The city's published records show little recorded distress here in the last three years. Less recorded distress than 76% of 25-99-unit residential buildings citywide. The citywide median for 25-99-unit residential buildings is 23.6 penalty
points per 10 units; this building carries 3.9. In ZIP 10011, 68% of residential buildings hold an A and
5% grade D or F.
How grades work
this building
A
B
C
Among 17,252 25-99-unit residential buildings citywide · left is less recorded distress, right is more
Open with the city right now
No current HPD flags in the latest weekly snapshot: no open violations, no
pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.
Patterns
17 heat or hot-water complaints in the last three years (winter 2023–24: 2 · winter 2024–25: 4). Repeated winter clusters suggest a chronic heating problem.
2
’23–24
4
’24–25
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
38 service requests in the last three years. Most common: HEAT/HOT WATER (8) · Noise (8) · Encampment (8) · Sewer (2) · Consumer Complaint (2) · Animal (2).
Filed construction activity
$132,500 in permitted construction work filed since
2016 (3 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
Rent-stabilization signals
No
Built before 1974 (2005)
Yes
Six or more residential units (98)
No
421-a / J-51 tax benefit on the current tax roll
1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit:
request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).
Registered with HPD — the names behind the building
Registered owner(s)
30 WEST 18 ASSOC, LLC
Head officer
JOE HAKIMIAN
Managing agent
30 WEST 18 ASSOC.
Last registered
2025-08-13
as filed by the owner in the building's HPD registration
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$35,759,000
$16,091,550
2026
$37,054,000
$16,674,300
2027
$34,472,000
$15,512,400
The city's market estimate has fallen
4% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 19/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NATURALGAS
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
14 St — 1 2 3 F L M · 600 ft straight-line (about a 3-minute walk) · station accessibility: full 14 St-Union Sq — 4 5 6 L N Q R W · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: partial
Bus
Nearest boarding stop: 6 Av / W 18 St — M7 M55 · 500 ft
Citi Bike
W 18 St & 6 Ave · 350 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
38 311 service requests from this address in the last three years — 8 of them about heat or hot water.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $744,336 on
2019-08-01 (lender: Apple Bank For Savings), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2019-08-01
AL&R $42,500,000 — from 30 WEST 18 ASSOCIATES, LLC to APPLE BANK FOR SAVINGS
$42,500,000
2019-08-01
Agreement $42,500,000 — from 30 WEST 18 ASSOCIATES, LLC to APPLE BANK FOR SAVINGS
$42,500,000
2019-08-01
Mortgage $744,336 — from 30 WEST 18 ASSOCIATES, LLC to APPLE BANK FOR SAVINGS
$744,336
2015-03-23
AL&R $45,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK
$45,000,000
2015-03-23
Agreement $45,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK
$45,000,000
2015-03-23
Mortgage $2,452,249 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNIY BANK
$2,452,249
2011-03-07
Agreement $44,000,000 — from 30 WEST 18 ASSOCIATES LLC to NEW YORK COMMUNITY BANK
$44,000,000
2009-02-26
Mortgage $15,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK
$15,000,000
2009-02-26
Agreement $44,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK
$44,000,000
2008-08-29
Agreement $27,514,199 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK
$27,514,199
2008-08-29
Agreement $1,485,801 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK
$1,485,801
2005-08-31
Mortgage $1,485,801 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK
$1,485,801
2005-08-31
AL&R $29,000,000 — from THE BANK OF NEW YORK to 30 WEST 18 ASSOCIATES, LLC
$29,000,000
2005-08-31
Mortgage $27,514,199 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK
$27,514,199
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
2024
2025
38
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
8
8
13
0
2
31
2018
0
2
10
0
8
20
2019
0
1
9
6
10
26
2020
0
1
15
0
8
24
2021
0
7
21
0
8
36
2022
0
7
11
0
7
25
2023
0
4
15
0
10
29
2024
0
2
14
0
9
25
2025
0
0
10
0
11
21
2026
0
0
30
0
8
38
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-20
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-12
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-12
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-11
HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
2026-07-11
HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM EAST
2026-07-10
311: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-10
Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-09
311: HEAT/HOT WATER — APARTMENT ONLY
2026-07-09
Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-05-28
Bedbug filing: 0 infested units
2026-05-16
HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-15
311: Noise — Noise: air condition/ventilation equipment (NV1)
2026-05-14
311: Noise — Noise: air condition/ventilation equipment (NV1)
2026-05-08
HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-07-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-20Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-12311: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-11HPD class C: § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
2026-07-11HPD class C: § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM EAST
2026-07-10311: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-07-09311: HEAT/HOT WATER — APARTMENT ONLY
2026-07-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2026-05-28Bedbug filing: 0 infested units
2026-05-16HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2026-05-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2026-05-14311: Noise — Noise: air condition/ventilation equipment (NV1)
2026-05-08HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2026-03-04311: Animal-Abuse — Neglected
2026-02-17311: Encampment — N/A
2026-02-17311: Encampment — N/A
2026-02-13311: DOOR/WINDOW — DOOR
2026-02-13Tenant complaint: DOOR/WINDOW — DOOR
2026-01-23311: Encampment — N/A
2026-01-23311: Encampment — N/A
2026-01-07311: Encampment — N/A
2026-01-07311: Encampment — N/A
2026-01-06311: Encampment — N/A
2026-01-06311: Encampment — N/A
2025
2025-12-31Restaurant inspection: LITTLE MAVEN — grade A
2024-12-06311: Lead — Lead Kit Request (Residential) (L10)
2024-12-03311: Noise — Noise: Construction Before/After Hours (NM1)
2024-11-26FDNY inspection (COM_OCPCY)
2024-11-26FDNY inspection (RISK)
2024-10-30311: Noise — Noise: Construction Before/After Hours (NM1)
2024-10-29HPD class C: § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MIS
2024-10-27311: HEAT/HOT WATER — ENTIRE BUILDING
2024-10-27Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2024-08-07Restaurant inspection: LITTLE MAVEN
2024-07-29311: WATER LEAK — HEAVY FLOW
2024-07-29Tenant complaint: WATER LEAK — HEAVY FLOW
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-07-15Boiler inspection
2024-06-18311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2024-01-15311: HEAT/HOT WATER — ENTIRE BUILDING
2024-01-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2023-03-30HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2023-03-13311: Lead — Lead Kit Request (Residential) (L10)
2023-02-27Facade (LL11) filing, cycle 9: SWARMP
2022
2022-12-09ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANC$1,250
2022-11-02HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-10-26311: Dirty Condition — Trash
2022-10-13311: Lead — Lead Kit Request (Residential) (L10)
2022-10-11311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2022-10-04311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2022-09-28311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2022-09-19311: Residential Disposal Complaint — Waste Set Out Too Early or Too Late
2022-09-07FDNY inspection (COM_OCPCY)
2022-09-05311: Dirty Condition — Trash
2022-08-26FDNY inspection (COM_OCPCY)
2022-08-26FDNY inspection (COM_OCPCY)
2022-08-26FDNY inspection (RISK)
2022-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-07-29Boiler inspection
2022-07-29Boiler inspection
2022-07-29Boiler inspection
2022-07-29Boiler inspection
2022-07-29Boiler inspection
2022-07-29Boiler inspection
2022-07-29Boiler inspection
2022-06-27Bedbug filing: 0 infested units
2022-03-09HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2022-01-07311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021
2021-12-24311: Noise — Noise: Construction Equipment (NC1)
2021-06-20DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
2021-06-17Boiler inspection
2021-06-17Boiler inspection
2021-06-17Boiler inspection
2021-06-17Boiler inspection
2021-06-17Boiler inspection
2021-06-17Boiler inspection
2021-04-21311: Noise — Noise: Construction Before/After Hours (NM1)
2021-04-20Bedbug filing: 0 infested units
2021-04-19HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2021-01-16311: Noise - Helicopter — Other
2020
2020-12-22Boiler inspection
2020-12-22Boiler inspection
2020-10-11311: Noise - Vehicle — Engine Idling
2020-10-07311: HEAT/HOT WATER — ENTIRE BUILDING
2020-10-07Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-09-27311: Noise - Vehicle — Engine Idling
2020-09-27311: Noise - Vehicle — Engine Idling
2020-09-25311: Noise - Vehicle — Engine Idling
2020-08-07311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-27311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-07-17311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-06-29DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
2020-06-18311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-13311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-05-12311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-04-27Boiler inspection
2020-04-27Boiler inspection
2020-04-27Boiler inspection
2020-04-27Boiler inspection
2020-04-27Boiler inspection
2020-04-27Boiler inspection
2020-03-04311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-01-07311: HEAT/HOT WATER — APARTMENT ONLY
2020-01-07Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019
2019-11-19311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-03FDNY inspection (RISK)
2019-08-01AL&R $42,500,000 — from 30 WEST 18 ASSOCIATES, LLC to APPLE BANK FOR SAVINGS$42,500,000
2019-08-01Agreement $42,500,000 — from 30 WEST 18 ASSOCIATES, LLC to APPLE BANK FOR SAVINGS$42,500,000
2019-08-01Mortgage $744,336 — from 30 WEST 18 ASSOCIATES, LLC to APPLE BANK FOR SAVINGS$744,336
2019-08-01Mortgage assigned — from NEW YORK COMMUNITY BANK to APPLE BANK FOR SAVINGS
2019-08-01TL&R — from NEW YORK COMMUNITY BANK to 30 WEST 18 ASSOCIATES, LLC
2019-08-01TL&R — from NEW YORK COMMUNITY BANK to 30 WEST 18 ASSOCIATES, LLC
2019-06-25311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2019-05-03Elevator permit: Furnish and install Door Lock Monitoring Circuitry. All work to comply with ASME A17.3-2002/K3 (3.10.12). All work to be inspect$14,000
2019-05-03Elevator permit: Furnish and install Door Lock Monitoring Circuitry. All work to comply with ASME A17.3-2002/K3 (3.10.12). All work to be inspect$14,000
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-15Boiler inspection
2019-04-01311: Lead — Lead Kit Request (Residential) (L10)
2019-04-01311: Water Quality — unknown odor/taste in drinking water (QA6)
2018-06-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-06-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-06-24311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-05-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-05-10311: Noise — Noise: Construction Before/After Hours (NM1)
2018-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017
2017-12-30311: HEAT/HOT WATER — APARTMENT ONLY
2017-12-30Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2017-11-28311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2017-11-27311: Noise — Noise: Construction Equipment (NC1)
2017-11-24Permit EW — ISSUED
2017-11-22Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#140670183, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND FIRE SU$3,000
2017-11-22Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#140670183, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND FIRE SU$3,000
2017-11-03Permit EW — ISSUED
2017-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-10-31311: Noise — Noise: Construction Before/After Hours (NM1)
2017-07-18Job filed: INTERIOR RENOVATION OF AN EXISTING EATING AND DRINKING ESTABLISHMENT INCLUDING THE REMOVAL OF NON-LOAD BEARING PARTITIONS, INSTALLATION OF NEW NON-LOA$126,500
2017-05-17DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-05-09Eviction executed (10C)
2017-05-08ECB CLASS - 2 violation: REMOVAL OF SIDEWALK SHED OR OTHER TYPE OF SAFETY MEASURES W/OUT DEPT APPROVAL. NOTED @ TIME OF INSP BLDG FACADES WERE STILL DESIGN$800
2017-05-05311: Noise — Noise: Construction Before/After Hours (NM1)
2017-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-02-22ECB CLASS - 1 violation: FAILURE TO TAKE AND PROVIDE SAFETY MEASURE SUCH AS SIDEWALK SHED, NET TING. ETC. WHERE REQURIED TO PROTECT AND PUBLIC SAFETY FROM $2,400
2017-01-10Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016
2016-11-28HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2015
2015-12-22311: Taxi Complaint — Driver Complaint
2015-09-21Certificate of occupancy Final
2015-05-09311: Found Property — Other
2015-04-15FDNY inspection (RISK)
2015-04-02311: Noise — Noise: Construction Before/After Hours (NM1)
2015-04-02311: Noise - Vehicle — Engine Idling
2015-03-23AL&R $45,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK$45,000,000
2015-03-23Agreement $45,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK$45,000,000
2015-03-23Mortgage $2,452,249 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNIY BANK$2,452,249
2015-02-09311: Taxi Complaint — Driver Complaint
2015-01-23311: Food Establishment — Letter Grading
2014-11-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-07-31DOB complaint, category ?
2014-07-15Certificate of occupancy Temporary
2014-07-14DOB violation E:
2014-07-14DOB violation E:
2014-06-05HPD class C: SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE KEY OPERATE CYLINDER LOCK AT BUILDING ENTRANCE DOOR FROM STREET TO VESTIB
2014-06-05HPD class C: SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE KEY OPERATE CYLINDER LOCK AT VESTIBULE DOOR TO 1ST STORY PUBLIC HALL
2014-06-01311: HEAT/HOT WATER — ENTIRE BUILDING
2014-06-01Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2014-05-15311: Taxi Complaint — Driver Complaint
2014-05-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-04-09Permit EW — ISSUED
2014-04-03Certificate of occupancy Temporary
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-02311: Taxi Complaint — Driver Complaint
2014-01-02Certificate of occupancy Temporary
2013
2013-12-02Permit EW — ISSUED
2013-11-18Rodent inspection: Passed
2013-11-08311: Rodent — Rat Sighting
2013-10-22DOB complaint, category ?
2013-10-10Certificate of occupancy Temporary
2013-09-12Job filed: ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2013-09-11Permit PL — ISSUED
2013-09-05Job filed: SCOPE OF WORK WILL INCLUDE MODIFYING EXISTING SPRINKLER SYSTEM, WITH RELOCATION OF HEADS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$32,900
2013-09-05Job filed: SCOPE OF WORK WILL INCLUDE MODIFYING EXISTING SPRINKLER SYSTEM, WITH RELOCATION OF HEADS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$32,900
2013-09-05Permit EW — ISSUED
2013-09-04Job filed: SCOPE OF WORK WILL INCLUDE INSTALLATION OF HVAC UNITS WITH DUCT WORK , AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2011-11-05HPD class B: § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 12B, 12th STORY, 1st APARTMENT FROM S
2011-06-14Job filed: FILE FOR THE INSTALLATION OF MANUAL AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER ALARM SYSTEM WITH INTERCONNECTION TO BASE BUILDING FIRE ALARM SYSTEM $15,000
2011-06-12311: NONCONST — VERMIN
2011-06-12Tenant complaint: NONCONST — VERMIN
2011-06-03Permit AL — ISSUED
2011-04-20Permit EW — ISSUED
2011-04-01Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. GAS VALVE WAS FILED UNDER APPL # 120547015. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2011-03-30Permit EW — ISSUED
2011-03-30Permit EW — ISSUED
2011-03-23Job filed: PA
2011-03-23Job filed: PA
2011-03-07Agreement $44,000,000 — from 30 WEST 18 ASSOCIATES LLC to NEW YORK COMMUNITY BANK$44,000,000
2011-01-15311: HEATING — HEAT
2011-01-15Tenant complaint: HEATING — HEAT RELATED
2011-01-14Permit PL — ISSUED
2011-01-10Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM.$17,000
2010
2010-12-28Permit AL — ISSUED
2010-12-02Job filed: MODIFY EXISTING SPRINKLER MONITOR SMOKE DETECTION SYSTEM WITHIN NEW RESTAURANT SPACE AT GROUND FLOOR AND CELLAR. FILED IN CONJUNCTION WITH NB #104048$1,000
2010-12-02Job filed: FILING HEREWITH ARCHITECTURAL PLANS FOR INTERIOR BUILD OUT OF RESTAURANT AT PARTIAL GROUND FLOOR AND PARTIAL CELLAR WITHIN VACANT SPACE PREVIOUSLY FIL$1,000
2010-12-02Job filed: INSTALLATION OF MECHANICAL AND PLUMBING SYSTEMS WITHIN NEW RESTAURANT SPACE AT GROUND FLOOR AND CELLAR.
2010-12-02Job filed: INFILL EXISTING SLAB OPENING FOR REMOVED STAIR. CREATE NEW SLAB OPENING FOR NEW STAIR. INSTALL NEW STEEL BEAM, STEEL ANGLES, METAL DECKING AND CONCR
2010-12-02Job filed: INFILL EXISTING SLAB OPENING FOR REMOVED STAIR. CREATE NEW SLAB OPENING FOR NEW STAIR. INSTALL NEW STEEL BEAM, STEEL ANGLES, METAL DECKING AND CONCR
2010-12-02Job filed: INSTALL SPRINKLERS WITHIN NEW RESTAURANT SPACE AT GROUND FLOOR AND CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #1040$1,000
2010-12-02Job filed: INSTALL SPRINKLERS WITHIN NEW RESTAURANT SPACE AT GROUND FLOOR AND CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH NB #1040$1,000
2010-12-02Job filed: INFILL EXISTING SLAB OPENING FOR REMOVED STAIR. CREATE NEW SLAB OPENING FOR NEW STAIR. INSTALL NEW STEEL BEAM, STEEL ANGLES, METAL DECKING AND CONCR
2010-10-20DOB complaint, category ?
2010-10-08DOB violation VCAT1:
2010-08-09311: Graffiti — Graffiti
2010-07-07Permit PL — ISSUED
2010-06-17Permit EW — ISSUED
2010-06-17Permit EW — ISSUED
2010-06-17Permit EW — ISSUED
2010-06-17Permit PL — ISSUED
2010-06-17Permit PL — ISSUED
2010-06-16Rodent inspection: Passed
2010-06-02Permit AL — ISSUED
2010-06-02Permit EQ — ISSUED
2010-06-01Permit EQ — ISSUED
2010-05-24311: Air Quality — Air: Dust, Commercial (AE2)
2010-05-24Tenant complaint: PLUMBING — WATER SUPPLY
2010-05-24Permit EW — ISSUED
2010-05-24Permit EW — ISSUED
2010-05-10311: Graffiti — Graffiti
2010-04-20311: Noise — Noise: Construction Equipment (NC1)
2010-04-19311: Street Condition — Pothole
2010-04-07311: Street Condition — Failed Street Repair
2010-03-17Permit PL — ISSUED
2010-03-08311: Taxi Complaint — Driver Complaint
2010-03-04DOB complaint, category ?
2010-03-04DOB complaint, category ?
2009
2009-12-31DOB violation LBLVIO:
2009-06-10Permit EW — ISSUED
2009-06-10Permit PL — ISSUED
2009-06-10Permit EW — ISSUED
2009-06-10Permit EW — ISSUED
2009-06-10Permit PL — ISSUED
2009-06-10Permit EW — ISSUED
2009-06-10Permit EW — ISSUED
2009-05-14Permit EW — ISSUED
2009-04-29Permit AL — ISSUED
2009-04-16Permit PL — ISSUED
2009-04-07Permit EW — ISSUED
2009-03-25Permit EQ — ISSUED
2009-02-26TL&R — from THE BANK OF NEW YORK MELLON
2009-02-26Mortgage assigned — from THE BANK OF NEW YORK MELLON to NEW YORK COMMUNITY BANK
2009-02-26Mortgage $15,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK$15,000,000
2009-02-26AL&R — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK
2009-02-26Agreement $44,000,000 — from 30 WEST 18 ASSOCIATES, LLC to NEW YORK COMMUNITY BANK$44,000,000
2009-02-26Mortgage assigned — from THE BANK OF NEW YORK MELLON to NEW YORK COMMUNITY BANK
2009-02-23Permit PL — ISSUED
2009-02-17Job filed: TO CHANGE LAYOUT AND PARTITIONS FOR 5 ART GALLERIES AT MEZZANINE LEVEL. NO CHANGE IN USE OR OCCUPANCY.$60,000
2009-01-27Permit EW — ISSUED
2009-01-20Permit PL — ISSUED
2009-01-12Permit EW — ISSUED
2009-01-12Permit EW — ISSUED
2008
2008-12-22Permit PL — ISSUED
2008-12-22Permit PL — ISSUED
2008-12-16Job filed: APPLICATION FILED FOR MINOR INTERIOR PARTITION CHANGES WITH PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS$40,000
2008-12-15Job filed: APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM WITH INSTALLATION OF HVAC EQUIPMENT AND MECHANICAL WORK AS PER PLAN. THERE IS NO CHANG$98,000
2008-12-15Job filed: APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM WITH INSTALLATION OF HVAC EQUIPMENT AND MECHANICAL WORK AS PER PLAN. THERE IS NO CHANG$98,000
2008-12-15Job filed: APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM WITH INSTALLATION OF HVAC EQUIPMENT AND MECHANICAL WORK AS PER PLAN. THERE IS NO CHANG$98,000
2008-12-08Job filed: THIS APPLICATION IS BEING FILED FOR INTERIOR RENOVATION AND MINOR PLUMBING WORK TO CHANGE THE USE AND OCCUPANCY OF THE FIRST FLOOR TO AN EATING AND DR$50,000
2008-12-08Job filed: THIS APPLICATION IS BEING FILED FOR INTERIOR RENOVATION AND MINOR PLUMBING WORK TO CHANGE THE USE AND OCCUPANCY OF THE FIRST FLOOR TO AN EATING AND DR$50,000
2008-11-25Job filed: 08-0729 INSTALLATION OF HVAC AND PLUMBING PIPING FOR FIRST FLOOR RETAIL TENANT (EAST). NO CHANGE TO USE, OCCUPANCY OR EGRESS ASSOCIATED WITH THE A$21,000
2008-11-25Job filed: 08-0729 INSTALLATION OF HVAC AND PLUMBING PIPING FOR FIRST FLOOR RETAIL TENANT (EAST). NO CHANGE TO USE, OCCUPANCY OR EGRESS ASSOCIATED WITH THE A$21,000
2008-10-01Job filed: 08-0730 INSTALLATION OF HVAC UNITS, BOILER AND PLUMBING FOR FIRST FLOOR RETAIL TENANT (WEST). NO CHANGE TO USE, OCCUPANCY OR EGRESS ASSOCIATED WIT$47,500
2008-08-29Agreement $27,514,199 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK$27,514,199
2008-08-29Agreement $1,485,801 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK$1,485,801
2008-08-20Job filed: HEREY FILING INTERIOR BUILDOUT OF RESTUARANT ON THE CELLAR AND 1ST FLOOR TO INCLUDE PLUMBING AS PER PLANS. WORK IN CONJUNCTION WITH ALT 1 APPLICATION $270,000
2008-06-26Permit EW — ISSUED
2008-06-26Permit EW — ISSUED
2008-06-26Permit PL — ISSUED
2008-06-26Permit PL — ISSUED
2008-06-26Permit EW — ISSUED
2008-06-26Permit EW — ISSUED
2008-03-21DOB violation LL1081:
2008-03-10DOB violation LANDMK:
2008-01-15Permit EQ — ISSUED
2008-01-07Job filed: Erect Temporary Scaffold 8' x 70' tall on setback of building at 15th Fl. south elevation for installation of new chimney under NB 104048905. No chang
2007
2007-12-13Permit EQ — ISSUED
2007-12-13Permit EQ — ISSUED
2007-12-13Permit EQ — ISSUED
2007-11-19ECB Hazardous violation: OPERATION OF HOISTING EQUIPMENT ON AN UNSAFE MANNER. OBSERVED NO TIEBACKS ON OUTRIGGER BEAMS. USING OUTRIGGER BEAMS SIDEWAYS. NO C$4,000
2007-11-19DOB complaint, category ?
2007-10-09Permit EW — ISSUED
2007-10-09Permit EW — ISSUED
2007-10-02Job filed: FILING HEREWITH BUILDER'SA PAVEMENT PLAN LINEAR FEET 75.
2007-09-11Job filed: INSTALLATION OF (6) NEW LOW PRESSURE GASFIRED BOILERS. ALL PL AND OT QOR K UNDER NB APPLICATION 104048905. NOCHANGE IN USE, EGRESS OR OCCUPANCY IS IN $130,000
2007-09-11Job filed: INSTALLATION OF (6) NEW LOW PRESSURE GASFIRED BOILERS. ALL PL AND OT QOR K UNDER NB APPLICATION 104048905. NOCHANGE IN USE, EGRESS OR OCCUPANCY IS IN $130,000
2007-08-20ECB Non-Hazardous violation: CEASE USE.06R10-RUNNING OUTSIDE HOIST 1V21690 W/CAR GATE JUMPED OUT.CALL DOB AT 212-566-5542 FOR REINSPECTION OF HOIST.HAZARDOUS C$800
2007-07-20Permit EQ — ISSUED
2007-07-02Permit EQ — ISSUED
2007-06-26Permit EW — ISSUED
2007-06-16DOB violation C:
2007-06-14Permit NB — ISSUED
2007-06-14Permit NB — ISSUED
2007-06-09DOB complaint, category ?
2007-05-21Permit EW — ISSUED
2007-05-21Permit EW — ISSUED
2007-05-21Permit PL — ISSUED
2007-05-16Job filed: PROPOSED INSTALLATION OF 8 FEET X 132 FEET HIGH PIPE SCAFFOLD. SCAFFOLD SHALL ORIGINATE FROM 2ND FLOOR ROOF DURING THE ERECTION OF A STEEL CHIMNEY AT
2007-05-16Permit EW — ISSUED
2007-05-16Permit EW — ISSUED
2007-05-16Permit EQ — ISSUED
2007-05-15Permit EQ — ISSUED
2007-05-15Permit EQ — ISSUED
2007-05-15Permit EQ — ISSUED
2007-05-10Permit PL — ISSUED
2007-03-22Permit EQ — ISSUED
2007-03-17DOB complaint, category ?
2007-03-14DOB complaint, category ?
2007-02-07Job filed: FILING HEREWITH FIRE PROTECTION PLANS.IN CONJUNCTION WITH NEW BUILDING APPLICATION#104048905.$1,000
2007-01-08Permit EQ — ISSUED
2007-01-06Permit NB — ISSUED
2007-01-06Permit EQ — RE-ISSUED
2007-01-06Permit NB — ISSUED
2007-01-06Permit EQ — ISSUED
2007-01-06Permit EQ — ISSUED
2006
2006-12-14Permit EQ — ISSUED
2006-12-11ECB Hazardous violation: NO DESIGN DRAWING. AS NOTED: UPON INSP A MULTI-POINT SUSPENDED SCAFFOLD IS HANGING OFF THE NORTH EXTERIOR WALL. THERE IS NO DESIGN$500
2006-11-24DOB complaint, category ?
2006-11-18ECB Hazardous violation: NO DESIGNATED SITE SAFETY MANAGER.UPON INSPECTION AT THE ABOVE PROPERTY NB UP TO ROOF.HOIST REPAIR IN PROGRESS & THERE IS NO SITE $2,000
2006-11-18DOB violation C:
2006-11-18ECB Non-Hazardous violation: NO DESIGNATED SITE SAFETY MANAGER. UPON INSPECTION @ THE ABOVE PARAPETNB UP TO ROOF. HOIST REPAIR IN PROGRESS & HOUSE IS NO SITE S
2006-11-13DOB violation C:
2006-11-13DOB violation C:
2006-10-20ECB Hazardous violation: MULTIPOINT SUSPENSION SCAFFOLD NOT IN COMPLIANCE W/BLDG CODE.NOTED:ON 10/10/06 DURING S.S. INSPEC.A VIOLATION WAS GIVEN FOR BRICK $1,880
2006-10-20ECB Hazardous violation: OPERATION OF DEFECTIVE CRANE DERRICK OR HOISTING EQUIPMENT.NOTED:@TIMEOF INSPEC.@ THE ABOVE SITE MATERIAL/PERSONNEL HOIST WAS BEIN$3,000
2006-10-20ECB Hazardous violation: FAILURE TO COMPLY W/AN ORDER OF THE DEPT.NOTED:ON 10/10/06 A STOP WORKORDER HAS BEEN ISSUED FOR WORK ON MULTI POINT SCAFFOLD BRICK$1,500
2006-10-17ECB Non-Hazardous violation: SAFETY NETTING DAMAGED & BROKEN. AS NOTED: SAFETY VERTICAL NETTING MISSING IN VARIOUS AREAAS OF THE 4,5,17,18 FLS SOUTH ELEV. REME$1,250
2006-10-17ECB Non-Hazardous violation: FAILURE TO PROVIDE HANDRAILS ON STAIRWELL. AS NOTED: STAIRWELL MISSINGHANDRAILS ON THE FOLLOWING FLS. (8- 13) REMEDY: PROVIDE HAND$1,250
2006-10-17ECB Non-Hazardous violation: IMPROPER/ DEFECTIVE INSTALLATION OF SCAFFOLD TO BLDG. AS NOTED: AN APPROX 30' PIPE SCAFFOLD ERECTED ON THE EAST ELEV 15 FL (SETBAC$1,000
2006-10-10ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY NOTED: AT TIME OF INSPECTION MEN ARE WORKING ON A SCAFFOLD AT SOUTH ELEVATION SCAFFOLD IS A$1,000
2006-10-10ECB Hazardous violation: WORK W/O A PERMIT. NOTED:AT TIME OF INSPECTION AT THE ABOVE SITE A PIPE SCAFFOLD WAS VIEWED AT THE SOUTH ELEVATION OF THE BLDG. SC$800
2006-10-10ECB Hazardous violation: MULTI POINT SUSPENSION SCAFFOLD NOT IN COMPLIANCE W/ BLDG CODE. NOTED:AT TIME OF INSP MEN ARE WORK ON MULTI POINT SUSPENSION BRICK$750
2006-08-22ECB Hazardous violation: FAILURE TO PROVIDED ADEQUATE HOUSEKEEPING UPON INSP AT THE ABOVE PROPERTY NB UP TO ROOF (FORMING) & CONST DEBRIS OUTSIDE OF VERTIC$1,760
2006-08-22ECB Hazardous violation: OPENING/ HOLES NOT COVERED. UPON INSP AT THE ABOVE PROPERTY HOLES & OPENINGS NOT COVERED ON 8,9,10 & 11 FLS OTHER FLS HOLES ARE CO$1,250
2006-08-22ECB Hazardous violation: INADEQUATE LIGHTING. UPON INSP AT THE TIME ABOVE PROPERTY NB UP TO ROOF & THERE IS NO TEMPORARY LIGHT AT STAIRS ON 8,9,10 & OTHER $1,000
2006-08-22ECB Hazardous violation: FAILURE TO PROTECT ROOFS, ROOF OUTLETS OR SKYLIGHTS OF ADJOINING PROPERTY. UPON INSP AT THE ABOVE PROPERTY ADJACENT PROPERTY EAST $500
2006-08-22DOB complaint, category ?
2006-08-14ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY NOTED:PRIOR WARNING GIVEN WITH NO RESPONSE IN ELEVATOR SHAFT PLATFORM BUILT W/O PROPER MATE$1,000
2006-08-14ECB Hazardous violation: UNSAFE STORAGE OF MATERIALS @ EDGE OF BLDG NOTED:UNSECURED DEBRIS CONSISTING OF CONCRETE, LUMBER & PLYWOOD, REBAR SCATTERED THROUG$3,130
2006-08-14ECB Hazardous violation: FAILURE TO PERFORM ADEQUATE HOUSEKEEPING NOTED:EXCESSIVE PILES OF DEBRIS STORED & SCATTERED THRU OUT THE 13TH, 14TH, 15TH & 16TH F$2,200
2006-08-14ECB Hazardous violation: HORIZONTAL SAFETY NETTING NOT PROVIDED NOTED:NO NETTING ON NORTH ELEVATION @ 15 FL STRIPPING OPERATIONS CONTINUE @ 16TH & 17TH FLR$500
2006-08-10ECB Hazardous violation: NO STANDPIPE SYSTEM.UPON INSPECTION AT THE ABOVE PROPERTY NB UP TO 18TH FL & STAND PIPE SYSTEM UP TO 12TH FL. REMEDY:STOP ALL WORK$1,000
2006-08-10ECB Hazardous violation: FAILURE TO PROTECT ROOF.ROOK OUTLETS OR SKYLIGHTS OF ADJ PROPERTY. UPON INSPECTION AT THE ABOVE PROPERTY ADJ PROPERTY AT WEST, ITS$500
2006-08-10ECB Hazardous violation: FAILURE TO PROVIDE ADEQAUTE HOUSEKEEPING.UPON INSPECTION AT THE ABOVE PROPERTY NB UP TO 18 FL OVER 15 YARDS OF DEBRIS ACCUMULATED $880
2006-08-10ECB Hazardous violation: NO ELEVATOR READINESS. UPON INSPECTION AT THE ABOVE PROPERTY NB UP TO 158TH FL & ELEVATOR SERVICE UP TO 13TH FL. REMEDY:STOP ALL W$1,000
2006-08-08ECB Hazardous violation: HORIZONTAL SAFETY NETTING INSUFFICIENT STORAGE OF GARBAGE NB#104048905ON INSPECTION HORIZONTAL SAFETY NETTING ERECTED AT 11 FL W/
2006-07-26ECB Hazardous violation: FAILURE TO PROVIDE HANDRAILS ON STAIRWELL AS NOTED:NO HANDRAILS PROVIDED FROM TH 1ST FL THRU 6TH FL STAIRWELL.BLOCK WORKS ON THE 8$1,250
2006-07-24ECB Hazardous violation: UNSAFE STORAGE OF MATERIALS AT EDGE OF BLDG. AS NOTED:6 UNSECURED CONCRETE BLOCKS WERE STORED ON TOP OF ELEVATED LINTELS ON THE NO$500
2006-07-22ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY EFFECTED BY CONSTRUCTION OPERATIONS AS NOTED:BLOCK WORK IN PROGRESS ON PERIMETER,8TH FL NOR$1,000
2006-07-22ECB Hazardous violation: FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED AST NOTED:BLOCK WORK IN PROGRESS IN STAIRCASE ON THE 7TH FL & 8TH FL NORTH$2,000
2006-07-11DOB violation C:
2006-05-30ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY DURING OPERATION. UPON INSP AT THE ABOVE PROPERTY THE 9 FL WAS BEING POURED THE 6TH FL WIND$1,000
2006-05-30ECB Non-Hazardous violation: NO LICENSED CONCRETE TESTER. UPON INSPECTION AT THE ABOVE PROPERTY THE9 FL WAS BEING POURED & THERE IS NO LICENSED CONCRETE TESTER
2006-05-30ECB Non-Hazardous violation: NO GUARD RAIL. UPON INSP AT THE ABOVE PROPERTY THE 9 FL WAS BEING POURED & THERE IS NO GUARD RAIL AT HOIST RUN, CORNER HOIST ON 1S$1,250
2006-05-26Permit EW — ISSUED
2006-05-26Permit EW — ISSUED
2006-05-11Permit EW — ISSUED
2006-05-09Permit EW — ISSUED
2006-05-04DOB complaint, category ?
2006-05-04DOB complaint, category ?
2006-05-03Permit EQ — ISSUED
2006-05-03Permit EQ — ISSUED
2006-05-03Permit EQ — ISSUED
2006-05-03Permit NB — ISSUED
2006-05-03Permit NB — ISSUED
2006-05-02Permit PL — ISSUED
2006-05-02Permit PL — ISSUED
2006-04-28DOB complaint, category ?
2006-03-17DOB complaint, category ?
2006-02-21ECB Hazardous violation: SHANTY BUILT OUT OF A COMBUSTIBLE MATERIALS. NOTED: AT TIME OF INSP. 2SHANTYS WERE VIEWED TO BE ON SITE ONE AT CELLAR LEVEL & THE $500
2006-02-17Permit EQ — ISSUED
2006-01-25Permit EQ — ISSUED
2006-01-18Permit EW — ISSUED
2006-01-17Permit PL — ISSUED
2006-01-17Permit PL — ISSUED
2005
2005-12-22Permit EQ — ISSUED
2005-12-22Permit EQ — ISSUED
2005-11-17Permit EW — ISSUED
2005-11-04ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY EFFECTED BY CONSTRUCTION OPERATIONS. NOTED AT: TIME OF INSPECTION OPEN/ACTIVE EXCAVATION
2005-10-13DOB complaint, category ?
2005-10-11Permit EQ — ISSUED
2005-10-11Permit EQ — ISSUED
2005-10-11Permit NB — ISSUED
2005-10-11Permit NB — ISSUED
2005-09-02CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2005-09-02ZONE — from 30 WEST 18 ASSOCIATES LLC
2005-08-31Mortgage $1,485,801 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK$1,485,801
2005-08-31AL&R $29,000,000 — from THE BANK OF NEW YORK to 30 WEST 18 ASSOCIATES, LLC$29,000,000
2005-08-31Mortgage $27,514,199 — from 30 WEST 18 ASSOCIATES, LLC to THE BANK OF NEW YORK$27,514,199
2005-08-10Job filed: NB
2005-08-09DOB violation C:
2005-08-08ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY EFFECTED BY CONSTRUCTION OPERATIONS. AS NOTED: ADJACENT BLDG 29 W 17TH ST IS LEANING APPR
2005-08-02Job filed: APPLICATION FILED FOR THE INSTALLATIONOF A NEW SPREINKLER SYSTEM AND BOOSTER PUMP IN CONJUCTION WITH N.B.-104048905_NO CHANGES$1,000
2005-08-02Job filed: APPLICATION FILED FOR THE INSTALLATIONOF A NEW SPREINKLER SYSTEM AND BOOSTER PUMP IN CONJUCTION WITH N.B.-104048905_NO CHANGES$1,000
2005-07-25ECB Hazardous violation: FAILURE TO HAVE SITE SAFTEY MANAGER PRESENT AS REQUIRED AS NOTED:AT TIME OF INSPECTION EXCAVATING TRUCKING OUT IN PROGRESS HOW EVE$2,000
2005-07-25ECB Hazardous violation: FAILURE TO COMPLY W/SITE SAFTEY PROGRAM PLAN PER REGULATION AS NOTED:FAILURE TO NOTIFY DOB 24 HOURS TO THE COMMENCEMENT OF SITE SA$1,000
2005-07-20Job filed: APPLICATION FILED FOR THE INSTALLATION OF A SPRINKLER ALARM AND SMOKE DE TECTION SYSTEM IN CONJUNCTION WITH NB 104048905. NO CHANGE TO USE, EGRESS OR $1,000
2005-07-05CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2005-07-05ZONE — from 30 WEST 18 ASSOCIATES LLC
2005-07-05DOB complaint, category ?
2005-05-24Permit EW — ISSUED
2005-05-24Permit EW — ISSUED
2005-05-11Permit EW — ISSUED
2005-05-09Job filed: APPLICATION FILED FOR SHAVING OF PARTY WALL AS PER PLANS. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING #S 10408905 AND 104048852. NO CHANGE IN U$1,000
2005-05-09Job filed: APPLICATION FILED FOR SHAVING OF PARTY WALL AS PER PLANS. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING #S 10408905 AND 104048852. NO CHANGE IN U$1,000
2005-04-26Permit EQ — ISSUED
2005-03-16Job filed: APPLICATION FILED FOR EXCAVATION & STRUC TURAL PILES IN CONJUNCTION WITH NEW BUILDING 104048852 & 104048905. TOADD FOUNDATION ONLY. NO CHANGE $1,000
2005-03-09Permit EQ — ISSUED
2005-03-08Job filed: APPLICATION FILED FOR TEMPORARY CONSTURT ION FENCE AS PER PLANS. APPLICA FILED IN CONJUNCTION WITH NEW BUILDING #'S 104048905 AND 104048852. NO CHANGE
2005-02-24Job filed: NB
2005-02-24Job filed: APPLICATION FILED FOR SUPERSTRUCTURE WORK ASSOCIATED WITH THE CONSTRUCTI ON OF A NEW BUILDING.
2003
2003-01-17DEEDO — from NEW SCHOOL UNIVERSITY to 30 WEST 18 ASSOCIATES, LLC
2003-01-17DEEDO — from 30 WEST 18 ASSOCIATES, LLC to NEW SCHOOL UNIVERSITY
2001
2001-04-24SAGE — from NEW SCHOOL UNIVERSITY
2000
2000-12-08SAGE — from NEW SCHOOL UNIVERSITY
2000-11-21Deed — from IRBIL REALTY COMPANY to NEW SCHOOL UNIVERSITY
1998
1998-01-28DOB complaint, category ?
1993
1993-01-14SAGE — from IRBIL REALTY COMPANY to WEST GRAMERCY ASSOCIATES