A modest record — below the level that usually signals systemic problems. More recorded distress than 82% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty
points per 10 units; this building carries 7.5. In ZIP 10012, 65% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
C
Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$655 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
14 service requests in the last three years. Most common: Obstruction (4) · Residential Disposal Complaint (4) · Noise (2) · Water System (2) · Asbestos (1) · Indoor Air Quality (1).
Filed construction activity
$792,075 in permitted construction work filed since
2016 (17 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
Yes
Built before 1974 (1879)
No
Six or more residential units (4)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
MANHATTAN REALTY COMPANY 1, LP
Head officer
ROBERT MOSKOWITZ
Managing agent
MAROB MANAGEMENT CORP
Last registered
2025-09-19
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$12,645,000
$5,690,250
2026
$13,488,000
$6,069,600
2027
$14,221,000
$6,399,450
The city's market estimate has risen
12% between tax years 2025 and 2027.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Prince St — R W · 350 ft straight-line (about a 2-minute walk) · station accessibility: none Bleecker St — 6 B D F M · 500 ft straight-line (about a 3-minute walk) · station accessibility: full
Bus
Nearest boarding stop: West Houston St / Greene St — M21 · 300 ft
Citi Bike
Greene St & Prince St · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
14 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Job filed: Reduction in size of existing loft in 5th floor apartment.
2026-01-20
311: Noise - Residential — Banging/Pounding
2026-01-07
311: Obstruction — Trash or Recycling
2025-12-22
Rodent inspection: Passed
2025-12-22
Bedbug filing: 0 infested units
2025-11-04
Job filed: STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT OF NEW SKYL
2025-11-03
Job filed: Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change i
The full timeline
2026
2026-07-09311: Indoor Air Quality — Dust from Construction
2026-07-07311: Asbestos — Asbestos Complaint (B1)
2026-07-07Permit Structural — Signed-off
2026-07-07Permit Structural — Permit Issued
2026-07-07Permit General Construction — Signed-off
2026-07-07Permit General Construction — Permit Issued
2026-05-04311: Water System — Hydrant Leaking (WC1)
2026-04-29311: Water System — Hydrant Running (WC3)
2026-02-09Permit Structural — Signed-off
2026-01-29Job filed: Reduction in size of existing loft in 5th floor apartment.$72,893
2025-11-04Job filed: STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT OF NEW SKYL$10,000
2025-11-03Job filed: Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change i$46,000
2025-09-17311: Residential Disposal Complaint — Trash or Recycling Not Secure
2025-07-23311: Noise — Noise: Construction Before/After Hours (NM1)
2025-07-08Permit Structural — Signed-off
2025-07-08Permit General Construction — Signed-off
2025-07-08Permit Structural — Signed-off
2025-07-08Permit General Construction — Permit Issued
2025-07-08Permit Structural — Permit Issued
2025-06-24Elevator permit: Modernize 1P42301. All work to comply with ASME A17.1-2013, Part 8, Section 8.7.3 for alterations for hydraulic elevators Safety C$130,000
2025-02-11Permit Sign — Signed-off
2025-01-31311: Residential Disposal Complaint — Trash or Recycling Not Secure
2025-01-17Permit General Construction — Signed-off
2025-01-03Permit Mechanical Systems — Signed-off
2025-01-03Permit General Construction — Signed-off
2024
2024-12-27Job filed: NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - PROENZA SCHOULER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$150
2024-12-23Job filed: GENERAL CONSTRUCTION WORK RELATED TO THE INSTALLATION OF NEW DRYWALL PARTITIONS, DOOR, FINISHES, AND RCP WORK AS SHOWN ON PLANS FILED HERWITH. INCLUDI$2,500
2024-12-18Bedbug filing: 0 infested units
2024-12-18Permit Mechanical Systems — Signed-off
2024-12-18Permit General Construction — Signed-off
2024-12-18Job filed: STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT OF NEW SKYL$10,000
2024-12-18Job filed: Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change i$46,000
2024-12-17311: Residential Disposal Complaint — Trash or Recycling Not Secure
2024-11-21DOB complaint, category ?
2024-11-04311: Residential Disposal Complaint — Trash or Recycling Not Secure
2024-10-22ECB CLASS - 2 violation: AT TIME OF INSPECTION I OBSERVED NO DOB STAMPED APPROVED PLANS ON SITE DURING ACTIVE CONSTRUCTION UNDER PERMIT#M01037738-I1., PROV$655
2024-10-21DOB complaint, category ?
2024-10-09Permit Mechanical Systems — Signed-off
2024-10-09Permit Sprinklers — Signed-off
2024-10-03Permit General Construction — Signed-off
2024-09-26Permit Structural — Signed-off
2024-08-22Rodent inspection: Passed
2024-08-01Job filed: REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AND RELATED INTERIOR RENOVATION WORK AS SHOWN ON PLANS FILED. NO CHAN$130,000
2024-08-01Job filed: MECHANICAL WORK RELATED TO INSTALLATION OF NEW VRF HEAT PUMP UNITS AND ASSOCIATED DUCTWORK & AIR REGISTERS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE$60,000
2024-07-23Job filed: SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH TO INCLUDE REMOVAL OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS ON ASS$15,000
2024-07-15Asbestos abatement: Removal — Green Tech Consulting Corp.
2024-05-28311: Obstruction — Trash or Recycling
2024-05-08311: Obstruction — Trash or Recycling
2024-05-07311: Obstruction — Trash or Recycling
2023
2023-12-18Bedbug filing: 0 infested units
2023-10-12Job filed: Removal of exterior partial stair & ladder at 2nd floor fire escape & replacement with new drop down ladder. No change in use, occupancy or egress.$30,000
2023-05-26Rodent inspection: Passed
2022
2022-12-05Bedbug filing: 0 infested units
2022-04-25Job filed: Installation of New Air Conditioner Units and associated Ductwork at cellar and 1st floor.$60,000
2022-03-17Rodent inspection: Passed
2022-01-05Permit Mechanical Systems — Signed-off
2021
2021-12-16Bedbug filing: 0 infested units
2021-12-16Job filed: Installation of New Air Conditioner Units and associated Ductwork at cellar and 1st floor.$60,000
2021-02-24Elevator permit: Furnish and install components and software providing Door Monitor Circuitry to existing controller. All work to comply with ASME$15,000
2020
2020-12-17Bedbug filing: 0 infested units
2020-10-22DOB violation E:
2020-06-18Permit EW — ISSUED
2020-03-03Permit EW — ISSUED
2020-02-25DOB complaint, category ?
2019
2019-12-16Bedbug filing: 0 infested units
2019-11-18Job filed: REMOVAL OF EIGHT (8) EXISTING LOT LINE WINDOWS. THE OPENINGS WILL BE BLOCKED UP WITH BRICKS TO MATCH EXISTING FACADE. NO CHANGE IN USE (U.G.), OCCUPAN$111,216
2019-11-18Job filed: REMOVAL OF EIGHT (8) EXISTING LOT LINE WINDOWS. THE OPENINGS WILL BE BLOCKED UP WITH BRICKS TO MATCH EXISTING FACADE. NO CHANGE IN USE (U.G.), OCCUPAN$111,216
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-05Permit EW — ISSUED
2019-03-25Rodent inspection: Passed
2019-01-22Bedbug filing: 0 infested units
2018
2018-06-28Permit EW — ISSUED
2018-06-12Rodent inspection: Passed
2018-06-12Elevator permit: Furnish and install new piston, cylinder and PVC liner. -All work to comply with ASME A17.1-2000 with supplement A17.1a-02 and A17$90,700
2018-06-06Job filed: DEMOLITION OF THE EXISTING TERRACOTA & CMU WALL FOR EXISTING ELEVATOR SHAFT AT CELLAR, TO REMOVE DAMAGED ELEVATOR EQUIPMENT. ELEVATOR WORK TO BE F$13,550
2018-06-06Job filed: DEMOLITION OF THE EXISTING TERRACOTA & CMU WALL FOR EXISTING ELEVATOR SHAFT AT CELLAR, TO REMOVE DAMAGED ELEVATOR EQUIPMENT. ELEVATOR WORK TO BE F$13,550
2018-04-25DOB violation E:
2017
2017-08-03Rodent inspection: Passed
2017-04-19DOB violation E:
2017-01-16311: Rodent — Rat Sighting
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-19Deed — from MOSKOWITZ, HERBERT to MANHATTAN REALTY COMPANY 1, LP
2016-11-23Rodent inspection: Passed
2016-10-25HPD class I: SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THER
2016-06-04311: Water System — Leak (Use Comments) (WA2)
2016-03-30DOB violation E:
2016-03-16311: Water System — Hydrant Leaking (WC1)
2016-01-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-01-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015
2015-12-17Rodent inspection: Passed
2015-11-18DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-10-08ECB CLASS - 1 violation: FAILURE TO MAINTAIN. CONSTRUCTION AT 151 MERCER STREET HAS CAUSED MOVEMENT IN THE BLDG STRUCTURE AT 153 MERCER ST. OWNERSHIP OF 15
2015-10-08ECB CLASS - 1 violation: SEC. 3309.6 FAILURE TO PROVIDE SUFFICIENT MONITORING AS PER BC3309.6 W/REGARD TO BC3309.4 THE BLDG AT 153 MERCER ST HAS BEEN DAMAG
2015-09-24311: Construction Safety Enforcement — Excavation Tracking Complaint
2015-09-24DOB complaint, category ?
2015-09-10DOB violation C:
2015-08-24ECB CLASS - 1 violation: 97X10 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER;SERVICE EQUIPMENT-ELEVATOR AS PER BC3001.2 AND 27-987.DOB RECORDS SHOW$1,000
2015-08-10311: Elevator — Elevator - Defective/Not Working
2015-08-10DOB complaint, category ?
2015-06-30311: Water System — Hydrant Defective (WC2)
2015-06-17311: Illegal Parking — Blocked Hydrant
2015-05-01311: Water System — Hydrant Running Full (WA4)
2014
2014-10-24311: Construction Safety Enforcement — Excavation Tracking Complaint
2014-10-24DOB complaint, category ?
2014-10-22DOB violation C:
2014-10-14Job filed: REMOVAL OF EIGHT (8) EXISTING LOT LINE WINDOWS. THE OPENINGS WILL BE BLOCKED UP WITH BRICKS TO MATCH EXISTING FACADE. NO CHANGE IN USE (U.G.), OCCUPAN$37,000
2014-10-14Job filed: REMOVAL OF EIGHT (8) EXISTING LOT LINE WINDOWS. THE OPENINGS WILL BE BLOCKED UP WITH BRICKS TO MATCH EXISTING FACADE. NO CHANGE IN USE (U.G.), OCCUPAN$37,000
2014-08-23311: Noise — Noise: Construction Before/After Hours (NM1)
2014-08-23DOB complaint, category ?
2014-05-16311: Water System — Hydrant Defective (WC2)
2014-05-16311: Water System — Hydrant Running Full (WA4)
2014-01-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013
2013-05-22ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. DEFECTS NOTED: AT TIME OF INSPECTION METAL FRAMED WINDOWS ARE INSTALLED IN FRONT $400
2013-05-20311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2013-05-20311: GENERAL CONSTRUCTION — FIRE-ESCAPE
2013-05-20311: GENERAL CONSTRUCTION — WINDOWS
2013-05-20311: GENERAL CONSTRUCTION — WINDOWS
2013-05-20311: GENERAL CONSTRUCTION — WINDOWS
2013-05-20311: GENERAL CONSTRUCTION — WINDOWS
2013-05-20311: GENERAL CONSTRUCTION — WINDOWS
2013-05-20311: HEATING — HEAT-PLANT
2013-05-20DOB complaint, category ?
2013-05-20Tenant complaint: HEATING — HEAT-PLANT
2013-05-20Tenant complaint: GENERAL — WINDOWS
2013-05-20Tenant complaint: GENERAL — WINDOWS
2013-05-20Tenant complaint: GENERAL — WINDOWS
2013-05-20Tenant complaint: GENERAL — FIRE-ESCAPE
2013-05-20Tenant complaint: GENERAL — WINDOWS
2013-05-20Tenant complaint: GENERAL — WINDOWS
2013-05-10311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2013-05-10311: GENERAL CONSTRUCTION — WINDOWS
2013-05-10311: GENERAL CONSTRUCTION — FIRE-ESCAPE
2013-05-10311: GENERAL CONSTRUCTION — LOCKS
2013-05-10DOB complaint, category ?
2013-05-10Tenant complaint: GENERAL — LOCKS
2013-05-10Tenant complaint: GENERAL — FIRE-ESCAPE
2013-05-10Tenant complaint: GENERAL — WINDOWS
2012
2012-04-10Rodent inspection: Passed
2011
2011-03-10Rodent inspection: Passed
2010
2010-07-02Permit EQ — ISSUED
2010-07-02Job filed: INSTALLATION OF 35 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2010-07-02Job filed: INSTALLATION OF 35 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WI
2010-03-24Permit EW — ISSUED
2010-03-09Permit AL — ISSUED
2010-03-01Rodent inspection: Passed
2009
2009-12-29Job filed: INSTALLATION OF INTERIOR PARTITIONS AS SHOWN ON PLANS. APPLICATION FOR CHANGE OF USE FILED UNDER ALT#120181560. NO CHANGE OF USE, EGRESS OR OCCUPANCY $10,000
2009-10-20Job filed: CHANGE IN USE OF FIRST FLOOR ART GALLERY TO RETAIL SALES U.G.6.$7,500
2009-10-20Job filed: CHANGE IN USE OF FIRST FLOOR ART GALLERY TO RETAIL SALES U.G.6.$7,500
2009-10-20Job filed: CHANGE IN USE OF FIRST FLOOR ART GALLERY TO RETAIL SALES U.G.6.$7,500
2009-04-15ECB CLASS - 2 violation: 11P16.14M7.40P16.39P16.11P NO ACCESS TO C LEVEL LOCKOUT
2009-02-09Permit PL — ISSUED
2009-02-09Permit PL — ISSUED
2009-02-09Permit PL — ISSUED
2008
2008-05-02Permit EW — ISSUED
2007
2007-12-14Job filed: ALTER EXISTING AUTOMATIC WET PIPE SYSTEM TO PROVIDE STAIRWELL PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2007-11-09DOB violation E:
2007-01-03DOB violation E:
2006
2006-02-20DOB violation E:
2004
2004-11-19DOB violation LL1081:
2004-04-21DOB violation LL1081:
2003
2003-09-16Permit EW — ISSUED
2003-08-25Job filed: CLOSING UP EXISTING LOT LINE WINDOWS AND CUTTING NEW LOT LINE WINDOWS IN NEW LOCATIONS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$8,000
2003-02-27DOB violation E: 1P12986
2003-01-09Permit EW — ISSUED
2003-01-09Permit EW — ISSUED
2003-01-09Permit EW — ISSUED
2002
2002-12-31Permit EQ — ISSUED
2002-12-27Job filed: FILING FOR FENCE FOR PURPOSES OF INSTALLING STOREFRONT APPROVED UNDER APPLIC. 102134245. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.
2002-10-16Permit EW — ISSUED
2002-10-03Permit PL — ISSUED
2002-09-17Job filed: REPLACEMENT OF EXISTING FURNACE. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$4,800
2002-04-01Permit EW — ISSUED
2002-03-13Permit PL — ISSUED
2002-03-01Permit EW — ISSUED
2002-02-11Job filed: MECHANICAL VENTILATION FOR BATHROOMS. ARCHITECTURAL WORK APPROVED UNDER APPLICATION NO. 103049014. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$3,000
2002-02-11Job filed: MECHANICAL VENTILATION FOR BATHROOMS. ARCHITECTURAL WORK APPROVED UNDER APPLICATION NO. 103049014. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$3,000
2001
2001-12-24Permit EW — ISSUED
2001-12-13Permit EW — ISSUED
2001-12-05Job filed: PROPOSE TO DEMOLISH & CONSTRUCT NEW PARTITIONS AND PLUMBING FIXTURES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRES$300,667
2001-11-07Permit PL — ISSUED
2001-10-23Job filed: EXTENSION OF SPRINKLER HEADS IN STAIR & HALLWAY. NO CHANGE IN USE (U.G), OCCUPANCY OR EGRESS.$1,000
2001-07-27Permit EW — ISSUED
2001-07-27Permit EW — ISSUED
2001-06-25Job filed: INSTALLATION OF STEEL BEAMS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$30,000
2001-06-25Job filed: PROPOSE TO CONSTRUCT NON-BEARING PARTITIONS AND NEW PLUMBING FIXTURES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$113,998
2001-06-25Job filed: INSTALLATION OF STEEL BEAMS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$30,000
2001-06-25Job filed: INSTALLATION OF STEEL BEAMS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$30,000
2001-06-25Job filed: PROPOSE TO CONSTRUCT NON-BEARING PARTITIONS AND NEW PLUMBING FIXTURES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$113,998
2001-04-25Permit EW — ISSUED
2001-04-25Permit EW — ISSUED
2001-02-02Job filed: NEW STOREFRONT AND SHOW WINDOWS, AND NEW ENTRANCE STEPS AND RAMP. NO CHANGE IN USE EGRESS OR OCCUPANCY.$70,000
2001-02-02Job filed: NEW STOREFRONT AND SHOW WINDOWS, AND NEW ENTRANCE STEPS AND RAMP. NO CHANGE IN USE EGRESS OR OCCUPANCY.$70,000
2001-02-02Job filed: NEW STOREFRONT AND SHOW WINDOWS, AND NEW ENTRANCE STEPS AND RAMP. NO CHANGE IN USE EGRESS OR OCCUPANCY.$70,000
2001-01-12Job filed: STRUCTURAL FRAMING AND REINFORCEMENT FOR NEW BULDHEAD AND STAIR TO ROOF.$6,000
2001-01-12Job filed: NEW BULKHEAD AND STAIR TO ROOF. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$16,000
1995
1995-04-17DOB violation LL1081:
1990
1990-01-19DOB violation E:
1982
1982-08-26Mortgage satisfied — from MOSKOWITZ, HERBERT to J. SMITH NOYES FNDTNINC
1977
1977-12-29Agreement — from MOSKOWITZ, HERBERT to JESSIE S NOYES FOUNDATN
1973
1973-08-17MISC — from LANDMARKS PRSVTN CMNNYC
1966
1966-07-12RTXL — from MACKENZIE, JOHN M DECD
1966-07-01Deed — from MAC KENZIE, EDITH M to MOSKOWITZ, HERBERT