112 East 11 Street · Manhattan · BBL 1005560016
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Open with the city right now
Open HPD violations
2 total — 0 class C (immediately hazardous), 0 class B, 2 class A. Oldest open since 2025-06-13.
status snapshot refreshed weekly from HPD records
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
102 service requests in the last three years. Most common: Noise (50) · Lost Property (15) · Illegal Parking (7) · For Hire Vehicle Complaint (6) · Taxi Complaint (4) · Food Poisoning (3).
Filed construction activity
$3,696,920 in permitted construction work filed since
2016 (47 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Registered with HPD — the names behind the building
Registered owner(s)
UD-DEV ASSOCIATES LLC
Head officer
Joseph Teichman
Managing agent
Charlie Katz
Last registered
2025-12-29
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$46,216,000
$20,797,200
2026
$103,119,000
$46,403,550
2027
$106,675,000
$48,003,750
The city's market estimate has risen
131% between tax years 2025 and 2027.
3 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
In the city's stormwater flood map only under the extreme-storm
scenario (3.66 in/hr cloudburst with 2080 sea levels) — an Ida-scale event.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Astor Pl — 6 · 600 ft straight-line (about a 3-minute walk) · station accessibility: none 8 St-NYU — R W · 800 ft straight-line (about a 4-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 4 Av / E 10 St — M1 M2 M3 · 250 ft
Citi Bike
E 11 St & 3 Ave · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)
Elementary: Elementary schools in this district are not zoned. Confirm with the DOE's school search.
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
102 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $5,719,095 on
2025-04-09 (lender: Tri-State Loan Acquisitions IV LLC). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-04-09
Mortgage $5,719,095 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC
$5,719,095
2025-04-09
Mortgage $20,000,000 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC
$20,000,000
2025-04-09
Agreement $25,719,095 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC
$25,719,095
2025-04-09
AL&R $20,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$20,000,000
2025-04-09
Agreement $20,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$20,000,000
2023-06-02
Agreement $57,100,000 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC
$57,100,000
2023-06-02
Mortgage $31,380,905 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC
$31,380,905
2023-06-02
Mortgage $25,719,095 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC
$25,719,095
2023-06-02
AL&R $33,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$33,000,000
2023-06-02
Agreement $33,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$33,000,000
2021-04-09
Mortgage $1,619,095 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$1,619,095
2021-04-09
AL&R $1,619,095 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$1,619,095
2019-12-23
Mortgage $11,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$11,000,000
2019-12-23
Agreement $102,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$102,000,000
2019-12-23
AL&R $175,000,000 — from US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA
$175,000,000
Ten-year activity
2001000
2017
135
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
37
17
64
0
5
123
2018
41
21
59
10
4
135
2019
27
4
18
10
19
78
2020
9
4
19
0
4
36
2021
6
5
17
2
5
35
2022
0
6
35
0
6
47
2023
0
2
20
8
6
36
2024
0
2
35
0
6
43
2025
0
1
36
7
8
52
2026
0
0
28
0
6
34
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-05-07
311: Drinking — Underage - Licensed Est
2026-05-06
Cooling tower inspection
2026-05-06
311: Noise - Commercial — Loud Music/Party
2026-05-06
311: Noise - Commercial — Loud Music/Party
2026-05-06
311: Drinking — Underage - Licensed Est
2026-05-02
311: Noise - Commercial — Loud Music/Party
2026-04-03
Boiler inspection
2026-04-03
Boiler inspection
2026-04-03
Boiler inspection
2026-03-14
311: Noise - Commercial — Loud Music/Party
2026-03-08
311: Noise - Commercial — Loud Music/Party
2026-03-08
311: Noise - Residential — Loud Music/Party
2026-03-08
311: Noise - Commercial — Loud Music/Party
2026-03-08
311: Noise - Commercial — Loud Music/Party
2026-03-08
311: Noise - Commercial — Loud Music/Party
2026-03-01
311: Noise - Commercial — Loud Music/Party
2026-02-26
311: Noise - Commercial — Loud Music/Party
2026-02-19
Rodent inspection: Passed
2026-02-01
311: Noise - Residential — Loud Talking
2026-01-15
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-12-13
311: Noise - Commercial — Loud Music/Party
2025-12-05
311: Lost Property — Bag/Wallet
2025-12-05
311: Lost Property — Electronics/Phones
2025-12-04
311: Noise - Commercial — Loud Music/Party
2025-12-02
Restaurant inspection: CATHEDRALE / THE READY CANTINA / ALPHABET / LITTLE SISTER LOUNGE — grade A
2025-12-02
311: Dirty Condition — Trash
2025-11-30
311: Lost Property — Bag/Wallet
2025-11-29
311: Noise - Commercial — Loud Music/Party
2025-11-28
311: Lost Property — Bag/Wallet
2025-11-24
311: Lost Property — Bag/Wallet
2025-11-17
HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-10-31
311: Construction Safety Enforcement — CSC - Monitoring Tracking
The full timeline
2026
2026-10-11311: Vendor Enforcement — Food Vendor
2026-09-18311: Overgrown Tree/Branches — Blocking Street
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-09-28311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2025-06-13HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2024-11-22HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2019-11-21Job filed: ILLUMINATED NON ADVERTISING ACCESSORY SIGN ON MARQUEE PERMITTED UNDER APPLICATION #123405154 - MOXY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$750
2019-10-22FDNY inspection (CONSTR)
2019-10-12311: Illegal Parking — Blocked Sidewalk
2019-10-10Permit EW — ISSUED
2019-09-18Job filed: Moxy Hotel events will take place daily from 5:00 pm to 11:45 pm recurring over a 30-day span.
2019-09-03Job filed: Family and friends event for pre-opening of hotel. Event will take place daily from Saturday, September 7, 2019 through Monday, September 16, 2019. Fr
2019-07-24Job filed: TEMPORARY STRUCTURE IN ACCORDANCE WITH BC 3103. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$142,740
2019-07-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2019-07-03311: Noise — Noise: Alarms (NR3)
2019-06-30311: Noise — Noise: air condition/ventilation equipment (NV1)
2019-06-27311: Noise — Noise: Alarms (NR3)
2019-06-19Elevator permit: Furnish And Install three (3) Gear-less traction overhead passenger elevators. Rated for Class A freight loading.$1,530,995
2019-06-18Job filed: No Work
2019-06-14Permit Sign — Signed-off
2019-06-07Elevator permit: Furnish And Install three (3) Gear-less traction overhead passenger elevators. Rated for Class A freight loading.$1,530,995
2019-06-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2019-06-05Job filed: ILLUMINATED NON ADVERTISING ACCESSORY SIGN ON MARQUEE PERMITTED UNDER APPLICATION #123405154 - MOXY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$750
2019-06-04Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NB 121191085$1,000
2019-05-30311: Noise — Noise: Alarms (NR3)
2019-05-07Permit NB — ISSUED
2019-05-03Permit EQ — ISSUED
2019-04-17Permit EW — ISSUED
2019-04-15ECB CLASS - 2 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTR. @ TIME OF INSP. OBSERVED AN ACTIVE CONST. SITE WITH
2019-04-04Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2019-04-01Permit AL — ISSUED
2019-04-01Job filed: FIRE PROTECTION PLAN - NO WORK UNDER THIS APPLICATION$10,000
2019-03-18Job filed: No Work
2019-03-12Job filed: FILING FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#121191085, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE$4,600
2019-03-12Job filed: FILING FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#121191085, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE$4,600
2019-03-11Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2019-02-15Rodent inspection: Passed
2019-02-03311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-02Permit EQ — ISSUED
2019-02-01Elevator permit: Furnish And Install three (3) Gear-less traction overhead passenger elevators. Rated for Class A freight loading.$1,530,995
2019-01-08ECB CLASS - 2 violation: RESPONDENT FAILED TO MAKE THE PROPER NOTIFICATION FOR MOBILE CRANE AFTER MAY 1, 2018 TO THE DEPARTMENT. AT TIME OF INSPECTION IT W$5,030
2018
2018-12-31Permit AL — ISSUED
2018-12-21Permit Sidewalk Shed — Signed-off
2018-12-21Permit Construction Fence — Signed-off
2018-12-20311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-12-20DOB complaint, category ?
2018-12-20Permit Construction Fence — Signed-off
2018-12-20Permit Sidewalk Shed — Signed-off
2018-12-17Permit EW — ISSUED
2018-12-13Job filed: INSTALLATION OF 6000 LB CHAIN HOIST AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH CHAPTER 33 OF NYC BU
2018-12-13Job filed: INSTALLATION OF 6000 LB CHAIN HOIST AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WITH CHAPTER 33 OF NYC BU
2018-12-07311: Noise — Noise: Construction Equipment (NC1)
2018-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-16Job filed: APPLICATION FILED FOR FINISHES AND FLOORING FOR THE PUBLIC ASSEMBLY AREAS ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,500,000
2018-11-15Permit Supported Scaffold — Signed-off
2018-11-15Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2018-11-13Job filed: APPLICATION FILED FOR INSTALLATION OF A MARQUEE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2018-11-10311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-02Elevator permit: Furnish and Install one (1) twin post hole-less hydraulic passenger elevator. Rated for class A freight loading.$170,426
2018-11-02Elevator permit: Furnish And Install three (3) Gear-less traction overhead passenger elevators. Rated for Class A freight loading.$1,530,995
2018-10-31Permit EW — ISSUED
2018-10-24311: Noise — Noise: Construction Equipment (NC1)
2018-10-19311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2018-10-19DOB complaint, category ?
2018-10-19DOB complaint, category ?
2018-10-19Permit EQ — ISSUED
2018-10-01311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-10-01DOB complaint, category ?
2018-09-15311: Noise — Noise: Construction Equipment (NC1)
2018-09-13Permit EW — ISSUED
2018-08-28Permit EW — ISSUED
2018-08-22FDNY inspection (RISK)
2018-08-16Rodent inspection: Passed
2018-08-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-08-04DOB complaint, category ?
2018-08-01311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2018-08-01Permit EW — ISSUED
2018-08-01Permit EW — ISSUED
2018-08-01DOB complaint, category ?
2018-07-31DOB violation C:
2018-07-30Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2018-07-12311: Water System — Remove Hydrant Locking Device (WC6)
2018-07-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-07-07311: Noise — Noise: Construction Before/After Hours (NM1)
2018-07-07DOB complaint, category ?
2018-07-03311: Sustainability Enforcement — Sustainability Enforcement Work Order
2018-07-03DOB complaint, category ?
2018-07-02Job filed: INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY FLO$157,000
2018-06-16311: Noise — Noise: Construction Before/After Hours (NM1)
2018-06-09FDNY inspection (CDA-90-DRILL)
2018-05-29311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-22Permit NB — ISSUED
2018-05-21Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2018-05-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-05-17311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-05-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-04-13Job filed: INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECTION AS PER PLANS, AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR
2018-04-13Job filed: INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECTION AS PER PLANS, AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR
2018-04-13Job filed: INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECTION AS PER PLANS, AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR
2018-04-12311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-12311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-04-12DOB complaint, category ?
2018-04-07311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-04-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-05DOB complaint, category ?
2018-04-02Permit EW — ISSUED
2018-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-24311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-24311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-24DOB complaint, category ?
2018-03-22Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2018-03-19Permit EQ — ISSUED
2018-03-19Permit EQ — ISSUED
2018-03-16Job filed: INSTALLATION OF SINGLE 6250 LB PERSONNEL/MATERIAL HOIST "B" AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY W
2018-03-16Job filed: INSTALLATION OF DUAL 6250 LB PERSONNEL/MATERIAL HOIST "A" AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST TO COMPLY WIT
2018-03-05Agreement $57,100,000 — from US-DEV ASSOCIATES LLC to TRI-STATE LOAN ACQUISITIONS IV LLC$57,100,000
2018-03-05Agreement — from TRI-STATE LOAN ACQUISITIONS IV LLC; US-DEV ASSOCIATES LLC to BANK OF THE OZARKS
2018-03-05AL&R $20,537,721 — from US-DEV ASSOCIATES LLC to BANK OF THE OZARKS$20,537,721
2018-03-05Mortgage $20,537,721 — from US-DEV ASSOCIATES LLC to BANK OF THE OZARKS$20,537,721
2018-03-05AL&R $42,562,279 — from US-DEV ASSOCIATES LLC to BANK OF THE OZARKS$42,562,279
2018-03-05Mortgage $42,562,279 — from US-DEV ASSOCIATES LLC to BANK OF THE OZARKS$42,562,279
2018-03-05AL&R $27,900,000 — from US-DEV ASSOCIATES LLC to BANK OF THE OZARKS$27,900,000
2018-03-05Agreement $27,900,000 — from US-DEV ASSOCIATES LLC to BANK OF THE OZARKS$27,900,000
2018-03-05Mortgage assigned — from GOLDMAN SACHS BANK USA to BANK OF THE OZARKS
2018-03-05TL&R — from GOLDMAN SACHS BANK USA to US-DEV ASSOCIATES LLC; US-DEV ASSOCIATES II LLC
2018-02-05311: Noise — Noise: Construction Before/After Hours (NM1)
2018-02-01Rodent inspection: Passed
2018-01-26311: Noise — Noise: Jack Hammering (NC2)
2018-01-26Job filed: INSTALLATION OF TITAN PLATFORM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-01-25Permit Sidewalk Shed — Signed-off
2018-01-25Permit Construction Fence — Signed-off
2018-01-24Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED & PLY WOOD FENCE AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 COD$10,000
2018-01-20FDNY inspection (CDA-90-DRILL)
2018-01-18311: Noise — Noise: Jack Hammering (NC2)
2017
2017-12-27311: Noise — Noise: Construction Before/After Hours (NM1)
2017-12-26Permit PL — RE-ISSUED
2017-12-22Permit NB — ISSUED
2017-12-19Job filed: INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECTION AS PER PLANS, AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR
2017-12-19Job filed: INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECTION AS PER PLANS, AND SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR
2017-12-16311: Noise — Noise: Construction Before/After Hours (NM1)
2017-12-07311: Noise — Noise: Construction Equipment (NC1)
2017-12-07311: Noise — Noise: Jack Hammering (NC2)
2017-12-07311: Noise — Noise: Construction Equipment (NC1)
2017-12-04Permit FO — ISSUED
2017-12-02311: Noise — Noise: Construction Before/After Hours (NM1)
2017-12-01311: Noise — Noise: Construction Equipment (NC1)
2017-11-29311: Noise — Noise: Construction Equipment (NC1)
2017-11-27Rodent inspection: Passed
2017-11-22311: Noise — Noise: Construction Before/After Hours (NM1)
2017-11-14311: Noise — Noise: Construction Equipment (NC1)
2017-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2017-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2017-10-26311: Noise — Noise: Construction Equipment (NC1)
2017-10-21311: Noise - Vehicle — Engine Idling
2017-10-19311: Noise — Noise: Construction Before/After Hours (NM1)
2017-09-23311: Noise — Noise: Construction Before/After Hours (NM1)
2017-09-23311: Noise — Noise: Construction Before/After Hours (NM1)
2017-09-22311: Noise — Noise: Construction Before/After Hours (NM1)
2017-09-22Permit FO — ISSUED
2017-09-21Job filed: A2$1,000
2017-09-19311: Noise — Noise: Construction Before/After Hours (NM1)
2017-09-16311: Noise — Noise: Construction Before/After Hours (NM1)
2017-09-14311: Noise — Noise: Construction Equipment (NC1)
2017-09-13311: General Construction/Plumbing — Safety Netting/Guard Rails - Damaged/Inadequate/None (6 Stories/75 Feet Or Less)
2017-09-13311: Noise — Noise: Construction Equipment (NC1)
2017-09-13311: Noise — Noise: Construction Equipment (NC1)
2017-09-13311: Noise — Noise: Construction Equipment (NC1)
2017-09-13DOB complaint, category ?
2017-08-30FDNY inspection (CONSTR)
2017-08-19311: Noise — Noise: Construction Before/After Hours (NM1)
2017-08-11FDNY inspection (CONSTR)
2017-08-09Permit FO — ISSUED
2017-08-09Permit FO — ISSUED
2017-08-07Permit EQ — ISSUED
2017-08-02311: Street Condition — Cave-in
2017-07-24Permit EW — ISSUED
2017-07-18Job filed: INSTALLATION OF TEMPORARY PRESSURIZED DRY STANDPIPE SYSTEM IN UNHEATED NEW BUILDING UNDER CONSTRUCTION AS SHOWN ON PLANS PROVIDED. APPLICATION FILED I$55,000
2017-07-18Job filed: INSTALLATION OF TEMPORARY PRESSURIZED DRY STANDPIPE SYSTEM IN UNHEATED NEW BUILDING UNDER CONSTRUCTION AS SHOWN ON PLANS PROVIDED. APPLICATION FILED I$55,000
2017-07-18Job filed: INSTALLATION OF TEMPORARY PRESSURIZED DRY STANDPIPE SYSTEM IN UNHEATED NEW BUILDING UNDER CONSTRUCTION AS SHOWN ON PLANS PROVIDED. APPLICATION FILED I$55,000
2017-07-01311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-07-01DOB complaint, category ?
2017-06-12FDNY inspection (DEMO)
2017-06-06Job filed: FILING FUEL STORAGE IN CONJUNCTION WITH NEW BUILDING 121191085.$1,000
2017-06-06Job filed: FILING BOILER IN CONJUNCTION WITH NEW BUILDING APPLICATION 121191085.$1,000
2017-06-06Job filed: FILING FUEL STORAGE IN CONJUNCTION WITH NEW BUILDING 121191085.$1,000
2017-06-01Job filed: A2$2,000
2017-06-01Job filed: A2$2,000
2017-05-08FDNY inspection (DEMO)
2017-04-25Job filed: FILING BPP FOR NB APPLICATION 121191085.
2017-04-21311: Water Conservation — Illegal Use Of A Hydrant (CIN)
2017-03-27Job filed: NEW JOB DESCRIPTION: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTIO N AND SPRINKLER FIRE ALARM SYSTEM WITH EMERGENCY VOICE/ALARM COMMUN$1,000
2017-03-27Job filed: NEW JOB DESCRIPTION: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTIO N AND SPRINKLER FIRE ALARM SYSTEM WITH EMERGENCY VOICE/ALARM COMMUN$1,000
2017-03-20Permit EQ — ISSUED
2017-03-15Job filed: FENCE FILING IN CONJUNCTION WITH FULL DEMOLITION APPLICATION 122851823
2017-03-15Job filed: FENCE FILING IN CONJUNCTION WITH FULL DEMOLITION APPLICATION 122851823
2017-03-12FDNY inspection (DEMO)
2017-03-06Rodent inspection: Passed
2017-03-06311: BEST/Site Safety — Demolition Notification Received
2017-03-06311: BEST/Site Safety — Demolition Notification Received
2017-03-06311: BEST/Site Safety — Demolition Notification Received
2017-03-06311: BEST/Site Safety — Demolition Notification Received
2017-03-06311: BEST/Site Safety — Demolition Notification Received
2017-03-06DOB complaint, category ?
2017-03-06DOB complaint, category ?
2017-03-06DOB complaint, category ?
2017-03-06DOB complaint, category ?
2017-03-06DOB complaint, category ?
2017-03-03Permit DM — ISSUED
2017-03-03Permit DM — ISSUED
2017-03-03Permit DM — ISSUED
2017-03-03Permit DM — ISSUED
2017-03-03Permit EQ — ISSUED
2017-03-01Permit EQ — ISSUED
2017-03-01Permit EQ — ISSUED
2017-03-01Permit EQ — ISSUED
2017-03-01Permit DM — ISSUED
2017-02-28Permit EQ — ISSUED
2017-02-24Job filed: FILING BPP FOR NB APPLICATION 121191085.
2017-01-30311: Illegal Parking — Blocked Sidewalk
2017-01-25311: Noise — Noise: Construction Equipment (NC1)
2017-01-11311: Noise - Vehicle — Engine Idling
2017-01-10311: Noise — Noise: Construction Before/After Hours (NM1)
2017-01-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2016-12-05Mortgage $57,100,000 — from US-DEV ASSOCIATES II LLC to GOLDMAN SACHS BANK USA$57,100,000
2016-12-05Mortgage $27,900,000 — from US-DEV ASSOCIATES LLC; US-DEV ASSOCIATES II LLC to GOLDMAN SACHS BANK USA$27,900,000
2016-12-05Agreement $85,000,000 — from US-DEV ASSOCIATES LLC; US-DEV ASSOCIATES II LLC to GOLDMAN SACHS BANK USA$85,000,000
2016-12-05Mortgage assigned — from GOLDMAN SACHS BANK USA to TRI-STATE LOAN ACQUISITIONS IV LLC
2016-12-05SUBM — from TRI-STATE LOAN ACQUISITIONS IV LLC; GOLDMAN SACHS BANK USA to US-DEV ASSOCIATES II LLC; US-DEV ASSOCIATES LLC
2016-11-23HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-11-23HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-11-23HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-11-23HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-11-17RPTT&RET — from MADISON TO PARK LLC to US-DEV HOLDINGS LLC
2016-11-15ZONE — from US-DEV ASSOCIATES LLC
2016-11-07Permit EW — ISSUED
2016-11-02Permit EW — ISSUED
2016-11-02Permit EW — ISSUED
2016-11-02Permit EW — ISSUED
2016-11-02Permit EW — ISSUED
2016-10-24HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-10-15311: Noise — Noise: Construction Before/After Hours (NM1)
2016-10-15311: Noise — Noise: Construction Before/After Hours (NM1)
2016-10-13311: Noise — Noise: Construction Before/After Hours (NM1)
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS.$20,000
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS$20,000
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS$20,000
2016-09-21Job filed: FILING SOE FOR NB
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS.$20,000
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS$20,000
2016-09-21Job filed: FILING STRUCTURAL FOR NB
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS$20,000
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS$20,000
2016-09-21Job filed: FILING FOUNDATION FOR NB
2016-09-21Job filed: FILING FOUNDATION FOR NB
2016-09-21Job filed: FILING STRUCTURAL FOR NB
2016-09-21Job filed: FILING MH & PL FOR NB
2016-09-21Job filed: INTERIOR AND EXTERIOR REMOVAL OF NON STRUCTURAL ELEMENTS$20,000
2016-09-14Job filed: NB
2016-09-14Job filed: NB
2016-09-14Job filed: NB
2016-09-08311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-09-08DOB complaint, category ?
2016-09-01Permit EQ — ISSUED
2016-09-01Permit EQ — ISSUED
2016-09-01Permit EQ — ISSUED
2016-09-01Permit EQ — ISSUED
2016-09-01Permit EQ — ISSUED
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-31Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUI
2016-08-24Permit EQ — ISSUED
2016-08-24Permit EQ — ISSUED
2016-08-24Permit EQ — ISSUED
2016-08-24Permit EQ — ISSUED
2016-08-24Permit EQ — ISSUED
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-08-24Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH
2016-07-07CERT — from OLD REPUBLIC NATIONAL TITLE INSURANCE CO to US-DEV ASSOCIATES LLC
2016-07-02311: Homeless Person Assistance — N/A
2016-05-12Rodent inspection: Passed
2016-05-04AL&R $85,000,000 — from US-DEV ASSOCIATES II LLC; US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA$85,000,000
2016-05-04Agreement $85,000,000 — from US-DEV ASSOCIATES II LLC; US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA$85,000,000
2016-05-04Mortgage assigned — from APPLE BANK FOR SAVINGS to GOLDMAN SACHS BANK USA
2016-05-04Deed $52,100,000 — from 85 EAST 10TH AND 112-120 EAST 11TH STREE to UD-DEV ASSOCIATES LLC$52,100,000
2016-05-04Mortgage $57,000,000 — from US-DEV ASSOCIATES II LLC; US-DEV ASSOCIATES LLC to GOLDMAN SACHS BANK USA$57,000,000
2016-05-04TL&R — from APPLE BANK FOR SAVINGS to 85 EAST 10TH AND 112-120 EAST 11TH STREE
2016-04-21Sold for $52,100,000$52,100,000
2016-03-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2016-03-08Job filed: FILING SUBDIVISION APPLICATION TO SUBDIVIDE BLOCK 556 LOT 15 INTO BLOCK 556 LOT 15 AND 16 AS PER RP602.
2016-03-07Job filed: A1$1,000
2016-03-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-03-04Job filed: A1$1,000
2016-03-04Job filed: A1$1,000
2016-03-04Job filed: FILING HEREWITH NO WORK PERMIT APPLICATION TO UPDATE MEETS AND BOUNDS.$1,000
2016-03-04Job filed: A1$1,000
2016-02-15Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015
2015-04-21Rodent inspection: Passed
2015-04-13Tenant complaint: PLUMBING — RADIATOR
2015-03-20Tenant complaint: PLUMBING — RADIATOR
2015-03-19HPD litigation: Tenant Action
2015-03-03Job filed: INTERIOR RENOVATION TO APT #1C ON 1ST FLOOR,REMOVE PARTITIONS AND EXISTING WOOD FLOOR AND REPLACE WITH NEW ONES. REPLACE PLUMBING FIXTURES ON EXISTING$59,000
2015-03-03Job filed: STRUCTURAL WORK IN CONJUNCTION WITH APARTMENT 1C RENOVATION, REPLACE FLOOR, REFRAME AND REINFORCE FLOOR. ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR O$15,000
2015-02-18Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2014
2014-03-20Rodent inspection: Passed
2014-01-25311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2014-01-25DOB complaint, category ?
2014-01-04Tenant complaint: HEATING — HEAT RELATED
2013
2013-07-18Job filed: INSTALLATION OF (1) FEBCO 850 2" DOUBLE CHECK BFP AT 1ST FLOOR CORRIDOR. NO CHANGE TO USE EGRESS OR OCCUPANCY. DEP APPROVAL # 12040470.$5,000
2013-07-18Job filed: INSTALLATION OF (1) FEBCO 850 2" BFP AT 1ST FLOOR CORRIDOR. NO CHANGE TO USE EGRESS OR OCCUPANCY. DEP APPROVAL # 12040468.$5,000
2013-07-18Job filed: INSTALLATION OF (1) FEBCO 850 2" BFP AT 1ST FLOOR CORRIDOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. DEP APPROVAL # 12040469$5,000
2013-07-18Job filed: INSTALLATION OF (1) FEBCO 850 - 2" DOUBLE CHECK CFP-RPZ AT 1ST FLOOR CORRIDOR. NO CHANGE TO USE EGRESS OR OCCUPANCY. DEP APPROVAL # 12040472.$5,000
2013-07-18Job filed: INSTALLATION OF (1) FEBCO 850 2" DOUBLE CHECK BFP AT 1ST FLOOR CORRIDOR. NO CHANGE TO USE EGRESS OR OCCUPANCY. DEP APPROVAL # 12040471$5,000
2013-06-30311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2013-06-17311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2013-06-17DOB complaint, category ?
2013-04-03Rodent inspection: Passed
2013-01-27Tenant complaint: HEATING — HEAT RELATED
2012
2012-07-24Job filed: STRUCTURAL WORK.$20,000
2012-07-24Job filed: INTERIOR RENOVATION TO EXISTING APT #B AT CELLAR AND 1ST FLOOR.REMOVE AND CONSTRUCT NEW PARTITIONS,REPLACE CONVENIENT STAIRS IN ADDITION REPLACE AND I$65,000
2012-06-04Rodent inspection: Passed
2012-05-17Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-05-16Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-05-16Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-05-16Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-05-16Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-04-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-04-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-04-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-04-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-04-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-04-02Job filed: STRUCTURAL WORK.$20,000
2012-04-02Job filed: INTERIOR ALTERATION TO APT#C ON CELLAR, FIRST AND LOFT LEVEL. REMOVE AND CONSTRUCT PARTITIONS,CEILING. RECONSTRUCT DAMAGE FLOOR SYSTEM. STAIRS. PLUMBI$58,000
2012-02-23DOB complaint, category ?
2012-02-08Job filed: INTERIOR ALTERATION TO EXISTING APT#B AND D ON CEL AND 1ST FLOOR. REMOVE & CONSTRUCT PARTITIONS. CEILING AND FLOORING. MISC WORK. INSTALL NEW WOO$60,000
2012-02-08Job filed: STRUCTURAL WORK.$15,000
2011
2011-12-20DOB complaint, category ?
2011-12-06DOB complaint, category ?
2011-12-05DOB complaint, category ?
2011-11-30Job filed: STRUCTURAL RE FRAMING OF FLOOR. REPLACE OF EXISTING WOOD BEAM WITH STEEL. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WIT$24,000
2011-11-30Job filed: STRUCTURAL RE FRAMING OF FLOOR. REPLACE OF EXISTING WOOD BEAM WITH STEEL. ALL AS PER PLANS.IN CONJUNCTION WITH INTERIOR WORK DONE UNDER APPLICATION #1$62,000
2011-06-16Rodent inspection: Passed
2011-05-20Rodent inspection: Failed for Other Reason
2011-05-06Job filed: INTERIOR RENOVATION TO APARTMENT# A ON THE 1ST FLOOR. REMOVE AND CONSTRUCT PARTITIONS. REPLACE JOIST. REMOVE AND INSTALL PLUMBING FIXTURES.ALL AS PER $63,000
2011-04-07Job filed: INTERIOR RENOVATION TO APARTMENT 1R ON THE FIRST FLOOR. REMOVE AND CONSTRUCT PARTITIONS. REMOVE AND INSTALL PLUMBING FIXTURES. ALL AS PER PLAN. NO$35,000
2010
2010-11-28Tenant complaint: HEATING — HEAT RELATED
2010-11-22HPD class B: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES STOVE IN THE KITCHEN LOCATED AT APT D, 1st STORY, 1st APARTMENT FROM SO
2010-11-15Tenant complaint: GENERAL — COOKING GAS
2010-11-14Tenant complaint: HEATING — HEAT RELATED
2010-11-14Tenant complaint: GENERAL — FLOOR
2010-11-14Tenant complaint: GENERAL — COOKING GAS
2010-11-14Tenant complaint: HEATING — HEAT RELATED
2002-12-11HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM NORT
1999
1999-11-10HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
1999-11-10HPD class B: § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNS
1968
1968-05-08Deed — from GUCKER, DOROTHY M to 114-120 E 11TH ST REALTY
1968-05-08Deed — from GUCKER, HENRY J EX to GUCKER, DOROTHY M
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL