Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

178 Prince Street · Manhattan · BBL 1005030020 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP0
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE A

The city's published records show little recorded distress here in the last three years. Less recorded distress than 100% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty points per 10 units; this building carries 0. In ZIP 10012, 65% of residential buildings hold an A and 5% grade D or F. How grades work

this building
A
C

Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

6 service requests in the last three years. Most common: Illegal Parking (3) · Food Poisoning (1) · Outdoor Dining (1) · For Hire Vehicle Complaint (1).

Filed construction activity

$2,214,184 in permitted construction work filed since 2016 (35 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1860)
NoSix or more residential units (3)
No421-a / J-51 tax benefit on the current tax roll

1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$8,078,000 $3,635,100
2026$8,007,000 $3,603,150
2027$8,442,000 $3,798,900

The city's market estimate has risen 5% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Restaurants in this building

RestaurantCuisineGradeNotes
Il CoralloItalianA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwaySpring St — C E · 500 ft straight-line (about a 3-minute walk) · station accessibility: partial (Downtown only)
Houston St — 1 · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: none
BusNearest boarding stop: 6 Av / Prince St — M21 M55 · 500 ft
Citi BikeMacDougal St & Prince St · 450 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 003 Charrette School
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

178 Prince Street

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

6 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $365,921 on 2017-09-05 (lender: Flushing Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2022-11-21RPTT&RET $7,000,000 — from CHAMBERS, TINA; CHAMBERS, MICHAEL to 178 PRINCE APARTMENT LLC $7,000,000
2022-10-28Sold for $7,000,000 $7,000,000 $2,333,333
2022-04-25RPTT&RET $3,162,500 — from ARTICLE II CHILDREN'S TRUST OF THE HANTI to ROBERT SALZMAN, TRUSTEE OF THE ANNE WILL $3,162,500
2022-04-06Sold for $3,162,500 $3,162,500 $1,054,167
2019-10-17RPTT&RET $2,950,000 — from PAGE, RICHARD A; GIBBS, JAMES G III to ARTICLE II CHILDREN'S TRUST OF THE HARIN $2,950,000
2019-10-17RPTT&RET $600,000 — from PAGE, RICHARD A; GIBBS, JAMES G III to ARTICLE II CHILDREN'S TRUST OF THE HARTI $600,000
2019-10-10Sold for $2,950,000 $2,950,000 $983,333
2019-10-10Sold for $600,000 $600,000 $200,000
2017-09-05Agreement $650,000 — from 178 PRINCE STREET OWNERS CORP to FLUSHING BANK $650,000
2017-09-05AL&R $650,000 — from 178 PRINCE STREET OWNERS CORP to FLUSHING BANK $650,000
2017-09-05Mortgage $365,922 — from 178 PRINCE STREET OWNERS CORP to FLUSHING BANK $365,922
2015-12-21Mortgage $300,000 — from 178 PRINCE STREET OWNERS CORP., to NATIONAL BANK OF NEW YORK CITY $300,000
2015-12-21AL&R $300,000 — from 178 PRINCE STREET OWNERS CORP., to NATIONAL BANK OF NEW YORK CITY $300,000
2014-07-17RPTT&RET $2,490,000 — from FROMBOLUTI WIRLS, IONA to CHAMBERS, MICHAEL; CHAMBERS, TINA $2,490,000
2014-07-17RPTT&RET $600,000 — from FROMBOLUTI WIRLS, IONA to CHAMBERS, TINA; CHAMBERS, MICHAEL $600,000

Ten-year activity

50250
2017
2018
2019
2020
2021
32
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201711735127
20184130210
201951124325
202021111116
20210190212
202290174232
202300110213
202412140421
202522000527
202615020320
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 26 records

DateRecord
2026-10-14311: Illegal Parking — Double Parked Blocking Traffic
2026-09-23Permit Mechanical Systems — Permit Issued
2026-09-15Restaurant inspection: IL CORALLO — grade A
2026-08-11Permit Structural — Permit Issued
2026-08-11Permit General Construction — Permit Issued
2026-08-10Job filed: No Work
2026-06-23Permit Plumbing — Permit Issued
2026-06-19Job filed: Replacement of a window on the rear 1st floor. No change to use, egress, or occupancy
2026-04-30Permit General Construction — Signed-off
2026-04-28Job filed: THIS PLUMBING ALTERATION WORK IS BEING FILED TO SHOW NEW BATHROOMS. GC WORK WAS FILED AND APPROVED UNDER DOB NOWAPPLICATION# M01058229-I1. NO CHANGE T
2026-04-20Job filed: ALT-CO APPLICATION IS FILED TO ADD AN ACCESSORY KITCHEN WITHOUT COOKING EQUIPMENT USE IN THE EXISTING CELLAR; TO CHANGE THE FIRST-FLOOR USE FROM MERCA
2026-04-01Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO
2026-03-24Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PRO
2026-03-17Permit Plumbing — Permit Issued
2026-03-03Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO
2026-03-01311: Illegal Parking — Blocked Bike Lane
2026-02-12Permit Sprinklers — Permit Issued
2026-02-03Rodent inspection: Passed
2026-01-22Boiler inspection
2026-01-14Permit Mechanical Systems — Permit Issued
2025-12-04Restaurant inspection: IL CORALLO
2025-11-19Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PRO
2025-11-19Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO
2025-11-19Job filed: SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROP
2025-11-06Permit General Construction — Permit Issued
2025-11-06Permit Structural — Permit Issued

The full timeline

2026
2026-10-14311: Illegal Parking — Double Parked Blocking Traffic
2026-09-23Permit Mechanical Systems — Permit Issued
2026-09-15Restaurant inspection: IL CORALLO — grade A
2026-08-11Permit Structural — Permit Issued
2026-08-11Permit General Construction — Permit Issued
2026-08-10Job filed: No Work
2026-06-23Permit Plumbing — Permit Issued
2026-06-19Job filed: Replacement of a window on the rear 1st floor. No change to use, egress, or occupancy$11,999
2026-04-30Permit General Construction — Signed-off
2026-04-28Job filed: THIS PLUMBING ALTERATION WORK IS BEING FILED TO SHOW NEW BATHROOMS. GC WORK WAS FILED AND APPROVED UNDER DOB NOWAPPLICATION# M01058229-I1. NO CHANGE T$87,647
2026-04-20Job filed: ALT-CO APPLICATION IS FILED TO ADD AN ACCESSORY KITCHEN WITHOUT COOKING EQUIPMENT USE IN THE EXISTING CELLAR; TO CHANGE THE FIRST-FLOOR USE FROM MERCA$95,003
2026-04-01Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO$55,000
2026-03-24Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PRO$72,850
2026-03-17Permit Plumbing — Permit Issued
2026-03-03Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO$55,000
2026-03-01311: Illegal Parking — Blocked Bike Lane
2026-02-12Permit Sprinklers — Permit Issued
2026-02-03Rodent inspection: Passed
2026-01-22Boiler inspection
2026-01-14Permit Mechanical Systems — Permit Issued
2025
2025-12-04Restaurant inspection: IL CORALLO
2025-11-19Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PRO$72,850
2025-11-19Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO$55,000
2025-11-19Job filed: SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROP$10,000
2025-11-06Permit General Construction — Permit Issued
2025-11-06Permit Structural — Permit Issued
2025-10-09Job filed: Installing HVAC system as per plans filed herewith$80,000
2025-09-19Air permit (REGISTRATION), fuel: ?
2025-09-17Job filed: Ground floor and cellar level shall be fully sprinkler and served via an existing 4' combined service with domestic take off as per plan$40,000
2025-09-07Job filed: THIS ALTERATION WORK IS BEING FILED FOR THE INSTALLATION OF THEPROPOSED ADA ACCES LIFT FOR THE BUILDING.$38,000
2025-09-04Job filed: RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION$69,052
2025-08-21Job filed: MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PRO$72,850
2025-08-20Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO$55,000
2025-08-20Job filed: SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROP$10,000
2025-08-15Elevator permit: Furnish and install one (1) new Dumbwaiter. All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Part$50,800
2025-06-23Permit Plumbing — Permit Issued
2025-06-16Permit Sprinklers — Permit Issued
2025-05-22Job filed: PLUMBING WORK FOR GENERAL CONSTRUCTION DOB NOW #M00976522-I1 INTERIOR RENOVATION AT APT. #2 LOCATED ON THE 2ND FLOOR.$22,250
2025-05-08Job filed: PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPO$55,000
2025-05-08Job filed: SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROP$10,000
2025-04-30Job filed: Alteration being filed to show new interior alterations. Restoration of existing cellar access stairs, new convenience stairs to existing cellar, new $252,992
2025-04-30Job filed: THIS PLUMBING ALTERATION WORK IS BEING FILED TO SHOW NEW BATHROOMS. GC WORK WAS FILED AND APPROVED UNDER DOB NOWAPPLICATION# M01058229-I1. NO CHANGE T$18,000
2025-04-25Permit General Construction — Signed-off
2025-04-08Permit General Construction — Signed-off
2025-04-07Job filed: RENOVATION OF EXISTING DWELLING UNIT 3 ON THE 3RD FLOOR AS NOTED. NO CHANGE OF USE, EGRESS,OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION$69,052
2025-03-10Boiler inspection
2025-01-15Rodent inspection: Passed
2024
2024-11-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-11-12311: Illegal Parking — Blocked Bike Lane
2024-11-04Permit General Construction — Permit Issued
2024-11-04Permit Structural — Permit Issued
2024-10-29Job filed: THIS PLUMBING ALTERATION WORK IS BEING FILED TO SHOW NEW BATHROOMS. GC WORK WAS FILED AND APPROVED UNDER DOB NOWAPPLICATION# M01058229-I1. NO CHANGE T$87,647
2024-10-24DOB complaint, category ?
2024-10-18Job filed: PLUMBING WORK FOR GENERAL CONSTRUCTION DOB NOW #M00976522-I1 INTERIOR RENOVATION AT APT. #2 LOCATED ON THE 2ND FLOOR.$22,250
2024-10-18Job filed: INTERIOR RENOVATION TO APARTMENT #2 ON 2ND FLOOR OF EXISTING BUILDING, ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$59,500
2024-09-30311: Outdoor Dining — Barrier Condition
2024-07-12Permit Plumbing — Signed-off
2024-06-11Restaurant inspection: IL CORALLO — grade A
2024-06-10Job filed: Alteration being filed to show new interior alterations. Restoration of existing cellar access stairs, new convenience stairs to existing cellar, new $252,992
2024-06-10Job filed: This alteration work is being filed for the installation of a proposed ADA access ramp for the building. No change to use egress or occupancy.$40,000
2024-05-02Permit Plumbing — Signed-off
2024-05-01Permit General Construction — Signed-off
2024-04-12Air permit (REGISTRATION), fuel: NATURALGAS
2024-03-19Job filed: PLUMBING WORK FOR GENERAL CONSTRUCTION DOB NOW #M00976522-I1 INTERIOR RENOVATION AT APT. #2 LOCATED ON THE 2ND FLOOR.$22,250
2024-01-12Rodent inspection: Passed
2024-01-10Boiler inspection
2024-01-09Job filed: INTERIOR RENOVATION TO APARTMENT #2 ON 2ND FLOOR OF EXISTING BUILDING, ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$59,500
2024-01-03311: Food Poisoning — 1 or 2
2023
2023-07-29311: Noise - Residential — Loud Music/Party
2023-06-20311: Hazardous Materials — Chemical Odor (HD1)
2023-06-14311: Illegal Parking — Blocked Bike Lane
2023-06-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-12311: Illegal Parking — Blocked Bike Lane
2023-05-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-18311: Illegal Parking — Blocked Bike Lane
2023-04-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-04-27311: Illegal Parking — Blocked Bike Lane
2023-04-23311: Food Poisoning — 3 or More
2023-02-06Rodent inspection: Passed
2023-02-06311: Illegal Parking — Blocked Bike Lane
2023-01-03Boiler inspection
2022
2022-11-21RPTT&RET $7,000,000 — from CHAMBERS, TINA; CHAMBERS, MICHAEL to 178 PRINCE APARTMENT LLC$7,000,000
2022-10-30311: Outdoor Dining — Barrier Condition
2022-10-28Sold for $7,000,000$7,000,000
2022-10-18Certificate of occupancy Final
2022-10-18Certificate of occupancy Final
2022-10-17311: Outdoor Dining — Site Setup Condition
2022-10-13311: Lead — Lead Kit Request (Residential) (L10)
2022-10-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-10-08311: Illegal Parking — Blocked Bike Lane
2022-08-26311: Outdoor Dining — Street Zone Blocked
2022-08-26Certificate of occupancy Renewal Without Change
2022-08-10311: Noise - Street/Sidewalk — Loud Music/Party
2022-08-10311: Noise - Residential — Loud Music/Party
2022-08-03311: Outdoor Dining — Barrier Condition
2022-08-03311: Outdoor Dining — Barrier Condition
2022-07-08311: Outdoor Dining — Barrier Condition
2022-06-24311: Outdoor Dining — Site Setup Condition
2022-06-23311: Outdoor Dining — Barrier Condition
2022-06-21Certificate of occupancy Renewal Without Change
2022-06-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-16311: Illegal Parking — Blocked Bike Lane
2022-06-06311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-25RPTT&RET $3,162,500 — from ARTICLE II CHILDREN'S TRUST OF THE HANTI to ROBERT SALZMAN, TRUSTEE OF THE ANNE WILL$3,162,500
2022-04-06Sold for $3,162,500$3,162,500
2022-04-01Certificate of occupancy Renewal Without Change
2022-03-29Rodent inspection: Passed
2022-03-17311: Sidewalk Condition — Canopy Complaint
2022-03-02Permit Plumbing — Signed-off
2022-02-04Job filed: RENOVATION TO THE KITCHEN AND MASTER BATHROOM VANITY. NO CHANGE OF USE, EGRESS, OR OCCUPANCY IS PROPEROSED UNDER THIS APPLICATION.$8,000
2022-01-31Permit PL — ISSUED
2022-01-31Permit PL — ISSUED
2022-01-10Boiler inspection
2021
2021-12-29311: Food Establishment — Letter Grading
2021-12-19311: Noise - Residential — Loud Music/Party
2021-11-06311: Food Poisoning — 1 or 2
2021-11-06311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-08-02Rodent inspection: Passed
2021-06-07311: Taxi Complaint — Driver Complaint - Passenger
2021-05-26Boiler inspection
2021-04-29DOB violation E:
2021-04-11311: Illegal Parking — Blocked Bike Lane
2021-01-24311: Noise - Commercial — Loud Music/Party
2021-01-18311: Noise - Street/Sidewalk — Loud Music/Party
2021-01-08311: Illegal Parking — Blocked Bike Lane
2020
2020-12-03311: Illegal Parking — Blocked Bike Lane
2020-12-03311: Illegal Parking — Blocked Bike Lane
2020-12-03311: Illegal Parking — Blocked Bike Lane
2020-11-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-11-10311: Illegal Parking — Blocked Bike Lane
2020-11-09311: For Hire Vehicle Complaint — Insurance Information Requested
2020-11-09311: For Hire Vehicle Complaint — Insurance Information Requested
2020-10-20LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-09-16Boiler inspection
2020-09-08311: Noise - Street/Sidewalk — Loud Music/Party
2020-06-25Permit AL — ISSUED
2020-04-06DOB violation E:
2020-03-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-03-05311: Illegal Parking — Blocked Bike Lane
2020-01-26311: Taxi Complaint — Driver Complaint - Passenger
2020-01-17Permit AL — ISSUED
2019
2019-12-27Certificate of occupancy Temporary
2019-11-25311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2019-11-25DOB complaint, category ?
2019-11-21311: Taxi Complaint — Driver Complaint - Non Passenger
2019-11-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-04Rodent inspection: Passed
2019-10-17RPTT&RET $2,950,000 — from PAGE, RICHARD A; GIBBS, JAMES G III to ARTICLE II CHILDREN'S TRUST OF THE HARIN$2,950,000
2019-10-17RPTT&RET $600,000 — from PAGE, RICHARD A; GIBBS, JAMES G III to ARTICLE II CHILDREN'S TRUST OF THE HARTI$600,000
2019-10-10Sold for $2,950,000$2,950,000
2019-10-10Sold for $600,000$600,000
2019-09-28311: Food Poisoning — 1 or 2
2019-09-27Certificate of occupancy Temporary
2019-09-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-26311: Illegal Parking — Blocked Bike Lane
2019-09-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-09-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-09-01311: Illegal Parking — Blocked Bike Lane
2019-07-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-07-26311: Illegal Parking — Blocked Bike Lane
2019-07-03Certificate of occupancy Temporary
2019-06-25Boiler inspection
2019-05-29Job filed: HEREWITH FILE FOR TO-GO & EAT-IN STORE INCLUDES NEW PLUMBING WORK, NEW PARTITION WALL, NEW FLOOR COVERING, NEW MECHANICAL WORK. NO CHANGE IN USE, $268,500
2019-04-29Rodent inspection: Passed
2019-02-13Certificate of occupancy Temporary
2019-02-07311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018
2018-12-12Boiler inspection
2018-11-20Certificate of occupancy Temporary
2018-10-03Permit PL — ISSUED
2018-09-14311: Illegal Parking — Blocked Bike Lane
2018-09-14311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2018-08-23Certificate of occupancy Temporary
2018-07-10Rodent inspection: Passed
2018-05-30Certificate of occupancy Temporary
2018-05-11311: Vending — Unlicensed
2018-05-07FDNY inspection (RISK)
2017
2017-10-05Permit EW — ISSUED
2017-09-29ECB CLASS - 2 violation: 69B07,68M07,68M07-69B07)PROVIDE PROPER CODE DATA PLATE TO COMPLY WITH NYC 2014.68M07)PROVIDE MAINTENANCE LOG BOOK.68M07)PROVIDE MA
2017-09-10311: Illegal Parking — Blocked Sidewalk
2017-09-05Agreement $650,000 — from 178 PRINCE STREET OWNERS CORP to FLUSHING BANK$650,000
2017-09-05AL&R $650,000 — from 178 PRINCE STREET OWNERS CORP to FLUSHING BANK$650,000
2017-09-05Mortgage $365,922 — from 178 PRINCE STREET OWNERS CORP to FLUSHING BANK$365,922
2017-09-05TL&R — from NATIONAL BANK OF NEW YORK CITY to 178 PRINCE STREET OWNERS CORP
2017-09-05Mortgage assigned — from NATIONAL BANK OF NEW YORK CITY to FLUSHING BANK, ISAOA
2017-08-24Job filed: RENOVATION TO AN EXISTING LOBBY ON THE FIRST FLOOR. ARCHITECTURAL WORK TYPE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$20,000
2017-08-24Job filed: RENOVATION TO AN EXISTING LOBBY ON THE FIRST FLOOR. ARCHITECTURAL WORK TYPE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$20,000
2017-08-11Permit EQ — ISSUED
2017-08-09Permit EW — ISSUED
2017-08-02Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO US
2017-07-18Rodent inspection: Passed
2017-07-09FDNY inspection (ALT)
2017-06-19Permit AL — ISSUED
2017-04-27FDNY inspection (ALT)
2017-04-07Permit EW — ISSUED
2017-03-27FDNY inspection (ALT)
2017-03-24311: Street Condition — Cave-in
2017-03-24311: Street Condition — Cave-in
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2017-02-24Permit PL — ISSUED
2017-02-20FDNY inspection (ALT)
2017-02-13Job filed: MODIFICATION OF THE EXISTING ELEVATOR BULKHEAD, INSTALLATION OF THE DOOR AND A WOODEN WALKWAY FOR THE MAINTENANCE OF THE MECHANICAL EQUIPMENT ON THE R$23,000
2017-02-13Job filed: MODIFICATION OF THE EXISTING ELEVATOR BULKHEAD, INSTALLATION OF THE DOOR AND A WOODEN WALKWAY FOR THE MAINTENANCE OF THE MECHANICAL EQUIPMENT ON THE R$23,000
2017-01-16FDNY inspection (ALT)
2016
2016-12-12FDNY inspection (ALT)
2016-11-09Rodent inspection: Passed
2016-11-07FDNY inspection (ALT)
2016-10-03FDNY inspection (ALT)
2016-09-01FDNY inspection (ALT)
2016-08-03Permit EQ — ISSUED
2016-08-01FDNY inspection (ALT)
2016-06-30FDNY inspection (ALT)
2016-06-21Permit AL — ISSUED
2016-05-31FDNY inspection (ALT)
2016-05-02311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-05-02DOB complaint, category ?
2016-04-25FDNY inspection (ALT)
2016-03-21FDNY inspection (ALT)
2016-03-18DOB violation E:
2016-03-16Permit EQ — ISSUED
2016-03-10Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2008 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCU
2016-03-10Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2008 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCU
2016-02-18FDNY inspection (ALT)
2016-02-15FDNY inspection (ALT)
2016-02-04Permit PL — ISSUED
2016-02-03Permit AL — ISSUED
2015
2015-12-31311: Miscellaneous Categories — Inspection Work Order (DOB)
2015-12-31DOB complaint, category ?
2015-12-30ECB CLASS - 1 violation: SEC. 3307.6.5 FAILURE TO MAINTAIN ADEQUATE ILLUMINATION BENEATH SIDEWALK SHED AS REQU. BY CODE. NOTED: SIDEWALK SHED ERECTED UNDER$1,600
2015-12-29Rodent inspection: Passed
2015-12-21Mortgage $300,000 — from 178 PRINCE STREET OWNERS CORP., to NATIONAL BANK OF NEW YORK CITY$300,000
2015-12-21AL&R $300,000 — from 178 PRINCE STREET OWNERS CORP., to NATIONAL BANK OF NEW YORK CITY$300,000
2015-08-07Job filed: CONVERSION AND RENOVATION OF FLOORS 4, 5 FROM NON-COMMERCIAL ART STUDIO TO RESIDENTIAL LOFT, BASED ON ART. 7B OF MDL. NEW C OF O TO BE OBTAINED.$570,400
2015-08-07Job filed: STRUCTURAL WORK IN CONJUNCTION WITH CONVERSION AND RENOVATION OF FLOORS 4 & 5 FROM NON-COMMERCIAL ART STUDIO TO RESIDENTIAL LOFT, BASE ON ART. 7B
2015-08-07Job filed: STRUCTURAL WORK IN CONJUNCTION WITH CONVERSION AND RENOVATION OF FLOORS 4 & 5 FROM NON-COMMERCIAL ART STUDIO TO RESIDENTIAL LOFT, BASE ON ART. 7B
2015-08-07Job filed: CONVERSION AND RENOVATION OF FLOORS 4, 5 FROM NON-COMMERCIAL ART STUDIO TO RESIDENTIAL LOFT, BASED ON ART. 7B OF MDL. NEW C OF O TO BE OBTAINED.$570,400
2015-08-07Job filed: PLUMBING, MECHANICAL AND SPRINKLER IN CONJUNCTION WITH CONVERSION AND RENOVATI ON OF FLOORS 4 & 5 FROM NON-COMMERCIAL ART STUDIO TO RESIDENTIAL LO
2015-08-05Permit EQ — ISSUED
2015-07-27Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE NO CHANGE TO US
2014
2014-07-17RPTT&RET $2,490,000 — from FROMBOLUTI WIRLS, IONA to CHAMBERS, MICHAEL; CHAMBERS, TINA$2,490,000
2014-07-17RPTT&RET $600,000 — from FROMBOLUTI WIRLS, IONA to CHAMBERS, TINA; CHAMBERS, MICHAEL$600,000
2014-04-01DOB violation E:
2013
2013-10-21DOB violation E:
2012
2012-12-18RPTT&RET — from SPEYER FROMBOLUTI, NORA; FROMBOLUTI, SIDEO to FROMBOLUTI-WIRLS, IONA
2012-04-14Rodent inspection: Passed
2011
2011-03-22Rodent inspection: Passed
2011-03-03RPTT&RET $1,950,000 — from SHURE, BRIAN K to CHAMBERS, MICHAEL; CHAMBERS, TINA$1,950,000
2010
2010-03-24DOB violation E:
2010-03-04Rodent inspection: Passed
2009
2009-04-21DOB violation E:
2007
2007-11-07DOB violation E:
2007-04-25Permit EQ — ISSUED
2007-04-18Job filed: INSTALLATION OF 28' SIDEWALK SHED FOR THE PURPOSE OF FACADE INSPECTION I NSPECTIONS. THE SIDEWALK SHED WILL COMNPLY WITH LL33/91 AND PPN 9/99. THE SID
2007-02-27DOB violation E:
2007-01-19DOB violation LL6291:
2006
2006-02-22Permit EW — ISSUED
2006-02-20DOB violation E:
2006-02-08Permit PL — ISSUED
2005
2005-12-15Permit EW — ISSUED
2005-12-15Permit EW — ISSUED
2005-10-07Job filed: Renovation to an existing apartment on the second floor. Architectural work. No change in use, occupancy or egress.$10,000
2005-10-07Job filed: Renovation to an existing apartment on the second floor. Architectural work. No change in use, occupancy or egress.$10,000
2005-10-07Job filed: Mechanical, plumbing and sprinkler work in conjunction with the renovation of an existing apartment on the second floor. No change in use, egress or $27,000
2005-10-01DOB violation LL1081:
2005-06-28RPTT $1,300,000 — from E/O ALLEN M. TRAN; E/O CLINTON J. HILL to GIBBS, JAMES G III; PAGE, RICHARD A$1,300,000
2004
2004-02-13DOB violation LL6291:
2002
2002-04-01Deed — from 178 PRINCE LLC, to 178 PRINCE STREET OWNERS CORP
2001
2001-11-14Permit EQ — ISSUED
2001-11-09Job filed: INSTALLATION OF SIDE WALK: 25' LONG-.DURING REMEDIAL REPAIRS WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS OR OCCUPANCY
2000
2000-02-22Permit EW — ISSUED
2000-02-03ECB Non-Hazardous violation: FAILRE TO PROVIDE APPROVED PLANS AT TIME OF INSPECTION. NOTED WORK IN PROGRESS UNDER PERMIT NUMBER 10209140. NO APPROVED PLANS
2000-02-03ECB Non-Hazardous violation: WORK WITHOUT PERMIT. EXPIRED PERMIT NOTED WORK IN PROGRESS INDER PERMIT NUMBER 102091040 EXPIRED DATE 09/01/99. METAL STUDS ERECTE
2000-02-01DOB complaint, category ?
2000-02-01DOB complaint, category ?
1999
1999-08-10Permit PL — ISSUED
1999-05-26Permit EW — ISSUED
1999-05-06Deed — from FROMBOLUTI, NORA SPEYER; HILL, CLINTON; MONES, WAYNE EXECUTOR; FROMBOLUTI, SIDEO; MONES, A to 178 PRINCE, LLC
1994
1994-09-01DOB violation LL6291:
1994-03-16Permit PL — ISSUED
1994-03-16Permit EW — ISSUED
1994-03-16Permit EW — ISSUED
1992
1992-07-10ECB Non-Hazardous violation: 15L,15L,$100
1989
1989-01-10DOB violation E: (02) REPAIR OR RENEW PHASES RELAY
1986
1986-04-28Mortgage satisfied — from HEN-ABE RTLY CORP to 178 PRINCE STREET CORP
1985
1985-06-11Mortgage satisfied — from FROMBOLUTI, SIDEO &ETAL to HEN--ABE REALTY CORP
1978
1978-11-06Mortgage assigned — from HEN-ABE REALTY CORP to SMITH, DONALD
1978-11-06Mortgage — from FROMBOLUTI, SIDEO ETAL to HEN-ABE REALTY CORP
1975
1975-12-05Mortgage assigned — from SCHEINWALD, ROSE S to SCHEINWALD, ROSE S; SCHEINWALD, ROBERT
1975-10-07Mortgage assigned — from SCHEINWALD, R DECD EX to SCHEINWALD, ROSE S
1970
1970-06-09DECL — from TRAN, ALLEN; FROMBOLUTI, SIDEO; MONES, ANTHUN; HILL, CLINTON; FROMBOLUTI, NORA S; MONES, R
1970-06-09Mortgage — from FROMBOLUTI, SIDEO to HEN ABE REALTY CORP
1970-06-09Deed — from HEN ABE REALTY CORP to FROMBOLUTI, SIDEO

Support this site Back to the building page