18 East 16 Street · Manhattan · BBL 1008430037
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
17 service requests in the last three years. Most common: Noise (8) · Food Establishment (3) · Air Quality (2) · Street Light Condition (2) · Outdoor Dining (1) · Encampment (1).
Filed construction activity
$794,194 in permitted construction work filed since
2016 (7 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$11,820,000
$5,319,000
2026
$11,991,000
$5,395,950
2027
$12,274,000
$5,523,300
The city's market estimate has risen
4% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 24/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
3 Food Establishment complaints to 311 at this address in the last three years (most often: Food Protection, Food Worker Hygiene, Pet/Animal) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
14 St-Union Sq — 4 5 6 L N Q R W · 350 ft straight-line (about a 2-minute walk) · station accessibility: partial 14 St — 1 2 3 F L M · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 14 St / Union Square West — M14A-SBS M14D-SBS · 450 ft · Select Bus Service
Citi Bike
E 16 St & 5 Ave · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
17 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $1,282,124 on
2026-06-25 (lender: Apple Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-06-25
AL&R $5,500,000 — from WINNER REALTY ASSOCIATES LLC to APPLE BANK
$5,500,000
2026-06-25
Mortgage $1,282,124 — from WINNER REALTY ASSOCIATES LLC to APPLE BANK
$1,282,124
2026-06-25
Agreement $5,500,000 — from WINNER REALTY ASSOCIATES LLC to APPLE BANK
$5,500,000
2023-12-15
Agreement $4,385,906 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$4,385,906
2014-01-28
Mortgage $4,665,122 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE , NATIONAL ASSOCIATION
$4,665,122
2014-01-28
Agreement $7,000,000 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE , NATIONAL ASSOCIATION
$7,000,000
2014-01-28
AL&R $7,000,000 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE , NATIONAL ASSOCIATION
$7,000,000
2010-03-26
RPTT $613,081 — from COX TMI, INC. to TCM PARENT, LLC
$613,081
2009-06-01
Agreement $2,572,260 — from WINNER REALTY CO. to THE BANK OF NEW YORK MELLON; THE BANK OF NEW YORK
$2,572,260
2009-06-01
AL&R $2,572,260 — from WINNER REALTY CO. to THE BANK OF NEW YORK MELLON; THE BANK OF NEW YORK
$2,572,260
2002-11-20
Mortgage $1,413,521 — from WINNER REALTY CO. to BANK OF NEW YORK
$1,413,521
1998-02-27
Mortgage $892,486 — from WINNER REALTY CO. to BANK OF NEW YORK
$892,486
1984-02-27
Mortgage $646,501 — from WINNER REALTY CO to AMERICAN SAVINGS BKFSB
$646,501
Ten-year activity
20100
2017
2018
2019
2020
2021
2022
2023
19
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
1
0
0
1
2018
0
1
0
0
1
2
2019
0
0
2
0
3
5
2020
0
0
2
0
1
3
2021
1
2
6
0
1
10
2022
5
0
4
0
1
10
2023
1
1
6
2
2
12
2024
6
1
9
0
3
19
2025
2
0
5
0
4
11
2026
0
0
3
5
3
11
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2024-12-01311: Outdoor Dining — Site Setup Condition
2024-11-12Permit Mechanical Systems — Signed-off
2024-11-11311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2024-10-28Job filed: Installation of 16 TON Condensing Unit as indicated on plans. Existing units placed on existing steel dunnage and PACM materials are not to be disturb$64,000
2024-10-19Restaurant inspection: NESPRESSO
2024-10-01311: Noise — Noise: air condition/ventilation equipment (NV1)
2024-10-01311: Noise — Noise: air condition/ventilation equipment (NV1)
2024-09-03311: Noise - Vehicle — Engine Idling
2024-08-07Boiler inspection
2024-07-18Restaurant inspection: NESPRESSO — grade A
2024-06-26Permit General Construction — Signed-off
2024-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2022-10-24Job filed: Installation of new duct work as indicated on plans. No changes to use, occupancy or egress.$90,000
2022-10-07Permit General Construction — Signed-off
2022-10-05Job filed: Interior demo & architectural changes as indicated on plans.$120,000
2022-06-06Boiler inspection
2022-05-30311: New Tree Request — For One Address
2022-04-23311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-04311: Noise - Vehicle — Engine Idling
2022-01-26Job filed: Filing General Construction to close up existing lot line windows as shown on plans. No Change in use, egress or occupancy.$106,200
2021
2021-12-14Job filed: INSTALLATION OF NEW LOT LINE WINDOWS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$274,994
2021-12-01311: Dumpster Complaint — Overflowing
2021-11-12311: Encampment — N/A
2021-05-11311: Food Establishment — Pet/Animal
2021-05-05311: Lead — Lead Kit Request (Residential) (L10)
2021-04-26Boiler inspection
2021-03-03311: Emergency Response Team (ERT) — After Hours Work - Illegal
2021-03-03311: General Construction/Plumbing — Building Permit - None
2019-09-24Elevator permit: Modification to the existing controller to install door position monitoring system (DLM) (Software only) as per requirements of AS$15,000
2019-08-13311: Noise — Noise: Construction Equipment (NC1)
2019-04-16311: Taxi Complaint — Driver Complaint
2019-03-27Boiler inspection
2019-01-31Facade (LL11) filing, cycle 8: SAFE
2018
2018-04-19Boiler inspection
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2017
2017-01-25311: Water Conservation — Illegal Use Of Hose - Private Residence (CCR)
2016
2016-03-03Permit EW — ISSUED
2016-01-22Permit EW — ISSUED
2015
2015-05-21Permit EQ — ISSUED
2015-05-20Job filed: SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
2015-05-15311: Water Conservation — Wasting Faucets,Sinks,Flushometer,Urinal,Etc. - Other (CWO)
2015-04-16Job filed: FACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,319
2015-04-16Permit EW — ISSUED
2014
2014-07-30DOB violation E:
2014-03-04Rodent inspection: Passed
2014-02-06REL — from WINNER REALTY CO. to THE BANK OF NEW YORK MELLON F/K/A THE
2014-01-30Agreement — from THE TRAVEL CHANNEL L.L.C.; WINNER REALTY CO. to CAPITAL ONE, NATIONAL ASSOCIATION
2014-01-28Mortgage $4,665,122 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE , NATIONAL ASSOCIATION$4,665,122
2014-01-28Agreement $7,000,000 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE , NATIONAL ASSOCIATION$7,000,000
2014-01-28AL&R $7,000,000 — from WINNER REALTY ASSOCIATES LLC to CAPITAL ONE , NATIONAL ASSOCIATION$7,000,000
2014-01-28Mortgage assigned — from BANK OF NEW YORK MELLON (F/K/A THE BANK to CAPITAL ONE , NATIONAL ASSOCIATION
2014-01-28Deed — from WINNER REALTY CO. to WINNER REALTY ASSOCIATES LLC
2013
2013-09-06Job filed: INSTALLATION OF NEW MANUAL AND AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM FOR BREAD OF UNION TENANT AREA AS PER PLANS SUBMITTED HEREWITH.$16,200
2013-06-21DOB violation E:
2013-03-27Permit AL — ISSUED
2013-02-19Facade (LL11) filing, cycle 7: SWARMP
2013-02-14Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY RETRACTABLE AWNING - LEHAMIM BAKERY$4,427
2013-02-14Job filed: NON ILLUMINATED NON ADVERTISING ACCESSORY RETRACTABLE AWNING - LEHAMIM BAKERY$4,427
2013-01-29311: Illegal Parking — Blocked Sidewalk
2013-01-22311: Illegal Parking — Blocked Sidewalk
2012
2012-12-10Rodent inspection: Passed
2012-10-17Permit EW — ISSUED
2012-10-17Permit PL — ISSUED
2012-10-12Permit EQ — ISSUED
2012-10-12Permit EW — ISSUED
2012-10-12Permit EW — ISSUED
2012-10-12Permit EW — ISSUED
2012-10-12Permit EW — ISSUED
2012-10-12Permit EW — ISSUED
2012-08-28Job filed: INSTALLATION OF NEW STOREFRONT WITH GENERAL CONSTRUCTION WORK AND PLYWOOD FENCE AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED UND$35,000
2012-08-28Job filed: INSTALLATION OF NEW STOREFRONT WITH GENERAL CONSTRUCTION WORK AND PLYWOOD FENCE AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED UND$35,000
2012-08-08Job filed: INTERIOR PARTITIONS WITH GENERAL CONSTRUCTION WORK AS PER PLAN. TWO SUBSEQUENT APPLICATIONS SHALL ACCOMPANY THIS FILING CONSISTING OF PLUMBING,SPRINK$672,000
2012-08-08Job filed: SUBSEQUENT FILING FOR INSTALLATION AND MODIFICATION OF PLUMBING FIXTURES, INSTALLATION OF NEW SPRINKLER HEADS OFF EXISTING SPRINKLER SYSTEM, AND INSTA$425,000
2012-08-08Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK AS PROPOSED ON DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED UNDER THIS APPLICATION.$435,000
2012-08-08Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK AS PROPOSED ON DRAWINGS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED UNDER THIS APPLICATION.$435,000
2012-08-08Job filed: SUBSEQUENT FILING FOR INSTALLATION AND MODIFICATION OF PLUMBING FIXTURES, INSTALLATION OF NEW SPRINKLER HEADS OFF EXISTING SPRINKLER SYSTEM, AND INSTA$425,000
2012-08-08Job filed: INTERIOR PARTITIONS WITH GENERAL CONSTRUCTION WORK AS PER PLAN. TWO SUBSEQUENT APPLICATIONS SHALL ACCOMPANY THIS FILING CONSISTING OF PLUMBING,SPRINK$672,000
2011-08-16311: Street Condition — Defective Hardware
2011-06-16Rodent inspection: Passed
2010
2010-12-13DOB violation E:
2010-12-13DOB violation E:
2010-11-15Permit AL — ISSUED
2010-10-28Job filed: RENOVATE/ RECONFIGURE EXISTING OFFICE SPACE, INSTALL NEW FLOORING- NO CHANGE IN USE, EGRESS OR OCCUPANCY$33,955
2010-10-28Job filed: RENOVATE/ RECONFIGURE EXISTING OFFICE SPACE, INSTALL NEW FLOORING- NO CHANGE IN USE, EGRESS OR OCCUPANCY$33,955
2010-10-08DOB violation VCAT1:
2010-10-05311: Air Quality — Air: Open Fire, Construction/Demolition (AC4)
2010-05-25311: Water System — Possible Water Main Break (Use Comments) (WA1)
2010-05-25311: Water System — Leak (Use Comments) (WA2)
2010-04-14Permit EW — ISSUED
2010-03-26RPTT $613,081 — from COX TMI, INC. to TCM PARENT, LLC$613,081
2010-03-24Job filed: INSTALL AIR CONDITIONING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$6,000
2010-03-24Job filed: INSTALL AIR CONDITIONING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$6,000
2010-03-24Job filed: INSTALL AIR CONDITIONING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$6,000
2009
2009-08-19DOB violation E:
2009-08-19DOB violation E:
2009-06-01Agreement $2,572,260 — from WINNER REALTY CO. to THE BANK OF NEW YORK MELLON; THE BANK OF NEW YORK$2,572,260
2009-06-01AL&R $2,572,260 — from WINNER REALTY CO. to THE BANK OF NEW YORK MELLON; THE BANK OF NEW YORK$2,572,260
2009-02-27DOB violation LL1081:
2009-02-18Job filed: PROPOSE TO FILE FOR THE ADDITIONS TO THE FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$12,600
2008
2008-12-17DOB violation E:
2008-12-17DOB violation E:
2008-12-10Permit EW — ISSUED
2008-11-12Permit PL — ISSUED
2008-10-31Job filed: RENOVATE/ RECONFIGURE 7 FLOOR- MECHANICAL WORK WILL BE FILED SEPARATELY- NO CHANGE IN USE, EGRESS OR OCCUPANCY-$354,855
2008-10-31Job filed: RENOVATE/ RECONFIGURE 7 FLOOR- MECHANICAL WORK WILL BE FILED SEPARATELY- NO CHANGE IN USE, EGRESS OR OCCUPANCY-$354,855
2008-10-31Job filed: RENOVATE/ RECONFIGURE 7 FLOOR- MECHANICAL WORK WILL BE FILED SEPARATELY- NO CHANGE IN USE, EGRESS OR OCCUPANCY-$354,855
2008-10-09Permit EW — ISSUED
2008-10-09Permit EW — ISSUED
2008-10-06Job filed: RENOVATE/ RECONFIGURE EXIST. TOILETS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$41,500
2008-10-06Job filed: RENOVATE/ RECONFIGURE EXIST. TOILETS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$41,500
2008-09-17Permit EW — ISSUED
2008-04-29Permit PL — ISSUED
2008-04-23Job filed: MODIFY EXIST. CLASS 'E' FIRE ALARM SYSTEM ON THE SECOND FLOOR- NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2008-04-23Job filed: RECONFIGURE THIRD FLOOR WITH NON-LOAD BEARING PARTITIONS NO CHANGE IN USE, EGRESS OR OCCUPANCY$30,000
2008-04-23Job filed: MODIFY EXIST. CLASS 'E' FIRE ALARM SYSTEM ON THE SECOND FLOOR- NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2008-04-18Job filed: MODIFY EXIST. SPRINKLER SYSTEM TO ACCOMODATE RECONFIGURED SPACES- NO CHANGE IN USE, EGRESS OR OCCUPANCY-$25,000
2008-04-18Job filed: MODIFY EXIST. SPRINKLER SYSTEM TO ACCOMODATE RECONFIGURED SPACES- NO CHANGE IN USE, EGRESS OR OCCUPANCY-$25,000
2008-03-25Permit EW — ISSUED
2008-03-25Permit EW — ISSUED
2008-03-19Job filed: REARRANGE/ RECONFIGURE EXIST. SPACES, INSTALL DUCTS, FIXTURES AND PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$137,000
2008-03-19Job filed: REARRANGE/ RECONFIGURE EXIST. SPACES, INSTALL DUCTS, FIXTURES AND PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$137,000
2008-02-20DOB violation E:
2008-02-20DOB violation E:
2008-02-20Permit PL — ISSUED
2008-02-14Permit EW — ISSUED
2008-02-01Job filed: RENOVATE/ RECONFIGURE EXISTING TOILETS, REPLACE EXIST. AND INSTALL NEW PLUMBING FIXTURES AS PER DRAWINGS. REWORK EXIST. DUCT WORK. NO CHANGE IN USE$39,000
2007
2007-09-27Permit EW — ISSUED
2007-09-12Permit EW — ISSUED
2007-08-23Job filed: Propose to renovate existing lobby as shown on drawings filed herewith. change in use, egress or occupancy.$40,000
2007-08-13Job filed: INSTALL HVAC SYSTEM IN BASEMENT AND GROUND FLOOR LOBBY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$9,000
2007-04-06Permit EW — ISSUED
2007-03-14Job filed: Installation of 58 new Sprinkler Heads on existing system on 6th floor of existing tenant space. No change in egress or occupancy. All as per plans $15,000
2007-01-23Facade (LL11) filing, cycle 6: SAFE
2007-01-05DOB violation E:
2006
2006-11-28Job filed: PROPOSE TO FILE FDOR THE ADDITION TO THE FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$4,000
2006-09-27Permit PL — ISSUED
2006-09-20Permit EQ — ISSUED
2006-09-18Job filed: ERECT A TOTAL OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS/FT2. INSTALLATION SHALL COMPLY WITH BSA-351-74-SM AND LL
2006-09-18Job filed: ERECT A TOTAL OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 LBS/FT2. INSTALLATION SHALL COMPLY WITH BSA-351-74-SM AND LL
2006-07-21Permit EW — ISSUED
2006-07-21Permit EW — ISSUED
2006-06-21Job filed: RECONFIGURE SPACES WITH NON-LAOD BEARING PARTITIONS, REPLACE EXIST. PLU MBING FIXTURES REWORK EXIST. DUCT WORKNEW(MH) WORK TYPE TO BE FILED SEPARATEL$200,000
2006-06-21Job filed: RECONFIGURE SPACES WITH NON-LAOD BEARING PARTITIONS, REPLACE EXIST. PLU MBING FIXTURES REWORK EXIST. DUCT WORKNEW(MH) WORK TYPE TO BE FILED SEPARATEL$200,000
2003
2003-09-15DOB violation E:
2003-09-15DOB violation E:
2003-05-28ECB Non-Hazardous violation: 69M07 69-M- COUNTER WEIGHT BUFFER/SPRING MISSING. CALL-DEPARTMENT OF BUILDINGS AT (212)566-5542 WHEN VIOLATION HAS BEEN COMPLETED.$500
2002
2002-11-20Agreement — from WINNER REALTY CO. to BANK OF NEW YORK
2002-11-20Mortgage assigned — from WINNER REALTY CO. to BANK OF NEW YORK
2002-11-20Mortgage $1,413,521 — from WINNER REALTY CO. to BANK OF NEW YORK$1,413,521
2002-10-17DOB violation E: 1P3514
2002-10-17DOB violation E: 1P3513
2002-05-03Job filed: PARTITIONS AND CEILING CHANGES ON THE 5TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L.#5 COMPLIANCE -$10,000
1999
1999-05-28DOB violation E: 1P3514
1999-05-28DOB violation E: 1P3513
1998
1998-02-27Agreement — from WINNER REALTY CO. to BANK OF NEW YORK
1998-02-27Mortgage assigned — from WINNER REALTY CO. to BANK OF NEW YORK
1998-02-27Mortgage $892,486 — from WINNER REALTY CO. to BANK OF NEW YORK$892,486
1994
1994-04-11Agreement — from WINNER REALTY CO. to BANK OF NEW YORK
1994-04-11Mortgage assigned — from WINNER REALTY CO. to BANK OF NEW YORK
1994-04-11Mortgage assigned — from LOCAL AMERICA BANK OF TULSA FSB to BANK OF NEW YORK
1993
1993-10-13Mortgage assigned — from KIDDER PEABODY MTGEETC to LOCAL AMERICA BANK/TULSA
1993-07-16Mortgage assigned — from FEDERAL DEPOSIT INSCORP to KIDDER PEABODY MTGEETC
1993-05-17Mortgage assigned — from FEDERAL DEPOSIT INSCORP to KIDDER PEABODY MTGEETC