Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Open with the city right now
Open HPD violations
1 total — 1 class C (immediately hazardous), 0 class B, 0 class A. Oldest open since 2004-03-10.
status snapshot refreshed weekly from HPD records
Patterns
7 heat or hot-water complaints in the last three years (winter 2023–24: 1 · winter 2024–25: 4 · winter 2025–26: 2). Repeated winter clusters suggest a chronic heating problem.
1
’23–24
4
’24–25
2
’25–26
No bedbug-infested units reported in the last three years of filings.
$85,000 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
289 service requests in the last three years. Most common: Homeless Person Assistance (56) · Illegal Parking (35) · For Hire Vehicle Complaint (25) · Encampment (20) · Noise (11) · Street Condition (11).
Filed construction activity
$277,734,770 in permitted construction work filed since
2016 (378 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$699,987,000
$314,994,150
2026
$710,397,000
$319,678,650
2027
$727,923,000
$327,565,350
The city's market estimate has risen
4% between tax years 2025 and 2027.
Tax exemptions on the roll: HEALTH & HOSPITALS C
Building systems
Energy grade (LL33)
B — ENERGY STAR score 76/100 (2022 disclosure cycle)
1 food-poisoning report to 311 at this address in the last three years (0 with three or more people sick), shared by 2 restaurants 3 Food Establishment complaints to 311 at this address in the last three years (most often: Food Protection, Food Worker Hygiene, Kitchen/Food Prep Area), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 1 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2011 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
28 St — 6 · 0.5 mi straight-line (about a 14-minute walk) · station accessibility: partial (Downtown only)
Bus
Nearest boarding stop: 1 Av / E 27 St — M9 M15 · 450 ft
Citi Bike
E 27 St & 1 Ave · 500 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
289 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $10,000,000 on
1986-03-12 (lender: Long Island Trust Co). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2013-07-09
RPTT $1,810,281 — from METROPCS COMMUNICATIONS, INC.; METROPCS COMMUNICATIONS, INC to T-MOBILE HOLDING GMBH; T-MOBILE HOLDING GMBH
$1,810,281
2013-07-09
RPTT $1,810,281 — from METROPCS COMMUNICATIONS, INC.; METROPCS COMMUNICATIONS, INC to T-MOBILE HOLDING GMBH; T-MOBILE HOLDING GMBH
$1,810,281
1986-03-12
Mortgage $10,000,000 — from NYC INDSTRIAL ETAL; ENZO BIOCHEM INC to FIRST NATN'L BK BOSTON
$10,000,000
1986-03-12
Mortgage $10,000,000 — from NYC INDUSTRIAL ETAL to LONG ISLAND TRUST CO
$10,000,000
Ten-year activity
1,0005000
2017
2018
2019
2020
2021
2022
2023
2024
2025
881
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
67
54
55
0
77
253
2018
46
36
73
0
80
235
2019
40
124
148
0
42
354
2020
57
40
76
0
44
217
2021
94
12
107
1
47
261
2022
130
3
99
0
56
288
2023
138
13
103
0
46
300
2024
109
30
98
0
45
282
2025
132
14
96
1
42
285
2026
151
13
77
0
640
881
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Partial Demolition for Chute, runback Platform and Hoist
2026-10-09
Job filed: Application for Interior demolition of structure
2026-10-08
Job filed: PAA Application for Interior demolition of structure
2026-10-08
Job filed: Partial Demolition for Chute, runback Platform and Hoist
2026-10-07
ECB CLASS - 1 violation: AT TIME OF INSPECTION, OBSERVED AN ACTIVE JOB SITE WITH WORK BEING PERFORMED IN PREPARATION FOR FULL DEMOLITION. UPON REVIEW OF DE
2026-10-07
Job filed: Remaining Steam Tunnel Enclosure System (Delegated Design)
2026-10-06
311: BEST/Site Safety — Demolition - Unsafe
2026-10-06
DOB complaint, category ?
2026-10-01
Elevator permit: Modernize 1P33035 and 1P33036: All work to comply with ASME A17.1-2013, Part 8, (Section 8.7.2 for alterations for electric elevat
2026-10-01
Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE
2026-10-01
Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-10-01
Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2026-09-30
Restaurant inspection: PANERA BREAD #9330 — grade A
2026-09-30
Job filed: INSTALLATION OF TEMPORARY MODULAR STRUCTURE WITH BUILT-IN SYSTEMS FOR TEMP OFFICE TRAILERS AS PER PLANS.
2026-09-25
Air permit (REGISTRATION), fuel: NO2FUEL
2026-09-25
Air permit (REGISTRATION), fuel: NO2FUEL
2026-09-25
Permit General Construction — Permit Issued
2026-09-25
Permit Structural — Permit Issued
2026-09-24
DOB complaint, category ?
2026-09-24
Job filed: THIS APPLICATION IS PROPOSED FOR THE COMBINED HEAT & POWER (CHP) PROJECT COMPRISED OF (2) 2 MW NATURAL GAS RECIPROCATING ENGINE GENERATORS. THE ASSOCI
2026-09-24
Permit Sprinklers — Permit Issued
2026-09-24
Permit General Construction — Permit Issued
2026-09-24
Permit Structural — Permit Issued
2026-09-23
Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS ON THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PER
2026-09-23
Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE
2026-09-23
Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE
2026-09-23
Permit Mechanical Systems — Permit Issued
2026-09-23
Permit General Construction — Permit Issued
2026-09-22
Job filed: HEREWITH FILING FOR ARCHITECTURAL ANTI-LIGATURE WORK ON THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) PER PLANS. NO CHANGE IN USE, OCCUPAN
2026-09-22
Permit Foundation — Permit Issued
2026-09-22
Permit Earth Work — Permit Issued
2026-09-22
Permit Structural — Permit Issued
2026-09-22
Permit Construction Fence — Permit Issued
2026-09-22
Permit General Construction — Permit Issued
2026-09-18
311: BEST/Site Safety — Demolition - Unsafe
2026-09-18
DOB complaint, category ?
2026-09-15
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2026-09-15
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2026-09-14
Asbestos abatement: Removal — Atco Contracting Group, Inc.
Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-09-14
Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-09-14
Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-09-14
Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-09-14
Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-09-10
311: Homeless Person Assistance — Chronic
2026-09-03
Permit Mechanical Systems — Permit Issued
2026-08-28
DOB complaint, category ?
2026-08-25
Permit Structural — Permit Issued
2026-08-25
Permit General Construction — Permit Issued
2026-08-24
Permit General Construction — Permit Issued
2026-08-24
Permit Structural — Permit Issued
2026-08-20
311: Non-Emergency Police Matter — Trespassing
2026-08-19
311: Lost Property — Other
2026-08-19
Job filed: Modification for the removal and replacement existing chiller plant on 13th FL with associated work on the 22nd,23rd,24th floors & Cooling towers eas
2026-08-17
Job filed: Filing for the removal of existing wall mounted FCU, piping and associated controls. Relocate existing wall mounted Fan Coil unit and Install New Hea
2026-08-17
Permit Suspended Scaffold — Permit Issued
2026-08-17
Permit Suspended Scaffold — Permit Issued
2026-08-15
311: Homeless Person Assistance — Non-Chronic
2026-08-15
311: Homeless Person Assistance — Non-Chronic
2026-08-14
Permit Sidewalk Shed — Permit Issued
2026-08-12
311: Illegal Parking — Parking Permit Improper Use
2026-08-12
Job filed: HEREWITH FILING GENERAL CONSTRUCTION WORK FOR 19TH FLOOR FORENSIC EXPANSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2026-08-10
311: Lost Property — Bag/Wallet
2026-08-07
Job filed: Partial Demolition for Chute, runback Platform and Hoist
2026-08-07
Job filed: PAA Application for Interior demolition of structure
2026-08-06
Job filed: Temporary Standpipe during Construction.
2026-08-06
Permit Suspended Scaffold — Permit Issued
2026-08-04
Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-08-04
Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-08-04
Job filed: STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SH
2026-08-04
Permit Protection and Mechanical Methods — Permit Issued
2026-08-04
Permit Sidewalk Shed — Permit Issued
2026-08-04
Permit Sidewalk Shed — Permit Issued
2026-08-04
Permit Protection and Mechanical Methods — Permit Issued
2026-08-03
311: Lost Property — Bag/Wallet
2026-08-03
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-10-10311: Homeless Person Assistance — Non-Chronic
2026-10-09311: Day Care — Day Care Facility
2026-10-09Job filed: Partial Demolition for Chute, runback Platform and Hoist$250,000
2026-10-09Job filed: Application for Interior demolition of structure$500,000
2026-10-08Job filed: PAA Application for Interior demolition of structure$500,000
2026-10-08Job filed: Partial Demolition for Chute, runback Platform and Hoist$250,000
2026-10-07ECB CLASS - 1 violation: AT TIME OF INSPECTION, OBSERVED AN ACTIVE JOB SITE WITH WORK BEING PERFORMED IN PREPARATION FOR FULL DEMOLITION. UPON REVIEW OF DE$10,000
2026-10-07Job filed: Remaining Steam Tunnel Enclosure System (Delegated Design)$1,000,000
2026-10-01Elevator permit: Modernize 1P33035 and 1P33036: All work to comply with ASME A17.1-2013, Part 8, (Section 8.7.2 for alterations for electric elevat$880,000
2026-10-01Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$250,000
2026-10-01Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2026-10-01Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$1,100,000
2026-09-30Restaurant inspection: PANERA BREAD #9330 — grade A
2026-09-30Job filed: INSTALLATION OF TEMPORARY MODULAR STRUCTURE WITH BUILT-IN SYSTEMS FOR TEMP OFFICE TRAILERS AS PER PLANS.$121,515
2026-09-25Permit General Construction — Permit Issued
2026-09-25Permit Structural — Permit Issued
2026-09-24DOB complaint, category ?
2026-09-24Job filed: THIS APPLICATION IS PROPOSED FOR THE COMBINED HEAT & POWER (CHP) PROJECT COMPRISED OF (2) 2 MW NATURAL GAS RECIPROCATING ENGINE GENERATORS. THE ASSOCI$400,000
2026-09-24Permit Sprinklers — Permit Issued
2026-09-24Permit General Construction — Permit Issued
2026-09-24Permit Structural — Permit Issued
2026-09-23Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS ON THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PER$100,000
2026-09-23Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE$1,492,500
2026-09-23Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE$1,575,000
2026-09-23Permit Mechanical Systems — Permit Issued
2026-09-23Permit General Construction — Permit Issued
2026-09-22Job filed: HEREWITH FILING FOR ARCHITECTURAL ANTI-LIGATURE WORK ON THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) PER PLANS. NO CHANGE IN USE, OCCUPAN$8,371,300
2026-09-22Permit Foundation — Permit Issued
2026-09-22Permit Earth Work — Permit Issued
2026-09-22Permit Structural — Permit Issued
2026-09-22Permit Construction Fence — Permit Issued
2026-09-22Permit General Construction — Permit Issued
2026-08-19Job filed: Modification for the removal and replacement existing chiller plant on 13th FL with associated work on the 22nd,23rd,24th floors & Cooling towers eas$138,000
2026-08-17Job filed: Filing for the removal of existing wall mounted FCU, piping and associated controls. Relocate existing wall mounted Fan Coil unit and Install New Hea$50,000
2026-08-15311: Homeless Person Assistance — Non-Chronic
2026-08-15311: Homeless Person Assistance — Non-Chronic
2026-08-14Permit Sidewalk Shed — Permit Issued
2026-08-12311: Illegal Parking — Parking Permit Improper Use
2026-08-12Job filed: HEREWITH FILING GENERAL CONSTRUCTION WORK FOR 19TH FLOOR FORENSIC EXPANSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$1,006,974
2026-08-10311: Lost Property — Bag/Wallet
2026-08-07Job filed: Partial Demolition for Chute, runback Platform and Hoist$250,000
2026-08-07Job filed: PAA Application for Interior demolition of structure$500,000
2026-08-06Job filed: Temporary Standpipe during Construction.$10,000
2026-08-04Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$260,000
2026-08-04Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2026-08-04Job filed: STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SH$5,000
2026-08-04Permit Protection and Mechanical Methods — Permit Issued
2026-08-04Permit Sidewalk Shed — Permit Issued
2026-08-04Permit Sidewalk Shed — Permit Issued
2026-08-04Permit Protection and Mechanical Methods — Permit Issued
2026-08-03311: Lost Property — Bag/Wallet
2026-08-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-08-03Job filed: Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
2026-07-31Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 19TH FLR FORENSIC UNIT PER PLANS.$128,736
2026-07-31Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS AND FIRE HOSE CABINET RELOCATION ON THE 19TH FLR PER PLANS.$69,217
2026-07-31Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 19TH FLR FORENSIC UNIT PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$243,788
2026-07-28311: Abandoned Bike — Chained to Public Property
2026-07-28Job filed: IRA Facade Inspection
2026-07-27311: Street Condition — Rough, Pitted or Cracked Roads
2026-07-24Job filed: Installation of new walls, ceiling, doors & finishes to accommodate the installation of new fire alarm closets, patch & repair existing affected by th$2,025,000
2026-07-23311: Street Condition — Cave-in
2026-07-20311: Street Condition — Cave-in
2026-07-20Permit General Construction — Permit Issued
2026-07-19311: Street Condition — Cave-in
2026-07-17Boiler inspection
2026-07-17Boiler inspection
2026-07-17Boiler inspection
2026-07-17Boiler inspection
2026-07-15Certificate of occupancy Renewal Without Change
2026-07-09311: Street Condition — Cave-in
2026-07-07Permit Sidewalk Shed — Permit Issued
2026-07-01311: Illegal Parking — Parking Permit Improper Use
2026-07-01Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2026-07-01Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$1,100,000
2026-06-29Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-06-29Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-06-29Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-06-29Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-06-29Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-06-29Asbestos abatement: Removal — Atco Contracting Group, Inc.
2026-06-24Elevator permit: Installation of a Temporary Dual 7000 LB Capacity Personnel Hoist. Installations and Tests as per A10.4-2016, Safety Requirements $20,000
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-06-23Permit Sidewalk Shed — Permit Issued
2026-06-17Job filed: Proposing new ATS room as part of elevator modernization project as per plans. No change in use, egress, or occupancy.$1,200,000
2026-06-17Job filed: Structural modifications to elevator machine room on roof as per plans. No change in use, egress, or occupancy.$35,000
2026-06-17Job filed: EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN US$190,000
2026-06-16Job filed: Addition of sump pump on ground floor elevator pit and removal of sump pump in basement elevator pit. Remove roof drain/piping in elevator machine roo$35,000
2026-06-16Job filed: Replace existing air conditioning unit and associated ductwork/piping in penthouse elevator machine room and roof elevator machine room. No change in $75,000
2026-06-15311: Homeless Person Assistance — Non-Chronic
2026-06-11311: Lost Property — Bag/Wallet
2026-06-09311: Abandoned Bike — Chained to Public Property
2026-06-05Job filed: INSTALLATION OF PIPE SCAFFOLDING, 300 PSF OVERHEAD PROTECTION AND SHORING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.$20,000
2026-06-05Permit Mechanical Systems — Permit Issued
2026-06-05Permit Mechanical Systems — Permit Issued
2026-06-01DOB complaint, category ?
2026-05-28311: Green Taxi Complaint — Driver Complaint - Passenger
2026-05-27Elevator permit: Removal of the device# 1P23040 in its entirety. All work to comply with ASME A17.1-2013, Part 8, Section 8.11.1.4.1.2, Safety Code$4,000
2026-05-26311: Elevator — Elevator - Multiple Devices On Property
2026-05-26DOB complaint, category ?
2026-05-26Job filed: New roof recovery system$900,000
2026-05-26Permit Mechanical Systems — Permit Issued
2026-05-23311: Illegal Parking — Blocked Hydrant
2026-05-22Permit Sidewalk Shed — Permit Issued
2026-05-14311: Illegal Parking — Parking Permit Improper Use
2026-05-13311: Water System — Hydrant Running (WC3)
2026-04-24Job filed: OVERHEAD PROTECTION FOR EXTERIOR MOBILE OFFICE TRAILER$10,000
2026-04-24Permit Plumbing — Permit Issued
2026-04-23Elevator permit: Removal of the (2) device 1F4762 and 1F4761 in its entirety. All work to comply with ASME A17.1-2013, Part 8, Section 8.11.1.4.1.2$8,000
2026-04-23Elevator permit: Removal of the device 1P31514 in its entirety. All work to comply with ASME A17.1-2013, Part 8, Section 8.11.1.4.1.2, Safety Code $4,000
2026-04-18311: Food Establishment — Kitchen/Food Prep Area
2026-04-17Elevator permit: Six (6) Elevator Devices used for Temporary Construction purpose as per section 5.10.1. It has all requirements for temporary cons$24,000
2026-04-15Certificate of occupancy Renewal Without Change
2026-04-15Job filed: Installation of 2 new security scanners at building lobbies. No actual construction proposed$20,000
2026-04-13Permit Sprinklers — Permit Issued
2026-04-13Permit Plumbing — Permit Issued
2026-04-13Permit Standpipe — Permit Issued
2026-04-09Rodent inspection: Failed for Rat Activity
2026-04-09311: Homeless Person Assistance — Non-Chronic
2026-04-08Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$9,000
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07311: Elevator — Elevator - Multiple Devices On Property
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-04-07DOB complaint, category ?
2026-04-06Cooling tower inspection
2026-04-06Cooling tower inspection
2026-04-06Cooling tower inspection
2026-04-05311: Animal-Abuse — Other (complaint details)
2026-03-13311: Maintenance or Facility — Rodent Sighting
2026-03-10311: General Construction/Plumbing — Building Permit - None
2026-03-10DOB complaint, category ?
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2026-03-09Job filed: INSTALLATION OF TWO NEW COGEN ENGINES.$4,000,000
2026-03-07311: Homeless Person Assistance — Non-Chronic
2026-03-06Boiler inspection
2026-03-06Boiler inspection
2026-03-06Boiler inspection
2026-03-06Boiler inspection
2026-03-06311: Illegal Parking — Parking Permit Improper Use
2026-03-06311: Abandoned Vehicle — With License Plate
2026-03-04311: Street Condition — Cave-in
2026-03-03Job filed: Cooling systems for elevator machine rooms$450,000
2026-03-02Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$9,000
2026-02-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-02-25Permit General Construction — Signed-off
2026-02-24Permit Structural — Permit Issued
2026-02-24Permit General Construction — Permit Issued
2026-02-23311: Maintenance or Facility — Snow or Ice
2026-02-23Job filed: BELLEVUE - CAFE - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$66,000
2026-02-23Job filed: BELLEVUE - CAFE - MECHANICAL MODIFICATIONS ACCORIND TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$740,000
2026-02-23Job filed: BELLEVUE - CAFE - INTERIOR RENOVATION ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,100,000
2026-02-21311: Encampment — N/A
2026-02-21311: Encampment — N/A
2026-02-21311: Consumer Complaint — Other Store (Non-Food)
2026-02-20311: Homeless Person Assistance — Non-Chronic
2026-02-20Permit General Construction — Signed-off
2026-02-18Job filed: OXYGEN VAPORIZER SYSTEM UPGRADE FOR AIR DEVICES IN CELLAR & GROUND FLOOR AS PER PLANS FOR BELLEVUE HOSPITAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$67,732
2026-02-18Job filed: PL WORK INCLUDES, BUT NOT LIMITED TO, DEMO/INSTALL OF NEW ASSOC. BRANCH PIPING IN CEL/001 TO SERVE UPGRADE OXYGEN VAPORIZER UPGRADES. NEW SUMP PUMP IN$179,469
2026-02-18Job filed: STRUCTURAL FRAMING AND CONCRETE PADS IN CELLAR AND 1ST FLOOR TO SERVE THE OXYGEN VAPORIZER SYSTEM UPGRADES AT BELLEVUE HOSPITAL. NO CHANGE IN USE, EGR$23,780
2026-02-18Permit Sprinklers — Permit Issued
2026-02-18Permit Standpipe — Permit Issued
2026-02-13Certificate of occupancy Renewal Without Change
2026-02-13Job filed: Bellevue Hospital Bldg H Exterior facade repairs as per the plans filed including: Repair of spalled concrete and deteriorated reinforcement of exteri$300,000
2026-02-11ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES.-NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 WEST (1)CRACKED STUCCO $5,000
2026-02-10Job filed: Filing for the modification of existing fire protection system for the removal and installation of sprinkler head on existing branch piping.$15,000
2026-02-10Job filed: Filing for the removal and installation of Plumbing & Medical Gas fixtures and associated piping.$25,000
2026-02-10Permit General Construction — Permit Issued
2026-02-09Job filed: INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND BETAMAX HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN
2026-02-05Job filed: Interior demolition of structure$500,000
2026-02-05Job filed: DECONSTRUCTION OF EXISTING INTERIOR NON-STRUCTURAL WALL CLADDING AND NON-LOAD BEARING PARTITIONS COMPRISED OF WOOD PANELING AND GLAZED CERAMIC BLOCK I$75,000
2026-01-27311: Snow or Ice — Pedestrian Feature
2026-01-27311: Homeless Person Assistance — Non-Chronic
2026-01-27311: Snow or Ice — Sidewalk
2026-01-27311: Homeless Person Assistance — Non-Chronic
2026-01-27Job filed: Temporary Standpipe during Construction.$10,000
2026-01-27Permit Protection and Mechanical Methods — Permit Issued
2026-01-27Permit Protection and Mechanical Methods — Permit Issued
2026-01-27Permit Protection and Mechanical Methods — Permit Issued
2026-01-26311: Snow or Ice — Sidewalk
2026-01-26Job filed: INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$250,000
2026-01-26Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$1,100,000
2026-01-26Job filed: OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL$120,000
2026-01-26Permit Construction Fence — Permit Issued
2026-01-24311: Homeless Person Assistance — Non-Chronic
2026-01-23Permit Protection and Mechanical Methods — Permit Issued
2026-01-23Permit Protection and Mechanical Methods — Permit Issued
2026-01-22ECB CLASS - 1 violation: 5/L/10 CAR CEASE USE, CLASS 1, CAR DOOR RESTRICTOR DEFECTIVE REPAIR.$1,250
2026-01-21Job filed: Temporary Steam Line Tunnel Enclosure$1,000,000
2026-01-21Permit Sidewalk Shed — Signed-off
2026-01-20311: Elevator — Elevator - Multiple Devices On Property
2026-01-20DOB complaint, category ?
2026-01-20Job filed: HEAVY DUTY SIDEWALK SHED DURING EXTERIOR REPAIRS FILED UNDER M01286339, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN $3,000
2026-01-20Permit Mechanical Systems — Permit Issued
2026-01-19311: Food Poisoning — 1 or 2
2026-01-16311: For Hire Vehicle Complaint — Car Service Company Complaint
2026-01-16311: Illegal Parking — Blocked Bike Lane
2026-01-16Permit Sidewalk Shed — Permit Issued
2026-01-16Permit Sidewalk Shed — Permit Issued
2026-01-13311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-01-09Job filed: Filing for interior alterations general construction work to modify an existing area on the ground floor level of Bellevue Hospital for New GE Radiolo$150,000
2025-12-23311: Homeless Person Assistance — Chronic
2025-12-22Boiler inspection
2025-12-22Boiler inspection
2025-12-22Boiler inspection
2025-12-22Boiler inspection
2025-12-22Job filed: Installation of three new ac split units in existing fire alarm closets located in main hospital (H), administration (A) & emergency department buildi$141,000
2025-12-22Job filed: AMENDMENT FILE FOR ADDITIONAL ANCHOR DETAILS FOR LIFE LINE AND TIE BACK.
2025-12-21311: Homeless Person Assistance — Non-Chronic
2025-12-21311: Homeless Person Assistance — Chronic
2025-12-21Job filed: Installation of 2 new security scanners at building lobbies. No actual construction proposed$20,000
2025-12-19311: For Hire Vehicle Complaint — Car Service Company Complaint
2025-12-17311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2025-12-17Job filed: HEREWITH FILING FOR ARCHITECTURAL ANTI-LIGATURE WORK ON THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) PER PLANS. NO CHANGE IN USE, OCCUPAN$8,371,300
2025-12-15Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS ON THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PER$100,000
2025-12-15Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE$1,492,500
2025-12-15Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE$1,575,000
2025-12-02Permit General Construction — Permit Issued
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Asbestos abatement: Removal — Beam Enterprises Inc.
2025-12-01Permit Mechanical Systems — Permit Issued
2025-11-24Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2025-11-24Job filed: EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN US$190,000
2025-11-21311: Homeless Person Assistance — Non-Chronic
2025-11-20311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2025-11-20ECB CLASS - 1 violation: NOTED CONCRETE ENTRY RAMP AT ENTRANCE IN DISREPAIR AND GLASS AT ENTRY DOOR NORTH COURTYARD OFF 25TH STREET REPAIRED WITH PLYWOOD.,$2,500
2025-11-20DOB complaint, category ?
2025-11-17Certificate of occupancy Renewal Without Change
2025-11-13Permit Mechanical Systems — Permit Issued
2025-11-08311: Homeless Person Assistance — Non-Chronic
2025-11-08311: Homeless Person Assistance — Non-Chronic
2025-11-07311: Homeless Person Assistance — Non-Chronic
2025-11-07311: Lead — Lead Kit Request (Residential) (L10)
2025-11-07311: Homeless Person Assistance — Non-Chronic
2025-11-05Permit Sprinklers — Permit Issued
2025-11-03311: Homeless Person Assistance — Non-Chronic
2025-10-31Permit General Construction — Permit Issued
2025-10-31Permit General Construction — Permit Issued
2025-10-28Job filed: MECHANICAL EQUIPMENT USE FOR FULL DEMOLITION$250,000
2025-10-28Job filed: Chute Installation$200,000
2025-10-28Job filed: Mechanical Equipment Use for Interior Demolition$500,000
2025-10-28Job filed: PAA Application for Interior demolition of structure$500,000
2025-10-26Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$9,000
2025-10-25Job filed: AMENDMENT FILE FOR ADDITIONAL ANCHOR DETAILS FOR LIFE LINE AND TIE BACK.
2025-10-24Job filed: Partial Demolition for Chute, runback Platform and Hoist$250,000
2025-10-22311: Homeless Person Assistance — Non-Chronic
2025-10-22311: Homeless Person Assistance — Non-Chronic
2025-10-22311: Homeless Person Assistance — Non-Chronic
2025-10-21311: Homeless Person Assistance — Non-Chronic
2025-10-16311: Asbestos — N/A
2025-10-12311: Bus Stop Shelter Complaint — Damaged Other
2025-10-07311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2025-10-07311: Taxi Complaint — Driver Complaint - Non Passenger
2025-10-07Job filed: Full Demolition of 3 Partially Connected Buildings$10,000,000
2025-10-06311: Day Care — Day Care Facility
2025-10-03311: Street Condition — Rough, Pitted or Cracked Roads
2025-10-03Permit Plumbing — Permit Issued
2025-10-03Permit Plumbing — Permit Issued
2025-10-02311: Emergency Response Team (ERT) — After Hours Work - Illegal
2025-10-02DOB complaint, category ?
2025-10-02Permit Mechanical Systems — Permit Issued
2025-10-01Cooling tower inspection
2025-10-01311: Blocked Driveway — No Access
2025-09-30Restaurant inspection: PANERA BREAD #9330 — grade A
2025-09-30Restaurant inspection: PANERA BREAD #9331 — grade A
2025-09-24Job filed: FILING FOR TEMPORARILY REMOVAL OF EXISTING VISION, SPANDREL GLAZING & HORIZONTAL MULLION. INSTALL NEW HORIZONTAL MULLION IN PLACE OF THE REMOVED ONE O$140,000
2025-09-24Permit Plumbing — Permit Issued
2025-09-23Permit Sprinklers — Permit Issued
2025-09-22Permit Mechanical Systems — Permit Issued
2025-09-22Permit General Construction — Permit Issued
2025-09-22Permit General Construction — Permit Issued
2025-09-22Permit Structural — Permit Issued
2025-09-22Permit General Construction — Permit Issued
2025-09-22Permit Foundation — Permit Issued
2025-09-22Permit General Construction — Permit Issued
2025-09-22Permit Foundation — Permit Issued
2025-09-22Permit Mechanical Systems — Permit Issued
2025-09-22Permit General Construction — Permit Issued
2025-09-22Permit Construction Fence — Permit Issued
2025-09-22Permit Earth Work — Permit Issued
2025-09-22Permit Construction Fence — Permit Issued
2025-09-22Permit Earth Work — Permit Issued
2025-09-22Permit Structural — Permit Issued
2025-09-19311: Indoor Air Quality — Ventilation
2025-09-19Job filed: REMOVAL & REPLACEMENT OF THREE (3) 800-TON ELECTRIC CENTRIFUGAL WATER CHILLERS WITH IN KIND. INSTALL REFRIGERANT EXHAUST SYSTEM WITH LEAK DETECTION & $4,000,000
2025-09-16Job filed: FACADE RESTORATION INCLUDING BRICK REPLACEMENT, TERRACOTA REPLACEMENT WITH PRECAST CONCRETE, TERRACOTTA/LIMESTONE/GRANITE PATCHING, WINDOW SILL REPLAC$757,170
2025-09-14311: Encampment — N/A
2025-09-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-09-10311: Street Sign - Dangling — Stop
2025-09-10311: Street Sign - Dangling — St Name - Over Intersection
2025-08-21311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2025-08-20Certificate of occupancy Renewal Without Change
2025-08-15ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED AT EXP #1 WEST, #2 NORTH, #3 E$5,000
2025-08-14Permit Construction Fence — Permit Issued
2025-08-13311: Street Sign - Damaged — Other/Unknown
2025-07-30Job filed: Removal and installation of 2 AHU units. AHU units will serve as temporary cooling, then converted to permanent heating and ventilation units. No chan$324,250
2025-07-23Rodent inspection: Failed for Rat Activity
2025-07-23Job filed: Plumbing modifications as indicated on the plans filed herewith. no change to use, egress or occupancy$194,700
2025-07-23Job filed: Mechanical modifications as indicated on the plans filed herewith. No change to use, egress or occupancy.$944,600
2025-07-18Job filed: INTERIOR MODIFICATIONS FOR THE RENOVATION OF EXISTING LAB IN THE BELLEVUE ADMINISTRATION BUILDING FOR THE NEW PHARMACY LAB SUITE. NO CHNAGE ION USE, E$1,000,000
2025-07-17311: Rodent — Rat Sighting
2025-07-17311: Abandoned Vehicle — With License Plate
2025-07-17311: Rodent — Rat Sighting
2025-07-15311: Abandoned Vehicle — With License Plate
2025-07-14311: Dirty Condition — Debris from Car Accident
2025-07-12311: Abandoned Vehicle — With License Plate
2025-07-09Permit Sidewalk Shed — Permit Issued
2025-07-07Job filed: Removal and installation of 2 AHU units. AHU units will serve as temporary cooling, then converted to permanent heating and ventilation units. No chan$324,250
2025-06-16311: Homeless Person Assistance — Non-Chronic
2025-06-13311: Day Care — Day Care Facility
2025-06-13Job filed: HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION $20,000
2025-06-12311: Sanitation Worker or Vehicle Complaint — Inappropriate Behavior
2025-05-31311: Homeless Person Assistance — Non-Chronic
2025-05-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-05-14Job filed: HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION $20,000
2025-05-09DOB complaint, category ?
2025-05-08DOB violation C: FAILURE TO MAINTAIN BUILDIING IN A CODE COMPLIANT MANNER. MULTIPLE CRACK BROKEN WINDOWS AT EXP#4 & EXP#1 DAMAGED PREFAB STONE I
2025-05-08Job filed: STRUCTURAL SUPPORTS FOR ROOF MOUNTED UNIT$16,500
2025-05-08Permit Structural — Signed-off
2025-05-07DOB violation FISPFCS: CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
2025-05-07DOB violation FISPFCS: CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
2025-04-29Permit Mechanical Systems — Permit Issued
2025-04-28Asbestos abatement: Removal — New York Environmental Systems, Inc.
2025-04-28Permit General Construction — Signed-off
2025-04-25311: Vendor Enforcement — Food Vendor
2025-04-25Job filed: BELLEVUE HOSPITAL IS FITTING OUT AN EXISTING 9TH FLOOR LAB AS NEW IT/MDF ROOM. ROOM WILL BE PROTECTED WITH A DEDICATED SINGLE INTERLOCKED ELECTRONIC A$126,000
2025-04-25Job filed: A NEW PACKAGED ROOFTOPUNIT WILL BE PROVIDED. THE UNIT WILL ALSO INCLUDE COOLINGCAPACITY FOR FUTURE RACKS TO BE INSTALLED IN THE SPACE. THISPACKAGED RO$575,000
2025-04-22311: Water System — Hydrant Defective (WC2)
2025-04-16Job filed: HEREWITH FILING FOR EMERGENCY GENERATOR ENCLOSURE PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$1,000,000
2025-04-16Permit General Construction — Permit Issued
2025-04-15Job filed: HEREWITH FILING FOR CIVIL SITE PLUMBING LINES AND STORM INLET PER PLANS.$20,000
2025-04-15Job filed: HEREWITH FILING FOR CIVIL SITE WORK/NEW CURB IN CONJUNCTION WITH GENERATOR REPLACEMENT AND FUEL OIL TANK INSTALLATION PER PLANS.$850,000
2025-04-15Job filed: HEREWITH FILING AUXILIARY GENERATOR UNIT FOR BELLEVUE HOSPITAL PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$100,000
2025-04-14Job filed: HEREWITH FILING UNDERGROUND OIL FUEL TANK IN SUPPORT OF NEW SECONDARY GENERATOR FOR BELLEVUE CAMPUS PER PLANS.$2,250,000
2025-04-09Asbestos abatement: Removal — New York Environmental Systems, Inc.
2025-04-08Job filed: Filing for the renovation at the 4th and 5th floors. Work includes removal and installation of interior non load bearing partitions, doors, finish wor$924,316
2025-04-08Job filed: Modifications to existing Sprinkler System at the 4th floor. No change in use, egress or occupancy.$144,806
2025-04-08Job filed: Filing for mechanical work at the 4th floor. No change in use, egress or occupancy.$389,254
2025-04-08Job filed: Filing for plumbing work at the 4th floor. No change in use, egress or occupancy.$73,330
2025-04-08Permit General Construction — Signed-off
2025-04-08Permit Mechanical Systems — Signed-off
2025-04-08Permit General Construction — Permit Issued
2025-04-08Permit General Construction — Permit Issued
2025-04-08Permit General Construction — Signed-off
2025-03-21311: Non-Residential Heat — Inadequate or No Heat
2025-03-21Permit Structural — Signed-off
2025-03-21Permit General Construction — Signed-off
2025-03-14Permit Mechanical Systems — Signed-off
2025-03-11Job filed: Roofing replacement. No change of occupancy use or egress.$312,250
2025-03-11Job filed: Install Support of Excavation including Slide Rail Shoring System as per attached drawings for fuel oil tank installation associated with outdoor spac$125,010
2025-03-06ECB CLASS - 2 violation: AT TIME OF INSPECTON I OBSERVED SIDEWALK SHED INSTALLED ON EXPOSURE # 1 WITHOUT SIGNS OR PROJECT INFORMATION PANEL ON THE SHED PA$1,250
2025-03-06ECB CLASS - 2 violation: AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 UPON REVIEW THE DEPARTMENT RECORD TO VERIFY COMPLIANCE IT$1,250
2025-03-05311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2025-03-05DOB complaint, category ?
2025-03-05Permit Sidewalk Shed — Permit Issued
2025-02-27Certificate of occupancy Renewal With Change
2025-02-27Job filed: Modifications to room 335$10,000
2025-02-26Boiler inspection
2025-02-26Boiler inspection
2025-02-26Boiler inspection
2025-02-26Boiler inspection
2025-02-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-02-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-02-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-02-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-02-10Facade (LL11) filing, cycle 9: UNSAFE
2025-02-10Job filed: Remove existing and provide new non load bearing partitions, floor tiles, and suspended ceilings. Provide new doors and roof curbs. No change of use, $874,500
2025-02-05311: Homeless Person Assistance
2025-02-04ECB CLASS - 1 violation: FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT THECONCRETE CRACKED EXPOSURE 1 NORTH ELE, EAST ELE, CRACKED/BRO$10,000
2025-02-04Job filed: Alterations to existing corridor$30,000
2025-01-31Job filed: Installation of safety netting under the two existing canopies$10,000
2025-01-19Job filed: THIS APPLICATION IS PROPOSED FOR THE COMBINED HEAT & POWER (CHP) PROJECT COMPRISED OF (2) 2 MW NATURAL GAS RECIPROCATING ENGINE GENERATORS. THE ASSOCI$400,000
2025-01-17Job filed: STRUCTURAL SUPPORTS FOR ROOF MOUNTED UNIT$16,500
2025-01-14311: Lost Property — Electronics/Phones
2025-01-14311: Non-Residential Heat — Inadequate or No Heat
2025-01-13311: Noise — Noise: Jack Hammering (NC2)
2025-01-13311: Noise — Noise: Construction Equipment (NC1)
2025-01-13Job filed: Proposed replacement of combined wet Sprinkler & SD south riser due to pipe corrosion. All as per plans filed herewith.$278,016
2025-01-10311: Illegal Parking — Parking Permit Improper Use
2025-01-10311: Non-Residential Heat — Inadequate or No Heat
2025-01-10311: Non-Residential Heat — Inadequate or No Heat
2025-01-09Job filed: Minor demolition; installing drywall partitions, doors, doorframes, resilient flooring, suspended ceiling grids & tiles; painting; and installing stru$350,000
2025-01-08Job filed: HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION $20,000
2025-01-08Job filed: HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$550,000
2025-01-08Job filed: HEREWITH FILING FOR 2ND FLR MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS PER PLANS FILED. RESPECTFULLY REQUESTING THAT THIS APPLICATION BE$5,868,177
2025-01-08Permit Standpipe — Signed-off
2025-01-08Permit Standpipe — Signed-off
2025-01-08Permit Structural — Signed-off
2025-01-08Permit Sprinklers — Signed-off
2025-01-08Permit Sprinklers — Signed-off
2025-01-08Permit Foundation — Signed-off
2025-01-08Permit General Construction — Signed-off
2025-01-07Job filed: Plumbing Work includes replacing existing plumbing fixtures and medical gases. There are no changes in egress or occupancy.$165,000
2025-01-07Job filed: HEREWITH FILING OUTDOOR RECREATION DECK PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$2,000,000
2025-01-03311: Consumer Complaint — Other Store (Non-Food)
2024-12-30ECB CLASS - 1 violation: FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNICAL REPORT #TR$10,000
2024-12-30Permit Sidewalk Shed — Permit Issued
2024-12-28DOB violation C: EWO DUE DETERIORATION HANGING/LOOSE/SPALLING CONCRETE, CRACKED/BROKEN WINDOW GLASS @ ALL EXP ALSO NOTED CRACKED/SPALLING CONCRETE
2024-12-27311: Sidewalk Condition — Metal Protruding - Sign Stump
2024-12-27ECB CLASS - 1 violation: FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED, NETTING,.. ECT WHERE REQUIRED TO PROTECT PUBLIC AND PROPERTY FROM DOCUME$10,000
2024-12-27Permit General Construction — Signed-off
2024-12-27Permit Mechanical Systems — Signed-off
2024-12-27Permit General Construction — Signed-off
2024-12-27Permit Mechanical Systems — Signed-off
2024-12-26Permit General Construction — Signed-off
2024-12-20Rodent inspection: Passed
2024-12-19Elevator permit: Furnish and Install One (1) Dual Roped Hydraulic Passenger Elevator. New Amendment/ P2. See Device Description for Details.$354,595
2024-12-17Facade (LL11) filing, cycle 9: UNSAFE
2024-12-16311: Lost Property — Clothing/Glasses
2024-12-16311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2024-10-04Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$62,000
2024-10-04Permit Boiler Equipment — Signed-off
2024-10-02Permit Mechanical Systems — Permit Issued
2024-10-02Permit Structural — Signed-off
2024-10-02Permit General Construction — Signed-off
2024-09-26Job filed: Decommission of existing Sprint site. Remove antennas and equipment from the roof. Service connection in basement. Initial installation approved under$25,000
2024-09-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-09-25Permit Construction Fence — Permit Issued
2024-09-23311: Lead — Lead Kit Request (Residential) (L10)
2024-09-23Job filed: BELLEVUE HOSPITAL CENTER - DAYCARE - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$50,000
2024-09-23Job filed: BELLEVUE HOSPITAL CENTER - DAYCARE CENTER AND OFFICE - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.$50,000
2024-09-12Permit Construction Fence — Permit Issued
2024-09-10Elevator permit: Furnish and Install One (1) Dual Roped Hydraulic Passenger Elevator. New Amendment/ P1. See Device Description for Details.$354,595
2024-09-10Permit General Construction — Permit Issued
2024-09-10Permit Mechanical Systems — Permit Issued
2024-09-09Boiler inspection
2024-09-09Boiler inspection
2024-09-09Boiler inspection
2024-09-09Boiler inspection
2024-09-09Boiler inspection
2024-09-06Permit General Construction — Permit Issued
2024-09-06Permit Earth Work — Permit Issued
2024-09-06Permit Foundation — Permit Issued
2024-09-06Permit Structural — Permit Issued
2024-09-05311: Day Care — Day Care Facility
2024-09-05Permit Standpipe — Signed-off
2024-09-05Permit Earth Work — Signed-off
2024-09-05Permit General Construction — Signed-off
2024-09-03Job filed: Install Support of Excavation including Slide Rail Shoring System as per attached drawings for fuel oil tank installation associated with outdoor spac$125,010
2024-09-03Permit General Construction — Signed-off
2024-08-28311: Sanitation Worker or Vehicle Complaint — Noise
2024-08-28311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2024-08-28311: Sanitation Worker or Vehicle Complaint — Noise
2024-08-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-08-01DOB violation FISPFCS: FAILURE TO CORRECT SWARMP CONDITIONS
2024-08-01DOB complaint, category ?
2024-07-31Asbestos abatement: Cleanup — PAR Environmental Corporation
2024-07-31Asbestos abatement: Repair — PAR Environmental Corporation
2024-07-31311: Illegal Parking — Blocked Hydrant
2024-07-30Job filed: HEREWITH FILING FOR EMERGENCY GENERATOR ENCLOSURE PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$1,000,000
2024-07-26Job filed: HEREWITH FILING FOR CIVIL SITE WORK/NEW CURB IN CONJUNCTION WITH GENERATOR REPLACEMENT AND FUEL OIL TANK INSTALLATION PER PLANS.$850,000
2024-07-24Job filed: HEREWITH FILING FOR CIVIL SITE PLUMBING LINES AND STORM INLET PER PLANS.$20,000
2024-07-24Permit Mechanical Systems — Permit Issued
2024-07-24Permit General Construction — Permit Issued
2024-07-23Job filed: HEREWITH FILING FOR STANDPIPE MODIFICATIONS IN CONJUNCTION WITH 3RD FLR (MARKETING 2) CHANGE OF OCCUPANCY PER PLANS.$20,000
2024-07-22Job filed: HEREWITH FILING UNDERGROUND OIL FUEL TANK IN SUPPORT OF NEW SECONDARY GENERATOR FOR BELLEVUE CAMPUS PER PLANS.$2,250,000
2024-07-17Job filed: HEREWITH FILING AUXILIARY GENERATOR UNIT FOR BELLEVUE HOSPITAL PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$100,000
2024-07-17Job filed: HEREWITH FILING STRUCTURAL WORK IN CONJUNCTION WITH NEW OUTDOOR EMERGENCY GENERATOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC$400,000
2024-07-13311: Homeless Person Assistance
2024-07-11311: Encampment — N/A
2024-07-11311: Illegal Parking — Blocked Sidewalk
2024-07-10Permit General Construction — Signed-off
2024-07-09311: Encampment — N/A
2024-07-09311: Encampment — N/A
2024-07-09Job filed: Steel dunnage support for mechanical equipment.$201,600
2024-07-09Job filed: Cut roofing membrane and provide flashing for the installation of steel dunnage. No change of use occupancy or egress.$50,000
2024-07-09Job filed: Cooling systems for elevator machine rooms$450,000
2024-07-08311: Elevator — Elevator - Multiple Devices On Property
2024-07-08DOB complaint, category ?
2024-07-03311: Hazardous Materials — Chemical Odor (HD1)
2024-06-13Job filed: THIS APPLICATION IS PROPOSED FOR THE COMBINED HEAT & POWER (CHP) PROJECT COMPRISED OF (2) 2 MW NATURAL GAS RECIPROCATING ENGINE GENERATORS. THE ASSOCI$400,000
2024-06-10Job filed: Mechanical: Mezz level install new fire dampers, exhaust fan and associated duct for fire pump room$90,000
2024-06-10Job filed: Installation of new sprinkler infrastructure and standpipe risers.$1,799,980
2024-06-10Job filed: Plumbing: Mezz Level new sanitary and cold-water piping. Penthouse Level remove and replace cold water piping and adjust water level sensors in gravit$185,000
2024-06-06Job filed: install new house keeping pads for new fire pump. Submental steel rig for fire pump maintenance.$60,000
2024-06-03ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING WALLS & APPURTENANCES.AT TIME OF INSPECTION OBSERVED DEFECTED MORTAR JOINTS DAMAGED MASONRY,RUSTED ME$1,250
2024-05-22Elevator permit: Modernize 1P28232. All work to comply with ASME A17.1-2013, Part 8, Section 8.72 Safety Code for Elevators and Escalators as modif$550,000
2024-05-20311: Rodent — Signs of Rodents
2024-05-18311: Homeless Person Assistance
2024-05-18311: Homeless Person Assistance
2024-05-17Rodent inspection: Failed for Other Reason
2024-05-17311: For Hire Vehicle Report — Car Service Company Report
2024-05-17Job filed: Remove, replace existing ceilings, walls thought-out for the installation of new standpipe/sprinkler system. Create 2 hour rated encloser for new fire$321,000
2024-05-16Permit Plumbing — Signed-off
2024-05-15Job filed: BELLEVUE HOSPITAL CENTER - DAYCARE CENTER AND OFFICE - GENERAL CONSTRUCTION INCLUDING MODIFCATIONS TO CEILING, FLOOR, PARTITIONS AND DOORS AS PER PLAN$100,000
2024-05-15Job filed: BELLEVUE HOSPITAL CENTER - DAYCARE CENTER AND OFFICE - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.$50,000
2024-05-15Job filed: BELLEVUE HOSPITAL CENTER - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.$75,000
2024-05-15Job filed: SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR INSPECTION AT 421 EAST 26TH STREET MANHATTAN NY 10016.
2024-05-15Job filed: BELLEVUE HOSPITAL CENTER - DAYCARE - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$50,000
2024-05-03ECB CLASS - 1 violation: FAILURE TO MAINTAIN. AT TIME OF INSPECTION, EXPRESS ELEVATORS Q4 AND Q5 ARE OUT OF SERVICE CREATING DELAYS FOR RAPID RESPONSE TEAM$1,250
2024-04-03Elevator permit: REGROOVE TRACTION SHEAVE- All work to comply with ASME A17.1-2013, Part 8, Section 8.7.2.25 Safety Code for Elevators and Escalato$10,000
2024-04-01Permit Sprinklers — Signed-off
2024-03-31311: Dirty Condition — Trash
2024-03-30311: Encampment — N/A
2024-03-29311: Rodent — Rat Sighting
2024-03-29311: Encampment — N/A
2024-03-28311: Lost Property — Jewelry
2024-03-28311: Elevator — Elevator - Multiple Devices On Property
2024-03-25Asbestos abatement: Removal — Empire Control Abatement, Inc.
2024-03-22311: Encampment — N/A
2024-03-22311: Elevator — Elevator - Multiple Devices On Property
2024-03-22DOB complaint, category ?
2024-03-22Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2024-03-20311: Elevator — Elevator - Multiple Devices On Property
2024-03-20DOB complaint, category ?
2024-03-20Permit Mechanical Systems — Signed-off
2024-03-14Permit Earth Work — Signed-off
2024-03-14Permit General Construction — Signed-off
2024-03-12311: New Tree Request — For One Address
2024-03-12311: New Tree Request — For One Address
2024-03-12311: New Tree Request — For One Address
2024-03-08Permit Plumbing — Permit Issued
2024-03-08Permit Standpipe — Permit Issued
2024-03-08Permit Sprinklers — Permit Issued
2024-03-07Permit Sidewalk Shed — Permit Issued
2024-03-06Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2024-03-06Permit Plumbing — Permit Issued
2024-03-05Job filed: HEREWITH FILING FOR NEW PLUMBING WORK IN CONJUNCTION WITH OUTDOOR RECREATION DECK PER PLANS.$330,000
2024-03-04Permit Standpipe — Permit Issued
2024-03-04Permit Sprinklers — Permit Issued
2024-03-04Permit Plumbing — Permit Issued
2024-02-27311: Lost Property — Bag/Wallet
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22ECB CLASS - 1 violation: FAILURE TO TAKE AND PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SIDEWALK SHED FENCE ECT.FISP 3 FILING UNSAFE ON 02/13/2024 BY QE/RA.N$25,000
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-20311: Encampment — N/A
2024-02-19311: Lead — Lead Kit Request (Residential) (L10)
2024-02-05311: For Hire Vehicle Complaint — Driver Report - Non Passenger
2024-02-01Permit Standpipe — Signed-off
2024-02-01Permit Sprinklers — Signed-off
2024-01-31Permit Sprinklers — Signed-off
2024-01-31Permit Standpipe — Signed-off
2024-01-29Job filed: Minor demolition; installing drywall partitions, doors, doorframes, resilient flooring, suspended ceiling grids & tiles; painting; and installing stru$350,000
2024-01-26Job filed: Plumbing Work includes replacing existing plumbing fixtures and medical gases. There are no changes in egress or occupancy.$165,000
2024-01-16ECB CLASS - 2 violation: FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C AND 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES $1,250
2024-01-02Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS ON THE 13TH, 19TH & 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PER$100,000
2023
2023-12-29Permit General Construction — Signed-off
2023-12-29Permit General Construction — Permit Issued
2023-12-29Permit Mechanical Systems — Signed-off
2023-12-29Permit General Construction — Signed-off
2023-12-29Permit General Construction — Signed-off
2023-12-29Permit Structural — Signed-off
2023-12-29Permit Foundation — Signed-off
2023-12-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-12-27Permit Structural — Signed-off
2023-12-27Permit General Construction — Signed-off
2023-12-27Permit Mechanical Systems — Signed-off
2023-12-27Permit General Construction — Signed-off
2023-12-27Permit Structural — Signed-off
2023-12-27Permit General Construction — Signed-off
2023-12-27Permit General Construction — Permit Issued
2023-12-27Permit General Construction — Signed-off
2023-12-27Permit General Construction — Signed-off
2023-12-27Permit Foundation — Signed-off
2023-12-26Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) IN CONJUNCTION W/ ANTI-LIGATURE RENOVATIONS PE$1,575,000
2023-12-26Job filed: HEREWITH FILING FOR ARCHITECTURAL ANTI-LIGATURE WORK ON THE 13TH, 19TH AND 21ST FLRS (MARKETING FLRS 12, 18 & 20) PER PLANS. NO CHANGE IN USE, OCCUPAN$8,371,300
2023-12-19Job filed: INSTALLATION OF NEW PL FIXTURES ON 1ST FL OF BELLVUE HOSPITAL (PANERA BREAD) WITH ASSOC. BRANCH PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUP$61,345
2023-12-18Permit Mechanical Systems — Permit Issued
2023-12-12311: Lost Property — Jewelry
2023-12-06Cooling tower inspection
2023-12-05311: Non-Residential Heat — Inadequate or No Heat
2023-11-22311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2023-11-22DOB complaint, category ?
2023-11-17311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-11-16Job filed: HEREWITH FILING FOR CHANGE OF USE ON THE 2ND FLOOR PER PLANS. RESPECTFULLY REQUESTING THAT THIS APPLICATION BE ACCEPTED INTO THE HUB PER OCT 8 MEETING$20,000
2023-11-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-11-14311: Homeless Person Assistance
2023-11-13311: Homeless Person Assistance
2023-11-13311: Homeless Person Assistance
2023-11-13Permit Mechanical Systems — Permit Issued
2023-11-13Permit General Construction — Permit Issued
2023-11-07FDNY inspection (ANNUL-COL-UNI)
2023-11-02311: Street Condition — Cave-in
2023-11-01Permit Structural — Permit Issued
2023-10-31311: Encampment — N/A
2023-10-30311: Encampment — N/A
2023-10-30311: Encampment — N/A
2023-10-26311: Noise — Noise: Construction Before/After Hours (NM1)
2023-10-24311: Noise — Noise: Construction Before/After Hours (NM1)
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-26Job filed: HEREWITH FILING FOR INTERIOR RENOVATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$1,356,481
2023-09-18Job filed: Decommission of existing Sprint site. Remove antennas and equipment from the roof. Service connection in basement. Initial installation approved under$25,000
2023-09-08311: Sanitation Worker or Vehicle Complaint — Noise
2023-09-08311: Noise - Vehicle — Engine Idling
2023-09-08Permit Plumbing — Signed-off
2023-09-07Job filed: .HEREWITH FILING FOR MODIFICATIONS TO THE MECHANICAL SYSTEM AT THE 16TH FLR INFUSION CENTER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDE$268,481
2023-09-07Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$69,217
2023-09-07Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS AT THE 16TH FLR INFUSION CENTER PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$186,349
2023-08-16Job filed: HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$550,000
2023-08-16Job filed: HEREWITH FILING FOR CIVIL SITE WORK IN CONJUNCTION WITH OUTDOOR RECREATION DECK PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATIO$400,000
2023-08-14Job filed: HEREWITH FILING FOR SPRINKLER/STANDPIPE MODIFICATIONS FOR THE OUTDOOR RECREATION DECK PER PLANS.$150,000
2023-08-14Job filed: HEREWITH FILING FOR NEW PLUMBING WORK IN CONJUNCTION WITH OUTDOOR RECREATION DECK PER PLANS.$330,000
2023-08-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-08-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-08-09311: Homeless Person Assistance
2023-08-09Permit Plumbing — Signed-off
2023-08-01Job filed: HEREWITH FILING FOR CIVIL PLUMBING SITE WORK IN CONJUNCTION WITH 2ND FLR OUTDOOR RECREATION DECK PER PLANS.$400,000
2023-08-01Job filed: HEREWITH FILING OUTDOOR RECREATION DECK PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$2,000,000
2023-07-28Permit Plumbing — Signed-off
2023-07-28Permit Plumbing — Signed-off
2023-07-28Permit Plumbing — Permit Issued
2023-07-27Job filed: BELLEVUE - CPEP EXPANSION - MECHANICAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$291,500
2023-07-24311: Homeless Person Assistance
2023-07-24Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS AND FIRE HOSE CABINET RELOCATION ON THE 19TH FLR PER PLANS.$69,217
2023-07-20Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapte r 33. No change in use, egress $25,000
2023-07-18311: Litter Basket Request — New Basket
2023-07-16311: Homeless Person Assistance
2023-07-15311: Homeless Person Assistance
2023-07-14ECB CLASS - 1 violation: AT TIME OF INSPECTION I OBSERVED CONSTRUCTION ACTIVITIES ON THE BUILDING ROOF WITH WELDING OPERATION ON GOING WITH USE OF APPROXIM$625
2023-07-12311: Plumbing — Gas Hook-Up/Piping - Illegal Or Defective
2023-07-12DOB complaint, category ?
2023-07-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-06-30Job filed: WEST TOWER: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS$40,000
2023-06-30Job filed: EAST TOWER: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS$40,000
2023-06-30Permit Protection and Mechanical Methods — Permit Issued
2023-06-29Job filed: Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o$5,000
2023-06-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-22Permit Mechanical Systems — Permit Issued
2023-06-22Permit Supported Scaffold — Signed-off
2023-06-21Job filed: Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapte r 33. No change in use, egress $25,000
2023-04-25ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. OBSERVED BROKEN GLASS WINDOWS AND VERTICAL BRICK CRACKS ON EXPOSUR$1,250
2023-04-25ECB CLASS - 2 violation: 3307.6.5 FAILURE TO MAINTAIN SIDEWALK SHED AS REQUIRED BY CODE. OBSERVED MISSING PARAPET PANEL AND DAMAGED MUDSILLS ON EXPOSURE #2$1,250
2023-04-24Job filed: HEREWITH FILING GENERAL CONSTRUCTION WORK FOR 19TH FLOOR FORENSIC EXPANSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$1,006,974
2023-04-18Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 19TH FLR FORENSIC UNIT PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$243,788
2023-04-18Permit Mechanical Systems — Permit Issued
2023-04-18Permit General Construction — Permit Issued
2023-04-18Permit EW — ISSUED
2023-04-18Permit EW — ISSUED
2023-04-16311: Indoor Air Quality — Chemical Vapors/Gases/Odors
2023-04-12Permit Mechanical Systems — Signed-off
2023-04-07Permit Construction Fence — Permit Issued
2023-04-06Boiler inspection
2023-04-06Boiler inspection
2023-04-06Boiler inspection
2023-04-06Boiler inspection
2023-04-05Permit Plumbing — Permit Issued
2023-03-31311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-03-13Permit Protection and Mechanical Methods — Permit Issued
2023-03-10311: Homeless Person Assistance
2023-03-08Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-03-08Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-03-07Permit Sprinklers — Signed-off
2023-02-27Permit Sidewalk Shed — Permit Issued
2023-02-24Permit Protection and Mechanical Methods — Permit Issued
2023-02-22Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$25,000
2023-02-15Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3 of 2015, as m$196,000
2023-02-15311: Taxi Report — Vehicle Report
2023-02-15Permit Standpipe — Signed-off
2023-02-15Permit Sprinklers — Signed-off
2023-02-08311: Lost Property — Electronics/Phones
2023-02-03311: Illegal Parking — Blocked Hydrant
2023-02-03311: Encampment — N/A
2023-02-01Permit Standpipe — Permit Issued
2023-02-01Permit Sprinklers — Permit Issued
2023-02-01Permit Plumbing — Permit Issued
2023-01-27Permit Sprinklers — Permit Issued
2023-01-27Permit Standpipe — Permit Issued
2023-01-27Permit Sprinklers — Signed-off
2023-01-26Rodent inspection: Passed
2023-01-19Permit General Construction — Signed-off
2023-01-19Permit Foundation — Signed-off
2023-01-19Permit Structural — Signed-off
2023-01-17Permit Mechanical Systems — Signed-off
2023-01-17Permit Structural — Signed-off
2023-01-17Permit Mechanical Systems — Signed-off
2023-01-17Permit Structural — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit Structural — Signed-off
2023-01-17Permit Structural — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit Structural — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit General Construction — Permit Issued
2023-01-17Permit Foundation — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit General Construction — Signed-off
2023-01-17Permit Mechanical Systems — Signed-off
2023-01-17Permit Mechanical Systems — Signed-off
2023-01-17Permit Foundation — Signed-off
2023-01-17Permit Mechanical Systems — Signed-off
2023-01-13Elevator permit: Modification to the existing controller to install Door Position Monitoring System as per requirements of ASME A17.3 of 2015, as m$24,500
2023-01-12311: Homeless Person Assistance
2023-01-11Permit Mechanical Systems — Signed-off
2023-01-06Permit Sidewalk Shed — Signed-off
2023-01-05311: Illegal Parking — Blocked Hydrant
2023-01-05Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE $5,000
2023-01-04Elevator permit: FURNISH AND INSTALL - DOOR OPERATOR, "THIC" PACKAGE.ALL WORK TO COMPLY WITH ASME A17.1-2013 PART 2, SAFETY CODE FOR ELEVATORS AND $50,000
2022
2022-12-30Permit Mechanical Systems — Signed-off
2022-12-30Permit Structural — Signed-off
2022-12-30Permit General Construction — Signed-off
2022-12-30Permit General Construction — Signed-off
2022-12-30Permit Mechanical Systems — Signed-off
2022-12-30Permit General Construction — Permit Issued
2022-12-30Permit Structural — Signed-off
2022-12-30Permit Foundation — Signed-off
2022-12-30Permit General Construction — Permit Issued
2022-12-30Permit Structural — Signed-off
2022-12-30Permit General Construction — Signed-off
2022-12-21311: Lost Property — Bag/Wallet
2022-12-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-12-13Permit Mechanical Systems — Permit Issued
2022-12-09Job filed: HEREWITH FILING FOR 2ND FLOOR MECHANICAL DEMOLITION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$294,406
2022-12-06Job filed: HEREWITH FILING FOR SPRINKLER MODIFICATIONS AND FIRE HOSE CABINET RELOCATION ON THE 19TH FLR PER PLANS.$69,217
2022-12-06Job filed: HEREWITH FILING FOR PLUMBING MODIFICATIONS TO THE 19TH FLR FORENSIC UNIT PER PLANS.$128,736
2022-12-06Job filed: HEREWITH FILING GENERAL CONSTRUCTION WORK FOR 19TH FLOOR FORENSIC EXPANSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$1,006,974
2022-12-06Job filed: HEREWITH FILING FOR MECHANICAL MODIFICATIONS IN THE 19TH FLR FORENSIC UNIT PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$243,788
2022-12-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-12-02311: Rodent — Rat Sighting
2022-12-02311: Lost Property — Bag/Wallet
2022-11-29311: Encampment — N/A
2022-11-16Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-11-14Permit General Construction — Permit Issued
2022-11-10Permit Mechanical Systems — Permit Issued
2022-11-09Permit Sidewalk Shed — Permit Issued
2022-11-07311: Abandoned Vehicle — With License Plate
2022-11-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-11-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-11-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-11-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-11-02Elevator permit: Furnish and Install One (1) Dual Roped Hydraulic Passenger Elevator. New Amendment/ P2. See Device Description for Details.$354,595
2022-11-01Permit Construction Fence — Signed-off
2022-10-31Rodent inspection: Failed for Other Reason
2022-10-26Job filed: Dunnage and openings for new AC unit and exhaust for Trauma room$51,360
2022-10-26Job filed: Cosmetic upgrades to Bellevue's ER Trauma Room ; replacement of an aging nurses station with new millwork$1,495,008
2022-10-20Job filed: Provide a dedicated air cooled conditioning unit for the trauma room and ICU. Provide trauma room with dedicated exhaust system.$904,304
2022-10-20Job filed: Replace existing medical gas outlets in Trauma room. Replace existing sinks in trauma room and nurse's station.$25,008
2022-10-20Job filed: Replace existing sprinklers in Trauma room$25,008
2022-10-18311: Homeless Person Assistance
2022-10-17Job filed: HEREWITH FILING FOR FOUNDATION AND STRUCTURAL WORK FOR OUTDOOR RECREATION SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICA$5,500,000
2022-10-14Permit General Construction — Permit Issued
2022-10-14Permit Structural — Permit Issued
2022-10-14Permit Earth Work — Permit Issued
2022-10-14Permit Foundation — Permit Issued
2022-10-11311: Rodent — Mouse Sighting
2022-10-06Permit General Construction — Signed-off
2022-10-04Permit Protection and Mechanical Methods — Permit Issued
2022-10-04Permit Protection and Mechanical Methods — Permit Issued
2022-10-03311: Noise - Helicopter — Other
2022-09-27311: Homeless Person Assistance
2022-09-27Job filed: HEREWITH FILING FOR FOUNDATION AND STRUCTURAL WORK FOR OUTDOOR RECREATION SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICA$5,500,000
2022-09-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-22Asbestos abatement: Removal — International Asbestos Removal, Inc.
2022-09-07311: Lead — Lead Kit Request (Residential) (L10)
2022-09-07Job filed: HEREWITH FILING FOR 2ND FLOOR INTERIOR RENOVATIONS AND GROUND FLR CANOPY REMOVAL/TEST PIT INFILL PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UND$5,074,149
2022-09-06Job filed: Proposed replacement of combined wet Sprinkler & SD south riser due to pipe corrosion. All as per plans filed herewith.$278,016
2022-08-31311: Day Care — Day Care Facility
2022-08-30Permit Structural — Permit Issued
2022-08-30Permit Foundation — Permit Issued
2022-08-30Permit General Construction — Permit Issued
2022-08-30Permit Earth Work — Permit Issued
2022-08-29Job filed: HEREWITH FILING FOR ROOF REPAIR WORK PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$150,000
2022-08-17Job filed: INSTALLATION OF NEW PL FIXTURES ON 1ST FL OF BELLVUE HOSPITAL (PANERA BREAD) WITH ASSOC. BRANCH PIPING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUP$61,345
2022-08-11311: New Tree Request — For One Address
2022-08-02Cooling tower inspection
2022-08-02Asbestos abatement: Removal — JVN Restoration Inc.
2022-08-02Asbestos abatement: Removal — JVN Restoration Inc.
2022-08-02Permit General Construction — Signed-off
2022-08-02Permit Structural — Signed-off
2022-08-02Permit Foundation — Signed-off
2022-08-01Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-07-29Permit Structural — Permit Issued
2022-07-29Permit Foundation — Signed-off
2022-07-29Permit Structural — Signed-off
2022-07-29Permit General Construction — Signed-off
2022-07-15Asbestos abatement: Removal — PAR Environmental Corporation
2022-07-12Cooling tower inspection
2022-07-09311: Mobile Food Vendor — Permit/License/Certificate
2022-07-03311: New Tree Request — For One Address
2022-07-01Job filed: Bellevue Hospital - Roche Lab - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$12,000
2022-06-27Job filed: Constructing CHP platform at Bellevue Hospital.$2,030,000
2022-06-27Job filed: HEREWITH FILING FOR FOUNDATION AND STRUCTURAL WORK FOR OUTDOOR RECREATION SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICA$5,500,000
2022-06-27Permit EW — ISSUED
2022-06-24311: Homeless Person Assistance
2022-06-24Permit EW — ISSUED
2022-06-18311: Abandoned Vehicle — With License Plate
2022-06-18311: Abandoned Vehicle — With License Plate
2022-06-17311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-14Permit General Construction — Signed-off
2022-06-12311: Homeless Person Assistance
2022-06-09Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-06-09Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-06-09Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-06-09311: Homeless Person Assistance
2022-06-08311: Homeless Person Assistance
2022-06-08Permit Construction Fence — Signed-off
2022-06-06Permit General Construction — Permit Issued
2022-06-05311: Homeless Person Assistance
2022-06-05311: Consumer Complaint — Mobile Food Vendor
2022-06-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-03Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $91,400
2022-06-01Job filed: HEREWITH FILING FOR CONSTRUCTION FENCE PER PLANS (H BUILDING). NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$50,000
2022-06-01Job filed: HEREWITH FILING FOR TEST PITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$1,000
2022-05-26Permit Construction Fence — Permit Issued
2022-05-17Permit Mechanical Systems — Permit Issued
2022-05-17Permit Structural — Signed-off
2022-05-17Permit General Construction — Permit Issued
2022-05-13Permit General Construction — Signed-off
2022-05-13Permit Construction Fence — Permit Issued
2022-05-13Permit General Construction — Permit Issued
2022-05-12Job filed: INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$24,000
2022-05-11Boiler inspection
2022-05-11Boiler inspection
2022-05-11Boiler inspection
2022-05-11Boiler inspection
2022-05-11Job filed: HEREWITH FILING FOR FOUNDATION WORK AS PER PLANS,$5,500,000
2022-04-13Job filed: HEREWITH FILING FOR CONDENSATE PIPING RELOCATION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$10,000
2022-04-12Job filed: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CH$20,000
2022-04-06Permit General Construction — Permit Issued
2022-04-02311: Broken Parking Meter — Coin or Card Did Not Register
2022-03-30Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$30,000
2022-03-29Job filed: FUEL GAS PIPING TO SUPPORT INSTALLATION OF TWO NEW COGEN ENGINES$400,000
2022-03-29Job filed: CONSTRUCTION FENCE TO SUPPORT INSTALLATION OF COGEN ENGINES.$2,000,000
2022-03-22Permit Protection and Mechanical Methods — Permit Issued
2022-03-22Permit Mechanical Systems — Signed-off
2022-03-22Permit EW — ISSUED
2022-03-22Permit EW — ISSUED
2022-03-21Job filed: INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPAN$3,000
2022-03-21Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$30,000
2022-03-14Asbestos abatement: Removal — PAR Environmental Corporation
2022-03-11Permit Sprinklers — Permit Issued
2022-03-11Permit Standpipe — Permit Issued
2022-03-11Permit Plumbing — Permit Issued
2022-03-09311: Illegal Parking — Blocked Hydrant
2022-03-09Permit Standpipe — Signed-off
2022-03-09Permit Sprinklers — Signed-off
2022-03-09Permit Plumbing — Signed-off
2022-03-07Elevator permit: Installation of a Dual 7000 LB Capacity Personnel/Material Hoist during building alteration, filed separately. Installations and T$20,000
2022-03-05Job filed: EXISTING FIRE DEPARTMENT CONNECTION TO BE EXTENDED OUT TO TEMPORARY FENCE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP$10,200
2022-03-03311: Abandoned Vehicle — With License Plate
2022-03-03Job filed: INSTALLATION OF A TEMPORARY SPRINKLER SYSTEM ON THE 2ND FLOOR AT BELLEVUE HOSPITAL AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPA$71,000
2022-03-02Job filed: EXISTING FIRE DEPARTMENT CONNECTION TO BE EXTENDED OUT TO TEMPORARY FENCE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP$10,200
2022-03-02Permit Standpipe — Permit Issued
2022-03-01Permit Sprinklers — Signed-off
2022-02-24311: Lead — Lead Kit Request (Residential) (L10)
2022-02-22Permit Construction Fence — Permit Issued