The city's published records show little recorded distress here in the last three years. Less recorded distress than 74% of 100+-unit residential buildings citywide. The citywide median for 100+-unit residential buildings is 3.7 penalty
points per 10 units; this building carries 1.1. In ZIP 10001, 68% of residential buildings hold an A and
6% grade D or F.
How grades work
this building
A
B
C
Among 4,677 100+-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
10 heat or hot-water complaints in the last three years (winter 2023–24: 2 · winter 2024–25: 6 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.
2
’23–24
6
’24–25
2
’25–26
No bedbug-infested units reported in the last three years of filings.
$11,250 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
192 service requests in the last three years. Most common: Illegal Parking (69) · Noise (33) · Consumer Complaint (12) · Vendor Enforcement (6) · New Tree Request (6) · Homeless Person Assistance (6).
Filed construction activity
$28,923,898 in permitted construction work filed since
2016 (179 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2000)
Yes
Six or more residential units (333)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
33/34 West Owner LLC
Head officer
Meghann Gill
Managing agent
SL GREEN MANAGEMENT CORP.
Last registered
2025-12-03
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$184,674,000
$83,103,300
2026
$192,562,000
$86,652,900
2027
$192,955,000
$86,829,750
The city's market estimate has risen
4% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
F — did not submit required benchmarking data, posted at the entrance by law (2022 disclosure cycle)
3 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick), shared by 3 restaurants 3 Food Establishment complaints to 311 at this address in the last three years (most often: Rodents/Insects/Garbage, Food Contaminated), shared by 3 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Penn Station — A C E · 200 ft straight-line (about a 1-minute walk) · station accessibility: full 34 St-Penn Station — 1 2 3 · 0.2 mi straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: W 34 St / 8 Av — M34-SBS · 300 ft · Select Bus Service
Citi Bike
8 Ave & W 33 St · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
192 311 service requests from this address in the last three years — 5 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Most recent mortgage recorded against this lot: $75,000,000 on
2017-02-07 (lender: 315 West 33 Funding LLC). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2017-02-07
Mortgage $250,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC
$250,000,000
2017-02-07
SMTG $325,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC
$325,000,000
2017-02-07
Agreement $250,000,000 — from 33/34 WEST OWNER LLC to ROTHESAY LIFE PLC
$250,000,000
2017-02-07
AL&R $250,000,000 — from 33/34 WEST OWNER LLC to ROTHESAY LIFE PLC
$250,000,000
2017-02-07
Mortgage $75,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC
$75,000,000
2016-03-10
RPTT&RET $87,565,050 — from SLG 315 WEST LLC to RECKSON OPERATING PARTNERSHIP, L.P.; 33/34 WEST OWNER LLC
$87,565,050
2016-01-27
Mortgage $148,247,437 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC
$148,247,437
2016-01-27
Agreement $325,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC
$325,000,000
2016-01-27
AL&R $325,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC
$325,000,000
2014-01-15
Agreement $176,752,563 — from SP WEST 33-34 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
$176,752,563
2013-12-05
RPTT&RET $386,775,000 — from CAREIT PENMARK LIMITED PARTNERSHIP; PUBLIC SECTOR PENSION INVESTMENT BOARD; BLUE CHIP WEST to SLG 315 WEST LLC
$386,775,000
2012-03-27
RPTT&RET $381,000 — from SMYTH, CHRISTINE T to COHEN, ZITA; COHEN, ARNOLD; COHEN, ALEXANDRA
$381,000
2011-04-21
Agreement $180,000,555 — from NEW YORK COMMUNITY BANK to SP WEST 33-34 LLC
$180,000,555
2011-04-21
AL&R $180,000,555 — from SP WEST 33-34 LLC to NEW YORK COMMUNITY BANK
$180,000,555
2005-06-21
AL&R $184,000,000 — from NEW YORK COMMUNITY BANK to SP WEST 33-34 LLC
$184,000,000
Ten-year activity
2001000
2017
2018
2019
2020
2021
165
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
62
22
40
11
9
144
2018
62
25
36
0
6
129
2019
24
20
29
0
11
84
2020
12
3
126
1
1
143
2021
48
17
79
0
4
148
2022
87
23
51
0
4
165
2023
31
37
76
0
11
155
2024
8
3
57
0
11
79
2025
6
15
80
0
7
108
2026
4
0
64
2
9
79
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-11-17HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2025-07-29ECB CLASS - 1 violation: FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING,..ECT, WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUME$10,000
2025-07-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-05311: Consumer Complaint — Garage or Parking Lot
2024-09-30311: Water Conservation — Water Meter Stolen/Missing - Other (CLO)
2024-09-30311: Vendor Enforcement — Food Vendor
2024-09-26311: Water Conservation — Water Meter Stolen/Missing - Private Residence (CLR)
2024-09-25311: Vendor Enforcement — Food Vendor
2024-09-23FDNY inspection (RISK)
2024-09-23FDNY inspection (THEATER)
2024-09-21311: Taxi Complaint — Driver Complaint - Non Passenger
2024-09-13311: Homeless Person Assistance
2024-09-01311: Water System — Hydrant Leaking (WC1)
2024-08-31311: Consumer Complaint — Garage or Parking Lot
2024-07-31Certificate of occupancy Renewal Without Change
2024-07-25311: Vendor Enforcement — Food Vendor
2024-07-19311: Residential Disposal Complaint — Trash Not Separated from Recycling
2024-07-18Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2024-07-02Restaurant inspection: CHIPOTLE MEXICAN GRILL — grade B
2024-05-13311: Noise — Noise: Construction Before/After Hours (NM1)
2024-05-10311: Consumer Complaint — Garage or Parking Lot
2024-05-06Permit General Construction — Signed-off
2024-05-02Elevator permit: Furnish and Install New Drive Sheave (Code 8.7.2.25), Cables 8.7.2.21. All work to conform with ASME A17.1 2013 as Modified by Ap$15,000
2024-04-30311: Noise — Noise: Construction Equipment (NC1)
2024-04-28311: Illegal Parking — Parking Permit Improper Use
2024-04-20311: New Tree Request — For One Address
2024-04-20311: New Tree Request — For One Address
2024-04-20311: New Tree Request — For One Address
2024-04-20311: New Tree Request — For One Address
2024-04-20311: New Tree Request — For One Address
2024-04-20311: New Tree Request — For One Address
2024-04-12311: Illegal Parking — Parking Permit Improper Use
2024-03-14311: Noise — Noise: Jack Hammering (NC2)
2024-03-14311: Noise — Noise: Jack Hammering (NC2)
2024-03-14311: Noise — Noise: Jack Hammering (NC2)
2024-03-14311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-14311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-14311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-14311: Noise — Noise: Jack Hammering (NC2)
2024-03-13Job filed: HVAC modifications for existing MS system and related piping for (2) MRI room build outs. No change in use, egress or occupancy.$50,000
2024-03-12311: Consumer Complaint — Garage or Parking Lot
2023-08-09HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2023-08-03Job filed: HVAC modifications for existing MS system and related piping for (2) MRI room build outs. No change in use, egress or occupancy.$50,000
2023-08-02Job filed: Interior build-out and finishes of (2) MRI rooms, including interior finish wall partition, ceilings, doors. No change in use, egress or occupancy.$250,000
2023-06-16Job filed: Additions & modifications to existing HVAC system and related piping. Installation of AC units. No change in use, egress or occupancy. Related applica$500,000
2023-06-14Boiler inspection
2023-06-14Boiler inspection
2023-06-14Boiler inspection
2023-06-14Boiler inspection
2023-06-14Boiler inspection
2023-06-13311: Illegal Parking — Blocked Sidewalk
2023-05-30Permit Plumbing — Signed-off
2023-05-30Permit Mechanical Systems — Signed-off
2023-05-30Permit General Construction — Signed-off
2023-05-23HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES . IN THE KITCHEN LOCATED AT APT 21H, 21st STORY, 3rd APARTMENT FROM EAS
2023-05-23HPD class C: §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTI
2023-05-23HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES . IN THE KITCHEN LOCATED AT APT 25H, 25th STORY, 3rd APARTMENT FROM EAS
2023-05-23HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES . IN THE KITCHEN LOCATED AT APT 32H, 32nd STORY, 3rd APARTMENT FROM EAS
2023-05-23HPD class C: §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTI
2023-05-23HPD class A: § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND
2023-05-23HPD class C: §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTI
2023-05-23HPD class A: § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON
2023-05-23HPD class A: § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX . AT
2023-05-23HPD class A: § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPE
2023-05-19Permit Sign — Signed-off
2023-05-19Permit Sign — Signed-off
2023-05-18Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS CABINET WALL SIGN-A ON STOREFRONT MULLION FRAME, NO CHANGE TO USE, EGRESS OR OCCUPATION$5,616
2023-05-18Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B ON STOREFRONT MULLION FRAME, NO CHANGE TO USE, EGRESS OR OCCUPATION$1,053
2023-04-18Job filed: PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPAN$69,700
2023-04-18Job filed: PLUMBING WORKS$14,000
2023-04-14Permit General Construction — Signed-off
2023-04-13Bedbug filing: 2 infested units
2023-04-04ECB CLASS - 1 violation: AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE #1 WITH INOPERABLE LIGHT BULBS UNDERSIDE OF THE SHED TO BRIN$625
2023-03-31311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-03-31DOB complaint, category ?
2023-03-30HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-02-18311: Elevator — Elevator - Multiple Devices On Property
2023-02-18DOB complaint, category ?
2023-02-14Permit Protection and Mechanical Methods — Signed-off
2023-02-14Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING COD$1,000
2023-02-06Permit Sidewalk Shed — Signed-off
2023-02-06Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2023-01-20311: Street Sign - Dangling — No Parking, Standing, Stopping
2023-01-19Job filed: Additions & modifications to existing HVAC system and related piping. Installation of AC units. No change in use, egress or occupancy. Related applica$500,000
2023-01-19Job filed: Modifications to existing plumbing system & related piping within tenant space. No change in use, egress or occupancy. Related applications filed unde$100,000
2023-01-19Job filed: Interior renovation of partitions, ceilings and doors within tenant space. No change in use, egress or occupancy. Related applications filed under MS $840,000
2023-01-11311: ELECTRIC — POWER OUTAGE
2023-01-11Tenant complaint: ELECTRIC — POWER OUTAGE
2023-01-11DOB complaint, category ?
2023-01-06311: APPLIANCE — ELECTRIC/GAS RANGE
2023-01-06Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2023-01-06Permit Structural — Signed-off
2023-01-05Job filed: EXTERIOR RESTORATION TO INCLUDE SEALANT APPLICATION, WINDOW TRIMS, PARAPET RAISING AND STUCCO PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE,$202,856
2023-01-05Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the 35th Floor (36th Floor - Marketing). All other related wor$68,000
2022-12-29Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2022-12-21FDNY inspection (COM_OCPCY)
2022-12-21FDNY inspection (COM_OCPCY)
2022-12-17HPD class C: § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 8H, 8th STORY, 3rd APARTMENT FRO
2022-12-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-12-14Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2022-12-09Permit Mechanical Systems — Signed-off
2022-12-08311: Noise — Noise: Construction Equipment (NC1)
2022-12-08311: Indoor Air Quality — Dust from Construction
2022-12-08311: Noise — Noise: Construction Equipment (NC1)
2022-12-07Permit Plumbing — Signed-off
2022-12-06Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3 of 2015, as m$21,000
2022-12-03Permit General Construction — Signed-off
2022-12-01311: Blocked Driveway — No Access
2022-11-29Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 9I, 14H AND 17I. THIS UNITS ARE ON THE 9TH, 14TH AND 17TH FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUP$6,000
2022-11-28Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 9I, 14H AND 17I $90,000
2022-11-15Job filed: Herewith Filing Mechanical Work in conjunction with interior renovations at the Lobby and 7th floor. No Change in Use, Egress or Occupancy Proposed un$750,000
2022-11-08311: PLUMBING — WATER SUPPLY
2022-11-08Tenant complaint: PLUMBING — WATER SUPPLY
2022-10-24Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 19A AND 21G.. THIS UNITS ARE ON THE 19TH AND 21ST FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-10-24Certificate of occupancy Renewal Without Change
2022-10-21Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 19A AND 21G ON T$60,000
2022-10-19Permit Plumbing — Signed-off
2022-10-19Permit Plumbing — Signed-off
2022-10-12311: HEAT/HOT WATER — ENTIRE BUILDING
2022-10-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-10-08311: HEAT/HOT WATER — ENTIRE BUILDING
2022-10-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-09-16311: Noise — Noise: Construction Before/After Hours (NM1)
2022-09-09Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the first floor lobby and Seventh Floor. All other related wor$195,000
2022-09-08311: UNSANITARY CONDITION — MOLD
2022-09-08311: WATER LEAK — HEAVY FLOW
2022-09-08Tenant complaint: WATER LEAK — HEAVY FLOW
2022-09-01Permit General Construction — Signed-off
2022-08-29311: Consumer Complaint — Garage/Parking Lot
2022-08-24311: Blocked Driveway — No Access
2022-08-22Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 18A. THIS UNIT IS ON THE 18TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-08-22Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNIT 18A ON THE 18ND F$30,000
2022-08-22Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the first floor lobby and Seventh Floor. All other related wor$195,000
2022-08-15Job filed: Herewith Filing Modification to existing Plumbing and Sprinkler Systems in conjunction with interior demolition filed in advance of renovations. No ch$35,000
2022-08-10Permit Structural — Signed-off
2022-08-08DOB complaint, category ?
2022-08-05Certificate of occupancy Renewal Without Change
2022-08-04Permit General Construction — Signed-off
2022-08-03Permit Plumbing — Signed-off
2022-07-29Permit General Construction — Signed-off
2022-07-28Job filed: Herewith Filing the Installation of a Steel Pergola at the 35th Floor (36th Floor Marketing) Accessory Roof Terrace as shown on plans. No change in us$20,000
2022-07-27Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 22B. THIS UNIT IS ON THE 22ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-07-26Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNIT 22B ON THE 22ND F$30,000
2022-07-21Permit Plumbing — Signed-off
2022-07-21Permit Sprinklers — Signed-off
2022-07-14311: Homeless Person Assistance
2022-07-13311: Encampment — N/A
2022-07-12Permit Mechanical Systems — Signed-off
2022-07-12Permit Plumbing — Signed-off
2022-07-11Permit Plumbing — Signed-off
2022-07-11Permit Sprinklers — Signed-off
2022-07-11Permit Sprinklers — Signed-off
2022-07-11Permit Plumbing — Signed-off
2022-07-07311: Encampment — N/A
2022-07-05Permit General Construction — Signed-off
2022-07-05Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 12I AND 14C. THESE UNITS ARE ON THE 12TH AND 14TH FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,000
2022-07-05Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 16G, 19H & 24F. THESE UNITS ARE ON THE 16TH, 19TH & 24TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN$6,000
2022-06-27Permit General Construction — Signed-off
2022-06-24Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 10G. THIS UNIT IS ON THE 10TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-06-23Permit Plumbing — Signed-off
2022-06-23Permit Sprinklers — Signed-off
2022-06-23Permit Plumbing — Signed-off
2022-06-23Permit Sprinklers — Signed-off
2022-06-23Permit Mechanical Systems — Signed-off
2022-06-20Bedbug filing: 1 infested units
2022-06-20311: Noise — Noise: Construction Equipment (NC1)
2022-06-16311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2022-06-16Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the first floor lobby and Seventh Floor. All other related wor$195,000
2022-06-16DOB complaint, category ?
2022-06-09Permit General Construction — Signed-off
2022-06-02Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 16G, 19H, 24F ON$90,000
2022-05-26Job filed: Herewith filing Interior Renovations at 35th Floor (36th Floor - Marketing) as per plans.$1,000,000
2022-05-25Job filed: Herewith Filing Mechanical Work in conjunction with interior renovations at the 35th Floor (36th Floor - Marketing). No Change in Use, Egress or Occup$95,000
2022-05-23Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 24F. THIS UNIT IS ON THE 24TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2022-05-23Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 10G. THIS UNIT IS ON THE 10TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-05-23Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the 35th Floor (36th Floor - Marketing). All other related wor$68,000
2022-05-20Job filed: Modifications to structural system (steel & framing) on 1st floor and 2nd floor roof. No change in use, egress or occupancy. Related applications file$60,000
2022-05-18Job filed: Herewith Filing demolition of mechanical system at ground floor retails/ eating and drinking establishment in advance of interior renovations.$25,000
2022-05-18Job filed: Herewith Filing Modification to existing Plumbing and Sprinkler Systems in conjunction with interior demolition filed in advance of renovations. No ch$35,000
2022-05-18Job filed: Herewith filing interior demolition in conjunction with renovations (to be filed separately). No change in Use, Egress or Occupancy Proposed under thi$252,000
2022-05-18Job filed: Modifications to existing plumbing system & related piping within tenant space. No change in use, egress or occupancy. Related applications filed unde$100,000
2022-05-18Job filed: Additions & modifications to existing HVAC system and related piping. Installation of AC units. No change in use, egress or occupancy. Related applica$500,000
2022-05-17Job filed: Interior renovation of partitions, ceilings and doors within tenant space. No change in use, egress or occupancy. Related applications filed under MS $840,000
2022-05-13Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 15C, 16H, 20H, 22G, 35F . THIS UNIT IS ON THE 15TH, 16TH, 20TH, 22ND AND 35TH FLOORS AS PER PLANS. NO CHANGE IN $10,000
2022-05-09Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 16G, 19H & 24F. THESE UNITS ARE ON THE 16TH, 19TH & 24TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN$6,000
2022-05-06Eviction executed (15J)
2022-05-05Permit General Construction — Signed-off
2022-05-05Permit Plumbing — Signed-off
2022-05-05Certificate of occupancy Renewal Without Change
2022-05-04DOB complaint, category ?
2022-05-04DOB complaint, category ?
2022-04-25DOB complaint, category ?
2022-04-22Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 12I AND 14C. THESE UNITS ARE ON THE 12TH AND 14TH FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,000
2022-04-21Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 12I AND 14C ON T$60,000
2022-04-18DOB complaint, category ?
2022-04-18DOB complaint, category ?
2022-04-14Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the first floor lobby and Seventh Floor. All other related wor$195,000
2022-04-14ECB CLASS - 2 violation: FAILURE TO POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS NOTE AT TIME OF INSPECTION OBSERVED WORK BEING PERFOMRED UNDER AFOR$3,125
2022-04-14ECB CLASS - 2 violation: FAILURE TO POST & DISTRIBUTE TENANT PROTECTION PLAN NOTE AT TIME OF INSPECTION OBSERVED WORK BEING PERFORMED IN APT 10G UNDER AFOR$3,125
2022-04-13Permit Plumbing — Signed-off
2022-04-13Permit Plumbing — Signed-off
2022-04-09311: Consumer Complaint — Garage/Parking Lot
2022-04-09311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-07311: Noise — Noise: Construction Equipment (NC1)
2022-04-07311: Indoor Air Quality — Dust from Construction
2022-04-07311: Consumer Complaint — Garage/Parking Lot
2022-04-01Permit General Construction — Signed-off
2022-03-24Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 10G. THIS UNIT IS ON THE 10TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-03-24Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNIT 10G ON THE 10TH F$30,000
2022-03-22Elevator permit: MODERNIZATION OF _4_ ELEVATORS(CHANGE IN WEIGHT WITHIN 5% OF EXISITING SUPPENDED WEIGHT)All work to comply with ASME A17.1-2000 an$219,000
2022-03-17Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 9H, 12F AND 33F. THESE UNITS ARE ON FLOORS 009, 012 AND 033 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,400
2022-03-17Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 14A, 16C, 23B, 30G . THESE UNITS ARE ON FLOORS 14, 16, 23, 30 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC$2,800
2022-03-08HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-03-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-03-06DOB complaint, category ?
2022-03-06DOB complaint, category ?
2022-02-18Permit Plumbing — Signed-off
2022-02-17Permit General Construction — Signed-off
2022-02-10Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 15C, 16H, 20H, 22G, 35F . THIS UNIT IS ON THE 15TH, 16TH, 20TH, 22ND AND 35TH FLOORS AS PER PLANS. NO CHANGE IN $10,000
2022-02-10Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 15C,16H, 20H, 22$150,000
2022-02-07311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2022-01-06Permit General Construction — Signed-off
2022-01-03311: Lead — Lead Kit Request (Residential) (L10)
2021
2021-12-29DOB complaint, category ?
2021-12-29DOB complaint, category ?
2021-12-27Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNIT 29H ON THE 29TH F$30,000
2021-12-23Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 29H . THIS UNIT IS ON THE 29TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2021-12-21ECB CLASS - 2 violation: FAILURE TO UNCOVER PLUMBING SYSTEM FOR INSPECTION &/ OR TESTED I OBSERVED AT TIME OF SPOT CHECK INSPECTION FOR THE 28 FLOOR FOR AP$1,280
2021-12-21DOB complaint, category ?
2021-12-12311: Taxi Complaint — Driver Complaint - Non Passenger
2021-12-10311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-12-10311: Noise — Noise: Construction Before/After Hours (NM1)
2021-12-10Permit General Construction — Signed-off
2021-12-09Permit Plumbing — Signed-off
2021-12-06DOB complaint, category ?
2021-11-30Permit General Construction — Signed-off
2021-11-30DOB complaint, category ?
2021-11-30DOB complaint, category ?
2021-11-30DOB complaint, category ?
2021-11-30DOB complaint, category ?
2021-11-24Job filed: PLUMBING MODIFICATIONS WITHIN UNIT 28G . THIS UNIT IS ON THE 28TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2021-11-22Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNIT 28G ON THE 28TH F$30,000
2021-11-20311: Consumer Complaint — Garage/Parking Lot
2021-11-18Job filed: Herewith Filing Interior Renovations at the 1st Floor Lobby and 7th Floor as per plans submitted. No Change in Use, Egress or Occupancy Proposed under$1,167,000
2021-11-08311: Noise — Noise: Construction Equipment (NC1)
2021-11-08311: Noise — Noise: Construction Equipment (NC1)
2021-11-08311: Noise — Noise: Construction Equipment (NC1)
2021-11-08Permit Plumbing — Signed-off
2021-11-05Elevator permit: MODERNIZATION of one traction Elevator$162,811
2021-11-05Elevator permit: MODERNIZATION of one traction Elevator$162,811
2021-11-05Permit Sprinklers — Signed-off
2021-11-05Permit Plumbing — Signed-off
2021-11-05Permit Sprinklers — Signed-off
2021-11-05Permit Plumbing — Signed-off
2021-11-04Permit General Construction — Signed-off
2021-11-03Permit Mechanical Systems — Signed-off
2021-11-03Permit General Construction — Signed-off
2021-11-01311: Encampment — N/A
2021-10-27311: Water System — Dirty Water (WE)
2021-10-27Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 14A, 16C, 23B, 30G . THESE UNITS ARE ON FLOORS 14, 16, 23, 30 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC$2,800
2021-10-27Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 14A, 16C, 23B AN$124,000
2021-10-09311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-10-07311: Vaccine Mandate Non-Compliance — Customer Proof of Vaccination Not Checked
2021-10-05Permit Sign — Signed-off
2021-10-04Permit Plumbing — Signed-off
2021-10-01Permit General Construction — Signed-off
2021-09-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-09-29Job filed: Herewith Filing Mechanical Work in conjunction with interior renovations at the Lobby and 7th floor. No Change in Use, Egress or Occupancy Proposed un$750,000
2021-09-28Permit Sign — Signed-off
2021-09-28Job filed: REPLACE ILLUMINATED, ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS JOB#121609116, NO CHANGE TO USE, EGRESS OR OCCUPATION$1,053
2021-09-28Job filed: REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A WITH BACK PANEL, REMOVE A PREVIOUS JOB#120483850, NO CHANGE TO USE, EGRESS OR OCCUP$4,797
2021-09-23311: Encampment — N/A
2021-09-22Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 10B, 10F, 12G, 1$217,000
2021-09-22Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 10B, 10F, 12G, 15 i ,20G, 21C . THESE UNITS ARE ON FLOORS 10, 10, 12, 15, 20, & 21 AS PER PLANS. NO CHANGE IN US$19,600
2021-09-20Job filed: Herewith Filing Interior Renovations at the 1st Floor Lobby and 7th Floor as per plans submitted. No Change in Use, Egress or Occupancy Proposed under$1,167,000
2021-09-17Job filed: Herewith Filing Plumbing and Sprinkler Work in conjunction with interior renovations at the first floor lobby and Seventh Floor. All other related wor$195,000
2021-08-30Permit General Construction — Signed-off
2021-08-17Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 9H, 12F AND 33F$93,000
2021-08-16FDNY inspection (RISK)
2021-08-12311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-08-09Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 9H, 12F AND 33F. THESE UNITS ARE ON FLOORS 009, 012 AND 033 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,400
2021-08-04Elevator permit: Modification to the existing controller to install door position monitoring system (DLM) (Hardware only) as per requirements of AS$30,000
2021-07-19311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-07-13Permit Plumbing — Signed-off
2021-07-12Permit General Construction — Signed-off
2021-07-01Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 8C, 12B, 16A, 16$217,000
2021-06-30311: Non-Emergency Police Matter — Other (complaint details)
2021-06-30311: Noise - Residential — Loud Talking
2021-06-30Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 8C, 12B, 16A, 16F, 28H AND 34G. THESE UNITS ARE ON FLOORS 008, 012, 016, 016, 028 AND 034. AS PER PLANS. NO CHAN$19,600
2021-06-09Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 9G, 17H, 19I, 21H, 22F, 23G AND25B. THESE UNITS ARE ON FLOORS 9, 17, 19, 21, 22, 23 AND 25 AS PER PLANS. NO CHANG$19,600
2021-06-07311: Consumer Complaint — Garage/Parking Lot
2021-04-23311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2021-04-20311: Encampment — N/A
2021-04-19Permit General Construction — Signed-off
2021-04-16311: Noise — Noise: Construction Before/After Hours (NM1)
2021-04-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-04-16HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2021-04-08Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 9G, 17H, 19I, 21$217,000
2021-04-08Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 9G, 17H, 19I, 21H, 22F, 23G AND25B. THESE UNITS ARE ON FLOORS 9, 17, 19, 21, 22, 23 AND 25 AS PER PLANS. NO CHANG$19,600
2021-03-04Permit General Construction — Signed-off
2021-02-25311: Lead — Lead Kit Request (Residential) (L10)
2021-02-23Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 14F, 17F, 19F, 21F, 24C, 27F & 30F. THESE UNITS ARE ON FLOORS 14, 17, 19, 21, 24, 27 & 30 AS PER PLANS. NO CHANGE$19,600
2021-02-21311: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-20HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8C, 8th STORY, 5th APARTMENT FROM WEST
2021-02-19Job filed: INTERIOR DEMOLITION OF PARTITIONS, NEW CABINETRY, FINISHES, LIGHTING, CEILING, DOOR MODIFICATIONS & RELATED CONSTRUCTION WITHIN UNITS 14F, 17F, 19F, 2$217,000
2021-02-17311: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-16DOB violation E:
2021-02-16DOB violation E:
2021-02-16DOB violation E:
2021-02-16DOB violation E:
2021-02-15HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16L, 16th STORY, 1st APARTMENT FROM EA
2021-02-11311: Consumer Complaint — Garage/Parking Lot
2021-02-10311: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-02-08311: Noise — Noise: Construction Before/After Hours (NM1)
2021-01-27311: Noise — Noise: Construction Before/After Hours (NM1)
2021-01-27311: Noise — Noise: Construction Before/After Hours (NM1)
2021-01-26Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 08B, 09C,11B, 17C, 19B, 24B, 32B. THESE UNITS ARE ON FLOORS 6, 7, 9, 14,16, 21 AND 29 AS PER PLANS. NO CHANGE IN $19,600
2020-12-03Job filed: PLUMBING MODIFICATIONS WITHIN UNITS 08B, 09C,11B, 17C, 19B, 24B, 32B. THESE UNITS ARE ON FLOORS 6, 7, 9, 14,16, 21 AND 29 AS PER PLANS. NO CHANGE IN $19,600
2020-12-02Permit EW — ISSUED
2020-11-28311: Homeless Street Condition — N/A
2020-11-21311: Homeless Person Assistance
2020-11-20311: Homeless Person Assistance
2020-11-20311: Homeless Person Assistance
2020-11-20311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-11-19311: Homeless Person Assistance
2020-11-19311: Homeless Person Assistance
2020-11-18311: Homeless Street Condition — N/A
2020-11-17311: Homeless Person Assistance
2020-11-17311: Homeless Person Assistance
2020-11-17311: Sanitation Condition — 15N Needle/Syringe on Street/Sidewalk
2020-11-17311: Homeless Street Condition — N/A
2020-11-17311: Homeless Person Assistance
2020-11-15311: Homeless Person Assistance
2020-11-15311: Homeless Person Assistance
2020-11-15311: Sanitation Condition — 15N Needle/Syringe on Street/Sidewalk
2020-11-15311: Homeless Street Condition — N/A
2020-11-14311: Homeless Street Condition — N/A
2020-11-14311: Homeless Person Assistance
2020-11-13311: Homeless Person Assistance
2020-11-12311: Homeless Person Assistance
2020-11-11311: Homeless Person Assistance
2020-11-11311: Homeless Person Assistance
2020-11-10Elevator permit: Modification to the existing controller to install door position monitoring system (DLM) (Hardware only) as per requirements of AS$15,000
2020-11-10311: Homeless Person Assistance
2020-11-10311: Homeless Person Assistance
2020-11-08311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-06Job filed: APARTMENT RENOVATIONS - INTERIOR DEMOLITION OF PARTITIONS; NEW CABINETRY, FINISHES AND LIGHTING; CEILING AND DOOR MODIFICATIONS AND RELATED CONSTRUCTI$217,000
2020-11-04311: Homeless Person Assistance — N/A
2020-11-04311: Homeless Street Condition — N/A
2020-11-04311: Homeless Street Condition — N/A
2020-11-03311: Homeless Person Assistance — N/A
2020-11-03311: Homeless Street Condition — N/A
2020-11-02311: Sanitation Condition — 15N Needle/Syringe on Street/Sidewalk
2020-11-02311: Homeless Person Assistance — N/A
2020-11-02311: Homeless Street Condition — N/A
2020-11-02311: Homeless Person Assistance — N/A
2020-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-11-01311: Homeless Street Condition — N/A
2020-11-01311: Homeless Person Assistance — N/A
2020-11-01311: Homeless Street Condition — N/A
2020-11-01311: Homeless Person Assistance — N/A
2020-11-01311: Sanitation Condition — 15N Needle/Syringe on Street/Sidewalk
2020-10-27311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2020-10-27311: Homeless Street Condition — N/A
2020-10-25311: Homeless Person Assistance — N/A
2020-10-24311: Homeless Person Assistance — N/A
2020-10-24311: Homeless Street Condition — N/A
2020-10-23311: Homeless Person Assistance — N/A
2020-10-23311: Homeless Street Condition — N/A
2020-10-22311: Urinating in Public — N/A
2020-10-22311: Homeless Street Condition — N/A
2020-10-22Job filed: INSTALLATION OF 8' HIGH TEMPORARY SMOOTH PLYWOOD CONSTRUCTION FENCE CONSTRUCTED ALONG BUILDING LINE AS PER PLANS FILED HEREWITH.$15,000
2019-10-30311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2019-10-22Elevator permit: Furnish and Install step chains to replace existing.(8.7.6.1.7) **Inspections during the process and upon compliance shall be per$10,000
2019-10-09Job filed: relocation of existing duct work as per plans filed herewith based on new architectural ceiling. relocation of air diffuser$73,361
2019-10-09Job filed: modification to existing plumbing fixtures per plans filed herewith$179,485
2019-10-04311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2019-09-23Job filed: Interior structural work as per plans filed herewith.$356,133
2019-09-16DOB violation P: BOROUGH COMMISSIONER HAS ISSUED A NOTICE TO IMMEDIATELY STOP WORK DUE TO APPLICANT WITHDRAWAL AS OF APPLICATION # 123439083 AS OF
2019-09-16Job filed: INTERIOR RENOVATIONS OF EXISTING THEATER SPACE WITH NO CHANGE TO USE, OCCUPANCY OR EGRESS.$2,836,352
2019-09-16DOB complaint, category ?
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-07-15Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $20,000
2019-07-09311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2019-07-09DOB complaint, category ?
2019-06-25Permit EW — ISSUED
2019-06-25Permit EW — ISSUED
2019-06-25Permit EW — ISSUED
2019-06-11Job filed: STRUCTURAL APPLICATION IN CONJUNCTION WITH DOC 1 - THEATER #13- INTERIOR REMODELING TO STRUCTURAL COMPONENTS AS SHOWN ON DRAWINGS FILED HEREWITH. NO C$50,000
2019-06-10Job filed: MCECHANICAL APPLICATION IN CONJUNCTION WITH DOC 1 TO MODIFY EXISTING DUCTWORK AND ADD INTERIOR EXHAUST FAN TO THEATER #13$50,000
2019-06-10Job filed: MCECHANICAL APPLICATION IN CONJUNCTION WITH DOC 1 TO MODIFY EXISTING DUCTWORK AND ADD INTERIOR EXHAUST FAN TO THEATER #13$50,000
2019-06-10Job filed: APPLICATION FILED FOR AN INTERIOR RENOVATION TO THEATER #13 ON THE 5TH FLOOR TO INCLUDE THE REPLACEMENT OF EXISTING SEATING, REPLACE EXISTING AISLE $300,000
2019-06-04311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2019-05-30311: General Construction/Plumbing — Building Permit - None
2019-05-30DOB complaint, category ?
2019-05-28311: General Construction/Plumbing — Building Permit - None
2019-05-28DOB complaint, category ?
2019-05-26311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2019-03-01Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$4,996
2019-03-01311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2019-01-15Elevator permit: Modernize elevator # 1P42627. All work to comply with A17.1 2000 with A17.1a-02 and A17.1b-03 Addendum and modifications within $142,880
2019-01-15Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SITE NAME FEDEX$13,000
2018-11-14Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) {Software/Hardware) as per requirements o$60,000
2018-11-13Job filed: FILING FOR A.C. SYSTEM REPLACEMENT ON 7TH FLOOR AS PER PLAN.$16,000
2018-11-13Job filed: FILING FOR A.C. SYSTEM REPLACEMENT ON 7TH FLOOR AS PER PLAN.$16,000
2018-10-29311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-22311: Noise — Noise: Construction Before/After Hours (NM1)
2018-10-19Elevator permit: Modernize elevator # 1P42627. All work to comply with A17.1 2000 with A17.1a-02 and A17.1b-03 Addendum and modifications within $142,880
2018-10-18311: Food Establishment — Letter Grading
2018-10-18Permit Sign — Signed-off
2018-10-16Permit PL — ISSUED
2018-10-11311: Blocked Driveway — No Access
2018-10-11Job filed: Erect illuminated non advertising sign on wall. No change of use,egress or occupancy$3,159
2018-10-09Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2018-10-09Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2018-10-08Job filed: AN UPGRADE TO EXISTING KITCHEN EQUIPMENT IN THE CONCESSIONS AREA.$2,000
2018-10-08Job filed: AN UPGRADE TO EXISTING KITCHEN EQUIPMENT IN THE CONCESSIONS AREA.$2,000
2018-10-08Job filed: AN UPGRADE TO EXISTING KITCHEN EQUIPMENT IN THE CONCESSIONS AREA.$2,000
2018-09-11ECB CLASS - 1 violation: 05J10CU; 10H11; 67X10. 10H11-REPLACE CAR DOOR GTIBS; 67X10-REPAIR PHONE CALL 212-393-2435 AND EMAIL EIR@BUILDING.NYC.GOV TO RE$1,250
2018-09-05Permit EW — ISSUED
2018-09-04Job filed: Installation of new sign as per plans.$3,250
2018-09-04Job filed: Installation of sign as per plans.$2,750
2018-09-04Job filed: Installation of sign as per plans.$2,750
2018-08-31Permit EW — ISSUED
2018-08-31Permit EW — ISSUED
2018-08-30311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-08-29311: Homeless Person Assistance
2018-08-24311: Taxi Report — Driver Report
2018-08-24Job filed: PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$30,000
2018-08-24Job filed: ARCHITECTURAL MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$170,000
2018-08-21Job filed: HVAC AND PLUMBING MODIFICATIONS ON THE 1ST FLOOR (FEDEX) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$42,250
2018-08-21Job filed: INSTALLATION OF NEW PARTITIONS, DOORS, FLOOR FINISHES AND SUSPENDED CEILINGS ON THE 1ST FLOOR (FEDEX) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP$15,800
2018-08-21Job filed: INSTALLATION OF NEW PARTITIONS, DOORS, FLOOR FINISHES AND SUSPENDED CEILINGS ON THE 1ST FLOOR (FEDEX) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP$15,800
2018-08-20FDNY inspection (RISK)
2018-08-16311: Homeless Person Assistance
2018-08-16Certificate of occupancy Temporary
2018-08-07Eviction executed (034H)
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-26311: Elevator — Elevator - Multiple Devices On Property
2018-07-26DOB complaint, category ?
2018-07-25Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2018-06-08311: Building/Use — Illegal Conversion Of Residential Building/Space
2018-06-08DOB complaint, category ?
2018-06-07311: Noise — Noise: Construction Equipment (NC1)
2018-05-25311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2018-05-25DOB complaint, category ?
2018-05-21Permit EW — ISSUED
2018-05-16311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2018-05-16DOB complaint, category ?
2018-05-15Permit EW — ISSUED
2018-05-03Job filed: ROOF REPLACEMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. SEE COMMENT #24$440,100
2018-05-01311: Homeless Person Assistance
2018-04-25311: Noise — Noise: Jack Hammering (NC2)
2018-04-23Job filed: PLUMBING MODIFICATIONS TO APARTMENTS 9B, 20B, 20C, 28C AND 30I AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY,$31,500
2018-04-23Job filed: ARCHITECTURAL MODIFICATIONS TO APARTMENTS 9B, 20B, 20C, 28C AND 30I AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$216,400
2018-04-19Permit EW — ISSUED
2018-04-10Permit EW — ISSUED
2018-04-10Permit EW — ISSUED
2018-04-10Permit EW — ISSUED
2018-04-05Job filed: PLUMBING MODIFICATIONS TO APARTMENT 28J AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,100
2018-04-05Job filed: A2$40,000
2018-04-05Job filed: PLUMBING MODIFICATIONS TO APARTMENT 28J AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,100
2018-04-05Job filed: A2$40,000
2018-03-21Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES IN THE CELLAR (LANDMARK EDUCATION) AS PER PLANS. NO CHAN$100,000
2018-03-20Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 1ST FLOOR (QUIZNOS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2018-03-20Job filed: REMOVAL OF PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES WITH INSTALLATION OF A RAMP ON THE 1ST FLOOR (QUIZNOS) AS PER PLANS. NO CHANGE TO USE, $55,000
2018-03-20Job filed: REMOVAL OF PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES WITH INSTALLATION OF A RAMP ON THE 1ST FLOOR (QUIZNOS) AS PER PLANS. NO CHANGE TO USE, $55,000
2018-03-20Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 1ST FLOOR (QUIZNOS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2018-03-05311: Street Condition — Pothole
2018-02-28Permit EW — ISSUED
2018-02-28Permit EW — ISSUED
2018-02-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-02-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-02-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-02-02Job filed: HVAC MODIFICATIONS ON THE 1ST FLOOR (FIVE GUYS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$42,000
2018-02-02Job filed: HVAC MODIFICATIONS ON THE 1ST FLOOR (FIVE GUYS) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$42,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation E:
2018-01-26DOB violation E:
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-10311: Consumer Complaint — Price Not Posted
2018-01-09311: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-09Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-02311: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-01311: HEAT/HOT WATER — ENTIRE BUILDING
2018-01-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017
2017-12-21Permit EW — ISSUED
2017-12-21Permit EW — ISSUED
2017-12-21Permit EW — ISSUED
2017-12-15Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2017-12-15Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2017-12-14Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2017-12-14Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2017-12-14Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2017-12-12Job filed: REPLACEMENT OF A/C UNIT .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY$600,250
2017-12-08Permit EW — ISSUED
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05311: Building Marshals office — Illegal Activity
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-12-05DOB complaint, category ?
2017-11-30311: Vending — In Prohibited Area
2017-11-20311: Noise — Noise: Construction Before/After Hours (NM1)
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE$2,400
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE$2,400
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE$2,400
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE$2,400
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE$2,400
2017-11-15ECB CLASS - 1 violation: FILED A CERTIFICATE FORM, APPLICATION ETC., CONTAINING A MATERIAL FALSE STATEMENT(S). NOTED: THE OWNER/REPRESENTATIVE MADE A FALSE$4,800
2017-11-08Permit PL — ISSUED
2017-11-08Permit PL — ISSUED
2017-10-26311: Noise — Noise: Jack Hammering (NC2)
2017-10-23311: Food Poisoning — 1 or 2
2017-10-19Permit EW — ISSUED
2017-10-19Permit EW — ISSUED
2017-10-06Permit EW — ISSUED
2017-10-06Permit EW — ISSUED
2017-10-06Job filed: RENOVATION OF APARTMENTS 9B, 20B, 20C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$160,011
2017-10-06Job filed: RENOVATION OF APARTMENTS 28C, 28J, 30I. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$201,937
2017-10-06Job filed: RENOVATION OF APARTMENTS 9B, 20B, 20C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$160,011
2017-10-02Job filed: RENOVATION OF APARTMENTS 9B, 20B, 20C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$74,300
2017-09-28311: Food Establishment — Letter Grading
2017-09-27311: Noise — Noise: air condition/ventilation equipment (NV1)
2017-09-18311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2017-09-18311: Food Establishment — Letter Grading
2017-09-13Job filed: RENOVATION OF APARTMENTS 32K, 33A, 35A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2017-09-13Job filed: RENOVATION OF APARTMENT #26H. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$38,000
2017-08-31Rodent inspection: Passed
2017-08-24311: Taxi Report — Driver Report
2017-08-18Permit PL — ISSUED
2017-08-18Permit PL — ISSUED
2017-08-07Permit EW — ISSUED
2017-07-21311: Taxi Complaint — Vehicle Complaint
2017-07-19Permit EQ — ISSUED
2017-07-13311: Food Poisoning — 1 or 2
2017-07-12Job filed: PA
2017-07-12Job filed: PA
2017-07-10Certificate of occupancy Temporary
2017-06-28Job filed: RENOVATION OF APARTMENT 10I, 25A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2017-06-27Job filed: PROPOSED INSTALLATION OF INTERNAL PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-06-20311: Noise — Noise: Construction Before/After Hours (NM1)
2017-06-13311: Consumer Complaint — Door Open with Air Conditioning On
2017-03-28311: Noise — Noise: Construction Before/After Hours (NM1)
2017-03-28311: Noise — Noise: Jack Hammering (NC2)
2017-03-21Permit PL — ISSUED
2017-03-21Permit PL — ISSUED
2017-03-21Permit PL — ISSUED
2017-03-10311: Taxi Complaint — Driver Complaint
2017-03-02311: Unleashed Dog — Unleashed Dog in Public
2017-03-02Permit EW — ISSUED
2017-03-02Job filed: REMOVAL AND INSTALLATION OF DUCT WORK . REPLACEMENT AND RELOCATION OF EYEGLASS WASHER AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANG$60,000
2017-03-02Job filed: INTERIOR REMODELING TO STRUCTURAL COMPONENTS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2017-03-02Job filed: REMOVAL AND INSTALLATION OF DUCT WORK . REPLACEMENT AND RELOCATION OF EYEGLASS WASHER AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANG$60,000
2017-03-02Job filed: INTERIOR RENOVATIONS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$390,000
2017-03-01Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM WITH INSTALLATION OF PLUMBING FIXTURES ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO $84,340
2017-03-01Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 2ND FLOOR (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$4,100
2017-03-01Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM WITH INSTALLATION OF PLUMBING FIXTURES ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO $84,340
2017-03-01Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2017-03-01Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. N$773,922
2017-03-01Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 2ND FLOOR (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$4,100
2017-03-01Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. N$773,922
2017-03-01Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM WITH INSTALLATION OF PLUMBING FIXTURES ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO $84,340
2017-03-01Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 2ND FLOOR (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$4,100
2017-03-01Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 1ST AND 2ND FLOORS (MUSIC CHOICE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2017-02-23Permit EW — ISSUED
2017-02-23Permit EW — ISSUED
2017-02-07TL&R — from 315 WEST 33 FUNDING LLC to 33/34 WEST OWNER LLC
2017-02-07Mortgage $250,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC$250,000,000
2017-02-07SMTG $325,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC$325,000,000
2017-02-07SUBM — from ROTHESAY LIFE PLC to 315 WEST 33 FUNDING LLC
2017-02-07Agreement $250,000,000 — from 33/34 WEST OWNER LLC to ROTHESAY LIFE PLC$250,000,000
2017-02-07AL&R $250,000,000 — from 33/34 WEST OWNER LLC to ROTHESAY LIFE PLC$250,000,000
2017-02-07Mortgage $75,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC$75,000,000
2017-02-07Mortgage assigned — from 315 WEST 33 FUNDING LLC to ROTHESAY LIFE PLC
2017-02-01Job filed: RENOVATION OF APARTMENT 8M. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$38,000
2017-02-01Job filed: RENOVATION OF APARTMENT 8M. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$38,000
2017-01-24311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2017-01-13311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017-01-06Rodent inspection: Passed
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016-12-14311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2016-12-14311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2016-12-14Job filed: RENOVATION OF APARTMENTS 14I, 15H, 18I. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2016-12-14Job filed: RENOVATION OF APARTMENTS 14I, 15H, 18I. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2016-12-13Permit PL — ISSUED
2016-12-01Job filed: RENOVATION OF APARTMENTS 8N & 12A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$60,000
2016-12-01Job filed: RENOVATION OF APARTMENTS 8N & 12A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$60,000
2016-11-28311: Asbestos — Asbestos Complaint (B1)
2016-11-28311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2016-11-28311: Noise — Noise: Construction Before/After Hours (NM1)
2016-10-08HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE 1st ROOM FROM NORTH LOCA
2016-10-08HPD class A: § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX. 2 SQ FT AT NORTH WALL IN THE 1st ROOM FROM N
2016-09-26Job filed: RENOVATION OF APARTMENTS 10A, 15G, 16L. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2016-09-26Job filed: RENOVATION OF APARTMENTS 10A, 15G, 16L. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2016-08-15311: Noise — Noise: Construction Before/After Hours (NM1)
2016-08-14311: Noise - Residential — Loud Talking
2016-08-13311: Homeless Person Assistance — N/A
2016-08-12311: Noise — Noise, Barking Dog (NR5)
2016-08-12Permit PL — ISSUED
2016-08-12Permit EW — ISSUED
2016-08-12Permit EQ — ISSUED
2016-08-11Job filed: RENOVATION OF APARTMENTS 18B, 20A, 29F. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2016-08-02311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2016-08-02Permit PL — ISSUED
2016-07-28Job filed: ROOF REPLACEMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$638,000
2016-07-26Permit EW — ISSUED
2016-07-21Permit EW — ISSUED
2016-07-14Job filed: RENOVATION OF APARTMENTS 25I, 29C, 35C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$75,000
2016-07-13311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-13311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-13311: Lead — Lead Kit Request (Residential) (L10)
2016-06-28Job filed: RENOVATION OF APARTMENTS 17L, 29A, 29E, 32A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$100,000
2016-06-28Job filed: RENOVATION OF APARTMENTS 17L, 29A, 29E, 32A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$100,000
2016-06-21311: Found Property — Bag/Wallet
2016-06-14311: Homeless Person Assistance — N/A
2016-06-09Permit EW — ISSUED
2016-06-04311: Noise — Noise: Construction Before/After Hours (NM1)
2016-06-04311: Food Poisoning — 1 or 2
2016-06-03311: Food Poisoning — 1 or 2
2016-06-02311: Food Establishment — Odor
2016-06-01Permit PL — ISSUED
2016-05-31ECB CLASS - 1 violation: 88111. 88 LEFT & RIGHT HANDRAILS DAMAGED/WORN.$1,000
2016-05-28311: Homeless Person Assistance — N/A
2016-05-20311: Noise — Noise: Construction Equipment (NC1)
2016-05-18Permit EW — ISSUED
2016-05-17Job filed: REPLACEMENT OF (2) AIR CONDITIONING UNITS ON THE ROOF. NO CHANGE IN USE EGRESS OR OCCUPANCY.$60,000
2016-05-17Job filed: REPLACEMENT OF (2) AIR CONDITIONING UNITS ON THE ROOF. NO CHANGE IN USE EGRESS OR OCCUPANCY.$60,000
2016-05-05311: Consumer Complaint — Car Not Available
2016-05-03Job filed: RENOVATION OF APARTMENTS 11C, 18H, 19J, 22D. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$100,000
2016-05-03Job filed: RENOVATION OF APARTMENTS 11C, 18H, 19J, 22D. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$100,000
2016-04-07Job filed: RENOVATION OF APARTMENTS 9F, 21E, 27C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$90,000
2016-03-30311: Noise — Noise: Construction Before/After Hours (NM1)
2016-03-25Permit EW — ISSUED
2016-03-22311: Homeless Person Assistance — N/A
2016-03-22311: Homeless Person Assistance — N/A
2016-03-12311: Homeless Person Assistance — No Status Call
2016-03-10RPTT&RET $87,565,050 — from SLG 315 WEST LLC to RECKSON OPERATING PARTNERSHIP, L.P.; 33/34 WEST OWNER LLC$87,565,050
2016-03-06311: Homeless Person Assistance — Status Call
2016-03-02311: Sidewalk Condition — Blocked - Construction
2016-03-02311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2016-02-28311: Food Establishment — Bare Hands in Contact w/ Food
2016-02-22Job filed: RENOVATION OF APARTMENTS 23K. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$38,000
2016-02-09Permit PL — ISSUED
2016-02-05311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2016-02-05Permit PL — ISSUED
2016-02-05DOB complaint, category ?
2016-02-03Permit EW — ISSUED
2016-01-28311: Consumer Complaint — Car Not Available
2016-01-27Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to 315 WEST 33 FUNDING LLC
2016-01-27Mortgage $148,247,437 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC$148,247,437
2016-01-27Agreement $325,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC$325,000,000
2016-01-27AL&R $325,000,000 — from 33/34 WEST OWNER LLC to 315 WEST 33 FUNDING LLC$325,000,000
2015-12-14Job filed: RENOVATION OF APARTMENTS 10C, 14L, 29B. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$96,000
2015-12-14Job filed: RENOVATION OF APARTMENTS 10C, 14L, 29B. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$96,000
2015-12-13311: Consumer Complaint — Overcharge
2015-12-08311: Food Poisoning — 1 or 2
2015-11-24311: Food Establishment — Food Temperature
2015-11-23Permit PL — ISSUED
2015-11-22311: Consumer Complaint — Overcharge
2015-11-21311: Noise — Noise: Construction Before/After Hours (NM1)
2015-11-16Permit EW — ISSUED
2015-11-09311: Street Condition — Pothole
2015-11-08311: Street Condition — Pothole
2015-11-07ECB CLASS - 2 violation: 02L10,86I11. REPAIR ALARM SYSTEM; 86I11-REPLACE ALL BOTTOM COMBS.
2015-11-07ECB CLASS - 1 violation: 88I11,86I11. 88I11-REPLACE RIGHT HAND RAIL; 86I11- REPLACE BOTTOM COMBS.$1,030
2015-11-07ECB CLASS - 1 violation: 88I11 REPLACE LEFT HANDRAIL.$1,030
2015-11-07ECB CLASS - 1 violation: 88I11,90I10. 88-REPLACE RIGHT HANDRAIL; 90-BOTTOM START STATION COVER DAMAGED.$1,030
2015-11-07ECB CLASS - 1 violation: 88U11,86I11. 88I11-REPLACE LEFT HANDRAIL; 86I11-REPLACE BOTTOM COMBPLATE.$1,030
2015-11-07ECB CLASS - 1 violation: 88I11, 86I11. 88I11-REPLACE LEFT HANDRAIL; 86I11-REPLACE TOP AND TOTTOM COMBS.$1,030
2015-11-07ECB CLASS - 2 violation: 89H11 REPLACE ALL WORN AND SHARP STEPS.
2015-11-07ECB CLASS - 3 violation: 90M07 PROVIDE MISSING START STATION COVER BUTTON.
2015-11-06311: Noise — Noise: Construction Before/After Hours (NM1)
2015-11-02Job filed: RENOVATION OF APARTMENTS 17G, 18D, 23C, 23F, 23J, 31E. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS$168,000
2015-10-29311: For Hire Vehicle Complaint — Driver Complaint
2015-10-28311: Homeless Person Assistance — No Status Call
2015-10-21Permit PL — ISSUED
2015-10-20311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2015-09-16Job filed: RENOVATION OF APARTMENTS 11F,14B,19C,22K,24G,35I. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPL$183,000
2015-09-08Job filed: MINOR PLUMBING CHANGES TO CONCESSION AREAS ON THE 3RD AND 4TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$15,725
2015-09-08Job filed: MINOR PLUMBING CHANGES TO CONCESSION AREAS ON THE 3RD AND 4TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$15,725
2015-09-08Job filed: MINOR PLUMBING CHANGES TO CONCESSION AREAS ON THE 3RD AND 4TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$15,725
2015-09-08Job filed: MINOR INTERIOR ARCHITECTURAL CHANGES TO CONCESSION AREAS ON THE 3RD THRU 4TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, O$67,700
2015-08-18HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 19J, 19th STORY, 5th APARTMENT FROM EAST
2015-08-17Permit EW — ISSUED
2015-08-15311: PLUMBING — WATER SUPPLY
2015-08-15311: PLUMBING — WATER SUPPLY
2015-08-15311: PLUMBING — WATER SUPPLY
2015-08-15311: PLUMBING — WATER SUPPLY
2015-08-15311: PLUMBING — WATER SUPPLY
2015-08-15311: PLUMBING — WATER SUPPLY
2015-08-15Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-15Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-15Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-15Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-15Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-15Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-11Permit EW — ISSUED
2015-08-07Certificate of occupancy Temporary
2015-08-05HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCKS INSTALLED AT THE DOORS OF THE BUILDING ENTRANCE ON
2015-08-05Job filed: RENOVATION OF APARTMENTS 11G, 11H, 20D, 22I, 24A, 34K. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS$180,000
2015-08-05Job filed: RENOVATION OF APARTMENTS 11G, 11H, 20D, 22I, 24A, 34K. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS$180,000
2015-08-03311: PLUMBING — WATER SUPPLY
2015-08-03311: PLUMBING — WATER SUPPLY
2015-08-03311: PLUMBING — WATER SUPPLY
2015-08-03311: PLUMBING — WATER SUPPLY
2015-08-03Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-03Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-03Tenant complaint: PLUMBING — WATER SUPPLY
2015-08-03Tenant complaint: PLUMBING — WATER SUPPLY
2015-07-21Job filed: RENOVATION OF APARTMENTS 9A,12L,14C,15F,27B,34J. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLI$183,000
2015-07-21Job filed: RENOVATION OF APARTMENTS 9A,12L,14C,15F,27B,34J. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLI$183,000
2015-07-20311: Noise - Commercial — Loud Television
2015-07-16311: Noise — Noise: Construction Before/After Hours (NM1)
2015-07-15311: Noise — Noise: Construction Before/After Hours (NM1)
2015-07-10Permit PL — ISSUED
2015-07-01Permit EW — ISSUED
2015-06-29311: Homeless Person Assistance — No Status Call
2015-06-26FDNY inspection (THEATER)
2015-06-11Permit PL — ISSUED
2015-06-09Permit EW — ISSUED
2015-06-01Job filed: RENOVATION OF APARTMENTS 11M,19E,31G,33E. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$132,000
2015-05-21Permit PL — ISSUED
2015-05-20DOB violation E:
2015-05-20DOB violation E:
2015-05-20DOB violation E:
2015-05-20DOB violation E:
2015-05-20DOB violation E:
2015-05-20DOB violation E:
2015-05-20DOB violation E:
2015-05-19311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2015-05-19Job filed: RENOVATION OF APARTMENTS 12C, 14M, 23H, 25G, 31J, 31K. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS$183,000
2015-04-22Job filed: RENOVATION OF APARTMENTS 10H & 11L. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$60,000
2015-04-22Job filed: RENOVATION OF APARTMENTS 10H & 11L. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$60,000
2015-04-16Permit PL — ISSUED
2015-04-09Certificate of occupancy Temporary
2015-04-08Permit EW — ISSUED
2015-03-21311: Sanitation Condition — 12 Dead Animals
2015-03-20Job filed: RENOVATION OF APARTMENTS 9L,14G,20F,24D & 31C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APP$175,000
2015-03-10Permit PL — ISSUED
2015-02-26Permit EW — ISSUED
2015-02-12Job filed: RENOVATION OF APARTMENTS 17E, 21B, 24J, 25F AND 31B. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS A$175,000
2015-02-07311: HEAT/HOT WATER — ENTIRE BUILDING
2015-02-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015-01-05Permit EW — ISSUED
2015-01-05ECB CLASS - 2 violation: 90D10/11; 92M07,80I11,86D05. 90-PROVIDE LOCKABLE COVERS ON START;32-MISSING HARDWARE ON DECKING; 86-REPALCE COMBPLATES TOP AND SOM
2015-01-05ECB CLASS - 2 violation: 90D05,100B01,86I11,88H11. 90-REPLACE COVERS OR START STATIONS; 100-ADJUST,CARRIAGE TENSION; 86-REPLACE COMBPLATES BOTTOM; 80-REPLA
2014
2014-12-20311: Taxi Complaint — Driver Complaint
2014-12-09Certificate of occupancy Temporary
2014-11-20Permit PL — ISSUED
2014-11-07Permit EW — ISSUED
2014-10-31Permit PL — ISSUED
2014-10-29ECB CLASS - 1 violation: CU 88I11. CEASE USE ITEMS: REPLACE DAMAGED LEFT HANDRAIL BEFORE RETURNTO SERVICE. CALL 212-566-5543.$1,000
2014-10-29ECB CLASS - 1 violation: CU 88I11 - CEASE USE ITEMS: REPLACE DAMAGED LEFT AND RIGHT HANDRAILS BEFORE RETURN TO SERVICE CALL 212-566-5543.$1,000
2014-10-28Job filed: RENOVATION OF APARTMENTS 11I, 22C, 23D, 23E, 25C. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPL$175,000
2014-10-21Job filed: INSTALLATION OF THE MAUNAL/ AUTOMATIC SMOKE SPRINKLER ALARM SYSTEM.$22,800
2014-10-06Permit PL — ISSUED
2014-10-01Job filed: RENOVATION OF APARTMENTS 8K, 17D, 18G, 18M, 27H. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLI$175,000
2014-09-03311: Water System — Hydrant Running Full (WA4)
2014-09-03311: Water System — Hydrant Defective (WC2)
2014-08-29Job filed: RENOVATION OF APARTMENTS 29G, 30D, 34F, 34H. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$140,000
2014-08-22Permit PL — ISSUED
2014-08-15Permit EW — ISSUED
2014-08-12Permit PL — ISSUED
2014-08-01RPTT&RET — from 315 W33 EAT LLC to 33/34 WEST OWNER LLC
2014-07-24Job filed: RENOVATION OF APARTMENTS 8I, 8J, 26J, 27A. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION$140,000
2014-06-30Job filed: RENOVATION OF APARTMENTS 18N, 30E, 32C, 33B & 33H. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS$175,000
2014-06-04Job filed: RENOVATION OF APARTMENTS 8D,16J,22H,26G,28K,32G. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLI$210,000
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-18DOB violation E:
2014-05-17DOB violation E:
2014-05-17DOB violation E:
2014-05-17DOB violation E:
2014-05-17DOB violation E:
2014-05-17DOB violation E:
2014-05-17DOB violation E:
2014-05-16DOB violation E:
2014-05-16DOB violation E:
2014-05-16DOB violation E:
2014-05-16DOB violation E:
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-13Permit PL — ISSUED
2014-05-13Permit PL — ISSUED
2014-05-12Permit EW — ISSUED
2014-05-12Permit EW — ISSUED
2014-05-08Job filed: RENOVATION OF APARTMENTS 34E. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$38,000
2014-05-06Job filed: RENOVATION OF APARTMENTS 10N, 20I, 20M, 30K, 35B. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPL$104,000
2014-05-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-04-25311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2014-03-31Job filed: RENOVATION OF APARTMENTS 26C,28I,30C,31D, & 32E. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS A$238,000
2014-03-24Certificate of occupancy Temporary
2014-03-21Permit EW — ISSUED
2014-03-21Job filed: RENOVATION OF APARTMENTS 12H, 15E & 17B. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$90,000
2014-03-21Job filed: RENOVATION OF APARTMENTS 12H, 15E & 17B. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATI$90,000
2014-03-19311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2014-03-19DOB complaint, category ?
2014-03-18Permit EW — ISSUED
2014-03-12Job filed: RENOVATION OF APARTMENTS 18L & 21J. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$72,000
2014-03-03Permit PL — ISSUED
2014-03-03Permit PL — ISSUED
2014-02-18Deed — from SP WEST 33-34 LLC to 33/34 WEST OWNER LLC
2014-02-18Deed — from SP WEST 33-34 LLC to SLG 315 WEST LLC
2014-01-28Permit EW — ISSUED
2014-01-28Job filed: RENOVATION OF APARTMENTS 8G, 17J, 25H, 26B & 27G. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS $104,000
2014-01-15TL&R — from NEW YORK COMMUNITY BANK
2014-01-15Mortgage assigned — from NEW YORK COMMUNITY BANK to WELLS FARGO BANK, NATIONAL ASSOCIATION
2014-01-15Agreement $176,752,563 — from SP WEST 33-34 LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$176,752,563
2014-01-13Certificate of occupancy Temporary
2014-01-08Permit EW — ISSUED
2014-01-07311: Consumer Complaint — Door Open with Air Conditioning On
2014-01-07Permit EW — ISSUED
2013
2013-12-30Job filed: RENOVATION OF APARTMENT 29D, 32H, 34A, 34I, 35H. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLI$104,000
2013-12-30Job filed: RENOVATION OF APARTMENT 29D, 32H, 34A, 34I, 35H. ARCHITECTURAL AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLI$104,000
2013-12-27FDNY inspection (THEATER)
2013-12-05RPTT&RET $386,775,000 — from CAREIT PENMARK LIMITED PARTNERSHIP; PUBLIC SECTOR PENSION INVESTMENT BOARD; BLUE CHIP WEST to SLG 315 WEST LLC$386,775,000
2013-10-22311: Street Condition — Defective Hardware
2013-10-16FDNY inspection (COMPLAINT)
2013-10-10311: Indoor Air Quality — Other (Explain Below)
2013-10-10311: Elevator — Elevator - Defective/Not Working
2013-10-10HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 8I, 8th STORY, 4th APARTMENT FROM WEST
2013-10-10HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BSMT. AT BOILER ROOM
2013-10-10DOB complaint, category ?
2013-10-08311: HEATING — HEAT
2013-10-08Tenant complaint: HEATING — HEAT RELATED
2013-02-05Job filed: RENOVATE EXISTING APARTMENT SPACE AS PER PLANS FILED. SCOPE INTAILS INTERIOR FINISHES AND PLUMBING AS INDICATED. NO CHANGE IN USE ,EGRESS OR OCCUPAN$34,999
2013-01-25Job filed: APPLICATION FILED HEREWITH FOR THE FIRE PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION JOB# 101982240.$1,000
2013-01-25Job filed: APPLICATION FILED HEREWITH FOR THE FIRE PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION JOB# 101982240.$1,000
2013-01-24311: Food Establishment — Kitchen/Food Prep Area
2013-01-23Permit EW — ISSUED
2013-01-23Job filed: RENOVATE EXISTING APARTMENT SPACE AS PER PLANS FILED. INTERIOR FINISHES AND PLUMBING AS INDICATED. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS $25,338
2013-01-23Job filed: RENOVATE EXISTING APARTMENT SPACE AS PER PLANS FILED. INTERIOR FINISHES AND PLUMBING AS INDICATED. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS $25,338
2013-01-15Certificate of occupancy Temporary
2012
2012-12-23311: Consumer Complaint — Overcharge
2012-12-18DOB complaint, category ?
2012-12-17Permit PL — ISSUED
2012-11-15Permit EW — ISSUED
2012-11-15Job filed: RENOVATION OF EXISTING APARTMENT SPACE AS PER PLANS FILED. SCOPE ENTAILS INTERIOR FINISHES AND PLUMBING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER $38,991
2012-11-15Job filed: RENOVATION OF EXISTING APARTMENT SPACE AS PER PLANS FILED. SCOPE ENTAILS INTERIOR FINISHES AND PLUMBING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER $38,991
2012-10-26Job filed: PROPOSED TO DEMO AND CONSTRUCT NEW PARTITION, CEILING AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2012-10-26Job filed: MODIFY DUCTS, INSTALL NEW DIFFUSERS AND GRILLE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,000
2012-10-26Job filed: MODIFY DUCTS, INSTALL NEW DIFFUSERS AND GRILLE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,000
2012-10-26Job filed: PROPOSED TO DEMO AND CONSTRUCT NEW PARTITION, CEILING AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2012-10-19Permit EW — ISSUED
2012-10-18Job filed: MODERATE RENOVATION OF EXISTING APARTMENT SPACE AS PER PLANS FILED. INTERIOR FINISHES AND PLUMBING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS $34,600
2012-10-05311: Food Establishment — Food Temperature
2012-10-05Certificate of occupancy Temporary
2012-10-04311: Food Poisoning — 1 or 2
2012-10-02Permit EW — ISSUED
2012-10-02Job filed: PROPOSE TO INSTALL TWO NEW FILL BOX AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2012-10-02Job filed: PROPOSE TO INSTALL TWO NEW FILL BOX AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-10-01Permit PL — ISSUED
2012-10-01Permit PL — ISSUED
2012-10-01Permit EW — ISSUED
2012-10-01Job filed: MODERSTE REHABILITATION OF AN EXISTING APARTMENT SPACE AS PER PLANS FILED. INTERIOR FINISHES AND PLUMBING AS INDICATED. NO CHANGE IN USE ,EGRESS OR O$29,500
2012-09-25Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$88,800
2012-09-17DOB complaint, category ?
2012-08-29311: Taxi Complaint — Driver Complaint
2012-08-23Permit PL — ISSUED
2012-08-23Permit EW — ISSUED
2012-08-23Permit PL — ISSUED
2012-08-22Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$97,240
2012-08-22Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$97,240
2012-08-21Facade (LL11) filing, cycle 7: SAFE
2012-08-17Rodent inspection: Passed
2012-08-15DOB violation E:
2012-08-15DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2010 CAT 1 INSP/TST
2012-08-06Permit EW — ISSUED
2012-08-06Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$39,000
2012-07-30Permit EW — ISSUED
2012-07-27Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$88,000
2012-07-27Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$88,000
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23DOB violation E:
2012-07-23Certificate of occupancy Temporary
2012-07-09311: New Tree Request — For One Address
2012-06-20Permit PL — ISSUED
2012-06-20Permit PL — ISSUED
2012-06-20Permit PL — ISSUED
2012-06-19DOB violation E:
2012-06-19DOB violation E:
2012-06-19DOB violation E:
2012-06-19DOB violation E:
2012-06-19DOB violation E:
2012-06-19DOB violation E:
2012-06-19DOB violation E:
2012-06-15Permit EW — ISSUED
2012-06-15Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$44,000
2012-06-08Permit EW — ISSUED
2012-06-07Permit EW — ISSUED
2012-06-07Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$132,000
2012-06-07Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$132,000
2012-06-05Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$44,000
2012-06-05Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$44,000
2012-06-01Permit EW — ISSUED
2012-05-30311: Taxi Complaint — Vehicle Complaint
2012-05-29Job filed: RENOVATE EXISTING APARTMENT AS PER PLANS FILED. INSTALL NEW PLUMBING FIXTURES ON EXISTING ROUGHING. NO CHANGE IN USE ,EGRESS OR OCCUPANCY UNDER THIS$88,000
2012-05-19311: Food Establishment — Letter Grading
2012-02-04311: Noise — Noise: Construction Before/After Hours (NM1)
2011
2011-12-13Permit EW — ISSUED
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-11-28311: NONCONST — VERMIN
2011-11-28Tenant complaint: NONCONST — VERMIN
2011-11-18Job filed: MODIFICATIOMS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS NO CHANGE IN USE EGRESS OR OCCUOANCY$6,000
2011-11-18Job filed: MODIFICATIOMS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS NO CHANGE IN USE EGRESS OR OCCUOANCY$6,000
2011-11-14Job filed: PROPOSE TO INSTALL MECHANICAL DUCT WORK AND DEVICES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,000
2011-11-09Permit EQ — ISSUED
2011-11-04311: Consumer Complaint — Mandatory Tip
2011-11-04Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-10-07311: Taxi Complaint — Driver Complaint
2011-10-07311: For Hire Vehicle Complaint — Driver Complaint
2011-02-10311: Water System — Hydrant Leaking (WC1)
2010
2010-12-16Permit SG — ISSUED
2010-12-16Permit SG — ISSUED
2010-11-19311: Lead — Lead Kit Request (Residential) (L10)
2010-11-08Permit EW — ISSUED
2010-10-28Permit EQ — ISSUED
2010-10-28Permit EW — ISSUED
2010-10-20Permit PL — ISSUED
2010-10-15DOB violation E:
2010-10-15DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-14DOB violation E:
2010-10-13311: Noise — Noise: Construction Before/After Hours (NM1)
2010-10-13DOB violation E:
2010-10-13DOB violation E:
2010-10-13DOB violation E:
2010-10-13DOB violation E:
2010-10-13DOB violation E:
2010-10-12311: Noise — Noise: Construction Equipment (NC1)
2010-10-12Permit EW — RE-ISSUED
2010-10-12Permit EW — ISSUED
2010-10-12Permit EW — RE-ISSUED
2010-10-08DOB violation VCAT1:
2010-09-30Permit EW — ISSUED
2010-09-28Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INTO DUNKIN DONUTS STORE WITH PARTITION, FLOORING, FINISHES WORK AND PLUMBING, MECHANICAL WO$250,000
2010-09-28Job filed: PROPOSED STRUCTURAL WORK - INSTALL HANDICAP RAMP FOR DUNKIN DONUTS STORE IN CONJUNCTION WITH ALT II APPLICATION. NO CHANGE IN USE, EGRESS, OR OCCUPANC$50,000
2010-09-28Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INTO DUNKIN DONUTS STORE WITH PARTITION, FLOORING, FINISHES WORK AND PLUMBING, MECHANICAL WO$250,000
2010-09-22311: Consumer Complaint — Overcharge
2010-09-21311: Street Condition — Pothole
2010-09-16Job filed: INSTALL NEW AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120341692. FIRE SUPPRESSION SHUT-OFF VALVE WAS FILED IN JOB#110392398. NO CHANGE$3,000
2010-09-16Job filed: INSTALL NEW AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#120341692. FIRE SUPPRESSION SHUT-OFF VALVE WAS FILED IN JOB#110392398. NO CHANGE$3,000
2010-08-30Job filed: INSTALLATION OF INTERLOCKING SYSTEM WITH EMERGENCY SOLENOID VALVE FOR EXISTING COOKING SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER$4,000
2010-08-30Job filed: INSTALLATION OF INTERLOCKING SYSTEM WITH EMERGENCY SOLENOID VALVE FOR EXISTING COOKING SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER$4,000
2010-08-18Job filed: PROPOSED STRUCTURAL WORK - INSTALL HANDICAP RAMP FOR DUNKIN DONUTS STORE IN CONJUNCTION WITH ALT II APPLICATION. NO CHANGE IN USE, EGRESS, OR OCCUPANC$50,000
2010-08-18Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INTO DUNKIN DONUTS STORE WITH PARTITION, FLOORING, FINISHES WORK AND PLUMBING, MECHANICAL WO$250,000
2010-07-28311: Street Condition — Defective Hardware
2010-07-23311: Street Condition — Defective Hardware
2010-07-22311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-07-09Permit PL — ISSUED
2010-06-22Permit EW — ISSUED
2010-06-22Permit EW — ISSUED
2010-06-22Permit EW — ISSUED
2010-06-22Permit EW — ISSUED
2010-06-14Rodent inspection: Passed
2010-05-07Job filed: PROPOSE TO INSTALL STURCUTRAL FRAMING AND STEAL BEAMS AS SHOWN ON DRAWIGNS FILED HEREWITH. NO CAHNEG IN OCCUAPANCY USE OR EGRESS.$20,000
2010-05-07Job filed: PROPOSE TO INSTALL SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FIELD HEREWITH.$60,000
2010-05-07Job filed: PROPOSE TO INSTALL A MANUAL AUTOMATIC SMOKE DET & SPRINKLER FAS AS SUB SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCC$10,000
2010-05-07Job filed: PROPOSE TO DEMO AND INSTALL NEW PARTITION CEILINGS, AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$100,000
2010-05-07Job filed: PROPOSE TO INSTALL NEW MECHANICAL DEVICES WITH RELATED DUCTWORK AND NEW PLUMBING FIXTURES WIHT RELATED PIPING AS SHOWN ON DRAWIGNS FIELD HEREWITH. NO$130,000
2010-05-07Job filed: PROPOSE TO INSTALL A MANUAL AUTOMATIC SMOKE DET & SPRINKLER FAS AS SUB SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCC$10,000
2010-05-07Job filed: PROPOSE TO INSTALL STURCUTRAL FRAMING AND STEAL BEAMS AS SHOWN ON DRAWIGNS FILED HEREWITH. NO CAHNEG IN OCCUAPANCY USE OR EGRESS.$20,000
2010-05-07Job filed: PROPOSE TO INSTALL STURCUTRAL FRAMING AND STEAL BEAMS AS SHOWN ON DRAWIGNS FILED HEREWITH. NO CAHNEG IN OCCUAPANCY USE OR EGRESS.$20,000
2010-04-27311: Broken Muni Meter — Coin or Card Did Not Register
2010-04-19311: New Tree Request — For Whole Block
2010-04-19DOB violation E:
2010-04-19DOB violation E:
2010-04-15DOB violation E:
2010-04-15DOB violation E:
2010-04-15DOB violation E:
2010-04-15DOB violation E:
2010-04-15DOB violation E:
2010-04-14DOB violation E:
2010-04-14DOB violation E:
2010-04-14DOB violation E:
2010-04-14DOB violation E:
2010-04-14DOB violation E:
2010-04-14DOB violation E:
2010-04-13Permit EQ — ISSUED
2010-04-13Permit EW — ISSUED
2010-04-08Job filed: PROPOSE TO DEMO AND CONSTRUCT NEW PARTITION CEILINGS, RAMP AND DOOR. INSTALLATION OF STOREFRONT AND A TEMPORARY FENCE AS SHOWN ON DRAWIGNS FILED HEREW$57,000
2010-03-03ECB CLASS - 2 violation: 97/X/10,67/X/10,68/M/11,70/Y/02,05/X/10,100/M/07,40/O/09/97-RETURN TO SERVICE SO A FALL INSPECTION CAN BE MADE BY THIS DEPT/68-CAR$2,500
2009
2009-12-07ECB CLASS - 2 violation: 02X10.10H10.48H7.02X 2 WAY COMMUNICATION 48M PROVIDE TEST ATG ON UNIT$2,500
2009-11-17Permit EW — ISSUED
2009-11-05Job filed: FILING HEREWITH IS AN INSTALLATION OF A MOBILE COFFEE CART. THERE WILL BE NO CONSTRUCTION TO THE PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2009-11-05Job filed: FILING HEREWITH IS AN INSTALLATION OF A MOBILE COFFEE CART. THERE WILL BE NO CONSTRUCTION TO THE PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2009-09-23ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: SOUTH/EAST EXIT AT SUB-CELLAR. IS TOTALLY OBSTRUCTED BY VEHICLES & MECHANI$1,200
2009-08-21DOB complaint, category ?
2009-08-17Permit SG — ISSUED
2009-07-31DOB complaint, category ?
2009-04-27Permit EW — ISSUED
2009-03-05Permit PL — ISSUED
2008
2008-12-03Permit EW — ISSUED
2008-12-03Permit EQ — ISSUED
2008-12-03Permit EW — ISSUED
2008-12-02Permit EW — ISSUED
2008-11-24Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#110158472, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$6,000
2008-11-24Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#110158472, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$6,000
2008-11-19DOB violation E:
2008-10-08ECB CLASS - 2 violation: 100BB05,100D05. 100 EXPIRED 2 YEAR TAGS 100 TOE GUARDS MISSING HARDWARE AND LOOSE.
2008-05-05Job filed: NEW PLUMBING AND MECHANICAL SYSTEM IN CONJUNCTION WITH EATING & DRINKING ESTABLISHMENT U.G. 6 AS PER PLANS FILED. NO CHANGE IN USE,EGRESS OR OCCUP$135,000
2008-05-05Job filed: NEW PLUMBING AND MECHANICAL SYSTEM IN CONJUNCTION WITH EATING & DRINKING ESTABLISHMENT U.G. 6 AS PER PLANS FILED. NO CHANGE IN USE,EGRESS OR OCCUP$135,000
2008-05-05Job filed: INSTALL NEW SPRINKLER SYSTEM IN CONJUNCTION WITH EATING & DRINKING ESTABLISHMENT U.G. 6 AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$45,000
2008-04-21Job filed: INSTALLATION OF TEMPORARY FENCE. PROPOSE TO REMOVE AND REPLACE EXISTING MARQUE E. PROPOSE TO RECONNECT MARQUEE ROOF DRAIN AS SHOWN ON DRAWINGS FILED H$158,000
2008-04-21Job filed: INSTALLATION OF TEMPORARY FENCE. PROPOSE TO REMOVE AND REPLACE EXISTING MARQUE E. PROPOSE TO RECONNECT MARQUEE ROOF DRAIN AS SHOWN ON DRAWINGS FILED H$158,000
2008-04-16Job filed: PROPOSE TO INSTALL NEW MECHANICAL DUTCTWORK ALONG WITH A/C UNIT AS SHOWN ON DR AWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2008-04-16Job filed: PROPOSE TO CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWI NGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2008-04-16Job filed: INSTALL SPRINKLER HEADS AND RELATED PIPING AS PER DRAWINGS$10,000
2008-04-16Job filed: PROPOSE TO INSTALL NEW MECHANICAL DUTCTWORK ALONG WITH A/C UNIT AS SHOWN ON DR AWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2008-04-16Job filed: MODIFY EXISTING INDIVIDUALLY CODED 1FA SYSTEM ON THIS FLOOR AS PER DRAWINGS$3,000
2008-04-16Job filed: PROPOSE TO CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWI NGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2008-04-16Job filed: INSTALL SPRINKLER HEADS AND RELATED PIPING AS PER DRAWINGS$10,000
2008-04-04ECB Non-Hazardous violation: 40W07,03L10: 03-REPAIR COMMUNICATION, 40-LOCK MOTOR ROOM DOOR$350
2008-03-31DOB violation Z:
2008-03-31ECB Non-Hazardous violation: FIRST OFFENSE.GROUND LEVEL SIGNAGE EXCEEDS SURFACE AREA RESTRICTIONS.(PHOTOS,NOTE & DWGS)INSPECTOR MUST BE PRESENT FOR WEARING.REM
2008-03-24Permit EW — ISSUED
2008-03-23ECB Non-Hazardous violation: 25I11.83X10 83X10 REPAIR ELEVATOR & RETURN TO SERVICE SO A COMPLETE INSPECTIION CAN BE MADE
2008-03-19Permit EQ — ISSUED
2008-03-13DOB complaint, category ?
2008-03-10Permit EW — ISSUED
2008-03-05Job filed: PA
2008-03-05Job filed: NEW INTERIOR NON-BEARING PARTITIONS, FLOORING AND CEILING TO EATING AND DRINKING ESTABLISHMENT U.G. 6 AT THE FIRST FLOOR LEVEL AS PER PLANS FILED. NO $75,000
2008-01-28DOB violation E:
2008-01-28DOB violation E:
2008-01-15DOB complaint, category ?
2008-01-08Permit EW — ISSUED
2008-01-06DOB complaint, category ?
2007
2007-12-27Permit PL — ISSUED
2007-12-18RPTT — from LITTLE PARTNERS, INC. to DMG WORLD MEDIA (USA) INC.
2007-12-13DOB complaint, category ?
2007-12-11Job filed: PROPOSE TO INSTALL NEW STRUCTURAL BEAM FRAMING AS SHOWN ON DRAWINGS FILED HEREWITH . NO CHANGE IN USE EGRESS OR OCCUPANCY.$50,000
2007-11-29Permit EQ — ISSUED
2007-11-29Permit EQ — ISSUED
2007-11-27Job filed: PRPOSE TO CONNECT THE NEW GAS METER T OTHE EXISTING INCOMING GAS SERVICE. THE GAS METER AND PIPING WILL BE SUPPLYING THE RETAIL TENANT AS SHOWN ON DRA$17,000
2007-11-21Job filed: PROPOSE TO INSTALL A 50 FT ACCESS LADDER FOR THE 34TH STREET SET BACK FOR FLOORS 4 THRU 7 AS SHOWN ON DRAWINGS FILED HERE WITH. NO CHANGE IN USE , EGR$15,000
2007-11-16Job filed: INSTALLATION OF 45 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SHED SHALL COMPLY TO LL 33/91 AND TPPN 9/1999. NO CHANGE IN USE, OCCU
2007-04-04Permit PL — ISSUED
2007-04-02DOB violation LL1081:
2007-03-30Permit EQ — ISSUED
2007-03-21DOB violation E:
2007-03-21DOB violation E:
2007-03-12Permit EW — ISSUED
2007-03-07ECB Non-Hazardous violation: 7I11/84M7/.7-I-11-REPLACE DAMAGED SAFETY EDGE BUMBER.84-M-7-PROVIDE EMERGENCY PHONE # LABEL ON MAIN LINE SWITCH
2007-03-07ECB Non-Hazardous violation: 66O02,84M07,51BB12.84M07-PROVIDE EMERGENCY PHONE NUMBER.51BB12-ROSSET TE IS NOT TO CODE PROPERLY RESHACKLE ROPE TO CODE.
2006-12-28ECB Non-Hazardous violation: 58B07.58-SINGLE BRAKE CONTACT ON DISC BRAKE,PLEASE PROVIDE & INSTALL HOLISTER WHITNEY RETROFIT KIT$350
2006-12-19Job filed: REPLACE TO (2) WATER COOLED PACKAGED ACUNITS IN GROUND FLOOR LOBBY. CON NECT TO EXISTING DUCTWORK. OBTAIN EQUIPMENT USE PERMITS. NO OTHER WORK TO BE P$6,000
2006-12-05ECB Non-Hazardous violation: 85BB5:85 EXPIRED 5YR TEST TAG PERFORM & FILE TEST$350
2006-10-26DOB violation C:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-18Permit EW — ISSUED
2006-09-18Permit EW — ISSUED
2006-09-14Job filed: Mofications to the existing IFA system on the 7th floor as shown on plans filed. No change to use,egress or occupancy.$25,000
2006-09-11Job filed: Propose to install new, relocate & remove sprinkler heads with related piping on the 7th floor as per plans filed. No change to use,egress or occu$9,000
2006-09-08Permit EW — ISSUED
2006-08-25Job filed: Install new mechanical ductwork along with a/c unit. Install new plumbing fixtures with related piping on the 7th fl as per plans filed. No change to $48,000
2006-08-24Job filed: A2$38,000
2006-08-24Job filed: A2$38,000
2006-08-23Job filed: Propose to demolish & construct interior partitions,ceiling & doors on the 7th floor as per plans filed. No change to use,egress or occupancy.$250,000
2006-08-23Job filed: Propose to demolish & construct interior partitions,ceiling & doors on the 7th floor as per plans filed. No change to use,egress or occupancy.$250,000
2006-08-18Job filed: Demolish & construct interior partitions,ceiling & doors on these floors as per plans filed. No change to use,egress or occupancy.$200,000
2006-07-18ECB Non-Hazardous violation: 84L10, M07. 84-SECTION OF STEP CHAIN ARE NOISY WHEN RUNNING THROUGH BOTTOM TURNAROUND; CHECK,REPAIR CHAINS LASHINGS ETC. STARTING
2006-04-11Job filed: Modify individually coded I.F.A. fire alarm system as shown on drawings filed herewith. No change in use egress or occupancy.$20,000
2006-03-08Permit EW — ISSUED
2006-03-02Job filed: Roof repair as shown on drawings filed herewith. No change in use egress or occupancy.$40,000
2006-03-02Job filed: Filing herewith architectural plans to show the rated fire separations and change of use on the 1st and 2nd floors to retail as shown on drawings file$55,000
2006-03-02Job filed: Filing herewith architectural plans to show the rated fire separations and change of use on the 1st and 2nd floors to retail as shown on drawings file$55,000
2006-03-02Job filed: Roof repair as shown on drawings filed herewith. No change in use egress or occupancy.$40,000
2006-02-17Mortgage satisfied — from THIRTY-FOUR STREET CINEMAS, INC to DEUTSCHE BANK TRUST COMPANY AMERICAS
2006-02-09ECB Non-Hazardous violation: 83R05/81D06. 83- THIS UNIT HAS NOT PASSED 2YR TEST; THIS UNIT SHOULD NOT BE TAGGED AS PASSING 2YR TEST; PERFORM & FILE TEST 81- ST
2006-02-09ECB Non-Hazardous violation: 83R05/81D06. 83- THIS UNIT HAS NOT PASSED TWO YR TEST; THIS UNIT SHOULD NOT BE TAGGED AS PASSING 2YR TEST; PERFORM & FILE TEST 81-
2006-02-09ECB Non-Hazardous violation: 81I10 81) START BUTTON COVER BOTTOM DAMAGED AND TOP COVER MISSING.
2006-02-09ECB Non-Hazardous violation: 81I10 81) START BUTTON COVER DAMAGED TOP AND BOTTOM.
2006-02-08Permit PL — ISSUED
2006-02-07Permit EW — ISSUED
2006-02-07ECB Non-Hazardous violation: 83X10/ 83- RESTORE ELEV. TO SERVICE.
2006-01-31Permit EW — ISSUED
2006-01-31Permit EW — ISSUED
2006-01-31Permit EW — ISSUED
2006-01-24Job filed: Install new mechanical ductwork along with a/c unit and mechanical equipment. Install plumbing fixtures and related piping as shown on drawings filed $560,000
2006-01-24Job filed: Propose to create new slab openings to install new convenience stair and elevator shaft. Install steel dunnage on 2nd floor roof setback for mechanica$165,000
2006-01-24Job filed: Demolish and construct interior partitions, ceilings and doors. Installation of convenience stairs and elevator shaft as shown on drawings filed herew$803,870
2006-01-24Job filed: Install new mechanical ductwork along with a/c unit and mechanical equipment. Install plumbing fixtures and related piping as shown on drawings filed $560,000
2006-01-24Job filed: MODIFY PRE-ACTION FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$5,000
2006-01-24Job filed: Propose to create new slab openings to install new convenience stair and elevator shaft. Install steel dunnage on 2nd floor roof setback for mechanica$165,000
2006-01-24Job filed: Install new sprinkler heads and pre-action sprinkler heads and related piping as shown on drawings filed herewith. No change in use egress or occupan$96,000