Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$2,430 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
20 service requests in the last three years. Most common: Encampment (6) · Sewer (2) · General Construction/Plumbing (2) · Non (2) · Commercial Disposal Complaint (1) · Illegal Parking (1).
Filed construction activity
$1,384,445 in permitted construction work filed since
2016 (23 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$10,623,000
$4,780,350
2026
$11,161,000
$5,022,450
2027
$10,891,000
$4,900,950
The city's market estimate has risen
3% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 37/100, posted at the entrance by law (2022 disclosure cycle)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Sewage) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2024 (2 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Times Sq-42 St — 1 2 3 7 A C E N Q R S W · 200 ft straight-line (about a 1-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 8 Av / W 39 St — M20 · 100 ft
Citi Bike
8 Ave & W 38 St · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
20 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
33
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
6
0
10
0
4
20
2018
10
2
13
0
2
27
2019
5
1
7
0
16
29
2020
0
0
7
1
7
15
2021
5
3
2
0
2
12
2022
2
1
10
0
3
16
2023
3
1
22
0
7
33
2024
7
4
11
0
4
26
2025
3
1
6
0
3
13
2026
0
0
3
0
3
6
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Disconnecting and reconnecting existing gas piping to new non-emergency gas generator on the roof. No change in use, egress or occupancy.
2025-11-07
Job filed: Replacement of existing non-emergency gas generator with new non-emergency gas generator on the roof. No change in use, egress or occupancy.
The full timeline
2026
2026-08-03311: Non-Emergency Police Matter — Other (complaint details)
2026-06-01Restaurant inspection: BERLINA CAFE — grade A
2026-05-27Boiler inspection
2026-05-27Boiler inspection
2026-05-21311: Food Establishment — Sewage
2025
2025-12-31311: Noise - Residential — Loud Talking
2025-11-29311: Vendor Enforcement — Food Vendor
2025-11-07Job filed: Disconnecting and reconnecting existing gas piping to new non-emergency gas generator on the roof. No change in use, egress or occupancy.$11,500
2025-11-07Job filed: Replacement of existing non-emergency gas generator with new non-emergency gas generator on the roof. No change in use, egress or occupancy.$40,000
2025-09-17311: Non-Emergency Police Matter — Other (complaint details)
2025-06-12Boiler inspection — defects found
2025-06-12Boiler inspection
2025-06-05311: Street Condition — Crash Cushion Defect
2025-05-17311: Homeless Person Assistance — Non-Chronic
2025-05-12311: Encampment — N/A
2025-03-07Facade (LL11) filing, cycle 10: SAFE
2025-03-04FDNY inspection (RISK)
2025-01-21Job filed: Application filed for facade, roof and chimney repairs as per drawings filed herewith. No change to use, egress or occupancy as a part of this applica$362,860
2024
2024-12-15311: Street Sign - Missing — St Name - Attached to Pole
2024-12-05Restaurant inspection: BERLINA CAFE — grade A
2024-11-14311: Illegal Parking — Parking Permit Improper Use
2024-10-23Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$20,000
2024-10-08Permit Sidewalk Shed — Signed-off
2024-10-08Permit General Construction — Signed-off
2024-08-16311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-08-16DOB complaint, category ?
2024-06-26Boiler inspection
2024-06-26Boiler inspection
2024-05-13ECB CLASS - 2 violation: OBSERVED SWS INSTALLED, AT EXP# 1 LIGHTS WERE NOT ILLUMINATED AS STIPULATED IN BC3307.6.4.8 CREATES HAZARDOUS CONDITIONS FOR PE$2,430
2024-05-06311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-05-06DOB complaint, category ?
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-02-28311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2024-02-28Permit General Construction — Signed-off
2024-01-04Permit Supported Scaffold — Signed-off
2024-01-03Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$20,000
2023
2023-12-11FDNY inspection (RISK)
2023-10-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-02311: Residential Disposal Complaint — Trash or Recycling Not Secure
2023-09-20311: Homeless Person Assistance
2023-09-19Permit Sidewalk Shed — Signed-off
2023-09-06Job filed: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRES$20,000
2023-08-28Rodent inspection: Failed for Rat Activity
2023-08-26311: Obstruction — Trash or Recycling
2023-08-25311: Dirty Condition — Syringes
2023-08-23311: Obstruction — Trash or Recycling
2023-08-22311: Obstruction — Trash or Recycling
2023-08-22311: Obstruction — Trash or Recycling
2023-07-31311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-07-18311: Water System — Hydrant Defective (WC2)
2023-07-13Restaurant inspection: BERLINA CAFE — grade A
2023-07-11311: Drug Activity — Use Outside
2023-07-10Rodent inspection: Failed for Rat Activity and Other Reason
2023-07-01311: Illegal Dumping — Chronic Dumping
2023-06-26311: Illegal Dumping — Removal Request
2023-06-26311: Illegal Dumping — Removal Request
2023-06-25311: Illegal Dumping — Chronic Dumping
2023-06-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-09311: Residential Disposal Complaint — Trash or Recycling Not Secure
2023-05-15Job filed: Application filed for facade, roof and chimney repairs as per drawings filed herewith. No change to use, egress or occupancy as a part of this applica$362,860
2023-04-27Boiler inspection
2023-04-27Boiler inspection
2023-04-27Rodent inspection: Failed for Rat Activity and Other Reason
2023-03-30Rodent inspection: Failed for Rat Activity and Other Reason
2023-02-23311: Rodent — Signs of Rodents
2023-02-16311: Homeless Person Assistance
2023-02-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-03Job filed: FILING FOR INTERIOR RENOVATION OF THE EXISTING CORNER COMMERCIAL STORE FOR CAFE ( USE GROUP 6 ) DELI FLOORING, CEILING , NON-BEARING PARTITIONS, CA$25,000
2022-04-14Boiler inspection
2022-04-14Boiler inspection
2022-03-29Job filed: Filing for Plumbing work for the proposed deli cafe) AT 1ST FLOOR CORNER in conjunction with application # M00601411, NON-RESEIDNTIAL COOKING EQUIP$12,000
2022-03-28311: Graffiti — Graffiti
2022-02-17Facade (LL11) filing, cycle 9: SWARMP
2021
2021-12-13311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2021-12-13DOB complaint, category ?
2021-10-19Permit Plumbing — Signed-off
2021-10-15Permit General Construction — Signed-off
2021-10-15Permit Mechanical Systems — Signed-off
2021-10-12Job filed: Filing for Plumbing work for the proposed deli cafe) AT 1ST FLOOR CORNER in conjunction with application # M00601411, NON-RESEIDNTIAL COOKING EQUIP$12,000
2021-10-07Job filed: FILING FOR INTERIOR RENOVATION OF THE EXISTING CORNER COMMERCIAL STORE FOR CAFE ( USE GROUP 6 ) DELI FLOORING, CEILING , NON-BEARING PARTITIONS, CA$25,000
2021-06-19311: Illegal Parking — Blocked Hydrant
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-16FDNY inspection (RISK)
2021-03-23Boiler inspection
2021-03-23Boiler inspection
2020
2020-11-30Rodent inspection: Bait applied
2020-11-12Rodent inspection: Failed for Rat Activity
2018-12-14311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2018-12-03Permit EW — ISSUED
2018-11-27Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$5,000
2018-11-27Permit Construction Fence — Signed-off
2018-11-14Permit Sidewalk Shed — Signed-off
2018-11-12Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2018-10-28311: Street Condition — Pothole
2018-10-09311: Street Condition — Pothole
2018-09-20Eviction executed (*)
2018-09-20Eviction executed (*)
2018-09-20Permit Antenna — Signed-off
2018-09-18Job filed: Modification to existing Verizon telecommunications site. Replace 3 antennas on roof. All in conformance with TPPN 5/98. No change in use, egress, or $3,300
2018-06-15311: Hazardous Materials — Chemical Spill/Release (HA1)
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-22311: Homeless Person Assistance
2018-05-10Boiler inspection
2018-05-10Boiler inspection
2018-04-11Job filed: UPGRADE OF AN EXISTING SPRINKLER ALARM SYSTEM FOLLOWING THE REQUIRED GUIDELINES OF BUILDINGS BULLETIN 2015-025 2(C) TO INCLUDE ELEVATOR RECALL FUNCTIO$16,000
2018-03-28Job filed: APPLICATION FILED FOR REPAIR OF BUILDING ENTRY AS PER DRAWINGS FILED HEREWITH; ELEVATOR APPLICATION SHALL BE FILED SEPARATELY. NO CHANGE TO USE, EGRES$55,000
2018-03-28Job filed: APPLICATION FILED FOR REPAIR OF BUILDING ENTRY AS PER DRAWINGS FILED HEREWITH; ELEVATOR APPLICATION SHALL BE FILED SEPARATELY. NO CHANGE TO USE, EGRES$55,000
2017-11-02Job filed: INTERIOR RENOVATION. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$150,000
2017-08-25Job filed: INSTALLATION OF SMOKE DETECTION FOR ELEVATOR RECALL.$17,700
2017-08-15Facade (LL11) filing, cycle 8: SAFE
2017-07-20Permit EW — ISSUED
2017-06-09Job filed: INTERIOR RENOVATION CHANGES AS INDICATED ON PLANS. PLUMBING CHANGES AS INDICATED ON PLANS. NO CHANGES TO USE, OCCUPANCY OR EGRESS.$70,000
2017-04-27Rodent inspection: Passed
2017-04-20311: Rodent — Rat Sighting
2017-04-17Permit EW — ISSUED
2017-04-06311: HEAT/HOT WATER — APARTMENT ONLY
2017-04-06Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-09Job filed: INSTALL HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 BUILDING CODE. NO CHANGE
2016-11-09Permit EQ — ISSUED
2016-11-07311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2016-08-17Rodent inspection: Failed for Rat Activity
2016-08-15Job filed: APPLICATION FILED FOR FACADE REPAIRS AS PER DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY AS A PART OF THIS APPLICATION.$79,625
2016-06-22Permit AL — ISSUED
2016-06-07Job filed: MODIFICATION OF EXISTING TELECOMMUNICATION SITE. REPLACE ANTENNAS AND INSTALL RELATED RRH AND GPS UNITS ON THE ROOF. ALL WORK IN CONFORMANCE WITH TPP$8,600
2013-07-03Job filed: MODIFICATION OF EXISTING SITE. REPLACING (12) EXISTING ANTENNAS AND ADDING (9) ANTENNAS ON THE ROOF. ALL WORK IS IN CONFORMANCE WITH TPPN #5/98. NO CH$22,200
2013-07-03Job filed: MODIFICATION OF EXISTING SITE. REPLACING (12) EXISTING ANTENNAS AND ADDING (9) ANTENNAS ON THE ROOF. ALL WORK IS IN CONFORMANCE WITH TPPN #5/98. NO CH$22,200
2013-02-21Job filed: APPLICATION FILED FOR REPAIR OF ELEVATOR SHAFT FOR ELEVATOR UPGRADE, DOORS AND FINISHES AS PER DRAWINGS FILED HEREWITH; ELEVATOR APPLICATION SHALL BE $84,000
2013-02-21Job filed: APPLICATION FILED FOR REPAIR OF ELEVATOR SHAFT FOR ELEVATOR UPGRADE, DOORS AND FINISHES AS PER DRAWINGS FILED HEREWITH; ELEVATOR APPLICATION SHALL BE $84,000
2012
2012-10-25Rodent inspection: Passed
2012-08-08311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2011-09-21ECB CLASS - 2 violation: 11P16,56Y13,42N09,17D06,79B14. 11P- PROVIDE ACCESS TO 'M' FLR. 42N- RESISTOR ON CONTROLLED - BY PASSED (JUMPER). 17D- 12,8TH, & 5T
2011-08-26311: Elevator — Elevator - Defective/Not Working
2009-10-21Job filed: INSTALLATION OF 170 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2009-10-21Job filed: INSTALLATION OF 170 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2009-10-21Permit EQ — ISSUED
2009-10-09Job filed: REMOVE/REPLACEMENT EXISTING WINDOWS ON THE SOUTH & WEST BUILDING FACADES AS IN DICATED ON FILED DRAWINGS. NO CHANGE TO USE OR EGRESS.$157,250
2009-10-09Job filed: REMOVE/REPLACEMENT EXISTING WINDOWS ON THE SOUTH & WEST BUILDING FACADES AS IN DICATED ON FILED DRAWINGS. NO CHANGE TO USE OR EGRESS.$157,250
2009-06-30DOB violation E:
2009-06-30DOB violation E:
2009-04-01Permit EW — ISSUED
2008
2008-06-20Permit EW — ISSUED
2008-06-19Job filed: NEW PARTITION, INTERIOR RENOVATION WORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$50,000
2008-06-19Job filed: NEW PARTITION, INTERIOR RENOVATION WORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$50,000
2008-05-29Permit EW — ISSUED
2008-05-15DOB violation E:
2008-05-15DOB violation E:
2008-01-10Permit EQ — ISSUED
2007
2007-10-15Permit EQ — ISSUED
2007-10-12Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 25LF AT 600 8TH AVENUE. DURING RMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL 33/91. NO CHANGE IN USE, EGRES
2007-10-12Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 25LF AT 600 8TH AVENUE. DURING RMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL 33/91. NO CHANGE IN USE, EGRES
2007-06-21Job filed: Application filed for sidewalk vault renovation as per drawings filed HEREWITH. NO CHANGE TO USE , EGRESS OR OCCUPANCY$82,000
2007-06-21Job filed: Application filed for sidewalk vault renovation as per drawings filed HEREWITH. NO CHANGE TO USE , EGRESS OR OCCUPANCY$82,000
2006
2006-09-20DOB violation E:
2006-09-20DOB violation E:
2006-06-22Permit EW — ISSUED
2006-06-20Job filed: Removal of partition, base cabinets, countertop, installation of new and patching of floor associated with the relocation of the warming station on th$5,000
2006-04-19Permit EW — ISSUED
2006-03-30Facade (LL11) filing, cycle 6: SAFE
2005
2005-12-14DOB violation E:
2005-10-20Job filed: Application filed for lobby renovation as per drawings filed herewith. No change to use, egress or occupancy.$70,000
2005-10-03DOB complaint, category ?
2005-08-30ECB Non-Hazardous violation: FAILURE TO PROVIDE CONTRACTORS SIGN. REMEDY: PROVIDE SIGN.$250
2005-06-29Permit EQ — RE-ISSUED
2005-06-22Job filed: INSTALLATION OF A HEAVY DUTY SHED 110' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2005-06-22Permit PL — ISSUED
2005-06-16Permit EW — ISSUED
2005-05-26Permit EW — ISSUED
2005-05-26Permit EW — ISSUED
2005-05-24MLEA — from BRITEX ASSOCIATES to NEW YORK SMSA LIMITED PARTNERSHIP
2005-05-19Job filed: INSTALLING A GAS FIRED GENERATOR ON THE ROOF.RELATED PLBG IN BASEMENT AN D ROOF. NO CHANGE IN USE,EGRESS OR OCCUP ANCY.$10,000
2005-05-19Job filed: INSTALLING A GAS FIRED GENERATOR ON THE ROOF.RELATED PLBG IN BASEMENT AN D ROOF. NO CHANGE IN USE,EGRESS OR OCCUP ANCY.$10,000
2005-05-19Job filed: INSTALLING A TELECOMMUNICATIONS SHELTER WITH HVAC RELATED DUNNAGE & REL- ATED ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN 5/98 NO CHANGES$50,000
2004
2004-04-13Permit EW — RE-ISSUED
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2003
2003-09-25Permit EQ — ISSUED
2003-09-19Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK BRIDGE, 150', DURING FACADE REPAIR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. SHED TO COMPLY WITH LL33/91. NO MATERIA
2003-09-17Permit EW — ISSUED
2003-05-29Job filed: Application filed to repair the exterior masonry as per drawings filed herewith. No change in use, egress or occupancy.$40,000
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2002
2002-09-18Permit EW — ISSUED
2002-09-18Permit EQ — ISSUED
2002-09-05Job filed: NEW PARTITIONS, SHELVING AND FINISHES, STOREFRONT WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2002-08-08DOB violation L1198:
2001
2001-05-31DOB violation C:
2001-05-31DOB violation C:
2001-05-31DOB violation C:
2000
2000-11-16Permit EQ — ISSUED
2000-11-06Job filed: INSTALL HEAVY DUTY SIDEWALK SHED: 160' LONG WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS OR OCCUPANCY
2000-11-06Job filed: INSTALL HEAVY DUTY SIDEWALK SHED: 160' LONG WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS OR OCCUPANCY
2000-03-09DOB violation E: 1P16233
2000-03-09DOB violation E: 1P16234
2000-02-07DOB violation LL6291:
2000-02-07DOB violation LL6291:
1999
1999-08-12Permit SG — ISSUED
1999-07-14Permit SG — ISSUED
1999-06-07Permit EW — ISSUED
1999-05-17Permit EQ — ISSUED
1999-05-17Permit EW — ISSUED
1999-05-14Permit PL — ISSUED
1999-05-07Permit EW — ISSUED
1998
1998-02-06Permit EW — ISSUED
1998-02-06Permit EW — ISSUED
1997
1997-10-02Permit EW — ISSUED
1997-10-02Permit EW — ISSUED
1997-10-02Permit EW — ISSUED
1997-10-02Permit PL — ISSUED
1997-10-02Permit EW — ISSUED
1997-10-02Permit EW — ISSUED
1997-10-02Permit EW — ISSUED
1997-10-02Permit EW — ISSUED
1997-10-02Permit EW — ISSUED
1997-07-10Permit EQ — ISSUED
1997-07-10Permit EW — ISSUED
1995
1995-04-24DOB complaint, category ?
1994
1994-07-15Permit SG — ISSUED
1993
1993-09-02Permit EW — ISSUED
1993-09-02Permit EW — ISSUED
1993-09-02Permit EQ — ISSUED
1993-08-09Permit EQ — ISSUED
1993-08-09Permit EW — ISSUED
1993-01-14ECB Non-Hazardous violation: 06L, (06) REPAIR WESTSIDE OF CAR GATE SWITCH
1992
1992-07-01DOB violation LL1080:
1992-04-14ECB Non-Hazardous violation: 15C, 15-REMOVE LOCKS ON HOISTWAY DOOR
1992-04-14ECB Non-Hazardous violation: 15C 15-REMOVE LOCKS ON HOISTWAY DOORS
1991
1991-09-11DOB violation C:
1989
1989-09-05DOB violation Z:
1988
1988-12-01DOB violation C:
1988-12-01DOB violation C:
1988-12-01DOB violation C:
1988-12-01DOB violation C:
1986
1986-11-21Deed — from BRITEX BUILDING CORP to BRITEX ASSOCIATES
1982
1982-04-19Agreement — from BRITEX BUILDING CORP. to AMERICAN SAVINGS BANK
1982-04-19Mortgage assigned — from BRITEX BUILDING CORP. to AMERICAN SAVINGS BANK
1977
1977-02-04Agreement — from BRITEX BUILDING CORP to FRANKLIN SAVINGS BANK NY
1966
1966-07-13Agreement — from BRITEX BUILDING CORP to BINSTOCK, PENNY; SCHWARTZ, WILLIAM
1966-07-01Mortgage — from BRITEX BUILDING CORP to SCHWARTZ, WILLIAM; BINSTOCK, PENNY
1966-07-01Mortgage assigned — from KALMON DOLGIN REALTIES to BINSTOCK, PENNY; SCHWARTZ, WILLIAM
1966-03-16Agreement — from BRITEX BUILDING CORP to KINGS HIGHWAY SAVINGS BK
1966-03-08Mortgage assigned — from EAST NEW YORK SAVINGS BK to KINGS HIGHWAY SAVINGS BK
1966-03-08Mortgage — from BRITEX BUILDING CORP to KINGS HIGHWAY SAVINGS BK
1966-03-08Mortgage assigned — from TRUST H; STRENGER, JOSEPH TR; TRUST A to KALMON DOLGIN REALTIES
1966-03-08Agreement — from BRITEX BUILDING CORP to KALMON DOLGIN REALTIES
1966-03-08SAGE — from KALMON DOLGIN REALTIES; KINGS HIGHWAY SAVINGS BK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL