Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

25 West 32 Street · Manhattan · BBL 1008340026 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

22 service requests in the last three years. Most common: Noise (4) · Lost Property (3) · Vendor Enforcement (2) · Food Establishment (2) · Water System (2) · Sidewalk Condition (2).

Filed construction activity

$2,375,272 in permitted construction work filed since 2016 (38 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$13,561,000 $6,102,450
2026$16,073,000 $7,232,850
2027$16,113,000 $7,250,850

The city's market estimate has risen 19% between tax years 2025 and 2027.

Building systems

Heating fuelNO2FUEL

Restaurants in this building

RestaurantCuisineGradeNotes
BB.Q ChickenKoreanGrade Pending—
Chorus Karaoke LoungeAmericanA—

Report to 311: Food poisoning · Food safety complaint

2 restaurants · 0 with mice evidence · See them on the Mice Map

2 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick), shared by 2 restaurants
2 Food Establishment complaints to 311 at this address in the last three years (most often: Rodents/Insects/Garbage), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway34 St-Herald Sq — B D F M N Q R W · 350 ft straight-line (about a 2-minute walk) · station accessibility: full
BusNearest boarding stop: W 32 St / Broadway — Q32 · 250 ft
Citi BikeE 33 St & 5 Ave · 550 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 033 Chelsea Prep
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

25 West 32 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

22 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $963,305 on 2024-06-28 (lender: Bank Of Hope). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2024-06-28Agreement $15,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE $15,000,000
2024-06-28AL&R $15,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE $15,000,000
2024-06-28Mortgage $963,306 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE $963,306
2018-09-27AL&R $16,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE $16,000,000
2018-09-27Mortgage $1,903,154 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE $1,903,154
2018-09-27Agreement $16,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE $16,000,000
2016-08-02AL&R $4,100,000 — from BROADWAY-32ND STREET REALTY CORP to WILSHIRE BANK $4,100,000
2016-08-02Agreement $4,100,000 — from BROADWAY-32ND STREET REALTY CORP to WILSHIRE BANK $4,100,000
2016-08-02Mortgage $2,100,000 — from BROADWAY-32ND STREET REALTY CORP to WILSHIRE BANK $2,100,000
2015-11-24AL&R $2,000,000 — from BROADWAY -32 STRET REALTY CORP to WILSHIRE BANK $2,000,000
2015-11-24Mortgage $2,000,000 — from BROADWAY -32 STRET REALTY CORP to WILSHIRE BANK $2,000,000
2014-11-15AL&R $11,000,000 — from BROADWAY-32ND STREET REALTY CORP. to WILSHIRE BANK $11,000,000
2014-11-15Agreement $11,000,000 — from BROADWAY-32ND STREET REALTY CORP. to WILSHIRE BANK $11,000,000
2014-11-15Mortgage $2,191,332 — from BROADWAY-32ND STREET REALTY CORP. to WILSHIRE BANK $2,191,332
2013-12-19Mortgage $3,000,000 — from BROADWAY - 32ND STREET REALTY CORP. to NOAH BANK $3,000,000

Ten-year activity

50250
2017
25
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20174340011
201813714025
20199841022
202010740223
202115230020
202212010013
2023341019
20241054313
20254080214
20264090417
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 24 records

DateRecord
2026-08-22311: Noise - Commercial — Loud Music/Party
2026-08-22311: Noise - Commercial — Loud Music/Party
2026-08-20311: Food Establishment — Rodents/Insects/Garbage
2026-08-14Restaurant inspection: BB.Q CHICKEN — grade Z
2026-08-14311: Sidewalk Condition — Sidewalk Violation
2026-08-10Restaurant inspection: BB.Q CHICKEN
2026-08-04311: Lost Property — Electronics/Phones
2026-07-07Restaurant inspection: CHORUS KARAOKE LOUNGE — grade A
2026-06-07311: Noise - Commercial — Loud Music/Party
2026-03-14311: Food Poisoning — 1 or 2
2026-02-07Job filed: Install partitions, door, and draft curtains per plans. No change in use, occupancy, egress.
2026-02-07Job filed: Renovation of existing sprinkler system in cellar and 1st floor. No change in use, occupancy and egress.
2026-01-29Permit Construction Fence — Signed-off
2026-01-23311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2026-01-21Job filed: Installation of temporary construction fence. No change of use, occupancy, or egress filed under this application.
2026-01-06Restaurant inspection: BB.Q CHICKEN
2026-01-01311: Lost Property — Bag/Wallet
2025-12-10Job filed: THIS APPLICATION IS FOR THE DOMESTIC WATER AND WASTE LINE WORK ONLY. ALL GAS WORK WAS FILED AND SIGNED OFF UNDER JOB #123585600.
2025-12-01311: Water System — Hydrant Leaking (WC1)
2025-11-13Permit Plumbing — Signed-off
2025-11-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-11-05311: Illegal Parking — Blocked Bike Lane
2025-10-31Job filed: THIS APPLICATION IS FOR THE DOMESTIC WATER AND WASTE LINE WORK ONLY. ALL GAS WORK WAS FILED AND SIGNED OFF UNDER JOB #123585600.
2025-10-29311: Food Poisoning — 1 or 2

The full timeline

2026
2026-08-22311: Noise - Commercial — Loud Music/Party
2026-08-22311: Noise - Commercial — Loud Music/Party
2026-08-20311: Food Establishment — Rodents/Insects/Garbage
2026-08-14Restaurant inspection: BB.Q CHICKEN — grade Z
2026-08-14311: Sidewalk Condition — Sidewalk Violation
2026-08-10Restaurant inspection: BB.Q CHICKEN
2026-08-04311: Lost Property — Electronics/Phones
2026-07-07Restaurant inspection: CHORUS KARAOKE LOUNGE — grade A
2026-06-07311: Noise - Commercial — Loud Music/Party
2026-03-14311: Food Poisoning — 1 or 2
2026-02-07Job filed: Install partitions, door, and draft curtains per plans. No change in use, occupancy, egress.$25,000
2026-02-07Job filed: Renovation of existing sprinkler system in cellar and 1st floor. No change in use, occupancy and egress.$18,000
2026-01-29Permit Construction Fence — Signed-off
2026-01-23311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2026-01-21Job filed: Installation of temporary construction fence. No change of use, occupancy, or egress filed under this application.$15,000
2026-01-06Restaurant inspection: BB.Q CHICKEN
2026-01-01311: Lost Property — Bag/Wallet
2025
2025-12-10Job filed: THIS APPLICATION IS FOR THE DOMESTIC WATER AND WASTE LINE WORK ONLY. ALL GAS WORK WAS FILED AND SIGNED OFF UNDER JOB #123585600.$80,000
2025-12-01311: Water System — Hydrant Leaking (WC1)
2025-11-13Permit Plumbing — Signed-off
2025-11-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-11-05311: Illegal Parking — Blocked Bike Lane
2025-10-31Job filed: THIS APPLICATION IS FOR THE DOMESTIC WATER AND WASTE LINE WORK ONLY. ALL GAS WORK WAS FILED AND SIGNED OFF UNDER JOB #123585600.$80,000
2025-10-29311: Food Poisoning — 1 or 2
2025-10-04311: Dirty Condition — Trash
2025-10-01Job filed: THIS JOB WAS PREVIOUSLY FILED UNDER JOB #122488478 BY ANOTHER APPLICANT IN 2015. THE WORK INCLUDED NEW PARTITIONS, FLOORING, CEILING FINISHES, MODIFY$200,000
2025-07-14Restaurant inspection: BB.Q CHICKEN — grade A
2025-07-01311: Sidewalk Condition — Sidewalk Violation
2025-05-29Restaurant inspection: BB.Q CHICKEN
2025-05-16311: Blocked Driveway — No Access
2025-04-19311: Water System — Hydrant Defective (WC2)
2024
2024-11-27311: Lost Property — Electronics/Phones
2024-11-20Restaurant inspection: CHORUS KARAOKE LOUNGE — grade A
2024-06-28Agreement $15,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE$15,000,000
2024-06-28AL&R $15,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE$15,000,000
2024-06-28Mortgage $963,306 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE$963,306
2024-06-28TL&R — from BANK OF HOPE to BROADWAY-32ND STREET REALTY CORP.
2024-06-05Restaurant inspection: CHORUS KARAOKE LOUNGE
2024-05-19311: Noise - Street/Sidewalk — Loud Music/Party
2024-04-03311: Food Establishment — Rodents/Insects/Garbage
2024-03-08311: Vendor Enforcement — Non-Food Vendor
2024-03-03311: Vendor Enforcement — Non-Food Vendor
2024-02-28Permit General Construction — Signed-off
2024-02-15Restaurant inspection: BB.Q CHICKEN — grade A
2023
2023-08-02Rodent inspection: Passed
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30Job filed: REMOVE EXISTING ROOF WATER TANK AND ITS SUPPORT FRAMING AND INSTALL NEW STEEL SUPPORT FRAMING ON ROOF. NO CHANGE OF USE, OCCUPANCY, EGRESS FILED UNDE$150,000
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-05-31311: Food Poisoning — 1 or 2
2023-04-25DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2023-03-09Permit General Construction — Signed-off
2023-01-05Job filed: FIRE PROTECTION AND PLUMBING INFRASTRUCTURE UPGRADE$120,000
2022
2022-12-14Permit Mechanical Systems — Signed-off
2022-12-06Job filed: INSTALL SPLIT HVAC SYSTEM AS SHOWN ON PLAN$50,000
2022-09-27Job filed: FIRE PROTECTION AND PLUMBING INFRASTRUCTURE UPGRADE$120,000
2022-08-17Job filed: This job was previously filed under Job#122488478 by another applicant in 2015. Since I can not supersede the old job I have to file for a new job. $100,000
2022-07-14Permit Mechanical Systems — Signed-off
2022-06-03Permit Structural — Signed-off
2022-05-16Permit General Construction — Signed-off
2022-05-10Permit Sprinklers — Permit Issued
2022-05-10Permit Plumbing — Permit Issued
2022-04-06Permit General Construction — Signed-off
2022-03-20311: Taxi Complaint — Driver Complaint - Passenger
2022-03-19Permit Structural — Signed-off
2022-03-09Job filed: Glue down vinyl flooring on an existing flooring on the 1st floor only. No Change of Egress, Use, and Occupancy under this application.$10,000
2021
2021-10-08311: UNSANITARY CONDITION — MOLD
2021-10-08Tenant complaint: UNSANITARY CONDITION — MOLD
2021-07-23DOB violation E:
2021-07-23DOB violation E:
2021-07-07Job filed: This job was previously filed under Job#122488478 by another applicant in 2015. Since I can not supersede the old job I have to file for a new job. $100,000
2021-06-28Permit Structural — Signed-off
2021-06-07Permit Structural — Signed-off
2021-06-04Job filed: THIS JOB WAS PREVIOUSLY FILED UNDER JOB #122488478 BY ANOTHER APPLICANT IN 2015. THE WORK INCLUDED NEW PARTITIONS, FLOORING, CEILING FINISHES, MODIFY$200,000
2021-05-18Permit Sign — Signed-off
2021-05-18Permit Sign — Signed-off
2021-05-11Permit Supported Scaffold — Signed-off
2021-05-10Permit Sidewalk Shed — Signed-off
2021-05-03Permit Structural — Signed-off
2021-04-20Job filed: No Work
2021-03-21311: NonCompliance with Phased Reopening — Business not in compliance
2021-03-05Job filed: ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,914
2021-03-05Job filed: ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY$1,350
2021-02-17Job filed: REMOVE EXISTING ROOF WATER TANK AND ITS SUPPORT FRAMING AND INSTALL NEW STEEL SUPPORT FRAMING ON ROOF. NO CHANGE OF USE, OCCUPANCY, EGRESS FILED UNDE$150,000
2021-02-11Permit EW — ISSUED
2021-02-03Job filed: FIRE PROTECTION AND PLUMBING INFRASTRUCTURE UPGRADE$120,000
2020
2020-12-04Job filed: WINDOW REPLACEMENT. NO CHANGE OF USE, OCCUPANCY OR EGRESS FIELD UNDER THIS APPLICATION.$100,000
2020-11-29311: Homeless Person Assistance
2020-11-18Permit Plumbing — Signed-off
2020-11-09Permit EW — ISSUED
2020-11-03Job filed: INSTALL WATER CLOSET AND LAVATORY ON 6TH FLOOR. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.$7,000
2020-11-03Job filed: REMOVAL AND INSTALLATION OF PARTITION WALL. NEW FLOORING AND CEILING FINISHES. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION.$55,000
2020-09-15Job filed: INSTALLATION OF PARTIAL ROOF DECK. NO CHANGE OF USE, OCCUPANCY OR EGRESS FIELD UNDER THIS APPLICATION$20,000
2020-09-15Job filed: INSTALLATION OF PARTIAL ROOF DECK. NO CHANGE OF USE, OCCUPANCY OR EGRESS FIELD UNDER THIS APPLICATION$20,000
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-08-14311: Food Poisoning — 3 or More
2020-08-14311: Food Establishment — Food Contaminated
2020-06-05Permit EW — ISSUED
2020-06-04Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$16,000
2020-06-04Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$16,000
2020-05-08Permit Supported Scaffold — Signed-off
2020-05-07Permit Sidewalk Shed — Signed-off
2020-03-26ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE W/EXPIRED PERMIT. AT TIME OF MY INSPECTION ON AN 6 STY BLDG I IBSERVED A PIPE SCAFFOLD IN$625
2020-03-26ECB CLASS - 2 violation: TEMPORARY CONSTRUCTION EQUIPMENT ON SITE W/EXPIRED PERMIT. AT TIME OF MY INSPECTION ON AN 6 STY BLDG I OBSERVED A SIDEWALK SHED IN$625
2020-03-26DOB complaint, category ?
2020-02-21ECB CLASS - 2 violation: THE JUVENEX SPA PLACE IS CONDUCTING BUSINESS OPERATIONS WITHOUT ADULT PHYSICAL CULTURE PERMIT.; ZR 73-36, COMPLY WITH ZONING RESOL
2020-02-21ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE NYCBC. THIS IS A CONTROLLER FEAT$1,250
2020-01-04311: Elevator — Elevator - Single Device On Property/No Alternate Service
2020-01-04DOB complaint, category ?
2019
2019-12-30311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2019-12-30DOB complaint, category ?
2019-12-24Permit EW — ISSUED
2019-12-18Job filed: REMOVE OLD CORNICE AND INSTALL NEW CORNICE. INSTALL NEW ROOF STRUCTURE WITH PARAPET WALL AND WATERPROOFING. REPAIR CORNER BRICK PARAPET WALL. NO CHANG$150,000
2019-12-18Job filed: REMOVE OLD CORNICE AND INSTALL NEW CORNICE. INSTALL NEW ROOF STRUCTURE WITH PARAPET WALL AND WATERPROOFING. REPAIR CORNER BRICK PARAPET WALL. NO CHANG$150,000
2019-12-18Job filed: REMOVE OLD CORNICE AND INSTALL NEW CORNICE. INSTALL NEW ROOF STRUCTURE WITH PARAPET WALL AND WATERPROOFING. REPAIR CORNER BRICK PARAPET WALL. NO CHANG$150,000
2019-11-18Job filed: REMOVAL AND INSTALLATION OF PARTITION WALLS.NEQ FLOORING AND CEILING FINISHES, INSTALL NEW TOILET, TUB WITH PLUMBING FIXTURES, MODIFY EXISTING A/C DUC$55,000
2019-09-03311: Dirty Conditions — E3 Dirty Sidewalk
2019-07-21311: Consumer Complaint — Retail Store
2019-07-03DOB complaint, category ?
2019-07-01ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECS CITED IN THIS CHAPTER NOTED AT TIME OF INSPECTION SIDEWALK SHED ERECTED CONNER AT EXPOSURE$2,400
2019-07-01DOB complaint, category ?
2019-07-01DOB complaint, category ?
2019-05-31311: Dirty Conditions — E3 Dirty Sidewalk
2019-05-02TL&R — from BANK OF HOPE; WILSHIRE BANK to BROADWAY-32ND STREET REALTY CORP.
2019-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-04-12Job filed: REMOVE AND INSTALL NON BEARING PARTITION, REPLACE BATHROOM TILES. NO CHANGE IN USE, EGRESS, OCCUPANCY.$25,000
2019-04-12Permit EW — ISSUED
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-21Permit Supported Scaffold — Signed-off
2019-03-21Permit Sidewalk Shed — Signed-off
2018
2018-12-28Permit Sidewalk Shed — Signed-off
2018-12-10Permit Supported Scaffold — Signed-off
2018-12-07Job filed: ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUP$5,000
2018-09-27AL&R $16,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE$16,000,000
2018-09-27Mortgage $1,903,154 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE$1,903,154
2018-09-27Agreement $16,000,000 — from BROADWAY-32ND STREET REALTY CORP. to BANK OF HOPE$16,000,000
2018-09-27TL&R — from BANK OF HOPE to BROADWAY-32ND STREET REALTY CORP.
2018-08-29DOB violation E:
2018-08-29DOB violation E: CEASE USE
2018-08-28Permit EW — ISSUED
2018-08-14Job filed: MODIFICATION OF EXISTING AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB #123585600.EXISTING FIRE SUPPRESSION SYSTEM WAS FILED UNDER JOB#122$3,000
2018-08-14Job filed: MODIFICATION OF EXISTING AUTOMATIC FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB #123585600.EXISTING FIRE SUPPRESSION SYSTEM WAS FILED UNDER JOB#122$3,000
2018-08-10Permit Sidewalk Shed — Signed-off
2018-07-25DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-07-09Permit EW — ISSUED
2018-07-09Permit PL — ISSUED
2018-06-19Job filed: HEREWITH FILE TO OBTAIN AMEND C/O FOR EATING AND DRINKING PLACE IN 1ST/CELLAR FLOOR. NO BULK CHANGE INVOLVED UNDER THIS APPLICATION$18,000
2018-06-08Job filed: HEREWITH FILE TO RELOCATE/REPLACE SPRINKLER HEAD WITH ASSOCIATED PIPING, AND PLUMBING WORK. NO CHANGE IN USE, EGRESS, AND OCCUPANCY$32,500
2018-05-04311: Plumbing — Gas Utility Referral
2018-05-04ECB CLASS - 1 violation: GAS BEING SUPPLIED TO BLDG W/O INSPECTION & CERTIFICATION BY DOB. AT TIME OF MY INSPECTION,I OBSERVED GAS BEING SUPPLIED TO THE BL$5,000
2018-05-04DOB complaint, category ?
2018-05-03Job filed: ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHA$8,000
2018-05-03Permit Sidewalk Shed — Signed-off
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
2017-12-29311: Water System — Hydrant Knocked Over/Missing (WC)
2017-12-05Permit Sign — Permit Issued
2017-12-04Permit Sign — Permit Issued
2017-10-27Job filed: ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,508
2017-10-27Job filed: ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY$3,000
2017-07-20DOB violation E:
2017-02-08311: Food Poisoning — 1 or 2
2017-01-13311: Illegal Parking — Blocked Hydrant
2017-01-07311: Water System — Hydrant Running Full (WA4)
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-29311: Food Poisoning — 3 or More
2016-11-05311: Taxi Complaint — Driver Complaint
2016-09-14Permit EW — ISSUED
2016-09-07Permit AL — ISSUED
2016-08-30Job filed: HEREWITH FILE TO OBTAIN AMEND C/O FOR EATING AND DRINKING PLACE IN 1ST/CELLAR FLOOR. NO BULK CHANGE INVOLVED UNDER THIS APPLICATION$18,000
2016-08-29Permit SG — ISSUED
2016-08-02AL&R $4,100,000 — from BROADWAY-32ND STREET REALTY CORP to WILSHIRE BANK$4,100,000
2016-08-02Agreement $4,100,000 — from BROADWAY-32ND STREET REALTY CORP to WILSHIRE BANK$4,100,000
2016-08-02Mortgage $2,100,000 — from BROADWAY-32ND STREET REALTY CORP to WILSHIRE BANK$2,100,000
2016-06-23DOB violation E:
2016-05-18Job filed: INSTALL THE FIRE SUPPRESSION SYSTEM @ CELLAR IN CONJUNCTION WITH #122488478 AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$8,000
2016-05-05Job filed: PA
2016-04-13311: Homeless Person Assistance — N/A
2016-03-30Permit EW — ISSUED
2016-03-30Permit EW — ISSUED
2016-03-25Permit EW — ISSUED
2016-03-25Permit PL — ISSUED
2016-03-02311: Miscellaneous Categories — Inspection Work Order (DOB)
2016-03-02DOB complaint, category ?
2016-02-10DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-01-21311: Beach/Pool/Sauna Complaint — Beach/Pool Water
2015
2015-11-27Permit EW — ISSUED
2015-11-24AL&R $2,000,000 — from BROADWAY -32 STRET REALTY CORP to WILSHIRE BANK$2,000,000
2015-11-24Mortgage $2,000,000 — from BROADWAY -32 STRET REALTY CORP to WILSHIRE BANK$2,000,000
2015-11-24Permit EW — ISSUED
2015-11-24Permit EW — ISSUED
2015-11-24Permit EQ — ISSUED
2015-11-20Permit EW — ISSUED
2015-11-17Job filed: RENOVATIONS TO EXISTING LOBBY, REPLACEMENT OF ENTRANCE DOORS. INSTALLATION OF NON LOAD BEARING PARTITIONS AT CELLAR. INSTALLATION OF CANOPY. INSTALLAT$71,000
2015-11-17Job filed: RENOVATIONS TO EXISTING LOBBY, REPLACEMENT OF ENTRANCE DOORS. INSTALLATION OF NON LOAD BEARING PARTITIONS AT CELLAR. INSTALLATION OF CANOPY. INSTALLAT$71,000
2015-11-16Job filed: INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS, CAP AND REMOVE SPRINKLER HEADS, NEW SPRINKLER HEADS AND PIPING AS PER PLANS. NO CHANGE IN USE EGRESS AND O$241,400
2015-11-16Job filed: INSTALL NEW HVAC SPLIT SYSTEM AS PER PLANS, CAP AND REMOVE SPRINKLER HEADS, NEW SPRINKLER HEADS AND PIPING AS PER PLANS. NO CHANGE IN USE EGRESS AND O$241,400
2015-11-10ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.FAILURE TO PROVIDE NUMBER OF REQUIRED MEANS OF EGRESS FOR EVERY FLOOR PER BC 101
2015-11-10ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS DICHARGARS AND PUBLIC CORRIDORS PER BC 1006.1 27-381(NOT $250
2015-11-06311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2015-11-06DOB complaint, category ?
2015-11-05Permit EW — ISSUED
2015-11-05Permit EQ — ISSUED
2015-11-05Permit EW — ISSUED
2015-10-23Permit PL — ISSUED
2015-10-20Permit EQ — ISSUED
2015-10-20Permit EW — ISSUED
2015-10-20Permit EW — ISSUED
2015-10-09Job filed: INSTALLATION OF NON-BEARING PARTITION WALLS, REPLACEMENT OF PARTIAL STOREFRONT, FLOORING & CEILING FINISHES. INSTALLATION OF DUNNAGE SUPPORT AND $95,500
2015-09-21Permit EQ — ISSUED
2015-09-21Permit EW — ISSUED
2015-09-21Permit EW — ISSUED
2015-09-18Job filed: HEREWITH FILE TO RENOVATE EATING & DRINKING PLACE. WORK INCLUDES ERECTION OF INT. NON-LOAD PARTITION WALL, INSTALLATION OF PLUMBING FIXTURES, NEW $550,000
2015-09-18Job filed: A2$550,000
2015-09-18Job filed: HEREWITH FILE TO OBTAIN AMEND C/O FOR EATING AND DRINKING PLACE IN 1ST/CELLAR FLOOR. NO BULK CHANGE INVOLVED UNDER THIS APPLICATION$18,000
2015-09-15Permit SG — ISSUED
2015-09-15Permit SG — ISSUED
2015-08-21311: Taxi Complaint — Driver Complaint
2015-08-06Permit AL — ISSUED
2015-08-05Job filed: TENANT FIT-OUT INTERIOR DEMOLITION OF EXISTING STORE INCLUDES REMOVAL OF DECORATIVE WALL COVERING, PARTITION WALL, AND MISC. DECORATION FINISHES. NO $20,000
2015-08-05Job filed: TENANT FIT-OUT INTERIOR DEMOLITION OF EXISTING STORE INCLUDES REMOVAL OF DECORATIVE WALL COVERING, PARTITION WALL, AND MISC. DECORATION FINISHES. NO $20,000
2015-06-29Permit PL — ISSUED
2015-06-12Permit EW — ISSUED
2015-06-11Job filed: INTERIOR RENOVATION OF COMMERCIAL SPACE, NEW FINISHES NEW FLOORING NEW TILE NEW CEIING NEW NON LOAD BEARING PARTITIONS, NEW PLUMBING FIXTURES. NO CHAN$205,000
2015-06-09Permit PL — ISSUED
2015-05-02Permit EW — ISSUED
2015-04-28Job filed: REMOVAL OF NON LOAD BEARING PARTITIONS. PATCH AND REPAIR, PREPARE FOR NEW FINISHES. CAP AND REMOVE PLUMBING FIXTURES. NO CHANGE IN USE EGRESS AND OCCU$94,000
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-01-06311: Water System — Hydrant Leaking (WC1)
2014
2014-11-19TL&R — from BROADWAY- 32ND STREET REALTY CORP. to SHINHAN BANK AMERICA F/K/A CHB AMERICA B
2014-11-19TL&R — from BROADWAY- 32ND STREET REALTY CORP. to NOAH BANK
2014-11-15Mortgage assigned — from NOAH BANK to WILSHIRE BANK
2014-11-15Mortgage assigned — from SHINHAN BANK AMERICA (F/K/A CHB AMERICA to WILSHIRE BANK
2014-11-15AL&R $11,000,000 — from BROADWAY-32ND STREET REALTY CORP. to WILSHIRE BANK$11,000,000
2014-11-15Agreement $11,000,000 — from BROADWAY-32ND STREET REALTY CORP. to WILSHIRE BANK$11,000,000
2014-11-15Mortgage $2,191,332 — from BROADWAY-32ND STREET REALTY CORP. to WILSHIRE BANK$2,191,332
2014-08-22Permit EW — ISSUED
2014-08-07Job filed: INSTALLATION AND RELOCATION OF SPRINKLER HEADS. NO CHANGE IN USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICATION.$17,400
2014-07-16DOB violation E:
2014-07-16DOB violation E:
2014-06-05311: New Tree Request — For One Address
2014-04-29FDNY inspection (DAY-CARE)
2014-04-24Permit PL — ISSUED
2014-04-24Permit EW — ISSUED
2014-03-31Permit EW — ISSUED
2014-03-31Permit EW — ISSUED
2014-03-28Job filed: INSTALLATION OF NON-BEARING PARTITION WALLS, FLOORING AND CEILING FINISHES, DUNNAGE ON ROOF. INSTALLAION OF PLUMBING FIXTURES AND A/C UNIT WITH DUCT W$335,500
2014-03-28Job filed: INSTALLATION OF NON-BEARING PARTITION WALLS, FLOORING AND CEILING FINISHES, DUNNAGE ON ROOF. INSTALLAION OF PLUMBING FIXTURES AND A/C UNIT WITH DUCT W$335,500
2014-03-18311: Building/Use — Illegal Conversion Of Residential Building/Space
2014-03-18DOB complaint, category ?
2014-03-17Rodent inspection: Passed
2014-02-28Job filed: REMOVAL OF NON BEARING PARTITION WALLS ON 4TH FLOOR TO CREATE OPEN SPACE FOR OFFICE. TO AMEND ENTIRE BUILDING C/O.$35,000
2014-02-28Job filed: REMOVAL OF NON BEARING PARTITION WALLS ON 4TH FLOOR TO CREATE OPEN SPACE FOR OFFICE. TO AMEND ENTIRE BUILDING C/O.$35,000
2014-02-04FDNY inspection (RISK)
2014-02-04FDNY inspection (SPECIAL-OTH)
2014-01-16DTL — from THE BANK OF NEW YORK MELLON, AS COLLATER
2013
2013-12-19Mortgage $3,000,000 — from BROADWAY - 32ND STREET REALTY CORP. to NOAH BANK$3,000,000
2013-12-19AL&R $3,000,000 — from BROADWAY - 32ND STREET REALTY CORP. to NOAH BANK$3,000,000
2013-12-11Air permit (REGISTRATION), fuel: NO2FUEL
2013-11-22311: Consumer Complaint — Overcharge
2013-10-23Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE DETECTION AND SPRINKLER ALARM.$5,400
2013-10-23Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE DETECTION AND SPRINKLER ALARM.$5,400
2013-10-02311: Water System — No Water/Low Pressure (WA5)
2013-07-31Job filed: INSTALLATION OF A/C UNIT, NON-BEARING PARTITION WALLS & SUPPORT FOR A/C UNIT. NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICATION.$66,250
2013-07-31Permit EW — ISSUED
2013-07-31Permit EW — ISSUED
2013-07-14311: Taxi Complaint — Driver Complaint
2013-07-11311: Consumer Complaint — Scale Inaccurate/Broken
2013-06-19DOB violation E:
2013-06-19DOB violation E:
2013-06-19Job filed: TO INSTALL MANUAL AND AUTOMATIC SMOKE/HEAT DETECTON FIRE ALARM SYSTEM FOR LEAR NING CENTER AND DAYCARE. NO CHANGE OF USE, OCCUPANCY OR EGRESS$5,400
2013-06-19Job filed: TO INSTALL MANUAL AND AUTOMATIC SMOKE/HEAT DETECTON FIRE ALARM SYSTEM FOR LEAR NING CENTER AND DAYCARE. NO CHANGE OF USE, OCCUPANCY OR EGRESS$5,400
2013-05-08Permit PL — ISSUED
2013-05-08Permit PL — ISSUED
2013-05-07Job filed: INSTALLATION OF NON-BEARING PARTITION WALLS AND FLOORING. INSTALLATION OF PLUMBING FIXTURES. RELOCATION OF MECHANICAL REGISTERS. FILING RELATED TO AL$78,000
2013-05-07Permit EW — ISSUED
2013-05-07Permit EW — ISSUED
2013-05-01Job filed: TO REMOVE ECB VIOLATION #35004559R & #35004560Y. REMOVAL OF NON-BEARING PARTITION WALLS. INSTALLATION OF PLUMBING FIXTURES AS PER PLAN. THIS APPL$23,000
2013-05-01Permit EW — ISSUED
2013-04-30ECB CLASS - 1 violation: BC1014.3/27-361 - FAILURE TO MAINTAIN UNOBSTRUCTED EXITS. NOTE: NON-PERMITTED WORK ON 6TH FLR CITED IN NOV#35004559R INCLUDED BLDG$3,000
2013-04-30ECB CLASS - 1 violation: UNLAWFUL ACTS: FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.NOTED:RESPONDENT FAILED TO CORRECT CONDITIONS CITED IN NOV#3500455$6,000
2013-03-20ECB CLASS - 2 violation: ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O: BLDG ALTERED UNDER APP #102935512 IS OCCUPIED AS A SPA W/SHOWERS SAUNAS STEAM ROOMS$500
2013-03-20ECB CLASS - 1 violation: WORK W/O A PERMIT: WORK NOTED AT 6TH FLR. BY ELEVATOR BANK ERECTED PARTITIONS TO CREATE ROOMS & CHANGE LAYOUT W/BATHROOM (BATHTUB $800
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2013-03-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2012
2012-12-03Rodent inspection: Passed
2012-10-10311: General Construction/Plumbing — Illegal Conversion Of Commercial Bldg/Space To Other Uses
2012-10-10DOB complaint, category ?
2012-05-25311: Building/Use — SRO - Illegal Work/No Permit/Change In Occupancy/Use
2012-05-25DOB complaint, category ?
2012-02-29311: Illegal Parking — Posted Parking Sign Violation
2012-02-29311: Illegal Parking — Posted Parking Sign Violation
2012-01-19Permit PL — ISSUED
2011
2011-12-23311: Food Poisoning — 1 or 2
2011-12-23311: Food Poisoning — 1 or 2
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-06-19311: Street Condition — Pothole
2011-06-17Rodent inspection: Passed
2011-05-26311: Smoking — Smoking Violation
2011-04-15DOB complaint, category ?
2011-03-25ECB CLASS - 2 violation: FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A COFC W/THE DOB.NOTED:RESPONDENT FAILEDD TO CORRECT THE VIOLATING CONDITIONS & FILE $800
2011-02-10Permit AL — ISSUED
2010
2010-12-13DOB violation E:
2010-12-13DOB violation E:
2010-12-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2010-10-08DOB violation VCAT1:
2010-09-09Job filed: TO REPAIR AND REPLACE EXISTING FIRE ESCAPE ON REAR YARD. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$30,000
2010-09-09Job filed: TO REPAIR AND REPLACE EXISTING FIRE ESCAPE ON REAR YARD. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$30,000
2010-08-07ECB CLASS - 1 violation: FAILURE TO MAINTAIN IN CODE-COMPLAINT MANNER. TREADS & RISERS ARE MISSING BROKEN & DEFECTIVE AT VARIOUS LOCATIONS OF THE REAR (NOR$1,000
2010-07-20Rodent inspection: Passed
2010-05-29DOB violation E:
2010-05-29DOB violation E:
2010-01-12311: Traffic/Illegal Parking — Blocked Hydrant
2009
2009-12-31DOB violation LBLVIO:
2009-12-31DOB violation LBLVIO:
2009-08-11DOB violation E:
2009-08-11DOB violation E:
2009-01-28Job filed: INSTALLATION OF NON-BEARING PARTITION WALL ONLY. NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICATION.$15,000
2009-01-28Job filed: INSTALLATION OF NON-BEARING PARTITION WALL ONLY. NO CHANGE OF USE, OCCUPANCY OR EGRESS FILED UNDER THIS APPLICATION.$15,000
2009-01-28Permit AL — ISSUED
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2008
2008-12-10DOB violation E:
2008-12-10DOB violation E:
2008-06-11DOB complaint, category ?
2008-06-11DOB complaint, category ?
2008-06-11DOB complaint, category ?
2008-06-11DOB complaint, category ?
2008-03-12Permit EW — ISSUED
2008-02-21Permit SG — ISSUED
2008-02-21Permit SG — ISSUED
2008-02-18DOB violation E:
2008-02-18DOB violation E:
2008-01-28Permit AL — ISSUED
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2007
2007-12-20Job filed: INSTALL NON-ILLUMINATED ACCESSORY BUSINESS AWNING NO WORDING NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,000
2007-10-16Permit SG — ISSUED
2007-10-16Permit AL — ISSUED
2007-10-16Permit SG — ISSUED
2007-03-28DOB violation E:
2007-03-28DOB violation E:
2007-03-20Permit PL — ISSUED
2007-01-29DOB complaint, category ?
2007-01-19DOB violation LL6291:
2007-01-10ECB Non-Hazardous violation: 19 B 10/2 X 10/19-HOISTWAY STAYING OPEN AT 3RD FL;REPAIR DOOR CLOSER.2-EMERGENCY PHONE INOPERATIVE;REPAIR$2,500
2006
2006-12-22Permit AL — ISSUED
2006-10-31AL&R $2,791,174 — from CHB AMERICA BANK to BROADWAY-32ND STREET REALTY CORP.$2,791,174
2006-10-31Agreement $7,000,000 — from BROADWAY-32ND STREET REALTY CORP. to CHB AMERICA BANK$7,000,000
2006-10-31Mortgage $2,791,174 — from BROADWAY-32ND STREET REALTY CORP. to CHB AMERICA BANK$2,791,174
2006-10-31Mortgage assigned — from WOORI AMERICA BANK to CHB AMERICA BANK
2006-10-31Mortgage assigned — from WOORI AMERICA BANK to CHB AMERICA BANK
2006-10-13ECB Non-Hazardous violation: 86M25.2 YR TEST TAG
2006-10-13ECB Non-Hazardous violation: 86M05. 2 YR TEST TAG MISSING.
2006-07-12TL&R — from BROADWAY-32ND STREET REALTY CORP. to WOORI AMERICA BANK
2006-07-12TL&R — from BROADWAY-32ND STREET REALTY CORP. to WOORI AMERICA BANK
2006-07-03ECB Non-Hazardous violation: APPROVED PLACE OF ASSEMBLY PLANS NOT AVAILABLE FOR INSPECTION. REMEDY:PROVIDE APPROVED P.A. PLANS.$200
2006-07-03ECB Non-Hazardous violation: OPERATION OF PLACE OF ASSEMBLY W/O A CURRENT PERMIT, EATING & DRINKINGESTABLISHMENT FOR MORE THAN 80 PERSONS W/O A PERMIT (NO P.A.$500
2006-07-03ECB Hazardous violation: EXIT DOOR TOTAL OBSTRUCTION. NOTED: AT FRONT OF 2ND STORY EATING & DRINKING ESTABLISHMENT. THE SECONDARY MEANS OF EGRESS IS OBSTRU$1,200
2006-03-17Permit EW — ISSUED
2006-02-04ECB Non-Hazardous violation: OPERATION OF A PLACE OF ASSEMBLY WHEN BLDG. DEPT. RECORDS DOES NOT ALLOW A PLACE OF ASSEMBLY AT 2ND FL (SEATING FOR 80 PLUS) REMED$350
2006-02-04ECB Hazardous violation: (HAZARDOUS) EXIT DOOR. TOTAL OBSTRUCTION. DEFECT IS: AT FRONT OF 2ND STY EATING & DRINKING ESTABLISHMENT. THE REQUIRED SECONDARY M$480
2005
2005-12-13Permit PL — ISSUED
2005-12-13Permit EW — ISSUED
2005-10-01DOB violation LL1081:
2005-09-20Permit EW — ISSUED
2005-09-19Job filed: GENERAL CONSTRUCTION INCLUDING INSTALL NEW PARTITION, NEW PLUMBING FIXTURES, MECHANICAL WORK & SPRINKLER WORK AS PER PLANS FILED HEREWITH. NO CH$47,600
2005-08-12Permit EW — ISSUED
2005-08-11Job filed: REMOVE EXISTING PARTITIONS. EXISTING PLUMBING FIXTURES TO BE REMOVED, ALL PIPINGS TO BE SEALED AND CAP. NO GAS WORK INVOLVED. NO CHANGE OF EGRESS, USE$15,000
2005-04-19Permit EW — ISSUED
2005-04-14Job filed: Need a boiler permit to get boiler inspection in order to sign off plumbing work. Boiler was filed and installed under the application #102935111. No $10,000
2004
2004-11-05DOB complaint, category ?
2004-11-05DOB complaint, category ?
2004-11-05DOB complaint, category ?
2004-11-03DOB complaint, category ?
2004-11-03DOB complaint, category ?
2004-11-03DOB complaint, category ?
2004-08-12DOB violation E:
2004-07-27Permit SG — ISSUED
2004-07-26Permit SG — ISSUED
2004-07-26Permit AL — ISSUED
2004-06-25Job filed: TO OBTAIN AMENDED C. OF O. FOR EATING & DRINKING ESTABLISHMENT ON 2ND FLOOR ONLY. ALL WORKS FILED UNDER JOB # 103554306.$1,000
2004-06-25Job filed: TO OBTAIN AMENDED C. OF O. FOR EATING & DRINKING ESTABLISHMENT ON 2ND FLOOR ONLY. ALL WORKS FILED UNDER JOB # 103554306.$1,000
2004-05-06AL&R $500,000 — from BROADWAY-32ND STREET REALTY CORP. to WOORI AMERICA BANK$500,000
2004-05-06Mortgage $500,000 — from BROADWAY-32ND STREET REALTY CORP. to WOORI AMERICA BANK$500,000
2004-04-26Job filed: INSTALL NON ILLUMINATED STOREFRONT BUSIN ESS AWNING. SIZE: 7'-5"(W) X 5' 8"(W) X 8'-5 1/2"(W) X 5'-8"(W) X 7'-5" X 4'-3"(H) X 2'(PROJECTION). READING:$2,000
2004-04-22DOB complaint, category ?
2004-03-23Permit EW — ISSUED
2004-02-27Permit EW — ISSUED
2004-02-17Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUP NCY.$3,000
2004-02-17Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUP NCY.$3,000
2003
2003-12-08DOB complaint, category ?
2003-12-03AL&R — from WOORI AMERICA BANK to BROADWAY-32ND STREET REALTY CORP.
2003-12-03Agreement — from WOORI AMERICA BANK to BROADWAY-32ND STREET REALTY CORP.
2003-12-03Mortgage $564,077 — from BROADWAY-32ND STREET REALTY CORP. to WOORI AMERICA BANK$564,077
2003-12-03Mortgage assigned — from KOREA EXCHANGE BANK, BROADWAY BRANCH to WOORI AMERICA BANK
2003-12-03TL&R — from BROADWAY 32ND STREET REALTY CORP. to KOREA EXCHANGE BANK, BROADWAY BRANCH
2003-12-03Agreement — from KOREA EXCHANGE BANK, BROADWAY BRANCH to BROADWAY 32ND STREET REALTY CORP.
2003-10-27Job filed: PLAYERS
2003-10-23Job filed: TO OBTAIN AMENDED C of O FOR EATING & DRINKING ESTABLISHMENT ON 2ND FLOOR ONLY.$10,000
2003-09-04Permit PL — ISSUED
2003-09-03Permit EW — ISSUED
2003-09-03Permit EW — ISSUED
2003-09-02Job filed: SEE SECTION #16 equipment, and new HVAC unit. ALT-I & PA will be filed under seperated applications. No change in use$127,500
2003-08-22Permit AL — ISSUED
2003-08-14Permit AL — ISSUED
2003-07-21DOB complaint, category ?
2003-04-08Permit AL — ISSUED
2003-04-07Job filed: RENOVATION OF OFFICE, INCLUDING MINOR GYP. BD. WORK. NO CHANGE IN USE, OCCUPANCY AND AN EGRESS IS INVOLVED UNDER THIS APPLICATION.$7,000
2003-03-19DOB violation LL6291:
2002
2002-07-10ECB Non-Hazardous violation: 46B13. RESHACKEL CABLES.$350
2002-04-24Job filed: General construction including drywall partitions replacing existing ships ladder with new stair, and add new sink on the 6th floor. No change to occu$9,000
2002-04-24Job filed: General construction including drywall partitions replacing existing ships ladder with new stair, and add new sink on the 6th floor. No change to occu$9,000
2002-04-11Job filed: Install fire alarm system.$10,000
2002-02-22Job filed: General construction including drywall partitions, new plumbing, and new mechanical units and ductwork. No change to occupancy, use or egress.$70,000
2002-02-01Permit AL — ISSUED
2002-01-16Mortgage assigned — from HANVIT AMERICA BANK to KOREA EXCHANGE BANK
2002-01-16Mortgage $1,249,259 — from BROADWAY 32ND STREETREALTY CORP. to KOREA EXCHANGE BANK$1,249,259
2002-01-16Mortgage assigned — from BROADWAY 32ND STREETREALTY CORP. to KOREA EXCHANGE BANK
2002-01-16Mortgage assigned — from KOREA COMMERCIAL BANK OF NEW YORK to KOREA EXCHANGE BANK
2001
2001-12-19Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY AWNING NO WORDING $2,000
2001-12-19Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY AWNING NO WORDING $2,000
2001-11-29Permit EW — ISSUED
2001-11-29Permit EW — ISSUED
2001-10-30Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILE R NO.43899-01) NO CHANGE IN EGR SS OCCUPANCY UNDER THIS APPLICATION.
2001-10-30Job filed: REPLACE BOILER AND OIL BURNER (NYC BOILE R NO.43899-01) NO CHANGE IN EGR SS OCCUPANCY UNDER THIS APPLICATION.
2001-08-17Permit EW — ISSUED
2001-08-15Job filed: MODIFICATIONS OF SPRINKLER HEADS. RELOCATE 4 SPRINKLER HEADS, REMO VE 4 SPR. HEADS.$6,000
2001-08-15Job filed: MODIFICATIONS OF SPRINKLER HEADS. RELOCATE 4 SPRINKLER HEADS, REMO VE 4 SPR. HEADS.$6,000
2001-08-08Job filed: Raised floor structural work. No change to occupancy, use or egress.$10,000
2001-08-03DOB violation C:
2001-08-03ECB Non-Hazardous violation: WORK CONTRARY TO PLAN STRUCTURAL STEEL AND CONCRETE POURED FLOOR NOT ON PLAN 102935111.DOMED STRUCTURE "SUANA IGLOO" NOT ON SAME P$2,500
2001-08-01DOB violation E: 1P5539
2001-08-01DOB violation E: 1F3146
2001-06-08ECB Hazardous violation: FAILURE TO PROPERLY STORE CONBUSTTIBLE(FIFTH)MATERIAL & EQUIPMENT DURING 5FL DEMOLITION OPERATIONS.OXY-ACETBLETANKS & FORCHES WITH
2001-06-08DOB violation C:
2001-05-03Permit PL — ISSUED
2001-04-26Permit EW — ISSUED
2001-04-26Permit EW — ISSUED
2001-01-26Permit EW — ISSUED
2001-01-26Permit EW — ISSUED
2000
2000-12-28Job filed: NEW SPA FACILITIES$15,000
2000-12-27Job filed: New partitions, mechanical and plumbing. No change to use, occupancy or egress.$88,000
2000-11-21Job filed: Demolition and removal of existing gyp board parttions, ceilings, lighting, HVAC, plumbing.$15,000
2000-11-21Job filed: Demolition and removal of existing gyp board parttions, ceilings, lighting, HVAC, plumbing.$15,000
2000-07-05DOB violation E: 1P5539
2000-07-05DOB violation E: 1F3146
2000-01-21DTL — from BANK OF NEW YORK
2000-01-21DTL — from BANK OF NEW YORK
1999
1999-12-10Mortgage $300,000 — from BROADWAY-32ND STREETREALTY CORP. to HANVIT AMERICA BANK$300,000
1999-10-26Permit AL — ISSUED
1999-10-21ECB Hazardous violation: REQUIRED MEANS OF EGRESS OBSTRUCTED NOTED PUBLIC FIRE STAIR FROM BSMT.TO 1ST FL.LOBBY BLOCKED BY ILLEGAL CONSTRUCTION OF CLOSET. ($400
1999-08-27Mortgage $588,777 — from BROADWAY-32ND STREETREALTY CORP. to HANVIT AMERICA BANK$588,777
1999-08-27Mortgage satisfied — from BROADWAY-32ND STREETREALTY CORP. to KOREA COMMERCIAL BANK OF NEW YORK
1999-08-27Agreement — from BROADWAY-32ND ST. REALTY CORP. to HANVIT AMERICA BANK
1999-08-27Mortgage assigned — from BROADWAY-32ND ST. REALTY CORP. to HANVIT AMERICA BANK
1999-04-08DOB complaint, category ?
1999-01-20ATL — from NYCTL 1997-1 TRUST to BANK OF NEW YORK
1999-01-20ATL — from NYCTL 1998-1 TRUST to BANK OF NEW YORK
1998
1998-08-10TLS — from CITY OF NEW YORK to NYCTL 1998-1 TRUST
1998-06-22ECB Non-Hazardous violation: 75U,74T,74D,74R,35O,35R,46R, 75-NO 5 YEAR TEST TAGS 74-LABEL AND LOCK OVERHEAD DOOR 74-PROVIDE PROPER LIGHTING IN OVERHEAD 74-REMO
1998-03-12AMTL — from COMMISSIONER OF FINANCE; BANK OF NEW YORK
1998-01-02Permit EW — ISSUED
1997
1997-09-18Permit EW — ISSUED
1997-08-07TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1997-06-18TLS — from CITY OF NEW YORK to BANK OF NEW YORK
1997-02-06Permit PL — ISSUED
1997-02-06Permit EW — ISSUED
1996
1996-10-01Permit EW — ISSUED
1996-10-01Permit PL — ISSUED
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1996-06-12TLS — from BANK OF NEW YORK; BANK OF NEW YORK to BANK OF NEW YORK; BANK OF NEW YORK
1996-02-20Permit SG — ISSUED
1996-02-09Permit PL — ISSUED
1995
1995-11-17Permit EW — ISSUED
1995-11-17Permit EW — ISSUED
1995-03-13DOB complaint, category ?
1994
1994-08-11Permit SG — ISSUED
1994-08-11Permit SG — ISSUED
1994-08-08Permit AL — ISSUED
1994-03-02ECB Non-Hazardous violation: 73T 5L 47 H 73 PERFORMT THE 5YR TEST DATE & TAG THE GOVEROR FILE ELEV 3 FORM WITH THIS DEPARTMENT
1994-03-02ECB Non-Hazardous violation: 73T PERPERFORM THE 5YR TEST DATE & TAG THE GOVERNOR 7 FILE ELEVATOR 3 FORM WITH THIS DEPARTMENT
1994-03-02Permit SG — ISSUED
1994-02-25Permit EW — ISSUED
1994-02-25Permit SG — ISSUED
1994-01-06DOB violation C:
1994-01-06DOB violation Z:
1994-01-06DOB violation C:
1994-01-06DOB violation Z:
1991
1991-04-16Mortgage $30,000 — from BROADWAY 32ND ST RTYCP to KOREA COMMERCIAL BKNY$30,000
1991-03-25Mortgage assigned — from RESOLUTION TRUST CORP to KOREA COMMERCIAL BKNY
1991-03-07Agreement — from BROADWAY-32ND ST RLTY CP to KOREA COMMERCIAL BKNY
1991-03-07Mortgage $311,474 — from BROADWAY-32ND ST RLTY CP to KOREA COMMERCIAL BKNY$311,474
1991-03-07Mortgage satisfied — from BROADWAY-32ND ST RLTY CP to KOREA FIRST BK N.Y.
1990
1990-04-25DOB complaint, category ?
1989
1989-10-23DOB violation E:
1989-10-23DOB violation E:
1988
1988-08-17DOB violation E: (15)SECURE TOP EXIT COVER.(51)CLEAN TOP OF CAR
1988-08-17DOB violation E: (47)PROVIDE ACCESS TO MOTOR ROOM.(50)PROVIDE ACCESS TO ELEVATOR SO A COMPPETE INSPECTION CAN BE MADE BY A MEMBER FROM THIS D
1988-06-16Mortgage assigned — from BROADWAY-32ND ST RTYCP to KOREA FIRST BK NY
1988-06-16Mortgage $300,000 — from BROADWAY-32ND RLTY CP to KOREA FIRST BK NY$300,000
1987
1987-04-20Mortgage assigned — from EXIM CAPITAL CORP to COLUMBIA CAPITAL CORP
1987-04-13Mortgage assigned — from KOREA COMMERCIAL BANK to YORKVILLE SAVINGS BANK
1987-04-13Mortgage $1,150,000 — from BROADWAY-32 ST REALTY CP to YORKVILLE FED S&L ASSN$1,150,000
1987-04-13Mortgage satisfied — from BRODWAY-32ND ST RLTYCP to KOREA COMMERCL BK N.Y.
1987-04-13Mortgage satisfied — from BROADWAY-23ND ST RLTY CP to KOREA COMMERCIAL BKN.Y.
1986
1986-10-27Mortgage $175,000 — from BROADWAY-32ND ST RLTY CP to KOREA COMMERCIAL BKNY$175,000
1986-08-27Mortgage $25,000 — from B'WAY 32ND ST RLTY CORP to KOREA COMMERCIAL BANK NY$25,000
1986-08-27Mortgage satisfied — from BROADWAY-32ND ST.RLTY CP to KOREA CEN.DAILY NEWS,INC
1986-08-27Mortgage $25,000 — from BROADWAY-32 ST RTY CORP to KOREA COMMERCIAL BKNY$25,000
1985
1985-11-19Agreement — from KOREA COMMERCIAL BANK NY to BROADWAY-32ND ST RLTY CP
1985-10-16Mortgage $89,720 — from BROADWAY-32ND ST.RLTY CP to KOREA CNTL DAILY NEWS,IN$89,720
1985-10-16Mortgage $650,000 — from BROADWAY 32ND ST.RLTY CP to COLUMBIA CAPITAL CORP.$650,000
1985-10-16Deed — from KOREA CNTL DAILY NEWS,IN; SEOUL CNTL DAILY,ETC.FKA to BROADWAY-32ND ST.RLTY CP
1985-10-16Mortgage $6,477 — from BROADWAY-32ND ST.RLTY CP to KOREA COMMERCIAL BANK/NY$6,477
1984
1984-09-18Agreement — from SEOUL CENTRL DLY NWS,INC to KOREA COMMERCIAL BK/N.Y.
1984-09-18Mortgage assigned — from C.S.K.Y. REALTY CORP. to KOREA COMMERCIAL BK/N.Y.
1984-09-18Mortgage assigned — from KOREA EXCHANGE BANK,ETC to KOREA COMMERCIAL BK/N.Y.
1984-09-18Mortgage assigned — from KOREA FIRST BANK to C.S.K.Y. REALTY CORP.
1984-09-18Mortgage $250,000 — from SEOUL CENTRL DLY NWS,INC to KOREA COMMERCIAL BK/N.Y.$250,000
1984-07-23Mortgage assigned — from C.S.K.Y. REALTY CORP. to KOREA FIRST BANK
1984-07-02Mortgage satisfied — from C.S.K.Y. REALTY CORP. to EMIGRANT SAVINGS BANK
1984-03-13Mortgage $300,000 — from SEOUL CENTRAL DAILYETC to KOREA EXCHANGE BANK$300,000
1984-03-13Mortgage $450,000 — from SEOUL CENTRAL DAILYETC to C.S.K.Y. REALTY CORP$450,000
1984-03-13Deed — from C.S.K.Y. REALTY CORP to SEOUL CENTRAL DAILYETC
1982
1982-01-06Mortgage satisfied — from JAVASILE, JOHN T. to KINGS HWAY SAVS BANK
1981
1981-12-10Mortgage — from C S K Y REALTY CORP to EMIGRANT SAVINGS BANK
1977
1977-01-31Agreement — from C S K Y REALTY CORP to FRANKLIN SVGS BK OFNY
1973
1973-07-13Deed — from CHANG, YONG HO to C S K Y REALTY CORP
1972
1972-11-20Deed — from 25 WEST 32ND ST REALTY to HOCHSTEIN, BERNARD; HOCHSTEIN, MIRIAM
1972-11-20Mortgage — from CHANG, YONG HO to HOCHSTEIN, BERNARD; HOCHSTEIN, MIRIAM
1972-11-20Deed — from HOCHSTEIN, MIRIAM; HOCHSTEIN, BERNARD to CHANG, YONG HO
1966
1966-11-03Deed — from JAVASILE, JOHN T to 25 WEST 32ND ST REALTY
1966-11-03Deed — from 25 WEST 32ND ST REALTY to JAVASILE, JOHN T
1966-11-03Mortgage — from JAVASILE, JOHN T to KINGS HIGHWAY SAVINGS BK

Support this site Back to the building page