Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

206 Spring Street · Manhattan · BBL 1004900023 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$3,125 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

11 service requests in the last three years. Most common: Food Establishment (4) · Illegal Parking (1) · New Tree Request (1) · Water System (1) · General Construction/Plumbing (1) · Special Projects Inspection Team (SPIT) (1).

Filed construction activity

$924,500 in permitted construction work filed since 2016 (13 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$6,784,000 $3,052,800
2026$7,037,000 $3,166,650
2027$7,218,000 $3,248,100

The city's market estimate has risen 6% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Restaurants in this building

RestaurantCuisineGradeNotes
Chubby CattleJapaneseGrade Pending—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

4 Food Establishment complaints to 311 at this address in the last three years (most often: Rodents/Insects/Garbage, Facility Construction, Food Contains Foreign Object) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwaySpring St — C E · 150 ft straight-line (about a 1-minute walk) · station accessibility: partial (Downtown only)
Houston St — 1 · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: none
BusNearest boarding stop: 6 Av / Spring St — M21 · 200 ft
Citi Bike6 Ave & Broome St · 400 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 003 Charrette School
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

206 Spring Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

11 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $5,250,000 on 2022-06-28 (lender: First Republic Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2022-06-28AL&R $5,250,000 — from 206 SPRING PROPERTY LLC to FIRST REPUBLIC BANK $5,250,000
2022-06-28Mortgage $5,250,000 — from 206 SPRING PROPERTY LLC to FIRST REPUBLIC BANK $5,250,000
2022-04-05Deed $10,500,000 — from 206 SPRING LLC to 206 SPRING PROPERTY LLC $10,500,000
2022-03-23Sold for $10,500,000 $10,500,000 $2,625,000
2013-10-09Agreement $8,900,000 — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS $8,900,000
2013-10-09Mortgage $4,100,000 — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS $4,100,000
2013-10-09AL&R $8,900,000 — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS $8,900,000
2012-12-03Deed $8,000,000 — from 206 SPRING STREET LLC to 206 SPRING LLC $8,000,000
2012-12-03Mortgage $2,000,000 — from 206 SPRING LLC to SIGNATURE BANK $2,000,000
2012-12-03AL&R $4,000,000 — from 206 SPRING LLC to SIGNATURE BANK $4,000,000
2012-12-03Agreement $4,000,000 — from 206 SPRING LLC to SIGNATURE BANK $4,000,000
2012-12-03Mortgage $807,000 — from 206 SPRING LLC to SIGNATURE BANK $807,000
2012-12-03AL&R $2,000,000 — from 206 SPRING LLC to SIGNATURE BANK $2,000,000
2010-04-01Agreement $4,000,000 — from 206 SPRING STREET LLC to JN 206, LLC $4,000,000
2007-03-23RPTT $1,380,000 — from JORDACHE INVESTMENT GROUP; PATERNO, CAROL; HANSON, STEPHEN P; MUCHNICK, HOWARD W; BUEHLER to ELEVENSEVEN HOLDINGS, LLC $1,380,000

Ten-year activity

50250
46
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20171313401646
20189200213
201975101932
202000311317
2021100034
20225206417
20234332416
20247010311
202541240525
20261250614
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 19 records

DateRecord
2026-10-02Restaurant inspection: CHUBBY CATTLE — grade Z
2026-09-29Restaurant inspection: CHUBBY CATTLE
2026-09-29311: Food Establishment — Facility Construction
2026-09-26311: Food Establishment — Rodents/Insects/Garbage
2026-09-20311: Food Establishment — Rodents/Insects/Garbage
2026-09-10311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-06-12ECB CLASS - 2 violation: VF.... CAR IN SIDE COMMUNICATION DEFECTIVE REPAIR... 8.6.4.15..... MACHINE ROOM NO MEANS OF ACCESS PROVIDE MEANS OF ACCESS 40.P,16
2026-05-05311: Elevator — Elevator - Single Device On Property/No Alternate Service
2026-05-05DOB complaint, category ?
2026-03-24Air permit (REGISTRATION), fuel: NATURALGAS
2026-03-23Air permit (REGISTRATION), fuel: NATURALGAS
2026-03-19Restaurant inspection: CHUBBY CATTLE
2026-01-22Rodent inspection: Passed
2026-01-02Job filed: No Work
2025-12-24ECB CLASS - 2 violation: OBSERVED AT EXP1 INSTALLED NON ILLUMINATED 6 ADVERTISING/BUSINESS SIGNS/A-FRAME READS (1) "HV" (2) "CHUBBY CATTLE" (3) "TVG HOSPIT
2025-11-17311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2025-11-17DOB complaint, category ?
2025-11-06Restaurant inspection: CHUBBY CATTLE — grade A
2025-10-23Restaurant inspection: CHUBBY CATTLE

The full timeline

2026
2026-10-02Restaurant inspection: CHUBBY CATTLE — grade Z
2026-09-29Restaurant inspection: CHUBBY CATTLE
2026-09-29311: Food Establishment — Facility Construction
2026-09-26311: Food Establishment — Rodents/Insects/Garbage
2026-09-20311: Food Establishment — Rodents/Insects/Garbage
2026-09-10311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-06-12ECB CLASS - 2 violation: VF.... CAR IN SIDE COMMUNICATION DEFECTIVE REPAIR... 8.6.4.15..... MACHINE ROOM NO MEANS OF ACCESS PROVIDE MEANS OF ACCESS 40.P,16$3,125
2026-05-05311: Elevator — Elevator - Single Device On Property/No Alternate Service
2026-05-05DOB complaint, category ?
2026-03-24Air permit (REGISTRATION), fuel: NATURALGAS
2026-03-23Air permit (REGISTRATION), fuel: NATURALGAS
2026-03-19Restaurant inspection: CHUBBY CATTLE
2026-01-22Rodent inspection: Passed
2026-01-02Job filed: No Work
2025
2025-12-24ECB CLASS - 2 violation: OBSERVED AT EXP1 INSTALLED NON ILLUMINATED 6 ADVERTISING/BUSINESS SIGNS/A-FRAME READS (1) "HV" (2) "CHUBBY CATTLE" (3) "TVG HOSPIT
2025-11-17311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2025-11-17DOB complaint, category ?
2025-11-06Restaurant inspection: CHUBBY CATTLE — grade A
2025-10-23Restaurant inspection: CHUBBY CATTLE
2025-10-09311: Food Establishment — Food Contains Foreign Object
2025-09-02Boiler inspection
2025-09-02Boiler inspection
2025-05-19311: General Construction/Plumbing — Building Permit - None
2025-05-19DOB complaint, category ?
2025-04-28311: Water System — Leak (Use Comments) (WA2)
2025-03-27Certificate of occupancy Final
2025-03-27Certificate of occupancy Final
2025-02-20Certificate of occupancy Renewal Without Change
2025-02-03Job filed: REMOVE EXISTING COOLING TOWER PIPING AT ROOF (COOLING TOWER TO REMAIN). PROVIDE NEW AIR-COOLED DX SPLIT-SYSTEM UNITS TO SERVE HEATINGAND COOLING LOADS$78,000
2025-01-23FDNY inspection (RISK)
2025-01-23FDNY inspection (COM_OCPCY)
2025-01-23FDNY inspection (COM_OCPCY)
2025-01-23FDNY inspection (AGED_OUT)
2025-01-23FDNY inspection (COM_OCPCY)
2025-01-23FDNY inspection (E-CIDS)
2025-01-23FDNY inspection (COM_OCPCY)
2025-01-21FDNY inspection (AGED_OUT)
2025-01-21FDNY inspection (E-CIDS)
2025-01-16Rodent inspection: Passed
2024
2024-12-30Permit Mechanical Systems — Signed-off
2024-11-15Boiler inspection
2024-11-15Boiler inspection
2024-11-06Certificate of occupancy Renewal Without Change
2024-09-10Job filed: REMOVE EXISTING COOLING TOWER PIPING AT ROOF (COOLING TOWER TO REMAIN). PROVIDE NEW AIR-COOLED DX SPLIT-SYSTEM UNITS TO SERVE HEATINGAND COOLING LOADS$78,000
2024-08-13Certificate of occupancy Renewal Without Change
2024-05-17Certificate of occupancy Renewal Without Change
2024-04-28311: New Tree Request — For One Address
2024-04-26Permit PL — ISSUED
2024-01-26Certificate of occupancy Renewal Without Change
2024-01-18Rodent inspection: Passed
2023
2023-11-21Mortgage assigned — from FIRST REPUBLIC BANK; JPMORGAN CHASE BANK, N.A.; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-21Mortgage assigned — from JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-10311: Illegal Parking — License Plate Obscured
2023-10-30Certificate of occupancy Renewal Without Change
2023-08-30FDNY inspection (RISK)
2023-08-21311: Lost Property — Electronics/Phones
2023-08-16311: Commercial Disposal Complaint — Waste Left in Front of Residence
2023-07-28Certificate of occupancy Renewal Without Change
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-05-02Certificate of occupancy Renewal Without Change
2023-04-13Boiler inspection
2023-03-30Boiler inspection
2023-03-30Boiler inspection — defects found
2023-02-08Certificate of occupancy Renewal Without Change
2023-01-30Rodent inspection: Passed
2022
2022-11-16Certificate of occupancy Renewal Without Change
2022-10-19Job filed: No Work
2022-09-14Boiler inspection
2022-09-14Boiler inspection
2022-08-23Certificate of occupancy Renewal Without Change
2022-06-28AL&R $5,250,000 — from 206 SPRING PROPERTY LLC to FIRST REPUBLIC BANK$5,250,000
2022-06-28Mortgage $5,250,000 — from 206 SPRING PROPERTY LLC to FIRST REPUBLIC BANK$5,250,000
2022-05-24Certificate of occupancy Renewal Without Change
2022-05-18FDNY inspection (RISK)
2022-05-11FDNY inspection (COM_OCPCY)
2022-04-26Rodent inspection: Failed for Rat Activity
2022-04-05TL&R — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2022-04-05Mortgage satisfied — from 206 SPRING LLC to U.S. BANK NATIONAL ASSOCIATION
2022-04-05Deed $10,500,000 — from 206 SPRING LLC to 206 SPRING PROPERTY LLC$10,500,000
2022-03-29Rodent inspection: Failed for Rat Activity
2022-03-23Sold for $10,500,000$10,500,000
2022-03-04Certificate of occupancy Renewal Without Change
2021
2021-11-29Certificate of occupancy Renewal Without Change
2021-08-02Rodent inspection: Passed
2021-07-30Boiler inspection
2021-07-30Boiler inspection
2020
2020-10-20LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-08-21311: Outdoor Dining — Site Setup Condition
2020-06-28311: Noise - Commercial — Loud Talking
2020-06-28311: Noise - Commercial — Loud Music/Party
2020-02-20Boiler inspection
2020-02-20Boiler inspection
2020-01-14Cooling tower inspection — violation AH9C
2020-01-14Cooling tower inspection — violation AH8J
2020-01-14Cooling tower inspection — violation AH8C
2020-01-14Cooling tower inspection — violation AH8L
2020-01-14Cooling tower inspection — violation AH8D
2020-01-14Cooling tower inspection — violation AH8Q
2020-01-14Cooling tower inspection — violation AH8S
2020-01-14Cooling tower inspection — violation AH8G
2020-01-14Cooling tower inspection — violation AH8R
2020-01-14Cooling tower inspection — violation AH8B
2020-01-14Cooling tower inspection — violation AH8E
2019
2019-12-30FDNY inspection (RISK)
2019-12-30FDNY inspection (COM_OCPCY)
2019-12-17Rodent inspection: Passed
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-04DOB complaint, category ?
2019-11-01Rodent inspection: Failed for Other Reason
2019-06-24311: Construction Safety Enforcement — CSC - Monitoring Tracking
2019-05-08Boiler inspection
2019-05-08Boiler inspection
2019-05-07Permit PL — ISSUED
2019-05-07Permit PL — ISSUED
2019-05-03Permit EW — ISSUED
2019-05-03Permit EW — ISSUED
2019-05-02Rodent inspection: Passed
2019-04-12Job filed: INTERIOR ALTERATION FOR EXISTING OFFICE SPACE AT THIRD FLOOR. INCLUDING NEW GLASS PARTITIONS AND INSTALLATION OF A PANTRY SINK$50,000
2019-03-01Certificate of occupancy Temporary
2019-02-28Certificate of occupancy Temporary
2019-01-02Cooling tower inspection — violation AH8W
2019-01-02Cooling tower inspection — violation AH8L
2019-01-02Cooling tower inspection — violation AH8R
2019-01-02Cooling tower inspection — violation AH8A
2019-01-02Cooling tower inspection — violation AH8X
2019-01-02Cooling tower inspection — violation AH8E
2019-01-02Cooling tower inspection — violation AH9C
2019-01-02Cooling tower inspection — violation AH8F
2019-01-02Cooling tower inspection — violation AH8Q
2019-01-02Cooling tower inspection — violation AH8H
2019-01-02Cooling tower inspection — violation AH8S
2019-01-02Cooling tower inspection — violation AH8D
2019-01-02Cooling tower inspection — violation AH8C
2019-01-02Cooling tower inspection — violation AH8T
2018
2018-11-30Job filed: PA
2018-10-24Permit EW — ISSUED
2018-10-24Permit EW — ISSUED
2018-10-02Job filed: A2
2018-07-19Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$16,000
2018-07-05Rodent inspection: Passed
2018-05-07Permit EW — ISSUED
2018-04-16DOB violation E:
2018-03-19Permit EW — ISSUED
2018-02-26Job filed: INSTALL THE FIRE SUPPRESSION SYSTEM @ 1ST & 2ND FLOOR IN CONJUNCTION WITH #123114879 AS PER PLAN. FIRE SUPP. NO CHANGE IN USE, EGRESS OR OCCUPANCY$27,500
2018-02-26Job filed: INSTALL THE FIRE SUPPRESSION SYSTEM @ 1ST & 2ND FLOOR IN CONJUNCTION WITH #123114879 AS PER PLAN. FIRE SUPP. NO CHANGE IN USE, EGRESS OR OCCUPANCY$27,500
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-10Permit PL — ISSUED
2017
2017-11-21Permit EW — ISSUED
2017-11-21Permit EW — ISSUED
2017-10-11Job filed: REFURBISHING EXISTING EATING & DRINKING ESTABLISHMENT: INSTALL NEW CONVENIENT METAL STAIR, NEW VENTILATED DINING TABLES, NEW COOKING EQUIPMENT, NE$280,500
2017-10-11Job filed: REFURBISHING EXISTING EATING & DRINKING ESTABLISHMENT: INSTALL NEW CONVENIENT METAL STAIR, NEW VENTILATED DINING TABLES, NEW COOKING EQUIPMENT, NE$280,500
2017-10-05Certificate of occupancy Temporary
2017-09-27ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35290207N ISSUED ON 08/21/17 AND TO FILE A CERTIFIC$800
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-08-21ECB CLASS - 3 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. FDNY CONNECTION AT FROM BLDG OBSTRUCTED W/MATERIALS AROUND THE CAP & OTHER CAP $100
2017-08-08Permit EW — ISSUED
2017-08-03Job filed: FILING HEREWITH FOR THE INSTALLATION OF INTERIOR PARTITIONS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2017-07-14Rodent inspection: Passed
2017-06-30Certificate of occupancy Temporary
2017-06-26DOB violation C: FLEX SIGN , APPROX 18FT WIDE X 2FT HIGH, ERECTED ACROSS 1ST FLOOR TOP, W/O PERMIT
2017-06-26ECB CLASS - 3 violation: FLEX SIGN,APPROX 18FT WIDE X 2FT HIGH,ERECTED ACROSS 1ST FL TOP W/O PERMIT. REMEDY: COMPLY W/NOTICE OF VIOLATION.$100
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERT THAT COOLING TOWER 1000005479 HAS BEEN INSPECTED,TESTED,& DISINFECTED, & THAT A MAINTENANCE PLAN HAS B
2017-06-15Certificate of occupancy Temporary
2017-06-06Permit EW — ISSUED
2017-05-02311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2017-05-02311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2017-05-02311: Elevator — Elevator Not Inspected/Illegal/No Permit
2017-05-02DOB complaint, category ?
2017-05-02DOB complaint, category ?
2017-05-02DOB complaint, category ?
2017-05-01311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2017-05-01DOB complaint, category ?
2017-04-10Cooling tower inspection — violation AH8L
2017-04-10Cooling tower inspection — violation AH8C
2017-04-10Cooling tower inspection — violation AH8H
2017-04-10Cooling tower inspection — violation AH8X
2017-04-10Cooling tower inspection — violation AH8R
2017-04-10Cooling tower inspection — violation AH8W
2017-04-10Cooling tower inspection — violation AH8A
2017-04-10Cooling tower inspection — violation AH8T
2017-04-10Cooling tower inspection — violation AH8Q
2017-04-10Cooling tower inspection — violation AH8S
2017-04-10Cooling tower inspection — violation AH8F
2017-04-10Cooling tower inspection — violation AH8D
2017-04-10Cooling tower inspection — violation AH8K
2017-04-10Cooling tower inspection — violation AH9C
2017-04-10Cooling tower inspection — violation AH8E
2017-04-05DOB violation E:
2017-04-03Permit EW — ISSUED
2017-02-14FDNY inspection (SPECIAL-OTH)
2017-02-01Permit EW — ISSUED
2017-01-31Job filed: INSTALL NEW HVAC EQUIPMENT ON THE 3RD FLOOR AND ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-23Job filed: SPRINKLER WORK BEING DONE ON THE 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$16,250
2016-12-23Job filed: SPRINKLER WORK BEING DONE ON THE 3RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$16,250
2016-11-09Rodent inspection: Passed
2016-11-02Certificate of occupancy Temporary
2016-10-04Permit EW — ISSUED
2016-09-15Permit PL — ISSUED
2016-08-08Permit EW — ISSUED
2016-08-02Job filed: INTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT ON THE THIRD FLOOR WORK TO INCLUDE REMOVING PARTITIONS, DOORS, BAR, AND FINISHES FLO$17,500
2016-08-02Job filed: INTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT ON THE THIRD FLOOR WORK TO INCLUDE REMOVING PARTITIONS, DOORS, BAR, AND FINISHES FLO$17,500
2016-07-22Certificate of occupancy Temporary
2016-03-16DOB violation E:
2016-03-16DOB violation E:
2016-03-01Certificate of occupancy Temporary
2015
2015-12-22Rodent inspection: Passed
2015-11-13311: Noise — Noise: Construction Before/After Hours (NM1)
2015-10-21FDNY inspection (RISK)
2015-07-08Permit EW — ISSUED
2015-07-08Permit EW — ISSUED
2015-07-08Permit PL — ISSUED
2015-03-19Certificate of occupancy Temporary
2015-03-18DOB violation E:
2015-03-07311: Noise — Noise: air condition/ventilation equipment (NV1)
2015-03-04311: Noise — Noise: air condition/ventilation equipment (NV1)
2015-02-17Permit SG — ISSUED
2015-02-11Permit AL — ISSUED
2015-02-05Job filed: MINOR INTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT INCLUDING REMOVAL OF THE EXTERIOR ENTRANCE AWNING AND ASSOCIATED FACADE REPAIR$40,000
2015-02-05Job filed: MINOR INTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT INCLUDING REMOVAL OF THE EXTERIOR ENTRANCE AWNING AND ASSOCIATED FACADE REPAIR$40,000
2014
2014-12-30Certificate of occupancy Temporary
2014-11-17Permit EW — ISSUED
2014-09-05Certificate of occupancy Temporary
2014-07-03Permit EW — ISSUED
2014-07-03Permit PL — ISSUED
2014-07-03Permit EW — ISSUED
2014-07-03Permit EW — ISSUED
2014-06-19Job filed: REPLACE BOILERS AND HOT WATER HEATERS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY,$54,000
2014-06-17Job filed: REPLACE BOILERS AND HOT WATER HEATERS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$54,000
2014-05-21Permit PL — ISSUED
2014-05-15Permit PL — ISSUED
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-13Permit PL — ISSUED
2014-04-20311: Water System — Excessive Water In Basement (WEFB)
2014-04-19311: Water System — Leak (Use Comments) (WA2)
2014-04-19311: Water System — Leak (Use Comments) (WA2)
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-18DOB violation E:
2014-03-18DOB violation E:
2014-02-18AALR — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2014-02-18Mortgage assigned — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013
2013-12-06DOB complaint, category ?
2013-11-11311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2013-11-11311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2013-11-11DOB complaint, category ?
2013-11-11DOB complaint, category ?
2013-10-17311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2013-10-17DOB complaint, category ?
2013-10-09TL&R — from SIGNATURE BANK
2013-10-09TL&R — from SIGNATURE BANK
2013-10-09Agreement $8,900,000 — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS$8,900,000
2013-10-09Mortgage $4,100,000 — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS$4,100,000
2013-10-09Mortgage assigned — from SIGNATURE BANK to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2013-10-09Mortgage assigned — from SIGNATURE BANK to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2013-10-09AL&R $8,900,000 — from 206 SPRING LLC to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS$8,900,000
2013-10-03311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2013-10-03DOB complaint, category ?
2013-09-16Permit EW — ISSUED
2013-08-14DOB complaint, category ?
2013-08-09Permit PL — ISSUED
2013-08-02Permit EW — ISSUED
2013-08-02Permit EW — ISSUED
2013-07-25ECB CLASS - 1 violation: WORK W/O A PERMIT. WORK NOTED: 5TH FL ERECTED METAL STUDS CREATING INTERIOR WALL PARTITIONS & ERECTING (ROUGH) FOR PLUMBING. STOP $800
2013-07-01Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$28,322
2013-07-01Job filed: REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$75,000
2013-07-01Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$70,000
2013-06-13311: Building/Use — Illegal Conversion Of Residential Building/Space
2013-05-13Permit PL — ISSUED
2013-05-12311: Dirty Conditions — E3 Dirty Sidewalk
2013-05-09Job filed: INSTALLATION OF NEW GAS SUB-METER IN ROOFTOP BOILER ROOM AS PER PLANS NO CHANGE IN USE, OCCUPANCY OR EGRESS( THIS WORK IS NOT ALLOWED AS PER PLUMBING $3,500
2013-05-09Job filed: INSTALLATION OF NEW GAS SUB-METER IN ROOFTOP BOILER ROOM AS PER PLANS NO CHANGE IN USE, OCCUPANCY OR EGRESS( THIS WORK IS NOT ALLOWED AS PER PLUMBING $3,500
2013-05-05DOB complaint, category ?
2013-05-01Permit AL — ISSUED
2013-05-01Permit AL — ISSUED
2013-05-01Permit AL — ISSUED
2013-04-29311: Electrical — Electrical Wiring Defective/Exposed
2013-04-29DOB complaint, category ?
2013-04-25311: Building/Use — Illegal Conversion Of Residential Building/Space
2013-04-25DOB complaint, category ?
2013-04-18DOB complaint, category ?
2013-04-08311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2013-04-06311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2013-04-06DOB complaint, category ?
2013-04-04Job filed: INSTALLATION OF A NEW AWNING AT 1ST FLOOR, AT AWNING #2$2,000
2013-04-04Job filed: INSTALLATION OF A NEW AWNING AT 1ST FLOOR.$6,000
2013-04-04Job filed: INSTALLATION OF A NEW AWNING AT 1ST FLOOR, AT AWNING # 3$2,000
2013-04-04Job filed: INSTALLATION OF A NEW AWNING AT 1ST FLOOR, AT AWNING # 3$2,000
2013-04-01Permit AL — ISSUED
2013-03-29ECB CLASS - 1 violation: OAC FAILURE TO HAVE LICENSED SIGN HANGER ATTACH OR ERECT SIGN. (BILLBOARDS 646-998-4439) REMEDY: REMOVE ILLEGAL SIGN.
2013-03-29ECB CLASS - 1 violation: PROPERTY OWNER ACTING AS OAC FAILURE TO OBTAIN OAC REGISTRATION # WHILE ENGAGING IN THE OUTDOOR AD BUSINESS (BILLBOARDS 646-998-44
2013-03-29ECB CLASS - 1 violation: OAC SIGN PROHIBITED IN C1-5 DISTRICT. (BILLBOARDS 646-998-4439) REMEDY: REMOVE ILLEGAL SIGN.$10,000
2013-03-29ECB CLASS - 1 violation: OAC SIGN ON DISPLAY W/O A PERMIT. (BILLBOARDS 646-998-4439) REMEDY: REMOVE ILLEGAL SIGN.
2013-03-29ECB CLASS - 1 violation: OAC FAILURE TO HAVE LICENSED SIGN HANGER ATTACH OR ERECT SIGN. (BILLBOARDS 646-998-4439) REMEDY: REMOVE ILLEGAL SIGN.
2013-03-29ECB CLASS - 1 violation: OAC FAILURE TO HAVE LICENSED SIGN HANGER ATTACH UL CLASSIFICATION MARKOR DATE OF SIGN'S ERECTION TO CORNER OF SIGN FABRIC. (BILLBO
2013-03-29ECB CLASS - 1 violation: OAC FAILURE TO HAVE LICENSED SIGN HANGER ATTACH UL CLASSIFICATION MARKOR DATE OF SIGN'S ERECTION TO CORNER OF SIGN FABRIC. (BILLBO
2013-03-29ECB CLASS - 1 violation: OAC SIGN PROHIBITED IN C1-5 DISTRICT. (BILLBOARDS 646-998-4439) REMEDY: REMOVE ILLEGAL SIGN.$10,000
2013-03-29ECB CLASS - 1 violation: OAC SIGN ON DISPLAY W/O PERMIT. (BILLBOARDS 646-998-4439) REMEDY: REMOVE ILLEGAL SIGN.
2013-03-26311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2013-03-26DOB complaint, category ?
2013-03-14Permit EW — ISSUED
2013-03-13Permit EQ — ISSUED
2013-03-11Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY
2013-03-06Permit EW — ISSUED
2013-03-04Job filed: INSTALL (1) NEW KITCHEN FIRE SUPPRESSION SYSTEM AND REPIPE (2) EXISTING FIRE SUPPRESSION SYSTEMS ONLY AS SHOWN ON PLANS. NO CHANGE IN OCCUPANCY, USE, $4,000
2013-03-04Job filed: INSTALL (1) NEW KITCHEN FIRE SUPPRESSION SYSTEM AND REPIPE (2) EXISTING FIRE SUPPRESSION SYSTEMS ONLY AS SHOWN ON PLANS. NO CHANGE IN OCCUPANCY, USE, $4,000
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-02-20Permit PL — ISSUED
2013-02-20Job filed: PA
2013-02-20Job filed: PA
2013-02-15Job filed: REPAIR EXISTING FACADE AND AMNED EXISTING C OF O FOR CEL, 001-005.$10,000
2013-02-15Job filed: REPAIR EXISTING FACADE AND AMNED EXISTING C OF O FOR CEL, 001-005.$10,000
2013-02-14Job filed: FILING HEREWITH FOR MINOR INTERIOR RENOVATIONS.$24,000
2013-02-08Job filed: MINOR PLUMBING WORK AS PER PLANS, NEW GAS METER AND GAS RISER TO THE ROOFTOP AC UNIT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$5,000
2013-02-08Job filed: MINOR PLUMBING WORK AS PER PLANS, NEW GAS METER AND GAS RISER TO THE ROOFTOP AC UNIT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$5,000
2013-02-08Job filed: FILING HEREWITH FOR MINOR INTERIOR RENOVATIONS.$20,000
2013-01-24311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2013-01-24311: Boilers — Boiler - Defective/Inoperative/No Permit
2013-01-24311: General Construction/Plumbing — Failure To Maintain
2013-01-24311: General Construction/Plumbing — Facade - Defective/Cracking (Ll11/98)
2013-01-24311: Elevator — Elevator Not Inspected/Illegal/No Permit
2013-01-24311: Elevator — Elevator - Defective/Not Working
2013-01-24311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2013-01-24DOB complaint, category ?
2012
2012-12-11Permit PL — ISSUED
2012-12-03Deed $8,000,000 — from 206 SPRING STREET LLC to 206 SPRING LLC$8,000,000
2012-12-03Mortgage $2,000,000 — from 206 SPRING LLC to SIGNATURE BANK$2,000,000
2012-12-03AL&R $4,000,000 — from 206 SPRING LLC to SIGNATURE BANK$4,000,000
2012-12-03Agreement $4,000,000 — from 206 SPRING LLC to SIGNATURE BANK$4,000,000
2012-12-03Mortgage $807,000 — from 206 SPRING LLC to SIGNATURE BANK$807,000
2012-12-03Mortgage assigned — from JN 206, LLC to SIGNATURE BANK
2012-12-03AL&R $2,000,000 — from 206 SPRING LLC to SIGNATURE BANK$2,000,000
2012-11-21Permit EW — ISSUED
2012-11-21Job filed: INTERIOR RENOVATION OF COMMERCIAL SPACE. MINOR PARTITION CHANGES AND MINOR PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$181,880
2012-08-15DOB violation E:
2012-04-16DOB violation E:
2012-04-13Rodent inspection: Passed
2011
2011-10-05311: Dirty Conditions — E12 Illegal Dumping Surveillance
2011-07-27DOB complaint, category ?
2011-07-20311: General Construction/Plumbing — Failure To Maintain
2011-07-20DOB complaint, category ?
2011-07-16ECB CLASS - 1 violation: C/O #10293989H HAS NO OCCUPANCY AT ROOF LVL 6FL ONLY MECHANICAL ROOM AND ELEVATOR BULKHEAD AT TIME OF INSP THERE WERE FIVE PORTABL$2,400
2011-07-11311: General Construction/Plumbing — Failure To Maintain
2011-07-11DOB complaint, category ?
2011-03-28Rodent inspection: Passed
2010
2010-12-16311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2010-07-19311: Food Establishment — Rodents/Insects/Garbage
2010-07-15311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2010-07-15DOB complaint, category ?
2010-06-28ECB CLASS - 2 violation: 34M07,39Q03,40R09,70T07. 39Q- WORK LIGHT 34M- 5TH FL FASCIA (DOORLOCK ASS) HAND BOX COVER. 40R- REMOVE NON ELEVATOR RELATED EQUIPM
2010-04-01TL&R — from 206 SPRING STREET LLC to ISRAEL DISCOUNT BANK OF NEW YORK
2010-04-01TL&R — from 206 SPRING STREET LLC to ISRAEL DISCOUNT BANK OF NEW YORK
2010-04-01Agreement $4,000,000 — from 206 SPRING STREET LLC to JN 206, LLC$4,000,000
2010-04-01Mortgage assigned — from ISRAEL DISCOUNT BANK OF NEW YORK to JN 206, LLC
2010-04-01Mortgage assigned — from ISRAEL DISCOUNT BANK OF NEW YORK to JN 206, LLC
2010-03-05Rodent inspection: Passed
2009
2009-04-22DOB violation E:
2008
2008-11-05DOB violation E:
2007
2007-11-07DOB violation E:
2007-09-21Permit EW — ISSUED
2007-09-12Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUPA NCY GAS VALVE WAS FILED UNDER APPLI# 102526278$3,000
2007-03-23RPTT $1,380,000 — from JORDACHE INVESTMENT GROUP; PATERNO, CAROL; HANSON, STEPHEN P; MUCHNICK, HOWARD W; BUEHLER to ELEVENSEVEN HOLDINGS, LLC$1,380,000
2007-03-02DOB violation E:
2005
2005-09-09Permit EW — ISSUED
2005-08-25Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY.NO CHANGE IN USE,EGRESS OR OCCUPANCY. GAS VALVE WAS FILLED UNDERAPPL. #120526278.$3,000
2005-08-25Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY.NO CHANGE IN USE,EGRESS OR OCCUPANCY. GAS VALVE WAS FILLED UNDERAPPL. #120526278.$3,000
2005-08-01DOB violation E:
2005-06-10Permit EW — ISSUED
2003
2003-01-14AL&R — from ISRAEL DISCOUNT BANK OF NEW YORK to 206 SPRING STREET LLC
2003-01-14Mortgage $922,582 — from 206 SPRING STREET LLC to ISRAEL DISCOUNT BANK OF NEW YORK$922,582
2002
2002-12-06Permit EW — ISSUED
2002-11-27Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY GAS VALVE WAS FILED UNDER APPLI#10 526278 NO CHANGE IN USE EGRESS OR OCCUPA NCY.$1,000
2002-04-08Permit EW — ISSUED
2002-03-26DOB violation LL6291:
2002-03-26DOB violation LL6291:
2002-03-19Job filed: SPRINKLER BOOSTER PUMP APPROVED UNDER AP PLICATION # 102480646 BUT LEFT FF SCHEDULE 'B'. NO CHANGE IN USE, EGRES S OR OCCUPANCY.$1,000
2002-03-19Job filed: SPRINKLER BOOSTER PUMP APPROVED UNDER AP PLICATION # 102480646 BUT LEFT FF SCHEDULE 'B'. NO CHANGE IN USE, EGRES S OR OCCUPANCY.$1,000
2002-03-06Permit EW — ISSUED
2002-03-06Permit EW — ISSUED
2002-02-11SAGE — from STEWART TITLE INSURANCE COMPANY
2002-02-11SAGE — from 206 SPRING STREET LLC
2002-01-29Permit PL — ISSUED
2002-01-09Permit EW — ISSUED
2001
2001-12-10Permit EW — ISSUED
2001-11-02DOB complaint, category ?
2001-10-31Permit EQ — ISSUED
2001-10-25Job filed: Propose to install new partitions, ceilings and doors. No change to use, egress or occupancy.$75,000
2001-10-25Job filed: Propose to install new partitions, ceilings and doors. No change to use, egress or occupancy.$75,000
2001-10-18Job filed: PROPOSE TO INSTALL NEW AWNING, 3'-0" FRO OM THE PROPERTY, WITH WORDING IAMMA OSTERIA'. NO CHANGE TO USE, EGRESS OR OCCUPANCY.NON-ILLUMINATED AWNI$3,000
2001-10-18Job filed: PROPOSE TO INSTALL NEW STRUCTURAL FRAMIN G FOR NEW AWNING. NO CHANGE TO SE, EGRESS OR OCCUPANCY.$3,000
2001-10-18Job filed: PROPOSE TO INSTALL NEW STRUCTURAL FRAMIN G FOR NEW AWNING. NO CHANGE TO SE, EGRESS OR OCCUPANCY.$3,000
2001-09-21Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK BRIDGE, 25' DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. SHED TO COMPLY WITH LL33/91.
2001-08-03Permit EQ — ISSUED
2001-08-03Permit EW — ISSUED
2001-08-03Permit EW — ISSUED
2001-07-31Job filed: PROPOSE TO INSTALL 2 NEW BOILERS. PLUMBING FOR GAS FILED UNDER APPLICATION 1024944427. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$23,000
2001-07-31Job filed: PROPOSE TO INSTALL 2 NEW BOILERS. PLUMBING FOR GAS FILED UNDER APPLICATION 1024944427. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$23,000
2001-07-30Permit AL — ISSUED
2001-07-30Permit PL — ISSUED
2001-07-27Job filed: PA
2001-07-27Job filed: PA
2001-07-27Job filed: PA
2001-07-27Job filed: PA
2001-07-27Job filed: PA
2001-07-24Job filed: PROPOSE TO INSTALL PLUMBING FIXTURES WITH RELATED PIPING. NO CHANGE TO USE,EGRESS OR OCCUPANCY.$10,000
2001-07-24Job filed: PROPOSE TO INSTALL PLUMBING FIXTURES WITH RELATED PIPING. NO CHANGE TO USE,EGRESS OR OCCUPANCY.$10,000
2001-05-24Permit EW — ISSUED
2001-05-10Job filed: Propose to install new sidewalk vault and new concrete sidewalk. Propose to create a new water main room, gas meter room and beverage walk-in freezer$30,000
2001-05-10Job filed: Propose to install new sidewalk vault and new concrete sidewalk. Propose to create a new water main room, gas meter room and beverage walk-in freezer$30,000
2001-05-10Job filed: Propose to install new concrete, beams and structural steel to create a new vault. Also, install new structural steel to create new structural steel $41,000
2001-05-10Job filed: Propose to install new concrete, beams and structural steel to create a new vault. Also, install new structural steel to create new structural steel $41,000
2001-04-27Job filed: PROPOSE TO INSTALL MECHANICAL DUCTWORK . NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2001-04-27Job filed: PROPOSE TO INSTALL MECHANICAL DUCTWORK . NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2001-04-25Permit EW — ISSUED
2001-04-24Job filed: PROPOSE TO FILE FOR AN INTERIOR CODED FIRE ALARM SYSTEM AS PER PLAN/S SUBMITTED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$5,000
2001-04-24Job filed: PROPOSE TO FILE FOR AN INTERIOR CODED FIRE ALARM SYSTEM AS PER PLAN/S SUBMITTED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$5,000
2001-04-11Job filed: INSTALL FIRE SUPPRESSION SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY$2,000
2001-04-11Job filed: INSTALL FIRE SUPPRESSION SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY$2,000
2001-04-05Permit PL — ISSUED
2001-04-05Permit PL — ISSUED
2001-04-04Permit PL — ISSUED
2001-03-14Job filed: PLUMBING MODIFICATIONS AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$88,000
2001-02-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$35,000
2001-02-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$35,000
2001-02-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$35,000
2001-02-08Permit EW — RE-ISSUED
2001-02-08Permit EW — RE-ISSUED
2001-01-23Job filed: Propose to construct new exit stair. No change to use, egress or occupancy.$64,000
2001-01-23Job filed: Propose to renovate existing stairs and floors. Construct new partitions, ceilings and doors. No change to use, egress or occupancy.$206,000
2001-01-23Job filed: Propose to construct new exit stair. No change to use, egress or occupancy.$64,000
2001-01-10Job filed: PROPOSE TO INSTALL NEW RESTAURANT ON 1ST, 2ND AND 3RD FLOORS WITH ACCESSORY OFFI CES ON THE 4TH AND 5TH FLOORS. ADD NEW 6TH FLOOR FOR ACCESSORY OFFIC$1,000
2000
2000-12-19Permit SG — ISSUED
2000-11-22Mortgage $4,500,000 — from 206 SPRING STREET LLC to ISRAEL DISCOUNT BANKOF NEW YORK$4,500,000
2000-11-22Deed — from WEST SPRING ESTATE,INC. to 206 SPRING STREET LLC
2000-11-22Mortgage assigned — from 206 SPRING STREET LLC to ISRAEL DISCOUNT BANKOF NEW YORK
2000-11-17Permit EW — RE-ISSUED
2000-11-16Job filed: PROPOSE TO DEMO EXISTING INTERIOR PARTITIONS, CEILINGS AND DOORS. REMOVE PLUMBING FIXTURES, REMOVE BOILER AND OIL TANK. NO CHANGE TO USE, EGRESS O$37,000
2000-02-23DOB violation E: 1F1761
2000-02-07DOB violation LL6291:
1998
1998-07-22ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL NOTED: PARPER WALL AT EAST SIDE NEEDS REPOINTING. ELEVATOR BULKHEAD HAS LOOSE BRICK AT
1998-07-21DOB complaint, category ?
1995
1995-08-29DOB violation LL6291:
1992
1992-01-30ECB Non-Hazardous violation: 46T,47#,74Y, (47) SHORTEN GOVERNOR CABLE (74) CLEAN THE OIL FROM THE TOP OF THE CAR.
1990
1990-04-02ECB Non-Hazardous violation: COMBUSTION CHAMBER COLLAPSED. WATER GUAGE GLASS DIRTY.
1990-01-17DOB violation E:

Support this site Back to the building page