226 West 4 Street · Manhattan · BBL 1006190074
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
104 service requests in the last three years. Most common: Noise (40) · Lost Property (13) · Homeless Person Assistance (6) · Panhandling (4) · Illegal Dumping (4) · For Hire Vehicle Complaint (4).
Filed construction activity
$3,404,388 in permitted construction work filed since
2016 (20 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$16,891,000
$7,600,950
2026
$17,103,000
$7,696,350
2027
$17,750,000
$7,987,500
The city's market estimate has risen
5% between tax years 2025 and 2027.
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Contaminated), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 5 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
5 street-flooding or sewer-backup complaints at this address since
2018 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Christopher St-Stonewall — 1 · 50 ft straight-line (under a minute) · station accessibility: none W 4 St-Wash Sq — A B C D E F M · 850 ft straight-line (about a 4-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Christopher St / 7 Av South — M8 · 100 ft
Citi Bike
W 4 St & 7 Ave S · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
104 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,963,050 on
2019-08-27 (lender: First Republic Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-08-27
AL&R $4,000,000 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK
$4,000,000
2019-08-27
Agreement $4,000,000 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK
$4,000,000
2019-08-27
Mortgage $1,963,050 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK
$1,963,050
2014-08-15
AL&R $2,250,000 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK
$2,250,000
2014-08-15
Mortgage $2,250,000 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK
$2,250,000
1987-02-23
Mortgage $257,979 — from HILLCREST REALTY COMPANY to QUEENS COUNTY SVGS BK
$257,979
Ten-year activity
100500
2017
75
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
20
3
7
0
5
35
2018
11
1
48
0
15
75
2019
2
2
66
3
2
75
2020
0
0
18
0
1
19
2021
0
0
37
0
2
39
2022
0
0
43
0
1
44
2023
2
1
32
2
3
40
2024
0
0
59
0
6
65
2025
3
2
20
0
3
28
2026
0
0
14
0
2
16
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-04-03311: Taxi Complaint — Driver Complaint - Non Passenger
2024-03-03311: Obstruction — Cone
2024-02-19311: Lost Property — Bag/Wallet
2024-02-11311: Dirty Condition — Trash
2024-02-09311: Illegal Parking — Blocked Bike Lane
2024-01-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-26311: Illegal Dumping — Chronic Dumping
2024-01-20311: Homeless Person Assistance
2024-01-20311: Homeless Person Assistance
2023
2023-12-24311: Panhandling — N/A
2023-12-24311: Panhandling — N/A
2023-12-24311: Homeless Person Assistance
2023-12-24311: Panhandling — N/A
2023-12-14Permit General Construction — Signed-off
2023-12-12Job filed: Lighting upgrades for Bank of America. No change to use, egress or occupancy.$22,000
2023-11-21Mortgage assigned — from JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-21Mortgage assigned — from JPMORGAN CHASE BANK, N.A.; FEDERAL DEPOSIT INSURANCE CORPORATION; FIRST REPUBLIC BANK to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2023-11-11311: Lost Property — Bag/Wallet
2023-11-03311: Lost Property — Bag/Wallet
2023-11-02Restaurant inspection: CELLAR DOG — grade A
2021-07-13Elevator permit: Installation of one (1) new Bruno SRE -2010 chairlift for commerical use. All work will comply with ASME A18.1-2005 (Sec. 4) Safe$5,500
2018-08-20311: General Construction/Plumbing — Failure To Maintain
2018-08-20DOB complaint, category ?
2018-07-30Job filed: APPLICATION FILED FOR NON-STRUCTURAL INTERIOR DEMOLITION, GENERAL CONSTRUCTION AND INSTALL OF MECHANICAL EQUIPMENT AT 2ND FLOOR (SUITE 202) AND ROOF A$25,000
2018-07-30Job filed: APPLICATION FILED FOR NON-STRUCTURAL INTERIOR DEMOLITION, GENERAL CONSTRUCTION AND INSTALL OF MECHANICAL EQUIPMENT AT 2ND FLOOR (SUITE 202) AND ROOF A$25,000
2018-07-23Rodent inspection: Passed
2018-06-21311: Homeless Person Assistance
2018-05-09Boiler inspection
2018-03-23Permit EW — ISSUED
2018-03-23Permit EW — ISSUED
2018-03-23Job filed: APPLICATION FILED FOR NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION AND MECHANICAL SCOPE AS SHOWN ON PLANS FILED HEREWITH.$25,000
2017-03-28Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$957,500
2017-03-28Job filed: HVAC AND PLUMBING MODIFICATIONS FOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$260,000
2017-03-28Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$957,500
2017-03-28Job filed: HVAC AND PLUMBING MODIFICATIONS FOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$260,000
2017-03-28Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2017-02-09ECB CLASS - 2 violation: UNDERSIDE LIT. PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. LIGHTING IS REQUIRED AT ALL TIMES(EIGTHER)NATURAL OR ILLUM$2,400
2017-02-02Permit EW — ISSUED
2017-02-01311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2017-02-01DOB complaint, category ?
2017-01-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2017-01-26DOB complaint, category ?
2016
2016-12-27311: Damaged Tree — Branch Cracked and Will Fall
2016-12-27311: Damaged Tree — Branch Cracked and Will Fall
2016-12-08Rodent inspection: Passed
2016-11-03311: For Hire Vehicle Complaint — Driver Complaint
2016-10-11Permit EQ — ISSUED
2016-10-05Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
2016-10-05Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
2016-09-23Job filed: MINOR RENOVATION TO EXISTING BANK SPACE AS PER SUBMITTED DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$54,000
2016-09-23Job filed: MINOR RENOVATION TO EXISTING BANK SPACE AS PER SUBMITTED DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$54,000
2016-09-20Job filed: MINOR RENOVATION TO EXISTING BANK SPACE AS PER SUBMITTED DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$54,000
2016-08-18DOB complaint, category ?
2016-08-10Permit EQ — ISSUED
2016-08-10Permit EW — ISSUED
2016-08-07311: Homeless Person Assistance — N/A
2016-07-29Job filed: INTERIOR RENOVATION OF EXISTING 3 RETAIL SPACES AT GROUND LEVEL (CVS EXPANSION INTO 2 SIDE STORES). PARTITION AND PLUMBING MODIFICATION AS REQUIRED PE$133,638
2016-07-15311: Taxi Complaint — Driver Complaint
2016-07-11311: Broken Muni Meter — Timer Defect - Fast/Fail
2016-04-25ECB CLASS - 2 violation: UNLAWFUL ACTS. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. ON 5/29/15 A ELECTRICAL VIOLATION WAS ISSUE TO THE RESPONDENT. TH$800
2015-11-24311: Other Enforcement — E2A Storage Of Receptacles
2015-11-24311: Other Enforcement — E2A Storage Of Receptacles
2015-11-23311: Other Enforcement — E2A Storage Of Receptacles
2015-11-20311: Other Enforcement — E2A Storage Of Receptacles
2015-10-21Permit PL — ISSUED
2015-10-13Permit EW — ISSUED
2015-10-06Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT PARTIAL 2ND FLOOR. INSTALL NON-BEARING PARTITIONS, FINISHES AND PLUMBING FIXTURES AS PER PLANS FIL$110,000
2015-10-06Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT PARTIAL 2ND FLOOR. INSTALL NON-BEARING PARTITIONS, FINISHES AND PLUMBING FIXTURES AS PER PLANS FIL$110,000
2015-09-27Rodent inspection: Monitoring visit
2015-09-23FDNY inspection (RISK)
2015-09-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-07-23311: For Hire Vehicle Report — Car Service Company Report
2015-07-09Rodent inspection: Failed for Other Reason
2015-07-06311: Noise — Noise: Construction Before/After Hours (NM1)
2014-11-25Job filed: INTERIOR RENOVATION OF COMMERCIAL OFFICE SPACE AT PARTIAL 2ND FLOOR: INSTALL NON-BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH; NO CHANG$50,000
2014-11-12Permit PL — ISSUED
2014-10-28Permit EW — ISSUED
2014-10-28Permit EW — ISSUED
2014-10-28Permit EW — ISSUED
2014-10-14Permit EW — ISSUED
2014-09-18311: Taxi Complaint — Driver Complaint
2014-09-12Job filed: LEGALIZATION OF OFFICE SPACE AS PER PLANS; GENERAL CONSTRUCTION. THIS APPLICATION IS FILED FOR THE REMOVAL OF VIOLATION #08-12-91-CA2GC01. NO CHANGE I$20,000
2014-09-04311: New Tree Request — For One Address
2014-08-27Job filed: INTERIOR RENOVATION OF EXISTING 1ST FLOOR, AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$48,600
2014-08-27Job filed: MECHANICAL & PLUMBING WORK FOR THE INTERIOR RENOVATION OF EXISTING 1ST FLOOR AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE OF USE, EGRESS, OR OC$16,000
2014-08-15AL&R $2,250,000 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK$2,250,000
2014-08-15Mortgage $2,250,000 — from HILLCREST REALTY CO., LLC to FIRST REPUBLIC BANK$2,250,000
2014-08-04Rodent inspection: Passed
2014-07-25311: Rodent — Mouse Sighting
2014-07-17311: Standing Water — Puddle in Ground
2014-07-01311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-06-22311: Standing Water — Puddle in Ground
2014-06-08311: Standing Water — Puddle in Ground
2014-06-04311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-05-15311: Standing Water — Other - Explain Below
2014-04-27311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2014-02-27Job filed: INTERIOR RENOVATION IN A COMMERCIAL SPACE ON THE 1ST FLOOR AT DUNKIN DONUTS STORE INCLUDING GENERAL CONSTRUCTION AND PLUMBING WORK TYPE AS PER PLANS S$20,000
2014-02-27Job filed: INTERIOR RENOVATION IN A COMMERCIAL SPACE ON THE 1ST FLOOR AT DUNKIN DONUTS STORE INCLUDING GENERAL CONSTRUCTION AND PLUMBING WORK TYPE AS PER PLANS S$20,000
2013
2013-12-13311: Noise — Noise: air condition/ventilation equipment (NV1)
2012-09-17Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD98111-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, METER AND PIPING. CHANGE GRADE OF F$25,000
2012-09-17Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD98111-01) WITH BOILER AND GAS/OIL BURNER. INSTALL NEW GAS SERVICE, METER AND PIPING. CHANGE GRADE OF F$25,000
2012-07-24311: General Construction/Plumbing — Adjacent Buildings Not Protected
2012-07-24311: General Construction/Plumbing — Adjacent Buildings Not Protected
2011-09-23Job filed: APPLICATION AND PLANS FILED HEREWITH TO OBTAIN MTA APPROVAL FOR THE STORE FRONT AT SUBWAY ENTRANCE ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE $5,000
2011-09-22Permit EW — ISSUED
2011-09-22Permit EQ — ISSUED
2011-09-22Permit EW — ISSUED
2011-09-22Permit EW — ISSUED
2011-09-22Permit EW — ISSUED
2011-07-15Permit EW — ISSUED
2011-07-15Permit EW — ISSUED
2011-07-15Permit EW — ISSUED
2011-07-12Permit EQ — ISSUED
2011-07-01DOB violation LANDMK:
2011-06-27Job filed: NEW STRUCTURAL WORK ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$25,000
2011-06-27Job filed: NEW STRUCTURAL WORK ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$25,000
2011-06-24Job filed: INSTALLATION OF NEW HVAC SYSTEM AND NEW PLUMBING FIXTURES TO ACCOMODATE NEW RENOVATION AND LAYOUT OF BANK ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO $95,000
2011-06-24Job filed: DEMOLITION AND CONSTRUCTION OF INTERIOR PARTITIONS AND INSTALLATION OF NEW ATMS AND SUSPENDED CEILING WITH NEW STORE FRONT AND TEMPORARY CONSTRUCTION $315,000
2011-06-23Job filed: INSTALLATION ON NEW SPRINKLERS HEADS AND PIPING FOR RENOVATION AND NEW LAYOUT OF BANK ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS$25,000
2010-05-28Job filed: HEREWITH THIS APPLICATION IS BEING SUBMITTED FOR INTERIOR ALTERATION TO AN EXISTING CVS RETAIL STORE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$75,000
2010-05-28Job filed: HEREWITH THIS APPLICATION IS BEING SUBMITTED FOR INTERIOR ALTERATION TO AN EXISTING CVS RETAIL STORE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$75,000
2010-02-07311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2009
2009-10-26DOB complaint, category ?
2009-09-16DOB complaint, category ?
2009-07-10DOB complaint, category ?
2009-07-09ECB CLASS - 1 violation: FAILURE TO PERFORM ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTED: SUPPORTED SCAFFOLD AT EXP #'S 1,2,4 APPROX 38'HIGH. CONS$400
2009-05-11Permit EQ — ISSUED
2009-05-11Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS, TO ORIGINATE FROM SIDEWALK SHED. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHAN
2009-04-29Permit EW — ISSUED
2009-04-27Job filed: PROPOSED FACADE REPAIRS AS INDICATED ON PLANS AND APPLICATION. NO CHANGE IN USE EGRESS OR OCCUPANCY.$112,000
2009-03-31Permit EQ — ISSUED
2009-03-10Job filed: PA
2009-03-10Job filed: PA
2009-02-17Permit EW — ISSUED
2008
2008-11-26Permit EQ — ISSUED
2008-11-26Job filed: INSTALLATION OF 235 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF TH
2008-10-02Permit EW — ISSUED
2008-09-16DOB violation LANDMK:
2008-09-16DOB violation LANDMK:
2008-09-16DOB violation LANDMK:
2008-08-27Job filed: FILING FOR THE RENOVATION OF AN EXISTING BILLIARD SPACE. ARCHITECTURAL WORK ONLY. NO CHANGE IN USE OCCUPANCY OR EGRESS.$5,000
2008-08-05DOB complaint, category ?
2008-07-18DOB complaint, category ?
2008-05-26DOB complaint, category ?
2008-05-25DOB violation C:
2008-05-25DOB violation C:
2008-04-30Permit EQ — ISSUED
2008-04-30Permit EW — ISSUED
2008-04-25Permit EQ — ISSUED
2008-04-25Permit EW — ISSUED
2008-04-25Permit EW — ISSUED
2008-04-25Permit EW — ISSUED
2008-03-28Job filed: FILING FOR REPLACING AND REFINISHING EXTERIOR FINISHES AND. INSTALLING AUTOMATIC DOOR OPENER ON EXISTING DOORS AND REPLACING CARPET IN WINDOW.$3,000
2008-02-22Permit PL — ISSUED
2008-02-12Permit EW — ISSUED
2008-02-12Permit EW — ISSUED
2008-02-12Permit EQ — ISSUED
2008-02-12Permit EW — ISSUED
2008-02-12Permit EW — ISSUED
2008-01-25Permit EW — ISSUED
2008-01-25Permit EW — ISSUED
2008-01-25Permit EQ — ISSUED
2008-01-25Permit EW — ISSUED
2008-01-15Permit SG — ISSUED
2008-01-15Permit SG — ISSUED
2008-01-03DOB violation LL6291:
2007
2007-10-22DOB complaint, category ?
2007-10-11Permit EW — ISSUED
2007-10-11Permit EW — ISSUED
2007-10-11Permit EQ — ISSUED
2007-10-11Permit EW — ISSUED
2007-10-09Job filed: HVAC AND PLUMBING WORK ON THE 1ST FLOOR AND ROOF. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$375,000
2007-10-09Job filed: STRUCTURAL WORK ON THE 1ST AND ROOF AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$153,000
2007-10-09Job filed: SPRINKLER WORK ON THE FIRST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$24,000
2007-10-09Job filed: SPRINKLER WORK ON THE FIRST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$24,000
2007-10-09Job filed: INSTALLATION OF A NON CODED I.F.A. SYSTEM ON THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$25,000
2007-10-09Job filed: PARTITIONS AND CEILING WORK ON THE 1ST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$163,000
2006-12-05Job filed: INSTALLATION OF PLUMBER AND PARTITIONS TO CREATE AN ICE CREAM PARLOR NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING.$20,000
2006-10-30Job filed: REMOVAL OF NON-BEARING INTERIOR PARTITIONS IN PART OF FIRST FLOOR. SEPERATE APPLICATION TO BE FILED FOR NEW LAYOUT BY TENANTS. NO CHANGE IN USE, OCCUP$10,000
2004
2004-06-03DOB violation LANDMK:
2004-04-14DOB violation LANDMK:
2004-04-01Permit SG — ISSUED
2004-03-29DOB complaint, category ?
2004-03-10Permit EW — ISSUED
2004-03-10Permit EQ — ISSUED
2004-03-09Job filed: Installation of new storefront. No change to zoning, use, occupancy or egress. Professional certification of job.$10,000
2004-03-09Job filed: Installation of new storefront. No change to zoning, use, occupancy or egress. Professional certification of job.$10,000
2003
2003-12-31DOB violation LANDMK:
2003-12-31DOB complaint, category ?
2003-12-29Permit PL — ISSUED
2003-12-23Permit EW — ISSUED
2003-12-23Permit EW — ISSUED
2003-12-19Job filed: Interior renovation to existing store for a new Dunkin' Donuts. Minor partitions, plumbing, HVAC and equipment. No change to zoning, use, occupancy $70,000
2002
2002-10-09Permit PL — ISSUED
2002-08-27Permit EW — ISSUED
2002-08-15Job filed: SMOOTHIE BAR, PLUMBING, PARTITIONS. ADD SEWER EJECTION PUMP WITHDRAW FLOOR DRAIN NO CHANGE IN USE OR OCCUPANC Y.$25,000
2002-08-15Job filed: SMOOTHIE BAR, PLUMBING, PARTITIONS. ADD SEWER EJECTION PUMP WITHDRAW FLOOR DRAIN NO CHANGE IN USE OR OCCUPANC Y.$25,000
2002-05-31DOB violation LANDMK:
2002-05-31DOB violation LANDMK:
2002-05-31DOB violation LANDMK:
2002-05-31DOB violation LANDMK:
2002-05-31DOB violation LANDMK:
2002-05-31DOB violation LANDMK:
2002-05-31DOB violation LANDMK:
2002-01-26DOB complaint, category ?
2002-01-18DOB complaint, category ?
2002-01-16Permit EW — ISSUED
2002-01-15Permit EQ — ISSUED
2002-01-15Permit SG — ISSUED
2002-01-07ECB Non-Hazardous violation: WORK WITHOUT PERMIT. NOTED; 1ST FLOOR COMM. SPACE HAS INSTALLATION OF NEW STORE FRONT APPROX. 14' WITH NEW ENTRY DOOR. ALSO INTERI
2002-01-04DOB complaint, category ?
2001
2001-10-16Job filed: RENOVATE STORE. SEAL EXISTING DOOR TO ADJACENT STORE. INSTALL NEW ENTRY DOOR. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.$8,000
1999
1999-10-04DOB complaint, category ?
1999-04-14Permit EW — ISSUED
1998
1998-07-27Deed — from HILLCREST REALTY COMPANY to HILLCREST REALTY CO., LLC
1997
1997-11-19Permit SG — ISSUED
1997-11-19Permit SG — ISSUED
1997-11-19Permit SG — ISSUED
1997-02-27Permit SG — ISSUED
1996
1996-06-13Permit EW — ISSUED
1996-04-17Permit PL — ISSUED
1995
1995-12-14Permit EQ — ISSUED
1995-12-14Permit EW — ISSUED
1995-12-12Permit EW — ISSUED
1995-10-04Permit EW — RE-ISSUED
1995-10-04Permit EW — RE-ISSUED
1995-08-29DOB violation LL6291:
1995-05-04Permit EW — ISSUED
1994
1994-09-01DOB violation LL6291:
1994-06-14DOB complaint, category ?
1994-03-18DOB violation LL6291:
1993
1993-03-19Mortgage satisfied — from YARDLEY ESTATES INC to CONTINENAL REALTY ETC
1993-03-18DOB violation LL6291:
1992
1992-08-03DOB violation LANDMRK:
1991
1991-08-12DOB violation C:
1991-08-12DOB violation C:
1991-07-22DOB complaint, category ?
1989
1989-08-16ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS FOR INSPECTION REMEDY PROVIDE APPROVE PLANS FOR INSPECTION$250
1987
1987-02-23Mortgage assigned — from HILLCREST REALTY CO to QUEENS COUNTY SVGS BANK
1987-02-23Mortgage $257,979 — from HILLCREST REALTY COMPANY to QUEENS COUNTY SVGS BK$257,979
1987-02-23Mortgage assigned — from EMIGRANT INDUSTRL SVG BK to QUEENS COUNTY SVGS BK
1977
1977-01-07Deed — from HILLCREST REALTY CORP to HILLCREST REALTY CO
1976
1976-11-24Agreement — from HILLCREST REALTY CORP to PRUDENTIAL SAVINGS BANK
1976-10-05Mortgage — from HILLCREST REALTY CORP to PRUDENTIAL SAVINGS BANK
1976-10-05Mortgage assigned — from HARLEM SAVINGS BANK to PRUDENTIAL SAVINGS BANK
1974
1974-07-23Agreement — from HILLCREST REALTY CORP to HARLEM SAVINGS BANK
1969
1969-04-29MISC — from GREENWICH VLLG HSTRCDST
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL