113 Spring Street · Manhattan · BBL 1004990039
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
3 service requests in the last three years. Most common: Commercial Disposal Complaint (1) · Noise (1) · Residential Disposal Complaint (1).
Filed construction activity
$12,453,879 in permitted construction work filed since
2016 (44 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$10,694,000
$4,812,300
2026
$10,338,000
$4,652,100
2027
$14,755,000
$6,639,750
The city's market estimate has risen
38% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Prince St — R W · 550 ft straight-line (about a 3-minute walk) · station accessibility: none Spring St — 6 · 800 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Broadway / Spring St — M1 M55 · 400 ft
Citi Bike
Mercer St & Spring St · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
3 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $4,300,000 on
2012-11-15 (lender: Safra National Bank Of New York). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-01-23
Deed $42,750,000 — from PPF RTL 113 SPRING STREET, LLC to SOHO RETAIL PORTFOLIO 113 SPRING STREET
$42,750,000
2026-01-15
Sold for $42,750,000
$42,750,000
$7,125,000
2015-08-21
ASPM $18,927,900 — from PPF RTL 113 SPRING STREET, LLC to SAFRA NATIONAL BANK OF NEW YORK
$18,927,900
2015-08-21
Deed $68,000,000 — from 113 SPRING OWNERS LLC; TAWIL 113 SPRING LLC to PPF RTL 113 SPRING STREET, LLC
$68,000,000
2012-11-15
AL&R $20,000,000 — from TAWIL 113 SPRING LLC; 113 SPRING OWNERS LLC to SAFRA NATIONAL BANK OF NEW YORK
$20,000,000
2012-11-15
Agreement $20,000,000 — from 113 SPRING OWNERS LLC; TAWIL 113 SPRING LLC to SAFRA NATIONAL BANK OF NEW YORK
$20,000,000
2012-11-15
Deed $32,500,000 — from WILLCITY HOLDINGS, LLC to TAWIL 113 SPRING LLC; 113 SPRING OWNERS LLC
$32,500,000
2012-11-15
Mortgage $4,300,000 — from TAWIL 113 SPRING LLC; 113 SPRING OWNERS LLC to SAFRA NATIONAL BANK OF NEW YORK
$4,300,000
2008-12-09
Deed $23,850,000 — from NEW SPRING CO., L.L.C., C/O MANDELBAUM S to WILLCITY HOLDINGS, LLC
$23,850,000
2008-12-04
AL&R $15,700,000 — from WILLCITY HOLDINGS, LLC C/O WILLETT COMPA to ALLIED IRISH BANKS, P.L.C
$15,700,000
2008-12-04
Mortgage $15,700,000 — from WILLCITY HOLDINGS, LLC C/O WILLETT COMPA to ALLIED IRISH BANKS, P.L.C
$15,700,000
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
29
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
3
0
1
4
2018
0
6
2
0
1
9
2019
0
6
3
0
1
10
2020
5
0
0
0
0
5
2021
15
1
1
0
4
21
2022
10
0
4
0
1
15
2023
5
16
4
0
2
27
2024
23
4
1
0
1
29
2025
13
1
0
1
4
19
2026
2
4
0
3
0
9
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: A 1 day Energy Summit reframing the vital conversation of energy as it relates to our wellness and longevity
2026-05-04
FDNY inspection (RISK)
2026-05-04
FDNY inspection (COM_OCPCY)
2026-05-04
FDNY inspection (RISK)
2026-05-04
FDNY inspection (COM_OCPCY)
2026-04-08
Job filed: Structural modifications to the Cellar and floors 1-2 as per plans filed herewith. No change in use, egress, or occupancy.
2026-01-23
TL&R — from SAFRA NATIONAL BANK OF NEW YORK to TAWIL 113 SPRING LLC
2026-01-23
Deed $42,750,000 — from PPF RTL 113 SPRING STREET, LLC to SOHO RETAIL PORTFOLIO 113 SPRING STREET
2026-01-15
Sold for $42,750,000
2025-12-30
Mortgage satisfied — from PPF RTL 113 SORING STREET, LLC to SAFRA NATIONAL BANK OF NEW YORK
2025-12-29
Permit Structural — Permit Issued
2025-12-18
Rodent inspection: Passed
The full timeline
2026
2026-06-11Job filed: A 1 day Energy Summit reframing the vital conversation of energy as it relates to our wellness and longevity
2026-05-04FDNY inspection (RISK)
2026-05-04FDNY inspection (COM_OCPCY)
2026-05-04FDNY inspection (RISK)
2026-05-04FDNY inspection (COM_OCPCY)
2026-04-08Job filed: Structural modifications to the Cellar and floors 1-2 as per plans filed herewith. No change in use, egress, or occupancy.$1,125,000
2026-01-23TL&R — from SAFRA NATIONAL BANK OF NEW YORK to TAWIL 113 SPRING LLC
2026-01-23Deed $42,750,000 — from PPF RTL 113 SPRING STREET, LLC to SOHO RETAIL PORTFOLIO 113 SPRING STREET $42,750,000
2026-01-15Sold for $42,750,000$42,750,000
2025
2025-12-30Mortgage satisfied — from PPF RTL 113 SORING STREET, LLC to SAFRA NATIONAL BANK OF NEW YORK
2025-12-29Permit Structural — Permit Issued
2025-12-18Rodent inspection: Passed
2025-09-23Restaurant inspection: 113 SPRING — grade N
2025-09-10Job filed: Cocktail event
2025-09-04Job filed: Mechanical modifications to the Cellar and Floor 1 as per plans filed herewith. No change in use, egress, or occupancy.$475,020
2025-09-04Job filed: Sprinkler modifications to the Cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.$64,980
2025-09-04Job filed: Plumbing modifications to the cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.$124,980
2025-09-03Job filed: General construction to the cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.$2,500,020
2025-04-28Permit General Construction — Signed-off
2025-04-16Job filed: Structural modifications to the Cellar and floors 1-2 as per plans filed herewith. No change in use, egress, or occupancy.$1,125,000
2025-04-16Job filed: General construction to the Facade as per plans filed herewith. No change in use, egress, or occupancy.$200,000
2025-03-21Elevator permit: Furnish and install one (1) Incline Platform Lift as detailed in the attached drawings. All work will comply with ASME A18.1-2017$62,300
2025-03-19Elevator permit: All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Part 7, Section 7.2 for electric and Hand Dumbwa$79,000
2025-03-11Permit Construction Fence — Signed-off
2025-03-11Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE PLYWOOD FENCE AT THE FRONT ( SPRING ST) ELEVATION FORM$1,000
2025-01-30DOB complaint, category ?
2025-01-06Permit Structural — Permit Issued
2025-01-06Permit Support of Excavation — Signed-off
2024
2024-12-12311: Residential Disposal Complaint — Trash or Recycling Not Secure
2024-12-05Permit General Construction — Signed-off
2024-12-05Permit Mechanical Systems — Signed-off
2024-12-04Permit Plumbing — Signed-off
2024-12-04Permit Sprinklers — Signed-off
2024-12-02Job filed: Support of Excavation in Cellar as per plans. No change in use, egress, or occupancy.$150,000
2024-11-26Job filed: Structural modifications to the Cellar and floors 1-2 as per plans filed herewith. No change in use, egress, or occupancy.$1,125,000
2024-11-21Job filed: General construction to the cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.$2,500,020
2024-11-20Job filed: Sprinkler modifications to the Cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.$64,980
2024-11-20Job filed: Plumbing modifications to the cellar and 1st floor as per plans filed herewith. No change in use, egress, or occupancy.$124,980
2024-11-20Job filed: Mechanical modifications to the Cellar and Floor 1 as per plans filed herewith. No change in use, egress, or occupancy.$475,020
2024-10-28Permit Plumbing — Signed-off
2024-10-28Permit Sprinklers — Signed-off
2024-10-03Permit Mechanical Systems — Signed-off
2024-10-03Permit General Construction — Signed-off
2023-03-30Asbestos abatement: Removal — Environmental Maintenance Contractors, Inc.
2023-02-08Job filed: Sprinkler modifications on the 5th floor as per plans filed herewith. No change to use, egress or occupancy.$12,500
2023-02-02311: Noise - Vehicle — Engine Idling
2023-01-18311: Noise - Vehicle — Engine Idling
2022
2022-10-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-20311: Street Condition — Pothole
2022-09-12Permit Sprinklers — Signed-off
2022-09-08Job filed: Sprinkler modifications on the 5th floor as per plans filed herewith. No change to use, egress or occupancy.$12,500
2022-08-31Permit General Construction — Signed-off
2022-08-31Permit Mechanical Systems — Signed-off
2022-08-23Job filed: Mechanical modifications on the 5th floor as per plans filed herewith. No change to use, egress or occupancy.$30,000
2022-08-23Job filed: General Construction on the 5th floor as per plans filed herewith. No change to use, egress or occupancy.$160,000
2022-06-21Job filed: Sprinkler modifications on the 4th and 5th floor as per plans filed herewith. No change to use, egress and occupancy.$42,966
2022-03-16Rodent inspection: Passed
2022-03-08311: Noise — Noise: Construction Equipment (NC1)
2022-03-07311: Noise — Noise: Construction Before/After Hours (NM1)
2022-02-16Permit Mechanical Systems — Signed-off
2022-02-14Job filed: Mechanical modifications on the 4th, 5th floors and roof as per plans filed herewith. No change to use, egress or occupancy.$249,984
2022-01-25Job filed: Plumbing modifications on the 4th and 5th floor as per plans filed herewith. No change to use, egress and occupancy.$99,944
2021
2021-12-30311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2021-12-30DOB complaint, category ?
2021-11-17Permit Sprinklers — Signed-off
2021-11-16Permit Plumbing — Signed-off
2021-11-09Permit General Construction — Signed-off
2021-11-02Job filed: Sprinkler modifications on the 4th and 5th floor as per plans filed herewith. No change to use, egress and occupancy.$42,966
2021-11-02Job filed: Plumbing modifications on the 4th and 5th floor as per plans filed herewith. No change to use, egress and occupancy.$99,944
2021-11-01Job filed: General Construction on the 4th and 5th floor as per plans filed herewith. No change to use, egress or occupancy.$779,960
2021-08-06Permit Sprinklers — Signed-off
2021-08-06Permit Plumbing — Signed-off
2021-07-28Permit Mechanical Systems — Signed-off
2021-07-28Permit General Construction — Signed-off
2021-07-26Job filed: Mechanical modifications on the 4th and 5th floors as per plans filed herewith. No change to use, egress or occupancy.$10,000
2021-07-26Job filed: Sprinkler Modifications on the 4th and 5th floor as per plans filed herewith. No change to use, egress or occupancy.$7,000
2021-07-26Job filed: Plumbing modifications on the 4th and 5th floor as per plans filed herewith. No change to use, egress and occupancy.$8,000
2021-07-23Job filed: General Construction Interior removal of non load bearing partitions on the 4th and 5th floor as per plans filed herewith. No change to use, egress or$43,000
2021-04-14Boiler inspection
2021-04-14Boiler inspection
2021-04-14Boiler inspection
2021-04-14Boiler inspection
2021-01-11Permit Plumbing — Signed-off
2020
2020-12-08Permit EW — ISSUED
2020-09-23Job filed: Relocating two (2) bathrooms, one (1) kitchenette and one (1) utility sink. Adding one (1) bathroom. Install new plumbing and fixtures as indicated on$11,850
2020-06-12Job filed: Relocating two (2) bathrooms, one (1) kitchenette and one (1) utility sink. Adding one (1) bathroom. Install new plumbing and fixtures as indicated on$11,850
2020-04-29Job filed: OT WORK TYPE IS FILED FOR INTERIOR ALTERATION WORK @ 3RD FLOOR LEVEL.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. PL WORK TYPE TO BE $50,000
2020-04-29Job filed: OT WORK TYPE IS FILED FOR INTERIOR ALTERATION WORK @ 3RD FLOOR LEVEL.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. PL WORK TYPE TO BE $50,000
2019
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-09-09FDNY inspection (RISK)
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-08-21311: Consumer Complaint — Retail Store
2019-08-15311: Consumer Complaint — Retail Store
2019-06-02311: Consumer Complaint — Door Open with Air Conditioning On
2019-03-15Rodent inspection: Passed
2018
2018-06-20311: Consumer Complaint — Door Open with Air Conditioning On
2018-06-07Rodent inspection: Passed
2018-04-25311: Homeless Person Assistance
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-01-22FDNY inspection (SPECIAL-OTH)
2018-01-17FDNY inspection (SPECIAL-OTH)
2017
2017-07-31Rodent inspection: Passed
2017-05-19311: Consumer Complaint — Door Open with Air Conditioning On
2017-03-08311: Noise — Noise: air condition/ventilation equipment (NV1)
2017-02-24311: Noise — Noise: air condition/ventilation equipment (NV1)
2016
2016-11-10Rodent inspection: Passed
2016-11-02Job filed: HEREWITH FILE SUBSEQUENT DOC 02 FOR PLUMBING WORK (FILED IN CONJUNCTION WITH DOC 01). NO CHANGE TO USE, EGRESS OR OCCUPANCY.$6,000
2016-10-12FDNY inspection (SPECIAL-OTH)
2016-09-29FDNY inspection (SPECIAL-OTH)
2016-09-29Job filed: HEREWITH FILE PLANS TO RENOVATE THE EXISTING 4TH FLOOR OFFICE SPACE, GENERAL CONSTRUCTION TO INCLUDE THE REMOVAL OF EXISTING PARTITIONS AND CONSTRUCTI$184,375
2016-03-24DOB violation E:
2015
2015-12-23Rodent inspection: Passed
2015-08-21ASPM $18,927,900 — from PPF RTL 113 SPRING STREET, LLC to SAFRA NATIONAL BANK OF NEW YORK$18,927,900
2015-08-21Deed $68,000,000 — from 113 SPRING OWNERS LLC; TAWIL 113 SPRING LLC to PPF RTL 113 SPRING STREET, LLC$68,000,000
2015-03-23FDNY inspection (SPECIAL-OTH)
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2014
2014-10-15311: Taxi Complaint — Driver Complaint
2014-07-29Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF THE 4TH FLOOR OFFICE SPACE. INCLUDES INSTALLATION OF NEW PARTITIONS, REMOVAL OF SHOWER, MECHANICAL DUCT W$305,800
2014-07-29Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF THE 4TH FLOOR OFFICE SPACE. INCLUDES INSTALLATION OF NEW PARTITIONS, REMOVAL OF SHOWER, MECHANICAL DUCT W$305,800
2014-07-25Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF THE 4TH FLOOR OFFICE SPACE. INCLUDES INSTALLATION OF NEW PARTITIONS, REMOVAL OF SHOWER, MECHANICAL DUCT W$305,800
2012-07-08311: Consumer Complaint — Door Open with Air Conditioning On
2012-05-15Permit SG — ISSUED
2012-05-04311: Noise — Noise: Construction Equipment (NC1)
2012-04-10Rodent inspection: Passed
2012-03-16311: Noise — Noise: air condition/ventilation equipment (NV1)
2012-03-14311: Noise — Noise: air condition/ventilation equipment (NV1)
2012-03-06Permit EW — ISSUED
2012-02-16Permit EW — ISSUED
2012-02-16Permit EW — ISSUED
2012-02-08Job filed: FILING HEREWITH DRAWINGS TO PERFORM MECHANICAL WORK ON THE 2ND FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, OR EGRESS OCCUPANCY UNDER THIS APPLI$13,000
2012-02-08Job filed: FILING HEREWITH TO SHOW DEMO/CONSTRUCTION OF PARTITIONS ON THE 2ND FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS A$44,000
2012-02-08Job filed: FILING HEREWITH DRAWINGS AS PER SPRINKLER WORK ON THE 2ND FLOOR AS PER DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$9,000
2012-02-08Job filed: FILING HEREWITH DRAWINGS TO PERFORM MECHANICAL WORK ON THE 2ND FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, OR EGRESS OCCUPANCY UNDER THIS APPLI$13,000
2012-02-08Job filed: FILING HEREWITH DRAWINGS AS PER SPRINKLER WORK ON THE 2ND FLOOR AS PER DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$9,000
2011
2011-12-20Permit PL — ISSUED
2011-12-20Permit EW — ISSUED
2011-12-20Permit EW — ISSUED
2011-12-14Job filed: REPLACE FOUR (4) DERELICT GAS FIRED BOILERS AT THE 4TH AND 5TH FLOORS. CAP AND REMOVE FOUR (4) DERELICT GAS FIRED BOILERS AT THE 2ND AND 3RD FLOORS. $19,000
2011-07-17311: Vending — In Prohibited Area
2011-07-06Permit EW — ISSUED
2011-05-06Permit PL — ISSUED
2011-05-02Permit EW — ISSUED
2011-05-02Permit EW — ISSUED
2011-05-02Permit EW — ISSUED
2011-04-26Job filed: FILING HEREWITH DRAWINGS TO MODIFY EXISTING FA SYSTEM FOR CELL&1ST. CELLAR: 6 HORN STROBES, 1 SMOKE DETECTOR, 1 HEAT DETECTOR, 1 PULL STATION, 1 $25,000
2011-04-26Job filed: FILING HEREWITH DRAWINGS TO MODIFY EXISTING FA SYSTEM FOR CELL&1ST. CELLAR: 6 HORN STROBES, 1 SMOKE DETECTOR, 1 HEAT DETECTOR, 1 PULL STATION, 1 $25,000
2011-04-26Job filed: FILING HEREWITH DRAWINGS TO MODIFY EXISTING FA SYSTEM FOR CELL&1ST. CELLAR: 6 HORN STROBES, 1 SMOKE DETECTOR, 1 HEAT DETECTOR, 1 PULL STATION, 1 $25,000
2011-04-25Job filed: FILING HEREWITH DRAWINGS TO PERFORM MECHANICAL AND PLUMBING WORK ON THE CELLAR , 1ST, 2ND FLOORS AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS O$308,000
2011-04-25Job filed: FILING HEREWITH DRAWINGS SHOWING SPRINKLER WORK ON THE CELLAR & 1ST FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T$135,000
2011-04-25Job filed: FILING HEREWITH DRAWING TO SHOW STRUCTURAL WORK ON THE CELLAR, 1ST FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS A$35,000
2011-04-25Job filed: FILING HEREWITH DRAWINGS SHOWING SPRINKLER WORK ON THE CELLAR & 1ST FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T$135,000
2011-04-25Job filed: FILING HEREWITH DRAWINGS TO SHOW CONSTRUCTION OF PARTITIONS, FLOORS, DOORS, HUNG CEILING ON CELLAR & 1ST FLOOR AS PER DRAWINGS SUBMITTED. NO CHANG$801,000
2011-04-25Job filed: FILING HEREWITH DRAWINGS SHOWING SPRINKLER WORK ON THE CELLAR & 1ST FLOOR AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T$135,000
2011-03-14Rodent inspection: Passed
2011-02-03Permit EW — ISSUED
2011-01-26Job filed: FILING HEREWITH DRAWINGS TO SHOW DEMOLITION OF NON BEARING PARTITIONS ON THE C ELLAR & 1ST FLOORS AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGR$25,000
2011-01-26Job filed: FILING HEREWITH DRAWINGS TO SHOW DEMOLITION OF NON BEARING PARTITIONS ON THE C ELLAR & 1ST FLOORS AS PER DRAWINGS SUBMITTED. NO CHANGE IN USE, EGR$25,000
2011-01-18DOB violation E:
2011-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2010
2010-10-14RPTT — from DESTEFANO, VINCENT; TARICA, LAURENCE; JIMLAR CORPORATION EMPLOYEE STOCK OWNERS; TARICA, JA to LF USA, INC.
2010-10-08DOB violation VCAT1:
2010-06-04Agreement — from ALLIED BANKS, P.L.C. to FRYE RETAIL LLC; WILCITY HOLDINGS, LLC
2010-05-12Permit EW — ISSUED
2010-04-02DOB violation E:
2010-03-05311: Building/Use — Illegal Conversion Of Residential Building/Space
2010-03-05DOB complaint, category ?
2010-03-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2010-03-04DOB complaint, category ?
2010-03-02Rodent inspection: Passed
2009
2009-10-06Job filed: APPLICATION FILED HEREWITH FOR VAULT REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2009-10-06Job filed: APPLICATION FILED HEREWITH FOR VAULT REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2009-06-11Permit EQ — ISSUED
2009-06-11Job filed: PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMIDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2009-04-28DOB violation E:
2008
2008-12-09Deed $23,850,000 — from NEW SPRING CO., L.L.C., C/O MANDELBAUM S to WILLCITY HOLDINGS, LLC$23,850,000
2008-12-04Agreement — from ALLIED IRISH BANKS, P.L.C to SOHO PHOENIX PARTNERS, LTD.
2008-12-04AL&R $15,700,000 — from WILLCITY HOLDINGS, LLC C/O WILLETT COMPA to ALLIED IRISH BANKS, P.L.C$15,700,000
2008-12-04Mortgage $15,700,000 — from WILLCITY HOLDINGS, LLC C/O WILLETT COMPA to ALLIED IRISH BANKS, P.L.C$15,700,000
2008-12-01TERL — from NEW SPRING CO., LLC to WILLCITY HOLDINGS, LLC
2008-12-01ASSTO — from NEW SPRING CO., LLC to WILLCITY HOLDINGS, LLC
2008-04-30DOB violation E:
2008-03-25CNTR — from NEW SPRING CO., L.L.C. to WILLCITY HOLDINGS, LLC
2007
2007-09-22DOB complaint, category ?
2007-06-15DOB violation E:
2007-01-19DOB violation LL6291:
2006
2006-09-06DOB violation E:
2006-01-06DOB violation LL6291:
2005
2005-08-01DOB violation E:
2004
2004-10-06DOB violation E:
2003
2003-09-05DOB violation E:
2003-02-27Permit EW — ISSUED
2003-01-21DOB violation LANDMK:
2002
2002-08-02Permit EW — ISSUED
2002-07-11Job filed: Below the street sidewalk, installation of new steel beams and new footings to support existing concrete slab and sidewalk stone. There is no change i$40,000
2001
2001-05-11Job filed: FIRE ALARM MODIFICATION ON THE 1ST FLR. AS INDICATED ON DRAWINGS$5,000
2001-05-11Job filed: FIRE ALARM MODIFICATION ON THE 1ST FLR. AS INDICATED ON DRAWINGS$5,000
2001-05-10Permit PL — ISSUED
2001-05-10Permit PL — ISSUED
2001-04-24Permit EW — ISSUED
2001-04-24Permit EW — ISSUED
2001-04-24Permit EQ — ISSUED
2001-04-24Permit EW — ISSUED
2001-04-24Permit EW — ISSUED
2001-04-24Job filed: Minor structural changes on the 1st floor as indicated on drawings.$9,000
2001-04-24Job filed: Partition changes on the 1st floor as indicated on drawings. Remove and replace sidewalk door. Storefront modification. No change in use egress or oc$405,000
2001-04-24Job filed: Mechanical and plumbing changes on the 1st floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$40,000
2001-04-24Job filed: Mechanical and plumbing changes on the 1st floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$40,000
2001-04-24Job filed: Partition changes on the 1st floor as indicated on drawings. Remove and replace sidewalk door. Storefront modification. No change in use egress or oc$405,000
2001-04-24Job filed: Minor structural changes on the 1st floor as indicated on drawings.$9,000
2001-04-16Job filed: Interior partition, minor ceiling work, plumbing and mechanical modification. N o change in use, egress, or occupancy.$15,000
2001-04-16Job filed: Interior partition, minor ceiling work, plumbing and mechanical modification. N o change in use, egress, or occupancy.$15,000
2001-04-16Job filed: Interior partition, minor ceiling work, plumbing and mechanical modification. N o change in use, egress, or occupancy.$15,000
2000
2000-12-18Permit EW — ISSUED
2000-11-27Job filed: INSTALLATION OF AIR CONDITIONING ON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1999-01-12Permit EW — ISSUED
1997
1997-09-16DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-06-07Deed — from NEW SPRING COMPANY to NEW SPRING CO., L.L.C.