The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 0. In ZIP 10003, 67% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
10 service requests in the last three years. Most common: Noise (5) · Illegal Parking (3) · Building/Use (1) · New Tree Request (1).
Filed construction activity
$246,510 in permitted construction work filed since
2016 (8 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1910)
Yes
Six or more residential units (24)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
EIGHT COOPER EQUITIES
Head officer
RUSSELL COOPER
Managing agent
NOVUM PROPERTIES, INC.
Last registered
2025-08-13
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$3,073,000
$1,382,850
2026
$3,340,000
$1,503,000
2027
$3,094,000
$1,392,300
The city's market estimate has risen
1% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
2 Av — F · 800 ft straight-line (about a 4-minute walk) · station accessibility: none Bleecker St — 6 B D F M · 0.3 mi straight-line (about a 9-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 1 Av / E 4 St — M15 · 300 ft
Citi Bike
E 3 St & 1 Ave · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
10 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $3,788,215 on
2019-04-18 (lender: Bankunited, N.A.), covering 5 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-04-18
Mortgage $3,788,215 — from EIGHT COOPER EQUITIES, LLC to BANKUNITED, N.A.
$3,788,215
2019-04-18
AL&R $18,400,000 — from EIGHT COOPER EQUITIES, LLC to BANKUNITED, N.A.
$18,400,000
2019-04-18
Agreement $18,400,000 — from EIGHT COOPER EQUITIES, LLC to BANKUNITED, N.A.
$18,400,000
2016-09-12
Agreement $15,000,000 — from EIGHT COOPER EQUITIES LLC to CAPITAL ONE, NATIONAL ASSOICIATION
$15,000,000
2016-09-12
Mortgage $6,695,155 — from EIGHT COOPER EQUITIES LLC to CAPITAL ONE, NATIONAL ASSOICIATION
$6,695,155
2016-09-12
AL&R $15,000,000 — from EIGHT COOPER EQUITIES LLC to CAPITAL ONE, NATIONAL ASSOICIATION
$15,000,000
2010-07-14
Mortgage $4,859,649 — from EIGHT COOPER EQUITIES LLC to CAPTIAL ONE, N.A.
$4,859,649
2010-07-14
Agreement $9,300,000 — from EIGHT COOPER EQUITIES LLC to CAPTIAL ONE, N.A.
$9,300,000
2003-09-04
Mortgage $1,000,000 — from EIGHT COOPER EQUITIES LLC to M&T REAL ESTATE TRUST
$1,000,000
2000-05-01
Mortgage $1,698,017 — from EIGHT COOPER EQUITIES LLC to M&T REAL ESTATE INC
$1,698,017
1998-08-21
Mortgage $750,000 — from EIGHT COOPER EQUITIES LLC to M & T REAL ESTATE, INC.
$750,000
1991-07-03
Mortgage $1,067,785 — from EIGHT COOPER EQUITIES to MANUFACTURERS &TRDRSETC
$1,067,785
1989-02-28
Mortgage $1,690,858 — from EIGHT COOPER EQTS to MANUFACTURERS &TDR TR CO
$1,690,858
1987-07-28
Mortgage $3,000,000 — from EIGHT COOPER EQUITIES to MANUFACTURERS&TRD TRCO
$3,000,000
1987-01-15
Mortgage $540,000 — from EIGHT COOPER EQUITIES to AMALGAMATED BK/N.Y.
$540,000
Ten-year activity
20100
2017
2018
2019
2020
14
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
5
0
7
0
1
13
2018
0
0
2
0
2
4
2019
3
0
3
5
2
13
2020
0
1
6
0
1
8
2021
0
0
13
0
1
14
2022
0
0
7
0
3
10
2023
0
1
6
0
3
10
2024
0
1
5
0
2
8
2025
4
0
3
0
3
10
2026
0
4
1
0
1
6
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: PLUMBING WORK IN APARTMENT #7 IN CONJUNCTION WITH APT RENOVATION IN DOB NOW UNDER JOB#M01303148. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2025-11-17
Job filed: RENOVATE EXISTING APARTMENT, PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
The full timeline
2026
2026-09-15311: Illegal Parking — Blocked Bike Lane
2026-05-29DOB complaint, category ?
2026-05-29DOB complaint, category ?
2026-04-15Rodent inspection: Passed
2026-01-09DOB complaint, category ?
2026-01-09DOB complaint, category ?
2025
2025-12-31Bedbug filing: 0 infested units
2025-12-22Permit General Construction — Signed-off
2025-12-17Permit Plumbing — Signed-off
2025-11-17Job filed: PLUMBING WORK IN APARTMENT #7 IN CONJUNCTION WITH APT RENOVATION IN DOB NOW UNDER JOB#M01303148. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2025-11-17Job filed: RENOVATE EXISTING APARTMENT, PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,300
2025-10-06Rodent inspection: Passed
2025-07-08Restaurant inspection: LA SULTANA CAFE — grade A
2025-06-02311: Illegal Parking — Blocked Bike Lane
2025-05-19311: Illegal Parking — Blocked Bike Lane
2017-07-07311: Lead — Lead Kit Request (Residential) (L10)
2017-07-03Permit EW — ISSUED
2017-04-12HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 9, 3rd STORY, 2nd APARTMENT FROM
2017-03-28311: APPLIANCE — ELECTRIC/GAS RANGE
2017-03-28Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2017-03-23311: GENERAL — COOKING GAS
2017-03-23Tenant complaint: GENERAL — COOKING GAS
2016
2016-12-27Permit PL — ISSUED
2016-12-23Permit EW — ISSUED
2016-12-22Rodent inspection: Passed
2016-12-19Job filed: HEREBY FILE APPLICATION TO PROVIDE NEW GAS PIPES AND NEW GAS METER FOR RESIDENTIAL BUILDING.NO CHANGE IN USE,EGRESS OR OCCUPANCY.$45,000
2016-12-12Permit PL — ISSUED
2016-12-09Job filed: REPLACEMENT OF EXISTING EXTERIOR FRONT STAIRS TO THE BUILDING WITH NEW. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$8,930
2016-12-08311: Plumbing — Gas Utility Referral
2016-12-08DOB complaint, category ?
2016-12-05Permit EW — ISSUED
2016-11-01Job filed: RENOVATE TWO (2) EXISTING APARTMENTS APT 2 FLOOR 1 APT 5 FLOOR 2 REPLACEMENT OF PARTITION WALL AND PLUMBING FIXTURES AS PER PLANS FILED NO CHANGE IN U$97,000
2016-09-12Agreement $15,000,000 — from EIGHT COOPER EQUITIES LLC to CAPITAL ONE, NATIONAL ASSOICIATION$15,000,000
2016-09-12Mortgage $6,695,155 — from EIGHT COOPER EQUITIES LLC to CAPITAL ONE, NATIONAL ASSOICIATION$6,695,155
2016-09-12TL&R — from CAPITAL ONE, NATIONAL ASSOICIATION to EIGHT COOPER EQUITIES LLC
2016-09-12AL&R $15,000,000 — from EIGHT COOPER EQUITIES LLC to CAPITAL ONE, NATIONAL ASSOICIATION$15,000,000
2016-09-12311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2016-01-20Rodent inspection: Passed
2015
2015-09-02Permit PL — ISSUED
2015-08-24Permit EW — ISSUED
2015-08-05Job filed: INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE AS PER PLANS. NEW MILLWORK, INTERIOR FINISHES AND PLUMBING FIXTURES. NO CHANGE IN BULK, FLOOR AREA OR$42,000
2015-08-05Job filed: INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE AS PER PLANS. NEW MILLWORK, INTERIOR FINISHES AND PLUMBING FIXTURES. NO CHANGE IN BULK, FLOOR AREA OR$42,000
2015-05-21311: Animal Abuse — Other (complaint details)
2015-03-19Rodent inspection: Passed
2014
2014-11-16311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2014-11-16DOB complaint, category ?
2014-04-25311: Indoor Air Quality — Other (Explain Below)
2014-04-22Rodent inspection: Passed
2014-04-14311: Building/Use — Illegal. Commercial Use In Resident Zone
2014-04-14DOB complaint, category ?
2014-01-19311: Noise - Commercial — Loud Talking
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-12-10311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2013-10-16FDNY inspection (SPECIAL-OTH)
2013-09-29311: Noise - Commercial — Loud Talking
2013-09-23ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED GAS METERSAND GAS PIPING INSTALLED IN PUBLIC HALLWAYS OF A MULTIPLE DW
2013-09-19311: Miscellaneous Categories — FDNY Referral - Pilot
2013-09-19DOB complaint, category ?
2013-08-15HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE METAL HAND RAIL EAST SIDE AT FRONT STOOP , 1st STORY
2013-05-01311: Street Condition — Defective Hardware
2013-04-14HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2012-08-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-08-01Permit PL — ISSUED
2012-06-28Permit EW — ISSUED
2012-06-14DOB complaint, category ?
2012-05-16ECB CLASS - 1 violation: FAILURE TO MAINTAIN IN CODE COMPLIANT MANNER.UPON PHYSICAL INSPEC FOUND PARTS OF BLDG MAIN SOIL/SANITARY DRAIN & VERT LINES DAMAGE$1,000
2012-05-15Rodent inspection: Passed
2012-05-15Job filed: MINOR PARTITION WORK IN APT #20, REPLACE AND RELOCATE PLUMBING FIXTURES. NO CHANGE TO USE,OCCUPANCY OR EGRESS.$27,000
2012-05-15Job filed: MINOR PARTITION WORK IN APT #20, REPLACE AND RELOCATE PLUMBING FIXTURES. NO CHANGE TO USE,OCCUPANCY OR EGRESS.$27,000
2012-04-18DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-02-17DOB complaint, category ?
2012-02-09311: Non-Residential Heat — Inadequate or No Heat
2012-01-25ECB CLASS - 2 violation: FAILURE TO COMPLY W/COMM'S ORDER TO FILE A C OF C W/THE DEPT OF BUILDINGS NOTE: TO CERTIFY THAT YOU HAVE CORRECTED THE VIOLATING C$2,000
2012-01-25ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. NOTED THE FOLLOWING CONDITIONS: THE COMMERCIAL SPACE WEST WALL HAS A SEPA$500
2012-01-25ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER: NO FIRE STOPPING PER BC 712.3;27-345 NOTED THE FOLLOWING CONDITIONS: CELLAR$1,000
2012-01-25ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BUILDING DEPT RECORDS. NOTED THE FOLLOWING CONDITIONS: CELLAR AREA BELOW COMME$1,200
2012-01-24311: General Construction/Plumbing — Illegal Conversion Of Commercial Bldg/Space To Other Uses
2012-01-24DOB complaint, category ?
2011
2011-05-09Rodent inspection: Passed
2011-04-25311: Animal Facility - No Permit — N/A
2010
2010-10-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER RE: INSTALLATION/MAINTENANCE OF PLUMBING MATERIALS/EQUIPMENT PER PC 102.3;27-902
2010-10-01Permit PL — ISSUED
2010-09-29311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2010-09-22Job filed: RENOVATE EXISTING APARTMENT: MINOR PARTITION AND PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$29,640
2010-09-22Job filed: RENOVATE EXISTING APARTMENT: MINOR PARTITION AND PLUMBING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$29,640
2010-07-14Mortgage $4,859,649 — from EIGHT COOPER EQUITIES LLC to CAPTIAL ONE, N.A.$4,859,649
2010-07-14Agreement $9,300,000 — from EIGHT COOPER EQUITIES LLC to CAPTIAL ONE, N.A.$9,300,000
2010-07-14AL&R — from EIGHT COOPER EQUITIES LLC to CAPTIAL ONE, N.A.
2010-07-14Mortgage assigned — from M&T REAL ESTATE TRUST to CAPTIAL ONE, N.A.
2010-07-14Mortgage assigned — from M&T REAL ESTATE TRUST to CAPTIAL ONE, N.A.
2010-06-28TL&R — from M & T REAL ESTATE TRUST to EIGHT COOPERS EQUITIES LLC
2010-04-19Rodent inspection: Passed
2009
2009-08-31ECB CLASS - 2 violation: ILLEGAL USE IN RESIDENTIAL DISTRICT NOTED OPERATING ANIMAL SHELTER WITH APPROX 25 ANIMALS BEING KEPT IN BASEMENT OF A R-7-2 ZONING$800
2009-08-18DOB complaint, category ?
2008
2008-12-06Tenant complaint: HEATING — HEAT RELATED
2008-12-05Tenant complaint: HEATING — HEAT RELATED
2007
2007-03-23DOB complaint, category ?
2007-03-08DOB complaint, category ?
2005
2005-04-15Tenant complaint: GENERAL — STAIRS
2005-02-26Tenant complaint: GENERAL — STAIRS
2003
2003-09-04Mortgage $1,000,000 — from EIGHT COOPER EQUITIES LLC to M&T REAL ESTATE TRUST$1,000,000
2003-09-04AL&R — from M&T REAL ESTATE TRUST to EIGHT COOPER EQUITIES LLC
2001
2001-11-29Job filed: PROPOSE TO REPAIR FACADE OF BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2001-11-29Job filed: PROPOSE TO REPAIR FACADE OF BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2000
2000-05-01SAGE — from MANUFACTURERS AND TRADERS TRUST COMPANY
2000-05-01SAGE — from M & T REAL ESTATE, INC.
2000-05-01Agreement — from EIGHT COOPER EQUITIES LLC to M & T REAL ESTATE, INC.
2000-05-01Mortgage $1,698,017 — from EIGHT COOPER EQUITIES LLC to M&T REAL ESTATE INC$1,698,017
2000-05-01Mortgage assigned — from EIGHT COOPER EQUITIES LLC to M & T REAL ESTATE, INC.
1998
1998-08-21Mortgage $750,000 — from EIGHT COOPER EQUITIES LLC to M & T REAL ESTATE, INC.$750,000
1998-08-21Mortgage assigned — from MANUFACTURERS AND TRADERS TRUST COMPANY to M & T REAL ESTATE, INC.
1998-08-21SAGE — from EIGHTH COOPER EQUITIES LLC to M & T REAL ESTATE, INC.
1993
1993-02-22Mortgage assigned — from MANUFACTURERS & ETAL to EAST NEW YORK SVGS BK
1993-02-22Mortgage assigned — from MANUFACTURERS & ETAL to EAST NEW YORK SVGS BK
1993-02-22SAGE — from MANUFACTURERS & ETAL
1993-02-22SAGE — from MANUFACTURERS & ETAL
1993-02-22Mortgage assigned — from EIGHT COOPER EQUITIES to EAST NEW YORK SVGS BK
1993-02-22Agreement — from EIGHT COOPER EQUITIES to EAST NEW YORK SVGS BK
1991
1991-07-03Agreement — from EIGHT COOPER EQUITIES to MANUFACTURERS &TRDRSETC
1991-07-03Agreement — from MANUFACTURERS& TRDRSETC to EIGHT COOPER EQUITIES
1991-07-03Mortgage $1,067,785 — from EIGHT COOPER EQUITIES to MANUFACTURERS &TRDRSETC$1,067,785
1991-07-03Mortgage assigned — from EIGHT COOPER EQUITIES to MANUFACTURERS &TRDRSETC
1989
1989-02-28Mortgage $1,690,858 — from EIGHT COOPER EQTS to MANUFACTURERS &TDR TR CO$1,690,858
1989-02-28Agreement — from MANUFACTURERS &TDR TR CO to EIGHT COOPER EQTS
1989-02-28Mortgage assigned — from EIGHT COOPER EQTS to MANUFACTURERS &TDR TR CO
1989-02-28SAGE — from MANUFACTURERS &TDR TR CO
1989-02-28SAGE — from MANUFACTURERS &TDR TR CO
1987
1987-07-28Mortgage assigned — from EIGHT COOPER EQUITIES to MANUFACTUARERS & ETAL
1987-07-28Mortgage assigned — from EIGHT COOPER EQUITIES to MANUFACTURERS & ETAL
1987-07-28Mortgage $3,000,000 — from EIGHT COOPER EQUITIES to MANUFACTURERS&TRD TRCO$3,000,000
1987-07-28Mortgage assigned — from AMALGAMATED BANK NY to MANFACTURERS & ETAL
1987-07-28Agreement — from EIGHT COOPER EQUITIES to MANUFACTURERS & ETAL
1987-01-15Deed — from 59-130-128 REALTY CORP to BRICKMAN, THEODORE
1987-01-15Mortgage $540,000 — from EIGHT COOPER EQUITIES to AMALGAMATED BK/N.Y.$540,000
1987-01-15Deed — from BRICKMAN, THEODORE to EIGHT COOPER EQUITIES
1987-01-15Mortgage satisfied — from WAJO RLTY CORP to SELF RELIANCE NY FEDETC
1987-01-15Mortgage satisfied — from 59-130-128 RLTY CORP to BRICKMAN, MORRIS
1986
1986-02-04Mortgage satisfied — from WAJO RTLY CORP; TREND ASSOCIATED INC to TREND ASSOC INC; WEISBERG, HANAH
1986-02-04Mortgage $216,421 — from 59-130-128 REALTY CORP. to BRICKMAN, MORRIS$216,421
1972
1972-09-26Mortgage assigned — from WAJO REALTY CO to SELF RLNC NY FDL CRDT UN
1967
1967-10-20Deed — from WAJO REALTY CO to WAJO REALTY CO
1967-10-20Deed — from WAJO REALTY CO to MOTED REALTIES INC
1967-10-19Agreement — from WAJO REALTY CO; FLIS, MARY, T; KOLOGY, JOSEPH; WERESH, WASYL to SELF REL NY FED CRDTUN
1967-10-19Mortgage — from MOTED REALTY INC to WAJO REALTY CO
1967-02-15Agreement — from WAJO REALTY CORP to UKRAINIAN NTL ASSOCINC
1967-02-15Mortgage assigned — from TREND ASSOCS INC to UKRAINIAN NTL ASSOCINC
1967-02-15Mortgage — from WAJO REALTY CORP to SELF REL NY FED CRDTUN
1966
1966-09-16Mortgage — from WAJO REALTY CORP to TREND ASSOCS INC
1966-09-16Deed — from TREND ASSOCS INC to WAJO REALTY CORP