Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

151 West 30 Street · Manhattan · BBL 1008060006 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$35,000 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

15 service requests in the last three years. Most common: Illegal Parking (3) · Food Poisoning (2) · Water Conservation (2) · New Tree Request (1) · Homeless Person Assistance (1) · Sidewalk Condition (1).

Filed construction activity

$6,686,594 in permitted construction work filed since 2016 (35 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$22,658,000 $10,196,100
2026$24,018,000 $10,808,100
2027$24,415,000 $10,986,750

The city's market estimate has risen 8% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)D — ENERGY STAR score 5/100, posted at the entrance by law (2022 disclosure cycle)
Elevators4 active device(s) on record
Heating fuelNATURALGAS
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
MujeAsian/Asian FusionA—
SeaNot yet graded—

Report to 311: Food poisoning · Food safety complaint

2 restaurants · 0 with mice evidence · See them on the Mice Map

2 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

3 street-flooding or sewer-backup complaints at this address since 2017 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway34 St-Penn Station — 1 2 3 · 500 ft straight-line (about a 2-minute walk) · station accessibility: full
BusNearest boarding stop: 7 Av / W 31 St — M7 M20 · 200 ft
Citi BikeW 31 St & 7 Ave · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 033 Chelsea Prep
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

151 West 30 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

15 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $6,087,893 on 2020-10-05 (lender: Apple Bank For Savings). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2020-10-05AL&R $11,200,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS $11,200,000
2020-10-05Agreement $11,200,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS $11,200,000
2020-10-05Mortgage $6,087,894 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS $6,087,894
2013-07-03AL&R $6,000,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS $6,000,000
2013-07-03Agreement $6,000,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS $6,000,000
2013-07-03Mortgage $1,202,746 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS $1,202,746
2004-12-29Agreement $5,850,032 — from 151 WEST 30TH STREET, L.L.C. to VNB CAPITAL CORP. $5,850,032
2001-11-09Mortgage $499,900 — from 151 WEST 30TH STREET, L.L.C. to VALLEY NATIONAL BANK $499,900
1990-01-10Mortgage $1,265,000 — from 151 WEST 30TH ST ASSOC to CHASE MANHATTAN BANK $1,265,000
1986-03-11Mortgage $4,235,000 — from 151 WEST 30TH ST ASSOCS to HUDSON'S BAY CO FURETC $4,235,000

Ten-year activity

50250
2017
2018
2019
2020
2021
2022
27
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20170290213
2018212016
2019303017
202015424126
2021011024
202210120215
202314460327
20248340217
202514050120
202610130317
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 25 records

DateRecord
2026-09-08Permit Standpipe — Permit Issued
2026-08-20Job filed: Structural Framing work to enlarge existing elevated water tank platform on roof for new water tanks as shown on plan set filed herewith. No change in
2026-07-31Certificate of occupancy Renewal Without Change
2026-07-16311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-07-16311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2026-07-16311: Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
2026-07-16DOB complaint, category ?
2026-07-09Boiler inspection
2026-06-18Permit Plumbing — Permit Issued
2026-06-15Job filed: PROPOSE TO CONVERT EXISTING SHOWROOM & FACTORY TO OFFICES AND OR MANUFACTURING ON FLOORS 2, 6, 8-12 . MINOR INTERIOR WORK , MASONRY OPENINGS / WINDOW
2026-05-13Boiler inspection — defects found
2026-04-27Certificate of occupancy Renewal Without Change
2026-04-14Restaurant inspection: MUJE — grade A
2026-04-14Permit General Construction — Permit Issued
2026-03-18Permit Structural — Permit Issued
2026-03-18Permit Structural — Permit Issued
2026-02-13Certificate of occupancy Renewal Without Change
2025-12-10311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2025-12-04Job filed: Plumbing work associated with the replacement of two gravity water tanks on roof. No change in use, egress, or occupancy under this application. Assoc
2025-12-04Job filed: Vertical extension of existing standpipe system related to the replacement of two existing gravity tanks on the roof. No change in use, egress, or occ
2025-11-18Certificate of occupancy Renewal Without Change
2025-11-12Permit Mechanical Systems — Permit Issued
2025-11-05Job filed: Structural Framing work to enlarge existing elevated water tank platform on roof for new water tanks as shown on plan set filed herewith. No change in
2025-10-24Permit General Construction — Permit Issued
2025-10-24Permit Sprinklers — Permit Issued

The full timeline

2026
2026-09-08Permit Standpipe — Permit Issued
2026-08-20Job filed: Structural Framing work to enlarge existing elevated water tank platform on roof for new water tanks as shown on plan set filed herewith. No change in$110,600
2026-07-31Certificate of occupancy Renewal Without Change
2026-07-16311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2026-07-16311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2026-07-16311: Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
2026-07-16DOB complaint, category ?
2026-07-09Boiler inspection
2026-06-18Permit Plumbing — Permit Issued
2026-06-15Job filed: PROPOSE TO CONVERT EXISTING SHOWROOM & FACTORY TO OFFICES AND OR MANUFACTURING ON FLOORS 2, 6, 8-12 . MINOR INTERIOR WORK , MASONRY OPENINGS / WINDOW$250,002
2026-05-13Boiler inspection — defects found
2026-04-27Certificate of occupancy Renewal Without Change
2026-04-14Restaurant inspection: MUJE — grade A
2026-04-14Permit General Construction — Permit Issued
2026-03-18Permit Structural — Permit Issued
2026-03-18Permit Structural — Permit Issued
2026-02-13Certificate of occupancy Renewal Without Change
2025
2025-12-10311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2025-12-04Job filed: Plumbing work associated with the replacement of two gravity water tanks on roof. No change in use, egress, or occupancy under this application. Assoc$40,000
2025-12-04Job filed: Vertical extension of existing standpipe system related to the replacement of two existing gravity tanks on the roof. No change in use, egress, or occ$190,000
2025-11-18Certificate of occupancy Renewal Without Change
2025-11-12Permit Mechanical Systems — Permit Issued
2025-11-05Job filed: Structural Framing work to enlarge existing elevated water tank platform on roof for new water tanks as shown on plan set filed herewith. No change in$110,600
2025-10-24Permit General Construction — Permit Issued
2025-10-24Permit Sprinklers — Permit Issued
2025-09-30Job filed: CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK $182,881
2025-09-16Job filed: Removal and installation of sprinkler heads and related piping as shown on plan set filed herewith. No change in use, egress or occupancy under this a$102,600
2025-09-16Job filed: Removal and installation of mechanical equipment and related ductwork / piping as shown on plan set filed herewith. No change in use, egress, or occup$300,000
2025-09-04Certificate of occupancy Renewal With Change
2025-08-25Job filed: Interior renovation of non-loadbearing partition walls and doors as shown on plan set filed herewith. No change in use, egress or occupancy under this$151,450
2025-08-19Permit Mechanical Systems — Permit Issued
2025-07-17311: Obstruction — Trash or Recycling
2025-07-01Boiler inspection
2025-06-17311: Illegal Parking — Parking Permit Improper Use
2025-05-26311: Food Poisoning — 1 or 2
2025-05-19311: Food Poisoning — 1 or 2
2025-02-27Permit Mechanical Systems — Signed-off
2024
2024-12-18Boiler inspection
2024-12-14311: Illegal Parking — Parking Permit Improper Use
2024-12-04Permit Suspended Scaffold — Permit Issued
2024-12-01Job filed: Renewal for suspended Scaffold out rigger for Facade repairs.
2024-09-03Restaurant inspection: MUJE — grade A
2024-08-01Job filed: Mechanical scope renovation of the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$152,000
2024-06-11311: Noise — Noise: Construction Before/After Hours (NM1)
2024-05-14Permit General Construction — Signed-off
2024-04-30311: Abandoned Vehicle — With License Plate
2024-04-24Job filed: Plumbing and Sprinkler work in the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$212,750
2024-04-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2024-04-11Job filed: Plumbing and Sprinkler work in the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$212,750
2024-03-07311: Sidewalk Condition — Blocked - Construction
2024-01-30Job filed: Plumbing and Sprinkler work in the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$212,750
2024-01-24Job filed: No Work
2024-01-11ECB CLASS - 1 violation: AN INCIDENT THAT OCCURRED ON 12-15-2023 AT THIS JOBSITE WHERE A WORKER FELL APPRO 20' FROM 1ST FLOOR TO CELLER AND WAS TAKEN TO HO$10,000
2024-01-08DOB complaint, category ?
2023
2023-12-19DOB complaint, category ?
2023-12-15ECB CLASS - 1 violation: 3301.2 FAILURE TO INSTITUTE ADEQUATE SAFETY MEASURES @ REAR EXPOSURE 3 WHILE WORKING OFF A HADDEN THE WORKER FELL APPROXIMATELY 20$12,500
2023-12-15ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: DOOR AT REAR ADDED TO ACCESS CATWALK A$12,500
2023-12-15DOB complaint, category ?
2023-12-14Permit Mechanical Systems — Signed-off
2023-12-08Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2023-12-04Job filed: INSTALLATION OF EQUIPMENT PER PLAN for complete post fire smoke purge system including roof fans, duct work, fire smoke dampers and control.$125,000
2023-11-28311: Illegal Parking — Parking Permit Improper Use
2023-11-28311: Homeless Person Assistance
2023-11-19311: New Tree Request — For One Address
2023-10-18311: Homeless Person Assistance
2023-10-12Permit Sprinklers — Signed-off
2023-10-12Permit Plumbing — Signed-off
2023-08-29Permit Construction Fence — Signed-off
2023-08-16Job filed: PLUMBING AND SPRINKLER FILED IN CONJUNCTION WITH ALT II APPLICATION NO. 140790856$91,820
2023-08-07Job filed: INSTALLATION OF 30'-0" PLYWOOD CONSTRUCTION FENCE$3,600
2023-07-25311: Homeless Person Assistance
2023-07-06Permit Plumbing — Signed-off
2023-07-06Permit Sprinklers — Signed-off
2023-06-15Elevator permit: All work to comply with Safety Code for Elevators and Escalators ASME A17.1-2013, Part 7, Section 7.2 for electric and Hand Dumbwa$44,700
2023-06-02Permit Plumbing — Signed-off
2023-06-02Permit Sprinklers — Signed-off
2023-05-25Boiler inspection
2023-03-22Permit General Construction — Signed-off
2023-03-20311: Noise — Noise: Construction Equipment (NC1)
2023-01-05Permit Sprinklers — Signed-off
2023-01-05Permit Plumbing — Signed-off
2022
2022-12-28Job filed: PLUMBING AND SPRINKLER FILED IN CONJUNCTION WITH ALT II APPLICATION NO. 140790856$91,820
2022-12-28Job filed: MECHANICAL FILED IN CONJUNCTION WITH ALT II APPLICATION NO. 140790856$10,751
2022-12-20Job filed: No Work
2022-12-08Permit Structural — Signed-off
2022-12-08Permit Mechanical Systems — Signed-off
2022-10-25Job filed: Plumbing and Sprinkler work in the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$212,750
2022-10-23Job filed: Mechanical scope renovation of the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$152,000
2022-10-17Job filed: Structural scope renovation of the cellar and 001Floor levels associated with the new restaurant. The change of use, and occupancy is filed under ALT1$55,000
2022-08-08Job filed: Architectural scope associated with the Interior and exterior work in the cellar and 001Floor for the new restaurant build-out. No change of use, egre$417,600
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-31311: Homeless Person Assistance
2022-06-27Boiler inspection
2022-06-16Permit EW — ISSUED
2022-02-03311: Derelict Vehicles — Derelict Vehicles
2022-02-01Facade (LL11) filing, cycle 9: SWARMP
2021
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-06-02Boiler inspection
2021-03-03Elevator permit: Provide New Door Lock Monitoring System per Section 3.10.12 of Chapter K3 of Appendix K of the New York City Building Code. All wo$38,628
2021-01-19311: Noise - Helicopter — Other
2020
2020-12-29DTL — from THE BANK OF NEW YORK MELLON
2020-12-14311: Noise - Street/Sidewalk — Loud Music/Party
2020-11-02Permit Sprinklers — Signed-off
2020-10-05AL&R $11,200,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS$11,200,000
2020-10-05Agreement $11,200,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS$11,200,000
2020-10-05Mortgage $6,087,894 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS$6,087,894
2020-10-02Permit Mechanical Systems — Signed-off
2020-09-25Job filed: Modification to existing mechanical system on 10th/11th floor office.$50,000
2020-08-24Permit Plumbing — Signed-off
2020-08-19311: NonCompliance with Phased Reopening — Business not in compliance
2020-08-03Permit EW — ISSUED
2020-07-06DOB violation E:
2020-07-06DOB violation E:
2020-07-06DOB violation E:
2020-07-01Boiler inspection
2020-06-29ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35174412Y ISSUED ON 6/3/2016 AND TO FILE A CERTIFICATE $1,250
2020-06-22Permit Plumbing — Signed-off
2020-06-10Job filed: Modification to existing mechanical system on 10th/11th floor office.$50,000
2020-06-10Job filed: Modification to existing sprinkler system on 10th and 11th floor.$50,000
2020-06-03Job filed: INTERIOR RENOVATION TO EXISTING OFFICE OCCUPANCY TO INCLUDE NEW PARTITIONS AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE EGRESS OR OCCUPANCY. RE-FILIN$100
2020-06-03Job filed: INTERIOR RENOVATION TO EXISTING OFFICE OCCUPANCY TO INCLUDE NEW PARTITIONS AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE EGRESS OR OCCUPANCY. RE-FILIN$100
2020-05-14Job filed: INTERIOR RENOVATION TO EXISTING OFFICE OCCUPANCY TO INCLUDE NEW PARTITIONS AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE EGRESS OR OCCUPANCY.$750,000
2020-05-14Job filed: INTERIOR RENOVATION TO EXISTING OFFICE OCCUPANCY TO INCLUDE NEW PARTITIONS AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE EGRESS OR OCCUPANCY.$750,000
2020-05-14Job filed: INTERIOR RENOVATION TO EXISTING OFFICE OCCUPANCY TO INCLUDE NEW PARTITIONS AND NEW FINISHES THROUGHOUT. NO CHANGE IN USE EGRESS OR OCCUPANCY.$750,000
2020-03-02Job filed: Modification to existing plumbing system located on the 10th and 11th floor for existing office occupancy. No change in use, egress or occupancy.$60,000
2020-01-30Permit AL — ISSUED
2019
2019-08-20Boiler inspection
2019-06-03311: Illegal Parking — Posted Parking Sign Violation
2019-05-01311: Illegal Parking — Posted Parking Sign Violation
2019-05-01311: Illegal Parking — Posted Parking Sign Violation
2019-04-19Permit EW — ISSUED
2019-03-07Job filed: NEW SCAV UNITS FOR 9TH FLOOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED. NO CHANGE IN USE OCCUPANCY OR EGRESS$63,000
2019-03-07Job filed: NEW SCAV UNITS FOR 9TH FLOOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED. NO CHANGE IN USE OCCUPANCY OR EGRESS$63,000
2018
2018-08-07Job filed: MECHANICAL, PLUMBING AND SPRINKLER (MEP) FILED IN CONJUNCTION WITH ALT II APPLICATION #140790856$143,070
2018-08-06Job filed: RENOVATIONS TO EXISTING SPACE FILED IN CONJUNCTION WITH ALT I APPLICATION #120528722.$514,800
2018-07-11311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2018-07-11DOB complaint, category ?
2018-06-11311: Taxi Complaint — Driver Complaint
2018-05-08Boiler inspection
2017
2017-06-26DOB violation E:
2017-06-26DOB violation E:
2017-04-20311: Sewer — Sewer Backup (Use Comments) (SA)
2017-04-18311: Sewer — Sewer Backup (Use Comments) (SA)
2017-04-11Boiler inspection
2017-04-10311: Sewer — Manhole Overflow (Use Comments) (SA1)
2017-03-22311: Sewer — Sewer Backup (Use Comments) (SA)
2017-03-08311: Sidewalk Condition — Broken Sidewalk
2017-02-17Facade (LL11) filing, cycle 8: SWARMP
2017-01-30311: Water System — Excessive Water In Basement (WEFB)
2017-01-26311: Noise - Commercial — Banging/Pounding
2017-01-24311: Water System — Excessive Water In Basement (WEFB)
2017-01-19311: Water System — Leak (Use Comments) (WA2)
2016
2016-12-16Permit EW — ISSUED
2016-11-14Job filed: MASONRY REPAIR AND REPLACEMENT AT THE FRONT AND REAR FACADES IN VARIES LOCATIONS.$27,000
2016-11-14Job filed: MASONRY REPAIR AND REPLACEMENT AT THE FRONT AND REAR FACADES IN VARIES LOCATIONS.$27,000
2016-08-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-07-20Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-07-20Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCU
2016-07-20Permit EQ — ISSUED
2016-06-03ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY MEASURES SUCH AS SIDEWALK SHED.FENCE ETC TO PROTECT PUBLIC FROM UNSAFE CONDITIONS AS PER 1RCNY103-04 & A$2,400
2016-05-18DOB violation E:
2016-05-18DOB violation E:
2016-05-18DOB violation E:
2016-05-17311: Facades — Facade (LL11/98)- Unsafe Notification
2016-05-17DOB complaint, category ?
2016-05-11311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2015
2015-09-24FDNY inspection (RISK)
2015-07-06DOB violation E:
2015-07-06DOB violation E:
2015-07-06DOB violation E:
2015-03-27311: Street Condition — Pothole
2014
2014-03-07Permit AL — ISSUED
2014-02-14FDNY inspection (STRUC_INT)
2014-02-04Permit PL — ISSUED
2014-01-31Job filed: INSTALLING NEW TELECOMMUNICATION EQUIPMENT ON 12TH FLOOR.INSTALLING NEW GPS ANTENNAS ON THE ROOF.ALL IN CONFORMANCE WITH TPPN# 5/98.NO CHANGE IN USE,E$50,050
2014-01-22Permit EW — ISSUED
2014-01-21Permit EW — ISSUED
2014-01-17Job filed: FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPAN$80,000
2014-01-17Job filed: FILING FOR INTERIOR RENOVATION OF EXISTING SPACE WITH ASSOCIATED PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY$120,000
2014-01-17Job filed: FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPAN$80,000
2013
2013-11-27DOB complaint, category ?
2013-11-13Permit AL — ISSUED
2013-10-25DOB complaint, category ?
2013-10-07Job filed: INSTALLING (4) NEW AIR COOLED CONDENSING UNITS ON THE ROOF ON ROOF TIMBERS. RELATED AIR HANDLERS IN EXISTING 12TH FLOOR ROOM. NO CHANGE IN USE, EGRESS$250,000
2013-10-07Permit EW — ISSUED
2013-10-02Job filed: INSTALL NEW TELECOMMUNICATIONS EQUIPMENT ON THE 12TH FLOOR. RELATED GPS ANTENNAS ON ROOF. ALL IN CONFORMANCE WITH TPPN # 5/98. NO CHANGE IN USE, EGRES$54,000
2013-09-28311: Sidewalk Condition — Blocked - Construction
2013-09-24Permit EW — ISSUED
2013-09-13ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION. FOR ALT 121626570 THE PROPOSED BUILD-OUT OF 1ST FLR
2013-09-12DOB complaint, category ?
2013-09-05Permit EW — ISSUED
2013-09-05Permit EW — ISSUED
2013-08-29FDNY inspection (COMPLAINT)
2013-08-22Permit PL — ISSUED
2013-08-21Permit EW — ISSUED
2013-08-21Permit EW — ISSUED
2013-08-20Permit PL — ISSUED
2013-08-16Permit EW — ISSUED
2013-07-24Permit EW — ISSUED
2013-07-23Permit EW — ISSUED
2013-07-11DOB violation E:
2013-07-11DOB violation E:
2013-07-11DOB violation E:
2013-07-03AL&R $6,000,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS$6,000,000
2013-07-03Agreement $6,000,000 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS$6,000,000
2013-07-03Mortgage $1,202,746 — from 151 WEST 30TH STREET, LLC to APPLE BANK FOR SAVINGS$1,202,746
2013-07-03Mortgage assigned — from VNB CAPITAL CORP. to APPLE BANK FOR SAVINGS
2013-07-03TL&R — from VALLEY NATIONAL BANK
2013-07-02Job filed: INSTALL NEW PLUMBING FIXTURES & MEDICAL GAS SYSTEM AS PER PLANS & SCH. B FILED. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.$25,000
2013-07-02Job filed: INSTALLATION OF NON LOAD BEARING INTERIOR PARTITIONS, CABINETRY & DENTAL EQUIPMENT FOR NEW DENTAL OFFICE. NO CHANGE TO EXISTING USE, OCCUPANCY OR $137,500
2013-06-26Job filed: FILING FOR MECHANICAL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$45,000
2013-06-26Job filed: FILING FOR INTERIOR RENOVATION WITH ASSOCIATED PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$55,000
2013-06-26Job filed: FILING FOR MECHANICAL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$45,000
2013-06-26Job filed: FILING FOR INTERIOR RENOVATION WITH ASSOCIATED PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$55,000
2013-06-20Permit EW — ISSUED
2013-06-20Permit EW — ISSUED
2013-06-18Certificate of occupancy Temporary
2013-06-12Job filed: FILING FOR STRUCTURAL WORK ASSOCIATED WITH STOREFRONT AS PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2013-06-12Job filed: FILING FOR REPLACEMENT OF EXISTING 1ST FLOOR STOREFRONT FACADE WITH NEW METAL AND GLASS STOREFRONT FACADE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE$55,000
2013-06-12Job filed: FILING FOR STRUCTURAL WORK ASSOCIATED WITH STOREFRONT AS PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2013-06-12Job filed: FILING FOR REPLACEMENT OF EXISTING 1ST FLOOR STOREFRONT FACADE WITH NEW METAL AND GLASS STOREFRONT FACADE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE$55,000
2013-05-29Permit EQ — ISSUED
2013-05-29Permit EW — ISSUED
2013-05-28Job filed: INSTALL 5 HVAC UNITS ON EXISTING DUNNAGE ON ROOF AND OBTAIN EUP CARDS. NO CHANGE TO USE EGRESS OR OCCUPANCY.$25,000
2013-05-28Job filed: INSTALL 5 HVAC UNITS ON EXISTING DUNNAGE ON ROOF AND OBTAIN EUP CARDS. NO CHANGE TO USE EGRESS OR OCCUPANCY.$25,000
2013-05-28Job filed: INSTALL 5 HVAC UNITS ON EXISTING DUNNAGE ON ROOF AND OBTAIN EUP CARDS. NO CHANGE TO USE EGRESS OR OCCUPANCY.$25,000
2013-05-22Job filed: MINOR RENOVATE EXISTING COMMERCIAL SPACE IN FIRST FLOOR, NEW STORE FRONT,NEW PARTITION, INTERIOR FINISH WORKS AS PER PLAN. NO CHANGE IN USE, DEGREES, $200,000
2013-03-21Certificate of occupancy Temporary
2013-02-20Permit EW — ISSUED
2013-02-07Job filed: REMOVE, RELOCATE AND INSTALL NEW SPRINKLER HEADS AT THE 12TH FLOOR. THE NEW SYSTEM IS A SINGLE INTERLOCK PRE-ACTION SYSTEM. NO CHANGE TO USE, EGRESS O$56,000
2013-02-07Job filed: REMOVE, RELOCATE AND INSTALL NEW SPRINKLER HEADS AT THE 12TH FLOOR. THE NEW SYSTEM IS A SINGLE INTERLOCK PRE-ACTION SYSTEM. NO CHANGE TO USE, EGRESS O$56,000
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2013-01-02Job filed: ADDITION TO EXISTING MODIFIED CLASS "E" SYSTEM WITH EMERGENCY VOICE/ALARM COMMUNICATIONS SYSTEM AND CENTRAL STATION CONNECTION$22,000
2013-01-02Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM.$30,000
2013-01-02Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM WITH EMERGENCY VOICE/ALARM COMMUNICATIONS SYSTEM AND CENTRAL STATION CONNECTION$22,000
2013-01-02Job filed: ADDITION TO EXISTING MODIFIED CLASS 'E' SYSTEM WITH EMERGENCY VOICE/ALARM COMMUNICATIONS SYSTEM AND CENTRAL STATION CONNECTION$22,000
2012
2012-12-18Certificate of occupancy Temporary
2012-12-14Permit PL — ISSUED
2012-12-13Rodent inspection: Passed
2012-10-01Permit EW — RE-ISSUED
2012-10-01Permit EW — ISSUED
2012-10-01Permit EW — ISSUED
2012-10-01Permit EW — ISSUED
2012-09-26Job filed: INSTALLATION OF EMERGENCY GENERATOR AND FUEL STORAGE TANK AS PER PLANS FILED HEREWITH. NO CHNAGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$262,000
2012-09-26Job filed: INSTALLATION OF NEW HVAC SYSTEM AND MODIFICATION TO EXISTING PLUMBING FIXTURES AS PER PLANS FILE HEREWITH. NO CHANGE IN USE, EGRGESS OR OCCUPANCY.$780,000
2012-09-26Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$147,000
2012-09-26Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$147,000
2012-09-26Job filed: INSTALLATION OF NEW HVAC SYSTEM AND MODIFICATION TO EXISTING PLUMBING FIXTURES AS PER PLANS FILE HEREWITH. NO CHANGE IN USE, EGRGESS OR OCCUPANCY.$780,000
2012-09-26Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OCCUPANCY UNDER THIS APPLICATION.$220,000
2012-09-19Certificate of occupancy Temporary
2012-04-05Permit PL — ISSUED
2012-04-05Permit EW — ISSUED
2012-03-21Permit EW — ISSUED
2012-03-20Permit EW — ISSUED
2012-03-19Facade (LL11) filing, cycle 7: SAFE
2012-01-09Job filed: MH & PL FILED FOR WORK ON 4TH & 5TH FLRS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$7,000
2012-01-09Job filed: FILED SPRINKLER APPLICATION IN CONJUCTION WITH ALT-2. NO CHANGE TO USE, OCCUPANCY OR EGRESS. APPLICATION # 120943248$6,500
2012-01-09Job filed: MH & PL FILED FOR WORK ON 4TH & 5TH FLRS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$7,000
2012-01-09Job filed: REMODEL EXISTING OFFICE SPACE ON FOURTH (4) AND FIFTH (5) FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$162,500
2012-01-09Job filed: MODIFICATION OF FIRE ALARM SYSTEM ON THE 4TH AND 5TH FLOOR,. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000
2011
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-11-07Permit EW — ISSUED
2011-09-29Permit PL — ISSUED
2011-08-19Permit AL — ISSUED
2011-07-29Permit EW — ISSUED
2011-06-28Rodent inspection: Passed
2011-05-24Job filed: REPLACE EXISTING DOORS WITH FIRE RATED DOORS AS SHOWN ON DRAWING FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 APPL.# 120528722. NO CHANGE IN USE; O$7,000
2011-05-24Job filed: REPLACE EXISTING DOORS WITH FIRE RATED DOORS AS SHOWN ON DRAWING FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 APPL.# 120528722. NO CHANGE IN USE; O$7,000
2011-03-11Job filed: INSTALLATION OF NEW SPRINKLER HEADS & RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. FILED IN CONJUNCT$5,000
2011-03-11Job filed: INSTALLATION OF NEW SPRINKLER HEADS & RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE; OCCUPANCY OR EGRESS. FILED IN CONJUNCT$5,000
2011-03-08Job filed: A1
2011-03-08Job filed: A1
2011-02-14DOB violation E:
2011-02-14DOB violation E:
2011-02-14DOB violation E:
2011-02-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-02-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-02-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2011-02-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2010
2010-11-10311: General Construction/Plumbing — Failure To Maintain
2010-11-10Job filed: PROPOSE TO CONVERT EXISTING SHOWROOM & FACTORY TO OFFICES AS SHOWN ON DRAWINGS FILED HEREWITH.$390,006
2010-11-10Job filed: PROPOSE TO CONVERT EXISTING SHOWROOM & FACTORY TO OFFICES AS SHOWN ON DRAWINGS FILED HEREWITH.$320,000
2010-11-10DOB complaint, category ?
2010-11-09ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.DEFECTS NOTED: 1) 4TH FLOOR COMMERCIAL SPACE HAS OPEN ELECTRIC BOXES W/EXPOS$1,000
2010-11-09ECB CLASS - 1 violation: FAIL MAINTAIN BLDG COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3, 27-346 NOTED: WESTSIDE STAIRCASE HAS OPEN HOLES ON FLOOR; & CE$1,000
2010-11-09ECB CLASS - 1 violation: FAIL TO MAINTAIN BLDG IN CODE COMPLIANT MANNER:USE OF PROHIBITED DOOR 1 & 1 OR HARDWARE AS PER BC 1008.1.8; 27-371(J) NOTED:WESTSI$1,000
2010-11-09ECB CLASS - 1 violation: 715.3 FAIL TO PROVIDE FIRE RATED/ LABELED FIRE DOORS FOR INCLOSED STAIRCASES. NOTED:BLDG HAVING FOR WEST & EAST STAIRCASES WOODEN,$1,600
2010-07-23Rodent inspection: Passed
2010-05-10DOB violation E:
2010-05-10DOB violation E:
2010-05-10DOB violation E:
2010-03-23Job filed: FILING FOR STRUCTURAL STOREFRONT WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2010-03-23Job filed: FILING FOR STRUCTURAL STOREFRONT WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2009
2009-10-14Job filed: FILING FOR REPLACEMENT OF EXISTING 1ST FLOOR STOREFRONT FACADE WITH NEW METAL AND GLASS STOREFRONT FACADE, AS WELL AS MINOR INTERIOR PARTITION WORK AS$55,000
2009-07-13DOB violation E:
2009-07-13DOB violation E:
2009-07-13DOB violation E:
2009-07-06DOB complaint, category ?
2009-07-06DOB complaint, category ?
2009-07-02DOB violation C:
2009-06-30Job filed: INSTALLATION OF AN EST-3 MODIFIED CLASS 'E' FIRE ALARM & COMMUNICATION SYSTEMS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$76,500
2009-06-30Job filed: INSTALLATION OF AN EST-3 MODIFIED CLASS 'E' FIRE ALARM & COMMUNICATION SYSTEMS . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$76,500
2008
2008-10-28Tenant complaint: HEATING — HEAT RELATED
2008-05-28DOB violation E:
2008-05-28DOB violation E:
2008-05-28DOB violation E:
2008-05-20Facade (LL11) filing, cycle 6: SAFE
2008-01-03DOB violation LL6291:
2007
2007-11-30DOB violation LL1198:
2007-07-11DOB violation E:
2007-07-11DOB violation E:
2007-07-11DOB violation E:
2007-06-13ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG IN THAT THE REAR FIRE STAIRS EXTERIOR ARC ROTTEN BROKEN MISSING & VERY RUSTED AT 10TH FLOOR.1-MA$800
2007-06-12DOB complaint, category ?
2006
2006-09-29DOB violation E:
2006-09-29DOB violation E:
2006-09-29DOB violation E:
2006-01-06DOB violation LL6291:
2005
2005-12-15DOB violation E:
2005-12-15DOB violation E:
2005-12-15DOB violation E:
2005-10-05Permit EQ — ISSUED
2005-10-01DOB violation LL1081:
2005-09-20Job filed: INSTALLATION OF A HEAVY DUTY SHED 115' DURING FACDE REPAIR. NO CHANGES IN USE,EGRESS OR OCCUPANCY.
2005-04-18ECB Non-Hazardous violation: 57B07/84H11/51B07. 51B07 PROVIDE OIL IN CAR CASE-84H. 84H11 REPAIR WORN DRUM BUSTINGS. 51B07 PROVIDE LUBRICATE TO THE HOIST ROPE S
2005-03-15DOB violation E:
2005-03-15DOB violation E:
2005-03-15DOB violation E:
2005-01-31DOB violation LL6291:
2004
2004-12-29Agreement $5,850,032 — from 151 WEST 30TH STREET, L.L.C. to VNB CAPITAL CORP.$5,850,032
2004-12-29Mortgage assigned — from VALLEY NATIONAL BANK to VNB CAPITAL CORP.
2004-03-16ECB Non-Hazardous violation: 23D06/62O02/30D06/35M07/72X11 23D06 SECURE TOP EXIT 62O02 CLEAN PIT 80D06 SECURE EMERGENCY COMMUNICATION COVER IN CAR 65M07 PROVID$2,500
2003
2003-09-12ECB Non-Hazardous violation: 25D06,32BB12,34Q03,36B07,44D13,46B07,51BB12,66O02,03I10,10I10. 25- SECURE 32-RESHACKLE 34-COVER IN PIT 36-SECURE OVERHEAD DOOR 36-$2,500
2003-07-30DOB complaint, category ?
2003-07-30DOB complaint, category ?
2003-07-22Permit EW — ISSUED
2003-07-22Permit EW — ISSUED
2003-07-01Job filed: It is proposed to remove and erect new bathroom partitions in same location. Replace existing bathroom fixtures as shown on plans. No change in use, $11,000
2003-06-06ECB Non-Hazardous violation: WORK W/O PERMIT.NOTED:1)ERECTED NEW PARTITIONS TO CREATE TWO TOILETS AND ONE JANITOR CLOSET.NEW STUDS NEW SHEET ROCK WALLS.NEW FL$250
2003-06-04DOB complaint, category ?
2003-04-29DOB complaint, category ?
2003-04-08Job filed: It is proposed to renovate existing lobby as shown on plans. No change to use, egress or occupancy.$50,000
2003-04-08Job filed: It is proposed to renovate existing lobby as shown on plans. No change to use, egress or occupancy.$50,000
2002
2002-10-07DOB violation E: 1P5265
2002-10-07DOB violation E: 1P5263
2001
2001-12-27DOB violation E: 1P5265
2001-12-27DOB violation E: 1P5264
2001-12-27DOB violation E: 1F5263
2001-11-09Mortgage $499,900 — from 151 WEST 30TH STREET, L.L.C. to VALLEY NATIONAL BANK$499,900
2001-11-09Mortgage assigned — from MSM FINANZ AG to ROSENGARTEN, BENNY
2001-11-09Mortgage assigned — from 151 WEST 30TH STREET, L.L.C. to VALLEY NATIONAL BANK
2001-11-09Agreement — from 151 WEST 30TH STREET, L.L.C. to VALLEY NATIONAL BANK
2001-11-09Mortgage assigned — from ROSENGARTEN, BENNY to VALLEY NATIONAL BANK
2000
2000-12-13DOB violation E: 1P5265
2000-12-13DOB violation E: 1P5263
2000-12-13DOB violation E: 1P5264
2000-07-27TLS — from BANK OF NEW YORK to BANK OF NEW YORK
2000-06-13Permit EW — ISSUED
2000-06-13Permit EW — ISSUED
2000-06-13Permit EW — ISSUED
2000-06-06Job filed: CONSTRUCT INTERIOR PARTITIONS AND NEW BATHROONS, MODIFY HVAC, NEW PLUMBING FIXTURES ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.$17,000
2000-06-06Job filed: CONSTRUCT INTERIOR PARTITIONS AND NEW BATHROONS, MODIFY HVAC, NEW PLUMBING FIXTURES ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.$17,000
2000-03-17DOB violation E: 1P5264
2000-03-17DOB violation E: 1P5263
2000-03-17DOB violation E: 1P5265
2000-02-16Deed — from 151 WEST 30TH STREETASSOCIATES to 151 WEST 30TH STREET, LLC
1999
1999-06-25Permit EW — ISSUED
1999-03-16DOB violation LL6291:
1999-03-01ECB Non-Hazardous violation: 03O,31M. PROVIDE COVERSFOR WIRING ON CAR TOP.
1999-03-01ECB Non-Hazardous violation: 35O,57O.
1999-03-01ECB Non-Hazardous violation: 57O,25M. REPLACE DOOR OPERATOR COVER.
1998
1998-05-04DOB violation LL6291:
1995
1995-08-15ECB Non-Hazardous violation: 01L,02L,21L,22D,46T,57O,73O. 01 + 02 MAKE AUDIBLE. 22 PROPERLY SECURE FROM TOP. 46 RESHACKLE,PROPERLY DATE + TAG FOR SAME.
1995-08-15ECB Non-Hazardous violation: 46T,73O,57O, 46 RESHACKLE;PROPERLY DATE + TAG.
1995-08-15ECB Non-Hazardous violation: 21L,22D,46T,57O,73O. 22 PROPERLY SECURE FROM TOP. 46 RESHACKLE;PROPERLY DATE + TAG FOR SAME.
1994
1994-09-01DOB violation LL6291:
1994-07-15ECB Non-Hazardous violation: 5I,5I,6L,74L,15L,74A,15C,(74) REPAIR COMMUNICATOR (74A) PROUTAG PHOPER CLEARANCE BETWEEN THE CWT & THE BUFFER
1993
1993-08-17Mortgage assigned — from CHASE MANHATTAN BANKNA to MILEGER, M. SPITZER
1992
1992-07-01DOB violation LL1080:
1992-04-22ECB Non-Hazardous violation: 01B,02B,MAKE BELL TO RING.
1992-04-22ECB Non-Hazardous violation: 10L,42F,50Y,64B,(10)PROVIDE CAR SWITCH HANDLE.
1992-04-22ECB Non-Hazardous violation: 50Y,
1992-04-07DOB violation LL1081: 1
1991
1991-06-28ECB Non-Hazardous violation: 22D 46T 60M
1991-06-28ECB Non-Hazardous violation: 18Q 19L 46T
1991-06-28ECB Non-Hazardous violation: 22D 46T 60M
1990
1990-09-29DOB violation E:
1990-09-29DOB violation E: 50 REMOVE NOISE FROM DRUM AS CAR IS RUNNING.14 RENEW CERTIFICATE FRAME
1990-09-29DOB violation E: 03 MAKE CAR SWITCH HANDLE SELF CENTERING.IT NOW REMAINS IN DOWN POSITION WHEN LET GO
1990-06-29DOB violation LL1081: 1
1990-01-10PAT — from SPITZWR, JOSEPH to SPITZER, ALBERT
1990-01-10Mortgage assigned — from 151 WEST 30TH ST ASS to CHASE MANHATTAN BANK
1990-01-10Mortgage assigned — from HUDSON'S BAY N.Y. INC. to CHASE MANHATTAN BANK
1990-01-10Mortgage $1,265,000 — from 151 WEST 30TH ST ASSOC to CHASE MANHATTAN BANK$1,265,000
1990-01-10Agreement — from 151 WEST 30TH ST ASSOC. to CHASE MANHATTAN BANK
1989
1989-10-12DOB violation LL1081: 2
1988
1988-12-01DOB violation E: (51)PROPERLY TAG THE GOVERNOR (52)REMOVE LOCKS FROM ALL HOISTWAY DOORS(53)REPAIR THE OUTSIDE ALARM SYSTEM(54)RENEW THE OVERHE
1988-11-30DOB violation E: (51) PROPERLY TAG THE GOVENOR (52) REPAIR PANKAGE DEVICE PREVENT CWT FORM SCRAPING
1988-02-09DOB violation E:
1986
1986-12-29Mortgage assigned — from HUDSON'S BAY CO FURSALE to HUDSON'S BAY CO FURSALE
1986-03-11Deed — from HUDSON'S BAY CO FURETC to 151 WEST 30TH ST ASSOCS
1986-03-11Mortgage $4,235,000 — from 151 WEST 30TH ST ASSOCS to HUDSON'S BAY CO FURETC$4,235,000
1969
1969-05-29Deed — from RUPERTS LAND TRADINGCO to HUDSONS BY CO FUR SALES
1969-05-15Deed — from LEHET REALTY CORP to RUPERTS LAND TRADINGCO
1967
1967-05-03Mortgage assigned — from BROADWAY SAVS BANK to CHASE MANHATTAN BANK
1967-05-03Agreement — from LEHET REALTY CORP to CHASE MANHATTAN BANK
1900
1900-01-01Restaurant inspection: SEA

Support this site Back to the building page