Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
2 heat or hot-water complaints in the last three years (winter 2025–26: 2).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
49 service requests in the last three years. Most common: Noise (30) · Encampment (8) · New Tree Request (2) · Illegal Parking (2) · Homeless Person Assistance (1) · Emergency Response Team (ERT) (1).
Filed construction activity
$61,728,394 in permitted construction work filed since
2016 (126 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$93,354,000
$42,009,300
2026
$96,782,000
$43,551,900
2027
$99,833,000
$44,924,850
The city's market estimate has risen
7% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2019 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
8 St-NYU — R W · 650 ft straight-line (about a 3-minute walk) · station accessibility: none 14 St-Union Sq — 4 5 6 L N Q R W · 850 ft straight-line (about a 4-minute walk) · station accessibility: partial
Bus
Nearest boarding stop: E 9 St / Broadway — M8 · 400 ft
Citi Bike
E 11 St & Broadway · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
49 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $26,702,119 on
2022-07-12 (lender: Parlex 18 Finco, LLC). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-11-26
Deed $255,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to WEISSHORN RE 799 BROADWAY LLC
$255,000,000
2024-11-19
Sold for $255,000,000
$255,000,000
$85,000,000
2022-07-12
AL&R $173,420,329 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$173,420,329
2022-07-12
Agreement $173,420,329 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$173,420,329
2022-07-12
Mortgage $63,420,329 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$63,420,329
2022-07-12
Mortgage $26,702,119 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$26,702,119
2022-07-12
AL&R $17,637,552 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$17,637,552
2022-07-12
Mortgage $17,637,552 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$17,637,552
2022-07-12
AL&R $26,702,119 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC
$26,702,119
2021-12-29
RPTT $1,440,776,500 — from COLUMBIA PROPERTY TRUST, INC. to OC III HOLDING LP; LVS III HOLDING LP; LVS IV HOLDING LP; PMIT OPERATING LP
$1,440,776,500
2020-07-14
Mortgage $13,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC
$13,000,000
2018-10-17
M&CON $97,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC
$97,000,000
2018-10-17
Mortgage $13,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC
$13,000,000
2018-10-17
AL&R $110,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC
$110,000,000
2018-10-09
Deed $145,500,000 — from 799 BROADWAY OWNER LLC to MAPLE C 799 BROADWAY OWNER II, LLC
$145,500,000
Ten-year activity
2001000
2017
141
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
2
4
5
0
16
27
2018
32
11
33
9
56
141
2019
25
27
68
0
2
122
2020
25
26
66
5
6
128
2021
21
13
9
1
2
46
2022
93
6
17
11
3
130
2023
31
3
16
0
3
53
2024
12
0
12
8
3
35
2025
54
2
19
0
5
80
2026
11
0
15
0
1
27
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-08-22Elevator permit: Furnish and install one (1) New Hydraulic Elevator in a New Shaft as per Layouts (Plan #: N1KF27-Elev4 ), new hoistway in existing$173,160
2025-08-22311: Encampment — N/A
2025-08-21311: Noise — Noise: Construction Before/After Hours (NM1)
2025-08-19Elevator permit: Furnish and install one (1) New Hydraulic Elevator in a New Shaft as per Layouts (Plan #: N1KF27-Elev4 ), new hoistway in existing$173,160
2025-08-14Permit Plumbing — Signed-off
2025-08-13311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-08-13311: Noise — Noise: air condition/ventilation equipment (NV1)
2024-02-09Permit General Construction — Signed-off
2024-02-07Job filed: Mechanical modifications taking place on the 4-5th & 7th floors as indicated on the drawings.$1,669,515
2024-02-06Job filed: Temporary structure installation for "The Marilyn Monroe Food mark". All installation shall be removed upon completion of the event.$5,000
2024-02-06Job filed: Temporary Event "The Marilyn Monroe Food mark"
2024-02-05Job filed: Fashion show and and accessory backstage areas.
2024-01-30311: Encampment — N/A
2024-01-30311: Encampment — N/A
2024-01-30Job filed: Mechanical modifications taking place on the 4-5th & 7th floors as indicated on the drawings.$1,669,515
2024-01-30Job filed: Mechanical modifications taking place on the 6th floor as indicated on the drawings.$564,880
2024-01-29Certificate of occupancy Renewal Without Change
2023
2023-12-21Permit Structural — Signed-off
2023-11-21Certificate of occupancy Renewal With Change
2023-04-24Job filed: Mechanical modifications taking place on the 4-5th & 7th floors as indicated on the drawings.$1,669,515
2023-04-24Job filed: Mechanical modifications taking place on the 6th floor as indicated on the drawings.$564,880
2023-04-22DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
2023-04-18Permit Structural — Signed-off
2023-04-13Job filed: Structural modifications taking place on the 6th floor as indicated on the drawings.$30,000
2023-04-11311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-04-11311: Noise — Noise: Construction Before/After Hours (NM1)
2023-04-11311: Noise — Noise: Construction Before/After Hours (NM1)
2023-04-11DOB complaint, category ?
2023-03-30Job filed: Plumbing modifications taking place on the 6th floor as indicated on the drawings.$90,600
2023-03-30Job filed: Plumbing modifications taking place on the 4-5th, & 7th floors as indicated on the drawings.$234,800
2023-03-29Job filed: OFFICE RENOVATION WORK TO INCLUDE PARTITION, CEILING, DOOR AND ACCESSORY TERRACE MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,369,782
2023-03-29Job filed: Sprinkler modifications as per plans. No change in use egress or occupancy.$47,420
2023-03-29Job filed: Mechanical modifications as per plans. No change in use egress or occupancy.$469,350
2023-03-29Job filed: Plumbing modifications as per plans. No change in use egress or occupancy.$127,928
2023-03-28Permit Mechanical Systems — Signed-off
2023-03-28Job filed: Sprinkler modifications taking place on the 6th floor as indicated on the drawings.$100,500
2023-03-28Job filed: Sprinkler modifications taking place on the 4-5th & 7th floors as indicated on the drawings.$334,100
2023-03-28Job filed: Construction modifications taking place on the 4th - 5th & 7th floors as indicated on the drawings.$9,273,080
2023-03-17311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-02-28Permit EQ — ISSUED
2023-02-27Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF
2023-02-21Job filed: Plumbing modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$89,974
2023-02-20Job filed: Sprinkler modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$7,996
2023-02-16Certificate of occupancy Renewal With Change
2023-02-13Job filed: Plumbing modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$89,974
2023-02-13Job filed: Mechanical service modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$24,998
2023-02-13Job filed: General construction taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$322,009
2023-02-08Job filed: Plumbing modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$89,974
2023-02-07Job filed: General construction taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$322,009
2022-12-21Certificate of occupancy Renewal With Change
2022-12-15Permit Plumbing — Signed-off
2022-11-04Job filed: Installation of a catwalk around a cooling tower on the roof per drawings filed herewith. No change to use, egress nor occupancy.$169,500
2022-11-03311: Noise — Noise: Construction Equipment (NC1)
2022-11-03Permit Sprinklers — Signed-off
2022-11-03Job filed: Sprinkler modifications taking place on the 2nd floor as indicated on the drawings.$43,000
2022-11-01Permit Plumbing — Signed-off
2022-11-01Permit Sprinklers — Signed-off
2022-11-01Permit Plumbing — Signed-off
2022-10-31Permit Mechanical Systems — Signed-off
2022-10-31Permit Mechanical Systems — Signed-off
2022-10-27Permit General Construction — Signed-off
2022-10-27Permit General Construction — Signed-off
2022-10-27Job filed: Mechanical modifications taking place on the 4-5th & 7th floors as indicated on the drawings.$1,669,515
2022-10-27Job filed: Plumbing modifications taking place on the 6th floor as indicated on the drawings.$90,600
2022-10-27Job filed: Mechanical modifications taking place on the 6th floor as indicated on the drawings.$564,880
2022-10-27Job filed: Sprinkler modifications taking place on the 4-5th & 7th floors as indicated on the drawings.$334,100
2022-10-27Job filed: Sprinkler modifications taking place on the 6th floor as indicated on the drawings.$100,500
2022-10-27Job filed: Plumbing modifications taking place on the 4-5th, & 7th floors as indicated on the drawings.$234,800
2022-10-26Job filed: Construction modifications taking place on the 4th - 5th & 7th floors as indicated on the drawings.$9,273,080
2022-10-26Job filed: Construction modifications taking place on the 6th floor as indicated on the drawings.$3,012,688
2022-10-24Permit Plumbing — Signed-off
2022-10-18Job filed: Mechanical modifications taking place on the 2nd floor as indicated on the drawings.$188,000
2022-10-17Permit Sprinklers — Signed-off
2022-10-15311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-10-07Job filed: Construction modifications taking place on the 2nd floor as indicated on the drawings.$569,000
2022-10-03311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-28311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-09-13Permit Sprinklers — Signed-off
2022-09-09Permit Plumbing — Signed-off
2022-09-05Permit General Construction — Signed-off
2022-09-02Permit Mechanical Systems — Signed-off
2022-08-31311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-08-26Job filed: Sprinkler modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$7,996
2022-08-26Job filed: Mechanical service modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$24,998
2022-08-26Job filed: General construction taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$322,009
2022-08-26Job filed: Plumbing modifications taking place in the cellar as per plans filed herewith. No change in use, egress nor occupancy.$89,974
2022-08-25311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-08-25DOB complaint, category ?
2022-08-22311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-08-18Job filed: General construction taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$3,099,830
2022-08-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-14311: Illegal Parking — Blocked Bike Lane
2022-08-09Permit Structural — Signed-off
2022-08-05Job filed: Plumbing modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy.$9,007
2022-08-04Certificate of occupancy Renewal Without Change
2022-08-03Job filed: Sprinkler modifications taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$129,869
2022-08-01311: Damaged Tree — Tree Alive - in Poor Condition
2022-07-29Job filed: Structural modifications taking place between the 8th & 9th floors per drawings filed herewith. No changes to use, egress nor occupancy.$53,999
2022-07-26Permit General Construction — Signed-off
2022-07-22Permit Sprinklers — Signed-off
2022-07-22Permit Mechanical Systems — Signed-off
2022-07-18Permit General Construction — Signed-off
2022-07-13311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2022-07-12TL&R — from ACREFI HOLDINGS J-I, LLC to MAPLE C 799 BROADWAY OWNER II, LLC
2022-07-12Agreement — from PARLEX 18 FINCO, LLC to NEWREZ LLC
2022-07-12AL&R $173,420,329 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$173,420,329
2022-07-12Agreement $173,420,329 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$173,420,329
2022-07-12Mortgage $63,420,329 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$63,420,329
2022-07-12Mortgage assigned — from ACREFI HOLDINGS J-I, LLC to PARLEX 18 FINCO, LLC
2022-07-12Mortgage $26,702,119 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$26,702,119
2022-07-12Mortgage assigned — from ACREFI HOLDINGS J-I, LLC to PARLEX 18 FINCO, LLC
2022-07-12AL&R $17,637,552 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$17,637,552
2022-07-12Mortgage $17,637,552 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$17,637,552
2022-07-12AL&R $26,702,119 — from MAPLE C 799 BROADWAY OWNER II, LLC to PARLEX 18 FINCO, LLC$26,702,119
2022-07-12Permit Plumbing — Signed-off
2022-07-11Job filed: Sprinkler modifications taking place on the 10th floor per the drawings filed herewith. No change to use, egress nor occupancy.$49,990
2022-07-11Job filed: Mechanical modifications taking place on the 10th floor per the drawings filed herewith. No change to use, egress nor occupancy.$149,969
2022-07-06Permit EW — ISSUED
2022-07-06Permit EW — ISSUED
2022-07-05Job filed: Construction modifications taking place on the 2nd floor as indicated on the drawings.$569,000
2022-07-05Job filed: Mechanical modifications taking place on the 2nd floor as indicated on the drawings.$188,000
2022-07-01Job filed: Sprinkler modifications taking place on the 2nd floor as indicated on the drawings.$43,000
2022-07-01Job filed: Plumbing modifications taking place on the 2nd floor as indicated on the drawings.$35,000
2022-07-01Job filed: Plumbing modifications taking place on the 10th floor per the drawings filed herewith. No change to use, egress nor occupancy.$14,975
2022-06-24Job filed: General construction taking place on the 10th floor as per plans filed herewith. No change in use, egress nor occupancy.$749,992
2022-06-23Job filed: No Work
2022-06-13Job filed: OFFICE RENOVATION WORK TO INCLUDE PARTITION, CEILING, DOOR AND ACCESSORY TERRACE MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,369,782
2022-06-13Job filed: Structural work to include installation of convenience stair as per plans. No change in use egress occupancy.$150,000
2022-06-10Job filed: Mechanical modifications as per plans. No change in use egress or occupancy.$469,350
2022-06-10Job filed: Sprinkler modifications as per plans. No change in use egress or occupancy.$47,420
2022-06-10Job filed: Plumbing modifications as per plans. No change in use egress or occupancy.$127,928
2022-05-27311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-05-27DOB complaint, category ?
2022-05-25Job filed: General construction modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy.$239,997
2022-05-11FDNY inspection (E-CIDS)
2022-05-11FDNY inspection (CONSTR)
2022-04-28Permit Sprinklers — Signed-off
2022-04-26Certificate of occupancy Renewal Without Change
2022-03-25Rodent inspection: Passed
2022-03-14Permit Plumbing — Signed-off
2022-03-11Permit Plumbing — Signed-off
2022-03-11Permit Sprinklers — Signed-off
2022-03-04Permit Sprinklers — Signed-off
2022-02-16Job filed: Sprinkler modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy$13,495
2022-02-11Permit Structural — Signed-off
2022-02-08Permit General Construction — Signed-off
2022-02-07Permit Mechanical Systems — Signed-off
2022-02-07Job filed: Structural modifications taking place on the 10th & 11th floors as per plans filed herewith. No change in use, egress nor occupancy.$49,990
2022-02-04Permit General Construction — Signed-off
2022-02-04Permit Structural — Signed-off
2022-02-03Job filed: General construction taking place on the 10th floor as per plans filed herewith. No change in use, egress nor occupancy.$749,992
2022-02-02Permit Mechanical Systems — Signed-off
2022-02-02Job filed: Plumbing modifications taking place on the 10th floor per the drawings filed herewith. No change to use, egress nor occupancy.$14,975
2022-02-02Job filed: Sprinkler modifications taking place on the 10th floor per the drawings filed herewith. No change to use, egress nor occupancy.$49,990
2022-02-02Job filed: Mechanical modifications taking place on the 10th floor per the drawings filed herewith. No change to use, egress nor occupancy.$149,969
2022-02-01Permit Mechanical Systems — Signed-off
2022-01-28Job filed: No Work
2022-01-27Permit Plumbing — Signed-off
2022-01-27Job filed: Plumbing modifications taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$159,991
2022-01-27Job filed: Sprinkler modifications taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$129,869
2022-01-27Job filed: Mechanical modifications taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$739,959
2022-01-27Job filed: General construction taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$3,099,830
2022-01-26Elevator permit: FandI (3) new "MachineRoomLess" passenger elevators designed for class A loading to comply with A17.1s -2005 and as modified by $1,236,000
2022-01-25Permit General Construction — Signed-off
2022-01-20Permit Sprinklers — Signed-off
2022-01-14Permit General Construction — Signed-off
2022-01-13Job filed: Plumbing modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy.$9,007
2022-01-13Job filed: Mechanical modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy.$34,990
2022-01-13Job filed: Sprinkler modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy$13,495
2022-01-12Job filed: General construction modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy.$239,997
2022-01-11Elevator permit: Furnish and install one (1) new "MachineRoomLess" passenger elevator designed for Class A loading to comply with A17.1s -2005 and$415,700
2022-01-10Certificate of occupancy Initial
2022-01-03311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2022-01-03DOB complaint, category ?
2021
2021-12-30Job filed: Structural modifications taking place between the 8th & 9th floors per drawings filed herewith. No changes to use, egress nor occupancy.$53,999
2021-12-30Job filed: General construction/demolition taking place on the 8th & 9th floors per the drawings filed herewith. No change to use, egress nor occupancy.$16,500
2021-12-29RPTT $1,440,776,500 — from COLUMBIA PROPERTY TRUST, INC. to OC III HOLDING LP; LVS III HOLDING LP; LVS IV HOLDING LP; PMIT OPERATING LP$1,440,776,500
2021-12-29Permit NB — ISSUED
2021-12-23311: Noise — Noise: air condition/ventilation equipment (NV1)
2021-12-03Permit PL — ISSUED
2021-11-12Cooling tower inspection
2021-10-29Permit Protection and Mechanical Methods — Signed-off
2021-10-28Job filed: use of existing davit as per plans filed herewith. no change of use egress or occupancy.$1,000
2021-10-21Permit Sidewalk Shed — Signed-off
2021-09-27ECB CLASS - 1 violation: FAILURE TO COMPLY W/MANUFACTURER SPECIFICATIONS. NOTE: AT TIME OF INSPECTION OF A 12 STY NEW BLDG AT ROOF LEVEL W/FINISHING ACTIVI$2,500
2021-09-27DOB complaint, category ?
2021-09-22311: Noise — Noise: air condition/ventilation equipment (NV1)
2021-09-03Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR E$25,000
2021-09-02Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST., FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN$20,000
2021-07-30Permit Supported Scaffold — Signed-off
2021-07-30Permit Protection and Mechanical Methods — Signed-off
2021-07-30Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATIO$10,000
2021-07-27Job filed: INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPA$1,500
2021-07-21Permit EQ — ISSUED
2021-07-16Permit EW — ISSUED
2021-07-16Permit EW — ISSUED
2021-06-20311: Illegal Parking — Blocked Bike Lane
2021-06-06311: Emergency Response Team (ERT) — After Hours Work - Illegal
2021-06-06DOB complaint, category ?
2021-06-03Permit EW — ISSUED
2021-06-03DOB complaint, category ?
2021-06-03DOB complaint, category ?
2021-06-02ECB CLASS - 2 violation: 2113.1.6.1 RESPONSIBILITY OF OWNER OF TALLER BUILDING-CHIMNEY.NOTED:ATTIME OF MY INSPECTION OF A NEW 12 STORY BUILDING CONSTRUCTIO
2021-06-02ECB CLASS - 2 violation: BC 3309.1 FAILURE TO PROTECT ADJOINING STRUCTURES(GENERAL).NOTED:AT TIME OF MY INSPECTION OF A NEW 12 STORY BUILDING CONSTRUCTION
2021-04-21311: Noise — Noise: Construction Before/After Hours (NM1)
2021-04-19ECB CLASS - 2 violation: CONSTRUCTION DOCUMENTS SHALL SHOW CORRECT INFO FGC 106.7 ALL CONTROLS TO BE WIRED AT TIME OF INSPECTION MC 1004.2 ELECTRICAL BOXES
2021-02-22FDNY inspection (STRUC_INT_3)
2021-02-22Permit Boiler Equipment — Signed-off
2021-02-19311: NonCompliance with Phased Reopening — Business not in compliance
2021-02-12Elevator permit: Furnish and install three (3) new "MachineRoomLess" passenger elevators designed for class A loading to comply with A17.1s -2005$1,236,000
2021-01-27Permit Boiler Equipment — Signed-off
2021-01-21Permit Boiler Equipment — Signed-off
2021-01-16311: Noise — Noise: Construction Before/After Hours (NM1)
2021-01-07Permit Construction Fence — Signed-off
2021-01-06ECB CLASS - 2 violation: BC 3307.1 FAILURE TO RENEW DOT PERMITS FOR TEMPORARY CONSTRUCTION EQUIPMENT IN ROADWAY.AT THE TIME OF INSPECTION I OBSERVED.THIS W
2021-01-06DOB complaint, category ?
2021-01-04311: COVID-19 Non-essential Construction — Construction
2021-01-04DOB complaint, category ?
2020
2020-12-29Permit NB — ISSUED
2020-12-22Permit NB — ISSUED
2020-12-17Elevator permit: Furnish and install one (1) new "MachineRoomLess" passenger elevator designed for Class A loading to comply with A17.1s -2005 and$415,700
2020-12-15Permit PL — ISSUED
2020-11-18Permit EQ — ISSUED
2020-11-17Permit Supported Scaffold — Signed-off
2020-11-17Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2020-11-09Permit EQ — ISSUED
2020-11-06ECB CLASS - 1 violation: FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATION AT TIME OF MY INSPECTION OF AN ACTIVE JOBSITE WITH 12 STORY TOPPED OFF.I OBSERVE$1,250
2020-11-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-11-05DOB complaint, category ?
2020-10-26Permit Sidewalk Shed — Signed-off
2020-10-16Job filed: USE OF TEMPORARY MAVLIFT CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121188133.
2020-10-16Job filed: USE OF TEMPORARY MAVLIFT CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121188133.
2020-09-30311: COVID-19 Non-essential Construction — Construction
2020-09-30DOB complaint, category ?
2020-09-27311: Noise — Noise: Construction Equipment (NC1)
2020-09-19311: Noise — Noise: Construction Before/After Hours (NM1)
2020-09-16DOB complaint, category ?
2020-08-15ECB CLASS - 1 violation: FAILURE TO MAINTAIN VERTICAL SAFETY NETTING SYSTEM-DEBRIS NETTING AT TIME OF INSPECTION IN RESPONSE TO COMPLAINT OF DEBRIS FALLIN$625
2020-08-14311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2020-08-14DOB complaint, category ?
2020-08-03Permit EQ — ISSUED
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-23Permit EW — ISSUED
2020-07-23Permit EW — ISSUED
2020-07-20Job filed: fuel oil storage installation related to generator as per plans filed herewith.$55,000
2020-07-17Job filed: Boiler installation as per plans filed herewith.$210,000
2020-07-14CERT — from COMMONWEALTH LAND TITLE INSURANCE COMPAN
2020-07-14Deed — from 799 BROADWAY OWNER, LLC to MAPLE C 799 BROADWAY OWNER II, LLC
2020-07-14Mortgage $13,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC$13,000,000
2020-07-14ZONE — from MAPLE C 799 BROADWAY OWNER II, LLC
2020-07-08Permit EQ — ISSUED
2020-07-01Job filed: USE OF TEMPORARY JEKKO MPK20 MINI CRANE CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121188133
2020-07-01Job filed: USE OF TEMPORARY JEKKO MPK20 MINI CRANE CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121188133
2020-06-22Rodent inspection: Passed
2020-06-17Elevator permit: FandI (3) new "MachineRoomLess" passenger elevators designed for class A loading to comply with A17.1s -2005 and as modified by $1,236,000
2020-06-17Elevator permit: Furnish and install one (1) new "MachineRoomLess" passenger elevator designed for Class A loading to comply with A17.1s -2005 and$415,700
2020-06-17Elevator permit: Furnish and install one (1) new "MachineRoomLess" passenger elevator designed for Class A loading to comply with A17.1s -2005 and$162,000
2020-06-10311: Non-Emergency Police Matter — Social Distancing
2020-06-10311: COVID-19 Non-essential Construction — Construction
2020-06-10DOB complaint, category ?
2020-06-04Permit EW — ISSUED
2020-05-27311: Mobile Food Vendor — Food Source/Protection
2020-05-19311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2020-05-19311: Non-Emergency Police Matter — Social Distancing
2020-05-19311: Non-Emergency Police Matter — Social Distancing
2020-05-15311: Noise — Noise: Construction Equipment (NC1)
2020-05-15311: COVID-19 Non-essential Construction — Construction
2020-05-15DOB complaint, category ?
2020-05-13311: Rodent — Rat Sighting
2020-05-13311: Non-Emergency Police Matter — Social Distancing
2020-05-13311: Non-Emergency Police Matter — Face Covering Violation
2020-05-12311: Non-Emergency Police Matter — Social Distancing
2020-05-12311: COVID-19 Non-essential Construction — Construction
2020-05-12311: Noise — Noise: Construction Before/After Hours (NM1)
2020-05-12311: COVID-19 Non-essential Construction — Construction
2020-05-12311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-05-12DOB complaint, category ?
2020-05-12DOB complaint, category ?
2020-05-12DOB complaint, category ?
2020-05-12DOB complaint, category ?
2020-05-07311: Noise — Noise: Construction Equipment (NC1)
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-04-24311: Noise — Noise: Construction Before/After Hours (NM1)
2020-04-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-04-15311: Non-Emergency Police Matter — Social Distancing
2020-04-15DOB complaint, category ?
2020-04-15DOB complaint, category ?
2020-04-02311: Noise — Noise: Construction Before/After Hours (NM1)
2020-03-30311: General Construction/Plumbing — Building Permit - None
2020-01-17311: Noise — Noise: Construction Equipment (NC1)
2020-01-17311: Noise — Noise: Construction Before/After Hours (NM1)
2020-01-17Permit Construction Fence — Signed-off
2020-01-17Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR E$25,000
2020-01-16DOB complaint, category ?
2020-01-15311: Homeless Person Assistance — N/A
2020-01-14311: Noise — Noise: Construction Before/After Hours (NM1)
2020-01-13311: Noise — Noise: Construction Equipment (NC1)
2020-01-11Elevator permit: Installation of a Dual 7000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tests$20,000
2020-01-10311: Noise — Noise: Construction Before/After Hours (NM1)
2020-01-10311: Noise — Noise: Construction Before/After Hours (NM1)
2020-01-04311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-01-04DOB complaint, category ?
2019
2019-12-31311: Noise — Noise: Construction Before/After Hours (NM1)
2019-12-31311: Noise — Noise: Construction Equipment (NC1)
2019-12-27311: Street Condition — Blocked - Construction
2019-12-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-12-27311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-12-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-12-27DOB complaint, category ?
2019-12-24Permit NB — ISSUED
2019-12-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-12-17FDNY inspection (CONSTR)
2019-12-17FDNY inspection (DEMO)
2019-11-25Permit EQ — ISSUED
2019-11-22311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-22Job filed: INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL HOISTS SHALL COMPLY WITH CHA
2019-11-22Job filed: INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL HOISTS SHALL COMPLY WITH CHA
2019-11-22Job filed: INSTALLATION OF DUAL 7000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL HOISTS SHALL COMPLY WITH CHA
2019-11-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-21311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-21ECB CLASS - 2 violation: BC3301,1,2=CONSTRUCTION OPERATIOSN SHALL BE CONDUCTED IN CONFORMANCE OF TEH N.Y.C FIRE CODE MONTHLY CHECKS NOTED AT TIME OF MY INS
2019-11-21ECB CLASS - 1 violation: BC3309.14=PROTECTION OF ADJOINING PROPERTIES WINDOWS NOTED AT TIME OF INSPECTION OF A NEW 12 STORIE BUILDING AT GROUN DLEVEL CONST
2019-11-20FDNY inspection (DEMO)
2019-11-20FDNY inspection (CONSTR)
2019-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-15DOB complaint, category ?
2019-11-14311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-14311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-11-14DOB complaint, category ?
2019-11-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-09311: Noise — Noise: Construction Before/After Hours (NM1)
2019-11-07Permit Sidewalk Shed — Signed-off
2019-11-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST., FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN$20,000
2019-10-28311: Homeless Person Assistance — N/A
2019-10-25311: Water System — Hydrant Defective (WC2)
2019-10-22FDNY inspection (DEMO)
2019-10-22FDNY inspection (CONSTR)
2019-10-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-10-22311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-22DOB complaint, category ?
2019-10-14311: Noise — Noise: Construction Equipment (NC1)
2019-10-12311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-05311: Noise — Noise: Construction Before/After Hours (NM1)
2019-10-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-10-05DOB complaint, category ?
2019-10-02FDNY inspection (CONSTR)
2019-09-11311: Consumer Complaint — Sidewalk Cafe
2019-09-05311: Water System — Hydrant Leaking (WC1)
2019-08-30Permit EQ — ISSUED
2019-08-29Job filed: INSTALLATION OF TEMPORARY ROOF/OVERHEAD PROTECTION AT THE ADJACENT PROPERTIES DURING NB CONSTRUCTION, FILED SEPARATELY. TEMPORARY ROOF/OVERHEAD PROTEC
2019-08-27311: Water System — Hydrant Defective (WC2)
2019-08-23Permit FO — ISSUED
2019-08-23Permit NB — ISSUED
2019-08-13Permit Construction Fence — Signed-off
2019-08-12311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-08-09311: Sidewalk Condition — Blocked - Construction
2019-08-07311: Noise — Noise: Construction Before/After Hours (NM1)
2019-07-17DOB violation C:
2019-07-17DOB complaint, category ?
2019-06-29311: Sidewalk Condition — Blocked - Construction
2019-06-23311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-06-23DOB complaint, category ?
2019-06-11311: Sewer — Street Flooding (SJ)
2019-06-09311: Water System — Hydrant Running (WC3)
2019-06-09311: Noise — Noise: Construction Equipment (NC1)
2019-06-09311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-29Job filed: INSTALLATION OF REPEATER AUXILIARY COMMUNICATION SYSTEM WITH A PASSIVE ANTENNA SYSTEM.$170,000
2019-04-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-22311: Construction Safety Enforcement — CSC - Full Demo Tracking
2019-04-20311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-20311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-17FDNY inspection (DEMO)
2019-04-13311: General Construction/Plumbing — Debris - Excessive
2019-04-13311: Emergency Response Team (ERT) — After Hours Work - Illegal
2019-04-13311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-13DOB complaint, category ?
2019-04-13DOB complaint, category ?
2019-04-11311: Noise — Noise: Construction Before/After Hours (NM1)
2019-04-08DOB complaint, category ?
2019-04-03311: Construction Safety Enforcement — Best - DM Tracking Complaint
2019-04-03DOB complaint, category ?
2019-03-27ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF MY INSPECTION OF AN ACTIVE DEMOLITIO
2019-03-25Permit Construction Fence — Signed-off
2019-03-23311: Noise — Noise: Construction Before/After Hours (NM1)
2019-03-19Job filed: INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2019-03-19Job filed: INSTALLATION OF TEMPORARY DRY STANDPIPE SYSTEM, ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WI$1,000
2019-03-16311: Noise — Noise: Construction Before/After Hours (NM1)
2019-03-07Rodent inspection: Passed
2019-03-07311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-07311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-07311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-06Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2019-03-06311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-06311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-05311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-05311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-03-02311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-23311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-16311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-09311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-11311: BEST/Site Safety — Demolition Notification Received
2019-01-11DOB complaint, category ?
2019-01-07Permit DM — ISSUED
2018
2018-12-20SAGE — from BF/RF REALTY LLC to AVIS RENT A-CAR SYSTEM, LLC; MAPLE C 799 BROADWAY OWNER II LLC
2018-12-20Permit Supported Scaffold — Signed-off
2018-12-20Permit Sidewalk Shed — Signed-off
2018-12-20Job filed: INSTALLATION OF SIDEWALK SHED & PIPE SCAFFOLD, NEEDLE BEAMS AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT COMPLY W$15,000
2018-12-19Permit Supported Scaffold — Signed-off
2018-12-19Permit Sidewalk Shed — Signed-off
2018-12-14Job filed: INSTALLATION OF SIDEWALK SHED & PIPE SCAFFOLD, NEEDLE BEAMS AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT COMPLY W$15,000
2018-12-10Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-12-10Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-12-10Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-12-10Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-12-10Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-11-24311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-11-24DOB complaint, category ?
2018-11-20311: Noise — Noise: Construction Equipment (NC1)
2018-11-20311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2018-11-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-17311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-17311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-11-17DOB complaint, category ?
2018-11-17DOB complaint, category ?
2018-11-16311: Asbestos — Asbestos Complaint (B1)
2018-11-16Job filed: INSTALLATION OF NEW SPRINKLER / STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING CONSTRUCTION AS PER PLANS FILED HEREWITH.$600,000
2018-11-14311: Asbestos — Asbestos Complaint (B1)
2018-11-13311: Asbestos — Asbestos Complaint (B1)
2018-11-13311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2018-11-13311: Asbestos — Asbestos Complaint (B1)
2018-11-13311: Asbestos — Asbestos Complaint (B1)
2018-11-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-11-12311: General Construction/Plumbing — Building Permit - None
2018-11-12311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-12DOB complaint, category ?
2018-11-12DOB complaint, category ?
2018-11-10311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2018-11-10311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-10311: Emergency Response Team (ERT) — After Hours Work - Illegal
2018-11-10311: Noise — Noise: Construction Before/After Hours (NM1)
2018-11-10DOB complaint, category ?
2018-11-10DOB complaint, category ?
2018-11-03311: Asbestos — Asbestos Complaint (B1)
2018-11-02Permit EW — ISSUED
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-29Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-10-17TL&R — from LADDER CAPITAL FINANCE LLC
2018-10-17M&CON $97,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC$97,000,000
2018-10-17Mortgage $13,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC$13,000,000
2018-10-17AL&R $110,000,000 — from MAPLE C 799 BROADWAY OWNER II, LLC to ACREFI HOLDINGS J-I, LLC$110,000,000
2018-10-17Mortgage assigned — from LADDER CAPITAL FINANCE LLC to ACREFI HOLDINGS J-I, LLC
2018-10-12Permit Construction Fence — Signed-off
2018-10-10Job filed: installation of construction fence, to protect site during full demolition, under DM# 123395147$1,500
2018-10-09Deed $145,500,000 — from 799 BROADWAY OWNER LLC to MAPLE C 799 BROADWAY OWNER II, LLC$145,500,000
2018-10-05311: Noise — Noise: Construction Equipment (NC1)
2018-10-04Job filed: INSTALLATION OF A MANUAL, AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE SYSTEM WITH VOICE COMMUNICATION, POST-FIRE SMOKE PURGE AND STAIR & $250,000
2018-10-04Job filed: INSTALLATION OF A MANUAL, AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE SYSTEM WITH VOICE COMMUNICATION, POST-FIRE SMOKE PURGE AND STAIR & $250,000
2018-10-03Sold for $145,500,000$145,500,000
2018-09-27Permit Sidewalk Shed — Signed-off
2018-09-27Permit Supported Scaffold — Signed-off
2018-09-26Job filed: INSTALLATION OF SIDEWALK SHED & PIPE SCAFFOLD, NEEDLE BEAMS AND ROOF PROTECTION AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT COMPLY W$15,000
2018-09-19Job filed: FOUNDATION WORK ASSOCIATED WITH WITH NEW BUILDING CONSTRUCTION.
2018-09-19Job filed: STRUCTURAL WORK ASSOCIATED WITH WITH NEW BUILDING CONSTRUCTION.
2018-09-19Job filed: FOUNDATION WORK ASSOCIATED WITH WITH NEW BUILDING CONSTRUCTION.
2018-09-19Job filed: SUPPORT OF EXCAVATION WORK ASSOCIATED WITH WITH NEW BUILDING CONSTRUCTION.
2018-09-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-08-29Job filed: INSTALLATION OF NEW SPRINKLER / STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING CONSTRUCTION AS PER PLANS FILED HEREWITH.$600,000
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-15Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-08-10Agreement — from 799 BROADWAY OWNER LLC to TCH 10TH ST, LLC
2018-08-03Permit EW — ISSUED
2018-07-09Job filed: INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, FRAMES, FLOORING & CEILING.$325,000
2018-07-09Job filed: INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, DOORS, FRAMES, FLOORING & CEILING.$325,000
2018-06-29Permit Antenna — Signed-off
2018-06-11Rodent inspection: Passed
2018-06-07Job filed: MECHANICAL AND PLUMBING WORK ASSOCIATED WITH WITH NEW BUILDING CONSTRUCTION.
2018-05-24Job filed: FULL DEMOLITION OF SIX STORY STRUCTURE, USING HAND HELD EQUIPMENT, AND MECHANICAL MEANS.
2018-05-24Job filed: FULL DEMOLITION OF SIX STORY STRUCTURE, USING HAND HELD EQUIPMENT, AND MECHANICAL MEANS.
2018-05-24Job filed: FULL DEMOLITION OF SIX STORY STRUCTURE, USING HAND HELD EQUIPMENT, AND MECHANICAL MEANS.
2018-05-11Permit Antenna — Signed-off
2018-05-07Job filed: FILING HEREWITH INSTALLATION OF 12' CURB CUT WITH TWO 2'5' SPLAYS LOCATED ON EAST 11TH STREET. NO CHANGE IN USE EGRESS OR OCCUPANCY$3,000
2018-04-30DOB violation E:
2018-04-17Job filed: Removal of telecommunication antennas, equipment and related cabling on the roof and in the basement. Initial telecommunication equipment approved und$25,000
2018-04-09Job filed: NB
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
2017-08-24Job filed: FILING HEREWIH BPP WITH 275.37 LF OF FRONTAGE. NO CHANGE IN USE EGRESS OR OCCUPANCY
2017-08-24Job filed: FILING HEREWIH BPP WITH 275.37 LF OF FRONTAGE. NO CHANGE IN USE EGRESS OR OCCUPANCY
2017-08-11Rodent inspection: Passed
2017-08-08311: Taxi Complaint — Driver Complaint
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000002793 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$10,000
2017-04-28DOB violation E:
2017-04-28DOB violation E:
2017-04-08311: Broken Muni Meter — No Receipt
2017-03-23311: Noise — Noise: Construction Before/After Hours (NM1)
2015-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-04-29Permit AL — ISSUED
2015-04-16Job filed: INSTALLATION OF RRU UNITS ON TO AN EXISTING TELECOMMUNICATION SITE ON THE ROOF. ALL WORK IN COMPLIANCE WITH TTPN 5/98. NO CHANGE IN USE, EGRESS OR OCC$10,000
2015-03-31311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2014
2014-11-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-06-14Job filed: PROPOSED REAR PARAPET WORK IN SELECTIVE AREAS AS PER PLANS. NO HEAVY DUTY SIDEWALK SHED NECESSARY SINCE WORK AREA IS IN THE REAR AND NO ACCESS TO PUBL$21,000
2013-06-09311: Street Sign - Missing — No Parking, Standing, Stopping
2013-06-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2013-04-30Job filed: PROPOSED PARAPET WORK AS PER PLANS. HEAVY DUTY SIDEWALK SHED FILED UNDER SEPARATE APPLICATION FOR PUBLIC SAFETY. NO CHANGE IN USE, EGRESS OR OCCUPANCY$50,000
2012
2012-12-12Permit AL — ISSUED
2012-10-22Job filed: INSTALLATION AND REINFORCEMENT OF EXISTING ANTENNAS ON ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/98. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2012-09-20311: Emergency Response Team (ERT) — After Hours Work - Illegal
2010-09-01311: General Construction/Plumbing — Site Conditions Endangering Workers
2010-09-01DOB complaint, category ?
2010-08-25311: Taxi Complaint — Driver Complaint
2010-08-12Permit EQ — ISSUED
2010-08-11Permit EW — ISSUED
2010-08-11Job filed: ERECT PIPE SCAFFOLD AS PER PLAN AT 80 EAST 11 STREET. DURING REMEDIAL REPAIR, WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE,
2010-08-11Job filed: ERECT PIPE SCAFFOLD AS PER PLAN AT 80 EAST 11 STREET. DURING REMEDIAL REPAIR, WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE,
2010-08-06Permit EQ — ISSUED
2010-08-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 281 L.F. AS PER PLAN AT 80 EAST 11 STREET. DURING REMEDIAL REPAIR, WORK SHALL COMPLY WITH 2008 BUI
2010-07-22Job filed: REPLACE CAST STONE LINTELS & WINDOW SILLS; REPAIR EXISGING METAL CORNICE;REPAIR STUCCO FACADE; ALL AS PER PLANS FILED HEREWITH.$238,000
2008-05-22Tenant complaint: PLUMBING — WATER SUPPLY
2008-01-14DOB complaint, category ?
2007
2007-11-26DOB violation E:
2007-11-26DOB violation E:
2007-07-11DOB complaint, category ?
2005
2005-09-27Permit EW — ISSUED
2005-09-09Permit EW — ISSUED
2005-06-29Job filed: TO REPLACE EXISTING AIR CONDITIONER UNIT WITH A NEW UNIT, EXISTING DUCT WORK TO REMAIN. NO CHANGE IN USE OCCUPANCY OR EGRESS.$20,000
2004
2004-12-16Job filed: REPLACEMENT AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUIPANCY.$40,000
2004-11-19DOB violation LL1081:
2004-10-06DOB violation E:
2004-10-06DOB violation E:
2004-09-01ECB Non-Hazardous violation: WORK WITHOUT A PERMIT-WORK NOTED:INSTALLED AN A/C UNIT A ROOF CENTER NORTH WITHOUT FIRST OBTAINING PERMITS AND APPROVALS AS REQUIR$250
2004-08-27DOB complaint, category ?
2004-06-28Permit EW — ISSUED
2004-04-14Permit EW — ISSUED
2004-03-31Job filed: INSTLNG TELECOMMUNICATIONS CABINETS WITH RELATED DUNNAGE AND ANTENNAS O ROOF IN CONFORMANCE WITH TPPN5/98 NO CH ANGES$25,000
2003
2003-11-19Permit EW — ISSUED
2003-11-10Job filed: CHANGE GRADE OF OIL. NO CHANGE IN EGRESS, OCCUPANCY OR USE.$3,000
2003-11-10Job filed: CHANGE GRADE OF OIL. NO CHANGE IN EGRESS, OCCUPANCY OR USE.$3,000
2003-09-15Permit EW — ISSUED
2003-09-15Permit EW — ISSUED
2003-09-11Job filed: REPLACE 3000 GALLON FUEL OIL TANK AND IN STALL NEW FUEL OIL TANK ENCLOSU E NO CHNAGE IN EGRESS USE OR OCCUPANCU U NDER THIS APPLICATION.$26,000
2002
2002-06-21DOB complaint, category ?
1999
1999-10-25Permit EQ — ISSUED
1999-06-11DOB complaint, category ?
1998
1998-08-10ECB Non-Hazardous violation: 73X10, 73X RESTORE DEVICE BACK TO SERVICE FOR PROPER INSPECTION.$180
1997
1997-07-29Mortgage satisfied — from HALSTEAD MANAGEMENTCORPORATION to SEAMEN'S BANK FOR SAVINGS
1996
1996-03-01EASE — from CAMBRIDGE ASSOCIATES to NEW YORK TELEPHONE COMPANY
1995
1995-07-06EASE — from CAMBRIDGE ASSOCIATES to NEW YORK TELEPHONE COMPANY
1994
1994-06-14Agreement — from CAMBRIDGE ASSOCIATES to ISRAEL DISCOUNT BANKOF NEW YORK
1992
1992-03-27DOB complaint, category ?
1989
1989-09-19Agreement — from ISRAEL DISCOUNT BK NY to CAMBRIDGE ASSOCIATES
1988
1988-11-07DOB violation E: 43)REPAIR OR RENEW THE GUIDE SHOE'S
1988-11-07DOB violation E: 43)REPAIR OR RENEW THE GUIDE SHOE'S
1988-11-07DOB violation E: 43-REPAIR OR RENEW THE GUIDE SHOES
1988-11-07DOB violation E: 43-REPAIR OR RENEW THE GUIDE SHOES
1984
1984-05-22Mortgage assigned — from EAST RIVER SAV BANK to ISRAEL DISCOUNT BANK
1984-05-22Agreement — from CAMBRIDGE ASSOCIATES to ISRAEL DISCOUNT BK/N.Y.
1979
1979-10-04Agreement — from CAMBRIDGE ASSOCIATES to EAST RIVER SAVINGS BANK
1973
1973-10-04Deed — from CAMBRIDGE MANAGEMENTCRP to CAMBRIDGE ASSOCIATES
1970
1970-08-07Agreement — from CAMBRIDGE MANAGEMENT to EAST RIVER SAVINGS BANK