Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
1 heat or hot-water complaints in the last three years (winter 2025–26: 1).
No bedbug-infested units reported in the last three years of filings.
$8,680 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
67 service requests in the last three years. Most common: Encampment (30) · Noise (13) · Homeless Person Assistance (6) · General Construction/Plumbing (4) · Non (3) · Consumer Complaint (3).
Filed construction activity
$3,879,555 in permitted construction work filed since
2016 (27 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$30,668,000
$13,800,600
2026
$31,238,000
$14,057,100
2027
$31,575,000
$14,208,750
The city's market estimate has risen
3% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 43/100, posted at the entrance by law (2022 disclosure cycle)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
33 St — 6 · 850 ft straight-line (about a 4-minute walk) · station accessibility: none 34 St-Herald Sq — B D F M N Q R W · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 34 St / 5 Av — M34-SBS M34A-SBS BM5 · 150 ft · Select Bus Service
Citi Bike
E 33 St & 5 Ave · 150 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
67 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $4,500,000 on
2026-03-20 (lender: Almalgamated Bank). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2026-03-20
AL&R $12,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK
$12,500,000
2026-03-20
Mortgage $4,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK
$4,500,000
2026-03-20
Agreement $12,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK
$12,500,000
2016-08-25
Mortgage $1,651,150 — from REGENCY ENTERPRISES to FIRST REPUBLIC BANK
$1,651,150
2016-08-25
Agreement $8,000,000 — from REGENCY ENTERPRISES to FIRST REPUBLIC BANK
$8,000,000
2016-08-25
AL&R $8,000,000 — from REGENCY ENTERPRISES to FIRST REPUBLIC BANK
$8,000,000
2012-01-23
Agreement $7,000,000 — from REGENCY ENTERPRISES to PRINCIPAL LIFE INSURANCE COMPANY
$7,000,000
2012-01-23
Mortgage $2,204,581 — from REGENCY ENTERPRISES to PRINCIPAL LIFE INSURANCE COMPANY
$2,204,581
2008-12-02
Mortgage $2,314,692 — from REGENCY ENTERPRISES, LP; F/K/A REGENCY ENTERPRISES to NEW YORK COMUNITY BANK
$2,314,692
2008-12-02
Agreement $5,000,000 — from NEW YORK COMUNITY BANK to F/K/A REGENCY ENTERPRISES; REGENCY ENTERPRISES, LP
$5,000,000
2008-12-02
AL&R $5,000,000 — from REGENCY ENTERPRISES, LP; F/K/A REGENCY ENTERPRISES to NEW YORK COMUNITY BANK
$5,000,000
2004-01-26
Mortgage $1,662,200 — from REGENCY ENTERPRISES LP to NORTH FORK BANK
$1,662,200
2004-01-26
Agreement $3,000,000 — from REGENCY ENTERPRISES LP to NORTH FORK BANK
$3,000,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
2023
51
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
14
3
2
0
1
20
2018
11
9
9
0
1
30
2019
6
3
8
0
1
18
2020
2
7
10
0
1
20
2021
1
7
17
0
1
26
2022
1
5
5
0
4
15
2023
0
3
12
0
2
17
2024
3
6
38
2
2
51
2025
9
2
19
0
2
32
2026
22
0
7
5
1
35
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS
Job filed: INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2026-07-30
Job filed: INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS & REPAIRS.
2026-07-28
Permit Suspended Scaffold — Permit Issued
2026-07-28
Permit Suspended Scaffold — Permit Issued
2026-07-22
Job filed: INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF, AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER
2026-07-10
311: Indoor Air Quality — Sewage Odor
2026-07-06
Permit Sidewalk Shed — Permit Issued
2026-06-30
Job filed: Facade restoration to include masonry, pointing, caulking, lintels, sills, terracotta, scrape, prime, and paint exposed steel.
2026-06-24
Facade (LL11) filing, cycle 10: UNSAFE
2026-05-06
Job filed: Overhead protection of adjacent building for fire escape repairs
2026-04-23
Permit Protection and Mechanical Methods — Permit Issued
2026-04-02
Permit Sidewalk Shed — Permit Issued
2026-03-27
Permit Supported Scaffold — Permit Issued
2026-03-27
Permit General Construction — Permit Issued
2026-03-27
Permit Structural — Permit Issued
2026-03-20
TL&R — from FIRST REPUBLIC BANK to REGENCY ENTERPRISES
2026-03-20
AL&R $12,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK
2026-03-20
Mortgage $4,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK
2026-03-20
Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to AMALGAMATED BANK
2026-03-20
Agreement $12,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK
2026-03-19
Job filed: Overhead protection of adjacent building for fire escape repairs
2026-03-16
Job filed: INSTALLATION AND USE OF TEMPORARY HOIST FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2026-03-13
311: Noise - Street/Sidewalk — Loud Music/Party
2026-01-29
311: Non-Residential Heat — Inadequate or No Heat
2026-01-27
Permit Suspended Scaffold — Permit Issued
2026-01-27
Permit Suspended Scaffold — Permit Issued
2026-01-13
Job filed: INSTALLATION AND USE OF TEMPORARY HOIST FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2026-01-12
311: Noise - Commercial — Car/Truck Music
2025-12-12
311: Noise - Residential — Loud Music/Party
2025-11-25
Permit General Construction — Permit Issued
2025-11-25
Permit Structural — Permit Issued
2025-11-14
DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2025-10-20
Restaurant inspection: ETC — grade B
The full timeline
2026
2026-10-13Permit Sidewalk Shed — Permit Issued
2026-09-17Job filed: INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS
2026-08-13311: Water Maintenance — Fire Hydrant Running
2026-08-10Job filed: INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2026-07-30Job filed: INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS & REPAIRS.
2026-07-22Job filed: INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF, AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER $10,020
2026-07-10311: Indoor Air Quality — Sewage Odor
2026-07-06Permit Sidewalk Shed — Permit Issued
2026-06-30Job filed: Facade restoration to include masonry, pointing, caulking, lintels, sills, terracotta, scrape, prime, and paint exposed steel.$439,585
2026-06-24Facade (LL11) filing, cycle 10: UNSAFE
2026-05-06Job filed: Overhead protection of adjacent building for fire escape repairs$1,000
2026-04-23Permit Protection and Mechanical Methods — Permit Issued
2026-03-27Permit General Construction — Permit Issued
2026-03-27Permit Structural — Permit Issued
2026-03-20TL&R — from FIRST REPUBLIC BANK to REGENCY ENTERPRISES
2026-03-20AL&R $12,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK$12,500,000
2026-03-20Mortgage $4,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK$4,500,000
2026-03-20Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to AMALGAMATED BANK
2026-03-20Agreement $12,500,000 — from REGENCY ENTERPRISES to ALMALGAMATED BANK$12,500,000
2026-03-19Job filed: Overhead protection of adjacent building for fire escape repairs$1,000
2026-03-16Job filed: INSTALLATION AND USE OF TEMPORARY HOIST FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2026-01-13Job filed: INSTALLATION AND USE OF TEMPORARY HOIST FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2026-01-12311: Noise - Commercial — Car/Truck Music
2025-07-24Job filed: Facade Repairs, and no change in use, egress or occupancy$465,000
2025-07-22Job filed: INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS
2025-07-20Job filed: Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.$1,000
2025-07-16311: Encampment — N/A
2025-07-16311: Encampment — N/A
2025-07-01311: Noise - Vehicle — Car/Truck Music
2025-06-26311: Noise - Vehicle — Car/Truck Music
2025-06-23311: Homeless Person Assistance — Non-Chronic
2025-06-23311: Encampment — N/A
2025-06-23311: Encampment — N/A
2025-06-09Permit Sidewalk Shed — Permit Issued
2025-04-08ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND$6,280
2025-03-25311: Consumer Complaint — Other Store (Non-Food)
2024-12-03311: Non-Emergency Police Matter — Other (complaint details)
2024-11-26311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2024-11-26DOB complaint, category ?
2024-11-19Restaurant inspection: ETC — grade C
2024-11-11311: Encampment — N/A
2024-11-01311: Encampment — N/A
2024-11-01311: Encampment — N/A
2024-09-28311: Encampment — N/A
2024-09-28311: Encampment — N/A
2024-09-18311: Encampment — N/A
2024-09-18311: Encampment — N/A
2024-09-17311: Encampment — N/A
2024-09-16311: Encampment — N/A
2024-09-16311: Encampment — N/A
2024-09-13311: Encampment — N/A
2024-09-13311: Encampment — N/A
2024-09-12311: Encampment — N/A
2024-09-12311: Encampment — N/A
2024-09-12311: Encampment — N/A
2024-09-12311: Homeless Person Assistance
2024-09-11311: Encampment — N/A
2024-09-11311: Encampment — N/A
2024-09-11311: Encampment — N/A
2024-09-11311: Encampment — N/A
2024-09-09311: Encampment — N/A
2024-09-05311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-09-05DOB complaint, category ?
2024-08-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-08-21311: Encampment — N/A
2024-08-19ECB CLASS - 2 violation: AT 3:40AM OBSERVED 17 STORY BUILDING WITH SWS INSTALLED AT EXP#1 THAT WAS NOT ILLUMINATED AS STIPULATED IN BC3307.6.4.8 CREATES HA$2,400
2024-08-10311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-06-20Job filed: INSTALLATION AND USE OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000
2024-06-19311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2024-06-19DOB complaint, category ?
2024-06-07Job filed: INSTALLATION AND USE OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$1,000
2024-04-10Mortgage assigned — from JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2024-04-10Mortgage assigned — from JPMORGAN CHASE BANK, N.A.; FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION to JPMORGAN CHASE BANK NATIONAL ASSOCIATION
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2022-02-02311: Illegal Parking — Unauthorized Bus Layover
2022-01-30311: Consumer Complaint — Travel Agency
2022-01-27Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $70,000
2022-01-10ECB CLASS - 1 violation: NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER$1,250
2021
2021-12-22311: Face Covering Violation — Mandate Not Enforced
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-11-26311: Elevator — Elevator - Multiple Devices On Property
2021-11-26DOB complaint, category ?
2021-11-02311: Homeless Person Assistance
2021-11-01ECB CLASS - 2 violation: 27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE FINAL SPRINKLER REPORT PREPARED BY REGIS$3,125
2021-07-28ECB CLASS - 2 violation: 1ST FL OCCUPIED AS ADULT PHYSICAL CULTURE ESTABLISHMENT & PHYSICAL CULTURE ESTABLISHMENT CLEANING BUSINESS AS A MASSAGE PARLOR(AS
2020-07-13ECB CLASS - 2 violation: SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRIKLERS & FILE A FINAL SPRINKLER REPORT PREPA$3,125
2020-07-01311: NonCompliance with Phased Reopening — Business not in compliance
2020-06-29311: Non-Emergency Police Matter — Face Covering Violation
2020-06-29DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019)
2020-06-25Boiler inspection
2020-03-19311: Broken Parking Meter — Coin or Card Did Not Register
2020-02-13ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTEN
2020-02-06311: Noise - Vehicle — Car/Truck Music
2020-02-04311: Noise - Vehicle — Car/Truck Music
2020-02-01311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2020-01-27Permit EW — ISSUED
2019
2019-12-08311: Lost Property — Electronics/Phones
2019-11-29311: Broken Parking Meter — No Receipt
2019-11-18311: For Hire Vehicle Report — Driver Report - Passenger
2019-11-15ECB CLASS - 2 violation: SEC. A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PR$1,250
2019-04-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
2019-04-05311: Consumer Complaint — Receipt Incomplete/Not Given
2019-04-05Permit PL — ISSUED
2019-04-03Permit EW — ISSUED
2019-04-02Job filed: INTERIOR ALTERATIONS TO ENTIRE 5TH FLOOR. PARTITIONS, CEILINGS AND PLUMBING FOR OFFICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$418,000
2019-02-25311: Sanitation Condition — 12 Dead Animals
2019-02-08Boiler inspection
2018
2018-12-12DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-11-08ECB CLASS - 2 violation: 70O2,80M7,100O2-ENTIRE SHAFTWAY DIRTY CLEAN.$3,125
2018-11-01ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35355257X ISSUED ON 09/09/18 AND TO FILE A CERTIFICATE $625
2018-10-23Eviction executed
2018-10-12DOB violation E:
2018-10-05311: For Hire Vehicle Complaint — Driver Complaint
2018-10-04FDNY inspection (SPECIAL-OTH)
2018-09-25Permit AL — ISSUED
2018-09-19311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2018-09-19ECB CLASS - 1 violation: FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.AT 1ST FLOOR REAR OF LOBBY FIRE EXIT PASSAGE BLOCKED WITH CARTS,GARBAGE,AND CONSTR$1,250
2018-09-19DOB complaint, category ?
2018-09-17311: General Construction/Plumbing — Failure To Maintain
2018-06-12Job filed: INSTALLATION OF MANUAL, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION. ARCS FILED UNDER A SEPARATE APPLICATI$177,000
2018-06-12Job filed: INSTALLATION OF MANUAL, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH VOICE COMMUNICATION. ARCS FILED UNDER A SEPARATE APPLICATI$177,000
2018-06-07Job filed: INSTALLATION OF NEW SPRINKLER SYSTEM INCLUDING SPRINKLER BOOSTER PUMP AND RISERS.$472,050
2018-04-12311: PAINT/PLASTER — WALL
2018-04-12311: PLUMBING — BASIN/SINK
2018-04-12Tenant complaint: PLUMBING — BASIN/SINK
2018-04-12Tenant complaint: PAINT/PLASTER — WALL
2018-03-27DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017)
2018-03-22Permit EW — ISSUED
2018-03-22Permit PL — ISSUED
2018-03-20Job filed: FILING APPLICATION TO ACTIVATE GAS PORTION OF EXISTING GAS/OIL BURNER IN CELLAR. INSTALLATION OF NEW GAS METER AND BOOSTER PUMP. INSTALLATION OF NEW C$201,000
2018-03-19Job filed: INSTALLATION OF MANUAL AUTOMATIC SMOKE/CO DETECTION/HEAT & SPRINKLER FA SYSTEM NO CHANGE IN USE OCCUPANCY OR EGRESS$25,200
2018-03-19Permit EW — ISSUED
2018-03-16Job filed: INSTALL THE FIRE KITCHEN SUPPRESSION SYSTEM. NO CHANGE IN USE , ERGRESS OR OCCUPANCY.$5,000
2018-02-07Boiler inspection
2017
2017-12-13Job filed: INTERIOR RENOVATION ON FIRST, MEZ, AND CELLAR LEVEL AS PER PLAN. OBTAIN NEW C OF O$10,000
2017-11-21Permit PL — ISSUED
2017-11-11Permit EW — ISSUED
2017-11-10Permit EW — ISSUED
2017-11-09Permit EW — ISSUED
2017-11-06Permit EW — ISSUED
2017-11-05Job filed: FILE FOR MECHANICAL AND SPRINKLER WORK AS PER PLAN, NO CHANGE IN USE, OCCUPANCY OR EGRESS.$127,850
2017-11-05Job filed: FILE STRUCTURAL WORK TYPE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS$85,000
2017-11-05Job filed: FILE FOR MECHANICAL AND SPRINKLER WORK AS PER PLAN, NO CHANGE IN USE, OCCUPANCY OR EGRESS.$127,850
2017-11-05Job filed: FILE STRUCTURAL WORK TYPE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS$85,000
2017-11-02ECB CLASS - 2 violation: 97X10/(97-X)RETURN ELEVATOR TO SERVICE.$250
2017-11-02Job filed: INTERIOR RENOVATION AS PER PLAN. WORK WILL INCLUDE EXTERIOR WORK ON THE STOREFRONT. NO CHANGE IN USE OCCUPANCY AND EGRESS.$298,000
2017-11-02Job filed: INTERIOR RENOVATION AS PER PLAN. WORK WILL INCLUDE PLUMBING, MECHANICAL, SPRINKLER AND STRUCTURAL WORK. NO CHANGE IN USE OCCUPANCY AND EGRESS.$173,000
2017-11-02Job filed: INTERIOR RENOVATION AS PER PLAN. WORK WILL INCLUDE PLUMBING, MECHANICAL, SPRINKLER AND STRUCTURAL WORK. NO CHANGE IN USE OCCUPANCY AND EGRESS.$173,000
2017-10-12311: Elevator — Elevator - Defective/Not Working
2017-10-12DOB complaint, category ?
2017-09-07Boiler inspection — defects found
2017-05-17Job filed: RENOVATION OF STOREFRONT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2017-02-16DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016)
2016-08-25Mortgage $1,651,150 — from REGENCY ENTERPRISES to FIRST REPUBLIC BANK$1,651,150
2016-08-25Agreement $8,000,000 — from REGENCY ENTERPRISES to FIRST REPUBLIC BANK$8,000,000
2016-08-25AL&R $8,000,000 — from REGENCY ENTERPRISES to FIRST REPUBLIC BANK$8,000,000
2016-08-25Mortgage assigned — from PRINCIPAL LIFE INSURANCE COMPANY to FIRST REPUBLIC BANK
2016-06-14311: Taxi Complaint — Driver Complaint
2016-06-01DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS(2015)
2016-05-11311: Homeless Person Assistance — N/A
2016-04-01Permit EQ — ISSUED
2016-03-30Job filed: HEREWITH FILING A PLYWOOD FENCE APPLICATION 61'-0" IN LENGHT DURING STORE FRONT REAPIR. THERE IS NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLIC
2015
2015-12-11311: Broken Muni Meter — Coin or Card Did Not Register
2015-12-04Job filed: REMOVAL OF INTERIOR PARTITIONS, CEILINGS, FINISHES AND STOREFRONTS AT ENTIRE FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$30,000
2015-12-04Job filed: REMOVAL OF INTERIOR PARTITIONS, CEILINGS, FINISHES AND STOREFRONTS AT ENTIRE FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$30,000
2012-07-26Job filed: INTERIOR ALTERATIONS TO SUITE 900 / 9TH FLOOR. PARTITIONS, CEILINGS AND PLUMBING FOR DENTAL OFFICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$124,000
2012-07-26Job filed: INTERIOR ALTERATIONS TO SUITE 900 / 9TH FLOOR. PARTITIONS, CEILINGS AND PLUMBING FOR DENTAL OFFICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$124,000
2010-01-27ECB CLASS - 2 violation: FAIL TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTEDD TO EMERGENCY POWER SOURCE/STORAGE BATTE$4,000
2009
2009-12-22Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING MCDONALD'S RESTAURANT; WORK INVOLVES INSTALLATION OF NEW LIGHTING & NEW WALL FINISHES, REPAIRING OF EXT'G$41,496
2009-08-27DOB violation E:
2009-05-04DOB complaint, category ?
2009-05-04DOB complaint, category ?
2008
2008-12-02TL&R — from CAPITAL ONE, NA to REGENCY ENTERPRISES, LP
2008-12-02Mortgage assigned — from CAPITAL ONE, NA to NEW YORK COMUNITY BANK
2008-12-02Mortgage $2,314,692 — from REGENCY ENTERPRISES, LP; F/K/A REGENCY ENTERPRISES to NEW YORK COMUNITY BANK$2,314,692
2008-12-02Agreement $5,000,000 — from NEW YORK COMUNITY BANK to F/K/A REGENCY ENTERPRISES; REGENCY ENTERPRISES, LP$5,000,000
2008-12-02AL&R $5,000,000 — from REGENCY ENTERPRISES, LP; F/K/A REGENCY ENTERPRISES to NEW YORK COMUNITY BANK$5,000,000
2008-11-28ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WAL
2008-09-25ECB CLASS - 1 violation: FAILURE TO FILE AFFIDAVITS AND/OR COMPLY W/OTHER REQUIREMENTS SET FORTH FOR PHOTOLUMINESCENT EXIT PATH MARKING.REMEDY:COMPLY W/REQ$2,400
2008-03-31DOB violation LL2604E:
2008-03-19Permit EW — ISSUED
2008-03-11Permit PL — ISSUED
2008-02-27DOB violation E:
2008-02-27DOB violation E:
2008-02-27DOB violation E:
2008-01-30Job filed: Alterations to existing office on11th floor (Suite 1100). New partitons plumbing. No change to use, egress or occupancy.$30,000
2008-01-30Job filed: Alterations to existing office on11th floor (Suite 1100). New partitons plumbing. No change to use, egress or occupancy.$30,000
2007-06-01Job filed: Alterations to existing office on 3rd floor. New partitons and a.c. ductwork. 2 new 5 ton airhandler and 1 new 5 ton condenser to be installed . No ch$90,000
2007-06-01Job filed: Alterations to existing office on 3rd floor. New partitons and a.c. ductwork. 2 new 5 ton airhandler and 1 new 5 ton condenser to be installed . No ch$90,000
2007-04-13Facade (LL11) filing, cycle 6: SAFE
2007-04-11DOB violation E:
2007-04-11DOB violation E:
2007-04-11DOB violation E:
2007-03-10DOB complaint, category ?
2007-01-19DOB violation LL6291:
2007-01-10Tenant complaint: HEATING — HEAT RELATED
2007-01-09Permit PL — ISSUED
2006
2006-12-05Job filed: Alterations to existing office on 16th floor. Partitions and plumbing. No change to use, egress or occupancy.$55,000
2006-12-05Job filed: Alterations to existing office on 16th floor. Partitions and plumbing. No change to use, egress or occupancy.$55,000
2006-12-05Permit EW — ISSUED
2006-11-30ECB Hazardous violation: WORK W/O PERMIT AT ELEVATOR LOBBY & OCCUPIED OFFICES.DID DEMOLITION TO WALLS CEILINGS AND ELECTRICAL TO CHANGE & REARRANGE ROOM CO$800
2006-11-29DOB complaint, category ?
2006-11-29DOB complaint, category ?
2006-11-24DOB complaint, category ?
2006-11-01DOB violation LL2604:
2006-10-27Permit SG — ISSUED
2006-02-23DOB violation E:
2006-02-23DOB violation E:
2006-02-23DOB violation E:
2005
2005-10-28Tenant complaint: HEATING — HEAT RELATED
2005-04-14DOB violation E:
2005-04-14DOB violation E:
2005-04-14DOB violation E:
2005-01-27Permit PL — ISSUED
2005-01-27Permit EW — ISSUED
2005-01-26Job filed: Alterations to existing office. Partitions and plumbing. No change to use, egress or occupancy.$25,000
2005-01-03ECB Non-Hazardous violation: WORK WITHOUT A PERMIT INTERIOR DEMLITION. REMOVAL OF PARTITIONS ON THE2 FL(SOUTHSIDE). REMEDY:STOP ALL WORK UNTIL PERMIT IS OBTAIN$250
2004
2004-12-29DOB complaint, category ?
2004-05-10ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW
2004-05-05DOB violation E:
2004-05-05DOB violation E:
2004-05-05DOB violation E:
2004-03-17Permit EW — ISSUED
2004-02-13DOB violation LL6291:
2004-02-13DOB violation LL6291:
2004-01-26TL&R — from JP MORGAN INVESTMENT MANAGEMENT INC
2004-01-26Mortgage assigned — from JP MORGAN INVESTMENT MANAGEMENT INC to NORTH FORK BANK
2004-01-26Mortgage $1,662,200 — from REGENCY ENTERPRISES LP to NORTH FORK BANK$1,662,200
2004-01-26Agreement $3,000,000 — from REGENCY ENTERPRISES LP to NORTH FORK BANK$3,000,000
2004-01-26AL&R — from NORTH FORK BANK to REGENCY ENTERPRISES LP
2003
2003-07-08DOB violation E:
2003-07-08DOB violation E:
2003-07-08DOB violation E:
2003-03-19DOB violation LL6291:
2003-03-19DOB violation LL6291:
2003-02-14Job filed: Renovate first floor lobby. Replace metal ceiling with new suspended drywall ceiling. Stone veneer on new masonry wall. Replace entrance doors. No cha$20,000
2003-02-14Permit EW — ISSUED
2002
2002-08-08DOB violation L1198:
2002-07-17ECB Hazardous violation: EXIT DOOR TOTAL OBSTRUCTION. MARKED REAR EGRESS DOOR AT OVER OCCUPIED COOKING KITCHEN IS FULLY OBSTRUCTED BY STORAGE OF MATERIALS $480
2002-07-17DOB violation C:
2002-07-17ECB Non-Hazardous violation: HAVING DOUBLE FACED SIGNAGE PROJECTING MORE THAN 18" ACROSS THE STREET LINE IN A C-5 DISTRICT. REMEDY: REMOVE ILLEGAL SIGNAGE.$2,500
2002-06-25DOB violation E: 1S2403
2002-03-26DOB violation LL6291:
2002-03-11Permit AL — ISSUED
2002-02-22Job filed: Partitions at 3rd floor office. No change to use, egress or occupancy.$7,000
2002-02-22Job filed: Partitions at 3rd floor office. No change to use, egress or occupancy.$7,000
2001
2001-12-26ECB Non-Hazardous violation: FAILURE TO COMPLY WITH LL58/57 NOTED: BATHROOMS DO NOT COMPLY WITH LL58/57 NOTED: WHEELCHAIR ACCESS OBSLRUCTED BY RASED FLOORING,
2001-12-26ECB Non-Hazardous violation: WORK WITHOUT A PERMIT. WORK NOTED: REMOVED INTERIOR MASANCY PARTITIONS AND INSTALLED NEW DRYWALL WITHOUT A PERMIT. NOTED LOCATION,
2001-10-09Permit EW — ISSUED
2001-09-21ECB Non-Hazardous violation: EMERGENCY EXIT LIGHT DOES NOT MEET THE REQUIREMENTS OF TH ECOMMISSIONER. {BUREAU OF ELECTRICAL CONTROL (BEC) CERTIFICATION OF INSP$800
2001-09-10DOB violation C:
2001-07-10Job filed: The shall include extrior facade restoration, partial parapet replacement and fire escape restoration as shown on dwgs. NO CHANGE IN USE, OCCUPANCY OR$85,000
2001-07-10Job filed: The shall include extrior facade restoration, partial parapet replacement and fire escape restoration as shown on dwgs. NO CHANGE IN USE, OCCUPANCY OR$85,000
2001-04-18ECB Non-Hazardous violation: EMERGENCY EXIT LIGHTING DOES NOT MEET THE REQUIREMENT OF THE COMMISSIONER.BUREAU OF ELECTRICAL CONTROL(BEC)CERTIFICATION OF INSPEC
2001-04-10Permit EQ — ISSUED
2000
2000-11-03ECB Non-Hazardous violation: EMERGENCY EXIT LIGHTING DOES NOT MEET THE REQUIREMENTS OF THE COMMISSIONER. (BUREAU OF ELECTRICAL CONTROL (BEC) C OF O REQUIRED) E$800
2000-10-13Permit EQ — ISSUED
2000-10-04Job filed: INSTALL HEAVY DUTY SIDEWALK SHED:120' LONG WORK SHALL COMPLY WITH LL33/91 NO CHANGE IN USE EGRESS OR OCCUPANCY
2000-09-21DOB violation C:
2000-09-21DOB violation C:
2000-09-07ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT NOTED:TERACOTTA AND BRICK MASONRY CRACKED AND DISPLACED WITH MORTAR JOINTS MISSI$800
2000-07-24DOB violation C:
2000-04-03ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WAQLL- HAZARDOUS NOTED: AT NORTH ELEVATION- WEST CORNER 13 FLOOR TERRACOTTA AND BRICK MASONR$2,000
2000-03-13DOB complaint, category ?
2000-03-10DOB violation C:
2000-02-22ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL.NOTED:AT NORTH ELEVATION WEST CORNER 14TH FLOOR TERRACOTTA AND BRICK MASONRY CRACKED AN$800
1999
1999-03-16DOB violation LL6291:
1998
1998-11-25Permit EW — ISSUED
1998-11-25Permit EW — ISSUED
1998-11-18Permit EW — ISSUED
1998-07-13Mortgage assigned — from REGENCY ENTERPRISES to J.P. MORGAN INVESTMENT MANAGEMENT INC.
1998-07-13Agreement — from REGENCY ENTERPRISES to J.P. MORGAN INVESTMETN MANAGEMENT INC.
1998-05-04DOB violation LL6291:
1998-01-16Permit PL — ISSUED
1997
1997-12-19Permit EW — ISSUED
1997-12-19Permit EQ — ISSUED
1997-09-16DOB violation LL6291:
1997-08-25DOB violation Z:
1997-07-09ECB Non-Hazardous violation: FAILURE TO OBTAIN A CERTIFICATE OF ELECTRICAL INSPECTION FROM THE BUREAU OF ELECTRICAL CONTROL FOR THE INSTALLATION OF EMERGENCY
1997-05-15DOB violation Z:
1997-05-15DOB violation Z:
1997-05-15DOB violation C:
1997-04-24DOB complaint, category ?
1997-04-22DOB complaint, category ?
1997-04-22DOB complaint, category ?
1997-03-21Permit EW — ISSUED
1997-03-21Permit EW — ISSUED
1997-03-21Permit EQ — ISSUED
1996
1996-01-24Permit EW — ISSUED
1996-01-24Permit EW — ISSUED
1996-01-24Permit EQ — ISSUED
1995
1995-12-07ECB Hazardous violation: 74-CEESE USE OF ELEV 1P5819 SUCH TIME AS ALL NECESSARY REPAIR ARE MADE AND ALL OPERATIONAL TESTS AND SAFETY TESTS ARE WITNESSED BY
1995-12-06DOB complaint, category ?
1995-08-29DOB violation LL6291:
1995-08-07ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYING TO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS REM
1995-06-01ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFYINGTO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS. RE$400
1995-06-01ECB Non-Hazardous violation: FAILURE TO PROVIDE EMERGENCY POWER EXIT LIGHTS ON STAIRCASE AND ADEQU-ATE EMERGENCY POWER EXIT LIGHTING IN CORRIDOR THROUGHOUT BUI$800
1991-11-21Mortgage assigned — from SINGER, HERMAN to J.P. MORGAN INVSTMNTETC
1991-11-21Mortgage assigned — from FIRST NEW YORK BK BSN to J.P. MORGAN INVTMNTETC
1991-11-21Mortgage satisfied — from REGENCY ENTERPRISES to STERN, HERMAN
1991-11-21Agreement — from REGENCY ENTERPRISES to J.P. MORGAN INVSTMNTETC
1991-11-21Agreement — from REGENCY ENTERPRISES to J.P. MORGAN INVSTMNTETC
1991-07-23DOB violation Z:
1991-06-13DOB complaint, category ?
1991-06-05ECB Non-Hazardous violation: 73#,PERFORM 5 YEAR TEST,PROPERLY TAG DEVICE AND FILE ELV3 FORM
1991-06-05ECB Non-Hazardous violation: 73#,PERFORM 5 YEAR TEST,PROPERLY TAG DEVICE AND FILE ELV3 FORM
1991-06-04ECB Non-Hazardous violation: 73#,PERFORM 5 YEAR TEST,PROPERLY TAG DEVICE AND FILE ELV 3 FORM.
1989
1989-08-21Mortgage satisfied — from COLEMAN, DAVID; FOUR DARTS CORP; 347 FIFTH AVE ASSOCIATES to CENTRAL FDRL SVNGS ETC; COLEMAN, DAVID; NATHANSON, JOSEPH
1989-07-31SAGE — from CENTRAL FEDERAL SAVINGS
1989-04-25Mortgage assigned — from 341-7 FIFTH AVENUE CO to FIRST WOMEN'S BANK
1988
1988-11-29ECB Hazardous violation: FAILURE TO MAINTAIN DEFECT IS FIRE ESCAPE AT REAR OF BLDG. BETWEEN 8&9 FLOORS. REMEDY: MAKE ALL REPAIRS TO THE SATISFACTION OF TH
1985
1985-02-21Agreement — from REGENCY ENTERPRISES to SINGER, HERMAN J.
1984
1984-11-21Mortgage assigned — from LEHMAN BROS.CP PROFTETC to SINGER, HERMAN
1981
1981-08-12Mortgage assigned — from NATHANSON, JOSEPH to 341 7 FIFTH AVE CO
1981-08-12Mortgage assigned — from STERLING NTNL BNK ETAL to NATHANSON, JOSEPH
1980
1980-11-24CERT — from REGENCY ENTERPRISES
1979
1979-11-01Mortgage assigned — from NATHANSON, JOSEPH to STERLIN NTNL BNK ETAL
1979-08-06Mortgage — from REGENCY ENTERPRISES to STERN, HERMAN
1979-08-06Mortgage — from REGENCY ENTERPRISES to 347 FIFTH AVE ASSOC
1979-08-06Deed — from 347 FIFTH AVE ASSOC; COLEMAN, DAVID to REGENCY ENTERPRISES
1979-07-10Agreement — from CENTRAL FDRL S/L ETAL to 347 FIFTH AVE ASSOC; COLEMAN, DAVID
1979-06-28Mortgage assigned — from STERLING NATIONAL ETAL to 341 7 FIFTH AVE CO
1979-06-28Mortgage assigned — from 347 FIFTH AVE ASSOC; COLEMAN, DAVID to CENTRAL FDRL S/L ETAL
1979-06-28Mortgage — from 347 FIFTH AVE ASSOC; COLEMAN, DAVID to CENTRAL FDRL S/L ETAL
1979-06-28Mortgage assigned — from 341 7 FIFTH AVE CO to CENTRAL FDRL S/L ETAL
1979-06-28Mortgage assigned — from STERLING NATIONAL ETAL to 314-7 FIFTH AVE CO
1979-06-28Agreement — from 341 7 FIFTH AVE CO to CENTRAL FDRL S/L ETAL
1979-06-28Mortgage assigned — from 341 7 FIFTH AVE CO to NATHANSON, JOSEPH
1979-01-25Agreement — from 347 FIFTH AVE ASSOC; COLEMAN, DAVID to 341 7 FIFTH AVE CO
1979-01-25Mortgage assigned — from 341 7 FIFTH AVE CO to NATHANSON, JOSEPH
1979-01-22Mortgage assigned — from STERLING NTNL BNK ETAL to NATHANSON, JOSEPH
1979-01-22Deed — from 341 7 FIFTH AVE CO to 347 FIFTH AVE ASSOC
1979-01-22Mortgage assigned — from STERLING NTNL BNK ETAL to 341 7 FIFTH AVE CO
1979-01-22MISC — from STERLING NTNL BNK ETAL
1979-01-22Mortgage assigned — from NATHANSON, JOSEPH to STERLING NATIONAL ETAL
1979-01-22Mortgage — from 347 FIFTH AVE ASSOC to 341 7 FIFTH AVE CO
1979-01-22Mortgage assigned — from 341 7 FIFTH AVE CO to NATHANSON, JOSEPH
1979-01-22Mortgage assigned — from NATHANSON, JOSEPH to STERLIN NATIONAL ETAL
1979-01-22Mortgage — from 347 FIFTH AVE ASSOC to 341 7 FIFTH AVE CO
1978
1978-06-07Mortgage assigned — from NAHTANSON, JOSEPH to STERLING NATIONAL ETAL
1978-03-14Mortgage assigned — from FOUR DARTS CORP to NATHANSON, JOSEPH
1978-03-14SAGE — from NATHANSON, JOSEPH
1978-03-14Agreement — from FOUR DARTS CORP to NATHANSON, JOSEPH
1978-03-14Mortgage — from FOUR DARTS CORP to NATHANSON, JOSEPH
1978-03-14Deed — from 341 7 FIFTH AVE CO to FOUR DARTS CORP
1978-03-14Deed — from FOUR DARTS CORP to 341 7 FIFTH AVE CO
1977
1977-12-12Deed — from FOUR DARTS CORP to 341 7 FIFTH AVE CO
1977-12-12Deed — from 341 7 FIFTH AVE CO to FOUR DARTS CORP
1977-12-12Agreement — from FOUR DARTS CORP to NATHANSON, JOSEPH
1977-12-12Mortgage — from FOUR DARTS CORP to NATHANSON, JOSEPH
1977-06-14Deed — from FOUR DARTS CORP to 341 7 FIFTH AVE CO
1977-06-10Mortgage — from FOUR DARTS CORP to NATHANSON, JOSEPH
1977-06-10Mortgage assigned — from FOUR DARTS CORP to NATHANSON, JOSEPH
1977-06-08Deed — from 347 FIFTH AVE ASSOC to FOUR DARTS CORP
1971
1971-09-09Deed — from LLOYD B THOMAS CO INC to THOMAS, VALERIE TIRRELL
1971-06-28Deed — from CHANLER, MARIA DE ADECD to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from BRYANT, HENRY E to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MATTHEWS, JOHN J TR; MC VEIGH, C S JR TRJR; CHAPMAN, CHANLER A TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHAPMAN, CHANLER A to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MC VEIGH, C S JR TR; CHAPMAN, E W DECD WDE; RUTHERFURD, GUY G TR; CHAPMAN, CHANLER A TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from DE MOTT, MARGARET A to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from SARGENT, IGNATIUS to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANDLER, JOSEPH R; CHANDLER, MARY W; HOUSTON, JUDITH C; CHANDLER, DAVID P; CHANDLER, PORT to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANLER, HUBERT W; ALLEGAERT, BEATRICEC; RUTHERFURD, GUY G TR; CHANDLER, PORTER R TR; WHIT to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANLER, WILLIAM A JR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANLER, WILLIAM C TR; MC VEIGH, C S JR TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from BOHN, ALIDA C; BOHN, ALIDA CHANLERAKA to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from LESSARD, ALIDA W to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANLER, WILLIAM C TR; CHANLER, L S JR A/K/A TR; CHANLER, L S DECD; CHANLER, BRONSON TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from ALDRICH, RICHARD to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANLER, BRONSON W to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MICHAHELLES, ROSALIND F to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from ALDRICH, JOHN WINTHROP to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from FORSTER, CLARE CHANLER to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from RICE, MARIE E to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from HARRIS, ROSANNA CHANLER to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from PICKMAN, HESTER MARION to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANLER, HUBERT W to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from FIRST WESTCHESTER BKTR; RICE, WILLIAM RICE DECD to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from ALDRICH, MARGARET LDECD; MC VEIGH, C S JR TR; RUTHERFURD, GUY G TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from CHANDLER, MAY M G DECD; CHANDLER, PORTER R TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MC VEIGH, C S JR TR; DUETSCH, JOHN E TR; EMMET, ALIDA DECD EX&TR; RUTHERFURD, GUY G TR to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MORGAN, EDWIN DIII to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from HERRICK, SUSAN CHANLER to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MORGAN, TEMPLE EMMET; BRO DOMINIC, MARIA A/K/A to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from LA FARGE, TIMOTHY to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from LA FARGE, BENJAMIN to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MC VEIGH, C S JR TR; CHANLER, WILLIAM C TR; CHANLER, LEWIS S DECD TR; CHANLER, WILLIAM C to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from PROSSER, M E DECD EX to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from MC VEIGH, C S JR TR; CHANLER, LEWIS S DECD TR; CHANLER, WILLIAM C TR; BOHN, ALIDA C to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from LAURIN, JULIA CHANLER; LAURIN, J C BEACH A/K/A to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from BARTON, SIDNEY M to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from ALLEGAERT, BEATRICEC to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from WHITE, LAURA ASTOR C to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from EMMET, JANE E to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from SHAYCOFT, MARION F to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from EMMET, WILLIAM P to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from RICE, RUTH E to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from EMMET, THOMAS A to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from EMMET, WINTHROP S to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from EMMET, CHRISTOPHER T to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from THOMAS, VALERIE TIRRELL to 347 FIFTH AVE ASSOCIATES
1971-06-28Deed — from NICOLAS, CELESTINE LA F to 347 FIFTH AVE ASSOCIATES
1971-02-16Deed — from CHANLER, MARIA A A/K/A; DE BRAGANCA, MARIA A to RUTHERFURD, GUY G TR; ALDRICH, MARGARET LDECD; MC VEIGH, C S JR TR
1971-02-05Deed — from EMMET, WINTHROP S to PROSSER, MARGARET EEX
1971-02-02RTXL — from CHANLER, MARIA DE ADECD
1971-01-15Mortgage — from CHANLER, WILLIAM A JR to LURIE, H LEE
1971-01-15Mortgage — from CHANLER, WILLIAM A JR to LURIE, H LEE
1971-01-07RTXL — from EMMET, A BEEKMAN DECDDE
1971-01-07RTXL — from EMMET, A BEEKMAN DECD
1970
1970-12-30RTXL — from CHANLER, MARIA D EST
1970-10-08Deed — from PROSSER, MARGARET E; YOUREE, MARGARET K to WINTHROP, EMMET S
1970-10-08PAT — from PROSSER, MARGARET E to YOWNEE, MARGARET K
1967
1967-11-09Mortgage — from CHAPMAN, CHANLER A to MC VEIGH, CHARLES STR; MC VEIGH, C S JR TR; CHAPMAN, OLIVIA J
1967-03-14Deed — from CHANLER, MARGARET TEXR to CHANDLER, PORTER R TR; CHANLER, MARGARET DECD; RUTHERFORD, GUY G TR
1967-02-09SMIS — from CHAPMAN, OLIVIA J; MC VEIGH, CHARLES JRTR to MATTHEWS, JOHN J TR
1966
1966-01-31Deed — from DELANO, LAURA DECD; ALDRICH, MARGARET FBO; MANUFACTURERS HANOVER TR to DEMOTT, MARGARET A
1966-01-31Deed — from DELANO, LAURA A DECD; MANUFACTURERS HANOVER TR; ALDRICH, MARGARET FBO to ALDRICH, JOHN W
1966-01-31Deed — from ALDRICH, MARGARET FBO; MANUFACTURERS HANOVER TR; DELANO, LAURA A DECD to ALDRICH, ROSALIND F
1966-01-31Deed — from DELANO, LAURA A DECD; MANUFACTURERS HANOVER TR; ALDRICH, MARGARET FBO to ALDRICH, RICHARD
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL