521 West 25 Street · Manhattan · BBL 1006970013
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
10 service requests in the last three years. Most common: Illegal Parking (4) · Encampment (3) · Homeless Person Assistance (2) · Noise (1).
Filed construction activity
$18,434,093 in permitted construction work filed since
2016 (37 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$30,724,000
$13,825,800
2026
$31,648,000
$14,241,600
2027
$32,030,000
$14,413,500
The city's market estimate has risen
4% between tax years 2025 and 2027.
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2017 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Hudson Yards — 7 · 0.4 mi straight-line (about a 10-minute walk) · station accessibility: full 23 St — C E · 0.4 mi straight-line (about an 11-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 10 Av / W 25 St — M11 · 450 ft
Citi Bike
W 26 St & 10 Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
10 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $37,000,000 on
2026-03-19 (lender: Emerald Creek Capital 4, LLC), covering 4 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-03-19
AL&R $37,000,000 — from PRIME STORAGE EMPIRE CAPITAL 550 WEST; PRIME STORAGE EMPIRE CAPITAL 599 ELEVENT; PRIME STO to EMERALD CREEK CAPITAL 4, LLC
$37,000,000
2026-03-19
Mortgage $37,000,000 — from PRIME STORAGE EMPIRE CAPITAL 550 WEST; PRIME STORAGE EMPIRE CAPITAL 599 ELEVENT; PRIME STO to EMERALD CREEK CAPITAL 4, LLC
$37,000,000
2025-01-28
Deed $49,500,000 — from AL 511 WEST 25TH STREET OWNER, LLC to PRIME STORAGE EMPIRE CAPITAL TWENTY-FIFT
$49,500,000
2025-01-21
Sold for $49,500,000
$49,500,000
$49,500,000
2022-09-21
Mortgage $5,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION
$5,000,000
2019-06-03
AL&R $5,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION
$5,000,000
2019-06-03
AL&R $100,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION
$100,000,000
2019-06-03
Agreement $100,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION
$100,000,000
2019-06-03
Mortgage $3,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION
$3,000,000
2019-06-03
Deed $148,254,147 — from 511 WEST 25TH STREET OWNER LP to AL 511 WEST 25TH STREET OWNER, LLC
$148,254,147
2019-06-03
Mortgage $5,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION
$5,000,000
2019-05-23
Sold for $148,254,147
$148,254,147
$148,254,147
2014-06-13
AL&R $98,000,000 — from 511 WEST 125TH STREET OWNER LP to AAREAL CAPITAL CORPORATION
$98,000,000
2014-06-13
Agreement $98,000,000 — from 511 WEST 125TH STREET OWNER LP to AAREAL CAPITAL CORPORATION
$98,000,000
2014-06-13
Mortgage $54,292,257 — from 511 WEST 125TH STREET OWNER LP to AAREAL CAPITAL CORPORATION
$54,292,257
Ten-year activity
50250
2017
2018
41
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
1
2
7
0
2
12
2018
9
6
8
0
7
30
2019
18
8
5
8
2
41
2020
2
3
2
1
0
8
2021
6
3
8
0
2
19
2022
23
1
4
1
3
32
2023
2
1
6
0
1
10
2024
2
0
4
0
3
9
2025
14
0
0
6
1
21
2026
13
2
5
2
1
23
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: LOBBY - REMOVAL AND INSTALLATION OF INTERIOR PARTITONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-22
Permit Structural — Permit Issued
2026-06-17
Job filed: INSTALLATION OF TEMPORARY SPRINKLER LOOP ON THE 1ST TO 4TH FLOOR.
2026-06-11
Permit Plumbing — Permit Issued
2026-05-16
311: Encampment — N/A
2026-05-16
311: Encampment — N/A
2026-05-14
FDNY inspection (ALT)
2026-05-13
FDNY inspection (ALT)
2026-05-01
Rodent inspection: Passed
2026-04-16
311: Encampment — N/A
2026-04-16
311: Homeless Person Assistance — Non-Chronic
2026-03-23
Permit Sprinklers — Permit Issued
2026-03-23
Permit Standpipe — Permit Issued
2026-03-20
311: Homeless Person Assistance — Non-Chronic
2026-03-20
Permit General Construction — Permit Issued
2026-03-20
Permit Foundation — Permit Issued
2026-03-19
AL&R $37,000,000 — from PRIME STORAGE EMPIRE CAPITAL 550 WEST; PRIME STORAGE EMPIRE CAPITAL 599 ELEVENT; PRIME STO to EMERALD CREEK CAPITAL 4, LLC
2026-03-19
Mortgage $37,000,000 — from PRIME STORAGE EMPIRE CAPITAL 550 WEST; PRIME STORAGE EMPIRE CAPITAL 599 ELEVENT; PRIME STO to EMERALD CREEK CAPITAL 4, LLC
2026-03-19
Permit Standpipe — Permit Issued
2026-03-19
Permit Sprinklers — Permit Issued
2026-03-11
Job filed: No Work
2026-03-02
Permit Mechanical Systems — Permit Issued
2025-11-19
Permit General Construction — Signed-off
2025-11-17
Job filed: Temporary Installation to be used on a temporary event "Spotify Presents : Wicked". All the Installations are to be removed upon completion of the eve
The full timeline
2026
2026-08-24Job filed: LOBBY - REMOVAL AND INSTALLATION OF INTERIOR PARTITONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2026-06-24Permit Sprinklers — Permit Issued
2026-06-22Permit Structural — Permit Issued
2026-06-17Job filed: INSTALLATION OF TEMPORARY SPRINKLER LOOP ON THE 1ST TO 4TH FLOOR.$78,000
2026-06-11Permit Plumbing — Permit Issued
2026-05-16311: Encampment — N/A
2026-05-16311: Encampment — N/A
2026-05-14FDNY inspection (ALT)
2026-05-13FDNY inspection (ALT)
2026-05-01Rodent inspection: Passed
2026-04-16311: Encampment — N/A
2026-04-16311: Homeless Person Assistance — Non-Chronic
2026-03-23Permit Sprinklers — Permit Issued
2026-03-23Permit Standpipe — Permit Issued
2026-03-20311: Homeless Person Assistance — Non-Chronic
2026-03-20Permit General Construction — Permit Issued
2026-03-20Permit Foundation — Permit Issued
2026-03-19AL&R $37,000,000 — from PRIME STORAGE EMPIRE CAPITAL 550 WEST; PRIME STORAGE EMPIRE CAPITAL 599 ELEVENT; PRIME STO to EMERALD CREEK CAPITAL 4, LLC$37,000,000
2026-03-19Mortgage $37,000,000 — from PRIME STORAGE EMPIRE CAPITAL 550 WEST; PRIME STORAGE EMPIRE CAPITAL 599 ELEVENT; PRIME STO to EMERALD CREEK CAPITAL 4, LLC$37,000,000
2026-03-19Permit Standpipe — Permit Issued
2026-03-19Permit Sprinklers — Permit Issued
2026-03-11Job filed: No Work
2026-03-02Permit Mechanical Systems — Permit Issued
2025
2025-11-19Permit General Construction — Signed-off
2025-11-17Job filed: Temporary Installation to be used on a temporary event "Spotify Presents : Wicked". All the Installations are to be removed upon completion of the eve$5,000
2025-09-04Permit Mechanical Systems — Permit Issued
2025-09-04Permit General Construction — Permit Issued
2025-08-29Permit Plumbing — Permit Issued
2025-08-26Job filed: ACCESSORY OFFICE - INSTALLATION OF MECHANICAL DUCTWORK AND AC UNIT.$500,000
2025-08-26Job filed: ACCESSORY OFFICE - REMOVAL AND INSTALLATION OF INTERIOR PARTITONS, FLOORING AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$700,000
2025-08-26Job filed: ACCESSORY OFFICE - INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING.$40,000
2025-08-07Restaurant inspection: LAVAN 541 — grade A · mice evidence
2025-07-31Job filed: STORAGE AREA - STRUCTURAL WORK. DETAILS PROVIDED IN THE COMMENTS BOX BELOW AND ON THE DRAWINGS.$504,000
2025-07-31Job filed: STORAGE - FOUNDATION FOR NEW RETAINING WALLS IN THE LOADING/PARKING AREA ON THE 1ST FLOOR IN CONJUNCTION WITH SLAB REPLACEMENT FILED UNDER SEPARATE A$57,600
2025-07-30Job filed: STORAGE - REMOVAL AND INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING. INSTALLATION OF ADDITONAL STANDPIPE MAIN PIPING, RISER AND HOSE RACKS OFF EX$2,531,017
2025-07-29Job filed: STORAGE - INSTALLATION OF MECHANICAL DUCTWORK AND AC UNITS.$870,000
2025-07-29Job filed: STORAGE - INSTALLATION OF PLUMBING FIXTURES AND RELATED WATER/SANITARY PIPING.$60,000
2025-07-16Job filed: CHANGE USE FROM FACTORY TO SELF-STORAGE , ACCESSORY LOADING AREA, ACCESSORY RETAIL OFFICE, AND ACCESSORY OFFICES. RELATED GENERAL CONSTRUCTION.$5,745,200
2025-01-31Mortgage satisfied — from AL 511 WEST 25TH STREET OWNER LLC to AAREAL CAPITAL CORPORATION
2025-01-31Mortgage satisfied — from AL 511 WEST 25TH STREET OWNER LLC to AAREAL CAPITAL CORPORATION
2025-01-31TL&R — from AAREAL CAPITAL CORPORATION to AL 511 WEST 25TH STREET OWNER LLC
2025-01-31TL&R — from AAREAL CAPITAL CORPORATION to AL 511 WEST 25TH STREET OWNER LLC
2025-01-28Deed $49,500,000 — from AL 511 WEST 25TH STREET OWNER, LLC to PRIME STORAGE EMPIRE CAPITAL TWENTY-FIFT$49,500,000
2024-09-23Permit General Construction — Signed-off
2024-09-17Job filed: Temporary Installation to be used on a temporary event "Merrell". All the Installations are to be removed upon completion of the event.$5,000
2024-04-09Restaurant inspection: LAVAN 541 — grade A · mice evidence
2023
2023-12-12311: Noise - Helicopter — Other
2023-10-06311: Sewer — Sewer Odor (SA2)
2023-09-08311: Illegal Parking — Parking Permit Improper Use
2023-08-09311: Street Condition — Blocked - Construction
2022-07-18Permit General Construction — Permit Issued
2022-07-18Permit Mechanical Systems — Permit Issued
2022-06-20Job filed: Foundation work taking place on the GRD floor as per plans filed herewith. No change in use, egress or occupancy.$425,000
2022-06-14Permit Plumbing — Permit Issued
2022-05-27Permit Sprinklers — Permit Issued
2022-05-27Permit Structural — Permit Issued
2022-05-25Permit Mechanical Systems — Permit Issued
2022-05-24Permit General Construction — Permit Issued
2022-05-23Job filed: Structural modifications taking place on the GRD floor as per plans filed herewith. No change in use, egress or occupancy.$425,000
2022-05-17Job filed: General construction taking place in the GRD floor as per plans filed herewith. No change in use, egress or occupancy.$275,000
2022-05-17Job filed: Plumbing modifications taking place on the GRD floor as per plans filed herewith. No change in in use, egress or occupancy.$30,000
2022-05-17Job filed: Sprinkler modifications taking place on the GRD floor as per plans filed herewith. No change in use, egress or occupancy.$84,999
2022-05-17Job filed: Mechanical modifications taking place on the GRD floor as per plans filed herewith. No change in use, egress or occupancy.$75,000
2022-03-17Permit General Construction — Permit Issued
2022-03-17Permit Mechanical Systems — Permit Issued
2022-03-14311: Street Sign - Damaged — Other/Unknown
2022-02-22Job filed: Mechanical modifications taking place on the 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy.$10,000
2022-02-22Job filed: General construction taking place on the 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy.$100,000
2022-02-22Job filed: Sprinkler modifications taking place on 3rd and 4th floors as per plans filed herewith. No change in use, egress or occupancy.$9,999
2022-02-22Job filed: Plumbing modifications on the 3rd and 4th floors as per plans filed herewith. No change is use, egress or occupancy.$30,000
2022-02-05311: Noise - Helicopter — Other
2022-01-14FDNY inspection (RISK)
2021
2021-12-17Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2021-11-28311: Noise - Helicopter — Other
2021-11-24311: Street Sign - Dangling — Other/Unknown
2021-10-29311: Noise - Helicopter — Other
2021-10-19311: Noise - Helicopter — Other
2021-10-17311: Noise - Helicopter — Other
2021-10-06Permit Plumbing — Signed-off
2021-10-05Permit General Construction — Permit Issued
2021-10-05Permit Mechanical Systems — Permit Issued
2021-09-27FDNY inspection (RISK)
2021-09-20311: Noise - Helicopter — Other
2021-09-15FDNY inspection (RISK)
2021-09-14Job filed: General construction on GRD floor as per plans filed herewith. No change in use, egress or occupancy.$148,260
2021-09-14Job filed: Mechanical modifications taking place on GRD floor as per drawings filed herewith. No change in use, egress or occupancy.$7,300
2021-09-14Job filed: Plumbing modifications taking place on GRD floor as per drawings filed herewith. No change in use, egress or occupancy.$10,003
2019-06-28Job filed: PROPOSE TO LEGALIZE (3) 15 TON ROOFTOP AC UNITS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$90,000
2019-06-25Job filed: MINOR INTERIOR ALTERATIONS TO EXISTING SPACE AS PER DRAWINGS. NO CHANGE TO EGRESS, OCCUPANCY, USE, ROOM COUNT OR ZONING IS PROPOSED UNDER THIS APPLICA$246,000
2019-06-25Job filed: MINOR INTERIOR ALTERATIONS TO EXISTING SPACE AS PER DRAWINGS. NO CHANGE TO EGRESS, OCCUPANCY, USE, ROOM COUNT OR ZONING IS PROPOSED UNDER THIS APPLICA$246,000
2019-06-24Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-03AL&R $5,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION$5,000,000
2019-06-03AL&R $100,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION$100,000,000
2019-06-03Agreement $100,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION$100,000,000
2019-06-03Mortgage $3,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION$3,000,000
2019-06-03Deed $148,254,147 — from 511 WEST 25TH STREET OWNER LP to AL 511 WEST 25TH STREET OWNER, LLC$148,254,147
2019-06-03Mortgage $5,000,000 — from AL 511 WEST 25TH STREET OWNER, LLC to AAREAL CAPITAL CORPORATION$5,000,000
2019-06-03TL&R — from AAREAL CAPITAL CORPORATION to 511 WEST 125TH STREET OWNER LP
2019-05-23Sold for $148,254,147$148,254,147
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-04Rodent inspection: Passed
2019-04-04Permit Sidewalk Shed — Signed-off
2019-03-22Job filed: TENANT PROTECTION PLAN FILED IN CONJUNCTION WITH NEW YORK CITY DEPORTMENT OF BUILDINGS JOB NUMBER #122762787$3,000
2019-03-20311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2019-03-20DOB complaint, category ?
2019-03-19ECB CLASS - 1 violation: 3303.10;OPERATIONS IN OCCUPIED BUILDINGS.NOTE:AT THE TIME OF MY INSPECTION OF AN ACTIVE JOBSITE WHERE THE BUILDING IS CURRENTLY OC$2,500
2019-01-19ECB CLASS - 2 violation: SEC. 3319-01(G)(7)(I) MICHAEL LOMBARDO PE#090287 FAILED TO SUBMIT REQUIRED CD8 SIGNOFF IN A TIMELY MANNER,ALLOWING CRANE TO OPERAT
2018-09-10Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OC
2018-09-10Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OC
2018-09-07Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2018-09-07Permit Sidewalk Shed — Signed-off
2018-09-04Permit AL — ISSUED
2018-07-26Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$32,000
2018-07-26Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$16,000
2018-07-10Job filed: FILED HEREWITH FOR THE MODIFICATION OF EXISTING FIRE ALARM SYSTEM AT ROOF. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$28,000
2018-04-04311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2018-02-23311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-02-16ECB CLASS - 1 violation: CI-5A10,41B10,98BB5. 5A10-DOOR ZONE RESTRICTOR HAS BEEN TAMPERED WITH DISABLED AND RENDERED INOPERATIVE. THIS IS A SAFETY DEVICE T$1,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-24311: Elevator — Elevator - Multiple Devices On Property
2018-01-24DOB complaint, category ?
2018-01-15DOB violation E:
2018-01-15DOB violation E:
2017
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2016-06-30311: Water System — Leak (Use Comments) (WA2)
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-04-28Job filed: FILE HEREWITH FOR SPRINKLER WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. NO CHANGES IN USE, OCCUPANCY OR EGRESS FILED UNDER THIS AP$5,000
2016-04-27Job filed: FILE HEREWITH FOR THE MODIFICATION OF EXISTING FIRE ALARM SYSTEM AT ROOF. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICA$28,000
2016-04-26Job filed: FILE HEREWITH FOR MECHANICAL AND PLUMBING WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER
2016-04-26Job filed: FILE HEREWITH FOR STRUCTURAL WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER THIS APPLICAT
2016-04-26Job filed: FILE HEREWITH FOR MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER THIS APPLICATION$2,408,000
2016-04-26Job filed: FILE HEREWITH FOR STRUCTURAL WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER THIS APPLICAT
2016-04-26Job filed: FILE HEREWITH FOR MECHANICAL AND PLUMBING WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER
2016-04-26Job filed: FILE HEREWITH FOR MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER THIS APPLICATION$2,408,000
2016-04-26Job filed: FILE HEREWITH FOR STRUCTURAL WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER THIS APPLICAT
2016-04-26Job filed: FILE HEREWITH FOR MECHANICAL AND PLUMBING WORK IN CONJUNCTION TO MODIFICATIONS TO ROOF DECK AS PER PLANS. CHANGES IN EGRESS AND OCCUPANCY FILED UNDER
2016-03-30311: Water System — Leak (Use Comments) (WA2)
2016-02-08311: Street Condition — Pothole
2016-01-05DOB violation E:
2015
2015-06-16Job filed: FILE HEREWITH FOR THE MODIFICATION OF AN EXISTING FIRE ALARM SYSTEM AT THE 1ST FLOOR LOBBY. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED$20,000
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-05-27Permit EW — ISSUED
2015-05-26Permit EW — ISSUED
2015-05-18Permit PL — ISSUED
2015-05-08DOB violation E:
2015-05-08DOB violation E:
2015-05-08DOB violation E:
2015-04-18Permit EW — ISSUED
2015-04-08Job filed: FIRE PROTECTION PLAN AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2015-03-27311: Water System — Leak (Use Comments) (WA2)
2015-03-23FDNY inspection (RISK)
2015-03-19Job filed: ALTERATIONS TO EXISTING HVAC DUCT WORK AND SPRINKLER SYSTEM. ADDITION OF SPLIT-SYSTEM MECHANICAL SYSTEM.$28,500
2015-03-19Job filed: ALTERATIONS TO EXISTING HVAC DUCT WORK AND SPRINKLER SYSTEM. ADDITION OF SPLIT-SYSTEM MECHANICAL SYSTEM.$28,500
2015-01-16Job filed: MINOR INTERIOR RENOVATION (PLUMBING AND PARTITIONS) ON GROUND FLOOR AND IN CELLAR. MINOR PLUMBING. MINOR ROOF PENETRATIONS AS SHOWN. NO CHANGES TO EGR$201,000
2014
2014-10-21Permit EW — ISSUED
2014-10-21Permit EW — ISSUED
2014-10-17Job filed: GENERAL CONSTRUCTION MODIFICATIONS WITHIN THE GROUND FLOOR AND TO THE STORE FRONT AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$25,000
2014-10-17Job filed: GENERAL STRUCTURAL MODIFICATIONS WITHIN THE GROUND FLOOR AND TO THE STORE FRONT AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$50,000
2014-09-30Permit EW — ISSUED
2014-09-30Permit EW — ISSUED
2014-09-25Permit PL — ISSUED
2014-09-23Permit PL — ISSUED
2014-08-06Permit EW — ISSUED
2014-08-01Job filed: JOB FILED FOR OFFICE SPACE RENOVATION TO INSTALL NEW GWB PARTITIONS AS PLAN SHOWS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$5,000
2014-07-17Permit PL — ISSUED
2014-07-05FDNY inspection (RISK)
2014-07-05FDNY inspection (RISK)
2014-06-30Permit EW — ISSUED
2014-06-30Permit EW — ISSUED
2014-06-25Permit EW — ISSUED
2014-06-13TL&R — from TD BANK N.A. to RRERF 25TH STREET LLC
2014-06-13AL&R $98,000,000 — from 511 WEST 125TH STREET OWNER LP to AAREAL CAPITAL CORPORATION$98,000,000
2014-06-13Agreement $98,000,000 — from 511 WEST 125TH STREET OWNER LP to AAREAL CAPITAL CORPORATION$98,000,000
2014-06-13Mortgage $54,292,257 — from 511 WEST 125TH STREET OWNER LP to AAREAL CAPITAL CORPORATION$54,292,257
2014-06-13Mortgage assigned — from TD BANK, N.A. to AAREAL CAPITAL CORPORATION
2014-06-13Deed $160,000,000 — from RRERF 25TH STREET, LLC to 511 WEST 25TH STREET OWNER LP$160,000,000
2014-04-25Job filed: REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMPORARY LOOP TO THE 2ND FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$190,601
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-02-24Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$110,000
2014-02-24Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$110,000
2014-02-24Permit PL — ISSUED
2014-02-21Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$631,000
2014-02-21Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$1,100,000
2014-02-21Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$69,000
2014-02-21Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$1,100,000
2014-02-21Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$631,000
2014-02-14ECB CLASS - 2 violation: 98BB05 - FIVE YEAR GOVERNOR TEST TAG HAS EXPIRED.
2014-01-30Job filed: STRUCTURAL MODIFICATION TO THE 2ND LEVEL AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
2014-01-30Job filed: STRUCTURAL MODIFICATION TO THE 2ND LEVEL AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
2014-01-30Permit EW — ISSUED
2013
2013-11-17311: Street Condition — Pothole
2013-11-17311: Street Condition — Pothole
2013-10-29CTOR — from TD BANK, N.A. to 25TH STREET ART PARTNERS LLC
2013-08-26Job filed: INTERIOR RENOVATION AND REMOVAL OF NON-LOAD BEARING PARTITIONS TO THE 2ND FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$40,000
2013-08-26DOB violation E:
2013-08-26DOB violation E:
2013-08-26DOB violation E:
2013-05-29Permit EW — ISSUED
2013-05-10Permit PL — ISSUED
2013-04-18311: Standing Water — Other - Explain Below
2013-03-11Permit EW — ISSUED
2013-03-08Permit EW — ISSUED
2013-03-08Permit EW — ISSUED
2013-02-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-02-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-02-14Job filed: ARCHITECTURAL & PLUMBING MODIFICATIONS TO THE EXISTING BATHROOMS AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY.$175,000
2012
2012-12-17DOB violation E:
2012-12-06Permit EW — ISSUED
2012-12-06Permit EW — ISSUED
2012-11-16Job filed: APPLICATION FILED FOR INSTALLATION OF PILES IN CONJUNCTION WITH NEW VAULTS.$300,000
2012-11-16Job filed: APPLICATION FILED FOR INSTALLATION OF CON ED VAULTS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$290,000
2012-11-16Job filed: APPLICATION FILED FOR INSTALLATION OF CON ED VAULTS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$290,000
2012-11-16Job filed: APPLICATION FILED FOR INSTALLATION OF PILES IN CONJUNCTION WITH NEW VAULTS.$300,000
2012-11-16Job filed: APPLICATION FILED FOR INSTALLATION OF CON ED VAULTS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$290,000
2012-11-16Job filed: APPLICATION FILED FOR INSTALLATION OF PILES IN CONJUNCTION WITH NEW VAULTS.$300,000
2012-10-10Job filed: JOB FILED FOR OFFICE SPACE RENOVATION TO INSTALL NEW GWB PARTITIONS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$82,000
2012-10-01Permit EW — ISSUED
2012-10-01Permit EW — ISSUED
2012-09-28311: Street Condition — Failed Street Repair
2012-09-27Permit EW — ISSUED
2012-09-20Job filed: GENERAL ARCHITECTURAL AND PLUMBING MODIFICATIONS TO THE 1ST FLOOR AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$165,565
2012-09-20Job filed: GENERAL ARCHITECTURAL AND PLUMBING MODIFICATIONS TO THE 1ST FLOOR AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$165,565
2012-09-19Job filed: CONSTRUCTION MODIFICATIONS IN RELATION TO THE REPLACEMENT OF TWO (2) EXISTING TIMBER STAIRS WITH NEW CONCRETE STAIRS AS PER DRAWINGS SUBMITTED HEREWIT$79,500
2012-09-19Job filed: STRUCTURAL MODIFICATIONS IN RELATION TO THE REPLACEMENT OF 2 EXISTING TIMBER STAIRS INTO CONCRETE STAIRS AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANG$100,000
2012-09-19Job filed: CONSTRUCTION MODIFICATIONS IN RELATION TO THE REPLACEMENT OF TWO (2) EXISTING TIMBER STAIRS WITH NEW CONCRETE STAIRS AS PER DRAWINGS SUBMITTED HEREWIT$79,500
2012-09-19Job filed: STRUCTURAL MODIFICATIONS IN RELATION TO THE REPLACEMENT OF 2 EXISTING TIMBER STAIRS INTO CONCRETE STAIRS AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANG$100,000
2012-09-12Rodent inspection: Passed
2012-07-31Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM.$14,350
2012-07-31Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM.$14,350
2012-07-31Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM.$14,350
2012-07-26Mortgage satisfied — from WHITEHALL BUSINESS ARCHIVES INC; FRANKLIN RECORD CENTER INC to TD BANK, NA; CHEMICAL BANK; AMPERITE REALTY INC
2012-04-17CORRD — from 25TH STREET ART PARTNERS, LLC to RRERF 25TH STREET, LLC
2012-04-10TL&R — from 25TH STREET ART PARTNERS LLC to TD BANK, NA
2012-02-24Deed $93,000,000 — from 25TH STREET ART PARTNERS, LLC to RRERF 25TH STREET, LLC$93,000,000
2012-02-24Agreement $45,000,000 — from RRERF 25TH STREET, LLC to TD BANK, N.A.$45,000,000
2012-02-09Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 2ND FLOOR.$150,000
2012-02-09Job filed: APPLICATION FILED FOR MODIFICATIONS TO EXISTING DUCTS ON 2ND FLOOR AND INSTALLATION OF A/C UNITS ON ROOF. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$725,000
2012-02-09Job filed: APPLICATION FILED FOR MODIFICATIONS TO EXISTING DUCTS ON 2ND FLOOR AND INSTALLATION OF A/C UNITS ON ROOF. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$725,000
2012-02-09Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 2ND FLOOR.$150,000
2012-02-02Permit EW — ISSUED
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-11-30Job filed: MODIFY SPRINKLER LAYOUT ON 3RD FLOOR EAST. RELOCATE (7) SPRINKLER HEADS & REMOVE (5) SPRINKLER HEADS ON 3RD FLOOR AS PER PLANS FILED HEREWITH. NO $10,000
2011-11-30Job filed: MODIFY SPRINKLER LAYOUT ON 3RD FLOOR EAST. RELOCATE (7) SPRINKLER HEADS & REMOVE (5) SPRINKLER HEADS ON 3RD FLOOR AS PER PLANS FILED HEREWITH. NO $10,000
2011-11-30Job filed: INTERIOR BUILD OUT FOR 3RD FLOOR EAST TENANT. INSTALL CONDENSER UNIT ON ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$110,000
2011-11-30Job filed: INTERIOR BUILD OUT FOR 3RD FLOOR EAST TENANT. INSTALL CONDENSER UNIT ON ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$110,000
2011-11-30Job filed: MECHANICAL & PLUMBING WORK FO 3RD FLOOR EAST TENANT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$255,000
2011-11-30Job filed: INTERIOR BUILD OUT FOR 3RD FLOOR EAST TENANT. INSTALL CONDENSER UNIT ON ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$110,000
2011-11-29311: Curb Condition — Broken Curb
2011-11-28Mortgage assigned — from RAIT PARTNERSHIP, L.P. to TD BANK, N.A.
2011-11-28Mortgage assigned — from RAIT PARTNERSHIP, L.P. to TD BANK, N.A.
2011-11-28Mortgage assigned — from RAIT PARTNERSHIP, L.P. to TD BANK, N.A.
2011-11-28Agreement $45,000,000 — from 25TH STREET ART PARTNERS LLC to TD BANK, N.A.$45,000,000
2011-11-28AL&R $35,000,000 — from 25TH STREET ART PARTNERS LLC to TD BANK, N.A.$35,000,000
2011-06-02Job filed: APPLICATION FILED TO INSTALL FIRE ALARM SYSTEM FEATURING MANUAL ALARM, SELECTIVE SMIOKE DETECTION, SPRINKLER ALARM AND COC. NO CHANGE IN USE, EGRESS O$142,000
2011-06-01Mortgage satisfied — from WHITEHALL LLC; JOMA PRINTING CO, INC to ALLFIRST MORTGAGE TRUST SUCCESSOR BY MER; M&T REAL ESTATE INC; M&T REAL ESTATE TRUST
2011-03-25Job filed: INSTALLATION OF ROOF DECK AS PER PLANS. NO CHNAGE IN USE, EGRESS OR OCCUPANCY.$5,000
2011-03-07Job filed: APPLICATION FILED FOR INSTALLATION OF CON ED VAULTS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$290,000
2011-03-07Job filed: APPLICATION FILED FOR INSTALLATION OF PILES IN CONJUNCTION WITH NEW VAULTS.$300,000
2011-03-07Job filed: APPLICATION FILED FOR INSTALLATION OF PILES IN CONJUNCTION WITH NEW VAULTS.$300,000
2011-03-07Job filed: APPLICATION FILED FOR INSTALLATION OF CON ED VAULTS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$290,000
2011-03-07Job filed: APPLICATION FILED FOR INSTALLATION OF CON ED VAULTS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$290,000
2011-02-01Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 3RD FLOOR. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$210,000
2011-02-01Job filed: APPLICATION FILED FOR BUILDERS PAVING PLAN. TOTAL NEW CURB CUT IS 250 LINEAR FEET. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2011-02-01Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 4TH FLOOR. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$149,000
2011-02-01Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 3RD FLOOR. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$210,000
2011-02-01Job filed: APPLICATION FILED FOR BUILDERS PAVING PLAN. TOTAL NEW CURB CUT IS 250 LINEAR FEET. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2011-02-01Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 3RD FLOOR. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$210,000
2011-02-01Job filed: APPLICATION FILED FOR BUILDERS PAVING PLAN. TOTAL NEW CURB CUT IS 250 LINEAR FEET. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2011-02-01Job filed: APPLICATION FILED FOR INTERIOR PARTITIONS ON 4TH FLOOR. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$149,000
2010
2010-11-12311: Street Sign - Damaged — No Parking, Standing, Stopping
2010-10-02311: Curb Condition — Broken Curb
2010-10-02311: Curb Condition — Broken Curb
2010-06-18Rodent inspection: Passed
2010-05-18311: General Construction/Plumbing — Building Permit - None
2010-05-18311: General Construction/Plumbing — Building Permit - None
2010-05-18DOB complaint, category ?
2010-05-18DOB complaint, category ?
2010-04-26ECB CLASS - 2 violation: 292.1MISC PEOPLE WITH PHYSICAL DISABILITIE FAILURE TO PROVIDE INADEQUATE ACCESS AT TIME OF INSPECTION BLDG ENTRANCE EGRESS LOBBY H$4,000
2010-04-14311: Special Projects Inspection Team (SPIT) — Contrary To LL 58/87(Handicapped Access)
2010-04-14311: General Construction/Plumbing — Building Permit - None
2010-04-14DOB complaint, category ?
2010-04-14DOB complaint, category ?
2010-04-13311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2010-04-13311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2010-04-13311: Elevator — Elevator - Dangerous Condition/Shaft Open/Unguarded
2010-04-13DOB complaint, category ?
2010-04-13DOB complaint, category ?
2010-04-13DOB complaint, category ?
2010-02-22Permit AL — ISSUED
2009
2009-06-11DOB violation E:
2009-06-04Permit AL — ISSUED
2009-02-27DOB violation LL1081:
2009-02-06Job filed: FILING HEREWITH BUILDERS PAVING PLANS TO REPLACE 158.6 LINEAR FEET OF STEEL FACE CURB, 1,450 SQFT OF NEW SIDEWALK, AND 114 SQ YDS OF NEW ROADWAY.FILED
2009-01-01DOB violation LL6291:
2008
2008-10-31Permit EW — ISSUED
2008-10-08Permit PL — ISSUED
2008-09-26Permit EW — ISSUED
2008-09-17Job filed: HEREWITH FILING MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2008-09-17Job filed: HEREWITH FILING MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$120,000
2008-05-21Permit AL — ISSUED
2008-05-09Job filed: FILING HEREWITH PLANS FOR THE INSTALLATION OF A NEW CLASS E SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$223,000
2008-05-09Job filed: FILING HEREWITH PLANS FOR THE INSTALLATION OF A NEW CLASS E SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$223,000
2008-05-09Permit EW — ISSUED
2008-05-08DOB violation E:
2008-04-08ECB Non-Hazardous violation: 03R09,39C16,38P16,66P16: 03R09-REMOVE ITEMS STORED INSIDE ELEVATOR CAB -NOT FOR STORAGE.$2,500
2008-03-28Job filed: APPLICATION FILED FOR CHANGE OF USE AT FLOORS 2 AND 3 AND NEW 5TH FLOOR. MODIFICATIONS AT CORE AREA AND EGRESS CHANGES. OBTAIN AMENDED CERTIFICATE OF$3,297,000
2008-03-28Job filed: MECHANICAL AND PLUMBING MODIFICATION IN CONJUNCTION WITH INITIAL APPLICATION
2008-03-28Job filed: STRUCTURAL WORK IN CONJUNCTION WITH INITIAL APPLICATION AS SHOWN ON PLANS FILED HEREWITH.
2008-03-28Job filed: MECHANICAL AND PLUMBING MODIFICATION IN CONJUNCTION WITH INITIAL APPLICATION
2008-03-21Job filed: AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY.$146,000
2008-02-20Deed $48,750,000 — from JOMA PRINTING CO., INC. to 25TH STREET ART PARTNERS LLC$48,750,000
2008-02-20Agreement — from RAIT PARTNERSHIP, L.P. to ARARIO GALLERY INC; 25TH STREET ART PARTNERS LLC
2008-02-20AL&R $6,996,646 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$6,996,646
2008-02-20AL&R $13,078,738 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$13,078,738
2008-02-20AL&R $49,924,616 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$49,924,616
2008-02-20Mortgage $6,996,646 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$6,996,646
2008-02-20Mortgage $13,078,738 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$13,078,738
2008-02-20Agreement $49,924,616 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$49,924,616
2008-02-20TL&R — from M&T REAL ESTATE TRUST to JOMA PRINTING CO. INC; WHITEHALL, LLC
2008-02-20TL&R — from M&T REAL ESTATE TRUST to JOMA PRINTING CO. INC; WHITEHALL, LLC
2008-02-20TL&R — from M&T REAL ESTATE TRUST to WHITEHALL, LLC; JOMA PRINTING CO. INC
2008-02-20TL&R — from MANUFACTURER AND TRADERS TRUST COMPANY to JOMA PRINTING CO. INC
2008-02-20Mortgage assigned — from M&T REAL ESTATE TRUST to RAIT PARTNERSHIP, L.P.
2008-02-20Mortgage $39,952,950 — from 25TH STREET ART PARTNERS LLC to RAIT PARTNERSHIP, L.P.$39,952,950
2008-02-20TERL — from JOMA PRINTING CO. INC, to WHITEHALL BUSINESS RECORDS, INC.
2008-02-20Mortgage satisfied — from JOMA PRINTING CO. INC. to MANUFACTURER AND TRADERS TRUST COMPANY
2007
2007-12-03Permit PL — ISSUED
2007-12-03Permit EW — ISSUED
2007-11-21Job filed: Sprinkler and plumbing work in an existing commerical space at the 2nd floor. No change in use and occupancy, or egress.$157,000
2007-11-21DOB complaint, category ?
2007-11-21DOB complaint, category ?
2007-10-22Permit EW — ISSUED
2007-10-18DOB complaint, category ?
2007-10-18DOB complaint, category ?
2007-10-17Job filed: Renovation of an existing commerical space at 2nd floor. Architectural work only. No change in use, occupancy, or egress.$200,000
2007-10-17Job filed: Renovation of an existing commerical space at 2nd floor. Architectural work only. No change in use, occupancy, or egress.$200,000
2007-08-01Agreement — from M&T REAL ESTATE TRUST to JOMA PRINTING CO. INC; ARARIO GALLERY INC
2007-08-01Agreement — from JOMA PRINTING CO. INC to WHITEHALL BUSINESS RECORDS INC; ARARIO GALLERY INC
2007-08-01Agreement — from MANUFACTURERS TRADERS TRUST COMPANY to JOMA PRINTING CO. INC; ARARIO GALLERY INC
2007-06-27DOB violation E:
2007-06-27DOB violation E:
2007-01-19Permit SG — ISSUED
2007-01-19DOB violation LL6291:
2006
2006-12-13Permit SG — ISSUED
2006-11-29ZONE — from BASS ASSOCIATES LLC
2006-09-12DOB violation E:
2006-09-12DOB violation E:
2006-06-19DOB complaint, category ?
2006-01-24Mortgage $16,436,155 — from BASS ASSOCIATES LLC to HSBC REALTY CREDIT CORPORATION (USA)$16,436,155
2006-01-24Agreement $28,436,155 — from BASS ASSOCIATES LLC to HSBC REALTY CREDIT CORPORATION (USA)$28,436,155
2006-01-24Mortgage assigned — from BRT REALTY TRUST to HSBC REALTY CREDIT CORPORATION (USA)
2006-01-24Mortgage assigned — from BRT REALTY TRUST to HSBC REALTY CREDIT CORPORATION (USA)
2006-01-24Mortgage $2,063,845 — from BASS ASSOCIATES LLC to HSBC REALTY CREDIT CORPORATION (USA)$2,063,845
2006-01-24TL&R — from BRT REALTY TRUST to BASS ASSOCIATES, LLC
2006-01-24TL&R — from BRT REALTY TRUST to BASS ASSOCIATES, LLC
2006-01-06DOB violation LL6291:
2005
2005-09-14DOB complaint, category ?
2005-06-29Permit EW —
2005-06-22Job filed: A2$2,500
2005-06-22Job filed: A2$2,500
2005-06-06Permit EQ — ISSUED
2005-06-03Job filed: INSTALLATION OF A HEAVY DUTY SHED 248' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
2005-06-03Job filed: INSTALLATION OF A HEAVY DUTY SHED 248' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
2005-04-21Agreement — from M & T REAL ESTATE TRUST; FORMERLY KNOWN M & T REAL ESTATE, INC. to JOMA PRINTING CO.,
2005-04-21AL&R — from JOMA PRINTING CO. INC to MANUFACTURERS AND TRADERS TRUST COMPANY
2005-04-21Mortgage $1,000,000 — from JOMA PRINTING CO. INC to MANUFACTURERS AND TRADERS TRUST COMPANY$1,000,000
2005-03-14Permit EW — ISSUED
2005-03-14Permit EQ — ISSUED
2005-03-01DOB violation E:
2005-02-28REL — from JOMA PRINTING CO. INC.; WHITEHALL , LLC to M&T REAL ESTATE TRUST; F/K/A M&T REAL ESTATE , INC.
2005-02-28REL — from JOMA PRINTING CO. INC.; WHITEHALL , LLC to F/K/A M&T REAL ESTATE , INC.; M&T REAL ESTATE TRUST
2005-02-28AL&R $8,033,000 — from BRT REALTY TRUST to BASS ASSOCIATES LLC$8,033,000
2005-02-28Mortgage $3,967,000 — from BASS ASSOCIATES LLC to BRT REALTY TRUST$3,967,000
2005-02-28AL&R $3,967,000 — from BRT REALTY TRUST to BASS ASSOCIATES LLC$3,967,000
2005-02-28PREL — from WHITEHALL , LLC; JOMA PRINTING CO. INC. to F/K/A M&T REAL ESTATE , INC.; M&T REAL ESTATE TRUST
2005-02-28CERT — from FIRST AMERICAN TITLE INSURANCE COMPANY O to BASS ASSOCIATES , LLC; JOMA PRINTING CO, INC.
2005-02-28SMIS — from JOMA PRINTING CO., INC. to BASS ASSOCIATES MLLC
2005-02-28SAGE — from F/K/A M&T REAL ESTATE, INC.
2005-02-28DEVR — from JOMA PRINTING CO., INC. to BASS ASSOCIATES LLC
2005-02-28Mortgage $8,033,000 — from BASS ASSOCIATES LLC to BRT REALTY TRUST$8,033,000
2005-02-28REL — from WHITEHALL , LLC; JOMA PRINTING CO. INC. to M&T REAL ESTATE TRUST
2005-02-28PREL — from WHITEHALL , LLC; JOMA PRINTING CO. INC. to M&T REAL ESTATE TRUST
2005-02-04DOB complaint, category ?
2005-01-31DOB violation LL6291:
2004
2004-08-19Job filed: Mechanical duct work and sprinkler system installation to be filed inconjunction with applications #103828823 & #103770475. No change to use, eg$37,350
2004-08-19Job filed: Mechanical duct work and sprinkler system installation to be filed inconjunction with applications #103828823 & #103770475. No change to use, eg$37,350
2004-07-12Permit PL — ISSUED
2004-07-08Permit EW — ISSUED
2004-07-02Job filed: File for minor architectural and plumbing work to existing manufacturing space at first floor. No change of use, occupancy or egress.$19,000
2004-06-04Permit EW — ISSUED
2004-05-19Permit PL — ISSUED
2004-05-18Permit EQ — ISSUED
2004-05-18Permit EW — ISSUED
2004-04-30Job filed: Directive II: Installation of partitions, doors, toilet, horizontal and vertical egress. Alteration to facade. No change to Use or Occupancy.$63,000
2004-04-30Job filed: Installation of new girders on first floor. Installation of steel beams on second floor. Installation and framing around staircase. Install steel duna$13,000
2004-04-30Job filed: Installation of (3) HVAC units and mechanical exhaust on the second floor.$44,000
2004-04-30Job filed: Directive II: Installation of partitions, doors, toilet, horizontal and vertical egress. Alteration to facade. No change to Use or Occupancy.$63,000
2004-04-30Job filed: Installation of (3) HVAC units and mechanical exhaust on the second floor.$44,000
2004-04-27DOB violation E:
2004-04-27DOB violation E:
2004-02-13DOB violation LL6291:
2004-01-27Mortgage $1,300,000 — from WHITEHALL, LLC; JOMA PRINTING CO. INC. to M&T REAL ESTATE TRUST$1,300,000
2004-01-27AL&R $1,300,000 — from M&T REAL ESTATE TRUST to WHITEHALL, LLC; JOMA PRINTING CO. INC.$1,300,000
2003
2003-10-29Job filed: Installation of Backflow preventer. No change to use, egress or occupancy.$5,000
2003-09-25Permit EW — ISSUED
2003-09-25Permit EW — ISSUED
2003-09-25Permit EW — ISSUED
2003-09-16Job filed: REPLACE BOILER AND OIL BURNER NO:96001- 01). CHANGE GRADE OF FUEL FROM #4 TO #2. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
2003-09-08Permit EW — ISSUED
2003-08-28ECB Hazardous violation: CEASE USE. 16A11/ 33M07/ 16M07/ 05L10/ 06L10/ 16A11= 1ST FLOOR DOOR HAS 2FT SECTION CUT OUT REPLACE DOOR. 33M07= PROVIDE MISSING$500
2003-08-28DOB violation E:
2003-08-28DOB violation E:
2003-08-13Job filed: Relocate existing sanitary waste including new house trap, installation of (6) new sprinkler heads and ventilation of sprinkler/gas meter room. No ch$14,000
2003-06-05Permit PL — ISSUED
2003-03-19DOB violation LL6291:
2002
2002-12-31Permit EW — ISSUED
2002-12-31Permit EW — ISSUED
2002-12-31Permit EW — ISSUED
2002-12-31Permit EQ — ISSUED
2002-12-27Job filed: Installation of Partitions and Doors, (2) Bathrooms and Storefront. No change to Use, Egress or Occupancy.$196,000
2002-07-22ECB Non-Hazardous violation: 06I11/ 73X11/ 11B11/ 14M07/ 06-I-11 REPAIR ROLLER ON GATE FOR SWITCH 73-X-11 RETURN TO SERVICE SO A COMPLETE INSPECTION MAY BE
2002-05-30Mortgage $1,300,000 — from JOMA PRINTING CO. INC.; WHITEHALL, LLC to M&T REAL ESTATE, INC.$1,300,000
2002-05-30Mortgage assigned — from JOMA PRINTING CO. INC.; WHITEHALL, LLC to M&T REAL ESTATE, INC.
2002-03-26DOB violation LL6291:
2002-01-24DOB violation E: 1P22330
2001
2001-02-27DOB violation LL6291:
2001-02-14SAGE — from CHASE MANHATTAN BANK
2001-02-14SAGE — from CHASE MANHATTAN BANK
2001-02-14SAGE — from CHASE MANHATTAN BANK
2001-02-14Mortgage assigned — from CHASE MANHATTAN BANK to M & T REAL ESTATE, INC.
2001-02-14Mortgage $1,610,453 — from M&T REAL ESTATE, INC. to JOMA PRINTING CO. INC.; WHITEHALL, LLC$1,610,453
2001-02-14Mortgage assigned — from WHITEHALL, LLC; JOMA PRINTING CO. INC. to M&T REAL ESTATE, INC.
2001-01-29DOB violation E: 1P22330
2001-01-29DOB violation E: 1P22339
2000
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
1999
1999-03-16DOB violation LL6291:
1998
1998-05-04DOB violation LL6291:
1998-05-04DOB violation LL6291:
1997
1997-09-16DOB violation LL6291:
1997-09-16DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-05-09Agreement — from JOMA PRINTING CO., INC. to CHEMICAL BANK
1996-05-09Agreement — from JOMA PRINTING CO., INC. to CHEMICAL BANK