240 West 35 Street · Manhattan · BBL 1007840064
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
45 service requests in the last three years. Most common: Noise (28) · Lost Property (3) · Consumer Complaint (3) · Non (3) · Street Condition (2) · Residential Disposal Complaint (1).
Filed construction activity
$20,268,282 in permitted construction work filed since
2016 (131 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$35,300,000
$15,885,000
2026
$35,322,000
$15,894,900
2027
$36,243,000
$16,309,350
The city's market estimate has risen
3% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
C — ENERGY STAR score 68/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 10)
1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick), shared by 3 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Penn Station — A C E · 300 ft straight-line (about a 2-minute walk) · station accessibility: full 34 St-Penn Station — 1 2 3 · 450 ft straight-line (about a 2-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 8 Av / W 34 St — M20 M34A-SBS · 400 ft · Select Bus Service
Citi Bike
W 35 St & 8 Ave · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
45 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,750,000 on
2018-02-15 (lender: Metropolitan Life Insurance Company). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-07-09
Deed $30,000,000 — from ELAINE SHAY, ESQ. to 240 WEST 35TH OWNER LLC
$30,000,000
2024-06-26
Sold for $30,000,000
$30,000,000
$857,143
2018-02-15
Mortgage $1,750,000 — from 240W35, LLC to METROPOLITAN LIFE INSURANCE COMPANY
$1,750,000
2018-02-15
AL&R $72,750,000 — from 240W35, LLC to METROPOLITAN LIFE INSURANCE COMPANY
$72,750,000
2018-02-15
Agreement $72,750,000 — from 240W35, LLC to METROPOLITAN LIFE INSURANCE COMPANY
$72,750,000
2016-12-29
Deed $108,000,000 — from 240 W 35 ST NYC, LLC to 240W35, LLC
$108,000,000
2016-12-29
Agreement $71,000,000 — from 240W35, LLC to METLIFE COMMECIAL MORTGAGE ORIGINATOR, L
$71,000,000
2016-12-29
Mortgage $1,000,000 — from 240W35, LLC to METLIFE COMMECIAL MORTGAGE ORIGINATOR, L
$1,000,000
2016-12-29
AL&R $71,000,000 — from 240W35, LLC to METLIFE COMMECIAL MORTGAGE ORIGINATOR, L
$71,000,000
2016-12-20
Sold for $108,000,000
$108,000,000
$3,085,714
2016-05-19
Mortgage $12,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY
$12,000,000
2016-05-19
Agreement $70,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY
$70,000,000
2016-05-19
AL&R $70,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY
$70,000,000
2014-10-18
AL&R $58,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY
$58,000,000
2014-10-11
Agreement $58,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY
$58,000,000
Ten-year activity
2001000
2017
2018
2019
2020
107
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
50
11
14
3
1
79
2018
49
4
5
6
1
65
2019
78
2
12
0
1
93
2020
31
14
11
0
5
61
2021
25
12
66
0
4
107
2022
19
1
11
0
2
33
2023
14
4
3
0
7
28
2024
0
5
22
3
4
34
2025
2
0
13
0
7
22
2026
19
0
9
0
3
31
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2023-01-23Permit General Construction — Signed-off
2023-01-19Job filed: Diptyque - Minor construction work on the 14th floor as indicated on drawings$125,000
2023-01-06Permit General Construction — Permit Issued
2022
2022-11-15Job filed: CLOSE EXISTING INTERIOR STAIR OPENING AT 1ST FLOOR MEZZANINE BY USING NEW STEEL BEAMS WITH CONCRETE SLAB ON METAL DECK IN CONJUNCTION W/ APPLICATION M$12,400
2022-11-14Facade (LL11) filing, cycle 9: SAFE
2022-11-08Job filed: Construction work on the 1st and mezzanine (Patiala Indian Grill) as indicated on drawings$219,983
2022-11-08Job filed: Plumbing work on the 1st, cellar and mezzanine (Patiala Indian Grill) as indicated on drawings$47,000
2022-11-08Job filed: Mechanical work on the 1st and mezzanine (Patiala Indian Grill) as indicated on drawings$3,000
2022-11-08Job filed: Sprinkler work on the 1st, cellar and mezzanine (Patiala Indian Grill) as indicated on drawings$3,000
2022-10-24311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-10-24DOB complaint, category ?
2022-09-20Permit General Construction — Permit Issued
2022-07-08Job filed: install new plumbing fixtures. general construction filed under separate application. no change in use, egress or occupancy$63,200
2022-07-07Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2022-07-07Permit Sidewalk Shed — Signed-off
2022-07-06Job filed: renovation of existing 1st fl eating and drinking est work shall include demo new partitions, doors , hardware , painting. and finishes. no structural$204,425
2022-05-26Permit Supported Scaffold — Signed-off
2022-05-25Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANC$1,000
2022-05-25Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY B$1,000
2022-05-20Permit Supported Scaffold — Signed-off
2022-05-20Permit Construction Fence — Permit Issued
2022-05-19Permit EW — ISSUED
2022-05-19Permit EQ — ISSUED
2022-03-25Job filed: Sprinkler work on the 8th floor as indicated on drawings$12,000
2022-01-12Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY B$1,000
2021-10-01ECB CLASS - 2 violation: AC28-104.7 DEFICIENT DESIGN NOTE:ATO MY INSP OF 17STYB UNDER FACADE RSTORATION I OBSERVED SUPPORTED SCF INSTALLED@EXPO1&3 OF BLDG $620
2021-09-02Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY B$1,000
2021-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS-MATERIAL HOIST INSTALLATION.ATTIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK UNDER A$2,500
2021-08-11ECB CLASS - 1 violation: BC33144-INSTALLATION,INSPECTION,REPAIR,MAINTENANCE,USE.AT TIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTERATION PE$625
2021-08-11ECB CLASS - 1 violation: BC331434-LOADS IMPOSED.AT TIME OF INSPECITON ON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTERATION PERMIT#123847668;IT WAS OBSERVED S$625
2021-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS-CD5.AT TIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTERATION PERMIT#123847$2,500
2021-08-11ECB CLASS - 1 violation: BC33013-INSPECTION-INSPECTION OF TEMPORARY EQUIPMENT.AT TIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTERATION PERM$625
2021-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.SITE SAFETY PLAN.AT TIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK $2,500
2021-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS-SUPPORTED PIPE SCAFFOLD.AT TIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTE$2,500
2021-08-11ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS-SIDEWALK SHED.AT TIME OF INSPECITON ON AN 17 STORY JOBS$2,500
2021-06-18Job filed: INSTALLATION OF TEMPORARY (182'-195') HIGH PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,P$1,000
2021-04-26Permit General Construction — Signed-off
2021-04-22Permit Mechanical Systems — Signed-off
2021-04-17311: NonCompliance with Phased Reopening — Restaurant/Bar Not in Compliance
2021-04-08Job filed: INSTALLATION OF TEMPORARY (182'-195') HIGH PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,P$1,000
2021-03-23Job filed: Renovation of existing recording studio on floor 012. Architectural work. There is to be no change of use, occupancy, or egress.$50,000
2020-12-10311: Mass Gathering Complaint — Mass Gathering
2020-12-08Job filed: INSTALLATION OF TEMPORARY (182'-195') HIGH PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,P$1,000
2020-11-17311: Private or Charter School Reopening — N/A
2020-11-05Facade (LL11) filing, cycle 9: SAFE
2020-11-05DOB violation FISPFCS: CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
2020-11-05DOB violation FISP: UNSAFE REPORT FILED
2020-11-05DOB violation FISP: UNSAFE REPORT FILED
2020-10-07311: Noise — Noise: Construction Equipment (NC1)
2020-10-07311: Noise — Noise: Construction Equipment (NC1)
2020-10-07311: Noise — Noise: Jack Hammering (NC2)
2020-09-18311: NonCompliance with Phased Reopening — Business not in compliance
2020-09-16Job filed: plumbing work on the 3rd floor (suite 302/304) as indicated on drawings. Related construction application filed under BIS # 123888971$15,000
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-08-31Permit Sidewalk Shed — Signed-off
2020-08-28Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-08-17Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY B$1,000
2020-08-17Permit Supported Scaffold — Signed-off
2020-07-29311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-09DOB complaint, category ?
2020-06-25DOB violation E:
2020-06-25DOB violation E:
2020-06-25DOB violation E:
2020-05-22Permit Construction Fence — Permit Issued
2020-05-21Permit EW — ISSUED
2020-04-06DOB violation C: FTM AND EMERGENCY WORK. UNSAFE NOTIFICATION(FISP3)WAS SUBMITTED BY QEWI A. ACCARDO,PE ON 4/6/20.IN THE FISP3 NOTIFICATION QEWI
2020-03-27DOB complaint, category ?
2020-03-26ECB CLASS - 2 violation: FAILED TO COMPLY WITH CONSTRUCTION DOCUMENTS SITE SAFETY PLAN NOTE 17 STORY COMMERCIAL BUILDING ACTIVE JOBSITE OBSERVE MATERIAL HO$1,250
2020-02-24ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFORMATION DURING SITE SAFETY ORIENTATION.NOTE AT THE TIME OF MY INSPECTION OF AN ACTIVE JOB-SITE
2020-02-21311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2020-02-21DOB complaint, category ?
2020-02-11Job filed: INSTALLATION OF TEMPORARY 182' HIGH PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCA$1,000
2020-02-11Permit Plumbing — Signed-off
2020-02-06Permit EQ — ISSUED
2020-02-05Job filed: Plumbing work on the 8th floor as indicated on drawings$25,000
2020-02-05Job filed: Plumbing work on the 5th floor (suite 504) as indicated on drawings$15,000
2020-02-05Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-02-05Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-02-05Job filed: INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-02-04Permit EW — ISSUED
2020-02-03Job filed: Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2020-02-03Permit Construction Fence — Permit Issued
2020-01-30Permit Mechanical Systems — Signed-off
2020-01-25311: Broken Parking Meter — No Receipt
2020-01-18311: Broken Parking Meter — No Receipt
2020-01-13Job filed: INSTALLATION OF TEMPORARY 182' HIGH PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCA$1,000
2020-01-13Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-01-10Boiler inspection
2020-01-10Permit Sprinklers — Signed-off
2020-01-07FDNY inspection (RISK)
2020-01-03Permit Sprinklers — Signed-off
2020-01-02Job filed: Mechanical work on the 3rd floor (suite 300) as indicated on drawings$25,000
2020-01-02Job filed: Sprinkler work on the 3rd floor (suite 300) as indicated on drawings$3,000
2020-01-02Job filed: Plumbing work on the 3rd floor (suite 300) as indicated on drawings$8,000
2019
2019-12-18Certificate of occupancy Temporary
2019-12-16Permit Sprinklers — Signed-off
2019-12-14311: Broken Parking Meter — No Receipt
2019-12-05Permit Sprinklers — Signed-off
2019-12-05Permit Sprinklers — Signed-off
2019-12-05Permit Sprinklers — Signed-off
2019-12-04311: Homeless Encampment — N/A
2019-12-04Permit Mechanical Systems — Signed-off
2019-12-03Job filed: PARTIAL PARAPET REPLACEMENT, MASONRY,LINTELS,POINTING, BULK HEAD ROOF MEM BRANE REPLACEMENT, REPLACE RAILINGS AND WALL PANELS, CAULK WINDOWS, REPAIR O$7,351,102
2019-12-03Job filed: PARTIAL PARAPET REPLACEMENT, MASONRY,LINTELS,POINTING, BULK HEAD ROOF MEM BRANE REPLACEMENT, REPLACE RAILINGS AND WALL PANELS, CAULK WINDOWS, REPAIR O$7,805,783
2019-12-02Permit Mechanical Systems — Permit Issued
2019-11-27Job filed: INSTALLATION OF TEMPORARY 182' HIGH PIPE SCAFFOLD AT VARIOUS LEVEL FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCA$1,000
2019-11-27Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2019-11-27Permit Plumbing — Signed-off
2019-11-27Permit Supported Scaffold — Signed-off
2019-11-27Permit Sidewalk Shed — Signed-off
2019-11-25Job filed: Sprinkler work on the 8th floor as indicated on drawings$12,000
2019-11-22FDNY inspection (RISK)
2019-11-21Permit Plumbing — Signed-off
2019-11-19Job filed: ARCHITECTURAL CHANGES ON THE 8TH FLOOR AS INDICATED ON DRAWINGS.$200,000
2019-11-19Job filed: ARCHITECTURAL CHANGES ON THE 8TH FLOOR AS INDICATED ON DRAWINGS.$200,000
2019-11-19Permit EW — ISSUED
2019-11-18Job filed: Plumbing work on the 8th floor as indicated on drawings$25,000
2019-11-18Job filed: Mechanical work on the 8th floor as indicated on drawings$15,000
2019-11-07Permit Construction Fence — Permit Issued
2019-11-07Permit Plumbing — Signed-off
2019-11-05Job filed: Sprinkler work on the 3rd floor (suite 302/304) as indicated on drawings$4,000
2019-11-01Job filed: Mechanical work on the 3rd floor (suite 302/304) as indicated on drawings.$30,000
2019-11-01Job filed: plumbing work on the 3rd floor (suite 302/304) as indicated on drawings. Related construction application filed under BIS # 123888971$15,000
2019-10-31311: Broken Parking Meter — No Receipt
2019-10-31311: Broken Parking Meter — No Receipt
2019-10-24Permit AL — ISSUED
2019-10-23Job filed: install construction fence to complete work to replace storefront at existing eating and drinking restaurant (cafe nunez)$3,000
2019-10-23Job filed: ARCHITECTURAL WORK ON THE 3RD FLOOR (SUITE 300) AS INDICATED ON DRAWINGS.$25,000
2019-10-23Job filed: ARCHITECTURAL WORK ON THE 3RD FLOOR (SUITE 300) AS INDICATED ON DRAWINGS.$25,000
2019-10-23Permit EW — ISSUED
2019-10-02Job filed: ARCHITECTURAL WORK ON THE 3RD FLOOR (SUITE 302/304) AS INDICATED ON DRAWINGS.$75,000
2019-10-02Permit EW — ISSUED
2019-09-20Certificate of occupancy Temporary
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 3RD FLOOR (SUITE 300) AS INDICATED ON DRAWINGS.$15,000
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 8TH FLOOR AS INDICATED ON DRAWINGS.$30,000
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 3RD FLOOR (SUITE 300) AS INDICATED ON DRAWINGS.$15,000
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 3RD FLOOR (SUITE 302/304) AS INDICATED ON DRAWINGS.$25,000
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 8TH FLOOR AS INDICATED ON DRAWINGS.$30,000
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 3RD FLOOR (SUITE 302/304) AS INDICATED ON DRAWINGS.$25,000
2019-09-19Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 3RD FLOOR (SUITE 300) AS INDICATED ON DRAWINGS.$15,000
2019-09-19Permit EW — ISSUED
2019-09-19Permit EW — ISSUED
2019-09-19Permit EW — ISSUED
2019-09-17Permit Plumbing — Signed-off
2019-09-12Permit Mechanical Systems — Signed-off
2019-09-12Permit Mechanical Systems — Signed-off
2019-09-05Job filed: plumbing work on the 18th floor s indicated on drawings$25,000
2019-09-05Job filed: mechanical work on the 18th floor as indicated on drawings.$25,000
2019-09-05Job filed: sprinkler work on the 18th floor as indicated on drawings$15,000
2019-09-04Job filed: Mechanical work on the 5th floor (suite 504) as indicated on drawings$12,000
2019-09-04Job filed: Sprinkler work on the 5th floor (suite 504) as indicated on drawings$4,000
2019-09-04Job filed: Plumbing work on the 5th floor (suite 504) as indicated on drawings$15,000
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-30Job filed: GENERAL CONSTRUCTION ON THE 18TH FLOOR AS INDICATED ON DRAWINGS.$175,000
2019-08-30Job filed: GENERAL CONSTRUCTION ON THE 18TH FLOOR AS INDICATED ON DRAWINGS.$175,000
2019-08-30Permit EW — ISSUED
2019-08-29Job filed: REPLACE STOREFRONT - FENCE PERMIT TO BE FILED UNDER DOB NOW$15,000
2019-08-29Job filed: REPLACE STOREFRONT - FENCE PERMIT TO BE FILED UNDER DOB NOW$15,000
2019-08-29Job filed: ARCHITECTURAL WORK ON THE 5TH FLOOR (SUITE 504)AS INDICATED ON DRAWINGS.$60,000
2019-04-24Job filed: FILING FOR FIRE PROTECTION PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2019-04-23Certificate of occupancy Temporary
2019-04-16Permit EW — ISSUED
2019-03-29Job filed: ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 14TH FLOOR AS INDICATED ON DRAWINGS.$8,500
2019-03-28311: Broken Parking Meter — No Receipt
2019-03-28Job filed: SPRINKLER CHANGES ON THE 14TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2019-03-22Certificate of occupancy Temporary
2019-03-13Job filed: ARCHITECTURAL WORK ON THE 14TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$225,000
2019-03-13Job filed: MECHANICAL CHANGES ON THE 14TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$30,000
2019-03-13Job filed: MECHANICAL CHANGES ON THE 14TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$30,000
2019-03-13Permit EW — ISSUED
2019-03-13Permit EW — ISSUED
2019-03-06Boiler inspection
2019-02-25311: Smoking — Flavored Tobacco
2019-02-01311: Food Poisoning — 1 or 2
2019-02-01Certificate of occupancy Temporary
2019-01-11Certificate of occupancy Temporary
2018
2018-12-21Certificate of occupancy Temporary
2018-12-03Permit EW — ISSUED
2018-11-07Permit PL — ISSUED
2018-11-07Certificate of occupancy Temporary
2018-10-26Job filed: SPRINKLER WORK ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2018-10-26Job filed: ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS.$5,000
2018-10-26Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$65,000
2018-10-26Job filed: ARCHITECTURAL WORK ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$100,000
2018-10-26Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$65,000
2018-10-26Job filed: SPRINKLER WORK ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2018-10-26Job filed: ARCHITECTURAL WORK ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$100,000
2018-10-26Job filed: ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 12TH FLOOR (SUITE 1200) AS INDICATED ON DRAWINGS.$5,000
2018-10-26Permit EW — ISSUED
2018-10-26Permit EW — ISSUED
2018-10-23Permit EW — ISSUED
2018-10-16Permit EW — ISSUED
2018-10-11Certificate of occupancy Temporary
2018-09-14Certificate of occupancy Temporary
2018-09-11311: DOF Property - Payment Issue — Payment Not Posted
2018-08-15Permit EW — ISSUED
2018-08-10Certificate of occupancy Temporary
2018-07-18Certificate of occupancy Temporary
2018-07-05DOB violation E:
2018-07-05DOB violation E:
2018-06-13Boiler inspection
2018-05-30Permit PL — ISSUED
2018-05-25311: DOF Property - Payment Issue — Payment Not Posted
2018-05-18Certificate of occupancy Temporary
2018-05-18Certificate of occupancy Temporary
2018-05-17Permit EW — ISSUED
2018-05-17Permit EW — ISSUED
2018-05-15Job filed: PARTITION CHANGES ON THE 10TH FLOOR (SUITE 1002) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$45,000
2018-05-15Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 10TH FLOOR (SUITE 1002) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$21,000
2018-05-15Job filed: SPRINKLER WORK ON THE 10TH FLOOR (SUITE 1002) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$4,000
2018-05-15Job filed: ADDITIONS/MODIFICATIONS TO FIRE ALARM SYSTEM ON THE 10TH FLOOR (SUITE 1002) AS INDICATED ON DRAWINGS.$3,000
2018-05-15Job filed: SPRINKLER WORK ON THE 10TH FLOOR (SUITE 1002) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$4,000
2018-05-15Job filed: ADDITIONS/MODIFICATIONS TO FIRE ALARM SYSTEM ON THE 10TH FLOOR (SUITE 1002) AS INDICATED ON DRAWINGS.$3,000
2018-04-17Certificate of occupancy Temporary
2018-03-23Job filed: ADDITIONS / MODIFICATIONS TO FIRE ALARM SYSTEM ON THE 10TH FLOOR (SUITE 1004) AS INDICATED ON DRAWINGS.$2,000
2018-03-12311: Food Poisoning — 1 or 2
2018-03-08311: DOF Property - Payment Issue — Payment Not Posted
2018-02-28SAGE — from METROPOLITAN LIFE INSURANCE COMPANY to 240W35, LLC; NEWSDAY LLC
2018-02-28Permit EW — ISSUED
2018-02-27Permit PL — ISSUED
2018-02-23Job filed: SPRINKLER CHANGE ON THE 10TH FLOOR (SUITE 1004) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2018-02-23Job filed: SPRINKLER CHANGE ON THE 10TH FLOOR (SUITE 1004) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2018-02-23Permit EW — ISSUED
2018-02-22Job filed: MINOR PARTITION CHANGES ON THE 10TH FLOOR (SUITE 1004) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$25,000
2018-02-22Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#123197673, AS SHOWN ON PLAN. COOKING EQUIPMENT WORK FILED UNDER JOB#123197673; EXI$3,000
2018-02-22Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 10TH FLOOR (SUITE 1004) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$22,000
2018-02-22Permit EW — ISSUED
2018-02-22Permit EW — ISSUED
2018-02-15Mortgage $1,750,000 — from 240W35, LLC to METROPOLITAN LIFE INSURANCE COMPANY$1,750,000
2018-02-15AL&R $72,750,000 — from 240W35, LLC to METROPOLITAN LIFE INSURANCE COMPANY$72,750,000
2018-02-15Agreement $72,750,000 — from 240W35, LLC to METROPOLITAN LIFE INSURANCE COMPANY$72,750,000
2018-02-15Mortgage assigned — from MCMIF HOLDCO I, LLC to METROPOLITAN LIFE INSURANCE COMPANY
2017-08-17Job filed: INSTALLATION OF AC UNITS ON THE ROOF AS INDICATED ON DRAWINGS.$167,000
2017-08-17Job filed: INSTALLATION OF AC UNITS ON THE ROOF AS INDICATED ON DRAWINGS.$167,000
2017-08-17Permit EW — ISSUED
2017-08-16Job filed: APPLICATION FILED FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY$4,500
2017-08-16Job filed: APPLICATION FILED FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY$4,500
2017-08-16DOB complaint, category ?
2017-08-14Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO C$120,375
2017-08-14Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO C$120,375
2017-08-14Job filed: SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$5,000
2017-08-14Job filed: SUBSEQUENT APPLICATION FILED FOR MECHANICAL WORK ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$26,250
2017-08-14Job filed: SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$5,000
2017-08-14Job filed: SUBSEQUENT APPLICATION FILED FOR SPRINKLER WORK ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$6,000
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-11311: Street Condition — Blocked - Construction
2017-08-11Job filed: ARCHITECTURAL WORK ON THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$70,000
2017-08-11Job filed: ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 3RD FLOOR AS INDICATED ON DRAWINGS.$4,500
2017-08-11Job filed: SPRINKLER WORK ON THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$7,000
2017-08-11Job filed: ARCHITECTURAL WORK ON THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$70,000
2017-08-11Job filed: MECHANICAL AND PLUMBING WORK ON THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$51,000
2017-08-11Permit EW — ISSUED
2017-08-07Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 12TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2017-08-07Permit EW — ISSUED
2017-07-28Certificate of occupancy Temporary
2017-06-21DOB violation E:
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005839 HAS BEEN INSPECTED,TESTED & DISINFECTED & THAT A MAINTENANCE PL$1,000
2017-06-16Job filed: INTERIOR DEMO OF NON LOAD BEARING PARTITIONS ON THE 10TH FLOOR (SUITE 1000 & 1002) AS INDICATED ON DRAWINGS$8,000
2017-06-16Permit EW — ISSUED
2017-06-12AALR — from METLIFE COMMERCIAL MORTGAGE ORIGINATOR, to MCMIF HOLDCO I, LLC
2017-06-12Mortgage assigned — from METLIFE COMMERCIAL MORTGAGE ORIGINATOR, to MCMIF HOLDCO I, LLC
2017-06-09Job filed: APPLICATION FILED FOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE PARTIAL 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANCE $16,200
2017-06-09Permit EW — ISSUED
2017-06-09Certificate of occupancy Temporary
2017-05-24311: Noise — Noise: Jack Hammering (NC2)
2017-05-13311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-03-29311: Street Condition — Failed Street Repair
2017-03-15Certificate of occupancy Temporary
2017-02-24FDNY inspection (RISK)
2017-02-22Certificate of occupancy Temporary
2017-02-17Facade (LL11) filing, cycle 8: SWARMP
2017-02-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-02-08DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-01-04311: Street Sign - Damaged — No Parking, Standing, Stopping
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-29Deed $108,000,000 — from 240 W 35 ST NYC, LLC to 240W35, LLC$108,000,000
2016-12-29Mortgage assigned — from THE UNION LABOR LIFE INSURANCE COMPANY to METLIFE COMMERCIAL MORTGAGE ORIGINATOR,
2016-12-29Agreement $71,000,000 — from 240W35, LLC to METLIFE COMMECIAL MORTGAGE ORIGINATOR, L$71,000,000
2016-12-29Mortgage $1,000,000 — from 240W35, LLC to METLIFE COMMECIAL MORTGAGE ORIGINATOR, L$1,000,000
2016-12-29TL&R — from THE UNION LABOR LIFE INSURANCE COMPANY
2016-12-29AL&R $71,000,000 — from 240W35, LLC to METLIFE COMMECIAL MORTGAGE ORIGINATOR, L$71,000,000
2016-12-27Certificate of occupancy Temporary
2016-12-23Certificate of occupancy Temporary
2016-12-21Certificate of occupancy Temporary
2016-12-20Sold for $108,000,000$108,000,000
2016-11-16311: Construction Safety Enforcement — SST Tracking Complaint
2016-11-16ECB CLASS - 1 violation: SUSPENDED ELEMENTS TO BE KEPT VERTICAL AND PARALLEL ROPES OR SIMILAR SUSPENSION ELEMENTS ARE VERTICAL AND/OR PARALLEL TO WALL AT $1,600
2016-11-16ECB CLASS - 1 violation: FAILURE TO HAVE SITE SAFETY MANAGER OR COORDINATOR PRESENT AS REQUIREDNOTED: AT TIME OF INSPECTION THERE ARE 3 SUSPENDED SCAFFOLD $2,400
2016-11-16ECB CLASS - 2 violation: PSWO SUSPENDED SCAFFOLD. FAILED TO NOTIFY DEPT PRIOR TO INSTALLATION OR REQUIRED OF SUSPENDED SCAFFOLD. NOTED: AT TIME OF INSPECTI$400
2016-06-23Job filed: FILE FIRE PROTECTION PLAN AS SHOWN ON DRAWINGS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2016-06-21Permit EW — ISSUED
2016-06-20Permit EW — ISSUED
2016-06-15Certificate of occupancy Temporary
2016-05-27Job filed: FACADE SITE SAFETY PLAN FILED IN CONJUNCTION WITH APPLICATION NO. 122748125
2016-05-27Job filed: FACADE SITE SAFETY PLAN FILED IN CONJUNCTION WITH APPLICATION NO. 122748125
2016-05-27Job filed: FACADE SITE SAFETY PLAN FILED IN CONJUNCTION WITH APPLICATION NO. 122748125
2016-05-27Permit EQ — ISSUED
2016-05-19TL&R — from THE UNION LABOR LIFE INSURANCE COMPANY
2016-05-19Mortgage $12,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$12,000,000
2016-05-19Agreement $70,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$70,000,000
2016-05-19AL&R $70,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$70,000,000
2016-05-19Job filed: MINOR RENOVATION OF OFFICE SPACE. SCOPE OF WORK DOES NOT CHANGE EGRESS, USE OR OCCUPANCY.$75,000
2016-05-19Job filed: MINOR RENOVATION OF OFFICE SPACE. SCOPE OF WORK DOES NOT CHANGE EGRESS, USE OR OCCUPANCY.$75,000
2016-05-17DOB violation E:
2016-05-17DOB violation E:
2016-05-17DOB violation E:
2016-05-17Certificate of occupancy Temporary
2016-05-16Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2016-03-31Job filed: EXTERIOR REPAIRS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$105,000
2016-03-23311: Food Establishment — Letter Grading
2016-03-17Permit EW — ISSUED
2016-02-19311: Food Establishment — Handwashing
2016-02-19311: Noise - Vehicle — Engine Idling
2016-02-17Permit PL — ISSUED
2016-02-16Job filed: CONSTRUCTION WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$166,829
2016-02-16Job filed: MECHANICAL AND PLUMBING WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$155,000
2016-02-16Job filed: FIRE ALARM MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2016-02-16Job filed: SPRINKLER WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$85,000
2016-02-16Job filed: FIRE ALARM MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2015-10-19Job filed: INSTALL NEW FIRE SUPPRESSION SYSTEMS ON THE FIRST FLOOR. THIS APPLICATION IS IN CONJUNCTION WITH ALT-2 APPLICATION #122243438. NO CHANGE IN USE, OCCUP$9,000
2015-09-30Job filed: MODIFY MECHANICAL DUCT WORK AND INSTALL NEW HVAC UNIT(S). MODIFY PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$155,000
2015-09-30Job filed: CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$500,500
2015-09-30Job filed: MODIFY SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$61,250
2015-09-30Job filed: MODIFY MECHANICAL DUCT WORK AND INSTALL NEW HVAC UNIT(S). MODIFY PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I$155,000
2015-09-30Permit EW — ISSUED
2015-09-30Permit EW — ISSUED
2015-09-24Certificate of occupancy Temporary
2015-09-11Job filed: MINOR PARTITION WORK TO 2ND FLOOR. CHANGE OF USE TO A ADULT CHARTER SCHOOL AS PER DRAWINGS FILED HEREWITH. AS SHOWN ON DRAWINGS FILED HEREWITH.$60,000
2015-08-07Job filed: DEMOLISH INTERIOR PARTITIONS, CEILINGS AND DOORS. REMOVAL OF MECHANICAL DUCT WORK. REMOVE PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS F$94,670
2015-04-25311: Food Establishment — Letter Grading
2015-03-31Permit EW — ISSUED
2015-03-30Permit PL — ISSUED
2015-03-26Job filed: INTERIOR RENOVATION OF EXISTING STORE ON THE FIRST & MEZZ.FL. INSTALL GYP.BD. WORK & DOORS AND LIGHTING FIX.INSTALL MECHANICAL WORK W.OUTDOOR $246,120
2015-03-26Job filed: INTERIOR RENOVATION OF EXISTING STORE ON THE FIRST & MEZZ.FL. INSTALL GYP.BD. WORK & DOORS AND LIGHTING FIX.INSTALL MECHANICAL WORK W.OUTDOOR $246,120
2015-03-26Job filed: INTERIOR RENOVATION OF EXISTING STORE ON THE FIRST & MEZZ.FL. INSTALL GYP.BD. WORK & DOORS AND LIGHTING FIX.INSTALL MECHANICAL WORK W.OUTDOOR $246,120
2014-11-24Job filed: UPGRADE OF EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM TO MANUAL, AUTOMATIC SM OKE /HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VIOCE COMMINUC$57,000
2014-11-24Job filed: UPGRADE OF EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM TO MANUAL, AUTOMATIC SM OKE /HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VIOCE COMMINUC$57,000
2014-11-12Job filed: GENERAL CONSTRUCTION: NEW PARITIONS, NEW PLANKING AT TERRACES, ELOCATION OF CAST IRON RADIATORS, NEW CABINETRY, NEW GLASS WALL AT ALL OFFICES, NEW PLY$186,276
2014-10-21Certificate of occupancy Temporary
2014-10-18AL&R $58,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$58,000,000
2014-10-16Certificate of occupancy Temporary
2014-10-11Agreement $58,000,000 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$58,000,000
2014-10-11Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to THE UNION LABOR LIFE INSURANCE COMPANY
2014-10-11Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION to THE UNION LABOR LIFE INSURANCE COMPANY
2014-10-11Mortgage $16,729,102 — from 240 W 35 ST NYC, LLC to THE UNION LABOR LIFE INSURANCE COMPANY$16,729,102
2014-10-10311: Consumer Complaint — Overcharge
2014-08-01Permit PL — ISSUED
2014-08-01Certificate of occupancy Temporary
2014-07-18Permit AL — ISSUED
2014-07-11Permit EW — ISSUED
2014-07-07Facade (LL11) filing, cycle 7: SWARMP
2014-06-24Permit PL — ISSUED
2014-05-09Job filed: MODIFICATION FIRE ALARM DEVICES TO THE EXISTING CLASS 'E' SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2014-05-09Job filed: INSTALLATION OF NEW CONDENSING UNITS (3) AND RELATED DUCT WORK. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. $107,000
2014-05-09Job filed: CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$275,000
2014-05-09Job filed: MODIFY SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$23,000
2014-05-09Job filed: MODIFY SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$23,000
2014-05-09Job filed: MODIFICATION FIRE ALARM DEVICES TO THE EXISTING CLASS 'E' SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$16,000
2014-05-09Job filed: INSTALLATION OF NEW CONDENSING UNITS (3) AND RELATED DUCT WORK. INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. $107,000
2014-05-09Permit EW — ISSUED
2014-05-09Permit EW — ISSUED
2014-05-06Permit EW — ISSUED
2014-04-10Job filed: INSTALL HVAC SYSTEM AND DUCTWORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$28,000
2014-04-10Job filed: INSTALL HVAC SYSTEM AND DUCTWORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$28,000
2014-04-03Permit EW — ISSUED
2014-03-07Certificate of occupancy Temporary
2014-01-28311: Elevator — Elevator - Defective/Not Working
2014-01-28DOB complaint, category ?
2013
2013-12-03Certificate of occupancy Temporary
2013-10-24311: Food Establishment — Food Spoiled
2013-09-07311: Broken Muni Meter — Coin or Card Did Not Register
2013-09-04Certificate of occupancy Temporary
2013-08-28311: Consumer Complaint — Mandatory Tip
2013-08-21Job filed: ESTABLISH EXISTING RESTAURANT ON C OF O , WORK FILED UNDER ALT. II APPLICATION # 103845118. THIS WORK INCLUDES ADDITONAL PLUMBING WORK$75,000
2013-08-19Agreement $40,000,000 — from 24035 PROPERTY LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$40,000,000
2013-08-19Mortgage $2,000,000 — from 24035 PROPERTY LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$2,000,000
2013-08-19TL&R — from HSH NORDBANK AG, NEW YORK BRANCH
2013-08-19Mortgage $425,000 — from 24035 PROPERTY LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION$425,000
2013-08-19Mortgage assigned — from HSH NORDBANK AG, NEW YORK BRANCH to WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-08-19Permit EW — ISSUED
2013-06-20Job filed: FILING FOR MODIFICATION OF EXISTING KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM, AS SHOWN ON PLAN. COOKING EQUIPMENT AND FIRE SUPP SHUTOFF VALVE FILED $3,000
2013-06-20Job filed: FILING FOR MODIFICATION OF EXISTING KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM, AS SHOWN ON PLAN. COOKING EQUIPMENT AND FIRE SUPP SHUTOFF VALVE FILED $3,000
2013-06-11Certificate of occupancy Temporary
2013-06-05Job filed: SHORING AS PER PLANS$110,160
2013-06-05Job filed: SHORING AS PER PLANS$110,160
2013-04-14311: Consumer Complaint — Overcharge
2013-03-27Permit EW — ISSUED
2013-03-15311: Noise - Commercial — Loud Talking
2013-03-14Certificate of occupancy Temporary
2012
2012-12-27Certificate of occupancy Temporary
2012-12-19Rodent inspection: Passed
2012-10-10Permit AL — ISSUED
2012-10-05Job filed: ADDITION AND/OR MODIFICATION TO AN EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM ON 13TH FLOOR CONSTRUCTION/14TH FLOOR MARKETING AND 17TH FLOOR CONSTRUC$12,900
2012-09-20Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY AWNING - JACK DOYLES 240$1,398
2012-09-20Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY AWNING - JACK DOYLES 240$1,398
2012-09-20Certificate of occupancy Temporary
2012-09-07Job filed: INSTALL HVAC SYSTEM ON SUITE 1400 AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$70,000
2012-09-07Job filed: INSTALL HVAC SYSTEM ON SUITE 1400 AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$70,000
2012-08-31Permit AL — ISSUED
2012-08-31Permit EQ — ISSUED
2012-08-30Job filed: PA
2012-08-30Job filed: PA
2012-08-30Permit SG — ISSUED
2012-08-28311: Broken Parking Meter — Timer Defect - Fast/Fail
2012-08-27Permit SG — ISSUED
2012-08-27Permit SG — ISSUED
2012-08-20Permit EW — ISSUED
2012-08-03Job filed: FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEM. GAS SHUT-OFF VALVE FILED UNDER SEPARATE APPLICATION 120958197. NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,000
2012-08-03Job filed: FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEM. GAS SHUT-OFF VALVE FILED UNDER SEPARATE APPLICATION 120958197. NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,000
2012-06-22311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2012-06-22DOB complaint, category ?
2012-06-21Permit PL — ISSUED
2012-06-21Permit EW — ISSUED
2012-06-20Permit EW — ISSUED
2012-06-20Permit EW — ISSUED
2012-06-13DOB violation E:
2012-06-13DOB violation E:
2012-06-13DOB violation E:
2012-06-13DOB violation E:
2012-06-12Job filed: INSTALL PLUMBING FIXTURES AND MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$115,500
2012-06-12Job filed: INSTALL PLUMBING FIXTURES AND MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$115,500
2012-06-12Job filed: INSTALL SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$42,750
2012-06-12Job filed: GENERAL CONSTRUCTION ON THE 18TH FLOOR TO INCLUDE NEW PARTITIONS, DOORS AND CEILING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$135,000
2012-06-09311: Smoking — Smoking Violation
2012-06-06Permit EW — ISSUED
2012-05-15Permit EW — ISSUED
2012-05-07Job filed: INSTALLATION OF (1) ONE NEW HVAC UNIT AND DUCT WORK AT THE 4TH FLOOR (SUITE 400) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2012-05-07Job filed: INSTALLATION OF (1) ONE NEW HVAC UNIT AND DUCT WORK AT THE 4TH FLOOR (SUITE 400) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2012-04-26Permit EW — ISSUED
2012-04-05Job filed: 7TH CYCLE LOCAL LAW 11/98 EXTERIOR REPAIRS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$954,500
2012-04-05Job filed: 7TH CYCLE LOCAL LAW 11/98 EXTERIOR REPAIRS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$954,500
2012-04-05Job filed: 7TH CYCLE LOCAL LAW 11/98 EXTERIOR REPAIRS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$954,500
2012-03-19Permit EQ — ISSUED
2012-03-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-03-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2012-03-12Permit PL — ISSUED
2012-03-08Permit AL — ISSUED
2012-03-08Permit EQ — ISSUED
2012-03-01Job filed: THIS APPLICATION IS FILED TO INSTALL (5)AC UNITS AND (9)HEAT PUMPS, KITCHEN HOOD AND VENTING PER MECHANICAL PLANS. INSTALL SANITARY FIXTURES PER PLUMB
2012-03-01Job filed: THIS APPLICATION IS FILED TO INSTALL (5)AC UNITS AND (9)HEAT PUMPS, KITCHEN HOOD AND VENTING PER MECHANICAL PLANS. INSTALL SANITARY FIXTURES PER PLUMB
2012-03-01Job filed: STRUCTURAL-REPLACE STEEL FIREPROOF EGRESS STAIR FROM CELLAR TO 1ST FLOOR AND 1ST TO MEZZANINE FLOOR, INSTALL STEEL DUNNAGE AT ROOF FOR AC UNITS, AND I
2012-03-01Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION/SPRINKLER ALARM FIRE ALARM SYSTEM.$25,000
2012-03-01Job filed: THIS APPLICATION IS FILED TO RELOCATE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE FOR NEW LAYOUT ON CELLAR(PART), 1ST FLOOR(PART),AND MEZ FLOOR PER $30,000
2012-03-01Job filed: THIS APPLICATION IS FILED TO ESTABLISH AN EATING & DRINKING ESTABLISHMENT ON 1ST, MEZ.,& CELLAR FLOORS PER PLANS HEREWITH SUBMITTED. TO OBTAIN$440,000
2012-01-10Job filed: INTERIOR DEMO AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$24,000
2011
2011-12-20311: Street Condition — Pothole
2011-11-16Permit EW — ISSUED
2011-11-15Permit PL — ISSUED
2011-09-21Agreement — from HSH NORDBANK AG, NEW YORK BRANCH to NEWSDAY LLC
2011-09-14Permit EW — ISSUED
2011-09-09Permit EW — ISSUED
2011-09-09Permit EW — ISSUED
2011-09-09Job filed: MODIFICATION OF SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$63,000
2011-09-09Job filed: MODIFICATION OF SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$63,000
2011-09-09Job filed: INSTALL PLUMBING FIXTURES AND MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$150,000
2011-09-09Job filed: GENERAL CONSTRUCTION ON THE 9TH FLOOR TO INCLUDE NEW PARTITIONS, DOORS AND CEILING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$199,500
2011-09-08Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON 9TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$35,000
2011-09-08Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON 9TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$35,000
2011-08-09Job filed: REPLACE 2 EXSTG HVAC UNITS WITH 2 NEW HVAC UNITS ON EXSTG ANGLE IRON FRAME (FR AME NOT TO BE DISTURBED) AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUP$100,000
2011-08-03Rodent inspection: Passed
2011-07-06Permit EW — ISSUED
2011-06-14Job filed: AIR CONDITIONING UNITS INSTALLATION. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY.$90,000
2011-06-14Job filed: AIR CONDITIONING UNITS INSTALLATION. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY.$90,000
2011-06-10DOB violation E:
2011-04-22Agreement $39,575,000 — from 24035 PROPERTY LLC to HSH NORDBANK AG, NEW YORK BRANCH$39,575,000
2011-03-08311: Graffiti — Graffiti
2010
2010-12-10311: Taxi Complaint — Driver Complaint
2010-10-28DOB violation E:
2010-10-28DOB violation E:
2010-10-28DOB violation E:
2010-10-28DOB violation E:
2010-10-28DOB violation E:
2010-10-08Permit EW — ISSUED
2010-10-08Job filed: FULL-FLOOR BUILD OUT WITH (6) NEW TOILET ROOM FIXTURES ON EXISTING PLUMBING, NEW SINK, DW, & WATER FILTER LINE ON MODIFIED EXISTING PLUMBING.NO CH$157,700
2010-06-02Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHAN GE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$40,000
2010-06-02Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITHE. NO CH ANGE I USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$5,000
2010-06-02Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISH ES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY U$200,000
2010-06-02Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITHE. NO CH ANGE I USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$5,000
2010-06-02Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$180,000
2010-06-02Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$180,000
2010-05-04DOB violation E:
2010-05-04DOB violation E:
2010-05-04DOB violation E:
2010-04-09311: Smoking — Smoking Violation
2010-03-19Job filed: INSTALLATION OF ADDITIONAL FIRE ALARM DEVICES TO THE MODIFIED CLASS E FIRE ALARM & COMMUNICATION SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,700
2010-02-18311: Water System — No Water/Low Pressure (WA5)
2009
2009-11-19Permit PL — ISSUED
2009-11-19Permit EW — ISSUED
2009-11-06ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INIT$4,000
2009-11-05Permit EW — ISSUED
2009-10-28Permit EW — ISSUED
2009-10-28Job filed: GENERAL CONSTRUCTION CHANGES TO THE 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2009-10-28Job filed: GENERAL CONSTRUCTION CHANGES TO THE 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2009-10-20Job filed: INTERIOR RENOVATION WORKS ON 7TH FLOOR, RELOCATE TOILETS AND MODIFY EXISTING AUTOMATIC SPRINKLER SYSTEMS.NO CHANGE OF OCCUPANCY, USE AND EGRESS.$91,000
2009-10-20Job filed: INTERIOR RENOVATION WORKS ON 7TH FLOOR, RELOCATE TOILETS AND MODIFY EXISTING AUTOMATIC SPRINKLER SYSTEMS.NO CHANGE OF OCCUPANCY, USE AND EGRESS.$91,000
2009-10-20Job filed: INTERIOR RENOVATION WORKS ON 7TH FLOOR, RELOCATE TOILETS AND MODIFY EXISTING AUTOMATIC SPRINKLER SYSTEMS.NO CHANGE OF OCCUPANCY, USE AND EGRESS.$91,000
2009-08-13Facade (LL11) filing, cycle 6: SAFE
2009-07-10Permit EW — ISSUED
2009-05-22ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPARTMETN INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED I$400
2009-03-13Permit EQ — ISSUED
2009-03-04Permit EQ — ISSUED
2009-03-04Permit EW — ISSUED
2009-02-17Job filed: WOOD FENCE IN CONJUNTION WITH JOB #110403215
2009-02-17Job filed: WOOD FENCE IN CONJUNTION WITH JOB #110403215
2008
2008-12-01Job filed: INTERIOR RENOVATION AS PER PLANS FOR LOBBY ,3,4,10,12,FLOORS$150,000
2008-11-07ECB CLASS - 2 violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN
2008-09-05TL&R — from NASSAU BAY ASSOCIATES, L.P. to BEAR STEARNS COMMERCIAL MORTGAGE, INC.
2008-09-05M&CON $41,200,000 — from 24035 PROPERTY LLC to HSH NORDBANK AG, NEW YORK BRANCH$41,200,000
2008-09-05Mortgage assigned — from LASALLE BANK NATIONAL ASSOCIATION to HSH NORDBANK AG, NEW YORK BRANCH
2008-09-05AL&R $41,200,000 — from 24035 PROPERTY LLC to HSH NORDBANK AG, NEW YORK BRANCH$41,200,000
2008-09-05Deed $58,000,000 — from DAGIM 26 LLC to 24035 PROPERTY LLC$58,000,000
2008-07-15DOB violation E:
2008-07-15DOB violation E:
2008-07-15DOB violation E:
2008-07-15DOB violation E:
2008-07-15DOB violation E:
2008-07-08Permit EW — ISSUED
2008-04-01Permit EQ — ISSUED
2008-03-28ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED 6TH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIA$700
2008-03-19Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 120' DURING FACADE REPAIR, NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99
2008-01-03DOB violation LL6291:
2007
2007-08-30ECB Hazardous violation: FAILURE TO PROVIDE FOR PUBLIC SAFETY AT PREMISES DESIGNATED "UNSAFE"IN REPORT FILED BY ARCHITECT/ ENGINEER.REMEDY:PROVIDE FOR PUBL$800
2007-07-06DOB violation E:
2007-07-06DOB violation E:
2007-06-25DOB violation L1198:
2007-03-29Permit EW — ISSUED
2007-02-23Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY.GAS VALVE FOR 1ST FLOOR SYSTEM WAS FILED . NO CHANGE IN USE,EGRESS OROCCUPANCY UNDER APPL. 103107987$3,000
2007-02-21Job filed: FACADE REPAIR TO MAINTAIN EXTERIOR WALL AS PAE PLAN AND COMPLY WITH LOCAL LAW REPORT.SCAFOLD TO BE FILED UNDER SEPERATE APPLICATION. NO CHANGE IN USE,$152,000
2007-02-21Job filed: FACADE REPAIR TO MAINTAIN EXTERIOR WALL AS PAE PLAN AND COMPLY WITH LOCAL LAW REPORT.SCAFOLD TO BE FILED UNDER SEPERATE APPLICATION. NO CHANGE IN USE,$152,000
2007-02-02DOB violation C:
2007-01-31DOB complaint, category ?
2007-01-17Facade (LL11) filing, cycle 6: SAFE
2006
2006-11-13Job filed: APPL. IS BEING MADE FOR ADDITION TO THECLAS E FACS AS FOLLOWS: ADDRESSA BLE CONTROL PANEL TO BE INSTALLTED AS PART OF THE EXISTING FIRE COMMAND STATIO$600
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2005
2005-12-15Permit EW — ISSUED
2005-12-06Job filed: LINTEL REPAIRS SCRAPING CLEANING AND POINTING AS NECESSARY. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$25,000
2005-11-30Agreement $13,000,000 — from NASSAU BAY ASSOCIATES L MADISON AVENUEP; DAGIM 26, LLC to LASALLE BANK NATIONAL ASSOCIATION$13,000,000
2005-11-30PAT — from LASALLE BANK NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION
2005-11-25Deed $31,750,000 — from NASSAU BAY ASSOCIATES, LP to DAGIM 26 LLC$31,750,000
2005-10-27Permit EQ — ISSUED
2005-10-20Job filed: ADDITION TO EXISTING MODIFIED CLASS ESYSTEM INSTALLATION OF SPEAKER STROBE LIGHTS STROBE LIGHTS SMOKE DETEOR MANUAL PULL STATIONS WARDED STATIONS NO C$12,600
2005-10-19Job filed: Installation of 100 linear feet of light duty sidewalk shed for waterproofing and repointing of facade only. All work to comply with LL 33/91. No chan
2005-05-05Mortgage assigned — from BEAR STEARNS COMMERCIAL MORTGAGE, INC., to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2005-05-05AALR — from BEAR STEARNS COMMERCIAL MORTGAGE, INC., to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2005-03-04DOB violation E:
2005-03-04DOB violation E:
2005-03-04DOB violation E:
2005-03-04DOB violation E:
2005-03-04DOB violation E:
2004
2004-10-26Job filed: PA
2004-10-21Mortgage assigned — from LASALLE BANK NATIONAL ASSOCIATION, AS TR to BEAR STERNS COMMERCIAL MORTGAGE, INC.
2004-10-21Mortgage assigned — from ROSENFELD BERNSTEIN & TANNENHAUSER, L.L. to BEAR STERNS COMMERCIAL MORTGAGE, INC.
2004-10-21Mortgage $4,862,368 — from NASSAU BAY ASSOCIATES, L.P. to BEAR STERNS COMMERCIAL MORTGAGE, INC.$4,862,368
2004-10-21AL&R $13,000,000 — from BEAR STERNS COMMERCIAL MORTGAGE, INC. to NASSAU BAY ASSOCIATES, L.P.$13,000,000
2004-10-21Agreement $13,000,000 — from NASSAU BAY ASSOCIATES, L.P. to BEAR STERNS COMMERCIAL MORTGAGE, INC.$13,000,000
2004-09-16Job filed: application file to change use, to eating and drinking establishmant at 1st fl.. all work done under application # 103845118$3,000
2004-09-16Job filed: application file to change use, to eating and drinking establishmant at 1st fl.. all work done under application # 103845118$3,000
2004-08-19Permit EW — ISSUED
2004-08-19Permit PL — ISSUED
2004-08-19Permit EW — ISSUED
2004-07-26Job filed: DEMOLITION OF MINOR PARTITIONS, ERECT MINOR PARTITIONS AND installation of a/c units. as per plans submitted. no change in use, egrees or occupancy wi$95,000
2004-04-15Job filed: ADDITION TO EXISTING MODIFIED CLASS "E" SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS; SMOKE DETE CTORS; MANUAL PULL STATIONS. NO CHA$10,800
2004-04-15Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS; SMOKE DETE CTORS; MANUAL PULL STATIONS. NO CHA$10,800
2004-03-08Permit EW — ISSUED
2004-03-08Permit PL — ISSUED
2004-03-08Permit EW — ISSUED
2004-03-08Permit EW — ISSUED
2004-03-04Job filed: Installation of two air conditioning units, sewer ejector pump & sink / relocation of existing sprinkler heads No change in use, egress or occup$48,000
2004-02-13DOB violation LL6291:
2003
2003-10-10Permit PL — ISSUED
2003-10-02Permit EW — ISSUED
2003-10-02Permit EW — ISSUED
2003-09-30Job filed: INSTALL NEW HANDICAP TOILET. INSTALLATION OF PLUMBING FIXTURES, MINOR GYP.BD. WORK AND MH. WORK. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UN$21,000
2003-09-29DOB complaint, category ?
2003-08-21DOB complaint, category ?
2003-06-19DOB violation E:
2003-06-19DOB violation E:
2003-06-19DOB violation E:
2003-03-26Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS; SMOKE/DUCT SMOKE DETECTORS; MANUAL PULL STATIO$6,600
2003-03-26Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STORBE LIGHTS; STROBE LIGHTS; DUCT SMOKE DETECTOR; MANUAL PULL STATION.$6,600
2003-03-26Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STORBE LIGHTS; STROBE LIGHTS; DUCT SMOKE DETECTOR; MANUAL PULL STATION.$6,600
2003-03-26Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS; SMOKE/DUCT SMOKE DETECTORS; MANUAL PULL STATIO$6,600
2003-03-19DOB violation LL6291:
2003-01-08Permit PL — ISSUED
2003-01-08Permit EW — ISSUED
2003-01-08Permit EW — ISSUED
2003-01-08Permit EW — ISSUED
2003-01-08Permit PL — ISSUED
2003-01-07Job filed: Interior renovation of existing office. Work inlcudes relocation of existing sprinkler heads, installtion of air conditioning unit and sewer ejecti$50,000
2002
2002-08-22Permit EW — ISSUED
2002-07-31Job filed: Filing herewith for general interior construction on the 14th floor as per plans filed herewith. No change to use egress or occupancy.$82,000
2002-05-21Permit PL — ISSUED
2002-03-26Permit EW — ISSUED
2002-03-26Permit PL — ISSUED
2002-03-22Job filed: INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN KITCHEN RANGEHOOD,NO CHANGE IN USE EGGRESS AND OCCUPANCY, APPLICATION WITHDRAWN BY OWNER'S REQUEST OK'D B$2,200
2002-03-12Permit EW — ISSUED
2002-02-15Permit EW — ISSUED
2002-02-15Job filed: GENERAL CONSTRUCTION TO INCLUDE PLUMBING, HVAC,$91,000
2002-02-15Job filed: General construction to include interior partitions and finishes, structural.$75,000
2002-01-09Mortgage assigned — from BEAR, STEARNS FUNDING, INC. to LASALLE NATIONAL BANK, AS TRUSTEE
2001
2001-10-30Permit EW — ISSUED
2001-10-30Permit EW — ISSUED
2001-10-30Permit EW — ISSUED
2001-10-23Job filed: REPLACE TWO (2) BOILERS AND OIL BURNERS WITH (1) BOILER AND OIL BURNER (NYC BOILER NO. 46313) AND CHANGE GRADE OF OIL FROM#6 TO#4 NO CHANGE IN EGRESS
2001-10-23Job filed: REPLACE TWO (2) BOILERS AND OIL BURNERS WITH (1) BOILER AND OIL BURNER (NYC BOILER NO. 46313) AND CHANGE GRADE OF OIL FROM#6 TO#4 NO CHANGE IN EGRESS
2001-08-20Permit EW — ISSUED
2001-08-10Job filed: Replacement air conditioning installation. there will be no change in use egress or occupancy.$15,000
2001-08-03Mortgage assigned — from BEAR, STERNS FUNDING, INC. to LASALLE NATIONAL BANK
2001-06-26DOB violation E: 1P13681
2001-06-26DOB violation E: 1P13682
2001-06-01Job filed: PROPOSED TO ERECT INTERIOR NON BEARING PARTITION FOR TENANT SPACE ON 18 TH FLOOR ALSO,PROPOSE TO RELOCATE SPRINKLER HEADS FOR NEW INTERIOR LAYOUT NO C$35,000
2000
2000-12-07Permit EW — ISSUED
2000-12-07Permit EW — ISSUED
2000-12-01Job filed: INSTALLATION OF FIRE ALARM PRE-ACTION SYSTEM, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2000-11-02Permit EW — ISSUED
2000-10-13Job filed: PROPOSE TO MODIFY EXISTING SPRINKLER SYS TEM AS PER DRAWING FILED HEREWI H$5,000
2000-10-05Job filed: AIR CONDITIONING INSTALLATION. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANC Y.$15,000
2000-08-16Job filed: ADDITION TO EXISTING FIRE ALARM SYSTEM. INSTALLATION OF SPEAKER/STROBE LIGHTS.$3,000
2000-08-14Permit EW — ISSUED
2000-08-01Job filed: PROPOSE TO INSTALL NEW INTERIOR NON-BEARING PARTITIONS AND FINISHES AS PER DRAWI NGS FILED HERWITH.$50,000
2000-04-10ECB Non-Hazardous violation: 35O02,18M07. 35- CLEAN M/R. 18- PROVIDE INTERLOCK COVERS WHERE NEEDED.$2,500
2000-04-10ECB Non-Hazardous violation: 73#07,52B10,50Y14,05H12,74O02,73O02,10X11. 73- PROPERLY TAG DEVICE M/R(1P13696) 52- RELINE BRAKE SHES. 50- SEAL MAIN MACHINE. 05- $2,500
2000-04-10ECB Non-Hazardous violation: 75#07,50B10,50Y14,50B11,74O02,73O02. 73- PROPERLY TAG DEVOCE M/R (1P13694). 52- RELINE BRAKE SHOES. 50- SEAL MAIN MACHINE. 50$2,500
2000-04-10ECB Non-Hazardous violation: 73#07,52B10,50Y14,74O02,73O02. 73- PROPERLY TAG DIVICE M/R (1P13695) 52- RELINE BRAKE SHOES. 50- SEAL MAIN MACHINE. 74- CLEAN T.O$2,500
2000-03-03Permit EW — ISSUED
2000-03-03Permit EW — ISSUED
2000-02-29Permit PL — ISSUED
2000-02-15Job filed: AIR CONDITIONING INSTALLATION . THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPAN CY.$15,000
2000-02-15DOB complaint, category ?
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
2000-01-18Permit EW — ISSUED
2000-01-18Permit EW — ISSUED
2000-01-06Job filed: INSTALLATION OF HVAC DUCTWORK, A/C UNITS AND PLUMBING FIXTURES AS PER P ANS FILED HEREWITH. NO CHANGE IN USE, EG RESS OR OCCUPANCY.$200,000
2000-01-06Job filed: Removal and installation of interior non load bearing partitions and related fin ishes, as per plans filed herewith. No change in use, egress or occu$500,000
2000-01-06Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2000-01-06Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2000-01-06Job filed: Installation of sprinkler and pre-action sprinkler heads, as per plans filed her ewith. No change in use, egress or occupancy.$50,000
2000-01-06Job filed: Removal and installation of interior non load bearing partitions and related fin ishes, as per plans filed herewith. No change in use, egress or occu$500,000
1999
1999-10-12Permit EW — ISSUED
1999-10-12Permit EW — ISSUED
1999-10-01Permit EW — ISSUED
1999-07-01ECB Non-Hazardous violation: 75U.
1999-07-01ECB Non-Hazardous violation: 75U.
1999-07-01ECB Non-Hazardous violation: 75U5.
1999-07-01ECB Non-Hazardous violation: 75U.
1999-07-01ECB Non-Hazardous violation: 75U5.
1999-03-12Permit EW — ISSUED
1999-03-12Permit EW — ISSUED
1999-03-12Permit EW — ISSUED
1999-02-01Mortgage assigned — from LASALLE NATIONAL BANK AS TRUSTEE to BEAN, STEARNS FUNDING, INC.
1999-02-01Mortgage assigned — from ROSENFELD, BERNSTEIN& TANNENHAUSER, L.L. to BEAR, STEARNS FUNDING, INC.
1999-02-01Mortgage $499,500 — from NASSAU BAY ASSOCIATES, L.P. to ROSENFELD, BERNSTEIN& TANNENHAUSER, L.L.$499,500
1999-02-01Agreement — from MARY MCFADDEN, INC. to BEAR, STEARNS FUNDING, INC.
1999-02-01Mortgage satisfied — from NASSAU BAY ASSOCIATES L.P. to ART CRAFT BUILDING ASSOCIATES
1999-02-01Agreement — from BEAR, STEARNS FUNDING, INC. to ROSENFELD BERNSTEINTANNENHAUSER, L.L.P.
1999-02-01Mortgage $894,779 — from NASSAU BAY ASSOCIATES, L.P. to BEAR, STEARNS FUNDING, INC.$894,779
1999-02-01Agreement — from NASSAU BAY ASSOCIATES, L.P. to BEAR, STEARNS FUNDING, INC.
1999-02-01Mortgage assigned — from NASSAU BAY ASSOCIATES, L.P. to BEAR, STEARNS FUNDING, INC.
1998
1998-10-13ECB Non-Hazardous violation: 28H 61X 74U 50Y GUIDE SHOES WORN 61# TAIL ROPE SLACK 74# PROVIDE PROPER CITY I D NUMBERS 50# CLEAN OIL FROM MACHINE
1998-04-15SMIS — from MELOHN, MARTHA TRUSTEE to MELOHN, ALFONS M.
1997
1997-06-05Permit EW — ISSUED
1997-06-05Permit PL — ISSUED
1997-02-07Mortgage assigned — from STRUCTURED ASSET SECURITIES CORPORATION to LASALLE NATIONAL BANK AS TRUSTEE; LB COMMERCIAL CONDUIT MORTGAGE TRUST
1997-02-07Mortgage assigned — from CONTITRADE SERVICESCORPORATION to ALI, INC.
1997-02-07Mortgage assigned — from STRUCTURED ASSET SECURITIES CORPORATION to LASALLE NATIONAL BANK AS TRUSTEE; LB COMMERCIAL CONDUIT MORTGAGE TRUST
1997-02-07Mortgage assigned — from CONTITRADE SERVICESCORPORATION to ALI, INC.
1997-02-07Mortgage assigned — from ALI, INC. to STRUCTURED ASSET SECURITIES CORPORATION
1997-02-07Mortgage assigned — from ALI, INC. to STRUCTURED ASSET SECURITIES CORPORATION
1996
1996-01-12Permit EW — ISSUED
1996-01-12Permit EW — ISSUED
1996-01-12Permit PL — ISSUED
1995
1995-06-01SAGE — from CITY OF NEW YORK
1995-04-14SMIS — from NASSAU BAY ASSOCIATES L.P. to SWH FUNDING CORP.
1995-03-30Mortgage assigned — from NASSAU BAY ASSOCIATES L.P. to PARALLEL CAPITAL CORPORATION
1995-03-30Mortgage assigned — from CHEMICAL BANK to PARALLEL CAPITAL CORPORATION
1995-03-30Agreement — from NASSAU BAY ASSOCIATES L.P. to ROSENFELD BERNSTEIN& TANNENHAUSER LLP
1995-03-30Mortgage assigned — from PARALLEL CAPTIAL CORPORATION to CONTITRADE SERVICESCORPORATION
1995-03-30SAGE — from SWH FUNDING CORP.
1995-03-30Mortgage assigned — from SWH FUNDING CORP to ROSENFELD BERNSTEIN& TANNENHAUSER L.L.P
1995-03-30Agreement — from ROSENFELD BERNSTEIN& TANNENHAUSER L.L.P to PARALLEL CAPITAL CORPORATION
1995-03-30Agreement — from ART CRAFT BUILDING ASSOCIATES to PARALLEL CAPITAL CORPORATION
1995-03-30Mortgage $90,000 — from NASSAU BAY ASSOCIATES L.P to ROSENFELD BERNSTEIN& TANNENHAUSER LLP AS$90,000
1995-03-30Mortgage $914,602 — from NASSAU BAY ASSOCIATES L.P. to PARALLEL CAPITAL CORPORATION$914,602
1995-03-30SAGE — from SWH FUNDING CORP; PMC FUNDING CORP.
1995-03-30Mortgage assigned — from PMC FUNDING CORP; SWH FUNDING CORP to ROSENFELD BERNSTEIN& TANNEHAUSER L.L.P
1995-03-30Agreement — from ART CRAFT BUILDING ASSOCIATES to ROSENFELD BERNSTEIN& TANNENHAUSER L.P.; PARALLEL CAPITAL CORP
1995-03-09Permit EQ — ISSUED
1995-01-12Mortgage assigned — from MARYLAND DEPOSIT INSURANCE FUND CORP REC to SWH FUNDING CORP.
1995-01-12Mortgage assigned — from NASSAU BAY ASSOCIATES L.P. to SWH FUNDING CORP
1995-01-12Agreement — from SWH FUNDING CORP; PMC FUNDING CORP to ROSENFELD BERNSTEIN& TANNENHAUSER TRTEE
1995-01-12Mortgage $75,000 — from NASSAU BAY ASSOCIATES, L.P. to SWH FUNDING CORP.$75,000
1995-01-12Agreement — from NASSAU BAY ASSOCIATES L.P. to SWH FUNDING CORP.
1995-01-12Agreement — from ART CRAFT BUILDING ASSOCIATES to SWH FUNDING CORP
1994
1994-05-31DOB violation LL1081:
1994-04-07DOB violation C:
1993
1993-12-23Permit PL — ISSUED
1993-12-23Permit EW — ISSUED
1993-12-23Permit EW — ISSUED
1993-12-23Permit EW — ISSUED
1993-12-08ECB Non-Hazardous violation: 36, HIGH PRESSURE BOILER ON 15TH FLOOR- FULTON NOT-REGISTERED$125
1993-07-22Permit EW — ISSUED
1993-07-15Permit PL — ISSUED
1993-06-25Permit EW — ISSUED
1993-05-05DOB violation C:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-01-15Permit EW — ISSUED
1993-01-15Permit PL — ISSUED
1992
1992-11-12Permit PL — ISSUED
1992-11-12Permit EW — ISSUED
1992-10-20ECB Hazardous violation: FAILURE TO FILE AN AMENDED REPORT ACCEPTABLET TO THIS DEPARTMENT PURSUANT TO RULE RCNY 32-03B(5)INDICATING CORRECTION OF HAZA$1,000
1992-08-05ECB Hazardous violation: FAILURE TO FILE AN AMENMDED REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y.32-03B(5)INDICATION CORRECTION OF HAZARD$400
1992-06-23Permit EW — ISSUED
1992-03-30ECB Non-Hazardous violation: 32 SAFETY VALUE DISCHARGE FACING WORKING BENCHES TO BE FITTED WITH SUITABLE PIPINGS TO DISCHARGE AL-SAFE PLACE AND TO AVOID SCALDI$85
1992-03-30ECB Non-Hazardous violation: 32 SAFETY VALUE FACING THE WORKING BENCHES. TO BE FILTED WITH SUITABLE PIPING TO DISCHARGE AT SAFEPLACE TO AVOID SCADING$85
1992-03-30ECB Non-Hazardous violation: 36$85
1992-03-30DOB violation B:
1992-03-30DOB violation B:
1992-03-30DOB violation B:
1992-03-24Mortgage $10,000 — from NASSAU BAY ASSOCIATES LP to ART CRAFT BUILDING ASSOC$10,000
1992-02-28Mortgage $1,175,000 — from ART CRAFT BUILDING ASOC to MARYLAND DPST INS FND CP$1,175,000
1992-02-28Mortgage $1,200,000 — from ART CRAFT BUILDING ASOC to MARYLAND DPST INS FDCP$1,200,000
1992-02-28Agreement — from ART CRAFT BUILDING ASSOC to PMC FUNDING CORP
1992-02-28Mortgage assigned — from ROSENFELD BERNSTEINETAL to NASSAU BAY ASSOCIATES LP
1992-02-28Mortgage $325,000 — from ART CRAFT BULIDING ASSOC to CHEMICAL BANK$325,000
1992-02-28Mortgage assigned — from MARYLAND DEPOSIT INSETC to ROSENFELD BERNSTEIN&ETC
1992-02-28Mortgage assigned — from MARLAND DEPOSIT INSETC to NASSAU BAY ASSOCIATES LP
1992-02-28Agreement — from ART CRAFT BUILDING ASSOC to CHEMICAL BANK; NASSAU BAY ASSOC LP
1992-02-28Mortgage $325,000 — from ART CRAFT BUILDING ASOC to MARYLAND DPST INS FDCP$325,000
1992-02-28REL — from ROSENFELD BERNSTEIN&ETC to ART CRAFT BUILDING ASSOC
1992-02-28Agreement — from ART CRAFT BUILDING ASSOC to CHEMICAL BANK
1992-02-28CERT — from CHEMICAL BANK
1992-02-28Agreement — from ART CRAFT BLDING ASSOC to PMC FUNDING CORP
1992-02-28Mortgage assigned — from MARYLAND DEPOSIT ETC to PMC FUNDING CORP
1992-02-28Mortgage satisfied — from ART CRAF BLDNG ASSOC to MARYLAND DPST INS FDCP
1992-02-28Mortgage assigned — from CHEMICAL BANK to PMC FUNDING CORP
1992-02-28Agreement — from ART CRAFT BUILDING ASSOC to MARYLAND DEPOSIT INSETC
1992-02-28Agreement — from MARYLAND DEPOSIT INSETC to ART CRAFT BUILDING ASSOC
1992-02-28Mortgage assigned — from ART CRAFT BUILDING ASSOC to NASSAU BAY ASSOCIATES LP; PMC FUNDING CORP
1992-02-28Agreement — from ART CRAFT BLDNG ASSOC to CHEMICAL BANK
1992-02-28Mortgage $6,145,526 — from ART CRAFT BUILDING ASSOC to MARYLAND DPST INS FND CP$6,145,526
1992-02-28Mortgage assigned — from ART CRAFT BUILDING ASSOC to PMC FUNDING CORP
1992-02-28Mortgage satisfied — from ART CRAFT BLDNG ASOC to ROSENFELD BERNSTEINETAL
1992-02-24DOB violation LL10/80:
1992-02-11Deed — from ART CRAFT BLDG ASSOC to NASSAU BAY ASSOCIATES LP
1992-02-11CTOR — from ART CRAFT BUILDING ASSOC
1991
1991-10-30Permit AL — ISSUED
1991-08-21Deed — from MELOHN, ALFONS TRTEE; MELOHN, MARTHA TRTEE; MELOHN, LEON TRTEE; MELOHN, JOHNY F/B/O to MELOHN, ALFONS M; MELOHN, LEON
1991-04-25DOB violation LL5:
1991-04-25DOB violation LL5:
1991-04-25DOB violation LL5:
1989
1989-10-10DOB violation E: (46)SHORTEN (40)PROVIDE ROTO PLATE AND (40)TEST AND TAG (74)STOP ARMATUAL ARCHING
1989-10-10DOB violation E: (22)REMOVE OIL (15)REMOVE ILLEGAL LOCK (40)TEST AND TAG (74)LOCK SECONDARY
1989-10-10DOB violation E: (15)REMOVE ILEGAL LOCK (40)TEST AND TAG TO PROPERLY INSTALL ALL WIRE ON TOP OF ELEV
1989-10-10DOB violation E: (74)POST NAME OF ELEV CO (40)PROVIDE DATA PLATE AND TEST AND TAG
1989-10-10DOB violation E: (15)REMOVE ILLEGAL LOCKS (40)TEST AND TAG (57)DOOR LOCK (35)REPAIR STEPS TO
1989-07-24DOB violation C:
1989-06-12DOB violation E: (51)RESTORE TO SERVICE FOR A PROPER INSPECTION
1989-05-23Mortgage assigned — from RESOURCES PENSION SHARES to RPS REALTY TRUST
1988
1988-10-21DOB violation E: (15)SECURE.(51)REPAIR FLOOR IN CAB
1988-10-21DOB violation E: (51)REMOVE ARCHING FROM ARMATURE
1988-10-21DOB violation E: (51)REPAIR RUBBER ON SAFETY EDGE
1988-10-21DOB violation E: (51)PUT BACK IN SERVICE OR FILE FOR DISMANTLE
1988-10-21DOB violation E:
1988-10-21DOB violation E:
1987
1987-09-30Mortgage $1,000,000 — from ART CRAFT BLDG ASSOCS to ROSENFELD FISCHBEINETAL$1,000,000
1987-09-30Mortgage assigned — from ART CRAFT BLDG ASSOCS to CHEMICAL BANK
1987-09-30Mortgage $2,225,000 — from ART CRAFT BLDG ASSOC to CHEMICAL BANK$2,225,000
1987-09-30Deed — from 240-35 ASSOCIATES to ART CRAFT BLDG ASSOC
1987-09-30Agreement — from STATE MARYLAND DEP ETAL to 240-35 ASSOCIATES
1987-09-30Agreement — from FIRST MARYLAND SV&LNINC to CHEMICAL BANK
1987-08-19Agreement — from 240-35 ASSOCIATES to CHEMICAL BANK
1987-08-19Agreement — from FIRST MARYLAND SV&LNINC to CHEMICAL BANK
1987-08-19Mortgage $275,000 — from 240-35 ASSOCIATES to CHEMICAL BANK$275,000
1987-08-19Mortgage assigned — from 240-35 ASSOCIATES to CHEMICAL BANK
1987-08-19Agreement — from FIRST MARYLAND SV&LNINC to RESOURCES PENSION ETAL
1987-08-19Agreement — from FIRST MARYLAND SV&LNINC to RESOURCES PENSION ETAL
1987-08-19SAGE — from 240-35 ASSOCIATES
1987-08-19CNTR — from 240-35 ASSOCIATES to ART CRAFT BLDG ASSOCIATE
1987-08-19Mortgage assigned — from RESOURCES PENSION ETAL to CHEMICAL BANK
1986
1986-07-14Mortgage $650,000 — from 240-35 ASSOCIATES to FIRST MARYLAND S&L INC$650,000
1985
1985-11-26Mortgage $1,722,000 — from 240-35 ASSOCIATES to FIRST MARYLAND SV&LNINC$1,722,000
1985-11-26Mortgage $1,000,000 — from 240-35 ASSOCIATES to FIRST MARYLAND SV&LNINC$1,000,000
1985-11-26Agreement — from FIRST MARYLAND S&L INC. to 240-35 ASSOCIATES
1985-11-26Mortgage $825,000 — from 240-35 ASSOCIATES to FIRST MARYLAND SV7LNINC$825,000
1985-11-08Agreement — from 37-57 PARNTERS; 240-35 ASSOCIATES to FIRST MARYLAND S&L INC.
1985-11-08REL — from FIRST MARYLAND SV&LN,INC to 37-57 PARTNERS; 240-35 ASSOCIATES
1985-11-08REL — from RESOURCES PENS. SHARES 3 to 240-35 ASSOCIATES; 37-57 PARTNERS
1985-11-08REL — from FIRST MARYLAND SV&LN,INC to 37-57 PARTNERS; 240-35 ASSOCIATES
1985-11-08Agreement — from 240-35 ASSOCIATES; 37-57 PARTNERS to FIRST MARYLAND S&L INC.
1985-11-08REL — from RESOURCES PENSN SHARES 3 to 37-57 PARTNERS; 240-35 ASSOCIATES
1985-11-08Agreement — from 37-57 PARTNERS; 240-35 ASSOCIATES to RESOURCES PENS. SHARES 3
1985-11-08Agreement — from 37-57 PARTNERS; 240-35 ASSOCIATES to RESOURCES PENS. SHARES 3
1985-06-13Mortgage $1,500,000 — from 240-35 ASSOCIATES to FIRST MARYLAND SV/LNINC$1,500,000
1985-06-03Mortgage $11,329,856 — from 240-35 ASSOCIATES; 37-57 PARTNERS to RESOURCES PENSION SHRS 3$11,329,856
1985-06-03Mortgage assigned — from 240-35 ASSOCIATES; 37-57 PARTNERS to RESOURCES PENSN SHARES 3
1985-06-03Agreement — from 240-35 ASSOCIATES; 37-57 PARTNERS to RESOURCES PENSION SHRS 3
1985-06-03SAGE — from RESOURCES PENSION SHRS 3; FIRST MARYLAND S & LINC; 240-35 ASSOCIATES
1985-06-03Mortgage $6,000,000 — from 240-35 ASSOCIATES to FIRST MARYLAND S & LINC$6,000,000
1985-06-03Agreement — from 37-57 PARTNERS; 240-35 ASSOCIATES to FIRST MARYLAND S & LINC
1985-06-03Mortgage $4,000,000 — from 240-35 ASSOCIATES to FIRST MARYLAND S & LINC$4,000,000
1985-06-03Mortgage assigned — from FIRST MARYLAND S/L INC to RESOURCES PENSION ETC
1985-06-03Agreement — from 240-35 ASSOCIATES to FIRST MARYLAND S & LINC; RESOURCES PENSION SHRE 3
1985-06-03Mortgage assigned — from 240-35 ASSOCIATES; 37-57 PARTNERS to RESOURCES PENSION SHRS 3
1985-06-03Agreement — from 240-35 ASSOCIATES to FIRST MARYLAND S & LINC
1984
1984-11-01Mortgage assigned — from 240-35 ASSOCIATES to FIRST MARYLAND SV&LNINC
1984-11-01Mortgage $7,200,000 — from 240-35 ASSOCIATES to FIRST MARYLAND SV&LN,INC$7,200,000
1984-11-01Mortgage satisfied — from ARBANA REALTY CORP. to EMPIRE CITY SVGS BANK
1984-11-01Deed — from ARBANA REALTY CORP. to 240-35 ASSOCIATES
1976
1976-05-04Mortgage assigned — from EMPIRE SAVINGS BANK to BAYLEK, THOMAS W
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL