Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

33 East 18 Street · Manhattan · BBL 1008470027 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

46 service requests in the last three years. Most common: Noise (18) · Food Establishment (6) · Outdoor Dining (5) · Street Condition (3) · Taxi Complaint (2) · Abandoned Vehicle (2).

Filed construction activity

$44,544,850 in permitted construction work filed since 2016 (103 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$41,200,000 $18,540,000
2026$41,798,000 $18,809,100
2027$42,216,000 $18,997,200

The city's market estimate has risen 2% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)D — ENERGY STAR score 20/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuelNO2FUEL
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
Abc Cocina / Abc VLatin AmericanA—
Abc KitchenAmericanA—

Report to 311: Food poisoning · Food safety complaint

2 restaurants · 0 with mice evidence · See them on the Mice Map

1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick), shared by 2 restaurants
6 Food Establishment complaints to 311 at this address in the last three years (most often: Food Contains Foreign Object, Food Protection, Food Worker Hygiene), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

1 street-flooding or sewer-backup complaints at this address since 2019 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway14 St-Union Sq — 4 5 6 L N Q R W · 550 ft straight-line (about a 3-minute walk) · station accessibility: partial
BusNearest boarding stop: Park Av South / E 18 St — M1 M2 M3 · 450 ft
Citi BikeBroadway & E 19 St · 200 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: Sixth Avenue Elementary School
Middle: J.H.S. 104 Simon Baruch. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

33 East 18 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

46 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $46,326,888 on 2025-10-27 (lender: Dekabank Deutsche Girozentrale), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2025-10-27Mortgage $46,326,889 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to DEKABANK DEUTSCHE GIROZENTRALE $46,326,889
2025-10-27Agreement $130,500,000 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to DEKABANK DEUTSCHE GIROZENTRALE $130,500,000
2025-10-27AL&R $130,500,000 — from 880 BROADWAY TENANT, LLC; 880 BROADWAY OWNER, LLC to DEKABANK DEUTSCHE GIROZENTRALE $130,500,000
2025-02-25AL&R $84,173,111 — from 880 BROADWAY TENANT, LLC to TRTX 2019-FL3 ISSUER, LTD $84,173,111
2025-02-25Deed $38,000,000 — from 33 REALTY ASSOCIATES, L.P. to 880 BROADWAY TENANT, LLC $38,000,000
2025-02-25Agreement $84,173,111 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to TRTX 2019-FL3 ISSUER, LTD $84,173,111
2025-02-10Sold for $38,000,000 $38,000,000 $1,900,000
2019-10-04AL&R $106,320,000 — from 880 BROADWAY TENANT, LLC to TPG RE FINANCE 1, LTD. $106,320,000
2019-10-04Mortgage $106,320,000 — from 880 BROADWAY TENANT, LLC to TPG RE FINANCE 1, LTD. $106,320,000
2017-12-29Mortgage $11,520,889 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC $11,520,889
2017-12-29Mortgage $72,311,068 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC $72,311,068
2017-12-29Mortgage $22,488,043 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC $22,488,043
2017-12-29AL&R $11,520,889 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC $11,520,889
2017-12-29AL&R $22,488,043 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC $22,488,043
2017-12-29AL&R $72,311,068 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC $72,311,068

Ten-year activity

2001000
2017
2018
108
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017512131940
2018404211057
2019671081310108
202031560244
2021228101344
20225190722
202349171901196
2024384151462
2025501618948
2026260100440
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 53 records

DateRecord
2026-09-19311: Abandoned Vehicle — With License Plate
2026-09-12311: Abandoned Vehicle — With License Plate
2026-06-24Job filed: Removal & installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.
2026-05-12Restaurant inspection: ABC KITCHEN — grade A
2026-05-07311: Street Condition — Plate Condition - Noisy
2026-05-06Boiler inspection
2026-05-06Boiler inspection
2026-05-05311: Street Condition — Plate Condition - Noisy
2026-04-14Cooling tower inspection — violation AH8S
2026-04-03Permit Plumbing — Permit Issued
2026-04-03Permit Sprinklers — Permit Issued
2026-04-03Permit Sprinklers — Permit Issued
2026-04-03Permit Plumbing — Permit Issued
2026-03-24Permit Plumbing — Permit Issued
2026-03-24Permit Plumbing — Signed-off
2026-03-24Permit Sprinklers — Signed-off
2026-03-24Permit Plumbing — Permit Issued
2026-03-24Permit Sprinklers — Permit Issued
2026-03-24Permit Sprinklers — Permit Issued
2026-03-11Permit Structural — Permit Issued
2026-03-11Permit Structural — Signed-off
2026-03-11Permit General Construction — Permit Issued
2026-03-11Permit General Construction — Permit Issued
2026-03-11Permit Structural — Permit Issued
2026-03-09Job filed: Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
2026-03-09Job filed: Removal & installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.
2026-03-03Certificate of occupancy Renewal With Change
2026-03-03Permit Mechanical Systems — Permit Issued
2026-03-03Permit Mechanical Systems — Permit Issued
2026-03-03Permit Mechanical Systems — Signed-off
2026-03-01311: Food Establishment — Toxic Chemical/Material
2026-02-27311: Food Establishment — Food Protection
2026-02-27Job filed: Installation of 2 drinking fountains & 112 new sprinkler heads. No change in use, egress or occupancy.
2026-02-27Job filed: Fitout of 3rd floor - supply, return, and exhaust ductwork. No change in use, egress or occupancy.
2026-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2026-02-19311: Noise — Noise: Construction Before/After Hours (NM1)
2026-02-07Job filed: No Work
2026-02-04311: Noise — Noise: air condition/ventilation equipment (NV1)
2026-01-29311: Noise — Noise: Manufacturing Noise (NK1)
2026-01-08Permit Suspended Scaffold — Signed-off
2025-12-23Job filed: ROPE ACCESS INSTALLATION FOR FACADE ACCESS AND INSPECTIONS
2025-10-27AALR — from TRTX 2019-FL3 ISSUER, LTD. to TRTX 2021-FL4 ISSUER, LTD.
2025-10-27TL&R — from 880 BROADWAY TENANT, LLC to TRTX 2021-FL4 ISSUER, LTD.
2025-10-27Mortgage assigned — from TRTX 2019-FL3 ISSUER, LTD. to TRTX 2021-FL4 ISSUER, LTD.
2025-10-27Mortgage assigned — from TRTX 2021-FL4 ISSUER, LTD. to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27Mortgage $46,326,889 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27Agreement $130,500,000 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27AL&R $130,500,000 — from 880 BROADWAY TENANT, LLC; 880 BROADWAY OWNER, LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27Agreement — from 880 BROADWAY TENANT, LLC; NETFLIX, INC.; 880 BROADWAY OWNER, LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27Agreement — from 880 BROADWAY TENANT, LLC; JG-ABC18TH LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-25311: Encampment — N/A
2025-10-22Certificate of occupancy Renewal Without Change
2025-10-21311: Food Establishment — Pet/Animal

The full timeline

2026
2026-09-19311: Abandoned Vehicle — With License Plate
2026-09-12311: Abandoned Vehicle — With License Plate
2026-06-24Job filed: Removal & installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.$2,411,963
2026-05-12Restaurant inspection: ABC KITCHEN — grade A
2026-05-07311: Street Condition — Plate Condition - Noisy
2026-05-06Boiler inspection
2026-05-06Boiler inspection
2026-05-05311: Street Condition — Plate Condition - Noisy
2026-04-14Cooling tower inspection — violation AH8S
2026-04-03Permit Plumbing — Permit Issued
2026-04-03Permit Sprinklers — Permit Issued
2026-04-03Permit Sprinklers — Permit Issued
2026-04-03Permit Plumbing — Permit Issued
2026-03-24Permit Plumbing — Permit Issued
2026-03-24Permit Plumbing — Signed-off
2026-03-24Permit Sprinklers — Signed-off
2026-03-24Permit Plumbing — Permit Issued
2026-03-24Permit Sprinklers — Permit Issued
2026-03-24Permit Sprinklers — Permit Issued
2026-03-11Permit Structural — Permit Issued
2026-03-11Permit Structural — Signed-off
2026-03-11Permit General Construction — Permit Issued
2026-03-11Permit General Construction — Permit Issued
2026-03-11Permit Structural — Permit Issued
2026-03-09Job filed: Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.$18,000
2026-03-09Job filed: Removal & installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.$2,411,963
2026-03-03Certificate of occupancy Renewal With Change
2026-03-03Permit Mechanical Systems — Permit Issued
2026-03-03Permit Mechanical Systems — Permit Issued
2026-03-03Permit Mechanical Systems — Signed-off
2026-03-01311: Food Establishment — Toxic Chemical/Material
2026-02-27311: Food Establishment — Food Protection
2026-02-27Job filed: Installation of 2 drinking fountains & 112 new sprinkler heads. No change in use, egress or occupancy.$269,592
2026-02-27Job filed: Fitout of 3rd floor - supply, return, and exhaust ductwork. No change in use, egress or occupancy.$780,457
2026-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2026-02-19311: Noise — Noise: Construction Before/After Hours (NM1)
2026-02-07Job filed: No Work
2026-02-04311: Noise — Noise: air condition/ventilation equipment (NV1)
2026-01-29311: Noise — Noise: Manufacturing Noise (NK1)
2026-01-08Permit Suspended Scaffold — Signed-off
2025
2025-12-23Job filed: ROPE ACCESS INSTALLATION FOR FACADE ACCESS AND INSPECTIONS
2025-10-27AALR — from TRTX 2019-FL3 ISSUER, LTD. to TRTX 2021-FL4 ISSUER, LTD.
2025-10-27TL&R — from 880 BROADWAY TENANT, LLC to TRTX 2021-FL4 ISSUER, LTD.
2025-10-27Mortgage assigned — from TRTX 2019-FL3 ISSUER, LTD. to TRTX 2021-FL4 ISSUER, LTD.
2025-10-27Mortgage assigned — from TRTX 2021-FL4 ISSUER, LTD. to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27Mortgage $46,326,889 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to DEKABANK DEUTSCHE GIROZENTRALE$46,326,889
2025-10-27Agreement $130,500,000 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to DEKABANK DEUTSCHE GIROZENTRALE$130,500,000
2025-10-27AL&R $130,500,000 — from 880 BROADWAY TENANT, LLC; 880 BROADWAY OWNER, LLC to DEKABANK DEUTSCHE GIROZENTRALE$130,500,000
2025-10-27Agreement — from 880 BROADWAY TENANT, LLC; NETFLIX, INC.; 880 BROADWAY OWNER, LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-27Agreement — from 880 BROADWAY TENANT, LLC; JG-ABC18TH LLC to DEKABANK DEUTSCHE GIROZENTRALE
2025-10-25311: Encampment — N/A
2025-10-22Certificate of occupancy Renewal Without Change
2025-10-21311: Food Establishment — Pet/Animal
2025-10-18Restaurant inspection: ABC COCINA / ABC V
2025-10-07311: Outdoor Dining — Sidewalk Zone Blocked
2025-09-30Restaurant inspection: ABC COCINA / ABC V — grade A
2025-09-30311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-09-26311: Noise - Street/Sidewalk — Loud Music/Party
2025-09-16311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-09-16311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-09-15311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-09-15311: Noise - Residential — Banging/Pounding
2025-09-14311: Noise - Commercial — Loud Music/Party
2025-09-12311: Outdoor Dining — Sidewalk Zone Blocked
2025-09-03311: Outdoor Dining — Sidewalk Zone Blocked
2025-07-17Certificate of occupancy Renewal Without Change
2025-06-20311: Homeless Person Assistance — Non-Chronic
2025-06-03311: Illegal Parking — Posted Parking Sign Violation
2025-05-03311: Outdoor Dining — Sidewalk Zone Blocked
2025-04-30Boiler inspection
2025-04-30Boiler inspection
2025-04-30Boiler inspection
2025-04-30Boiler inspection
2025-04-24Boiler inspection
2025-04-24Boiler inspection
2025-04-18Certificate of occupancy Renewal With Change
2025-02-28Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2025-02-25AL&R $84,173,111 — from 880 BROADWAY TENANT, LLC to TRTX 2019-FL3 ISSUER, LTD$84,173,111
2025-02-25Mortgage satisfied — from TRTX 2019-FL3 ISSUER, LTD to 880 BROADWAY TENANT, LLC
2025-02-25Deed $38,000,000 — from 33 REALTY ASSOCIATES, L.P. to 880 BROADWAY TENANT, LLC$38,000,000
2025-02-25TL&R — from APPLE BANK to 33 REALTY ASSOCIATES, L.P.
2025-02-25MLEA — from 880 BROADWAY OWNER, LLC to NETFLIX, INC.
2025-02-25Agreement $84,173,111 — from 880 BROADWAY OWNER, LLC; 880 BROADWAY TENANT, LLC to TRTX 2019-FL3 ISSUER, LTD$84,173,111
2025-02-25TERL — from 880 BROADWAY TENANT, LLC to 880 BROADWAY TENANT, LLC
2025-02-25Mortgage assigned — from APPLE BANK to TRTX 2019-FL3 ISSUER, LTD
2025-02-10Sold for $38,000,000$38,000,000
2025-01-17Job filed: Sprinkler modifications taking place on the 2nd, 3rd floors & roof as per plans filed herewith. No change to use, egress or occupancy.$7,480
2025-01-04311: Lost Property — Electronics/Phones
2024
2024-12-13RPTT&RET — from MAPLE H 880 BROADWAY INVESTOR, LLC to 880 BROADWAY PROPERTY, LLC
2024-12-03Job filed: General construction / demolition modifications taking place on the 2nd, 3rd & 8th through 10th floors as per plans filed herewith. No change to use, $299,785
2024-12-02311: Noise — Noise, Barking Dog (NR5)
2024-11-21Job filed: Mechanical modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change to use, egress nor occupancy.$79,999
2024-10-01Job filed: Mechanical modifications taking place on the 8th thru 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$500,030
2024-09-24Permit Mechanical Systems — Signed-off
2024-09-24Permit Structural — Signed-off
2024-09-24Permit General Construction — Signed-off
2024-09-21311: Food Establishment — Food Worker Hygiene
2024-09-13Certificate of occupancy Renewal Without Change
2024-09-11Job filed: Sprinkler modifications taking place on the 2nd, 3rd floors & roof as per plans filed herewith. No change to use, egress or occupancy.$7,480
2024-09-11Job filed: Mechanical modifications taking place on the 2nd, 3rd floors & roof as per plans filed herewith. No change to use, egress or occupancy.$1,250,100
2024-08-19311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2024-08-19DOB complaint, category ?
2024-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-08-02311: Food Poisoning — 1 or 2
2024-06-28311: Taxi Complaint — Driver Complaint - Passenger
2024-06-27Permit Sprinklers — Signed-off
2024-06-27Permit Plumbing — Signed-off
2024-06-26Permit Plumbing — Signed-off
2024-06-26Permit Sprinklers — Signed-off
2024-06-25311: Smoking or Vaping — Allowed in Smoke Free Area
2024-06-21Permit General Construction — Signed-off
2024-06-18Permit Mechanical Systems — Signed-off
2024-06-13Job filed: Installation of 2 drinking fountains & 112 new sprinkler heads. No change in use, egress or occupancy.$132,400
2024-06-13Job filed: Interior tenant fit-out. No change in use, egress or occupancy$1,856,361
2024-06-13Job filed: Tenant fit out of commercial office space. Scope is the installation of ductwork, terminal units and additional electric heat to serve the space.$580,000
2024-06-13Permit Construction Fence — Signed-off
2024-06-13Permit Supported Scaffold — Signed-off
2024-06-05311: Street Sign - Missing — Other/Unknown
2024-06-04Job filed: Structural modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.$140,886
2024-06-04Permit General Construction — Signed-off
2024-05-31Boiler inspection — defects found
2024-05-31Boiler inspection — defects found
2024-05-24Permit Structural — Signed-off
2024-05-06Job filed: General construction modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.$341,122
2024-05-03Job filed: Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.$150,000
2024-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-04-09311: Food Establishment — Food Contains Foreign Object
2024-04-09Job filed: Plumbing modifications taking place on the 8th Thru 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$69,998
2024-04-02Permit Plumbing — Signed-off
2024-04-01Restaurant inspection: ABC COCINA / ABC V — grade A
2024-04-01Restaurant inspection: ABC KITCHEN — grade A
2024-04-01Permit Plumbing — Signed-off
2024-04-01Permit Plumbing — Signed-off
2024-03-26Permit Sprinklers — Signed-off
2024-03-22Job filed: Sprinkler modifications taking place on the 8th & 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$26,969
2024-03-22Job filed: Plumbing modifications taking place on the 8th & 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$69,998
2024-03-21Permit Mechanical Systems — Signed-off
2024-03-21Permit Mechanical Systems — Signed-off
2024-03-21Permit General Construction — Signed-off
2024-03-21Permit General Construction — Signed-off
2024-03-19311: Food Establishment — Food Contains Foreign Object
2024-03-13Job filed: General construction modifications taking place on the 8th thru 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$1,020,024
2024-03-07311: Taxi Complaint — Driver Complaint - Non Passenger
2024-02-27311: Street Condition — Cave-in
2024-02-23DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2024-02-13311: Noise - Commercial — Banging/Pounding
2024-02-13Permit Mechanical Systems — Signed-off
2024-02-08311: Noise — Noise: air condition/ventilation equipment (NV1)
2024-01-29311: Noise — Noise: Private Carting Noise (NQ1)
2024-01-09311: Outdoor Dining — Unauthorized Restaurant
2023
2023-12-29Elevator permit: Buffer and Safety replacement. All work to comply with ASME A17.1-2013, Part 8, section (8.7.2.18) and (8.7.2.23) only, NYC DOB 20$5,500
2023-12-23311: Noise - Commercial — Banging/Pounding
2023-12-20311: Dirty Condition — Trash
2023-12-20Permit EW — ISSUED
2023-11-22311: Commercial Disposal Complaint — Waste Left in Front of Residence
2023-11-15Elevator permit: Making existing entrance active at level 1 front. Controller software upgrade and add of new fixture(s). All work to comply with$25,000
2023-11-14Permit Structural — Signed-off
2023-11-12311: Noise - Residential — Banging/Pounding
2023-11-10Elevator permit: Interior Cab and COP remodel. All work to comply with ASME A17.1-2013, Part 8, section (8.7.2.14.2) and (8.7.2.27) only, NYC DOB 2$65,000
2023-11-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023-11-01DOB violation FISPFCS: FAILURE TO CORRECT SWARMP CONDITIONS
2023-10-29311: Noise - Street/Sidewalk — Loud Music/Party
2023-10-12Facade (LL11) filing, cycle 9: SWARMP
2023-10-03311: Plumbing — Failure To Retain Water/Improper Drainage- (LL103/89)
2023-10-03311: Water Drainage — Drain/Pipe Clogged
2023-10-03DOB complaint, category ?
2023-09-27Cooling tower inspection
2023-09-27Cooling tower inspection — violation AH8D
2023-09-27Cooling tower inspection — violation AH8S
2023-09-22Permit General Construction — Signed-off
2023-09-18Job filed: General construction modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.$341,122
2023-09-18Job filed: Structural modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.$140,886
2023-09-15Permit Mechanical Systems — Signed-off
2023-09-13Job filed: Mechanical modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.$107,692
2023-09-07311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-08-29311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-08-11Certificate of occupancy Renewal Without Change
2023-08-03311: Noise — Noise: air condition/ventilation equipment (NV1)
2023-08-03311: Noise - Street/Sidewalk — Loud Music/Party
2023-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023-07-26311: Noise - Residential — Loud Music/Party
2023-07-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-07-26ECB CLASS - 1 violation: INCIDENT OCCURRED ON JULY 25, 2023, AND FDNY CUT THE FIRE ON 4TH FLOOR ON SUPPORTED SCAFFOLD. THE PERMIT HOLDER FAILED TO NOTIFY T$5,000
2023-07-26ECB CLASS - 1 violation: FAILURE TO DESIGNATE A QUALIFIED FOREMAN, UPON MY INSPECTION I FOUND TWO WORKERS ON SUSPENDED SCAFFOLD PERFORMING WORK AND THE THI$625
2023-07-26ECB CLASS - 1 violation: FAILURE TO COMPLY WITH FIRE CODE. THE PERMIT HOLDER WAS CUTTING STEEL SHEETS COVER THE WINDOWS ON 4TH FLOOR LEVEL WITHOUT FIRE WAT$2,500
2023-07-26DOB complaint, category ?
2023-07-26DOB complaint, category ?
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2023-06-16311: Food Establishment — Pet/Animal
2023-06-15Permit Construction Fence — Signed-off
2023-06-15Permit Supported Scaffold — Signed-off
2023-06-14Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
2023-06-14Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
2023-05-21311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-05-13Certificate of occupancy Renewal Without Change
2023-05-10311: Illegal Dumping — Chronic Dumping
2023-05-09311: Illegal Dumping — Chronic Dumping
2023-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023-04-18Job filed: INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2022 CHAPTER 33 . NO CHANGE IN EGRESS, U$1,000
2023-03-27Permit Sprinklers — Signed-off
2023-03-20Permit Supported Scaffold — Signed-off
2023-03-17Permit Sprinklers — Signed-off
2023-03-14Permit Plumbing — Signed-off
2023-03-14Permit Mechanical Systems — Signed-off
2023-03-10Permit Plumbing — Signed-off
2023-03-10Permit Plumbing — Signed-off
2023-03-09Permit Sprinklers — Signed-off
2023-03-09Permit Sprinklers — Signed-off
2023-03-08Permit Mechanical Systems — Signed-off
2023-03-08Permit Mechanical Systems — Signed-off
2023-03-03Job filed: Mechanical modifications taking place on the 2nd, 3rd floors & roof as per plans filed herewith. No change to use, egress or occupancy.$1,250,100
2023-03-03Job filed: Plumbing modifications taking place on the 2nd, 3rd floors & roof as per plans filed herewith. No change to use, egress nor occupancy.$18,000
2023-03-03Job filed: Sprinkler modifications taking place on the 2nd, 3rd & 8th through 10th floors as per plans filed herewith. No change to use, egress nor occupancy.$24,957
2023-03-03Job filed: Sprinkler modifications taking place on the 2nd, 3rd floors & roof as per plans filed herewith. No change to use, egress or occupancy.$7,480
2023-03-02Job filed: Sprinkler modifications taking place on the 8th & 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$26,969
2023-03-02Job filed: Plumbing modifications taking place on the 8th Thru 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$69,998
2023-03-02Job filed: Mechanical modifications taking place on the 8th thru 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$500,030
2023-03-02Permit Plumbing — Signed-off
2023-02-28311: Noise — Noise: Construction Before/After Hours (NM1)
2023-02-28Job filed: Sprinkler modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change to use, egress nor occupancy.$4,998
2023-02-28Job filed: Plumbing modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change to use, egress nor occupancy.$5,751
2023-02-28Job filed: Mechanical modifications taking place on the 1st & 2nd floors as per plans filed herewith. No change to use, egress nor occupancy.$79,999
2023-02-24Permit Mechanical Systems — Signed-off
2023-02-23Boiler inspection
2023-02-23Boiler inspection
2023-02-23Permit EW — ISSUED
2023-02-23Permit EW — ISSUED
2023-02-22Job filed: Plumbing modifications taking place on the 2nd, 3rd & 8th through 10th floors as per plans filed herewith. No change to use, egress nor occupancy.$17,957
2023-02-22Job filed: Mechanical modifications taking place on the 2nd, 3rd & 8th through 10th floors as per plans filed herewith. No change to use, egress nor occupancy.$35,000
2023-02-22Permit General Construction — Signed-off
2023-02-22Permit General Construction — Signed-off
2023-02-21Facade (LL11) filing, cycle 9: SWARMP
2023-02-21DOB violation FISPHAZ: CYCLE 9B UNSAFE REPORT FILED
2023-02-17Permit General Construction — Signed-off
2023-02-15Job filed: General construction / demolition modifications taking place on the 2nd, 3rd & 8th through 10th floors as per plans filed herewith. No change to use, $299,785
2023-02-15Job filed: General construction modifications taking place on the 1st, 2nd, 3rd, 8th & 10th floors as per plans filed herewith. No change to use, egress nor occu$249,915
2023-02-15Job filed: General construction modifications taking place on the 8th thru 10th floors as per plans filed herewith. No change in use, egress nor occupancy.$1,020,024
2023-02-13Job filed: INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2022 CHAPTER 33 . NO CHANGE IN EGRESS, U$1,000
2023-02-13Permit Sidewalk Shed — Signed-off
2023-02-10311: Food Poisoning — 1 or 2
2023-01-25Elevator permit: All work to comply with Safety Code for elevator and escalators ASME A17.1-2013, Part 8, Section 8.7 as modified by chapter K1 of $31,406
2022
2022-12-31311: Homeless Person Assistance
2022-11-16Asbestos abatement: Removal — Incinia Contracting Inc
2022-11-14Restaurant inspection: ABC COCINA / ABC V — grade A
2022-11-05311: Homeless Person Assistance
2022-10-05311: Broken Parking Meter — No Receipt
2022-09-11311: Food Establishment — Rodents/Insects/Garbage
2022-09-11311: Food Establishment — Kitchen/Food Prep Area
2022-09-02Permit Sidewalk Shed — Signed-off
2022-09-02Permit Supported Scaffold — Signed-off
2022-08-24311: Drinking — Underage - Licensed Est
2022-08-21311: Drinking — Underage - Licensed Est
2022-08-21DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
2022-08-09Boiler inspection
2022-08-09Boiler inspection
2022-07-14Elevator permit: Modernization of one passenger and one freight elevator per ANSI/ASME A17.1 2000 with A171a-02 and A17.1b - 2003/NYC Building Code$175,000
2022-07-07Cooling tower inspection
2022-07-07Cooling tower inspection
2022-06-13311: Obstruction — Cone
2022-03-30Permit PL — ISSUED
2022-03-21Certificate of occupancy Renewal With Change
2022-02-08Certificate of occupancy Renewal Without Change
2022-01-25311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2021
2021-12-27Permit Sprinklers — Permit Issued
2021-12-23311: Food Establishment — Handwashing
2021-12-13311: Food Poisoning — 1 or 2
2021-11-10Certificate of occupancy Renewal Without Change
2021-11-08311: Food Poisoning — 1 or 2
2021-11-01ECB CLASS - 2 violation: SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREP$5,000
2021-10-04311: Noise — Noise: Construction Before/After Hours (NM1)
2021-09-17Agreement — from TRTX 2019-FL3 ISSUER, LTD. to 880 BROADWAY OWNER, LLC; NETFLIX, INC.
2021-08-06Certificate of occupancy Renewal Without Change
2021-07-28Cooling tower inspection — violation AH8S
2021-07-28Cooling tower inspection — violation AH8U
2021-07-28Cooling tower inspection — violation AH8S
2021-07-12Permit EW — ISSUED
2021-07-12Permit PL — ISSUED
2021-07-07FDNY inspection (STRUC_INT_3)
2021-06-20DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
2021-06-13311: Encampment — N/A
2021-06-13311: Encampment — N/A
2021-05-21Certificate of occupancy Renewal Without Change
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-16ECB CLASS - 2 violation: CAT 1 TAG MISSING. PERFORM AND FILE TEST. NO 2021 ENTRIES IN MAINTENANCE LOG. PERFORM MAINTENANCE. CLEAN MOTOR ROOM. GIBS WORN. RE$1,562
2021-04-16DOB complaint, category ?
2021-04-05Job filed: Sprinkler modifications taking place in the sub-cellar & cellar per the drawings. No change to use, egress nor occupancy.$10,000
2021-03-30ECB CLASS - 2 violation: A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPA$5,000
2021-03-30Certificate of occupancy Renewal With Change
2021-03-24FDNY inspection (SPECIAL-OTH)
2021-03-20311: Noise - Helicopter — Other
2021-03-02Job filed: Sprinkler modifications taking place on the 6th floor as indicated on the drawings. No change in use, egress or occupancy.$97,988
2021-03-02Job filed: Sprinkler modifications taking place on the 7th floor as indicated on the drawings. No change in use, egress or occupancy.$96,619
2021-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-26311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-25311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-25Permit Structural — Signed-off
2021-02-22Permit Sprinklers — Permit Issued
2021-02-19Job filed: Sprinkler modifications taking place on the 7th floor as indicated on the drawings. No change in use, egress or occupancy.$96,619
2021-02-19Job filed: Sprinkler modifications taking place on the 6th floor as indicated on the drawings. No change in use, egress or occupancy.$97,988
2021-02-19Permit PL — ISSUED
2021-02-12Permit PL — ISSUED
2021-02-10Permit Standpipe — Signed-off
2021-02-09Permit EW — ISSUED
2021-02-05Job filed: Standpipe modifications taking place on the 7th floor per drawing set. No change to use, egress nor occupancy.$9,500
2021-02-01Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$399,948
2021-01-29Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$452,540
2021-01-29Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE BETWEEN THE 6TH & 7TH FLOORS AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$70,002
2020
2020-12-18Permit EW — ISSUED
2020-12-18Permit EW — ISSUED
2020-12-18Permit EW — ISSUED
2020-12-16Job filed: No Work
2020-12-09Facade (LL11) filing, cycle 8: SWARMP
2020-11-18311: Noise — Noise: Construction Before/After Hours (NM1)
2020-11-09Permit Supported Scaffold — Signed-off
2020-11-09Permit Sidewalk Shed — Signed-off
2020-10-23DOB complaint, category ?
2020-10-22ECB CLASS - 2 violation: PERMIT HOLDER FAILED TO PROVIDE ACCESS. NOTE:AT TIME OF INSPECTION GAINED ACCESS TO 7 STORY BUILDING,SPOKE TO DOORMAN. THE DOORMAN$2,530
2020-09-29ECB CLASS - 2 violation: SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARE$3,125
2020-09-06311: Noise - Helicopter — Other
2020-07-02Permit Sprinklers — Signed-off
2020-07-02Permit Plumbing — Signed-off
2020-07-02Permit Plumbing — Signed-off
2020-07-02Permit Plumbing — Signed-off
2020-07-02Permit Sprinklers — Signed-off
2020-07-02Permit PL — ISSUED
2020-07-02Permit EW — ISSUED
2020-06-29DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
2020-06-29Permit Mechanical Systems — Signed-off
2020-06-29Permit Mechanical Systems — Signed-off
2020-06-29Permit Mechanical Systems — Permit Issued
2020-06-24Permit EW — ISSUED
2020-06-24Permit EW — ISSUED
2020-06-24Permit EW — ISSUED
2020-06-05Permit EW — ISSUED
2020-06-05Permit EW — ISSUED
2020-06-05Permit AL — ISSUED
2020-06-05Permit EW — ISSUED
2020-06-05Permit EW — ISSUED
2020-06-05Permit EW — ISSUED
2020-05-01311: Homeless Person Assistance — N/A
2020-04-20311: Noise - Residential — Loud Music/Party
2020-04-01Permit EW — ISSUED
2020-03-20Job filed: Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in
2020-03-02Permit PL — ISSUED
2020-02-25311: Noise — Noise: Construction Before/After Hours (NM1)
2020-02-21Facade (LL11) filing, cycle 8: SWARMP
2020-02-21DOB violation FISP:
2020-02-12Permit Sprinklers — Signed-off
2020-01-31Job filed: Relocate and install Sprinkler heads on Cellar and first floor . No change in use, egress or occupancy$31,500
2020-01-17Permit EW — ISSUED
2020-01-13311: Noise — Noise: Construction Equipment (NC1)
2019
2019-12-23Permit EW — ISSUED
2019-12-23Permit EW — ISSUED
2019-12-23Permit EW — ISSUED
2019-12-23Permit EW — ISSUED
2019-12-20Permit Structural — Signed-off
2019-12-20Permit Mechanical Systems — Permit Issued
2019-12-20Permit Mechanical Systems — Signed-off
2019-12-20Permit Mechanical Systems — Signed-off
2019-12-16ECB CLASS - 2 violation: BC3314435-PARTIAL STOP WORK FOR SUPPORTED SCAFFOLD,EXPECT TO MAKE SAFENOTE AT TIME OF INSPECTION I OBSERVED SUPPORTED SCAFFOLD BEI
2019-12-16DOB complaint, category ?
2019-12-15ECB CLASS - 1 violation: NOTED, I OBSERVED APPROX. 48 L.F HEIGHTS PIPE SCAFFOLD TOWER COLLAPSED AND FELL ON TO 7TH FLOOR SET BACK ROOF. PIPE SCAFFOLD ERECT
2019-12-15ECB CLASS - 1 violation: FAILURE TO INSTITUTE ADEQUATE SAFETY MEASURES. NOTED, AT THE TIME OF INSPECTION I OBSERVED A SINGLE PIPE SCAFFOLD TOWER AT 7TH FLO
2019-12-15DOB complaint, category ?
2019-12-11AALR — from TPG RE FINANCE 1, LTD. to TRTX 2019-FL3 ISSUER, LTD.
2019-12-11Mortgage assigned — from TPG RE FINANCE 1, LTD. to TRTX 2019-FL3 ISSUER, LTD.
2019-12-05Permit EW — ISSUED
2019-11-15Permit Mechanical Systems — Signed-off
2019-11-15Permit Mechanical Systems — Permit Issued
2019-11-12Permit Supported Scaffold — Signed-off
2019-11-12Permit Sidewalk Shed — Signed-off
2019-11-08Permit Supported Scaffold — Signed-off
2019-11-08Permit Supported Scaffold — Signed-off
2019-11-08Permit Sidewalk Shed — Signed-off
2019-10-04AL&R $106,320,000 — from 880 BROADWAY TENANT, LLC to TPG RE FINANCE 1, LTD.$106,320,000
2019-10-04Mortgage $106,320,000 — from 880 BROADWAY TENANT, LLC to TPG RE FINANCE 1, LTD.$106,320,000
2019-10-04TERA — from 888 BROADWAY FUNDING LLC to 880 BROADWAY TENANT, LLC
2019-10-04TERA — from 888 BROADWAY FUNDING LLC to 880 BROADWAY TENANT, LLC
2019-10-04TERA — from 888 BROADWAY FUNDING LLC to 880 BROADWAY TENANT, LLC
2019-10-04TL&R — from 888 BROADWAY FUNDING LLC
2019-10-04TL&R — from 888 BROADWAY FUNDING LLC
2019-10-04TL&R — from 888 BROADWAY FUNDING LLC
2019-10-03311: Illegal Parking — Blocked Sidewalk
2019-10-03311: Sidewalk Condition — Blocked - Construction
2019-09-25Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE BETWEEN THE 6TH & 7TH FLOORS AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$70,002
2019-09-25Permit Structural — Signed-off
2019-09-23DOB complaint, category ?
2019-09-23DOB complaint, category ?
2019-09-17Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$452,540
2019-09-17Permit Mechanical Systems — Signed-off
2019-09-13311: Unsanitary Pigeon Condition — Pigeon Waste
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-27Cooling tower inspection
2019-08-27Cooling tower inspection
2019-08-22Permit PL — ISSUED
2019-08-13Permit AL — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-12Asbestos abatement: Removal — PAR Environmental Corporation
2019-08-12Asbestos abatement: Removal — PAR Environmental Corporation
2019-08-12Asbestos abatement: Removal — PAR Environmental Corporation
2019-08-12Asbestos abatement: Removal — PAR Environmental Corporation
2019-08-12Asbestos abatement: Removal — PAR Environmental Corporation
2019-08-09Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$57,535
2019-08-09Job filed: Sprinkler modifications taking place on the 6th floor as indicated on the drawings. No change in use, egress or occupancy.$97,988
2019-08-09Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$104,045
2019-08-09Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$74,293
2019-08-09Permit EW — ISSUED
2019-08-09Permit EW — ISSUED
2019-08-09Permit EW — ISSUED
2019-08-09Permit EW — ISSUED
2019-08-08Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$399,948
2019-08-07Job filed: Sprinkler modifications taking place on the 7th floor as indicated on the drawings. No change in use, egress or occupancy.$96,619
2019-08-07Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$452,540
2019-08-02Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$1,866,670
2019-08-02Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE BETWEEN THE 6TH & 7TH FLOORS AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$990,000
2019-08-02Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$2,305,000
2019-08-02Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$2,305,000
2019-08-02Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$3,513,945
2019-07-30Permit EW — ISSUED
2019-07-24311: Sewer — Sewer Backup (Use Comments) (SA)
2019-07-24311: Water System — No Water (WNW)
2019-07-19Agreement — from 888 BROADWAY FUNDING LLC to NEFLIX, INC.
2019-07-19Agreement — from THE BOARD OF MANAGERS OF THE 880 BROADWA to NETFLIX, INC.
2019-07-19Agreement — from NETFLIX, INC.; 880 BROADWAY TENANT LLC; 33 REALTY ASSOCIATES to 880 BROADWAY OWNER, LLC
2019-07-03Permit EW — ISSUED
2019-06-28Permit PL — ISSUED
2019-06-26Job filed: INSULATION OF A DAY TANK AND NEW FUEL OIL LINES RUNNING TO EXISTING GENERATOR ON THE ROOF AS INDICATED ON THE DRAWINGS.$125,000
2019-06-26Job filed: INSULATION OF A DAY TANK AND NEW FUEL OIL LINES RUNNING TO EXISTING GENERATOR ON THE ROOF AS INDICATED ON THE DRAWINGS.$125,000
2019-06-24Permit EW — ISSUED
2019-06-21Permit EW — ISSUED
2019-06-21Permit EW — ISSUED
2019-06-12Permit PL — ISSUED
2019-05-02Permit AL — ISSUED
2019-04-30Permit EW — ISSUED
2019-04-30Permit EW — ISSUED
2019-04-30Permit EW — ISSUED
2019-04-30Permit EW — ISSUED
2019-04-30Permit EW — ISSUED
2019-04-19311: Elevator — Elevator - Multiple Devices On Property
2019-04-19DOB complaint, category ?
2019-04-10Asbestos abatement: Removal — PAR Environmental Corporation
2019-04-10Asbestos abatement: Removal — PAR Environmental Corporation
2019-03-18DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2018)
2019-03-15311: Street Condition — Pothole
2019-02-26Permit PL — ISSUED
2019-02-22Job filed: INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH PASSIVE DISTRIBUTED ANTENNA, TAKING PLACE ON ALL FLOORS: SUB, CEL, 001-010 & RO$325,000
2019-02-22Job filed: INSTALLATION OF A MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH ONE-WAY VOICE COMMUNICATION UTILIZING THE BASE BUILDING FIRE $10,000
2019-02-22Permit AL — ISSUED
2019-02-12Elevator permit: Modernization of one passenger and one freight elevator per ANSI/ASME A17.1 2000 with A171a-02 and A17.1b - 2003/NYC Building Code$175,000
2019-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2019-01-28Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$10,000
2019-01-25Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$45,000
2019-01-25Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCC$6,000
2019-01-25Job filed: MECHANICAL & PLUMBING MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$325,001
2019-01-25Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCC$6,000
2019-01-25Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$750,000
2019-01-25Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.$750,000
2019-01-22Permit EW — ISSUED
2019-01-22Permit EW — ISSUED
2018
2018-12-06Permit EW — ISSUED
2018-12-06Permit EW — ISSUED
2018-11-19Cooling tower inspection — violation AH8X
2018-11-19Cooling tower inspection — violation AH8D
2018-11-19Cooling tower inspection — violation AH8S
2018-11-07Permit Sidewalk Shed — Signed-off
2018-11-07Permit Supported Scaffold — Signed-off
2018-11-05Permit Supported Scaffold — Signed-off
2018-10-16Permit EW — ISSUED
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQU$3,125
2018-09-25DOB violation E:
2018-09-07Job filed: DEMOLITION/CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 4TH THROUGH 7TH A S INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$151,800
2018-09-07Job filed: DEMOLITION/CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 4TH THROUGH 7TH A S INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$151,800
2018-09-06Permit AL — ISSUED
2018-08-24Job filed: INSTALLATION OF TEMPORARY SHORING AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,000
2018-08-16Job filed: Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in
2018-08-16Permit Sidewalk Shed — Signed-off
2018-08-16Permit Supported Scaffold — Signed-off
2018-08-06Job filed: STANDPIPE MODIFICATIONS TAKING PLACE ON ALL FLOORS, AS INDICATED ON THE DRAWINGS. ALT-1 BEING FILED TO ESTABLISH USE ON FLOORS 2 THROUGH 10.$145,000
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-27Permit EW — ISSUED
2018-07-23Asbestos abatement: Removal — New York Insulation Inc.
2018-07-23Asbestos abatement: Removal — New York Insulation Inc.
2018-07-23Asbestos abatement: Removal — New York Insulation Inc.
2018-07-23Asbestos abatement: Removal — New York Insulation Inc.
2018-07-23Asbestos abatement: Removal — New York Insulation Inc.
2018-07-20Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS, IN CONJUNCTION WITH DOB JOBF# 101948939. FIRE SUPP. SHUT OFF VALVE AND COOKING EQUIPMENTS ARE $3,000
2018-07-12Permit PL — ISSUED
2018-07-10Permit EW — ISSUED
2018-07-10Permit EW — ISSUED
2018-07-10Permit EW — ISSUED
2018-06-19Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON FLOORS 1-10, IN THE SUB-CELLAR, CELLAR & THE ROOF AS INDICATED ON THE DRAWINGS. ALT-1 BEING FILED TO ESTAB$180,000
2018-06-18311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2018-06-14Permit PL — ISSUED
2018-05-15Job filed: GENERAL STRUCTURAL MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 2ND & 3RD FLOORS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EG$500,000
2018-05-15Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON ALL FLOORS, AS INDICATED ON THE DRAWINGS. ALT-1 BEING FILED TO ESTABLISH USE ON FLOORS 2 THROUGH 10.
2018-05-15Job filed: GENERAL MECHANICAL & PLUMBING MODIFICATIONS TAKING PLACE ON THE 2ND & 3RD FLOORS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES$78,000
2018-05-15Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE BETWEEN THE CELLAR & THE 3RD FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS $1,500,000
2018-05-15Job filed: MECHANICAL & PLUMBING MODIFICATIONS TAKING PLACE ON ALL FLOORS, AS INDICATED ON THE DRAWINGS. ALT-1 BEING FILED TO ESTABLISH USE ON FLOORS 2 THROU
2018-05-15Job filed: GENERAL STRUCTURAL MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 2ND & 3RD FLOORS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EG$500,000
2018-05-15Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE BETWEEN THE CELLAR & THE 3RD FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS $1,500,000
2018-05-15Job filed: MECHANICAL & PLUMBING MODIFICATIONS TAKING PLACE ON ALL FLOORS, AS INDICATED ON THE DRAWINGS. ALT-1 BEING FILED TO ESTABLISH USE ON FLOORS 2 THROU
2018-05-14SAGE — from 33 REALTY ASSOCIATES to ATLASSIAN INC; 880 BROADWAY TENANT LLC
2018-05-04Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON ALL FLOORS, AS INDICATED ON THE DRAWINGS. ALT-1 BEING FILED TO ESTABLISH USE ON FLOORS 2 THROUGH 10$4,900,000
2018-05-04Job filed: INSTALLATION OF MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION AND POST-FIRE SMOKE PURGE IN THE SUB, CEL, $70,000
2018-05-03Permit Supported Scaffold — Signed-off
2018-05-03Permit EW — ISSUED
2018-05-03Permit EW — ISSUED
2018-05-02Job filed: Installation of temporary supported scaffold for Landmark Mock-Up per plan submitted. Work shall comply with 2014 building codes chapter 33. No change
2018-04-24311: Taxi Complaint — Driver Complaint
2018-04-11Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE FACADE AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2018-04-11Job filed: CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE FACADE AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$900,000
2018-04-10Job filed: GENERAL SPRINKLER MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,000
2018-04-10Job filed: GENERAL FIRE ALARM MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,500
2018-04-03Boiler inspection
2018-04-03Boiler inspection
2018-03-27DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2017
2017
2017-12-29Mortgage $11,520,889 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC$11,520,889
2017-12-29ASSTO — from TREVOR HILL ASSOCIATES, LLC to 880 BROADWAY TENANT, LLC
2017-12-29MLEA — from 880 BROADWAY TENANT LLC to AMMA421, LLC
2017-12-29Agreement — from 888 BROADWAY FUNDING LLC to AMMA421, LLC
2017-12-29Mortgage $72,311,068 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC$72,311,068
2017-12-29Mortgage $22,488,043 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC$22,488,043
2017-12-29EASE — from HUDRUF REALTY, L.L.C.; 880 BROADWAY OWNER, LLC; THE BOARD OF MANAGERS OF; 880 BROADWAY TEN to 880 BROADWAY TENANT, LLC; AMMA421, LLC; 880 BROADWAY OWNER, LLC
2017-12-29AL&R $11,520,889 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC$11,520,889
2017-12-29AL&R $22,488,043 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC$22,488,043
2017-12-29AL&R $72,311,068 — from 880 BROADWAY TENANT, LLC to 888 BROADWAY FUNDING LLC$72,311,068
2017-12-20RPTT&RET $40,000,000 — from TREVOR HILL ASSOCIATES, LLC to 880 BROADWAY TENANT, LLC$40,000,000
2017-12-12MLEA — from 33 REALTY ASSOCIATES to TREVOR HILL ASSOCIATES, LLC
2017-10-17Cooling tower inspection — violation AH8C
2017-10-17Cooling tower inspection — violation AH8S
2017-10-17Cooling tower inspection — violation AH8F
2017-10-17Cooling tower inspection — violation AH8M
2017-10-17Cooling tower inspection — violation AH8M
2017-10-17Cooling tower inspection — violation AH8S
2017-10-17Cooling tower inspection — violation AH8B
2017-10-17Cooling tower inspection — violation AH8L
2017-10-17Cooling tower inspection — violation AH8T
2017-10-17Cooling tower inspection — violation AH8L
2017-10-17Cooling tower inspection — violation AH8V
2017-10-17Cooling tower inspection — violation AH8C
2017-10-17Cooling tower inspection — violation AH8B
2017-10-17Cooling tower inspection — violation AH8T
2017-10-17Cooling tower inspection — violation AH8W
2017-10-17Cooling tower inspection — violation AH8V
2017-10-17Cooling tower inspection — violation AH8W
2017-10-17Cooling tower inspection — violation AH8G
2017-10-17Cooling tower inspection — violation AH8G
2017-10-10Agreement — from APPLE BANK FOR SAVINGS to TREVOR HILL ASSOCIATES LLC
2017-05-30311: Food Poisoning — 1 or 2
2017-04-17Permit EW — ISSUED
2017-04-11Permit EW — ISSUED
2017-04-10Job filed: PROPOSED MECHANICAL & BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$133,000
2017-04-10Job filed: PROPOSED MECHANICAL & BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$133,000
2017-04-06Permit EW — ISSUED
2017-02-18311: Street Condition — Pothole
2017-01-27DOB violation LANDMK:
2016
2016-11-04Permit EW — ISSUED
2016-09-14311: Taxi Complaint — Driver Complaint
2016-08-28311: Homeless Person Assistance — N/A
2016-07-06DOB violation E:
2016-07-06DOB violation E:
2016-06-30Job filed: PROPOSED SPRINKLER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$10,000
2016-06-14Permit EW — ISSUED
2016-06-10Permit EW — ISSUED
2016-05-18Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSION SYSTEM SHUT OFF VALVE HAS BEEN FILED AND APPROVED UNDER DOB# 122748893. NO CH$3,000
2016-05-18Job filed: INSTALL FIRE SUPPRESSION SYSTEM FOR SOLID FUEL COOKING EQUIPMENT ONLY AS SHOWN ON PLANS. NO GAS VALVE REQUIRED. NO CHANGE IN OCCUPANCY, USE, OR EGRESS$3,000
2016-05-18Job filed: INSTALL FIRE SUPPRESSION SYSTEM FOR SOLID FUEL COOKING EQUIPMENT ONLY AS SHOWN ON PLANS. NO GAS VALVE REQUIRED. NO CHANGE IN OCCUPANCY, USE, OR EGRESS$3,000
2016-05-12Job filed: PROPOSED MECHANICAL & BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$133,000
2016-04-28Permit EW — ISSUED
2016-04-28Permit PL — ISSUED
2016-04-25Job filed: INTERIOR RENOVATION AND STOREFRONT REPAIR WITH PARTITIONS AND FINISH WORK AS P ER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$73,000
2016-04-22Permit EW — ISSUED
2016-04-22Permit EW — ISSUED
2016-04-20Job filed: PROPOSED PLUMBING AND MINOR PARTITION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$19,000
2016-03-07Job filed: MODIFY KITCHEN EXHAUST SYSTEM ONLY AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$127,654
2016-03-02311: Food Establishment — Facility Construction
2016-02-11311: Food Establishment — Plumbing
2016-02-08Permit EW — ISSUED
2016-02-08Permit EW — ISSUED
2016-02-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015
2015-11-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-08-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-07-06Permit EW — ISSUED
2015-06-11Job filed: COVER EXISTING FLOOR WITH Q DECKING AND POUR NEW CEMENT FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY$101,000
2015-06-10311: Street Condition — Pothole
2015-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2015-03-04Permit EW — ISSUED
2015-03-04Permit PL — ISSUED
2015-03-03311: Taxi Complaint — Driver Complaint
2014
2014-11-15311: Broken Muni Meter — Timer Defect - Fast/Fail
2014-11-09311: Food Establishment — Food Contains Foreign Object
2014-08-13Job filed: APPLICATION IS FILED FOR REMOVAL OF EXISTING RANGE HOOD AND EQUIPMENT AND REPLACE WITH NEW. NEW ANSUL SYSTEM TO BE FILED UNDER SEPARATE APPLICATION. N$25,000
2014-07-17Permit EW — ISSUED
2014-07-17Permit EW — ISSUED
2014-06-30311: Consumer Complaint — Sidewalk Blocked
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-05-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-03-07Rodent inspection: Passed
2014-02-11311: Street Condition — Pothole
2014-01-16Permit EW — ISSUED
2014-01-12FDNY inspection (RISK)
2013
2013-12-05Job filed: INSTALL NEW KITCHEN FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.$3,000
2013-12-02Job filed: REMOVE EXISTING EXTERIOR GREASE DUCT AND FAN. INSTALL NEW KITCHEN EXHAUST SYSTEM ONLY AS SHOWN ON PLANS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.$35,000
2013-07-19Permit EQ — ISSUED
2013-07-09Permit AL — ISSUED
2013-06-14Job filed: PA
2013-06-14Job filed: PA
2013-06-07311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-05-31311: Noise — Noise: air condition/ventilation equipment (NV1)
2013-04-10Agreement $12,000,000 — from 33 REALTY ASSOCIATES to APPLE BANK FOR SAVINGS$12,000,000
2013-04-10Mortgage assigned — from M&T REAL ESTATE TRUST to APPLE BANK FOR SAVINGS
2013-04-10Mortgage $7,476,211 — from 33 REALTY ASSOCIATES to APPLE BANK FOR SAVINGS$7,476,211
2013-04-10TL&R — from M&T REAL ESTATE TRUST
2013-04-10AL&R $12,000,000 — from 33 REALTY ASSOCIATES to APPLE BANK FOR SAVINGS$12,000,000
2013-04-08311: Food Poisoning — 3 or More
2013-04-08311: Food Poisoning — 3 or More
2013-04-08311: Food Poisoning — 3 or More
2013-03-13311: Noise — Noise: Construction Before/After Hours (NM1)
2013-03-12DOB complaint, category ?
2012
2012-12-07Rodent inspection: Passed
2012-11-16311: Industrial Waste — Chemical Spill (IAC)
2012-09-26Job filed: REMOVE AND INSTALL NEW HVAC DUCTWORK. REMOVE AND RELOCATE EXISTING AC UNIT. INSTALL NEW AC UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$53,500
2012-09-26Job filed: REMOVE AND RELOCATE EXISTING SPRINKLER HEADS AND INSTALL NEW HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$27,000
2012-09-26Job filed: INSTALL NEW FIRE RATED AND INTERIOR PARTITIONS AS SHOWN ON DRAWINGS FOR RESTAURANT (LE PAIN DINING) NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2012-07-24Permit EQ — ISSUED
2012-06-08Job filed: MINOR PARTITION WORK ON THE 1ST & MEZZANINE FLOORS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$89,000
2012-06-08Job filed: MINOR PARTITION WORK ON THE 1ST & MEZZANINE FLOORS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$89,000
2012-06-08Job filed: INSTALLATION OF FIRE SMOKE DAMPERS ON THE 1ST & MEZZ FLOORS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2012-06-08Job filed: INSTALLATION OF FIRE SMOKE DAMPERS ON THE 1ST & MEZZ FLOORS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-04-19Facade (LL11) filing, cycle 6: SAFE
2012-04-19Facade (LL11) filing, cycle 7: SAFE
2012-04-13Permit EQ — ISSUED
2012-04-05Job filed: FILED HEREWITH INSTALLATION OF ROOF PROTECTION AS PER PLANS DURING BUILDING ALTERATION. ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2008 COD
2012-04-04Permit EW — ISSUED
2012-04-02Permit EW — ISSUED
2012-03-31311: Broken Muni Meter — Coin or Card Did Not Register
2011
2011-12-06DOB violation LL11/98:
2011-12-06DOB violation LL11/98:
2011-12-01Facade (LL11) filing, cycle 6: SAFE
2011-12-01Facade (LL11) filing, cycle 7: SAFE
2011-08-29Permit EQ — ISSUED
2011-08-26Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-08-26Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-08-26Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-08-25Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-08-25Permit EQ — ISSUED
2011-08-15Job filed: EXTERIOR REPAIRS AS PER PLANS FILED. THERE IS NO CHANGE TO OCCUPANCY USE OR EGRESS.$229,000
2011-08-15Job filed: EXTERIOR REPAIRS AS PER PLANS FILED. THERE IS NO CHANGE TO OCCUPANCY USE OR EGRESS.$135,000
2011-06-28DOB violation E:
2011-06-28DOB violation E:
2011-06-27Rodent inspection: Passed
2011-06-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-06-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-06-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33
2011-06-23Permit EQ — ISSUED
2011-06-23Permit EQ — ISSUED
2011-06-17311: For Hire Vehicle Complaint — Driver Complaint
2011-05-20ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG.NORTH ELEVATION (EXP.#1).OBSERVE CRACKS AND DISPLACEMENT IN UPPER FACADE(NORTH/EASTEND);SPALLING$500
2011-04-13311: Street Condition — Pothole
2011-03-28Job filed: ADDITIONS/MODIFICATION OF EXISTING BUILDING FIRE ALARM SYSTEM.$3,000
2011-03-18Job filed: FILING TO ESTABLISH RESTAURANT USE ON THE CELLAR, 1ST FLOOR. THIS APPLICATION WILL SUPERSEDE PREVIOUS ALT 1 #101750277 WHICH WAS NEVER COMPLETED . MIN$458,000
2011-03-17311: Food Establishment — Food Contaminated
2011-03-11311: Food Establishment — Kitchen/Food Prep Area
2011-02-11311: Food Poisoning — 1 or 2
2011-02-04Job filed: FILING TO ESTABLISH RESTAURANT USE ON THE CELLAR & 1ST FLOOR TO REFLECT RESTAU RANT USE. THIS APPLICATION WILL SUPERSEDE PREVIOUS ALT-1 FILED #101$30,000
2011-02-03311: Noise — Noise: Air Condition/Ventilation Equip, Residential (NJ1)
2011-01-30311: Taxi Complaint — Driver Complaint
2011-01-30311: Noise — Noise: Air Condition/Ventilation Equip, Commercial (NJ2)
2011-01-25ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS PERIODIC INSP OF EXTERIOR WALLS AND AP$2,000
2010
2010-10-26Job filed: INSTALLATION OF FIRE SMOKE DAMPERS ON THE 1ST & MEZZANINE FLOORS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2010-10-26Job filed: MINOR PARTITION WORK ON THE 1ST & MEZZANINE FLOORS. NO CHANGE IN EGRESS, USE O R OCCUPANCY.$15,000
2010-07-30Job filed: MANUAL SMOKE/HEAT DETECTION/SPRINKLER ALARM SYSTEM$50,000
2010-07-30Job filed: MANUAL SMOKE/HEAT DETECTION/SPRINKLER ALARM SYSTEM$50,000
2010-06-21DOB violation E:
2010-06-21DOB violation E:
2010-06-16Rodent inspection: Passed
2010-05-28Job filed: PA
2010-05-28Job filed: PA
2010-05-28Job filed: PA
2010-05-14311: Taxi Complaint — Driver Complaint
2010-04-28ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEW/CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND$800
2008
2008-11-28ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS$800
2008-06-24ECB Hazardous violation: 27-127 FAILURE TO MAINTAIN EXTERIOR BLDG WALL DEFECT NOTED: ON 7TH FL @ FRONT OF PREMISES BRKK @ FASADE HAS LOOSEN & PORTION OF BR$800
2008-06-24DOB complaint, category ?
2008-02-20DOB violation E:
2008-02-20DOB violation E:
2007
2007-11-30DOB violation LL1198:
2007-09-13Job filed: LUCY'S, PIPA & LE PAIN
2007-09-13Job filed: LUCY'S, PIPA & LE PAIN
2007-04-09DOB violation E:
2007-04-09DOB violation E:
2007-02-16Permit PL — ISSUED
2006
2006-11-08Permit PL — ISSUED
2005
2005-10-01DOB violation LL1081:
2005-06-21ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY # ALT 101750277-1ST FEET REMEDY:OBTAIN VALID C/O$180
2005-06-03DOB complaint, category ?
2005-05-17Permit PL — ISSUED
2004
2004-11-16ECB Hazardous violation: FAILURE TO FILE AN AMENDED FIFTH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED I
2004-11-09Permit EW — ISSUED
2004-11-03Job filed: Removal of paint coat at stone, patch deteriorating stone, repoint brick, replace brick and provide flashing at East 19th and East 18th Street facades$25,000
2004-10-15Permit EQ — ISSUED
2004-10-15Permit EQ — ISSUED
2004-10-14Job filed: Install heavyduty sidewalk shed 48 ft on 35 East 18th Street - during remedial repairs. Work shall comply with LL33/91. No change in use egress or occ
2004-10-13DOB violation LANDMK:
2004-10-12Permit EQ — ISSUED
2004-10-08Job filed: Install heavy duty sidewalk shed a total of 90 ft long at 38 East 19 Street, - during remedial repairs. Work shall comply with LL33/91. No change in
2004-06-04DOB violation LL11/98:
2004-05-18ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG.FACADE ISSUES:(1)SOUTH ELEVATION PARPET WALLS SHOWS LOOSE AND MISSING BRICKS,OPEN JOINTS & CRACK
2004-01-23ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OR EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW$350
2003
2003-09-17DOB violation E:
2003-02-13AL&R — from M & T REAL ESTATE, INC. to 33 REALTY ASSOCIATES
2003-02-13Agreement — from 33 REALTY ASSOCIATES to M & T REAL ESTATE, INC.
2003-02-13CALR — from M & T REAL ESTATE, INC. to 33 REALTY ASSOCIATES
2003-02-13CALR — from M & T REAL ESTATE, INC. to 33 REALTY ASSOCIATES
2002
2002-10-25DOB violation E: 1F1003
2002-08-08DOB violation L1198:
2002-04-23DOB violation C:
2002-03-05ECB Non-Hazardous violation: 50Y14/74M07/73O02/41A07/36I11/40O02/57O02/25Q07/16B07/44Q07/02B01/37B01/15P07/ 74 PROVIDE TOE GUARD 16 PROVIDE BOTH GIBS ON SECURE
2001
2001-12-14DOB violation LANDMK:
2001-08-16DOB violation E: 1P13524
2000
2000-07-11DOB violation LANDMK:
2000-07-11DOB violation LANDMK:
2000-07-10DOB violation LANDMK:
2000-07-10DOB violation LANDMK:
2000-04-25ECB Non-Hazardous violation: 50Y14,57O02,55B07,32Q07. 50- MAIN MACHINE LEAKING OIL. 57- CLEAN PIT. 55- PROVIDE LIGHT IN PIT. 32- DUCTS IN PIT COVER.
2000-03-10DOB violation LL1081:
2000-02-14Mortgage $2,899,475 — from 33 REALTY ASSOCIATES to M & T REAL ESTATE, INC.$2,899,475
2000-02-14Mortgage assigned — from 33 REALTY ASSOCIATES to M & T REAL ESTATE, INC.
2000-02-14Agreement — from 33 REALTY ASSOCIATES to M & T REAL ESTATE, INC.
1999
1999-07-19DOB violation E: 1F10033
1999-06-17DOB complaint, category ?
1999-05-26DOB violation E: 1P13524
1999-05-26DOB violation E: 1F10033
1999-04-02Permit EW — ISSUED
1999-03-09Permit AL — ISSUED
1999-02-26Permit EW — ISSUED
1998
1998-11-20Permit PL — ISSUED
1998-11-16Permit EW — ISSUED
1998-11-16Permit EW — ISSUED
1997
1997-10-21ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYINGTO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. REM$500
1997-06-27Permit EW — ISSUED
1997-06-27Permit EW — ISSUED
1997-05-22Mortgage assigned — from 33 REALTY ASSOCIATES to M&T REAL ESTATE, INC.
1997-05-22Mortgage assigned — from MANUFACTURERS AND TRADERS TRUST COMPANY to M&T REAL ESTATE, INC.
1997-05-22Agreement — from 33 REALTY ASSOCIATES to M&T REAL ESTATE, INC.
1997-05-22Mortgage assigned — from EAST NEW YORK SAVINGS BANK to MANUFACTURERS AND TRADERS TRUST COMPANY
1995
1995-02-03ECB Non-Hazardous violation: FAILURE TO PROVIDE ADEQUATE EMERGENCY POWER EXIT LIGHTS ON MERCHNDISE FLOORS THROUGHOUT BLDG. FAILURE TO PROVIDE ADEQUATE DIRECTIO
1994
1994-05-31DOB violation LL1081:
1994-02-09Permit EW — ISSUED
1993
1993-11-22ECB Non-Hazardous violation: FAILURE TO PROVIDE ELEVATOR LANDING SIGNS AT EACH ELEVATOR BANK THROUGHOUT BLDG. FAILURE TO PROVIDE STAIR AND ELEVATOR ID SIGNS TH$400
1993-11-22ECB Non-Hazardous violation: FAILURE TO PROVIDE ADEQUATE EMERGENCY POWER EXIT LIGHTS ON VARIOUS FLSTHROUGHOUT BLDING. FAILURE TO PROVIDE DEIRECTION SIGNS FLOOR$1,050
1993-09-17Agreement — from 33 REALTY ASSOCIATES to EAST NEW YORK SAVINGS BK
1993-04-29Agreement — from 33 REALTY ASSOCIATES to EAST NEW YORK SVGS BK
1993-04-19Agreement — from EAST NEW YORK SAVINGS BK to ABC CARPET CO INC.
1993-03-11Permit EW — ISSUED
1992
1992-07-15Permit EQ — ISSUED
1992-07-01DOB violation LL1080:
1992-05-12Permit EW — ISSUED
1992-04-07DOB violation LL1081: 2
1992-03-31ECB Non-Hazardous violation: WORK WITHOUT PERMIT- AT TIME OF INSPECTION OF 5TH FLOOR NEW BATHROOM FIXTURES HAVE BEEN INSTALLED WITHOUT OBTAINING A MASTER PLUMB$720
1992-03-31ECB Non-Hazardous violation: WORK WITHOUT PERMIT-AT TIME OF INSPECTION DUCK WORK BEING INSTALLED FOR HIVAC SYSTEM ON 5TH FL DEPT RECORDE SHOW NO PERMITS ISSUED$720
1992-03-31ECB Non-Hazardous violation: WORK WITHOUT PERMITS-AT TIME OF INSPECTION SCOPE OF WORK ON 5TH FL CONSISTS OF SHEET ROCKING OF WALL PARTIONING OF COLUMNS ON WEST$720
1992-03-31DOB complaint, category ?
1991
1991-10-07DOB complaint, category ?
1991-10-04DOB complaint, category ?
1991-01-24Permit EW — ISSUED
1990
1990-01-03DOB violation E: (15)REMOVE ILLEGAL LOCK (KEY AND MANUAL). (74)REMOVE WOOD ON PLATFORM FROM TOP OF CAR
1990-01-03DOB violation E: (15)REMOVE ILLEGAL LOCK (KEY AND MANUAL).(74)OVERHEAD REMOVE CARD BOARD FROM GRATE AND SECURE SAME.(74)A*PROPERLY INSTALL ALL
1989
1989-10-13SAGE — from LANDMARKS PRSVN CMMSN
1989-04-03SMIS — from WILLIAMS REAL EST COINC to GREYHOUND FINCL CORP
1988
1988-11-30DOB violation E: (51)DATE & TAG FOR 5 YEAR SAFETY TEST
1988-11-30DOB violation E: (51)PROVIDE CABLE GUARD
1986
1986-11-25PAT — from COHEN, JEROME M to ROOS, EDWIN G
1986-11-25Agreement — from EAST NEW YORK SVGS BK to 33 REALTY ASSOCS
1986-11-25Mortgage assigned — from APPLE BANK SAVINGS to EAST NEW YORK SVGS BK
1986-11-25Mortgage $2,642,885 — from 33 REALTY ASSOCS to EAST NEW YORK SVGS BK$2,642,885
1983
1983-11-23Mortgage $900,000 — from 33 REALTY ASSOCIATES to APPLE BANK/SAVINGS$900,000
1982
1982-04-22Mortgage satisfied — from REGNIS HOLDING CORP.; JEFMAR REALTY CORP. to SINGER, NATHAN & ANO; HARLEM SAVINGS BANK; WILLIAM JOHN CORP.
1977
1977-04-13Agreement — from 216 18 NOMINEE CORP to MIDDLETOWN SAVINGS BANK
1977-04-07Mortgage assigned — from HARLEM SAVINGS BANK to MIDDLETOWN SAVINGS BANK
1977-04-07Mortgage assigned — from SINGER, STANLEY A; SINGER, RUTH M; SINGER, NATHAN DECD; SINGER, JOSEF H; SINGER, HAYWARD to MIDDLETOWN SAVINGS BANK
1977-04-07Deed — from 216 18 NOMINEE CORP to 33 REALTY ASSOCIATES
1977-04-07Deed — from 33 REALTY ASSOCIATES to 216 18 NOMINEE CORP
1972
1972-03-06Deed — from WILLIAMS BROKERAGE CORP to 33 REALTY ASSOCIATES
1972-03-06Agreement — from WILLIAMS BROKERAGE CORP to HARLEM SAVINGS BANK
1972-03-03Deed — from 33 REALTY ASSOCIATES to WILLIAMS BROKERAGE CORP

Support this site Back to the building page