Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
930 service requests in the last three years. Most common: Vendor Enforcement (875) · Illegal Parking (9) · Taxi Complaint (7) · Homeless Person Assistance (6) · Lost Property (6) · Noise (3).
Filed construction activity
$583,041,769 in permitted construction work filed since
2016 (406 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$16,232,105
$7,304,447
2026
$16,694,105
$7,512,347
2027
$17,057,105
$7,675,697
The city's market estimate has risen
5% between tax years 2025 and 2027.
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 6 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Penn Station — A C E · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full 34 St-Hudson Yards — 7 · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 9 Av / W 34 St — M11 · 350 ft
Citi Bike
9 Ave & W 33 St · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
930 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2026-06-02
Agreement $1,900,000,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC; BOP SE LLC to CITI REAL ESTATE FUNDING INC.; BANK OF AMERICA, N.A.; GERMAN AMERICAN CAPITAL CORP
$1,900,000,000
2026-06-02
Mortgage $378,148,000 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP SE LLC to SANTANDER BANK, N.A.; CITI REAL ESTATE FUNDING INC.; BANK OF MONTREAL; WELLS FARGO BA
$378,148,000
2025-04-15
Agreement $156,200,000 — from BOP MW RETAIL SUBSIDIARY LLC to CITIBANK, N.A.; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
$156,200,000
2024-08-07
Agreement $156,200,000 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to CITIBANK, N.A.
$156,200,000
2024-08-07
Mortgage $3,158,774 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to CITIBANK, N.A.
$3,158,774
2023-11-06
CMTG $2,537,501 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY
$2,537,501
2023-11-01
RPTT $94,080,000 — from MEMBERS OF BP US REIT LLC to BPR HOLDING REIT I LLC
$94,080,000
2022-04-15
Mortgage $5,030,215 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC; to MANUFACTURERS AND TRADERS TRUST COMPANY
$5,030,215
2022-04-15
Mortgage $2,582,284 — from BOP MW RETAIL SUBSIDIARY LLC; BOP SE RETAIL LLC; BOP NE RETAIL LLC; BOP SW RETAIL LLC; NEW to MANUFACTURERS AND TRADERS TRUST COMPANY
$2,582,284
2020-09-02
Mortgage $201,522,400 — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; DBR INVESTMENTS CO. LIMITED; CITI REAL ESTATE FU
$201,522,400
2020-09-02
Agreement $1,500,000,000 — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to DBR INVESTMENTS CO. LIMITED; BARCLAYS CAPITAL REAL ESTATE INC.; CITI REAL ESTATE FUNDING I
$1,500,000,000
2020-07-29
Mortgage $11,482,474 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC; to MANUFACTURERS AND TRADERS TRUST COMPANY
$11,482,474
2020-07-29
Mortgage $22,367,526 — from BOP NE RETAIL LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC; to MANUFACTURERS AND TRADERS TRUST COMPANY
$22,367,526
2020-07-29
Mortgage $6,251,100 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; HUDSON YARDS INFRASTRUCTURE CORPORATION
$6,251,100
2020-07-29
Mortgage $388,750 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC to HUDSON YARDS INFRASTRUCTURE CORPORATION; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
$388,750
Ten-year activity
1,0005000
2017
2018
2019
2020
2021
2022
2023
2024
850
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
42
31
0
0
0
73
2018
72
44
0
0
3
119
2019
189
6
0
0
7
202
2020
347
62
0
114
9
532
2021
142
4
0
8
4
158
2022
101
5
60
4
4
174
2023
87
2
161
2
8
260
2024
45
15
72
18
8
158
2025
15
3
825
3
4
850
2026
46
5
7
6
6
70
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Interior renovations has shown on plans filed herewith.
2026-09-15
Permit Mechanical Systems — Permit Issued
2026-09-14
Permit Sprinklers — Permit Issued
2026-09-10
Restaurant inspection: ERNST & YOUNG — grade A
2026-09-03
311: Homeless Person Assistance — Non-Chronic
2026-08-28
Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION,; BANK OF AMERICA, N.A.,; BANK OF MONTREAL; GERMAN to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2026-08-27
311: Lost Property — Bag/Wallet
2026-08-25
Job filed: Sprinkler work as shown on plans filed herewith.
2026-08-13
Permit General Construction — Permit Issued
2026-08-12
Job filed: Mechanical work as shown on plans filed herewith.
2026-08-11
Permit Plumbing — Permit Issued
2026-08-11
Permit Plumbing — Permit Issued
2026-08-03
Permit General Construction — Permit Issued
2026-08-03
Permit Mechanical Systems — Permit Issued
2026-07-29
Job filed: General construction as shown on plans.
2026-07-20
Permit Sign — Permit Issued
2026-07-20
Permit Sign — Permit Issued
2026-07-16
Permit Mechanical Systems — Permit Issued
2026-07-16
Permit General Construction — Permit Issued
2026-07-15
Job filed: Propose to install non-advertising sign. No change in use, egress, or occupancy.
2026-07-14
Job filed: Modification of sprinkler system as shown on plans.
2026-07-13
Job filed: INTERIOR ALTERATION OF AN EXISTING COMMERCIAL SPACE. WORK INCLUDES NEW INTERIOR PARTITIONS, CEILINGS, FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY
2026-07-13
Job filed: Mechanical work as shown on plans in conjunction with GC work type.
2026-07-13
Job filed: Plumbing work as shown on plans subsequent to GC work type.
2026-07-06
Certificate of occupancy Renewal Without Change
2026-07-01
Permit Mechanical Systems — Permit Issued
2026-06-19
Job filed: Modifications to the existing ductwork system. No change in use, egress or occupancy.
2026-06-18
Job filed: Interior alteration for landlord pre-build office space, including removal of existing non-load bearing partitions, ceilings, and finishes and adding
2026-06-14
311: Graffiti — Graffiti
2026-06-11
Facade (LL11) filing, cycle 10: SAFE
2026-06-02
Agreement $1,900,000,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC; BOP SE LLC to CITI REAL ESTATE FUNDING INC.; BANK OF AMERICA, N.A.; GERMAN AMERICAN CAPITAL CORP
2026-06-02
Agreement — from SANTANDER BANK, N.A.; GERMAN AMERICAN CAPITAL CORPORATION; BANK OF MONTREAL; WELLS FARGO B to BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2026-06-02
Mortgage $378,148,000 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP SE LLC to SANTANDER BANK, N.A.; CITI REAL ESTATE FUNDING INC.; BANK OF MONTREAL; WELLS FARGO BA
2026-06-02
Agreement — from SANTANDER BANK, N.A.; BANK OF MONTREAL; CITI REAL ESTATE FUNDING INC.; GERMAN AMERICAN CAP to BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2026-05-19
Mortgage assigned — from CITIBANK, N.A. to BANK OF MONTREAL; BANK OF AMERICA, N.A.; GERMAN AMERICAN CAPITAL CORPORATION; WELLS FARGO
2026-05-19
Job filed: Outdoor event for dogs and their owners, with monitored entry.
Job filed: Sprinkler work as shown on plans. No change in use, egress or occupancy.
2026-01-31
311: Snow or Ice — Roadway
2026-01-15
Certificate of occupancy Renewal Without Change
2026-01-14
Permit Sprinklers — Permit Issued
2026-01-14
Permit Structural — Permit Issued
2026-01-14
Permit Sprinklers — Permit Issued
2026-01-14
Permit General Construction — Permit Issued
2026-01-14
Permit Structural — Permit Issued
2026-01-14
Permit General Construction — Permit Issued
2026-01-13
Permit Mechanical Systems — Permit Issued
2026-01-13
Permit Mechanical Systems — Permit Issued
2026-01-05
Permit General Construction — Signed-off
2025-12-29
Job filed: Temporary dome for an event in the plaza. To be removed at the end of the programing. No changes to existing structures, use or egress.
2025-12-23
311: Vendor Enforcement — Food Vendor
2025-12-23
311: Vendor Enforcement — Food Vendor
2025-12-23
Permit Mechanical Systems — Permit Issued
2025-12-22
311: Vendor Enforcement — Food Vendor
2025-12-22
311: Vendor Enforcement — Food Vendor
2025-12-22
311: Vendor Enforcement — Food Vendor
2025-12-21
311: Vendor Enforcement — Food Vendor
2025-12-21
311: Vendor Enforcement — Food Vendor
2025-12-21
311: Vendor Enforcement — Food Vendor
showing the 80 most recent
The full timeline
showing the 2,000 most recent of
2,676 events
2026
2026-10-01Permit Sprinklers — Permit Issued
2026-09-28Permit Sprinklers — Permit Issued
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-21Permit Plumbing — Permit Issued
2026-09-18Job filed: SPRINKLER WORK AS SHOWN ON PLANS$59,000
2026-09-18Job filed: MECHANICAL WORK AS SHOWN ON PLANS$287,000
2026-09-18Job filed: PLUMBING WORK AS SHOWN ON PLANS$131,350
2026-09-18Permit General Construction — Permit Issued
2026-09-16Job filed: Interior renovations has shown on plans filed herewith.$1,624,323
2026-09-15Permit Mechanical Systems — Permit Issued
2026-09-14Permit Sprinklers — Permit Issued
2026-09-10Restaurant inspection: ERNST & YOUNG — grade A
2026-09-03311: Homeless Person Assistance — Non-Chronic
2026-08-28Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION,; BANK OF AMERICA, N.A.,; BANK OF MONTREAL; GERMAN to COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2026-08-27311: Lost Property — Bag/Wallet
2026-08-25Job filed: Sprinkler work as shown on plans filed herewith.$15,000
2026-08-13Permit General Construction — Permit Issued
2026-08-12Job filed: Mechanical work as shown on plans filed herewith.$375,000
2026-08-11Permit Plumbing — Permit Issued
2026-08-11Permit Plumbing — Permit Issued
2026-08-03Permit General Construction — Permit Issued
2026-08-03Permit Mechanical Systems — Permit Issued
2026-07-29Job filed: General construction as shown on plans.$461,000
2026-07-20Permit Sign — Permit Issued
2026-07-20Permit Sign — Permit Issued
2026-07-16Permit Mechanical Systems — Permit Issued
2026-07-16Permit General Construction — Permit Issued
2026-07-15Job filed: Propose to install non-advertising sign. No change in use, egress, or occupancy.$1,000
2026-07-14Job filed: Modification of sprinkler system as shown on plans.$17,998
2026-07-13Job filed: INTERIOR ALTERATION OF AN EXISTING COMMERCIAL SPACE. WORK INCLUDES NEW INTERIOR PARTITIONS, CEILINGS, FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY$194,995
2026-07-13Job filed: Mechanical work as shown on plans in conjunction with GC work type.$61,963
2026-07-13Job filed: Plumbing work as shown on plans subsequent to GC work type.$45,956
2026-07-06Certificate of occupancy Renewal Without Change
2026-07-01Permit Mechanical Systems — Permit Issued
2026-06-19Job filed: Modifications to the existing ductwork system. No change in use, egress or occupancy.
2026-06-18Job filed: Interior alteration for landlord pre-build office space, including removal of existing non-load bearing partitions, ceilings, and finishes and adding $320,000
2026-06-14311: Graffiti — Graffiti
2026-06-11Facade (LL11) filing, cycle 10: SAFE
2026-06-02Agreement $1,900,000,000 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC; BOP SE LLC to CITI REAL ESTATE FUNDING INC.; BANK OF AMERICA, N.A.; GERMAN AMERICAN CAPITAL CORP$1,900,000,000
2026-06-02Agreement — from SANTANDER BANK, N.A.; GERMAN AMERICAN CAPITAL CORPORATION; BANK OF MONTREAL; WELLS FARGO B to BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2026-06-02Mortgage $378,148,000 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP SE LLC to SANTANDER BANK, N.A.; CITI REAL ESTATE FUNDING INC.; BANK OF MONTREAL; WELLS FARGO BA$378,148,000
2026-06-02Agreement — from SANTANDER BANK, N.A.; BANK OF MONTREAL; CITI REAL ESTATE FUNDING INC.; GERMAN AMERICAN CAP to BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2026-05-19Mortgage assigned — from CITIBANK, N.A. to BANK OF MONTREAL; BANK OF AMERICA, N.A.; GERMAN AMERICAN CAPITAL CORPORATION; WELLS FARGO
2026-05-19Job filed: Outdoor event for dogs and their owners, with monitored entry.
2026-02-20Job filed: Sprinkler work as shown on plans. No change in use, egress or occupancy.$105,500
2026-01-31311: Snow or Ice — Roadway
2026-01-15Certificate of occupancy Renewal Without Change
2026-01-14Permit Sprinklers — Permit Issued
2026-01-14Permit Structural — Permit Issued
2026-01-14Permit Sprinklers — Permit Issued
2026-01-14Permit General Construction — Permit Issued
2026-01-14Permit Structural — Permit Issued
2026-01-14Permit General Construction — Permit Issued
2026-01-13Permit Mechanical Systems — Permit Issued
2026-01-13Permit Mechanical Systems — Permit Issued
2026-01-05Permit General Construction — Signed-off
2025
2025-12-29Job filed: Temporary dome for an event in the plaza. To be removed at the end of the programing. No changes to existing structures, use or egress.$5,000
2025-12-23311: Vendor Enforcement — Food Vendor
2025-12-23311: Vendor Enforcement — Food Vendor
2025-12-23Permit Mechanical Systems — Permit Issued
2025-11-26Job filed: Susman Godfrey Holiday Party 2025
2025-11-25311: Vendor Enforcement — Food Vendor
2025-11-25311: Vendor Enforcement — Food Vendor
2025-11-24311: Vendor Enforcement — Food Vendor
2025-11-23311: Vendor Enforcement — Food Vendor
2025-11-23311: Vendor Enforcement — Food Vendor
2025-11-23311: Vendor Enforcement — Food Vendor
2025-11-23311: Vendor Enforcement — Food Vendor
2025-11-21311: Vendor Enforcement — Food Vendor
2025-11-21311: Vendor Enforcement — Food Vendor
2025-11-20311: Vendor Enforcement — Food Vendor
2025-11-19311: Vendor Enforcement — Food Vendor
2025-11-19311: Vendor Enforcement — Food Vendor
2025-11-18311: Vendor Enforcement — Food Vendor
2025-11-18311: Vendor Enforcement — Food Vendor
2025-11-17311: Vendor Enforcement — Food Vendor
2025-11-17311: Vendor Enforcement — Food Vendor
2025-11-17311: Vendor Enforcement — Food Vendor
2025-11-14311: Vendor Enforcement — Food Vendor
2025-11-14311: Vendor Enforcement — Food Vendor
2025-11-13311: Vendor Enforcement — Food Vendor
2025-11-12311: Vendor Enforcement — Food Vendor
2025-11-11311: Vendor Enforcement — Food Vendor
2025-11-11311: Vendor Enforcement — Food Vendor
2025-11-11311: Vendor Enforcement — Food Vendor
2025-11-10311: Vendor Enforcement — Food Vendor
2025-11-10311: Vendor Enforcement — Food Vendor
2025-11-10311: Vendor Enforcement — Food Vendor
2025-11-07311: Vendor Enforcement — Food Vendor
2025-11-07311: Vendor Enforcement — Food Vendor
2025-11-06311: Vendor Enforcement — Food Vendor
2025-11-06311: Vendor Enforcement — Food Vendor
2025-11-04311: Vendor Enforcement — Food Vendor
2025-11-04311: Vendor Enforcement — Food Vendor
2025-11-03311: Vendor Enforcement — Food Vendor
2025-11-03311: Vendor Enforcement — Food Vendor
2025-11-03311: Vendor Enforcement — Food Vendor
2025-11-03311: Vendor Enforcement — Food Vendor
2025-11-02311: Vendor Enforcement — Food Vendor
2025-11-02311: Vendor Enforcement — Food Vendor
2025-11-02311: Vendor Enforcement — Food Vendor
2025-11-02311: Vendor Enforcement — Food Vendor
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-10-30311: Vendor Enforcement — Food Vendor
2025-10-30311: Vendor Enforcement — Food Vendor
2025-10-29311: Vendor Enforcement — Food Vendor
2025-10-29311: Vendor Enforcement — Food Vendor
2025-10-29Job filed: Adjustment of existing sprinkler heads to accommodate new layout. Revision from upright to pendant heads in spaces where ceiling is being added.$75,001
2025-10-29Job filed: Interior renovation of an existing business-use, tenant space. Demolition scope includes removal of existing partitions, finishes & ceilings. New work$350,000
2025-10-29Job filed: Adjustment of existing ductwork, diffusers and terminal units to accommodate the new layout.$150,000
2025-10-29Job filed: Relocating the steel supporting the folding Partition wall stack to allow for the wall to be Extended one panel.$50,010
2024-12-03Job filed: Susman Godfrey Holiday Party 2024
2024-12-02311: Vendor Enforcement — Food Vendor
2024-12-02311: Vendor Enforcement — Food Vendor
2024-12-02Permit General Construction — Signed-off
2024-12-01311: Vendor Enforcement — Food Vendor
2024-11-30311: Vendor Enforcement — Food Vendor
2024-11-29311: Vendor Enforcement — Food Vendor
2024-11-29311: Vendor Enforcement — Food Vendor
2024-11-27311: Vendor Enforcement — Food Vendor
2024-11-27Job filed: Installing ductwork distribution with fan powered boxes for cooling and heating. Also install water cooled ac units for supplemental cooling. No chan$3,299,370
2024-11-27Job filed: Modification to existing plumbing systems and installation of fixtures. No change in use, egress or occupancy.$40,000
2024-11-27Job filed: Removal of existing temporary sprinkler loop and installation of new sprinkler systems on 8-10 floors and installation of (1) new hose on 9th floor. N$414,934
2024-11-26Job filed: Removal and renovation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.$14,499,620
2024-11-26Job filed: Temporary outdoor sculpture platform on the plaza. Island of Warmth. Removed at the end of the programing. No changes to existing structures, use or e$5,000
2024-11-20311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2024-11-20311: Vendor Enforcement — Food Vendor
2024-11-19311: Vendor Enforcement — Food Vendor
2024-11-18311: Vendor Enforcement — Food Vendor
2024-11-17311: Vendor Enforcement — Food Vendor
2024-11-16311: Blocked Driveway — No Access
2024-11-15311: Vendor Enforcement — Food Vendor
2024-11-14311: Vendor Enforcement — Food Vendor
2024-11-13311: Vendor Enforcement — Food Vendor
2024-11-13Job filed: OPEN SPACE WAYFINDING: MINOR STRUCTURAL WORK IN CONJUNCTION WITH ON-SITE WAYFINDING PROGRAM FOR THE DIRECTION & CONVENIENCE OF THE PUBLIC. ALL WORK IS$20,000
2024-11-12311: Vendor Enforcement — Food Vendor
2024-11-11311: Vendor Enforcement — Food Vendor
2024-11-10311: Vendor Enforcement — Food Vendor
2024-11-09311: Vendor Enforcement — Food Vendor
2024-11-06311: Vendor Enforcement — Food Vendor
2024-11-05311: Rodent — Rat Sighting
2024-11-05311: Vendor Enforcement — Food Vendor
2024-11-04311: Vendor Enforcement — Food Vendor
2024-11-03311: Vendor Enforcement — Food Vendor
2024-11-02311: Vendor Enforcement — Food Vendor
2024-11-01311: Vendor Enforcement — Food Vendor
2024-10-31311: Vendor Enforcement — Food Vendor
2024-10-30311: Vendor Enforcement — Food Vendor
2024-10-29311: Vendor Enforcement — Food Vendor
2024-10-25311: Vendor Enforcement — Food Vendor
2024-10-24311: Vendor Enforcement — Food Vendor
2024-10-23311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2024-10-23311: Vendor Enforcement — Food Vendor
2024-10-23DOB complaint, category ?
2024-10-22311: Vendor Enforcement — Food Vendor
2024-10-21Rodent inspection: Passed
2024-10-21311: Vendor Enforcement — Food Vendor
2024-10-20311: Vendor Enforcement — Food Vendor
2024-10-19311: Vendor Enforcement — Food Vendor
2024-10-18311: Vendor Enforcement — Food Vendor
2024-10-17311: Vendor Enforcement — Food Vendor
2024-10-16311: Vendor Enforcement — Food Vendor
2024-10-15Restaurant inspection: ERNST AND YOUNG — grade A
2024-10-15Restaurant inspection: ERNST AND YOUNG — grade A
2024-10-15Restaurant inspection: ERNST AND YOUNG — grade A
2024-10-11311: Vendor Enforcement — Food Vendor
2024-10-07Certificate of occupancy Renewal Without Change
2024-10-04311: Vendor Enforcement — Food Vendor
2024-10-03311: Vendor Enforcement — Food Vendor
2024-10-02311: Vendor Enforcement — Food Vendor
2024-09-30Job filed: Temporary tented food festival. Open to the public with monitored entry, with food and beverage served.
2024-09-26Permit Sprinklers — Signed-off
2024-09-24Permit Mechanical Systems — Signed-off
2024-09-20Permit General Construction — Permit Issued
2024-09-19Permit General Construction — Signed-off
2024-09-13CONS — from CITIBANK, N.A.
2024-09-13311: Vendor Enforcement — Food Vendor
2024-09-12SMIS — from 450 PARTNERS LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP NE LLC; BOP NW LOFT LLC; BOP NW LLC; B
2024-09-12SMIS — from 450 PARTNERS LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP NE LLC; BOP NW LOFT LLC; BOP NW LLC; B
2024-09-12311: Vendor Enforcement — Food Vendor
2024-09-12311: Vendor Enforcement — Food Vendor
2024-09-11311: Vendor Enforcement — Food Vendor
2024-09-11311: Vendor Enforcement — Food Vendor
2024-09-11Job filed: Tenant alterations to commercial interior. Interior demolition only.$283,686
2024-09-09FDNY inspection (COM_OCPCY)
2024-09-09FDNY inspection (COM_OCPCY)
2024-09-06Job filed: New branch ductwork, new diffusers, rebalancing existing diffusers$72,013
2024-09-06Job filed: MINOR MODIFICATIONS TO THE EXSITING SPRINKLER SYSTEM$7,000
2024-08-29311: Elevator — Elevator - Multiple Devices On Property
2024-08-29DOB complaint, category ?
2024-08-26Agreement — from CITIBANK, N.A. to NATIONAL HOCKEY LEAGUE; NHL ENTERPRISES, L.P.; BOP MW RETAIL SUBSIDIARY LLC
2024-08-22Agreement — from CITIBANK, N.A. to BOP MW RETAIL SUBSIDIARY LLC; BOP NW LOFT LLC; BOP NE LLC; BOP SE LLC; BOP MW RESIDENTIAL
2024-08-22Agreement — from CITIBANK, N.A. to BOP MW RETAIL SUBSIDIARY LLC; BOP NW LOFT LLC; BOP NE LLC; BOP SE LLC; BOP MW RESIDENTIAL
2024-08-15311: Homeless Person Assistance
2024-08-14FDNY inspection (COM_OCPCY)
2024-08-14FDNY inspection (COM_OCPCY)
2024-08-14FDNY inspection (COM_OCPCY)
2024-08-14FDNY inspection (THEATER)
2024-08-14FDNY inspection (COM_OCPCY)
2024-08-08311: Homeless Person Assistance
2024-08-07Agreement — from CITIBANK, N.A. to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC
2024-08-07Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2024-08-07Agreement $156,200,000 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to CITIBANK, N.A.$156,200,000
2024-08-07Mortgage $3,158,774 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to CITIBANK, N.A.$3,158,774
2024-08-07Mortgage assigned — from MANUFACTURERS AND TRADERS TRUST COMPANY to CITIBANK, N.A.
2024-08-07Mortgage satisfied — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY
2024-08-07Job filed: Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.$104,440
2024-07-15Certificate of occupancy Renewal With Change
2024-07-11Agreement — from BOP SE LLC; BOP NW LLC; BOP NE LLC; BOP MW RESIDENTIAL MARKET LLC to MANHATTAN WEST OWNERS ASSOCIATION LLC
2024-07-11Agreement — from MANUFACTURERS AND TRADERS TRUST COMPANY to MANHATTAN WEST OWNERS ASSOCIATION LLC; BOP NW LLC; BOP NE LLC; BOP MW RESIDENTIAL MARKET L
2024-07-11Agreement — from BOP SE LLC; BOP NW LLC; BOP NE LLC; BOP MW RESIDENTIAL MARKET LLC to MANHATTAN WEST OWNERS ASSOCIATION LLC
2024-07-11Agreement — from WILMINGTON TRUST, NATIONAL ASSOCIATION, to BOP MW RESIDENTIAL MARKET LLC; BOP NE LLC; BOP NW LLC; MANHATTAN WEST OWNERS ASSOCIATION L
2024-07-02Job filed: No Work
2024-07-02Job filed: No Work
2024-07-02Job filed: No Work
2024-05-16311: Consumer Complaint — Street Fair Vendor
2024-05-16311: Consumer Complaint — Street Fair Vendor
2024-05-15Restaurant inspection: ARAMARK@ACCENTURE #19261 — grade A
2024-05-14311: Vendor Enforcement — Food Vendor
2024-05-06Permit Plumbing — Signed-off
2024-05-06Permit Sprinklers — Signed-off
2024-05-06Permit Standpipe — Signed-off
2024-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-05-02311: Found Property — Electronics/Phones
2024-04-24Permit General Construction — Signed-off
2024-04-23Permit Structural — Signed-off
2024-04-23Permit Mechanical Systems — Signed-off
2024-04-16Job filed: Removal and renovation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.$14,499,620
2024-04-16Job filed: Removal of existing temporary sprinkler loop and installation of new sprinkler systems on 8-10 floors and installation of (1) new hose on 9th floor. N$414,934
2024-04-16Job filed: Modification to existing plumbing systems and installation of fixtures. No change in use, egress or occupancy.$40,000
2024-04-16Job filed: Modifications to existing strucutral systems as per plans filed herewith. No change in use, egress or occupancy,$749,760
2024-04-16Job filed: Installing ductwork distribution with fan powered boxes for cooling and heating. Also install water cooled ac units for supplemental cooling. No chan$3,299,370
2024-04-05Permit Structural — Signed-off
2024-04-01Job filed: OPEN SPACE WAYFINDING: MINOR STRUCTURAL WORK IN CONJUNCTION WITH ON-SITE WAYFINDING PROGRAM FOR THE DIRECTION & CONVENIENCE OF THE PUBLIC. ALL WORK IS$20,000
2024-03-29EASE — from BOP MW RESIDENTIAL MARKET LLC; BOP NW LLC; BOP SE LLC; 450 PARTNERS LLC to BOP NW LOFT LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP NE LLC
2024-03-29EASE — from BOP MW RESIDENTIAL MARKET LLC; BOP NW LLC; BOP SE LLC; 450 PARTNERS LLC to BOP NW LOFT LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP NE LLC
2024-03-25Certificate of occupancy Renewal Without Change
2024-01-30Job filed: Installation of a 3 ton water sourced heatpump to serve CEOs Office on 67th floor. Mechanical work as per plans filed herewith. No change to use, egr$30,000
2024-01-28311: Consumer Complaint — Street Fair Vendor
2024-01-25Permit Mechanical Systems — Permit Issued
2024-01-14311: Rodent — Rat Sighting
2024-01-12311: Vendor Enforcement — Food Vendor
2024-01-11Permit Plumbing — Signed-off
2024-01-08Permit Sprinklers — Signed-off
2024-01-08Permit Standpipe — Signed-off
2024-01-06Permit Mechanical Systems — Signed-off
2024-01-06Permit General Construction — Signed-off
2024-01-04311: Vendor Enforcement — Food Vendor
2024-01-04311: Vendor Enforcement — Food Vendor
2024-01-02Certificate of occupancy Renewal With Change
2023
2023-12-29311: Vendor Enforcement — Food Vendor
2023-12-28311: Vendor Enforcement — Food Vendor
2023-12-27Permit Mechanical Systems — Permit Issued
2023-12-22311: Vendor Enforcement — Food Vendor
2023-12-21311: Vendor Enforcement — Food Vendor
2023-12-21311: Vendor Enforcement — Food Vendor
2023-12-20311: Vendor Enforcement — Food Vendor
2023-12-15311: Vendor Enforcement — Food Vendor
2023-12-14311: Vendor Enforcement — Food Vendor
2023-12-14311: Vendor Enforcement — Food Vendor
2023-12-14Job filed: Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.$104,440
2023-12-12311: Vendor Enforcement — Food Vendor
2023-12-08Elevator permit: Regroove drive sheave only 1P50387 -**All work to be done per ASME A17.1-2013, Part 8, Section 8.7.2, Safety Code for Elevators an$15,000
2023-12-08311: Vendor Enforcement — Food Vendor
2023-12-08311: Vendor Enforcement — Food Vendor
2023-12-07311: Vendor Enforcement — Food Vendor
2023-12-06Elevator permit: Regroove drive sheave only 1P50389 -**All work to be done per ASME A17.1-2013, Part 8, Section 8.7.2, Safety Code for Elevators an$15,000
2023-12-06Elevator permit: Regroove drive sheave only 1P50388 -**All work to be done per ASME A17.1-2013, Part 8, Section 8.7.2, Safety Code for Elevators an$15,000
2023-12-05311: Vendor Enforcement — Food Vendor
2023-12-01311: Vendor Enforcement — Food Vendor
2023-11-30311: Vendor Enforcement — Food Vendor
2023-11-30311: Vendor Enforcement — Food Vendor
2023-11-28Job filed: Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.$67,595
2023-11-28Job filed: Interior fit-out of partitions, ceilings, and door for pre-built suites. No change in use, egress, or occupancy.$931,693
2023-11-28Job filed: Installation of new sprinkler heads and related piping. Installation of new FHC and related piping. No change in use, egress, or occupancy.$37,225
2023-11-17Permit General Construction — Signed-off
2023-11-17Permit Mechanical Systems — Signed-off
2023-11-13Permit Mechanical Systems — Signed-off
2023-11-09311: Vendor Enforcement — Food Vendor
2023-11-09311: Vendor Enforcement — Food Vendor
2023-11-09Permit General Construction — Signed-off
2023-11-06CMTG $2,537,501 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC to MANUFACTURERS AND TRADERS TRUST COMPANY$2,537,501
2023-11-02311: Vendor Enforcement — Food Vendor
2023-11-02311: Noise - Vehicle — Engine Idling
2023-11-01RPTT $94,080,000 — from MEMBERS OF BP US REIT LLC to BPR HOLDING REIT I LLC$94,080,000
2023-10-25311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-10-24311: Taxi Complaint — Driver Complaint - Non Passenger
2023-10-20311: Vendor Enforcement — Food Vendor
2023-10-20311: Vendor Enforcement — Food Vendor
2023-10-20Job filed: No Work
2023-10-19311: Vendor Enforcement — Food Vendor
2023-10-19311: Vendor Enforcement — Food Vendor
2023-10-13311: Vendor Enforcement — Food Vendor
2023-10-13311: Vendor Enforcement — Food Vendor
2023-10-12311: Vendor Enforcement — Food Vendor
2023-10-06311: Vendor Enforcement — Food Vendor
2023-10-06311: Vendor Enforcement — Food Vendor
2023-10-05311: Vendor Enforcement — Food Vendor
2023-10-05311: Vendor Enforcement — Food Vendor
2023-10-05311: Vendor Enforcement — Food Vendor
2023-09-28311: Vendor Enforcement — Food Vendor
2023-09-28311: Vendor Enforcement — Food Vendor
2023-09-27Permit Construction Fence — Permit Issued
2023-09-26311: Food Poisoning — 1 or 2
2023-09-25Permit General Construction — Signed-off
2023-09-22311: Vendor Enforcement — Food Vendor
2023-09-22311: Vendor Enforcement — Food Vendor
2023-09-21311: Vendor Enforcement — Food Vendor
2023-09-21311: Vendor Enforcement — Food Vendor
2023-09-19Permit Sprinklers — Permit Issued
2023-09-19Permit Plumbing — Permit Issued
2023-09-19Job filed: Temporary lighting structures for an event on the plaza. Removed at the end of the programing. No changes to existing structures, use or egress.$5,000
2023-09-18Permit Plumbing — Signed-off
2023-09-18Permit Sprinklers — Signed-off
2023-09-18Permit Mechanical Systems — Signed-off
2023-09-14311: Vendor Enforcement — Food Vendor
2023-09-14311: Vendor Enforcement — Food Vendor
2023-09-11Job filed: No Work
2023-09-08311: Vendor Enforcement — Food Vendor
2023-09-07311: Vendor Enforcement — Food Vendor
2023-09-07311: Vendor Enforcement — Food Vendor
2023-09-07Job filed: Plumbing work as shown on plans filed herewith for a tenant fitout.$89,958
2023-09-07Job filed: Sprinkler system modification as shown on plans for tenant fitout.$79,968
2023-09-06Job filed: Mechanical work as shown on plans for tenant fitout$149,990
2023-09-05Permit Mechanical Systems — Signed-off
2023-09-01311: Vendor Enforcement — Food Vendor
2023-09-01311: Vendor Enforcement — Food Vendor
2023-08-31311: Vendor Enforcement — Food Vendor
2023-08-31Permit Mechanical Systems — Permit Issued
2023-08-31Job filed: Tenant buildout as shown on the plans. No change to use egress or occupancy.$649,956
2023-08-28311: Vendor Enforcement — Food Vendor
2023-08-25311: Vendor Enforcement — Food Vendor
2023-08-24311: Vendor Enforcement — Food Vendor
2023-08-24311: Vendor Enforcement — Food Vendor
2023-08-23Permit General Construction — Signed-off
2023-08-22Job filed: Mechanical work as filed on plans herewith. No change in egress, use, or occupancy$1,099,800
2023-08-21311: Vendor Enforcement — Food Vendor
2023-08-21311: Vendor Enforcement — Food Vendor
2023-08-18311: Vendor Enforcement — Food Vendor
2023-08-18311: Vendor Enforcement — Food Vendor
2023-08-17311: Vendor Enforcement — Food Vendor
2023-08-16Job filed: Mechanical work in conjunction with partial demo to accommodate new prep warming pantry. No change to use, egress, or occupancy.$19,999
2023-08-16Certificate of occupancy Renewal With Change
2023-08-15Job filed: Sprinkler work to include relocation of 3 sprinkler heads. Plumbing work to include added floor sinks, added sink and ice machine. No change to use, e$39,962
2023-08-09Job filed: Demolition of team conference rooms to accommodate new prep warming pantry. No change to use, egress, or occupancy.$99,993
2023-08-09Job filed: No Work
2023-08-05311: Vendor Enforcement — Food Vendor
2023-08-04311: Vendor Enforcement — Food Vendor
2023-08-04311: Vendor Enforcement — Food Vendor
2023-08-03311: Vendor Enforcement — Food Vendor
2023-08-03311: Vendor Enforcement — Food Vendor
2023-07-31311: Vendor Enforcement — Food Vendor
2023-07-30311: Vendor Enforcement — Food Vendor
2023-07-28311: Vendor Enforcement — Food Vendor
2023-07-27311: Vendor Enforcement — Food Vendor
2023-07-27311: Vendor Enforcement — Food Vendor
2023-07-24311: Consumer Complaint — Dealer in Products for the Disabled
2023-07-24311: Vendor Enforcement — Food Vendor
2023-07-21311: Homeless Person Assistance
2023-07-21311: Vendor Enforcement — Food Vendor
2023-07-21311: Vendor Enforcement — Food Vendor
2023-07-20311: Vendor Enforcement — Food Vendor
2023-07-20311: Vendor Enforcement — Food Vendor
2023-07-19311: Vendor Enforcement — Food Vendor
2023-07-14311: Vendor Enforcement — Food Vendor
2023-07-14311: Vendor Enforcement — Food Vendor
2023-07-13FDNY inspection (E-CIDS)
2023-07-13311: Vendor Enforcement — Food Vendor
2023-07-13311: Vendor Enforcement — Food Vendor
2023-07-13Permit Sprinklers — Signed-off
2023-07-12311: Vendor Enforcement — Food Vendor
2023-07-11311: Vendor Enforcement — Food Vendor
2023-07-09311: Vendor Enforcement — Food Vendor
2023-07-07311: Vendor Enforcement — Food Vendor
2023-07-07311: Vendor Enforcement — Food Vendor
2023-07-06311: Food Establishment — Odor
2023-07-06311: Vendor Enforcement — Food Vendor
2023-07-06311: Vendor Enforcement — Food Vendor
2023-07-05311: Vendor Enforcement — Food Vendor
2023-07-05Permit Mechanical Systems — Signed-off
2023-07-04311: Vendor Enforcement — Food Vendor
2023-07-04311: Vendor Enforcement — Food Vendor
2023-07-03311: Vendor Enforcement — Food Vendor
2023-07-03Permit General Construction — Signed-off
2023-07-02311: Vendor Enforcement — Food Vendor
2023-07-01311: Vendor Enforcement — Food Vendor
2023-07-01311: Vendor Enforcement — Food Vendor
2023-06-30311: Vendor Enforcement — Food Vendor
2023-06-29311: Vendor Enforcement — Food Vendor
2023-06-29311: Vendor Enforcement — Food Vendor
2023-06-28311: Vendor Enforcement — Food Vendor
2023-06-27311: Vendor Enforcement — Food Vendor
2023-06-27Job filed: No Work
2023-06-27Job filed: No Work
2023-06-27Job filed: No Work
2023-06-27Job filed: No Work
2023-06-24311: Vendor Enforcement — Food Vendor
2023-06-24311: Vendor Enforcement — Food Vendor
2023-06-23311: Vendor Enforcement — Food Vendor
2023-06-22311: Vendor Enforcement — Food Vendor
2023-06-22Job filed: Mechanical work as shown on plans. No change in egress, use, or occupancy$30,000
2023-06-21311: Vendor Enforcement — Food Vendor
2023-06-21311: Vendor Enforcement — Food Vendor
2023-06-21Certificate of occupancy Renewal With Change
2023-06-20311: Vendor Enforcement — Food Vendor
2023-06-18311: Vendor Enforcement — Food Vendor
2023-06-17311: Vendor Enforcement — Food Vendor
2023-06-16311: Vendor Enforcement — Food Vendor
2023-06-16311: Vendor Enforcement — Food Vendor
2023-06-14Permit Sprinklers — Signed-off
2023-06-12311: Vendor Enforcement — Food Vendor
2023-06-12Job filed: Sprinkler work as shown on plans. No change in use, egress or occupancy.$4,000
2023-06-10311: Vendor Enforcement — Food Vendor
2023-06-09311: Vendor Enforcement — Food Vendor
2023-06-08311: Vendor Enforcement — Food Vendor
2023-06-07311: Vendor Enforcement — Food Vendor
2023-06-06311: Vendor Enforcement — Food Vendor
2023-06-05Permit General Construction — Permit Issued
2023-06-04311: Graffiti — Police Report Requested
2023-06-02Job filed: General Construction work as shown on plans. No change in use, egress or occupancy.$99,990
2023-05-31311: Vendor Enforcement — Food Vendor
2023-05-31Job filed: Temporary tented food festival. Open to the public with monitored entry, with food and beverage served.
2023-05-30311: Vendor Enforcement — Food Vendor
2023-05-30Job filed: Installation of temp tent on existing plaza, no alt to exist structures for Manhattan West Food Fest. TPA required. Producer is responsible to monitor$6,500
2023-05-26311: Vendor Enforcement — Food Vendor
2023-05-24Permit Mechanical Systems — Signed-off
2023-05-23Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM & INSTALLATION OF (1) NEW AC UNIT ON 17TH FL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$114,920
2023-04-12Job filed: Sprinkler work as filed on plans herewith. No change in egress, use, or occupancy$125,000
2023-04-11311: Vendor Enforcement — Food Vendor
2023-04-10Permit Construction Fence — Permit Issued
2023-04-10Job filed: TEMPORARY CONSTRUCTION FENCE ENCLOSURE AS PER DRAWINGS. CONSTRUCTION FENCE ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPAN$5,000
2023-04-07311: Vendor Enforcement — Food Vendor
2023-04-06311: Vendor Enforcement — Food Vendor
2023-03-31Elevator permit: Request temporary use of the elevator during building construction. (Section 5.10-2000)*Tests to be conducted in the presence of a$20,000
2023-03-31Elevator permit: Request temporary use of the elevator during building construction. (Section 5.10-2000)*Tests to be conducted in the presence of a$10,000
2023-03-31311: Mobile Food Vendor — Placement
2023-03-30311: Mobile Food Vendor — Placement
2023-03-24311: Mobile Food Vendor — Placement
2023-03-23311: Mobile Food Vendor — Placement
2023-03-20Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,728,050
2023-03-17311: Graffiti — Police Report Requested
2023-03-13Job filed: MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,422,436
2023-03-10311: Mobile Food Vendor — Placement
2023-03-06Permit Mechanical Systems — Signed-off
2023-03-03311: Mobile Food Vendor — Placement
2023-03-03Job filed: Mechanical work as shown on plans. No change in egress, use, or occupancy$199,943
2023-03-02311: Mobile Food Vendor — Placement
2023-02-28Permit Plumbing — Signed-off
2023-02-28Permit Sprinklers — Signed-off
2023-02-28Permit Standpipe — Signed-off
2023-02-27Job filed: Plumbing work as shown on plans. No change in egress, use or occupancy.$24,935
2023-02-24Permit General Construction — Signed-off
2023-02-24Job filed: Standpipe work as shown on plans. Removal of 1 FHVC and a Relocation of 1 FHVC. No change in use, egress, or occupancy.$2,496
2023-02-23311: Mobile Food Vendor — Placement
2023-02-23Job filed: Sprinkler work as shown on plans. No change in use, egress or occupancy.$20,000
2023-02-21Job filed: General Construction work as shown on plans. No change in use, egress or occupancy.$499,958
2023-02-17311: Mobile Food Vendor — Placement
2023-02-16311: Mobile Food Vendor — Placement
2023-02-13Certificate of occupancy Renewal Without Change
2023-02-07Permit Plumbing — Signed-off
2023-02-06Permit Plumbing — Signed-off
2023-02-06Permit Sprinklers — Signed-off
2023-02-02Permit General Construction — Signed-off
2023-02-02Permit Mechanical Systems — Signed-off
2023-01-27311: Consumer Complaint — Mobile Food Vendor
2023-01-27Job filed: Sprinkler work as shown on plans filed herewith.$161,078
2023-01-20Job filed: General Construction work as shown on plans. No change in use, egress, or occupancy.$449,983
2023-01-13311: Consumer Complaint — Mobile Food Vendor
2023-01-13Permit General Construction — Signed-off
2023-01-13Permit Mechanical Systems — Signed-off
2023-01-13Permit Sprinklers — Signed-off
2023-01-11Job filed: Plumbing work as shown on plans. No change in use, egress, or occupancy.$59,998
2023-01-11Job filed: Sprinkler work as shown on plans. No change in use, egress, or occupancy.$20,000
2023-01-11Job filed: Mechanical work as shown on plans. No change in use, egress, or occupancy. (Suite 105)$99,982
2023-01-10Job filed: General Construction work as shown on plans. No change in use, egress, or occupancy.$449,983
2023-01-07311: Consumer Complaint — Mobile Food Vendor
2023-01-06311: Consumer Complaint — Mobile Food Vendor
2023-01-06311: Consumer Complaint — Mobile Food Vendor
2023-01-06Permit Sprinklers — Signed-off
2023-01-06Permit Structural — Signed-off
2023-01-05Permit Mechanical Systems — Signed-off
2023-01-03Permit Sprinklers — Signed-off
2022
2022-12-29Permit Plumbing — Signed-off
2022-12-16311: Consumer Complaint — Mobile Food Vendor
2022-12-16Permit Mechanical Systems — Signed-off
2022-12-15311: Homeless Person Assistance
2022-12-12Job filed: Interior fit-out of single floor shell space in an office building. Architectural work will include new interior partitions, ceilings, millwork, fini$3,883,027
2022-12-09Restaurant inspection: ARAMARK@ACCENTURE #19261 — grade A
2022-12-09Job filed: Sprinkler work including installation of new sprinklers and piping. No change to use, egress or occupancy.$127,567
2022-12-09Permit Structural — Signed-off
2022-12-09Permit General Construction — Signed-off
2022-12-03311: Consumer Complaint — Mobile Food Vendor
2022-12-02311: Consumer Complaint — Mobile Food Vendor
2022-12-02311: Consumer Complaint — Mobile Food Vendor
2022-11-29Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,728,050
2022-11-28Certificate of occupancy Renewal Without Change
2022-11-19311: Consumer Complaint — Mobile Food Vendor
2022-11-18311: Consumer Complaint — Mobile Food Vendor
2022-11-17Permit General Construction — Signed-off
2022-11-17Permit General Construction — Signed-off
2022-11-11311: Consumer Complaint — Mobile Food Vendor
2022-11-10311: Consumer Complaint — Mobile Food Vendor
2022-11-04311: Consumer Complaint — Mobile Food Vendor
2022-10-28311: Consumer Complaint — Mobile Food Vendor
2022-10-27311: Consumer Complaint — Mobile Food Vendor
2022-10-27311: Consumer Complaint — Mobile Food Vendor
2022-10-26311: Curb Condition — Broken Curb
2022-10-26311: Consumer Complaint — Mobile Food Vendor
2022-10-26311: Consumer Complaint — Mobile Food Vendor
2022-10-25311: Mobile Food Vendor — Placement
2022-10-25311: Consumer Complaint — Mobile Food Vendor
2022-10-24311: Consumer Complaint — Mobile Food Vendor
2022-10-21Elevator permit: Furnish and Install One () new passenger as per attached drawings, Car 1. All work to comply with ASME A17.1-2000 with supplemen$158,000
2022-10-21311: Illegal Dumping — Removal Request
2022-10-21311: Consumer Complaint — Mobile Food Vendor
2022-10-20311: Consumer Complaint — Mobile Food Vendor
2022-10-19311: Consumer Complaint — Mobile Food Vendor
2022-10-19311: Consumer Complaint — Mobile Food Vendor
2022-10-18311: Consumer Complaint — Mobile Food Vendor
2022-10-17311: Consumer Complaint — Mobile Food Vendor
2022-10-14311: Consumer Complaint — Mobile Food Vendor
2022-10-11311: Consumer Complaint — Mobile Food Vendor
2022-10-11Permit Mechanical Systems — Permit Issued
2022-10-11Job filed: Interior renovation to include construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this applic$3,375,000
2022-10-10311: Consumer Complaint — Mobile Food Vendor
2022-10-08311: Consumer Complaint — Mobile Food Vendor
2022-10-07311: Consumer Complaint — Mobile Food Vendor
2022-10-07Permit Sprinklers — Signed-off
2022-10-07Permit General Construction — Signed-off
2022-10-06311: Mobile Food Vendor — Placement
2022-10-04Job filed: Installation of HVAC System and related Dutcwork. No change in user, egress or occupancy is involved.$145,000
2022-10-03311: Missed Collection — Bulky Trash
2022-10-03311: Consumer Complaint — Mobile Food Vendor
2022-09-30311: Consumer Complaint — Mobile Food Vendor
2022-09-28311: Consumer Complaint — Mobile Food Vendor
2022-09-27311: Mobile Food Vendor — Placement
2022-09-22Elevator permit: *Request temporary use of the elevator during building construction. (Section 5.10-2000)*Tests to be conducted in the presence of $10,000
2022-09-22Job filed: Mechanical work as shown on plans (Retail 106).$263,591
2022-09-22Job filed: Mechanical work as shown on plans (Retail 105).$263,591
2022-09-21Job filed: Installation of interior partitions for public corridor and tenant separation. Application filed in conjunction with NB # 121187143.$685,000
2022-09-20Permit Sign — Signed-off
2022-09-20Permit Sign — Signed-off
2022-09-19Job filed: ERECT ILLUMINATED, ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, INSIDE OF PROPERTY LINE @ SIDE ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION$702
2022-09-19Job filed: ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A, INSIDE OF PROPERTY LINE @ SIDE ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION$1,404
2022-09-15Permit General Construction — Signed-off
2022-09-11Job filed: Installation of temporary tent, no alt to exist structures for a private event Sept 21, 2022A TPA permit is not required. Producer is responsible to m$3,500
2022-09-06Certificate of occupancy Renewal Without Change
2022-09-02SMIS — from BOP SE LLC; BOP NE LLC; BOP MW RESIDENTIAL MARKET LLC; BOP NW LOFT LLC; 450 PARTNERS LLC;
2022-09-02SMIS — from BOP SE LLC; BOP NE LLC; BOP MW RESIDENTIAL MARKET LLC; BOP NW LOFT LLC; 450 PARTNERS LLC;
2022-08-25Job filed: Mechanical work as filed on plans herewith. No change in egress, use, or occupancy$1,099,800
2022-08-16Permit Sprinklers — Signed-off
2022-08-15Permit Plumbing — Signed-off
2022-08-09311: Consumer Complaint — Mobile Food Vendor
2022-08-04311: Consumer Complaint — Mobile Food Vendor
2022-08-01Job filed: Sprinkler work as filed on plans herewith. No change in egress, use, or occupancy$37,750
2022-07-30Permit General Construction — Signed-off
2022-07-29Permit Plumbing — Signed-off
2022-07-28Permit Sprinklers — Signed-off
2022-07-28Permit Mechanical Systems — Signed-off
2022-07-28Permit General Construction — Signed-off
2022-07-28Permit General Construction — Signed-off
2022-07-28Permit General Construction — Signed-off
2022-07-27Job filed: Temporary outdoor sculpture platform on the plaza. Removed at the end of the programing. No changes to existing structures, use or egress.$5,000
2022-07-27Permit Plumbing — Signed-off
2022-07-26311: Consumer Complaint — Mobile Food Vendor
2022-07-26Permit Plumbing — Signed-off
2022-07-26Job filed: General construction work as shown on plans filed herewith. No change to use, egress, or occupancy.$1,941,608
2022-07-25Job filed: Mechanical work as shown on plans filed herewith. No change to use, egress, or occupancy.$949,388
2022-07-20311: Lost Property — Electronics/Phones
2022-07-20Permit Mechanical Systems — Signed-off
2022-07-19Permit Mechanical Systems — Signed-off
2022-07-18Permit General Construction — Signed-off
2022-07-18Job filed: Plumbing work as shown on plans filed herewith.$122,188
2022-07-13Job filed: Sprinkler work as shown on plans filed herewith.$161,078
2022-07-13Job filed: Mechanical work as shown on plans filed herewith.$36,152
2022-07-08311: Encampment — N/A
2022-07-08311: Encampment — N/A
2022-07-07Job filed: Plumbing work as shown on plans (Retail Spaces 105 and 106).$8,400
2022-07-03311: Consumer Complaint — Mobile Food Vendor
2022-06-30Job filed: Interior renovation with mechanical work including new ducting off existing main unit, IT room supplemental split water-cooled unit, hot water-heated $1,569,701
2022-06-30Job filed: Installation of new plumbing features including sinks, drinking fountains and electric water heaters. No change to use, egress or occupancy.$155,570
2022-06-30Job filed: Sprinkler work including installation of new sprinklers and piping. No change to use, egress or occupancy.$127,567
2022-06-29Job filed: Interior fit-out of single floor shell space in an office building. Architectural work will include new interior partitions, ceilings, millwork, fini$3,883,027
2022-06-23Permit General Construction — Signed-off
2022-06-22Permit Mechanical Systems — Signed-off
2022-06-20FDNY inspection (E-CIDS)
2022-06-15Certificate of occupancy Renewal Without Change
2022-06-14311: Consumer Complaint — Mobile Food Vendor
2022-06-13311: Graffiti — Police Report Not Requested
2022-06-13Job filed: No Work
2022-06-07311: Graffiti — Police Report Not Requested
2022-06-05Job filed: Plumbing work as shown on plans filed herewith. No change in egress, use or occupancy$210,000
2022-06-05Job filed: Sprinkler work as filed on plans herewith. No change in egress, use, or occupancy$125,000
2022-06-01FDNY inspection (STRUC_INT_3)
2022-06-01FDNY inspection (E-CIDS)
2022-06-01Job filed: Sprinkler work as shown on plans filed herewith.$13,986
2022-05-26Permit General Construction — Signed-off
2022-05-20Cooling tower inspection
2022-05-14311: Consumer Complaint — Mobile Food Vendor
2022-05-12311: Consumer Complaint — Vendor
2022-05-12Job filed: INTERIOR RENOVATION AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$216,821
2022-05-12Permit General Construction — Signed-off
2022-05-12Permit Mechanical Systems — Signed-off
2022-05-12Permit Mechanical Systems — Signed-off
2022-05-12Permit General Construction — Signed-off
2022-05-11311: Consumer Complaint — Mobile Food Vendor
2022-05-11311: Graffiti — Police Report Not Requested
2022-05-06Job filed: COMPANY EXHIBIT AND RECEPTION EVENT
2022-05-05311: Graffiti — Police Report Not Requested
2022-05-04311: Graffiti — Police Report Requested
2022-05-04Job filed: Mechanical work as shown on plans (Retail 105).$263,591
2022-05-04Job filed: Mechanical work as shown on plans (Retail 106).$263,591
2022-04-28Job filed: Installation of temp platform on existing plaza, no alt to exist structures for Metro NY West Fest. TPA required. Producer is responsible to monitor s$5,000
2022-04-26Job filed: General construction work as shown on plans. Retail Space 105.$352,625
2022-04-26Job filed: General construction work as shown on plans. Retail Space 106.$352,625
2022-04-26Job filed: Outdoor celebration with performance for employees. For invited guests only, with food and beverage served.
2022-04-25Job filed: Filing for new mechanical recirculating hood$8,160
2022-04-22Permit Sidewalk Shed — Signed-off
2022-04-22Permit Supported Scaffold — Signed-off
2022-04-18Job filed: Interior renovation to include construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this applic$3,375,000
2022-04-15Mortgage $5,030,215 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC; to MANUFACTURERS AND TRADERS TRUST COMPANY$5,030,215
2022-04-15Mortgage $2,582,284 — from BOP MW RETAIL SUBSIDIARY LLC; BOP SE RETAIL LLC; BOP NE RETAIL LLC; BOP SW RETAIL LLC; NEW to MANUFACTURERS AND TRADERS TRUST COMPANY$2,582,284
2022-04-12Job filed: Installation of interior partitions for public corridor and tenant separation. Application filed in conjunction with NB # 121187143.$685,000
2022-04-08Permit General Construction — Signed-off
2022-04-04Job filed: Plumbing work as shown on plans filed herewith for a tenant fitout.$89,958
2022-04-04Job filed: Sprinkler system modification as shown on plans for tenant fitout.$79,968
2022-04-04Job filed: Tenant buildout as shown on the plans. No change to use egress or occupancy.$649,956
2022-03-29Job filed: TPA filed for a company reception event.
2022-03-29Job filed: Mechanical work as shown on plans for tenant fitout$149,990
2022-03-29Job filed: TPA filed for a company reception event.
2022-03-28Job filed: Structural work associated with tenant buildout.$99,993
2022-03-23Job filed: Temporary tented ceremony with seated dinner and cocktail reception. Invited guests only with food and beverage served.
2022-03-22Job filed: Installation of temp tents on existing plaza, no alt to exist structures for Irmas Award Gala. TPA required. Producer is responsible to monitor site s$5,000
2022-03-21Job filed: Mechanical work as filed on plans herewith. No change in egress, use, or occupancy$100,000
2022-03-20Job filed: Sprinkler work as filed on plans herewith. No change in egress, use, or occupancy$37,975
2022-03-18Certificate of occupancy Renewal With Change
2022-03-15Job filed: Sprinkler work as shown on plans,$6,046
2022-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2022-02-14Job filed: Company Reception Event Eating & Drinking (90 Days) - 2/21/22 - 5/21/22 - 5:00 PM - 8:00 PM - Multiple Layouts as per filed drawings
2022-02-09Job filed: Company Reception Event Eating & Drinking (90 Days) - 2/21/22 - 5/21/22 - 5:00 PM - 8:00 PM - Multiple Layouts as per filed drawings
2022-01-31FDNY inspection (CONSTR)
2022-01-07Certificate of occupancy Renewal With Change
2021
2021-12-17DOB complaint, category ?
2021-12-03Permit Sprinklers — Signed-off
2021-12-03Permit General Construction — Signed-off
2021-12-02Permit Plumbing — Signed-off
2021-11-26Job filed: Installation of temporary tent and platform for a temporary ice rink. No alterations to existing structures. A TPA permit IS required. Producer respon$5,500
2021-11-22Job filed: Seasonal ice rink with ticketed entry, open to the public.
2021-11-15EASE — from BOP NW LOFT LLC; BOARD OF MANAGERS OF 3 MANHATTAN WEST CO; BOARD OF MANAGERS OF 1 MANHATTA to BOP NW LLC; BOP NW RETAIL LLC; BOP SW RETAIL LLC; BOP NW RETAIL II LLC; BOP SE RETAIL LLC;
2021-11-15EASE — from BOP NW LOFT LLC; BOARD OF MANAGERS OF 3 MANHATTAN WEST CO; BOARD OF MANAGERS OF 1 MANHATTA to BOP NW LLC; BOP NW RETAIL LLC; BOP SW RETAIL LLC; BOP NW RETAIL II LLC; BOP SE RETAIL LLC;
2021-11-15Permit General Construction — Signed-off
2021-11-15Permit Mechanical Systems — Signed-off
2021-11-12Job filed: Sprinkler work as shown on plans,$6,046
2021-11-11Job filed: COMPANY NETWORKING RECEPTION EVENT EATING & DRINKING
2021-11-10Job filed: Plumbing work as shown on plans.$23,987
2021-11-10Job filed: Mechanical work as shown on plans.$14,893
2021-10-28Job filed: Interior tenant fit-out as shown on plans.$495,996
2021-10-22Job filed: COMPANY NETWORKING RECEPTION EVENT EATING & DRINKING
2021-10-22Job filed: COMPANY NETWORKING RECEPTION EVENT EATING & DRINKING
2021-10-21RPTT&RET — from BOP MW RETAIL HOLDINGS LLC to BOP MW RETAIL HOLDINGS SUBSIDIARY LLC
2021-10-15ZONE — from BOP NE LLC; BOP NE RETAIL LLC; BOP NW LLC; BOP SE LLC
2021-10-15ZONE — from BOP NE LLC; BOP NE RETAIL LLC; BOP NW LLC; BOP SE LLC
2021-10-07Certificate of occupancy Renewal Without Change
2021-09-29Permit General Construction — Signed-off
2021-09-28Job filed: Install of temp tents, platform and production equipment, no alterations to exist structures, for grand opening event. TPA required. All equipment rem$5,000
2021-09-28DOB complaint, category ?
2021-09-23Job filed: Install of temp tents, platform and production equipment, no alterations to exist structures, for grand opening event. TPA required. All equipment rem$5,000
2021-09-17Job filed: Celebration on the promenade with live music for grand opening. Invited guests only with food and beverage served.
2021-09-15Elevator permit: *Request temporary use of the elevator during building construction. (Section 5.10-2000)*Tests to be conducted in the presence of $10,000
2021-09-10Permit General Construction — Signed-off
2021-09-07RPTT&RET — from BOP NE HOLDINGS LLC to BOP NE HOLDINGS SUBSIDIARY LLC
2021-09-03Job filed: Temporary structures consisting of speaker truss stand and performance platforms.$120,000
2021-08-11Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$100,000
2021-08-09Permit EW — ISSUED
2021-08-09Permit EW — ISSUED
2021-07-28Permit Plumbing — Signed-off
2021-07-21Permit Standpipe — Signed-off
2021-07-16Permit EW — ISSUED
2021-07-16Certificate of occupancy Renewal With Change
2021-07-14Certificate of occupancy Renewal With Change
2021-07-12Job filed: Cocktail reception for Ernst & Young employees. Invited guests only with food and beverage served.
2021-07-02Job filed: Mechanical work as shown on plans.$263,591
2021-07-02Job filed: Energy analysis in conjunction with general construction Alt 2 application # M00487205-I1. Retail Space 108.$1,000
2021-06-30Job filed: General construction work as shown on plans. Retail Space 108.$352,625
2021-06-29Job filed: Modifications to an existing standpipe system.$9,540
2021-06-24Permit General Construction — Signed-off
2021-06-23Permit Mechanical Systems — Signed-off
2021-06-23Permit Sprinklers — Signed-off
2021-06-23Permit General Construction — Signed-off
2021-06-02FDNY inspection (CONSTR)
2021-06-02FDNY inspection (E-CIDS)
2021-05-25Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,007,100
2021-05-25Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,246,080
2021-05-25Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,365,000
2021-05-22Permit Sprinklers — Signed-off
2021-05-22Permit Standpipe — Signed-off
2021-05-22Permit Standpipe — Signed-off
2021-05-22Permit Plumbing — Signed-off
2021-05-22Permit Sprinklers — Signed-off
2021-05-22Permit Plumbing — Signed-off
2021-05-14Permit Sprinklers — Signed-off
2021-05-14Permit Standpipe — Signed-off
2021-05-14Permit Plumbing — Signed-off
2021-05-13Permit Sidewalk Shed — Signed-off
2021-05-12Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$100,000
2021-05-11Job filed: Mechanical work as shown on plans.$263,591
2021-05-11Job filed: Modification to an existing sprinkler system.$22,260
2021-05-11Job filed: Plumbing work as shown on plans.$43,000
2021-05-11Permit Supported Scaffold — Signed-off
2021-05-10Job filed: INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP$1,000
2021-05-06Job filed: Energy analysis in conjunction with general construction Alt 2 application # M00487205-I1. Retail Space 108.$1,000
2021-05-03Permit General Construction — Signed-off
2021-04-27Job filed: Installation of a temporary video display unit as per plans filed herewith. no change to use, egress or occupancy.$5,000
2021-04-27Permit Protection and Mechanical Methods — Signed-off
2021-04-22Job filed: Installation and use of suspended scaffold on track system as per plans filed herewith. No change in use, egress, or occupancy.$1,000
2021-04-19Permit EW — ISSUED
2021-04-19Permit Mechanical Systems — Signed-off
2021-04-19Permit EW — ISSUED
2021-04-19Job filed: STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS: 20TH-22ND). NO CHANGE OF USE, EGRESS, OR OCCUPANCY$3,792,000
2021-04-16Job filed: General construction work as shown on plans. Retail Space 108.$352,625
2021-04-08Permit Mechanical Systems — Signed-off
2021-04-08Permit Mechanical Systems — Signed-off
2021-04-08Permit Mechanical Systems — Signed-off
2021-04-01Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,007,100
2021-04-01Job filed: SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH. STANDPIPE WORK RELATED TO FHC AS SHOWN ON PLANS FILED HEREWITH.$103,500
2021-03-31Permit Sprinklers — Signed-off
2021-03-31Permit Plumbing — Signed-off
2021-03-30Job filed: Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.$55,000
2021-03-30Job filed: Additions/modification to existing sprinkler system.$167,507
2021-03-29Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,365,000
2021-03-25Job filed: MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE OR OCCUPANCY UNDER THIS APPLICATION. NHL RETAIL - SUITE 104/203$475,000
2021-03-18Certificate of occupancy Temporary
2021-03-16Job filed: MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,422,436
2021-03-15Permit Plumbing — Signed-off
2021-03-15Job filed: MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$689,438
2021-03-15Permit Sprinklers — Signed-off
2021-03-12Job filed: Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.$44,000
2021-03-12Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,246,080
2021-03-12Job filed: MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,177,704
2021-03-10Job filed: Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.$743,000
2021-03-09Job filed: MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,728,050
2021-03-05Permit EQ — ISSUED
2021-03-05Job filed: MODIFICATION TO EXISTING PLUMBING FIXTURES, SPRINKLER & STANDPIPE SYSTEMS, removal of sub-cellar floor.$375,862
2021-03-01Permit Standpipe — Signed-off
2021-03-01Permit Standpipe — Signed-off
2021-03-01Permit Sprinklers — Signed-off
2021-03-01Permit Sprinklers — Signed-off
2021-03-01Permit Plumbing — Signed-off
2021-03-01Permit Plumbing — Signed-off
2021-03-01Permit Sprinklers — Signed-off
2021-03-01Permit Plumbing — Signed-off
2021-03-01Permit Plumbing — Signed-off
2021-03-01Permit Plumbing — Permit Issued
2021-03-01Permit Sprinklers — Signed-off
2021-03-01Permit Standpipe — Signed-off
2021-03-01Permit Standpipe — Signed-off
2021-03-01Permit Standpipe — Signed-off
2021-03-01Permit Sprinklers — Permit Issued
2021-03-01Permit Plumbing — Signed-off
2021-03-01Permit Sprinklers — Signed-off
2021-02-26Permit Sprinklers — Signed-off
2021-02-26Permit Standpipe — Signed-off
2021-02-26Permit Plumbing — Signed-off
2021-02-24Permit Sprinklers — Signed-off
2021-02-24Permit Standpipe — Signed-off
2021-02-24Permit Plumbing — Signed-off
2021-02-24Permit Standpipe — Signed-off
2021-02-24Permit Plumbing — Signed-off
2021-02-24Permit Sprinklers — Signed-off
2021-02-19Certificate of occupancy Temporary
2021-02-18Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM FOR TENANT SPACE (PHARO CAPITAL) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS A$474,852
2021-02-12Permit Sign — Signed-off
2021-02-12Permit Sign — Signed-off
2021-02-11Job filed: MODIFICATION TO THE EXISTING SPRINKLER AND PLUMBING SYSTEM AS PER PANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$1,022,466
2021-02-11Permit Sprinklers — Signed-off
2021-02-11Permit Standpipe — Signed-off
2021-02-10Permit Standpipe — Signed-off
2021-02-10Permit Sprinklers — Signed-off
2021-01-28Permit Plumbing — Signed-off
2021-01-27Cooling tower inspection
2021-01-26Permit EW — ISSUED
2021-01-25Permit Structural — Signed-off
2021-01-25Permit Supported Scaffold — Signed-off
2021-01-25Permit Structural — Signed-off
2021-01-25Permit Structural — Signed-off
2021-01-25Permit Structural — Signed-off
2021-01-22Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$32,000
2021-01-21Permit Structural — Signed-off
2021-01-20Permit Structural — Signed-off
2021-01-20Permit Structural — Signed-off
2021-01-14Job filed: MODIFICATION TO EXISTING PLUMBING FIXTURES, SPRINKLER & STANDPIPE SYSTEMS (FILING PAA TO AMEND PL DRAWINGS: P-401.01 & P-603.01 - TO AMEND GAS RISER A$1,131,000
2021-01-13Mortgage assigned — from CITI REAL ESTATE FUNDING INC; JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; GERMAN AMERICAN CA to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2021-01-13Mortgage assigned — from DBR INVESTMENTS CO. LIMITED to GERMAN AMERICAN CAPITAL CORPORATION
2021-01-12Elevator permit: pin 3 cars on the 59th Floor. ALL WORK TO COMPLY TO ASME A17.1, 2000-3, APPENDIX "k" AND CHAPTER 30 OF THE NYC IBC. PERFORM NECESS$49,000
2021-01-12Elevator permit: Pin 3 cars on 59th Floor. ALL WORK TO COMPLY TO ASME A17.1, 2000-3, APPENDIX "k" AND CHAPTER 30 OF THE NYC IBC. PERFORM NECESSARY $49,000
2021-01-12Job filed: Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.$44,000
2020-12-10Job filed: Structural modifications as per plans filed herewith. No change in use, egress or occupancy.$566,841
2020-12-10Job filed: Structural modifications as per plans filed herewith. No change in use, egress or occupancy.$377,709
2020-12-10Permit EW — ISSUED
2020-12-10Permit EW — ISSUED
2020-12-09Permit Mechanical Systems — Signed-off
2020-12-08DOB complaint, category ?
2020-12-03Permit Sprinklers — Signed-off
2020-12-03Permit Sprinklers — Signed-off
2020-12-03DOB complaint, category ?
2020-12-03DOB complaint, category ?
2020-12-02Job filed: Mechanical modifications taking place on the 57 & 58th floors as per plans filed herewith. No change in use, egress or occupancy$1,501,857
2020-12-02Permit EW — ISSUED
2020-12-02Permit EW — ISSUED
2020-12-01Permit Plumbing — Signed-off
2020-12-01Permit Plumbing — Signed-off
2020-11-30Permit Mechanical Systems — Signed-off
2020-11-30Permit Mechanical Systems — Signed-off
2020-11-24Job filed: Mechanical work as shown on plans filed herewith. (Prebuild)$409,578
2020-11-24Job filed: Mechanical work as shown on plans filed herewith. (Prebuild)$533,120
2020-11-24Job filed: Modification to existing sprinkler system.$131,200
2020-11-24Job filed: Plumbing work as shown on plans filed herewith. (Prebuild)$69,921
2020-11-24Job filed: Plumbing work as shown on plans filed herewith. (Prebuild)$42,690
2020-11-19Job filed: ENERGY ANALYSIS FOR INTERIOR LIGHTING INSPECTIONS.$1,000
2020-11-19DOB complaint, category ?
2020-11-18Permit EW — ISSUED
2020-11-13Permit Plumbing — Signed-off
2020-11-13Permit Plumbing — Signed-off
2020-11-11Job filed: Mechanical work as shown on plans filed herewith.$426,499
2020-11-11Job filed: Additions/Modifications to existing sprinkler system.$45,793
2020-11-11Job filed: addition/modification to existing sprinkler system. (Prebuild)$67,275
2020-11-11Job filed: Plumbing work as shown on plans filed herewith.$36,100
2020-11-09Permit EW — ISSUED
2020-11-05Permit Mechanical Systems — Signed-off
2020-11-04Permit Sprinklers — Signed-off
2020-11-02Permit NB — ISSUED
2020-11-02Permit Mechanical Systems — Signed-off
2020-11-02Permit Standpipe — Signed-off
2020-11-02Permit Sprinklers — Signed-off
2020-11-02Permit EW — ISSUED
2020-10-30Permit EW — ISSUED
2020-10-30Permit EW — ISSUED
2020-10-30Permit EW — ISSUED
2020-10-30Permit EW — ISSUED
2020-10-30Permit EW — ISSUED
2020-10-30Permit EW — ISSUED
2020-10-29Permit EW — ISSUED
2020-10-29Permit EW — ISSUED
2020-10-29Permit EW — ISSUED
2020-10-29Permit EW — ISSUED
2020-10-29Job filed: APPLICATION FILED FOR INSTALLATION OF NON-LOAD BEARING CORRIDOR PARTITIONS AND ASSOCIATED LIGHTING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.(PREBUILD)$1,307,880
2020-10-29Job filed: APPLICATION FILED FOR INSTALLATION OF NON-LOAD BEARING CORRIDOR PARTITIONS AND ASSOCIATED LIGHTING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. (PREBUILD$900,549
2020-10-29Job filed: APPLICATION FILED FOR INSTALLATION OF NON-LOAD BEARING CORRIDOR PARTITIONS AND ASSOCIATED LIGHTING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. (PREBUILD$900,549
2020-10-28Permit PL — ISSUED
2020-10-27Job filed: PAA being filed to reflect updated plans.(Corridor)$19,980
2020-10-27Job filed: plumbing work as shown on plans filed herewith.$118,000
2020-10-27Job filed: PAA being filed to reflect updated plans.$19,980
2020-10-26Job filed: Mechanical work as shown on plans filed herewith.$1,078,378
2020-10-26Job filed: Additions/modification to existing sprinkler system.$167,507
2020-10-26Job filed: PAA being filed to reflect updated plans.$19,980
2020-10-19Job filed: Sprinkler modifications taking place on the 57th & 58th floors as per plans filed herewith. No change in use, egress or occupancy$300,004
2020-10-09Agreement — from DBR INVESTMENTS CO. LIMITED; CITI REAL ESTATE FUNDING INC. to WELLS FARGO BANK, NATIONAL ASSOCIATION; ERNST & YOUNG U.S. LLP; BOP NE LLC; BARCLAYS CAPIT
2020-10-01Job filed: Filing PAA to reflect as-built conditions. (Hedge)$133,999
2020-09-25DOB complaint, category ?
2020-09-23Permit Mechanical Systems — Signed-off
2020-09-23Permit Mechanical Systems — Signed-off
2020-09-23Permit Mechanical Systems — Signed-off
2020-09-23Permit Mechanical Systems — Signed-off
2020-09-23Permit Mechanical Systems — Signed-off
2020-09-23Certificate of occupancy Temporary
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-22Job filed: PAA being filed to reflect updated plans and number of sprinkler heads.$50,000
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-22Permit EW — ISSUED
2020-09-18Job filed: PAA being filed to reflect updated plans.$50,000
2020-09-18Job filed: PAA being filed to reflect updated plans and number of SP heads. (Corridor)$49,999
2020-09-16Permit Structural — Signed-off
2020-09-11Permit Sprinklers — Signed-off
2020-09-11Permit Sprinklers — Signed-off
2020-09-11Permit Sprinklers — Signed-off
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION; DBR INVESTMENTS CO. LIMITED; BARCLAYS CAPITAL REAL
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to CITI REAL ESTATE FUNDING INC.; WELLS FARGO BANK, NATIONAL ASSOCIATION; BARCLAYS CAPITAL RE
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION; BARCLAYS CAPITAL REAL ESTATE INC.; CITI REAL ESTAT
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to CITI REAL ESTATE FUNDING INC.; DBR INVESTMENTS CO. LIMITED; JPMORGAN CHASE BANK, NATIONAL
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to BARCLAYS CAPITAL REAL ESTATE INC.; DBR INVESTMENTS CO. LIMITED; WELLS FARGO BANK, NATIONAL
2020-09-02Mortgage $201,522,400 — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; DBR INVESTMENTS CO. LIMITED; CITI REAL ESTATE FU$201,522,400
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to CITI REAL ESTATE FUNDING INC.; JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; DBR INVESTMENTS C
2020-09-02Agreement $1,500,000,000 — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to DBR INVESTMENTS CO. LIMITED; BARCLAYS CAPITAL REAL ESTATE INC.; CITI REAL ESTATE FUNDING I$1,500,000,000
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to BARCLAYS CAPITAL REAL ESTATE INC.; DBR INVESTMENTS CO. LIMITED; CITI REAL ESTATE FUNDING I
2020-09-02Agreement — from CITI REAL ESTATE FUNDING INC.; WELLS FARGO BANK, NATIONAL ASSOCIATION; BARCLAYS CAPITAL RE to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC
2020-09-02Agreement — from BARCLAYS CAPITAL REAL ESTATE INC.; HUDSON YARDS INFRASTRUCTURE CORPORATION; DBR INVESTMENT to BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to BARCLAYS CAPITAL REAL ESTATE INC.; JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO; DBR INVESTMEN
2020-09-02Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to CITI REAL ESTATE FUNDING INC.; WELLS FARGO BANK, NATIONAL ASSOCIATION; JPMORGAN CHASE BANK
2020-09-02Permit Sprinklers — Signed-off
2020-09-02Permit Plumbing — Signed-off
2020-08-28Job filed: MODIFICATION TO EXISTING PLUMBING FIXTURES, SPRINKLER & STANDPIPE SYSTEMS (FILING PAA TO AMEND PL DRAWINGS: P-401.01 & P-603.01 - TO AMEND GAS RISER A$1,131,000
2020-08-27Job filed: INSTALLATION OF NON-BEARING CORRIDOR PARTITIONS AND ASSOCIATED LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$20,000
2020-08-25SMIS — from BOP NW LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP SE LLC; BOP NE LLC; 450 PARTNERS LLC; BOP NW
2020-08-25SMIS — from BOP NW LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP SE LLC; BOP NE LLC; 450 PARTNERS LLC; BOP NW
2020-08-19DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-18DOB complaint, category ?
2020-08-13Permit EW — RE-ISSUED
2020-08-13Permit EW — ISSUED
2020-08-07Elevator permit: Install One (1) New Oil Hydraulic Passenger Elevator in a New Shaft. All work to conform to Safety Code for Elevators and Escalato$195,000
2020-08-06Agreement — from BOP NE LLC to BOP NE RETAIL LLC
2020-08-06Agreement — from THE BOARD OF MANAGERS OF THE 1 MANHATTAN to NHL ENTERPRISES, L.P.; NATIONAL HOCKEY LEAGUE
2020-08-06Agreement — from THE BOARD OF MANAGERS OF THE 1 MANHATTAN to NHL ENTERPRISES, L.P.; NATIONAL HOCKEY LEAGUE
2020-08-05Permit Mechanical Systems — Signed-off
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to BOP MW RETAIL SUBSIDIARY LLC; NHL ENTERPRISES, L.P.; NATIONAL HOCKEY LEAGUE
2020-08-03Agreement — from WELLS FARGO BANK, NATIONAL ASSOCIATION to BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to ERNST & YOUNG U.S. LLC
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to ACCENTURE LLC
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to NATIONAL HOCKEY LEAGUE; NHL ENTERPRISES, L.P.
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION; WELLS FARGO BANK, NATIONAL ASSOCIATION to BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-08-03TERA — from BOP NE LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP NE RETAIL LLC to MANUFACTURERS AND TRADERS TRUST COMPANY; WELLS FARGO BANK, NA
2020-08-03Agreement — from THE BOARD OF MANAGERS OF THE 1 MANHATTAN to ACCENTURE LLP
2020-08-03Agreement — from THE BOARD OF MANAGERS OF THE 1 MANHATTAN to SKADDEN, ARPS, SLATE, MEAGHER & FLOM LLP
2020-08-03Agreement — from THE BOARD OF MANAGERS OF THE 1 MANHATTAN to ERNST & YOUNG U.S. LLP
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to SKADDEN, ARPS, SLATE, MEAGHER & FLOM LLP
2020-08-03TERA — from BOP NE LLC; BOP MW RETAIL SUBSIDIARY LLC; BOP NE RETAIL LLC to MANUFACTURERS AND TRADERS TRUST COMPANY; WELLS FARGO BANK, NA
2020-08-03Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION to BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-30Permit EW — ISSUED
2020-07-30Permit EW — ISSUED
2020-07-29Agreement — from HUDSON YARDS INFRASTRUCTURE CORPORATION; MANUFACTURERS AND TRADERS TRUST COMPANY to BOP NE RETAIL LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-07-29Mortgage $11,482,474 — from BOP MW RETAIL SUBSIDIARY LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC; to MANUFACTURERS AND TRADERS TRUST COMPANY$11,482,474
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage $22,367,526 — from BOP NE RETAIL LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP MW RETAIL SUBSIDIARY LLC; to MANUFACTURERS AND TRADERS TRUST COMPANY$22,367,526
2020-07-29SUBM — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SUBM — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage assigned — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION
2020-07-29Mortgage $6,251,100 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; HUDSON YARDS INFRASTRUCTURE CORPORATION$6,251,100
2020-07-29SUBM — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage assigned — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION
2020-07-29Mortgage $388,750 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC to HUDSON YARDS INFRASTRUCTURE CORPORATION; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE$388,750
2020-07-29ASPM $6,251,100 — from BOP NE LLC to BOP NE RETAIL LLC$6,251,100
2020-07-29LEAS — from BOP NE LLC to BOP NE RETAIL LLC
2020-07-29LEAS — from BOP NE LLC to BOP NE RETAIL LLC
2020-07-29Deed — from BOP NE LLC to BOP NE RETAIL LLC
2020-07-29Agreement $6,251,100 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to HUDSON YARDS INFRASTRUCTURE CORPORATION$6,251,100
2020-07-29MLEA — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to BOP NE LLC; BOP NE LLC
2020-07-29MLEA — from NEW YORK CITY INDUSTRIAL DEVELOPMET AGEN to BOP NE LLC
2020-07-29LEAS — from BOP NE LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-07-29SAGE — from U.S. BANK NATIONAL ASSOCIATION; HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SAGE — from U.S. BANK NATIONAL ASSOCIATION; HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SAGE — from HUDSON YARDS INFRASTRUCTURE CORPORATION; U.S. BANK NATIONAL ASSOCIATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29PREL — from HUDSON YARDS INFRASTRUCTURE CORPORATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from HUDSON YARDS INFRASTRUCTURE CORPORATION
2020-07-29SAGE — from HUDSON YARDS INFRASTRUCTURE CORPORATION; U.S. BANK NATIONAL ASSOCIATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SAGE — from U.S. BANK NATIONAL ASSOCIATION; HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SAGE — from U.S. BANK NATIONAL ASSOCIATION; HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29LEAS — from BOP NE LLC to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2020-07-29MLEA — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to BOP NE LLC; BOP NE LLC
2020-07-29Agreement $24,611,250 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to HUDSON YARDS INFRASTRUCTURE CORPORATION$24,611,250
2020-07-29Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SUBM — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Agreement $395,748,900 — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION$395,748,900
2020-07-29Mortgage assigned — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29SUBM — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Mortgage $395,748,900 — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to HUDSON YARDS INFRASTRUCTURE CORPORATION; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE$395,748,900
2020-07-29Mortgage assigned — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to HUDSON YARDS INFRASTRUCTURE CORPORATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29PREL — from WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from BOP NE LLC; NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2020-07-29Agreement — from MANUFACTURERS AND TRADERS TRUST COMPANY to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE; BOP NE RETAIL LLC
2020-07-29SUBM — from HUDSON YARDS INFRASTRUCTURE CORPORATION to U.S. BANK NATIONAL ASSOCIATION
2020-07-29Job filed: Description: Modification of sprinkler system in conjunction with NB # 121187143. Post Approval Amendment filed to increase the number of sprinkler h$1,000
2020-07-24MAPS — from ONE MANHATTAN WEST CONDOMINIUM
2020-07-24CDEC — from BOP NE LLC
2020-07-24MAPS — from ONE MANHATTAN WEST CONDOMINIUM
2020-07-24CDEC — from BOP NE LLC
2020-07-23Job filed: No Work
2020-07-23Job filed: No Work
2020-07-21Permit EW — ISSUED
2020-07-21Permit EW — ISSUED
2020-07-10Permit Supported Scaffold — Signed-off
2020-07-10Permit Mechanical Systems — Permit Issued
2020-07-10Certificate of occupancy Temporary
2020-07-08Permit NB — ISSUED
2020-07-07Job filed: INSTALLATION OF A TEMPORARY SHAFT SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHAFT SCAFFOL$5,000
2020-06-30Permit Standpipe — Signed-off
2020-06-30Permit Plumbing — Signed-off
2020-06-30Permit Sprinklers — Signed-off
2020-06-29Permit EW — ISSUED
2020-06-26Permit Structural — Signed-off
2020-06-26Permit Structural — Signed-off
2020-06-25Permit Mechanical Systems — Signed-off
2020-06-25Permit Mechanical Systems — Signed-off
2020-06-25Permit Structural — Signed-off
2020-06-25Permit Mechanical Systems — Signed-off
2020-06-24Permit Mechanical Systems — Signed-off
2020-06-23Permit EW — ISSUED
2020-06-23Permit EW — ISSUED
2020-06-22Elevator permit: Install One (1) New Oil Hydraulic Passenger Elevator in a New Shaft. All work to conform to Safety Code for Elevators and Escalato$195,000
2020-06-22Permit Structural — Signed-off
2020-06-22Permit Mechanical Systems — Signed-off
2020-06-17Elevator permit: Install One (1) New Oil Hydraulic Passenger Elevator in a New Shaft. All work to conform to Safety Code for Elevators and Escalato$195,000
2020-06-16Permit Mechanical Systems — Signed-off
2020-06-15Permit EW — ISSUED
2020-06-15DOB complaint, category ?
2020-06-11Elevator permit: *Request temporary use of the elevator during building construction. (Section 5.10-2000)*Tests to be conducted in the presence of $10,000
2020-06-10Job filed: No Work
2020-06-10Job filed: No Work
2020-06-05Job filed: No Work
2020-06-04Job filed: PAA being filed to reflect updated plans.$19,980
2020-06-04Permit EW — ISSUED
2020-06-04Job filed: PAA being filed to reflect updated plans.$50,000
2020-06-03Permit Plumbing — Signed-off
2020-06-03Permit Sprinklers — Signed-off
2020-06-03Permit Standpipe — Signed-off
2020-06-02Permit Mechanical Systems — Signed-off
2020-05-20Job filed: ENERGY ANALYSIS FOR INTERIOR LIGHTING INSPECTIONS.$1,000
2020-05-20Job filed: ENERGY ANALYSIS FOR INTERIOR LIGHTING INSPECTIONS.$1,000
2020-05-14Job filed: No Work
2020-05-11Job filed: plumbing modifications taking place on the 57th & 58th floors as per plans filed herewith. No change in use, egress or occupancy$100,000
2020-05-11Job filed: Standpipe modifications taking place on the 57th & 58th floor as per plans filed herewith. No change in use, egress or occupancy$15,000
2020-05-11Job filed: Sprinkler modifications taking place on the 57th & 58th floors as per plans filed herewith. No change in use, egress or occupancy$300,004
2020-05-11Job filed: Mechanical modifications taking place on the 57 & 58th floors as per plans filed herewith. No change in use, egress or occupancy$1,501,857
2020-05-08Job filed: Structural modifications taking place on the 57th & 58th floor as per plans filed herewith. No change in use, egress or occupancy$500,142
2020-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-04-29Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 57 & 58 FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$6,820,000
2020-04-10Job filed: INTERIOR RENOVATIONS AS SHOWN ON PLANS HEREWITH$20,000
2020-04-10Job filed: MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE OR OCCUPANCY UNDER THIS APPLICATION. NHL RETAIL - SUITE 104/203$475,000
2020-04-09Certificate of occupancy Temporary
2020-04-08Permit NB — ISSUED
2020-04-06Elevator permit: Work is to be done to lower the entrance sill by 1" for landing #9. All work to comply with A17.1 200 with A17.1a-02 and A17.1b-03$10,000
2020-04-01Job filed: PLUMBING MODIFICATIONS IN COMMERCIAL SPACE AS SHOWN ON PLANS FILED HEREWITH (NHL RETAIL- SUITE 104/203).$50,000
2020-03-26Permit Plumbing — Signed-off
2020-03-26Permit Plumbing — Signed-off
2020-03-26Permit Sprinklers — Signed-off
2020-03-26Permit Standpipe — Signed-off
2020-03-25Permit Mechanical Systems — Signed-off
2020-03-25Permit Sprinklers — Signed-off
2020-03-19Permit Mechanical Systems — Signed-off
2020-03-16Permit Mechanical Systems — Permit Issued
2020-03-13Permit EQ — ISSUED
2020-03-12Job filed: INSTALLATION OF TEMPORARY ENCLOSURE AS PER DRAWINGS. TEMPORARY ENCLOSURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCC
2020-03-12Job filed: Plumbing work as shown on plans filed herewith.$152,000
2020-03-12Job filed: Filing PAA to reflect as-built conditions. (Hedge)$133,999
2020-03-12Job filed: Mechanical work as shown on plans filed herewith.$726,089
2020-03-12Job filed: INSTALLATION OF TEMPORARY ENCLOSURE AS PER DRAWINGS. TEMPORARY ENCLOSURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCC
2020-03-10Permit Plumbing — Signed-off
2020-03-10Permit Sprinklers — Signed-off
2020-03-10Job filed: 20_119-CSS Bard College Gala-Awards dinner for invited guests, with food and beverage. Event will be ready for inspection at 4pm on March 31, 2020.
2020-03-10Permit Sprinklers — Signed-off
2020-03-10Permit Standpipe — Signed-off
2020-03-10Permit Standpipe — Signed-off
2020-03-10Permit Sprinklers — Signed-off
2020-03-10Permit Plumbing — Signed-off
2020-03-10Permit Standpipe — Signed-off
2020-03-10Permit Standpipe — Signed-off
2020-03-10Permit Plumbing — Signed-off
2020-03-10Permit Structural — Signed-off
2020-03-10Permit Sprinklers — Signed-off
2020-03-10Permit Plumbing — Signed-off
2020-03-09Permit Sprinklers — Signed-off
2020-03-09Permit Standpipe — Signed-off
2020-03-09Permit Plumbing — Signed-off
2020-03-09Permit Structural — Signed-off
2020-03-09Job filed: INSTALLATION OF NON-BEARING CORRIDOR PARTITIONS AND ASSOCIATED LIGHTING. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$700,000