The city's published records show little recorded distress here in the last three years. More recorded distress than 54% of 6-24-unit residential buildings citywide. The citywide median for 6-24-unit residential buildings is 16.3 penalty
points per 10 units; this building carries 20. In ZIP 10003, 67% of residential buildings hold an A and
4% grade D or F.
How grades work
this building
A
B
C
Among 46,798 6-24-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
Open HPD violations
15 total — 14 class C (immediately hazardous), 1 class B, 0 class A. Oldest open since 1992-03-19.
status snapshot refreshed weekly from HPD records
Patterns
4 heat or hot-water complaints in the last three years (winter 2023–24: 2 · winter 2024–25: 2). Repeated winter clusters suggest a chronic heating problem.
2
’23–24
2
’24–25
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
19 service requests in the last three years. Most common: Noise (7) · Graffiti (6) · HEAT/HOT WATER (2) · Emergency Response Team (ERT) (1) · Homeless Person Assistance (1) · Food Establishment (1).
Filed construction activity
$171,600 in permitted construction work filed since
2016 (7 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1900)
Yes
Six or more residential units (7)
No
421-a / J-51 tax benefit on the current tax roll
2 of 3 signals present. This is the classic profile of a rent-stabilized building (pre-1974, 6+ units) — many units in such buildings remain stabilized. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
1ST AVENUE ENTERPRISES LLC
Head officer
Jonah Kriger
Managing agent
Luciano Lazcano
Last registered
2026-07-30
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$3,178,000
$1,430,100
2026
$3,390,000
$1,525,500
2027
$4,068,000
$1,830,600
The city's market estimate has risen
28% between tax years 2025 and 2027.
1 Food Establishment complaint to 311 at this address in the last three years (most often: Kitchen/Food Prep Area) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
1 Av — L · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 9 St / 1 Av — M8 · 100 ft
Citi Bike
St Marks Pl & 1 Ave · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
19 311 service requests from this address in the last three years — 2 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,912,219 on
2013-11-15 (lender: Signature Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2013-11-15
Agreement $5,000,000 — from 1ST AVENUE ENTERPRISES, LLC to SIGNATURE BANK
$5,000,000
2013-11-15
Mortgage $1,912,220 — from 1ST AVENUE ENTERPRISES, LLC to SIGNATURE BANK
$1,912,220
2013-11-15
AL&R $5,000,000 — from 1ST AVENUE ENTERPRISES, LLC to SIGNATURE BANK
$5,000,000
2008-06-19
Mortgage $2,879,409 — from 1ST AVENUE ENTERPRISES, LLC to SOVEREIGN BANK
$2,879,409
2008-06-19
Agreement $3,360,000 — from SOVEREIGN BANK to 1ST AVENUE ENTERPRISES, LLC
$3,360,000
2008-06-19
AL&R $3,360,000 — from 1ST AVENUE ENTERPRISES, LLC to SOVEREIGN BANK
$3,360,000
1998-08-13
Mortgage $135,380 — from 1ST AVENUE ENTERPRISES, LLC to MERRILL LYNCH CREDITCORPORATION
$135,380
1989-12-12
Mortgage $194,246 — from 1ST AVE ENTERPRISESINC to BANKERS FEDERAL SAVINGS
$194,246
1985-02-21
Mortgage $275,000 — from 1ST AVE. ENTERPRS, INC. to BANKERS FDL SVGS&LNETC.
$275,000
Ten-year activity
100500
82
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
1
0
76
0
5
82
2018
0
1
12
0
8
21
2019
17
17
29
0
3
66
2020
8
23
10
2
2
45
2021
12
8
7
0
1
28
2022
3
7
4
0
5
19
2023
0
2
5
0
2
9
2024
5
2
10
0
2
19
2025
0
1
13
0
3
17
2026
0
0
5
0
2
7
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-13
Rodent inspection: Passed
2026-05-30
311: Noise - Residential — Loud Music/Party
2026-05-05
Bedbug filing: 0 infested units
2026-01-12
Rodent inspection: Passed
2025-12-24
Bedbug filing: 0 infested units
2025-12-11
Restaurant inspection: FLUFFY FLUFFY CAFE — grade A
2025-11-17
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-12-11Restaurant inspection: FLUFFY FLUFFY CAFE — grade A
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-06-09311: Food Establishment — Kitchen/Food Prep Area
2025-06-04HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-10-22311: Noise — Noise: Construction Before/After Hours (NM1)
2024-09-14311: Emergency Response Team (ERT) — After Hours Work - Illegal
2024-09-14DOB complaint, category ?
2024-09-08311: Graffiti — Graffiti
2024-07-08Rodent inspection: Passed
2024-06-17Permit Mechanical Systems — Signed-off
2024-06-17Permit General Construction — Signed-off
2024-06-13Permit Plumbing — Signed-off
2024-06-04Job filed: 1ST FLOOR INTERIOR RENOVATION. INSTALL PARTITION WALLS, AIR CONDITIONING SYSTEM, AND KITCHEN HOOD EXHAUST SYSTEM. NO CHANGE IN USE, OCCUPANCY, OR EGRE$92,000
2024-06-04Job filed: 1ST FLOOR INTERIOR RENOVATION. INSTALL PARTITION WALLS AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$9,600
2024-05-24311: Graffiti — Graffiti
2024-04-02Bedbug filing: 0 infested units
2024-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-03-11311: Graffiti — Graffiti
2024-01-20311: HEAT/HOT WATER — APARTMENT ONLY
2024-01-20Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2023-03-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-01-06Rodent inspection: Passed
2022
2022-11-23Job filed: SOE IN CONJUNCTION WITH ALT 2 # 121114524. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-06-04ECB CLASS - 2 violation: FENCE NOT PAINTED HUNTER GREEN.AT TIME OF INSPECTION OBSERVED JOBSITE FENCE INSTALLED AT EXP #1 NOT PAINTED HUNTER GREEN.REMEDY:PR
2022-03-04ECB CLASS - 2 violation: BC3303.7.2 INADEQUATE FIRE EXTINGUISHERS.ATOI@ACTIVE JOBSITE,OBSERVED MISSING FIRE EXTINGUISHERS ON 2,3,4,5FL.ALSO FIRE EXTINGUISH
2022-03-04ECB CLASS - 1 violation: FAILURE TO MAINTAIN/DISPLAY ONSITE DOCS RECD BY BCCH33.ATOI@ACTIVE JOBSITE,OBSERVED WORKERS ENGAGED IN CONST ACTIVITY.UPON REQUEST$1,250
2022-02-24FDNY inspection (STRUC_INT_3)
2022-02-24FDNY inspection (E-CIDS)
2022-02-23Bedbug filing: 0 infested units
2022-02-15HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-11Rodent inspection: Failed for Rat Activity
2022-01-18Rodent inspection: Failed for Rat Activity
2021
2021-12-21311: Graffiti — Police Report Not Requested
2021-11-08311: Graffiti — Graffiti
2021-11-08Permit Sidewalk Shed — Signed-off
2021-11-08Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$5,000
2021-10-14Permit Structural — Signed-off
2021-10-13Permit EQ — ISSUED
2021-10-12Permit EW — ISSUED
2021-10-12Permit EW — ISSUED
2021-10-12Permit EW — ISSUED
2021-09-03Job filed: INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
2021-08-10ECB CLASS - 2 violation: BC3314.1 INSTALLED SUPPORTED SCF DOESNT MEET CODE SPEC.NOTE:ATOI@5STYBLDG I OBSERVED INSTALLED SUPPORTED SCF@EXP1.INSTALLED SUPPOR$625
2021-08-10ECB CLASS - 2 violation: WORK DOESNT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS.NOTE:ATOI@ACTIVE 5STYALT2BLDG1 OBSERVED ERECTED SUPPORTED SCF@$625
2021-08-05DOB complaint, category ?
2021-07-09Rodent inspection: Passed
2021-07-06Bedbug filing: 0 infested units
2021-06-23Permit PL — ISSUED
2021-06-22311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2021-06-22DOB complaint, category ?
2021-05-26DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-04-04Job filed: INSTALLATION OF PIPE SCAFFOLDING FRONT ELEVATION$10,000
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-25Permit Sidewalk Shed — Signed-off
2021-03-05311: COVID-19 Non-essential Construction — Construction
2021-03-05DOB complaint, category ?
2021-03-04DOB complaint, category ?
2021-03-04ECB CLASS - 1 violation: 3303.7.2 EXPIRED FIRE EXTINGUISHER INSPECTION LOGS.AT TIME OF INSPECTION OF AN ACTIVE JOBSITE,I OBSERVED SHANTIES BUILT OUT OF COM$12,500
2020-12-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-11-06Permit EQ — ISSUED
2020-11-05Permit Sidewalk Shed — Signed-off
2020-11-04Permit EW — ISSUED
2020-11-04Permit EW — ISSUED
2020-11-04Permit EW — ISSUED
2020-10-14Boiler inspection
2020-10-02ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. NOTE: AT THETIME OF MY INSPECTION OF A 5 STY CONSTRUCTION JOBSITE UNDER $2,500
2020-10-02DOB complaint, category ?
2020-08-13Permit Structural — Signed-off
2020-07-31311: Street Condition — Pothole
2020-05-29DOB complaint, category ?
2020-05-20Permit PL — ISSUED
2020-05-11311: Homeless Person Assistance — N/A
2020-04-03311: General Construction/Plumbing — Working Contrary To Stop Work Order
2020-04-03DOB complaint, category ?
2020-03-27Permit Sidewalk Shed — Signed-off
2020-03-10DOB complaint, category ?
2020-03-05Mortgage assigned — from SIGNATURE BANK to EMAZAL REALTY ASSOCIATES, LLC
2020-03-05TL&R — from SIGNATURE BANK to 1ST AVENUE ENTERPRISES, LLC
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-03-01311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2020-03-01DOB complaint, category ?
2020-02-13311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2020-02-13311: General Construction/Plumbing — Working Contrary To Stop Work Order
2020-02-13DOB complaint, category ?
2020-02-13DOB complaint, category ?
2020-02-10311: General Construction/Plumbing — Working Contrary To Stop Work Order
2020-02-10DOB complaint, category ?
2020-02-08311: General Construction/Plumbing — Working Contrary To Stop Work Order
2020-02-08DOB complaint, category ?
2020-01-30ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT THE TIME OFINSPECTION OF A 5 STORY ALT2 JOBSITE OBSERVED SIDEWALK SHED $2,400
2020-01-29311: General Construction/Plumbing — Excavation Undermining Adjacent Building
2019-12-18Job filed: SOE IN CONJUNCTION WITH ALT 2 # 121114524. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2019-12-13DOB complaint, category ?
2019-12-13DOB complaint, category ?
2019-12-13DOB complaint, category ?
2019-12-12ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE THAT EACH CONSTRUCTION OR DEMOLITION WORKER WORKING/ENGAGED AT THE SITE SUCCESSFULLY COMPLETED THE
2019-12-12ECB CLASS - 1 violation: WORK DOES CONFORM TO APPROVED PLANS NOTED TA TIME OF INSPECTION FO A ACTIEV JOBSIET OF A 5 STROY BUIDLING OBSERVED THROUGHOUT TEH $2,500
2019-12-12ECB CLASS - 1 violation: BC3301.6=FAILURE TO PROVIDE DESAIGN DRAWINGS NOTED AT TIME OF INSPCTION ACTIEV CONSTRUCTION SIET OF A 5 STORY BUIDLING I OBSERVED $2,500
2019-12-12ECB CLASS - 1 violation: PERMIT HOLDERS FIALED TO ENSURE EAHC CONSTRUCTION OR DEMOLITIO NWORKER WORKING .ENGAGGED AT THE SITE SUCCESSUFLLY COMPLETED THE RE
2019-12-12ECB CLASS - 1 violation: OWNER FAILED TO ESURE THAT EAHC CONSTRUCTION OR DEMOLITION WORKER WORKING ENEGAGED AT THE SITE SUCCESSFULLY COMPLETED THE REQUIRED
2019-12-12ECB CLASS - 1 violation: OWNER FAILED TO ENSURE THAT EAHC CONSTRUCTION OR DEMOLITION WORKER WORKING ENGAGED TA TH SITE SUCCESSFULLY COMPLETED TH EREQUIRED
2019-12-12ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED ACCEPTED CONSTRUCTION DOCUEMNTS AT JOSBIET AT TIEM FO INSPECTION NOETD AT TIME OF INSPECTION AT ACTIEV$625
2019-12-12ECB CLASS - 1 violation: PERMIT HOLDERS FAILED TO ENSURE THAT EACH CONSTRUCTION IN DEMOLITIO NWORKER WORKING ENGAGED AT THE SIT ESUCCESSUFLLY COMPLETED THE
2019-12-12ECB CLASS - 1 violation: OWNER FAILE DTO ESNURE THAT EACH OSNTRUCTION OR DEMOLITION WORKER WOKRING ENGAGED AT TEH SITE SUCCESSFULLY COMPLETED TEH REQUIRED
2019-12-12ECB CLASS - 1 violation: OWNER FAILED TO ENSURE THAT EAHC CONSTRUCTION OR DEMOLITION WORKER WORKING ENGGAGED AT TEH SITE SUCCESSFULLY COMPELETED THE REQUIR
2019-12-12ECB CLASS - 1 violation: BC3303.7.2=FIRE EXTINGUIHSERS NOTED AT TIME O FINSPECTION OF AN ATCIEV JOBSIET OF A 5 STORY BUIDLING OBSERVED ON MULTIPLE FLOORS F$2,500
2019-12-12ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ESNRE THAT EACH CONSTRUCTION OR DEMOLITION WORKER WORKING ENGAGED AT THE SITE SUCCESSFULLY COMPLETED THE R
2019-12-06Permit EW — ISSUED
2019-12-06Permit EW — ISSUED
2019-12-06Permit EW — ISSUED
2019-11-21Permit Sidewalk Shed — Signed-off
2019-11-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$5,000
2018-12-11ECB CLASS - 1 violation: ELECTRICAL WORK W/O A PERMIT. OBSERVED IN THE 2ND FLOOR APT THEY TOOK ALL ELECTRICAL FIXTURE OUT AND HAVE ALL EXPOSING WIRES THROU
2017-07-15HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
2017-03-11HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BASEMENT
2017-03-11HPD class C: § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT LOCATED AT APT 5, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
2017-03-07Tenant complaint: PLUMBING — RADIATOR
2017-03-07Tenant complaint: PLUMBING — RADIATOR
2017-03-04311: HEAT/HOT WATER — APARTMENT ONLY
2017-03-04311: HEAT/HOT WATER — ENTIRE BUILDING
2017-03-04Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-03-04Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-27311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-21311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-17HPD litigation: Tenant Action
2017-02-15Rodent inspection: Failed for Rat Activity and Other Reason
2017-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-12311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-11311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-11Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-08311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-07311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-05311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-03311: HEAT/HOT WATER — APARTMENT ONLY
2017-02-03Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-02-02311: HEAT/HOT WATER — ENTIRE BUILDING
2017-02-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-31311: HEAT/HOT WATER — APARTMENT ONLY
2017-01-31Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-01-30311: Water System — NO WATER - WNW
2017-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-29HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BASEMENT
2017-01-29HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FROM NORTH
2017-01-29Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-28311: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-28311: HEAT/HOT WATER — APARTMENT ONLY
2017-01-28Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-01-28Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-01-26311: HEAT/HOT WATER — APARTMENT ONLY
2017-01-26Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-01-23311: HEAT/HOT WATER — APARTMENT ONLY
2017-01-23Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-01-14311: HEAT/HOT WATER — APARTMENT ONLY
2017-01-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2016-03-30Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-10-01HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2014-04-25Job filed: INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.$44,000
2013-01-04Tenant complaint: HEATING — HEAT RELATED
2013-01-04Tenant complaint: HEATING — HEAT RELATED
2013-01-04Tenant complaint: HEATING — HEAT RELATED
2012
2012-11-11311: HEATING — HEAT
2012-11-11Tenant complaint: HEATING — HEAT RELATED
2012-09-11Permit EW — ISSUED
2012-09-11Permit EW — ISSUED
2012-09-11Permit PL — ISSUED
2012-08-07Rodent inspection: Passed
2012-08-07Job filed: REMODEL APARTMENT #4 ON THE THIRD FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$26,500
2012-08-05311: Rodent — Mouse Sighting
2012-08-05311: HEATING — HEAT
2012-08-05Tenant complaint: HEATING — HEAT RELATED
2012-08-01311: Rodent — Mouse Sighting
2012-06-26Job filed: ADD NEW REAR EXTENSION AT CELLAR AND FIRST THROUGH FIFTH. REMODEL APT 1 & 2 ON 2ND, 3 & 4 ON 3RD, 5 & 6 ON 4TH, 7 & 8 ON 5TH FLOORS, C$275,042
2012-06-26Job filed: STRUCTURAL PLANS BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION TO ADD NEW REAR EXTENSION AT FIRST THROUGH FIFTH FLOORS. NO CHANGE TO USE, E$70,000
2012-06-26Job filed: ADD NEW REAR EXTENSION AT CELLAR AND FIRST THROUGH FIFTH. REMODEL APT 1 & 2 ON 2ND, 3 & 4 ON 3RD, 5 & 6 ON 4TH, 7 & 8 ON 5TH FLOORS, C$468,500
2012-03-22311: Noise Survey — People Created Noise
2012-02-29HPD class B: SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FRO
2012-02-16Permit EW — ISSUED
2012-02-14Permit EW — ISSUED
2011
2011-11-29311: Food Establishment — Facility Construction
2011-06-09311: Food Establishment — Odor
2011-05-12Job filed: REMODEL APARTMENT 1 ON SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$34,000
2011-05-12Job filed: REMODEL APARTMENT 1 ON SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$34,000
2011-05-12Job filed: REMODEL APARTMENT 1 ON SECOND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$34,000
2011-04-25Rodent inspection: Passed
2011-03-15Rodent inspection: Passed
2011-01-10311: Broken Muni Meter — Coin or Card Did Not Register
2010
2010-12-13311: HEATING — HEAT
2010-12-13Tenant complaint: HEATING — HEAT RELATED
2010-08-05Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2010-04-23Rodent inspection: Passed
2010-03-01Permit AL — ISSUED
2010-03-01Job filed: REPLACEMENT OF STUCCO AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$4,800
2010-03-01Job filed: REPLACEMENT OF STUCCO AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$4,800
2010-02-25Permit EQ — ISSUED
2010-02-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2010-02-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2010-02-08Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2010-01-19311: Noise — Noise: Construction Before/After Hours (NM1)
2008
2008-06-19Mortgage assigned — from WELLS FARGO BANK, N.A., AS TRUSTEE to SOVEREIGN BANK
2008-06-19Mortgage $2,879,409 — from 1ST AVENUE ENTERPRISES, LLC to SOVEREIGN BANK$2,879,409
2008-06-19Agreement $3,360,000 — from SOVEREIGN BANK to 1ST AVENUE ENTERPRISES, LLC$3,360,000
2008-06-19AL&R $3,360,000 — from 1ST AVENUE ENTERPRISES, LLC to SOVEREIGN BANK$3,360,000
2008-06-19TL&R — from WELLS FARGO BANK, N.A., AS TRUSTEE to 1ST AVENUE ENTERPRISES, LLC
2008-06-15Tenant complaint: HEATING — HEAT RELATED
2008-02-29Permit EW — ISSUED
2008-02-29Permit EW — ISSUED
2008-02-13Tenant complaint: HEATING — HEAT RELATED
2008-02-12Tenant complaint: HEATING — HEAT RELATED
2008-01-25HPD litigation: Heat and Hot Water
2008-01-22Job filed: Remodel Apt #6 on the 4th floor. No change to use, egress, or occupancy$18,000
2008-01-10City emergency repair (OMO): #2 oil boiler: make all necessary repairs to #2 oil boiler to restore to proper working condition. restore heat and hot $70
2008-01-07Tenant complaint: HEATING — HEAT RELATED
2008-01-07Tenant complaint: HEATING — HEAT RELATED
2008-01-07Tenant complaint: HEATING — HEAT RELATED
2008-01-07Tenant complaint: GENERAL — VENTILATION SYSTEM
2008-01-06Tenant complaint: HEATING — HEAT RELATED
2008-01-06Tenant complaint: HEATING — HEAT RELATED
2008-01-05Tenant complaint: HEATING — HEAT RELATED
2008-01-04Tenant complaint: HEATING — HEAT RELATED
2008-01-04Tenant complaint: HEATING — HEAT RELATED
2008-01-03Tenant complaint: HEATING — HEAT RELATED
2007
2007-12-24Tenant complaint: HEATING — HEAT RELATED
2007-12-18Tenant complaint: HEATING — HEAT RELATED
2007-12-16Tenant complaint: HEATING — HEAT RELATED
2007-12-16Tenant complaint: HEATING — HEAT RELATED
2007-12-02Tenant complaint: HEATING — HEAT RELATED
2007-10-10Tenant complaint: PLUMBING — WATER SUPPLY
2007-10-10Tenant complaint: PLUMBING — WATER SUPPLY
2007-09-20Tenant complaint: GENERAL — DOORS
2007-09-19Tenant complaint: GENERAL — DOORS
2007-09-12Tenant complaint: GENERAL — DOORS
2007-05-02Tenant complaint: HEATING — HEAT RELATED
2007-04-16Tenant complaint: HEATING — HEAT RELATED
2007-02-17Tenant complaint: HEATING — HEAT RELATED
2007-02-07Tenant complaint: HEATING — HEAT RELATED
2007-02-07Tenant complaint: HEATING — HEAT RELATED
2007-01-30DOB complaint, category ?
2007-01-30DOB complaint, category ?
2007-01-22ECB Non-Hazardous violation: B4A,21B,24B,34A,36,38,40,41C,50,A,B,C,D. 36-NEW OIL BOILER INSTALLED W/ PERMIT BUT WAS NOT 1ST TEST INSP & REGISTERED. 50-DEBRIS &$2,500
2007-01-22DOB complaint, category ?
2006
2006-12-02ECB Non-Hazardous violation: FAILURE TO MAINTAIN.DEFECT NOTED:BAR AT 1ST FL LEVEL(COYOTE UGLY)HAS A SECTION OF FL THAT IS DEFECTIVE,THIS SECTION IS LOCATED IN $180
2006-10-07Tenant complaint: HEATING — HEAT RELATED
2006-10-07Tenant complaint: ELECTRIC — BELL-BUZZER/INTERCOM
2006-10-07Tenant complaint: HEATING — HEAT RELATED
2006-09-27City emergency repair (OMO): repair and secure bent up portion of sheetmetal cornice at roof at front of building. approx. 30 lf. paint new work. sca$4,200
2005-03-31ECB Non-Hazardous violation: REFUSAL OF CONSENT IN THAT OWNER OF 153 1AST AVE REFUSED TO ALLOW OWNER OF 240 E 10TH ST TO CARRY THE CHIMNEY HEIGHT OF 153 1ST AV$2,500
2004-12-31Tenant complaint: HEATING — HEAT RELATED
2004-12-30Tenant complaint: HEATING — HEAT RELATED
2004-12-29Tenant complaint: HEATING — HEAT RELATED
2004-12-28Tenant complaint: HEATING — HEAT RELATED
2004-12-28Tenant complaint: HEATING — HEAT RELATED
2004-12-03Job filed: INSTALLATION OF NEW OIL BOILER AND GAS HOT WATER HEATER. ALL AS PE PLANS AND APPLICATIONS FILED HEREWITH. THERE IS NO CHANGE IN USE, OCCUPANMCY OR MEA$20,000
2004-11-16Job filed: A2$45,000
2004-10-22Permit PL — ISSUED
2004-10-07Permit EW — ISSUED
2004-10-07Permit EW — ISSUED
2004-10-07Permit EW — ISSUED
2004-10-04Job filed: A2$45,000
2004-09-14Mortgage assigned — from MERRILL LYNCH CREDIT CORPORATION to MERRILL LYNCH MORTGAGE CAPITAL
2004-09-14Mortgage assigned — from MERRILL LYNCH MORTGAGE CAPITAL to WELLS FARGO BANK N.A. F/K/A NORWEST BANK
2004-05-04Tenant complaint: HEATING — HEAT RELATED
2004-02-12DOB complaint, category ?
2004-02-02Tenant complaint: HEATING — HEAT RELATED
2004-01-27Tenant complaint: HEATING — HEAT RELATED
2004-01-21Tenant complaint: HEATING — HEAT RELATED
2004-01-19Tenant complaint: HEATING — HEAT RELATED
2004-01-15Tenant complaint: HEATING — HEAT RELATED
2004-01-15Tenant complaint: HEATING — HEAT RELATED
2004-01-14Tenant complaint: HEATING — HEAT RELATED
2004-01-14Tenant complaint: HEATING — HEAT RELATED
2004-01-13Tenant complaint: HEATING — HEAT RELATED
2004-01-13Tenant complaint: HEATING — HEAT RELATED
2004-01-10Tenant complaint: HEATING — HEAT RELATED
2004-01-02Tenant complaint: HEATING — HEAT RELATED
2003
2003-12-27HPD class C: SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST LOCATED AT APT 6, 4th STORY, 1st APARTMENT FR
2003-12-27HPD class C: SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST LOCATED AT APT 4, 3rd STORY, 1st APARTMENT FR
2003-12-27Tenant complaint: HEATING — HEAT RELATED
2003-12-26Tenant complaint: HEATING — HEAT RELATED
2003-12-18Tenant complaint: HEATING — HEAT RELATED
2003-12-11Tenant complaint: HEATING — HEAT RELATED
2003-12-04Tenant complaint: HEATING — HEAT RELATED
2003-11-29Tenant complaint: HEATING — HEAT RELATED
2003-11-29Tenant complaint: HEATING — HEAT RELATED
2003-11-29Tenant complaint: HEATING — HEAT RELATED
2003-11-28Tenant complaint: HEATING — HEAT RELATED
2003-11-15Tenant complaint: HEATING — HEAT RELATED
2003-11-14Tenant complaint: HEATING — HEAT RELATED
2003-11-14Tenant complaint: HEATING — HEAT RELATED
2003-11-13Tenant complaint: HEATING — HEAT RELATED
2003-11-13Tenant complaint: HEATING — HEAT RELATED
2003-10-24Tenant complaint: HEATING — HEAT RELATED
2003-08-28Tenant complaint: HEATING — HEAT RELATED
2003-08-26Tenant complaint: HEATING — HEAT RELATED
2003-08-26Tenant complaint: HEATING — HEAT RELATED
2003-08-26Tenant complaint: HEATING — HEAT RELATED
2001
2001-08-21Permit EW — ISSUED
2001-08-10Job filed: REFURBISH APARTMENT # 2; PAINT AND PLASTER TO MATCH EXISTING CONDITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2000
2000-11-20Mortgage assigned — from MERRILL LYNCH CREDITCORPORATION to MERRILL LYNCH MORTGAGE CAPITAL, INC.
2000-11-20Mortgage assigned — from MERRILL LYNCH MORTGAGE CAPITAL, INC. to NORWEST BANK MINNESOTA, NATIONAL ASSOCIA
2000-02-07DOB violation LL6291:
1998
1998-08-13Deed — from 1ST AVENUE ENTERPRISES, INC. to 1ST AVENUE ENTERPRISES, LLC
1998-08-13Mortgage assigned — from 1ST AVENUE ENTERPRISES, LLC to MERRILL LYNCH CREDITCORPORATION
1998-08-13Agreement — from 1ST AVENUE ENTERPRISES, LLC to MERRILL LYNCH CREDITCORPORATION
1998-08-13Mortgage assigned — from DIME SAVINGS BANK OFNEW YORK to MERRILL LYNCH CREDITCORPORATION
1998-08-13SAGE — from DIME SAVINGS BANK OFNEW YORK
1998-08-13SAGE — from DIME SAVINGS BANK OFNEW YORK
1998-08-13Mortgage $135,380 — from 1ST AVENUE ENTERPRISES, LLC to MERRILL LYNCH CREDITCORPORATION$135,380
1997
1997-05-19HPD class B: SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE 4 STY WEST APT 5 CUTLER. , SECTION '' ''
1997-05-19HPD class A: SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE
1996
1996-04-12Permit EW — ISSUED
1996-04-12Permit EW — ISSUED
1996-02-28HPD class C: SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 2 STY EAST APT 4 , SECTION '' ''
1996-02-26HPD class C: SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN & BATHROOM 3 STY EAST APT 4. , SECTION '' ''
1996-02-15HPD class C: SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN & BATHROOM 2 STY REAR APT 1 , SECTION '' ''
1995
1995-09-13DOB complaint, category ?
1995-08-29DOB violation LL6291:
1994
1994-03-18DOB violation LL6291:
1993
1993-03-18DOB violation LL6291:
1992
1992-08-31HPD class C: SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE KITCHEN 2 STY WEST APT 1. , SECTION '' ''
1992-08-06HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF TEMP ELECTRICITY EXPOSED WIRING WALL KITCHEN 2 STY WEST APT 1. LOCAT
1992-08-06HPD class C: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE METAL DOOR FIRE DAMAGE ENTRANCE TO 2 STY WEST APT 1. LOCATED AT APT 1
1992-08-06HPD class B: SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR 2 STY WEST APT 1 MRS TEDALD. LOCATED AT APT 1
1992-08-04DOB complaint, category ?
1992-07-23HPD class B: SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR TO 2 STY REAR APT 1. , SECTION '' ''
1992-07-17HPD class C: SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY THRU OUT 2 STY WEST APT 1. , SECTION '' ''
1992-04-09DOB violation C:
1992-04-09DOB violation C:
1992-03-19HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT BATHROOM EAST WALL NORTH AND SOUTH WA
1992-03-19HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING 5 STY APT 7 MR ANDERSON 477-5
1992-03-19HPD class C: SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT RADIATOR 5 STY APT 7 BATHROOM. , SECT
1992-03-17DOB complaint, category ?
1991
1991-10-10Permit EW — ISSUED
1991-10-09Permit EQ — ISSUED
1991-08-12DOB complaint, category ?
1989
1989-12-12Mortgage $194,246 — from 1ST AVE ENTERPRISESINC to BANKERS FEDERAL SAVINGS$194,246
1989-12-12Mortgage assigned — from 1ST AVE ENTERPRISESINC to BANKERS FEDERAL SAVINGS
1989-12-12Agreement — from 1ST AVE ENTERPRISESINC to BANKERS FEDERAL SAVINGS
1987
1987-03-09HPD class B: D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR 2 STY REAR APT 1 KITCHEN AND CENTER ROOM. , SECTION '' ''
1986
1986-07-30HPD class A: SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE
1986-07-30HPD class A: SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE
1985
1985-02-21Mortgage assigned — from 1ST AVE. ENTERPRS, INC. to BANKERS FDL SVGS&LNETC.
1985-02-21Mortgage $275,000 — from 1ST AVE. ENTERPRS, INC. to BANKERS FDL SVGS&LNETC.$275,000
1980
1980-02-05Deed — from RAPPAPORT, LEWIS J REF; 153 FIRST AVE CORP ETAL to 1ST AVE ENTERPRISESINC