Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
1 heat or hot-water complaints in the last three years (winter 2025–26: 1).
No bedbug-infested units reported in the last three years of filings.
$18,750 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
74 service requests in the last three years. Most common: Noise (21) · For Hire Vehicle Complaint (12) · Encampment (6) · Homeless Person Assistance (4) · Abandoned Bike (3) · Illegal Parking (3).
Filed construction activity
$59,208,202 in permitted construction work filed since
2016 (238 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$161,666,700
$72,750,000
2026
$166,631,000
$74,983,950
2027
$166,419,000
$74,888,550
The city's market estimate has risen
3% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
C — ENERGY STAR score 67/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Temperature), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
3 street-flooding or sewer-backup complaints at this address since
2015 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
23 St — 1 · 600 ft straight-line (about a 3-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 7 Av / W 24 St — M7 M20 · 500 ft
Citi Bike
W 24 St & 7 Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
74 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $50,000,000 on
2020-02-21 (lender: Lincoln Life & Annuity Company Of New York). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2020-02-21
Mortgage $50,000,000 — from 275 SEVENTH AVENUE LLC to LINCOLN LIFE & ANNUITY COMPANY OF NEW YO
$50,000,000
2020-02-21
AL&R $50,000,000 — from 275 SEVENTH AVENUE LLC to LINCOLN LIFE & ANNUITY COMPANY OF NEW YO
$50,000,000
2018-01-02
RPTT $28,050,000 — from LEVEL 3 COMMUNICATIONS LLC to CENTURY LINK INC.
$28,050,000
2011-11-23
RPTT&RET $350,000 — from TSC DESIGN ASSOCIATES, INC. to HALSEY, MCCORMACK & HELMER, INC.,DBA MAN
$350,000
2007-01-12
AL&R $25,800,000 — from 275 SEVENTH AVENUE BUILDING LLC to GERMAN AMERICAN CAPITAL CORPORATION
$25,800,000
2007-01-12
Mortgage $25,800,000 — from 275 SEVENTH AVENUE BUILDING LLC to GERMAN AMERICAN CAPITAL CORPORATION
$25,800,000
1998-09-24
Mortgage $14,660,000 — from 1710 BROADWAY, INC. to PRIMARY CARE DEVELOPMENT CORPORATION
$14,660,000
Ten-year activity
2001000
132
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
81
2
17
0
32
132
2018
46
34
27
1
17
125
2019
48
25
28
0
9
110
2020
61
9
24
2
6
102
2021
29
16
28
0
15
88
2022
17
0
27
0
13
57
2023
23
2
21
0
18
64
2024
29
2
14
0
14
59
2025
32
0
15
1
1
49
2026
46
12
41
0
6
105
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: General construction as shown on the plans.
2026-10-05
Job filed: Plumbing work as shown on the plans.
2026-10-05
Job filed: Mechanical work as shown on the plans.
2026-10-02
311: Noise - Street/Sidewalk — Loud Talking
2026-09-29
311: Noise — Construction
2026-09-24
311: Noise — Construction
2026-09-24
311: Noise — Construction
2026-09-11
Permit Sidewalk Shed — Permit Issued
2026-09-11
Permit Sidewalk Shed — Permit Issued
2026-09-09
Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-09-02
Permit Mechanical Systems — Permit Issued
2026-09-02
Permit General Construction — Permit Issued
2026-09-01
311: Encampment — N/A
2026-09-01
311: Encampment — N/A
2026-08-31
Permit General Construction — Permit Issued
2026-08-31
Permit Structural — Permit Issued
2026-08-28
Permit Mechanical Systems — Permit Issued
2026-08-27
311: Lost Property — Bag/Wallet
2026-08-27
Permit Sprinklers — Permit Issued
2026-08-18
Job filed: Plumbing alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.
2026-08-18
Job filed: Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.
2026-08-18
Job filed: Filing herewith mechanical workscope to adjust VAV box airflow and balance existing diffusers. No change in use egress or occupancy.
2026-08-18
Job filed: Mechanical systems alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per
2026-08-18
Permit Plumbing — Permit Issued
2026-08-11
Job filed: Structural alterations on the 9th & 13th floors (14th marketing floor) for proposed interior renovations to existing commercial tenant space; related
2026-08-04
Job filed: Mechanical systems alterations on the 8th thru 9th and 12th thru 13th (14th marketing) floors for proposed interior demolition to existing commercial
2026-08-04
Job filed: Sprinkler system alterations on the 8th thru 9th and 12th thru 13th floors for proposed interior demolition to existing commercial tenant space; relat
2026-08-04
Job filed: Plumbing alterations on the 8th & 13th (14th marketing) floors for proposed interior demolition to existing commercial tenant space; related work as p
2026-07-31
ECB CLASS - 2 violation: AT THE TIME OF INSPECTION, I OBSERVED INADEQUATE ROOF PROTECTION AT EXPOSURE #2. THE REQUIRED FLAME-RETARDANT FOAM AND FLAME-RETAR
2026-07-31
ECB CLASS - 1 violation: NOTE: AT TIME OF INSPECTION ON A ACTIVE SITE, I OBSERVED SUSPENDED SCAFFOLD IN PLACE UPON REQUEST FOR THE REQUIRED INSTALLATION IN
2026-07-31
ECB CLASS - 1 violation: NOTE: AT TIME OF INSPECTION, I OBSERVED MULTIPLE PARAPET CLAMPS INSTALLED ALONG THE PARAPET, UPON REQUEST FOR THE REGISTERED DESIG
Job filed: General construction alterations on the 8th thru 9th and 12th thru 13th (14th marketing) floors for proposed interior demolition to existing commercia
2026-07-27
Job filed: FILING HEREWITH COMMERCIAL TENANT IMPROVEMENTS TO EXISTING BUILDING, NO CHANGE IN USE EGRESS OR OCCUPANCY.
2026-07-08
ECB CLASS - 1 violation: ATOI CONSTRUCTION WORK WAS OBSERVED IN PROGRESS WITHOUT THE REQUIRED DAILY PRE-SHIFT SAFETY DOCUMENTATION AVAILABLE ON SITE, MAINT
2026-07-08
ECB CLASS - 2 violation: ATOI CONSTRUCTION WORK WAS IN PROGRESS AND THE REQUIRED DOB WORK PERMIT WAS NOT POSTED IN A CONSPICUOUS LOCATION ON THE SITE AS RE
2026-07-08
DOB complaint, category ?
2026-07-07
311: Emergency Response Team (ERT) — After Hours Work - Illegal
2026-07-07
311: Water System — Hydrant Leaking (WC1)
2026-07-07
DOB complaint, category ?
2026-07-06
311: Water System — Hydrant Running Full (WA4)
2026-07-02
Permit Plumbing — Permit Issued
2026-07-01
311: Abandoned Vehicle — With License Plate
2026-06-24
Job filed: Replacement of air conditioning unit. No change in use egress and occupancy.
2026-06-24
Permit Mechanical Systems — Permit Issued
2026-06-22
Job filed: Mechanical systems alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per
2026-06-18
311: Taxi Report — Driver Report - Passenger
2026-06-18
Permit Suspended Scaffold — Permit Issued
2026-06-14
311: Noise - Street/Sidewalk — Loud Talking
2026-06-12
Permit Sidewalk Shed — Permit Issued
2026-06-04
Job filed: INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION.
2026-05-12
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-05-12
Permit Sign — Signed-off
2026-05-11
Job filed: ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-05-07
Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2026-04-30
311: Encampment — N/A
2026-04-29
311: General Construction/Plumbing — Building Permit - None
2026-04-29
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-04-29
DOB complaint, category ?
2026-04-22
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-04-22
311: Noise - Residential — Banging/Pounding
2026-04-21
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-04-20
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-04-20
311: Noise - Residential — Banging/Pounding
2026-04-20
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-04-20
DOB complaint, category ?
2026-04-18
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-04-16
311: General Construction/Plumbing — Building Permit - None
2026-04-16
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-04-16
DOB complaint, category ?
2026-04-14
311: Encampment — N/A
2026-04-14
311: Encampment — N/A
2026-04-14
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-04-13
311: Noise - Residential — Banging/Pounding
2026-04-13
311: Noise - Vehicle — Engine Idling
2026-04-13
311: Mobile Food Vendor — Food Source/Protection
2026-04-12
311: Encampment — N/A
showing the 80 most recent
The full timeline
showing the 2,000 most recent of
2,151 events
2026
2026-10-05311: Noise — Construction
2026-10-05Job filed: Sprinkler work as shown on the plans.$34,600
2026-10-05Job filed: General construction as shown on the plans.$750,000
2026-10-05Job filed: Plumbing work as shown on the plans.$67,000
2026-10-05Job filed: Mechanical work as shown on the plans.$500,000
2026-09-09Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,700
2026-09-02Permit Mechanical Systems — Permit Issued
2026-09-02Permit General Construction — Permit Issued
2026-09-01311: Encampment — N/A
2026-09-01311: Encampment — N/A
2026-08-31Permit General Construction — Permit Issued
2026-08-31Permit Structural — Permit Issued
2026-08-28Permit Mechanical Systems — Permit Issued
2026-08-27311: Lost Property — Bag/Wallet
2026-08-27Permit Sprinklers — Permit Issued
2026-08-18Job filed: Plumbing alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.$10,000
2026-08-18Job filed: Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.$18,000
2026-08-18Job filed: Filing herewith mechanical workscope to adjust VAV box airflow and balance existing diffusers. No change in use egress or occupancy.$35,000
2026-08-18Job filed: Mechanical systems alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per$10,000
2026-08-18Permit Plumbing — Permit Issued
2026-08-11Job filed: Structural alterations on the 9th & 13th floors (14th marketing floor) for proposed interior renovations to existing commercial tenant space; related $127,400
2026-08-04Job filed: Mechanical systems alterations on the 8th thru 9th and 12th thru 13th (14th marketing) floors for proposed interior demolition to existing commercial $23,000
2026-08-04Job filed: Sprinkler system alterations on the 8th thru 9th and 12th thru 13th floors for proposed interior demolition to existing commercial tenant space; relat$20,700
2026-08-04Job filed: Plumbing alterations on the 8th & 13th (14th marketing) floors for proposed interior demolition to existing commercial tenant space; related work as p$9,800
2026-07-31ECB CLASS - 2 violation: AT THE TIME OF INSPECTION, I OBSERVED INADEQUATE ROOF PROTECTION AT EXPOSURE #2. THE REQUIRED FLAME-RETARDANT FOAM AND FLAME-RETAR$2,500
2026-07-31ECB CLASS - 1 violation: NOTE: AT TIME OF INSPECTION ON A ACTIVE SITE, I OBSERVED SUSPENDED SCAFFOLD IN PLACE UPON REQUEST FOR THE REQUIRED INSTALLATION IN$5,000
2026-07-31ECB CLASS - 1 violation: NOTE: AT TIME OF INSPECTION, I OBSERVED MULTIPLE PARAPET CLAMPS INSTALLED ALONG THE PARAPET, UPON REQUEST FOR THE REGISTERED DESIG$5,000
2026-07-29Job filed: General construction alterations on the 8th thru 9th and 12th thru 13th (14th marketing) floors for proposed interior demolition to existing commercia$250,750
2026-07-27Job filed: FILING HEREWITH COMMERCIAL TENANT IMPROVEMENTS TO EXISTING BUILDING, NO CHANGE IN USE EGRESS OR OCCUPANCY.$250,000
2026-07-08ECB CLASS - 1 violation: ATOI CONSTRUCTION WORK WAS OBSERVED IN PROGRESS WITHOUT THE REQUIRED DAILY PRE-SHIFT SAFETY DOCUMENTATION AVAILABLE ON SITE, MAINT$5,000
2026-07-08ECB CLASS - 2 violation: ATOI CONSTRUCTION WORK WAS IN PROGRESS AND THE REQUIRED DOB WORK PERMIT WAS NOT POSTED IN A CONSPICUOUS LOCATION ON THE SITE AS RE
2026-07-08DOB complaint, category ?
2026-07-07311: Emergency Response Team (ERT) — After Hours Work - Illegal
2026-07-07311: Water System — Hydrant Leaking (WC1)
2026-07-07DOB complaint, category ?
2026-07-06311: Water System — Hydrant Running Full (WA4)
2026-07-02Permit Plumbing — Permit Issued
2026-07-01311: Abandoned Vehicle — With License Plate
2026-06-24Job filed: Replacement of air conditioning unit. No change in use egress and occupancy.$10,000
2026-06-24Permit Mechanical Systems — Permit Issued
2026-06-22Job filed: Mechanical systems alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per$10,000
2026-02-03Restaurant inspection: DIG INN — grade A
2026-02-02Job filed: Sprinkler alterations on the 1st floor for proposed commercial tenant renovations; related work as per plans.$9,500
2026-01-29311: Non-Residential Heat — Inadequate or No Heat
2026-01-22Job filed: 9th cycle FISP repairs. No change to use, egress or occupancy.$1,105,135
2026-01-06Permit Structural — Signed-off
2026-01-05Permit Plumbing — Permit Issued
2026-01-05Permit Sprinklers — Permit Issued
2026-01-02Cooling tower inspection
2026-01-02Cooling tower inspection
2026-01-02Cooling tower inspection
2026-01-02Permit Mechanical Systems — Permit Issued
2026-01-02Permit General Construction — Permit Issued
2026-01-02Permit General Construction — Signed-off
2025
2025-12-26LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2025-12-26311: Blocked Driveway — No Access
2025-12-23Job filed: Plumbing work as shown on the plans.$67,000
2025-12-23Job filed: Mechanical work as shown on the plans.$500,000
2025-12-23Job filed: Sprinkler work as shown on the plans.$34,600
2025-12-23Job filed: Structural work as shown on the plans.$34,000
2025-12-23Job filed: General construction as shown on the plans.$750,000
2025-12-18Permit Mechanical Systems — Permit Issued
2025-12-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-12-09311: Illegal Parking — Blocked Bike Lane
2025-12-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-11-24Job filed: Mechanical systems alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per$10,000
2025-11-24Job filed: Plumbing alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.$10,000
2025-11-24Job filed: Sprinkler alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial tenant space; related work as per plans.$18,000
2025-11-20Permit General Construction — Permit Issued
2025-11-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-11-17Job filed: General construction alterations on the 7th floor for proposed interior demolition and whitebox of existing commercial space; related work as per plan$501,750
2025-11-07Restaurant inspection: 7 GRAMS CAFFE — grade A
2025-10-30Permit Plumbing — Signed-off
2025-10-30Permit Plumbing — Permit Issued
2025-10-28Permit General Construction — Permit Issued
2025-10-27Job filed: Sprinkler alterations on the 1st floor for proposed commercial tenant renovations; related work as per plans.$9,500
2025-10-27Job filed: Plumbing alterations at the 1st floor for proposed commercial tenant renovations; related work as per plans.$3,600
2025-10-23Job filed: General construction alterations on the 1st floor for proposed commercial tenant renovations; related work as per plans. No proposed change in buildin$22,500
2025-09-08Permit Mechanical Systems — Permit Issued
2025-09-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-07-22Job filed: Roof & limited terrace repairs along the 18th floor Terrace. No change to use, occupancy or egress.$897,221
2025-07-12311: Homeless Person Assistance — Non-Chronic
2025-06-28311: Blocked Driveway — No Access
2025-06-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-06-05Job filed: Sprinkler alterations at the 1st floor for proposed re-demise of existing commercial tenant space; related work as per plans.$4,255
2025-06-05Job filed: Plumbing alterations at the 1st floor for proposed re-demise of existing commercial space; related work as per plans.$17,940
2025-06-04Job filed: General construction alterations at the 1st floor for proposed re-demise of commercial tenant space; related work as per plans. No proposed change in $51,000
2025-04-18311: Abandoned Bike — Chained to Public Property
2025-04-17311: Abandoned Bike — Chained to Public Property
2025-04-04Permit Sprinklers — Signed-off
2025-03-10311: Homeless Person Assistance
2025-03-06Permit Mechanical Systems — Signed-off
2025-03-05311: Homeless Person Assistance
2025-03-04Job filed: Sprinkler alterations at the 15th floor for proposed renovations to existing commercial tenant space; related work as per plans.$7,000
2025-03-04Job filed: Mechanical systems alterations at the 15th floor for proposed renovations to existing commercial tenant space; related work as per plans.$72,000
2025-03-04Permit General Construction — Signed-off
2025-03-03311: Blocked Driveway — Partial Access
2025-02-28Job filed: General construction alterations on the 15th floor for proposed renovations to existing commercial tenant space; related work as per plans. No propose$67,900
2025-02-21311: Consumer Complaint — Other Store (Non-Food)
2025-01-30Job filed: General construction and structural alterations at the 19th floor for proposed installation and replacement of terrace doors and wheelchair access ram$185,000
2025-01-02Permit General Construction — Signed-off
2025-01-02Permit General Construction — Permit Issued
2025-01-02Permit Structural — Permit Issued
2024
2024-12-23311: Consumer Complaint — Stoop Line Stand
2024-11-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-11-12311: Noise — Noise: Construction Before/After Hours (NM1)
2024-11-12311: Noise — Noise: Construction Before/After Hours (NM1)
2024-09-18Permit General Construction — Signed-off
2024-09-05Job filed: MODIFICATION OF PLUMING WORK, ADDITION OF PLUMBING FIXTURES$15,000
2024-09-05Job filed: MECHANICAL MODIFICATIONS TO INCLUDE HVAC REFURBISHMENT, BALANCINGOF EXISTING DUCTWORK, INSTALL OF NEW DUCTWORK AND ASSOCIATED AIROUTLETS$25,500
2024-09-05Job filed: RELOCATION AND NEW INSTALLATION OF SP HEADS$10,010
2024-09-05Permit General Construction — Signed-off
2024-09-03311: Mobile Food Vendor — Insects / Pests
2024-08-30311: Homeless Person Assistance
2024-08-22Job filed: INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON FLOOR 5.$318,000
2024-08-13Job filed: INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON FLOOR 4.$43,857
2024-08-03311: Mold — Public Complaint - Comm Location
2024-07-02Restaurant inspection: DIG INN — grade A
2024-06-20Permit Plumbing — Signed-off
2024-06-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-06-12311: New Tree Request — For One Address
2024-06-10Permit General Construction — Signed-off
2024-06-10Permit General Construction — Signed-off
2024-05-16Job filed: INTERIOR DEMO OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON FLOOR 4.$43,857
2024-05-16Job filed: INTERIOR DEMO OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON FLOOR 5.$37,170
2024-04-16Permit General Construction — Signed-off
2024-04-15Permit General Construction — Permit Issued
2024-04-15Permit Structural — Permit Issued
2024-03-26Job filed: General construction and structural alterations at the 19th floor for proposed installation and replacement of terrace doors and wheelchair access ram$185,000
2024-03-25Job filed: Minor mechanical systems alterations at the 19th floor; related work as per plans. No proposed change in building use, egress, or occupancy.$6,000
2024-03-21Permit Boiler Equipment — Signed-off
2024-03-19Job filed: Roof & limited terrace repairs along the 18th floor Terrace. No change to use, occupancy or egress.$748,171
2024-03-11Job filed: Minor mechanical systems alterations at the 19th floor; related work as per plans. No proposed change in building use, egress, or occupancy.$6,000
2024-03-11Job filed: General construction and structural alterations at the 19th floor for proposed installation and replacement of terrace doors and wheelchair access ram$185,000
2024-02-27Job filed: Roof & limited terrace repairs along the 18th floor Terrace. No change to use, occupancy or egress.$748,171
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22Job filed: Boiler Equipment alterations at the cellar level to decommission and abandon existing boilers and convert to high pressure steam piping system and met$850,000
2024-02-22Job filed: Plumbing alterations at the cellar level to decommission and abandon existing boilers and convert to high pressure steam piping system and metering sy$255,000
2024-02-21Facade (LL11) filing, cycle 9: SWARMP
2024-02-15311: Abandoned Bike — Chained to Public Property
2024-02-12Asbestos abatement: Removal — SK Improvements Corp
2023-12-26Job filed: FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site superviso
2023-12-19ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. AT TIME OF INSPECTION, OBSERVED TERRA-COTTA CRACKED AT THE CORNER OF EXPOS. $1,250
2023-12-07311: For Hire Vehicle Complaint — Car Service Company Complaint
2023-06-30311: Food Establishment — Kitchen/Food Prep Area
2023-06-28Restaurant inspection: 7 GRAMS CAFFE — grade A
2023-06-13311: Homeless Person Assistance
2023-06-13Certificate of occupancy Renewal Without Change
2023-06-05Elevator permit: Un-pin and Re-activate the 19th floor service on the existing elevators and adding destination dispatch, hardware and software. A$80,000
2023-05-30311: Encampment — N/A
2023-05-22311: Homeless Person Assistance
2023-05-12Permit Plumbing — Signed-off
2023-05-12Permit Sprinklers — Signed-off
2023-05-08Restaurant inspection: DIG INN — grade B
2023-05-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-04-20Permit Mechanical Systems — Signed-off
2023-04-18Permit Plumbing — Signed-off
2023-04-18Permit Sprinklers — Signed-off
2023-04-18Permit Plumbing — Signed-off
2023-04-18Permit Sprinklers — Signed-off
2023-04-10Job filed: Mechanical systems alterations on the 1st floor for proposed interior non-structural demolition and whitebox fit-out; related work as per plans. No pr$18,000
2023-04-10Job filed: Plumbing and sprinkler alterations on the 1st floor for interior non-structural demolition and whitebox fit-out; related work as per plans. No propose$34,500
2023-04-10Permit General Construction — Signed-off
2023-04-10Permit Structural — Signed-off
2023-04-07Boiler inspection
2023-04-07Boiler inspection
2023-04-07311: Consumer Complaint — Other
2023-04-05311: Graffiti — Graffiti
2023-04-05Job filed: Structural alterations at the 18th and 19th floor ceilings (under 19th & 20th floor slabs) for proposed repair and reinforcement of existing steel bea$252,950
2023-03-31Job filed: General construction alterations at the 1st floor for proposed interior non-structural demolition and repairs; related work as per plans. No proposed $100,000
2023-03-29Permit Mechanical Systems — Signed-off
2023-03-28Permit General Construction — Signed-off
2023-03-23Job filed: Mount Sinai - Interior renovations related to the modifications to the HIV Program Clinic as per plans filed herewith. No change in use, egress, or oc$256,325
2023-03-22Job filed: Mount Sinai - Sprinkler modifications related to the HIV Program Clinic renovations as per plans filed herewith. No change in use, egress, or occupanc$7,000
2023-03-22Job filed: Mount Sinai - Mechanical modifications related to the HIV Program Clinic renovations as per plans filed herewith. No change in use, egress, or occupan$27,000
2023-03-22Job filed: Mount Sinai - Plumbing modifications related to the HIV Program Clinic renovations as per plans filed herewith. No change in use, egress, or occupancy$25,000
2022-01-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-01-25311: Illegal Parking — Blocked Bike Lane
2022-01-21311: Non-Residential Heat — Inadequate or No Heat
2022-01-21311: Non-Residential Heat — Inadequate or No Heat
2022-01-15Permit Sidewalk Shed — Signed-off
2022-01-14Permit Supported Scaffold — Signed-off
2021
2021-12-02Permit EQ — ISSUED
2021-11-22Permit Sprinklers — Signed-off
2021-11-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-11-05311: Illegal Parking — Blocked Bike Lane
2021-10-31311: Lost Property — Electronics/Phones
2021-10-27DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021-10-21311: Illegal Parking — Blocked Bike Lane
2021-10-20ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.NOTED:AT THE TIME OF MY INSPECTION OF A 27 STO
2021-10-20ECB CLASS - 2 violation: FAILURE TO COMPLY WITH MANUFACTURERS SPECIFICATIONS.NOTED:AT THE TIME OF MY INSPECTION OF ACTIVE 27 STORY FACADE RESTORATION JOBSI
2021-10-20DOB complaint, category ?
2021-10-13Permit EW — ISSUED
2021-10-08Permit Mechanical Systems — Signed-off
2021-09-15Job filed: MECHANICAL WORK AT 20TH FLOOR SPACE (EPAM) AS INDICATED ON DRAWINGS.$35,000
2021-09-03Permit Supported Scaffold — Signed-off
2021-08-25Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2021-08-11311: Lost Property — Electronics/Phones
2021-08-10Permit Mechanical Systems — Signed-off
2021-08-09311: Lost Property — Electronics/Phones
2021-08-04DOB complaint, category ?
2021-08-03ECB CLASS - 1 violation: BC 3301.1.1 RESPONSIBILITY FOR SAFETY AT TIME OF INSPECTION ON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTERATION PERMIT#123069776,IT$2,500
2021-08-03ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS/DRAWINGS AT TIME OF INSPECTIONON ACTIVE JOBSITE FOR FACADE WORK UNDER ALTERATION PERMIT#12$2,500
2021-08-03ECB CLASS - 1 violation: FAILURE TO INSTALL SUSPENDED SCAFFOLD AS PER PLANS/WORK CONTRARY TO CD5.AT TIME OF INSPECTION OF AN ACTIVE JOBSITE FOR FACADE WORK$625
2021-07-27Permit Sprinklers — Signed-off
2021-06-15Cooling tower inspection
2021-06-15Cooling tower inspection
2021-06-15Cooling tower inspection
2021-06-14311: Homeless Person Assistance
2021-05-24311: Noise - Helicopter — Other
2021-05-08311: Homeless Person Assistance
2021-05-04Job filed: Removal, installation and replacement of plumbing fixtures as shown on drawings. Modification to existing sprinkler system and related piping. as sho$390,000
2021-04-28311: Illegal Parking — Blocked Bike Lane
2021-04-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-04-24311: Illegal Parking — Blocked Bike Lane
2021-04-22311: Illegal Parking — Blocked Bike Lane
2021-04-08Boiler inspection
2021-04-08Boiler inspection
2021-04-08ECB CLASS - 1 violation: BC 3301.7 DOCUMENTS TO BE KEPT ON SITE(PARAPET STABILITY REPORT BY ENGINEER). AT TIME OF INSPECTION OF THIS 27 STORY MAJOR BUILDIN$1,250
2021-04-08DOB complaint, category ?
2021-03-30ECB CLASS - 2 violation: SEC. A.C 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PR
2021-03-29311: NonCompliance with Phased Reopening — Business not in compliance
2021-03-29Permit Mechanical Systems — Signed-off
2021-03-26DOB complaint, category ?
2021-03-25ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED CONSTRUCTION DOCUMENTS AT JOBSITE AT THE TIME OF INSPECTION.AT THE TIME OF INSPECTION ON AN ACTIVE JOB
2021-03-25ECB CLASS - 2 violation: 28-110.1 INADEQUATE SITE SAFETY PLAN.AT THE TIME OF INSPECTION ON AN ACTIVE JOBSITE FOR FACADE REPAIR.I OBSERVED A SUSPENDED SCAFF
2021-01-12311: For Hire Vehicle Complaint — Car Service Company Complaint
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-08Asbestos abatement: Removal — PAR Environmental Corporation
2021-01-07Job filed: Sprinkler alterations on the 1st through 26th floors and cellar level; related work as per plans.$230,000
2021-01-06311: Noise - Helicopter — Other
2021-01-05311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-05Permit Plumbing — Signed-off
2020
2020-12-28311: Consumer Complaint — Other
2020-12-22Job filed: Removal, installation and replacement of plumbing fixtures as shown on drawings. Modification to existing sprinkler system and related piping. as sho$390,000
2020-12-22Job filed: New Duct work and ceiling diffusers, installation of new A/C units as shown on drawings. No change to use, egress or occupancy.$400,000
2020-12-22Job filed: STRUCTURAL WORK INFILL OF CONVENIENCE STAIR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2020-12-22Job filed: STRUCTURAL WORK INFILL OF CONVENIENCE STAIR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2020-12-08Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL
2020-11-23Permit Sprinklers — Signed-off
2020-11-18Permit Plumbing — Signed-off
2020-11-12311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-12311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-02311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2020-11-02DOB complaint, category ?
2020-10-26Permit EW — ISSUED
2020-10-22Job filed: IT IS PROPOSED TO REMOVE NON LOAD BEARING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW AT SELECT LOCATIONS AS PER PLANS FILED. TH$1,150,000
2020-10-15Permit EQ — ISSUED
2020-09-30Certificate of occupancy Temporary
2020-09-28311: Homeless Person Assistance — N/A
2020-09-28Permit EQ — ISSUED
2020-09-27311: Homeless Person Assistance — N/A
2020-09-25311: Homeless Person Assistance — N/A
2020-09-11Job filed: SPRINKLER WORK AT 20TH FLOOR SPACE (EPAM) AS INDICATED ON DRAWINGS.$7,000
2020-09-11Job filed: INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-08-28Permit Supported Scaffold — Signed-off
2020-08-27Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-07-15311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-15311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-12311: Illegal Parking — Blocked Bike Lane
2020-07-11311: Illegal Parking — Blocked Bike Lane
2020-07-10311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-10311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-10311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-07Certificate of occupancy Temporary
2020-06-30311: Non-Emergency Police Matter — Social Distancing
2020-06-18Permit Sprinklers — Signed-off
2020-06-16Permit Plumbing — Signed-off
2020-06-11Permit EW — ISSUED
2020-06-08Job filed: PLYWOOD FENCE PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020-06-08Permit Construction Fence — Signed-off
2020-05-22DOB violation E:
2020-05-22DOB violation E: CEASE USE
2020-05-22DOB violation E: CEASE USE
2020-05-22DOB violation E: CEASE USE
2020-05-22DOB violation E:
2020-05-22DOB violation E:
2020-05-22DOB violation E:
2020-05-22DOB violation E:
2020-05-11Job filed: PROPOSED MODIFICATION TO MECH/HVAC SYSTEM AS PER PLANS FILED.NO CHANGE TO OCCUPANCY USE OR EGRESS. NO NEW MECH EQPMT IS BEING PROPOSED, THE SCOPE OF W$57,500
2020-05-11Job filed: THE SCOPE OF INCLUDES REMODELING EXIST. PORTION OF 4TH & 5TH FLS OF UHC TO REFRESH CLINICAL, STAFF & WAITING AREAS. NO EXT ENV WORK IS DONE. GENERALSP$3,400
2020-05-11Job filed: SCOPE OF PROJECT INCLUDES REMODELING EXISTING PORTION OF THE 4TH & 5TH FLS OF UHC TO REFRESH ITS CLINICAL,STAFF&WAITING AREAS.NO EXT ENVELOPE WORK IS $51,000
2020-05-08Permit Mechanical Systems — Signed-off
2020-04-29311: Noise — Noise: air condition/ventilation equipment (NV1)
2020-04-23311: Homeless Person Assistance — N/A
2020-04-21Certificate of occupancy Temporary
2020-04-20Job filed: IT IS PROPOSED TO REMOVE NON LOAD BEARING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW AT SELECT LOCATIONS AS PER PLANS FILED. THE$1,150,000
2020-04-20Job filed: IT IS PROPOSED TO REMOVE NON LOAD BEARING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW AT SELECT LOCATIONS AS PER PLANS FILED. THE$1,150,000
2020-04-16311: Non-Emergency Police Matter — Social Distancing
2020-04-10Job filed: IT IS PROPOSED TO REMOVE NON LOAD BEARING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW AT SELECT LOCATIONS AS PER PLANS FILED. THE$1,150,000
2020-04-06Certificate of occupancy Temporary
2020-03-27Permit EW — ISSUED
2020-03-20Permit Sidewalk Shed — Signed-off
2020-03-18Boiler inspection
2020-03-18Boiler inspection
2020-03-12Cooling tower inspection
2020-03-12Cooling tower inspection
2020-03-12Cooling tower inspection
2020-02-27Job filed: ADDITION/MODIFICATION TO AN EXISTING SPRINKLER SYSTEM ON THE 26TH FLOOR AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER T$30,000
2020-02-21Mortgage $50,000,000 — from 275 SEVENTH AVENUE LLC to LINCOLN LIFE & ANNUITY COMPANY OF NEW YO$50,000,000
2020-02-21AL&R $50,000,000 — from 275 SEVENTH AVENUE LLC to LINCOLN LIFE & ANNUITY COMPANY OF NEW YO$50,000,000
2020-02-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-02-21311: Illegal Parking — Blocked Bike Lane
2020-02-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-02-21311: Illegal Parking — Blocked Bike Lane
2020-02-21Permit Mechanical Systems — Signed-off
2020-02-20Permit Mechanical Systems — Signed-off
2020-02-19Job filed: PROPOSED MECHANICAL/HVAC SYSTEM INSTALLATION WITH ASSOCIATED DUCT WORK AS PER PLANS. NO CHANGE TO OCCUPANCY, EGRESS OR USE.$50,000
2020-02-19Job filed: FILING HEREWITH FOR INTERIOR RENOVATION. WORK TYPES SHALL INCLUDE NON-STRUCTURAL DEMOLITION AND GENERAL CONSTRUCTION AS SHOWN ON PLANS. NO CHANGE OF U$38,000
2020-02-19Job filed: FILING HEREWITH FOR INTERIOR RENOVATION. WORK TYPES SHALL INCLUDE NON-STRUCTURAL DEMOLITION AND GENERAL CONSTRUCTION AS SHOWN ON PLANS. NO CHANGE OF U$38,000
2020-02-19Job filed: FILING HEREWITH FOR INTERIOR RENOVATION. WORK TYPES SHALL INCLUDE NON-STRUCTURAL DEMOLITION AND GENERAL CONSTRUCTION AS SHOWN ON PLANS. NO CHANGE OF U$38,000
2020-02-04Job filed: INTERIOR RENOVATION TO PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,500,000
2020-02-04Job filed: INTERIOR RENOVATION TO PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,500,000
2020-02-03Job filed: MECHANICAL WORK AT 1ST FLOOR (26TH STREET LOBBY) AS INDICATED ON DRAWINGS.$54,481
2020-02-03Job filed: PLUMBING WORK AT 1ST FLOOR (26TH FLOOR LOBBY) AS INDICATED ON DRAWINGS.$2,500
2020-02-03Job filed: SPRINKLER WORK AT 1ST FLOOR (26TH STREET LOBBY) AS INDICATED ON DRAWINGS.$15,600
2020-02-03Job filed: ARCHITECTURAL ALTERATIONS AT 1ST FLOOR (26TH STREET LOBBY) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$745,946
2020-02-03Job filed: ARCHITECTURAL ALTERATIONS AT 1ST FLOOR (26TH STREET LOBBY) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$745,946
2020-02-03Job filed: ARCHITECTURAL ALTERATIONS AT 1ST FLOOR (26TH STREET LOBBY) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$745,946
2020-02-03Permit EW — ISSUED
2020-01-22Permit EQ — ISSUED
2020-01-09Permit EW — ISSUED
2020-01-08Job filed: Installation of new HVAC units, condensate water pump, and associated ducts/piping at 17th floor; related work as per plans.$121,000
2020-01-06Permit Plumbing — Signed-off
2019
2019-12-20DOB complaint, category ?
2019-12-19ECB CLASS - 1 violation: FAILURE TO MAINATIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY CHAPTER 33-C HOOK DRAWINSG AT THE TIMW OF MY INSPECTION OF A 27 STROY BU
2019-12-19ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OPERATION OF CRANE /DERRICK HOISTING EQUIPMENYT IN UNSAFE MANNER AT THE TIME OF MY INSPECTION OF A 27 S
2019-12-17Certificate of occupancy Temporary
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-13DOB violation E:
2019-12-05Permit Sprinklers — Signed-off
2019-11-26Permit Mechanical Systems — Signed-off
2019-11-22Job filed: PLUMBING WORK AT 20TH FLOOR SPACE (EPAM) AS INDICATED ON DRAWINGS.$2,000
2019-11-22Job filed: MECHANICAL WORK AT 20TH FLOOR SPACE (EPAM) AS INDICATED ON DRAWINGS.$35,000
2019-11-22Job filed: SPRINKLER WORK AT 20TH FLOOR SPACE (EPAM) AS INDICATED ON DRAWINGS.$7,000
2019-11-22Permit Plumbing — Signed-off
2019-11-21Job filed: INTERIOR ALTERATIONS AT 20TH FLOOR (EPAM) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$166,000
2019-11-21Job filed: INTERIOR ALTERATIONS AT 20TH FLOOR (EPAM) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$166,000
2019-11-21Permit EW — ISSUED
2019-11-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-15311: Illegal Parking — Blocked Bike Lane
2019-11-15ECB CLASS - 2 violation: A.C.27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL YSTSEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPA$1,250
2019-11-12311: Homeless Person Assistance — N/A
2019-11-07Permit EW — ISSUED
2019-11-01Elevator permit: MODERNIZATION OF PE1-PE6 1P17093- 1P17098 - All work to comply with ASME A17.1-2000 and supplement A17.1a-02 and A17.10-03as modif$1,295,000
2019-10-17311: Elevator — Elevator - Single Device On Property/No Alternate Service
2019-10-16Job filed: FACADE REPAIR SITE SAFETY PLAN FILED IN CONJUNCTION WITH NEW YORK CITY DEPARTMENT OF BUILDINGS JOB NUMBER 123888980$3,000
2019-10-11Permit EQ — ISSUED
2019-10-09311: Water System — High Water Pressure (WHP)
2019-10-09Permit Supported Scaffold — Signed-off
2019-10-09Permit Sidewalk Shed — Signed-off
2019-10-08Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-10-03311: Lost Property — Bag/Wallet
2019-10-02Job filed: GENERAL CONSTRUCTION ALTERATIONS FOR FULL FACADE RENOVATION; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUP$6,790,000
2019-10-02Job filed: GENERAL CONSTRUCTION ALTERATIONS FOR FULL FACADE RENOVATION; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUP$6,790,000
2019-10-02Certificate of occupancy Temporary
2019-09-11Permit PL — ISSUED
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-09-03Permit EW — ISSUED
2019-09-03Permit EW — ISSUED
2019-08-26Permit EW — ISSUED
2019-08-26Permit EW — ISSUED
2019-08-22311: Elevator — Elevator - Multiple Devices On Property
2019-08-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-08-01311: Illegal Parking — Blocked Bike Lane
2019-07-31311: Consumer Complaint — Retail Store
2019-07-31Permit PL — ISSUED
2019-07-24Permit EW — ISSUED
2019-07-22311: Illegal Parking — Blocked Bike Lane
2019-07-22Permit EW — ISSUED
2019-07-22Permit EW — ISSUED
2019-07-22Permit EW — ISSUED
2019-07-18Permit EW — ISSUED
2019-07-18Permit EW — ISSUED
2019-07-17Permit EW — ISSUED
2019-07-16311: Homeless Encampment — N/A
2019-07-16311: Homeless Person Assistance — N/A
2019-07-14311: Illegal Parking — Blocked Bike Lane
2019-07-14311: Homeless Person Assistance — N/A
2019-07-12311: Homeless Person Assistance — N/A
2019-07-09311: Illegal Parking — Blocked Bike Lane
2019-07-09311: Illegal Parking — Blocked Bike Lane
2019-07-03Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2019-06-28Job filed: NON-STRUCTURAL DEMO & INTERIOR RENOVATION AS SHOWN ON PLANS.$143,040
2019-06-28Job filed: SPRINKLER WORK AS SHOWN ON PLANS.$22,752
2019-06-28Job filed: STRUCTURAL WORK AS SHOWN ON PLANS.$7,260
2019-06-28Job filed: MECHANICAL & PLUMBING AS SHOWN ON PLANS.$130,885
2019-06-24Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE ON THE 17TH FLOOR; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS$190,000
2019-06-24Job filed: SPRINKLER ALTERATIONS TO TENANT SPACE ON THE 17TH FLOOR; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY$20,000
2019-06-24Job filed: GENERAL CONSTRUCTION ALTERATIONS TO TENANT SPACE ON THE 17TH FLOOR; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, O$140,000
2019-06-24Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE ON THE 17TH FLOOR; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS$190,000
2019-06-12311: Street Condition — Pothole
2019-06-05311: Street Condition — Pothole
2019-06-05Certificate of occupancy Temporary
2019-05-11311: Graffiti — Graffiti
2019-04-23Cooling tower inspection
2019-04-23Cooling tower inspection
2019-04-23Cooling tower inspection
2019-03-28Rodent inspection: Passed
2019-03-19Boiler inspection
2019-03-19Boiler inspection
2019-03-19Elevator permit: MODERNIZATION OF PE7-PE9- SE10-SE11 1P17099- 1P17103 - All work to comply with ASME A17.1-2000 and supplement A17.1a-02 and A17.10$1,070,000
2019-03-19Elevator permit: MODERNIZATION OF PE1-PE6 1P17093- 1P17098 - All work to comply with ASME A17.1-2000 and supplement A17.1a-02 and A17.10-03as modif$1,295,000
2019-03-06311: For Hire Vehicle Complaint — Driver Complaint
2019-02-20Permit EW — ISSUED
2019-02-09311: Street Condition — Pothole
2019-02-06311: Illegal Parking — Blocked Bike Lane
2019-02-06311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-02-01Permit EQ — ISSUED
2019-01-30Permit Supported Scaffold — Signed-off
2019-01-29Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$225,890
2019-01-29Job filed: INSTALLATION OF TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJACENT PROPERTY DURING BUILDING ALTERATION, FILED SEPARATELY. TEMPORARY ROOF / OVERHEAD PROT
2019-01-24311: Illegal Parking — Blocked Bike Lane
2018
2018-12-31311: Homeless Person Assistance
2018-12-27311: Homeless Person Assistance
2018-12-24DOB complaint, category ?
2018-12-15311: Blocked Driveway — No Access
2018-11-29311: Sidewalk Condition — Dumpster - Construction Waste
2018-11-02311: Illegal Parking — Blocked Bike Lane
2018-11-01311: Taxi Complaint — Driver Complaint
2018-11-01Permit EW — ISSUED
2018-10-19311: Taxi Complaint — Vehicle Complaint
2018-10-19Certificate of occupancy Temporary
2018-10-12311: For Hire Vehicle Complaint — Driver Complaint
2018-08-23311: Illegal Parking — Blocked Bike Lane
2018-08-20Permit PL — ISSUED
2018-08-17311: Illegal Parking — Blocked Bike Lane
2018-08-17311: For Hire Vehicle Complaint — Driver Complaint
2018-08-16Facade (LL11) filing, cycle 8: SAFE
2018-08-16311: Illegal Parking — Blocked Bike Lane
2018-08-16311: For Hire Vehicle Complaint — Driver Complaint
2018-08-16DOB violation FISP:
2018-08-13Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 25TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$33,500
2018-08-13Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 25TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$33,500
2018-07-26311: Homeless Person Assistance
2018-07-19Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 25TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$15,000
2018-07-19Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 25TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$15,000
2018-07-18ECB CLASS - 3 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS FOR JOB #12049327. NOTED: 12TH FL LAYOUT (ROOM$500
2018-07-17311: Street Condition — Blocked - Construction
2018-07-17DOB complaint, category ?
2018-07-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-07-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-07-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-07-05Cooling tower inspection
2018-06-29Rodent inspection: Passed
2018-06-26Certificate of occupancy Temporary
2018-06-25Asbestos abatement: Removal — Pal Environmental Safety Corp.
2018-06-20311: Illegal Parking — Blocked Sidewalk
2018-06-13Permit EW — ISSUED
2018-06-13Permit EW — ISSUED
2018-05-24311: Water System — Leak (Use Comments) (WA2)
2018-05-10Job filed: REPLACEMENT OF COOLING TOWER ON THE ROOF AND INSTALLATION OF BACK FLOW PREVENTER DEVICE. NO CHANGE IN USE EGRESS OR OCCUPANCY.$291,000
2018-05-10Job filed: REPLACEMENT OF COOLING TOWER ON THE ROOF AND INSTALLATION OF BACK FLOW PREVENTER DEVICE. NO CHANGE IN USE EGRESS OR OCCUPANCY.$291,000
2018-04-20Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE ON THE 25TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EG$126,925
2018-04-20Job filed: GENERAL CONSTRUCTION ALTERATIONS TO TENANT SPACE ON ON THE 25TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EG$247,800
2018-04-20Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE ON THE 25TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EG$126,925
2018-04-18311: Construction Safety Enforcement — SST Tracking Complaint
2018-04-18311: For Hire Vehicle Complaint — Driver Complaint
2018-04-18311: Construction Safety Enforcement — SST Tracking Complaint
2018-04-18ECB CLASS - 1 violation: FAILURE TO DESIGNATE &/OR HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED.NOTE: THROUGH INVESTIGATION OF DEPT RECORDS,THE DEPT DETERM
2018-04-18ECB CLASS - 1 violation: SEC. 3310.1 FAILURE TO OBTAIN AN APPROVED SITE SAFETY PLANS. NOTE: THROUGH INVESTIGATION OF THE DEPT ELECTRONIC FILING SYSTEM THE
2018-04-18ECB CLASS - 1 violation: SEC. 28-207.2.8 TAMPERED W/REMOVED OR DEFACED A WRITTEN STOP WORK ORDER. NOTE: AT TIME OF INSPECTION STOP WORK ORDER STICKER WAS R$2,500
2018-04-18DOB complaint, category ?
2018-04-18DOB complaint, category ?
2018-04-09Permit PL — ISSUED
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-06DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2018-04-03Boiler inspection
2018-04-03Boiler inspection
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-22Permit Supported Scaffold — Signed-off
2018-03-05Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE ON PART OF THE 2ND FLOOR WITH RELATED PIPING ON THE 1ST FLOOR AND CELLAR LEVELS AS PER PLANS SUBMI$86,000
2018-03-05Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON PART OF THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH.$29,000
2018-03-05Job filed: INTERIOR ALTERATIONS TO TENANT SPACE ON PART OF THE 2ND FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR$175,000
2018-03-05Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON PART OF THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH.$29,000
2018-03-05Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE ON PART OF THE 2ND FLOOR WITH RELATED PIPING ON THE 1ST FLOOR AND CELLAR LEVELS AS PER PLANS SUBMI$86,000
2018-03-05Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 2ND FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUP$17,000
2018-03-03311: Street Condition — Pothole
2018-02-13Eviction executed (*)
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-02-07DOB violation E:
2018-01-31Certificate of occupancy Temporary
2018-01-29Permit EW — ISSUED
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-22FDNY inspection (RISK)
2018-01-11Permit PL — ISSUED
2018-01-09Permit EW — ISSUED
2018-01-09Permit EW — ISSUED
2018-01-09Permit EW — ISSUED
2018-01-09Permit EW — ISSUED
2018-01-09Permit EW — ISSUED
2018-01-03Permit EW — ISSUED
2018-01-03Permit EW — ISSUED
2018-01-03Permit EW — ISSUED
2018-01-03Permit EW — RE-ISSUED
2018-01-02RPTT $28,050,000 — from LEVEL 3 COMMUNICATIONS LLC to CENTURY LINK INC.$28,050,000
2017
2017-12-23311: For Hire Vehicle Complaint — Driver Complaint
2017-12-22Permit Supported Scaffold — Signed-off
2017-12-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-12-11Permit EW — ISSUED
2017-12-11Permit EW — ISSUED
2017-12-04311: Homeless Person Assistance — N/A
2017-12-04Permit EW — ISSUED
2017-12-01Permit AL — ISSUED
2017-12-01Permit AL — ISSUED
2017-12-01Permit PL — ISSUED
2017-11-29Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$40,000
2017-11-29Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCU$62,000
2017-11-29Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$40,000
2017-11-28Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 22ND AND 23RD FLOORS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$15,000
2017-11-28Job filed: INTERIOR ALTERATIONS TO TENANT SPACE (CANCER CARE) ON PART 22ND FLOOR WITH MINOR WORK AT CONVENIENCE STAIR CONNECTING THE 22ND AND 23RD FLOORS; RELATE$340,000
2017-11-28Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 22ND FLOOR AS PER PLANS SUBMITTED HEREWITH.$7,000
2017-11-28Job filed: MECHANICAL AND PLUMBING ALTERATIONS TO TENANT SPACE (CANCER CARE) ON PART OF THE 22ND FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE$53,000
2017-11-28Job filed: INTERIOR ALTERATIONS TO TENANT SPACE (CANCER CARE) ON PART 22ND FLOOR WITH MINOR WORK AT CONVENIENCE STAIR CONNECTING THE 22ND AND 23RD FLOORS; RELATE$340,000
2017-11-21311: Taxi Complaint — Driver Complaint
2017-11-17Permit EW — ISSUED
2017-11-17Permit EW — ISSUED
2017-11-14Job filed: INTERIOR ARCHITECTURAL CHANGES RELATED TO TENANT FIT-OUT ON PART OF THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUI$1,198,000
2017-11-14Job filed: MECHANICAL AND PLUMBING MODIFICATIONS RELATED TO TENANT FIT-OUT ON PART OF THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE$461,000
2017-11-14Job filed: MECHANICAL AND PLUMBING MODIFICATIONS RELATED TO TENANT FIT-OUT ON PART OF THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE$461,000
2017-11-14Job filed: INTERIOR ARCHITECTURAL CHANGES RELATED TO TENANT FIT-OUT ON PART OF THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUI$1,198,000
2017-11-06Permit EW — ISSUED
2017-11-01Permit EQ — ISSUED
2017-10-30Permit Supported Scaffold — Signed-off
2017-10-28Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$70,000
2017-10-26Job filed: INSTALLATION OF ROOF PROTECTION AT ADJACENT PROPERTY AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPARATELY. ROOF PROTECTION SHALL COMPLY WITH C
2017-10-02311: Homeless Person Assistance — N/A
2017-09-28Job filed: INSTALLATION OF HVAC UNITS IN EXISTING EQUIPMENT ROOM ON 30TH FLOOR WITH RELATED CONDENSING UNITS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$35,000
2017-09-27Permit EQ — ISSUED
2017-09-26Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDI
2017-09-26Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDI
2017-09-25Permit PL — ISSUED
2017-09-22ECB CLASS - 1 violation: FAILURE TO (TAKE) & PROVIDE SAFETY MEASURES SIDEWALK SHED NETTING ETC TO PROTECT & SECURE PUBLIC SAFETY FOR DOCUMENTED UNSAFE FACA$2,400
2017-09-15311: For Hire Vehicle Complaint — Driver Complaint
2017-09-14Rodent inspection: Passed
2017-09-11Permit EW — ISSUED
2017-09-11Permit EW — ISSUED
2017-09-07Permit EW — ISSUED
2017-08-29311: For Hire Vehicle Complaint — Driver Complaint
2017-08-29311: Taxi Complaint — Driver Complaint
2017-08-29Permit AL — ISSUED
2017-08-23Permit EW — ISSUED
2017-08-23Permit EW — ISSUED
2017-08-22311: Street Condition — Cave-in
2017-08-18Permit PL — ISSUED
2017-08-11Certificate of occupancy Temporary
2017-07-27Job filed: INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (CROSS MEDIA) ON THE 27TH AND 28TH FLOORS WITH RELATED WORK ON THE 28TH FLOOR ROOF SETBACK AS PER PLANS$2,250,000
2017-07-27Job filed: MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE (CROSS MEDIA) ON THE 27TH AND 28TH FLOOR WITH RELATED WORK ON THE 28TH FLOOR ROOF SETBACK AND PART OF $890,000
2017-07-27Job filed: STRUCTURAL MODIFICATIONS TO TENANT SPACE (CROSS MEDIA) ON THE 27TH AND 28TH FLOORS AND PART OF THE ROOF LEVEL AS PER PLANS SUBMITTED HEREWITH. NO CHAN$25,000
2017-07-12Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE CONSTRUCTION FLOORS 26 AND PENTHOUSE (MARKETING FLOORS 27 AND 28) AND PART OF THE ROO$105,000
2017-07-12Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 27TH AND 28TH FLOORS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$80,000
2017-07-12Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE CONSTRUCTION FLOORS 26 AND PENTHOUSE (MARKETING FLOORS 27 AND 28) AND PART OF THE ROO$105,000
2017-07-12Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE CONSTRUCTION FLOORS 26 AND PENTHOUSE (MARKETING FLOORS 27 AND 28) AND PART OF THE ROO$105,000
2017-07-12Job filed: STANDPIPE SYSTEM MODIFICATIONS ON THE 27TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$30,000
2017-06-22Job filed: REPLACEMENT OF EXISTING TELECOMMUNICATION ANTENNAS AND RRH UNITS, RELOCATION OF ONE ANTENNA SECTOR ON LOWER ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/9$20,000
2017-06-22Job filed: REPLACEMENT OF EXISTING TELECOMMUNICATION ANTENNAS AND RRH UNITS, RELOCATION OF ONE ANTENNA SECTOR ON LOWER ROOF. ALL WORK IN COMPLIANCE WITH TPPN 5/9$20,000
2017-06-07Job filed: STANDPIPE SYSTEM MODIFICATIONS ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$7,000
2017-06-07Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 18TH FLOOR AS PER PLANSSUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$125,000
2017-06-07Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS.$60,000
2017-06-07Job filed: STRUCTURAL MODIFICATIONS ON THE 27TH FLOOR (28TH CONSTRUCTION FLOOR) ROOF SETBACK AND FACADE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHA$24,000
2017-06-07Job filed: FACADE ALTERATIONS, REMEDIAL WORK/REPAIR TO EXPOSED STEEL, INSTALLATION OF METAL FACADE AND SUPPLEMENTAL STEEL SUPPORT ADJACENT TO AREA OF WORK, METAL$45,000
2017-06-07Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 18TH FLOOR AS PER PLANSSUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$125,000
2017-06-07Job filed: STANDPIPE SYSTEM MODIFICATIONS ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$7,000
2017-06-07Job filed: MECHANICAL AND PLUMBING CHANGES TO PRE-BUILT SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$535,000
2017-06-07Job filed: INTERIOR ARCHITECTURAL CHANGES TO PRE-BUILT SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$900,000
2017-06-07Permit EW — ISSUED
2017-06-07Permit EW — ISSUED
2017-06-01Job filed: STRUCTURAL CHANGES ASSOCIATED WITH ROOF REPLACEMENT ON THE ROOF (29TH FLOOR LEVEL) AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.$18,000
2017-06-01Job filed: STRUCTURAL CHANGES ASSOCIATED WITH ROOF REPLACEMENT ON THE ROOF (29TH FLOOR LEVEL) AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.$18,000
2017-06-01Job filed: ARCHITECTURAL CHANGES ASSOCIATED WITH ROOF REPLACEMENT ON THE ROOF (29TH FLOOR LEVEL) AS INDICATED ON PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.$69,000
2017-06-01Job filed: STRUCTURAL CHANGES ASSOCIATED WITH ROOF REPLACEMENT ON THE ROOF (29TH FLOOR LEVEL) AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.$18,000
2017-05-18Certificate of occupancy Temporary
2017-05-12311: For Hire Vehicle Complaint — Driver Complaint
2017-04-16311: For Hire Vehicle Complaint — Driver Complaint
2017-03-21Permit EW — ISSUED
2017-03-17Permit EW — ISSUED
2017-03-16Job filed: STRUCTURAL MODIFICATIONS ON THE 28TH FLOOR ROOF TERRACE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUP$120,000
2017-03-16Job filed: ARCHITECTURAL CHANGES TO THE 28TH FLOOR ROOF TERRACE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANC$1,000
2017-03-16Job filed: STRUCTURAL MODIFICATIONS ON THE 28TH FLOOR ROOF TERRACE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUP$120,000
2017-03-16Job filed: ARCHITECTURAL CHANGES TO THE 28TH FLOOR ROOF TERRACE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANC$1,000
2017-03-16Permit EW — ISSUED
2017-03-16Permit EW — ISSUED
2017-03-09Job filed: APPLICATION FILED IN ORDER TO INCREASE OCCUPANT LOAD ON THE PENTHOUSE LEVEL FR FROM 10 TO 90 AS PER PLANS SUBMITTED HEREWITH.$10,000
2017-01-11311: Broken Parking Meter — Coin or Card Did Not Register
2017-01-10Rodent inspection: Passed
2016
2016-12-23Job filed: REMOVAL OF SPRINKLER HEADS ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$11,800
2016-12-23Job filed: REMOVAL OF SPRINKLER HEADS ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$11,800
2016-12-20Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE CONSTRUCTION: PENTHOUSE/MARKETING:28TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$2,000
2016-12-20Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE CONSTRUCTION: PENTHOUSE/MARKETING:28TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$2,000
2016-12-20Job filed: ENERGY ANALYSIS AS PER PLANS. WITHDRAWN BY APPLICANT'S REQUEST
2016-12-20Job filed: ARCHITECTURAL CHANGES TO THE 28TH FLOOR ROOF TERRACE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANC$248,540
2016-12-20Job filed: ARCHITECTURAL CHANGES TO THE 28TH FLOOR ROOF TERRACE WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANC$248,540
2016-12-20Job filed: ENERGY ANALYSIS AS PER PLANS. WITHDRAWN BY APPLICANT'S REQUEST
2016-12-20Permit EW — ISSUED
2016-11-29311: Noise — Noise: Construction Before/After Hours (NM1)
2016-11-29311: Noise — Noise: Construction Before/After Hours (NM1)
2016-11-10Job filed: DEMOLITION OF MECHANICAL COMPONENTS, REMOVAL OF PLUMBING FIXTURES AND CAP PIPING, RELATED WORK ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO C$14,900
2016-11-10Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRES$62,000
2016-11-10Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 17TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRES$62,000
2016-11-10Job filed: DEMOLITION OF MECHANICAL COMPONENTS, REMOVAL OF PLUMBING FIXTURES AND CAP PIPING, RELATED WORK ON THE 17TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO C$14,900
2016-09-28311: Noise — Noise: Construction Before/After Hours (NM1)
2016-09-21311: Homeless Person Assistance — N/A
2016-09-12Permit EW — ISSUED
2016-09-12Permit EW — ISSUED
2016-09-07Permit PL — ISSUED
2016-09-02311: Noise — Noise: Construction Before/After Hours (NM1)
2016-09-02Job filed: REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION ON THE 28TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUI$10,000
2016-09-02Job filed: REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION ON THE 28TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUI$10,000
2016-08-31311: Noise — Noise: Construction Before/After Hours (NM1)
2016-08-26311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2016-08-26DOB violation C: DUE TO VEHICLE STRIKING THE FRONT OF THE STOREFORNT
2016-08-26DOB complaint, category ?
2016-08-24311: Vending — In Prohibited Area
2016-08-19Job filed: DEMOLITION OF MECHANICAL COMPONENTS AND REMOVAL OF PLUMBING FIXTURES ON THE 28TH FLOOR; RELATED WORK AS PER PLANS. NO CHANGE IN BUILDING USE, EGRESS, $8,900
2016-08-19Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 28TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRES$61,500
2016-08-19Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 28TH FLOOR WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRES$61,500
2016-08-19Job filed: FACADE SSP A3 FILED IN CONJUNCTION WITH APPLICATION # 122844814$5,000
2016-08-19Permit EW — ISSUED
2016-08-17Job filed: INSTALLATION OF RRH UNITS ON ROOF. INSTALLATION OF RRH UNITS ON FACADE. INSTALLATION OF RELATED CABLING FROM EXISTING ROOM ON 27TH FLOOR TO EQUIPMENT $5,000
2016-08-16Job filed: MODIFICATION OF EXISTING FA SYSTEM$5,000
2016-08-16Job filed: MODIFICATION OF EXISTING FA SYSTEM$5,000
2016-08-16Job filed: MODIFICATION OF EXISTING FA SYSTEM$5,000
2016-08-12Permit EW — ISSUED
2016-08-09Job filed: MASONRY REPAIRS AT THE 28TH FLOOR ROOF SETBACK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$715,000
2016-08-09Job filed: MASONRY REPAIRS AT THE 28TH FLOOR ROOF SETBACK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$715,000
2016-08-05Permit PL — ISSUED
2016-08-04Permit EW — ISSUED
2016-08-03Certificate of occupancy Temporary
2016-08-02311: Noise — Noise: Construction Before/After Hours (NM1)
2016-08-01311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-20Job filed: SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (REGUS MANAGEMENT GROUP) ON THE 7TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, E$15,000
2016-07-20Job filed: MECHANICAL CHANGES WITH RELATED DUCTWORK TO TENANT SPACE (REGUS MANAGEMENT GROUP) ON THE 7TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILD$8,500
2016-07-20Job filed: INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (REGUS MANAGEMENT GROUP) ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRES$120,000
2016-07-20Job filed: REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION ON THE 18TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE $37,500
2016-07-20Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 7TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCU$4,000
2016-07-20Job filed: MECHANICAL CHANGES WITH RELATED DUCTWORK TO TENANT SPACE (REGUS MANAGEMENT GROUP) ON THE 7TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILD$8,500
2016-07-20Permit EW — ISSUED
2016-07-20Permit EW — ISSUED
2016-07-19Permit EQ — ISSUED
2016-07-15Job filed: INSTALLATION OF SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUP
2016-07-11Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 18TH AND 27TH FLOORS WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING$133,965
2016-07-11Job filed: DEMOLITION OF MECHANICAL COMPONENTS, REMOVAL OF PLUMBING FIXTURES AND CAP PIPING, RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING $26,400
2016-07-11Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 18TH AND 27TH FLOORS WITH RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING$133,965
2016-07-11Permit EW — ISSUED
2016-07-11Permit EW — ISSUED
2016-07-07311: Sustainability Enforcement — Sustainability Enforcement Work Order
2016-07-07DOB complaint, category ?
2016-07-01Permit SG — ISSUED
2016-06-29Job filed: INTERIOR RENOVATION OF MEDICAL OFFICE, REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, FLOORS AND FINISHES.$80,000
2016-06-29Job filed: INTERIOR RENOVATION OF MEDICAL OFFICE, REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, FLOORS AND FINISHES.$80,000
2016-06-29Job filed: MODIFICATION OF MECHANICAL SYSTEM, PLUMBING AND SPRINKLER WORK AS PER PLANS$53,000
2016-06-29Job filed: INTERIOR RENOVATION OF MEDICAL OFFICE, REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, FLOORS AND FINISHES.$80,000
2016-06-21Permit EW — ISSUED
2016-05-11311: Homeless Person Assistance — N/A
2016-05-06Certificate of occupancy Temporary
2016-05-05311: Broken Muni Meter — Coin or Card Did Not Register
2016-02-24Job filed: SPRINKLER SYSTEM MODIFICATIONS TO PRE-BUILT SPACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$28,000
2016-02-24Job filed: SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (HAYMARKET MEDIA) ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR $153,000
2016-02-24Job filed: SPRINKLER SYSTEM MODIFICATIONS TO PRE-BUILT SPACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$28,000
2016-02-24Job filed: SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (HAYMARKET MEDIA) ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR $153,000
2016-02-24Permit EW — ISSUED
2016-02-24Permit EW — ISSUED
2016-02-24Permit EW — ISSUED
2016-02-18311: Broken Muni Meter — Out of Order
2016-02-18311: Broken Muni Meter — Out of Order
2016-02-17Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$16,000
2016-02-17Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$16,000
2016-02-17Job filed: MECHANICAL AND PLUMBING CHANGES TO PRE-BUILT SPACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$362,700
2016-02-17Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$55,000
2016-02-17Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$55,000
2016-02-17Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH.$16,000
2016-02-17Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH.$16,000
2016-02-17Job filed: INTERIOR ARCHITECTURAL CHANGES TO PRE-BUILT SPACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$284,000
2016-02-17Job filed: MECHANICAL AND PLUMBING CHANGES TO PRE-BUILT SPACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$362,700
2016-02-17Permit PL — ISSUED
2016-02-12311: Broken Muni Meter — Out of Order
2016-02-12311: Broken Muni Meter — Out of Order
2016-02-12Job filed: MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE (HAYMARKET MEDIA) ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR$1,164,970
2016-02-12Job filed: INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (HAYMARKET MEDIA) ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR $1,404,830
2016-02-12Permit EW — ISSUED
2016-02-12Permit EW — ISSUED
2016-02-05311: Broken Parking Meter — Out of Order
2016-02-05Permit SG — ISSUED
2016-02-04Permit SG — ISSUED
2016-02-04Permit SG — ISSUED
2016-02-04Permit SG — ISSUED
2016-02-04Permit SG — ISSUED
2016-02-03311: Broken Muni Meter — Out of Order
2016-02-01311: Street Sign - Missing — Other/Unknown
2016-01-28311: Broken Muni Meter — Out of Order
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-26DOB violation E:
2016-01-25DOB violation E:
2016-01-25DOB violation E:
2016-01-22Certificate of occupancy Temporary
2015
2015-12-16311: Noise — Noise: Construction Before/After Hours (NM1)
2015-12-08FDNY inspection (SPECIAL-OTH)
2015-11-13Permit EW — RE-ISSUED
2015-11-13Permit EW — ISSUED
2015-11-11311: Taxi Complaint — Driver Complaint
2015-11-10Job filed: INTERIOR ARCHITECTURAL CHANGES ON PART OF THE CELLAR AND 1ST FLOOR FOR ADDITIONAL RENOVATIONS TO BUILDING LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE$98,750
2015-11-10Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON PART OF THE CELLAR LEVEL AS PER PLANS FILED HEREWITH.$4,000
2015-11-10Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM ON PART OF THE 1ST FLOOR AND CELLAR LEVEL AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR$95,000
2015-11-09Permit AL — ISSUED
2015-11-03311: Noise — Noise: Construction Before/After Hours (NM1)
2015-10-28Permit EW — ISSUED
2015-10-27311: Noise — Noise: Construction Before/After Hours (NM1)
2015-10-08311: Homeless Person Assistance — No Status Call
2015-10-07311: Broken Muni Meter — Out of Order
2015-10-07Permit EW — ISSUED
2015-10-07Permit EW — ISSUED
2015-10-06Permit EW — ISSUED
2015-10-06Permit EW — ISSUED
2015-10-06Permit EW — RE-ISSUED
2015-10-06Permit EW — ISSUED
2015-09-29Permit EW — ISSUED
2015-09-28Permit PL — ISSUED
2015-09-25Permit EW — ISSUED
2015-09-25Permit EW — ISSUED
2015-09-25Permit EW — RE-ISSUED
2015-09-25Permit EW — ISSUED
2015-09-16Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$2,500
2015-09-16Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$2,500
2015-09-16Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$30,000
2015-09-15311: Broken Muni Meter — Coin or Card Did Not Register
2015-09-11311: Broken Muni Meter — Out of Order
2015-09-11Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH.$35,000
2015-09-11Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH.$7,000
2015-09-10Job filed: INTERIOR ARCHITECTURAL CHANGES TO MAIL ROOM AND PANTRY AREAS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS$103,500
2015-09-10Job filed: MECHANICAL AND PLUMBING CHANGES TO MAIL ROOM AND PANTRY AREAS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRES$34,000
2015-09-09Job filed: INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (MAXPOINT) ON PART OF THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, O$450,000
2015-09-09Job filed: MECHANICAL CHANGES TO TENANT SPACE (MAXPOINT) ON PART OF THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY$124,000
2015-08-28311: Broken Muni Meter — No Receipt
2015-08-25311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2015-08-24311: Unsanitary Animal Pvt Property — Other Animal
2015-08-19Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$20,000
2015-08-19Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$20,000
2015-08-19Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$20,000
2015-08-18311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-18Job filed: INTERIOR ARCHITECTURAL CHANGES ON PART OF THE 2ND FLOOR FOR CONSTRUCTION OF NEW BUILDING MANAGEMENT OFFICE AS PER PLANS FILED HEREWITH. NO CHANGE IN $150,000
2015-08-18Job filed: MECHANICAL CHANGES WITH RELATED DUCTWORK ON PART OF THE 2ND FLOOR FOR CONSTRUCTION OF NEW BUILDING MANAGEMENT OFFICE AS PER PLANS FILED HEREWITH. NO $75,000
2015-08-18Job filed: INTERIOR ARCHITECTURAL CHANGES ON PART OF THE 2ND FLOOR FOR CONSTRUCTION OF NEW BUILDING MANAGEMENT OFFICE AS PER PLANS FILED HEREWITH. NO CHANGE IN $150,000
2015-08-18Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH.$12,000
2015-08-18Permit EW — ISSUED
2015-08-18Permit EW — ISSUED
2015-08-10Permit PL — ISSUED
2015-08-04Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$144,500
2015-08-04Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$144,500
2015-08-04Job filed: MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE (CLASSPASS) ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCU$1,051,500
2015-08-04Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH.$45,000
2015-08-04Job filed: INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (CLASSPASS) ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUP$1,291,700
2015-08-04Permit EW — ISSUED
2015-08-04Permit EW — RE-ISSUED
2015-07-27Permit AL — ISSUED
2015-07-18311: Homeless Person Assistance — No Status Call
2015-07-14311: Broken Muni Meter — Coin or Card Did Not Register
2015-07-14Permit EQ — ISSUED
2015-07-10311: Broken Muni Meter — Out of Order
2015-07-10311: Broken Muni Meter — Coin or Card Did Not Register
2015-07-07311: Broken Muni Meter — Coin or Card Did Not Register
2015-07-07311: Broken Muni Meter — Out of Order
2015-07-04311: Broken Muni Meter — Coin or Card Did Not Register
2015-07-02Job filed: STRUCTURAL CHANGES RELATED TO SLAB INFILL BETWEEN THE 10TH AND 11TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPAN$41,800
2015-07-02Job filed: MINOR ARCHITECTURAL CHANGES RELATED TO SLAB INFILL BETWEEN THE 10TH AND 11TH FLOORS AS PER PLANS FILED HEREWITH. RELATED INTERIOR DEMOLITION WORK PRE$17,200
2015-07-02Permit EW — ISSUED
2015-07-02Permit EW — ISSUED
2015-06-30311: Broken Muni Meter — Coin or Card Did Not Register
2015-06-30311: Broken Muni Meter — Coin or Card Did Not Register
2015-06-30Job filed: PIPE SCAFFOLDING 559 LIN. FEET AS PER PLANS, AT THE 26TH,28TH FLOORS AND ROOF. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
2015-06-28311: Illegal Parking — Blocked Hydrant
2015-06-15311: Noise — Noise: Construction Before/After Hours (NM1)
2015-06-15Job filed: REPLACEMENT OF EXISTING TELECOMMUNICATIONS ANTENNAS WITH INSTALLATION OF RELATED RRH UNITS ON ROOF. INSTALLATION OF ADDITIONAL CABINET WITH INSTALLAT$20,000
2015-06-15Job filed: REPLACEMENT OF EXISTING TELECOMMUNICATIONS ANTENNAS WITH INSTALLATION OF RELATED RRH UNITS ON ROOF. INSTALLATION OF ADDITIONAL CABINET WITH INSTALLAT$20,000
2015-06-11311: Noise — Noise: Construction Before/After Hours (NM1)
2015-06-10311: Noise — Noise: Construction Before/After Hours (NM1)
2015-06-10311: Broken Muni Meter — Coin or Card Did Not Register
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-04311: Broken Parking Meter — Coin or Card Did Not Register
2015-06-01Job filed: INSTALLATION OF A TEMPORARY SPRINKLER LOOP SYSTEM ON THE 10TH AND 11TH FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GR$45,000
2015-06-01Job filed: INSTALLATION OF A TEMPORARY SPRINKLER LOOP SYSTEM ON THE 10TH AND 11TH FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GR$45,000
2015-06-01Permit EW — ISSUED
2015-05-29311: Noise — Noise: Construction Before/After Hours (NM1)
2015-05-28311: Noise — Noise: Construction Before/After Hours (NM1)
2015-05-28311: Broken Muni Meter — Coin or Card Did Not Register
2015-05-26311: Broken Muni Meter — Coin or Card Did Not Register
2015-05-20Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$65,000
2015-05-20Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$65,000
2015-05-20Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 20TH FLOOR AS PER PLANS FILED HEREWITH.$35,000
2015-05-20Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$65,000
2015-05-19311: Noise — Noise: Construction Before/After Hours (NM1)
2015-05-19Job filed: INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE ON THE 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$450,000
2015-05-19Job filed: MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE ON THE 20TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$405,000
2015-05-19Permit EW — ISSUED
2015-05-19Permit EW — ISSUED
2015-05-18311: Noise — Noise: Construction Before/After Hours (NM1)
2015-05-14311: Graffiti — Graffiti
2015-05-14Permit PL — ISSUED
2015-05-12311: Noise — Noise: Construction Before/After Hours (NM1)
2015-05-12311: Taxi Complaint — Driver Complaint
2015-05-08Permit EW — ISSUED
2015-05-07Job filed: SPRINKLER SYSTEM MODIFICATIONS ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$55,500
2015-05-07Job filed: INTERIOR DEMOLITION OF MECHANICAL COMPONENTS, REMOVAL OF PLUMBING FIXTURES AND CAP PIPING, RELATED WORK ON THE 2ND, 10TH, AND 11TH FLOORS AS PER PLANS$22,000
2015-05-07Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS AND RELATED WORK ON THE 2ND, 10TH, AND 11TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDIN$287,500
2015-05-07Permit EW — ISSUED
2015-05-06311: Broken Muni Meter — Out of Order
2015-05-01311: Broken Muni Meter — Out of Order
2015-04-15311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2015-04-15ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPERATIONS.NOTED:A SMALL ROCK FELL FROM SITE CRACKING A PARKED CAR W$1,200
2015-04-15DOB complaint, category ?
2015-03-30Permit EQ — ISSUED
2015-03-25Permit EQ — ISSUED
2015-03-25Permit EQ — ISSUED
2015-02-24Permit EW — ISSUED
2015-02-19Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$145,000
2015-02-19Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$145,000
2015-02-18Permit PL — ISSUED
2015-02-18Permit PL — ISSUED
2015-02-17Permit EW — ISSUED
2015-02-12Permit EW — ISSUED
2015-02-03311: Construction Safety Enforcement — SST Tracking Complaint
2015-02-03ECB CLASS - 2 violation: SIDEWALK SHED SIGN SHALL BE POSTED @LEAST 3' & NO MORE THAN 6'LEFT EDGE OF THE SIDEWALK SHED NOTED:@TIME OF INSP SIDEWALK SHED SIG$4,000
2015-02-03ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET COLOR SPECIFICATION.NOTED:@TIME OF INSP SIDEWALK SHED ON EXP#1 & EXP#2 & EXP#4 IS RED IN COLOR.REM:COM
2015-02-03DOB complaint, category ?
2015-01-30Permit EW — ISSUED
2015-01-20311: Noise — Noise: Construction Before/After Hours (NM1)
2015-01-20Permit EW — ISSUED
2015-01-20Permit EQ — ISSUED
2015-01-16Job filed: INSTALL NEW MECHANICAL DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,000
2015-01-16Job filed: RELOCATE AND INSTALL NEW SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,000
2015-01-16Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$192,000
2015-01-16Job filed: INSTALL NEW MECHANICAL DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,000
2015-01-16Job filed: DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS & DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$192,000
2015-01-16Permit EW — ISSUED
2015-01-16Permit EW — ISSUED
2015-01-15311: Broken Muni Meter — Out of Order
2015-01-08311: Noise — Noise: Construction Before/After Hours (NM1)
2015-01-07Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$145,000
2015-01-07Job filed: MECHANICAL AND PLUMBING CHANGES ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$905,000
2015-01-07Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPA$70,000
2015-01-07Job filed: INTERIOR ARCHITECTURAL CHANGES ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$1,278,000
2015-01-07Job filed: SPRINKLER SYSTEM MODIFICATIONS ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$145,000
2015-01-07Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPA$70,000
2015-01-07Job filed: INTERIOR ARCHITECTURAL CHANGES ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, OR OCCUPANCY.$1,278,000
2015-01-07Permit EW — ISSUED
2015-01-06311: Noise — Noise: Construction Before/After Hours (NM1)
2015-01-06311: Noise — Noise: Construction Before/After Hours (NM1)
2015-01-05311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2015-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2014
2014-12-30311: Noise — Noise: Construction Equipment (NC1)
2014-12-18Job filed: MODIFY EXISTING SPRINKLER SYSTEM FOR TEMPORARY PROTECTION$20,000
2014-12-18Job filed: MODIFY EXISTING SPRINKLER SYSTEM FOR TEMPORARY PROTECTION$20,000
2014-12-18Job filed: MODIFY EXISTING SPRINKLER SYSTEM FOR TEMPORARY PROTECTION$20,000
2014-12-18Permit EW — ISSUED
2014-12-16Permit PL — ISSUED
2014-12-10ECB CLASS - 2 violation: WORK DOESNOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS: NOTE:SIDEWALK SHED HAS BEEN ERECTED AT EXP#1 (
2014-12-08311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2014-12-08DOB complaint, category ?
2014-11-20Permit EW — ISSUED
2014-11-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-28311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2014-10-28Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS, REMOVAL OF PLUMBING FIXTURES, AND RELATED WORK ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CH$120,000
2014-10-28Permit EW — ISSUED
2014-10-28DOB complaint, category ?
2014-10-24Permit EW — ISSUED
2014-10-24Permit EW — ISSUED
2014-10-14311: Food Establishment — Facility Construction
2014-09-23Job filed: INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2014-09-16Permit EW — ISSUED
2014-09-08Job filed: SPRINKLER SYSTEM MODIFICATIONS TO PUBLIC CORRIDORS ON THE 15TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$26,350
2014-09-08Job filed: SPRINKLER SYSTEM MODIFICATIONS TO PUBLIC CORRIDORS ON THE 15TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$26,350
2014-09-08Job filed: MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM ON THE 15TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH.$9,900
2014-09-08Permit PL — ISSUED
2014-09-08Permit PL — ISSUED
2014-09-05Permit EW — ISSUED
2014-09-04Permit PL — ISSUED
2014-09-03Job filed: INTERIOR ARCHITECTURAL CHANGES TO PUBLIC CORRIDORS ON THE 15TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$180,000
2014-09-03Permit EW — ISSUED
2014-09-02Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-09-02Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-08-13311: Construction Safety Enforcement — SST Tracking Complaint
2014-08-13DOB complaint, category ?
2014-08-12ECB CLASS - 2 violation: PARTIAL SWO ISSUED FOR SUSPENDED SCAFFOLD PURSUANT 28-207.2 & POSTED ON PREM.WORK DOES NOT CONFORM TO APPROVED PLANS.NOTED:@ TIME
2014-08-05Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY $935,000
2014-08-05Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$65,000
2014-08-05Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION$452,000
2014-08-05Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$36,000
2014-08-05Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$31,000
2014-08-05Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$36,000
2014-08-04Permit EW — ISSUED
2014-08-01Certificate of occupancy Temporary
2014-07-29Job filed: SPRINKLER SYSTEM MODIFICATIONS TO CORE RESTROOMS AND MECHANICAL EQUIPMENT ROOM ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES$10,000
2014-07-29Job filed: INTERIOR ARCHITECTURAL CHANGES TO CORE RESTROOMS AND MECHANICAL EQUIPMENT ROOM ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES$650,000
2014-07-29Job filed: INTERIOR ARCHITECTURAL CHANGES TO CORE RESTROOMS AND MECHANICAL EQUIPMENT ROOM ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES$650,000
2014-07-29Job filed: SPRINKLER SYSTEM MODIFICATIONS TO CORE RESTROOMS AND MECHANICAL EQUIPMENT ROOM ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES$10,000
2014-07-29Job filed: MECHANICAL AND PLUMBING CHANGES TO CORE RESTROOMS AND MECHANICAL EQUIPMENT ROOM ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRE$340,000
2014-07-29Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH.$25,000
2014-07-29Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEMS,ON 21ST FL TO CUT, CAP AND INSTALL TEMPORARY SPRINKLER LOOP ON 15TH AND 20TH FL EXISTING CONCEALED SPRINKLE$93,500
2014-07-29Permit EW — RE-ISSUED
2014-07-26311: Hazardous Materials — Chemical Spill/Release (HA1)
2014-07-24Permit EW — ISSUED
2014-07-17311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2014-07-17Job filed: RESPECTFULLY SUBMITTING APPLICATION TO RENOVATE GROUND FLOOR CAFE. NO CHANGE TO USE, EGRESS AND BULK.$71,250
2014-06-23Job filed: INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS WITH RELATED WORK ON THE 15TH, 20TH, AND 21ST FLOORS, AND REMOVAL OF PLUMBING FIXTURES ON THE 20TH AN$441,155
2014-06-23Permit EW — ISSUED
2014-06-09Permit EW — ISSUED
2014-06-09Permit EW — ISSUED
2014-05-30DOB violation E:
2014-05-30DOB violation E:
2014-05-30DOB violation E:
2014-05-30DOB violation E:
2014-05-30DOB violation E:
2014-05-21Job filed: RENOVATIONS TO FACADE AS INDICATED ON DRAWINGS. SIDEWALK SHED TO BE FILED UNDER SEPARATE APPLICATION.$2,650,000
2014-05-19311: Taxi Complaint — Driver Complaint
2014-05-08Certificate of occupancy Temporary
2014-04-24Job filed: INSTALLATION OF 500 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPL
2014-04-24Job filed: INSTALLATION OF PLYWOOD FENCE ENCLOUSRE AS PER DRAWINGS. PLYWOOD FENCE ENCLOUSRE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCC
2014-04-24Job filed: STORAGE OF MATERIALS ON SIDEWALK SHED NOT TO EXCEED 25 PSF, AS PER DRAWINGS. SIDEWALK SHED FILED UNDER SEPERATE APPLICATION, DESIGNED FOR 300 PSF. STO
2014-04-24Permit EQ — ISSUED
2014-04-24Permit EQ — ISSUED
2014-04-24Permit EQ — ISSUED
2014-04-10311: Broken Muni Meter — No Receipt
2014-03-21Permit EW — ISSUED
2014-03-19Permit EW — ISSUED
2014-02-21Permit EW — ISSUED
2014-02-21Permit EW — ISSUED
2014-02-16311: Consumer Complaint — Paid in Advance
2014-02-14311: Broken Muni Meter — No Receipt
2014-02-11Certificate of occupancy Temporary
2014-02-11Permit EW — ISSUED
2014-02-10Job filed: INSTALLATION OF TEMPORARY SPRINKLER LOOP AT 1ST FLOOR LOBBY AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$33,600
2013-12-02Job filed: ARCHITECTURAL CHANGES ON THE 17TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$325,330
2013-12-02Permit EW — ISSUED
2013-11-22311: Broken Muni Meter — Coin or Card Did Not Register
2013-11-22Permit EW — ISSUED
2013-11-19311: Broken Muni Meter — Timer Defect - Fast/Fail
2013-11-15Job filed: ON 24TH FL TO CUT, CAP, REMOVE EXISTING SPKR SYSTEM AND INSTALL TEMPORARY SPKR LOOP. ON 17TH FL EXIST. CONCEALED SPKR HEADS TO BE REPLACED W/ PENDENT $30,000
2013-11-13Certificate of occupancy Temporary
2013-11-01Permit EW — ISSUED
2013-11-01Permit EW — ISSUED
2013-10-29Job filed: INSTALLATION OF OVERHEAD RPOTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY O
2013-10-29Permit EQ — ISSUED
2013-10-18Permit EW — ISSUED
2013-10-11Job filed: REMOVAL AND REPLACEMENT OF SKYLIGHT ON THE 29TH FLOOR AND ROOF AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2013-09-18Job filed: SPRINKLER WORK TO MODIFY EXISTING BUILDING LOBBY AND ENTRY ON 1ST FLOOR AND 2ND FLOOR AS INDICATED ON DRAWINGS.$50,000
2013-09-18Job filed: RELOCATION OF FIRE COMMAND STATION AND ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM.$80,000
2013-09-17Job filed: STRUCTURAL WORK TO MODIFY EXISTING BUILDING LOBBY AND ENTRY ON 1ST FLOOR AND MINOR RELATED WORK ON THE 2ND FLOOR AS INDICATED ON DRAWINGS.$100,000
2013-09-17Job filed: STRUCTURAL WORK TO MODIFY EXISTING BUILDING LOBBY AND ENTRY ON 1ST FLOOR AND MINOR RELATED WORK ON THE 2ND FLOOR AS INDICATED ON DRAWINGS.$100,000
2013-09-17Job filed: MECHANICAL AND PLUMBING WORK TO MODIFY EXISTING LOBBY AND ENTRY ON THE 1ST FLOOR AND MINOR RELATED WORK ON THE 2ND FLOOR AS INDICATED ON DRAWINGS.$380,000
2013-09-17Job filed: ARCHITECTURAL WORK TO MODIFY EXISTING BUILDING LOBBY AND ENTRY ON 1ST FLOOR; ERECTION OF CONSTRUCTION FENCE AS INDICATED ON DRAWINGS. MECHANICAL AND P$1,500,000
2013-09-17Permit EW — ISSUED
2013-09-17Permit EQ — ISSUED
2013-09-16Job filed: PARTITIONS TO BE DEMOLISHED TO WITHIN 3 INCHES ABOVE THE FLOOR ; REMOVE PLUMBING FIXTURES AND CAP RELATED PIPING AS INDICATED ON DRAWINGS.$70,000
2013-09-16Permit EW — ISSUED
2013-08-21Permit EW — ISSUED
2013-08-20Certificate of occupancy Temporary
2013-08-13DOB violation E:
2013-08-13DOB violation E:
2013-08-05Job filed: SPRINKLER WORK ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,200
2013-08-05Job filed: SPRINKLER WORK ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,200
2013-08-01311: Broken Muni Meter — Out of Order
2013-07-25Job filed: MECHANICAL CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$6,000
2013-07-25Job filed: ARCHITECTURAL WORK ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$16,000
2013-07-25Job filed: MECHANICAL CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$6,000
2013-07-25Permit EW — ISSUED
2013-07-25Permit EW — ISSUED
2013-07-01311: Street Condition — Cave-in
2013-06-26311: Street Condition — Cave-in
2013-06-26311: Water System — Defective Street Cut (WZZ1)
2013-05-17311: Non-Emergency Police Matter — Other (complaint details)
2013-05-09Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS; REMOVE PLUMBING FIXTURES AND CAP PIPING ON THE 24TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN U$100,000
2013-02-01Job filed: REPLACE FUEL OIL TANK. TEMPORARY FUEL OIL TANK FILED UNDER APPLICATION NO. 140032186.$80,000
2013-02-01Job filed: REPLACE FUEL OIL TANK. TEMPORARY FUEL OIL TANK FILED UNDER APPLICATION NO. 140032186.$80,000
2013-02-01Job filed: REPLACE FUEL OIL TANK. TEMPORARY FUEL OIL TANK FILED UNDER APPLICATION NO. 140032186.$80,000
2013-02-01Job filed: REPLACE FUEL OIL TANK. TEMPORARY FUEL OIL TANK FILED UNDER APPLICATION NO. 140032186.$80,000
2013-01-15Facade (LL11) filing, cycle 7: SWARMP
2012
2012-12-20Certificate of occupancy Temporary
2012-11-29Permit PL — ISSUED
2012-11-19Permit PL — ISSUED
2012-11-15Permit EW — ISSUED
2012-10-22Permit EW — ISSUED
2012-10-22Permit EW — ISSUED
2012-10-19Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 1ST & 7TH FLR (REGUS) AS INDICATED ON DRAWINGS.$35,000
2012-10-19Job filed: PARTITION CHANGES ON THE 1ST AND 7TH FLOOR (REGUS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,176,515
2012-10-19Job filed: SPRINKLER CHANGES ON THE 1ST AND 7TH FLOOR (REGUS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$90,000
2012-10-19Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 7TH FLOOR (REGUS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$304,000
2012-10-01Certificate of occupancy Temporary
2012-09-10Permit EW — ISSUED
2012-08-27Permit PL — ISSUED
2012-08-21311: Broken Muni Meter — Out of Order
2012-08-09Rodent inspection: Passed
2012-08-08Permit EW — ISSUED
2012-08-07Job filed: DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 7TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN US EGRESS OR OCCUPANCY.$87,826
2012-08-02Permit EW — ISSUED
2012-08-02Permit EW — ISSUED
2012-07-31Job filed: DEMOLITION AND CONSTRUCTION WORK ON THE 18TH FLOOR (SRBI)AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$32,000
2012-07-31Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THE 18TH FLOOR (SRBI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$14,000
2012-07-31Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 18TH FLOOR (SRBI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$45,000
2012-07-31Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THE 18TH FLOOR (SRBI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$14,000
2012-07-31Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 18TH FLOOR AS INDICATED ON DRAWINGS.$25,000
2012-07-31Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 18TH FLOOR (SRBI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$45,000
2012-07-20Permit EW — ISSUED
2012-07-20DOB complaint, category ?
2012-07-13Permit PL — ISSUED
2012-07-10Permit EW — ISSUED
2012-07-03Job filed: MODIFICATION OF SPRINKLER SYSTEM, INCLUDING RELOCATION AND REMOVAL OF SPRINKLER HEADS AS SHOWN ON PLANS HEREWITH.NO CHANGE IN USE EGRESS OR OCCUPANCY.$9,400
2012-07-03Job filed: MODIFICATION OF SPRINKLER SYSTEM, INCLUDING RELOCATION AND REMOVAL OF SPRINKLER HEADS AS SHOWN ON PLANS HEREWITH.NO CHANGE IN USE EGRESS OR OCCUPANCY.$9,400
2012-07-03Permit EW — ISSUED
2012-06-22Permit PL — ISSUED
2012-06-21Job filed: SPRINKLER CHANGES ON THE 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$64,000
2012-06-12Permit EW — ISSUED
2012-06-12Permit EW — ISSUED
2012-06-08Job filed: ADDITION AND/OR MODIFICATION TO AN EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,600
2012-06-08Job filed: ADDITION AND/OR MODIFICATION TO AN EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,600
2012-06-07Permit PL — ISSUED
2012-05-11Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 19 AND 20TH FLRS AS INDICATED ON DRAWINGS. PAA FILED IN ORDER TO RECORD FLOORS OF WORK A$12,000
2012-05-10Job filed: SPRINKLER CHANGES ON THE 19TH AND 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$64,000
2012-05-07Job filed: PARTITION CHANGES ON THE 19TH AND 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$135,000
2012-05-07Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 19TH AND 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLI$181,000
2012-05-07Permit EW — ISSUED
2012-05-07Permit EW — ISSUED
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-04-26Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR (GNC) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE$37,000
2012-04-26Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR (GNC) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE$37,000
2012-04-26Job filed: PARTITION CHANGES ON THE 1ST FLOOR (GNC) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$77,000
2012-03-17311: Street Condition — Pothole
2012-03-08Job filed: SPRINKLER MODIFICATIONS ASSOCIATED WITH THE INSTALLATION OF WATER FLOW AND TAMPER SWITCHES ON THE CELLAR, 1ST THRU 3RD, 15TH THRU 18TH AND 20TH THRU 2$100,000
2012-03-07Job filed: SPRINKLER CHANGES ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$5,000
2012-03-07Job filed: SPRINKLER CHANGES ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$5,000
2012-03-07Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS.$10,000
2012-03-06Job filed: ARCHITECTURAL CHANGES ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$145,000
2012-03-06Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIAN$105,000
2012-03-06Job filed: ARCHITECTURAL CHANGES ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$145,000
2012-03-06Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR (CRUMBS) AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIAN$105,000
2012-03-06Permit EW — ISSUED
2012-03-06Permit EW — ISSUED
2012-02-10Job filed: ARCHITECTURAL CHANGES TO STOREFRONT ON THE 1ST FLOOR; ERECTION OF CONSTRUCTION FENCE AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. N$39,000
2012-02-10Permit EQ — ISSUED
2012-02-10Permit EW — ISSUED
2012-02-08Facade (LL11) filing, cycle 6: SAFE
2012-01-31Job filed: ARCHITECTURAL AND MECHANICAL CHANGES ON THE 1ST FLOOR; ERECTION OF CONSTRUCTION FENCE AS INDICATED ON DRAWINGS.$54,000
2012-01-31Permit EW — ISSUED
2012-01-31Permit EQ — ISSUED
2012-01-31Permit EW — ISSUED
2012-01-23Mortgage satisfied — from 275 SEVENTH AVENUE BUILDING LLC to GERMAN AMERICAN CAPITAL CORPORATION
2012-01-23Permit PL — ISSUED
2011
2011-12-12Permit EW — ISSUED
2011-12-08Permit EW — ISSUED
2011-12-06Job filed: INTERIOR DEMOLITION OF TENANT SPACE ON PART OF THE 1ST FLOOR; PARTIAL REMOVAL OF EXISTING MEZZANINE, INSTALL NEW DEMISING PARTITIONS; REMOVE PLUMBING $21,900
2011-12-06Job filed: STRUCTURAL WORK ASSOCIATED WITH PARTIAL REMOVAL OF THE EXISTING MEZZANINE AS INDICATED ON DRAWINGS.$8,000
2011-12-06Permit EW — ISSUED
2011-11-23RPTT&RET $350,000 — from TSC DESIGN ASSOCIATES, INC. to HALSEY, MCCORMACK & HELMER, INC.,DBA MAN$350,000
2011-11-21Permit AL — ISSUED
2011-11-16311: Water System — Hydrant Leaking (WC1)
2011-09-02Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$25,000
2011-09-02Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$25,000
2011-08-15Permit EW — ISSUED
2011-08-15Permit EW — ISSUED
2011-08-05311: Consumer Complaint — Door Open with Air Conditioning On
2011-08-04311: Construction Safety Enforcement — SST Tracking Complaint
2011-08-04DOB complaint, category ?
2011-07-26ECB CLASS - 1 violation: 3314.6.3 LIFE LINES AND SUSPENSION ROPES LIFE LINE TIEBACKS AND SUSPENSION ROPES SHALL EACH BE ATTACHED TO A DIFFERENT POINT OF AN$1,600
2011-07-22Job filed: APPLICATION FILED HEREWITH FOR THE ADDITION/INSTALLATION OF DUCT RETURNS AND RELOCATION OF EXISITING DUCT. AS PER DRAWING FILED.$30,000
2011-07-22Job filed: APPLICATION FILED HEREWITH TO RECONFIGURE EXISITING OFFICE SPACE.(MOUNT SINAI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2011-07-21Job filed: APPLICATION FILED HEREWITH FOR THE ADDITION/INSTALLATION OF DUCT RETURNS AND RELOCATION OF EXISITING DUCT. AS PER DRAWING FILED.$30,000
2011-07-21Job filed: APPLICATION FILED HEREWITH FOR THE ADDITION/INSTALLATION OF DUCT RETURNS AND RELOCATION OF EXISITING DUCT. AS PER DRAWING FILED.$30,000
2011-07-21Job filed: APPLICATION FILED HEREWITH TO RECONFIGURE EXISITING OFFICE SPACE.(MOUNT SINAI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2011-07-21Job filed: APPLICATION FILED HEREWITH TO RECONFIGURE EXISITING OFFICE SPACE.(MOUNT SINAI) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
2011-06-09311: General Construction/Plumbing — Failure To Maintain
2011-06-09DOB complaint, category ?
2011-06-01Rodent inspection: Passed
2011-05-31Permit EW — ISSUED
2011-05-31Permit EW — ISSUED
2011-05-31Permit EW — ISSUED
2011-05-27Job filed: MECHANICAL CHANGES ON THE 21ST FLOOR (KALMBACH) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$5,670
2011-05-27Job filed: MECHANICAL CHANGES ON THE 21ST FLOOR (KALMBACH) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$5,670
2011-05-27Job filed: DEMOLITION AND CONSTRUCTION WORK ON THE 21ST FLOOR (KALMBACH) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COM$22,350
2011-05-27Job filed: DEMOLITION AND CONSTRUCTION WORK ON THE 21ST FLOOR (KALMBACH) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COM$22,350
2011-05-19Job filed: INSTALLATION OF ADDITIONAL EQUIPMENT IN EXISTING TELECOMMUNICATIONS ROOM ON 29TH FL. RELATED ANTENNAS ON ROOF (18 FL SETBACK ROOF )$25,000
2011-05-19Job filed: INSTALLATION OF ADDITIONAL EQUIPMENT IN EXISTING TELECOMMUNICATIONS ROOM ON 29TH FL. RELATED ANTENNAS ON ROOF (18 FL SETBACK ROOF )$25,000
2011-05-19Job filed: INSTALLATION OF ADDITIONAL EQUIPMENT IN EXISTING TELECOMMUNICATIONS ROOM ON 29TH FL. RELATED ANTENNAS ON ROOF (18 FL SETBACK ROOF )$25,000
2011-05-18Permit EW — ISSUED
2011-04-22Permit EW — ISSUED
2011-04-20Permit SG — ISSUED
2011-04-18Permit PL — ISSUED
2011-04-14Job filed: SPRINKLER CHANGES ON THE 1ST FLOOR (ARGO TEA) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$6,900
2011-04-14Job filed: SPRINKLER CHANGES ON THE 1ST FLOOR (ARGO TEA) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$6,900
2011-04-14Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 1ST FLOOR (ARGO TEA) AS INDICATED ON DRAWINGS.$5,000
2011-04-14Permit EW — ISSUED
2011-04-14Permit EW — ISSUED
2011-04-12Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR(ARGO TEA) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.. NO CHANGE TO LL#5/73 COMPL$70,000
2011-04-12Job filed: PARTITION CHANGES ON THE 1ST FLOOR (ARGO TEA) AS INDICATED ON DRAWINGS . NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$85,000
2011-04-12Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR(ARGO TEA) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.. NO CHANGE TO LL#5/73 COMPL$70,000
2011-04-12Job filed: PARTITION CHANGES ON THE 1ST FLOOR (ARGO TEA) AS INDICATED ON DRAWINGS . NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$85,000
2011-04-06Permit EQ — ISSUED
2011-04-04Permit EW — ISSUED
2011-03-31Permit EW — ISSUED
2011-03-31Permit EW — ISSUED
2011-03-17Job filed: ARCHITECTURAL CHANGES ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$12,000
2011-03-17Permit EW — ISSUED
2011-03-08311: Air Quality — Air: Smoke, Commercial (AA2)
2011-01-26ECB CLASS - 1 violation: FAILURE TO HAVE SITE SAFETY MANAGER OR COORDINATOR PRESENT AS REQUIRED NOTED:APPROX 4 INSTALLED SUPPORTED SCAFFOLD ON TOP OF SIDEW$1,200
2011-01-26DOB complaint, category ?
2011-01-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2011-01-11Job filed: SPRINKLER CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$98,450
2011-01-11DOB complaint, category ?
2011-01-10311: Broken Muni Meter — Credit Card Stuck in Meter
2010
2010-12-10Job filed: INSTALLATION OF A SCAFFOLD AS PER PLANS FILED HEREWITH SCAFFFOLD TO COMPLY WITH NEW YORK CITY BUILDING CODE 2008,CHAPTER 33. FOR ASSOCIATED BUILDING A
2010-12-10Permit EQ — ISSUED
2010-12-02311: Broken Muni Meter — Out of Order
2010-11-05311: Public Payphone Complaint — Damaged Telephone
2010-11-05311: Lead — Lead Kit Request (Residential) (L10)
2010-11-05311: Lead — Lead Kit Request (Residential) (L10)
2010-11-04ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS IN LIGHTING HAS BEEN INSTALLED UNDERNEATH SIDEWALK SHED BUT IS NOT ILLUMINATED AT $2,400
2010-10-22Permit PL — ISSUED
2010-10-19311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-10-19DOB complaint, category ?
2010-10-15311: Street Condition — Pothole
2010-10-13311: Water System — Hydrant Leaking (WC1)
2010-10-08Permit EW — ISSUED
2010-10-08Permit EW — ISSUED
2010-10-08Permit PL — ISSUED
2010-10-06Job filed: SPRINKLER MODIFICATIONS ON THE 12TH FLOOR (NYU MEDICAL ) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLI$59,375
2010-10-06Job filed: SPRINKLER MODIFICATIONS ON THE 12TH FLOOR (NYU MEDICAL ) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLI$59,375
2010-10-06Job filed: SPRINKLER MODIFICATIONS ON THE 12TH FLOOR (NYU MEDICAL ) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLI$59,375
2010-10-01Permit AL — ISSUED
2010-09-28Job filed: ERECT A TOTAL OF 31 LINEAR FEET BY 39 FEET APPROXIMATE HEIGHT OF TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-3
2010-09-28Job filed: ERECT A TOTAL OF 31 LINEAR FEET BY 39 FEET APPROXIMATE HEIGHT OF TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-3
2010-09-28Job filed: ERECT A TOTAL OF 31 LINEAR FEET BY 39 FEET APPROXIMATE HEIGHT OF TUBULAR STEEL SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-3
2010-09-28Permit EQ — ISSUED
2010-09-24Job filed: FIRE ALARM MODIFICATION ON THE 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIAN$41,500
2010-09-24Job filed: FIRE ALARM MODIFICATION ON THE 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIAN$41,500
2010-09-24Job filed: FIRE ALARM MODIFICATION ON THE 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIAN$41,500
2010-09-24Permit PL — ISSUED
2010-09-17Job filed: PARTITION CHANGES ON THE 9TH, 10TH, 11TH 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$1,271,667
2010-09-17Job filed: PARTITION CHANGES ON THE 9TH, 10TH, 11TH 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$1,271,667
2010-09-17Job filed: MECHANICAL CHANGES ON THE 12TH FLOOR; PLUMBING CHANGES ON THE 9TH, 10TH, 11TH AND 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE$467,100
2010-09-17Job filed: PARTITION CHANGES ON THE 9TH, 10TH, 11TH 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$1,271,667
2010-09-17Job filed: MECHANICAL CHANGES ON THE 12TH FLOOR; PLUMBING CHANGES ON THE 9TH, 10TH, 11TH AND 12TH FLOOR (NYC MEDICAL) AS INDICATED ON DRAWINGS. NO CHANGE IN USE$467,100
2010-09-17Permit EW — ISSUED
2010-09-17Permit EW — ISSUED
2010-09-09Job filed: DEMOLITION AND CONSTRUCTION WORK ON THE 12TH FLOOR; REMOVAL OF PLUMBING FIXTURES AND CAP PIPING AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR O$20,000
2010-09-09Job filed: DEMOLITION AND CONSTRUCTION WORK ON THE 12TH FLOOR; REMOVAL OF PLUMBING FIXTURES AND CAP PIPING AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR O$20,000
2010-09-09Permit EW — ISSUED
2010-09-02Permit AL — ISSUED
2010-09-02Permit AL — ISSUED
2010-08-31311: Broken Muni Meter — No Receipt
2010-08-11Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500
2010-08-11Job filed: A3$3,000
2010-08-11Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2010-08-11Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2010-08-11Job filed: ERECT NON-ILLUMINATED ACCESSORY BUSINESS AWNING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500
2010-08-11Job filed: A3$3,000
2010-08-10Permit EW — ISSUED
2010-08-10Permit EW — ISSUED
2010-08-10Permit EW — ISSUED
2010-08-06Job filed: DEMOLITION AND CONSTRUCTION CHANGES ON THE 1ST FLOOR (CLEARWIRE) AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 C$130,000
2010-08-06Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR (CLEARWIRE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMP$25,000
2010-08-06Job filed: STRUCTURAL CHANGES ON THE 1ST FLOOR (CLEARWIRE) AS INDICATED ON DRAWINGS.$8,000
2010-08-06Job filed: STRUCTURAL CHANGES ON THE 1ST FLOOR (CLEARWIRE) AS INDICATED ON DRAWINGS.$8,000
2010-08-06Job filed: DEMOLITION AND CONSTRUCTION CHANGES ON THE 1ST FLOOR (CLEARWIRE) AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 C$130,000
2010-07-23Job filed: FIRE ALARM CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$12,000
2010-07-22Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 C$133,000
2010-07-22Job filed: PARTITION CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$1,125,383
2010-07-22Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 23RD FLOOR (CANCER CARE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 C$133,000
2010-07-22Permit PL — ISSUED
2010-07-22Permit EW — ISSUED
2010-07-09Permit EW — ISSUED
2010-06-17Permit EW — ISSUED
2010-06-15311: Water System — Leak (Use Comments) (WA2)
2010-06-14Job filed: ALTERNATION OF EXISTING STORE. INTERIOR REFURBISH, RECONDITION, REMODEL AS PER PROPOSED PLAN.$30,000
2010-06-14Permit EW — ISSUED
2010-06-14Permit EW — ISSUED
2010-06-11Job filed: DEMOLITION OF NON LOAD BEARING PARTITIONS/CONSTRUCTION CHANGES AND REMOVAL OF PLUMBING FIXTURES ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE I$42,800
2010-06-11Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 23RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$26,000
2010-06-11Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 23RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$26,000
2010-06-11Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 23RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5$26,000
2010-06-08Rodent inspection: Passed
2010-06-03Job filed: PARTITION PLUMBING AND SPRINKLER CHANGES ON THE 1ST FLOOR (COHENS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/7$22,000
2010-06-03Job filed: PARTITION PLUMBING AND SPRINKLER CHANGES ON THE 1ST FLOOR (COHENS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/7$22,000
2010-06-03Job filed: PARTITION PLUMBING AND SPRINKLER CHANGES ON THE 1ST FLOOR (COHENS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/7$22,000
2010-05-25311: Taxi Complaint — Driver Complaint
2010-05-24Permit EW — ISSUED
2010-05-18Job filed: INSTALLATION OF AUXILLARY AIR CONDITIONING SYSTEM AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2010-04-21Job filed: MASONRY REPAIR WORK ON THE BUILDING EXTERIOR FACADE AND FIRESTOPPING AND CONSTRUCTION WORK ON THE 2ND, 3RD, 5TH, 6TH, 7TH, 10TH, 11TH, 12TH, 14TH, 15T$650,000
2010-04-13Job filed: INSTALLATION OF 86.LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR ASSOCIATED BUILDING ALTERATION FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHA
2010-04-13Job filed: INSTALLATION OF 86.LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR ASSOCIATED BUILDING ALTERATION FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHA
2010-04-13Permit EQ — ISSUED
2010-04-02Permit EW — ISSUED
2010-04-02Permit EW — ISSUED
2010-03-25Job filed: DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 1ST FLOOR AND MEZZANINE AS INDICATED ON DRAWINGS. THIS APPLICATION IS BEING FILED TO REMOVE VIOLATIO$17,500
2010-03-25Job filed: STRUCTURAL WORK ASSOCIATED WITH THE REMOVAL OF A MEZZANINE; STRUCTURAL DEMO ON THE 1ST FLOOR AS INDICATED ON DRAWINGS.$17,500
2010-03-25Job filed: DEMOLITION OF NON LOAD BEARING PARTITIONS ON THE 1ST FLOOR AND MEZZANINE AS INDICATED ON DRAWINGS. THIS APPLICATION IS BEING FILED TO REMOVE VIOLATIO$17,500
2010-03-25Job filed: STRUCTURAL WORK ASSOCIATED WITH THE REMOVAL OF A MEZZANINE; STRUCTURAL DEMO ON THE 1ST FLOOR AS INDICATED ON DRAWINGS.$17,500
2009-07-31Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON PART OF THE 2ND FLOOR (MOTLEY RICE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO $7,000
2009-07-31Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON PART OF THE 2ND FLOOR (MOTLEY RICE) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO $7,000
2009-07-13DOB violation E:
2009-07-13DOB violation E:
2009-07-02DOB violation E:
2009-07-02DOB violation E:
2009-07-02DOB violation E:
2009-06-22Job filed: REPLACEMENT OF THE EXISITING EDWARDS 5800 FCS WITH AN ADDRESSABLE EST-3 FCS. WITH REPLACEMENTS OF SMOKE DETECTORS, DUCT DETECTORS MANUAL PULL STATIONS$96,250
2009-06-22Job filed: REPLACEMENT OF THE EXISITING EDWARDS 5800 FCS WITH AN ADDRESSABLE EST-3 FCS. WITH REPLACEMENTS OF SMOKE DETECTORS, DUCT DETECTORS MANUAL PULL STATIONS$96,250
2009-06-17Permit PL — ISSUED
2009-06-05Job filed: MODIFICATION OF SPRINKLER SYSTEM ON PART OF THE 2ND FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIA$29,000
2009-06-05Permit EW — ISSUED
2009-06-05Permit EW — ISSUED
2009-06-04Job filed: ARCHITECTURAL MECHANICAL AND PLUMBING CHANGES ON PART OF THE 2ND FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL$241,000
2009-06-04Job filed: ARCHITECTURAL MECHANICAL AND PLUMBING CHANGES ON PART OF THE 2ND FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL$241,000
2009-03-21DOB complaint, category ?
2009-03-20ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS NOTED PALLETS OF BRICKS ROOFING MATERIALS ON SIDEWALK SHED REM:
2009-03-20ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR AMENDMENTS NOTED OUTRIGGER BEAM NOT SET UP ACCORDING TO CD5 CD5 SH
2009-01-01DOB violation LL6291:
2008
2008-10-20DOB complaint, category ?
2008-10-17DOB complaint, category ?
2008-09-19Permit EW — ISSUED
2008-09-19Permit EW — ISSUED
2008-09-19Permit EW — ISSUED
2008-09-10Permit EW — ISSUED
2008-09-03ECB CLASS - 2 violation: FAIL NOTIFY DEPT/OBTAIN PERMIT PRIOR TO USE/INST OF OUTRIGGER BEAMS REMEDY: CALL PRIOR TO INSPECTION/COMPLY WITH CODE$800
2008-08-13DOB complaint, category ?
2008-08-05DOB complaint, category ?
2008-08-04Permit EQ — ISSUED
2008-07-30ECB CLASS - 2 violation: SEC BC3307.2.1 ALL TEMPORARY WALK WAYS SHALL BE ILLUMINATED AT ALL TIME EITHER BY NATURAL OR ARTIFICIAL LIGHT THE LEVEL OF ILLUMIN$400
2008-07-30ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: THE DESIGN DRAWINGS SHOW ALL OUTRIGGER$500
2008-07-30ECB CLASS - 1 violation: SEC.BC3301.2 27-1009 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED THERE IS WORK BEING $2,400
2008-07-30ECB CLASS - 1 violation: SEC.BC3314.15.2 27-1046 THE HANGER OR STIRRUPS SHALL BE PLACED AT LEAST 6 INCHES BUT NOT MORE THAN 18 INCHES FROM THE OF THE PLATF$1,600
2008-07-30DOB complaint, category ?
2008-07-30DOB complaint, category ?
2008-07-24Job filed: MECHANICAL WORK ON THE 5TH - 29TH FLOOR AND ROOF ASSOCIATED WITH NEW COOLING TOWER AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO$1,575,000
2008-07-24Job filed: STRUCTURAL WORK ON THE 5TH-29TH FLOOR AND ROOF ASSOCIATED WITH NEW COOLING TOWER.$185,000
2008-07-24Job filed: STRUCTURAL WORK ON THE 5TH-29TH FLOOR AND ROOF ASSOCIATED WITH NEW COOLING TOWER.$185,000
2008-07-24Job filed: ARCHITECTURAL WORK ON THE 5TH-29TH FLOORS AND ROOF ASSOCIATED WITH NEW COOLING TOWER. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPL$165,000
2008-07-22AALR — from LASALLE BANK NATIONAL ASSOCIATION, AS TR to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2008-07-22Mortgage assigned — from LASALLE BANK NATIONAL ASSOCIATION, AS TR to U.S. BANK NATIONAL ASSOCIATION, AS TRUST
2008-06-05Permit EW — ISSUED
2008-06-05Permit PL — ISSUED
2008-06-05Permit EW — ISSUED
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-19DOB violation E:
2008-05-16DOB violation E:
2008-05-16DOB violation E:
2008-05-16DOB violation E:
2008-04-30Job filed: SPRINKLER MODIFICATIONS ON THE 10TH AND 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$35,000
2008-04-28ECB Non-Hazardous violation: SEC32A,34A,50,50A,50B,50C,50D. 50-BOILER SAFETY VALVE BTU'S LESS THAN MIN. BOILER SAFETY VALVES CAP. PEO,BOILER RATTING TAG. 50A-H
2008-04-18Permit EW — ISSUED
2008-04-16Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON THE 10TH AND 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMP$15,000
2008-04-16Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON THE 10TH AND 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMP$15,000
2008-04-14Job filed: MECHANICAL CHANGES ON THE 10TH AND 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY .NO CHANGE TO LL#5/73 COMPLIANCE.$30,000
2008-04-14Job filed: MECHANICAL CHANGES ON THE 10TH AND 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY .NO CHANGE TO LL#5/73 COMPLIANCE.$30,000
2008-04-14Job filed: PARTITION CHANGES ON THE 10TH AND 11TH FLOOR AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$150,000
2008-04-14DOB complaint, category ?
2008-03-31DOB violation LL2604E:
2008-03-25Permit EW — ISSUED
2008-03-25Permit EW — ISSUED
2008-03-25Permit EW — ISSUED
2008-03-18Permit EW — ISSUED
2008-03-18Permit EW — ISSUED
2008-03-11Permit EW — ISSUED
2008-03-07Job filed: PARTITION CHANGES ON THE 18TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$90,000
2008-03-06Job filed: MECHANICAL CHANGES ON THE 20TH FLOOR AS INDICATED ON DRAWINGS .NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$24,000
2008-03-06Job filed: MECHANICAL CHANGES ON THE 20TH FLOOR AS INDICATED ON DRAWINGS .NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$24,000
2008-03-05Job filed: FIRE ALARM MODIFICATIONS ON THE 20TH FLOOR AS INDICATED ON DRAWINGS.$9,000
2008-03-05Job filed: FIRE ALARM MODIFICATIONS ON THE 20TH FLOOR AS INDICATED ON DRAWINGS.$9,000
2008-03-05Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THE 20TH FLOOR AS INDICATED ON DRAWINGS.$8,000
2008-03-04Job filed: PARTITION AND PLUMBING CHANGES ON THE 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$150,000
2008-03-04Job filed: PARTITION AND PLUMBING CHANGES ON THE 20TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$150,000
2008-01-17Permit PL — ISSUED
2008-01-16ECB Hazardous violation: 27-1054 OPERATION OF DEFECTIVE HOISTING EQUIPMENT- 1) REAR FULCRUM IS BENDED. 2) MISSING JUNIOR BEAM ON REAR FULCRUM 3) REAR FULCR$3,000
2008-01-15ECB Non-Hazardous violation: FAILED TO NOTIFY THE DOB PRIOR TO THE USE OR INSTALLATION OF C HOOKS OR OUTRIGGER BEAMS IN CONNECTION WITH SUSPENDED SCAFFOLDS$500
2007
2007-11-29Permit EW — ISSUED
2007-11-29Permit EW — ISSUED
2007-11-19Job filed: MODIFICATION OF FIREALARM SYSTEM ON18FLOOR AS PER DRAWINGS NO CHANGES$5,000
2007-11-19Job filed: MODIFICATION OF SPRINKLER SYSTEM ON 18THFLOOR NO CHANGE IN USE EGRESS OR OCCUPANCY NO CHANGE TO LL5/73 COMPLIANCE$4,000
2007-11-19Job filed: MODIFICATION OF SPRINKLER SYSTEM ON 18THFLOOR NO CHANGE IN USE EGRESS OR OCCUPANCY NO CHANGE TO LL5/73 COMPLIANCE$4,000
2007-11-19Job filed: MODIFICATION OF FIREALARM SYSTEM ON18FLOOR AS PER DRAWINGS NO CHANGES$5,000
2007-11-16Job filed: Mechanical and plumbing changes on the 18th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$65,000
2007-11-16Job filed: Partiton changes on the 18th floor as indicated on drawings. No change in us egress or occupancy. No change to LL#5/73 compliance.$70,000
2007-11-16Job filed: Partiton changes on the 18th floor as indicated on drawings. No change in us egress or occupancy. No change to LL#5/73 compliance.$70,000
2007-11-16Job filed: Partiton changes on the 18th floor as indicated on drawings. No change in us egress or occupancy. No change to LL#5/73 compliance.$70,000
2007-11-13Permit EW — ISSUED
2007-11-08Permit PL — ISSUED
2007-10-23Permit EW — ISSUED
2007-10-19Permit EW — ISSUED
2007-10-19Permit EW — ISSUED
2007-10-19Permit EW — ISSUED
2007-10-11Job filed: Exterior facade repair as indicated on drawings.$750,000
2007-10-05Permit EW — ISSUED
2007-10-03Job filed: Modifications to existing fire alarm system as indicated on plans filed herewith. No change in use, egress or occupancy.$30,000
2007-10-02Job filed: Modifications to existing sprinkler system as indicated on plans filed herewith. No change in use, egress or occupancy.$35,000
2007-10-02Job filed: Interior renovation, partition and ceiling work as indicated on plans filed herewith. No change in use, egress or occupancy.$210,000
2007-10-02Job filed: Mechanical and plumbing modifications as indicated on plans filed herewith. No change in use, egress or occupancy.$260,000
2007-10-02Job filed: Structural modifications as indicated on plans filed herewith. No change in use, egress or occupancy.$50,000
2007-09-25Permit EW — ISSUED
2007-09-14Permit PL — ISSUED
2007-09-07Permit EW — ISSUED
2007-09-07Permit EW — ISSUED
2007-09-07Permit EW — ISSUED
2007-08-27AALR — from GERMAN AMERICAN CAPITAL CORPORATION to LASALLE BANK NATIONAL ASSOCIATION, AS TH
2007-08-27Mortgage assigned — from GERMAN AMERICAN CAPITAL CORPORATION to LASALLE BANK NATIONAL ASSOCIATION, AS TH
2007-08-24Permit EQ — ISSUED
2007-08-21Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 507' DURING FACADE REPAIR. NO CHANGES IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/9
2007-08-20Permit EW — ISSUED
2007-08-20Permit EW — ISSUED
2007-08-17Job filed: Installation of A/C unit on the 25th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$33,000
2007-08-17Permit EW — ISSUED
2007-08-17Permit EW — ISSUED
2007-08-16Job filed: Demolition of non load bearing partitions on the 19th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compl$45,000
2007-08-14Job filed: REPLACE RIGHT HAND BOILER (NYC BOILER NO. 1520-03) AND REINSTALL EXISTING OIL BURNER. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
2007-06-26Permit PL — ISSUED
2007-06-25DOB violation L1198:
2007-06-19Permit EW — ISSUED
2007-06-19Permit EW — ISSUED
2007-05-24Permit EW — ISSUED
2007-05-24Permit EW — ISSUED
2007-05-21Job filed: Mechanical and plumbing changes on the 17th and 20th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compli$115,000
2007-05-18Job filed: Partition changes on the 17th and 20th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$150,000
2007-05-18Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON THE17TH /20TH FLOORS AS INDICATED ON DRAWINGS NO CHANGE IN USE EGRESS OROCCUPANCY NO CHANGE TO LL5/73 COMPLIANCE$10,000
2007-05-18Job filed: MODIFICATION OF SPRINKLER SYSTEM ON17/20FLOORS AS PER DRAWINGS NO CHANGE IN USE/EGRESS/OCCUOANCY & NOCHANGE TO LL5/73 COMPLIANCE$10,000
2007-05-15ECB Non-Hazardous violation: WORK W/O PERMIT. WORK NOTED: NEW PARTITION WALLS ON MEZZANINE AND STAIRWAY TO MEZZANINE ERECTED TO CREATE TO ROOMS. REMEDY: OBTAIN$500
2007-05-15ECB Non-Hazardous violation: ALTERED BLDG OCCUPIED W/O A VALID C OF O ALT #104200810 EXPIRED 05/02/07 ILLEGAL OCCUPANCY NOTED AT MEZZANINE LEVEL AS OFFICE SPAC$180
2007-05-15DOB complaint, category ?
2007-05-15DOB complaint, category ?
2007-05-03Job filed: MODIFICATION OF SPRINKLER SYSTEM ONTHE 28TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OROCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE.$15,000
2007-05-01Permit EW — ISSUED
2007-05-01Permit EW — ISSUED
2007-05-01Permit EW — ISSUED
2007-04-26Job filed: MODIFICATION OF FIRE ALARM SYSTEM ONTHE 28TH FLOOR AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL5/73 COMPLIANCE.$16,000
2007-04-26Job filed: Structural changes on the 28th floor as indicated on drawings.$150,000
2007-04-26Job filed: Structural changes on the 28th floor as indicated on drawings.$150,000
2007-04-25Job filed: Partition changes on the 28th floor and roof as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$220,000
2007-04-25Job filed: Mechanical and plumbing changes on the 28th floor and roof as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compli$125,000
2007-04-25Job filed: Mechanical and plumbing changes on the 28th floor and roof as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compli$125,000
2007-04-19Permit EW — ISSUED
2007-03-14Permit EW — ISSUED
2007-03-14Permit EW — ISSUED
2007-03-09Job filed: MECHANICAL CHANGES ON THE 17TH FLOOR AS INDICATED ON DRAWINGS. NO change in use egress or occupancy. No change to LL#5/73 compliance.$175,000
2007-03-09Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON 17TH FLOOR AS INDICATED ON DRAWINGS NO CHANGE IN USE EGRESS OR OCCUPANCY.NOCHANGE TO LL#5/73 COMPLIANCE.$13,000
2007-03-09Job filed: Architectural changes on the 17th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$170,000
2007-03-09Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THE17TH FLOOR AS INDICATED ON DRAWI NGS. NO CHANGE IN USE, OR EGRESS OR OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANCE$25,000
2007-02-06Facade (LL11) filing, cycle 6: SAFE
2007-02-06Permit EW — ISSUED
2007-01-12AL&R $25,800,000 — from 275 SEVENTH AVENUE BUILDING LLC to GERMAN AMERICAN CAPITAL CORPORATION$25,800,000
2007-01-12Mortgage $25,800,000 — from 275 SEVENTH AVENUE BUILDING LLC to GERMAN AMERICAN CAPITAL CORPORATION$25,800,000
2007-01-05Deed — from 275 SEVENTH AVENUE LLC to 275 SEVENTH AVENUE BUILDING LLC
2006
2006-12-22Permit EW — ISSUED
2006-12-15Mortgage satisfied — from 1710 BROADWAY, INC. to PRIMARY CARE DEVELOPMENT CORPORATION
2006-12-15DOB complaint, category ?
2006-11-21Job filed: INSTALLATION OF PER-ACTION SYSTEM NO THE 8TH FLOOR AS INDICATION ON N DRAWINGS. NO CHAGE IN USE, OR EGRESS OCCUPANCY. NO CHANGE TO LL#5/73 COMPLIANC E$5,000
2006-11-20Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON THEBASEMENT, 2ND AND 7TH FLOOR AS I NDICATED ON DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY. NO CHANE TO LL#5/$5,000
2006-11-17Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THEBASEMENT , 6,,8,9,,12,14 FLOORS AS INDICATED DRAWINGS. NO CHANGE IN USEEGRESS OR OCCUPANCY. NO CHANGE TO LL#5/$520,000
2006-11-17Permit EW — ISSUED
2006-11-16Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THE2ND AND 7TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE,EGRESS OROCCUPANCY. NO CHANGE TO LL5/73 COMPLANC $8,000
2006-11-15Permit EW — ISSUED
2006-11-15Permit PL — ISSUED
2006-11-15Permit PL — ISSUED
2006-11-15Permit EW — ISSUED
2006-11-13Job filed: Partition changes on part of the basement, 2nd and 7th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 comp$130,000
2006-11-13Job filed: Mechanical and plumbing changes on the basement, 2nd and 7th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/7$105,000
2006-11-08Permit EW — ISSUED
2006-11-08Permit EW — ISSUED
2006-11-08Permit EW — ISSUED
2006-11-08Permit EW — ISSUED
2006-11-06Job filed: Partition changes on the basement, 6th, 8th, 9th, 12th, 14th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/7$2,750,000
2006-11-06Job filed: Mechanical and plumbing changes on the basement, 6th, 8th, 9th, 12th and 14th floor as indicated on drawings. No change in use egress or occupancy. N$900,000
2006-11-06Job filed: Installation of convenience stair on the 8th - 9th floor and the 12th - 14th floor as indicated on drawings.$75,000
2006-11-06Job filed: Demolition of non load bearing partitions on the 28th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compl$60,000
2006-11-01Job filed: MODIFICATION OF FIRE ALARM SYSTEM ONTHE BASEMENT, 6,8, 9, 12 AND 14TH FLOORS AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE $240,000
2006-11-01Job filed: MODIFICATION OF FIRE ALARM SYSTEM ONTHE BASEMENT, 6,8, 9, 12 AND 14TH FLOORS AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE $240,000
2006-10-11Permit EW — ISSUED
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-09-21DOB violation E:
2006-08-04Permit EW — ISSUED
2006-08-01Job filed: Demolition of non load bearing partitions on the 6th, 8th, 9th , part of the 12th and part of the 14th floor as indicated on drawings. No change in u$500,000
2006-08-01Job filed: Demolition of non load bearing partitions on the 6th, 8th, 9th , part of the 12th and part of the 14th floor as indicated on drawings. No change in u$500,000
2006-07-31Permit PL — ISSUED
2006-06-27Permit EW — ISSUED
2006-06-27Permit EW — ISSUED
2006-04-28Job filed: INSTALL NEW FIRE ALARM DEVICES AS SHOWNON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2006-04-25Job filed: Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$15,000
2006-04-25Job filed: Install new plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$15,000
2006-04-25Job filed: Modify HVAC ductwork and branch piping and install AC units as shown on drawings filed herewith. No change in use, egress or occupancy.$118,000
2006-04-24Job filed: REPLACE,RELOCATE AND INSTALLNEW SPRIKLER HEADS AND BRACH PIPING AS SHOWN ON DRAWING FILED HEREWITH. ON CHANGE IN USE, EGRESS OR OCCUPANCY.$29,000
2006-04-24Job filed: REPLACE,RELOCATE AND INSTALLNEW SPRIKLER HEADS AND BRACH PIPING AS SHOWN ON DRAWING FILED HEREWITH. ON CHANGE IN USE, EGRESS OR OCCUPANCY.$29,000
2006-04-24Job filed: Install new interior partitions and doors as shown on drawings filed herewith. No change in use, egress or occupancy.$250,000
2006-02-07Permit EW — ISSUED
2006-02-02Permit EW — ISSUED
2006-01-30DOB complaint, category ?
2006-01-11Permit EW — ISSUED
2006-01-11Permit EW — ISSUED
2006-01-10Permit EW — ISSUED
2006-01-10Permit EW — ISSUED
2006-01-09Job filed: Partition changes on part of the 10th and 11th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$50,000
2006-01-09Job filed: Mechanical changes on part of the 10th and 11th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$47,000
2006-01-06Job filed: FIRE ALARM MODIFICATIONS ON PART OF 27TH FLOOR AS PER DRAWINGS FILED NO CHANGE IN USE EGRESS OR OCCUPANCYNO CHANGE TO LL5/73 COMPLIANCE$15,000
2006-01-06Job filed: FIRE ALARM MODIFICATIONS ON PART OF 27TH FLOOR AS PER DRAWINGS FILED NO CHANGE IN USE EGRESS OR OCCUPANCYNO CHANGE TO LL5/73 COMPLIANCE$15,000
2006-01-06Job filed: SPRINKLER MODIFICATIONS ON PART OF THE 27TH AS INDICATED ON DRAWINGS.NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO LL #5/73 COMPLIANCE.$18,000
2006-01-06Job filed: Mechanical changes on part of the 27th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$50,000
2006-01-06Job filed: Partition and plumbing changes on part of the 27th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 complia$100,000
2005
2005-11-21Permit PL — ISSUED
2005-11-18Job filed: MODIFICATION OF SPRINKLER SYSTEM ON THE15TH FLOOR AS INDICATED ON DRAWI NGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY. NO CHANGE TO LL #5/73 COMPLIANCE.$50,000
2005-11-18Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON 15FLOOR AS PER DRAWINGS FILED NO CHANGE IN USE EGRESS OR OCCUPANCYNO CHANGE TO LL5/73 COMPLIANCE$25,000
2005-11-17Permit EW — ISSUED
2005-11-17Permit EW — ISSUED
2005-11-15Job filed: Partition changes on the 15th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$295,000
2005-11-15Job filed: ADDITION TO EXISTING ADVISORY CLASS ESYSTEM.INSTALLATION OF SPEAKER/ STROBE LIGHTS,STROBE LIGHTS,SMOKEDETECTORS.NO CHANGE IN USE EGRESS/OCCUPC$27,000
2005-11-15Job filed: Partition changes on the 15th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$295,000
2005-11-15Job filed: Mechanical and plumbing changes on the 15th floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$155,000
2005-11-14DOB complaint, category ?
2005-09-23Permit EW — ISSUED
2005-08-24Permit AL — ISSUED
2005-08-16Job filed: NO WORK UNDER THIS APPLICATION CONSTRCTNFILED UNDER 104084429 SPRINKLER 104087166,FIRE ALARM 104105521$1,000
2005-08-15Permit PL — ISSUED
2005-08-09Permit EW — ISSUED
2005-08-05Job filed: Modify mechanical ductwork, install new a/c units. Modify plumbing fixtures and related piping as shown on drawings filed herewith. No change in use,$300,000
2005-05-31Permit PL — ISSUED
2005-05-19Job filed: MODIFICATION TO FIRE ALARM SYSTEM ON THE 21ST FLOOR AS INDICATED ON DRA INGS. NO CHANGE IN USE EGRESS OR OCCUPAN CY. NO CHANGE TO LL #5/73 COMPLIANCE$3,000
2005-05-16Job filed: FILING HEREWITH FOR INSTALLATION OF COMB INATION OF SPEAKER/STROBE, MOU TED STROBE LIGHT AND SMOKE DETECTORS TO EXISTING SYSTEM AS PER PLANS. NO CHAN$43,000
2005-05-04Job filed: FILING HEREWITH FOR SPRINKLER MODIFICATI ONS AS PER PLANS. NO CHANGE TO SE, EGRESS OR OCCUPANCY.$120,000
2005-05-04Permit EW — ISSUED
2005-05-04Permit EW — ISSUED
2005-05-03Job filed: FILING HEREWITH FOR HVAC MODIFICATIONS A ND PLUMBING MODIFICATIONS AS PE PLANS. NO CHANGE TO USE, EGRESS OR OCCU PANCY.$742,000
2005-05-03Job filed: FILING HEREWITH FOR HVAC MODIFICATIONS A ND PLUMBING MODIFICATIONS AS PE PLANS. NO CHANGE TO USE, EGRESS OR OCCU PANCY.$742,000
2005-05-03Job filed: FILING HEREWITH FOR THE REMOVAL AND INST ALLATION OF INTERIOR NON BEARIN PARTITIONS AS PER PLANS. NO CHANGE TO U SE, EGRESS OR OCCUPANCY.$1,200,000
2005-04-28Permit SG — ISSUED
2005-04-28Permit SG — ISSUED
2005-04-25Permit PL — ISSUED
2005-04-21Job filed: Mechanical plumbing and sprinkler changes on the 21st floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compl$44,000
2005-04-21Job filed: Architectural changes on the 21st floor as indicated on drawings. No change in use egress or occupancy. No change to LL#5/73 compliance.$39,000
2005-04-21Permit EW — ISSUED
2005-04-21Permit EW — ISSUED
2005-04-19Permit SG — ISSUED
2005-03-11DOB violation E:
2005-03-11DOB violation E:
2005-03-10DOB violation E:
2005-03-10DOB violation E:
2005-01-20Permit EQ — ISSUED
2005-01-19Permit PL — ISSUED
2004
2004-12-15Permit EW — ISSUED
2004-12-10Permit PL — ISSUED
2004-12-01Permit EW — ISSUED
2004-12-01Permit EW — ISSUED
2004-12-01Permit EW — ISSUED
2004-11-19Permit EW — ISSUED
2004-11-19Permit EW — ISSUED
2004-11-12Permit EQ — ISSUED
2004-11-12Permit EW — ISSUED
2004-11-12Permit EW — ISSUED
2004-11-12Permit EW — ISSUED
2004-11-12DOB complaint, category ?
2004-10-12Job filed: Propose to remove and install new sprinkler heads No change to use, egress or occupancy.$10,000
2004-10-08Job filed: Propose to demo partitions, ceilings and doors. Install partitions, ceilings and doors. No change to use, egress or occupancy.$50,000
2004-10-08Job filed: Propose to install new mechanical vent ductwork, and new a.c. unit. Install new plumbing fixtures with related piping. No change to use, egress or o$43,000
2004-09-09Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYST EM TO ACCOMADATE NEW PARTITION AYOUT. NO CHANGE IN USE (U.G.), OCCUPANC Y OR EGRESS.$25,000
2004-09-09Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYST EM TO ACCOMADATE NEW PARTITION AYOUT. NO CHANGE IN USE (U.G.), OCCUPANC Y OR EGRESS.$25,000
2004-09-09Job filed: INSTALLATION OF TWO STEEL BEAMS TO INFILL STAIR OPENING. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$5,000
2004-09-09Job filed: MODIFICATIONS TO EXISTING FIRE ALARM AS SHOWN ON PLANS. NO CHANGE IN USE (U.G), OCCUPANCY OR EGRESS.$20,000
2004-09-09Job filed: NEW HVAC & PLUMBING FIXTURES AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$110,000
2004-09-09Job filed: CONSTRUCTION OF NON-BEARING PARTITIONS, HUNG CEILING AND REPLACE EXISTING STOREFRONT WITH NEW. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$200,000
2004-09-03DOB complaint, category ?
2004-08-30ECB Non-Hazardous violation: HAVING INSTALLED A SIGN WITHOUT FIRST OBTAINING A PERMIT FLEX SIGN APPROX 2145 SQ FEET INSTALLED AT NORTH/WEST CORNER OF BUIDLING $400
2004-08-30ECB Non-Hazardous violation: HAVING SIGNAGE WITH A TOTAL SURFACE AREA GREATER THAN 6 TIMES THE STREET FRONTAGE OF THE ZONING LOT (OR MORE THAN 1200 SQ FEET) FL$400
2004-08-30DOB complaint, category ?
2004-07-13Permit EW — ISSUED
2004-07-13Permit EW — ISSUED
2004-07-13Permit EW — ISSUED
2004-06-02Job filed: Lobby renovation on the first floor. No change of use, egress or occupancy under this application.$550,000
2004-06-02Job filed: Installation of new HVAC system. No change of use, egress or occupancy under this application$100,000
2004-06-02Job filed: Structural work in conjunction with new openings for duct work. No change of use,egress or occupancy under this application.$10,000
2004-05-05DOB violation E:
2004-05-05DOB violation E:
2004-01-14Permit EW — ISSUED
2004-01-14Permit EW — ISSUED
2003
2003-11-13Job filed: INSTALLATION OF FREE STANDING STORAGE MEZZANINE IN CELLAR. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$19,000
2003-11-13Job filed: INSTALLATION OF SIX (6) NEW SPRINKLER HEADS. NO CHANGE TO EXISTING USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$5,000
2003-11-13Job filed: MISCELLANEOUS AR WORK RELATED TO INSTALLATION OF FREE STANDING STORAGE MEZZANINE IN CELLAR. NO INCREASE IN FLOOR AREA. NO CHANGE TO EXISTING US OCCUPA$10,000
2003-08-21Permit EW — ISSUED
2003-08-12Job filed: ADDITION TO EXISTING ADVISORY CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS. DUCT/AREA SMOKE DETECTORS. MANUAL PULL STATION.$88,800
2003-08-12Job filed: ADDITION TO EXISTING ADVISORY CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS. DUCT/AREA SMOKE DETECTORS. MANUAL PULL STATION.$88,800
2003-07-23Permit PL — ISSUED
2003-07-08Permit EW — ISSUED
2003-07-03Permit EW — ISSUED
2003-07-03Permit EW — ISSUED
2003-06-25DOB violation E:
2003-06-25DOB violation E:
2003-06-25DOB violation E:
2003-06-25DOB violation E:
2003-06-25DOB violation E:
2003-06-20Job filed: INTERIOR DEMOLITION OF NON LOAD BEARING INTERIOR PARTITIONS AND INSTALLA TION OF SAME FOR NEW OFFICE CONFIGURATIO N. ADD NEW H.C. BATHROOM, PANTRY AND$227,000
2003-06-20Job filed: MODIFICATION OF EXISTING MECHANICAL SYST EM. INSTALL ALL NEW HVAC DUCT WORK TO ACCOMMODATE PARTITION CHANGES. ADD NEW SUPPLEMENTAL WATER COOLED A.C. U$283,000
2003-06-18Job filed: SUPPLEMENTAL AIR CONDITIONING INSTALLATION . THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2003-06-05Permit EW — ISSUED
2003-05-29Permit EW — ISSUED
2003-05-22Permit PL — ISSUED
2003-05-20Job filed: REMOVE & CAP PLUMBING FIXTURES AS SHOWN ON PLANS FOR INTERIOR DEMOLITION NO CHANGE TO EXISTING USE,OCCUPANCY OR E GRESS UNDER THIS APPLICATION.$3,000
2003-05-20Job filed: REMOVAL ALL NON STRUCTURAL INTERIOR PART ITIONS THROUGHOUT 14TH FLOOR TO ASSESS FIELD CONDITIONS FOR NEW BUILDOUT NO CHANGE TO EXISITNG USE OCCUPANCY$34,000
2003-05-15Permit EW — ISSUED
2003-05-15Permit EW — ISSUED
2003-05-15Permit EW — ISSUED
2003-05-01Permit EW — ISSUED
2003-04-07Job filed: ADDITION TO EXISTING ADVISORY CLASS 'E' SYSTEM. INSTALLATION OF SPEAKER/ STROBE LIGHTS; STROBE LIGHTS; DUCT/AREA SMOKE DETECTORS; MANUAL PULL STATION;$40,200
2003-03-25Job filed: INSTALLATION OF NON LOAD BEARING INTERIO R THROUGHOUT SINGLE TENANT FLR. 10 & 11 INTERIOR DEMOLITION PREVIOUSLY F ILED & APPROVED UNDER ALT11 $832,000
2003-03-25Job filed: INSTALLATION OF ENTIRELY NEW HVAC DUCTWO RK & THE INSTALLATION OF 3 NEW C UNITS ON 10TH FLOOR & 2 NEW UNITS ON 1 1TH FLR. RELOCATE,REPLACE OR $1,320,000
2003-03-25Job filed: PROVIDE NEW FRAMING ON THE 11TH FLR. FOR COMMUNICATING STAIR BETWEEN 10 H & 11TH FLRS.ADD ADDITIONAL SUPPORT/REI NFORCEMENT FOR MOVABLE PARTITION$400,000
2003-03-25Job filed: INSTALLATION OF NON LOAD BEARING INTERIO R THROUGHOUT SINGLE TENANT FLR. 10 & 11 INTERIOR DEMOLITION PREVIOUSLY F ILED & APPROVED UNDER ALT11 $832,000
2003-03-05Job filed: Modification of sprinkler system on 1st & Mezz No change to use, egress or occupancy.$5,000
2003-03-05Job filed: Modification of sprinkler system on 1st & Mezz No change to use, egress or occupancy.$5,000
2003-02-25Permit EW — ISSUED
2003-02-21Job filed: Remove all non structural interior partitions throughout 10th & 11th floors to assess field conditions for new buildout. No other work to be perfo$70,000
2003-02-03Permit EW — ISSUED
2002
2002-12-27ECB Non-Hazardous violation: 02B01/ 15M07/ 80M07/ 02B01 ALARM NOT AUDIBLE ENOUGH ADJUST ALARM 80M07 PROVIDE NOTICE AS TO LOCATE CERTIFICATE AND BUSINESS HOU
2002-10-11Permit EW — ISSUED
2002-10-11Permit EW — ISSUED
2002-10-10DOB violation E: 1P17099
2002-10-10DOB violation E: 1P17100
2002-10-03Job filed: Minor partition, mechanical and sprinkler modifications on part of the 24th floor as indicated on plans. No change in use, egress, or occupancy. No c$9,000
2002-10-03Permit EW — ISSUED
2002-10-03Permit EW — ISSUED
2002-09-30DOB complaint, category ?
2002-09-24Job filed: APPLICATION IS FILED FOR MINOR PARTITION WORK, MINOR DUCT WORK AND SPRINKLER RELOCATION AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCC$26,500
2002-09-04Permit PL — ISSUED
2002-08-22Permit EW — ISSUED
2002-08-22Permit EW — ISSUED
2002-08-22Permit EW — ISSUED
2002-08-14DOB complaint, category ?
2002-08-08DOB violation L1198:
2002-08-08Job filed: Filed for purposes of interior demolition only on 7th floor. No other work to be performed. No change to use, occupancy or egress under this applicati$30,000
2002-08-08Permit EW — ISSUED
2002-08-02Job filed: PROVIDE NEW FRAMING TO ALLOW FOR THE INSTALLATION OF OPERABLE PARTITIONS ON SEVETH FLOOR, & PROVIDE NEW STEEL DUNNAGE FOR COOLING TOWER TO BE INST$30,000
2002-08-02Job filed: INTERIOR DEMO.RECONSTRUCTION OF NON LOAD BEARING INTERIOR PARTITIONS THROUGHOUT SINGLE TENANT FLOOR. INSTALL NEW FINISHES & SUSPENDED CEILING. CRE$700,000
2002-08-02Job filed: INSTALL NEW COOLING TOWER ON ROOF & NEW DUCTWORK THROUGHOUT ENTIRE SEVENTH FL. ADD TWO SUPPLEMENTAL A.C. UNITS ON FL. REL.REPL.&/OR INSTALL NE$951,000
2002-08-02Job filed: PROVIDE NEW FRAMING TO ALLOW FOR THE INSTALLATION OF OPERABLE PARTITIONS ON SEVETH FLOOR, & PROVIDE NEW STEEL DUNNAGE FOR COOLING TOWER TO BE INST$30,000
2002-03-26Permit EW — ISSUED
2002-01-17Permit EW — ISSUED
2001
2001-12-17DOB violation E: 1P17101
2001-12-17DOB violation E: 1P17094
2001-12-17DOB violation E: 1P17098
2001-12-17DOB violation E: 1P17093
2001-12-14DOB violation E: 1P17100
2001-12-14DOB violation E: 1P17103
2001-12-14DOB violation E: 1P17102
2001-12-14DOB violation E: 1P17099
2001-12-05Permit PL — ISSUED
2001-11-01Job filed: Replacement of antenna and associated equipment at a telecommunications facility in compliance with TPPN #5/98 with no change in occupancy, use or egr$50,000
2001-11-01Job filed: Replacement of antenna and associated equipment at a telecommunications facility in compliance with TPPN #5/98 with no change in occupancy, use or egr$50,000
2001-10-26Permit EQ — ISSUED
2001-10-22Job filed: Filing herewith for installation of sidwalk shed 138' long during facade repair. No change to use egress or occupancy.
2001-06-14Permit PL — ISSUED
2001-06-06Permit EW — ISSUED
2001-06-06Permit EW — ISSUED
2001-05-11Job filed: Mechanical and plumbing changes as indicated on plans.$59,000
2001-05-11Job filed: Mechanical and plumbing changes as indicated on plans.$59,000
2001-05-11Job filed: Architecural changes as indicated on plans. No change in use, egress or occupancy. No change to LL5/73 compliance.$115,000
2001-05-11Job filed: Architecural changes as indicated on plans. No change in use, egress or occupancy. No change to LL5/73 compliance.$115,000
2001-05-11Job filed: Sprinkler modifications as indicated on plans.$5,000
2001-05-11Job filed: Sprinkler modifications as indicated on plans.$5,000
2001-05-11Job filed: Mechanical and plumbing changes as indicated on plans.$59,000