Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

246 West 38 Street · Manhattan · BBL 1007870067 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$1,250 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

13 service requests in the last three years. Most common: Consumer Complaint (3) · Noise (2) · Outdoor Dining (1) · General Construction/Plumbing (1) · Commercial Disposal Complaint (1) · Boilers (1).

Filed construction activity

$2,140,718 in permitted construction work filed since 2016 (22 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$16,484,000 $7,417,800
2026$16,723,000 $7,525,350
2027$17,101,000 $7,695,450

The city's market estimate has risen 4% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)B — ENERGY STAR score 70/100 (2022 disclosure cycle)
Heating fuelNO2FUEL
Facade (Local Law 11)UNSAFE — unsafe conditions reported (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
District Tap HouseAmericanA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

1 Food Establishment complaint to 311 at this address in the last three years (most often: Rodents/Insects/Garbage) · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayTimes Sq-42 St — 1 2 3 7 A C E N Q R S W · 650 ft straight-line (about a 3-minute walk) · station accessibility: full
BusNearest boarding stop: 8 Av / W 37 St — M20 M34A-SBS · 450 ft · Select Bus Service
Citi Bike8 Ave & W 38 St · 450 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 051 Elias Howe
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

246 West 38 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

13 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $999,166 on 2017-02-24 (lender: Apple Bank For Savings). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2023-04-13RPTT&RET $3,895,000 — from WEISS FAMILY REALTY CORP. to LCB6 LLC $3,895,000
2023-03-29Sold for $3,895,000 $3,895,000 $259,667
2017-02-24AL&R $3,400,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK FOR SAVINGS $3,400,000
2017-02-24Mortgage $999,166 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK FOR SAVINGS $999,166
2017-02-24Agreement $3,400,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK FOR SAVINGS $3,400,000
2017-01-26RPTT&RET $6,215,000 — from LION PARTNERS to LAXMAN HARI REAL ESTATE LLC $6,215,000
2015-08-18RPTT&RET $4,080,000 — from IRE NY LLC to 246 WEST 38 HOLDINGS LLC $4,080,000
2014-12-16Mortgage $500,000 — from 246 WEST 38TH STREET TENANTS CORP. to APPLE BANK FOR SAVINGS $500,000
2014-12-16AL&R $500,000 — from 246 WEST 38TH STREET TENANTS CORP. to APPLE BANK FOR SAVINGS $500,000
2014-12-16Agreement $2,237,873 — from 246 WEST 38TH STREET TENANTS CORP. to APPLE BANK FOR SAVINGS $2,237,873
2014-12-03RPTT&RET $3,800,000 — from BARTHOLOMEW VOORSANGER 2014 CHARITABLE R to TWO FOUR SIX WEST LLC $3,800,000
2013-05-03RPTT&RET $2,300,000 — from LION PARTNERS to DEL GIUDICE, JOHN; LIPARI, JOSEPH; LIPARI, MARIO $2,300,000
2007-12-11AL&R $2,900,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK OF SAVINGS $2,900,000
2007-12-11Agreement $2,900,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK OF SAVINGS $2,900,000
2007-12-11Mortgage $2,001,735 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK OF SAVINGS $2,001,735

Ten-year activity

50250
2017
2018
2019
2020
2021
2022
40
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201716354028
2018611019
20196920219
2020131016
2021061018
2022222017
2023175132340
20249640423
20256020412
2026002035
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 7 records

DateRecord
2026-08-12311: Food Establishment — Rodents/Insects/Garbage
2026-05-09Facade (LL11) filing, cycle 9: UNSAFE
2026-05-05Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2026-05-05311: Noise - Residential — Loud Music/Party
2026-04-02Restaurant inspection: DISTRICT TAP HOUSE — grade A
2025-12-19Boiler inspection
2025-11-24Permit General Construction — Permit Issued

The full timeline

2026
2026-08-12311: Food Establishment — Rodents/Insects/Garbage
2026-05-09Facade (LL11) filing, cycle 9: UNSAFE
2026-05-05Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2026-05-05311: Noise - Residential — Loud Music/Party
2026-04-02Restaurant inspection: DISTRICT TAP HOUSE — grade A
2025
2025-12-19Boiler inspection
2025-11-24Permit General Construction — Permit Issued
2025-08-21Permit General Construction — Permit Issued
2025-08-18Air permit (CERTIFICATE TO OPERATE), fuel: NONE
2025-08-18Air permit (CERTIFICATE TO OPERATE), fuel: NONE
2025-08-12Permit Suspended Scaffold — Permit Issued
2025-07-21Permit Sidewalk Shed — Signed-off
2025-06-07Facade (LL11) filing, cycle 9: UNSAFE
2025-06-02Certificate of occupancy Renewal Without Change
2025-02-27Certificate of occupancy Renewal Without Change
2025-02-21311: Water System — Leak (Use Comments) (WA2)
2025-02-18311: Water Conservation — Water Meter Broken/Leaking - Other (CMO)
2024
2024-12-02Facade (LL11) filing, cycle 9: UNSAFE
2024-11-26Restaurant inspection: DISTRICT TAP HOUSE — grade A
2024-10-17Certificate of occupancy Renewal Without Change
2024-09-24Job filed: TPA request for 6th floor space, one day event on October 3rd, 2024, 5pm to 9pm with 150 persons and 2 FGs
2024-08-15Boiler inspection
2024-08-13Permit General Construction — Permit Issued
2024-08-12Job filed: suspended scaffold installation.
2024-08-12Permit Suspended Scaffold — Permit Issued
2024-08-01DOB violation FISPFCS: FAILURE TO CORRECT SWARMP CONDITIONS
2024-07-26Permit Sidewalk Shed — Signed-off
2024-07-12Certificate of occupancy Renewal Without Change
2024-06-04311: Consumer Complaint — Employment Agency
2024-04-29Job filed: Plumbing work as shown on plans for 6th floor existing office space.$49,000
2024-04-12Certificate of occupancy Renewal Without Change
2024-04-03311: Homeless Person Assistance
2024-02-07311: Boilers — Boiler - Defective/Inoperative/No Permit
2024-02-07311: Noise — Noise: Jack Hammering (NC2)
2024-02-07DOB complaint, category ?
2024-02-01DOB complaint, category ?
2024-02-01DOB complaint, category ?
2024-01-16ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT $1,250
2024-01-10Facade (LL11) filing, cycle 9: UNSAFE
2024-01-10DOB violation FISPHAZ: CYCLE 9B UNSAFE REPORT FILED
2023
2023-12-29311: Consumer Complaint — Employment Agency
2023-12-21DOB complaint, category ?
2023-12-14311: Commercial Disposal Complaint — No Private Carter
2023-12-08311: Consumer Complaint — Auction House or Auctioneer
2023-11-24Permit Mechanical Systems — Signed-off
2023-11-20Certificate of occupancy Renewal Without Change
2023-11-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-11-13DOB complaint, category ?
2023-11-10311: Outdoor Dining — Barrier Condition
2023-10-26Permit General Construction — Signed-off
2023-10-19Permit Sprinklers — Signed-off
2023-10-17Job filed: Mechanical work as shown on plans for 6th floor existing office space.$196,000
2023-10-05Permit Plumbing — Signed-off
2023-09-13Job filed: Plumbing work as shown on plans for 6th floor existing office space.$49,000
2023-09-13Job filed: Sprinkler work on 6th floor as shown in plans.$9,768
2023-09-11Job filed: General Construction work for existing office space at 6th floor.$336,000
2023-09-10311: Green Taxi Complaint — Driver Complaint - Non Passenger
2023-08-31Permit Sidewalk Shed — Signed-off
2023-08-30Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$5,000
2023-08-14311: Dumpster Complaint — Blocking Sidewalk or Street
2023-08-08Certificate of occupancy Renewal Without Change
2023-07-21311: Food Establishment — Food Contains Foreign Object
2023-07-20311: Street Sign - Dangling — Other/Unknown
2023-07-17FDNY inspection (COMPLAINT)
2023-07-17FDNY inspection (RISK)
2023-06-22311: Commercial Disposal Complaint — No Private Carter
2023-06-21Job filed: FILING FOR FACADE REPAIR FROM FLOORS 001-014 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$150,000
2023-06-06Restaurant inspection: DISTRICT TAP HOUSE — grade A
2023-06-01Permit General Construction — Signed-off
2023-05-24Job filed: Demo work only at 6th floor existing office space.$112,000
2023-05-17Certificate of occupancy Renewal Without Change
2023-05-08Asbestos abatement: Removal — Acme National Corp.
2023-05-05311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2023-04-13RPTT&RET $3,895,000 — from WEISS FAMILY REALTY CORP. to LCB6 LLC$3,895,000
2023-04-12Boiler inspection
2023-03-29Sold for $3,895,000$3,895,000
2023-02-28311: Commercial Disposal Complaint — No Private Carter
2023-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2023-02-14Certificate of occupancy Renewal Without Change
2023-02-01311: Commercial Disposal Complaint — No Private Carter
2022
2022-11-22Certificate of occupancy Renewal Without Change
2022-10-05311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2022-08-29Certificate of occupancy Renewal With Change
2022-08-04Boiler inspection
2022-02-15FDNY inspection (RISK)
2022-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-01-20311: Consumer Complaint — Auction House/Auctioneer
2021
2021-12-27Boiler inspection
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-07-15DOB violation E:
2021-07-15DOB violation E:
2021-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2021-01-27311: Consumer Complaint — Auction House/Auctioneer
2020
2020-08-24311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-07-24Permit EW — ISSUED
2020-06-24DOB violation E:
2020-06-24DOB violation E:
2020-06-24DOB violation E:
2020-06-17Boiler inspection
2019
2019-12-31Certificate of occupancy Temporary
2019-12-12DOB complaint, category ?
2019-11-07DOB complaint, category ?
2019-10-28ECB CLASS - 1 violation: UNLAWFUL ACTS.FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.IN SEPTEMBER 13,2019.A ELECTRICAL VIOLATION WAS ISSUED TO THE RE$2,500
2019-10-24DOB complaint, category ?
2019-10-01Certificate of occupancy Temporary
2019-09-13ECB CLASS - 1 violation: UNAPPROVED/UNSAFE/UNSUITABLE/ELECTRICAL EQUIPMENT,APPARATUS,MATERIALS DEVICES,APPLIANCES OR WIRING IN USE.OBSERVED SEVERAL EXTENSI$1,600
2019-09-06DOB complaint, category ?
2019-09-06Permit EW — ISSUED
2019-09-03Job filed: APPLICATION FILED TO RENOVATE EXISTING COMMERCIAL SPACE ON 9TH FLOOR PER PLANS HEREWITH SUBMITTED. WORK INCLUDES INSTALLATION OF NON-LOADBEARING PARTI$28,000
2019-08-22ECB CLASS - 1 violation: WORK WITHOUT A PERMIT ON THE 9TH FLOOR FULL HEIGHT PARTITION WALLS ERECTED WITH ELECTRICAL OUTLETS AND LIGHT SWITCHES, WALLS FRAME$625
2019-08-21311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-08-21DOB complaint, category ?
2019-07-05Certificate of occupancy Temporary
2019-05-15311: Street Sign - Dangling — Other/Unknown
2019-04-11Certificate of occupancy Temporary
2019-04-05FDNY inspection (RISK)
2019-03-19Boiler inspection
2019-02-22Elevator permit: PROVIDE NEW DOOR LOCK MONITORING SYSTEM PER SECTION 3.10.12 OF CHAPTER K3 OF APPENDIX K OF THE NEW YORK CITY BUILDING CODE. ALL W$16,950
2018
2018-11-19Certificate of occupancy Temporary
2018-11-06311: Sidewalk Condition — Dumpster - Construction Waste
2018-09-07Permit EW — ISSUED
2018-09-05Permit PL — ISSUED
2018-07-13Permit Supported Scaffold — Signed-off
2018-07-12Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-04-24Boiler inspection
2018-03-19FDNY inspection (RISK)
2018-01-30Permit PL — ISSUED
2017
2017-12-27311: Non-Emergency Police Matter — Other (complaint details)
2017-12-15Permit EW — ISSUED
2017-12-15Permit EW — ISSUED
2017-10-25Job filed: REMOVAL, RELOCATION AND INSTALLATION OF NEW SPRINKLER HEADS AS PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$66,400
2017-10-25Job filed: INSTALLATION OF NEW NOTIFIER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2017-10-25Job filed: GENERAL CONSTRUCTION TO INCLUDE PARTITION WORK, WINDOW REPLACEMENT & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$227,500
2017-10-25Job filed: REMOVAL, RELOCATION AND INSTALLATION OF NEW SPRINKLER HEADS AS PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$66,400
2017-10-25Job filed: GENERAL CONSTRUCTION TO INCLUDE PARTITION WORK, WINDOW REPLACEMENT & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$227,500
2017-10-25Job filed: SUBSEQUENT FILING FOR INSTALLATION OF MECHANICAL UNITS, DUCTWORK & PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCU$160,000
2017-10-25Job filed: SUBSEQUENT FILING FOR INSTALLATION OF MECHANICAL UNITS, DUCTWORK & PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCU$160,000
2017-06-21DOB violation E:
2017-06-21DOB violation E:
2017-06-21DOB violation E:
2017-06-13311: Sidewalk Condition — Blocked - Construction
2017-06-05Job filed: GENERAL CONSTRUCTION AND PARTITION REMOVALS FOR OFFICE SPACE ON 7TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$23,000
2017-06-05Permit EW — ISSUED
2017-05-18Permit EQ — ISSUED
2017-05-16Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-04-17311: Sidewalk Condition — Sidewalk Violation
2017-02-24AL&R $3,400,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK FOR SAVINGS$3,400,000
2017-02-24Mortgage $999,166 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK FOR SAVINGS$999,166
2017-02-24Agreement $3,400,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK FOR SAVINGS$3,400,000
2017-02-23311: Homeless Person Assistance — N/A
2017-02-09311: Sidewalk Condition — Sidewalk Violation
2017-01-26RPTT&RET $6,215,000 — from LION PARTNERS to LAXMAN HARI REAL ESTATE LLC$6,215,000
2017-01-23Permit EQ — ISSUED
2017-01-19Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-01-19Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016
2016-11-30Job filed: INTERIOR RENOVATION INCLUDING EXTEND HVAC DUCT, MINOR PARTITION WORK, PATCH AND PAINT CEILING, WALL AND FLOOR, INSTALL NEW DOORS IN LION BUTTON (USA) $13,380
2016-11-30Job filed: INTERIOR RENOVATION INCLUDING EXTEND HVAC DUCT, MINOR PARTITION WORK, PATCH AND PAINT CEILING, WALL AND FLOOR, INSTALL NEW DOORS IN LION BUTTON (USA) $13,380
2016-11-30Permit EW — ISSUED
2016-11-30Permit EW — ISSUED
2016-11-21311: Homeless Person Assistance — N/A
2016-11-18Tenant complaint: ELECTRIC — POWER OUTAGE
2016-11-17ECB CLASS - 1 violation: ELECTRICAL WRK W/OUT A PERMIT.OFFICE SPACE 4FLR;BRANCH CIRCUIT WIRING,RECEPTACLES,OUTLETS,SWITCHES,LIGHTING FIXTURES."NOT ON FILE:$800
2016-11-16311: Electrical — Electrical Wiring Defective/Exposed
2016-11-16DOB complaint, category ?
2016-11-16DOB complaint, category ?
2016-11-15311: Street Condition — Pothole
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB complaint, category ?
2016-10-31Permit EW — ISSUED
2016-10-31Permit EW — ISSUED
2016-09-20Job filed: RENOVATE EXISTING SHOWROOM WITH NEW PARTITIONS AT SUITE 4C. NO CHANGE IN EGRESS, NO CHANGE USE IN OCCUPANCY.$35,000
2016-09-20Job filed: RENOVATE EXISTING SHOWROOM WITH NEW PARTITIONS AT SUITE 4C. NO CHANGE IN EGRESS, NO CHANGE USE IN OCCUPANCY.$35,000
2016-09-20Permit EW — ISSUED
2016-09-15Job filed: RENOVATION INCLUDING GENERAL CONST AND PLUMBING TO PART OF 5TH FLOOR NO CHANGE TO USE OCCUPANCY OR EGRESS$168,390
2016-07-07311: Sustainability Enforcement — Sustainability Enforcement Work Order
2016-07-07DOB complaint, category ?
2016-05-18DOB violation E:
2016-05-18DOB violation E:
2016-05-18DOB violation E:
2016-05-18DOB violation E:
2015
2015-12-22Permit EW — ISSUED
2015-12-18Job filed: INSTALL NEW PARTITIONS, DOORS AND CEILING ON 5TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$107,100
2015-12-18Job filed: INSTALL NEW PARTITIONS, DOORS AND CEILING ON 5TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$107,100
2015-09-15311: Indoor Air Quality — Dust from Construction
2015-09-14311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2015-09-10Permit EW — ISSUED
2015-09-04Job filed: INTERIOR DEMOLITION OF NON BEARING PARTITION WALLS ON FIFTH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$45,000
2015-09-04Job filed: INTERIOR DEMOLITION OF NON BEARING PARTITION WALLS ON FIFTH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$45,000
2015-08-18RPTT&RET $4,080,000 — from IRE NY LLC to 246 WEST 38 HOLDINGS LLC$4,080,000
2015-07-31Permit EW — ISSUED
2015-07-16Facade (LL11) filing, cycle 8: SWARMP
2015-07-16Facade (LL11) filing, cycle 7: SWARMP
2015-07-16Job filed: MODIFICATION OF A FIRE SUPPRESSION SYSTEM FILED UNDER APPL#121897144. GAS VALVE WAS PREVIOUSLY FILED UNDER APPL#120748414. NO CHANGE IN USE, EGRESS OR$3,000
2015-07-16Job filed: MODIFICATION OF A FIRE SUPPRESSION SYSTEM FILED UNDER APPL#121897144. GAS VALVE WAS PREVIOUSLY FILED UNDER APPL#120748414. NO CHANGE IN USE, EGRESS OR$3,000
2015-06-25DOB violation E:
2015-06-25DOB violation E:
2015-06-25DOB violation E:
2015-06-25DOB violation E:
2015-05-12Certificate of occupancy Temporary
2015-03-24Permit EQ — ISSUED
2015-03-20Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-03-20Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-03-17Permit EW — ISSUED
2015-01-22Certificate of occupancy Temporary
2014
2014-12-22Permit EQ — ISSUED
2014-12-19Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-12-18Permit EW — ISSUED
2014-12-17311: Hazardous Materials — Chemical Odor (HD1)
2014-12-16Mortgage $500,000 — from 246 WEST 38TH STREET TENANTS CORP. to APPLE BANK FOR SAVINGS$500,000
2014-12-16AL&R $500,000 — from 246 WEST 38TH STREET TENANTS CORP. to APPLE BANK FOR SAVINGS$500,000
2014-12-16Agreement $2,237,873 — from 246 WEST 38TH STREET TENANTS CORP. to APPLE BANK FOR SAVINGS$2,237,873
2014-12-03RPTT&RET $3,800,000 — from BARTHOLOMEW VOORSANGER 2014 CHARITABLE R to TWO FOUR SIX WEST LLC$3,800,000
2014-12-02311: Asbestos — N/A
2014-11-26Job filed: INTERIOR RENOVATION ON 14TH FLOOR. REMOVE AND INSTALL PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2014-11-26Job filed: INTERIOR RENOVATION ON 14TH FLOOR. REMOVE AND INSTALL PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2014-11-26Permit EW — ISSUED
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-23Certificate of occupancy Temporary
2014-07-18Job filed: INTERIOR RENOVATION ON 4TH FLOOR. REMOVE AND INSTALL PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2014-07-18Permit EW — ISSUED
2014-07-18Permit EW — ISSUED
2014-07-16Certificate of occupancy Temporary
2014-07-08Job filed: REPAIR EXTERIOR WALLS, WORK TO INCLUDE: LINTELS, WINDOWS, BRICKWORK, PARAPET WALLS, ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SHED TO BE$65,000
2014-07-08Job filed: PA
2014-07-08Job filed: PA
2014-07-01ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &$800
2014-06-23DOB violation E:
2014-06-23DOB violation E:
2014-06-23DOB violation E:
2014-06-23DOB violation E:
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-25Certificate of occupancy Temporary
2014-03-04ECB CLASS - 2 violation: B254,25,50A,50B. 50A-FRESH AIR INTAKE FAN DEFECTIVE; 50B-BOILER ROOM NOT A STORAGE ROOM.
2014-02-05311: Consumer Complaint — Non-Delivery Goods/Services
2014-02-04311: Consumer Complaint — Exchange/Refund/Return
2014-01-30Permit EW — ISSUED
2014-01-17Job filed: MODIFICATION OF EXISTING FIRE SUPPRESSION SYSTEM FILED UNDER APPL # 120886586. GAS VALVE WAS FILED UNDER APPL # 120748414. NO CHANGE IN USE, EGRESS OR$3,000
2013
2013-12-27Certificate of occupancy Temporary
2013-12-03Permit EW — ISSUED
2013-11-14Permit PL — ISSUED
2013-11-08Job filed: HEREWITH FILING FOR STOREFRONT AND INTERIOR BUILDOUT OF PARTITIONS, MECHANICAL AND PLUMBING AS PER PLANS FILED HEREWITH. NO CHANGE IS USE, EGRESS OR $115,000
2013-11-08Permit EW — ISSUED
2013-11-08Permit EW — ISSUED
2013-11-08Permit EQ — ISSUED
2013-09-11Certificate of occupancy Temporary
2013-09-10Job filed: HEREWITH FILING FOR INTERIOR DEMO OF PARTITIONS, MECHANICAL. NO CHANGE IS USE, EGRESS OR OCCUPANCY.$10,000
2013-09-10Permit EW — ISSUED
2013-09-10Permit EW — ISSUED
2013-08-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
2013-08-14DOB complaint, category ?
2013-08-12Permit EW — ISSUED
2013-08-05Job filed: INTERIOR RENOVATION ON 7TH FLOOR. REMOVE AND INSTALL PARTITION WALLS & REPLACE PLUMBING FIXTURES ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCC$50,000
2013-07-25DOB violation E:
2013-07-25DOB violation E:
2013-07-25DOB violation E:
2013-07-25DOB violation E:
2013-07-18311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2013-07-15311: Industrial Waste — Wastewater Into Catch Basin (IEB)
2013-06-06Certificate of occupancy Temporary
2013-05-03PAT — from LIPARI, JOSEPH to LIPARI, MARIO
2013-05-03RPTT&RET $2,300,000 — from LION PARTNERS to DEL GIUDICE, JOHN; LIPARI, JOSEPH; LIPARI, MARIO$2,300,000
2013-03-27Certificate of occupancy Temporary
2013-03-12DOB complaint, category ?
2013-03-01ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS FOR ACT II JOB#121372344 OF WHICH PERMIT IS ACTIVE TIL 11/19/13. NON-CO
2013-01-08DOB complaint, category ?
2012
2012-12-28Certificate of occupancy Temporary
2012-12-20Rodent inspection: Passed
2012-12-05Permit EW — ISSUED
2012-11-28Permit EW — ISSUED
2012-11-27DOB complaint, category ?
2012-11-19Job filed: INTERIOR RENOVATION ON 8TH FLOOR SHOWROOM. REMOVE AND INSTALL PARTITION WALLS. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2012-10-19Job filed: INTERIOR RENOVATION ON 12TH FLOOR SHOWROOM. REMOVE AND INSTALL PARTITION WALLS. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2012-10-19Job filed: INTERIOR RENOVATION ON 12TH FLOOR SHOWROOM. REMOVE AND INSTALL PARTITION WALLS. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2012-10-19Job filed: INTERIOR RENOVATION ON 12TH FLOOR SHOWROOM. REMOVE AND INSTALL PARTITION WALLS. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2012-09-25Certificate of occupancy Temporary
2012-07-18311: Dirty Conditions — E3A Dirty Area/Alleyway
2012-07-02ECB CLASS - 2 violation: 100B7)PROVIDE ZERO CLEARANCE VESTIBULE ON 9FLR & 6FLR & 5FLR.
2012-06-25DOB violation E:
2012-06-25DOB violation E:
2012-06-20311: Broken Muni Meter — No Receipt
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-02-13DOB violation E:
2012-02-13DOB violation E:
2012-02-13DOB violation E:
2012-01-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011
2011-12-06ECB CLASS - 2 violation: (97X10),97-X-10-RETURN TO SERVICE.
2011-12-02311: Elevator — Elevator - Defective/Not Working
2011-12-02DOB complaint, category ?
2011-11-30Job filed: MANUAL/AUTOMATIC SMOKW/HEAT DETECTION,SPRINKLER WATERFLOW FIRE ALARM SYSTEM WITH FAN SHUTDOWN & CENTRAL OFFICE CONNECTION WORK IN CELLAR AND 1ST F$20,000
2011-11-04Job filed: FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEM. GAS FILED UNDER SEPARATE APPLICATION #120748414. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,000
2011-11-04Permit EW — ISSUED
2011-08-29Permit PL — ISSUED
2011-08-18Permit EW — ISSUED
2011-08-11Job filed: PA
2011-08-11Permit EW — ISSUED
2011-08-05Job filed: STRUCTURAL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$37,000
2011-08-05Job filed: STRUCTURAL WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$37,000
2011-08-04Rodent inspection: Passed
2011-08-04Permit AL — ISSUED
2011-08-01Permit EW — ISSUED
2011-08-01Permit EW — ISSUED
2011-07-29Permit EQ — ISSUED
2011-07-29Permit EW — ISSUED
2011-07-29Permit EW — ISSUED
2011-07-27Job filed: MECHANICAL, SPRINKLER WORK ALONG WITH ELECTRICAL LIGHTING AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$281,000
2011-07-27Job filed: MECHANICAL, SPRINKLER WORK ALONG WITH ELECTRICAL LIGHTING AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$281,000
2011-07-27Job filed: REMOVAL OF INTERIOR PARTITIONS, REMOVAL OF PLUMBING FIXTURES, MECHANICAL REMOVAL AND STOREFRONT WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPAN$50,000
2011-06-30Job filed: PLUMBING WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$280,000
2011-06-30Job filed: PLUMBING WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$280,000
2011-03-25311: Food Poisoning — 1 or 2
2010
2010-12-02DOB violation E:
2010-12-02DOB violation E:
2010-12-02DOB violation E:
2010-12-02DOB violation E:
2010-07-26Rodent inspection: Passed
2010-05-12DOB violation E:
2010-05-12DOB violation E:
2010-03-02Rodent inspection: Passed
2009
2009-06-29DOB violation E:
2009-06-29DOB violation E:
2009-06-29DOB violation E:
2009-06-29DOB violation E:
2009-06-19RPTT&RET — from ARK REALTY CO. INC to ARK PROPERTIES LLC
2008
2008-12-15Permit EW — ISSUED
2008-11-21Job filed: TO INSTALL AC UNITS ON FIRST FLOOR AND MEZZANINE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2008-05-15DOB violation E:
2008-05-15DOB violation E:
2008-05-15DOB violation E:
2008-05-15DOB violation E:
2007
2007-12-19Permit AL — ISSUED
2007-12-11AL&R $2,900,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK OF SAVINGS$2,900,000
2007-12-11Agreement $2,900,000 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK OF SAVINGS$2,900,000
2007-12-11Mortgage $2,001,735 — from 246 WEST 38TH STREET TENANTS CORP to APPLE BANK OF SAVINGS$2,001,735
2007-12-11Mortgage assigned — from COMMINGLED PENSION TRUST FUND OF JPMORGA to APPLE BANK OF SAVINGS
2007-12-11TL&R — from COMMINGLED PENSION TRUST FUND OF JPMORGA to 246 WEST 38TH STREET TENANTS CORP
2007-11-28Job filed: TO LEGALIZE THE EXISTING MEZZANINE BETWEEN FIRST AND SECOND FLOOR AND MINOR INTERIOR RENOVATION. AMEND CERTIFICATE OF OCCUPANCY.$80,000
2007-11-10DOB complaint, category ?
2007-11-08DOB complaint, category ?
2007-10-11DOB complaint, category ?
2007-10-03DOB complaint, category ?
2007-09-27DOB complaint, category ?
2007-09-04Permit AL — ISSUED
2007-08-06ECB Non-Hazardous violation: WORK W/O PERMIT - AT 1ST FL REAR CREATED A MEZZANINE W/STAIRS TO ACCESS OFFICE AREA. REMEDY: FILE OBTAIN PERMITS IF FEASIBLE OR RE$2,500
2007-07-10Permit EW — ISSUED
2007-07-05DOB violation E:
2007-06-25DOB complaint, category ?
2007-06-12Permit EW — ISSUED
2007-06-12Permit EW — ISSUED
2007-06-11Job filed: RELOCATION OF EXISTING SPRINKLER HEADS, INSTALLATION OF NEW AC WITH DUCTWORK, AND MINOR GYP. BD. WORK RELATED TO MECH WORK. NO CHANGE IN USE, EGRESS, $52,000
2007-06-11Job filed: CONVERT EXISTING SHOWROOM & FACTORYAT FIFTH FLOOR TO WHOLESALE ESTABLISHMENT GARMENT CENTER UG-A.WORK TO INCLUDE INSTALLATION OF NEW INTERIOR PART$150,000
2007-04-27Permit EW — ISSUED
2007-04-23Job filed: Removal of existing non-bearing gyp.bd. walls and drop ceiling. No change in Use, Egress, and Occupancy.$15,000
2007-04-09DOB complaint, category ?
2007-04-04RPTT&RET $2,150,000 — from LERNER & BEAR, INC. to WISHPEARL WORLD, LLC$2,150,000
2007-03-06RPTT&RET $2,500,000 — from WISHPEARL WORLD, LLC to IRE NY LLC$2,500,000
2007-02-21Facade (LL11) filing, cycle 6: SWARMP
2006
2006-09-19DOB violation E:
2006-09-19DOB violation E:
2006-09-19DOB violation E:
2006-09-19DOB violation E:
2006-05-08DOB complaint, category ?
2006-02-28Permit EW — ISSUED
2006-01-03Permit EQ — ISSUED
2005
2005-12-16RPTT&RET — from ARK REALTY CO., INC. to KASHI, AMNON
2005-11-23DOB complaint, category ?
2005-11-21DOB complaint, category ?
2005-11-17DOB complaint, category ?
2005-11-14Permit EW — ISSUED
2005-11-03Job filed: Renovation of existing commercial space on the 11th Floor. Architectural work. No change of use, occupancy or egress.$30,000
2005-09-12Job filed: REPAIR EXTERIOR WALLS, WORK TO INCLUDE: LINTELS, WINDOWES, BRICKWORK, PARPET WALLS, ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. (Shed file$95,000
2005-08-30ECB Non-Hazardous violation: FAILURE TO POSTED PERMIT HOLDERS SIGN AS REQUSESTED BY AC CODE REMEDY:POST SIGN AS REQUIRED
2005-08-30ECB Non-Hazardous violation: FAILURE TO PROVIDE CONTRACTORS SIGN REMEDY:PROVIDE CONTRACTORS SIGN
2005-06-15Permit EQ — ISSUED
2005-06-10Job filed: INSTALLATION OF 115' SIDEWALK SHED FOR T THE PURPOSE OF FACADE INSPECTIO THE SIDEWALK SHED WILL COMPLY WITH LL33/ 91 AND PPN 9/99. THE SIDEWALK WILL B
2005-03-08DOB violation E:
2005-03-08DOB violation E:
2005-03-08DOB violation E:
2005-03-08DOB violation E:
2004
2004-12-13ECB Non-Hazardous violation: 83X10/59L10/ 83-X-10 REPAIR AND RETURN TO SERVICE 59-L-10 REPAIR LIGHTING MOTOR ROOM PROVIDE LIGHT SWITCH$350
2004-09-20Permit EW — ISSUED
2004-09-15Job filed: Upgrade existing fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2004-09-15Job filed: Upgrade existing fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2004-04-12ECB Non-Hazardous violation: 59B07/39P07 59-PROVIDE ADEQUATE ADDITIONAL IN MOTOR ROOM 39-REPAIR & SECURE LADDER (STEPS)IN MOTOR ROOM 15)USE CERTIFICATE OR LOCA
2004-04-12ECB Non-Hazardous violation: 59B07/39P07/15B07 59-PROVIDE ADDITIONAL ADEQUATE LIGHTING IN MOTOR ROOM(39)REPAIR STAIRWAY & SECURE SAME TO MOTOR ROOM (15)USE CER
2002
2002-10-10DOB violation E: 1P12435
2002-10-10DOB violation E: 1P12434
2002-09-20ECB Non-Hazardous violation: 37R09/ 46M07/ 46B13/ 37R09 REMOVE COPPER WIRE JUMPER ON FUSES 46M07PROVIDE ROPE TAG ( DATA ) 46B13 RESHACKLE ROPES
2002-09-09Permit EW — ISSUED
2002-09-09Permit EW — ISSUED
2002-08-29Job filed: REPLACE (1) NEW L.P. BOILER AND (1) NEW BURNER. NO CHANGE IN MEANS OF EG RESS, USE GROUP OR OCCUPANCY.
2002-08-15Permit EW — ISSUED
2002-07-31Job filed: Installation of HVAC split unit. No change in use egress or occupancy.$15,000
2002-04-12Job filed: REPLACEMENT OF EXISTING BOILER. REFURBIS H EXISTING FUEL OIL TANKS FOR C ANGE IN OIL GRADE FROM #6 TO #4. RELOCAT E GAS LINES TO ACCOMMODATE NEW BOILE$9,000
2001
2001-11-19Permit EW — ISSUED
2001-10-19Job filed: INSTALL THREE SANYO CONDENSING UNITS ON ROOF.$5,000
2001-07-25Permit EW — ISSUED
2001-07-11Job filed: at 12th floor installation of interior non-bearing partitions. no change to use , occupancy or means of egress.$5,000
2001-07-11Job filed: at 12th floor installation of interior non-bearing partitions. no change to use , occupancy or means of egress.$5,000
2001-07-11Job filed: at 12th floor installation of interior non-bearing partitions. no change to use , occupancy or means of egress.$5,000
2000
2000-10-16DOB violation E: 1P12435
2000-10-16DOB violation E: 1P12433
2000-10-16DOB violation E: 1P12434
2000-10-16DOB violation E: 1P12432
2000-09-20ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID C OF O.14FL OCCUPIED AS OFFICES.ALT 100514150.REM:OBTAIN VALID C OF O.$2,500
1999
1999-08-17ECB Non-Hazardous violation: 15B9.$180
1999-08-17ECB Non-Hazardous violation: 15B9, -15 REMOVE LOCK OFF HOIST DOOR'S.$180
1999-03-08DOB complaint, category ?
1998
1998-09-30ECB Non-Hazardous violation: 60D6,60M7. -60D6 ONE SIDE OF BUFFER SPRING MISSING - OTHER SIDE OF BUFFER SPRING UNSECURED - BUFFER STEEL NO LONGER SUPPORTED, $350
1998-09-16ECB Non-Hazardous violation: 35Y,74B,31M,57O,63H,60T. OIL LEAK MAIN MACHINE, SUPPLY LIGHT TOP OF CAR. REPLACE COVER ON TOP OF CAR, CLEAN PIT AREA, REPAIR TEN
1998-09-16ECB Non-Hazardous violation: 51B,74B,50Y,74B,57O,47B,60B. REMOVE FUNNEL FROM GEAR HOUSING, PROVIDE COVER FOR OIL ON GEAR CASE, REPAIR OIL LEAK MAIN MACHINE, SU
1998-01-07Permit EW — ISSUED
1997
1997-07-01DOB violation LL1080:
1996
1996-01-16ECB Non-Hazardous violation: EXIT DOOR SWINGS AGAINST FLOS OF EGRESS. ON 9TH FLR, GARMENT CUTING AREA, REAR OUTSIDE FIRE EXIT. REMEDY: REPAIR/REPLACE DOOR.$500
1995
1995-11-08DOB complaint, category ?
1995-10-25Permit EW — ISSUED
1995-10-24ECB Hazardous violation: EXIT DOOR. TOTAL OBSTRUCTION. EXTERIOR REAR COMMON BALCONY USED AS EGRESS HAS BEEN DEMOLISHED. THE INTERIOR IS TOTALY SEALED WITH $475
1995-10-24ECB Hazardous violation: WORK WITHOUT A PERMIT - HAZARDOUS. FIRE BALCONY AT THE SOUTHERN SECTION OF BUILDING HAS BEEN COMPLETELY DEMOLISHED AT FLOORS 5,6 A$800
1995-10-24DOB complaint, category ?
1995-10-20DOB complaint, category ?
1995-01-18Permit EW — ISSUED
1994
1994-04-13Permit EW — ISSUED
1994-03-09ECB Non-Hazardous violation: 37#,50Y,50O,35O. 37# BURNED CONTACTS.
1994-03-09ECB Non-Hazardous violation: 37#,50Y,50Y. 37 BURNED CONTACTS AND WORN SHUNTS.
1993
1993-11-24Permit EW — ISSUED
1993-11-24Permit PL — ISSUED
1993-11-24Permit EW — ISSUED
1993-11-10Mortgage $50,000 — from 246 W 38TH ST TENANTS CP to MORGAN GURANTY TR CONY$50,000
1993-11-10Agreement — from 246 WEST 38TH ST TNTS CP to MORGAN GUARANTY TRTETC
1993-11-10Agreement — from 246 WEST 38TH ST ETC to MORGAN GUARANTY TRTETC
1993-10-27Permit EW — ISSUED
1993-03-18DOB violation LL6291:
1993-02-16Permit AL — ISSUED
1993-01-15Permit AL — ISSUED
1992
1992-07-01DOB violation LL1080:
1992-02-13Permit EW — ISSUED
1991
1991-09-18DOB violation E:
1991-09-18DOB violation E:
1991-09-18DOB violation E:
1990
1990-03-07DOB violation C:
1989
1989-08-16DOB violation C:
1989-08-16DOB violation Z:
1989-05-08Mortgage satisfied — from NEW YORK CITY INDSTLETC to BANK NEW YORK
1989-04-03DOB violation C:
1989-04-03DOB violation C:
1989-04-03DOB violation C:
1989-04-03DOB violation C:
1989-03-30DOB violation C:
1989-03-30DOB violation C:
1989-03-30DOB violation C:
1989-03-03DOB violation C:
1988
1988-10-21DOB violation E: (51)REMOVE ALL TENANT LOCKS FROM HOISTWAY DOORS
1988-10-21DOB violation E: (35)COVERS.(51)REMOVE TENANT LOCKS FROM HOISTWAY DOORS
1988-10-21DOB violation E: (35)COVERS.(51)REMOVE TENANT LOCK FROM HOISTWAY DOORS
1988-10-21DOB violation E: (51)REMOVE TENANT LOCKS FROM HOISTWAY DOORS
1986
1986-12-18Agreement — from 246 WEST 38 ST ETAL to MORGAN GUARANTY TR CO NY
1986-12-18Mortgage assigned — from 246 VENTURES to MORGAN GUARANTY TR CO NY
1986-12-18Mortgage assigned — from 38 TOWN ASSOCIATES to MORGAN GUARANTY TR CO NY
1986-12-18Agreement — from 246 WEST 38 ST ETAL to MORGAN GUARANTY TR CO NY
1986-12-18Mortgage $300,000 — from 246 WEST 38 ST ETAL to MORGAN GUARANTY TR CO NY$300,000
1984
1984-10-15Agreement — from TYPOGRAPHIC INVTNS,INC to NEW YORK CTY INDTL ETC.
1984-10-15Agreement — from NYC INDUSTRIAL DEV.AGCY to TYPOGRAPHIC INOVTNSINC.
1984-10-15Mortgage $1,100,000 — from TYPOGRAPHIC INNOVTNS,INC to LONG ISLAND TRUST CO.,NA$1,100,000
1984-10-15LEAS — from 38 TOWN ASSOC. (38 TOWN) to TYPOGRAPHIC INVTNS,INC.
1984-10-15Mortgage $1,100,000 — from NYC INDSTL DVLMT AGENCY to LONG ISLAND TRUST CO.,NA$1,100,000
1984-05-21Agreement — from 38 TOWN ASSOCIATES to TYPOGRAPHIC INNOVTNSINC
1984-05-21LEAS — from 38 TOWN ASSOCIATES to TYPOGRAPHIC INNOVTNSETC
1984-02-29Deed — from 38 TOWN ASSOCIATES to 246 W 38TH ST TENANTS CP
1984-02-29Mortgage $200,000 — from 246 W 38TH ST TENANTS CP to 38 TOWN ASSOCIATES$200,000
1981
1981-07-15Deed — from LEFRO ESTATES INC to 38 TOWN ASSOCIATES
1981-07-15Mortgage assigned — from CITIBANK N A to 246 VENTURES
1981-07-15Mortgage — from 38 TOWN ASSCTS to 246 VENTURES
1981-07-15Agreement — from 38 TOWN ASSCTS to 246 VENTURES
1974
1974-04-15Agreement — from LEFRO ESTATES INC to FIRST NATIONAL CITYBANK
1974-04-04Mortgage assigned — from NORTH SIDE SAVINGS BANK to FIRST NATIONAL CITYBANK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL

Support this site Back to the building page