT BANK to SYSTEM REALTY INC.$500,000
2004-12-20Mortgage $300,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK$300,000
2004-12-20AL&R $500,000 — from UNITED ORIENT BANK to SYSTEM REALTY INC.$500,000
2004-07-03Mortgage satisfied — from MOY, WAYNE; CHUNG, CHI H; MUI, SHING M to ROYAL BANK OF PENNSYLVANIA
2004-04-27DOB violation E:
2004-02-13DOB violation LL6291:
2003
2003-08-27DOB violation E:
2003-07-15ECB Non-Hazardous violation: 50A,50B.FUCTON VT BLR NB 65694,15HP, 908-FIRED, 1992 50A)SECONDRY BLOWDOWN VALVE NOT SLOW CLOSING TYPE. 50B)REMOVE EXISTING PLUG F
2003-07-15ECB Non-Hazardous violation: 50A,50B,50C,48AB. 50A)WATER COLUMN NOT ALIGNED WITH VERTICAL BOILER. 50B)SECONDARY BLOW DOWN VALVE NOT SLOW-CLOSING TYPE. 50C)NO D$2,500
2003-07-15ECB Non-Hazardous violation: 50A,50B,50C,18AB. 50A)NO DISCHARGE PIPE ON THE SAFETY VALVE 50B)SECONDARY FLOW DOWN VALVE NOT SLOW CLOSING TYPE. 50C)NO DRAIN LIN$2,500
2003-07-15ECB Non-Hazardous violation: 50A,50B.FULTON VT BLR NB63501,15HP,GAS-FIRED, 1991 50A)SCREW THREADS AT THE END OF THE SAFETY VALVE DISCHARGE PIPE. 50B)SECONDARY
2003-03-21DOB violation LL1081:
2003-03-19DOB violation LL6291:
2003-03-10Mortgage satisfied — from C.L.K. CORP . to EASTBANK , N.A .
2003-03-10Mortgage $102,711 — from C.L.K. CORP ., to EASTBANK , N.A.,$102,711
2003-03-10Agreement — from C.L.K. CORP ., to EASTBANK , N.A.,
2003-03-10AL&R — from EASTBANK , N.A., to C.L.K. CORP .,
2002
2002-12-30Permit EW — ISSUED
2002-12-12Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,000
2002-12-05Job filed: Install partitions,plumbing fixtures and HVAC system for proposed new offices on 4th floor. Change the use of 4th floor from manufacturing to new off$100,000
2002-09-19DOB violation E: 1P1279
2002-08-08DOB violation L1198:
2002-04-29Permit AL — ISSUED
2002-03-26DOB violation LL6291:
2001
2001-11-26DOB violation E:
2001-07-09Job filed: REAR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2001-07-09Job filed: REAR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2001-07-05Mortgage $200,000 — from SYSTEM REALTY INC. to UNITED ORIENT BANK$200,000
2001-04-19ECB Non-Hazardous violation: 40E11-38L11-17L11-57P07-74## 40-ELIMINATE NOISE 38-REPAIR 17-WHERE NECESSARY 57-PROVIDE ACCESS 74-STORED MATERIAL IN FRONT OF BASE$350
2001-03-19Mortgage satisfied — from BTJ INC. to ROYAL BANK OF PENNSYLVANIA
2001-02-27DOB violation LL6291:
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2001-01-17SAGE — from 103 MOTT STREET CONDOMINIUM
2000
2000-10-30DOB violation E: 1P1279
2000-10-17Mortgage assigned — from FLEET BANK, NATIONALASSOCIATION to ROYAL BANK OF PENNSYLVANIA
2000-10-17Mortgage assigned — from FLEET BANK, NATIONALASSOCIATION to ROYAL BANK OF PENNSYLVANIA
2000-10-03DOB violation E: 1P1279
2000-09-14Deed — from BTJ INC. to KEE YIP REALTY 1037LLC
2000-09-14PAT — from LEE, PAO CHUNG CHIO to 103 MOTT STREET CONDOMINIUM
2000-09-14Mortgage assigned — from KEE YIP REALTY 1037LLC to CHINESE AMERICAN BANK
2000-09-14Mortgage $330,000 — from KEE YIP REALTY 1037LLC to CHINESE AMERICAN BANK$330,000
2000-07-19Agreement — from KEE YIP REALTY CORP. to CHINESE AMERICAN BANK
2000-07-19Mortgage assigned — from KEE YIP REALTY CORP. to CHINESE AMERICAN BANK
2000-07-19Mortgage $95,259 — from KEE YIP REALTY CORP to CHINESE AMERICAN BANK$95,259
2000-07-19PAT — from LEE, PAO CHUNG to 103 MOTT STREET CONDOMINIUM
2000-07-19Mortgage assigned — from EASTBANK, N.A. to CHINESE AMERICAN BANK
2000-07-19SAGE — from EASTBANK, N.A.
2000-06-29Deed — from TOMISHIRO REALTY CO.INC to KEE YIP REALTY CORP.
2000-02-07DOB violation LL6291:
1999
1999-11-19Deed — from MOY, WAYNE; CHUNG, CHI HUA; MUI, SHING MAN to SYSTEM REALTY INC.
1999-10-29SAGE — from GOLDEN CITY COMMERCIAL BANK
1999-10-29Agreement — from GREAT EASTERN BANK to KEE YIP REALTY CORP.
1999-10-29SAGE — from GOLDEN CITY COMMERCIAL BANK
1999-10-29Mortgage $983,912 — from KEE YIP REALTY CORP. to GREAT EASTERN BANK$983,912
1999-10-29Agreement — from GREAT EASTERN BANK to KEE YIP REALTY CORP.
1999-10-29Mortgage assigned — from GOLDEN CITY COMMERCIAL BANK to GREAT EASTERN BANK
1999-10-29Mortgage assigned — from GOLDEN CITY COMMERCIAL BANK to GREAT EASTERN BANK
1999-10-29Mortgage $983,912 — from KEE YIP REALTY CORP. to GREAT EASTERN BANK$983,912
1999-10-12ECB Non-Hazardous violation: 75U,3O,74X,57P. FIVE YEAR TEST TAG, CLEAN TOP OF CAR, REMOVE ITEMS FROM ELEVATOR SHAFT WINDOWS. REMOVE BOXES FROM BASEMENT DOOR$180
1999-03-16DOB violation LL6291:
1998
1998-10-06ECB Non-Hazardous violation: 50Q3,50B9,73O2,74I11,31D6,18D6,28H11,57O2. -50 INSTALL ROPE GUARD (FRONT), -50 REMOVE SQUEAK NOISE FROM MACH. -73 CLEAN ENTIRE DEV
1998-09-24Mortgage satisfied — from 168 REALTY CORP. to UNITED ORIENT BANK
1998-08-12ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LA$400
1998-07-10Mortgage $250,000 — from RAYMAOND AND STEVENINC to ABACUS FEDERAL SAVINGS BANK$250,000
1998-07-10PAT — from RAYMOND AND STEVEN INC. to 103 MOTT STREET CONDOMINIUM
1998-07-10Deed — from 168 REALTY CORP. to RAYMOND AND STEVEN INC
1998-06-25ECB Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTIONOF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW$2,500
1998-06-22Mortgage assigned — from FONG, YIM BON to EASTBANK, N.A.
1998-06-22Mortgage assigned — from KIMBO DYNASTY REALTY, INC. to FONG, YIM BONG
1998-05-04DOB violation LL6291:
1997
1997-12-29ECB Non-Hazardous violation: 49-BOILER CANT BE INSPECTED ON LEFT SIDE, DUE TO BOILER ROOM WALL TOO CLOSE TO BOILER.$400
1997-07-01DOB violation LL1080:
1997-04-01Mortgage $100,000 — from CLK CORP. to KIMBO DYNASTY REALTY, INC.$100,000
1997-04-01Mortgage assigned — from KIMBO DYNASTY REALTY, INC. to FONG, YIM BON
1997-03-05Deed — from KIMBO DYNASTY REALTY, INC. to CLK CORP.
1997-03-05PAT — from CLK CORP. to 103 MOTT STREET CONDOMINIUM
1997-03-05Mortgage $300,000 — from C.L.K. CORP. to EASTBANK, NA$300,000
1997-03-05Mortgage assigned — from C.L.K. CORP. to EASTBANK, NA
1996
1996-04-12ECB Non-Hazardous violation: 3A CORRODED SECTION OF FLUE PIPE IN THE WINDOW BE REPLACED BY NEW ONE ALONG WITH T CONNECTION OUTSIDE.$400
1996-01-24Permit AL — ISSUED
1995
1995-08-29DOB violation LL6291:
1995-04-17DOB violation LL1081:
1995-03-16Mortgage $300,000 — from 168 REALTY CORP. to UNITED ORIENT BANK$300,000
1995-01-23REL — from HONGKONG AND SHANGHAI BANKING CORPORATIO to KIMBO DYNASTY REALTY, INC.
1995-01-23REL — from HONGKONG AND SHANGHAI BANKING CORPORATIO to KIMBO DYNASTY REALTY, INC.
1994
1994-12-30PAT — from 168 REALTY CORP. to 103 MOTT STREET CONDO
1994-12-30Deed — from KIMBO DYNASTY REALTYINC. to 168 REALTY CORP
1994-12-20Permit EW — ISSUED
1994-12-07Permit PL — ISSUED
1994-11-25Permit PL — ISSUED
1994-11-25Permit EW — ISSUED
1994-11-23Permit EQ — ISSUED
1994-11-23Permit EW — ISSUED
1994-11-23Permit EW — ISSUED
1994-11-23Permit EQ — ISSUED
1994-10-31PAT — from TOMISHIRO REALTY COINC. to 103 MOTT STREET CONDO
1994-10-31Deed — from KIMBO DNASTY REALTY,INC. to TOMISHIRO REALTY CO., INC.
1994-10-31Mortgage $300,000 — from TOMISHIRO REALTY CO., INC. to EASTBANK, N.A.$300,000
1994-10-31Mortgage assigned — from TOMISHIRO REALTY CO.INC. to EASTBANK, N.A.
1994-10-20Permit EW — ISSUED
1994-10-20Permit PL — ISSUED
1994-10-20Permit EW — ISSUED
1994-05-27Mortgage $300,000 — from BTJ INC. to WESTMINSTER BANK USA$300,000
1994-05-27Deed — from KIMBO DYNASTY REALTY, INC. to BTJ INC.
1994-05-27PAT — from BTJ INC. to 103 MOTT STREET CONDO
1994-05-18ECB Non-Hazardous violation: 49, (1) VACUUM TANK TOO CLOSE TO THE BLR (2) HAND & HOLES DIRTY TO REPLACE GASKETS (3) G. GLASS TO TIT WITH STOP VALVE & DRAIN PIP$350
1994-05-18ECB Non-Hazardous violation: 18B,49, FOOD LAID ON TOP OF THE BOILER IS HAZARDOUS FOR EMPLOYEES EQUIIPMENT AND PROPERTY
1991-08-08ECB Non-Hazardous violation: 32,46(A),32 THIS SUPERCEDES VIOLATION#42929 OF 3-17-88. BOILER NO ACCESSIBLE FOR INSPECTION ON LT SIDE DUE VACCUUM PUMP AND ITS AC$250
1990
1990-10-12DOB complaint, category ?
1990-09-28Permit EQ — ISSUED
1990-09-28Permit EQ — ISSUED
1990-09-20DOB complaint, category ?
1990-08-01Permit EW — ISSUED
1990-06-26DOB violation ES:
1990-01-08DOB violation E:
1989
1989-09-07ECB Non-Hazardous violation: VACCUM MACHINE SHALL BE RELOCATED AT LEAST 18" AWAY FROM THE BOILER SLOW OPENING VALVES TO BE FITTED IN BLOWDOWN AND GAGE GLASS WA$150
1989-05-08ECB Hazardous violation: REQUIRED MEANS OF EGRESS OBSTRUCTED EXIT PASSAGE 1 STY SOUTH SIDE REDUCED FROM 4 TO 3'6" NOTH SIDE ROLL DOWN SHUTTER INSTALLED INS$400
1989-04-20DOB violation C:
1989-04-18DOB violation C:
1988
1988-12-09DOB violation E:
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL