143 West 29 Street · Manhattan · BBL 1008050017
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$3,125 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
4 service requests in the last three years. Most common: Air Quality (1) · General Construction/Plumbing (1) · Food Establishment (1) · Damaged Tree (1).
Filed construction activity
$1,936,316 in permitted construction work filed since
2016 (20 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$13,009,000
$5,854,050
2026
$12,580,000
$5,661,000
2027
$11,754,000
$5,289,300
The city's market estimate has fallen
10% between tax years 2025 and 2027.
Building systems
Heating fuel
NO4FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 10)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Spoiled) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
28 St — 1 · 450 ft straight-line (about a 2-minute walk) · station accessibility: none 34 St-Penn Station — 1 2 3 · 750 ft straight-line (about a 4-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 7 Av / W 31 St — M7 M20 · 500 ft
Citi Bike
W 31 St & 7 Ave · 600 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
4 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $320,000 on
1983-04-08 (lender: Bank Of India). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-03-19
RPTT&RET $1,850,000 — from DEVSONS REALTY INC. to ABM STERLING REALTY LLC
$1,850,000
2026-03-19
Sold for $1,850,000
$1,850,000
$44,048
2019-05-13
RPTT&RET $3,952,000 — from 29TH STREET HOLDINGS LLC to 29TH STREET HOLDINGS I LLC
$3,952,000
2019-04-30
Sold for $3,952,000
$3,952,000
$94,095
2016-05-09
RPTT&RET $4,100,000 — from CORDELAY 143, LLC to 143 29TH STREET LLC
$4,100,000
2013-01-14
RPTT&RET $2,280,000 — from 29TH STREET REALTY, LLC to TBL DESIGNS LLC
$2,280,000
2012-08-07
RPTT&RET $2,320,988 — from GOLDNER HOLDINGS LLC to CORDELAY 143 LLC
$2,320,988
2011-03-09
RPTT&RET $1,380,000 — from ACCENT MERCANTILE, INC. to SONA REALTY COMPANY
$1,380,000
2007-07-23
RPTT&RET $2,000,000 — from ABBY GROUP, INC to TERESHARAN LAND CO. OF MANHATTAN LLC
$2,000,000
2005-02-15
RPTT&RET $980,000 — from MEVISIONS INTERNATIONAL INC. to POLOGEROGIS, NICK
$980,000
1983-04-08
Mortgage $320,000 — from TERESHARAN ASSOCIATES to BANK OF INDIA
$320,000
1983-01-18
Mortgage $869,011 — from TERESHARAN ASSOCIATES to LOFT HOLDING COMPANY
$869,011
Ten-year activity
50250
21
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
12
3
4
0
2
21
2018
3
3
1
0
1
8
2019
4
5
2
2
1
14
2020
8
3
4
3
0
18
2021
0
1
1
0
1
3
2022
2
3
4
0
2
11
2023
2
3
0
0
0
5
2024
3
2
2
0
1
8
2025
1
2
1
3
2
9
2026
1
0
1
2
1
5
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Installation of New Metal Framing Structure to be Installed at the Exterior Building Wall located on the 8th Floor, for the future installation of HVA
2026-05-19
Boiler inspection
2026-03-19
RPTT&RET $1,850,000 — from DEVSONS REALTY INC. to ABM STERLING REALTY LLC
2026-03-19
Sold for $1,850,000
2026-03-04
311: Damaged Tree — Branch or Limb Has Fallen Down
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
The full timeline
2026
2026-08-19Job filed: Installation of New Metal Framing Structure to be Installed at the Exterior Building Wall located on the 8th Floor, for the future installation of HVA$60,000
2026-05-19Boiler inspection
2026-03-19RPTT&RET $1,850,000 — from DEVSONS REALTY INC. to ABM STERLING REALTY LLC$1,850,000
2026-03-19Sold for $1,850,000$1,850,000
2026-03-04311: Damaged Tree — Branch or Limb Has Fallen Down
2025-09-22RPTT&RET — from POLOGEORGIS, NICK to PFF-143-8, LLC
2025-09-22RPTT&RET — from POLOGEORGIS, NICK to PFF-143-6, LLC
2025-08-27Deed transfer (nominal price)
2025-08-21Boiler inspection
2025-07-24Facade (LL11) filing, cycle 10: SWARMP
2025-07-01ECB CLASS - 2 violation: FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 10000170743N0001 IN ACCORDANCE WITH THE RULES OF$3,125
2025-02-24Job filed: Demolish existing partitions. New walls, interior storefront walls, flooring. New tile in existing bathrooms.$10,000
2025-02-10311: Food Establishment — Food Spoiled
2024
2024-12-24Job filed: Demolish existing partitions. New walls, interior storefront walls, flooring. New tile in existing bathrooms.$10,000
2024-10-22Restaurant inspection: SWEETS LABORATORY BY HANAMIZUKI — grade A
2024-10-03Permit General Construction — Signed-off
2024-10-01Job filed: Demolish existing partitions. New walls, interior storefront walls, flooring. New tile in existing bathrooms.$10,000
2024-09-23311: General Construction/Plumbing — Building Permit - None
2023-03-09Job filed: Facade restoration to address ECB violation 35669459X$12,000
2022
2022-12-09ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT$1,250
2022-12-06311: Encampment — N/A
2022-12-06311: Encampment — N/A
2022-12-06311: Encampment — N/A
2022-12-06311: Encampment — N/A
2022-11-29ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR OF BUILDING FACADE AND APPURTENANCES.NOTE:OBSERVED AT EXP #2 EROSION/PITTING/ABRASION OF BRICK FACE.B$1,250
2022-11-18Permit Mechanical Systems — Permit Issued
2022-10-26Job filed: INSTALLATION OF VENTILATION SYSTEM FOR EXISTING NAIL SALON AS REQUIRED BY SECTION 160.16 OF PART 160 OF TITLE 19 OF THE NEW YORK STATE CODES, RULES AN$16,000
2022-09-08Restaurant inspection: SWEETS LABORATORY BY HANAMIZUKI — grade A · mice evidence
2022-03-16Restaurant inspection: SWEETS LABORATORY BY HANAMIZUKI · mice evidence
2022-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2021
2021-11-12Elevator permit: Provide Door Lock Position Monitoring System as per requirements of ASME A17.3 of 2002, as modified by chapter K3 of 2014 NYC buil$11,000
2020-01-24RPTT&RET — from TERESHARAN LAND CO OF MANHATTAN LLC to TERESHARAN PARTNERS LP
2020-01-24RPTT&RET — from RADHESHARAN REALTY, LLC to RADHESHARAN PARTNERS LP
2020-01-17Permit Plumbing — Signed-off
2020-01-02Job filed: Herewith as per plan filed for sprinkler modification related to alteration 2 application for tenant fit out filed in BIS system.$58,926
2020-01-02Job filed: Herewith as per plan filed for mechanical work related to alteration 2 application for tenant fit out filed in BIS system.$122,500
2020-01-02Job filed: Herewith as per plan filed for plumbing work related to alteration 2 application for tenant fit out filed in the BIS system.$59,500
2020-01-01Deed transfer (nominal price)
2019
2019-12-26Permit EW — ISSUED
2019-12-04Job filed: FILING OF ALTERATION TYPE 2 APPLICATION FOR TENANT FIT OUT IN EXISTING COMMERCIAL OFFICE SPACE AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBIN$280,000
2019-12-04Job filed: FILING OF ALTERATION TYPE 2 APPLICATION FOR TENANT FIT OUT IN EXISTING COMMERCIAL OFFICE SPACE AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBIN$280,000
2019-11-28Boiler inspection
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-08-11311: New Tree Request — For One Address
2019-06-13311: Homeless Person Assistance
2019-06-12ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADES AND APPURTENANCES.EXPOSURE 3,NORTH ELEVATION:SCUTTLE LADDER BRACKET(LOWER) NOT$2,500
2019-05-13RPTT&RET $3,952,000 — from 29TH STREET HOLDINGS LLC to 29TH STREET HOLDINGS I LLC$3,952,000
2019-04-30Sold for $3,952,000$3,952,000
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-27Permit PL — ISSUED
2018
2018-07-19DOB violation E:
2018-07-19DOB violation E:
2018-07-19DOB violation E:
2018-06-05Boiler inspection
2018-05-21Permit PL — ISSUED
2018-03-28Permit EW — ISSUED
2018-03-28Permit EW — ISSUED
2018-02-05311: Non-Emergency Police Matter — Other (complaint details)
2017-07-28Job filed: RENOVATION OF NAIL STORE, INCLUDING INSTALLATION OF PARTITION, PLUMBING FIXTURE AND H.V.A.C. UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS$73,160
2017-07-28Job filed: RENOVATION OF NAIL STORE, INCLUDING INSTALLATION OF PARTITION, PLUMBING FIXTURE AND H.V.A.C. UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS$73,160
2017-07-05ECB CLASS - 2 violation: FAILURE TOMAINTAIN EXTERIOR BLDG FACADE AND APPURTENANCES AS PER 1 RCNY 103-04.EXP#2,ROOF LEVEL PARAPET,LOOSE METAL COPING COVER O
2017-06-29311: Non-Emergency Police Matter — Other (complaint details)
2017-06-26Facade (LL11) filing, cycle 8: SAFE
2017-06-14Permit EW — ISSUED
2017-05-23Permit EQ — ISSUED
2017-05-09311: Non-Emergency Police Matter — Other (complaint details)
2017-04-17Job filed: MINOR INTERIOR RENOVATION OF COMMERCIAL SPACE- NEW PAINT, DRYWALL, AND PLUMBING FIXTURES, ALL AS PER PLANS FILED HEREWITH.$19,000
2017-03-30Permit EW — ISSUED
2017-03-22311: Water System — Hydrant Running (WC3)
2017-03-20DOB complaint, category ?
2017-03-15Permit PL — ISSUED
2017-02-01Permit EW — ISSUED
2017-01-31ECB CLASS - 2 violation: 76I11/76-I-CAR TILLER ROPE-REPLACE.
2016
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-07ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT. $800
2016-10-27Permit EW — ISSUED
2016-10-25311: Elevator — Elevator - Defective/Not Working
2016-10-25DOB complaint, category ?
2016-10-19Job filed: INTERIOR RENOVATION OF 2ND FLOOR. HEREWITH FILING FOR INTERIOR DEMO OF SOME PARTITIONS AND INSTALLATION OF NEW, RELATED PLUMBING SPRINKLER AND MECHANI$140,000
2016-10-19Job filed: INTERIOR RENOVATION OF 2ND FLOOR. HEREWITH FILING FOR INTERIOR DEMO OF SOME PARTITIONS AND INSTALLATION OF NEW, RELATED PLUMBING SPRINKLER AND MECHANI$140,000
2016-10-19Job filed: INTERIOR RENOVATION OF 2ND FLOOR. HEREWITH FILING FOR INTERIOR DEMO OF SOME PARTITIONS AND INSTALLATION OF NEW, RELATED PLUMBING SPRINKLER AND MECHANI$140,000
2016-10-11Permit PL — ISSUED
2016-09-23Job filed: APPLICATION FILED FOR INTERIOR OFFICE RENOVATION AS SHOWN TO INCLUDE NON-STRUCTURAL DEMOLITION AND GENERAL CONSTRUCTION.$280,000
2016-09-23Job filed: APPLICATIONS FILED FOR INTERIOR OFFICE RENOVATION TO INCLUDE MECHANICAL EQUIPMENT AND DUCT WORK.$143,500
2016-09-23Permit EW — ISSUED
2016-09-23Permit EW — ISSUED
2016-09-16Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM.$8,570
2016-08-23311: Homeless Person Assistance — N/A
2016-08-02311: Homeless Person Assistance — N/A
2016-07-08311: Panhandling — N/A
2016-07-01Permit EW — ISSUED
2016-06-20Permit EQ — ISSUED
2016-06-02DOB violation E:
2016-06-02DOB violation E:
2016-05-09RPTT&RET $4,100,000 — from CORDELAY 143, LLC to 143 29TH STREET LLC$4,100,000
2015-12-07Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$93,390
2015-10-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-07-29ECB CLASS - 1 violation: FAILURE TO RAKE REQUIRED ACTION TO SECURE PUBLIC SAFETY,UNSAFE FACADE.NOTED:ON 6/30/15 A FISP 3:NOTIFICATION OF UNSAFE CONDITIONS $2,400
2015-07-23FDNY inspection (RISK)
2015-07-15Job filed: INSTALLATION OF 88 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 O
2015-07-15Job filed: INSTALLATION OF 88 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 O
2015-04-09311: Street Condition — Defective Hardware
2014
2014-06-30DOB violation E:
2014-06-30DOB violation E:
2014-06-30DOB violation E:
2014-04-21ECB CLASS - 2 violation: FAILUER TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &$2,000
2013
2013-07-26DOB violation E:
2013-07-26DOB violation E:
2013-07-26DOB violation E:
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2013-01-14RPTT&RET $2,280,000 — from 29TH STREET REALTY, LLC to TBL DESIGNS LLC$2,280,000
2012
2012-12-28Rodent inspection: Passed
2012-12-14Rodent inspection: Failed for Rat Activity
2012-11-27DOB violation E:
2012-08-07RPTT&RET $2,320,988 — from GOLDNER HOLDINGS LLC to CORDELAY 143 LLC$2,320,988
2012-07-18Job filed: GENERAL FACADE RESTORATION - LINTEL & SILL REPLACEMENT, SHEET METAL REPAIRS AND MINOR CAULKING/POINTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$14,000
2012-07-18Job filed: GENERAL FACADE RESTORATION - LINTEL & SILL REPLACEMENT, SHEET METAL REPAIRS AND MINOR CAULKING/POINTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$14,000
2012-07-18Permit EW — ISSUED
2012-02-16311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2011
2011-06-29Rodent inspection: Passed
2011-03-09RPTT&RET $1,380,000 — from ACCENT MERCANTILE, INC. to SONA REALTY COMPANY$1,380,000
2011-02-15DOB violation E:
2011-02-15DOB violation E:
2011-02-15DOB violation E:
2010
2010-08-17311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2010-08-17DOB complaint, category ?
2010-07-23Rodent inspection: Passed
2010-05-05DOB violation E:
2010-05-05DOB violation E:
2010-05-05DOB violation E:
2009
2009-09-17DOB complaint, category ?
2009-07-10DOB violation E:
2009-07-10DOB violation E:
2008
2008-12-03DOB violation E:
2008-06-11Facade (LL11) filing, cycle 6: SAFE
2008-05-22DOB violation E:
2008-05-22DOB violation E:
2008-04-11ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED SIXTH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIOND DESCRIBED I$700
2008-01-31DOB violation E:
2008-01-07Permit EQ — ISSUED
2007
2007-10-11Permit EW — ISSUED
2007-08-02Job filed: REPAIRS ON ALL FACADES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO INCREASE IN EXISTING FLOOR AREA.$40,000
2007-07-23RPTT&RET $2,000,000 — from ABBY GROUP, INC to TERESHARAN LAND CO. OF MANHATTAN LLC$2,000,000
2007-07-13DOB violation E:
2007-06-25DOB violation L1198:
2007-06-18Permit EQ — ISSUED
2007-06-14Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 85 FT LONG AT 143 west 29 street . DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91. NO CHANGE IN U
2007-06-14Job filed: INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 85 FT LONG AT 143 west 29 street . DURING REMEDIAL REPAIRS. WORK SHALL COMPLY WITH LL33/91. NO CHANGE IN U
2007-04-13DOB violation C:
2007-03-20DOB violation E:
2007-02-18DOB complaint, category ?
2007-02-15Facade (LL11) filing, cycle 6: SAFE
2006
2006-09-27DOB violation E:
2006-06-05DOB violation E:
2006-01-06DOB violation LL6291:
2005
2005-12-16DOB violation E:
2005-08-30DOB violation E:
2005-05-02DOB complaint, category ?
2005-03-11DOB violation E:
2005-03-11DOB violation E:
2005-02-15RPTT&RET $980,000 — from MEVISIONS INTERNATIONAL INC. to POLOGEROGIS, NICK$980,000
2005-01-31DOB violation LL6291:
2004
2004-08-25DOB violation E:
2004-05-04DOB violation E:
2004-02-13DOB violation LL6291:
2003
2003-06-24DOB violation E:
2003-06-24DOB violation E:
2002
2002-06-14DOB violation E: 1P5218
2002-06-14DOB violation E: 1P5220
2001
2001-11-19ECB Hazardous violation: CEASE USE 46B13/ 49B13/ 73U16/ 73O02/ 57O02/ 09D06/ 16D06/ 16M07/ 16- SECURE HOISTWAY DOOR GIBS - FLOORS 8, 10. PROVIDE SECOND $500
2001-11-13DOB complaint, category ?
2001-06-22DOB violation E: 1P5220
2001-06-22DOB violation E: 1P5218
2001-02-14Permit EW — ISSUED
2001-02-13Job filed: Replace existing air conditioning unit; no change in use, egress or occupancy.$1,500
2001-02-09ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL UNSECURE MULITIPLE INSTALLATION OF AC UNITS @ SOUTH ELEVATION/WINDOWS OVERLOOKING WEST
2001-02-09ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL NOTED ON THE 10TH FLOOR,PLANTERS/FLOWER POTTERY ON SOUTH EAST WINDOW SILLS OVERLOOKING
2001-02-01Job filed: Interior office renovation of thenorth side of 12th floor. Install new 5 ton ceiling hung AC unit. No change in use, occupancy, or egress.$65,000
2001-02-01Job filed: Interior office renovation of thenorth side of 12th floor. Install new 5 ton ceiling hung AC unit. No change in use, occupancy, or egress.$65,000
2001-02-01Permit EW — ISSUED
2001-02-01Permit EW — ISSUED
2001-01-23Job filed: MINOR INTERIOR PARTITION WORK. NO CHANGE TO ZONING, USE EGRESS OR OCCUPANCY. MINOR PLUMBING WORK.$7,000
2000
2000-12-19Job filed: REMOVE EXISTING STOREFRONT/AWNING AND REPLACE WITH NEW ALUMINUM AND GLASS STOREFRONT AS INDICATED ON PLANS.$10,000
2000-10-05Job filed: Construction of partitions as indicated on drawings; no change in use, egress an d/or occupancy.$40,000
2000-10-05Job filed: Construction of partitions as indicated on drawings; no change in use, egress an d/or occupancy.$40,000
2000-10-05Permit EW — ISSUED
2000-02-14ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS. NOTED: AT SOUTH ELEVATION12TH FL, - 1) ORGANIC MATERIAL (IE WEEDS) GROWING OUT OF MOR
1993-10-22ECB Non-Hazardous violation: 46T,49T,73T,15L. 15 TERMINAL LANDINGS. 73 PERFORM THE 5YR. TEST, DATE AND TAG THE GOVERNOR AND FILE ELEVATOR 3 FORM WITH THIS DEPT
1993-10-21ECB Non-Hazardous violation: 46T,49T,73T. 73 PERFORM THE 5YR. TEST, DATE AND TAG THE GOVERNOR AND FILE ELEVATOR 3 FORM WITH THIS DEPT.
1993-03-18DOB violation LL6291:
1991
1991-04-05Mortgage satisfied — from TERESHARAN ASSOCIATES to LOFT HOLDING CO.
1990
1990-01-30DOB violation E:
1989
1989-01-30DOB violation E:
1989-01-30DOB violation E:
1989-01-30DOB violation E: 21)RESHACKLE
1989-01-30DOB violation E:
1986
1986-05-07Mortgage satisfied — from TERESHARAN ASSOC to BANK INDIA
1986-04-28Deed — from TERESHARAN ASSOCS to 143-145 W 29TH OWNRSCP
1986-04-28Mortgage satisfied — from LOFT HOLDING CO; TWENTY FIFTH CONSTRUC CO to BROADWAY SVGS BANK; CHELSEA RTLY CO
1986-04-22Deed — from TERESHARAN ASSOCIATES to POHANI, NARI; JAGWANI, CHANDRU
1984
1984-07-12Mortgage assigned — from EMIGRANT SAVINGS BANK to TERESHARAN ASSOCIATES
1983
1983-11-30Mortgage assigned — from LOFT HOLDING COMPANY to BERLEY, HARRY TR.; LAUPOT, TIMOTHY EST/; LAUPOT, JANET ADM.; SHAREHOLDERS/ETC.FBO; WEINBER
1983-04-08Mortgage $320,000 — from TERESHARAN ASSOCIATES to BANK OF INDIA$320,000
1983-01-18Deed — from LOFT HOLDING COMPANY to TERESHARAN ASSOCIATES
1983-01-18Mortgage $869,011 — from TERESHARAN ASSOCIATES to LOFT HOLDING COMPANY$869,011
1980
1980-07-25Agreement — from LOFT HOLDING CO to EMIGRANT SAVINGS BANK
1974
1974-08-09Agreement — from LOFT HOLDING CO to PRUDENTIAL SAVINGS BANK
1972
1972-10-02Agreement — from LOFT HOLDING CO to BROADWAY SAVINGS BANK
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL