Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
22 service requests in the last three years. Most common: Noise (12) · Obstruction (4) · Consumer Complaint (2) · Residential Disposal Complaint (2) · General Construction/Plumbing (1) · Snow or Ice (1).
Filed construction activity
$2,030,000 in permitted construction work filed since
2016 (4 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,857,000
$835,650
2026
$1,893,000
$851,850
2027
$1,984,000
$892,800
The city's market estimate has risen
7% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Canal St — 6 J N Q R W Z · 800 ft straight-line (about a 4-minute walk) · station accessibility: partial Grand St — B D · 950 ft straight-line (about a 5-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Centre St / Grand St — M1 · 650 ft
Citi Bike
Grand St & Elizabeth St · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
22 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $500,000 on
1999-02-11 (lender: Chinese American Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
1999-02-11
Mortgage $500,000 — from 142/44 MULBERRY REALTY CORP. to CHINESE AMERICAN BANK
$500,000
Ten-year activity
20100
2017
2018
2019
2020
2021
2022
17
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
6
1
2
0
1
10
2018
5
0
2
2
3
12
2019
0
0
6
0
2
8
2020
0
3
2
0
0
5
2021
0
1
2
0
0
3
2022
0
0
0
0
2
2
2023
0
11
5
0
1
17
2024
0
2
7
0
3
12
2025
0
3
8
0
2
13
2026
0
0
5
0
0
5
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2018-09-24311: Water System — Hydrant Defective (WC2)
2018-09-07Rodent inspection: Passed
2018-07-19Permit EQ — ISSUED
2018-07-19Permit EW — ISSUED
2018-07-19Permit AL — ISSUED
2018-06-07Rodent inspection: Passed
2018-06-06Permit PL — ISSUED
2018-06-06Permit AL — ISSUED
2018-04-12CERT — from SUMMIT ASSOCIATES
2018-04-12ZONE — from 142 MULBERRY REALTY CORP.
2018-03-01Rodent inspection: Passed
2017
2017-09-25Job filed: CONVERT EXISTING USE GROUP 11 WHOLESALE ESTABLISHMENT TO COMMERCIAL USE GROUP 6, INTERIOR RENOVATION THROUGHOUT, PARTITION AND PLUMBING WORK AS PER PL$1,445,000
2017-08-03Rodent inspection: Passed
2017-05-04Job filed: CONVERT EXISTING USE GROUP 11 WHOLESALE ESTABLISHMENT TO COMMERCIAL USE GROUP 6, INTERIOR RENOVATION THROUGHOUT, PARTITION AND PLUMBING WORK AS PER PL$385,000
2017-02-28Permit EW — ISSUED
2017-02-28Permit EQ — ISSUED
2017-02-20Job filed: INTERIOR DEMOLITION OF CEL, 001, 002 IN AN EXISTING COMMERCIAL BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY UNDER THIS APPLICATION.$100,000
2017-02-20Job filed: INTERIOR DEMOLITION OF CEL, 001, 002 IN AN EXISTING COMMERCIAL BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY UNDER THIS APPLICATION.$100,000
2017-02-16311: Rodent — Rat Sighting
2017-01-24311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-01-03FDNY inspection (RISK)
2016
2016-11-25Rodent inspection: Passed
2016-05-07311: Broken Muni Meter — Coin or Card Did Not Register
2015
2015-10-14311: Standing Water — Puddle on Roof
2015-10-10311: Disorderly Youth — Playing in Unsuitable Place
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2014-01-03311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2013
2013-12-07311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2012
2012-04-10Rodent inspection: Passed
2011
2011-06-30311: Broken Muni Meter — No Receipt
2011-03-08Rodent inspection: Passed
2010
2010-02-05Rodent inspection: Passed
2004
2004-11-26TL&R — from THE CHINESE AMERICAN BANK to 142 MULBERRY REALTY CORP.
2004-11-26Mortgage assigned — from THE CHINESE AMERICAN BANK to 161 BOWERY LLC
2004-10-15Agreement — from 18 BOWERY LLC; 161 BOWERY LLC to 142 MULBERRY REALTY COPR
1999
1999-02-11Mortgage assigned — from 142/44 MULBERRY STREET CORP to CHINESE AMERICAN BANK
1999-02-11Mortgage $500,000 — from 142/44 MULBERRY REALTY CORP. to CHINESE AMERICAN BANK$500,000
1996
1996-08-16Permit AL — ISSUED
1996-08-16Permit PL — ISSUED
1996-08-16Permit EQ — ISSUED
1996-03-28ECB Non-Hazardous violation: WORK WITHOUT A PERMIT WORK NOTED: CONST OF MEZZANINE AT 2ND FLR SOUTH OVER RAMP ERECTING INTERIOR PARTITIONS FOR BATH ROOMS, PLUMB$350
1993-06-06ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. NOTE BUILT MEZZANNIE AT SECOND FL SOUTH OVER RAMP. ERECTING INTERIOR PARTITIONS FOR BATH ROOMS PLUMBING A$350
1993-06-04DOB complaint, category ?
1972
1972-09-18Mortgage assigned — from FREIDUS, ELLA to IRVING R RABER CO INC
1972-09-18Mortgage assigned — from COMMERCIAL TRADING CO to FREIDUS, ELLA
1972-05-26Mortgage assigned — from FREIDUS, ELLA to COMMERCIAL TRADING CO
1972-03-24Mortgage — from 142 MULBERRY REALTYCORP to FREIDUS, ELLA
1972-03-24Deed — from FREIDUS, EDLA to 142 MULBERRY REALTYCORP
1968
1968-08-14Deed — from 601 W 26 CORP to FREIDUS, JACOB
1968-08-14Deed — from FREIDUS, JACOB to FREIDUS, ELLA