Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

1095 Avenue of the Americas · Manhattan · BBL 1009947501 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

3 heat or hot-water complaints in the last three years (winter 2024–25: 1).

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

204 service requests in the last three years. Most common: Noise (53) · For Hire Vehicle Complaint (34) · Illegal Parking (22) · Consumer Complaint (12) · Non (10) · Water System (8).

Filed construction activity

$232,739,439 in permitted construction work filed since 2016 (558 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$17,283,339 $7,777,503
2026$533,868,485 $240,240,818
2027$17,417,947 $7,838,076

The city's market estimate has risen 1% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)D — ENERGY STAR score 14/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuelNO2FUEL
Facade (Local Law 11)SAFE (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
Dechert (the Dech)AmericanA—
EarthbarNot yet graded—
Ohana Exhibition KitchenFusionA—
Rosetta BakerySpanishA—
Shake Shack Bryant ParkSandwichesA—
Standard CharteredNot yet graded—
Valbella At the ParkItalianA—

Report to 311: Food poisoning · Food safety complaint

7 restaurants · 0 with mice evidence · See them on the Mice Map

3 food-poisoning reports to 311 at this address in the last three years (0 with three or more people sick), shared by 7 restaurants
4 Food Establishment complaints to 311 at this address in the last three years (most often: Food Contains Foreign Object, Food Protection, Food Spoiled), shared by 7 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

2 street-flooding or sewer-backup complaints at this address since 2014 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway42 St-Bryant Pk — 7 B D F M · 100 ft straight-line (about a 1-minute walk) · station accessibility: none
Times Sq-42 St — 1 2 3 7 A C E N Q R S W · 500 ft straight-line (about a 2-minute walk) · station accessibility: full
BusNearest boarding stop: W 42 St / Av of the Americas — M42 SIM8 SIM22 SIM25 +2 more · 200 ft
Citi BikeW 42 St & 6 Ave · 150 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 051 Elias Howe
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

1095 Avenue of the Americas

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

204 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION $1,125,000,000
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION $1,125,000,000
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION $1,125,000,000
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION $1,125,000,000
2023-04-20RPTT $1,121,273 — from FRANK RUSSELL COMPANY to RUSSELL INVESTMENTS US INSTITUTIONAL HOL $1,121,273
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC $84,100,000
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC $84,100,000
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC $84,100,000
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC $84,100,000
2016-08-03RPTT&RET $1,152,970,000 — from 3 BRYANT PARK LP to REAL SUMMIT INVESTMENT COMPANY LIMITED $1,152,970,000
2016-08-03RPTT&RET $1,152,970,000 — from 3 BRYANT PARK LP to REAL SUMMIT INVESTMENT COMPANY LIMITED $1,152,970,000
2016-08-03RPTT&RET $1,152,970,000 — from 3 BRYANT PARK LP to REAL SUMMIT INVESTMENT COMPANY LIMITED $1,152,970,000
2016-08-03RPTT&RET $1,152,970,000 — from 3 BRYANT PARK LP to REAL SUMMIT INVESTMENT COMPANY LIMITED $1,152,970,000
2016-07-12RPTT $2,170,709 — from NORTHWESTERN MUTUAL LIFE INSURANCE COMAP to LSEG US HOLDCO, INC. $2,170,709
2015-01-26AL&R $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to GERMAN AMERICAN CAPITAL CORPORATION $1,125,000,000

Ten-year activity

5002500
2017
2018
2019
2020
2021
2022
2023
2024
294
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017138264149218
20181341543019211
20191151269026222
2020511312005189
202180624021131
20225236005120
20238135118144
2024165871010254
202516411652826294
202685461792249
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 312 records

DateRecord
2026-10-14Permit Protection and Mechanical Methods — Permit Issued
2026-10-14Permit Supported Scaffold — Permit Issued
2026-10-09311: Sidewalk Condition — Broken Sidewalk
2026-10-07Facade (LL11) filing, cycle 10:
2026-10-02Permit Plumbing — Permit Issued
2026-10-01Permit Sprinklers — Permit Issued
2026-09-30Permit Plumbing — Permit Issued
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floors as per plans (Verizon - Demo Phas
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Pha
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floors as per plans (Verizon - Demo Phas
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floors as per plans (Verizon - Demo Pha
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 11th Floors as per plans (Verizon - Demo Pha
2026-09-29311: Illegal Parking — Parking Permit Improper Use
2026-09-29Permit General Construction — Permit Issued
2026-09-29Permit Mechanical Systems — Permit Issued
2026-09-23311: Homeless Person Assistance — Non-Chronic
2026-09-23Permit General Construction — Permit Issued
2026-09-23Job filed: Removal of two (2) sinks, one (1) WC and associated CW/sanitary piping on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egres
2026-09-23Job filed: Modifications to the existing Sprinkler System: Remove (48) existing sprinkler heads, Install (41) new sprinkler heads and associated sprinkler piping
2026-09-23Job filed: Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (
2026-09-23Job filed: Modifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work -
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-09-21Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 12th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupa
2026-09-21Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 12th Floor as per plans (Verizon Demo P
2026-09-18311: Food Establishment — Food Spoiled
2026-09-18Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Pha
2026-09-17Permit General Construction — Permit Issued
2026-09-16Permit Sprinklers — Permit Issued
2026-09-15Permit Plumbing — Permit Issued
2026-09-14311: Illegal Parking — Posted Parking Sign Violation
2026-09-14Permit Mechanical Systems — Permit Issued
2026-09-14Job filed: Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Buildout Phase.) No c
2026-09-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-09-10Job filed: Install new plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Buildout Phase.) No change to use, egress or occu
2026-09-10Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy
2026-09-10Job filed: Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 40th Floor as per plans (LL Work - Demo.) No c
2026-09-10Job filed: Modifications to the existing Sprinkler System: Remove (3) heads, relocate (21) heads and Install (7) new sprinkler heads and associated piping on the
2026-09-10Job filed: Modifications to the existing Sprinkler System: Remove (277) existing sprinkler heads, Install (43) new sprinkler heads and associated sprinkler pipin
2026-09-10Job filed: Modifications to the existing HVAC System: Installation and relocation of ductwork and returns on the 38th Floor as per plans (IMC Buildout Phase.) No
2026-09-09Job filed: Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 40th Floor as per plans
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-28Permit Plumbing — Permit Issued
2026-08-26Permit General Construction — Permit Issued
2026-08-26Permit General Construction — Permit Issued
2026-08-25311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2026-08-25DOB complaint, category ?
2026-08-24SAGE — from BOARD MANAGERS OF 1095 AVENUE OF THE AME; 3 BP PROPERTY OWNER LLC to SALESFORCE, INC.
2026-08-24SAGE — from BOARD MANAGERS OF 1095 AVENUE OF THE AME; 3 BP PROPERTY OWNER LLC to SALESFORCE, INC.
2026-08-24SAGE — from BOARD MANAGERS OF 1095 AVENUE OF THE AME; 3 BP PROPERTY OWNER LLC to SALESFORCE, INC.
2026-08-24Permit Mechanical Systems — Permit Issued
2026-08-24Permit Mechanical Systems — Permit Issued
2026-08-20Certificate of occupancy Renewal Without Change
2026-08-20Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Demo Phase.)
2026-08-20Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 38th Floor as per plans (IMC Demo Phase
2026-08-19Restaurant inspection: SHAKE SHACK BRYANT PARK — grade A
2026-08-19Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Demo Phase.) No change to use, egress or occupancy
2026-08-11Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 7th Floor as per plans (Verizon Demo Ph
2026-08-11Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 11th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupa
2026-08-11Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 10th Floors as per plans (Verizon Demo Phase.) No change to use, egress or occup

showing the 80 most recent

The full timeline

showing the 2,000 most recent of 4,730 events

2026
2026-10-14Permit Protection and Mechanical Methods — Permit Issued
2026-10-14Permit Supported Scaffold — Permit Issued
2026-10-09311: Sidewalk Condition — Broken Sidewalk
2026-10-07Facade (LL11) filing, cycle 10:
2026-10-02Permit Plumbing — Permit Issued
2026-10-01Permit Sprinklers — Permit Issued
2026-09-30Permit Plumbing — Permit Issued
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floors as per plans (Verizon - Demo Phas$125,000
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Pha$125,000
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floors as per plans (Verizon - Demo Phas$125,000
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floors as per plans (Verizon - Demo Pha$125,000
2026-09-30Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 11th Floors as per plans (Verizon - Demo Pha$125,000
2026-09-29311: Illegal Parking — Parking Permit Improper Use
2026-09-29Permit General Construction — Permit Issued
2026-09-29Permit Mechanical Systems — Permit Issued
2026-09-23311: Homeless Person Assistance — Non-Chronic
2026-09-23Permit General Construction — Permit Issued
2026-09-23Job filed: Removal of two (2) sinks, one (1) WC and associated CW/sanitary piping on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egres$14,100
2026-09-23Job filed: Modifications to the existing Sprinkler System: Remove (48) existing sprinkler heads, Install (41) new sprinkler heads and associated sprinkler piping$42,500
2026-09-23Job filed: Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans ($111,900
2026-09-23Job filed: Modifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work - $34,000
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21SAGE — from COMPUTERSHARE TRUST COMPANY, NATIONAL AS to 3 BP PROPERTY OWNER LLC; SALESFORCE, INC.
2026-09-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-09-21Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 12th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupa$25,000
2026-09-21Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 12th Floor as per plans (Verizon Demo P$50,000
2026-09-18311: Food Establishment — Food Spoiled
2026-09-18Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Pha$125,000
2026-09-17Permit General Construction — Permit Issued
2026-09-16Permit Sprinklers — Permit Issued
2026-09-15Permit Plumbing — Permit Issued
2026-09-14311: Illegal Parking — Posted Parking Sign Violation
2026-09-14Permit Mechanical Systems — Permit Issued
2026-09-14Job filed: Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Buildout Phase.) No c$952,000
2026-09-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-09-10Job filed: Install new plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Buildout Phase.) No change to use, egress or occu$10,000
2026-09-10Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy$11,775
2026-09-10Job filed: Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 40th Floor as per plans (LL Work - Demo.) No c$54,000
2026-09-10Job filed: Modifications to the existing Sprinkler System: Remove (3) heads, relocate (21) heads and Install (7) new sprinkler heads and associated piping on the$45,900
2026-09-10Job filed: Modifications to the existing Sprinkler System: Remove (277) existing sprinkler heads, Install (43) new sprinkler heads and associated sprinkler pipin$28,400
2026-09-10Job filed: Modifications to the existing HVAC System: Installation and relocation of ductwork and returns on the 38th Floor as per plans (IMC Buildout Phase.) No$85,000
2026-09-09Job filed: Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 40th Floor as per plans $243,581
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-09-01Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-28Permit Plumbing — Permit Issued
2026-08-26Permit General Construction — Permit Issued
2026-08-26Permit General Construction — Permit Issued
2026-08-25311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2026-08-25DOB complaint, category ?
2026-08-24SAGE — from BOARD MANAGERS OF 1095 AVENUE OF THE AME; 3 BP PROPERTY OWNER LLC to SALESFORCE, INC.
2026-08-24SAGE — from BOARD MANAGERS OF 1095 AVENUE OF THE AME; 3 BP PROPERTY OWNER LLC to SALESFORCE, INC.
2026-08-24SAGE — from BOARD MANAGERS OF 1095 AVENUE OF THE AME; 3 BP PROPERTY OWNER LLC to SALESFORCE, INC.
2026-08-24Permit Mechanical Systems — Permit Issued
2026-08-24Permit Mechanical Systems — Permit Issued
2026-08-20Certificate of occupancy Renewal Without Change
2026-08-20Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Demo Phase.)$22,000
2026-08-20Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 38th Floor as per plans (IMC Demo Phase$8,000
2026-08-19Restaurant inspection: SHAKE SHACK BRYANT PARK — grade A
2026-08-19Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Demo Phase.) No change to use, egress or occupancy$3,300
2026-08-11Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 7th Floor as per plans (Verizon Demo Ph$50,000
2026-08-11Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 11th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupa$25,000
2026-08-11Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 10th Floors as per plans (Verizon Demo Phase.) No change to use, egress or occup$25,000
2026-08-10Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 11th Floor as per plans (Verizon Demo P$50,000
2026-08-10Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 11th Floors as per plans (Verizon - Demo Pha$125,000
2026-08-10Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floors as per plans (Verizon - Demo Pha$125,000
2026-08-10Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 9th Floors as per plans (Verizon Demo Phase.) No change to use, egress or occupa$25,000
2026-08-10Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 9th Floor as per plans (Verizon Demo Ph$50,000
2026-08-10Job filed: Removal of plumbing fixtures and associated CW/sanitary piping on the 7th Floors as per plans (Verizon Demo Phase.) No change to use, egress or occupa$25,000
2026-08-10Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floors as per plans (Verizon - Demo Phas$125,000
2026-08-10Job filed: Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 10th Floor as per plans (Verizon Demo P$50,000
2026-08-10Job filed: Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floors as per plans (Verizon - Demo Phas$125,000
2026-08-07311: Water Maintenance — Leak
2026-08-05311: Consumer Complaint — Door to Door Sales
2026-08-05Job filed: meeting hall for training and cocktail events
2026-08-04Job filed: Alterations to the existing exterior wall to relocate generator exhaust flue and repair and replace existing exterior wall on the 1st & 2nd Floor Roof$15,000
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Asbestos abatement: Removal — JVN Restoration Inc.
2026-08-03Certificate of occupancy Renewal With Change
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-27Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-24311: Lost Property — Electronics/Phones
2026-07-24Permit Sprinklers — Permit Issued
2026-07-24Permit Sprinklers — Signed-off
2026-07-23311: Graffiti — Graffiti
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-21Permit General Construction — Permit Issued
2026-07-21Permit General Construction — Signed-off
2026-07-20Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-20Asbestos abatement: Removal — JVN Restoration Inc.
2026-07-15Job filed: Sprinkler modifications on 39th floor as per plans filed herewith, no changes in use, egress or occupacny.$21,132
2026-07-14Job filed: General construction on 39th floor as per plans filed herewith. No change in use, egress or occupancy.$177,141
2026-07-13311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2026-07-13DOB complaint, category ?
2026-07-10311: Food Poisoning — 1 or 2
2026-07-10Job filed: Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 16-20th Floors as per plans (Sa$650,000
2026-07-10Job filed: Modifications to the existing Sprinkler System: Remove (43) temporary heads and Install (188) new sprinkler heads and associated piping on the 25th Fl$140,000
2026-07-06Certificate of occupancy Renewal Without Change
2026-06-23Permit Mechanical Systems — Permit Issued
2026-06-22Asbestos abatement: Removal — JVN Restoration Inc.
2026-06-21311: Noise - Street/Sidewalk — Loud Music/Party
2026-06-20311: Noise - Street/Sidewalk — Loud Music/Party
2026-06-08Job filed: Modifications to the existing HVAC System: Installation of new supplemental AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - $230,000
2026-06-05311: Animal-Abuse — Other (complaint details)
2026-06-05311: Homeless Person Assistance — Non-Chronic
2026-06-03311: Noise - Street/Sidewalk — Loud Talking
2026-06-03311: Noise - Street/Sidewalk — Loud Talking
2026-06-03311: Noise - Street/Sidewalk — Loud Talking
2026-06-03311: Noise - Street/Sidewalk — Loud Music/Party
2026-06-02311: Noise - Street/Sidewalk — Loud Talking
2026-06-02311: Noise - Residential — Loud Talking
2026-06-02311: Noise - Street/Sidewalk — Loud Talking
2026-06-02311: Noise - Street/Sidewalk — Loud Talking
2026-06-01311: For Hire Vehicle Complaint — Equipment Complaint
2026-05-29311: Noise - Residential — Loud Talking
2026-05-29311: Noise - Street/Sidewalk — Loud Talking
2026-05-29311: Noise - Vehicle — Car/Truck Music
2026-05-28311: Noise - Street/Sidewalk — Loud Talking
2026-05-28311: Noise - Street/Sidewalk — Loud Talking
2026-05-26Certificate of occupancy Renewal Without Change
2026-05-19311: Illegal Parking — Posted Parking Sign Violation
2026-05-17311: Non-Emergency Police Matter — Other (complaint details)
2026-05-13311: Illegal Parking — Double Parked Blocking Traffic
2026-05-05311: Taxi Complaint — Driver Complaint - Non Passenger
2026-04-22311: Food Establishment — Food Protection
2026-04-22Certificate of occupancy Renewal Without Change
2026-04-07Job filed: Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application numbers: M009879$7,000
2026-04-01311: Consumer Complaint — Mobile Food Vendor
2026-03-27311: Vendor Enforcement — Non-Food Vendor
2026-03-24311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2026-03-24DOB complaint, category ?
2026-03-19Cooling tower inspection — violation AH8S
2026-03-05311: Illegal Parking — Posted Parking Sign Violation
2026-03-05Job filed: Minor interior demo. Installation of new interior partitions, doors, suspended ceilings, raised flooring and finishes on the 36th Floor as per plans ($7,168,068
2026-02-26Job filed: Install (392) new sprinkler heads and associated Sprinkler Piping on the 36th Floor as per plans (Standard Chartered Bank - Phase 2) No change to use,$189,600
2026-02-26Job filed: Furnish and Install New Mechanical System throughout floor - new ductwork, piping, FPBs, air outlets and AC Units on the 36th Floor as per plans (Stan$1,562,520
2026-02-26Job filed: Additions and modifications to the existing Sprinkler System: Install (14) new temporary heads and (374) new permanent sprinkler heads and associated $225,810
2026-02-26Job filed: New mechanical system throughout 37th Floor, inclusive of new ductwork, piping, air outlets, AC units, as per plans (Standard Chartered Bank.) No chan$2,187,135
2026-02-25311: Noise - Street/Sidewalk — Loud Talking
2026-02-25311: Noise - Street/Sidewalk — Loud Talking
2026-02-25311: Noise - Street/Sidewalk — Loud Talking
2026-02-25311: Noise - Street/Sidewalk — Loud Talking
2026-02-25Certificate of occupancy Renewal Without Change
2026-02-24311: Consumer Complaint — Bodega, Deli, or Convenience Store
2026-02-21311: Taxi Complaint — Driver Complaint - Passenger
2026-02-19311: Homeless Person Assistance — Non-Chronic
2026-02-19Certificate of occupancy Renewal Without Change
2026-02-17Permit Plumbing — Permit Issued
2026-02-13311: Non-Emergency Police Matter — Other (complaint details)
2026-02-12Permit Sprinklers — Permit Issued
2026-02-10311: Non-Emergency Police Matter — Other (complaint details)
2026-02-09311: Non-Emergency Police Matter — Other (complaint details)
2026-02-06311: Water System — Excessive Water In Basement (WEFB)
2026-02-03311: Taxi Complaint — Driver Complaint - Passenger
2026-02-03311: Water System — Hydrant Defective (WC2)
2026-02-03Job filed: Alt CO filed to increase population and establish PA on the 36th fl.$311,250
2026-02-01311: Snow or Ice — Sidewalk
2026-01-23Permit General Construction — Permit Issued
2026-01-23Permit General Construction — Permit Issued
2026-01-21Job filed: No Work
2026-01-19311: Non-Emergency Police Matter — Other (complaint details)
2026-01-15311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2026-01-15311: Vendor Enforcement — Food Vendor
2026-01-15DOB complaint, category ?
2026-01-14311: Non-Emergency Police Matter — Other (complaint details)
2026-01-13311: Street Light Condition — Street Light Out
2026-01-04311: Consumer Complaint — Pedicab
2025
2025-12-31311: Noise - Street/Sidewalk — Loud Music/Party
2025-12-28311: Non-Emergency Police Matter — Other (complaint details)
2025-12-25311: Water System — Hydrant Leaking (WC1)
2025-12-22Permit Sign — Permit Issued
2025-12-18311: Illegal Parking — Posted Parking Sign Violation
2025-12-18311: Food Poisoning — 1 or 2
2025-12-17Restaurant inspection: ROSETTA BAKERY — grade A
2025-12-15Job filed: Replace (8) water closets, (2) urinals, (10) lavatories and Install New: (2) lavs, (2) WCs, (3) HWH, (9) FD, (7) Ice Makers, (2) DW, (2) DF, (12) Sink$462,160
2025-12-09311: Illegal Parking — License Plate Obscured
2025-12-04Permit Mechanical Systems — Permit Issued
2025-12-03Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR PANDORA$2,574
2025-12-01Permit Mechanical Systems — Signed-off
2025-12-01Job filed: Remove (6) head, install (6) new heads on 17; Remove (7) head, install (7) new heads on 18; Remove (7) head, install (7) new heads on 19; Remove (6) h$50,000
2025-12-01Job filed: Remove plumbing fixtures and associated piping. Install new plumbing fixtures and associated CW/sanitary piping on the 16-20th Floors as per plans (Sa$650,000
2025-11-28Certificate of occupancy Renewal With Change
2025-11-26311: Consumer Complaint — Street Fair Vendor
2025-11-26Permit General Construction — Permit Issued
2025-11-26Job filed: Modifications to the existing HVAC System: Installation of new ductwork, diffusers and grilles on the 17-20th Floors as per plans (Salesforce Restroom$87,000
2025-11-24Certificate of occupancy Renewal Without Change
2025-11-24Permit Protection and Mechanical Methods — Signed-off
2025-11-21Job filed: Holiday Celebration
2025-11-20Elevator permit: Furnish and install one (1) Vertical Platform Lift as detailed in the attached drawings. All work will comply with ASME A18.1-201$91,000
2025-11-20Job filed: Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 17-20th Floors as per plans (Salesf$1,165,000
2025-11-20Job filed: No Work
2025-11-20Job filed: Installation of temporary plywood enclosure and platform during construction operation as per plans (Hines Cubes Amenity Project.) No change to use, e$17,000
2025-11-19Job filed: Modifications to the existing HVAC System: Installation of new 40-ton AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - AC Uni$300,000
2025-11-17Elevator permit: Removal of Device 1W7218 (wheelchair lift).All work to comply with ASME A18.1-2017, Section 2, Vertical Platform Lifts, Chapter 30$30,200
2025-11-17311: Illegal Parking — Blocked Crosswalk
2025-11-13Job filed: TPA PERMIT IS REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 27, 2025 FROM 7:30 AM TO 1:30 PM FOR 300 PERSONS. OCCUPANCY WILL BE 150 P
2025-11-11Elevator permit: nstall Rope Grippers and the necessary controller software on (Device 1P29930) All work to comply with ASME A17.3-2015, Section 3$52,551
2025-11-10Permit Mechanical Systems — Signed-off
2025-11-10Permit Mechanical Systems — Signed-off
2025-11-07Permit Sprinklers — Signed-off
2025-11-07Permit Sprinklers — Permit Issued
2025-11-07Permit Plumbing — Permit Issued
2025-11-03Permit General Construction — Signed-off
2025-11-03Job filed: Modifications to the existing Sprinkler System: Remove (43) temporary heads and Install (188) new sprinkler heads and associated piping on the 25th Fl$140,000
2025-11-03Job filed: Install (5) BFPs (secondary), (3) CM, (2) DW, (1) IM, (4) FDs, (1) WC, (1) Lav, (1) HWH, (2) sinks, (1) water dispenser, (1) circulation pump and asso$144,000
2025-10-31Certificate of occupancy Renewal Without Change
2025-10-31Job filed: Modifications to the existing HVAC System: HVAC demolition, cut back & demolish duck work on the 25th Floor as per plans (Salesforce NY Tower.) No cha$60,000
2025-10-31Job filed: Modifications to the existing HVAC System: Installation of new Water-Air Heat Pump, ductwork, diffusers and grilles on the 25th Floor as per plans (Sa$946,000
2025-10-31Job filed: Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 25th Floor as per plans (Salesforce$2,251,000
2025-10-29Permit Standpipe — Permit Issued
2025-10-29Permit Sprinklers — Signed-off
2025-10-29Permit Sprinklers — Permit Issued
2025-10-29Permit Standpipe — Signed-off
2025-10-27Permit Sprinklers — Signed-off
2025-10-24311: Noise - Street/Sidewalk — Loud Talking
2025-10-24311: Noise - Street/Sidewalk — Loud Music/Party
2025-10-24311: Noise - Street/Sidewalk — Loud Talking
2025-10-24311: Noise - Street/Sidewalk — Loud Talking
2025-10-24311: Noise - Street/Sidewalk — Loud Music/Party
2025-10-24311: Noise - Street/Sidewalk — Loud Talking
2025-10-24Permit Mechanical Systems — Permit Issued
2025-10-24Permit Mechanical Systems — Permit Issued
2025-10-24Permit General Construction — Permit Issued
2025-10-24Permit General Construction — Permit Issued
2025-10-24Permit General Construction — Signed-off
2025-10-24Permit Mechanical Systems — Signed-off
2025-10-21311: Vendor Enforcement — Non-Food Vendor
2025-10-20311: Noise - Street/Sidewalk — Loud Music/Party
2025-10-20311: Noise - Street/Sidewalk — Loud Talking
2025-10-20311: Noise - Street/Sidewalk — Loud Talking
2025-10-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-17Permit General Construction — Signed-off
2025-10-17Permit General Construction — Permit Issued
2025-10-16Permit Mechanical Systems — Signed-off
2025-10-16Permit Plumbing — Signed-off
2025-10-15Job filed: Office party in pantry and adjacent meeting room.
2025-10-14Permit Supported Scaffold — Permit Issued
2025-10-14Permit Protection and Mechanical Methods — Permit Issued
2025-10-13Job filed: INSTALLATION OF TEMPORARY GUARDRAIL SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2025-10-13Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2025-10-11311: Noise - Street/Sidewalk — Loud Music/Party
2025-10-10311: Noise - Street/Sidewalk — Loud Music/Party
2025-10-10Permit Sidewalk Shed — Permit Issued
2025-10-10Job filed: INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2025-10-10Job filed: Minor interior demo: remove and discard walls, ceilings, flooring. Install new drywall partitions, office front system, millwork, suspended ceiling, f$522,000
2025-10-09Job filed: Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & 1st Floor as per plans (Pa$700,000
2025-10-08Job filed: Remove (32) sprinkler heads, Install (33) new sprinkler heads, Relocate (1) sprinkler head and (1) FHC and associated SP/SD piping on the 3rd Floor; $42,250
2025-10-08Job filed: Remove (1) water dispenser and install (1) Sink, (1) HWH, (1) FD, (1) Sewage Ejection Pump on the 3rd Floor; Install (1) sink, (1) HWH, (1) FD and ass$65,000
2025-10-08Job filed: Modifications to the existing HVAC System: Installation of new ductwork, insulation, air outlets, relocate FPB and controls on the 3-4th Floors as per$45,000
2025-10-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-06311: Noise - Street/Sidewalk — Loud Talking
2025-10-02311: Noise - Street/Sidewalk — Loud Talking
2025-10-02311: Noise - Street/Sidewalk — Loud Talking
2025-10-01311: Noise - Street/Sidewalk — Loud Talking
2025-10-01DOB complaint, category ?
2025-10-01Job filed: Modifications to the existing HVAC System: Cut back & demolish duck work as required for Department relocation, relocate and/or disconnect hoods and v$85,000
2025-09-29311: Noise - Residential — Loud Talking
2025-09-29311: Noise - Street/Sidewalk — Loud Talking
2025-09-29Permit Mechanical Systems — Signed-off
2025-09-29Permit Mechanical Systems — Signed-off
2025-09-26Permit General Construction — Signed-off
2025-09-26Permit General Construction — Signed-off
2025-09-26Permit General Construction — Signed-off
2025-09-26Permit Mechanical Systems — Signed-off
2025-09-25311: Mobile Food Vendor — Food Worker Activity
2025-09-24SAGE — from US BANK NATIONAL ASSOCIATION to HOLDERS OF NYC COMMERCIAL MORTGAGE TRUST; COMPUTERSHARE TRUST COMPANY NATIONAL ASS
2025-09-24SAGE — from US BANK NATIONAL ASSOCIATION to HOLDERS OF NYC COMMERCIAL MORTGAGE TRUST; COMPUTERSHARE TRUST COMPANY NATIONAL ASS
2025-09-24SAGE — from US BANK NATIONAL ASSOCIATION to HOLDERS OF NYC COMMERCIAL MORTGAGE TRUST; COMPUTERSHARE TRUST COMPANY NATIONAL ASS
2025-09-24SAGE — from US BANK NATIONAL ASSOCIATION to HOLDERS OF NYC COMMERCIAL MORTGAGE TRUST; COMPUTERSHARE TRUST COMPANY NATIONAL ASS
2025-09-20311: Taxi Complaint — Driver Complaint - Non Passenger
2025-09-19SAGE — from SALESFORCE INC to TRUST 2025-3BP COMMERCIAL MORTGAGE PASS-; COMPUTERSHARE TRUST COMPANY NA AS TRUSTE
2025-09-19SAGE — from 3 BP PROPERTY OWNER LLC; BOARD OF MANAGERS OF 1095 AVENUE OF THE to SALESFORCE INC
2025-09-19SAGE — from 3 BP PROPERTY OWNER LLC; BOARD OF MANAGERS OF 1095 AVENUE OF THE to SALESFORCE INC
2025-09-19SAGE — from SALESFORCE INC to TRUST 2025-3BP COMMERCIAL MORTGAGE PASS-; COMPUTERSHARE TRUST COMPANY NA AS TRUSTE
2025-09-19SAGE — from SALESFORCE INC to TRUST 2025-3BP COMMERCIAL MORTGAGE PASS-; COMPUTERSHARE TRUST COMPANY NA AS TRUSTE
2025-09-19SAGE — from 3 BP PROPERTY OWNER LLC; BOARD OF MANAGERS OF 1095 AVENUE OF THE to SALESFORCE INC
2025-09-19SAGE — from SALESFORCE INC to TRUST 2025-3BP COMMERCIAL MORTGAGE PASS-; COMPUTERSHARE TRUST COMPANY NA AS TRUSTE
2025-09-19SAGE — from 3 BP PROPERTY OWNER LLC; BOARD OF MANAGERS OF 1095 AVENUE OF THE to SALESFORCE INC
2025-09-18Job filed: Removal of plumbing fixtures on the Ground & 2nd Floors; Relocate and Install new plumbing fixtures and associated CW/sanitary piping on the 2nd Floor$140,000
2025-09-16Job filed: Removal of dept equipment, partial interior partitions, grocery shelving; Relocate/install new service departments, equipment, shelving and partitions$643,692
2025-09-16Job filed: Structural modifications: Remove and pour back topping of a portion of structural slab for new freezer Walk-In Box on the 2nd Floor as per plans (Whol$95,000
2025-09-14311: HEAT/HOT WATER — APARTMENT ONLY
2025-09-14Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2025-09-07311: Noise - Residential — Loud Music/Party
2025-09-04Restaurant inspection: SHAKE SHACK BRYANT PARK — grade A
2025-09-04Permit Structural — Signed-off
2025-09-03311: Illegal Parking — Unauthorized Bus Layover
2025-09-02Certificate of occupancy Renewal Without Change
2025-09-02Job filed: Structural Modifications: Installation of structural steel beams and supports on the 1st Floor as per plans (Cubes Plaza Amenity.) No change to use, e$111,000
2025-08-28Permit Sprinklers — Signed-off
2025-08-28Permit Plumbing — Signed-off
2025-08-27Permit Mechanical Systems — Signed-off
2025-08-27Permit General Construction — Signed-off
2025-08-26Job filed: Modifications to the existing Sprinkler System: Remove (43) sprinkler heads and Install (54) new sprinkler heads on the 1st Floor as per plans (Cubes $19,800
2025-08-26Job filed: Modifications to the existing HVAC System: Installation of chilled water piping and outside air ductwork on the 1st Floor as per plans (Cubes Plaza Am$396,102
2025-08-26Job filed: Install new plumbing fixtures: (3) HWH, (4) sinks, (7) FDs, (3) WCs, (3) Lavatories, (1) IM, (1) DW and associated CW/sanitary piping on the 1st Floor$88,000
2025-08-25311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2025-08-25311: Food Poisoning — 1 or 2
2025-08-22Permit Mechanical Systems — Permit Issued
2025-08-22Permit General Construction — Permit Issued
2025-08-22Permit Structural — Permit Issued
2025-08-21Job filed: Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring, finishes and white box space on the 1st Floor as per$1,165,191
2025-08-15Permit Mechanical Systems — Permit Issued
2025-08-15Permit General Construction — Permit Issued
2025-08-13Job filed: Filing for Plumbing modifications as per the plans filed herewith. No change in use, egress or occupancy.$60,000
2025-08-06Elevator permit: Install Rope Grippers and the necessary controller software on (Device 1P29910) All work to comply with ASME A17.3-2015, Section $52,551
2025-07-31FDNY inspection (ALT)
2025-07-30Restaurant inspection: DECHERT (THE DECH) — grade A
2025-07-30Job filed: Removal of plumbing fixtures. Install new fixtures: (2) HWH, (1) FD, (1) sink, (1) Lavatory, (1) water closet and associated CW/sanitary piping on the$70,000
2025-07-30Job filed: Alt CO filed to increase population and establish PA on the 36th fl.$311,250
2025-07-30Job filed: Modifications to the existing Sprinkler System: Remove (10) existing sprinkler heads and install (10) new sprinkler heads and associated piping on the$25,000
2025-07-30Job filed: Filing for Mechanical modifications to include rework of existing system to align with new wall location to the 15th floor as per plans filed herewith$200,000
2025-07-29Job filed: Filing for General construction modifications to the 15th floor as per plans filed herewith. No change in use, egress or occupancy.$1,103,000
2025-07-28Permit Mechanical Systems — Signed-off
2025-07-25Restaurant inspection: OHANA EXHIBITION KITCHEN — grade A
2025-07-25311: Consumer Complaint — Cell Phone Store
2025-07-25Permit Plumbing — Signed-off
2025-07-24Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL to BANK OF AMERICA, N.A; COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2025-07-24Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL to BANK OF AMERICA, N.A; COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2025-07-24Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL to BANK OF AMERICA, N.A; COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2025-07-24Mortgage assigned — from WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL to BANK OF AMERICA, N.A; COMPUTERSHARE TRUST COMPANY, NATIONAL AS
2025-07-24Certificate of occupancy Renewal Without Change
2025-07-24Permit Sprinklers — Signed-off
2025-07-22Permit General Construction — Signed-off
2025-07-19311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2025-07-19DOB complaint, category ?
2025-07-16Restaurant inspection: VALBELLA AT THE PARK — grade A
2025-07-11311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2025-07-11DOB complaint, category ?
2025-07-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-07-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-07-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-07-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-07-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-07-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-07-04311: Sidewalk Condition — Sidewalk Grating - Defective
2025-06-28311: Illegal Parking — Posted Parking Sign Violation
2025-06-27Certificate of occupancy Renewal Without Change
2025-06-26Permit Standpipe — Permit Issued
2025-06-24Job filed: Minor interior demo. Installation of new interior partitions, doors, suspended ceilings, raised flooring and finishes on the 36th Floor as per plans ($7,168,068
2025-06-23311: Illegal Parking — Commercial Overnight Parking
2025-06-23Job filed: Remove and replace existing horizontal split case fire pump on the Sub-Cellar Level as per plans. No change to use, egress or occupancy.$80,000
2025-06-20Permit Plumbing — Signed-off
2025-06-20Job filed: Plumbing Modifications: Install (1) DFs, (1) WD, (2) DW, (2) sinks, (2) CMs, (1) IM, (2) refrigerators, (3) WCs, (3) Lavatories, (1) shower, (4) HWHs $150,000
2025-06-18FDNY inspection (E-CIDS)
2025-06-18FDNY inspection (CDA-90-DRILL)
2025-06-12311: Homeless Person Assistance — Non-Chronic
2025-06-12Permit Sprinklers — Permit Issued
2025-06-11311: Derelict Vehicles — Derelict Vehicles
2025-06-10Permit Mechanical Systems — Permit Issued
2025-06-10Job filed: INSTALLATION OF WATER SOURCE INDOOR UNIT WITH SUPPLY, RETURN, EXHAUST AIR FANS, AND ELECTRIC AIR CURTAIN.$63,000
2025-06-10Job filed: MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEADS WITH PIPES.$53,000
2025-06-10Job filed: INTERIOR RENOVATION OF EXISTING RETAIL SPACE INCLUDING PARTITIONS, FLOORING, CEILING, AND LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$69,900
2025-06-09Permit General Construction — Permit Issued
2025-06-06311: Vendor Enforcement — Food Vendor
2025-06-04Permit Plumbing — Signed-off
2025-06-03Job filed: Minor demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & 1st Floor as per plans (Pa$700,000
2025-06-03Job filed: Modifications to the existing Sprinkler System: Remove (17) existing heads, Relocate (2) heads and install (16) new heads on the 1st Floor as per plan$80,000
2025-06-03Job filed: Install (1) Drinking fountain and relocate (1) existing sink and associated CW/sanitary piping on the cellar level as per plans (Pandora.) No change t$15,000
2025-06-03Job filed: Modifications to the existing HVAC System on the Cellar & 1st Floors as per plans (Pandora - Evoke 2.0.) No change to use, egress or occupancy.$100,000
2025-05-30FDNY inspection (ALT)
2025-05-29Job filed: Filing for Plumbing modifications as per the plans filed herewith. No change in use, egress or occupancy.$60,000
2025-05-27Asbestos abatement: Removal — JVN Restoration Inc.
2025-05-27Asbestos abatement: Removal — JVN Restoration Inc.
2025-05-27Asbestos abatement: Removal — JVN Restoration Inc.
2025-05-27Asbestos abatement: Removal — JVN Restoration Inc.
2025-05-19Permit Sprinklers — Signed-off
2025-05-14Permit Sprinklers — Signed-off
2025-05-07Permit Plumbing — Signed-off
2025-04-30311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2025-04-30DOB complaint, category ?
2025-04-30Permit Mechanical Systems — Signed-off
2025-04-30Permit General Construction — Signed-off
2025-04-30Permit Sprinklers — Signed-off
2025-04-30Job filed: Replace (8) water closets, (2) urinals, (10) lavatories and Install New: (2) lavs, (2) WCs, (3) HWH, (9) FD, (7) Ice Makers, (2) DW, (2) DF, (12) Sink$462,160
2025-04-29Certificate of occupancy Renewal Without Change
2025-04-29Job filed: Install (392) new sprinkler heads and associated Sprinkler Piping on the 36th Floor as per plans (Standard Chartered Bank - Phase 2) No change to use,$189,600
2025-04-29Job filed: Furnish and Install New Mechanical System throughout floor - new ductwork, piping, FPBs, air outlets and AC Units on the 36th Floor as per plans (Stan$1,562,520
2025-04-25Permit General Construction — Signed-off
2025-04-24311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2025-04-24DOB complaint, category ?
2025-04-21311: Vendor Enforcement — Food Vendor
2025-04-18Job filed: Art benefit, dinner / banquet
2025-04-17Permit General Construction — Permit Issued
2025-04-16Permit Mechanical Systems — Signed-off
2025-04-16Permit Structural — Permit Issued
2025-04-16Permit General Construction — Signed-off
2025-04-15311: Lost Property — Bag/Wallet
2025-04-15311: Lost Property — Bag/Wallet
2025-04-12311: Consumer Complaint — Bodega, Deli, or Convenience Store
2025-04-10Job filed: Structural modifications: new extension of generator exhaust risers and opening in new slab and existing roof slab for exhaust pipes on the 3rd Floor/$25,000
2025-04-09Permit Mechanical Systems — Permit Issued
2025-04-09Job filed: Alterations to the existing exterior wall to relocate generator exhaust flue and repair and replace existing exterior wall on the 1st & 2nd Floor Roof$15,000
2025-04-09Job filed: Modifications to the existing Sprinkler System: Install (134) new sprinkler heads and associated piping on the 33rd Floor as per plans (CDPQ.) No chan$120,000
2025-04-08311: Elevator — Elevator - Multiple Devices On Property
2025-04-08DOB complaint, category ?
2025-04-07FDNY inspection (ALT)
2025-04-04Certificate of occupancy Renewal With Change
2025-04-03Job filed: Modifications to the existing Sprinkler System: Remove (10) existing sprinkler heads and install (10) new sprinkler heads and associated piping on the$25,000
2025-04-02Job filed: Modifications to the existing HVAC System: Extend flue exhaust pipes on the 3rd Floor/ Annex Roof as per plans (Sub-cellar Generator Exhaust Remediati$75,000
2025-04-01311: Noise — Noise: Jack Hammering (NC2)
2025-04-01Job filed: Filing for Mechanical modifications to include rework of existing system to align with new wall location to the 15th floor as per plans filed herewith$200,000
2025-04-01Job filed: Removal of plumbing fixtures. Install new fixtures: (2) HWH, (1) FD, (1) sink, (1) Lavatory, (1) water closet and associated CW/sanitary piping on the$70,000
2025-03-31Permit Sprinklers — Permit Issued
2025-03-28Job filed: Filing for General construction modifications to the 17th floor (Wudu Room) as per plans filed herewith. No change in use, egress or occupancy.$75,000
2025-03-25Job filed: Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and$1,027,815
2025-03-24Job filed: Filing for General construction modifications to the 15th floor as per plans filed herewith. No change in use, egress or occupancy.$1,103,000
2025-03-21311: Consumer Complaint — Pedicab
2025-03-20Job filed: Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.$1,214,108
2025-03-18Elevator permit: Install Rope Grippers and the necessary controller software on (Devices 1P45027, 1P45028 and 1P45029) All work to comply with ASM$157,653
2025-03-15Elevator permit: Install Rope Grippers and the necessary controller software on (Devices 1P29908, 1P29909, 1P29911, 1P29912 and 1P29913) All work $262,755
2025-03-14Job filed: Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 33rd Floors as per plans (CDPQ - Buildout.) No change$4,200,000
2025-03-13311: Consumer Complaint — Door to Door Sales
2025-03-13Job filed: Hereby filing modification to existing sprinkler system per plans filed herewith.$31,243
2025-03-11Job filed: Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and$1,027,815
2025-03-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-03-10Asbestos abatement: Removal — JVN Restoration Inc.
2025-03-07311: Noise - Street/Sidewalk — Loud Talking
2025-02-27Job filed: Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application numbers: M009879$7,000
2025-02-24311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-02-24311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-02-24Permit Structural — Signed-off
2025-02-24Permit Mechanical Systems — Signed-off
2025-02-21Permit Mechanical Systems — Permit Issued
2025-02-19Elevator permit: Install Rope Grippers and the necessary controller software on cars 17-22. (Devices 1P29924, 1P29925, 1P29926, 1P29927, 1P29928 an$316,071
2025-02-19Elevator permit: Install Rope Grippers and the necessary controller software on cars 11-16 (Devices 1P29918, 1P29919, 1P29920, 1P29921, 1P29922 and$315,306
2025-02-18311: Illegal Parking — Posted Parking Sign Violation
2025-02-14TL&R — from WILMINGTON TRUST, NATIONAL ASSOCIATION to 3 BP PROPERTY OWNER LLC
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION$1,125,000,000
2025-02-14Mortgage assigned — from WILMINGTON TRUST, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL
2025-02-14TL&R — from WILMINGTON TRUST, NATIONAL ASSOCIATION to 3 BP PROPERTY OWNER LLC
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION$1,125,000,000
2025-02-14Mortgage assigned — from WILMINGTON TRUST, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION$1,125,000,000
2025-02-14Mortgage assigned — from WILMINGTON TRUST, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL
2025-02-14TL&R — from WILMINGTON TRUST, NATIONAL ASSOCIATION to 3 BP PROPERTY OWNER LLC
2025-02-14Mortgage assigned — from WILMINGTON TRUST, NATIONAL ASSOCIATION to WELLS FARGO BANK, NATIONAL ASSOCIATION; BANK OF AMERICA, N.A.; BANK OF MONTREAL
2025-02-14TL&R — from WILMINGTON TRUST, NATIONAL ASSOCIATION to 3 BP PROPERTY OWNER LLC
2025-02-14Agreement $1,125,000,000 — from 3 BP PROPERTY OWNER LLC to BANK OF AMERICA, N.A.; BANK OF MONTREAL; WELLS FARGO BANK, NATIONAL ASSOCIATION$1,125,000,000
2025-02-12Job filed: Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith.$2,293,162
2025-02-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-02-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-02-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-01-24Certificate of occupancy Renewal Without Change
2025-01-23Permit Plumbing — Signed-off
2025-01-23Permit Plumbing — Signed-off
2025-01-23Permit Mechanical Systems — Signed-off
2025-01-23Permit General Construction — Signed-off
2025-01-22311: Illegal Parking — Blocked Sidewalk
2025-01-22Permit Sprinklers — Signed-off
2025-01-22Permit General Construction — Signed-off
2025-01-21Job filed: Interior fit-out, construction of the 37th Floor, new partitions, doors, suspended ceilings, office front system, flooring and finishes on as per plan$7,752,619
2025-01-20Job filed: Hereby filing general construction for modification to concrete equipment pad and minor wall alterations in support of new mechanical equipment and ri$1,378,321
2025-01-17Job filed: New mechanical system throughout 37th Floor, inclusive of new ductwork, piping, air outlets, AC units, as per plans (Standard Chartered Bank.) No chan$2,187,135
2025-01-17Job filed: Additions and modifications to the existing Sprinkler System: Install (14) new temporary heads and (374) new permanent sprinkler heads and associated $225,810
2025-01-17Job filed: All new plumbing works, inclusive of sinks, drinking fountains, drains, water heaters, and restroom work for the 37th Floor, as per plans (Standard Ch$314,739
2025-01-10Certificate of occupancy Renewal Without Change
2025-01-09Elevator permit: Replace existing Westinghouse counterweight governor with a hollister whitney model. Replace governor rope. All work to comply wi$11,292
2025-01-09311: Non-Residential Heat — Inadequate or No Heat
2025-01-09311: Illegal Parking — Double Parked Blocking Traffic
2025-01-07Job filed: Hereby filing modification to existing sprinkler system per plans filed herewith.$15,622
2024
2024-12-31Permit Sprinklers — Signed-off
2024-12-28311: Non-Emergency Police Matter — Other (complaint details)
2024-12-24311: Taxi Complaint — Driver Complaint - Passenger
2024-12-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-12Permit Mechanical Systems — Signed-off
2024-12-09Permit General Construction — Signed-off
2024-12-05Job filed: Minor interior demo. Installation of new interior drywall partitions, doors, suspended ceilings, office front system, raised flooring and finishes on $11,588,000
2024-12-04Job filed: Install New: (1) HWH, (2) FDs, (1) sink, (1) WC, (1) Lav, (2) CM, (1) WD, (1) IM, (4) backflow preventers and associated CW/sanitary piping on the 20t$3,000
2024-11-27Job filed: Minor interior demo of interior partitions, doors, suspended ceilings, office front system, flooring and finishes on the 36th & 37th Floors as per pla$600,000
2024-11-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-11-26Job filed: Plumbing and piping capping & removals for the 36th & 37th Floors, as per plans (Standard Charter Bank). No change to use, egress, or occupancy.$20,000
2024-11-26Job filed: Modifications to the existing Sprinkler System on the 36th & 37th Floors as per plans (Standard Chartered Bank). No change to use, egress, or occupanc$15,000
2024-11-26Job filed: Interior removals and modifications to ductwork, associated piping on the 36th & 37th Floors as per plans (Standard Chartered Bank.) No change to use,$20,000
2024-11-26Job filed: Salesforce Holiday Celebration - dinner / banquet
2024-11-20Job filed: Modifications to the existing HVAC system on the 23rd Floor (Salesforce - AV Room), as per plans. No change to use, egress, or occupancy.$150,000
2024-11-20Job filed: Minor interior structural modifications - installation of structural supports for HVAC equipment on the 23rd floor as per plans (Salesforce). No chang$10,000
2024-11-19311: Water System — Hydrant Leaking (WC1)
2024-11-19311: Water System — Hydrant Leaking (WC1)
2024-11-14Elevator permit: Install Rope Grippers and the necessary controller software on cars 11-16 (Devices 1P29918, 1P29919, 1P29920, 1P29921, 1P29922 and$315,306
2024-11-14Elevator permit: Install Rope Grippers and the necessary controller software on cars 17-22. (Devices 1P29924, 1P29925, 1P29926, 1P29927, 1P29928 an$316,071
2024-11-12Job filed: TPA PERMIT IS REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 28, 2024 FROM 7:30 AM TO 1:30 PM FOR 300 PERSONS. OCCUPANCY WILL BE 150 P
2024-11-09311: Water System — Hydrant Leaking (WC1)
2024-11-06Permit General Construction — Permit Issued
2024-11-06Job filed: Installation of new interior partitions, glass office fronts, new conference rooms, doors, suspended ceilings, flooring and finishes on the 17-18th Fl$1,000,000
2024-11-06Job filed: Installation of new interior partitions, glass office fronts, new conference rooms, doors, suspended ceilings, flooring and finishes on the 20th Floor$1,100,000
2024-10-25Certificate of occupancy Renewal Without Change
2024-10-25Certificate of occupancy Renewal Without Change
2024-10-23311: Noise - Residential — Banging/Pounding
2024-10-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-11Permit Sprinklers — Signed-off
2024-10-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-10-09Job filed: MS work to replace CRAC Unit at the 11th floor.$535,000
2024-10-07311: Consumer Complaint — Door to Door Sales
2024-10-03Permit Plumbing — Signed-off
2024-10-03Permit Mechanical Systems — Signed-off
2024-10-01Permit General Construction — Signed-off
2024-10-01Permit Structural — Signed-off
2024-09-30Job filed: Plumbing Modifications: Install (1) DFs, (1) WD, (2) DW, (2) sinks, (2) CMs, (1) IM, (2) refrigerators, (3) WCs, (3) Lavatories, (1) shower, (4) HWHs $150,000
2024-09-30Job filed: Modifications to the existing HVAC System: Installation of new ductwork, diffusers, controls and AC Units on the 33rd Floor as per plans (CDPQ.) No ch$930,000
2024-09-30Job filed: Modifications to the existing Sprinkler System: Install (134) new sprinkler heads and associated piping on the 33rd Floor as per plans (CDPQ.) No chan$120,000
2024-09-27Permit General Construction — Signed-off
2024-09-27Permit Structural — Signed-off
2024-09-27Permit Mechanical Systems — Signed-off
2024-09-27Permit Structural — Signed-off
2024-09-27Permit General Construction — Signed-off
2024-09-26Job filed: Interior Structural Modifications: Installation of structural steel support for modern fold wall on the 33rd Floor as per plans (CDPQ.) No change to u$45,000
2024-09-26Job filed: Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 33rd Floors as per plans (CDPQ - Buildout.) No change$4,200,000
2024-09-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-09-19Permit General Construction — Signed-off
2024-09-17Job filed: Install NEW: (12) Lavs, (10) WC, (2) UR, (6) HWH, (6) IM, (6) CM, (6) WD, (4) DFs, (6) sinks, (1) DW, (1) Booster Pump, (7) Funnel drain, drip pans an$450,000
2024-09-15311: Illegal Parking — Posted Parking Sign Violation
2024-09-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-09-13311: Water System — Dirty Water (WE)
2024-09-12311: Elevator — Elevator - Single Device On Property/No Alternate Service
2024-09-12DOB complaint, category ?
2024-09-11Permit Plumbing — Signed-off
2024-09-10311: Homeless Person Assistance
2024-09-10311: Encampment — N/A
2024-09-10Permit Mechanical Systems — Signed-off
2024-09-06Job filed: Modifications to the existing Sprinkler System: Remove (253) existing sprinkler heads, Install (43) new temporary sprinkler heads, and (5) new permane$22,800
2024-09-06Job filed: Climate reception / Dinner party.
2024-09-06Job filed: Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 25th Floor as per plans (LL Wo$307,100
2024-09-04311: Water System — Hydrant Leaking (WC1)
2024-09-03Permit General Construction — Signed-off
2024-09-03Permit Plumbing — Signed-off
2024-09-03Permit Sprinklers — Signed-off
2024-08-30Permit Mechanical Systems — Signed-off
2024-08-30Job filed: Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 25th Floor as per plans (LL Work - Restroom.) $32,000
2024-08-29Job filed: Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 33rd Floors as per plans (Corridors & Bathrooms.) No $860,375
2024-08-28Job filed: Install New Plumbing Fixtures: (10) lavatories, (8) WCs, (2) UR, (1) FD and associated CW/sanitary piping on the 25th Floor as per plans (LL Work - R$78,000
2024-08-25Job filed: Modifications to the existing Sprinkler System: Remove (32) existing sprinkler heads and Install (35) new sprinkler heads and associated piping on the$22,500
2024-08-25Job filed: Plumbing Modifications: Install new (1) drinking fountain, (8) Water Closets, (10) Lavatories, (2) urinals and associated CW/sanitary piping on the 33$73,000
2024-08-25Job filed: Modifications to the existing HVAC System: Remove existing ductwork, grilles, wires. Install new ductwork, diffusers, controls and registers on the 33$70,500
2024-08-23Permit General Construction — Signed-off
2024-08-23Permit Mechanical Systems — Signed-off
2024-08-22311: Illegal Parking — Blocked Crosswalk
2024-08-22311: Illegal Parking — Blocked Hydrant
2024-08-21Certificate of occupancy Renewal Without Change
2024-08-21Permit Sprinklers — Signed-off
2024-08-21Permit Plumbing — Signed-off
2024-08-19Job filed: Modifications to the existing HVAC System: Installation of new ductwork, insulation and air outlets on the 3-4th Floors as per plans (Stifel Restroom $20,000
2024-08-16Job filed: Modifications to the existing Sprinkler System: Remove (7) heads and Install (7) new heads and piping on 3rd Floor, Remove (6) heads and Install (6) n$14,000
2024-08-16Job filed: Replace (12) lavs, (4) UR, (14) WCs, (2) FDs, (2) DFs on 3rd Floor; and (13) lavs, (4) UR, (11) WCs, (2) FDs and (1) shower on 4th Floor and associate$234,000
2024-08-15311: Noise - Street/Sidewalk — Loud Music/Party
2024-08-15Job filed: Minor interior demo: remove and discard walls, ceilings, flooring and millwork. Install new walls, doors, frames, pantry cabinets, island, suspended c$425,780
2024-08-14311: Non-Emergency Police Matter — Other (complaint details)
2024-08-02Certificate of occupancy Renewal Without Change
2024-08-01311: Noise - Street/Sidewalk — Loud Music/Party
2024-08-01311: Lost Property — Bag/Wallet
2024-07-30Job filed: Modifications to the existing HVAC System: Remove supply diffusers and ductwork, Relocate existing transfers and diffusers, cap and seal on the 20th F$2,500
2024-07-30Job filed: Modifications to the existing HVAC System: Modifications to existing mechanical equipment and associated sheet metal on the 20th Floor as per plans (S$205,000
2024-07-30Job filed: Modifications to the existing HVAC System: Modifications to existing mechanical equipment and associated sheet metal on the 17-18th Floors as per plan$175,000
2024-07-30Job filed: Modifications to the existing HVAC System: Remove supply diffusers and ductwork, Relocate existing transfers and diffusers, cap and seal on the 17th F$3,500
2024-07-23Job filed: Remove (5) existing sprinkler heads and Install (9) new heads and associated piping on the 17th Floor, and Install (3) new heads and associated piping$32,000
2024-07-23Job filed: Modifications to the existing Sprinkler System: Install (9) new sprinkler heads and associated piping on the 20th Floor as per plans (Salesforce - Bui$41,000
2024-07-22311: New Tree Request — For One Address
2024-07-21311: Noise - Street/Sidewalk — Loud Music/Party
2024-07-21311: Noise - Street/Sidewalk — Loud Music/Party
2024-07-18Job filed: Installation of new interior partitions, glass office fronts, new conference rooms, doors, suspended ceilings, flooring and finishes on the 17-18th Fl$1,000,000
2024-07-18Job filed: Interior Structural Modifications: Installation of structural steel for modern fold wall on the 20th Floor as per plans (Salesforce - Buildout/ Confer$30,000
2024-07-18Job filed: Installation of new interior partitions, glass office fronts, new conference rooms, doors, suspended ceilings, flooring and finishes on the 20th Floor$1,100,000
2024-07-17Job filed: Structural Modifications: Installation of New Structural Steel and supports for equipment at HUB Room and miscellaneous steel supports on the 35-36th$130,000
2024-07-16Job filed: Minor interior demo. Installation of new interior drywall partitions, doors, suspended ceilings, office front system, raised flooring and finishes on $11,588,000
2024-07-15Permit General Construction — Signed-off
2024-07-10Permit Structural — Signed-off
2024-07-10Job filed: Install new Mechanical System throughout: New CAC, WSHPs, PCWPs, HX, SCWP, new ductwork, associated piping, FPBs, air outlets etc on the 35th Floor as$2,350,000
2024-07-10Job filed: Install NEW: (12) Lavs, (10) WC, (2) UR, (6) HWH, (6) IM, (7) CM, (6) WD, (4) DFs, (6) sinks, (1) DW, (1) Booster Pump, (1) Grease Interceptor, (1) FD$450,000
2024-07-10Job filed: Modifications to the existing Sprinkler System: Install (344) new sprinkler heads and associated sprinkler piping on the 35th Floor and Install new 2"$220,000
2024-07-08Job filed: Install New: (1) HWH, (2) FDs, (1) sink, (1) WC, (1) Lav, (2) CM, (1) WD, (1) IM, (4) backflow preventers and associated CW/sanitary piping on the 20t$3,000
2024-07-08Job filed: Plumbing Modifications: Remove 3/4" Cold Water Piping from point of connection to base building stub, points to be adjusted and capped on the 20th Flo$1,500
2024-07-02Job filed: Structural Modifications: Installation of New Structural Steel and concrete floor slab infill on the 38th Floors as per plans (Standard Chartered Bank$50,000
2024-07-01Job filed: Minor interior demo: remove portion of walls, existing stair and associated steel. Install new hollow door and frame, and storeroom lockset on the 38t$40,000
2024-06-30311: Illegal Parking — Blocked Crosswalk
2024-06-28Restaurant inspection: DECHERT (THE DECH) — grade A
2024-06-24311: Taxi Complaint — Driver Complaint - Non Passenger
2024-06-24Permit Sprinklers — Signed-off
2024-06-24Permit Plumbing — Signed-off
2024-06-18Permit Plumbing — Signed-off
2024-06-18Permit Sprinklers — Signed-off
2024-06-15311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2024-06-15DOB complaint, category ?
2024-06-14311: Abandoned Bike — Chained to Public Property
2024-06-13Permit Mechanical Systems — Signed-off
2024-06-12311: Noise - Street/Sidewalk — Loud Music/Party
2024-06-12Permit General Construction — Signed-off
2024-06-09311: Illegal Parking — Blocked Bike Lane
2024-06-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-06-08311: Illegal Parking — Blocked Crosswalk
2024-06-04311: Elevator — Elevator - Single Device On Property/No Alternate Service
2024-06-04DOB complaint, category ?
2024-06-03311: Elevator — Elevator - Single Device On Property/No Alternate Service
2024-06-03DOB complaint, category ?
2024-06-02Job filed: Modifications to the existing Sprinkler System: Install (9) new sprinkler heads and associated piping on the 20th Floor as per plans (Salesforce - Bui$41,000
2024-05-31311: Abandoned Bike — Chained to Public Property
2024-05-30311: Elevator — Elevator - Single Device On Property/No Alternate Service
2024-05-30Certificate of occupancy Renewal Without Change
2024-05-30DOB complaint, category ?
2024-05-24Certificate of occupancy Renewal Without Change
2024-05-23Certificate of occupancy Renewal Without Change
2024-05-23Job filed: MS work to replace CRAC Unit at the 11th floor.$535,000
2024-05-17FDNY inspection (COM_OCPCY)
2024-05-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-16Permit Plumbing — Signed-off
2024-05-16Permit Plumbing — Signed-off
2024-05-16Job filed: INSTALLATION OF WATER SOURCE INDOOR UNIT WITH SUPPLY, RETURN, EXHAUST AIR FANS, AND ELECTRIC AIR CURTAIN.$63,000
2024-05-16Job filed: MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEADS WITH PIPES.$53,000
2024-05-15Job filed: INTERIOR RENOVATION OF EXISTING RETAIL SPACE INCLUDING PARTITIONS, FLOORING, CEILING, AND LIGHTING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$69,900
2024-05-10Permit Plumbing — Signed-off
2024-05-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-01Permit Plumbing — Signed-off
2024-04-30Permit Mechanical Systems — Signed-off
2024-04-30Permit Sprinklers — Permit Issued
2024-04-29Cooling tower inspection
2024-04-26311: Consumer Complaint — Bodega, Deli, or Convenience Store
2024-04-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-04-24Job filed: Remove fixtures and piping. Install NEW: (2) DF, (2) chiller, (2) CM, (1) IM, (1) DW, (1) PS, (1) WD, (1) HWH, (1) FD on 3rd Floor, (2) Chiller, (2) C$45,000
2024-04-23Permit Mechanical Systems — Signed-off
2024-04-22311: Illegal Parking — Parking Permit Improper Use
2024-04-18Job filed: Modifications to the existing HVAC System: Installation of new ductwork, insulation and air outlets on the 3-4th Floors as per plans (Stifel Pantry Pr$33,750
2024-04-17Permit Sprinklers — Signed-off
2024-04-17Permit Mechanical Systems — Signed-off
2024-04-17Permit Sprinklers — Signed-off
2024-04-17Permit General Construction — Signed-off
2024-04-16Permit General Construction — Signed-off
2024-04-16Job filed: Modifications to the existing Sprinkler System: Remove (14) heads and Install (16) new heads and piping on 3rd Floor, Remove (16) heads and Install (1$23,400
2024-04-15Job filed: Removal of (2) Pantry Sinks, (2) CW roughing, (2) Funnel Drains and associated CW/Sanitary piping capped back to main on the 31st Floor as per plans ($60,000
2024-04-15Job filed: Modifications to the existing HVAC System: Removal of ductwork, piping, AC units, controls and wiring. Relocate thermostats, extend control wiring, in$503,942
2024-04-15Job filed: Minor interior demo: remove and discard walls, ceilings, flooring and millwork. Install new walls, doors, frames, pantry cabinets, island, suspended c$297,000
2024-04-15Job filed: Remove (15) heads, Relocate (44), Install (10) new heads on 26; REL (11) heads, Install (3) new heads on 27; REL (28) heads, Install (3) new on 29; RE$124,071
2024-04-12Job filed: Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 26-27, 29-31st Floors as p$4,968,354
2024-04-05311: Food Establishment — Rodents/Insects/Garbage
2024-04-05Permit Mechanical Systems — Signed-off
2024-04-05Permit Mechanical Systems — Signed-off
2024-03-26Permit General Construction — Signed-off
2024-03-25Restaurant inspection: OHANA EXHIBITION KITCHEN — grade A
2024-03-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-03-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-03-19Certificate of occupancy Renewal Without Change
2024-03-19Job filed: Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 32nd Floor as per plans (C$3,170,000
2024-03-18Permit Structural — Signed-off
2024-03-15Permit Mechanical Systems — Signed-off
2024-03-14Permit General Construction — Signed-off
2024-03-14Permit Mechanical Systems — Signed-off
2024-03-14Job filed: Birthday party event.
2024-03-14Job filed: Minor interior Structural Modifications: Installation of structural steel supports for Modernfold wall on the 32nd Floor as per plans (China Construct$75,000
2024-03-13Job filed: Installation of new interior partitions, glass office fronts, new conference rooms, doors, suspended ceilings, flooring and finishes on the 20th Floor$1,100,000
2024-03-13Job filed: Installation of new interior partitions, glass office fronts, new conference rooms, doors, suspended ceilings, flooring and finishes on the 17-18th Fl$1,000,000
2024-03-12311: Noise - Street/Sidewalk — Loud Music/Party
2024-03-11Job filed: Herewith filing administrative removal of Place of assembly occupancies on the 25th and 33rd office floors. Related Alt-2 application numbers: M009879$7,000
2024-03-08Job filed: Install New: (1) HWH, (2) FDs, (1) sink, (1) WC, (1) Lav, (2) CM, (1) WD, (1) IM, (4) backflow preventers and associated CW/sanitary piping on the 20t$3,000
2024-03-08Job filed: Interior Structural Modifications: Installation of structural steel for modern fold wall on the 20th Floor as per plans (Salesforce - Buildout/ Confer$30,000
2024-03-08Job filed: Remove (5) existing sprinkler heads and Install (9) new heads and associated piping on the 17th Floor, and Install (3) new heads and associated piping$32,000
2024-03-08Job filed: Modifications to the existing HVAC System: Modifications to existing mechanical equipment and associated sheet metal on the 17-18th Floors as per plan$175,000
2024-03-08Job filed: Modifications to the existing HVAC System: Modifications to existing mechanical equipment and associated sheet metal on the 20th Floor as per plans (S$205,000
2024-03-08Job filed: Modifications to the existing Sprinkler System: Install (9) new sprinkler heads and associated piping on the 20th Floor as per plans (Salesforce - Bui$41,000
2024-03-01Air permit (REGISTRATION), fuel: NO2FUEL
2024-03-01Permit Sprinklers — Signed-off
2024-03-01Permit Structural — Signed-off
2024-02-27Permit Plumbing — Signed-off
2024-02-26311: Noise - Street/Sidewalk — Loud Music/Party
2024-02-26311: Noise - Street/Sidewalk — Loud Music/Party
2024-02-26Certificate of occupancy Renewal Without Change
2024-02-22Permit Plumbing — Signed-off
2024-02-16Permit Sprinklers — Signed-off
2024-02-15Permit Mechanical Systems — Signed-off
2024-02-13Permit General Construction — Signed-off
2024-02-12Job filed: Modifications to the existing Sprinkler System: Remove (253) existing sprinkler heads, Install (43) new temporary sprinkler heads, and (5) new permane$22,800
2024-02-12Job filed: Removal of plumbing fixtures: (1) pantry sink, (2) Drinking fountains, (10) Lavatories, (8) Water closets, (2) Urinals and cap associated piping on th$5,485
2024-02-12Job filed: Modifications to the existing HVAC System. Removal of existing ductwork, piping, controls and equipment on the 25th Floor as per plans (LL Work - Demo$29,550
2024-02-09Certificate of occupancy Renewal Without Change
2024-02-08311: Panhandling — N/A
2024-02-08Job filed: Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 25th Floor as per plans (LL Wo$307,100
2024-02-08Job filed: Modifications to the existing HVAC System: Installation of chilled water piping and outside air ductwork on the Ground Floor as per plans (Retail Demi$103,000
2024-02-08Job filed: Install domestic water supply and drain line piping; Remove (1) Lavatory, (1) WC and associated piping on the Ground Floor, Install (1) new grease tra$77,000
2024-02-08Job filed: Modifications to the existing Sprinkler System: Installation of (4) new sprinkler heads and associated sprinkler piping and provide (2) new sprinkler $15,000
2024-02-08Job filed: Structural Modifications; Installation of structural steel hanging support for grease interceptor in cellar as per plans (Retail Demising Project - An$9,000
2024-02-07Permit General Construction — Signed-off
2024-02-06Job filed: Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring, finishes and white box space on the ground floor as $611,006
2024-02-05311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2024-02-05311: Food Establishment — Food Contains Foreign Object
2024-02-05DOB complaint, category ?
2024-02-05Permit Sprinklers — Permit Issued
2024-02-02311: Noise - Street/Sidewalk — Loud Music/Party
2024-01-31311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-31311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-30311: Animal-Abuse — Other (complaint details)
2024-01-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-01-25Permit Sprinklers — Signed-off
2024-01-24Permit Plumbing — Signed-off
2024-01-23Air permit (REGISTRATION), fuel: NO2FUEL
2024-01-23Air permit (REGISTRATION), fuel: NO2FUEL
2024-01-18Restaurant inspection: SHAKE SHACK BRYANT PARK — grade A
2024-01-18Restaurant inspection: VALBELLA AT THE PARK — grade A
2024-01-17Permit Sprinklers — Signed-off
2024-01-16Permit Sprinklers — Signed-off
2024-01-14311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2024-01-12311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2024-01-12311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2024-01-08311: Noise - Street/Sidewalk — Loud Music/Party
2024-01-08311: Noise - Street/Sidewalk — Loud Music/Party
2024-01-05FDNY inspection (E-CIDS)
2024-01-03Permit General Construction — Signed-off
2024-01-03Permit General Construction — Signed-off
2024-01-02Job filed: Modifications to the existing HVAC System: Remove supply diffusers and ductwork, Relocate existing transfers and diffusers, cap and seal on the 20th F$2,500
2024-01-02Job filed: Plumbing Modifications: Remove 3/4" Cold Water Piping from point of connection to base building stub, points to be adjusted and capped on the 20th Flo$1,500
2024-01-02Job filed: Modifications to the existing HVAC System: Remove supply diffusers and ductwork, Relocate existing transfers and diffusers, cap and seal on the 17th F$3,500
2024-01-02Job filed: Modifications to the existing Sprinkler System: Removal of (4) existing sprinkler heads and associated sprinkler piping on the 17th Floor as per plans$3,000
2023
2023-12-28Job filed: Minor interior demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 20th Floor as per plans (Salesforce$3,500
2023-12-28Job filed: Minor interior demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 17-18th floors as per plans (Salesf$4,000
2023-12-26Permit Structural — Signed-off
2023-12-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-12-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-12-22311: Illegal Parking — Blocked Bike Lane
2023-12-18Permit General Construction — Signed-off
2023-12-16Air permit (REGISTRATION), fuel: NO2FUEL
2023-12-15Job filed: Minor interior demolition; Furnish & Install new credenza, new suspended ceiling, floor finishes, relocate wall panels, paint affected areas, install $120,400
2023-12-14Permit Mechanical Systems — Signed-off
2023-12-14Permit Mechanical Systems — Signed-off
2023-12-14Job filed: Modifications to the existing sprinkler system: Relocate (11) existing sprinkler heads and install (1 ) new sprinkler heads, Remove 2 and associated $12,000
2023-12-14Job filed: Modifications to the existing HVAC System: Installation of new Ductwork, air outlets, relocate thermostat, controls on the 4th Floor as per plans (Sti$77,000
2023-12-14Job filed: Structural Modifications: Installation of New Structural Steel and supports for equipment at HUB Room and miscellaneous steel supports on the 35-36th$130,000
2023-12-13311: Consumer Complaint — Cell Phone Store
2023-12-12Job filed: Minor interior demo. Installation of new interior drywall partitions, doors, suspended ceilings, office front system, raised flooring and finishes on $11,588,000
2023-12-12Job filed: Install NEW: (12) Lavs, (10) WC, (2) UR, (6) HWH, (6) IM, (6) CM, (6) WD, (4) DFs, (6) sinks, (1) DW, (1) Booster Pump, (7) Funnel drain, drip pans an$450,000
2023-12-12Job filed: Install new Mechanical System throughout: New CAC, WSHPs, PCWPs, HX, SCWP, new ductwork, associated piping, FPBs, air outlets etc on the 35th Floor as$2,350,000
2023-12-12Job filed: Modifications to the existing Sprinkler System: Install (344) new sprinkler heads and associated sprinkler piping on the 35th Floor and Install new 2"$220,000
2023-12-11Certificate of occupancy Renewal Without Change
2023-12-10Elevator permit: Replace car and counterweight governor. EBN ** All work to comply with ASME A17.1- 2013, Part 8, Section 8.7.2 Safety Code for El$21,000
2023-12-05Job filed: CEO- hosted Salesforce Holiday Customer Celebration
2023-12-01311: Lost Property — Electronics/Phones
2023-11-28Certificate of occupancy Renewal Without Change
2023-11-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-11-20Job filed: Modifications to the existing Sprinkler System: Remove (39) existing sprinkler heads, Relocate (19) existing sprinkler heads and install (12) new spri$62,500
2023-11-14311: Noise - Street/Sidewalk — Loud Music/Party
2023-11-13Elevator permit: Replace car and counterweight governor. EBN ** All work to comply with ASME A17.1- 2013, Part 8, Section 8.7.2 Safety Code for El$21,000
2023-11-07Job filed: TPA PERMIT IS REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 23, 2023 FROM 7:30 AM TO 1:30 PM FOR 300 PERSONS. OCCUPANCY WILL BE 150 P
2023-10-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-19311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2023-10-19DOB complaint, category ?
2023-10-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-18311: Illegal Parking — Posted Parking Sign Violation
2023-10-18Permit Structural — Signed-off
2023-10-18Permit General Construction — Permit Issued
2023-10-17Permit General Construction — Signed-off
2023-10-17Permit General Construction — Signed-off
2023-10-12Job filed: Interior Renovations as per plans filed herewith. Structural stair Infill work from floors 25th to 26th. No changes to use, egress or occupancy.$150,000
2023-10-12Job filed: Interior stair demolition on 25th floor as per plans filed herewith. No change to use, egress, or occupancy .$30,000
2023-10-05311: Street Sign - Damaged — No Parking, Standing, Stopping
2023-10-04311: Street Condition — Blocked - Construction
2023-10-03311: Indoor Sewage — Sewage Leak
2023-10-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-10-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-09-28Certificate of occupancy Renewal Without Change
2023-09-25Elevator permit: Pinning and closing of one opening for 6th floor Device 1P29913 - EBN ** All work to comply with ASME A17.1- 2013, Part 8, Section$15,095
2023-09-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-09-21Permit Mechanical Systems — Signed-off
2023-09-21Permit Structural — Signed-off
2023-09-21Permit General Construction — Signed-off
2023-09-19311: Food Poisoning — 1 or 2
2023-09-19Job filed: No Work
2023-09-14Elevator permit: Replace car and counterweight governor. EBN ** All work to comply with ASME A17.1- 2013, Part 8, Section 8.7.2 Safety Code for El$21,000
2023-09-12311: Homeless Person Assistance
2023-09-08Permit Plumbing — Signed-off
2023-09-08Job filed: Herewith filing to establish new place of assembly on the 32nd floor, accessory to offices.$60,000
2023-09-08Job filed: Removal of finishes; Installation of new doors and hardware at the elevator lobby on Floors 17-20 as per plans (Salesforce NY Elevator Lobby Doors.) N$127,000
2023-09-07311: Dirty Condition — Trash
2023-09-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-09-02311: Illegal Parking — Blocked Bike Lane
2023-08-25Certificate of occupancy Renewal Without Change
2023-08-24ECB CLASS - 1 violation: OBSERVED SECURITY CLOSED 42ND STREET ENTRANCE TO POPS TO PUBLIC 10:14PM WITH BICYCLE RACKS. AND 41ST STREET ENTRANCE WAS CLOSED TO$10,000
2023-08-24Job filed: Dinner Party
2023-08-23311: Panhandling — N/A
2023-08-22Permit Sprinklers — Signed-off
2023-08-19311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2023-08-19DOB complaint, category ?
2023-08-14311: Illegal Parking — Posted Parking Sign Violation
2023-08-09311: Illegal Tree Damage — Bicycle Chained to Tree
2023-08-08311: Homeless Person Assistance
2023-08-08Permit General Construction — Signed-off
2023-08-08Permit Mechanical Systems — Signed-off
2023-08-04Job filed: Remove (12) existing sprinkler heads, Relocate (6) sprinkler heads and install (27) new sprinkler heads and associated piping on the Sub Cellar Level $134,000
2023-08-03Job filed: Minor interior demo: Removal and disposal of interior partitions, fixtures, suspended ceilings, floor finishes; Installation of new partitions, doors,$743,000
2023-08-03Job filed: Installation of new plumbing fixtures: (2) drinking fountains, (2) sinks, (2) water dispensers and (1) HWH with associated waste, vent, and water pipi$10,000
2023-08-03Job filed: Modifications to the existing Sprinkler System: Remove (39) existing sprinkler heads, Relocate (19) existing sprinkler heads and install (12) new spri$62,500
2023-08-03Job filed: Modifications to the existing HVAC System: F/I new ductwork/diffusers to accommodate new layout as per plans (VTS Office Renovations.) No change to us$225,000
2023-07-26311: Derelict Vehicles — Derelict Vehicles
2023-07-17Permit Standpipe — Signed-off
2023-07-11Job filed: Modifications to the existing Standpipe System: Removal of (1) Auxiliary Fire Hose Cabinet and associated standpipe piping, cap piping back to riser o$7,500
2023-07-06311: Illegal Parking — Parking Permit Improper Use
2023-07-03Certificate of occupancy Renewal Without Change
2023-06-22311: Lost Property — Electronics/Phones
2023-06-22Job filed: Minor interior demolition. Installation of new interior partitions, office fronts, folding partitions, flooring, suspended ceilings, conference rooms,$2,778,673
2023-06-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-07Job filed: Remove (12) existing sprinkler heads, Relocate (6) sprinkler heads and install (27) new sprinkler heads and associated piping on the Sub Cellar Level $134,000
2023-05-30Permit Mechanical Systems — Signed-off
2023-05-26Certificate of occupancy Renewal Without Change
2023-05-24Job filed: Remove (12) existing sprinkler heads, Relocate (6) sprinkler heads and install (27) new sprinkler heads and associated piping on the Sub Cellar Level $134,000
2023-05-23Job filed: MS work to replace CRAC Unit at the 11th floor.$535,000
2023-05-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-13311: Blocked Driveway — Partial Access
2023-04-27311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-04-21311: Taxi Complaint — Driver Complaint - Non Passenger
2023-04-20RPTT $1,121,273 — from FRANK RUSSELL COMPANY to RUSSELL INVESTMENTS US INSTITUTIONAL HOL$1,121,273
2023-04-12311: Food Establishment — Food Contains Foreign Object
2023-04-11Permit Plumbing — Signed-off
2023-04-10Permit Structural — Signed-off
2023-04-04Certificate of occupancy Renewal Without Change
2023-03-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-03-22311: Illegal Parking — Blocked Bike Lane
2023-03-22Job filed: Networking Party for Salesforce.
2023-03-21311: Panhandling — N/A
2023-03-12311: Illegal Parking — Posted Parking Sign Violation
2023-03-08311: Indoor Air Quality — Dust from Construction
2023-03-07311: Noise - Residential — Loud Music/Party
2023-03-06Restaurant inspection: OHANA EXHIBITION KITCHEN
2023-03-04311: Food Poisoning — 1 or 2
2023-03-02311: Food Poisoning — 1 or 2
2023-03-01Permit General Construction — Signed-off
2023-03-01Job filed: Roof reinforcement on the 2nd floor (Valbella) as per plans. No change to use, egress or occupancy.$233,600
2023-02-28Certificate of occupancy Renewal Without Change
2023-02-27Job filed: Architectural modifications for 2nd floor roof trellis (Valbella) as per plans. No change to use, egress or occupancy.$300,000
2023-02-10Cooling tower inspection
2023-02-01311: Illegal Parking — Blocked Sidewalk
2023-01-31Restaurant inspection: DECHERT (THE DECH) — grade A
2023-01-26Permit Sprinklers — Signed-off
2023-01-26Permit Sprinklers — Signed-off
2023-01-26Permit Mechanical Systems — Signed-off
2023-01-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-01-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-01-20Permit Sprinklers — Signed-off
2023-01-19Permit Sprinklers — Permit Issued
2023-01-19Permit General Construction — Signed-off
2023-01-18Permit Plumbing — Signed-off
2023-01-17Job filed: Installation of new Structural Steel beam and supports for for sliding modernfold partition and movable partition tracks on the 5th Floor as per plans$20,000
2023-01-13311: Consumer Complaint — Debt Collection Agency
2023-01-13Permit Mechanical Systems — Signed-off
2023-01-13Job filed: Install new fixtures: (3) WD, (5) CM, (8) FD, (2) IM, (2) Dishwashers, (4) sinks, (1) Keg, (1) HWH, (3) refrigerators, (1) circulation pump and associ$159,010
2023-01-13Job filed: Modifications to the existing Sprinkler System: Installation of (278) new sprinkler heads and associated piping on the 5th Floor as per plans (RenRe -$230,796
2023-01-13Job filed: Modifications to the existing HVAC System: Install new ductwork, new pipework distribution, new FPB's, FCU's, (2) CRAC's and BMS controls on the 5th F$1,315,188
2023-01-12Job filed: Minor interior demolition. Installation of new interior partitions, office fronts, folding partitions, flooring, suspended ceilings, conference rooms,$2,778,673
2023-01-11Certificate of occupancy Renewal Without Change
2023-01-10Permit Sprinklers — Signed-off
2023-01-10Job filed: Modifications to the existing Sprinkler System: Removal of (179) existing heads and associated piping; Install (22) new temporary heads and associated$10,000
2023-01-10Job filed: Removal of existing plumbing fixtures: (2) pantry sinks, (1) dishwasher, (2) chillers and associated CW/sanitary piping on the 35th Floor as per plans$7,500
2023-01-05311: Illegal Parking — Unauthorized Bus Layover
2023-01-05Permit Mechanical Systems — Signed-off
2023-01-05Permit Mechanical Systems — Signed-off
2023-01-05Permit Plumbing — Signed-off
2023-01-04Permit Sprinklers — Signed-off
2023-01-02311: Noise - Residential — Loud Music/Party
2022
2022-12-29Permit Mechanical Systems — Signed-off
2022-12-29Job filed: Modifications to the existing HVAC System: Removal and disposal of 2.5 ton ceiling mounted AC unit and associated ductwork on the 35th Floor as per pl$3,750
2022-12-28Permit General Construction — Signed-off
2022-12-27Job filed: Modifications to the existing HVAC System: Installation of new Ductwork, air outlets, relocate thermostat, controls on the 4th Floor as per plans (Sti$77,000
2022-12-27Job filed: Modifications to the existing sprinkler system: Relocate (11) existing sprinkler heads and install (1 ) new sprinkler heads, Remove 2 and associated $12,000
2022-12-23311: Lost Property — Clothing/Glasses
2022-12-23Job filed: Removal of existing HVAC unit, and install new units and associated ductwork and accessories on the 32nd Floor as per plans (China Construction Bank -$630,000
2022-12-22Job filed: Minor interior demolition; Removal and disposal of interior partitions, fixtures, suspended ceilings, flooring and finishes on the 35th Floor as per p$83,209
2022-12-21Job filed: Modifications to the existing Sprinkler System: Removal of (100) existing sprinkler heads and piping, Install (110) new sprinkler heads and piping on $63,000
2022-12-21Job filed: Install new pantry fixtures: Install (1) HWH, (1) refrigerator, (1) dishwasher, (1) sink, (1) coffeemaker, (1) floor drain and associated CW/sanitary $25,000
2022-12-20311: Lost Property — Bag/Wallet
2022-12-20Permit General Construction — Signed-off
2022-12-16Permit General Construction — Signed-off
2022-12-16Permit Structural — Signed-off
2022-12-14Job filed: Minor interior demolition; Furnish & Install new credenza, new suspended ceiling, floor finishes, relocate wall panels, paint affected areas, install $120,400
2022-12-12Job filed: Minor interior Structural Modifications: Installation of structural steel supports for Modernfold wall on the 32nd Floor as per plans (China Construct$75,000
2022-12-09Asbestos abatement: Removal — A.S.A.R. International Corp.
2022-12-09Job filed: Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 32nd Floor as per plans (C$3,170,000
2022-12-08Certificate of occupancy Renewal Without Change
2022-11-21Job filed: Holiday party.
2022-11-09Elevator permit: Furnish and install one (1) Vertical Platform Lift as detailed in the attached drawings. All work will comply with ASME A18.1-201$23,200
2022-11-08311: Street Condition — Pothole
2022-11-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-10-31Permit Structural — Signed-off
2022-10-26Job filed: TPA PERMIT IS REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 24, 2022 FROM 7:30 AM TO 1:30 PM FOR 300 PERSONS. OCCUPANCY WILL BE 150 P
2022-10-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-10-13311: DOOR/WINDOW — DOOR
2022-10-13Tenant complaint: DOOR/WINDOW — DOOR
2022-10-12Certificate of occupancy Renewal Without Change
2022-10-11Job filed: Roof reinforcement on the 2nd floor (Valbella) as per plans. No change to use, egress or occupancy.$233,600
2022-10-05311: Encampment — N/A
2022-10-05311: Encampment — N/A
2022-10-04311: Lost Property — Electronics/Phones
2022-09-30311: Encampment — N/A
2022-09-30311: Encampment — N/A
2022-09-15Permit General Construction — Permit Issued
2022-09-13311: Encampment — N/A
2022-09-13311: Encampment — N/A
2022-09-13Certificate of occupancy Renewal Without Change
2022-09-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-09-08311: Food Establishment — Pet/Animal
2022-09-06Job filed: Installation of temporary tents, no alt to exist structures for Catapult -USA Productions. A TPA permit is not required. Producer is responsible to mo$5,000
2022-08-31311: Noise - Street/Sidewalk — Loud Music/Party
2022-08-27311: Illegal Parking — Blocked Hydrant
2022-08-26311: Street Sign - Missing — No Parking, Standing, Stopping
2022-08-24311: Encampment — N/A
2022-08-24311: Encampment — N/A
2022-08-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-19311: Encampment — N/A
2022-08-19311: Encampment — N/A
2022-08-12311: Sidewalk Condition — Blocked - Construction
2022-08-10311: Encampment — N/A
2022-08-10311: Encampment — N/A
2022-08-08311: Noise - Street/Sidewalk — Loud Music/Party
2022-08-01311: Encampment — N/A
2022-08-01311: Encampment — N/A
2022-07-28311: Encampment — N/A
2022-07-28311: Encampment — N/A
2022-07-27311: Encampment — N/A
2022-07-27311: Encampment — N/A
2022-07-27311: Sidewalk Condition — Blocked - Construction
2022-07-27311: Drug Activity — Use Outside
2022-07-25311: Obstruction — Cone
2022-07-23311: Encampment — N/A
2022-07-23311: Encampment — N/A
2022-07-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-29Permit Mechanical Systems — Signed-off
2022-06-28Certificate of occupancy Renewal With Change
2022-06-28Permit Mechanical Systems — Permit Issued
2022-06-28Permit Plumbing — Permit Issued
2022-06-28Permit Structural — Signed-off
2022-06-28Permit General Construction — Permit Issued
2022-06-24311: Noise — Noise: Construction Before/After Hours (NM1)
2022-06-17311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-16Certificate of occupancy Renewal Without Change
2022-06-15311: Noise - Commercial — Loud Talking
2022-06-15311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2022-06-08Job filed: Remove (1) WC, (1) Sink, (1) Lav, (1) HWH, (1) Floor drain and associated piping on the 1st Floor; Install NEW: (1) HWH, (1) WC, (1) Lav, (1) sink and$17,000
2022-06-08Job filed: Modifications to the existing HVAC System: Removal of existing toilet exhaust fan and associated ductwork. Install new 50 CFM toilet exhaust fan to be$2,000
2022-06-08Job filed: Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Re$61,740
2022-06-01Certificate of occupancy Renewal Without Change
2022-05-10311: Street Light Condition — Street Light Out
2022-05-02Elevator permit: Install MOVFR door operator on car side and hatch side; new car track, hangers, clutch and closures. This work shall comply to ASM$54,000
2022-04-28Certificate of occupancy Renewal Without Change
2022-04-24311: Consumer Complaint — Cell Phone Store
2022-04-21Permit General Construction — Signed-off
2022-04-08Certificate of occupancy Renewal Without Change
2022-04-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-06311: Illegal Parking — Blocked Bike Lane
2022-04-02311: Homeless Person Assistance
2022-04-01311: Urinating in Public — N/A
2022-04-01311: Encampment — N/A
2022-03-31311: Homeless Person Assistance
2022-03-31311: Homeless Person Assistance
2022-03-29Permit Mechanical Systems — Signed-off
2022-03-28311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2022-03-28Permit Sprinklers — Signed-off
2022-03-23Certificate of occupancy Renewal With Change
2022-03-14Certificate of occupancy Renewal Without Change
2022-03-04DOB complaint, category ?
2022-03-02Job filed: Modifications to the existing sprinkler system: Install (9) new sprinkler heads, Relocate (13) existing sprinkler heads and Remove (2) existing sprink$26,500
2022-03-02Job filed: Modifications to the existing HVAC System as per plans (Lloyds Banking Group.) No change to use, egress or occupancy.$237,415
2022-03-01311: Illegal Parking — Blocked Bike Lane
2022-02-28Permit General Construction — Signed-off
2022-02-25311: Illegal Parking — Posted Parking Sign Violation
2022-02-24Job filed: Structural Modifications and reinforcement of existing beams as per plans (Life Safety Generator Project.) No change to use, egress or occupancy.$155,000
2022-02-23Job filed: Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 34th Floor as per plans (L$867,433
2022-02-23Job filed: Minor interior demolition. Installation of new sheetrock partitions, suspended ceilings, lighting, doors, flooring and finishes as per plans (Life Saf$678,000
2022-02-18Certificate of occupancy Renewal Without Change
2022-02-18Job filed: Remove (12) existing sprinkler heads, Relocate (6) sprinkler heads and install (27) new sprinkler heads and associated piping on the Sub Cellar Level $134,000
2022-02-18Job filed: Installation of new 1,300 gallon NYC-rated Main Fuel Oil Tank with concrete curb around room for 100% containment as per plans (Life Safety Generator.$50,000
2022-02-15Facade (LL11) filing, cycle 9: SAFE
2022-02-09Certificate of occupancy Renewal With Change
2022-02-08Cooling tower inspection — violation AH8S
2022-01-24FDNY inspection (STRUC_INT_3)
2022-01-24FDNY inspection (COM_OCPCY)
2022-01-19311: HEAT/HOT WATER — APARTMENT ONLY
2022-01-19Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021
2021-12-17Certificate of occupancy Renewal Without Change
2021-12-11311: Illegal Dumping — Removal Request
2021-12-08Asbestos abatement: Removal — JVN Restoration Inc.
2021-12-08Asbestos abatement: Removal — JVN Restoration Inc.
2021-12-08Job filed: Rem/Rep (1) Gas Booster on Cel; Rem (24) FDs & (8) sinks, rep (6) WCs, Install (32) new PL fix, (8) gas cook eq. & (1) Emer. Shutoff Valve on 2nd Flr;$60,000
2021-11-17Job filed: TPA PERMIT REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 25, 2021 FROM 7:30 AM TO 1:30 PM FOR 300 PERSONS (150 PERSONS ON EACH FLOOR)
2021-11-04Permit Sprinklers — Signed-off
2021-11-01ECB CLASS - 2 violation: 27-929.1 A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REP
2021-10-21Permit Plumbing — Signed-off
2021-10-20Permit Sprinklers — Signed-off
2021-10-19311: Street Sign - Dangling — Other/Unknown
2021-10-18Permit General Construction — Signed-off
2021-10-18Permit General Construction — Signed-off
2021-10-18Permit Mechanical Systems — Signed-off
2021-10-12Job filed: Modifications to the existing Sprinkler System: Remove (9) existing sprinkler heads, Relocate (40) exiting sprinkler heads and Install (11) new sprink$50,000
2021-10-12Job filed: Modifications to the existing HVAC System; Installation of new ductwork, pumps and piping to fee existing unit as per plans (Apollo Global - Tenant Re$225,000
2021-10-12Job filed: REM: (1) UR, (2) HWH, (2) Sink, (1) IM, (2) CM and cap associated piping; Relocate: (1) Urinal; New: (1) Water Closet, (4) Floor Drains, (3) HWH, (5) $50,000
2021-10-12Job filed: Minor interior demolition. Installation of new partitions, doors, floor finishes and suspended ceilings as per plans (Apollo Global Management - Tenan$1,539,000
2021-10-07Certificate of occupancy Renewal With Change
2021-09-24311: Homeless Person Assistance
2021-09-20311: Homeless Person Assistance
2021-09-19311: Noise - Street/Sidewalk — Loud Music/Party
2021-09-17DOB violation E:
2021-09-17DOB violation E:
2021-09-16311: Food Establishment — Pet/Animal
2021-09-12311: Encampment — N/A
2021-09-11311: Sanitation Condition — 12 Dead Animals
2021-09-08311: Homeless Person Assistance
2021-09-06311: Noise - Street/Sidewalk — Loud Music/Party
2021-09-04311: Noise - Street/Sidewalk — Loud Music/Party
2021-09-04311: Homeless Person Assistance
2021-09-03311: Homeless Person Assistance
2021-09-02311: Homeless Person Assistance
2021-08-30FDNY inspection (RISK)
2021-08-23Permit Sprinklers — Signed-off
2021-08-21311: Noise - Street/Sidewalk — Loud Music/Party
2021-08-21311: Noise - Street/Sidewalk — Loud Music/Party
2021-08-05Job filed: Installation of new 1,300 gallon NYC-rated Main Fuel Oil Tank with concrete curb around room for 100% containment as per plans (Life Safety Generator.$50,000
2021-08-05Job filed: Remove (5) sprinkler heads, relocate (6) sprinkler heads and install (15) new sprinkler heads and associated piping on the Sub Cellar Level and Instal$134,000
2021-08-05Job filed: Modifications to the existing HVAC, Install new ductwork, exhaust flue, dampers and controls in relation to new Life Safety Generator as per plans. No$1,560,000
2021-07-30Permit Boiler Equipment — Signed-off
2021-07-30Permit General Construction — Signed-off
2021-07-30Permit Mechanical Systems — Signed-off
2021-07-27Permit Structural — Signed-off
2021-07-25Job filed: Replacement of entrance doors and associated partitions on the 14th Floor as per plans (Salesforce.) No change to use, egress or occupancy.$17,000
2021-07-23311: Noise - Street/Sidewalk — Loud Music/Party
2021-07-23Job filed: Modifications to the existing Sprinkler System; Remove (1) existing sprinkler head and piping; Install nineteen (19) new concealed sprinkler heads and$5,000
2021-07-15Permit Plumbing — Signed-off
2021-07-15Permit Sprinklers — Signed-off
2021-07-09Permit General Construction — Signed-off
2021-07-07Permit General Construction — Signed-off
2021-07-02Permit Mechanical Systems — Signed-off
2021-07-01Permit General Construction — Signed-off
2021-07-01Permit Structural — Signed-off
2021-06-30Job filed: Modifications to the existing HVAC System; Relocate branch lines from existing trunk lines as per plans (Valbella's - Bryant Park.) No change to use, $30,000
2021-06-30Job filed: Rem/Rep (1) Gas Booster on Cel; Rem (24) FDs & (8) sinks, rep (6) WCs, Install (32) new PL fix, (8) gas cook eq. & (1) Emer. Shutoff Valve on 2nd Flr;$60,000
2021-06-30Job filed: Relocate (2) heads and remove (1) head on the Cellar; Install (2) new heads and relocate (1) head on the 1st Flr, (3) new heads and relocate (11) exis$10,800
2021-06-29Job filed: Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes as per plans (Tenant Interior Fit$1,320,000
2021-06-29Job filed: Structural modifications: Installation of structural steel supports for bracing of glass walls on the 3rd Floor and roof as per plans (Valbella at Bry$54,000
2021-06-19311: Noise - Helicopter — Other
2021-06-17311: Uprooted Stump — Remove Stump
2021-06-10Permit Plumbing — Signed-off
2021-06-10Permit Mechanical Systems — Permit Issued
2021-06-10Job filed: Replacement of air conditioning units on the 39th and 40th floor IDF rooms$60,000
2021-06-09Permit Sprinklers — Signed-off
2021-06-08Permit General Construction — Signed-off
2021-06-05311: Illegal Parking — Unauthorized Bus Layover
2021-06-03Permit Mechanical Systems — Signed-off
2021-06-03Job filed: Installation of temporary supported scaffold as access scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change i
2021-05-27Job filed: Install new plumbing fixtures: (1) pantry sink, (1) chiller, (1) funnel drain, (1) Hot Water Heater, (1) Coffeemaker and (1) dishwasher and associated$18,800
2021-05-27Job filed: Modifications to the existing HVAC System and installation of new boot & taps and new diffusers as per plans (LL Work - Partial 24th Floor/ Suites 240$145,200
2021-05-27Job filed: Minor interior demolition. Installation of new partitions, flooring, suspended ceilings, doors and finishes as per plans (Partial 24th Floor/ Suites 2$478,400
2021-05-27Job filed: Modifications to the existing Sprinkler System; Remove forty-nine (49) sprinkler heads; Install sixty-eight (68) new sprinkler heads and associated pi$39,600
2021-05-20311: Illegal Parking — Blocked Bike Lane
2021-05-12Permit Plumbing — Signed-off
2021-05-11311: Illegal Parking — Unauthorized Bus Layover
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29Asbestos abatement: Removal — JVN Restoration Inc.
2021-04-29DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-04-24311: Broken Parking Meter — No Receipt
2021-04-22Permit Plumbing — Signed-off
2021-04-13Permit Sprinklers — Signed-off
2021-04-11311: Illegal Parking — Double Parked Blocking Vehicle
2021-04-09Job filed: Structural Modifications and reinforcement of existing beams as per plans (Life Safety Generator Project.) No change to use, egress or occupancy.$155,000
2021-04-09Job filed: Installation of new 1,300 gallon NYC-rated Main Fuel Oil Tank with concrete curb around room for 100% containment as per plans (Life Safety Generator.$50,000
2021-04-09Job filed: Modifications to the existing HVAC, Install new ductwork, exhaust flue, dampers and controls in relation to new Life Safety Generator as per plans. No$1,560,000
2021-04-09Job filed: Remove (12) existing sprinkler heads, Relocate (6) sprinkler heads and install (27) new sprinkler heads and associated piping on the Sub Cellar Level $134,000
2021-04-08Job filed: Minor interior demolition. Installation of new sheetrock partitions, suspended ceilings, lighting, doors, flooring and finishes as per plans (Life Saf$678,000
2021-04-07Permit General Construction — Signed-off
2021-04-07Permit General Construction — Signed-off
2021-04-06Permit General Construction — Permit Issued
2021-04-06Permit Mechanical Systems — Signed-off
2021-04-05Job filed: Minor interior demolition. Removal of interior partitions, suspended ceilings, flooring, fixtures and finishes of existing restaurant to prepare for r$17,500
2021-03-31Permit Plumbing — Signed-off
2021-03-31Job filed: INTERIOR RENOVATION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$112,450
2021-03-31Job filed: Modifications to mechanical system as per plans. No change to use, egress or occupancy.$25,000
2021-03-30ECB CLASS - 2 violation: 27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY$1,250
2021-03-30Permit Sprinklers — Signed-off
2021-03-30Job filed: Modifications to sprinkler system as per plans. No change to use, egress or occupancy.$16,500
2021-03-25Permit Mechanical Systems — Signed-off
2021-03-18Job filed: Modifications to the existing HVAC System; Cap two main ducts at shaft with BMS controls as per plans (LL Work/ Demo and Whitebox.) No change to use, $20,000
2021-03-18Job filed: Removal of Existing Pantry and Bathroom Fixtures: (3) pantry sinks, (1) lavatory, (1) water closet, (1) shower and associated sanitary and cold water $4,000
2021-03-18Job filed: Modifications to the existing Sprinkler System: Removal of (124) existing sprinkler heads and installation of (14) new temporary sprinkler heads and l$7,500
2021-03-18Job filed: Minor interior demo, removal of prior tenants buildout; Install new partitions, wall scar patching, firestopping, flooring and finishes as per plans ($178,000
2021-03-01Certificate of occupancy Temporary
2021-02-26Certificate of occupancy Temporary
2021-02-24Elevator permit: FILE FOR TEMPORARY CONSTRUCTION PERMIT TO BE IN COMPLIANCE WITH SECTION 5.10 ALL WORK TO COMPLY TO ASME A17.1, 2000-3, APPENDIX K$5,410
2021-02-24Permit Sprinklers — Signed-off
2021-02-11Permit Plumbing — Signed-off
2021-02-01Permit EW — ISSUED
2021-01-26Permit Mechanical Systems — Signed-off
2021-01-22Job filed: Installation of new plumbing fixtures and associated piping on the 1st floor (Shake Shack) as per plans. No change to use, egress or occupancy.$200,000
2021-01-22Job filed: Installation of new HVAC and kitchen exhaust system on the 1st floor (Shake Shack) as per plans. No change to use, egress or occupancy.$349,990
2021-01-21Job filed: Modifications to the existing HVAC System; Installation of new high pressure steam PRV station with high pressure steam welding and piping as per plan$267,850
2021-01-18Asbestos abatement: Removal — JVN Restoration Inc.
2021-01-18Asbestos abatement: Removal — JVN Restoration Inc.
2021-01-18Asbestos abatement: Removal — JVN Restoration Inc.
2021-01-15Job filed: PAA to show Sprinkler FCVA Floor Control Valve Assembly has been relocated to be close to the sprinkler riser inside the Stairwell$40,000
2020
2020-12-30311: Non-Residential Heat — Inadequate or No Heat
2020-12-29Certificate of occupancy Temporary
2020-12-29Certificate of occupancy Temporary
2020-12-18Permit Sprinklers — Signed-off
2020-12-18Permit Mechanical Systems — Signed-off
2020-12-10ECB CLASS - 2 violation: SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARE$500
2020-12-02Permit Mechanical Systems — Signed-off
2020-11-30311: Homeless Person Assistance
2020-11-30Permit Plumbing — Signed-off
2020-11-28Permit EW — ISSUED
2020-11-26311: Homeless Person Assistance
2020-11-23311: Homeless Person Assistance
2020-11-23Job filed: Removal of existing plumbing fixtures; Install NEW: (3) Drinking Fountains, (3) Funnel drains, (11) Lavatories, (9) Water Closets, (2) Urinals and ass$86,250
2020-11-23Job filed: Removal of (214) existing Sprinkler System and Installation of (41) new temporary sprinkler heads, associated piping and temp loop as per plans (Demo,$32,200
2020-11-23Job filed: Modifications to the existing HVAC System; Supply and Exhaust ductwork to/from base building as per plans (Demo, Whitebox & Restrooms.) No change to u$59,800
2020-11-23Job filed: MINOR DEMOLITION. INSTALLATION OF NEW SHEETROCK PARTITIONS, SUSPENDED CEILINGS, DOORS, FLOORING AND FINISHES AS PER PLANS (DEMO, WHITEBOX & RESTRO$331,200
2020-11-23Job filed: MINOR DEMOLITION. INSTALLATION OF NEW SHEETROCK PARTITIONS, SUSPENDED CEILINGS, DOORS, FLOORING AND FINISHES AS PER PLANS (DEMO, WHITEBOX & RESTRO$331,200
2020-11-22311: Homeless Person Assistance
2020-11-21311: Homeless Person Assistance
2020-11-20311: Homeless Person Assistance
2020-11-16311: Homeless Person Assistance
2020-11-15311: Homeless Person Assistance
2020-11-13311: Homeless Person Assistance
2020-11-12311: Homeless Person Assistance
2020-11-09311: Homeless Person Assistance
2020-11-07311: Homeless Person Assistance — N/A
2020-11-07311: Homeless Person Assistance — N/A
2020-11-06311: Homeless Person Assistance — N/A
2020-10-29311: Homeless Person Assistance — N/A
2020-10-29Permit Mechanical Systems — Signed-off
2020-10-28Asbestos abatement: Removal — P.A.L. Environmental Safety Corp.
2020-10-28Asbestos abatement: Removal — P.A.L. Environmental Safety Corp.
2020-10-28Asbestos abatement: Removal — P.A.L. Environmental Safety Corp.
2020-10-19311: Homeless Person Assistance — N/A
2020-10-18311: Homeless Person Assistance — N/A
2020-10-16311: Homeless Person Assistance — N/A
2020-10-16311: Homeless Person Assistance — N/A
2020-10-15311: Street Condition — Crash Cushion Defect
2020-10-15311: Homeless Person Assistance — N/A
2020-10-14Permit Sprinklers — Signed-off
2020-10-12311: Homeless Person Assistance — N/A
2020-10-11311: Homeless Person Assistance — N/A
2020-10-10311: Homeless Person Assistance — N/A
2020-10-09311: Homeless Person Assistance — N/A
2020-10-09311: Homeless Person Assistance — N/A
2020-10-05311: Homeless Person Assistance — N/A
2020-10-04311: Homeless Person Assistance — N/A
2020-10-03311: Homeless Person Assistance — N/A
2020-10-02311: Homeless Person Assistance — N/A
2020-10-01311: Homeless Person Assistance — N/A
2020-10-01Certificate of occupancy Temporary
2020-09-30DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-09-29ECB CLASS - 2 violation: 27-929.1 A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REP$1,250
2020-09-28Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$7,319
2020-09-28311: Homeless Person Assistance — N/A
2020-09-27311: Homeless Person Assistance — N/A
2020-09-26311: Homeless Person Assistance — N/A
2020-09-25311: Homeless Person Assistance — N/A
2020-09-25311: Homeless Person Assistance — N/A
2020-09-24311: Homeless Person Assistance — N/A
2020-09-24311: Homeless Person Assistance — N/A
2020-09-20311: Homeless Person Assistance — N/A
2020-09-19311: Homeless Person Assistance — N/A
2020-09-18311: Homeless Person Assistance — N/A
2020-09-18311: Homeless Person Assistance — N/A
2020-09-14311: Homeless Person Assistance — N/A
2020-09-11311: Homeless Person Assistance — N/A
2020-09-11311: Homeless Person Assistance — N/A
2020-09-10311: Homeless Person Assistance — N/A
2020-09-06311: Homeless Person Assistance — N/A
2020-09-05311: Homeless Person Assistance — N/A
2020-09-04311: Homeless Person Assistance — N/A
2020-09-03311: Homeless Person Assistance — N/A
2020-08-31311: Homeless Person Assistance — N/A
2020-08-30311: Homeless Person Assistance — N/A
2020-08-28311: Homeless Person Assistance — N/A
2020-08-28311: Homeless Person Assistance — N/A
2020-08-28311: Homeless Person Assistance — N/A
2020-08-26311: Homeless Person Assistance — N/A
2020-08-24311: Homeless Person Assistance — N/A
2020-08-23311: Homeless Person Assistance — N/A
2020-08-22311: Homeless Person Assistance — N/A
2020-08-22311: Illegal Parking — Posted Parking Sign Violation
2020-08-22311: Homeless Person Assistance — N/A
2020-08-21311: Homeless Person Assistance — N/A
2020-08-21311: Homeless Person Assistance — N/A
2020-08-20311: Homeless Person Assistance — N/A
2020-08-19311: Street Condition — Cave-in
2020-08-17311: Homeless Person Assistance — N/A
2020-08-16311: Homeless Person Assistance — N/A
2020-08-15311: Homeless Person Assistance — N/A
2020-08-14311: Homeless Person Assistance — N/A
2020-08-13311: Homeless Person Assistance — N/A
2020-08-10311: Homeless Person Assistance — N/A
2020-08-09311: Homeless Person Assistance — N/A
2020-08-08311: Homeless Person Assistance — N/A
2020-08-07311: Homeless Person Assistance — N/A
2020-08-07311: Homeless Person Assistance — N/A
2020-08-06311: Homeless Person Assistance — N/A
2020-08-05311: Illegal Parking — Posted Parking Sign Violation
2020-08-03311: Homeless Person Assistance — N/A
2020-08-02311: Homeless Person Assistance — N/A
2020-08-02311: Homeless Person Assistance — N/A
2020-08-01311: Illegal Parking — Posted Parking Sign Violation
2020-08-01311: Illegal Parking — Posted Parking Sign Violation
2020-08-01311: Homeless Person Assistance — N/A
2020-07-31311: Homeless Person Assistance — N/A
2020-07-31311: Homeless Person Assistance — N/A
2020-07-30311: Illegal Parking — Posted Parking Sign Violation
2020-07-30311: Homeless Person Assistance — N/A
2020-07-30Permit Mechanical Systems — Signed-off
2020-07-29311: Illegal Parking — Posted Parking Sign Violation
2020-07-29311: Illegal Parking — Posted Parking Sign Violation
2020-07-29311: Illegal Parking — Posted Parking Sign Violation
2020-07-29311: Illegal Parking — Posted Parking Sign Violation
2020-07-28311: Homeless Person Assistance — N/A
2020-07-27311: Illegal Parking — Posted Parking Sign Violation
2020-07-26311: Homeless Person Assistance — N/A
2020-07-26311: Homeless Person Assistance — N/A
2020-07-26311: Illegal Parking — Posted Parking Sign Violation
2020-07-25311: Homeless Person Assistance — N/A
2020-07-25311: Homeless Person Assistance — N/A
2020-07-24311: Homeless Person Assistance — N/A
2020-07-23311: Homeless Person Assistance — N/A
2020-07-09Certificate of occupancy Temporary
2020-07-08ECB CLASS - 2 violation: COMMUNICATION DEFECTIVE REPAIR. MAINTENANCE LOG UPDATE MISSING PROVIDE.
2020-07-08ECB CLASS - 1 violation: 5-A-10 CEASE USED . DOOR RESTRICTOR DEFECTIVE REPAIR RE INSPECTION REQUIRED. COMMUNICATION DEFECTIVE REPAIR. MAINTENANCE LOG UPDAT$1,250
2020-07-08ECB CLASS - 2 violation: HOIST CABLE SHORTENING.$310
2020-07-08ECB CLASS - 2 violation: COMMUNICATION DEFECTIVE REPAIR. MAINTENANCE LOG UPDATE MISSING PROVIDE.
2020-07-08DOB complaint, category ?
2020-07-08DOB complaint, category ?
2020-07-07ECB CLASS - 2 violation: HOIST CABLES NEED SHORTENING. GOVERNOR CABLE NEEDS SHORTNING$310
2020-07-07ECB CLASS - 2 violation: COMP ROPE RUSTED REPLACE.$310
2020-07-07DOB complaint, category ?
2020-07-07DOB complaint, category ?
2020-07-06Certificate of occupancy Temporary
2020-06-20311: Non-Emergency Police Matter — Social Distancing
2020-05-29Certificate of occupancy Temporary
2020-05-12Job filed: CONVERSION OF AN EXISTING PREACTION SPRINKLER SYSTEM TO WET-PIPE SPRINKLER SYSTEM$5,000
2020-04-22311: Non-Emergency Police Matter — Social Distancing
2020-04-16Job filed: Installation of a kitchen exhuast fan.$60,000
2020-04-16Job filed: HEREWITH FILING FOR MINOR STRUCTURAL WORK (6TH FLOOR) AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$120,000
2020-04-16Job filed: HEREWITH FILING FOR MINOR STRUCTURAL WORK (6TH FLOOR) AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$120,000
2020-04-11311: Non-Emergency Police Matter — Social Distancing
2020-04-06Certificate of occupancy Temporary
2020-03-30311: Non-Emergency Police Matter — Social Distancing
2020-03-20311: Noise - Street/Sidewalk — Loud Music/Party
2020-03-11311: Homeless Person Assistance — N/A
2020-03-11Permit Plumbing — Signed-off
2020-03-11Permit Mechanical Systems — Permit Issued
2020-03-08311: Noise - Street/Sidewalk — Loud Music/Party
2020-03-05Certificate of occupancy Temporary
2020-03-05Permit EW — ISSUED
2020-03-05Job filed: REMOVAL AND DISPOSAL OF INTERIOR PARTITIONS, DOORS, SUSPENDED CEILINGS, STAIR AND FINISHES ON THE 1ST FLOOR (RETAIL- DEMO & WHITEBOX) AS PER PLANS$12,000
2020-03-05Job filed: REMOVAL AND DISPOSAL OF INTERIOR PARTITIONS, DOORS, SUSPENDED CEILINGS, STAIR AND FINISHES ON THE 1ST FLOOR (RETAIL- DEMO & WHITEBOX) AS PER PLANS$12,000
2020-03-04311: Consumer Complaint — Pedicab
2020-03-04Job filed: Removal of existing plumbing fixtures and associated piping on the 1st floor (Retail- Demo & Whitebox) as per plans. No change to use, egress or occu$4,500
2020-03-04Job filed: HVAC removals on the 1st floor (Retail- Demo & Whitebox) as per plans. No change to use, egress or occupancy.$1,500
2020-02-28Job filed: Installation of new plumbing fixtures and associated piping on the 1st floor (Shake Shack) as per plans. No change to use, egress or occupancy.$200,000
2020-02-21Certificate of occupancy Temporary
2020-02-11311: Noise - Street/Sidewalk — Loud Music/Party
2020-02-11Certificate of occupancy Temporary
2020-02-03311: Food Poisoning — 3 or More
2020-02-01311: Non-Emergency Police Matter — Trespassing
2020-01-28Permit Mechanical Systems — Signed-off
2020-01-28Permit Plumbing — Signed-off
2020-01-28Job filed: PAA to show Sprinkler FCVA Floor Control Valve Assembly has been relocated to be close to the sprinkler riser inside the Stairwell$40,000
2020-01-24Cooling tower inspection
2020-01-24311: Illegal Parking — Double Parked Blocking Traffic
2020-01-23311: Illegal Parking — Posted Parking Sign Violation
2020-01-23Job filed: Installation of new HVAC and kitchen exhaust system on the 1st floor (Shake Shack) as per plans. No change to use, egress or occupancy.$349,990
2020-01-23Job filed: Installation of new plumbing fixtures and associated piping on the 1st floor (Shake Shack) as per plans. No change to use, egress or occupancy.$200,000
2020-01-17Permit EW — ISSUED
2020-01-17Permit EW — ISSUED
2020-01-15Certificate of occupancy Temporary
2020-01-15Permit AL — ISSUED
2020-01-13Job filed: INSTALLATION OF MARQUEE ON THE 1ST FLOOR (SHAKE SHACK) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$45,000
2020-01-13Job filed: INSTALLATION OF MARQUEE ON THE 1ST FLOOR (SHAKE SHACK) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$45,000
2020-01-10Certificate of occupancy Temporary
2020-01-10Job filed: HEREWITH FILING STRUCTURAL WORK FOR RAISED FLOOR FRAMING WITH STAIR, STEEL FRAMING FOR THE MARQUEE ROOF, REINFORCEMENT FOR CEILING HUNG EQUIPMENT ON F$75,000
2020-01-10Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, CEILINGS, FINISHES, CASEWORK, STOREFRONT MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, E$450,000
2020-01-10Job filed: HEREWITH FILING STRUCTURAL WORK FOR RAISED FLOOR FRAMING WITH STAIR, STEEL FRAMING FOR THE MARQUEE ROOF, REINFORCEMENT FOR CEILING HUNG EQUIPMENT ON F$75,000
2020-01-10Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, CEILINGS, FINISHES, CASEWORK, STOREFRONT MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, E$450,000
2020-01-08311: Food Establishment — Food Contains Foreign Object
2020-01-06311: Noise - Street/Sidewalk — Loud Music/Party
2020-01-05311: Taxi Report — Driver Report - Passenger
2020-01-02311: Noise - Residential — Banging/Pounding
2020-01-02311: Noise - Street/Sidewalk — Loud Music/Party
2020-01-02311: Food Establishment — Food Contaminated
2019
2019-12-28311: Food Poisoning — 1 or 2
2019-12-17311: Food Poisoning — 1 or 2
2019-12-06311: Broken Parking Meter — No Receipt
2019-12-06Job filed: Board Of Directors Reception
2019-12-05Certificate of occupancy Temporary
2019-11-27311: Homeless Person Assistance — N/A
2019-11-27Certificate of occupancy Temporary
2019-11-26311: Homeless Person Assistance — N/A
2019-11-23311: Disorderly Youth — Playing in Unsuitable Place
2019-11-21311: Homeless Person Assistance — N/A
2019-11-21Job filed: TPA PERMIT REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 28TH OF 2019 FROM 7:30 AM TO 1:30 PM NOON FOR 300 PERSONS (150 ON EACH FLOOR
2019-11-20311: Homeless Person Assistance — N/A
2019-11-19311: Homeless Person Assistance — N/A
2019-11-18Job filed: TPA PERMIT REQUESTED FOR A PRIVATE PARTY TO BE HELD ON THURSDAY, NOVEMBER 28TH OF 2019 FROM 9:00 AM TO 12:00 NOON FOR 150 PEOPLE, 2 FIREGUARDS.
2019-11-15311: Noise - Street/Sidewalk — Loud Music/Party
2019-11-13311: Food Poisoning — 1 or 2
2019-11-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-06Permit Sign — Permit Issued
2019-11-05Job filed: Lecture
2019-11-04311: Noise - Street/Sidewalk — Loud Music/Party
2019-11-04Job filed: INSTALL ILLUMINATED ADVERTISING SIGN ON EXISTING WALL STRUCTURE FILED UNDER APPLICATION # 123451656 (CHANGEABLE COPY)$24,300
2019-11-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-31Certificate of occupancy Temporary
2019-10-29Permit EW — ISSUED
2019-10-28311: Taxi Complaint — Driver Complaint - Non Passenger
2019-10-28Job filed: Lecture
2019-10-25Certificate of occupancy Temporary
2019-10-24311: Broken Parking Meter — No Receipt
2019-10-17Permit PL — ISSUED
2019-10-15Permit Sidewalk Shed — Signed-off
2019-10-15Permit EW — ISSUED
2019-10-11Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-10-10Permit EW — ISSUED
2019-10-10Permit EW — ISSUED
2019-10-08Job filed: Lecture
2019-10-02311: Homeless Person Assistance — N/A
2019-10-02311: Noise - Street/Sidewalk — Loud Music/Party
2019-10-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-01311: Illegal Parking — Blocked Bike Lane
2019-10-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-01311: Illegal Parking — Blocked Bike Lane
2019-10-01311: Illegal Parking — Blocked Bike Lane
2019-09-25311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-25Permit Standpipe — Signed-off
2019-09-24311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-24311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-24311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-24Permit EW — ISSUED
2019-09-24Permit EW — ISSUED
2019-09-24Permit EW — ISSUED
2019-09-24Permit EW — ISSUED
2019-09-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-20311: Illegal Parking — Blocked Bike Lane
2019-09-20311: Illegal Parking — Posted Parking Sign Violation
2019-09-18311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-17311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-17311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-16311: Illegal Parking — Blocked Bike Lane
2019-09-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-16Job filed: Modification of Standpipe system. Relocation of hose cabinet. No change of use, occupancy or egress.$6,000
2019-09-16Job filed: Lecture
2019-09-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-06311: Noise - Vehicle — Engine Idling
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-05311: Noise - Street/Sidewalk — Loud Music/Party
2019-09-04Certificate of occupancy Temporary
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-09-01311: Illegal Parking — Blocked Bike Lane
2019-08-29311: Noise - Street/Sidewalk — Loud Music/Party
2019-08-28Permit PL — ISSUED
2019-08-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-08-27311: Illegal Parking — Blocked Bike Lane
2019-08-22311: Homeless Person Assistance — N/A
2019-08-21Certificate of occupancy Temporary
2019-08-20311: Noise - Street/Sidewalk — Loud Music/Party
2019-08-16311: Noise - Street/Sidewalk — Loud Music/Party
2019-08-14DOB violation E:
2019-08-13Permit EW — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-13Permit EW — ISSUED
2019-08-07Permit AL — ISSUED
2019-08-01Permit EW — ISSUED
2019-07-27311: Taxi Complaint — Driver Complaint - Passenger
2019-07-26311: Illegal Parking — Commercial Overnight Parking
2019-07-22311: Taxi Complaint — Driver Complaint - Non Passenger
2019-07-18Certificate of occupancy Temporary
2019-07-18Permit PL — ISSUED
2019-07-01311: For Hire Vehicle Complaint — Insurance Information Requested
2019-07-01Permit EW — ISSUED
2019-07-01Permit EW — ISSUED
2019-07-01Permit EW — ISSUED
2019-06-28Job filed: GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS, MECHANICAL INSTALLATIONS AND STRUCTURAL MODIFICATIONS FOR NEW MECHANICAL ROOM. NO CHANGE T$136,000
2019-06-27311: Animal-Abuse — Other (complaint details)
2019-06-27Job filed: HEREWITH FILING SUBSEQUENT MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH ALT-1 FILING.
2019-06-27Job filed: HEREWITH FILING ALTERATION TYPE 1 FOR INCREASED OCCUPANCY AT 6TH FLOOR OFFICE AND RELATED INTERIOR RENOVATIONS.$1,514,000
2019-06-26Permit EW — ISSUED
2019-06-26Permit EW — ISSUED
2019-06-17Facade (LL11) filing, cycle 8: SAFE
2019-06-14311: Noise - Street/Sidewalk — Loud Music/Party
2019-06-14Permit EW — ISSUED
2019-06-10Permit PL — ISSUED
2019-06-07311: Elevator — Elevator - Multiple Devices On Property
2019-06-07DOB complaint, category ?
2019-06-05Job filed: Salesforce event: 6/10, Reception; 6/11 Press event, Open house.
2019-06-05Job filed: FILING FOR TEMPORARY SPRINKLER LOOP ON THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,900
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-05-31Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND PIPING ON THE 6TH FLOOR (TIME MAGAZINE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$260,247
2019-05-31Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES ON THE 6TH FLOOR (TIME MAGAZINE) AS PER PLANS. NO CHANGE$6,316,149
2019-05-31Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM WITH INSTALLATION OF PLUMBING FIXTURES ON THE 6TH FLOOR (TIME MAGAZINE) AS PER PLANS. NO CHANGE TO USE, EGR$854,100
2019-05-30Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER ON THE 6TH FLOOR (TIME MAGAZINE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR O$40,000
2019-05-30Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 6TH FLOOR (TIME MAGAZINE) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$59,175
2019-05-28Certificate of occupancy Temporary
2019-05-21311: Homeless Person Assistance
2019-05-20Permit EW — ISSUED
2019-05-20Permit EW — ISSUED
2019-05-20Permit EW — ISSUED
2019-05-20Permit EW — ISSUED
2019-05-17311: Noise - Street/Sidewalk — Loud Music/Party
2019-05-17Permit EW — ISSUED
2019-05-17Permit EW — ISSUED
2019-05-17Permit EW — ISSUED
2019-05-16Permit Sidewalk Shed — Permit Issued
2019-05-15311: Noise - Street/Sidewalk — Loud Music/Party
2019-05-15Job filed: INSTALLATION OF CONVENIENCE STAIR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$190,000
2019-05-15Job filed: INTERIOR RENOVATIONS OF THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,301,548
2019-05-15Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 16TH FLOOR, AS SHOWN ON PLANS.$1,696,627
2019-05-15Job filed: SUBSEQUENT FILING FOR MECHANICAL WORK RELATED TO THE CONSTRUCTION OF CONVENIENCE STAIR ON THE 16TH FLOOR, AS SHOWN ON PLAN AS SHOWN ON DRAWINGS FILED $25,000
2019-05-15Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK RELATED TO THE CONSTRUCTION OF CONVENIENCE STAIR ON THE 16TH FLOOR, AS SHOWN ON PLANS.$110,000
2019-05-15Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 16TH FLOOR, AS SHOWN ON PLANS.$1,696,627
2019-05-15Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$198,231
2019-05-13Job filed: Event space for Salesforce. Week days only 9am to 6pm
2019-05-13Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,250
2019-05-13Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$110,250
2019-05-07Permit EW — ISSUED
2019-05-07Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM$10,000
2019-05-07Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM$10,000
2019-05-07Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$6,500
2019-05-07Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM$10,000
2019-05-03Job filed: Salesforce events. Multipurpose event space
2019-05-03Job filed: REMOVAL & INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$90,000
2019-05-03Job filed: MODIFICATION TO EXISTING PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2019-05-03Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,000
2019-05-03Job filed: MODIFICATION TO EXISTING PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2019-04-23Permit EW — ISSUED
2019-04-23Permit EW — ISSUED
2019-04-19FDNY inspection (STRUC_INT_6)
2019-04-19FDNY inspection (STRUC_INT_3)
2019-04-17311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-04-17311: Illegal Parking — Blocked Bike Lane
2019-04-17Job filed: Event space for Salesforce
2019-04-16311: For Hire Vehicle Complaint — Driver Complaint
2019-04-16311: Illegal Parking — Blocked Bike Lane
2019-04-10Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$97,500
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-04-03Permit EW — ISSUED
2019-04-02Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM FOR ELECTRIC COOKING EQUIPMENT IN CONJUNCTION WITH JOB#121188525, AS SHOWN ON PLAN. COOKING EXHAUST SYSTEM$6,500
2019-03-28311: Street Sign - Dangling — Other/Unknown
2019-03-27Job filed: Salesforce events. Multipurpose event space
2019-03-22Certificate of occupancy Temporary
2019-03-20Permit PL — ISSUED
2019-03-18Permit AL — ISSUED
2019-03-15311: ELECTRIC — OUTLET/SWITCH
2019-03-15Tenant complaint: ELECTRIC — OUTLET/SWITCH
2019-03-15Permit EW — ISSUED
2019-03-14311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-03-14311: Illegal Parking — Blocked Bike Lane
2019-03-14Certificate of occupancy Temporary
2019-03-11Certificate of occupancy Temporary
2019-03-05Permit EW — ISSUED
2019-03-05Permit PL — ISSUED
2019-02-20Job filed: INSTALLATION OF TWO (2) AUTOMATIC HEAT DETECTION FIRE ALARM SYSTEM FOR CFF-800 DUAL AGENT DELUGE SUPPRESSION SYSTEM AS SHOWN ON DRAWINGS FILED HEREWIT$250,000
2019-02-14Permit EW — ISSUED
2019-02-14Permit EW — ISSUED
2019-02-14Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AND PIPING AS PER PLANS (GRANITE POINT - OFFICE BUILDOUT.) NO CHANGE T$30,000
2019-02-14Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM AS PER PLANS (GRANITE POINT - OFFICE BUILDOUT.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$8,000
2019-02-14Job filed: MINOR DEMOLITION. INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES AS PER PLANS (GRANITE POINT - OFFICE BUILDOUT.) NO CHANGE TO $54,500
2019-02-14Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM AS PER PLANS (GRANITE POINT - OFFICE BUILDOUT.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$8,000
2019-02-14Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS (GRANITE POINT - OFFICE BUILDOUT.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$10,000
2019-02-14Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AND PIPING AS PER PLANS (GRANITE POINT - OFFICE BUILDOUT.) NO CHANGE T$30,000
2019-02-11311: Asbestos — Asbestos Complaint (B1)
2019-02-08311: Elevator — Elevator - Single Device On Property/No Alternate Service
2019-02-08DOB complaint, category ?
2019-01-17Permit PL — ISSUED
2019-01-15Cooling tower inspection
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-14Asbestos abatement: Removal — ETS Contracting, Inc.
2019-01-13311: Homeless Person Assistance
2019-01-10Permit AL — ISSUED
2019-01-03Permit Sign — Signed-off
2019-01-03Permit EW — ISSUED
2019-01-02311: Blocked Driveway — No Access
2018
2018-12-28Certificate of occupancy Temporary
2018-12-26Permit Sidewalk Shed — Signed-off
2018-12-18311: Food Establishment — Food Contaminated
2018-12-18Certificate of occupancy Temporary
2018-12-14311: Consumer Complaint — Price Not Posted
2018-12-11Permit PL — ISSUED
2018-12-11Permit EW — ISSUED
2018-12-10Permit Sidewalk Shed — Permit Issued
2018-12-06Certificate of occupancy Temporary
2018-12-03Job filed: PA
2018-12-03Job filed: PA
2018-12-03Job filed: PA
2018-12-03Job filed: PA
2018-11-15311: Building Condition — Bikes in Buildings
2018-11-07311: Noise - Street/Sidewalk — Loud Music/Party
2018-11-07Permit Sidewalk Shed — Permit Issued
2018-11-06Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$97,500
2018-11-05Certificate of occupancy Temporary
2018-11-01311: Homeless Person Assistance
2018-11-01311: Noise - Street/Sidewalk — Loud Music/Party
2018-10-31Permit EW — ISSUED
2018-10-31Permit EW — ISSUED
2018-10-31Job filed: INSTALLATIONS OF NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,000
2018-10-31Job filed: FILING FOR THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND HUNG CEILING RELATED TO THE LIFE SAFETY DESIGN PROJECT AS SHO$1,000,000
2018-10-31Job filed: FILING FOR THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND HUNG CEILING RELATED TO THE LIFE SAFETY DESIGN PROJECT AS SHO$1,000,000
2018-10-31Job filed: INSTALLATION OF NEW EXHAUST FANS AND SMOKE DAMPERS INTO EXISTING DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$300,000
2018-10-29Job filed: FIRE PROTECTION PLAN BEING FILED FOR HIGHRISE BUILDING ON THE REFERENCED TAX LOT.$1,000
2018-10-29Job filed: FIRE PROTECTION PLAN BEING FILED FOR HIGHRISE BUILDING ON THE REFERENCED TAX LOT.$1,000
2018-10-29Job filed: FIRE PROTECTION PLAN BEING FILED FOR HIGHRISE BUILDING ON THE REFERENCED TAX LOT.$1,000
2018-10-26DOB violation E:
2018-10-26DOB violation E:
2018-10-26DOB violation E:
2018-10-25DOB violation E:
2018-10-24311: Vending — In Prohibited Area
2018-10-22DOB violation E:
2018-10-22DOB violation E:
2018-10-18Permit Sidewalk Shed — Signed-off
2018-10-18Permit EW — ISSUED
2018-10-18Permit EW — ISSUED
2018-10-18Job filed: REMOVAL AND DISPOSAL OF INTERIOR PARTITIONS, DOORS, CEILINGS AND FINISHES WITH INSTALLATION OF NEW DOOR, CARPET AND PAINT ON THE 24TH FLOOR AS PER PLA$34,450
2018-10-18Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 24TH FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,465
2018-10-18Job filed: REMOVAL AND DISPOSAL OF INTERIOR PARTITIONS, DOORS, CEILINGS AND FINISHES WITH INSTALLATION OF NEW DOOR, CARPET AND PAINT ON THE 24TH FLOOR AS PER PLA$34,450
2018-10-18Job filed: REMOVAL AND DISPOSAL OF INTERIOR PARTITIONS, DOORS, CEILINGS AND FINISHES WITH INSTALLATION OF NEW DOOR, CARPET AND PAINT ON THE 24TH FLOOR AS PER PLA$34,450
2018-10-18Job filed: HVAC AND PLUMBING REMOVALS ON THE 24TH FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$18,585
2018-10-17Permit EW — ISSUED
2018-10-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-10-17Job filed: ROOFTOP WORK FOR THE SKYLIGHTS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,000
2018-10-17Job filed: ROOFTOP WORK FOR THE SKYLIGHTS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,000
2018-10-15Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-10-15311: New Tree Request — For One Address
2018-10-11311: Illegal Parking — Blocked Bike Lane
2018-10-10311: For Hire Vehicle Complaint — Driver Complaint
2018-10-09Certificate of occupancy Temporary
2018-10-03311: Blocked Driveway — No Access
2018-10-02311: Blocked Driveway — Partial Access
2018-10-02Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON THE 41ST FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2018-10-02Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON THE 41ST FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2018-10-01Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-10-01Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-10-01Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-10-01Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-10-01Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-10-01311: Blocked Driveway — No Access
2018-09-29311: Noise - Street/Sidewalk — Loud Music/Party
2018-09-28311: For Hire Vehicle Complaint — Driver Complaint
2018-09-28311: Illegal Parking — Blocked Bike Lane
2018-09-28Permit EW — ISSUED
2018-09-28Permit EW — ISSUED
2018-09-28Permit EW — ISSUED
2018-09-28Permit EW — ISSUED
2018-09-28Permit PL — ISSUED
2018-09-28Permit PL — ISSUED
2018-09-28Permit EW — ISSUED
2018-09-26Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 41ST FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$210,000
2018-09-26Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 41ST FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$210,000
2018-09-25Permit EW — ISSUED
2018-09-25Permit EW — ISSUED
2018-09-25Permit EW — ISSUED
2018-09-25Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 41ST FLOOR & ROF, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $44,000
2018-09-25Job filed: INTERIOR RENOVATIONS ON THE 41ST FLOOR & ROF, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$145,500
2018-09-25Job filed: INTERIOR RENOVATIONS ON THE 41ST FLOOR & ROF, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$1,130,000
2018-09-25Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 41ST FLOOR & ROF, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $44,000
2018-09-25Job filed: INTERIOR RENOVATIONS ON THE 41ST FLOOR & ROF, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$145,500
2018-09-25Job filed: INTERIOR RENOVATIONS ON THE 41ST FLOOR & ROF, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$1,130,000
2018-09-20Permit EW — ISSUED
2018-09-19311: Blocked Driveway — Partial Access
2018-09-12311: Noise - Street/Sidewalk — Loud Music/Party
2018-09-12311: Noise - Street/Sidewalk — Loud Music/Party
2018-09-12311: Noise - Street/Sidewalk — Loud Music/Party
2018-09-05Job filed: INSTALL WALL STRUCTURE FOR LED ADVERTISING SIGN FILED UNDER SEPARATE APPLICATION # M00019213-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,000
2018-08-31311: Taxi Complaint — Driver Complaint
2018-08-27311: Noise - Street/Sidewalk — Loud Music/Party
2018-08-27311: Noise - Residential — Loud Music/Party
2018-08-27311: Noise - Street/Sidewalk — Loud Music/Party
2018-08-24311: Broken Parking Meter — Timer Defect - Fast/Fail
2018-08-23311: Homeless Person Assistance
2018-08-23311: Noise - Street/Sidewalk — Loud Music/Party
2018-08-23311: Noise - Street/Sidewalk — Loud Music/Party
2018-08-23311: Noise - Residential — Loud Music/Party
2018-08-22Elevator permit: Install a system to monitor and prevent automatic operation of passenger elevators with faulty door contact circuits as per 3.10.1$2,766
2018-08-22Elevator permit: Install a system to monitor and prevent automatic operation of passenger elevators with faulty door contact circuits as per 3.10.1$922
2018-08-22Elevator permit: Install a system to monitor and prevent automatic operation of passenger elevators with faulty door contact circuits as per 3.10.1$3,688
2018-08-22Elevator permit: Replace exiting relay logic controller and motor room generator set with a new solid state controller and an integral solid state $449,300
2018-08-22Elevator permit: Install a system to monitor and prevent automatic operation of passenger elevators with faulty door contact circuits as per 3.10.1$6,559
2018-08-20311: Noise - Street/Sidewalk — Loud Music/Party
2018-08-17Certificate of occupancy Temporary
2018-08-16311: Noise - Street/Sidewalk — Loud Music/Party
2018-08-16311: Homeless Person Assistance
2018-08-13Certificate of occupancy Temporary
2018-08-04311: For Hire Vehicle Complaint — Driver Complaint
2018-07-28Elevator permit: INSTALL A SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF PASSENGER ELEVATORS WITH FAULTY DOOR CONTACT CIRCUITS AS PER 3.10.1$5,532
2018-07-28Elevator permit: INSTALL A SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF PASSENGER ELEVATORS WITH FAULTY DOOR CONTACT CIRCUITS AS PER 3.10.1$10,001
2018-07-28Elevator permit: INSTALL A SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF PASSENGER ELEVATORS WITH FAULTY DOOR CONTACT CIRCUITS AS PER 3.10.1$5,532
2018-07-28Elevator permit: INSTALL A SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF PASSENGER ELEVATORS WITH FAULTY DOOR CONTACT CIRCUITS AS PER 3.10.1$5,532
2018-07-25Certificate of occupancy Temporary
2018-07-25Permit EW — ISSUED
2018-07-20311: Noise - Street/Sidewalk — Loud Music/Party
2018-07-20Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS.
2018-07-19Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS.
2018-07-19Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS.
2018-07-18Certificate of occupancy Temporary
2018-07-16Asbestos abatement: Removal — Degmor Environmental Services, LLC
2018-07-10Job filed: STRUCTURAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$7,800
2018-06-28Elevator permit: Reclad elevator cabs and car door with no change in weight of suspended load. Install new top emergency contact, (1202.5,204.2a). $54,300
2018-06-28Elevator permit: Reclad elevator cabs and car door with no change in weight of suspended load. Install new top emergency contact, (1202.5,204.2a). $53,235
2018-06-27311: Homeless Person Assistance
2018-06-21311: Homeless Person Assistance
2018-06-15Job filed: TO INCREASE NUMBER OF OCCUPANTS FOR THE OFFICE AND ASSEMBLY USE ON THE 23RD & 41ST FLOORS. INCREASE OCCUPANCY FOR 14TH FLOOR OFFICE, AS SHOWN ON P$6,691,000
2018-06-15Job filed: TO INCREASE NUMBER OF OCCUPANTS FOR THE OFFICE AND ASSEMBLY USE ON THE 23RD & 41ST FLOORS. INCREASE OCCUPANCY FOR 14TH FLOOR OFFICE, AS SHOWN ON P$6,691,000
2018-06-14311: Noise - Street/Sidewalk — Loud Music/Party
2018-06-11Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE 23RD FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. IN CONJUNCTION WITH ALT-I$210,000
2018-06-09311: Noise - Street/Sidewalk — Loud Music/Party
2018-06-08Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON THE 23RD FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. IN CONJUNCTION WITH ALT-I$10,000
2018-06-02311: Derelict Bicycle — 14B Derelict Bicycle
2018-05-31Job filed: ADDITIONS OF NEW SMOKE CONTROL SYSTEM TO EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$750,000
2018-05-31Job filed: MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$150,000
2018-05-31Job filed: ADDITIONS/MODIFICATIONS TO EXISTING CLASS E FIRE ALARM SYSTEM VIA VESDA AS SHOWN ON DRAWINGS FILED HEREWITH.$275,000
2018-05-31Job filed: INSTALLATION OF TWO (2) AUTOMATIC HEAT DETECTION FIRE ALARM SYSTEM FOR CFF-800 DUAL AGENT DELUGE SUPPRESSION SYSTEM.$250,000
2018-05-31Job filed: INSTALLATIONS OF NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$275,000
2018-05-31Job filed: FILING FOR THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND HUNG CEILING RELATED TO THE LIFE SAFETY DESIGN PROJECT AS SHO$500,000
2018-05-31Job filed: FILING FOR THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND HUNG CEILING RELATED TO THE LIFE SAFETY DESIGN PROJECT AS SHO$500,000
2018-05-31Job filed: INSTALLATION OF TWO (2) AUTOMATIC HEAT DETECTION FIRE ALARM SYSTEM FOR CFF-800 DUAL AGENT DELUGE SUPPRESSION SYSTEM.$250,000
2018-05-31Job filed: INSTALLATIONS OF NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$275,000
2018-05-31Job filed: INSTALLATION OF NEW EXHAUST FANS AND SMOKE DAMPERS INTO EXISTING DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2018-05-31Job filed: INSTALLATION OF NEW EXHAUST FANS AND SMOKE DAMPERS INTO EXISTING DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2018-05-25Permit EW — ISSUED
2018-05-25Permit EW — ISSUED
2018-05-25Permit EW — ISSUED
2018-05-25Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,500
2018-05-25Job filed: INTERIOR RENOVATIONS ON THE 23RD FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. AS SHOWN ON DRAWINGS FILED HEREWITH.$113,000
2018-05-25Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $46,700
2018-05-25Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $46,700
2018-05-25Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $46,700
2018-05-25Job filed: INTERIOR RENOVATIONS ON THE 23RD FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. AS SHOWN ON DRAWINGS FILED HEREWITH.$113,000
2018-05-25Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 23RD FLOOR, AS SHOWN ON PLANS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,500
2018-05-16Certificate of occupancy Temporary
2018-05-16Permit EW — ISSUED
2018-05-10Permit Sign — Signed-off
2018-05-09Job filed: Erect non illuminated non advertising sign on wall replacing Bis #122896704. No change of use,egress or occupancy.$25,285
2018-05-04Permit EW — ISSUED
2018-04-27Certificate of occupancy Temporary
2018-04-16311: Broken Parking Meter — No Receipt
2018-04-11Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,068,000
2018-04-05Certificate of occupancy Temporary
2018-03-29Permit EW — ISSUED
2018-03-27Permit EW — ISSUED
2018-03-23Certificate of occupancy Temporary
2018-03-22Job filed: INSTALL LED ILLUMINATED ADVERTISING SIGN ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION.$454,050
2018-03-22Job filed: FILING FOR OCCUPANT PROTECTION PLAN ON THE 20TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$5,000
2018-03-22Job filed: FILING FOR OCCUPANT PROTECTION PLAN ON THE 20TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$5,000
2018-03-06DOB violation P: BOROUGH COMMISSIONER HAS ISSUED A NOTICE OF IMMEDIATE STOP WORK DUE TO APPLICANT WITHDRAWAL OF JOB #122288158 AS OF 03/06/2018
2018-03-05311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2018-03-05DOB complaint, category ?
2018-02-20Certificate of occupancy Temporary
2018-02-14Permit PL — ISSUED
2018-02-09Permit PL — ISSUED
2018-02-08Permit EW — ISSUED
2018-02-08Permit EW — ISSUED
2018-02-08Permit EW — ISSUED
2018-02-07Permit EW — ISSUED
2018-02-07Permit EW — ISSUED
2018-02-06Permit EW — ISSUED
2018-02-06Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES ON THE 33RD FLOOR (FINANCIALFORCE INC.) AS PER PLANS. NO$22,025
2018-02-06Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM WITH INSTALLATION OF NEW PLUMBING FIXTURES ON THE 33RD FLOOR (FINANCIALFORCE INC) AS PER PLANS. NO CHANGE T$3,500
2018-02-06Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 33RD FLOOR (FINANCIALFORCE INC) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,250
2018-02-06Job filed: MINOR DEMOLITION WITH INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS AND FINISHES ON THE 33RD FLOOR (FINANCIALFORCE INC.) AS PER PLANS. NO$22,025
2018-02-06Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM WITH INSTALLATION OF NEW PLUMBING FIXTURES ON THE 33RD FLOOR (FINANCIALFORCE INC) AS PER PLANS. NO CHANGE T$3,500
2018-02-06Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 33RD FLOOR (FINANCIALFORCE INC) AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$500
2018-02-05Certificate of occupancy Temporary
2018-01-31Cooling tower inspection
2018-01-30Permit EW — ISSUED
2018-01-30Permit EW — ISSUED
2018-01-30Permit EW — ISSUED
2018-01-30Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON CEL AND 001, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2018-01-30Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON CEL AND 001, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$45,000
2018-01-30Job filed: INTERIOR RENOVATIONS ON CEL AND 001, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$209,250
2018-01-30Job filed: PLUMBING AND MECHANICAL WORK ON CEL AND 001, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$68,500
2018-01-30Job filed: STRUCTURAL WORK ON CEL AND 001, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$2,200
2018-01-30Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON CEL AND 001, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-22Permit PL — ISSUED
2018-01-10Permit EW — ISSUED
2018-01-10Job filed: MODIFICATION TO EXISTING STRUCTURAL FRAME WITH INFILLS TO EXISTING SLABS ON 16TH THRU 23RD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APP$66,300
2018-01-08311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2018-01-08DOB complaint, category ?
2018-01-02311: Noise - Vehicle — Engine Idling
2017
2017-12-27Certificate of occupancy Temporary
2017-12-26311: Non-Residential Heat — Inadequate or No Heat
2017-12-08311: HEAT/HOT WATER — ENTIRE BUILDING
2017-12-08Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2017-11-29Certificate of occupancy Temporary
2017-11-22311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2017-11-22DOB complaint, category ?
2017-11-20Permit EW — ISSUED
2017-11-17Job filed: MINOR DEMOLITION, CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION ON THE FIRST FLOOR AS SHOWN ON DRAWINGS FILED$100,000
2017-11-17Job filed: MINOR DEMOLITION, CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION ON THE FIRST FLOOR AS SHOWN ON DRAWINGS FILED$100,000
2017-11-17Job filed: MINOR RENOVATIONS TO EXISTING SPACE AS PER SUBMITTED DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY$45,000
2017-11-17Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2017-11-17Job filed: RELATED PLUMBING AND MECHANICAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH.$75,000
2017-11-17Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2017-11-17Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2017-11-17Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2017-11-17Job filed: RELATED PLUMBING AND MECHANICAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH.$75,000
2017-11-17Job filed: MINOR RENOVATIONS TO EXISTING SPACE AS PER SUBMITTED DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY$45,000
2017-11-17Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2017-11-17Job filed: RELATED PLUMBING AND MECHANICAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH.$75,000
2017-11-17Job filed: MINOR DEMOLITION, CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING MODIFICATIONS AND RELATED CONSTRUCTION ON THE FIRST FLOOR AS SHOWN ON DRAWINGS FILED$100,000
2017-11-17Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2017-11-16Permit EW — ISSUED
2017-11-15DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-11-13Certificate of occupancy Temporary
2017-11-08Facade (LL11) filing, cycle 8: SAFE
2017-11-01Permit EQ — ISSUED
2017-10-27311: Sidewalk Condition — Broken Sidewalk
2017-10-27Job filed: TEMPORARY MATERIAL HOIST AS SHOWN ON PLANS
2017-10-20311: Taxi Complaint — Driver Complaint
2017-10-17311: Homeless Person Assistance — N/A
2017-10-12311: Noise - Street/Sidewalk — Loud Music/Party
2017-10-10311: For Hire Vehicle Complaint — Driver Complaint
2017-10-09311: Noise - Street/Sidewalk — Loud Music/Party
2017-10-05Certificate of occupancy Temporary
2017-10-04311: Homeless Person Assistance — N/A
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC$84,100,000
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC$84,100,000
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC$84,100,000
2017-10-03RPTT $84,100,000 — from WHOLE FOODS MARKET, INC. to WALNUT SUB PROPERTIES LLC$84,100,000
2017-10-03Permit EW — ISSUED
2017-10-03Permit EW — ISSUED
2017-10-02FDNY inspection (ABATE)
2017-10-02Job filed: INSTALL DUCT, FANS AND VENTING FOR NEW MECHANICAL ROOMS; CONNECT TO EXISTING SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$21,000
2017-10-02Job filed: GENERAL CONSTRUCTION INCLUSIVE OF ERECTING PARTITIONS FOR NEW MECHANICAL ROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$68,000
2017-10-02Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM.$18,000
2017-10-02Job filed: INSTALL DUCT, FANS AND VENTING FOR NEW MECHANICAL ROOMS; CONNECT TO EXISTING SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$21,000
2017-10-02Job filed: GENERAL CONSTRUCTION INCLUSIVE OF ERECTING PARTITIONS FOR NEW MECHANICAL ROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$68,000
2017-09-29311: Homeless Person Assistance — N/A
2017-09-27Permit EW — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-26Job filed: INSTALLATION OF AUTOMATIC HEAT DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM ON THE 15TH FLOOR FOR NER ROOM COVERAGE AS PER PLANS FILED HEREWITH. N$15,000
2017-09-26Job filed: FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION CONJUNCTION WITH JOB#122956220, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM FILED UNDER$3,000
2017-09-25311: Blocked Driveway — No Access
2017-09-25Permit EW — ISSUED
2017-09-25Permit EW — ISSUED
2017-09-25Permit EW — ISSUED
2017-09-25Permit EW — ISSUED
2017-09-25Permit EW — ISSUED
2017-09-25Permit EW — ISSUED
2017-09-21Permit PL — ISSUED
2017-09-21Permit AL — ISSUED
2017-09-21Permit PL — ISSUED
2017-09-21Permit EW — ISSUED
2017-09-19311: Consumer Complaint — Price Not Posted
2017-09-19ECB CLASS - 2 violation: 80B14)PERFORM SHORTENING ON HOIST ROPES.$250
2017-09-19ECB CLASS - 2 violation: 39B11,78B14,80B14-39B11)REPLACE PLASTIC LIGHT GUARD ON TOP OF CAR. 78B11)PERFORM SHORTENING ON GOVERNOR ROPE. 80B14)PERFORM SHORTE$250
2017-09-19ECB CLASS - 2 violation: 80B14)PERFORM SHORTENING ON HOIST ROPES.$250
2017-09-19ECB CLASS - 2 violation: 52K11)HOIST CABLES RUSTED AND HAVE FLAT SPOTS.$250
2017-09-19ECB CLASS - 2 violation: 80B14)PERFORM SHORTENING ON HOIST ROPES.$250
2017-09-19Permit EW — ISSUED
2017-09-18Permit EW — ISSUED
2017-09-18Permit EW — ISSUED
2017-09-18Permit EW — ISSUED
2017-09-18Job filed: STRUCTURAL WORK FOR NEW CONVENIENCE STAIR ON FLOORS 019-020, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$25,000
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-09-14Permit EW — ISSUED
2017-09-13Job filed: FILING HEREWITH APPLICATION FOR EMERGENCY GENERATOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,000
2017-09-13Job filed: FILING HEREWITH APPLICATION FOR EMERGENCY GENERATOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,000
2017-09-12Permit PL — ISSUED
2017-09-11Permit EW — ISSUED
2017-09-10311: Food Establishment — Food Spoiled
2017-09-10311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2017-09-10DOB complaint, category ?
2017-09-09DOB complaint, category ?
2017-09-08311: Noise - Residential — Banging/Pounding
2017-09-08311: Noise - Residential — Banging/Pounding
2017-09-08Job filed: FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION CONJUNCTION WITH JOB#122956220, AS SHOWN ON PLAN. COOKING EXHAUST SYSTEM FILED UNDER JOB#122956220. SE$3,000
2017-09-05DOB violation E:
2017-09-02311: Broken Muni Meter — Coin or Card Did Not Register
2017-08-29DOB violation E:
2017-08-28DOB violation E:
2017-08-25DOB violation E:
2017-08-25DOB violation E:
2017-08-23Permit EW — ISSUED
2017-08-23Permit EW — ISSUED
2017-08-23Permit EW — ISSUED
2017-08-22Permit EW — ISSUED
2017-08-22Permit EW — ISSUED
2017-08-22Permit EW — ISSUED
2017-08-22Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AND REMOVAL OF SPRINKLER PRE-ACTION HEADS. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$146,600
2017-08-22Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AND REMOVAL OF SPRINKLER PRE-ACTION HEADS. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$146,600
2017-08-22Job filed: REMOVAL OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$238,000
2017-08-22Job filed: DEMOLITION OF EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$19,500
2017-08-21Permit EQ — ISSUED
2017-08-21Job filed: SUBEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON FLOORS 018-019, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS..$253,000
2017-08-21Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON THE 20TH FLOOR,AS SHOWN ON PLANS.NO CHANGE IN USE, OCCUPANCY OR EGRESS.$10,000
2017-08-21Job filed: INTERIOR RENOVATIONS ON FLOORS 018-019, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$1,130,000
2017-08-21Job filed: SUBEQUENT FILING FOR MECHANICAL AND PLUMBING WORK ON FLOOR 20 AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$126,500
2017-08-21Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON FLOORS 018-019, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2017-08-21Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON FLOORS 018-019, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$537,000
2017-08-21Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON FLOORS 018-019, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$20,000
2017-08-21Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM ON FLOORS 20, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$268,500
2017-08-18Permit PL — ISSUED
2017-08-17Certificate of occupancy Temporary
2017-08-15Job filed: MODIFICATION TO EXISTING PRE-ACTION SPRINKLER SYSTEM ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. OCCUPANCY UNDER$50,000
2017-08-15Job filed: MODIFICATION TO EXISTING PRE-ACTION SPRINKLER SYSTEM ON 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. OCCUPANCY UNDER$50,000
2017-08-14311: Noise - Street/Sidewalk — Loud Music/Party
2017-08-07ECB CLASS - 1 violation: 100## FAILURE TO REPORT AN ESCALATOR ACCIDENT.FAILURE TO REPORT AN ELEVATOR ACCIDENT PROMPTLY.ACCIDENT OCCURED 08-07-2017 @6:30PM $1,000
2017-08-05311: Noise - Street/Sidewalk — Loud Music/Party
2017-08-05311: Noise - Residential — Banging/Pounding
2017-08-02311: Water System — Leak (Use Comments) (WA2)
2017-08-02Job filed: PA
2017-08-02Job filed: FILING HEREWITH FENCE APPLICATION IN CONJUNCTION TO RESTAURANT BUILD-OUT.
2017-08-02Job filed: PA
2017-08-02Job filed: FILING HEREWITH FENCE APPLICATION IN CONJUNCTION TO RESTAURANT BUILD-OUT.
2017-08-02Job filed: PA
2017-07-31FDNY inspection (ABATE)
2017-07-25311: Homeless Person Assistance — N/A
2017-07-17311: Homeless Person Assistance — N/A
2017-07-11Certificate of occupancy Temporary
2017-06-30311: Noise - Street/Sidewalk — Loud Music/Party
2017-06-28DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-06-26311: Homeless Person Assistance — N/A
2017-06-26311: Homeless Person Assistance — N/A
2017-06-19Job filed: MODIFICATION TO SPRINKLER SYSTEM AND SPRINKLER PRE-ACTION HEADS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT$130,000
2017-06-19Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM S AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$50,000
2017-06-12311: Street Condition — Pothole
2017-06-10311: Illegal Parking — Blocked Bike Lane
2017-06-10311: Noise - Street/Sidewalk — Loud Music/Party
2017-06-06Permit PL — ISSUED
2017-06-06Permit EW — ISSUED
2017-06-05FDNY inspection (ABATE)
2017-06-05Permit EW — ISSUED
2017-06-05Permit EW — ISSUED
2017-06-05Job filed: APPLICATION FILED FOR SPRINKLER MODIFICATION ON FLOORS 018-020, 041, AS SHOWN ON PLANS. HEADS ARE BEING REPLACED AND TURNED TO THE UPWARD POSITION. $110,000
2017-06-05Job filed: APPLICATION FILED FOR SPRINKLER MODIFICATION ON FLOORS 018-020, 041, AS SHOWN ON PLANS. HEADS ARE BEING REPLACED AND TURNED TO THE UPWARD POSITION. $110,000
2017-06-02Permit EW — ISSUED
2017-06-02Permit EW — ISSUED
2017-06-02Job filed: PLUMBING AND MECHANICAL DEMOLITION WORK ON FLOORS 018-020 & 41, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$347,000
2017-06-02Job filed: PLUMBING AND MECHANICAL DEMOLITION WORK ON FLOORS 018-020 & 41, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$347,000
2017-06-02Job filed: NON-STRUCTURAL DEMOLITION WORK ON FLOORS. 001, 018-020, 023, 041. AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, OCCUPANCY OR EGRESS AS SHOWN ON PLANS$875,175
2017-06-01Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$2,700,000
2017-06-01Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$290,000
2017-05-25311: Taxi Report — Driver Report
2017-05-03Certificate of occupancy Temporary
2017-04-24Permit EW — ISSUED
2017-04-20Certificate of occupancy Temporary
2017-04-17311: Homeless Person Assistance — N/A
2017-04-13Permit EW — ISSUED
2017-04-13Permit EW — ISSUED
2017-04-11Permit PL — ISSUED
2017-04-06311: Noise — Noise: Construction Equipment (NC1)
2017-04-05Permit SG — RE-ISSUED
2017-04-05Permit SG — RE-ISSUED
2017-04-04Permit EW — ISSUED
2017-03-29311: Noise - Street/Sidewalk — Loud Music/Party
2017-03-29ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY MEASURES SUCH AS SIDEWALK SHED. FENCE ETC TOPROTECT PUBLIC FROM UNSAFE FACADES AS PER 1RCNY 103-04 AND A$2,400
2017-03-21311: Facades — Facade (LL11/98)- Unsafe Notification
2017-03-21DOB complaint, category ?
2017-03-17FDNY inspection (STRUC_INT)
2017-03-16311: Bus Stop Shelter Complaint — Snow Removal Requested
2017-03-15Certificate of occupancy Temporary
2017-03-09311: Consumer Complaint — Overcharge
2017-03-09Permit AL — ISSUED
2017-03-09Permit SG — ISSUED
2017-03-09Permit AL — ISSUED
2017-03-09Permit SG — ISSUED
2017-02-28Cooling tower inspection — violation AH8G
2017-02-28Cooling tower inspection — violation AH8T
2017-02-28Cooling tower inspection — violation AH8S
2017-02-28Cooling tower inspection — violation AH8W
2017-02-28Cooling tower inspection — violation AH8E
2017-02-28Cooling tower inspection — violation AH8B
2017-02-28Cooling tower inspection — violation AH8L
2017-02-19311: Homeless Person Assistance — N/A

Support this site Back to the building page