Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
3 heat or hot-water complaints in the last three years (winter 2025–26: 3).
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
147 service requests in the last three years. Most common: Panhandling (32) · Homeless Person Assistance (32) · Encampment (30) · Sidewalk Condition (15) · Vendor Enforcement (8) · Water System (5).
Filed construction activity
$194,862,893 in permitted construction work filed since
2016 (240 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$11,349,010
$5,107,055
2026
$1,477,570
$664,907
2027
$0
$0
The city's market estimate has fallen
100% between tax years 2025 and 2027.
Tax exemptions on the roll: CHARTBLE PHILAN · COLLEGE-UNIVERSITY · FOREIGN MISSION · MENTAL-MORAL IMPROVE
Building systems
Energy grade (LL33)
C — ENERGY STAR score 67/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2024 (2 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
34 St-Herald Sq — B D F M N Q R W · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full 42 St-Bryant Pk — 7 B D F M · 1,050 ft straight-line (about a 5-minute walk) · station accessibility: none
Bus
Nearest boarding stop: W 37 St / 5 Av — Q32 · 100 ft
Citi Bike
W 37 St & 5 Ave · 150 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
147 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2026-01-30
Deed $16,487,571 — from 420 OWNER LLC to NY 42056 OWNER LLC
$16,487,571
2026-01-20
Sold for $16,487,571
$16,487,571
$366,390
2024-04-11
Deed $13,750,000 — from 420 JS, LLC to ESSILORLUXOTTICA USA INC.
$13,750,000
2024-04-05
Sold for $13,750,000
$13,750,000
$305,556
2022-09-08
Deed $16,250,000 — from MARIST REAL PROPERTY SERVICES, INC. to UHOC REAL PROPERTY HOLDINGS LLC
$16,250,000
2022-09-08
Deed $16,250,000 — from MARIST REAL PROPERTY SERVICES, INC. to UHOC REAL PROPERTY HOLDINGS LLC
$16,250,000
2022-08-25
Sold for $16,250,000
$16,250,000
$361,111
2022-08-25
Sold for $16,250,000
$16,250,000
$361,111
2021-12-06
RPTT&RET $23,071,991 — from LUXOTTICA U.S. HOLDINGS CORP to ESSILOR LUXOTTICA USA INC.
$23,071,991
2021-12-06
RPTT&RET $49,074,150 — from LUXOTTICA U.S. HOLDINGS CORP to ESSILOR LUXOTTICA USA INC.
$49,074,150
2021-12-06
RPTT&RET $23,071,991 — from LUXOTTICA U.S. HOLDINGS CORP to ESSILOR LUXOTTICA USA INC.
$23,071,991
2021-09-30
Sold for $23,071,991
$23,071,991
$512,711
2021-09-30
Sold for $49,074,150
$49,074,150
$1,090,537
2021-09-30
Sold for $23,071,991
$23,071,991
$512,711
2020-07-06
Agreement $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG
$31,200,000
Ten-year activity
2001000
182
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
112
4
12
43
11
182
2018
26
3
5
70
6
110
2019
57
9
13
29
3
111
2020
80
8
8
24
1
121
2021
45
4
16
6
1
72
2022
41
2
9
20
3
75
2023
18
1
7
3
5
34
2024
47
1
56
21
1
126
2025
12
1
34
14
5
66
2026
41
1
58
5
1
106
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2026-09-30
DOB complaint, category ?
2026-09-24
Permit Sidewalk Shed — Permit Issued
2026-08-31
311: Encampment — N/A
2026-08-17
Permit Sprinklers — Permit Issued
2026-08-17
Permit Sprinklers — Permit Issued
2026-08-10
311: Vendor Enforcement — Food Vendor
2026-08-10
311: Vendor Enforcement — Food Vendor
2026-08-06
Permit Mechanical Systems — Permit Issued
2026-08-04
Permit General Construction — Permit Issued
2026-08-03
Job filed: Removal and installation of ductwork. Relocation of existing supply and return diffusers, and relocation of existing thermostats . Installation of new
2026-08-03
Permit Mechanical Systems — Permit Issued
2026-08-03
Permit General Construction — Permit Issued
2026-08-01
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-08-01
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-30
Job filed: Sprinkler modifications on Unit 34th as per plans filed herewith. No change to use, egress or occupancy.
2026-07-30
Job filed: Removal and installation of ductwork, relocation of existing supply and return diffusers, and relocation of existing thermostats. Installation of new
2026-07-30
Job filed: Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
2026-07-29
Job filed: Demolition and restoration of the existing 3rd Floor office buildout at Major League Soccer's (unit 33) existing 420 5th Avenue office, per lease requ
2026-07-29
Job filed: Demolition and restoration of the existing 3rd Floor office buildout (Unit 34) at Major League Soccer's existing 420 5th Avenue office, per lease requ
Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC
2026-06-25
Permit Sidewalk Shed — Permit Issued
2026-06-23
311: Encampment — N/A
2026-06-23
311: Encampment — N/A
2026-06-23
311: Encampment — N/A
2026-06-23
311: Homeless Person Assistance — Non-Chronic
2026-06-22
311: Encampment — N/A
2026-06-22
311: Encampment — N/A
2026-06-20
311: Encampment — N/A
2026-06-20
311: Encampment — N/A
2026-06-19
311: Encampment — N/A
2026-06-19
311: Encampment — N/A
2026-06-18
311: Encampment — N/A
2026-06-15
311: Homeless Person Assistance — Non-Chronic
2026-06-15
Job filed: Minor Mechanical work related to CVS Retail renovation. No change to use, egress or occupancy.
2026-06-15
Job filed: Minor plumbing work related to CVS renovation. No change to use, egress or occupancy.
2026-06-15
Certificate of occupancy Renewal Without Change
2026-06-10
Job filed: CVS Retail Space - General Interior renovation as per plans. Plumbing, and mechanical work to be filing subsequently. No change to use, egress or occu
2026-06-09
311: Encampment — N/A
2026-06-08
311: Homeless Person Assistance — Non-Chronic
2026-06-08
Job filed: Facade Inspection via Industrial Rope Access as shown on plans
2026-06-08
Permit Suspended Scaffold — Permit Issued
2026-06-04
Job filed: Suspended Scaffold for Facade Restoration as Shown on Plans
2026-06-03
311: Illegal Dumping — Removal Request
2026-06-02
311: Encampment — N/A
2026-06-02
311: Encampment — N/A
2026-06-01
311: Encampment — N/A
2026-06-01
311: Encampment — N/A
2026-05-20
Certificate of occupancy Renewal Without Change
2026-05-19
Job filed: Suspended Scaffold for Facade Restoration as Shown on Plans
2026-04-27
311: Homeless Person Assistance — Chronic
2026-04-24
311: Homeless Person Assistance — Non-Chronic
2026-04-24
311: Homeless Person Assistance — Non-Chronic
2026-04-23
311: Homeless Person Assistance — Chronic
2026-04-22
311: Encampment — N/A
2026-04-20
311: Encampment — N/A
2026-04-20
311: Encampment — N/A
2026-04-20
311: Homeless Person Assistance — Non-Chronic
2026-04-15
Permit General Construction — Permit Issued
2026-04-15
Permit General Construction — Permit Issued
2026-04-14
311: Water System — Possible Water Main Break (Use Comments) (WA1)
2026-04-13
311: Water System — Possible Water Main Break (Use Comments) (WA1)
2026-04-13
311: Water System — Leak (Use Comments) (WA2)
2026-04-12
311: Water System — Possible Water Main Break (Use Comments) (WA1)
2026-04-12
311: Water System — Leak (Use Comments) (WA2)
2026-04-12
311: Homeless Person Assistance — Non-Chronic
2026-04-12
311: Encampment — N/A
2026-04-12
311: Vendor Enforcement — Food Vendor
2026-04-12
311: Encampment — N/A
2026-04-02
Restaurant inspection: ROCKEFELLER FOUNDATION
2026-03-29
311: Homeless Person Assistance — Non-Chronic
2026-03-25
Permit Suspended Scaffold — Permit Issued
showing the 80 most recent
The full timeline
showing the 2,000 most recent of
2,856 events
2026
2026-10-13Permit Plumbing — Permit Issued
2026-10-09Certificate of occupancy Renewal With Change
2026-09-30311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2026-09-30DOB complaint, category ?
2026-09-24Permit Sidewalk Shed — Permit Issued
2026-08-31311: Encampment — N/A
2026-08-17Permit Sprinklers — Permit Issued
2026-08-17Permit Sprinklers — Permit Issued
2026-08-10311: Vendor Enforcement — Food Vendor
2026-08-10311: Vendor Enforcement — Food Vendor
2026-08-06Permit Mechanical Systems — Permit Issued
2026-08-04Permit General Construction — Permit Issued
2026-08-03Job filed: Removal and installation of ductwork. Relocation of existing supply and return diffusers, and relocation of existing thermostats . Installation of new$14,500
2026-08-03Permit Mechanical Systems — Permit Issued
2026-08-03Permit General Construction — Permit Issued
2026-08-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-08-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-30Job filed: Sprinkler modifications on Unit 34th as per plans filed herewith. No change to use, egress or occupancy.$3,900
2026-07-30Job filed: Removal and installation of ductwork, relocation of existing supply and return diffusers, and relocation of existing thermostats. Installation of new $14,500
2026-07-30Job filed: Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.$3,900
2026-07-29Job filed: Demolition and restoration of the existing 3rd Floor office buildout at Major League Soccer's (unit 33) existing 420 5th Avenue office, per lease requ$37,004
2026-07-29Job filed: Demolition and restoration of the existing 3rd Floor office buildout (Unit 34) at Major League Soccer's existing 420 5th Avenue office, per lease requ$37,004
2026-07-27Permit Mechanical Systems — Permit Issued
2026-07-27Permit General Construction — Permit Issued
2026-06-25Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$100,000
2026-06-25Permit Sidewalk Shed — Permit Issued
2026-06-23311: Encampment — N/A
2026-06-23311: Encampment — N/A
2026-06-23311: Encampment — N/A
2026-06-23311: Homeless Person Assistance — Non-Chronic
2026-06-22311: Encampment — N/A
2026-06-22311: Encampment — N/A
2026-06-20311: Encampment — N/A
2026-06-20311: Encampment — N/A
2026-06-19311: Encampment — N/A
2026-06-19311: Encampment — N/A
2026-06-18311: Encampment — N/A
2026-06-15311: Homeless Person Assistance — Non-Chronic
2026-06-15Job filed: Minor Mechanical work related to CVS Retail renovation. No change to use, egress or occupancy.$5,000
2026-06-15Job filed: Minor plumbing work related to CVS renovation. No change to use, egress or occupancy.$2,500
2026-06-15Certificate of occupancy Renewal Without Change
2026-06-10Job filed: CVS Retail Space - General Interior renovation as per plans. Plumbing, and mechanical work to be filing subsequently. No change to use, egress or occu$250,000
2026-06-09311: Encampment — N/A
2026-06-08311: Homeless Person Assistance — Non-Chronic
2026-06-08Job filed: Facade Inspection via Industrial Rope Access as shown on plans
2026-03-23311: Homeless Person Assistance — Non-Chronic
2026-03-20311: Dirty Condition — Trash
2026-03-18Job filed: INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANC$100,000
2026-03-18Permit Sidewalk Shed — Signed-off
2026-03-17Job filed: Suspended Scaffold for Facade Restoration as Shown on Plans
2026-03-16311: Homeless Person Assistance — Non-Chronic
2026-03-16Certificate of occupancy Renewal Without Change
2026-03-13Job filed: Facade and roof repair as per plans filed. No change in use, egress or occupancy.$701,250
2026-03-09311: Homeless Person Assistance — Non-Chronic
2026-03-08311: Homeless Person Assistance — Non-Chronic
2026-03-02311: Vendor Enforcement — Food Vendor
2026-02-15311: Dirty Condition — Syringes
2026-02-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-02-02311: HEAT/HOT WATER — ENTIRE BUILDING
2026-02-02Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2026-01-30PAT — from NY 42056 OWNER LLC to BOARD OF MANAGERS OF 420 FIFTH AVENUE CO
2026-01-30Deed $16,487,571 — from 420 OWNER LLC to NY 42056 OWNER LLC$16,487,571
2026-01-30REL — from DEUTSCHE BANK AG, A NEW YORK BRANCH to 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC
2026-01-30PREL — from DEUTSCHE BANK AG, A NEW YORK BRANCH to 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC
2026-01-30311: Non-Residential Heat — Inadequate or No Heat
2026-01-30Permit Structural — Permit Issued
2026-01-30Permit Structural — Signed-off
2026-01-30Permit General Construction — Permit Issued
2026-01-22Job filed: Demolition of the existing convenience stair and restoration of the floor slab.$20,000
2026-01-22Job filed: Slab infill of existing stair opening$75,000
2026-01-20Sold for $16,487,571$16,487,571
2025
2025-12-04DOB complaint, category ?
2025-11-24Certificate of occupancy Renewal Without Change
2025-11-11311: Encampment — N/A
2025-11-11311: Encampment — N/A
2025-10-03Permit Mechanical Systems — Signed-off
2025-09-28311: Homeless Person Assistance — Non-Chronic
2025-09-08311: Homeless Person Assistance — Non-Chronic
2025-09-04Restaurant inspection: LIFE TIME DIGITAL — grade N
2025-07-01Restaurant inspection: LIFE TIME DIGITAL
2025-06-22311: Encampment — N/A
2025-06-22311: Encampment — N/A
2025-06-21311: Homeless Person Assistance — Non-Chronic
2025-06-18Job filed: REPLACEMENT OF 3 WATER COOLED SELF CONTAINED UNITS ON FLOORS 016, 017, AND 018 WITH A TOTAL CAPACITY OF 150 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPAN$525,000
2025-06-18Permit Mechanical Systems — Signed-off
2025-06-17311: Sidewalk Condition — Blocked - Construction
2025-06-15311: Homeless Person Assistance — Non-Chronic
2025-03-03LOCC — from 420 FIFTH AVENUE LLC to THE BOARD OF MANAGERS OF 420 FIFTH
2025-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2025-02-23311: Homeless Person Assistance
2025-02-11Certificate of occupancy Renewal Without Change
2025-02-11Permit Plumbing — Signed-off
2025-02-05311: Encampment — N/A
2025-02-03311: Homeless Person Assistance
2025-01-30Cooling tower inspection
2025-01-30Cooling tower inspection
2025-01-26311: Homeless Person Assistance
2025-01-16Job filed: Sprinkler modification on 8th fl as per plans filed herewith. No change in egress, use, or occupancy.$175,298
2025-01-08311: Panhandling — N/A
2025-01-07311: Panhandling — N/A
2025-01-06Permit Mechanical Systems — Signed-off
2025-01-05311: Homeless Person Assistance
2024
2024-12-27Deed — from THE ROCKEFELLER FOUNDATION to THE ROCKEFELLER FOUNDATION
2024-12-24311: Panhandling — N/A
2024-12-24311: Panhandling — N/A
2024-12-17Deed transfer (nominal price)
2024-12-17Permit Sprinklers — Signed-off
2024-12-13311: Noise — Noise: Construction Equipment (NC1)
2024-12-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-08311: Homeless Person Assistance
2024-12-05MAPS — from 420 FIFTH AVENUE LEASEHOLD CONDOMINIUM
2024-12-05MAPS — from 420 FIFTH AVENUE LEASEHOLD CONDOMINIUM
2024-12-05CDEC — from THE ROCKEFELLER FOUNDATION
2024-12-05CDEC — from THE ROCKEFELLER FOUNDATION
2024-12-05ADEC — from DRYLAND PROPERTIES LLC
2024-12-05MAPS — from 420 FIFTH AVENUE CONDOMINIUM
2024-12-05MAPS — from 420 FIFTH AVENUE LEASEHOLD CONDOMINIUM
2024-12-05MAPS — from 420 FIFTH AVENUE LEASEHOLD CONDOMINIUM
2024-12-05CDEC — from THE ROCKEFELLER FOUNDATION
2024-12-05CDEC — from THE ROCKEFELLER FOUNDATION
2024-12-03311: Panhandling — N/A
2024-12-03311: Panhandling — N/A
2024-12-01311: Homeless Person Assistance
2024-11-19311: Panhandling — N/A
2024-11-18311: Panhandling — N/A
2024-11-14311: Encampment — N/A
2024-11-14Permit Plumbing — Signed-off
2024-11-14Permit Plumbing — Signed-off
2024-11-07311: Panhandling — N/A
2024-11-07311: Panhandling — N/A
2024-11-07311: Vendor Enforcement — Food Vendor
2024-11-07Certificate of occupancy Renewal Without Change
2024-11-07Permit General Construction — Signed-off
2024-11-05311: Panhandling — N/A
2024-11-04311: Panhandling — N/A
2024-11-01Permit Mechanical Systems — Signed-off
2024-10-30311: Panhandling — N/A
2024-10-30Permit Sprinklers — Signed-off
2024-10-29311: Panhandling — N/A
2024-10-29Job filed: Sprinkler modification on 8th fl as per plans filed herewith. No change in egress, use, or occupancy.$175,298
2024-10-29Job filed: Mechanical modifications taking place on 8th fl as per plans filed herewith. No change in use, egress or occupancy.$1,365,373
2024-10-29Job filed: Modification to existing plumbing system on 8th fl as per plans filed herewith. No change in egress, use, or occupancy.$244,057
2024-10-29Job filed: General Construction Modification of 8th floor as per plans filed herewith. No change in egress, use, or occupancy.$3,549,250
2024-10-27311: Homeless Person Assistance
2024-10-27311: Homeless Person Assistance
2024-10-25Job filed: FILING HEREWITH FOR SPRINKLER ADDITION/MODIFICATION AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$13,670
2024-10-25Job filed: Filing herewith for demo mechanical work on 8th and 26th floors as shown on plans. There will be no change of use, occupancy or egress under this appl$30,200
2024-10-25Job filed: FILING HEREWITH PLUMBING PLANS TO REFELECT ADDTION/MODIFICATION OF PLUMBING WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRES$25,000
2024-10-24311: Panhandling — N/A
2024-10-23Restaurant inspection: ROCKEFELLER FOUNDATION — grade A
2024-10-20311: Homeless Person Assistance
2024-10-18Job filed: Filing herewith for non-structural demo work on 8th and 26th floors as shown on plans. There will be no change of use, occupancy or egress under this $5,000
2024-10-17311: Panhandling — N/A
2024-10-02311: Noise — Noise: Construction Equipment (NC1)
2024-09-25311: Panhandling — N/A
2024-09-22311: Homeless Person Assistance
2024-09-18311: Panhandling — N/A
2024-09-17311: Panhandling — N/A
2024-09-17Permit General Construction — Signed-off
2024-08-08Job filed: . NEW GLASS OPENINGS IN CURTAIN WALL FACADE: INSTALLATION OF NEW GLASS OPENINGS IN THE CURTAIN WALL FACADE TO PROVIDE ACCESS TO THE NORTH AND SOUTH TE$50,000
2024-08-08Certificate of occupancy Renewal Without Change
2024-08-07311: Curb Condition — Broken Curb
2024-08-02Job filed: TAX LOT SUBDIVISION FOR CONDOMINIUM PURPOSES ONLY. FORMERLY KNOWN AS TAX LOT 1008, NOW KNOWN AS TAX LOTS 1301, 1302 AND 1303. NO CHANGES TO METES AND
2024-05-16Mortgage satisfied — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL FI to TD BANK N.A.; TH COMMERCIAL MORTGAGE LLC
2024-05-16Mortgage satisfied — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL FI to TD BANK N.A.; TH COMMERCIAL MORTGAGE LLC
2024-05-16Mortgage satisfied — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL FI to TD BANK N.A.; TH COMMERCIAL MORTGAGE LLC
2024-05-16TL&R — from 420 JS LLC to TD BANK N.A.
2024-05-16Mortgage satisfied — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL FI to TD BANK N.A.; TH COMMERCIAL MORTGAGE LLC
2024-05-15Certificate of occupancy Renewal Without Change
2024-05-13Certificate of occupancy Renewal Without Change
2024-05-10Job filed: FILING HEREWITH FOR INTERIOR RENOVATION TO INCLUDE THE REMOVAL OF A PRE-ACTION SYSTEM AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE OCCUPANCY OR $6,000
2024-05-09311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2024-05-09DOB complaint, category ?
2024-05-07311: Panhandling — N/A
2024-05-07Permit Mechanical Systems — Signed-off
2024-05-03Permit General Construction — Signed-off
2024-04-30Job filed: Filing herewith to indicate mechanical work ductwork as shown on plans. There will be no change of use, occupancy or egress under this application.$724,000
2024-04-30Job filed: (MSC) FILING HEREWITH FOR NON-STRUCTURAL INTERIOR DEMOLITION AND INTERIOR RENOVATION AS SHOWN ON PLANS . THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR $3,100,000
2024-04-30Job filed: Filing herewith to indicate plumbing work as shown on plans. There will be no change of use, occupancy or egress under this application.$168,012
2024-04-30Job filed: FILING HEREWITH FOR THE ADDITION/MODIFICATION TO EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. THERE WILL BE NO CHAGE OF USE,OCCUPANCY OR EGRESS UNDER $76,001
2024-04-16311: Noise — Noise: Construction Before/After Hours (NM1)
2024-04-11PAT — from ESSILORLUXOTTICA USA INC. to THE BD OF MGRS OF THE 420 FIFTH AVENUE C
2024-04-11Deed $13,750,000 — from 420 JS, LLC to ESSILORLUXOTTICA USA INC.$13,750,000
2024-04-05Sold for $13,750,000$13,750,000
2024-03-21MCON — from 420 JS, LLC to ESSILORLUXOTTICA USA INC.
2024-03-13311: Panhandling — N/A
2024-02-29Permit Sprinklers — Signed-off
2024-02-26Permit Plumbing — Signed-off
2024-02-22Permit Mechanical Systems — Signed-off
2024-02-22Permit General Construction — Signed-off
2024-02-21Job filed: Filing herewith for non-structural demo work on 8th and 26th floors as shown on plans. There will be no change of use, occupancy or egress under this $5,000
2024-02-20Job filed: Filing herewith for demo mechanical work on 8th and 26th floors as shown on plans. There will be no change of use, occupancy or egress under this appl$30,200
2024-02-20Job filed: Filing herewith for plumbing demo work on 8th and 26th floors as shown on plans. There will be no change of use, occupancy or egress under this appli$35,100
2024-02-20Job filed: Filing herewith for sprinkler demo work on 8th and 26th floors as shown on plans. There will be no change of use, occupancy or egress under this appl$39,700
2024-01-22Certificate of occupancy Renewal Without Change
2024-01-19Permit Mechanical Systems — Permit Issued
2024-01-18Job filed: Demolish and replace existing cooling towers and provide new ping to new cooling towers as shown on plans. No change to use, egress or occupancy.$350,000
2024-01-03Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o
2023-11-27Certificate of occupancy Renewal With Change
2023-10-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-19311: Illegal Parking — Blocked Bike Lane
2023-10-16Permit Structural — Permit Issued
2023-10-16Permit General Construction — Permit Issued
2023-09-13311: Consumer Complaint — Drug Store or Pharmacy
2023-09-08Certificate of occupancy Renewal Without Change
2023-07-05Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3 of 2015, as m$22,300
2023-06-21Certificate of occupancy Renewal Without Change
2023-05-08Certificate of occupancy Renewal With Change
2023-04-28Permit Mechanical Systems — Signed-off
2023-04-27Job filed: Rockefeller Foundation Corporate Events
2023-04-24Job filed: Re-filing of Mechanical -M00648256-I1 to include EUP card. Fees were already paid under M00648256. No change in use, egress or occupancy under this a$1,000
2023-04-05Restaurant inspection: ROCKEFELLER FOUNDATION — grade A
2023-04-05PAT — from UHOC REAL PROPERTY HOLDINGS LLC to BOARD OF MANAGERS OF
2023-04-05PAT — from UHOC REAL PROPERTY HOLDINGS LLC to BOARD OF MANAGERS OF
2023-03-27Certificate of occupancy Renewal With Change
2023-03-16Job filed: Rockefeller Foundation Corporate Events
2023-03-13Job filed: Herewith filing to amend the certificate of occupancy on 1st and 2nd floors as per plans.$7,200,978
2023-03-11311: Lost Property — Other
2023-03-01311: Indoor Air Quality — Sewage Odor
2023-02-22Elevator permit: F and I complete new entrance and hoistway door assembly @ 2F (8.7.2.10). Work to include new hoistway door interlocks @ the 2nd f$50,000
2023-02-07Permit General Construction — Signed-off
2023-02-06Elevator permit: Reline cab.(8.7.2.14) Work with no change in weight or operation. All work to comply with ASME A17.1-2013, Part 2, Safety Code for$12,000
2023-02-06MLEA — from DRYLAND PROPERTIES, LLC to THE ROCKEFELLER FOUNDATION
2023-02-03Job filed: Herewith filing to amend the certificate of occupancy on 1st and 2nd floors as per plans.$7,200,978
2023-02-01Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$246,158
2023-02-01Permit General Construction — Permit Issued
2023-01-23311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2023-01-23311: Street Condition — Defective Hardware
2023-01-23DOB complaint, category ?
2023-01-16Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3 of 2015, as m$10,000
2023-01-11Job filed: New interior fit out of offices, cafeteria and conference rooms. General construction of new partitions, doors and finishes on the 23rd floor. No cons$20,508,292
2023-01-05Job filed: RF HEADQUARTERS 19-23 FIT OUT - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,757,685
2022
2022-12-19Job filed: RF Foundation - Floors 19-23 Fit Out - MODIFICATIONS OF PARTITIONS, CEILINGS, DOORS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCC$20,508,292
2022-12-19Job filed: RF Headquarters - 19-23 Fit Out - PLUMBING AND SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,441,640
2022-12-15Certificate of occupancy Renewal Without Change
2022-12-13Permit General Construction — Permit Issued
2022-11-15311: Taxi Complaint — Driver Complaint - Non Passenger
2022-11-09Job filed: RF Headquarters - 19-23 Fit Out - PLUMBING AND SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,441,640
2022-11-09Job filed: No Work
2022-11-09Job filed: Rockefeller HQ Fit Out - Floors 1-2 - PLUMBING AND SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY.$335,182
2022-11-03Job filed: RF Headquarters - 1-2 Fit Out - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$85,140
2022-11-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-10-28Permit Structural — Signed-off
2022-10-26311: Illegal Parking — Unauthorized Bus Layover
2022-10-21Job filed: RF Headquarters -19-23 Fit Out - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$80,600
2022-10-21Permit General Construction — Signed-off
2022-10-21Permit General Construction — Signed-off
2022-10-20Permit Mechanical Systems — Signed-off
2022-10-20Permit Mechanical Systems — Signed-off
2022-10-18ADEC — from DRYLAND PROPERTIES, LLC
2022-10-18ADEC — from DRYLAND PROPERTIES, LLC
2022-10-18MAPS — from 420 FIFTH AVENUE CONDOMINIUM
2022-10-18MAPS — from 420 FIFTH AVENUE CONDOMINIUM
2022-10-18ADEC — from DRYLAND PROPERTIES, LLC
2022-10-18MAPS — from 420 FIFTH AVENUE CONDOMINIUM
2022-10-18ADEC — from DRYLAND PROPERTIES, LLC
2022-10-18MAPS — from 420 FIFTH AVENUE CONDOMINIUM
2022-10-06Permit General Construction — Permit Issued
2022-10-06Permit Structural — Permit Issued
2022-09-23Certificate of occupancy Renewal With Change
2022-09-23Permit Mechanical Systems — Signed-off
2022-09-22Facade (LL11) filing, cycle 9: SWARMP
2022-09-21Job filed: Direct replacement of two (2) indoor water source heat pumps: mounted on existing hangers.$30,000
2022-09-16Permit Sprinklers — Signed-off
2022-09-16Permit Plumbing — Signed-off
2022-09-16Permit Plumbing — Signed-off
2022-09-16Permit Sprinklers — Signed-off
2022-09-08Deed $16,250,000 — from MARIST REAL PROPERTY SERVICES, INC. to UHOC REAL PROPERTY HOLDINGS LLC$16,250,000
2022-09-08Deed $16,250,000 — from MARIST REAL PROPERTY SERVICES, INC. to UHOC REAL PROPERTY HOLDINGS LLC$16,250,000
2022-08-25Sold for $16,250,000$16,250,000
2022-08-25Sold for $16,250,000$16,250,000
2022-08-19Job filed: PLAZA AND SIDEWALK REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$94,775
2022-07-06Permit Sprinklers — Signed-off
2022-07-06Permit Plumbing — Signed-off
2022-07-01Permit Plumbing — Signed-off
2022-07-01Permit Sprinklers — Signed-off
2022-06-20311: Street Condition — Cave-in
2022-06-05311: Street Condition — Pothole
2022-06-03311: Lost Property — Electronics/Phones
2022-04-11Deed — from LUXOTTICA U.S. HOLDINGS CORP to ESSILORLUXOTTICA USA INC.
2022-04-11Deed — from LUXOTTICA U.S. HOLDINGS CORP to ESSILORLUXOTTICA USA INC.
2022-04-06Deed — from LUXOTTICA U.S. HOLDINGS CORP to ESSILORLUXOTTICA USA INC.
2022-04-06Deed — from LUXOTTICA U.S. HOLDINGS CORP to ESSILORLUXOTTICA USA INC.
2022-03-12311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2022-03-12DOB complaint, category ?
2022-03-07DOB complaint, category ?
2022-02-16Permit Construction Fence — Signed-off
2022-02-15Job filed: INSTALLATION OF PLYWOOD CONSTRUCTION FENCE ENCLOSURE AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$15,000
2022-02-10Permit Plumbing — Signed-off
2022-02-10Permit Sprinklers — Signed-off
2022-02-10Permit Sprinklers — Signed-off
2022-02-10Permit Plumbing — Signed-off
2022-02-09Permit Mechanical Systems — Signed-off
2022-02-09Permit General Construction — Signed-off
2022-02-07Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$1,180,065
2022-02-04Job filed: Modification to existing Plumbing fixtures AND existing Sprinkler system as per plans filed herewith$128,884
2022-02-04Job filed: Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.$342,166
2022-02-02311: Sewer — Other Sewer Problem (Use Comments) (SZZ)
2022-02-01Permit General Construction — Permit Issued
2022-01-11Cooling tower inspection
2022-01-11Cooling tower inspection
2022-01-07Permit Structural — Signed-off
2021
2021-12-22Permit General Construction — Permit Issued
2021-12-14Permit EW — ISSUED
2021-12-08Permit Plumbing — Signed-off
2021-12-08Permit Plumbing — Signed-off
2021-12-08Permit Sprinklers — Signed-off
2021-12-08Permit Sprinklers — Signed-off
2021-12-06RPTT&RET $23,071,991 — from LUXOTTICA U.S. HOLDINGS CORP to ESSILOR LUXOTTICA USA INC.$23,071,991
2021-12-06RPTT&RET $49,074,150 — from LUXOTTICA U.S. HOLDINGS CORP to ESSILOR LUXOTTICA USA INC.$49,074,150
2021-12-06RPTT&RET $23,071,991 — from LUXOTTICA U.S. HOLDINGS CORP to ESSILOR LUXOTTICA USA INC.$23,071,991
2021-12-01Permit Sprinklers — Signed-off
2021-12-01Permit Sprinklers — Signed-off
2021-12-01Permit Plumbing — Signed-off
2021-12-01Permit Plumbing — Signed-off
2021-11-29311: Sewer — Other Sewer Problem (Use Comments) (SZZ)
2021-11-29Permit Structural — Signed-off
2021-11-22Eviction executed (7)
2021-11-22Permit Mechanical Systems — Signed-off
2021-11-20Permit Mechanical Systems — Signed-off
2021-11-18Permit General Construction — Signed-off
2021-11-17Permit Mechanical Systems — Signed-off
2021-11-16Job filed: RF HEADQUARTERS - 1-2 FIT OUT - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,013,387
2021-11-16Job filed: RF HEADQUARTERS 19-23 FIT OUT - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,757,685
2021-11-15Job filed: HEREWITH FILING FOR GENERAL CONSTRUCTION WORK RELATED TO 27TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$300,000
2021-11-15Permit Plumbing — Signed-off
2021-11-10Job filed: HEREWITH FILING FOR MECHANICAL WORK ASSOCIATED WITH 27TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$20,000
2021-11-10Job filed: HEREWITH FILING FOR PLUMBING WORKASSOCIATED WITH27TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$40,000
2021-11-10Permit General Construction — Signed-off
2021-11-10Permit General Construction — Signed-off
2021-10-27Permit EW — ISSUED
2021-10-25Job filed: RF Foundation - Floors 19-23 Fit Out - MODIFICATIONS OF PARTITIONS, CEILINGS, DOORS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCC$20,508,292
2021-10-18Job filed: 420 FIFTH AVENUE - INSTALLATION OF INTERIOR TEMPORARY LOBBY BARRICADE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$7,500
2021-10-18Job filed: RF HEADQUARTERS 19-23 FIT OUT - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,757,685
2021-10-14Job filed: RF Headquarters - 19-23 Fit Out - PLUMBING AND SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,441,640
2021-10-13Job filed: RF Headquarters -19-23 Fit Out - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$80,600
2021-10-12Job filed: RF HEADQUARTERS - 1-2 FIT OUT - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,013,387
2021-10-10Job filed: Rockefeller HQ Fit Out - Floors 1-2 - PLUMBING AND SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY.$335,182
2021-10-07Job filed: RF Headquarters - 1-2 Fit Out - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$85,140
2021-09-30Sold for $23,071,991$23,071,991
2021-09-30Sold for $49,074,150$49,074,150
2021-09-30Sold for $23,071,991$23,071,991
2021-09-27Job filed: New interior fit out of offices, cafeteria and conference rooms. General construction of new partitions, doors and finishes on the 23rd floor. No cons$20,508,292
2021-09-02Job filed: Herewith filing to amend the certificate of occupancy on 1st and 2nd floors as per plans.$7,200,978
2021-08-20Elevator permit: To comply with ASME A17.1 - 2000, Part 8.7, with up to 2003 Addendum and NYC Appendix K. Modernize elevatosr as further specifi$107,656
2021-08-13Job filed: ROCKEFELLER FOUNDATION HEADQUARTERS - 1-2 - PLUMBING AND SPRINKLER DEMOLITION MODIFICATIONS AND TEMPORARY SPRINKLER LOOP ACCORDING TO PLANS FILED HERE$45,000
2021-06-29Job filed: ROCKEFELLER FOUNDATION HEADQUARTERS - 19-23 - PLUMBING AND SPRINKLER DEMOLITION MODIFICATIONS AND TEMPORARY SPRINKLER LOOP ACCORDING TO PLANS FILED HE$121,900
2021-05-21311: Illegal Parking — Blocked Bike Lane
2021-05-13311: Noise — Noise: Construction Before/After Hours (NM1)
2021-05-06Permit Sign — Permit Issued
2021-05-06Permit Sign — Permit Issued
2021-05-06Permit Sign — Permit Issued
2021-05-02311: Lost Property — Bag/Wallet
2021-04-27311: Illegal Parking — Blocked Bike Lane
2021-04-06311: COVID-19 Non-essential Construction — Construction
2021-04-06DOB complaint, category ?
2021-03-29311: Illegal Parking — Blocked Bike Lane
2021-03-26ECB CLASS - 2 violation: FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION USE OF TEMPORARY CONSTRUCTION EQUIPMENT CONSTRUCTION FENCE
2021-03-09Permit Mechanical Systems — Signed-off
2021-02-25Job filed: FILING HEREWITH ALT 1 NO WORK TO CHANGE FLOOR NAME DESIGNATION ONLY.FROM FOURTH FLOOR TO MARKETING FLOOR:3A. THERE WILL BE NO CHANGE IN USE, OCCUPANCY$100
2021-02-25Job filed: FILING HEREWITH ALT 1 NO WORK TO CHANGE FLOOR NAME DESIGNATION ONLY.FROM FOURTH FLOOR TO MARKETING FLOOR:3A. THERE WILL BE NO CHANGE IN USE, OCCUPANCY$100
2021-01-27Job filed: APPLICATION FILED FOR MECHANICAL WORK ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$72,000
2021-01-19311: NonCompliance with Phased Reopening — Business not in compliance
2021-01-12Permit Plumbing — Signed-off
2021-01-02311: Homeless Person Assistance
2020
2020-12-17Certificate of occupancy Temporary
2020-12-16Job filed: Installation of mechanical equipment as per plans filed herewith. No change in use, egress or occupancy.$12,610
2020-12-14311: Water Conservation — Water Meter Broken/Leaking - Private Residence (CMR)
2020-12-10TL&R — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK
2020-12-10TL&R — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK
2020-12-10TL&R — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK
2020-12-10TL&R — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK; NEW YORK COMMUNITY BANK
2020-12-10311: NonCompliance with Phased Reopening — Business not in compliance
2020-11-10Permit Mechanical Systems — Signed-off
2020-10-30Permit Mechanical Systems — Signed-off
2020-10-29Permit EW — ISSUED
2020-10-29Permit EW — ISSUED
2020-10-29Permit EW — ISSUED
2020-10-27Job filed: Modifications to the existing Mechanical Systems on the 16-18th Floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.$328,800
2020-10-27Job filed: APPLICATION FILED FOR PLUMBING AND SPRINKLER WORK ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$67,500
2020-10-22Permit Plumbing — Signed-off
2020-10-22Permit Sprinklers — Signed-off
2020-10-22Permit Sprinklers — Signed-off
2020-10-22Permit Plumbing — Signed-off
2020-10-19Permit Plumbing — Signed-off
2020-10-19Permit Sprinklers — Signed-off
2020-10-19Permit Plumbing — Signed-off
2020-10-19Permit Sprinklers — Signed-off
2020-10-16Permit EW — ISSUED
2020-10-15Permit EW — ISSUED
2020-10-14Permit EW — ISSUED
2020-10-08Permit Mechanical Systems — Signed-off
2020-10-08Permit Plumbing — Signed-off
2020-10-07Permit Mechanical Systems — Signed-off
2020-10-05Job filed: ROCKEFELLER FOUNDATION HEADQUARTERS - 1-2 - MODIFICATIONS FOR DEMOLITION OF MECHANICAL EQUIPMENT ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE$60,000
2020-10-05Job filed: RF - 420 FIFTH AVENUE PACKAGE A - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2020-10-05Job filed: RF - 420 FIFTH AVENUE PACKAGE B - INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$600,000
2020-10-05Job filed: ROCKEFELLER FOUNDATION HEADQUARTERS - 1-2 - PLUMBING AND SPRINKLER DEMOLITION MODIFICATIONS AND TEMPORARY SPRINKLER LOOP ACCORDING TO PLANS FILED HERE$45,000
2020-10-05Job filed: RF - 420 FIFTH AVENUE PACKAGE A - INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$135,000
2020-10-05Job filed: RF - 420 FIFTH AVENUE PACKAGE B - INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$600,000
2020-10-05Job filed: RF - 420 FIFTH AVENUE PACKAGE B - INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$600,000
2020-10-05Job filed: RF - 420 FIFTH AVENUE PACKAGE A - INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$135,000
2020-10-02Job filed: ROCKEFELLER FOUNDATION HEADQUARTERS - 19-23 - MODIFICATIONS FOR DEMOLITION OF MECHANICAL EQUIPMENT ACCORDING TO PLANS FILED HEREWITH NO CHANGE TO USE,$249,000
2020-10-02Job filed: ROCKEFELLER FOUNDATION HEADQUARTERS - 19-23 - PLUMBING AND SPRINKLER DEMOLITION MODIFICATIONS AND TEMPORARY SPRINKLER LOOP ACCORDING TO PLANS FILED HE$121,900
2020-09-25Permit Sprinklers — Permit Issued
2020-09-25Permit Sprinklers — Permit Issued
2020-09-23Job filed: HEREBY FILING OFR THE INSTALLATION OF SPRINMKELR HEADS ON FLOORS 16-18. NO CHANGE TO USE OCCUAPNCY OR EGRESS.$100,002
2020-09-23Job filed: HEREBY FILING FOR THE INSTALLATION OF TEMP LOOP. NO CHANGE TO USE EGRESS OR OCCUAPNCY.$20,020
2020-09-18Certificate of occupancy Temporary
2020-09-18Permit Mechanical Systems — Signed-off
2020-09-18Permit EW — ISSUED
2020-09-17Permit EW — ISSUED
2020-09-16Permit Sprinklers — Signed-off
2020-09-16Permit Standpipe — Signed-off
2020-09-16Permit EW — ISSUED
2020-09-14Job filed: FILING HEREWITH PLANS INDICATING THE ADDITION/MODIFICATION TO AN EXISTING SPRINKLER/STANDPIPE SYSTEM AND REMOVAL OF A AUXILIARY FIRE HOSE RACK. .THERE$100,426
2020-09-14Job filed: FILING HEREWITH FOR MECHANICAL DUCT WORK AND INSTALLATION OF HVAC ON 4TH FLOOR OFFICE SPACE AS SHOWN ON PLANS. THERE WILL NO CHANGE OF USE, OCCUPANCY $415,000
2020-09-14Job filed: FILING HEREWITH PLANS TO SHOW PLUMBING WORK IN AN EXISTING OFFICE SPACE ON THE FOURTH FLOOR. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$115,009
2020-09-14Permit Standpipe — Signed-off
2020-09-11Agreement — from CVS ALBANY, L.L.C. to CREDIT SUSSIE AG
2020-09-11Agreement — from CVS ALBANY, L.L.C. to CREDIT SUSSIE AG
2020-09-11Agreement — from CVS ALBANY, L.L.C. to CREDIT SUSSIE AG
2020-09-10Job filed: INSTALLATION OF INTERIOR TEMPORARY LOBBY BARRICADE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$7,500
2020-09-10Job filed: Modification to standpipe system and related piping as shown on drawings filed herewith. No change in use egress or occupancy.$36,000
2020-09-10Job filed: INSTALLATION OF INTERIOR TEMPORARY LOBBY BARRICADE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$7,500
2020-09-09Permit Plumbing — Signed-off
2020-09-03Job filed: Install new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$250,001
2020-09-03Job filed: Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$1,078,488
2020-08-25Deed transfer (nominal price)
2020-08-17Permit EW — ISSUED
2020-08-14DOB violation E:
2020-08-14DOB violation E:
2020-08-14DOB violation E:
2020-08-11DOB violation E:
2020-08-11DOB violation E:
2020-08-11DOB violation E:
2020-08-11DOB violation E:
2020-08-11DOB violation E:
2020-08-11Permit EW — ISSUED
2020-08-10Job filed: INTERIOR DEMOLITION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$25,000
2020-08-10Job filed: INTERIOR DEMOLITION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$25,000
2020-08-06Permit Sprinklers — Signed-off
2020-08-02311: Homeless Street Condition — N/A
2020-07-28311: Homeless Person Assistance — N/A
2020-07-21Elevator permit: Remove in entirety. Work to comply with A18.1-2005, Part 2 with Addendum and modifications within Appendix K and Chapter 30 of th$6,980
2020-07-08311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-06Agreement $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06Mortgage assigned — from NEW YORK COMMUNITY BANK to CREDIT SUISSE AG
2020-07-06Mortgage $1,361,943 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$1,361,943
2020-07-06Mortgage $1,361,943 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$1,361,943
2020-07-06Agreement $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06Mortgage assigned — from NEW YORK COMMUNITY BANK to CREDIT SUISSE AG
2020-07-06Agreement $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06Mortgage $1,361,943 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$1,361,943
2020-07-06AL&R $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06AL&R $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06AL&R $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06Agreement $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06Mortgage assigned — from NEW YORK COMMUNITY BANK to CREDIT SUISSE AG
2020-07-06AL&R $31,200,000 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$31,200,000
2020-07-06Mortgage assigned — from NEW YORK COMMUNITY BANK to CREDIT SUISSE AG
2020-07-06Mortgage $1,361,943 — from DRYLAND PROPERTIES, LLC to CREDIT SUISSE AG$1,361,943
2020-07-02Certificate of occupancy Temporary
2020-06-29Permit Mechanical Systems — Signed-off
2020-06-26Permit EW — ISSUED
2020-06-25Job filed: Removal of (49) existing sprinkler heads and installation of (2) new sprinkler heads and associated piping on the 3rd Floor as per plans (Demo/ Whiteb$8,300
2020-06-25Job filed: Modifications to the existing HVAC system, cap ductwork, drain and remove piping for fan powered boxes back to riser, safe off control wiring as per p$5,763
2020-06-25Job filed: Modifications to the existing Plumbing systems on the 16-18th floors as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.$148,500
2020-06-25Job filed: Removal of one (1) pantry sink and associated piping back to riser on the 3rd floor as per plans (Demo/ Whitebox.) No change to use, egress or occupan$1,650
2020-06-23Job filed: MINOR DEMOLITION. REMOVAL OF INTERIOR PARTITIONS AND FINISHES. PATCHING AND REPAIR WALLS AND CEILING, CONCRETE SCARIFICATION AND REPAIR WINDOW MULLION$52,000
2020-06-23Job filed: MINOR DEMOLITION. REMOVAL OF INTERIOR PARTITIONS AND FINISHES. PATCHING AND REPAIR WALLS AND CEILING, CONCRETE SCARIFICATION AND REPAIR WINDOW MULLION$52,000
2020-05-29Job filed: STRUCTURAL SUPPORT INSTALLATION AND SLAB WORK AS PER SUBMITTED PLANS HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$125,000
2020-05-29Job filed: STRUCTURAL SUPPORT INSTALLATION AND SLAB WORK AS PER SUBMITTED PLANS HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$125,000
2020-05-29Job filed: INTERIOR ALTERATION TO EXISTING BUSINESS SPACE ON THE 16TH, 17TH, AND 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, O$1,200,000
2020-05-29Job filed: INTERIOR ALTERATION TO EXISTING BUSINESS SPACE ON THE 16TH, 17TH, AND 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, O$1,200,000
2020-05-27311: Non-Emergency Police Matter — Face Covering Violation
2020-03-25Job filed: APPLICATION FILED FOR PLUMBING WORK ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
2020-03-17Certificate of occupancy Temporary
2020-02-14Permit EW — ISSUED
2020-02-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-12-05Job filed: GENERAL CONSTRUCTION ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$590,000
2019-12-05Job filed: GENERAL CONSTRUCTION ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$590,000
2019-12-05Permit EW — ISSUED
2019-12-04Job filed: APPLICATION FILED FOR MECHANICAL WORK ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$72,000
2019-11-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-26Permit Plumbing — Signed-off
2019-11-26Permit Sprinklers — Signed-off
2019-11-20Job filed: APPLICATION FILED FOR PLUMBING AND SPRINKLER WORK ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$67,500
2019-11-15ECB CLASS - 2 violation: AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED
2019-11-14311: Lost Property — Bag/Wallet
2019-10-31Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST & 2ND FLOOR AS PER PLANS FILED HEREWIT$562,500
2019-10-31Job filed: APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST & 2ND FLOOR AS PER PLANS FILED HEREWIT$562,500
2019-10-09Job filed: Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$1,078,488
2019-10-07Job filed: Plumbing modification on the 4th floor (removal & cap) as per plans filed herewith. No change in use, egress, or occupancy.$6,490
2019-10-07Job filed: Removal of existing sprinkler system and installation of temporary loop on 4th floor as per plans filed herewith. No change in use, egress, or occupan$20,976
2019-10-07Job filed: Mechanical modification as per plans filed herewith on 4th floor (removal). No Change in use, egress, or occupancy.$7,296
2019-10-03Job filed: INSTALLATION OF NON-ILLUMINATED WALL SIGN ((LOGO) CVS PHARMACY).$2,600
2019-10-03Job filed: INSTALLATION OF NON-ILLUMINATED WALL SIGN ((LOGO) CVS PHARMACY).$2,600
2019-10-03Job filed: INSTALLATION OF NON-ILLUMINATED WALL SIGN (CVS PHARMACY-GROCERY).$300
2019-10-02Job filed: Install new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$250,001
2019-10-02Job filed: Modification to plumbing fixtures and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.$240,275
2019-10-01Job filed: REMOVE AND CONSTRUCT INTERIOR PARTITIONS, DOORS AND CEILINGS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,595,000
2019-09-10Elevator permit: Door Lock Monitoring System$20,000
2019-09-06Job filed: APPLICATION FILED FOR PLUMBING WORK ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-27Job filed: APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST & 2ND FLOOR AS PER PLANS FILED HEREWITH. $75,000
2019-08-27Permit EW — ISSUED
2019-08-16Permit Sign — Signed-off
2019-08-14Permit Sign — Signed-off
2019-08-12Job filed: REPLACE NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN-C @REAL ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY$800
2019-08-12Job filed: REPLACE NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN-A @WEST 37 STREET ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCC$1,700
2019-08-12Job filed: REPLACE NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN-B @5 AVENUE ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY$1,700
2019-08-12Permit Sign — Signed-off
2019-08-01Permit PL — ISSUED
2019-07-22Certificate of occupancy Temporary
2019-07-15DOB violation E:
2019-07-15DOB violation E:
2019-07-15DOB violation E: CEASE USE
2019-07-15DOB violation E:
2019-07-11Permit EW — ISSUED
2019-07-10Permit EW — ISSUED
2019-07-09311: Homeless Encampment — N/A
2019-07-08311: Lost Property — Electronics/Phones
2019-07-08Permit EW — ISSUED
2019-06-28Job filed: SPRINKLER MODIFICATIONS ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$80,000
2019-06-28Job filed: GENERAL MECHANICAL AND PLUMBING MODIFICATIONS ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$536,000
2019-06-28Job filed: GENERAL CONSTRUCTION MODIFICATION TAKING PLACE ON 15TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,986,000
2019-06-28Permit PL — ISSUED
2019-06-24AL&R $25,945,000 — from 420-26 FIFTH NEW YORK, LLC; MEDITERRANEAN SHIPPING COMPANY (USA) INC to THE FIRST NATIONAL BANK OF LONG ISLAND$25,945,000
2019-06-24AL&R $25,945,000 — from 420-26 FIFTH NEW YORK, LLC; MEDITERRANEAN SHIPPING COMPANY (USA) INC to THE FIRST NATIONAL BANK OF LONG ISLAND$25,945,000
2019-06-24Mortgage $25,945,000 — from MEDITERRANEAN SHIPPING COMPANY (USA) INC; 420-26 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$25,945,000
2019-06-24Mortgage $25,945,000 — from MEDITERRANEAN SHIPPING COMPANY (USA) INC; 420-26 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$25,945,000
2019-06-21PREL — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC; 420 FIFTH ASSOCIATES OWNER LLC
2019-06-21REL — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC
2019-06-19311: Homeless Person Assistance
2019-06-13Agreement $46,867,190 — from 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$46,867,190
2019-06-13AL&R $46,867,190 — from 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$46,867,190
2019-06-13Agreement $46,867,190 — from 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$46,867,190
2019-06-13AL&R $46,867,190 — from 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$46,867,190
2019-06-13Agreement $46,867,190 — from 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$46,867,190
2019-06-13AL&R $46,867,190 — from 420 FIFTH ASSOCIATES OWNER LLC; 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$46,867,190
2019-06-10311: Homeless Encampment — N/A
2019-06-07Deed $25,100,000 — from 420 OWNER LLC; 420 FIFTH ASSOCIATES OWNER LLC to MEDITERRANEAN SHIPPING COMPANY (USA) INC$25,100,000
2019-06-07PAT — from MEDITERRANEAN SHIPPING COMPANY (USA) INC to BOARD OF MANAGERS OF THE 420 FIFTH AVENU
2019-06-05Deed $27,272,850 — from 420 OWNER LLC; 420 FIFTH ASOCIATES OWNER LLC to ZIFF BROTHERS INVESTMENTS, L.L.C.$27,272,850
2019-06-05PAT — from ZIFF BROTHERS INVESTMENTS, L.L.C. to BOARD OF MANAGERS OF 420 FIFTH
2019-05-29Sold for $25,100,000$25,100,000
2019-05-28Deed — from 420 OWNER LLC to 420 OWNER LLC; 420 FIFTH ASSOCIATES LLC
2019-05-28Deed — from 420 FIFTH ASSOCIATES LLC to 420 FIFTH ASSOCIATES OWNER LLC
2019-05-28Deed — from 420 OWNER LLC to 420 OWNER LLC; 420 FIFTH ASSOCIATES LLC
2019-05-28Deed — from 420 FIFTH ASSOCIATES LLC to 420 FIFTH ASSOCIATES OWNER LLC
2019-05-23TL&R — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC
2019-05-23TL&R — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC
2019-05-23TL&R — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC
2019-05-23TL&R — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC
2019-05-23PREL — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC
2019-05-23PREL — from DEUTSCHE BANK AG, NEW YORK BRANCH to 420 OWNER LLC
2019-04-08Job filed: FILING TEMPORARY PLACE OF ASSEMBLY FOR THE 14TH FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-03-06Permit EW — ISSUED
2019-02-28311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2019-02-28Permit EW — ISSUED
2019-02-28DOB complaint, category ?
2019-02-13Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$174,200
2019-02-13Permit EW — ISSUED
2019-01-28Certificate of occupancy Temporary
2019-01-21311: HEAT/HOT WATER — ENTIRE BUILDING
2019-01-21Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018
2018-12-20311: Noise — Noise: Construction Before/After Hours (NM1)
2018-12-18311: Water System — Leak (Use Comments) (WA2)
2018-11-29PAT — from MARIST REAL PROPERTY SERVICES, INC. to BOARD OF MANAGERS OF HE CONDOMINIUM
2018-11-29Deed $375,000 — from TECHINT, INC. to MARIST REAL PROPERTY SERVICES, INC.$375,000
2018-11-24311: Noise — Noise: air condition/ventilation equipment (NV1)
2018-11-09Sold for $375,000$375,000
2018-11-07PAT — from 420 JS, LLC to BOARD OF THE 420 FIFTH AVENUE CONDOMINIU
2018-11-07TL&R — from TH COMMERCIAL MS II, LLC
2018-11-07Mortgage $6,359,387 — from 420 JS, LLC to TD BANK, N.A.$6,359,387
2018-11-07Mortgage assigned — from TH COMMERCIAL MS II, LLC to TD BANK, N.A.
2018-11-07Mortgage assigned — from TH COMMERCIAL MS II, LLC to TD BANK, N.A.
2018-11-07AL&R $15,000,000 — from 420 JS, LLC to TD BANK, N.A.$15,000,000
2018-11-07Agreement $15,000,000 — from 420 JS, LLC to TD BANK, N.A.$15,000,000
2018-11-07Mortgage assigned — from TH COMMERCIAL MS II, LLC to TD BANK, N.A.
2018-11-07Deed $18,723,120 — from WASSERMAN 420 5TH TIC LLC; YH 420 FIFTH LLC; BH 420 5TH TIC LLC; GRAFTON APTS TIC LLC; WAS to 420 JS, LLC$18,723,120
2018-11-02311: Homeless Encampment — N/A
2018-11-01Sold for $18,723,120$18,723,120
2018-10-23Job filed: REPLACEMENT OF AC UNIT ON THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$95,000
2018-10-23Job filed: REPLACEMENT OF AC UNIT ON THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$95,000
2018-10-23Permit EW — ISSUED
2018-10-19Elevator permit: To comply with ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code. -$33,200
2018-10-19Elevator permit: To comply with ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code. -$33,200
2018-10-19Elevator permit: To comply with ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code. -$33,200
2018-10-19Elevator permit: To comply with ASME A17.3 of 2002, as modified by Chapter K3 of Appendix K Section 3.10.12 of the New York City Building Code. -$8,300
2018-08-24Job filed: FILING AN ALTERATION TYPE 1 TO CHANGE THE OCCUPANCY & ESTABLISH PA SPACE ON THE 14TH FLOOR.$500,000
2018-08-24Job filed: FILING AN ALTERATION TYPE 1 TO CHANGE THE OCCUPANCY & ESTABLISH PA SPACE ON THE 14TH FLOOR.$500,000
2018-08-24Job filed: FILING AN ALTERATION TYPE 1 TO CHANGE THE OCCUPANCY & ESTABLISH PA SPACE ON THE 14TH FLOOR.$500,000
2018-08-24Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$117,000
2018-08-24Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$900,000
2018-08-24Job filed: MODOFICATION OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$389,600
2018-08-24Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$60,648
2018-08-24Job filed: ADDING STRUCTURAL SUPPORTS FOR MOVABLE PARTITIONS AND MISCELLANEOUS MECHANICAL EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCU$132,400
2018-07-19Permit EW — ISSUED
2018-07-16PREL — from WASSERMAN WILLOUGHBY TIC LLC; GRAFTON APTS TIC LLC; WASSERMAN 420 5TH TIC LLC; BH 420 5TH to TH COMMERCIAL MS II, LLC
2018-07-16REL — from KFIR CAPITAL 5TH AVE JB LLC; BH 420 5TH TIC LLC; GRAFTON APTS TIC LLC; WASSERMAN 420 5TH T to TH COMMERCIAL MS II, LLC
2018-07-16PREL — from YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 5TH TIC to TH COMMERCIAL MS II, LLC
2018-07-16PREL — from QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; WASSERMAN 420 5TH TIC LLC; GRAFTON to TH COMMERCIAL MS II, LLC
2018-07-16PREL — from KFIR CAPITAL 5TH AVE JB LLC; YH 420 FIFTH LLC; WASSERMAN 420 5TH TIC LLC; WASSERMAN WILLOU to TH COMMERCIAL MS II, LLC
2018-07-16PREL — from BH 420 FIFTH INVESTORS LLC; BH 420 5TH TIC LLC; WASSERMAN WILLOUGHBY TIC LLC; KFIR CAPITAL to TH COMMERCIAL MS II, LLC
2018-07-16REL — from GRAFTON APTS TIC LLC; BH 420 5TH TIC LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE J to TH COMMERCIAL MS II, LLC
2018-07-16PREL — from YH 420 FIFTH LLC; GRAFTON APTS TIC LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE JB LLC; W to TH COMMERCIAL MS II, LLC
2018-07-10Agreement $36,147,176 — from QUALITY BH 420 FIFTH LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH IN to TH COMMERCIAL MS II, LLC$36,147,176
2018-07-10Agreement $3,604,017 — from KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH INVESTORS LLC; WASSERMAN 420 5TH TIC LLC; KFIR C to TH COMMERCIAL MS II, LLC$3,604,017
2018-07-10Agreement $5,794,057 — from BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; GRAFTON APTS TIC LLC; BH 420 5TH to TH COMMERCIAL MS II, LLC$5,794,057
2018-07-10AL&R $45,545,250 — from BH 420 FIFTH INVESTORS LLC; BH 420 5TH TIC LLC; WASSERMAN 420 5TH TIC LLC; WASSERMAN WILLO to TH COMMERCIAL MS II, LLC$45,545,250
2018-07-10Agreement $36,147,176 — from QUALITY BH 420 FIFTH LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH IN to TH COMMERCIAL MS II, LLC$36,147,176
2018-07-10Agreement $3,604,017 — from KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH INVESTORS LLC; WASSERMAN 420 5TH TIC LLC; KFIR C to TH COMMERCIAL MS II, LLC$3,604,017
2018-07-10Agreement $5,794,057 — from BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; GRAFTON APTS TIC LLC; BH 420 5TH to TH COMMERCIAL MS II, LLC$5,794,057
2018-07-10Agreement — from KFIR CAPITAL 5TH AVE JB LLC; YH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5T to BH 420 5TH TIC LLC; WASSERMAN WILLOUGHBY TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; WASSERMAN
2018-07-10AL&R $45,545,250 — from BH 420 FIFTH INVESTORS LLC; BH 420 5TH TIC LLC; WASSERMAN 420 5TH TIC LLC; WASSERMAN WILLO to TH COMMERCIAL MS II, LLC$45,545,250
2018-07-10Agreement — from KFIR CAPITAL 5TH AVE JB LLC; YH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5T to BH 420 5TH TIC LLC; WASSERMAN WILLOUGHBY TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; WASSERMAN
2018-07-10Agreement — from KFIR CAPITAL 5TH AVE JB LLC; YH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5T to BH 420 5TH TIC LLC; WASSERMAN WILLOUGHBY TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; WASSERMAN
2018-07-10AL&R $45,545,250 — from BH 420 FIFTH INVESTORS LLC; BH 420 5TH TIC LLC; WASSERMAN 420 5TH TIC LLC; WASSERMAN WILLO to TH COMMERCIAL MS II, LLC$45,545,250
2018-07-10Agreement $5,794,057 — from BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; GRAFTON APTS TIC LLC; BH 420 5TH to TH COMMERCIAL MS II, LLC$5,794,057
2018-07-10Agreement $3,604,017 — from KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH INVESTORS LLC; WASSERMAN 420 5TH TIC LLC; KFIR C to TH COMMERCIAL MS II, LLC$3,604,017
2018-07-10Agreement $36,147,176 — from QUALITY BH 420 FIFTH LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH IN to TH COMMERCIAL MS II, LLC$36,147,176
2018-07-10AL&R $45,545,250 — from BH 420 FIFTH INVESTORS LLC; BH 420 5TH TIC LLC; WASSERMAN 420 5TH TIC LLC; WASSERMAN WILLO to TH COMMERCIAL MS II, LLC$45,545,250
2018-07-10Agreement $5,794,057 — from BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; GRAFTON APTS TIC LLC; BH 420 5TH to TH COMMERCIAL MS II, LLC$5,794,057
2018-07-10Agreement — from KFIR CAPITAL 5TH AVE JB LLC; YH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5T to BH 420 5TH TIC LLC; WASSERMAN WILLOUGHBY TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; WASSERMAN
2018-07-10Agreement $3,604,017 — from KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH INVESTORS LLC; WASSERMAN 420 5TH TIC LLC; KFIR C to TH COMMERCIAL MS II, LLC$3,604,017
2018-07-10Agreement $36,147,176 — from QUALITY BH 420 FIFTH LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE JB LLC; BH 420 FIFTH IN to TH COMMERCIAL MS II, LLC$36,147,176
2018-07-02Deed $18,363,060 — from KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH INVESTORS LLC; YH 420 FIFTH LLC; WASSERMAN WILLO to MARIST REAL PROPERTY SERVICES, INC.$18,363,060
2018-07-02PREL — from QUALITY BH 420 FIFTH LLC; YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; KFIR CAPITAL 5TH to TH COMMERICAL MS II,LLC
2018-07-02Deed — from QUALITY BH 420 FIFTH LLC; YH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH A to KFIR CAPITAL 5TH AVE SF LLC; YH 420 FIFTH LLC; WASSERMAN WILLOUGHBY TIC LLC; GRAFTON APTS
2018-07-02PAT — from MARIST REALPROPERTY SERVICES,INC to BOARD OF MANAGERS
2018-07-02REL — from QUALITY BH 420 FIFTH LLC; YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; KFIR CAPITAL 5TH to TH COMMERICAL MORTGAGE LLC
2018-07-02PREL — from YH 420 FIFTH LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; QUALITY BH 420 FIFTH LLC; to TH COMMERICAL MS II,LLC
2018-07-02PREL — from BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; KFIR CAPITAL 5TH AVE JB LLC; QUAL to TH COMMERICAL MS II,LLC
2018-06-27PAT — from LUXOTTICA US HOLDINGS CORP. to 420 FIFTH AVENUE CONDOMINIUM
2018-06-27Deed $36,000,000 — from YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; WASSERMAN WILLOUGHBY TIC LLC; GRAFTON APTS to LUXOTTICA U.S. HOLDINGS, CORP.$36,000,000
2018-06-27Deed $36,000,000 — from YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; WASSERMAN WILLOUGHBY TIC LLC; GRAFTON APTS to LUXOTTICA U.S. HOLDINGS, CORP.$36,000,000
2018-06-27PAT — from LUXOTTICA US HOLDINGS CORP. to 420 FIFTH AVENUE CONDOMINIUM
2018-06-20Deed — from BH 420 FIFTH INVESTORS LLC; BH 420 FIFTH LLC; YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LL to GRAFTON APTS TIC LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; QUALITY BH 420 FIFT
2018-06-20Deed — from BH 420 FIFTH INVESTORS LLC; BH 420 FIFTH LLC; YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LL to GRAFTON APTS TIC LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; QUALITY BH 420 FIFT
2018-06-20Deed — from BH 420 FIFTH INVESTORS LLC; BH 420 FIFTH LLC; YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LL to GRAFTON APTS TIC LLC; BH 420 5TH TIC LLC; KFIR CAPITAL 5TH AVE SF LLC; QUALITY BH 420 FIFT
2018-06-07Deed transfer (nominal price)
2018-06-07Sold for $36,000,000$36,000,000
2018-06-07Deed transfer (nominal price)
2018-06-07Deed transfer (nominal price)
2018-06-07Deed transfer (nominal price)
2018-06-05Sold for $18,363,060$18,363,060
2018-05-10Deed $5,650,000 — from THE AMERICAN UNIVERSITY IN CAIRO to ZHONGKE HEALTH INTERNATIONAL (NEW YORK) $5,650,000
2018-05-10PAT — from ZHONGKE HEALTH INTERNATIONAL (NEW YORK) to CONDO BOARD OF 420 FIFTH AVENUE CONDOMIN
2018-05-08Sold for $5,650,000$5,650,000
2018-05-04Certificate of occupancy Temporary
2018-04-03PAT — from LUXOTTICA US HOLDINGS CORP. to 420 FIFTH AVENUE CONDOMINIUM
2018-04-03Deed $19,700,000 — from TECHINT, INC. to LUXOTTICA US HOLDINGS CORP.$19,700,000
2018-04-03PAT — from LUXOTTICA US HOLDINGS CORP. to 420 FIFTH AVENUE CONDOMINIUM
2018-04-03Deed $19,700,000 — from TECHINT, INC. to LUXOTTICA US HOLDINGS CORP.$19,700,000
2018-03-23Deed transfer (nominal price)
2018-03-23Sold for $19,700,000$19,700,000
2018-03-15Job filed: ADDITION/MODIFICIATION TO THE EXITSING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SC,2,4,6,14,16,19,26,27,29 FLOORS DID NOT FIT IN SEC$10,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-23Job filed: REPAIR/REPLACEMENT OF THE EXISTING APPROVED CLASS 'E' SYSTEM FIRE COMMAND CENTER, WITH UPDATING OF ELECTRONICS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$63,000
2018-01-23Job filed: REPAIR/REPLACEMENT OF THE EXISTING APPROVED CLASS "E" SYSTEM FIRE COMMAND CENTER, WITH UPDATING OF ELECTRONICS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$63,000
2018-01-12Certificate of occupancy Temporary
2018-01-05311: Homeless Person Assistance — N/A
2017
2017-12-29311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2017-12-29DOB complaint, category ?
2017-12-09311: Blocked Driveway — No Access
2017-12-07Permit EW — ISSUED
2017-12-07Permit EW — ISSUED
2017-12-05Permit EW — ISSUED
2017-11-30Job filed: DEMOLITION OF THE EXISTING SPRINKLER SYSTEM AND INSTALL TEMPORARY SPRINKLER LOOP AT THE 16TH & 17TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$46,000
2017-11-30Job filed: SPRINKLER WORK BEING FILED ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$43,300
2017-11-30Job filed: SPRINKLER WORK BEING FILED ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$43,300
2017-11-30Job filed: DEMOLITION OF THE EXISTING SPRINKLER SYSTEM AND INSTALL TEMPORARY SPRINKLER LOOP AT THE 16TH & 17TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$46,000
2017-11-29Permit EW — ISSUED
2017-11-28Job filed: INTERIOR RENOVATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2017-11-28Job filed: INTERIOR RENOVATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2017-11-28Job filed: INTERIOR RENOVATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2017-10-18Job filed: FILING FOR THE INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS OF AN EXISTING OFFICE SPACE ON THE 16TH AND 17TH FLOOR. NO CHANGE TO USE, EGRESS OR $171,390
2017-10-18Job filed: FILING FOR THE INTERIOR DEMOLITION OF NON LOAD BEARING PARTITIONS OF AN EXISTING OFFICE SPACE ON THE 16TH AND 17TH FLOOR. NO CHANGE TO USE, EGRESS OR $171,390
2017-09-07Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. GIRL SCOUTS$192,215
2017-09-07Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. GIRL SCOUTS$192,215
2017-09-07Permit EW — ISSUED
2017-08-31Permit EW — ISSUED
2017-08-22Permit PL — ISSUED
2017-08-21Job filed: PA
2017-08-21Job filed: PA
2017-08-18Permit PL — ISSUED
2017-08-18Permit PL — ISSUED
2017-08-16Permit EW — ISSUED
2017-08-11Permit EW — ISSUED
2017-08-04Permit EW — ISSUED
2017-08-04Permit EW — ISSUED
2017-08-01Job filed: ADDITION OF STRUCTURAL STEEL SUPPORTS FOR FOLDING PARTITIONS AS PER PLANS FILED HEREWITH.
2017-08-01Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$77,004
2017-08-01Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH.
2017-08-01Job filed: FILING AN ALTERATION TYPE 1 TO CHANGE THE OCCUPANCY & ESTABLISH PA SPACE ON THE 9TH FLOOR AND REMOVE THE PA SPACE FROM THE 11TH FLOOR.$466,825
2017-08-01Job filed: FILING AN ALTERATION TYPE 1 TO CHANGE THE OCCUPANCY & ESTABLISH PA SPACE ON THE 9TH FLOOR AND REMOVE THE PA SPACE FROM THE 11TH FLOOR.$466,825
2017-08-01Job filed: ADDITION OF STRUCTURAL STEEL SUPPORTS FOR FOLDING PARTITIONS AS PER PLANS FILED HEREWITH.
2017-08-01Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$77,004
2017-08-01Job filed: INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$32,481
2017-07-28Job filed: ADDING STRUCTURAL STEEL SUPPORTS FOR HUNG ELECTRICAL EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATI$37,661
2017-07-28Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$2,000,482
2017-07-28Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM & INSTALLATION OF PRE-ACTION SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC$131,225
2017-07-28Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM & INSTALLATION OF PRE-ACTION SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC$131,225
2017-07-28Job filed: MODOFICATION OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$736,845
2017-07-28Permit EW — ISSUED
2017-07-28Permit EW — ISSUED
2017-07-28Permit EW — ISSUED
2017-07-28Permit EW — ISSUED
2017-07-27Job filed: INTERIOR ALTERATION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$105,300
2017-07-27Job filed: INTERIOR ALTERATION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$105,300
2017-07-27Job filed: INTERIOR ALTERATION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$105,300
2017-07-25DOB violation E:
2017-07-19Job filed: INTERIOR DEMOLITION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$30,240
2017-07-19Job filed: INTERIOR DEMOLITION TO EXISTING BUSINESS SPACE ON THE 18TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY GROUP, OR EGRESS.$30,240
2017-07-19Permit EW — ISSUED
2017-07-13Job filed: SPRINKLER MODIFICATIONS ON THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$8,000
2017-07-13Job filed: SPRINKLER MODIFICATIONS ON THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$8,000
2017-07-11Job filed: ADDITIONS/ MODIFICATIONS TO AN EXISTING CLASS "E" FIRE ALARM SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$20,000
2017-07-11Job filed: ADDITIONS/ MODIFICATIONS TO AN EXISTING CLASS 'E' FIRE ALARM SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$20,000
2017-07-11Job filed: PLUMBING AND MECHANICAL WORK ON THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$98,000
2017-07-11Job filed: INTERIOR CONSTRUCTION WORK ON THE 7TH FLOOR TO INCLUDE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, CEILING AND FINISHES. NO CHANGE TO USE, EGRESS O$675,000
2017-07-06Certificate of occupancy Temporary
2017-06-30Permit EW — ISSUED
2017-06-30Permit EW — RE-ISSUED
2017-06-30Permit EW — ISSUED
2017-06-29Job filed: MODIFICATION OF EXISTING STRUCTURAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$5,567
2017-06-29Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$30,000
2017-06-29Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$39,000
2017-06-29Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$39,000
2017-06-29Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$633,299
2017-06-29Job filed: MODOFICATION OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$305,350
2017-06-29Job filed: MODOFICATION OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$305,350
2017-06-19Permit EW — ISSUED
2017-06-05Permit PL — ISSUED
2017-06-02Permit EW — ISSUED
2017-06-02Permit EW — ISSUED
2017-06-02Permit EW — ISSUED
2017-06-01Job filed: ADDING NEW STEEL BEAMS FOR FOLDING PARTITIONS, CONCRETE HOUSEKEEPING PADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THI$121,491
2017-06-01Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$6,558,076
2017-06-01Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$248,407
2017-06-01Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$344,265
2017-06-01Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$344,265
2017-06-01Job filed: MODOFICATION OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$2,339,804
2017-05-18311: Homeless Person Assistance — N/A
2017-04-21311: Homeless Person Assistance — N/A
2017-04-17311: Homeless Person Assistance — N/A
2017-04-07Certificate of occupancy Temporary
2017-03-23Permit PL — ISSUED
2017-03-23Permit EW — ISSUED
2017-03-23Permit PL — ISSUED
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-03-17EASE $2,000,000 — from BOARD OF MANAGERS OF 420 FIFTH AVENUE CO to LUXOTTICA U.S. HOLDINGS CORP$2,000,000
2017-02-28Permit EW — ISSUED
2017-02-28Permit AL — ISSUED
2017-02-24Permit EW — ISSUED
2017-02-23Permit PL — ISSUED
2017-02-22Job filed: REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATI$149,400
2017-02-16Permit EW — ISSUED
2017-02-16Permit EW — ISSUED
2017-02-14Facade (LL11) filing, cycle 8: SAFE
2017-02-13311: Street Sign - Damaged — Other/Unknown
2017-02-13Job filed: REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMP LOOP HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATI$62,450
2017-02-13Job filed: REMOVAL OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2017-02-13Job filed: REMOVAL OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2017-02-13Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$175,000
2017-02-08311: Homeless Person Assistance — N/A
2017-02-03311: Noise — Noise: Construction Before/After Hours (NM1)
2017-01-20Permit EW — ISSUED
2017-01-19Job filed: INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS. AND LIGHTING SYSTEMS AND FLOOR, WALLS AND CEILING FINISHES IN EXISTING OFFICE SPACE AT THE 15TH FL$424,500
2017-01-19Job filed: INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS. AND LIGHTING SYSTEMS AND FLOOR, WALLS AND CEILING FINISHES IN EXISTING OFFICE SPACE AT THE 15TH FL$424,500
2017-01-19Job filed: INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS. AND LIGHTING SYSTEMS AND FLOOR, WALLS AND CEILING FINISHES IN EXISTING OFFICE SPACE AT THE 15TH FL$424,500
2017-01-19Permit EW — ISSUED
2017-01-19Permit EW — ISSUED
2017-01-13Job filed: ADDITIONS TO THE EXISTING FIRE ALARM SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,000
2017-01-13Permit EW — ISSUED
2017-01-11Certificate of occupancy Temporary
2017-01-06Job filed: INSTALL TEMPORARY SPRINKLER LOOP IN CONJUNCTION WITH OFFICE RENOVATION ON THE 14TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$14,950
2017-01-06Job filed: REMOVAL OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$350,000
2017-01-06Job filed: PLUMBING, MECHANICAL AND SPRINKLER WORK BEING FILING IN CONJUNCTION WITH ALTERATION 2 APPLICATION NUMBER 122939393 TO RENOVATE OFFICE SPACE ON THE 14T$26,500
2017-01-06Job filed: REMOVAL OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$40,000
2017-01-06Job filed: REMOVAL OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$40,000
2017-01-06Job filed: INSTALL TEMPORARY SPRINKLER LOOP IN CONJUNCTION WITH OFFICE RENOVATION ON THE 14TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$14,950
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-21Permit EW — ISSUED
2016-12-21Permit EW — ISSUED
2016-12-21Permit EW — ISSUED
2016-12-18311: Homeless Person Assistance — N/A
2016-12-18311: Homeless Person Assistance — N/A
2016-12-13Permit EW — ISSUED
2016-12-09Job filed: RENOVATE EXISTING OFFICE SPACE ON THE 14TH FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING NON-LOAD BEARING PARTITIONS, PLUMBING, LIGHTING, FLOORING A$431,000
2016-12-09Permit EW — ISSUED
2016-12-09Permit EW — ISSUED
2016-12-07Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND CEILING CHANGES ON 19TH & 21ST FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$308,000
2016-12-07Job filed: SPRINKLER WORK ON 19TH & 21ST FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,800
2016-12-07Job filed: SPRINKLER WORK ON 19TH & 21ST FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,800
2016-12-07Job filed: MECHANICAL WORK ON THE 19TH AND 20TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$38,500
2016-12-07Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM ON 19TH & 21ST FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,500
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06AALR — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06AALR — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06AALR — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06AALR — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-12-06Mortgage assigned — from TH COMMERCIAL MORTGAGE LLC to TH COMMERCIAL MS II, LLC
2016-11-15Agreement — from BH 420 FIFTH INVESTORS LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; YH 420 to QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH
2016-11-15Mortgage $5,794,057 — from KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 FIFTH LLC; BH 420 FIFTH INVE to TH COMMERCIAL MORTGAGE LLC$5,794,057
2016-11-15Mortgage $36,147,176 — from KFIR CAPITAL 5TH AVE SF LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$36,147,176
2016-11-15Agreement — from BH 420 FIFTH INVESTORS LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; YH 420 to QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH
2016-11-15Deed $48,213,200 — from GIRL SCOUTS OF THE UNITED STATES OF AMER; NEW YORK GIRL SCOUTS, INC., AS NOMINEE to YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB L$48,213,200
2016-11-15Deed $48,213,200 — from GIRL SCOUTS OF THE UNITED STATES OF AMER; NEW YORK GIRL SCOUTS, INC., AS NOMINEE to YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB L$48,213,200
2016-11-15Mortgage $3,604,017 — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH to TH COMMERCIAL MORTGAGE LLC$3,604,017
2016-11-15Mortgage $5,794,057 — from KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 FIFTH LLC; BH 420 FIFTH INVE to TH COMMERCIAL MORTGAGE LLC$5,794,057
2016-11-15Deed $48,213,200 — from GIRL SCOUTS OF THE UNITED STATES OF AMER; NEW YORK GIRL SCOUTS, INC., AS NOMINEE to YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB L$48,213,200
2016-11-15AL&R $45,545,250 — from QUALITY BH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$45,545,250
2016-11-15Deed $48,213,200 — from GIRL SCOUTS OF THE UNITED STATES OF AMER; NEW YORK GIRL SCOUTS, INC., AS NOMINEE to YH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB L$48,213,200
2016-11-15Agreement — from BH 420 FIFTH INVESTORS LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; YH 420 to QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH
2016-11-15Mortgage $3,604,017 — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH to TH COMMERCIAL MORTGAGE LLC$3,604,017
2016-11-15Mortgage $36,147,176 — from KFIR CAPITAL 5TH AVE SF LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$36,147,176
2016-11-15Mortgage $36,147,176 — from KFIR CAPITAL 5TH AVE SF LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$36,147,176
2016-11-15Mortgage $3,604,017 — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH to TH COMMERCIAL MORTGAGE LLC$3,604,017
2016-11-15Mortgage $3,604,017 — from BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH to TH COMMERCIAL MORTGAGE LLC$3,604,017
2016-11-15AL&R $45,545,250 — from QUALITY BH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$45,545,250
2016-11-15Mortgage $36,147,176 — from KFIR CAPITAL 5TH AVE SF LLC; KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$36,147,176
2016-11-15Mortgage $5,794,057 — from KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 FIFTH LLC; BH 420 FIFTH INVE to TH COMMERCIAL MORTGAGE LLC$5,794,057
2016-11-15Mortgage $5,794,057 — from KFIR CAPITAL 5TH AVE JB LLC; QUALITY BH 420 FIFTH LLC; BH 420 FIFTH LLC; BH 420 FIFTH INVE to TH COMMERCIAL MORTGAGE LLC$5,794,057
2016-11-15Agreement — from BH 420 FIFTH INVESTORS LLC; QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE JB LLC; YH 420 to QUALITY BH 420 FIFTH LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 FIFTH LLC; KFIR CAPITAL 5TH
2016-11-15AL&R $45,545,250 — from QUALITY BH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$45,545,250
2016-11-15AL&R $45,545,250 — from QUALITY BH 420 FIFTH LLC; BH 420 FIFTH INVESTORS LLC; KFIR CAPITAL 5TH AVE SF LLC; BH 420 to TH COMMERCIAL MORTGAGE LLC$45,545,250
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-07Deed transfer (nominal price)
2016-11-07Deed transfer (nominal price)
2016-11-07Deed transfer (nominal price)
2016-11-07Sold for $48,213,200$48,213,200
2016-11-07ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED REPROT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL LOCAL LAW 11/98 REPORT.R$800
2016-10-24311: Homeless Person Assistance — N/A
2016-10-18Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE TO OCCUPANCY, USE OR EGRESS.$30,000
2016-10-18Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE TO OCCUPANCY, USE OR EGRESS.$30,000
2016-10-18Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE TO OCCUPANCY, USE OR EGRESS.$30,000
2016-10-17311: Broken Muni Meter — Credit Card Stuck in Meter
2016-10-17Job filed: STRUCTURAL WORK FOR INSTALLATION OF CONVENIENCE STAIR BETWEEN THE 6TH AND 7TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$250,000
2016-09-14Job filed: INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2016-09-14Permit EW — ISSUED
2016-09-12311: Homeless Person Assistance — N/A
2016-09-09311: Homeless Person Assistance — N/A
2016-09-09Permit EW — ISSUED
2016-09-07Job filed: MODIFICATION OF AND EXISTING SPRINKLER SYSTEM AND INSTALLATION OF TEMP LOOP. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$109,000
2016-09-06311: Homeless Person Assistance — N/A
2016-09-06311: Homeless Person Assistance — N/A
2016-08-30311: Homeless Person Assistance — N/A
2016-08-19311: Homeless Person Assistance — N/A
2016-08-18311: Homeless Person Assistance — N/A
2016-08-18311: Homeless Person Assistance — N/A
2016-08-17Permit EW — ISSUED
2016-08-11Permit PL — ISSUED
2016-08-06311: Homeless Person Assistance — N/A
2016-07-28Permit EW — ISSUED
2016-07-28Permit EW — ISSUED
2016-07-28Permit EW — ISSUED
2016-07-26311: Homeless Person Assistance — N/A
2016-07-25Certificate of occupancy Temporary
2016-07-25Permit PL — ISSUED
2016-07-16311: Homeless Person Assistance — N/A
2016-07-13Permit EW — ISSUED
2016-07-13Permit EW — ISSUED
2016-07-13Permit EW — ISSUED
2016-07-12311: Homeless Person Assistance — N/A
2016-07-11Job filed: ADDITIONS/ MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$90,000
2016-07-11Job filed: ADDITIONS/ MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$90,000
2016-06-30Job filed: HVAC AND PLUMBING WORK ON FLOORS 6 AND 7 AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$959,000
2016-06-30Job filed: STRUCTURAL WORK FOR STRENGTHENING THE FLOOR OPENING AROUND NEW STAIR AND PROVIDE SUPPORT FOR NEW STAIR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR$300,000
2016-06-30Job filed: SPRINKLER WORK ON THE 6TH AND 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$175,000
2016-06-30Job filed: GENERAL CONSTRUCTION ON FLOORS 6 AND 7 TO INCLUDE THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, CEILING AND FINISHES. NO CHANGE TO USE, EGRESS OR$2,700,000
2016-06-30Job filed: SPRINKLER WORK ON THE 6TH AND 7TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$175,000
2016-06-30Job filed: STRUCTURAL WORK FOR STRENGTHENING THE FLOOR OPENING AROUND NEW STAIR AND PROVIDE SUPPORT FOR NEW STAIR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR$300,000
2016-06-24FDNY inspection (SPECIAL-OTH)
2016-06-23DOB violation E:
2016-06-11311: Homeless Person Assistance — N/A
2016-06-10Job filed: REMOVAL AND INSTALLATION OF EXISTING MECHANICAL/HVAC, DUCTWORK EQUIPMENT, PLUMBING FIXTURES AND ALL ASSOCIATED PIPING FOR CELLAR AND SUBCELLAR RENOVAT$360,000
2016-06-10Job filed: STRUCTURAL REINFORCEMENTS FOR CELLAR AND SUBCELLAR RENOVATIONS.$100,000
2016-06-10Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AND HUNG CEILINGS. RELOCATE STAIRS TO ENLARGE STORAGE SPACE AT LOFT AT MEZZANINE. N$1,390,000
2016-06-10Job filed: REMOVAL AND INSTALLATION OF EXISTING MECHANICAL/HVAC, DUCTWORK EQUIPMENT, PLUMBING FIXTURES AND ALL ASSOCIATED PIPING FOR CELLAR AND SUBCELLAR RENOVAT$360,000
2016-06-08311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2016-06-08DOB complaint, category ?
2016-06-07Deed — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to 420 OWNER LLC
2016-06-07AL&R $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07Mortgage $4,084,235 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$4,084,235
2016-06-07TL&R — from ARBOR REALTY PARTICIPATION, LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC
2016-06-07Mortgage assigned — from ARBOR REALTY PARTICIPATION, LLC to DEUTSCHE BANK AG, NEW YORK BRANCH
2016-06-07Agreement $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07AL&R $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07TL&R — from ARBOR REALTY PARTICIPATION, LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC
2016-06-07Mortgage $4,084,235 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$4,084,235
2016-06-07Agreement $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07Deed — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to 420 OWNER LLC
2016-06-07AL&R $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07Mortgage $4,084,235 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$4,084,235
2016-06-07Mortgage assigned — from ARBOR REALTY PARTICIPATION, LLC to DEUTSCHE BANK AG, NEW YORK BRANCH
2016-06-07Mortgage assigned — from ARBOR REALTY PARTICIPATION, LLC to DEUTSCHE BANK AG, NEW YORK BRANCH
2016-06-07TL&R — from ARBOR REALTY PARTICIPATION, LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC
2016-06-07Mortgage assigned — from ARBOR REALTY PARTICIPATION, LLC to DEUTSCHE BANK AG, NEW YORK BRANCH
2016-06-07Deed — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to 420 OWNER LLC
2016-06-07Deed — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to 420 OWNER LLC
2016-06-07Agreement $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07Mortgage $4,084,235 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$4,084,235
2016-06-07AL&R $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07Agreement $61,915,765 — from 420 OWNER LLC to DEUTSCHE BANK AG, NEW YORK BRANCH$61,915,765
2016-06-07TL&R — from ARBOR REALTY PARTICIPATION, LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC
2016-05-25Deed transfer (nominal price)
2016-05-25Deed transfer (nominal price)
2016-05-25Deed transfer (nominal price)
2016-05-25Deed transfer (nominal price)
2016-05-13311: Homeless Person Assistance — N/A
2016-04-27Certificate of occupancy Temporary
2016-04-26FDNY inspection (SPECIAL-OTH)
2016-04-25311: Homeless Person Assistance — N/A
2016-04-15Certificate of occupancy Final
2016-04-11311: Water System — Hydrant Leaking (WC1)
2016-03-30Permit EW — ISSUED
2016-03-19311: Homeless Person Assistance — N/A
2016-03-15Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2016-03-15Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2016-03-15Job filed: REMOVAL OF INTERIOR NON LOADING PARTITIONS ON THE 12TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$209,000
2016-03-15Job filed: REMOVAL TO EXISTING SPRINKLER SYSTEM AND INSTLLATION OF TEMP LOOP. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,500
2016-03-15Permit EW — ISSUED
2016-03-15Permit EW — ISSUED
2016-03-05311: Homeless Person Assistance — Status Call
2016-02-29Job filed: PROPOSED TO INCREASE OCCUPANCY ON THE 6TH FLOOR TO 225 PERSONS. NO WORK TO BE PERFORMED. NO CHANGE TO USE IS PROPOSED.$1,000
2016-02-23FDNY inspection (SPECIAL-OTH)
2016-02-09Permit PL — ISSUED
2016-02-02Certificate of occupancy Temporary
2016-01-22Permit EW — ISSUED
2016-01-22Permit EW — ISSUED
2016-01-13Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$3,000
2016-01-13Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$3,000
2016-01-06Job filed: REMOVAL TO EXISTING SPRINKLER SYSTEM AND INSTLLATION OF TEMP LOOP. ALSO, REMOVING A FIRE HOSE STATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,$35,000
2016-01-06Job filed: REMOVAL TO EXISTING SPRINKLER SYSTEM AND INSTLLATION OF TEMP LOOP. ALSO, REMOVING A FIRE HOSE STATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,$35,000
2016-01-05Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$45,000
2016-01-05Job filed: REMOVAL OF INTERIOR NON LOADING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$145,000
2016-01-05Permit EW — ISSUED
2016-01-05Permit EW — ISSUED
2015
2015-12-20311: Taxi Complaint — Driver Complaint
2015-11-23Certificate of occupancy Temporary
2015-11-18311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2015-11-18DOB complaint, category ?
2015-10-28Certificate of occupancy Temporary
2015-10-01311: Taxi Complaint — Driver Complaint
2015-08-27Certificate of occupancy Temporary
2015-07-29DOB violation E:
2015-07-29DOB violation E:
2015-07-29DOB violation E:
2015-07-29DOB violation E:
2015-07-29DOB violation E:
2015-07-01311: Taxi Complaint — Driver Complaint
2015-06-29Permit EW — ISSUED
2015-06-29Permit EW — ISSUED
2015-06-02Certificate of occupancy Temporary
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-14ADEC — from 420 FIFTH AVENUE CONDOMINIUM
2015-05-11311: Homeless Person Assistance — No Status Call
2015-04-16311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2015-04-16DOB complaint, category ?
2015-04-10Permit EW — ISSUED
2015-03-30Permit EW — ISSUED
2015-03-11Certificate of occupancy Temporary
2015-02-20311: Non-Residential Heat — Inadequate or No Heat
2015-02-20311: Non-Residential Heat — Inadequate or No Heat
2015-02-20311: Non-Residential Heat — Inadequate or No Heat
2015-02-20311: Non-Residential Heat — Inadequate or No Heat
2015-02-20311: Non-Residential Heat — Inadequate or No Heat
2015-02-11Deed $620,000 — from LTC PROPERTY 2 LLC to 420 FIFTH AVENUE, LLC$620,000
2014
2014-12-24Certificate of occupancy Temporary
2014-12-15Certificate of occupancy Temporary
2014-12-09Permit AL — ISSUED
2014-11-12Permit EW — ISSUED
2014-11-12Permit EW — ISSUED
2014-11-12Permit EW — ISSUED
2014-09-24Certificate of occupancy Temporary
2014-08-27311: Taxi Complaint — Driver Complaint
2014-06-16Permit EW — ISSUED
2014-06-16Permit EW — ISSUED
2014-06-11Certificate of occupancy Temporary
2014-06-02311: Vending — In Prohibited Area
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-20TL&R — from DRYLAND PROPERTIES, LLC to U.S. BANK NATIONAL ASSOCIATION
2014-05-20Mortgage $12,504,277 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$12,504,277
2014-05-20Agreement $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20TL&R — from DRYLAND PROPERTIES, LLC to U.S. BANK NATIONAL ASSOCIATION
2014-05-20Agreement $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20Mortgage $12,504,277 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$12,504,277
2014-05-20AL&R $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION, AS TRUST to NEW YORK COMMERCIAL BANK
2014-05-20Mortgage $12,504,277 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$12,504,277
2014-05-20Agreement $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20AL&R $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20TL&R — from DRYLAND PROPERTIES, LLC to U.S. BANK NATIONAL ASSOCIATION
2014-05-20AL&R $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20TL&R — from DRYLAND PROPERTIES, LLC to U.S. BANK NATIONAL ASSOCIATION
2014-05-20AL&R $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION, AS TRUST to NEW YORK COMMERCIAL BANK
2014-05-20Agreement $35,000,000 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$35,000,000
2014-05-20Mortgage $12,504,277 — from DRYLAND PROPERTIES, LLC to NEW YORK COMMERCIAL BANK$12,504,277
2014-05-20Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION, AS TRUST to NEW YORK COMMERCIAL BANK
2014-05-20Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION, AS TRUST to NEW YORK COMMERCIAL BANK
2014-05-16Permit PL — ISSUED
2014-05-14Permit EW — ISSUED
2014-05-09Job filed: ARCHITECTURAL AND PLUMBING RENOVATIONS PER PLANS FILED TO ESTABLISH NEW COFFEE SERVING SPACE (USE GROUP 6). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$45,000
2014-04-03Permit EW — ISSUED
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-27Permit PL — ISSUED
2014-03-21Permit EW — ISSUED
2014-03-21Permit EW — ISSUED
2014-03-20Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,000
2014-03-20Job filed: INTERIOR PARTITIONS AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$206,000
2014-03-20Job filed: MECHANICAL AND SPRINKLER WORK FOR INTERIOR PARTITIONS AS SHOWN ON PLANS.$30,000
2014-03-20Permit EW — ISSUED
2014-03-20Permit EW — ISSUED
2014-03-13311: Taxi Complaint — Driver Complaint
2014-02-26Permit EW — ISSUED
2014-02-25Job filed: RELOCATE ONE (1) SPRINKLER HEAD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPNACY UNDER THIS APPLICATION.$5,000
2014-01-30Certificate of occupancy Temporary
2014-01-28Permit EW — ISSUED
2014-01-14Permit EW — ISSUED
2014-01-08Job filed: MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$15,750
2014-01-07311: Non-Residential Heat — Inadequate or No Heat
2013
2013-12-31Deed $310,000 — from TLT & J ENTERPRISES, LLC to LTC PROPERTY 2, LLC$310,000
2013-11-19Permit EW — ISSUED
2013-11-19Permit EW — ISSUED
2013-11-19Permit EW — RE-ISSUED
2013-11-15311: Broken Muni Meter — Coin or Card Did Not Register
2013-11-04Certificate of occupancy Temporary
2013-10-22Permit EW — ISSUED
2013-10-22Permit EW — ISSUED
2013-09-17Permit EW — RE-ISSUED
2013-09-11Permit EW — ISSUED
2013-09-06Job filed: FILING HEREWITH INTERIOR RENOVATION OF AN EXISITING OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$525,000
2013-09-06Job filed: FILING HEREWITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$36,325
2013-09-06Job filed: FILING HEREWITH MODIFICATION TO THE EXISTING SPRINKLE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$20,600
2013-09-06Job filed: FILING HEREWITH MODIFICATION TO THE EXISTING CLASS E FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$7,500
2013-09-06Job filed: FILING HEREWITH MODIFICATION TO THE EXISTING SPRINKLE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$20,600
2013-09-06Job filed: FILING HEREWITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$36,325
2013-09-06Job filed: FILING HEREWITH INTERIOR RENOVATION OF AN EXISITING OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$525,000
2013-08-28Permit PL — ISSUED
2013-08-27Permit EW — ISSUED
2013-08-12Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 23RD FLOOR. NO CHANGE IN OCCUANCY, USE OR EGRESS.$13,000
2013-08-12Job filed: RELOCATING DOOR, MECHANICAL,PLUMBING, & SPRINKLER MODIFICATIONS ON THE 23RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$69,000
2013-08-12Job filed: RELOCATING DOOR, MECHANICAL,PLUMBING, & SPRINKLER MODIFICATIONS ON THE 23RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$69,000
2013-08-12Permit EW — ISSUED
2013-08-12Permit EW — ISSUED
2013-07-23Certificate of occupancy Temporary
2013-07-05Permit EQ — ISSUED
2013-06-28Job filed: INSTALLATION OF 654 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPL
2013-06-28Job filed: INSTALLATION OF 654 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPL
2013-06-19DOB violation E:
2013-06-19DOB violation E:
2013-06-19DOB violation E:
2013-06-14Permit PL — ISSUED
2013-06-03AALR — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03AALR — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03Mortgage assigned — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03AALR — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03Mortgage assigned — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03Mortgage assigned — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03Mortgage assigned — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-06-03AALR — from ARBOR REALTY FUNDING LLC to ARBOR REALTY PARTICIPATION, LLC
2013-04-29Certificate of occupancy Temporary
2013-04-12Permit EW — ISSUED
2013-04-10Permit EW — ISSUED
2013-04-10Permit EW — ISSUED
2013-04-09Job filed: PROPOSE TO FILE FOR THE ADDITIONS/MODIFICATIONS TO THE EXISTING CLASS 'E' FIRE ALARM SYSTEM FOR NEW TENANT IN SUB CELLAR AS SHOWN ON PLANS. NO CHANGE $15,116
2013-04-09Job filed: PROPOSE TO FILE FOR THE ADDITIONS/MODIFICATIONS TO THE EXISTING CLASS 'E' FIRE ALARM SYSTEM FOR NEW TENANT IN SUB CELLAR AS SHOWN ON PLANS. NO CHANGE $15,116
2013-04-09Job filed: PROPOSE TO FILE FOR THE ADDITIONS/MODIFICATIONS TO THE EXISTING CLASS 'E' FIRE ALARM SYSTEM FOR NEW TENANT IN SUB CELLAR AS SHOWN ON PLANS. NO CHANGE $15,116
2013-04-05Permit PL — ISSUED
2013-04-04Job filed: MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE CELLAR, FIRST AND SECOND FLOORS AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUP$96,600
2013-03-12Job filed: FIRE ALARM SYSTEMS MODIFICATIONS AS PER PLANS FILE HERE WITH. THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$14,000
2013-03-11Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND INSTALLATION OF A CONVENIENCE STAIR BETWEEN 1ST & 2ND FLOORS AS PER PLANS FILED HE$90,000
2013-03-11Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND INSTALLATION OF A CONVENIENCE STAIR BETWEEN 1ST & 2ND FLOORS AS PER PLANS FILED HE$90,000
2013-03-11Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AND RELATED PLUMBING FIXTURES AS PER PLANS FILED HERE WITH. THERE IS NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER$279,000
2013-03-11Job filed: SPRINKLER SYSTEMS MODIFICATIONS AS PER PLANS FILE HERE WITH. THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$15,000
2013-03-11Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HERE WITH. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.$77,500
2013-03-11Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AND RELATED PLUMBING FIXTURES AS PER PLANS FILED HERE WITH. THERE IS NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER$279,000
2013-02-28Job filed: INTERIOR RENOVATIONS TO EXISTING RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$460,230
2013-02-28Job filed: SUBSEQUENT MECHANICAL VENTILATION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$89,700
2013-02-28Job filed: SUBSEQUENT MECHANICAL VENTILATION WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$89,700
2013-02-28Permit EW — ISSUED
2013-02-28Permit EW — ISSUED
2013-02-21Permit PL — ISSUED
2013-02-13Permit EW — ISSUED
2013-02-12Job filed: INTERIOR RENOVATE OF AN EXISTING OFFICE SPACE INCLUDING PARTITION CHANGES, MINOR MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS O$95,800
2013-02-12Job filed: INTERIOR RENOVATE OF AN EXISTING OFFICE SPACE INCLUDING PARTITION CHANGES, MINOR MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS O$95,800
2013-02-12Permit EW — ISSUED
2013-01-31Certificate of occupancy Temporary
2013-01-22Job filed: INTERIOR RENOVATE OF AN EXISTING OFFICE SPACE INCLUDING PARTITION CHANGES, MINOR MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS O$95,800
2012
2012-11-27Permit EW — ISSUED
2012-11-27Permit EW — ISSUED
2012-11-20Permit EW — ISSUED
2012-11-20Permit EW — ISSUED
2012-11-03Permit EW — ISSUED
2012-11-03Permit EW — ISSUED
2012-10-24Rodent inspection: Passed
2012-10-19311: Taxi Complaint — Driver Complaint
2012-10-04Job filed: A1$15,000
2012-10-04ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR BLDG DEPT RECORDS.DEFECT NOTED: AT TIME OF INSPECTION TEMP C OF O #104514517T0$1,200
2012-10-04Job filed: A1$15,000
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-27311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2012-09-27DOB complaint, category ?
2012-09-21Permit PL — ISSUED
2012-09-07Job filed: IT IS PROPOSED TO CONSTRUCT TENANT BUILD-OUT FOR MEDICAL OFFICES IN SUB CELLAR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$529,060
2012-09-07Job filed: IT IS PROPOSED TO INSTALL CONCRETE FOR VAULTS AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPAMCY.$60,000
2012-09-07Job filed: IT IS PROPOSED TO INSTALL NEW PLUMBING FIXTURES, MECHANICAL UNITS AND SPRINKLERS FOR MEDICAL OFFICE AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OC$189,000
2012-09-07Job filed: IT IS PROPOSED TO INSTALL NEW PLUMBING FIXTURES, MECHANICAL UNITS AND SPRINKLERS FOR MEDICAL OFFICE AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OC$189,000
2012-09-07Job filed: IT IS PROPOSED TO CONSTRUCT TENANT BUILD-OUT FOR MEDICAL OFFICES IN SUB CELLAR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$529,060
2012-08-28Job filed: ERECT NON-ILLUMINATED STOREFRONT ENTRANCE AWNING. COPY TO BE 12 SQ FEET OR LESS AND READ "CVS/PHARMACY DEPT WITHIN - 24 HOURS". NO CHANGE IN USE, EGRE$2,000
2012-08-16Certificate of occupancy Temporary
2012-08-13Permit EW — ISSUED
2012-08-13DOB complaint, category ?
2012-08-10Agreement — from DRYLAND PROPERTIES LLC to CVS ALBANY, L.L.C.; U.S. BANK, N.A.
2012-08-10MLEA — from DRYLAND PROPERTIES, LLC to CVS ALBANY, L.L.C.
2012-08-10Agreement — from DRYLAND PROPERTIES LLC to CVS ALBANY, L.L.C.; U.S. BANK, N.A.
2012-08-10MLEA — from DRYLAND PROPERTIES, LLC to CVS ALBANY, L.L.C.
2012-08-10Agreement — from DRYLAND PROPERTIES LLC to CVS ALBANY, L.L.C.; U.S. BANK, N.A.
2012-08-10MLEA — from DRYLAND PROPERTIES, LLC to CVS ALBANY, L.L.C.
2012-08-10Agreement — from DRYLAND PROPERTIES LLC to CVS ALBANY, L.L.C.; U.S. BANK, N.A.
2012-08-10MLEA — from DRYLAND PROPERTIES, LLC to CVS ALBANY, L.L.C.
2012-08-06Job filed: CVS ALTER EXISTING SPRINKLER SYSTEM IN CELLAR AND 1ST FLOOR AS PER PLANS NO CH CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION$71,500
2012-07-26Permit EW — ISSUED
2012-07-13Permit EW — ISSUED
2012-07-10Permit PL — ISSUED
2012-07-09DOB complaint, category ?
2012-07-06Permit EW — ISSUED
2012-07-03Permit SG — ISSUED
2012-07-03DOB complaint, category ?
2012-07-03DOB complaint, category ?
2012-07-03DOB complaint, category ?
2012-07-02Permit SG — ISSUED
2012-07-02Permit SG — ISSUED
2012-07-02Permit SG — ISSUED
2012-07-02Permit SG — ISSUED
2012-07-02Permit SG — ISSUED
2012-06-29Permit PL — ISSUED
2012-06-28Job filed: CVS. DISCONNECT EXISTING PARTIAL SPRINKLER SYSTEM ON 1ST FLOOR TO ACCOMODATE STORE RENOVATION. INSTALL TEMPORARY SPRINKLER PROTECTION. NO CHANGE IN US$29,250
2012-06-28Permit PL — ISSUED
2012-06-26Job filed: INSTALLATION OF MECHANICAL/HVAC DUCTWORK AND EQUIPMENT AND PLUMBING FIXTURES PER PLANS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$216,000
2012-06-26Job filed: MODIFICATION TO EXISTING CLASS 'E' FIRE ALARM SYSTEM PER PLANS FILED. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$23,000
2012-06-26Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM PER PLANS FILED. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$8,000
2012-06-26Job filed: INSTALLATION OF NON-BEARING PARTITIONS & HUNG CEILINGS PER PLANS FILED. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$73,019
2012-06-26Permit EW — ISSUED
2012-06-26Permit EW — ISSUED
2012-06-15Permit PL — ISSUED
2012-06-08Permit EW — ISSUED
2012-06-08Permit EQ — ISSUED
2012-06-08Permit EW — ISSUED
2012-06-08Permit EW — ISSUED
2012-06-08Permit EW — ISSUED
2012-05-31Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
2012-05-31Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
2012-05-31Permit EW — ISSUED
2012-05-31Permit EQ — ISSUED
2012-05-31Permit EW — ISSUED
2012-05-29Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS O$107,252
2012-05-29Job filed: MODIFICATION TO EXISITING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHA NGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$29,700
2012-05-29Job filed: MODIFICATION TO EXISITING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHA NGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$13,750
2012-05-29Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS O$107,252
2012-05-29Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.$41,252
2012-05-29Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS O$107,252
2012-05-29Job filed: MODIFICATION TO EXISITING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHA NGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$13,750
2012-05-29Job filed: MODIFICATION TO EXISITING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHA NGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$29,700
2012-05-29Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.$41,252
2012-05-24311: General Construction/Plumbing — Accident - Construction/Plumbing
2012-05-24ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPERATIONS IN THAT A WORKER AT 1ST FL LEVEL,FELL THRU AN APPROX 3'X
2012-05-24Permit SG — ISSUED
2012-05-24Permit SG — ISSUED
2012-05-24Permit SG — ISSUED
2012-05-24Permit SG — ISSUED
2012-05-24Permit SG — ISSUED
2012-05-24DOB complaint, category ?
2012-05-18Permit EW — ISSUED
2012-05-18Permit EW — ISSUED
2012-05-09Permit EW — ISSUED
2012-05-09Permit EW — ISSUED
2012-05-09Permit EW — ISSUED
2012-05-04Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.$452,000
2012-05-04Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS, SHAFT WALLS FOR NEW ELEVATOR AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE $320,000
2012-05-04Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$85,000
2012-05-04Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS, SHAFT WALLS FOR NEW ELEVATOR AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE $320,000
2012-05-04Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH.$452,000
2012-05-04Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND INSTALLATION OF AXILLARY FIRE HOSE RACK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$85,000
2012-05-04Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$20,000
2012-05-04Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2012-05-04Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$85,000
2012-05-04Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND INSTALLATION OF AXILLARY FIRE HOSE RACK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$85,000
2012-05-04Permit EW — ISSUED
2012-04-30Permit EW — ISSUED
2012-04-24Job filed: REMOVAL AND INSTALLATION OF STANDPIPE PIPING. REROUTING FIRE PROTECTION SERVICES AROUND PROPOSED STAIR ENCLOSURE. STAIR ENCLOSURE PROPOSED UNDER APPL$1,000
2012-04-18Job filed: MODIFICATION TO EXISITING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHA NGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$2,600
2012-04-18Job filed: ENERGY CODE ANALYSIS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,500
2012-04-18Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AND RELATED PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY U$260,000
2012-04-18Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$58,300
2012-04-18Job filed: ENERGY CODE ANALYSIS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,500
2012-04-18Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$58,300
2012-04-18Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE IN USE, EGRESS O$957,500
2012-04-18Permit EW — ISSUED
2012-04-18Permit EW — ISSUED
2012-03-30Permit EW — ISSUED
2012-03-30Permit EW — ISSUED
2012-03-28Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND RELOCATION OF PLUMBING PIPING AS PER PLANS FILED HEREWITH.$421,000
2012-03-28Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND RELOCATION OF PLUMBING PIPING AS PER PLANS FILED HEREWITH.$421,000
2012-03-28Permit EW — ISSUED
2012-03-28Permit EW — ISSUED
2012-03-27Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$100,825
2012-03-27Job filed: MODIFICATION TO EXISTING CLASS E FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH.$20,250
2012-03-27Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$25,000
2012-03-27Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$100,825
2012-03-27Job filed: MODIFICATION TO EXISTING CLASS E FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH.$20,250
2012-03-06Permit EW — ISSUED
2012-02-16311: Taxi Complaint — Driver Complaint
2012-02-10Permit EW — ISSUED
2012-02-10Permit EW — ISSUED
2012-01-30Permit PL — ISSUED
2012-01-17Permit PL — ISSUED
2012-01-17Permit EW — ISSUED
2012-01-17Permit EW — ISSUED
2012-01-10Permit EW — ISSUED
2012-01-10Permit EW — ISSUED
2012-01-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2011
2011-12-13Job filed: FILING HEREWITH MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$199,000
2011-12-13Job filed: FILING HEREWITH INTERIOR DEMOLITION AND RENOVATION OF AN EXISITING OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$581,610
2011-12-13Job filed: FILING HEREWITH MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$199,000
2011-12-13Job filed: FILING HEREWITH INTERIOR DEMOLITION AND RENOVATION OF AN EXISITING OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$581,610
2011-12-12Job filed: FILING HEREWITH MODIFICATION TO THE EXISTING CLASS E FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,500
2011-12-12Job filed: FILING HEREWITH MODIFICATION TO THE EXISTING SPRINKLE AND STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$82,600
2011-12-12Job filed: FILING HEREWITH MODIFICATION TO THE EXISTING CLASS E FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,500
2011-12-07Permit EW — ISSUED
2011-12-01Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY$2,000
2011-12-01Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH.$10,000
2011-12-01Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS$25,000
2011-12-01Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS$25,000
2011-12-01Job filed: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY$2,000
2011-12-01Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH.$10,000
2011-12-01Job filed: FILING FOR MODIFICATION OF EXISTING KITCHEN FIRE SUPPRESSION SYSTEM ORIGINALLY FILED UNDER JOB#100771540, AS SHOWN ON PLAN. NO PLUMBING WORKTYPE SINC$3,000
2011-11-28TERT — from THE BANK OF NEW YORK MELLON to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE ROCKEFELLER FOUNDATION
2011-11-28TERL — from THE ROCKEFELLER FOUNDATION to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERT — from THE BANK OF NEW YORK MELLON to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERT — from THE BANK OF NEW YORK MELLON to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERT — from THE BANK OF NEW YORK MELLON to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERL — from THE ROCKEFELLER FOUNDATION to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE ROCKEFELLER FOUNDATION
2011-11-28TERL — from THE ROCKEFELLER FOUNDATION to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERL — from THE ROCKEFELLER FOUNDATION to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE ROCKEFELLER FOUNDATION
2011-11-28TERL — from THE ROCKEFELLER FOUNDATION to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERT — from THE BANK OF NEW YORK MELLON to NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE
2011-11-28TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE ROCKEFELLER FOUNDATION
2011-11-28TERL — from NEW YORK CITY INDUSTRIAL DEVELOPMENT AGE to THE ROCKEFELLER FOUNDATION
2011-11-16Facade (LL11) filing, cycle 7: SWARMP
2011-09-06311: Taxi Complaint — Driver Complaint
2011-08-05Rodent inspection: Passed
2011-04-20Permit EW — ISSUED
2011-04-20Permit EW — ISSUED
2011-03-09Permit EW — ISSUED
2011-01-13TL&R — from 420-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13Mortgage satisfied — from 420-08 FIFTH NEW YORK LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13TL&R — from 420-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13TL&R — from 420-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13Mortgage satisfied — from 420-08 FIFTH NEW YORK LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13TL&R — from 420-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13Mortgage satisfied — from 420-08 FIFTH NEW YORK LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13TL&R — from 420-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13Mortgage satisfied — from 420-08 FIFTH NEW YORK LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2011-01-13Mortgage satisfied — from 420-08 FIFTH NEW YORK LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2010
2010-12-23311: Food Poisoning — 1 or 2
2010-12-16DOB violation E:
2010-12-16DOB violation E:
2010-12-16DOB violation E:
2010-12-16DOB violation E:
2010-12-16Permit EW — ISSUED
2010-12-15DOB violation E:
2010-12-15DOB violation E:
2010-12-15DOB violation E:
2010-12-15DOB violation E:
2010-12-15Permit EW — ISSUED
2010-12-13Permit PL — ISSUED
2010-12-10Permit EW — ISSUED
2010-11-30Permit EW — ISSUED
2010-11-30Permit EW — ISSUED
2010-11-29Job filed: MODIFY/INSTALL NEW HVAC AND PLUMBING AS SHOWN.$8,000
2010-11-29Job filed: DEMO AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS AND FINISHES AS SHOWN ON PLANS.$10,000
2010-11-29Job filed: MODIFY/INSTALL NEW HVAC AND PLUMBING AS SHOWN.$8,000
2010-11-10Permit EW — ISSUED
2010-11-04Job filed: RELOCATION OF TWO SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$6,000
2010-11-04Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$85,000
2010-11-04Permit EW — ISSUED
2010-10-14Job filed: RELOCATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$4,500
2010-10-14Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UND$23,500
2010-10-08DOB violation VCAT1:
2010-08-20Permit EW — ISSUED
2010-08-17Job filed: SEE SECTION #24$45,000
2010-08-17Job filed: SEE SECTION #24$45,000
2010-08-13Permit EW — ISSUED
2010-08-13Permit EW — ISSUED
2010-08-06Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$3,000
2010-08-06Job filed: RELOCATIONS OF 2 DIFFUSERS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2010-08-06Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$72,000
2010-08-06Job filed: RELOCATION OF 2 SPRINKLER HEADS ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$3,000
2010-08-06Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$72,000
2010-08-06Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$3,000
2010-08-06Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$3,000
2010-08-05Deed $8,547,270 — from EMERALD MERCER LLC; WARRENBY MERCER LLC to UNIPEC AMERICA, INC.$8,547,270
2010-08-05REL — from WELLS FARGO BANK NATIONAL ASSOCIATION
2010-08-05PREL — from WELLS FARGO BANK NATIONAL ASSOCIATION
2010-08-05AALR — from NRFC WA HOLDINGS II, LLC to WELLS FARGO BANK NATIONAL ASSOCIATION
2010-08-05Mortgage assigned — from NRFC WA HOLDINGS II, LLC to WELLS FARGO BANK NATIONAL ASSOCIATION
2010-06-28Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$37,000
2010-06-28Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$375,000
2010-06-28Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$17,600
2010-06-28Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,500
2010-05-19DOB violation E:
2010-05-19DOB violation E:
2010-05-19DOB violation E:
2010-05-07Permit EW — ISSUED
2010-04-23Permit PL — ISSUED
2010-04-05Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$180,489
2010-04-05Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$31,860
2010-04-05Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$624,637
2010-04-05Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$20,000
2010-02-16Job filed: MODIFICATION TO HVAC SYSTEM AND RELATED FINISHES AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2010-02-16Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$105,000
2010-02-16Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$105,000
2010-02-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED WORK AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$2,500
2009
2009-12-14Mortgage $12,000,000 — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$12,000,000
2009-12-14AL&R — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2009-12-14AL&R — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2009-12-14Mortgage $12,000,000 — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$12,000,000
2009-12-14AL&R — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2009-12-14Mortgage $12,000,000 — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$12,000,000
2009-12-14AL&R — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2009-12-14Mortgage $12,000,000 — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$12,000,000
2009-12-14Mortgage $12,000,000 — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND$12,000,000
2009-12-14AL&R — from 42-08 FIFTH NEW YORK, LLC to THE FIRST NATIONAL BANK OF LONG ISLAND
2009-12-11Permit EW — ISSUED
2009-11-27Permit EW — ISSUED
2009-11-27Permit EW — ISSUED
2009-11-24Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$2,500
2009-11-24Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$35,000
2009-11-24Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$35,000
2009-11-24Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$2,500
2009-11-24Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$2,500
2009-11-16Permit EW — ISSUED
2009-11-02Job filed: MODIFICATION TO FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,500
2009-11-02Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN$10,000
2009-11-02Job filed: MODIFICATION TO FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,500
2009-11-02Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN$10,000
2009-09-28Deed — from MEDITERRANEAN SHIPPING COMPANY (USA), IN to 420-08 FIFTH NEW YORK, LLC
2009-09-28Deed — from MEDITERRANEAN SHIPPING COMPANY (USA), IN to 420-08 FIFTH NEW YORK, LLC
2009-09-28Deed — from MEDITERRANEAN SHIPPING COMPANY (USA), IN to 420-26 FIFTH NEW YORK, LLC
2009-09-28Deed — from MEDITERRANEAN SHIPPING COMPANY (USA), IN to 420-08 FIFTH NEW YORK, LLC
2009-09-28Deed — from MEDITERRANEAN SHIPPING COMPANY (USA), IN to 420-08 FIFTH NEW YORK, LLC
2009-09-28Deed — from MEDITERRANEAN SHIPPING COMPANY (USA), IN to 420-08 FIFTH NEW YORK, LLC
2009-08-10DOB violation E:
2009-08-10DOB violation E:
2009-04-20Permit EW — ISSUED
2009-04-20Permit EW — ISSUED
2009-03-04Job filed: INTERIOR RENOVATION OF AN EXISTING OFFICE SPACES, INCLUDING PARTITION CHANGES. MINOR MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRE$46,000
2008
2008-12-10DOB violation E:
2008-12-09DOB violation E:
2008-12-09DOB violation E:
2008-08-21Permit EW — ISSUED
2008-08-11Permit EW — ISSUED
2008-07-24Permit EW — ISSUED
2008-07-24Permit EW — ISSUED
2008-06-23ECB Non-Hazardous violation: 01X,L10. CU 38M07.11B10. 01X,L STOP SW. AUXILLARY STATION N/G CAN'T PUSH INTO STOP.REPAIR 38M ALARM BELL-NO SOUND ON TOP OF ELEVAT$800
2008-06-16Permit EW — ISSUED
2008-06-16Permit EW — ISSUED
2008-06-13Job filed: MODIFICATION TO HVAC DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE UNDER THIS APPLICATION.$40,000
2008-06-13Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN$71,000
2008-06-12Job filed: MODIFICATION TO SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$10,000
2008-06-12Job filed: MODIFICATION TO FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2008-05-06Job filed: MODIFICATION TO FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,000
2008-05-06Job filed: MODIFICATION TO SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2008-04-30Job filed: MODIFICATION OF HVAC DUCT WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$111,000
2008-04-30Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANC$201,000
2008-04-29RPTT&RET $3,000,000 — from COMPUSA STORES L.P.; COMPUSA INC. to DRYLAND PROPERTIES, LLC$3,000,000
2008-04-18Permit EW — ISSUED
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-02-15DOB violation E:
2008-01-14DOB complaint, category ?
2007
2007-12-19Permit EW — ISSUED
2007-12-07Permit EW — ISSUED
2007-12-04Permit EW — ISSUED
2007-11-02Job filed: ADDITION TO BEXISTING FIRE ALARM SYSTEMAS PER DRAWINGS$22,000
2007-10-18Job filed: NODIFY CLASS E FIRE ALARM SYSTEM AS SHOWN ON PLANS. NO CHANGE IN USE EG RESS OR OCCUPANCY$1,000
2007-10-18Job filed: Modifying / Installing new HVAC abd plumbing as shown.$8,000
2007-10-17Job filed: Demo and construction non partitions and finshes as shown on plans. No change in use, egress or occupancy.$10,000
2007-10-17Job filed: Modifying existing sprinkler system as shown on plans. No change in use, egress or occupancy.$2,000
2007-10-17Job filed: Demo and construction non partitions and finshes as shown on plans. No change in use, egress or occupancy.$10,000
2007-10-10Permit EW — ISSUED
2007-10-05Job filed: Filing herewith removal and installation of non load bearing partitions and related finishes as per plans. No change in use, egress or occupancy under$158,000
2007-10-05Job filed: Filing herewith removal and installation of non load bearing partitions and related finishes as per plans. No change in use, egress or occupancy under$158,000
2007-10-02Mortgage $1,892,866 — from WARRENBY MERCER LLC; EMERALD MERCER LLC to NRFC WA HOLDINGS II, LLC$1,892,866
2007-10-02SPRD $12,000,000 — from EMERALD MERCER LLC; WARRENBY MERCER LLC to NRFC WA HOLDINGS II, LLC$12,000,000
2007-10-02AL&R $12,000,000 — from WARRENBY MERCER LLC; EMERALD MERCER LLC to NRFC WA HOLDINGS II, LLC$12,000,000
2007-10-02Mortgage assigned — from WELLS FARGO BANK, N.A. to NRFC WA HOLDINGS II, LLC
2007-09-27Job filed: Filing herewith modifications to sprinkler and standpipe system as per plans. No change in use, egress or occupancy under this application.$40,000
2007-09-27Job filed: Filing herewith modifications to sprinkler and standpipe system as per plans. No change in use, egress or occupancy under this application.$40,000
2007-09-24Permit PL — ISSUED
2007-08-15Deed $7,800,000 — from FIFTH AVENUE PROPRTIES LLC to EMERALD MERCER LLC; WARRENBY MERCER LLC$7,800,000
2007-08-14Permit PL — ISSUED
2007-08-13Job filed: Filing herewith modifications to HVAC system and installation of plumbing fixtures as per plans. No change in use, egress or occupancy under this app$95,000
2007-08-13Job filed: Filing herewith modifications to HVAC system and installation of plumbing fixtures as per plans. No change in use, egress or occupancy under this app$95,000
2007-08-13Permit EW — ISSUED
2007-08-13Permit EW — ISSUED
2007-08-10Job filed: Filing herewith removal and installation of non load bearing partitions and related finishes as per plans. No change in use, egress or occupancy unde$95,000
2007-06-18Permit EW — ISSUED
2007-06-18Permit EW — ISSUED
2007-06-15Job filed: ADDITIONS TO EXISTING FIRE ALARM SYSTEMAS PER SUBMITTED DRAWINGS$2,000
2007-06-15Job filed: ADDITIONS TO EXISTING FIRE ALARM SYSTEMAS PER SUBMITTED DRAWINGS$2,000
2007-06-12Permit EW — ISSUED
2007-06-01Mortgage assigned — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2007-06-01AALR — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION AS TRU
2007-06-01Mortgage assigned — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2007-06-01AALR — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION AS TRU
2007-06-01Mortgage assigned — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2007-06-01AALR — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION AS TRU
2007-06-01Mortgage assigned — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION, AS TR
2007-06-01AALR — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NATIONAL ASSOCIATION AS TRU
2007-05-18Job filed: Modifications to existing Fire Alarm systems as per riser filed herewith. No change in use, egress or occupancy under this application.$15,000
2007-05-18Job filed: Modifications to existing Fire Alarm systems as per riser filed herewith. No change in use, egress or occupancy under this application.$15,000
2007-04-19DOB violation E:
2007-04-13Permit EW — ISSUED
2007-04-13Permit EW — ISSUED
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-10DOB violation E:
2007-04-09Job filed: Filing herewith modifications to existing sprinkler system as per plans. No change in use, egress or occupancy under this application.$38,000
2007-04-09DOB violation E:
2007-04-09DOB violation E:
2007-04-09DOB violation E:
2007-04-09DOB violation E:
2007-04-03Job filed: Filing herewith modifications to existing HVAC system as per plans. No change in use, egress or occupancy under this application.$22,000
2007-04-03Job filed: Filing herewith modifications to existing HVAC system as per plans. No change in use, egress or occupancy under this application.$22,000
2007-04-03Job filed: Filing herewith for installation of plumbing fixtures as per plans. No change in use egress or occupancy under this application.$28,000
2007-04-02Job filed: Filing herewith removal and installation of non load bearing partitions and related finishes as per plans. No change in use, egress or occupancy unde$450,000
2007-03-27Permit AL — ISSUED
2007-03-14Permit EW — ISSUED
2007-03-13Permit EW — ISSUED
2007-03-09Job filed: Minor office renovation to include construction of new partitions and finishes as shown on plans filed herewith. No change in use, egress or occupanc$30,000
2007-03-09Job filed: MODIFICATION TO EXISTING CLASS E FIREALARM SYSTEM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESSOR OCCUPANCY..$10,000
2007-03-09Job filed: Minor HVAC modifications and sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.$20,000
2007-02-16Agreement $63,885,000 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$63,885,000
2007-02-16AL&R $63,885,000 — from ARBOR REALTY FUNDING LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC$63,885,000
2007-02-16Mortgage $21,078,201 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$21,078,201
2007-02-16AL&R $63,885,000 — from ARBOR REALTY FUNDING LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC$63,885,000
2007-02-16Agreement $63,885,000 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$63,885,000
2007-02-16Agreement $63,885,000 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$63,885,000
2007-02-16Mortgage $21,078,201 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$21,078,201
2007-02-16Mortgage $21,078,201 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$21,078,201
2007-02-16AL&R $63,885,000 — from ARBOR REALTY FUNDING LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC$63,885,000
2007-02-16AL&R $63,885,000 — from ARBOR REALTY FUNDING LLC to 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC$63,885,000
2007-02-16Mortgage $21,078,201 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ARBOR REALTY FUNDING LLC$21,078,201
2007-01-22Deed $8,400,000 — from JIANLIBAO FAI YIN (U.S.A.) CO. LTD. to MEDITERRANEAN SHIPPING COMPANY (USA), IN$8,400,000
2007-01-08AL&R — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC
2007-01-08Mortgage assigned — from LANDESBANK HESSENTHUEIGEN GIROZENTRALE to ABBOR REALTY FUNDING LLC
2007-01-08Agreement $42,806,799 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$42,806,799
2007-01-08Deed $61,785,000 — from MERIT FIFTH AVENUE, L.P. to 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC$61,785,000
2007-01-08Mortgage $32,806,799 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$32,806,799
2007-01-08Mortgage assigned — from LANDESBANK HESSENTHUEIGEN GIROZENTRALE to ABBOR REALTY FUNDING LLC
2007-01-08Agreement — from 420 FIFTH ASSOCIATES LLC to 420 ASSOCIATES LLC
2007-01-08Mortgage $32,806,799 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$32,806,799
2007-01-08PAT — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to THE BOARD OF MANANGERS OF THE 420 CONDOM
2007-01-08PAT — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to THE BOARD OF MANANGERS OF THE 420 CONDOM
2007-01-08TL&R — from LANDESBANK HESSEN-THURINGEN GIROZENTRALE
2007-01-08TL&R — from LANDESBANK HESSEN-THURINGEN GIROZENTRALE
2007-01-08AL&R — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC
2007-01-08Deed $61,785,000 — from MERIT FIFTH AVENUE, L.P. to 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC$61,785,000
2007-01-08Agreement $42,806,799 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$42,806,799
2007-01-08Deed $61,785,000 — from MERIT FIFTH AVENUE, L.P. to 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC$61,785,000
2007-01-08PAT — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to THE BOARD OF MANANGERS OF THE 420 CONDOM
2007-01-08AL&R — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC
2007-01-08Agreement $42,806,799 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$42,806,799
2007-01-08Mortgage assigned — from LANDESBANK HESSENTHUEIGEN GIROZENTRALE to ABBOR REALTY FUNDING LLC
2007-01-08PAT — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to THE BOARD OF MANANGERS OF THE 420 CONDOM
2007-01-08Agreement — from 420 FIFTH ASSOCIATES LLC to 420 ASSOCIATES LLC
2007-01-08Deed $61,785,000 — from MERIT FIFTH AVENUE, L.P. to 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC$61,785,000
2007-01-08TL&R — from LANDESBANK HESSEN-THURINGEN GIROZENTRALE
2007-01-08TL&R — from LANDESBANK HESSEN-THURINGEN GIROZENTRALE
2007-01-08Agreement $42,806,799 — from 420 FIFTH ASSOCIATES LLC; 420 ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$42,806,799
2007-01-08Mortgage $32,806,799 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$32,806,799
2007-01-08AL&R — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC
2007-01-08Mortgage assigned — from LANDESBANK HESSENTHUEIGEN GIROZENTRALE to ABBOR REALTY FUNDING LLC
2007-01-08Mortgage $32,806,799 — from 420 ASSOCIATES LLC; 420 FIFTH ASSOCIATES LLC to ABBOR REALTY FUNDING LLC$32,806,799
2007-01-08Agreement — from 420 FIFTH ASSOCIATES LLC to 420 ASSOCIATES LLC
2007-01-08Agreement — from 420 FIFTH ASSOCIATES LLC to 420 ASSOCIATES LLC
2006
2006-11-20Permit EW — ISSUED
2006-10-13Permit EW — ISSUED
2006-10-13Permit EW — ISSUED
2006-09-07Permit PL — ISSUED
2006-08-25Job filed: Modifications to HVAC system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.$663,000
2006-08-25Permit EW — ISSUED
2006-08-25Permit EW — ISSUED
2006-08-24Job filed: Modifications to fire alarm system as per plans filed herewith. No change in use, egress or occupancy under this application.$30,000
2006-08-24Job filed: Removal and installation of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupa$400,000
2006-08-24Job filed: Modifications to sprinkler system and installation of new Fire Hose Cabinet as per plans filed herewith. No change in use, egress or occupancy under $105,000
2006-08-24Job filed: Modifications to sprinkler system and installation of new Fire Hose Cabinet as per plans filed herewith. No change in use, egress or occupancy under $105,000
2006-08-15Permit EW — ISSUED
2006-08-15Permit EW — ISSUED
2006-08-11Job filed: THE ROCKEFELLER FOUNDATION
2006-08-11Job filed: THE ROCKEFELLER FOUNDATION
2006-08-09Job filed: HVAC AND SPRINKLER WORK ON 23RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EG RESS.$39,000
2006-08-09Job filed: ARCHITECTURAL MODIFICATION ON THE 23RD FLOOR, AS PER PLANS.$120,000
2006-08-09Job filed: FIRE ALARM MODIFICATIONS ON THE 23RDFLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$61,000
2006-08-09Job filed: A1$1,000
2006-08-09Job filed: HVAC AND SPRINKLER WORK ON 23RD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EG RESS.$39,000
2006-07-14Permit EW — ISSUED
2006-06-28Job filed: SPRINKLER WORK ON THE 9TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$11,000
2006-06-08Permit EW — ISSUED
2006-06-02Permit EW — ISSUED
2006-06-01Permit PL — ISSUED
2006-05-18Permit EW — ISSUED
2006-05-18Permit EW — ISSUED
2006-05-18Permit EW — ISSUED
2006-05-03Permit EW — ISSUED
2006-05-03Permit EW — ISSUED
2006-05-02Permit EW — ISSUED
2006-05-01Job filed: FIRE ALARM MODIFICATIONS ON THE 6TH FLOOR.$108,000
2006-04-28Job filed: STRUCTURAL WORK ON THE 6TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. L.L. 5 COMPLIANCE - FLOOR IS SPRINKLERED.$10,000
2006-04-28Job filed: PARTITIONS AND CEILING WORK ON THE 6TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY. L.L. 5 COMPLIANCE - FLOOR IS SPRINKLERED.$266,000
2006-04-28Job filed: SPRINKLER WORK ON 6TH FLOOR$85,000
2006-04-28Job filed: MECHANICAL AND PLUMBING WORK ON THE 6TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$561,000
2006-04-12Job filed: INTERIOR DEMOLITION ON THE 5TH FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$38,000
2006-04-12Job filed: CLOSING OF SLAB ON THE 5TH FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$10,000
2006-04-12Job filed: INTERIOR DEMOLITION ON THE 5TH FLOOR AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$38,000
2006-04-04Job filed: ADDITIONS TO EXISTING FIRE ALARM SYSEM AS PER SUBMITTED DRAWINGS$4,000
2006-03-31Job filed: MODIFICATION OF FIRE ALARM SYSTEM IN THESUB-CELLAR AS PER PLANS. NO CHAN GFE TO USE, EGRESS OR OCCUPANCY.$3,000
2006-03-29Job filed: SPRINKLER WORK IN THE SUB-CELLAR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$4,000
2006-03-29Job filed: PARTITIONS AND CEILING WORK AS WELL AS MOVABLE FOLDING PARTITIONS IN THE SUB-CELLAR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2006-03-27Permit EW — ISSUED
2006-03-20Job filed: INTERIOR DEMOLITION ON THE 6TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$38,000
2006-01-18Permit EW — ISSUED
2005
2005-12-28Job filed: STRUCTURAL WORK ON THE 6TH FLOOR. NO CHANGE IN OCCUPANCY USE OR EGRESS.$23,000
2005-12-13AL&R $2,500,000 — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to DRYLAND PROPERTIES, LLC$2,500,000
2005-12-13AL&R $2,500,000 — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to DRYLAND PROPERTIES, LLC$2,500,000
2005-12-13Mortgage $2,729,167 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$2,729,167
2005-12-13Mortgage assigned — from HSH NORDBANK AG NEW YORK BRANCH to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN
2005-12-13TL&R — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES LLC
2005-12-13Agreement $24,500,000 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$24,500,000
2005-12-13Mortgage $2,729,167 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$2,729,167
2005-12-13Mortgage assigned — from HSH NORDBANK AG NEW YORK BRANCH to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN
2005-12-13Mortgage assigned — from HSH NORDBANK AG NEW YORK BRANCH to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN
2005-12-13Mortgage $2,729,167 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$2,729,167
2005-12-13TL&R — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES LLC
2005-12-13Agreement $24,500,000 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$24,500,000
2005-12-13AL&R $2,500,000 — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to DRYLAND PROPERTIES, LLC$2,500,000
2005-12-13TL&R — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES LLC
2005-12-13Agreement $24,500,000 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$24,500,000
2005-12-13Mortgage assigned — from HSH NORDBANK AG NEW YORK BRANCH to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN
2005-12-13TL&R — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES LLC
2005-12-13AL&R $2,500,000 — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to DRYLAND PROPERTIES, LLC$2,500,000
2005-12-13Mortgage $2,729,167 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$2,729,167
2005-12-13Agreement $24,500,000 — from DRYLAND PROPERTIES, LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$24,500,000
2005-10-19REL — from SPECTRUM COMPANIES, INC. to ZIONS FIRST NATIONAL BANK
2005-10-19REL — from SPECTRUM COMPANIES, INC. to ZIONS FIRST NATIONAL BANK
2005-10-19Agreement $10,000,000 — from MERIT FIFTH AVENUE L.P. to LANDESBANK HESSEN-THURINGEN GIROZENTRALE$10,000,000
2005-10-19Agreement $10,000,000 — from MERIT FIFTH AVENUE L.P. to LANDESBANK HESSEN-THURINGEN GIROZENTRALE$10,000,000
2005-10-19Agreement $10,000,000 — from MERIT FIFTH AVENUE L.P. to LANDESBANK HESSEN-THURINGEN GIROZENTRALE$10,000,000
2005-10-19Agreement $10,000,000 — from MERIT FIFTH AVENUE L.P. to LANDESBANK HESSEN-THURINGEN GIROZENTRALE$10,000,000
2005-09-08DOB violation E:
2005-08-02Job filed: ADDITION TO CLASS E SYSTEMS AMPLIFIERSNO CHANGES$14,000
2005-07-26Permit EW — ISSUED
2005-07-26Permit EW — ISSUED
2005-06-24Permit PL — ISSUED
2005-06-22Permit EW — ISSUED
2005-06-07Permit EW — ISSUED
2005-06-07Permit EW — ISSUED
2005-05-27Job filed: SPRINKLER MODIFICATIONS ON7TH FLOOR NO CHANGES$18,000
2005-05-27Job filed: SPRINKLER MODIFICATIONS ON7TH FLOOR NO CHANGES$18,000
2005-05-27Job filed: FIRE ALARM MODIFICATIONS ON 7TH FLOOR NO CHANGES$25,000
2005-05-27Permit EW — ISSUED
2005-05-26Job filed: PARTITIONS AND CEILING CHANGES ON THE 7TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$140,000
2005-05-26Job filed: HVAC AND PLUMBING WORK ON THE 7TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$115,000
2005-05-25Facade (LL11) filing, cycle 6: SWARMP
2005-05-25Job filed: REMOVAL OF CONVENIENCE STAIR FROM 6TH TO 7TH FLOORS AND SLAB OVER AT 7TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOORS A$10,000
2005-05-25Job filed: REMOVAL OF CONVENIENCE STAIR FROM 6TH TO 7TH FLOORS AND SLAB OVER AT 7TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOORS A$10,000
2005-05-19Deed $240,000 — from SPECTRUM COMPANIES, INC. to TLT & J ENTERPRISES, LLC$240,000
2005-03-17Permit EW — ISSUED
2005-03-14Job filed: Demolition work on the 4th floor. No change in occupancy, use or egress. L.L. #5 compliance - floor is sprinklered.$50,000
2005-03-14Job filed: Demolition work on the 4th floor. No change in occupancy, use or egress. L.L. #5 compliance - floor is sprinklered.$50,000
2004
2004-12-16Permit EW — ISSUED
2004-12-13DOB violation E:
2004-12-10DOB violation E:
2004-11-30Agreement — from JIANLIBAO FAI YIN (USA) CO. LTD. to BANK OF CHINA, NEW YORK BRANCH
2004-11-30AL&R $3,700,000 — from BANK OF CHINA, NEW YORK BRANCH to JIANLIBAO FAI YIN (USA) CO. LTD.$3,700,000
2004-11-30AMTX $7,300,000 — from JIANLIBAO FAI YIN (U.S.A.) CO., LTD. to BANK OF CHINA, NEW YORK BRANCH$7,300,000
2004-11-19DOB violation LL1081:
2004-10-15AL&R $22,000,000 — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES, LLC.$22,000,000
2004-10-15AL&R $22,000,000 — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES, LLC.$22,000,000
2004-10-15TL&R — from LANDESBANK BADEN-WURTTEMBERG FKA SUDWEST to SECURED PROPERTIES INVESTORS XIII, L.P
2004-10-15Agreement $22,000,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$22,000,000
2004-10-15Mortgage $14,010,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$14,010,000
2004-10-15Mortgage assigned — from LANDESBANK BADEN-WURTTENBERG F/K/A to HSH NORDBANK AG, NEW YORK BRANCH
2004-10-15AL&R $22,000,000 — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES, LLC.$22,000,000
2004-10-15TL&R — from LANDESBANK BADEN-WURTTEMBERG FKA SUDWEST to SECURED PROPERTIES INVESTORS XIII, L.P
2004-10-15PAT — from DRYLAND PROPERTIES, LLC. to 420 FIFTH AVENUE CONDOMINIUM
2004-10-15Deed $34,657,700 — from SECURED PROPERTIES INVESTORS XIII, L.P. to DRYLAND PROPERTIES, LLC.$34,657,700
2004-10-15Agreement $22,000,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$22,000,000
2004-10-15Mortgage $14,010,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$14,010,000
2004-10-15Mortgage assigned — from LANDESBANK BADEN-WURTTENBERG F/K/A to HSH NORDBANK AG, NEW YORK BRANCH
2004-10-15PAT — from DRYLAND PROPERTIES, LLC. to 420 FIFTH AVENUE CONDOMINIUM
2004-10-15Deed $34,657,700 — from SECURED PROPERTIES INVESTORS XIII, L.P. to DRYLAND PROPERTIES, LLC.$34,657,700
2004-10-15Deed $34,657,700 — from SECURED PROPERTIES INVESTORS XIII, L.P. to DRYLAND PROPERTIES, LLC.$34,657,700
2004-10-15Mortgage assigned — from LANDESBANK BADEN-WURTTENBERG F/K/A to HSH NORDBANK AG, NEW YORK BRANCH
2004-10-15Mortgage $14,010,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$14,010,000
2004-10-15Deed $34,657,700 — from SECURED PROPERTIES INVESTORS XIII, L.P. to DRYLAND PROPERTIES, LLC.$34,657,700
2004-10-15PAT — from DRYLAND PROPERTIES, LLC. to 420 FIFTH AVENUE CONDOMINIUM
2004-10-15TL&R — from LANDESBANK BADEN-WURTTEMBERG FKA SUDWEST to SECURED PROPERTIES INVESTORS XIII, L.P
2004-10-15AL&R $22,000,000 — from HSH NORDBANK AG, NEW YORK BRANCH to DRYLAND PROPERTIES, LLC.$22,000,000
2004-10-15PAT — from DRYLAND PROPERTIES, LLC. to 420 FIFTH AVENUE CONDOMINIUM
2004-10-15Mortgage assigned — from LANDESBANK BADEN-WURTTENBERG F/K/A to HSH NORDBANK AG, NEW YORK BRANCH
2004-10-15Mortgage $14,010,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$14,010,000
2004-10-15TL&R — from LANDESBANK BADEN-WURTTEMBERG FKA SUDWEST to SECURED PROPERTIES INVESTORS XIII, L.P
2004-10-15Agreement $22,000,000 — from DRYLAND PROPERTIES, LLC. to HSH NORDBANK AG, NEW YORK BRANCH$22,000,000
2004-08-12Permit EW — ISSUED
2004-08-05Job filed: HVAC work on the 18th floor. No change in occupancy, use or egress. L.L. #5 compliance - floor is sprinklered.$12,000
2004-07-27Permit PL — ISSUED
2004-07-21Permit EW — ISSUED
2004-07-16Permit PL — ISSUED
2004-07-07Permit EW — ISSUED
2004-06-29Permit EW — ISSUED
2004-06-29Permit EW — ISSUED
2004-06-24Job filed: MECHANICAL AND PLUMBING WORK ON THE 28TH FLOOR_NO CHANGE IN USE EGRESS O OCCUPAMCY LL5 COMPLIANCE FLR.IS SPRINKL ERED$30,000
2004-06-21Job filed: FIRE ALARM WORK ON THE 28TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPAN CY.$2,000
2004-06-21Job filed: SPRINKLER WORK ON THE 28TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$2,000
2004-06-15Job filed: MECHANICAL AND PLUMBING WORK ON THE 26TH FLOOR NO CHANGE IN OCCUPANCY US OR EGREES LL#5 COMPLIANCE FLOOR IS SPRINKLERED$50,000
2004-06-15Job filed: PARTITIONS AND CEILING WORK ON THE 26TH FLOORNO CHANGE IN OCCUPANCY USE OR EGREES LL#5 COMPLIANCE FLOOR IS SPRIN KLERED$34,000
2004-06-15Job filed: SPRINKER WORK ONTHE 26TH FLOOR NO CHANGE IN OCCUPANCY USE OR EGREES$5,000
2004-06-15Job filed: PARTITIONS AND CEILING WORK ON THE 26TH FLOORNO CHANGE IN OCCUPANCY USE OR EGREES LL#5 COMPLIANCE FLOOR IS SPRIN KLERED$34,000
2004-06-15Job filed: MECHANICAL AND PLUMBING WORK ON THE 26TH FLOOR NO CHANGE IN OCCUPANCY US OR EGREES LL#5 COMPLIANCE FLOOR IS SPRINKLERED$50,000
2004-06-15Job filed: FIRE ALARM WORK ON THE 26 TH FLOOR NO CHANGE IN OCCUPANCY USE OR EGREE S$3,000
2004-06-14Permit EW — ISSUED
2004-06-01Job filed: Propose to modify existing non load bearing partitions and hung ceiling as per plans filed herewith. No change to use, egress or occupancy. No chang$15,000
2004-06-01Job filed: Propose to modify existing non load bearing partitions and hung ceiling as per plans filed herewith. No change to use, egress or occupancy. No chang$15,000
2004-06-01Job filed: Propose to modify existing non load bearing partitions and hung ceiling as per plans filed herewith. No change to use, egress or occupancy. No chang$15,000
2004-04-21DOB violation LL1081:
2004-03-01Permit EW — ISSUED
2003
2003-12-04Permit EW — ISSUED
2003-12-04Permit EW — ISSUED
2003-11-13Job filed: FILING HEREWITH FOR HVAC DUCTWORK INVOLV ING THE INSTALLATION OF DIFFUSE S AND DUCTWORK AS PER PLANS. NO CHANGE T O USE, EGRESS OR OCCUPANCY.$20,000
2003-11-13Job filed: FILING HEREWITH FOR FIRE ALARM MODIFICAT ION TO EXISTING SYSTEM AS PER P ANS. NO CHANGE TO USE, EGRESS OR OCCUPAN CY.$3,000
2003-11-13Job filed: FILING HEREWITH FOR SPRINKLER MODIFICATI ON TO EXISTING SYSTEM AS PER PL NS. NO CHANGE TO USE, EGRESS OR OCCUPANC Y.$12,000
2003-11-13Job filed: FILING HEREWITH FOR INTERIOR RENOVATION OF NON LOAD BEARING PARTITIONS A ND CEILING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$75,000
2003-10-06Permit PL — ISSUED
2003-09-29Permit EW — ISSUED
2003-09-29Permit EW — ISSUED
2003-09-16DOB violation E:
2003-09-16DOB violation E:
2003-09-08Permit EW — ISSUED
2003-09-08Permit EW — ISSUED
2003-09-08Permit EW — ISSUED
2003-09-04Job filed: FIRE ALARM MODIFICATIONS ON THE 8TH FLOO R. NO CHANGE IN OCCUPANCY, USE R EGRESS.$6,000
2003-08-28Job filed: INSTALLATUON OF PRE-ACTION SYSTEM ON THE 8TH FLOOR NO CHANGE IN OCCUPAN Y,USE OR EGRESS$12,000
2003-08-28Job filed: SPRINKLER MODIFICATIONS ON THE 8TH FLOOR NO CHANGE IN OCCUPANCY, USE OR GRESS.$10,000
2003-08-28Job filed: SPRINKLER MODIFICATIONS ON THE 8TH FLOOR NO CHANGE IN OCCUPANCY, USE OR GRESS.$10,000
2003-08-28Job filed: INSTALLATION OF PRE-ACTION SPRINKLER HEA DS ON THE 8TH FLOOR NO CHANGE I USE EGRESS OR OCCUPANCY$10,000
2003-08-27Job filed: Partitions and patching of ceilings on the 8th Floor. No change in Occupancy, Use or Egress. L.L. #5 Compliance - Floor is sprinklered.$70,000
2003-08-27Job filed: STRUCTURAL WORK ON THE 8TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$10,000
2003-08-27Job filed: Partitions and patching of ceilings on the 8th Floor. No change in Occupancy, Use or Egress. L.L. #5 Compliance - Floor is sprinklered.$70,000
2003-08-27Job filed: HVAC AND PLUMBING CHANGES ON THE 8TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$65,000
2003-08-27Job filed: HVAC AND PLUMBING CHANGES ON THE 8TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$65,000
2003-08-27Job filed: STRUCTURAL WORK ON THE 8TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$10,000
2003-07-29DOB complaint, category ?
2003-06-16AALR — from CREDIT SUISSE FIRST BOSTON MORTGAGE CAPI to WELLS FARGO BANK MINNESOTA, N.A., AS TRU
2003-06-16Mortgage assigned — from CREDIT SUISSE FIRST BOSTON MORTGAGE CAPI to WELLS FARGO BANK MINNESOTA, N.A., AS TRU
2003-04-04Job filed: REPLACEMENT OF FIRE COMMAND STATION NO CHANGE IN USE EGRESS OR OCCUP ANCY$30,000
2002
2002-12-12ECB Non-Hazardous violation: 62O02-12Q02-45R05. 45-R-05 3 YEAR PRESSURE TEST.
2002-10-16DOB violation E: 1P36205
2002-10-16DOB violation E:
2002-10-16DOB violation E:
2002-10-16DOB violation E: 1P37352
2002-01-09Mortgage assigned — from BANCO DI SICILIA, SPA to BANCA DI ROMA - NEWYORK BRANCH