Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

163 Varick Street · Manhattan · BBL 1005807503 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

20 service requests in the last three years. Most common: Illegal Parking (10) · Noise (2) · Encampment (1) · General Construction/Plumbing (1) · Traffic (1) · Litter Basket Request (1).

Filed construction activity

$49,506,125 in permitted construction work filed since 2016 (74 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$0 $0
2026$7,634,900 $3,435,706
2027$7,793,500 $3,507,076

Restaurants in this building

RestaurantCuisineGradeNotes
WonderOtherA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Hurricane evacuation zone 3 of 6 — zone 1 evacuates first.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayHouston St — 1 · 300 ft straight-line (about a 2-minute walk) · station accessibility: none
Spring St — C E · 600 ft straight-line (about a 3-minute walk) · station accessibility: partial (Downtown only)
BusNearest boarding stop: Varick St / Charlton St — M20 · 50 ft
Citi BikeKing St & Varick St · 350 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 003 Charrette School
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

163 Varick Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

20 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2024-03-18Mortgage $73,751,267 — from 60 CHARLTON, LLC to ACRC LENDER W LLC $73,751,267
2024-03-18AL&R $73,751,227 — from 60 CHARLTON, LLC to ACRC LENDER W LLC $73,751,227
2024-03-18Mortgage $73,751,267 — from 60 CHARLTON, LLC to ACRC LENDER W LLC $73,751,267
2024-03-18AL&R $73,751,227 — from 60 CHARLTON, LLC to ACRC LENDER W LLC $73,751,227
2021-07-09Sold for $86,175,949 $86,175,949 $43,087,975
2017-07-13Sold for $64,900,000 $64,900,000 $32,450,000

Ten-year activity

100500
2017
2018
2019
2020
2021
2022
2023
73
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20178501115
2018284002355
2019272100654
202014900427
202120301731
202226024436
2023146100434
202454384473
202512072324
202615040322
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 24 records

DateRecord
2026-10-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-10-01Job filed: Plumbing modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No change
2026-09-23Boiler inspection
2026-09-23Boiler inspection
2026-09-16Job filed: Sprinkler modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No change
2026-08-31311: Noise — Construction Equipment
2026-07-13Permit Plumbing — Permit Issued
2026-07-13Permit Plumbing — Permit Issued
2026-07-13Permit Plumbing — Permit Issued
2026-06-26Permit Sprinklers — Permit Issued
2026-06-26Permit Sprinklers — Permit Issued
2026-06-12311: Street Condition — Cave-in
2026-06-12Permit Mechanical Systems — Permit Issued
2026-06-12Permit General Construction — Permit Issued
2026-06-12Permit General Construction — Permit Issued
2026-06-12Permit Mechanical Systems — Permit Issued
2026-06-10Job filed: Plumbing modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupancy
2026-06-10Job filed: General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress
2026-06-10Job filed: Mechanical modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupa
2026-06-10Job filed: sprinkler modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupanc
2026-05-12311: Graffiti — Graffiti
2026-04-09Cooling tower inspection
2025-12-03311: Food Poisoning — 1 or 2
2025-11-03Certificate of occupancy Renewal Without Change

The full timeline

2026
2026-10-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-10-01Job filed: Plumbing modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No change $35,000
2026-09-23Boiler inspection
2026-09-23Boiler inspection
2026-09-16Job filed: Sprinkler modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No change$64,979
2026-08-31311: Noise — Construction Equipment
2026-07-13Permit Plumbing — Permit Issued
2026-07-13Permit Plumbing — Permit Issued
2026-07-13Permit Plumbing — Permit Issued
2026-06-26Permit Sprinklers — Permit Issued
2026-06-26Permit Sprinklers — Permit Issued
2026-06-12311: Street Condition — Cave-in
2026-06-12Permit Mechanical Systems — Permit Issued
2026-06-12Permit General Construction — Permit Issued
2026-06-12Permit General Construction — Permit Issued
2026-06-12Permit Mechanical Systems — Permit Issued
2026-06-10Job filed: Plumbing modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupancy$15,000
2026-06-10Job filed: General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress $900,000
2026-06-10Job filed: Mechanical modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupa$190,050
2026-06-10Job filed: sprinkler modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupanc$30,000
2026-05-12311: Graffiti — Graffiti
2026-04-09Cooling tower inspection
2025
2025-12-03311: Food Poisoning — 1 or 2
2025-11-03Certificate of occupancy Renewal Without Change
2025-09-26Agreement — from 60 CHARLTON, LLC to ACRC LENDER W LLC
2025-09-26Agreement — from 60 CHARLTON, LLC to ACRC LENDER W LLC
2025-09-11311: Illegal Parking — Posted Parking Sign Violation
2025-08-07Certificate of occupancy Renewal Without Change
2025-08-01Boiler inspection
2025-08-01Boiler inspection
2025-07-15Permit Sprinklers — Permit Issued
2025-06-30Restaurant inspection: WONDER — grade A
2025-06-27311: Illegal Parking — Blocked Crosswalk
2025-06-15311: Litter Basket Request — New Basket
2025-05-22311: Traffic — Congestion/Gridlock
2025-05-22Permit Sprinklers — Signed-off
2025-05-22Permit Sprinklers — Signed-off
2025-05-21Certificate of occupancy Renewal Without Change
2025-05-14Permit General Construction — Permit Issued
2025-05-14Permit Plumbing — Permit Issued
2025-05-05311: Illegal Parking — Posted Parking Sign Violation
2025-04-28311: Illegal Parking — Parking Permit Improper Use
2025-03-14Job filed: PRIMARY SCOPE OF WORK UNDER THIS APPLICATION IS THE INTERIOR ALTERATIONOF A CORPORATE OFFICE ON THE 9TH FLOOR OF THE BUILDING. THIS WORKCONSISTS OF NE$8,300
2025-02-26Certificate of occupancy Renewal Without Change
2025-01-09Permit Sprinklers — Signed-off
2025-01-09Permit Plumbing — Signed-off
2024
2024-12-26311: General Construction/Plumbing — Building Permit - None
2024-12-23Permit General Construction — Signed-off
2024-12-23Permit Mechanical Systems — Signed-off
2024-12-17Job filed: Mechanical modifications taking place on the 7th & 9th Fl construction/ 8th & 10th Fl marketing floors as per plans filed herewith. No change in use, $350,094
2024-12-17Job filed: plumbing modifications taking place on the 7th & 9th Fl construction/ 8th & 10th Fl marketing floors as per plans filed herewith. No change in use, eg$35,000
2024-12-17Job filed: Sprinkler modifications taking place on the 7th & 9th Fl construction/ 8th & 10th Fl marketing floors as per plans filed herewith. No change in use, $50,001
2024-12-12311: Encampment — N/A
2024-12-11Job filed: General construction modifications taking place on the 7th & 9th Fl construction/ 8th & 10th Fl marketing floors as per plans filed herewith. No cha$1,220,001
2024-12-06Certificate of occupancy Renewal Without Change
2024-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2024-11-20311: Illegal Parking — License Plate Obscured
2024-10-08Boiler inspection
2024-10-08Boiler inspection
2024-10-08311: Illegal Parking — Blocked Crosswalk
2024-09-19Certificate of occupancy Renewal Without Change
2024-09-19Job filed: General construction modifications taking place on the cellar construction fl / LL marketing floor & 1st fl construction/ L Marketing as per plans f$650,014
2024-08-16Permit Sprinklers — Permit Issued
2024-08-02311: Noise - Street/Sidewalk — Loud Talking
2024-08-01Permit Plumbing — Permit Issued
2024-07-31Rodent inspection: Passed
2024-07-31Permit Sprinklers — Signed-off
2024-07-30Permit Sign — Signed-off
2024-07-30Permit Sign — Signed-off
2024-07-29Job filed: PRIMARY SCOPE OF WORK UNDER THIS APPLICATION IS THE INTERIOR ALTERATIONOF A CORPORATE OFFICE ON THE 9TH FLOOR OF THE BUILDING. THIS WORKCONSISTS OF NE$8,300
2024-07-29Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTERS WALL SIGN A ON A RACEWAY, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION$2,300
2024-07-29Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTERS WALL SIGN B ON A RACEWAY, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION$2,300
2024-07-22311: Illegal Parking — Blocked Crosswalk
2024-07-09Permit General Construction — Signed-off
2024-07-09Permit General Construction — Signed-off
2024-07-01Certificate of occupancy Renewal With Change
2024-06-26Permit General Construction — Signed-off
2024-06-20Permit Plumbing — Signed-off
2024-06-20Permit General Construction — Signed-off
2024-06-12Job filed: HVAC alterations of the existing building system to support interior alterations of an existing corporate office on the 9th floor of the building.$8,030
2024-06-12Job filed: The primary scope of work under this application is the Interior Alteration of a Corporate office located on the 9th Floor of 60 Charlton Street. The $286,160
2024-05-29Permit Sprinklers — Signed-off
2024-05-28Permit Plumbing — Signed-off
2024-05-28Permit Mechanical Systems — Signed-off
2024-05-23Job filed: Mechanical modifications taking place on the cellar construction fl / LL marketing floor & 1st fl construction/ L Marketing & Roof as per plans filed $160,056
2024-05-21Permit Plumbing — Signed-off
2024-05-17Permit Mechanical Systems — Signed-off
2024-05-17Permit General Construction — Signed-off
2024-05-16Permit Sprinklers — Signed-off
2024-05-15Permit General Construction — Signed-off
2024-05-15Job filed: Sprinkler modifications taking place on the cellar construction fl / LL marketing floor & 1st fl construction/ L Marketing as per plans filed herewith$60,000
2024-05-15Job filed: plumbing modifications taking place on the cellar construction fl / LL marketing floor & 1st fl construction/ L Marketing as per plans filed herewith.$180,000
2024-05-13Job filed: General construction modifications taking place on the cellar construction fl / LL marketing floor & 1st fl construction/ L Marketing as per plans f$650,014
2024-05-06Permit Structural — Signed-off
2024-05-06Permit Structural — Permit Issued
2024-05-03Permit Mechanical Systems — Signed-off
2024-05-03Permit Mechanical Systems — Permit Issued
2024-05-03Job filed: General construction modifications taking place on the 6th Fl construction/ 7th Fl marketing floor as per plans filed herewith. No change in use, egr$300,001
2024-05-02Permit General Construction — Permit Issued
2024-04-26Job filed: Sprinkler modifications taking place on the 6th Fl construction/ 7th Fl marketing floor as per plans filed herewith. No change in use, egress or occu$50,000
2024-04-26Job filed: plumbing modifications taking place on the 6th Fl construction/ 7th Fl marketing floor as per plans filed herewith. No change in use, egress or occupa$25,000
2024-04-26Job filed: Mechanical modifications taking place on the 6th Fl construction/ 7th Fl marketing floor as per plans filed herewith. No change in use, egress or occu$150,039
2024-04-17Job filed: Mechanical modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No chang$239,897
2024-04-16Job filed: General construction modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith$2,751,380
2024-04-16Job filed: Sprinkler modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No change$64,979
2024-04-16Job filed: Plumbing modifications to the (Arcade Village) 2nd-floor and 3rd-floor construction/4th-floor marketing floors as per plans filed herewith. No change $35,000
2024-04-16Job filed: Structural modifications to the 2nd-floor (Arcade Village) as per plans filed herewith. No change in use, egress, or occupancy.$14,401
2024-04-05Elevator permit: Furnish and Install 1 Vertical Platform Lift as detailed in the attached drawings. All work will comply with ASME A18.1-2017,Secti$15,212
2024-04-01FDNY inspection (E-CIDS)
2024-04-01FDNY inspection (RISK)
2024-03-18Mortgage $73,751,267 — from 60 CHARLTON, LLC to ACRC LENDER W LLC$73,751,267
2024-03-18AL&R $73,751,227 — from 60 CHARLTON, LLC to ACRC LENDER W LLC$73,751,227
2024-03-18Mortgage $73,751,267 — from 60 CHARLTON, LLC to ACRC LENDER W LLC$73,751,267
2024-03-18AL&R $73,751,227 — from 60 CHARLTON, LLC to ACRC LENDER W LLC$73,751,227
2024-03-04Job filed: Mechanical modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occu$150,074
2024-03-04Job filed: Sprinkler modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occup$45,001
2024-02-22Job filed: General construction modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egr$375,073
2024-02-16311: Illegal Parking — Posted Parking Sign Violation
2024-02-06311: Illegal Parking — Posted Parking Sign Violation
2023
2023-12-05Certificate of occupancy Renewal Without Change
2023-12-04Cooling tower inspection
2023-11-08Permit Mechanical Systems — Signed-off
2023-11-06Permit Sprinklers — Signed-off
2023-11-03Permit Plumbing — Signed-off
2023-11-02311: Illegal Parking — Posted Parking Sign Violation
2023-11-01Boiler inspection
2023-11-01Boiler inspection
2023-11-01Permit General Construction — Signed-off
2023-10-03Job filed: Mechanical modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occu$150,074
2023-10-03Job filed: Sprinkler modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occup$45,001
2023-10-03Job filed: plumbing modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occupa$30,000
2023-10-03Job filed: General construction modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egr$375,073
2023-09-20Certificate of occupancy Renewal Without Change
2023-08-21311: Illegal Parking — Commercial Overnight Parking
2023-08-10311: Illegal Parking — Posted Parking Sign Violation
2023-08-08311: Illegal Parking — Posted Parking Sign Violation
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20311: Illegal Parking — Unauthorized Bus Layover
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-05-31Certificate of occupancy Renewal Without Change
2023-05-04Job filed: Modification of 12th floor per plans filed herewith$26,998
2023-04-28Rodent inspection: Passed
2023-03-03Certificate of occupancy Renewal Without Change
2023-02-28311: Illegal Parking — Posted Parking Sign Violation
2023-02-27311: Illegal Parking — Posted Parking Sign Violation
2023-02-24311: Illegal Parking — Posted Parking Sign Violation
2023-02-23311: Illegal Parking — Posted Parking Sign Violation
2023-02-02Permit Sprinklers — Signed-off
2023-01-24311: Street Sign - Missing — No Parking, Standing, Stopping
2022
2022-12-30Boiler inspection
2022-12-30Boiler inspection
2022-12-29311: Illegal Parking — Posted Parking Sign Violation
2022-12-28311: Illegal Parking — Posted Parking Sign Violation
2022-12-13Permit Plumbing — Signed-off
2022-12-08Certificate of occupancy Renewal Without Change
2022-11-03Permit Sprinklers — Signed-off
2022-10-26Permit Plumbing — Signed-off
2022-10-18Permit General Construction — Signed-off
2022-10-14Permit Mechanical Systems — Signed-off
2022-09-30Job filed: Modification of 12th floor per plans filed herewith$19,000
2022-09-26MAPS — from 60 CHARLTON LLC
2022-09-26MAPS — from 60 CHARLTON LLC
2022-09-26CDEC — from 60 CHARLTON LLC
2022-09-26CDEC — from 60 CHARLTON LLC
2022-09-26Job filed: Modification of 12th floor per plans filed herewith$26,998
2022-09-26Job filed: Modification of 12th floor per plans filed herewith$212,984
2022-09-23Job filed: Modification of 12th floor per plans filed herewith$309,975
2022-09-12Rodent inspection: Passed
2022-08-22Certificate of occupancy Renewal With Change
2022-07-29Rodent inspection: Passed
2022-07-14Job filed: Modification of sprinkler system per plans filed herewith$14,976
2022-06-24Permit Plumbing — Signed-off
2022-05-06Certificate of occupancy Renewal Without Change
2022-04-14Job filed: Modification of sprinkler systems per plans filed herewith; no change to use, occupancy, or egress$27,024
2022-02-25Permit Sprinklers — Signed-off
2022-02-22Job filed: Modification of sprinkler systems per plans filed herewith; no change to use, occupancy, or egress$27,024
2022-02-10Permit Sprinklers — Signed-off
2022-02-10Permit Mechanical Systems — Signed-off
2022-02-09Permit Plumbing — Signed-off
2022-02-09Permit General Construction — Signed-off
2022-02-09Certificate of occupancy Renewal With Change
2022-01-12Job filed: Modification of existing mechanical systems per plans filed herewith$25,054
2022-01-12Job filed: Modification of sprinkler system per plans filed herewith$14,976
2022-01-12Job filed: Modification of 6th floor per plans filed herewith. No change to use, occupancy, or egress$74,485
2022-01-12Job filed: Modification of Plumbing per plans filed herewith$10,021
2021
2021-12-15Rodent inspection: Passed
2021-12-06Job filed: FILING FOR CONDO SUBDIVISION FOR LOT FORMERLY KNOWN AS LOT 19, NOW KNOWN AS LOTS 1401 AND 1402. NO WORK OR PROPOSED CHANGES IN ZONING UNDER THIS APPLI
2021-12-06Job filed: FILING FOR CONDO SUBDIVISION FOR LOT FORMERLY KNOWN AS LOT 19, NOW KNOWN AS LOTS 1401 AND 1402. NO WORK OR PROPOSED CHANGES IN ZONING UNDER THIS APPLI
2021-12-02Job filed: FILING FOR CONDO SUBDIVISION
2021-12-02Job filed: FILING FOR CONDO SUBDIVISION
2021-12-02Job filed: FILING FOR CONDO SUBDIVISION
2021-10-15Permit Plumbing — Signed-off
2021-10-07Permit Sprinklers — Signed-off
2021-09-24Permit Mechanical Systems — Signed-off
2021-09-24Permit General Construction — Signed-off
2021-09-16Job filed: Modification of mechanical elements on 9th floor; no change to use, occupancy, egress$203,975
2021-09-16Job filed: Modification of 9th floor per plans filed herewith. No change to use, occupancy, or egress$395,001
2021-09-16Job filed: Modification of plumbing systems on 9th floor per plans filed herewith. No change to occupancy, use, egress$18,016
2021-09-16Job filed: Modification of sprinkler systems per plans filed herewith; no change to use, occupancy, or egress$27,024
2021-07-09Sold for $86,175,949$86,175,949
2021-06-21Permit AL — ISSUED
2021-06-20DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
2021-06-10Certificate of occupancy Initial
2021-05-06Cooling tower inspection — violation AH8R
2021-05-06Cooling tower inspection — violation AH8E
2021-05-06Cooling tower inspection — violation AH8T
2021-05-06Cooling tower inspection — violation AH8Q
2021-05-06Cooling tower inspection — violation AH9C
2021-05-06Cooling tower inspection — violation AH8B
2021-04-13DOB complaint, category ?
2021-04-13DOB complaint, category ?
2021-03-23Permit Construction Fence — Signed-off
2021-03-03Permit Sidewalk Shed — Signed-off
2021-03-03Permit Supported Scaffold — Signed-off
2021-01-21Job filed: HEREWITH FILING OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH ALT-I 123337004$1,000
2021-01-21Job filed: HEREWITH FILING OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH ALT-I 123337004$1,000
2020
2020-12-31Permit Construction Fence — Signed-off
2020-11-25Permit EW — ISSUED
2020-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-10-13Permit EW — ISSUED
2020-09-01Permit EW — ISSUED
2020-09-01Permit EW — ISSUED
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-05-28Job filed: Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in
2020-05-12Permit EW — ISSUED
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-05-01Permit AL — ISSUED
2020-04-30Elevator permit: Installation of temporary single car personnel/material hoist (Part of a dual car hoists/ the other hoist car is filed under M0010$20,000
2020-04-10DOB complaint, category ?
2020-04-02ECB CLASS - 2 violation: AT TIME OF MY INSPECTION OF INACTIVE JOBSITE I OBSERVED SIDEWALK SHED(SWS)AND SUPPORTED SCAFFOLD(S.S)INSTALLED AT EXP1,4.I NOTED M$1,250
2020-03-25Elevator permit: Installation of temporary single car personne/material hoist during enlargement of existing building (filed under BIS # 123337004)$20,000
2020-03-24Elevator permit: Installation of temporary single car personnel/material hoist (Part of a dual car hoists/ the other hoist car is filed under M0010$20,000
2020-03-06Permit Sidewalk Shed — Signed-off
2020-03-06Permit Supported Scaffold — Signed-off
2020-03-05Permit Construction Fence — Signed-off
2020-03-05Permit Supported Scaffold — Signed-off
2020-03-05Permit Sidewalk Shed — Signed-off
2020-02-19Elevator permit: FURNISH AND INSTALL DUAL JACK HOLELESS HYDRAULIC ELEVATOR AS PER ASME A17.1-2000/03, PART 3, CHAPTER 30 APPENDIK KandK3, NYC BUIL$40,000
2020-02-14DOB complaint, category ?
2020-02-13Permit PL — ISSUED
2020-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-01-17DOB complaint, category ?
2020-01-15ECB CLASS - 2 violation: 28-105.5 FORMS FILED W/ DOB DO NOT HAVE REQUIRED SIGNATURES:AS NOTED AT TIME OF INSPECTION OBSERVED ON REVIEWING DOCUMENTS FOR THE
2019
2019-12-06Permit EQ — ISSUED
2019-11-25Permit EQ — ISSUED
2019-11-25ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIRMENETS NOTED AT TIME OF INSPETCION OF A AN CTIEV JOBSITE OF APROPOSE
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-11-06Permit EQ — ISSUED
2019-11-06Job filed: USE OF MINI CRAWLER CRANES TO INSTALL UNITIZED CURTAIN WALL. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2019-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-09-26FDNY inspection (ALT)
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-08-30Job filed: USE OF EQUIPMENT FOR MANIPULATION OF GLAZING UNITS.
2019-08-26DOB complaint, category ?
2019-08-09DOB complaint, category ?
2019-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-07-24DOB complaint, category ?
2019-07-22Permit EW — ISSUED
2019-06-13Permit AL — ISSUED
2019-06-05FDNY inspection (ALT)
2019-05-24Elevator permit: Furnish and install gearless traction elevators in compliance with NYC DOB ASME A17.1/2000-2003 Chapter 30 , appendik k/k3. All in$400,000
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-13Permit EW — ISSUED
2019-05-06DOB complaint, category ?
2019-05-03ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS-SITE SAFETY PLAN. AT TIME OF INSPECTION AT AN ACT$625
2019-05-02Permit AL — ISSUED
2019-05-02DOB complaint, category ?
2019-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-04-30Permit AL — RE-ISSUED
2019-04-30Permit EW — RE-ISSUED
2019-04-26DOB complaint, category ?
2019-04-26ECB CLASS - 2 violation: CONCRETE WASHOUT(COLLECTION & CONTAINMENT)-FAILURE TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES.AT TIME OF INSPECTION AT A$2,500
2019-04-26DOB complaint, category ?
2019-04-19Job filed: FILING ALT-II FOR BOILER AS PER PLAN$25,000
2019-04-19Job filed: FILING ALT-II FOR BOILER AS PER PLAN$25,000
2019-04-18Permit EW — ISSUED
2019-04-18Permit EQ — ISSUED
2019-04-17Job filed: NEW 350 KW DIESEL POWERED EMERGENCY GENERATOR WITH 330 GALLON SUB-BASE TANK TO BE INSTALLED ON THE ROOF LEVEL. NEW 500 GALLON FUEL OIL TANK & DUPL$25,000
2019-04-15Job filed: ALTERATION-II FOR TEMPORARY STEEL CONSTRUCTION PLATFORM WITH MECHANICAL EQUIPMENT USE OF BOOM LIFT$30,000
2019-04-05Elevator permit: Removal of device(s) as per ASME A17.1-2000/03, Chapter 30, Appendix K Rule 8.11.1.4.1.2.Perform all necessary inspections in pres$5,000
2019-04-02ECB CLASS - 2 violation: PROHIBITED SIGNS & UNLAWFUL POSTING ON PROTECTIVE STRUCTURES. AT THE TIME OF MY INSPECTION OF A PROPOSED 12 STY BLDG CURRENTLY AT $2,500
2019-04-02Permit EW — ISSUED
2019-03-21Permit Sidewalk Shed — Signed-off
2019-03-21Permit Supported Scaffold — Signed-off
2019-03-18FDNY inspection (RISK)
2019-03-18Permit EW — ISSUED
2019-03-18Permit EW — ISSUED
2019-03-15Rodent inspection: Passed
2019-03-08Permit Sidewalk Shed — Signed-off
2019-03-08Permit Supported Scaffold — Signed-off
2019-03-08Permit Construction Fence — Signed-off
2019-03-07Elevator permit: Installation of temporary single car personnel/material hoist (Part of a dual car hoists/ the other hoist car is filed under M0010$20,000
2019-02-07Permit PL — ISSUED
2019-01-10Elevator permit: Installation of temporary single car personne/material hoist during enlargement of existing building (filed under BIS # 123337004)$20,000
2019-01-09Elevator permit: Removal of device(s) as per ASME A17.1-2000/03, Chapter 30, Appendix K Rule 8.11.1.4.1.2.Perform all necessary inspections in pres$5,000
2019-01-07Job filed: FILING HEREWITH PLANS FOR THE SOE WORK IN CONJUNCTION WITH THE INSTALLATION OF CON EDISON VAULTS. NO CHANGE IN USE OCCUPANCY OR EGRESS.$1,000
2018
2018-12-28Elevator permit: Removal elevator as per ASME A17.1-2000/03, Chapter 30, Appendix K Rule 8.11.1.4.1.2.Perform all necessary inspections in presence$5,000
2018-12-17FDNY inspection (ALT)
2018-12-14Job filed: INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM. FILED IN CONJUNCTION WITH ALT. 1 APPLICATIO$1,000
2018-12-10Permit EQ — ISSUED
2018-12-03Job filed: INSTALLATION OF A REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY$119,000
2018-11-27Job filed: INSTALLATION OF TEMPORARY DUAL CARS PERSONNEL/MATERIAL HOISTS DURING MAJOR CONSTRUCTION (ENLARGEMENT OF THE EXISTING BUILDING FILED BY SEPARATE APPLIC
2018-11-08Permit EQ — ISSUED
2018-11-02Permit EW — ISSUED
2018-11-02Job filed: FILING ALT 3 FOR MECHANICAL EQUIPMENT AS PER PLANS SKID STEEL LOADER MINI EXCAVATOR COMPACT EXCAVATOR
2018-10-22Job filed: FILING PARTIAL DEMOLITION AS PER PLANS$10,000
2018-10-22Job filed: FILING PARTIAL DEMOLITION AS PER PLANS$10,000
2018-09-24FDNY inspection (ALT)
2018-09-14Job filed: INSTALLATION OF TEMPORARY DUAL CARS PERSONNEL/MATERIAL HOISTS DURING MAJOR CONSTRUCTION (ENLARGEMENT OF THE EXISTING BUILDING FILED BY SEPARATE APPLIC
2018-08-24Permit EW — ISSUED
2018-08-09Job filed: FILING HEREWITH THE REMOVAL OF SIGN STRUCTURE AND SIGN AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2018-08-06Permit AL — ISSUED
2018-08-02Permit Supported Scaffold — Signed-off
2018-08-02Permit Sidewalk Shed — Signed-off
2018-08-01Job filed: Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in
2018-07-20Permit EW — ISSUED
2018-07-19Job filed: INSTALLATION OF TEMPORARY DRY STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$80,000
2018-06-27Permit Construction Fence — Signed-off
2018-06-26Job filed: Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2018-05-24Rodent inspection: Passed
2018-04-18Job filed: "INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO AND SPRINKLER FIRE ALARM SYS TEM WITH VOICE COMMUNICATION SYSTEM & PURGE SYSTEM & STAIR $350,000
2018-04-18Job filed: FILING FOR INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM. IN CONJUNCTION WITH ALT.1 123337004$325,000
2018-04-18Job filed: FILING FOR INSTALLATION OF SPRINKLER AND STANDPIPE SYSTEM. IN CONJUNCTION WITH ALT.1 123337004$325,000
2018-04-18Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO AND SPRINKLER FIRE ALARM SYS TEM WITH VOICE COMMUNICATION SYSTEM & PURGE SYSTEM & STAIR &$350,000
2018-04-02Job filed: BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH ALTERATION 1, 206 LINEAR FEET OF CURB
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Asbestos abatement: Removal — New York Insulation Inc.
2018-01-29Job filed: HEREWITH FILING THE SOE.
2018-01-29Job filed: HEREWITH FILING THE SOE.
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-09Permit EW — ISSUED
2017
2017-12-22Permit EW — ISSUED
2017-12-01Job filed: HEREWITH FILING INTERIOR REMOVAL OF NON-BEARING PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$75,000
2017-12-01Job filed: HEREWITH FILING INTERIOR REMOVAL OF NON-BEARING PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$75,000
2017-11-21Job filed: HEREWITH FILING STRUCTURAL AND FOUNDATION WORK.
2017-11-21Job filed: HEREWITH FILING STRUCTURAL AND FOUNDATION WORK.
2017-11-20Job filed: HEREWITH FILING THE MECHANICAL AND PLUMBING.
2017-11-16Job filed: HEREWITH TO ENLARGE THE EXISTING AND OBTAIN A NEW CERTIFICATE OF OCCUPANCY$18,264,000
2017-11-16Job filed: HEREWITH TO ENLARGE THE EXISTING AND OBTAIN A NEW CERTIFICATE OF OCCUPANCY$18,264,000
2017-08-02Rodent inspection: Passed
2017-07-13Sold for $64,900,000$64,900,000
2017-06-28DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-05-11DOB violation E:
2017-05-11DOB violation E:
2017-03-31ECB CLASS - 1 violation: 07M07 NO DOOR ZONE RESTRICTOR INSTALLED$1,000
2017-03-29DOB complaint, category ?
2016
2016-12-09Rodent inspection: Passed
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-06-01DOB violation E:
2016-06-01DOB violation E:
2016-04-06DOB violation E:
2016-04-06DOB violation E:
2016-03-09ECB CLASS - 1 violation: 17H11,28I11,07J01,61W11,60B10. REPLACE HOISTWAY DOOR GIBS, CAR DOOR ROLLERS SHAKE BACK AND FORTH CAUSING CLUTCH TO CHIP HOISTWAY D$1,000
2016-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015
2015-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-05-14ECB CLASS - 2 violation: #A10,41D06,60M07. #IMPROPER/CONTINUOUS NOISE WHILE DEVICE IS IN MOTION41-MACHINE ROOM DOOR IS W/O LOCKING DEVICE; 60-MOTOR/MACHINE$1,250
2015-05-13DOB complaint, category ?
2015-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-04-06DOB violation E:
2015-04-06DOB violation E:
2014
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-04-07DOB violation E:
2014-04-07DOB violation E:
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2013
2013-10-15DOB violation E:
2013-10-15DOB violation E:
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-02-01Permit EW — ISSUED
2013-02-01Permit EW — ISSUED
2013-02-01Permit EW — ISSUED
2012
2012-12-18Permit PL — ISSUED
2012-12-04DOB violation E:
2012-12-04DOB violation E:
2012-11-21DOB complaint, category ?
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-03-22Rodent inspection: Passed
2012-02-24Permit SG — ISSUED
2011
2011-09-13Permit EW — ISSUED
2011-09-13Permit EW — ISSUED
2011-09-13Permit EW — ISSUED
2011-08-29Permit PL — ISSUED
2011-08-26Air permit (BOILER REGISTRATION II), fuel: NO2FUEL
2011-08-18Job filed: REPLACE (1) NEW L.P. BOILER WITH COMBINATION NAT GAS/OIL BURNER. INSTALL (1) NEW GAS SERVICE AS PER CON EDISON. INSTALL (1) NEW GAS METER AND CONNEC$10,000
2011-08-18Job filed: REPLACE (1) NEW L.P. BOILER WITH COMBINATION NAT GAS/OIL BURNER. INSTALL (1) NEW GAS SERVICE AS PER CON EDISON. INSTALL (1) NEW GAS METER AND CONNEC$10,000
2011-08-12Permit PL — ISSUED
2011-08-02Permit EW — ISSUED
2011-07-29Job filed: MINOR INTERIOR PARTITION CHANGES AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$25,000
2011-07-25ECB CLASS - 2 violation: 02X10,11P16,16A10,40O02,70P16,39P16.(02X)2 WAY COMMUNICATION-INOPERABLE.(11P)BSMNT-LOCKOUT.(16)BSMNT HALL DOOR DOES NOT OPEN WHEN $500
2011-07-21Permit EW — ISSUED
2011-07-21Permit EW — ISSUED
2011-07-20DOB complaint, category ?
2011-07-19Job filed: REMOVAL OF INTERIOR PARTITIONS,PLUMBING FIXTURES AND MECHANICAL WORK. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$20,000
2011-07-19Job filed: REMOVAL OF INTERIOR PARTITIONS,PLUMBING FIXTURES AND MECHANICAL WORK. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$20,000
2011-02-22Rodent inspection: Passed
2011-01-24DOB violation E:
2010
2010-11-29ECB CLASS - 2 violation: 16P16,39P16,16I10,40O02,29J01,601X0,98BB05. 39P- NO ACCESS TO CAR TOP ONLY ACCESS TO CAR TOP FROM LOBBY DUE TO 16P- NO ACCESS TO B$500
2010-11-22DOB complaint, category ?
2010-10-08DOB violation VCAT1:
2010-04-21DOB violation E:
2010-04-21DOB violation E:
2010-03-09Rodent inspection: Passed
2009
2009-05-27DOB violation E:
2009-05-27DOB violation E:
2008
2008-10-22DOB complaint, category ?
2008-10-06Permit EW — ISSUED
2008-09-19Job filed: FILING HEREWITH PLANS INDICATING FACADE RENOVATIONS IN RESPONSE TO ECB VIOLATION 34689360H. NO CHANGE TO USE, EGRESS AND OCCUPANCY.$10,000
2008-09-10Permit EQ — ISSUED
2008-08-28Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 30 L.F AS PER PLAN AT 163 VARICK STREET. DURING REMEDIAL REPAIRS, WORK SHALL COMPLY WITH LL 33/91.
2008-08-05DOB complaint, category ?
2008-08-05ECB CLASS - 1 violation: FAILURE TO MAINTAIN WALL; NOTED: AT EXPOSURE #3 EXTERIOR WALL, SPALLING CONCRETE FACADE - FALLING FROM GROUND FLOOR TO 6TH FLOOR, $1,000
2008-08-05DOB complaint, category ?
2008-06-19DOB complaint, category ?
2008-04-30DOB violation E:
2008-04-30DOB violation E:
2008-02-14DOB complaint, category ?
2008-01-14DOB complaint, category ?
2007
2007-06-20DOB violation E:
2007-06-20DOB violation E:
2007-04-17ECB Non-Hazardous violation: 86BB05,84X10,17H11,33O02,66O02,84L11.84X10-IN CAB COMMUNICATIONS SYSTEM NOT WORKING-REPAIR COMMUNICATION.84L11-REPLACE DEFECTIVE S
2007-02-13DOB complaint, category ?
2006
2006-09-13DOB violation E:
2006-09-13DOB violation E:
2004
2004-04-28DOB violation E:
2004-04-28DOB violation E:
2004-02-13DOB violation LL6291:
2001
2001-10-18DOB violation E: 1P14593
2001-08-31DOB complaint, category ?
2001-07-03DOB complaint, category ?
2001-06-21DOB violation C:
2001-06-06DOB complaint, category ?
2001-01-19Permit SG — ISSUED
2001-01-19Permit SG — ISSUED
2001-01-19Permit AL — ISSUED
2000
2000-11-17Job filed: ERECT SIGN STRUCTURE SIGN FILED SEPERATELY NOT ADJACENT TO ARTERIAL HGWY NOT INSIDE BLDG LINE$30,000
2000-07-18DOB violation E: 1P14594
1998
1998-12-21Permit PL — ISSUED
1998-12-21Permit PL — ISSUED
1998-12-18Permit AL — ISSUED
1998-11-05Permit EW — ISSUED
1998-09-02Permit PL — ISSUED
1998-07-01Permit EW — ISSUED
1997
1997-01-13DOB violation LL1081:
1997-01-13DOB violation LL1081:
1995
1995-04-17DOB violation LL1081:
1994
1994-10-27Permit EW — ISSUED
1994-10-27Permit EQ — ISSUED
1993
1993-07-20DOB complaint, category ?
1992
1992-11-23DOB violation E:
1992-07-16ECB Non-Hazardous violation: FAILURE TO PROVIDE FLOOR NUMBER SIGNS 3'AND DURABLE MATERIAL(PLASTIC ON METAL FAILURE TO PROVIDE STAIR IDENTIFICATION AND ELEVATO$400
1992-01-31ECB Non-Hazardous violation: 15L;6L;5L;$75
1990
1990-10-03DOB violation E:
1989
1989-11-01Air permit (CERTIFICATE TO OPERATE), fuel: ?
1989-03-28DOB violation E: (51)TAG GOVERNOR FOR ALL TESTS (52)REPAIR DOOR RETURN
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL

Support this site Back to the building page