Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$10,030 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
90 service requests in the last three years. Most common: Illegal Parking (15) · Encampment (14) · Vendor Enforcement (10) · Homeless Person Assistance (6) · Consumer Complaint (5) · For Hire Vehicle Complaint (4).
Filed construction activity
$487,344,894 in permitted construction work filed since
2016 (486 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$868,311,100
$390,740,000
2026
$870,424,000
$391,690,800
2027
$888,504,000
$399,826,800
The city's market estimate has risen
2% between tax years 2025 and 2027.
Tax exemptions on the roll: IDA - PILOT
Building systems
Energy grade (LL33)
C — ENERGY STAR score 62/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 10)
1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick), shared by 6 restaurants 2 Food Establishment complaints to 311 at this address in the last three years (most often: Pet/Animal, Toilet Facility), shared by 6 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2023 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Hudson Yards — 7 · 150 ft straight-line (about a 1-minute walk) · station accessibility: full 34 St-Penn Station — A C E · 0.5 mi straight-line (about a 12-minute walk) · station accessibility: full
Bus
Nearest boarding stop: W 34 St / 11 Av — M34-SBS · 200 ft · Select Bus Service
Citi Bike
W 34 St & 11 Ave · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
90 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,245,000,000 on
2019-12-03 (lender: Dbr Investments Co. Limited and Morgan Stanley Bank, N.A.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-12-03
AL&R $1,245,000,000 — from ONE HUDSON YARDS OWNER LLC to DBR INVESTMENTS CO. LIMITED; WELLS FARGO BANK, NATIONAL ASSOCIATION; MORGAN STANLEY BANK,
$1,245,000,000
2019-12-03
Mortgage $1,245,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPEMENT AG to DBR INVESTMENTS CO. LIMITED; WELLS FARGO BANK, NATIONAL ASSOCIATION; MORGAN STANLEY BANK,
$1,245,000,000
2014-12-30
RPTT&RET $258,780,647 — from ONE HUDSON YARDS HOLDINGS LLC; 55 HUDSON YARDS MEMBER LLC to MFA 55 HY LLC
$258,780,647
2014-12-30
RPTT&RET $272,763,872 — from HUDSON YARDS GEN-PAR, LLC to 55 HUDSON YARDS MEMBER LLC
$272,763,872
2014-12-11
Mortgage $238,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
$238,000,000
2014-12-11
Mortgage $25,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
$25,000,000
2014-12-11
Agreement $90,547,156 — from HUDSON YARDS INFRASTRUCTURE CORPORATION; METROPOLITAN TRANSPORTATION AUTHORITY to ONE HUDSON YARDS OWNER LLC
$90,547,156
2014-12-11
Mortgage $238,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
$238,000,000
2013-10-11
Mortgage $70,000,000 — from ONE HUDSON YARDS OWNER LLC to BANK OF AMERICA, N.A.
$70,000,000
2013-10-11
Agreement $100,000,000 — from BANK OF AMERICA, N.A. to ONE HUDSON YARDS OWNER LLC
$100,000,000
2013-10-11
Deed $168,000,000 — from STRATEGIC/EXTELL 34TH STREET, LLC to ONE HUDSON YARDS OWNER LLC
$168,000,000
2010-11-23
EASE $33,885,825 — from WEST 33TRD STREET LLC; STRATEGIC/EXTELL 34TH STREET, LLC to THE CITY OF NEW YORK
$33,885,825
2010-10-20
AL&R $30,000,000 — from STRATEGIC/EXTELL 34TH STREET, LLC; WEST 33RD STREET LLC to NEW YORK COMMUNITY BANK
$30,000,000
2010-10-20
Agreement $30,000,000 — from WEST 33RD STREET LLC; STRATEGIC/EXTELL 34TH STREET, LLC to NEW YORK COMMUNITY BANK
$30,000,000
2007-08-23
AL&R $60,000,000 — from STRATEGIC/ EXTELL 34TH STREET, LLC; WEST 33RD STREET LLC to NEW YORK COMMUNITY BANK
$60,000,000
Ten-year activity
5002500
2017
426
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
150
57
30
5
2
244
2018
352
35
22
1
16
426
2019
193
34
31
6
8
272
2020
63
2
17
8
5
95
2021
66
8
68
0
6
148
2022
29
4
69
1
6
109
2023
72
1
13
3
10
99
2024
101
3
31
0
10
145
2025
51
3
21
0
7
82
2026
48
2
38
0
10
98
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Elevator — Elevator - Multiple Devices On Property
2026-06-08
DOB complaint, category ?
2026-06-04
Job filed: Modification to existing fixtures
2026-06-04
Job filed: Modification to plumbing fixtures
2026-06-03
Job filed: Propose plumbing modifications all as per plans herewith filed, no change in use, egress or occupancy.
2026-06-03
Job filed: Interior Tenant Build-Out
2026-05-30
311: Illegal Parking — Parking Permit Improper Use
2026-05-21
311: Day Care — Day Care Facility
2026-05-19
311: Encampment — N/A
2026-05-13
Permit Plumbing — Permit Issued
2026-05-10
311: Vendor Enforcement — Food Vendor
2026-05-07
Job filed: Propose plumbing modifications all as per plans herewith filed, no change in use, egress or occupancy.
2026-05-05
Certificate of occupancy Renewal With Change
2026-04-30
Permit Protection and Mechanical Methods — Permit Issued
2026-04-30
Permit Protection and Mechanical Methods — Permit Issued
2026-04-30
Job filed: USE OF MECHANICAL DEMOLITION EQUIPMENT FOR SLAB OPENING, FILED SEPARATELY UNDER M01357468-I1.
2026-04-21
Rodent inspection: Passed
2026-04-16
Permit Plumbing — Permit Issued
2026-04-16
Permit Plumbing — Permit Issued
2026-04-14
Job filed: Propose interior renovation of existing commercial space at 8th & 10th f.loors Removal and installation of non load bearing partitions and related fin
2026-04-13
Job filed: HEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS
2026-04-06
Restaurant inspection: COOLEY LLP — grade A
2026-04-02
Job filed: HEREWITH FILING SPRINKLER MODIFICATIONS FOR INTERIOR FIT-OUT ON THE 48TH FLR (MARKETING FLR 49) PER PLANS.
2026-04-02
Job filed: HEREWITH FILING PLUMBING MODIFICATIONS FOR 48TH FLR (MARKETING FLR 49) INTERIOR FIT-OUT PER PLANS.
2026-04-02
Job filed: HEREWITH FILING MECHANICAL MODIFICATIONS FOR INTERIOR FITOUT ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2026-04-01
311: Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
2026-04-01
DOB complaint, category ?
2026-03-30
Certificate of occupancy Renewal With Change
2026-03-12
Restaurant inspection: BLUESTONE LANE — grade A
2026-03-10
311: Sidewalk Condition — Broken Sidewalk
2026-03-06
Permit Mechanical Systems — Permit Issued
2026-03-05
Permit General Construction — Permit Issued
2026-03-03
Job filed: NEW SLAB OPENING AT 30TH FLOOR MARKETING TO ACCOMMODATE SAME NEW STAIR FROM 29TH TO 30TH FLOOR MARKETING
2026-02-27
Restaurant inspection: FLIK INTERNATIONAL CORP. — grade A
2026-05-30311: Illegal Parking — Parking Permit Improper Use
2026-05-21311: Day Care — Day Care Facility
2026-05-19311: Encampment — N/A
2026-05-13Permit Plumbing — Permit Issued
2026-05-10311: Vendor Enforcement — Food Vendor
2026-05-07Job filed: Propose plumbing modifications all as per plans herewith filed, no change in use, egress or occupancy.$50,000
2026-05-05Certificate of occupancy Renewal With Change
2026-04-30Permit Protection and Mechanical Methods — Permit Issued
2026-04-30Permit Protection and Mechanical Methods — Permit Issued
2026-04-30Job filed: USE OF MECHANICAL DEMOLITION EQUIPMENT FOR SLAB OPENING, FILED SEPARATELY UNDER M01357468-I1.$5,001
2026-04-21Rodent inspection: Passed
2026-04-16Permit Plumbing — Permit Issued
2026-04-16Permit Plumbing — Permit Issued
2026-04-14Job filed: Propose interior renovation of existing commercial space at 8th & 10th f.loors Removal and installation of non load bearing partitions and related fin$1,700,000
2026-04-13Job filed: HEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $1,450,000
2026-04-06Restaurant inspection: COOLEY LLP — grade A
2026-04-02Job filed: HEREWITH FILING SPRINKLER MODIFICATIONS FOR INTERIOR FIT-OUT ON THE 48TH FLR (MARKETING FLR 49) PER PLANS.$25,000
2026-04-02Job filed: HEREWITH FILING PLUMBING MODIFICATIONS FOR 48TH FLR (MARKETING FLR 49) INTERIOR FIT-OUT PER PLANS.$60,000
2026-04-02Job filed: HEREWITH FILING MECHANICAL MODIFICATIONS FOR INTERIOR FITOUT ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$380,000
2026-04-01311: Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
2026-04-01DOB complaint, category ?
2026-03-30Certificate of occupancy Renewal With Change
2026-03-12Restaurant inspection: BLUESTONE LANE — grade A
2026-02-06Permit General Construction — Permit Issued
2026-01-29Job filed: REMOVE ALL EXISTING AIR HANDLERS, CEILING AND FLOOR MOUNTED AIRCONDITIONING UNITS WITH ALL ASSOCIATED DUCTWORK, TERMINAL BOXES,DIFFUSERS, GRILLES, HAN$27,000
2026-01-29Job filed: Modifications of existing sprinkler system$30,000
2026-01-29Job filed: Removal of fixtures$6,000
2026-01-28Job filed: Interior Demo at Level 29$184,500
2026-01-23Permit Mechanical Systems — Permit Issued
2026-01-05Cooling tower inspection
2025
2025-12-31311: Food Poisoning — 1 or 2
2025-12-10311: Day Care — Day Care Facility
2025-12-08311: Water System — Dirty Water (WE)
2025-12-04311: Day Care — Day Care Facility
2025-12-02Job filed: HEREWITH FILING FOR INTERIOR SOFT DEMOLITION ON THE 49TH (MARKETING FLR 50) AND 50TH (MARKETING FLR 51) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRE$20,000
2025-12-02Certificate of occupancy Renewal Without Change
2025-11-09311: For Hire Vehicle Complaint — Car Service Company Complaint
2025-11-08311: Illegal Parking — Parking Permit Improper Use
2025-11-04Job filed: Interior alterations to include new partitions as shown on the drawings filed herewith. No change in use, egress, or occupancy.$1,292,000
2025-10-31Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$46,000
2025-09-22Permit Mechanical Systems — Permit Issued
2025-09-22Permit General Construction — Permit Issued
2025-09-18311: Consumer Complaint — Tobacco Sales
2025-09-17311: Lost Property — Electronics/Phones
2025-09-15Permit Sprinklers — Permit Issued
2025-09-12Certificate of occupancy Renewal Without Change
2025-09-09Job filed: Propose mechanical modifications all as per plans herewith filed, no change in use, egress or occupancy.$295,000
2025-09-08Permit Standpipe — Signed-off
2025-09-03Restaurant inspection: HUDSON YARDS CATERING LLC — grade A
2025-09-03Job filed: Propose plumbing modifications all as per plans herewith filed, no change in use, egress or occupancy.$44,000
2025-09-02Job filed: Propose sprinkler modifications all as per plans herewith filed, no change to use, occupancy or egress.$24,990
2025-09-02Job filed: Propose interior renovation of existing commercial space at 8th & 10th f.loors Removal and installation of non load bearing partitions and related fin$1,700,000
2025-08-21Permit General Construction — Permit Issued
2025-08-20Permit Plumbing — Signed-off
2025-08-19Permit Mechanical Systems — Permit Issued
2025-08-19Permit Mechanical Systems — Signed-off
2025-08-15Permit Mechanical Systems — Signed-off
2025-08-15Permit Mechanical Systems — Permit Issued
2025-08-14Permit Sprinklers — Signed-off
2025-08-14Permit General Construction — Permit Issued
2025-08-14Permit General Construction — Signed-off
2025-08-14Permit Sprinklers — Permit Issued
2025-08-12Job filed: Modifications to plumbing fixtures and piping$58,415
2025-08-11Job filed: Mechanical Modifications on 22nd floor. No change to use, egress or occupancy.$1,276,000
2025-08-11Job filed: Interior Renovations to existing office space$192,000
2025-08-11Job filed: EXISTING SPRINKLER SYSTEM PIPING AND SPRINKLER HEADS TO BE MODIFIED TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$105,000
2025-08-11Job filed: Modification of existing Ductwork.$13,400
2025-08-11Job filed: NEW PLUMBING FIXTURES, EQUIPMENT, AND PIPING TO BE INSTALLED TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY..$47,250
2025-08-11Job filed: Interior construction of 22nd floor commercial office tenant fit-out. New layout for office spaces, open work areas, and conferencing rooms. Existing $1,310,124
2025-08-08Job filed: Modifications to existing Sprinkler system$120,570
2025-08-07Job filed: Modifications to existing HVAC duct system.$618,876
2025-08-04ECB CLASS - 1 violation: AT TIME OF INSPECTION OF 55 STORY BUILDING WHERE ELEVATOR OPERATOR WAS STRUCK IN HEAD WHILE A DELIVERY OPERATION WAS IN PROGRESS $10,030
2025-08-04DOB complaint, category ?
2025-07-30Job filed: PROPOSED RENOVATION OF EXISTING OFFICE SPACE ON 47th FLOOR OF EXISTING HIGH-RISE OFFICE BUILDING. NEW INTERIOR LAYOUT, NEW PARTITIONS, NEW FINISHES. N$2,138,000
2025-07-22Job filed: Interior alteration of the existing office space as shown on the drawings filed herewith. No change in use, egress, or occupancy.$213,002
2025-07-03311: Street Sign - Missing — No Parking, Standing, Stopping
2025-06-26311: Encampment — N/A
2025-06-25Certificate of occupancy Renewal Without Change
2025-05-29Permit General Construction — Signed-off
2025-05-07311: Illegal Parking — Blocked Sidewalk
2025-05-05Facade (LL11) filing, cycle 10: SWARMP
2025-04-22Job filed: General construction to include a convenience stair and smoke curtain as shown on the drawings filed herewith. No change in use, egress, or occupancy.$212,184
2025-04-03Permit Sprinklers — Signed-off
2025-04-03Permit Plumbing — Signed-off
2025-04-02Permit General Construction — Signed-off
2025-04-02Certificate of occupancy Renewal With Change
2025-03-28Permit General Construction — Signed-off
2025-03-27Permit Mechanical Systems — Permit Issued
2025-03-22311: Sewer — Catch Basin Search (SC2)
2025-03-13Job filed: Mechanical Modifications on 22nd floor. No change to use, egress or occupancy.$1,276,000
2025-03-11Job filed: NEW PLUMBING FIXTURES, EQUIPMENT, AND PIPING TO BE INSTALLED TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY..$47,250
2025-03-11Job filed: EXISTING SPRINKLER SYSTEM PIPING AND SPRINKLER HEADS TO BE MODIFIED TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$105,000
2025-03-10Job filed: Interior construction of 22nd floor commercial office tenant fit-out. New layout for office spaces, open work areas, and conferencing rooms. Existing $1,310,124
2024-12-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-09Permit Structural — Permit Issued
2024-12-09Permit General Construction — Permit Issued
2024-12-09Permit Mechanical Systems — Permit Issued
2024-12-09Job filed: General construction to include a convenience stair and smoke curtain as shown on the drawings filed herewith. No change in use, egress, or occupancy.$212,184
2024-11-27Job filed: HEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $1,450,000
2024-11-27Job filed: HEREWITH FILING STRUCTURAL MODIFICATIONS FOR 48TH FLR (MARKETING FLR 49) INTERIOR FIT-OUT PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $80,000
2024-11-27Job filed: HEREWITH FILING PLUMBING MODIFICATIONS FOR 48TH FLR (MARKETING FLR 49) INTERIOR FIT-OUT PER PLANS.$60,000
2024-11-27Job filed: HEREWITH FILING SPRINKLER MODIFICATIONS FOR INTERIOR FIT-OUT ON THE 48TH FLR (MARKETING FLR 49) PER PLANS.$25,000
2024-11-27Job filed: HEREWITH FILING MECHANICAL MODIFICATIONS FOR INTERIOR FITOUT ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$380,000
2024-11-26Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$24,000
2024-11-12Restaurant inspection: FLIK INTERNATIONAL CORP. — grade A
2024-11-09311: Consumer Complaint — Street Fair Vendor
2024-10-31Restaurant inspection: BLUESTONE LANE — grade A
2024-10-30Permit Plumbing — Permit Issued
2024-10-07311: Vendor Enforcement — Food Vendor
2024-10-01Rodent inspection: Passed
2024-09-26Job filed: Modification of the mechanical system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$223,000
2024-09-25Job filed: Interior alterations to include new partitions as shown on the drawings filed herewith. No change in use, egress, or occupancy.$1,292,000
2024-09-25Job filed: Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$34,200
2024-08-30Permit General Construction — Signed-off
2024-08-27Job filed: Interior alteration of the existing office space as shown on the drawings filed herewith. No change in use, egress, or occupancy.$213,002
2024-08-27Job filed: Modification of the mechanical system in relation to tenant space fitout as shown on the drawings filed herewith. No change in use, egress, or occupan$38,697
2024-08-13Permit General Construction — Signed-off
2024-08-13Permit Mechanical Systems — Signed-off
2024-08-12311: Water System — Hydrant Leaking (WC1)
2024-08-11311: Dirty Condition — Trash
2024-07-28311: Consumer Complaint — Mobile Food Vendor
2024-07-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-07-20311: Consumer Complaint — Mobile Food Vendor
2024-07-16Permit Structural — Signed-off
2024-07-10311: Illegal Dumping — Removal Request
2024-07-08Job filed: Removal of stair and slab infill on the 48th & 49th floors (49th & 50th floors - Marketing) as per plans. No change to use, egress or occupancy.$99,995
2024-07-01Permit General Construction — Signed-off
2024-06-26Job filed: Minor demolition of architectural stair and installation of finishes on the 48th & 49th floors (49th & 50th floor - Marketing) - Stair Filing as per $149,996
2024-05-08Restaurant inspection: FLIK INTERNATIONAL CORP.
2024-05-07311: Illegal Parking — Blocked Sidewalk
2024-05-03Permit Plumbing — Signed-off
2024-05-03Job filed: Modification of the plumbing system to remove and install plumbing fixtures and associated piping as shown on the drawings filed herewith. No change i$4,200
2024-05-03Job filed: Removal and installation of mechanical equipment and associated ducts in relation to tenant space fit-out as shown on the drawings filed herewith. No $9,240
2024-05-03Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$4,500
2024-05-03Permit Plumbing — Signed-off
2024-05-02Job filed: Interior non-load bearing demolition and tenant fit-out as shown on the drawings filed herewith. No change in use, egress, or occupancy.$101,420
2024-04-25Permit General Construction — Signed-off
2024-04-19Job filed: THIS APPLICATION IS FILED TO PARTIALLY RENOVATE OFFICE SPACE ON THE 18TH FLOOR OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, $50,000
2024-04-16311: Vendor Enforcement — Food Vendor
2024-04-16Job filed: Interior non-load bearing demolition and tenant fit-out as shown on the drawings filed herewith. No change in use, egress, or occupancy.$101,420
2024-04-16Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$4,500
2024-04-10Permit Sprinklers — Signed-off
2024-04-10Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$147,490
2024-04-06311: Illegal Parking — Blocked Hydrant
2024-04-05311: New Tree Request — For One Address
2024-04-05311: New Tree Request — For One Address
2024-04-05Permit Mechanical Systems — Signed-off
2024-04-04Permit Standpipe — Signed-off
2024-04-03Job filed: Modification of the plumbing system to remove and install plumbing fixtures and associated piping as shown on the drawings filed herewith. No change i$4,200
2024-04-02Job filed: Removal and installation of mechanical equipment and associated ducts in relation to tenant space fit-out as shown on the drawings filed herewith. No $9,240
2024-04-01FDNY inspection (E-CIDS)
2024-04-01Permit General Construction — Signed-off
2024-03-27Permit Mechanical Systems — Signed-off
2024-03-27Permit Sprinklers — Signed-off
2024-03-26Permit General Construction — Signed-off
2024-03-26Permit Mechanical Systems — Signed-off
2024-03-25Permit Plumbing — Signed-off
2024-03-21311: Illegal Parking — Blocked Bike Lane
2024-03-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-03-21Job filed: Modifications to the existing HVAC system on the 23rd floor (JF Lehman& Company) as per plans. No change to use, egress or occupancy.$335,650
2024-03-20Permit General Construction — Signed-off
2024-03-20Job filed: Modification of the plumbing system in relation to interior tenant fit-out as shown on the drawings filed herewith. No change in use, egress, or occup$47,337
2024-03-20Job filed: Modification of the sprinkler system in relation to interior tenant fit-out as shown on the drawings filed herewith. No change in use, egress, or occu$167,034
2024-03-20Job filed: Modifications to the existing sprinkler system on the 23rd floor (JF Lehman & Company) as per plans. No change to use, egress or occupancy.$61,584
2024-03-20Job filed: Modification of the mechanical system in relation to interior tenant fit-out as shown on the drawings filed herewith. No change in use, egress, or occ$520,560
2024-03-19Job filed: Minor demolition with installation of new partitions, doors, ceilings and finishes on the 23rd floor (JF Lehman & Company) as per plans. No change to $1,483,550
2024-03-14Job filed: Interior renovation of a tenant space as shown on the drawings filed herewith. No change in use, egress, or occupancy.$4,325,070
2024-03-14Job filed: Interior non-load bearing demolition and tenant fit-out as shown on the drawings filed herewith. No change in use, egress, or occupancy.$101,420
2024-03-14Permit Sprinklers — Signed-off
2024-03-13Permit Standpipe — Signed-off
2024-03-08Permit Plumbing — Signed-off
2024-03-07Permit Mechanical Systems — Signed-off
2024-02-28Certificate of occupancy Renewal With Change
2024-02-26Permit Mechanical Systems — Signed-off
2024-02-20Permit Sprinklers — Signed-off
2024-02-16Job filed: Modification of the plumbing system to remove and install new fixtures and associated piping as shown on the drawings filed herewith. No change in use$185,000
2024-02-16Job filed: Modification of the mechanical system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$1,750,000
2024-02-16Job filed: Standpipe work in relation to interior tenant alterations as shown on the drawings filed herewith. No change in use, egress, or occupancy.$15,000
2024-02-16Job filed: Modification of the mechanical system in relation to IDF room, as shown on the drawings filed herewith. No change in use, egress, or occupancy.$425,000
2024-02-16Permit General Construction — Signed-off
2024-02-16Permit Plumbing — Signed-off
2024-02-16Permit Mechanical Systems — Permit Issued
2024-02-16Permit Plumbing — Signed-off
2024-02-16Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$200,000
2024-02-15Permit General Construction — Signed-off
2024-02-08Job filed: Interior alterations in relation to main floor buildout as shown on the drawings filed herewith. No change in use, egress, or occupancy.$4,500,000
2024-02-05Permit Plumbing — Signed-off
2024-02-05Permit Mechanical Systems — Signed-off
2024-02-05Permit General Construction — Signed-off
2024-02-05Permit Sprinklers — Signed-off
2024-02-02Permit Plumbing — Signed-off
2024-02-02Permit Sprinklers — Signed-off
2024-01-31Job filed: THIS APPLICATION IS FILED FOR THE MECHANICAL WORK TO RENOVATE THE EXISTING 27TH MARKETING FLOOR OF THIS BUILDING AS PER PLANS FILED HEREWITH. NO CHANG$600,000
2024-01-31Job filed: THIS APPLICATION IS FILED FOR THE PLUMBING AND SPRINKLER WORK TO RENOVATE THE EXISTING 27TH MARKETING FLOOR OF THIS BUILDING AS PER PLANS FILED HEREWI$135,000
2024-01-30Job filed: THIS APPLICATION IS FILED TO RENOVATE THE EXISTING 27TH MARKETING FLOOR OF THIS BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC$1,800,000
2024-01-25Permit Plumbing — Signed-off
2024-01-25Permit Mechanical Systems — Signed-off
2024-01-25Permit General Construction — Signed-off
2024-01-24Permit Standpipe — Signed-off
2024-01-22Job filed: Standpipe work in conjunction with office fit-out as shown on the drawings filed herewith. No change in use, egress, or occupancy.$10,000
2024-01-17311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2024-01-17Permit Sprinklers — Signed-off
2024-01-17DOB complaint, category ?
2024-01-11Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$46,000
2024-01-11Job filed: Modification of the mechanical system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$223,000
2024-01-10Permit Sprinklers — Signed-off
2024-01-10Permit Plumbing — Signed-off
2024-01-08Job filed: Interior alterations to include new partitions as shown on the drawings filed herewith. No change in use, egress, or occupancy.$1,292,000
2024-01-05Job filed: Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$117,550
2024-01-04Permit General Construction — Signed-off
2024-01-04Certificate of occupancy Renewal Without Change
2024-01-02Job filed: Removal of interior non-load bearing partitions and related finishes as shown on the drawings filed herewith. No change in use, egress, or occupancy.$163,325
2023
2023-12-28Permit Mechanical Systems — Signed-off
2023-12-26Job filed: Demolition work in preparation for floor buildout as shown on the drawings filed herewith. No change in use, egress, or occupancy.$5,825
2023-12-26Job filed: Demolition work in preparation for sprinkler system modifications as shown on the drawings filed herewith. No change in use, egress, or occupancy.$11,800
2023-12-26Job filed: Modification of the mechanical system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$53,850
2023-12-20Job filed: Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$92,045
2023-12-20Job filed: Modification of existing mechanical system to remove and install new ductwork and associated piping. No change in use, egress, or occupancy.$327,000
2023-12-20Job filed: Modification of existing sprinkler system to remove, relocate, and install new sprinkler heads. No change in use, egress, or occupancy.$70,400
2023-12-19Job filed: Renovation of third floor office space. Work to include the removal and installation of interior non-load bearing partitions and finishes. No change i$1,767,731
2023-12-19Job filed: Full interior floor tenant improvements to the 24th floor of an existing 51-story building with new offices, meeting rooms, and a pantry as shown on t$3,922,000
2023-12-01Permit General Construction — Signed-off
2023-12-01Permit Plumbing — Signed-off
2023-11-20Permit Plumbing — Signed-off
2023-11-17Permit Mechanical Systems — Signed-off
2023-11-15Restaurant inspection: HUDSON YARDS CATERING LLC — grade A
2023-11-03Permit Sprinklers — Signed-off
2023-11-02Permit General Construction — Signed-off
2023-10-31Permit Sprinklers — Signed-off
2023-10-30Permit Mechanical Systems — Signed-off
2023-10-25Job filed: Sprinkler work related to renovation of existing office. No change of use, occupancy or egress.$15,000
2023-10-20Job filed: Modification of the plumbing system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$117,550
2023-10-20Job filed: Modification of the sprinkler system in relation to a new IDF and Pump Room as shown on the drawings filed herewith. No change in use, egress, or occu$6,360
2023-10-20Job filed: Full interior floor tenant improvements to the 24th floor of an existing 51-story building with new offices, meeting rooms, and a pantry as shown on t$3,922,000
2023-10-20Job filed: Modification to the plumbing system in relation to a new IDF and Pump Room as shown on the drawings filed herewith. No change in use, egress, or occup$8,000
2023-10-20Job filed: Modification of the mechanical system in relation to a new IDF and Pump Room as shown on the drawings filed herewith. No change in use, egress, or occ$347,000
2023-10-20Job filed: Modification of the mechanical system to remove and install new ductwork and associated piping as shown on the drawings filed herewith. No change in u$1,315,500
2023-10-20Job filed: Modification of the sprinkler system as shown on the drawings filed herewith. No change in use, egress, or occupancy.$147,490
2023-10-18311: Vendor Enforcement — Food Vendor
2023-10-16311: Water System — Hydrant Running Full (WA4)
2023-10-16Job filed: Standpipe work in conjunction with office fit-out as shown on the drawings filed herewith. No change in use, egress, or occupancy.$20,000
2023-10-16Certificate of occupancy Renewal Without Change
2023-10-11Permit Sprinklers — Signed-off
2023-10-05311: Dead Animal — Bird
2023-10-03311: Abandoned Bike — Chained to Public Property
2023-10-03Job filed: Mechanical work related to renovation of existing office. No change of use, occupancy or egress. 26C/27M$158,220
2023-09-27Job filed: Modification of existing mechanical system to remove and install new ductwork and associated piping. No change in use, egress, or occupancy.$86,050
2023-09-27Job filed: Modification of existing sprinkler system to remove, relocate, and install new sprinkler heads. No change in use, egress, or occupancy.$47,600
2023-09-13Permit General Construction — Signed-off
2023-09-12Permit Mechanical Systems — Signed-off
2023-08-31FDNY inspection (RISK)
2023-08-31Permit Plumbing — Signed-off
2023-08-30Permit Plumbing — Signed-off
2023-08-30Permit Sprinklers — Signed-off
2023-08-29Permit General Construction — Signed-off
2023-08-21Job filed: Renovation of third floor office space. Work to include the removal and installation of interior non-load bearing partitions and finishes. No change i$1,024,954
2023-08-18Job filed: Modification of the existing sprinkler system to remove and install new sprinkler heads as shown on the drawings filed herewith. No change in use, egr$10,000
2023-08-17Job filed: Modification of the existing mechanical system to remove and install new ductwork and associated piping as shown on the drawings filed herewith. No ch$106,900
2023-08-16Job filed: THIS APPLICATION IS FILED FOR PLUMBING WORK FOR SUPPORT SPACES FOR ENGINEERING AND MAINTENANCE STAFF ON THE 9TH FLOOR OF THIS BUILDING AS PER PLANS FI$50,000
2023-08-16Job filed: THIS APPLICATION IS FILED TO INSTALL MINOR PARTITIONS, FURNITURE AND FINISHES FOR SUPPORT SPACES FOR ENGINEERING AND MAINTENANCE STAFF ON THE 9TH FLOO$150,000
2023-08-10Permit Sprinklers — Signed-off
2023-08-10Permit Plumbing — Signed-off
2023-08-07Job filed: Interior renovation to convert existing storage room to a new IT room and storage closet, including the addition of a wall, door, and relocation of ex$95,000
2023-07-27Job filed: THIS APPLICATION IS FILED TO PARTIALLY RENOVATE OFFICE SPACE ON THE 29TH FLOOR OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, $50,000
2023-07-26Certificate of occupancy Renewal Without Change
2023-07-17Permit General Construction — Signed-off
2023-07-14Permit Mechanical Systems — Signed-off
2023-07-13Job filed: Removal and installation on interior non-loadbearing partitions as shown on the drawings filed herewith. No change in use, egress, or occupancy.$163,323
2023-07-12Job filed: Modification of the mechanical system to install new ductwork and associated piping as shown on the drawings filed herewith. No change in use, egress,$23,500
2023-07-10311: Homeless Person Assistance
2023-07-09Job filed: Plumbing and Sprinkler work related to renovation of existing office. No change of use, occupancy or egress.. 25C/26M$62,185
2023-07-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-19Boiler inspection
2023-06-19Boiler inspection
2023-06-19Boiler inspection
2023-06-19Boiler inspection
2023-06-19Boiler inspection
2023-06-18311: Homeless Person Assistance
2023-06-16Restaurant inspection: BLUESTONE LANE — grade A
2023-05-11Permit General Construction — Signed-off
2023-05-11Permit Sprinklers — Signed-off
2023-05-09Job filed: Interior office renovations as shown on the drawings filed herewith. No change in use, egress, or occupancy.$1,826,153
2023-05-06Certificate of occupancy Renewal Without Change
2023-05-05Job filed: Modification of existing mechanical system to remove and install new ductwork and associated piping. No change in use, egress, or occupancy.$424,481
2023-05-05Job filed: Modification of existing sprinkler system to remove, relocate, and install new sprinkler heads. No change in use, egress, or occupancy.$130,490
2023-04-27311: Illegal Parking — Blocked Sidewalk
2023-04-27Permit Sprinklers — Signed-off
2023-04-24Job filed: SPRINKLER FILING IN CONJUNCTION WITH THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH . NO CHANGE TO USE EGRESS OR OCCUPANCY.$9,760
2023-04-06Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION; LEHMAN, J.F. to J.F. LEHMAN & COMPANY, LLC
2023-04-06Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION; LEHMAN, J.F. to J.F. LEHMAN & COMPANY, LLC
2023-04-06Agreement — from J.F. LEHMAN & COMPANY LLC to WELLS FARGO BANK, N.A.
2023-04-06Permit Mechanical Systems — Signed-off
2023-04-06Permit General Construction — Signed-off
2023-04-01311: Street Condition — Plate Condition - Shifted
2023-03-28Job filed: Renovation of third floor office space. Work to include the removal and installation of interior non-load bearing partitions and finishes. No change i$1,767,731
2023-03-27Job filed: Modification of existing sprinkler system to remove, relocate, and install new sprinkler heads. No change in use, egress, or occupancy.$70,400
2023-03-27Job filed: Modification of existing mechanical system to remove and install new ductwork and associated piping. No change in use, egress, or occupancy.$327,000
2023-03-02Job filed: Plumbing and Sprinkler work related to renovation of existing office. No change of use, occupancy or egress.. 25C/26M$62,185
2023-03-01Job filed: Mechanical work related to renovation of existing office. No change of use, occupancy or egress. 26C/27M$158,220
2023-02-15311: Street Condition — Pothole
2023-02-02Permit Plumbing — Signed-off
2023-01-30Cooling tower inspection
2022
2022-12-28Certificate of occupancy Renewal Without Change
2022-12-13Permit General Construction — Signed-off
2022-12-09ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT
2022-12-08Job filed: Interior office renovation. General construction work. No change of use, occupancy or egress.$228,000
2022-12-08Permit Mechanical Systems — Signed-off
2022-11-22Job filed: HOLIDAY EVENT, INDOOR. event will be catered with horsdoeuvres, food stations and beverage bars. Please note there will be absolutely no open flame co
2022-11-14FDNY inspection (RISK)
2022-11-07311: Consumer Complaint — Mobile Food Vendor
2022-11-01EASE — from ONE HUDSON YARDS OWNER LLC to THE CITY OF NEW YORK
2022-10-28Job filed: Sprinkler work related to renovation of existing office. No change of use, occupancy or egress$13,000
2022-10-12Certificate of occupancy Renewal Without Change
2022-09-20311: Consumer Complaint — Mobile Food Vendor
2022-07-15Certificate of occupancy Renewal Without Change
2022-07-14311: Homeless Person Assistance
2022-07-13Job filed: Renovation of existing office. Architectural work. No change of use, occupancy or egress.$699,300
2022-06-28311: Lost Property — Clothing/Glasses
2022-06-18311: Consumer Complaint — Mobile Food Vendor
2022-06-18311: Consumer Complaint — Mobile Food Vendor
2022-06-18311: Consumer Complaint — Mobile Food Vendor
2022-06-17Boiler inspection
2022-06-17Boiler inspection
2022-06-17Boiler inspection
2022-06-17Boiler inspection
2022-06-17Boiler inspection
2022-06-13311: Consumer Complaint — Mobile Food Vendor
2022-06-12311: Consumer Complaint — Mobile Food Vendor
2022-06-09311: Consumer Complaint — Mobile Food Vendor
2022-06-09311: Consumer Complaint — Mobile Food Vendor
2022-06-08311: Consumer Complaint — Mobile Food Vendor
2022-06-07311: Consumer Complaint — Mobile Food Vendor
2022-06-07311: Consumer Complaint — Mobile Food Vendor
2022-06-06311: Consumer Complaint — Mobile Food Vendor
2022-06-03311: Consumer Complaint — Mobile Food Vendor
2022-05-19311: Hazardous Materials — Oil Spill On Street, Large (HQL)
2022-05-13311: Consumer Complaint — Mobile Food Vendor
2022-05-11311: Consumer Complaint — Mobile Food Vendor
2022-05-08311: Consumer Complaint — Mobile Food Vendor
2022-05-04311: Consumer Complaint — Mobile Food Vendor
2022-05-04311: Consumer Complaint — Mobile Food Vendor
2022-05-03311: Consumer Complaint — Mobile Food Vendor
2022-05-02311: Mobile Food Vendor — Placement
2022-04-30311: Consumer Complaint — Mobile Food Vendor
2022-04-27Permit Plumbing — Signed-off
2022-04-27Permit Sprinklers — Signed-off
2022-04-27Certificate of occupancy Renewal Without Change
2022-04-26311: Illegal Parking — Blocked Hydrant
2022-04-25311: Consumer Complaint — Mobile Food Vendor
2022-04-21311: Consumer Complaint — Mobile Food Vendor
2022-04-20311: Consumer Complaint — Mobile Food Vendor
2022-04-19311: Consumer Complaint — Mobile Food Vendor
2022-04-18311: Consumer Complaint — Mobile Food Vendor
2022-04-15311: Consumer Complaint — Mobile Food Vendor
2022-04-14311: Consumer Complaint — Mobile Food Vendor
2022-04-14311: Consumer Complaint — Mobile Food Vendor
2022-04-13311: Consumer Complaint — Mobile Food Vendor
2022-04-13311: Consumer Complaint — Mobile Food Vendor
2022-04-12311: Consumer Complaint — Mobile Food Vendor
2022-04-12311: Consumer Complaint — Mobile Food Vendor
2022-04-12Permit Plumbing — Signed-off
2022-04-12Permit Sprinklers — Signed-off
2022-04-11311: Consumer Complaint — Mobile Food Vendor
2022-04-08311: Consumer Complaint — Mobile Food Vendor
2022-04-07311: Consumer Complaint — Mobile Food Vendor
2022-04-07311: Consumer Complaint — Mobile Food Vendor
2022-04-06311: Consumer Complaint — Mobile Food Vendor
2022-04-06311: Dirty Condition — Trash
2022-04-05311: Consumer Complaint — Mobile Food Vendor
2022-04-04311: Consumer Complaint — Mobile Food Vendor
2022-04-03311: Consumer Complaint — Mobile Food Vendor
2022-04-01311: Consumer Complaint — Mobile Food Vendor
2022-03-31311: Food Establishment — Letter Grading
2022-03-31311: Consumer Complaint — Mobile Food Vendor
2022-03-30311: Consumer Complaint — Mobile Food Vendor
2022-03-29311: Consumer Complaint — Mobile Food Vendor
2022-03-28311: Consumer Complaint — Mobile Food Vendor
2022-03-28311: Consumer Complaint — Mobile Food Vendor
2022-03-27311: Consumer Complaint — Mobile Food Vendor
2022-03-25311: Consumer Complaint — Mobile Food Vendor
2022-03-10311: Consumer Complaint — Mobile Food Vendor
2022-03-09311: Consumer Complaint — Mobile Food Vendor
2022-03-06311: Consumer Complaint — Mobile Food Vendor
2022-03-02311: Consumer Complaint — Mobile Food Vendor
2022-03-01311: Consumer Complaint — Mobile Food Vendor
2022-02-24311: Consumer Complaint — Mobile Food Vendor
2022-02-22311: Consumer Complaint — Mobile Food Vendor
2022-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2022-02-17Permit Plumbing — Signed-off
2022-02-11Job filed: Plumbing and Sprinkler work related to renovation of existing office. No change of use, occupancy or egress.. 25,26C/26,27M$62,185
2022-02-09FDNY inspection (RISK)
2022-02-09311: Consumer Complaint — Mobile Food Vendor
2022-02-07311: Mobile Food Vendor — Equipment
2022-02-01311: Non-Emergency Police Matter — Other (complaint details)
2022-02-01Permit Sprinklers — Signed-off
2022-02-01Permit Mechanical Systems — Signed-off
2022-02-01Job filed: MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING OFFICES AT THE 47TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.$26,000
2022-01-27Permit General Construction — Signed-off
2022-01-27Permit Sprinklers — Signed-off
2022-01-27Permit Mechanical Systems — Signed-off
2022-01-24Certificate of occupancy Renewal Without Change
2022-01-13Permit Sprinklers — Signed-off
2022-01-13Permit Sprinklers — Signed-off
2022-01-13Permit Plumbing — Signed-off
2022-01-10Job filed: Renovation of existing office. No change of use, occupancy or egress.$885,000
2022-01-06Job filed: Sprinkler work related to renovation of existing office. No change of use, occupancy or egress.$15,000
2022-01-06Job filed: Mechanical work related to renovation of existing office. No change of use, occupancy or egress$165,000
2021
2021-12-21Permit Mechanical Systems — Signed-off
2021-12-21Permit General Construction — Signed-off
2021-12-10Job filed: Duct work and piping per submitted plans.$65,750
2021-12-09Job filed: MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING OFFICES AT THE 47TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.$26,000
2021-12-09Job filed: SPRINKLER FILING IN CONJUNCTION WITH THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH . NO CHANGE TO USE EGRESS OR OCCUPANCY.$9,760
2021-12-09Job filed: PLUMBING FILING IN CONJUNCTION WITH THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$10,000
2021-12-09Permit General Construction — Signed-off
2021-12-06311: Consumer Complaint — Mobile Food Vendor
2021-12-06Job filed: Renovation of existing office. No change of use, occupancy or egress.$468,000
2021-12-01Job filed: Mechanical work related to renovation of existing office. No change of use, occupancy or egress.$57,000
2021-12-01Job filed: Sprinkler work related to renovation of existing office. No change of use, occupancy or egress$13,000
2021-11-30Job filed: FILING FOR THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.$121,667
2021-11-23Cooling tower inspection
2021-10-25Certificate of occupancy Renewal Without Change
2021-10-21Permit Plumbing — Signed-off
2021-10-21Permit Sprinklers — Signed-off
2021-10-17311: Consumer Complaint — Mobile Food Vendor
2021-10-09311: Mobile Food Vendor — Food Source/Protection
2021-10-08311: Consumer Complaint — Mobile Food Vendor
2021-10-01Job filed: Renovation of existing offices. No change of use, occupancy or egress.$404,310
2021-09-30Permit General Construction — Signed-off
2021-09-29Permit General Construction — Signed-off
2021-09-29Permit Mechanical Systems — Signed-off
2021-09-28Job filed: Duct work and piping per submitted plans.$65,750
2021-09-27Job filed: Installation of new plumbing, sprinkler work for tenant fit-out on 21st (22nd marketing floor). New domestic & sanitary work to connect to existing sy$50,500
2021-09-25311: Illegal Parking — Detached Trailer
2021-09-24Job filed: Renovation of existing offices. No change of use, occupancy or egress.$16,800
2021-09-23311: Consumer Complaint — Mobile Food Vendor
2021-09-22311: Consumer Complaint — Mobile Food Vendor
2021-07-16311: Consumer Complaint — Mobile Food Vendor
2021-07-15311: Consumer Complaint — Mobile Food Vendor
2021-07-14311: Consumer Complaint — Mobile Food Vendor
2021-07-13311: Consumer Complaint — Mobile Food Vendor
2021-07-12311: Consumer Complaint — Mobile Food Vendor
2021-07-12Permit Sprinklers — Signed-off
2021-07-09Permit General Construction — Signed-off
2021-07-09Job filed: FILING FOR THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.$121,667
2021-07-08Job filed: PLUMBING FILING IN CONJUNCTION WITH THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$10,000
2021-07-08Job filed: SPRINKLER FILING IN CONJUNCTION WITH THE RENOVATION OF INTERIOR LAYOUT AT THE 47TH . NO CHANGE TO USE EGRESS OR OCCUPANCY.$9,760
2021-07-08Job filed: MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING OFFICES AT THE 47TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.$26,000
2021-07-06311: Consumer Complaint — Mobile Food Vendor
2021-07-02311: Consumer Complaint — Mobile Food Vendor
2021-07-01311: Consumer Complaint — Mobile Food Vendor
2021-06-30311: Consumer Complaint — Mobile Food Vendor
2021-06-29311: Consumer Complaint — Mobile Food Vendor
2021-06-29Job filed: Renovation of existing offices. No change of use, occupancy or egress.$404,310
2021-06-29Job filed: Renovation of existing offices. Mechanical work. No change of use, occupancy or egress.$41,968
2021-06-29Job filed: Renovation of existing offices. Sprinkler work. No change of use, occupancy or egress.$17,354
2021-06-28311: Consumer Complaint — Mobile Food Vendor
2021-06-24311: Consumer Complaint — Mobile Food Vendor
2021-06-23311: Consumer Complaint — Mobile Food Vendor
2021-06-23Permit Sprinklers — Signed-off
2021-06-23Permit Plumbing — Signed-off
2021-06-22311: Consumer Complaint — Mobile Food Vendor
2021-06-21311: Consumer Complaint — Mobile Food Vendor
2021-06-18311: Traffic — Congestion/Gridlock
2021-06-17311: Consumer Complaint — Mobile Food Vendor
2021-06-16311: Consumer Complaint — Mobile Food Vendor
2021-06-14Job filed: Renovation of existing offices. No change of use, occupancy or egress.$100,000
2021-06-11311: Consumer Complaint — Mobile Food Vendor
2021-06-11311: Consumer Complaint — Mobile Food Vendor
2021-06-11311: Mobile Food Vendor — Placement
2021-06-11Job filed: Plumbing work related to office renovation. No change of use, occupancy or egress.$20,000
2021-06-11Permit General Construction — Signed-off
2021-06-10311: Consumer Complaint — Mobile Food Vendor
2021-06-08Boiler inspection
2021-06-08Boiler inspection
2021-06-08Boiler inspection
2021-06-08Boiler inspection
2021-06-08Boiler inspection
2021-06-07Permit Sprinklers — Signed-off
2021-06-07Permit Plumbing — Signed-off
2021-06-04311: Noise - Helicopter — Other
2021-05-26Permit Mechanical Systems — Signed-off
2021-05-25Job filed: Renovation of existing offices. Architectural work. No change of use, occupancy or egress$665,716
2021-05-21Job filed: Renovation of existing offices. Sprinkler and plumbing work. No change of use, occupancy or egress$160,600
2021-05-21Job filed: Renovation of existing offices. Mechanical work. No change of use, occupancy or egress$128,340
2021-04-27Permit General Construction — Signed-off
2021-04-20Job filed: THIS APPLICATION IS FILED TO PARTIALLY RENOVATE OFFICE SPACE ON THE 29TH FLOOR OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$50,000
2020-08-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-17Permit EW — ISSUED
2020-08-12Certificate of occupancy Temporary
2020-07-29311: COVID-19 Non-essential Construction — Construction
2020-07-29Permit AL — ISSUED
2020-07-29Permit AL — ISSUED
2020-07-29DOB complaint, category ?
2020-07-28311: Elevator — Elevator - Multiple Devices On Property
2020-07-28DOB complaint, category ?
2020-07-12311: Homeless Person Assistance — N/A
2020-07-08311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-06Permit EW — ISSUED
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-06-25Boiler inspection
2020-06-12Permit EW — ISSUED
2020-05-28Job filed: STRUCTURAL WORK RELATED TO RENOVATION OF COMMERCIAL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2020-05-26311: Homeless Person Assistance — N/A
2020-05-18Job filed: RENOVATION OF COMMERCIAL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$555,551
2020-05-17311: Homeless Person Assistance — N/A
2020-05-08Job filed: PAA filed to remove 1MZ from scope of work as per plans.$195,898
2020-05-05Certificate of occupancy Temporary
2020-04-16Certificate of occupancy Temporary
2020-03-31311: Non-Emergency Police Matter — Social Distancing
2020-03-12Permit Mechanical Systems — Signed-off
2020-03-11Permit Plumbing — Signed-off
2020-03-11Permit Sprinklers — Signed-off
2020-03-09Permit Plumbing — Signed-off
2020-03-09Permit Sprinklers — Signed-off
2020-03-06Job filed: MINOR ARCHITECTURAL CHANGES AND MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2020-03-06Job filed: MINOR ARCHITECTURAL CHANGES AND MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2020-03-06Certificate of occupancy Temporary
2020-03-05Job filed: Modify sprinkler system as shown on plans.$115,280
2020-03-04Job filed: Installation of new plumbing, sprinkler work for tenant fit-out on 21st (22nd marketing floor). New domestic & sanitary work to connect to existing sy$50,500
2020-03-04Job filed: Duct work and piping per submitted plans.$65,750
2020-03-04Job filed: New installation of plumbing fixtures and related piping as shown on plans.$193,310
2020-03-02Permit Mechanical Systems — Signed-off
2020-02-26Job filed: Point 72: Standpipe work in conjunction with Interior build out of office spaces$1,000
2020-02-19AALR — from WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN AMERICAN CAPITAL CORPORATION; MORGAN STANLE to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2020-02-19Mortgage assigned — from MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS; WELLS FARGO BANK, NATIONAL ASSOCIATION; GERMAN A to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2020-02-19AALR — from DBR INVESTMENTS CO. LIMITED to GERMAN AMERICAN CAPITAL CORPORATION
2020-02-19Mortgage assigned — from DBR INVESTMENTS CO. LIMITED to GERMAN AMERICAN CAPITAL CORPORATION
2020-02-19AALR — from MORGAN STANLEY BANK, N.A to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2020-02-19Mortgage assigned — from MORGAN STANLEY BANK, N.A to MORGAN STANLEY MORTGAGE CAPITAL HOLDINGS
2020-02-18311: Food Establishment — Allergy Information
2020-02-14Job filed: Tenant fit out. Mechanical work in conjunction with Interior build out of office spaces.$2,160,000
2020-02-14Permit Plumbing — Signed-off
2020-02-14Permit Plumbing — Signed-off
2020-02-14Permit Sprinklers — Signed-off
2020-02-14Job filed: Tenant fit out. Plumbing, Sprinkler and Standpipe work in conjunction with Interior build out of office spaces.$1,055,003
2020-02-10311: Street Condition — Wear & Tear
2020-02-07Job filed: SUITE B&C. GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$385,000
2020-02-07Job filed: SUITE B&C. GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$385,000
2020-02-06Permit Plumbing — Signed-off
2020-02-06Permit Sprinklers — Signed-off
2020-01-31Job filed: Elite Model World; Mechanical work in conjunction with general construction of office spaces$999,550
2020-01-30Job filed: POINT72: 12TH FLOOR RESTROOM ADDITION. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$76,154
2020-01-30Job filed: POINT72: 12TH FLOOR RESTROOM ADDITION. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$76,154
2020-01-30Job filed: POINT72: 12TH FLOOR RESTROOM ADDITION. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$76,154
2020-01-30Permit Sprinklers — Signed-off
2020-01-28Job filed: Elite Model World; Plumbing and Sprinkler work in conjunction with general construction of office spaces$259,851
2020-01-28Certificate of occupancy Temporary
2020-01-10Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to ONE HUDSON YARDS OWNER LLC; FACEBOOK, INC
2020-01-10MLEA — from ONE HUDSON YARDS OWNER LLC to FACEBOOK, INC
2020-01-08Job filed: Point 72: Plumbing and Sprinkler work in conjunction with Interior build out of office spaces$235,000
2020-01-07311: Street Sign - Damaged — No Parking, Standing, Stopping
2020-01-07Permit Sprinklers — Signed-off
2020-01-07Permit Plumbing — Signed-off
2020-01-06Permit NB — ISSUED
2020-01-06Job filed: Point 72: Mechanical work in conjunction with Interior build out of office spaces$655,000
2020-01-03Certificate of occupancy Temporary
2019
2019-12-27311: Elevator — Elevator - Multiple Devices On Property
2019-12-27ECB CLASS - 2 violation: 2X10/98U7/99U7-(2X10)IN CAR PHONE INOPERATIVE(99U7)MISSING CURRENT ONEYEAR TEST TAG IN MACHINE ROOM(98U7)MISSING CURRENT FIVE YEAR$1,562
2019-12-27DOB complaint, category ?
2019-12-27DOB complaint, category ?
2019-12-26Certificate of occupancy Temporary
2019-12-24Permit Sprinklers — Signed-off
2019-12-24Permit Standpipe — Signed-off
2019-12-24Permit Plumbing — Signed-off
2019-12-20Permit EW — ISSUED
2019-12-20Permit EW — ISSUED
2019-12-20Permit EW — ISSUED
2019-12-20Permit EW — ISSUED
2019-12-20Permit NB — ISSUED
2019-12-12Permit EW — ISSUED
2019-12-06Certificate of occupancy Temporary
2019-12-05Cooling tower inspection
2019-12-04Job filed: POINT 72: INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,200,000
2019-12-04Job filed: POINT 72: INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,200,000
2019-12-03Agreement — from MORGAN STANLLEY BANK, N.A.; WELLS FARGO BANK, NATIONAL ASSOCIATION; DBR INVESTMENTS CO. LI to ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2019-12-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION; MORGAN STANLLEY BANK, N.A.; WELLS FARGO BANK, NAT to ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2019-12-03MLEA — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to ONE HUDSON YARDS OWNER LLC
2019-12-03AL&R $1,245,000,000 — from ONE HUDSON YARDS OWNER LLC to DBR INVESTMENTS CO. LIMITED; WELLS FARGO BANK, NATIONAL ASSOCIATION; MORGAN STANLEY BANK, $1,245,000,000
2019-12-03Mortgage $1,245,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPEMENT AG to DBR INVESTMENTS CO. LIMITED; WELLS FARGO BANK, NATIONAL ASSOCIATION; MORGAN STANLEY BANK, $1,245,000,000
2019-12-03Permit AL — ISSUED
2019-11-21Job filed: This is a Corporate Holiday Party for Point72. There will be food and beverages served.
2019-11-20311: Illegal Parking — Blocked Hydrant
2019-11-20Job filed: Mechanical work as shown on plans$44,666
2019-11-20Job filed: Modify sprinkler system as shown on plans.$115,280
2019-11-20Job filed: New installation of plumbing fixtures and related piping as shown on plans.$193,310
2019-11-20Permit Standpipe — Signed-off
2019-11-20Permit Plumbing — Signed-off
2019-11-20Permit Sprinklers — Signed-off
2019-11-14Permit EW — ISSUED
2019-11-08Permit PL — ISSUED
2019-11-04Permit Mechanical Systems — Signed-off
2019-11-01Permit Plumbing — Signed-off
2019-11-01Permit Sprinklers — Signed-off
2019-10-31Job filed: APPLICATION FILED FOR NON-STRUCTURAL INTERIOR DEMOLITION AND GENERAL CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. 15TH FLOOR CONSTRUCTION/16TH FLOOR$75,073
2019-10-30Job filed: Tenant fit out. Mechanical work in conjunction with Interior build out of office spaces.$2,160,000
2019-10-30Job filed: FILING FOR OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH APPLICATION 123746143 & M00239053$1,000
2019-10-30Permit Sprinklers — Signed-off
2019-10-30Permit Standpipe — Signed-off
2019-10-30Permit Plumbing — Signed-off
2019-10-24311: Taxi Complaint — Driver Complaint - Non Passenger
2019-10-24Permit EW — ISSUED
2019-10-23Permit EW — ISSUED
2019-10-23Permit Mechanical Systems — Signed-off
2019-10-22Permit EW — ISSUED
2019-10-22Permit EW — ISSUED
2019-10-22Job filed: Tenant fit out. Plumbing, Sprinkler and Standpipe work in conjunction with Interior build out of office spaces.$1,055,003
2019-10-16Job filed: Elite Model World; Mechanical work in conjunction with general construction of office spaces$999,550
2019-10-16Job filed: Elite Model World; Plumbing and Sprinkler work in conjunction with general construction of office spaces$259,851
2019-10-11Job filed: FILING FOR OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH APPLICATIONS #123693752, M00202516, M00202438 AS SHOWN ON DRAWINGS FILED HEREWITH.$1,000
2019-10-11Job filed: FILING FOR OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH APPLICATIONS #123693752, M00202516, M00202438 AS SHOWN ON DRAWINGS FILED HEREWITH.$1,000
2019-10-11Job filed: FILING FOR OCCUPANT PROTECTION PLAN IN CONJUNCTION WITH APPLICATIONS #123693752, M00202516, M00202438 AS SHOWN ON DRAWINGS FILED HEREWITH.$1,000
2019-10-11Permit Mechanical Systems — Signed-off
2019-10-08EASE — from ONE HUDSON YARDS OWNER LLC to ERY TENANT LLC
2019-10-08Rodent inspection: Passed
2019-10-07Permit EW — ISSUED
2019-10-07Job filed: MODIFY DUCTWORK AND INSTALL AC UNITS AS PER PLANS$120,000
2019-10-07Permit EW — ISSUED
2019-10-04Permit EW — ISSUED
2019-10-01311: Consumer Complaint — Retail Store
2019-10-01Permit NB — ISSUED
2019-09-25Job filed: TENNANT FIT OUT. INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000,000
2019-09-23311: Elevator — Elevator - Multiple Devices On Property
2019-09-23Job filed: ELITE MODEL WORLD; GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,050,750
2019-09-23Job filed: ELITE MODEL WORLD; GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,050,750
2019-09-23DOB complaint, category ?
2019-09-20311: Sidewalk Condition — Blocked - Construction
2019-09-19Job filed: DEMOLISH AND CONSTRUCT PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2019-09-19Job filed: DEMOLISH AND CONSTRUCT PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2019-09-19Permit Sprinklers — Signed-off
2019-09-19Permit Plumbing — Signed-off
2019-09-17Certificate of occupancy Temporary
2019-09-04Job filed: Office party, standing room only with some high top tables.
2019-08-30Permit Mechanical Systems — Signed-off
2019-08-30Certificate of occupancy Temporary
2019-08-28Permit EW — ISSUED
2019-08-26311: Street Sign - Dangling — Other/Unknown
2019-08-21Permit PL — ISSUED
2019-08-21Job filed: POINT 72: MECHANICAL WORK IN CONJUNCTION WITH BATHROOM INSTALLATION$10,000
2019-08-21Certificate of occupancy Temporary
2019-08-20Permit EW — ISSUED
2019-08-20Job filed: POINT 72: PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH BATHROOM INSTALLATION$72,000
2019-08-15311: Vending — In Prohibited Area
2019-08-15311: Illegal Parking — Blocked Hydrant
2019-08-15Permit EW — ISSUED
2019-08-15Permit EW — ISSUED
2019-08-15Permit EW — ISSUED
2019-08-15Permit EW — ISSUED
2019-08-15Permit EW — ISSUED
2019-08-15Permit EW — ISSUED
2019-08-14Permit EW — ISSUED
2019-08-14Permit EW — ISSUED
2019-08-14Job filed: POINT 72: BATHROOM INSTALLATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$80,000
2019-08-08311: Street Sign - Missing — No Parking, Standing, Stopping
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-07-05311: Homeless Person Assistance — N/A
2019-07-03Permit EW — ISSUED
2019-07-01311: Illegal Parking — Blocked Sidewalk
2019-06-27Job filed: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$166,250
2019-06-27Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES$603,000
2019-06-27Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,700,000
2019-06-27Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES$603,000
2019-06-27Permit EW — RE-ISSUED
2019-06-27Permit EW — ISSUED
2019-06-26Permit EW — ISSUED
2019-06-26Permit EW — ISSUED
2019-06-21Permit EW — ISSUED
2019-06-18Job filed: Cocktail reception for clients
2019-06-17Permit PL — ISSUED
2019-06-17Permit PL — ISSUED
2019-06-17Permit EW — ISSUED
2019-06-14Permit EW — ISSUED
2019-06-14Permit EW — ISSUED
2019-06-14Job filed: COOLEY SUBTENANT: INTERIOR FIT OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$125,000
2019-06-14Job filed: COOLEY SUBTENANT: MECHANICAL WORK IN CONJUNCTION WITH INTERIOR FIT OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $25,000
2019-06-14Job filed: COOLEY SUBTENANT: SPRINKLER WORK RELATED TO INTERIOR FIT OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN$10,000
2019-06-07Job filed: Employee training/orientation for new joining staff. Orientation, classroom style chairs with stage and projector. Tables for registration and docume
2019-06-04Permit PL — ISSUED
2019-06-03Permit EW — ISSUED
2019-06-03Permit EW — ISSUED
2019-06-03Permit EW — ISSUED
2019-06-03Permit EW — ISSUED
2019-06-03Job filed: FILING FOR TENANT PROTECTION PLAN IN CONJUNCTION WITH APPLICATIONS #123424428 AS SHOWN ON DRAWINGS FILED HEREWITH.$1,000
2019-06-03Permit NB — ISSUED
2019-05-30Job filed: INTERN EVENT, INDOOR. event will be catered with horsdoeuvres, food stations and beverage bars. Please note there will be absolutely no open flame coo
2019-05-30Job filed: PRE BUILD. SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES PRE BUILD. SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES$166,250
2019-05-29Permit EW — ISSUED
2019-05-29Certificate of occupancy Temporary
2019-05-28Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON FLOOR 22 CONSTRUCTION /23RD FLOOR MARKETING$116,000
2019-05-28Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON FLOOR 22 CONSTRUCTION /23RD FLOOR MARKETING$116,000
2019-05-21Permit NB — ISSUED
2019-05-16Job filed: SPRINKLER WORK IN CONJUCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$223,000
2019-05-15Job filed: VISTA: GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,700,000
2019-05-15Job filed: VISTA: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, E$1,260,500
2019-05-15Job filed: VISTA: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, E$1,260,500
2019-05-14Certificate of occupancy Temporary
2019-05-10Job filed: PRE BUILD. MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN US$603,000
2019-05-10Job filed: PRE BUILD. GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$1,700,000
2019-05-03Job filed: 10TH FLOOR EXTERIOR. ARCHITECTURAL WORK RELATED TO THE OUTDOOR TERRACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,100,000
2019-05-03Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON FLOOR 46 CONSTRUCTION /47 MARKETING$15,000
2019-05-02Certificate of occupancy Temporary
2019-05-01311: Construction Safety Enforcement — CSC - Scaffolding
2019-04-30Permit EQ — ISSUED
2019-04-25Certificate of occupancy Temporary
2019-04-22Permit EW — ISSUED
2019-04-22Permit EW — ISSUED
2019-04-22Permit EW — ISSUED
2019-04-19311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-19311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-19311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-19311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-19311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-19Job filed: FILING FOR TENANT PROTECTION PLAN IN CONJUNCTION WITH APPLICATIONS #123424400, 123185132, 123424393, 123360424, 123360433, 123360451, 123360442, 12318$1,000
2019-04-19DOB complaint, category ?
2019-04-19DOB complaint, category ?
2019-04-19DOB complaint, category ?
2019-04-19DOB complaint, category ?
2019-04-19DOB complaint, category ?
2019-04-18Permit PL — ISSUED
2019-04-18Job filed: BSF ASHURST: STRUCTURAL WORK ASSOCIATED WITH CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
2019-04-18Job filed: BSF ASHURST: MECHANICAL AND PLUMBING WORK ASSOCIATED WITH CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $154,000
2019-04-18Job filed: BSF ASHURST: GENERAL CONSTRUCTION OF OFFICE SPACES. ARCHITECTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$860,000
2019-04-17ECB CLASS - 1 violation: BC 3303.10 OPERATIONS IN OCCUPIED @ TIME OF INSP ON AN ACTIVE JOB SITE.IT WAS OBSERVED WORKERS WORKING IN CONJUNTION WITH TENANTS $2,500
2019-04-17ECB CLASS - 1 violation: BC-3303.10 OPERATIONS IN OCCUPIED BLDGS. @ TIME OF INSP ON AN ACTIVE JOB SITE. IT WAS OBSERVED CONSTRUCTION OPERATIONS ON THE 12 F$2,500
2019-04-17ECB CLASS - 1 violation: SEC. 3310.8.4.1 RECORDING INSPECTIONS IN THE SITE SAFETY LOG. AT TIME OF INSPECTION ON A ACTIVE JOBSITE W/MULTIPLE ALT-2 PERMITS(7
2019-04-17ECB CLASS - 1 violation: SEC. 3301.7 DOCUMENTS TO BE KEPT ON SITE-SITE SAFETY MANAGER AT MULTIPLE PERMITS. NO CCD1 OR OTHER FORM APPROVED BY THE DEPT. AT T$2,500
2019-04-17ECB CLASS - 1 violation: BC 3303.10 OPERATIONS IN OCCUPIED BLDGS @ TIME OF INSP ON AN ACTIVE JOB SITE IT WAS OBSERVED CONSTRUCTION OPERATIONS ON THE 5TH FL$2,500
2019-04-17ECB CLASS - 1 violation: SEC. 3303.7.2 FIRE EXTINGUISHERS. AT TIME OF INSPECTION ON A ACTIVE JOBSITE ON THE 12 FLOOR ACTIVE CONSTRUCTION OPERATIONS FOR FRA$2,500
2019-04-17ECB CLASS - 1 violation: BC-3303.10 OPERATIONS IN OCCUPIED BLDGS. @ TIME OF INSP ON AN ACTIVE JOB SITE IT WAS OBSERVED WORKERS WORKING ON SET BACK BALCONY $2,500
2019-04-17ECB CLASS - 1 violation: SEC. 3303.10 OPERATIONS IN OCCUPIED BLDGS. AT TIME OF INSPECTION ON A ACTIVE JOBSITE,WHERE PERMIT WAS ISSUED FOR MULTIPLE FLOORS,&$2,500
2019-04-17ECB CLASS - 1 violation: SEC. 3303.7.2 FIRE EXTINGUISHERS. AT TIME OF INSPECTION ON A ACTIVE JOBSITE ON THE 10 FLOOR W/.CONJUNCTION W/11 FLOOR,ACTIVE CONST$2,500
2019-04-16Job filed: BSF ASHURST: MODIFICATION OF SPRINKLER WORK ASSOCIATED WITH CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$35,000
2019-04-16Job filed: ADDITIONS/MODIFICATION OF FIRE ALARM WORK SYSTEM FOR CONSTRUCTION FLOOR 17 (18TH MARKETING).$10,000
2019-04-12Permit EW — ISSUED
2019-04-12Permit EW — ISSUED
2019-04-12Job filed: event will be catered with horsdoeuvres, food stations and beverage bars on the east side of the floor. Please note there will be absolutely no openfl
2019-04-10ECB CLASS - 2 violation: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. PARTIAL STOP WORK EXPOSURE#4 ALL EXTERIOR WORK 11 AVE. NOTE AT TIME OF IN
2019-04-10DOB complaint, category ?
2019-04-09Certificate of occupancy Temporary
2019-04-08Rodent inspection: Passed
2019-04-04311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-04-04DOB complaint, category ?
2019-03-27Permit EW — ISSUED
2019-03-27Permit EW — ISSUED
2019-03-27Permit EW — ISSUED
2019-03-26311: Street Condition — Pothole
2019-03-22Certificate of occupancy Temporary
2019-03-19Permit EW — ISSUED
2019-03-15Certificate of occupancy Temporary
2019-03-13Job filed: POINT 72: SPRINKLER WORK RELATED TO INTERIOR BUILD OUT OF OFFICE SPACES$100,000
2019-03-13Job filed: INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,100,000
2019-03-13Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR BUILD OUT OF OFFICE SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$730,000
2019-03-13Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$50,000
2019-03-04Permit PL — ISSUED
2019-02-27Certificate of occupancy Temporary
2019-02-25Permit PL — ISSUED
2019-02-22311: Street Condition — Failed Street Repair
2019-02-19Permit EW — ISSUED
2019-02-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-02-13Permit EW — ISSUED
2019-02-13DOB complaint, category ?
2019-02-09311: Construction Safety Enforcement — CSE - Sweep
2019-02-09DOB complaint, category ?
2019-02-07Certificate of occupancy Temporary
2019-02-05Permit EW — ISSUED
2019-02-05Permit EW — ISSUED
2019-02-04Permit PL — ISSUED
2019-02-04Job filed: 19_098-Fashion show for the Proenza Schouler brand on the 22nd floor. For invited guests only.
2019-01-30Certificate of occupancy Temporary
2019-01-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-01-23DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-01-23Certificate of occupancy Temporary
2019-01-16Permit EW — ISSUED
2019-01-16Permit EW — ISSUED
2019-01-16Permit EW — ISSUED
2019-01-16Permit EW — ISSUED
2019-01-15Permit EW — ISSUED
2019-01-15Permit EW — ISSUED
2019-01-15Permit EW — ISSUED
2019-01-09311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-01-09DOB complaint, category ?
2019-01-08Job filed: This event is to be hosted by Related Hudson Yards Management Company as a year-end celebration.
2019-01-08Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$50,000
2019-01-08Permit Supported Scaffold — Signed-off
2019-01-08Permit EW — ISSUED
2019-01-08Permit EW — ISSUED
2019-01-08Permit EW — ISSUED
2019-01-07Job filed: FILING FOR TENANT PROTECTION PLAN WITH NEW BUILDING APPLICATION #121184841, CHANGE IN EGRESS, NO CHANGE TO USE, OR OCCUPANCY$5,000
2019-01-07Permit PL — ISSUED
2019-01-04Permit EW — ISSUED
2019-01-04Permit EW — ISSUED
2019-01-03Permit EW — ISSUED
2019-01-03Permit EW — ISSUED
2019-01-03Permit EW — ISSUED
2019-01-02Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. FENCE SHALL BE INSTALLED ON SIDEWALK/ROADWAY. DOT PERMITS BY OTHERS. PLYWOOD FENCE SHALL COMPLY WITH C$32,000
2018-12-17Job filed: MOUNT SINAI: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR FIT OUT OF COMMERCIAL SPACE$550,000
2018-12-17Job filed: MOUNT SINAI: INTERIOR FIT OUT OF COMMERCIAL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,653,500
2018-12-17Job filed: MOUNT SINAI: STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR FIT OUT OF COMMERCIAL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR$30,000
2018-12-17Job filed: MOUNT SINAI: INTERIOR FIT OUT OF COMMERCIAL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,653,500
2018-12-17Job filed: MOUNT SINAI: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR FIT OUT OF COMMERCIAL SPACE$550,000
2018-12-14Permit Construction Fence — Signed-off
2018-12-14Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$50,000
2018-12-14ECB CLASS - 2 violation: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35244333R ISSUED ON 10/23/18 AND TO FILE A CERTIFI
2018-12-13Job filed: INSTALLATION OF NEW FIRE ALARM SYSTEM$1,000
2018-12-13Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
2018-12-13Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
2018-12-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-12-11DOB complaint, category ?
2018-12-05Permit NB — ISSUED
2018-12-03311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-12-03ECB CLASS - 2 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES AND TEMPORARY CONSTRUCTION EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION RESPOND
2018-12-03ECB CLASS - 1 violation: INSPECTION. NOTE: AT THE TIME OF MY INSPECTION RESPONDING TO COMPLAINT# 1496231 WHERE A WORKER WAS USING AN EQUIPMENT (SCISSOR LIF$625
2018-12-03DOB complaint, category ?
2018-11-27Job filed: POINT 72: INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$173,000
2018-11-27Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$10,000
2018-11-27Job filed: POINT 72: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, $232,000
2018-11-27Job filed: POINT 72: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, $232,000
2018-11-26Permit PL — ISSUED
2018-11-15Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR E$32,000
2018-11-15Permit Construction Fence — Signed-off
2018-11-12Permit Sidewalk Shed — Signed-off
2018-11-12Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BU$102,000
2018-11-07Job filed: FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR AND RELATED FUEL STORAGE PIPING AND TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CO$2,000
2018-11-07Job filed: FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR AND RELATED FUEL STORAGE PIPING AND TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CO$2,000
2018-11-02Permit EW — RE-ISSUED
2018-11-02Permit EW — RE-ISSUED
2018-11-02Permit EW — ISSUED
2018-11-02Permit EW — RE-ISSUED
2018-11-01Permit PL — ISSUED
2018-11-01Permit PL — ISSUED
2018-10-31DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-10-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2018-10-26Permit EW — ISSUED
2018-10-26DOB complaint, category ?
2018-10-25Permit NB — RE-ISSUED
2018-10-25Permit EW — ISSUED
2018-10-25Permit EW — ISSUED
2018-10-24ECB CLASS - 1 violation: 3314.6.2 TEMPORARY CONSTRUCTION DOES NOT MEET CODE SPECIFICATION.NOTE:@TIME OF INSPECTION I OBSERVED ELECTRIC CABLES NOT PROTECTED
2018-10-24ECB CLASS - 2 violation: FAILED TO NOTIFY DEPT. PRIOR TO INSTALLATION OR REMOVAL OF SUSPENDED SCAFFOLD.PARTIAL STOP WORK ORDER FOR ALL SUSPENDED SCAFFOLDIN$1,250
2018-10-23311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2018-10-23Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR REACTION SPRINKLER ON THE 49TH FL (CONSTRUCTION) THAT CORRESPONDS TO MARKETING 50TH FL AS SHOWN O$30,000
2018-10-23Permit EW — ISSUED
2018-10-23Permit EW — ISSUED
2018-10-23ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: WHILE WORKING ON A HANGING SCAFFOLDING (A
2018-10-23DOB complaint, category ?
2018-10-22Permit PL — ISSUED
2018-10-19Permit PL — ISSUED
2018-10-17311: Sidewalk Condition — Blocked - Construction
2018-10-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-10-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-10-17DOB complaint, category ?
2018-10-17DOB complaint, category ?
2018-10-15Permit PL — ISSUED
2018-10-15Permit PL — ISSUED
2018-10-12Permit EW — ISSUED
2018-10-12Permit EW — ISSUED
2018-10-12Permit EW — ISSUED
2018-10-11Job filed: NOKOTA. SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$83,125
2018-10-10Job filed: PA
2018-10-05Permit EW — ISSUED
2018-10-05Job filed: NOKOTA: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON FLOOR 26 (CONSTRUCTION), 27 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH.$7,500
2018-10-05Job filed: NOKOTA. GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$850,000
2018-10-05Job filed: NOKOTA. MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, $301,500
2018-10-04Permit EW — ISSUED
2018-10-03Permit EW — ISSUED
2018-10-03Permit EW — ISSUED
2018-10-03Permit EW — ISSUED
2018-10-02Permit EW — ISSUED
2018-10-02Permit EW — ISSUED
2018-09-28311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-09-28Permit EW — ISSUED
2018-09-28DOB complaint, category ?
2018-09-25Permit EW — ISSUED
2018-09-25Permit EW — ISSUED
2018-09-25Permit EW — ISSUED
2018-09-25Permit EW — ISSUED
2018-09-24Permit EW — ISSUED
2018-09-24Permit EW — ISSUED
2018-09-19311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-09-19DOB complaint, category ?
2018-09-18Job filed: STONEPEAK: SPRINKLER WORK RELATED TO INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$140,000
2018-09-18Job filed: STONEPEAK: SPRINKLER WORK RELATED TO INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$140,000
2018-09-18Permit EQ — ISSUED
2018-09-14Job filed: MODIFY DUCTWORK AND INSTALL AC UNIT .INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,450,000
2018-09-14Job filed: STONEPEAK: MECHANICAL AND PLUMBING WORK RELATED TO INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$1,375,000
2018-09-14Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO EGRESS OR OCCUPANCY NOTE: CONSTRUCTION FLOORS: 48,49,50 CO$300,000
2018-09-14Job filed: STONEPEAK: MECHANICAL AND PLUMBING WORK RELATED TO INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$1,375,000
2018-09-14Permit PL — ISSUED
2018-09-14Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO EGRESS OR OCCUPANCY NOTE: CONSTRUCTION FLOORS: 48,49,50 CO$300,000
2018-09-14Job filed: DEMOLISH AND CONSTRUCT PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$21,000,000
2018-09-14Job filed: STRUCTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$160,000
2018-09-14Job filed: STONEPEAK: INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,530,000
2018-09-14Job filed: INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$779,900
2018-09-14Job filed: DEMOLISH AND CONSTRUCT PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$21,000,000
2018-09-14Job filed: MODIFY DUCTWORK AND INSTALL AC UNIT .INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,450,000
2018-09-14Job filed: INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$779,900
2018-09-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-09-13Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON 47TH CONSTRUCTION FLOOR/48TH MARKETING FLOOR.$60,000
2018-09-13DOB complaint, category ?
2018-09-12Job filed: COGNIZANT: STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR BUILD OUT OF OFFICES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$140,655
2018-09-12Job filed: COGNIZANT: SPRINKLER WORK RELATED TO INTERIOR BUILD OUT OF OFFICES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$260,152
2018-09-12Job filed: COGNIZANT: FILING FOR INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,571,000
2018-09-12Job filed: COGNIZANT: FILING FOR INTERIOR BUILD OUT OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,571,000
2018-09-12Permit EW — ISSUED
2018-09-12Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 25TH & 26TH CO NSTRUCTION FLOORS/26TH & 27TH MARKETING FLOORS$97,752
2018-09-12Job filed: COGNIZANT: SPRINKLER WORK RELATED TO INTERIOR BUILD OUT OF OFFICES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$260,152
2018-09-12Job filed: COGNIZANT: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH INTERIOR BUILD OUT OF OFFICES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$1,855,369
2018-09-12Job filed: FILING FOR A TEMPORARY CONSTRUCTION OFFICE AT THIRD LEVEL IN CONJUNCTION WITH NEW BUILDING APPLICATION #121184841, CHANGE IN EGRESS, NO CHANGE IN USE $5,000
2018-09-11Job filed: FILING FOR A TEMPORARY CONSTRUCTION OFFICE AT GROUND LEVEL IN CONJUNCTION WITH NEW BUILDING APPLICATION #121184841, CHANGE IN EGRESS, NO CHANGE IN USE$5,000
2018-09-11Permit EW — ISSUED
2018-09-11Job filed: FILING FOR A TEMPORARY CONSTRUCTION OFFICE AT GROUND LEVEL IN CONJUNCTION WITH NEW BUILDING APPLICATION #121184841, CHANGE IN EGRESS, NO CHANGE IN USE$5,000
2018-09-11Permit EW — ISSUED
2018-09-11Permit EW — ISSUED
2018-09-08Permit EQ — ISSUED
2018-09-08Permit EQ — ISSUED
2018-09-08Permit EQ — ISSUED
2018-09-08Permit EQ — ISSUED
2018-09-08Permit EQ — ISSUED
2018-09-07Permit EQ — ISSUED
2018-09-07Permit EQ — ISSUED
2018-09-07Permit EW — ISSUED
2018-09-07Permit EQ — ISSUED
2018-09-07Permit EQ — ISSUED
2018-08-30Job filed: FILING FOR TENANT PROTECTION PLAN WITH NEW BUILDING APPLICATION #121184841, CHANGE IN EGRESS, NO CHANGE TO USE, OR OCCUPANCY$5,000
2018-08-29Permit EW — ISSUED
2018-08-29Permit EW — ISSUED
2018-08-23ECB CLASS - 1 violation: 100M07-FAILURE TO PERFORM PERIODIC 90 DAY INSPECTION OF PERSONAL HOISTPER RULES OF THE DEPT (RS 18-7) PROVIDE MISSING ELV 3 TO SHO
2018-08-23ECB CLASS - 1 violation: 100M07 FAILURE TO PERFORM PERIODIC 90DAY INSPECTION OF PERSONAL HOISTPER RULES OF THE DEPT (RS18-7) PROVIDE MISISNG ELV 3 TO SHOW
2018-08-23ECB CLASS - 1 violation: 100M07 FAILURE TO PEROFRM PERIOD 90 DAY INSPECTION OF PERSONAL HOIST AS PER RULES OF THE DEPT (RS 18-7) PROVIDE MISSING ELV 3 TO
2018-08-23ECB CLASS - 1 violation: 100M07- FAILURE TO PEFORM PERIODIC 90 DAY INSPECTIO OF PERSONAL HOIST PER RULES OF THE DEPT (RS 18-7) PROVIDED MISSING ELV 3 TO SH
2018-08-21311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-08-21DOB complaint, category ?
2018-08-20Elevator permit: ALL WORK TO CPMLY WITH ASME A17.1 2000-03 AS AMENDED BY CHAPTER 30 and APPENDIX K1 TO 4 with 2014 changes. Furnish and install (1)$250,000
2018-08-20Permit EW — ISSUED
2018-08-20Permit EW — ISSUED
2018-08-18Permit EW — ISSUED
2018-08-18Permit EW — ISSUED
2018-08-18Permit EW — ISSUED
2018-08-18Permit EW — ISSUED
2018-08-14Permit EW — ISSUED
2018-08-14Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-13Permit EW — ISSUED
2018-08-10311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-08-10Permit EW — ISSUED
2018-08-10Permit PL — ISSUED
2018-08-10DOB complaint, category ?
2018-08-09Permit EW — ISSUED
2018-08-09Permit EW — ISSUED
2018-08-09Permit EW — ISSUED
2018-08-09Permit EW — ISSUED
2018-08-09Permit EW — ISSUED
2018-08-09Permit EW — ISSUED
2018-08-09Permit EW — ISSUED
2018-08-08Permit EW — ISSUED
2018-08-08Permit EW — ISSUED
2018-08-03311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-08-03DOB complaint, category ?
2018-08-01311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2018-08-01FDNY inspection (CDA-90-DRILL)
2018-08-01Permit EQ — ISSUED
2018-08-01DOB violation C:
2018-08-01DOB complaint, category ?
2018-07-31Job filed: USE OF SPYDER CRANE AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB - 121184841.
2018-07-30DOB violation C:
2018-07-30ECB CLASS - 1 violation: SITE SAFETY PLAN/SITE SAFETY MONITORING PROGRAM. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, I REQUESTED TO SEE SSP FOR CONSTRUCTI$625
2018-07-30ECB CLASS - 1 violation: 3310.3; 3310.4 SITE SAFETY PLAN/SITE SAFETY MONITORING PROGRAM. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE. I REQUESTED TO SEE SSP$2,500
2018-07-25Job filed: PA
2018-07-23Permit EW — ISSUED
2018-07-23Permit EW — ISSUED
2018-07-16Permit EW — ISSUED
2018-07-16Permit EW — ISSUED
2018-07-13Permit PL — ISSUED
2018-07-11Permit EW — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-03Job filed: SEE SECTION 24$685,062
2018-07-03Job filed: SEE SECTION 24$685,062
2018-07-03Permit EW — ISSUED
2018-07-03Permit EW — ISSUED
2018-07-03Permit EW — ISSUED
2018-07-02Job filed: COOLEY: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON FLOORS 41,42, 43,44,45 (CONSTRUCTION); 42,43,44,45,46 (MARKETING) AS SHOWN ON DRAWING$497,049
2018-07-02Job filed: COOLEY: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM ON FLOORS 41,42, 43,44,45 (CONSTRUCTION); 42,43,44,45,46 (MARKETING) AS SHOWN ON DRAWING$497,049
2018-06-25Rodent inspection: Passed
2018-06-25Permit EW — ISSUED
2018-06-25Permit EW — ISSUED
2018-06-14Job filed: ADDITION/MODIFICATION TO EXISTING FIRE ALARM SYSTEM AT 13C/14M AS SHOWN ON DRAWINGS FILED HEREWITH.$55,000
2018-06-14Permit EW — ISSUED
2018-06-14Job filed: ADDITION/MODIFICATION TO EXISTING FIRE ALARM SYSTEM AT 13C/14M AS SHOWN ON DRAWINGS FILED HEREWITH.$55,000
2018-06-13Job filed: POINT 72, EAST SIDE SUITE: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM/13TH CONSTRUCTION FLOOR/14TH MARKETING$51,000
2018-06-12Job filed: POINT 72, EAST SIDE SUITE: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$70,000
2018-06-12Job filed: POINT 72, WEST SIDE SUITE: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$95,000
2018-06-12Job filed: POINT 72, EAST SIDE SUITE: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$70,000
2018-06-12Job filed: POINT 72, WEST SIDE SUITE: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$95,000
2018-06-11Elevator permit: Installation of one (1) 3 stage telescopic holeless hydraulic passenger elevator, including glass cab polished frame, glass car do$575,000
2018-06-11Permit EW — ISSUED
2018-06-11Permit EW — ISSUED
2018-06-11Permit EW — ISSUED
2018-06-11Permit EW — ISSUED
2018-06-08Job filed: FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION CONJUNCTION WITH JOB#123278443, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE SUPP SHUTOFF VALVE AND COOKIN$15,000
2018-06-08Job filed: FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION CONJUNCTION WITH JOB#123278443, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE SUPP SHUTOFF VALVE AND COOKIN$15,000
2018-06-08Job filed: FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION CONJUNCTION WITH JOB#123278443, AS SHOWN ON PLAN. COOKING EQUIPMENT, FIRE SUPP SHUTOFF VALVE AND COOKIN$15,000
2018-06-07Job filed: FILING HEREWITH FOR INSTALLATION OF BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION 121184841$1,000
2018-06-07Job filed: FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR AND RELATED FUEL STORAGE PIPING AND TANK (LIFE SAFETY) NO CHANGE IN USE, EGRESS OR OCCUPANCY. $2,000
2018-06-07Job filed: FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR AND RELATED FUEL STORAGE PIPING AND TANK (LIFE SAFETY) NO CHANGE IN USE, EGRESS OR OCCUPANCY. $2,000
2018-06-07Job filed: FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR AND RELATED FUEL STORAGE PIPING AND TANK (TENANT) NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILE$2,000
2018-06-05Permit EW — ISSUED
2018-06-05Permit EW — ISSUED
2018-06-01Job filed: FIRE PROTECTION PLAN IN CONJUNCTION WITH NB APPLICATION #121184841 AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841.$1,000
2018-05-24311: Illegal Parking — Blocked Hydrant
2018-05-24Permit EW — ISSUED
2018-05-24Permit PL — ISSUED
2018-05-24Permit EW — ISSUED
2018-05-23Permit EW — ISSUED
2018-05-23Job filed: POINT 72, EAST SIDE SUITE: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH.$40,000
2018-05-23Job filed: POINT 72, WEST SIDE SUITE: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,755,000
2018-05-23Job filed: POINT 72, EAST SIDE SUITE: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,400,000
2018-05-23Job filed: POINT 72, WEST SIDE SUITE: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH.$90,000
2018-05-23Job filed: POINT 72, EAST SIDE SUITE: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH.$40,000
2018-05-23Job filed: POINT 72, EAST SIDE SUITE: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,400,000
2018-05-23Permit EQ — ISSUED
2018-05-23Permit EW — ISSUED
2018-05-23Job filed: POINT 72, WEST SIDE SUITE: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,755,000
2018-05-22Job filed: USE OF JEKKO CRANE AS PER PLANS FILED HEREWITH.
2018-05-22Permit PL — ISSUED
2018-05-22Permit PL — ISSUED
2018-05-22Job filed: USE OF JEKKO CRANE AS PER PLANS FILED HEREWITH.
2018-05-22Permit PL — ISSUED
2018-05-22Permit PL — ISSUED
2018-05-17Permit Supported Scaffold — Signed-off
2018-05-16Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-05-11Elevator permit: ALL WORK TO CPMLY WITH ASME A17.1 2000-03 AS AMENDED BY CHAPTER 30 and APPENDIX K1 TO 4 with 2014 changes. Furnish and install (1)$250,000
2018-05-09Permit EW — ISSUED
2018-05-08Permit PL — ISSUED
2018-05-07311: Illegal Parking — Blocked Sidewalk
2018-05-07Permit PL — ISSUED
2018-05-04Job filed: COOLEY: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCC$306,000
2018-05-04Job filed: COOLEY: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,736,675
2018-05-04Job filed: COOLEY: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, $3,221,500
2018-05-03311: Illegal Parking — Blocked Hydrant
2018-05-03Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT FLOOR 40 (CONSTRUCTION), 41 (MARKETING) AS SHOWN ON DRA$5,000
2018-05-03Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT FLOOR 40 (CONSTRUCTION), 41 (MARKETING) AS SHOWN ON DRA$5,000
2018-05-03Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT FLOOR 40 (CONSTRUCTION), 41 (MARKETING) AS SHOWN ON DRA$5,000
2018-05-02311: Illegal Parking — Blocked Sidewalk
2018-05-01Permit EW — ISSUED
2018-04-30Job filed: ENGINEERS GATE: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,200,000
2018-04-30Job filed: ENGINEERS GATE: GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,200,000
2018-04-30Job filed: ENGINEERS GATE: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE $315,000
2018-04-28311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-27Job filed: ENGINEERS GATE: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP$183,600
2018-04-27Job filed: ENGINEERS GATE: ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM ON FLOOR 28 (CONSTRCTION), 29 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH$64,000
2018-04-27Job filed: ENGINEERS GATE: SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP$183,600
2018-04-27Job filed: ENGINEERS GATE: ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM ON FLOOR 28 (CONSTRCTION), 29 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH$64,000
2018-04-25Permit EW — ISSUED
2018-04-24Permit PL — ISSUED
2018-04-20Permit EW — ISSUED
2018-04-18311: Street Condition — Pothole
2018-04-18Permit EW — ISSUED
2018-04-18Permit EW — ISSUED
2018-04-18Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-17Permit EW — ISSUED
2018-04-06Job filed: PRE-BUILD. ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON FLOOR 27 (CONSTRUCTION), 28 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREW$15,000
2018-04-06Job filed: PRE-BUILD. SPRINKLER WORK RELATED TO GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$166,250
2018-04-06Job filed: PRE-BUILD. GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,772,400
2018-04-06Job filed: PRE-BUILD. MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN US$603,000
2018-04-06Job filed: SEE SECTION 24$105,000
2018-04-06Job filed: SEE SECTION 24$105,000
2018-04-06Job filed: PRE-BUILD. ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON FLOOR 27 (CONSTRUCTION), 28 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREW$15,000
2018-04-06Job filed: PRE-BUILD. MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN US$603,000
2018-04-05Job filed: SPRINKLER WORK RELATED TO PRE-ACTION SYSTEM AS SHOW ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2018-04-05Job filed: SPRINKLER WORK RELATED TO PRE-ACTION SYSTEM AS SHOW ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2018-04-04Job filed: POINT 72, (INTERIOR) MECHANICAL & PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES$1,425,000
2018-04-04Job filed: ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AT FLOOR 40(CONSTRUCTIO N), 41(MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH.$35,000
2018-04-04Job filed: ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AT FLOOR 40(CONSTRUCTIO N), 41(MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH.$35,000
2018-04-04Job filed: POINT 72, (INTERIOR) MECHANICAL & PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES$1,425,000
2018-04-04Permit EW — ISSUED
2018-04-04Permit EW — ISSUED
2018-04-04Job filed: SILVERLAKE: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES.$250,000
2018-04-04Permit EW — ISSUED
2018-04-04Permit EW — ISSUED
2018-04-04Permit EW — ISSUED
2018-04-04Permit EW — ISSUED
2018-04-04Permit EW — ISSUED
2018-04-04Job filed: "POINT 72", (INTERIOR) GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,800,000
2018-04-04Job filed: SILVERLAKE: GENERAL CONSTRUCTION OF OFFICE SPACES. ARCHITECTURAL WORK$3,250,000
2018-04-04Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM. THE 20TH FL (CONSTRUCTION) IS SAME CALLED 21ST FLOOR (MA$50,000
2018-04-04Job filed: "POINT 72", EXTERIOR GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,100,000
2018-04-04Permit EW — ISSUED
2018-04-04Job filed: SILVERLAKE: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES.$250,000
2018-04-04Job filed: SILVERLAKE: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES.$825,000
2018-04-03Job filed: SILVERLAKE: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $250,000
2018-04-03Job filed: ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AT FLOOR 39 (CONSTRUCTI ON), 40 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH.$35,000
2018-04-03Job filed: SILVERLAKE: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $250,000
2018-04-03Job filed: SILVERLAKE: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN$1,350,000
2018-04-03Job filed: SILVERLAKE: GENERAL CONSTRUCTION OF OFFICE SPACES. ARCHITECTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,705,000
2018-04-03Job filed: ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AT FLOOR 39 (CONSTRUCTI ON), 40 (MARKETING) AS SHOWN ON DRAWINGS FILED HEREWITH.$35,000
2018-04-02Job filed: "POINT 72" MODIFICATIONS/ADDITIONS TO EXISTING FIRE ALARM SYSTEM$80,000
2018-04-02Job filed: "POINT 72", SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$155,000
2018-04-02Job filed: POINT 72$75,000
2018-04-02Job filed: POINT 72$80,000
2018-04-02Job filed: POINT 72$155,000
2018-04-02Job filed: "POINT 72" MODIFICATIONS/ADDITIONS TO EXISTING FIRE ALARM SYSTEM$75,000
2018-04-02Job filed: POINT 72$80,000
2018-03-29FDNY inspection (CDA-90-DRILL)
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-27Permit EW — ISSUED
2018-03-27Permit EW — ISSUED
2018-03-20Permit EW — ISSUED
2018-03-16Permit EW — ISSUED
2018-03-16Permit EW — ISSUED
2018-03-09Job filed: MAISON KAYSER: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$30,000
2018-03-09Job filed: MAISON KAYSER: SPRINKLER WOK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$55,800
2018-03-09Job filed: MAISON KAYSER: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$30,000
2018-03-08Permit PL — ISSUED
2018-03-08Permit EW — ISSUED
2018-03-07Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to STONEPEAK PARTNERS, LP
2018-03-05Permit PL — ISSUED
2018-03-02311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-03-02ECB CLASS - 1 violation: 3320.2 UNSAFE MATERIAL HANDLING: AT THE TIME OF MY INSPECTION IN RESPONSE TO AN INCIDENT THAT OCCURRED WHERE A PC OF HVAC DUCT FEL
2018-03-02DOB complaint, category ?
2018-02-27Job filed: "POINT 72" SPRINKLER & STANDPIPE WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$287,000
2018-02-27Job filed: "POINT 72" SPRINKLER & STANDPIPE WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$284,000
2018-02-27Job filed: "POINT 72" SPRINKLER & STANDPIPE WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$185,534
2018-02-27Job filed: "POINT 72" SPRINKLER & STANDPIPE WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$269,000
2018-02-24ECB CLASS - 1 violation: 3308.5 VERTICAL NETTING (INADEQUATE). AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 51 STORY BUILDING, OBSERVED INADEQUATE VERTI$400
2018-02-23Permit EW — ISSUED
2018-02-22Permit EW — ISSUED
2018-02-22Job filed: "POINT 72" ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$104,973
2018-02-22Permit EW — ISSUED
2018-02-22Job filed: POINT 72$137,000
2018-02-22Job filed: POINT 72$135,000
2018-02-22Job filed: POINT 72$104,973
2018-02-22Job filed: "POINT 72" ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$135,000
2018-02-22Job filed: "POINT 72" ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$137,000
2018-02-22Job filed: "POINT 72" ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.$137,000
2018-02-22Permit EW — ISSUED
2018-02-13Job filed: "POINT 72" MECHANICAL & PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN $1,381,737
2018-02-13Job filed: "POINT 72" GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,007,000
2018-02-13Job filed: "POINT 72" MECHANICAL & PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN $1,820,000
2018-02-13Job filed: "POINT 72" GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,920,000
2018-02-13Job filed: "POINT 72" MECHANICAL & PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN $1,855,000
2018-02-13Job filed: "POINT 72" GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,642,000
2018-02-13Job filed: "POINT 72" MECHANICAL & PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN $1,827,000
2018-02-13Job filed: POINT 72: STRUCTURAL WORK RELATED TO THE CONVENIENCE STAIR INSTALLATION, FLOORS 6-8 AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$500,000
2018-02-13Job filed: POINT 72$7,920,000
2018-02-13Job filed: POINT 72$8,007,000
2018-02-13Job filed: POINT 72$1,820,000
2018-02-13Job filed: POINT 72$7,642,000
2018-02-13Job filed: POINT 72$1,827,000
2018-02-13Job filed: POINT 72$1,855,000
2018-02-13Job filed: POINT 72$1,381,737
2018-02-13Job filed: POINT 72: STRUCTURAL WORK RELATED TO THE CONVENIENCE STAIR INSTALLATION, FLOORS 7-11 AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $1,000,000
2018-02-13Permit NB — ISSUED
2018-02-13Permit EW — ISSUED
2018-02-13Permit EW — ISSUED
2018-02-13Permit EW — ISSUED
2018-02-13Job filed: "POINT 72" GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,880,022
2018-02-12Job filed: MAISON KAYSER-MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE. PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE AS SHOWN ON$180,600
2018-02-12Job filed: MAISON KAYSER-STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$45,000
2018-02-12Job filed: MAISON KAYSER-RENOVATION OF RETAIL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$225,000
2018-02-12Job filed: MAISON KAYSER-STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$45,000
2018-02-12ECB CLASS - 2 violation: POSTING OF UNLAWFUL SIGNS.NOTICED AT TIME OF INSPECTION NB IN PROGRESS NOTICED AT EXP 1 FENCE HAS UNLAWFUL ADVERTISING SIGN POSTED$2,400
2018-02-08Job filed: PA
2018-02-07Job filed: PA
2018-01-31311: Sustainability Enforcement — Sustainability Enforcement Work Order
2018-01-31DOB complaint, category ?
2018-01-29Permit EW — ISSUED
2018-01-25Permit PL — ISSUED
2018-01-16Permit EQ — ISSUED
2018-01-12Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT MTA STATION PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. TEMPORARY OVERHEAD PROTE
2017
2017-12-28Permit PL — ISSUED
2017-12-28Permit PL — ISSUED
2017-12-28Permit PL — ISSUED
2017-12-28Permit PL — ISSUED
2017-12-26Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to COOLEY LLP
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-26Permit EW — ISSUED
2017-12-22Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYST SYSTEMS CONSTRUCTION FLOOR 34,MARKETING FLOOR 35 AS SHOWN ON DRAWINGS F$50,000
2017-12-22Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$693,670
2017-12-20Permit NB — RE-ISSUED
2017-12-14FDNY inspection (CDA-90-DRILL)
2017-12-14Permit EW — ISSUED
2017-12-14Permit EQ — ISSUED
2017-12-13Job filed: PA
2017-12-12Permit EW — ISSUED
2017-12-12Permit EW — ISSUED
2017-12-07311: General Construction/Plumbing — Inadequate Support Shoring
2017-12-07DOB complaint, category ?
2017-12-06311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-12-06ECB CLASS - 1 violation: SEC: BC 3301.2. FAILURE TO MAINTAIN SAFETY. @ TIME OF RESPONSE TO INCIDENT WHERE IT WAS STATED BY THE SITE SAFETY MANAGER& SITE SU
2017-12-06DOB complaint, category ?
2017-12-04Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES. ARCHITECTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,013,646
2017-12-04Job filed: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$288,150
2017-12-04Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES. ARCHITECTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,013,646
2017-12-04Job filed: STRUCTURAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$288,150
2017-12-04Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$5,086,272
2017-12-04Job filed: FILING FOR ADDITION AND/OR MODIFICARION TO EXISTING FA SYSTEM.CONSTRUCTION FLOORS-17,18,19,20; MARKETING FLOORS-18,19,20,21 AS SHOWN ON THE FILED HERE$138,412
2017-12-04Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$5,086,272
2017-12-01Permit PL — ISSUED
2017-12-01Permit PL — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-30Permit EW — ISSUED
2017-11-29Job filed: PA
2017-11-29Job filed: PA
2017-11-29Permit PL — ISSUED
2017-11-28Job filed: STRUCTURAL WORK AS SHOWN ON PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH NB# 121184841. (MARKETING FLOORS 15, 16, 17)$1,000
2017-11-28Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841. (MARKETING FLOORS 15, 16, 17)$2,000
2017-11-28Job filed: MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841. (MARKETING FLOORS 15, 16, 17)$2,000
2017-11-28Job filed: A2$1,000
2017-11-28Job filed: ADDITIONS/MODIFICATIONS TO AN EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841. (MARKETING FLOORS- 15, 16$1,000
2017-11-28Job filed: ADDITIONS/MODIFICATIONS TO AN EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841. (MARKETING FLOORS- 15, 16$1,000
2017-11-28Job filed: ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM. (CONSTRUCTION FLOORS: 14, 15,16. MARKETING FLOORS: 15, 16, 17)$1,000
2017-11-27Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to ENGINEERS GATE MANAGER LP
2017-11-21Permit EW — ISSUED
2017-11-21Permit EW — ISSUED
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM. CONSTRUCTION FLS 30,31,32. MARKETING FLS 31,32,33 AS SHOWN ON DRAWINGS FILED HEREWITH$225,000
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM. CONSTRUCTION FLS 34,35,36. MARKETING FLS 35, 36, 37 AS SHOWN ON DRAWINGS FILE HEREWITH.$225,000
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM, CONSTRUCTION FL 29, MARKETING FLOOR 30 AS SHOWN ON DRAWINGS FILED HEREWITH$75,000
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM. CONSTRUCTION FLS 33,37,38. MARKETING FLS: 34, 38,39 AS SHOWN ON DRAWINGS FILED HEREWITH$225,000
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM. CONSTRUCTION FLS 30,31,32. MARKETING FLS 31,32,33 AS SHOWN ON DRAWINGS FILED HEREWITH$225,000
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM, CONSTRUCTION FL 29, MARKETING FLOOR 30 AS SHOWN ON DRAWINGS FILED HEREWITH$75,000
2017-11-16Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM. CONSTRUCTION FLS 33,37,38. MARKETING FLS: 34, 38,39 AS SHOWN ON DRAWINGS FILED HEREWITH$225,000
2017-11-15Job filed: SLAB OPENINGS FOR FUTURE CONVENIENCE STAIRS IN CONJUNCTION WITH NB APPLICATION #121184841 AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$1,300,000
2017-11-02311: Traffic — Congestion/Gridlock
2017-11-01Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 34,35,36 CONSTRUCTION, 35,36,37 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$13,650,000
2017-11-01Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 34,35,36 CONSTRUCTION, 35,36,37 MARKETING AS SHOWN ON DRAWINGS FI$385,000
2017-11-01Job filed: SEE SECTION 24$770,000
2017-11-01Job filed: STRUCTURAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$190,000
2017-11-01Job filed: MECHANICAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 33,37,38 CONSTRUCTION, 34,38,39 MARKETING. PLUMBING WORK IN CONJUNCTION WITH OFFICE SPACES$2,250,000
2017-11-01Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$7,350,000
2017-11-01Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING AS SHOWN ON DRAWINGS FILE$340,000
2017-11-01Job filed: MECHANICAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING. PLUMBING WORK IN CONJUNCTION WITH OFFICE SPACES$2,325,000
2017-11-01Job filed: GENERAL CONSTRUCTION WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 29 CONSTRUCTION, 29, 30 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE$2,150,000
2017-11-01Job filed: STRUCTURAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 34,35,36 CONSTRUCTION, 35,36,37 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$170,000
2017-11-01Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 29 CONSTRUCTION, 29, 30 MARKETING AS SHOWN ON DRAWINGS FILED HEREWI$110,000
2017-11-01Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$7,350,000
2017-11-01Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 33,37,38 CONSTRUCTION, 34,38,39 MARKETING AS SHOWN ON DRAWINGS FILE$340,000
2017-11-01Job filed: SEE SECTION 24$3,350,000
2017-11-01Job filed: STRUCTURAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 33,37,38 CONSTRUCTION, 34,38,39 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$185,000
2017-11-01Job filed: MECHANICAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 33,37,38 CONSTRUCTION, 34,38,39 MARKETING. PLUMBING WORK IN CONJUNCTION WITH OFFICE SPACES$2,250,000
2017-11-01Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$7,350,000
2017-11-01Job filed: SPRINKLER WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 33,37,38 CONSTRUCTION, 34,38,39 MARKETING AS SHOWN ON DRAWINGS FILE$340,000
2017-11-01Job filed: GENERAL CONSTRUCTION WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 29 CONSTRUCTION, 29, 30 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE$2,150,000
2017-11-01Job filed: STRUCTURAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 30,31,32 CONSTRUCTION, 31,32,33 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$190,000
2017-11-01Job filed: STRUCTURAL WORK IN CONJUNCTION WITH OFFICE SPACES ON FLOORS 29 CONSTRUCTION, 29, 30 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, E$56,000
2017-11-01Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 33,37,38 CONSTRUCTION, 34,38,39 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$7,500,000
2017-11-01Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES ON FLOORS 34,35,36 CONSTRUCTION, 35,36,37 MARKETING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES$13,650,000
2017-10-24Permit EW — ISSUED
2017-10-24Permit EW — ISSUED
2017-10-24Permit EW — ISSUED
2017-10-24Permit EW — ISSUED
2017-10-24Permit EW — ISSUED
2017-10-24Permit EW — RE-ISSUED
2017-10-24Permit EW — RE-ISSUED
2017-10-17Job filed: SPRINKLER SCOPE RELATED TO PRE ACTION SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$36,500
2017-10-17Job filed: SPRINKLER SCOPE RELATED TO PRE ACTION SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$36,500
2017-10-05Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$13,000
2017-10-05Job filed: INSTALLATION OF CHILLER. MECHANICAL WORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS AS SHOWN ON DRAWINGS FILED HEREWITH.$856,000
2017-10-05Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$13,000
2017-10-03311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-10-03311: General Construction/Plumbing — Accident - Construction/Plumbing
2017-10-03DOB complaint, category ?
2017-10-03DOB complaint, category ?
2017-10-02Job filed: SPRINKLER WORK RELATED TO TENANT FIT OUT. NO CHANGE OF USE, OCCUPANCY OR EGRESS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP$162,500
2017-10-02Job filed: SPRINKLER WORK RELATED TO TENANT FIT OUT AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$162,500
2017-10-02ECB CLASS - 1 violation: BC3308.5.3.CABLES-INADEQUATLEY MAINTAINED.AT TIME OF INSPECTION OBSERVED ACTIVE JOB SITE THE CABLE SYSTEM PROVIDED HAS NOT BEEN A$400
2017-09-29Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHAGEN IN USE, EGRESS OR OCCUPANCY.$1,160,000
2017-09-29Job filed: GENERAL CONSTRUCTION WORK FOR MDF AND IDF ROOMS. CONSTRUCTION FLOORS 5 THRU 13 (14TH FLOOR - MARKETING FLOOR). ARCHITECTURAL WORK, NO CHANGE OF USE, O$1,138,650
2017-09-29Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM.$170,000
2017-09-29Job filed: SPRINKLER WORK FOR MDF AND IDF ROOMS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$109,897
2017-09-29Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$6,908,000
2017-09-29Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM.$170,000
2017-09-29Job filed: GENERAL CONSTRUCTION WORK FOR MDF AND IDF ROOMS. CONSTRUCTION FLOORS 5 THRU 13 (14TH FLOOR - MARKETING FLOOR). ARCHITECTURAL WORK, NO CHANGE OF USE, O$1,138,650
2017-09-29Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE OF USE, OCCUPANCY OR EGRESS AS SHOWN ON DRAWINGS FI$1,160,000
2017-09-29Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHAGEN IN USE, EGRESS OR OCCUPANCY.$1,160,000
2017-09-29Job filed: MECHANICAL AND PLUMBING WORK FOR MDF AND IDF ROOMS. CONSTRUCTION FLOORS 5 THRU 13 (14TH FLOOR - MARKETING FLOOR). NO CHANGE IN USE, EGRESS OR OCCUPANC$2,713,765
2017-09-29Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE OF USE, OCCUPANCY OR EGRESS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$6,908,000
2017-09-29Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$157,333
2017-09-29Job filed: SPRINKLER WORK FOR MDF AND IDF ROOMS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$109,897
2017-09-29Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM$157,333
2017-09-29Job filed: MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE OF USE, OCCUPANCY OR EGRESS AS SHOWN ON DRAWINGS FI$1,160,000
2017-09-29Job filed: ADDITIONS/MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM.$170,000
2017-09-29Job filed: GENERAL CONSTRUCTION OF OFFICE SPACES. NO CHANGE OF USE, OCCUPANCY OR EGRESS.$6,908,000
2017-09-21Permit EQ — ISSUED
2017-09-14311: Sustainability Enforcement — Sustainability Enforcement Work Order
2017-09-11Permit EQ — ISSUED
2017-09-11Permit EQ — ISSUED
2017-09-11Permit EQ — ISSUED
2017-09-11Permit EQ — ISSUED
2017-09-11Permit EQ — ISSUED
2017-09-08Permit EQ — ISSUED
2017-09-07Permit EQ — ISSUED
2017-09-07Permit EQ — ISSUED
2017-09-07Permit EQ — ISSUED
2017-08-28Rodent inspection: Passed
2017-08-25311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2017-08-25DOB complaint, category ?
2017-08-24ECB CLASS - 2 violation: BC3301.7 FAILURE TO PROVIDE P.E. APPROVED DESIGN DRAWINGS.AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE CONSTRUCTION SITE OBSERVE
2017-08-23311: General Construction/Plumbing — Accident - Construction/Plumbing
2017-08-23311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-08-23ECB CLASS - 1 violation: 97X17 RESPONDENT FAILED TO SAFEGUARD PUBLIC AND PROPERTY BY NOT ADEQUATELY MAINTAINING HOIST EQUIPMENT AS SPECIFIDED IN BC 3315.2$25,000
2017-08-23DOB complaint, category ?
2017-08-23DOB complaint, category ?
2017-08-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-08-22DOB complaint, category ?
2017-08-18Permit NB — ISSUED
2017-08-10FDNY inspection (CDA-90-DRILL)
2017-08-04ECB CLASS - 1 violation: SITE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPT OF CONDI TIONS AS REQUIRED. AS NOTED: AT TIME OF INSPECTION ON AN ACT
2017-08-03311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2017-08-03311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2017-08-03DOB violation C: FAILURE TO PROVIDE P.E. DESIGN DRAWINGS FOR COLUMN FORMWORK. PROVIDE DESIGN DRAWINGS WITH P.E.'S SIGNATURE AND SEAL AND PRE-CONST
2017-08-03ECB CLASS - 1 violation: BC3301.7 FAILURE TO PROVIDE PE DESIGN DRAWINGS-COLUMN FORMWORK. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE OB$400
2017-08-03ECB CLASS - 2 violation: CONCRETE SAFETY MANAGER FAILED TO IMMEDIATELY NOTIFY THE DEPT OF CONDITIONS AS REQUIRED. AS NOTED: AT TIME OF INSPECTION ON AN ACT
2017-08-03DOB complaint, category ?
2017-08-03DOB complaint, category ?
2017-08-02Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2017-08-02Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2017-08-02Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2017-07-30311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-07-30311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-07-30DOB complaint, category ?
2017-07-30DOB complaint, category ?
2017-07-29DOB violation C: DUE TO VEHICLE IMPACTING SIDEWALK SHED
2017-07-21Permit NB — ISSUED
2017-07-06Permit NB — ISSUED
2017-07-03311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-07-03ECB CLASS - 2 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTION. NOTE: AT THE TIME OF MY INSPECTION OF A 51 STY
2017-07-03DOB complaint, category ?
2017-06-22311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-06-22DOB violation C:
2017-06-22ECB CLASS - 1 violation: FAILURE TO SAFEGUARD:AT TIME OF INSPECTION OF A PROPOSED 51 STORY NEW BUILDING A WORKER WAS INJURED DURING DELIVERY OPERATION.WHIL$10,000
2017-06-22DOB complaint, category ?
2017-06-14ECB CLASS - 2 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPRORARY CONSTRUCTION EQUIPMENT.NOTE:AT TIME OF MY INSPECTION OF$5,000
2017-06-12311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-06-12DOB complaint, category ?
2017-06-08Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH CHAPTER
2017-06-08Permit EQ — ISSUED
2017-05-25311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-05-25ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.NOTE:AT TIME OF INSPECTION RESPONDING TO COMPLAINT$10,000
2017-05-25DOB complaint, category ?
2017-05-18311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-05-18Permit EW — ISSUED
2017-05-18Permit EW — ISSUED
2017-05-18DOB complaint, category ?
2017-05-17FDNY inspection (CDA-90-DRILL)
2017-05-17DOB violation C:
2017-05-17DOB violation C:
2017-05-17DOB violation C:
2017-05-17ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCS AND/OR APPROVED AMENDMENTS.NOTE:AT TIME OF MY INSPECTION OF A 51 STORY BLDG @4$250
2017-05-17ECB CLASS - 2 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES AND TEMPORARY CONSTRUCTION EQUIPMENT.NOTE:AT TIME OF MY INSPEXTION OF A 51 STORY$400
2017-05-17ECB CLASS - 1 violation: BC 3301.1.3:MANUFACTURER SPECIFICATIONS.NOTE:@ TIME OF MY INSPECTION OF A 51 STORY BLDG AT 42 FL LEVEL,CONSTRUCTION WORK IN PROGRE$400
2017-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-04-25Job filed: INSTALLATION OF OVERHEAD PROTECTION SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. OVERHEAD PROTECTIO
2017-04-25Permit EQ — ISSUED
2017-04-04Permit EW — ISSUED
2017-03-28311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-03-08Permit PL — ISSUED
2017-03-07311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-07311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-07311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-07DOB complaint, category ?
2017-03-07DOB complaint, category ?
2017-03-07DOB complaint, category ?
2017-03-06311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-06ECB CLASS - 1 violation: SEC: BC3301.6.3. DESIGN. NOTE: @ TIME OF INSP OF A 51 STORY BLDG @ 32ND FLR LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED A MANUF
2017-03-06ECB CLASS - 1 violation: SEC: BC3303.11. STAIRS DURING CONSTRUCTION. NOTE: @ TIME OF INSP OF A 51 STORY BLDG @ 32ND FLR LEVEL, CONSTRUCTION WORK IN PROGRES$400
2017-03-06ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: @ TIME OF INSP OF A 51 STORY BLDG @ 32ND FL
2017-03-06ECB CLASS - 2 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION. NOTE: @ TIME OF INSP OF A 51 STORY BLDG @ 32N
2017-03-06ECB CLASS - 1 violation: SEC: BC3301.2. ADEQUATE MEANS OF EGRESS. NOTE: @ TIME OF INSP OF A 51 STORY BLDG @ 32RD FLR LEVEL CONSTRUCTION WORK IN PROGRESS. I
2017-03-06ECB CLASS - 1 violation: SEC: BC3301.8.1. USE & TAMPERING PROHIBITED. NOTE: @ TIME OF INSP OF A 51 STORY BLDG @ 32ND FLR CONSTRUCTION WORK IN PROGRESS. RES$1,600
2017-03-06ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS. NOTE: @ TIME OF MY INSP OF A 52 STORY BLDG @ 32$250
2017-03-06DOB complaint, category ?
2017-03-03311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-03DOB complaint, category ?
2017-02-27311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-02-27DOB complaint, category ?
2017-02-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-02-14DOB complaint, category ?
2017-02-10311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-02-10Permit NB — ISSUED
2017-02-10DOB complaint, category ?
2017-01-27311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2017-01-27DOB complaint, category ?
2017-01-25Permit EQ — ISSUED
2017-01-19Permit EQ — ISSUED
2017-01-18311: Taxi Report — Driver Report
2017-01-17Permit NB — ISSUED
2017-01-12Permit EQ — ISSUED
2017-01-05Rodent inspection: Passed
2016
2016-12-07311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-12-07DOB complaint, category ?
2016-12-06Permit EQ — ISSUED
2016-12-02Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2016-12-02Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2016-11-18Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD @ NINTH FLOOR AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SCAFFOLD TO
2016-11-18Permit EQ — ISSUED
2016-11-15Permit EQ — ISSUED
2016-11-14Permit EQ — ISSUED
2016-11-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to MILBANK, TWEED, HADLEY & MCCLOY, LLP
2016-11-03MLEA — from ONE HUDSON YARDS OWNER LLC to MILBANK, TWEED, HADLEY & MCCLOY, LLP
2016-11-03311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-11-03DOB complaint, category ?
2016-11-02Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to POINT72 ASSET MANAGEMENT, L.P.
2016-11-02MLEA — from ONE HUDSON YARDS OWNER LLC to POINT72 ASSET MANAGEMENT, L.P.
2016-10-31Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to MARKETAXESS HOLDINGS INC.
2016-10-22ECB CLASS - 2 violation: SIDEWALK SHED PARAPET PANEL NOT PROVIDED. NOTE: @ TIME OF INSP OF A NEW 51 STORY BLDG UNDER CONSTRUCTION. I OBSERVED NO SIDEWALK S
2016-10-18311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-10-18311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-10-18DOB complaint, category ?
2016-10-17311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-10-17DOB complaint, category ?
2016-10-11Permit EQ — ISSUED
2016-09-21Permit EQ — ISSUED
2016-09-20Permit EQ — ISSUED
2016-09-14Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2016-09-14Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2016-09-08FDNY inspection (CDA-90-DRILL)
2016-08-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-08-12Permit NB — ISSUED
2016-07-26311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-07-26DOB complaint, category ?
2016-05-31Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2016-05-31Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2016-05-25311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-05-25ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OPERATION OF CRANE. WHILE PULLING LOAD HMO CHRIS G. VAN DUYNE CD#4749 CN#0831/15. THE LOAD STRUCK DOOR $10,000
2016-05-25ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OPERATION OF CRANE/DERRICK HOISTING EQUIPMENT IN AN UNSAFE MANNER. WHILE PULLING LOAD, LOAD STRUCK DOOR
2016-05-25DOB complaint, category ?
2016-05-23Permit EW — ISSUED
2016-05-23Permit EW — ISSUED
2016-04-14311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2016-04-14DOB complaint, category ?
2016-04-12Job filed: INSTALLATION OF ALTERNATIVE NETTING SYSTEM AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121184841.
2016-04-12Job filed: INSTALLATION OF ALTERNATIVE NETTING SYSTEM AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121184841.
2016-04-04Permit EW — ISSUED
2016-04-01311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-04-01DOB complaint, category ?
2016-03-10FDNY inspection (CDA-90-DRILL)
2016-03-03Permit PL — ISSUED
2016-02-24311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2016-02-24DOB complaint, category ?
2016-01-22Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 253'LONG AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPA
2016-01-22Job filed: INSTALLATION OF A TEMPORARY PERSONNEL/MATERIAL HOIST COMPLEX (EAST HOIST & WEST HOIST)AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE
2016-01-22Job filed: INSTALLATION OF A TEMPORARY PERSONNEL/MATERIAL HOIST COMPLEX (EAST HOIST & WEST HOIST)AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE
2016-01-22Permit EQ — ISSUED
2016-01-22Permit EQ — ISSUED
2016-01-20Permit EQ — ISSUED
2016-01-13Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 253'LONG AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPA
2016-01-13Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 253'LONG AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPA
2016-01-13Permit EQ — ISSUED
2016-01-08311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-01-08DOB complaint, category ?
2015
2015-12-15Permit EQ — ISSUED
2015-11-25FDNY inspection (CDA-90-DRILL)
2015-11-23Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 401'LONG AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPA
2015-11-23Job filed: INSTALLATION OF A CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.FENCE TO COMPLY WITH CHAP
2015-11-23Permit EQ — ISSUED
2015-11-23Permit EQ — ISSUED
2015-11-19Job filed: FILING FOR THE INSTALLATION OF HOT WATER BOILERS. ALL GAS PIPING FILED UNDER NB APPLICATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, E$1,000
2015-11-17311: Street Condition — Pothole
2015-11-13Permit NB — ISSUED
2015-11-06311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2015-11-06DOB complaint, category ?
2015-10-30311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-10-30DOB complaint, category ?
2015-10-27Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33
2015-10-27Permit EQ — ISSUED
2015-10-19Permit EW — ISSUED
2015-10-05311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2015-10-05DOB complaint, category ?
2015-09-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-09-14DOB complaint, category ?
2015-08-14Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION SYSTEM & PURGE SYSTEM &$1,000
2015-08-14Job filed: FILING FOR A NEW 17.4' WIDE CURB CUT ON WEST 34TH STREET LOCATED 103.9' WEST OF 11TH AVENUE IN CONJUNCTION W/ NB APPLICATION #121184841 AS SHOWN ON DR
2015-08-14Job filed: INSTALLATION OF A BASE BUILDING STANDPIPE SYSTEM & INSTALLATION OF A BASE BUILDING SPRINKLER SYSTEM IN COMPLIANCE WITH 2008 BUILDING CODE AS SHOWN$1,000
2015-08-14Job filed: FILING FOR A NEW 41.5' WIDE CURB CUT ON WEST 34TH STREET LOCATED 124.3' WEST OF 11TH AVENUE AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH N
2015-08-14Job filed: FILING FOR A NEW 41.5' WIDE CURB CUT ON WEST 34TH STREET LOCATED 124.3' WEST OF 11TH AVENUE AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH N
2015-08-14Job filed: INSTALLATION OF A BASE BUILDING STANDPIPE SYSTEM & INSTALLATION OF A BASE BUILDING SPRINKLER SYSTEM IN COMPLIANCE WITH 2008 BUILDING CODE AS SHOWN$1,000
2015-08-14Job filed: FILING FOR A NEW 17.4' WIDE CURB CUT ON WEST 34TH STREET LOCATED 103.9' WEST OF 11TH AVENUE IN CONJUNCTION W/ NB APPLICATION #121184841 AS SHOWN ON DR
2015-06-19Permit FO — ISSUED
2015-06-19Permit FO — ISSUED
2015-06-16311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-06-16DOB complaint, category ?
2015-06-15311: Emergency Response Team (ERT) — After Hours Work - Illegal
2015-06-15DOB complaint, category ?
2015-03-16FDNY inspection (CONSTR)
2015-02-05FDNY inspection (CONSTR)
2015-01-21Permit FO — RE-ISSUED
2015-01-21Permit FO — ISSUED
2015-01-15Permit EW — ISSUED
2015-01-14Job filed: INSTALLATION OF CHAIN LINK FENCE ON TOP OF JERSEY BARRIERS AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN
2015-01-14Permit EQ — ISSUED
2015-01-13Job filed: INSTALLATION OF A TEMPORARY STANDPIPE SYSTEM - PRESSURIZED ALARM SYSTEM PER LL 64/09 FOR OPERATION DURING CONSTRUCTION AS SHOWN ON DRAWINGS FILED HER$1,000
2014
2014-12-30RPTT&RET $258,780,647 — from ONE HUDSON YARDS HOLDINGS LLC; 55 HUDSON YARDS MEMBER LLC to MFA 55 HY LLC$258,780,647
2014-12-30RPTT&RET $272,763,872 — from HUDSON YARDS GEN-PAR, LLC to 55 HUDSON YARDS MEMBER LLC$272,763,872
2014-12-23Job filed: FOUNDATION WORK IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-12-19Job filed: STRUCTURAL WORK (SUPERSTRUCTURE) IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-12-19Job filed: SEE SECTION 24
2014-12-19Job filed: STRUCTURAL WORK (SUPERSTRUCTURE) IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-12-18Job filed: INSTALLATION OF FENCE DURING CONSTRUCTION OF FOUNDATION FOR NEW BUILDING, FILED SEPARATELY. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. FENC
2014-12-18Permit EQ — ISSUED
2014-12-11CORRD — from STRATEGIC/EXTELL 34TH STREET, LLC to ONE HUDSON YARDS OWNER LLC
2014-12-11Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2014-12-11Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2014-12-11Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2014-12-11Mortgage assigned — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION
2014-12-11Mortgage assigned — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION
2014-12-11Mortgage $238,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE$238,000,000
2014-12-11Mortgage $25,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE$25,000,000
2014-12-11LEAS — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to ONE HUDSON YARDS OWNER LLC
2014-12-11LEAS — from ONE HUDSON YARDS OWNER LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2014-12-11SMIS — from METROPOLITAN TRANSPORTATION AUTHORITY; HUDSON YARDS INFRASTRUCTURE CORPORATION to ONE HUDSON YARDS OWNER LLC
2014-12-11Agreement $90,547,156 — from HUDSON YARDS INFRASTRUCTURE CORPORATION; METROPOLITAN TRANSPORTATION AUTHORITY to ONE HUDSON YARDS OWNER LLC$90,547,156
2014-12-11Mortgage satisfied — from VIRTUOSO, THOMAS; BERRITTO, MARIO J to BANK OF AMERICA, N.A.
2014-12-11Mortgage assigned — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION
2014-12-11Mortgage $238,000,000 — from ONE HUDSON YARDS OWNER LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE$238,000,000
2014-11-17SAGE — from ONE HUDSON YARDS OWNER LLC
2014-09-16Job filed: BUILDERS PAVEMENT PLAN. TOTAL STREET FRONTAGE = 603 LF AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841.
2014-09-16Job filed: BUILDERS PAVEMENT PLAN. TOTAL STREET FRONTAGE = 603 LF AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB# 121184841.
2014-08-30ZONE — from ONE HUDSON YARDS OWNER LLC
2014-08-30CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2014-05-14Job filed: FOUNDATION WORK IN CONJUNCTION W/ NEW BUILDING. STRUCTURAL WORK (SUPERSTRUCTURE) IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-05-14Job filed: SUPPORT OF EXCAVATION WORK IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-05-14Job filed: FOUNDATION WORK IN CONJUNCTION W/ NEW BUILDING. STRUCTURAL WORK (SUPERSTRUCTURE) IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-05-14Job filed: SUPPORT OF EXCAVATION WORK IN CONJUNCTION W/ NEW BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH.
2014-02-19Job filed: SEE SECTION 24
2014-02-19Job filed: SEE SECTION 24
2013
2013-11-20Rodent inspection: Passed
2013-10-11Mortgage assigned — from NEW YORK COMMUNITY BANK to BANK OF AMERICA, N.A.
2013-10-11TL&R — from NEW YORK COMMUNITY BANK
2013-10-11Mortgage $70,000,000 — from ONE HUDSON YARDS OWNER LLC to BANK OF AMERICA, N.A.$70,000,000
2013-10-11Agreement $100,000,000 — from BANK OF AMERICA, N.A. to ONE HUDSON YARDS OWNER LLC$100,000,000
2013-10-11TL&R — from NEW YORK COMMUNITY BANK
2013-10-11Deed $168,000,000 — from STRATEGIC/EXTELL 34TH STREET, LLC to ONE HUDSON YARDS OWNER LLC$168,000,000
2013-08-19SMIS — from LEVEL 3 COMMUNICATIONS, LLC to LEVEL 3 COMMUNICATIONS, LLC
2013-03-22CTOR — from 514 WEST 34TH STREET CORP; 460 W 34TH ST ASSOC; AVON DEVELOPMENT ENTERPRISES INC; 9TH & 33 to LEVEL 3 COMMUNICATIONS, LLC
2013-01-09FDNY inspection (SPECIAL-OTH)
2012
2012-11-08Rodent inspection: Passed
2012-11-08Rodent inspection: Passed
2012-10-03ECB CLASS - 2 violation: 97**- FAILURE TO MAINTAIN ELEVATOR DEVICE. RESPONDENT FAILED TO PROVIDE PROPER ACCESS IN ORDER THAT THE DEPT CAR PERFORMED PERIODI$1,250
2012-09-13Rodent inspection: Failed for Other Reason
2012-09-13Rodent inspection: Failed for Other Reason
2012-04-03311: General Construction/Plumbing — Accident - Construction/Plumbing
2012-04-03DOB complaint, category ?
2011
2011-06-03Rodent inspection: Passed
2011-06-03Rodent inspection: Passed
2010
2010-11-23EASE $33,885,825 — from WEST 33TRD STREET LLC; STRATEGIC/EXTELL 34TH STREET, LLC to THE CITY OF NEW YORK$33,885,825
2010-10-20RPTT&RET — from WEST 33RD STREET LLC; STRATEGIC/EXTELL 34TH STREET, LLC to THE CITY OF NEW YORK
2010-10-20AL&R $30,000,000 — from STRATEGIC/EXTELL 34TH STREET, LLC; WEST 33RD STREET LLC to NEW YORK COMMUNITY BANK$30,000,000
2010-10-20Agreement $30,000,000 — from WEST 33RD STREET LLC; STRATEGIC/EXTELL 34TH STREET, LLC to NEW YORK COMMUNITY BANK$30,000,000
2010-10-15SUBM — from NEW YORK COMMUNITY BANK to STRATEGIC/EXTELL 34TH STREET, LLC
2010-09-03311: Stalled Sites — Stalled Construction Site
2010-09-03DOB complaint, category ?
2010-07-01ECB CLASS - 2 violation: FAILURE TO POST ANY PERMITS AT THIS LOCATIONS FENCE REMAINS UP AND NO PERMIT IS POSTED DEMOLITION JOB HAS NOT BEEN SIGNED OFF AND $4,000
2010-07-01ECB CLASS - 2 violation: FAILURE TO POST PROVIDE SIGNS REQUIRED AT JOBSITE PURSUANT TO SUBSECTION THERE ARE 2 OPEN NOT SIGNED OFF DEMOLITION PERMIT #104936$4,000
2010-06-24Rodent inspection: Passed
2010-06-24Rodent inspection: Passed
2009
2009-09-02DOB violation C:
2009-09-02DOB violation C:
2009-09-02ECB CLASS - 2 violation: EXPIRED PERMIT. NOTED: AT THE TIME OF INSPECTION ON DEMO SITE, SITE CLOSED NO ACTIVITY FENCE IN PLACE W/O A VALID FENCE PERMIT. PE$800
2009-09-02ECB CLASS - 2 violation: EXPIRED PERMIT. NOTED: AT THE TIME OF INSPECTION ON DEMO SITE, FENCE PERMIT #104936786 EXPIRED ON 6.11.09. NO PERMIT IN PROCESS. R$800
2009-09-02ECB CLASS - 2 violation: EXPIRED PERMIT. NOTED: AT THE TIME OF INSPECTION ON DEMO SITE, FENCE IN PLACE W/O A VALID PERMIT. FENCE PERMIT #104946374 EXPIRED$800
2008
2008-06-17Permit DM — ISSUED
2008-06-17Permit DM — ISSUED
2008-06-17Permit EQ — ISSUED
2008-04-22Job filed: INSTALLATION OF 304 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR DEMOLITION. FILED UNDER SEPARATE APPLICATION #104936786 & 104938882. SIDEWALK SHED
2008-04-15Permit EQ — ISSUED
2008-03-22ECB Non-Hazardous violation: NO PERMIT FOR SIDEWALK SHED UPON INSP AT 558-572 WEST 34 ST SIDEWALK SHED ERECTED AROUND DEMO SITE NO PERMIT WAS ISSUED FOR THIS A
2008-03-19Permit DM — ISSUED
2008-03-18Permit EQ — ISSUED
2008-03-18Permit DM — ISSUED
2008-03-16ECB Non-Hazardous violation: WORK W/O PERMIT UPON INSPECTION OF ABOVE ADDRESS FRAME FOR SIDEWALK SHED IN PLACE DOB RECORDS SHOW NO(8H) PERMIT WAS ISSUED. REMED$500
2008-02-06Permit EQ — ISSUED
2008-01-30Job filed: DM
2008-01-30Job filed: DM
2008-01-29Permit EQ — ISSUED
2007
2007-08-23Agreement — from NEW YORK COMMUNITY BANK to CITY OF NEW YORK
2007-08-23AL&R $60,000,000 — from STRATEGIC/ EXTELL 34TH STREET, LLC; WEST 33RD STREET LLC to NEW YORK COMMUNITY BANK$60,000,000
2007-08-23Agreement $60,000,000 — from WEST 33RD STREET LLC; STRATEGIC/ EXTELL 34TH STREET, LLC to NEW YORK COMMUNITY BANK$60,000,000
2007-08-23Mortgage $51,088,671 — from WEST 33RD STREET LLC; STRATEGIC/ EXTELL 34TH STREET, LLC to NEW YORK COMMUNITY BANK$51,088,671
2007-08-23Mortgage assigned — from SOVEREIGN BANK to NEW YORK COMMUNITY BANK
2007-08-23TL&R — from SOVEREIGN BANK
2007-08-23RPTT&RET $12,500,000 — from RIVER WATCH RESTAURANT, INC. to STRATEGIC/EXTELL 34TH STREET, LLC$12,500,000
2007-03-20DOB violation E:
2007-03-20DOB violation E:
2006
2006-12-19Permit EW — ISSUED
2006-11-06MAPS — from NYC DEPT. OF CITY PLANNING
2006-05-31DOB violation E:
2006-05-31DOB violation E:
2005
2005-08-16DOB violation E:
2004
2004-04-04ECB Non-Hazardous violation: WORK DOES NOT CONFORM TO APPROVED PLANS.NON-CONFORMING WORK NOTED:EXITDOORS NOT INSTALLED AS SHOWN ON PLANS DOOR TO RAMP NOT OPEN.$250
2003
2003-10-16ECB Non-Hazardous violation: PLACE OF ASSEMBLY IS CONTRARY TO APPROVED P.A PLAN# 103122381 NITE CLUB AND 103122381 RESTURANT.CELLAR CORRIDOR BETWEEN SERVICE AR$130
2003-07-09Agreement — from INDEPENDENCE COMMUNITY BANK to STRATEGIC/INTELL 34TH STREET, LLC
2003-07-09LEAS — from STRATEGIC/INTELL 34TH STREET LLC to URBANFETCH.COM, INC.
2003-07-09AL&R — from INDEPENDENCE COMMUNITY BANK to STRATEGIC/INTELL 34TH STREET, LLC
2003-07-09Mortgage assigned — from INDEPENDENCE COMMUNITY BANK to INDEPENDENCE COMMUNITY REALTY CORP.
2003-07-09Mortgage assigned — from INDEPENDENCE COMMUNITY REALTY CORP. to INDEPENDENCE COMMUNITY BANK
2003-07-09Mortgage $5,189,071 — from STRATEGIC/INTELL 34TH STREET, LLC to INDEPENDENCE COMMUNITY BANK$5,189,071
2003-06-23ECB Non-Hazardous violation: 83,R,# 83-R-# REMOVED ELEVATOR 1P24064 WITHOUT PERMIT
2002
2002-12-14ECB Non-Hazardous violation: PLACE OF ASSEMBLY CONTRARY TO APPROVED PLANS.IN THAT NORTH WALL CELLERSHOWS ONE 6'OPENING.NOW HAS TWO 6'OPENING NO SELF CLOSING FI$250
2002-12-14ECB Non-Hazardous violation: WORK W/O A PERMIT. WORK NOTED SEALED EXIT DOOR AT CELLAR NORTH EAST CORNER. OPENED FPSC DOOR. VARIOUS FIRE RATING MISSING OFFICE $800
2002-10-15Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY AWNING READING- COPACABANA NO CHANGE TO USE, EGRESS OR OC$3,000
2002-09-09Job filed: NEW CODED FIRE ALARM SYSTEM. NO CHANGE IN USE,EGRESS OR OCCUPANCY/$40,000
2002-06-18Agreement — from RIVER WATCH RESTAURANT INC. to INDEPENDENCE COMMUNITY BANK
2002-03-05Permit EW — ISSUED
2002-03-05Permit EW — ISSUED
2002-02-26Job filed: Erect temporary construction fence as shown on plans. No change in use, egress or occupancy.
2002-02-14Job filed: INSTALLATION OF FIRE ALARM SYSTEM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2002-02-14Job filed: Change use from shipping terminal and garage to eating and drinking establishment, Use Group 12A. Combine buildings (Lot 68 & Lot 1) into one bui$1,800,000
2002-02-14Job filed: Mechanical and plumbing work as shown on plans filed herewith.
2002-02-07Permit EW — ISSUED
2002-02-07Permit EW — ISSUED
2002-01-29Job filed: Interior structural demolition and new structural infrastructure improvements.$25,000
2002-01-29Job filed: Interior demolition as shown on plans filed herewith. No change in use, egress or occupancy.$10,000
2002-01-11Job filed: Interior structural demolition and new structural infrastructure improvements.$150,000
2002-01-11Job filed: Interior demolition as shown on plans filed herewith. No change in use, egress or occupancy.$35,000
2001
2001-08-31ECB Hazardous violation: FAILURE TO PROVIDE APPROVED PLACE OF ASSEMBLY PLAN AT TIME OF INSPECTION PLACE OF ASSEMBLY. PLAN IS REQUIRED AT TIME OF INSPECTION$200
2001-04-24REL — from 1567 BROADWAY FUNDING LLC to STRATEGIC/INTELL 34TH STREET, LLC; TIMES SQUARE PARTNERS LLC; INTELL 1567 LLC; 240 WEST 73
2001-04-24SAGE — from 1567 BROADWAY FUNDING LLC
2000
2000-12-18Permit PL — ISSUED
2000-10-12Permit EW — ISSUED
2000-10-12Permit EW — ISSUED
2000-08-31LEAS — from URBANFETCH.COM, INC. to STRATEGIC/INTELL 34TH STREET LLC
2000-08-25Agreement — from STRATEGIC/INTELL 34TH STREET LLC to URBANFETCH/.COM, INC.; PRINCIPAL COMMERCIALACCEPTANCE, L.L.C.
2000-08-08Agreement — from URBANFETCH.COM, INC. to INDEPENDENCE COMMUNITY BANK
2000-08-08SAGE — from PRINCIPAL COMMERCIALACCEPTANCE, LLC
2000-08-08Agreement — from STRATEGIC/INTELL 34TH STREET, LLC to INDEPENDENCE COMMUNITY BANK
2000-08-08Mortgage $4,000,000 — from STRATEGIC/INTELL 34TH STREET, LLC to INDEPENDENCE COMMUNITY BANK$4,000,000
2000-08-08Mortgage assigned — from STRATEGIC/INTELL 34TH STREET, LLC to INDEPENDENCE COMMUNITY BANK
2000-08-08Mortgage assigned — from PRINCIPAL COMMERCIALACCEPTANCE, LLC to INDEPENDENCE COMMUNITY BANK
2000-07-17Agreement — from STRATEGIC/INTELL 34TH STREET LLC to PRIMCIPAL COMMERCIALACCEPTANCE, LLC
2000-07-11Job filed: Installation of non-bearing partitions. No change in use, eggrees, or occupancy .$125,000
2000-05-25SMIS — from INTELL 34TH STREET LLC to PRINCIPAL COMMERCIALADVISOR'S INC.
2000-04-27Job filed: DEMOLITION OF NON-BEARING INTERIOR PARTITIONS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$15,000
1999
1999-03-16Mortgage assigned — from PRINCIPAL COMMERCIALADVISORS INC. to PRINCIPAL COMMERCIALACCEPTANCE, LLC
1999-03-16Deed — from INTELL 34TH STREET LLC to STRATEGIC/INTELL 34TH STREET, LLC
1999-02-01DTL — from BANK OF NEW YORK
1999-01-20ATL — from NYCTL 1997-1 TRUST to BANK OF NEW YORK
1998
1998-11-17DTL — from BANK OF NEW YORK
1998-08-12Deed — from BERRITTO, JANET ASEXECUTRIX; VIRTUOSO, THOMAS; BERRITTO, MARIO L/W/T to INTELL 34TH STREET LLC
1998-08-12Mortgage $656,650 — from INTELL 34TH STREET LLC to PRINCIPAL COMMERCIALADVISOR'S, INC.$656,650
1998-08-12SAGE — from MARINE MIDLAND BANK
1998-08-12Mortgage assigned — from INTELL 34TH STREET LLC to PRINCIPAL COMMERCIALADVISORS, INC.
1998-08-12SAGE — from MARINE MIDLAND BANK
1998-08-12SAGE — from BERRITTO, MARIO J.; VIRTUOSO, THOMAS
1998-08-12Mortgage assigned — from MARINE MIDLAND BANK to PRINCIPAL COMMERCIALADVISORS, INC.
1998-03-12AMTL — from COMMISSIONER OF FINANCE; BANK OF NEW YORK
1997
1997-12-03DOB complaint, category ?
1997-08-07TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1997-06-18TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1996
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1992
1992-07-21Mortgage assigned — from BERRITTO, MARIO J.; VIRTUOSO, THOMAS to MARINE MIDLAND BANKNA
1992-07-21Agreement — from BERRITTO, MARIO J.; VIRTUOSO, THOMAS to MARINE MIDLAND BANKNA
1990
1990-06-29DOB violation LL1081: 1
1989
1989-10-12DOB violation LL1081: 3
1988
1988-11-14Mortgage assigned — from HOME SVGS BK to MARINE MIDLAND BANK
1988-11-14Mortgage $2,246,331 — from BERRITTO, MARIO J; VIRTUSOS, THOMAS to MARINE MIDLAND BANK$2,246,331
1988-11-14Agreement — from MARINE MIDLAND BANK to BERRITTO, MARIO J; VIRTUOSO, THOMAS
1988-09-27DOB violation E: (51)PROVIDE MOTOR ROOM LIGHT.(52)PROPERLY DATE & TAG FOR 5 YEAR TEST.(53)REPLACE DOOR KNOB ON MOTOR ROOM DOOR
1985
1985-06-04Mortgage satisfied — from LINCOLN SQUR SCNC ETC to BANCO POPULAR DE ETC
1985-03-14Agreement — from BERRITTO, MARIO J to HAMBURG SAVINGS BANK
1985-03-14Mortgage assigned — from BERRITTO, MARIO J; VIRTUOSO, THOMAS to HAMBURG SAVINGS BANK
1985-03-14Mortgage assigned — from BANK LEUMI TRUST CONY to HAMBURG SAVINGS BANK
1984
1984-05-17Agreement — from VIRTUOSO, THOMAS; BERRITTO, MARIO J. to BANK LEUMI TR CO NY
1982
1982-08-27Deed — from BALZARETTI, ALFRED C.; BERRITTO, MARIO J.; VIRTUOSO, THOMAS to BERRITTO, MARIO J.; VIRTUOSO, THOMAS
1980
1980-06-27Deed — from LINCOLN SQUARE ETAL to BALZARETTI, ALFRED C; BERRITTO, MARIA J; VIRTUOSO, THOMAS
1980-06-19Deed — from INTERSTATE DRESS CRRRS to LINCOLN SQUARE SCNCSTDS
1980-06-19Mortgage — from LINCOLN SQUARE ETAL to BANCO POPULAR DE ETAL
1900
1900-01-01Restaurant inspection: THIRD POINT
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL