Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
238 service requests in the last three years. Most common: Non (87) · Vendor Enforcement (77) · Homeless Person Assistance (15) · Noise (13) · Illegal Parking (9) · Taxi Complaint (5).
Filed construction activity
$42,519,347 in permitted construction work filed since
2016 (99 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$138,507,528
$62,328,388
2026
$147,652,000
$66,443,400
2027
$159,280,000
$71,676,000
The city's market estimate has risen
15% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
D — ENERGY STAR score 1/100, posted at the entrance by law (2022 disclosure cycle)
Heating fuel
NO4FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Food Temperature), shared by 3 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
21 street-flooding or sewer-backup complaints at this address since
2010 (1 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
49 St — N R W · 100 ft straight-line (about a 1-minute walk) · station accessibility: partial (Uptown only) 47-50 Sts-Rockefeller Ctr — B D F M · 700 ft straight-line (about a 3-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 7 Av / W 49 St — M104 · 500 ft
Citi Bike
Broadway & W 48 St · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
238 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $650,000,000 on
2018-05-07 (lender: Natixis, New York Branch). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-10-24
RPTT $925,344,000 — from 20 TSQ GROUNDCO MEZZ LLC to 20TSQ HANA ONE LLC
$925,344,000
2022-03-16
ACON $56,715,573 — from CHRISTOPHER E CHANG to 20 TSQ PROPERTY OWNER LLC
$56,715,573
2018-05-07
AL&R $750,000,000 — from 20 TSQ GROUNDCO LLC to NATIXIS REAL ESTATE CAPITAL LLC
$750,000,000
2018-05-07
Agreement $750,000,000 — from 20 TSQ GROUNDCO LLC to NATIXIS REAL ESTATE CAPITAL LLC
$750,000,000
2018-05-07
Mortgage $650,000,000 — from 20 TSQ LESSEE LLC; 20 TSQ SIGN LLC to NATIXIS, NEW YORK BRANCH
$650,000,000
2018-05-07
Mortgage $240,000,000 — from 20 TSQ GROUNDCO LLC to NATIXIS REAL ESTATE CAPITAL LLC
$240,000,000
2018-05-07
AL&R $650,000,000 — from 20 TSQ SIGN LLC; 20 TSQ LESSEE LLC to NATIXIS, NEW YORK BRANCH
$650,000,000
2018-05-07
Deed $719,100,000 — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ GROUNDCO LLC
$719,100,000
2018-05-07
RPTT&RET $672,900,000 — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ OWNER MEZZ LLC
$672,900,000
2018-05-07
RPTT&RET $100,000,000 — from 701 SIGN LLC to 20 TSQ SIGN LLC
$100,000,000
2018-04-27
Sold for $719,099,999
$719,099,999
$179,775,000
2016-11-14
Agreement $237,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
$237,500,000
2016-11-14
M&CON $125,000,000 — from 701 SEVENTH PROPERTY OWNER LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
$125,000,000
2016-11-14
M&CON $147,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
$147,500,000
2014-08-28
Mortgage $50,000,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.
$50,000,000
Ten-year activity
2001000
2017
156
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
97
32
22
0
0
151
2018
86
26
22
21
1
156
2019
12
16
12
0
1
41
2020
11
8
22
0
4
45
2021
11
6
22
0
11
50
2022
7
1
85
2
4
99
2023
2
9
70
1
8
90
2024
11
0
31
0
7
49
2025
15
0
92
0
4
111
2026
21
2
109
0
7
139
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2026-03-17Job filed: Lecture and networking event with light refreshments. Event will begin on the 2nd floor for the lecture then all participants will move to the 3rd fl
2026-03-16311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-14311: Non-Emergency Police Matter — Other (complaint details)
2026-03-13311: Non-Emergency Police Matter — Other (complaint details)
2026-03-12311: Non-Emergency Police Matter — Other (complaint details)
2026-03-06311: Non-Emergency Police Matter — Other (complaint details)
2026-03-04311: Non-Emergency Police Matter — Other (complaint details)
2026-03-04Job filed: PROPOSED INSTALLATION OF 1 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN. WORDING "CENTRAL PERK" "COFFEE CO."$5,967
2026-03-04Permit Sign — Permit Issued
2026-03-04Permit Sign — Permit Issued
2026-02-26311: Non-Emergency Police Matter — Other (complaint details)
2025-10-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-25311: Homeless Person Assistance — Non-Chronic
2025-10-20Permit General Construction — Signed-off
2025-10-20Permit Mechanical Systems — Permit Issued
2025-10-20Permit Mechanical Systems — Signed-off
2025-10-20Permit General Construction — Permit Issued
2025-10-15311: Vendor Enforcement — Food Vendor
2025-10-11311: Non-Emergency Police Matter — Other (complaint details)
2025-10-10311: Vendor Enforcement — Food Vendor
2025-10-09311: Vendor Enforcement — Food Vendor
2025-10-06311: Vendor Enforcement — Food Vendor
2025-10-06Job filed: Alterations to existing PL/SP Systems as per plans filed herewith$58,000
2025-10-06Job filed: MODIFICATIONS TO EXISTING HVAC/DUCTS PIPING AS PER PLANS FILED HEREWITH$65,000
2025-10-04311: Vendor Enforcement — Food Vendor
2025-10-03311: Vendor Enforcement — Food Vendor
2025-10-02311: Vendor Enforcement — Food Vendor
2025-10-01311: Vendor Enforcement — Food Vendor
2025-09-27311: Vendor Enforcement — Food Vendor
2025-09-27311: Non-Emergency Police Matter — Street Con Game
2025-09-27311: Non-Emergency Police Matter — Other (complaint details)
2025-09-26311: Homeless Person Assistance — Non-Chronic
2025-09-26Job filed: Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy$145,000
2025-09-25311: Vendor Enforcement — Food Vendor
2025-09-24311: Vendor Enforcement — Food Vendor
2025-09-23311: Vendor Enforcement — Food Vendor
2025-09-22311: Vendor Enforcement — Food Vendor
2025-09-20311: Non-Emergency Police Matter — Street Con Game
2025-09-19311: Non-Emergency Police Matter — Other (complaint details)
2025-09-17311: Non-Emergency Police Matter — Other (complaint details)
2025-09-13311: Illegal Parking — Blocked Sidewalk
2025-09-12311: Vendor Enforcement — Food Vendor
2025-09-11311: Vendor Enforcement — Food Vendor
2025-09-08311: Non-Emergency Police Matter — Other (complaint details)
2025-09-01311: Lost Property — Bag/Wallet
2025-08-30311: Non-Emergency Police Matter — Other (complaint details)
2025-03-10Certificate of occupancy Renewal Without Change
2025-03-05Permit Plumbing — Signed-off
2025-02-26Job filed: PLUMBING WORK IN COMMERCIAL KITCHEN ON THE FIRST FLOOR ALONG WITH PIPING WORK IN THE CEILING OF THE CELLAR AS PER PLANS FILEDHEREWITH. NO CHANGE IN US$18,000
2024-08-07Job filed: INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE 41st FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD T$10,000
2024-07-22Permit General Construction — Signed-off
2024-07-16Certificate of occupancy Renewal Without Change
2024-07-12Job filed: Remove of Exterior Roof Terrace Bar and Installation of New Roof Pavers Within a Residential Building Hotel (R-1 Occupancy Classification) as per plan$40,000
2024-07-04311: Vendor Enforcement — Food Vendor
2024-06-25Job filed: INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE 41st FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD T$10,000
2024-06-25Permit Protection and Mechanical Methods — Signed-off
2022-07-11311: Sewer — Other Sewer Problem (Use Comments) (SZZ)
2022-07-06311: Sewer — Street Flooding (SJ)
2022-07-06311: Sewer — Street Flooding (SJ)
2022-06-23Boiler inspection
2022-06-23Boiler inspection
2022-06-23Boiler inspection
2022-06-23Boiler inspection
2022-06-23311: Noise — Noise: Construction Before/After Hours (NM1)
2022-06-16311: Mobile Food Vendor — Food Source/Protection
2022-06-08311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-06-08DOB complaint, category ?
2022-06-02311: Noise — Noise: Construction Before/After Hours (NM1)
2022-05-10Permit General Construction — Signed-off
2022-05-10Permit EW — ISSUED
2022-05-06311: Illegal Parking — Blocked Sidewalk
2022-05-05311: Noise — Noise: Construction Before/After Hours (NM1)
2022-05-04311: Noise — Noise: Construction Before/After Hours (NM1)
2022-05-04Job filed: minor architectural work to include the removal and installation of a counter top and related finishes . no change in use egress or occupancy$84,960
2022-04-28311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-27311: Noise — Noise: Construction Before/After Hours (NM1)
2022-04-19311: Lost Property — Bag/Wallet
2022-04-11311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-06-22Certificate of occupancy Renewal Without Change
2021-06-21311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2021-06-04Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$4,000
2021-06-04Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$2,000
2021-06-02311: Other Enforcement — E2A Storage Of Receptacles
2021-05-27Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$5,000
2021-05-25311: Noise — Noise: Construction Before/After Hours (NM1)
2021-05-17Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$1,000
2021-05-17Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$3,000
2021-05-17Elevator permit: Installation of door lock monitoring system. All work to conform to Safety Code for Elevators and Escalators [ASME A17.1 2000-2003$1,000
2021-05-11Permit EW — ISSUED
2021-04-15Permit General Construction — Signed-off
2021-04-14Permit General Construction — Signed-off
2021-04-10Job filed: This application if filed for temporary use permit for hospital occupancy pursuant to section AC 28-111 in conjunction with covid 19 vaccinations.$93,500
2021-04-10Job filed: This application if filed for temporary use permit for hospital occupancy pursuant to section AC 28-111 in conjunction with covid 19 testing.$107,125
2021-02-19311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-06311: Noise — Noise: Construction Before/After Hours (NM1)
2021-01-05311: Noise — Noise: Construction Before/After Hours (NM1)
2020
2020-12-28Boiler inspection
2020-12-28Boiler inspection
2020-12-28Boiler inspection
2020-12-28Boiler inspection
2020-12-16Job filed: Modify and erect illuminated projecting advertising sign on wall. Sign "X"- Structure modified under separate application. No change of use, egress or$56,160
2020-12-16Job filed: Modify and erect illuminated projecting LED advertising sign on wall- Sign "A". No change of use, egress or occupancy.$168,246
2020-12-16Job filed: Modify projecting sign on wall. Sign "B" Structure modified under separate application. No change of use, egress or occupancy.$525,000
2020-12-16Job filed: Modify and erect illuminated advertising LED sign on wall. Sign "Y". No change of use, egress or occupancy.$56,160
2020-12-16Job filed: Modify and erect illuminated projecting advertising sign on wall . Sign "Z". No change of use egress or occupancy.$100,971
2020-12-06311: Noise — Noise: Construction Equipment (NC1)
2020-10-10311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2020-10-09311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2019-11-18Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$100,000
2019-10-16311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-27311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-24311: Noise — Noise: Construction Before/After Hours (NM1)
2019-09-04Permit EW — ISSUED
2019-09-04Permit EW — ISSUED
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-28Certificate of occupancy Temporary
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-23DOB violation E:
2019-08-13311: Street Sign - Damaged — Construction
2019-06-22311: Lost Property — Other
2019-05-31Certificate of occupancy Temporary
2019-05-01Permit EW — ISSUED
2019-04-14311: Taxi Complaint — Vehicle Complaint
2019-04-14311: Vending — In Prohibited Area
2019-03-05Job filed: Time SQ Edition Opening Week Events,3/11 to 3/17, 5PM to 2AM. 7TH FL (PA 123435292) MAX LOAD FOR 670 PPL (7 FG's); 9TH FL (PA 123435309) MAX LOAD FOR
2018-10-12311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-10-12DOB complaint, category ?
2018-10-11Permit PL — ISSUED
2018-09-28Job filed: Filing for sign #8 as per plans filed herewith.$187,500
2018-09-28Permit AL — ISSUED
2018-09-27Job filed: Filing for sign #10 as per plans filed herewith.$105,000
2018-09-27Job filed: Filing for sign #5 as per plans filed herewith.$105,000
2018-09-27Job filed: Filing for sign #3 as per plans filed herewith.$187,500
2018-09-27Job filed: Filing for sign #7 as per plans filed herewith.$128,750
2018-09-27Job filed: Filing for sign #9 as per plans filed herewith.$21,750
2018-09-27Job filed: Filing for sign #2 as per plans filed herewith.$128,750
2018-09-27Job filed: Filing for sign #4 as per plans filed herewith.$21,750
2018-09-27Job filed: Filing for sign #6 as per plans filed herewith.$30,750
2018-09-27Job filed: Filing for sign #1 as per plans filed herewith.$30,750
2018-09-24Permit Sidewalk Shed — Signed-off
2018-09-18FDNY inspection (CDA-90-DRILL)
2018-09-13Permit EW — ISSUED
2018-09-13Permit EW — ISSUED
2018-09-06Job filed: INSTALLATION OF STRUCTURAL SUPPORT FOR LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,500,000
2018-09-06Job filed: INSTALLATION OF STRUCTURAL SUPPORT FOR LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$1,500,000
2018-09-06Job filed: INSTALLATION OF NEW MANUAL AND AUTOMATIC, SMOKE DETECTION SPRINKLER ALARM SYSTEM W/COC, AS PER PLANS FILED (POP OF SHOP).$7,128
2018-08-27Job filed: FILING HEREWITH MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$194,883
2018-08-27Job filed: FILING HEREWITH RETAIL RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$108,300
2018-08-27Job filed: FILING HEREWITH MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF RETAIL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$194,883
2018-08-27Job filed: FILING HEREWITH SPRINKLER MODIFICATION AS PER PLANS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2018-08-02Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING$150,000
2018-08-02Permit Sidewalk Shed — Signed-off
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-31Permit AL — ISSUED
2018-07-20Job filed: erect illuminated sign on existing marquee. Marquee filed under 121324343.$1,638
2018-07-16ECB CLASS - 1 violation: BC 3309.1 FAILURE TO MAINTAINN OVERHEAD PROTECTION @TIME OF INSP ON A ACTIVE JOBSITE OF A 42 STORY BLDG,OBSERVED @EXP#4 SUSPENDED
2018-07-16ECB CLASS - 1 violation: BC 3303.10 OPS IN OCCUPIED BLDGS (TENANT PROTECTION PLAN) @TIME OF INSP ON A ACTIVE JOBSITE OF 42 STORY BLDG UNDER A OPERATION, OB
2018-07-16ECB CLASS - 1 violation: SIDEWALK SHED WHERE REQUIRED.@TIME OF INSP ON A ACTIVE JOBSITE OF A 42STORY BLDG OBSERVED THAT SIDEWALK SHED WAS MISSING @EXP#1 & $10,000
2018-07-16ECB CLASS - 1 violation: WORK CONTRARY TO SIZE SAFETY PLAN (SUSPENDED SCAFFOLD) @TIME OF INSP ON A ACTIVE JOBSITE OF A 42 STORY BLDG,OBSERVED SUSPENDED SCA$2,500
2018-07-09311: Street Sign - Damaged — No Parking, Standing, Stopping
2018-07-08311: Mobile Food Vendor — Smoke/Odor
2018-07-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-07-05DOB complaint, category ?
2018-07-02311: Elevator — Elevator - Multiple Devices On Property
2018-07-02ECB CLASS - 1 violation: BC3009.3/CU-97R5-(97-R-5)CEASE USE-RESPONDENT FAILED TO RENEW TEMPORARY USE CERTIFICATE OF THIS DEVICE FORM AN ADDITIONAL 30 DAY P$2,500
2018-07-02ECB CLASS - 2 violation: 97R5 RESPONDENT FAILED TO RENEW TEMPORARY USE CERTIFICATE OF THIS DEVICE FOR AN ADDITIONAL 30 DAYS PERIOD. RMDY: SUBMIT RENEWAL RE
2018-07-02DOB complaint, category ?
2018-06-20Certificate of occupancy Temporary
2018-06-17FDNY inspection (CDA-90-DRILL)
2018-06-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-06-13DOB complaint, category ?
2018-06-12Permit AL — ISSUED
2018-06-12Permit PL — ISSUED
2018-06-07Mortgage assigned — from NATIXIS REAL ESTATE CAPITAL LLC to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2018-06-07AALR — from NATIXIS REAL ESTATE CAPITAL LLC to WILMINGTON TRUST, NATIONAL ASSOCIATION,
2018-06-01311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-06-01DOB complaint, category ?
2018-05-30311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-17Permit AL — ISSUED
2018-05-17Permit EQ — ISSUED
2018-05-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-05-15DOB complaint, category ?
2018-05-09FDNY inspection (STRUC_INT_3)
2018-05-08Permit EW — ISSUED
2018-05-07AL&R $750,000,000 — from 20 TSQ GROUNDCO LLC to NATIXIS REAL ESTATE CAPITAL LLC$750,000,000
2018-05-07Agreement $750,000,000 — from 20 TSQ GROUNDCO LLC to NATIXIS REAL ESTATE CAPITAL LLC$750,000,000
2018-05-07Mortgage $650,000,000 — from 20 TSQ LESSEE LLC; 20 TSQ SIGN LLC to NATIXIS, NEW YORK BRANCH$650,000,000
2018-05-07Mortgage $240,000,000 — from 20 TSQ GROUNDCO LLC to NATIXIS REAL ESTATE CAPITAL LLC$240,000,000
2018-05-07Mortgage assigned — from JPMORGAN CHASE BANK NATIONAL ASSOCIATION to NATIXIS REAL ESTATE CAPITAL LLC
2018-05-07AL&R $650,000,000 — from 20 TSQ SIGN LLC; 20 TSQ LESSEE LLC to NATIXIS, NEW YORK BRANCH$650,000,000
2018-05-07Mortgage assigned — from JPMORGAN CHASE BANK NATIONAL ASSOCIATION to NATIXIS REAL ESTATE CAPITAL LLC
2018-05-07ASSTO — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ GROUNDCO LLC
2018-05-07Deed $719,100,000 — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ GROUNDCO LLC$719,100,000
2018-05-07SAGE — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ LESSEE LLC
2018-05-07Agreement — from 20 TSQ GROUNDCO LLC; 20 TSQ LESSEE LLC to MARRIOTT HOTEL SERVICES, INC.
2018-05-07Agreement — from NATIXIS, NEW YORK BRANCH to 20 TSQ LESSEE LLC; MARRIOTT HOTEL SERVICES, INC.
2018-05-07Agreement — from NATIXIS, NEW YORK BRANCH to THE HERSHY COMPANY
2018-05-07RPTT&RET $672,900,000 — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ OWNER MEZZ LLC$672,900,000
2018-05-07RPTT&RET $100,000,000 — from 701 SIGN LLC to 20 TSQ SIGN LLC$100,000,000
2018-05-07Agreement — from NATIXIS, NEW YORK BRANCH to MARRIOTT HOTEL SERVICES, INC.; 20 TSQ LESSEE LLC
2018-05-07MLEA — from 701 SEVENTH PROPERTY OWNER LLC to 20 TSQ LESSEE LLC
2018-05-07Mortgage assigned — from JPMORGAN CHASE BANK NATIONAL ASSOCIATION to NATIXIS REAL ESTATE CAPITAL LLC
2018-05-04311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-11Job filed: MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$85,000
2018-04-11Job filed: SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$15,000
2018-04-11Job filed: MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$85,000
2018-04-11Job filed: SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$15,000
2018-04-11Job filed: INTERIOR RENOVATIONS FOR NON LOAD BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$55,000
2018-04-11Job filed: ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$12,500
2018-03-28311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-03-28DOB complaint, category ?
2018-03-19FDNY inspection (CDA-90-DRILL)
2018-03-14Certificate of occupancy Temporary
2018-03-14Permit EW — ISSUED
2018-03-09311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-03-09DOB complaint, category ?
2018-03-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-03-01Permit EW — ISSUED
2018-02-27Job filed: PA
2018-02-27Job filed: PA
2018-02-27Job filed: PA
2018-02-27Job filed: PA
2018-02-27Job filed: PA
2018-02-15Job filed: INSTALLATION OF NEW BOILERS.$1,000
2018-02-14311: Industrial Waste — Concrete In Catch Basin (IEA)
2018-01-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-01-24DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-01-16Permit Sign — Signed-off
2018-01-16Permit Sign — Signed-off
2018-01-11Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. COOKING EQUIPMENT, GAS VALVE, HOOD AND DUCT WERE FILED UNDER APPL# 121324343. NO CHANGE IN USE, EGRESS OR OCCUPA$3,000
2018-01-11Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. COOKING EQUIPMENT, GAS VALVE, HOOD AND DUCT WERE FILED UNDER APPL# 121324343. NO CHANGE IN USE, EGRESS OR OCCUPA$3,000
2018-01-04Permit EW — ISSUED
2018-01-04Permit EW — ISSUED
2018-01-04Permit EW — ISSUED
2017
2017-12-29Job filed: HEREWITH FILING SHORING/DEMO/MEANS & METHODS SCOPE AS PER PLANS.$400,000
2017-12-29Job filed: HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS.$900,000
2017-12-29Job filed: HEREWITH FILING FOR SPRINKLER WORK AS PER PLANS.$27,000
2017-12-29Job filed: HEREWITH FILING FOR MECHANICAL AND PLUMBING WORK AS PER PLANS.$1,961,000
2017-12-26311: Snow — 15I Street Condition Ice-Non Storm
2017-12-22Job filed: COMPREHENSIVE DAY 2 RENOVATION AND UPGRADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$7,960,000
2017-12-22Job filed: COMPREHENSIVE DAY 2 RENOVATION AND UPGRADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$7,960,000
2017-12-15Certificate of occupancy Temporary
2017-12-11Permit EW — ISSUED
2017-12-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-12-05ECB CLASS - 2 violation: SEC: BC 3316.8. FAILURE TO MAINTAIN. IN RESPONSE TO AN INCIDENT OF A WORKER INJURED FROM A COLLAPSED MANLIFT, ON AN 11 FLR SETBACK$400
2017-12-05DOB complaint, category ?
2017-12-04Permit AL — ISSUED
2017-12-01311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-12-01DOB complaint, category ?
2017-11-30311: Graffiti — Graffiti
2017-11-30Permit Sign — Signed-off
2017-11-30Permit EQ — ISSUED
2017-11-28Job filed: Erect non illuminated Double faced projecting sign on wall. No change of use, egress or occupancy.$22,425
2017-11-28Permit Sign — Signed-off
2017-11-28Permit Sign — Permit Issued
2017-11-27Permit Sign — Signed-off
2017-11-24Job filed: ERECT SIGN STRUCTURE. SIGN FILED UNDER SEPARATE APPLICATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$75,000
2017-11-24Job filed: ERECT SIGN STRUCTURE. SIGN FILED UNDER SEPARATE APPLICATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$75,000
2017-11-18FDNY inspection (CDA-90-DRILL)
2017-11-14311: Street Condition — Pothole
2017-11-06311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-11-06DOB complaint, category ?
2017-11-06Job filed: Erect illuminated accessory business sign on existing structure. Copy reading "Hershey's". Not within view/200 ft of arterial highway or public park o$5,148
2017-11-06Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON EXISTING STRUCTURE. COPY READING "HERSHEY'S HERSHEY'S CHOCOLATE WORLD HERSHEY'S". NOT WITHIN VIEW/200 FT $5,031
2017-11-06Job filed: ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON EXISTING STRUCTURE. COPY READING "HERSHEY'S HERSHEY'S CHOCOLATE WORLD HERSHEY'S". NOT WITHIN VIEW/200 FT $4,446
2017-11-06Job filed: Erect illuminated accessory business sign on existing structure. Copy reading "Hershey's". Not within view/200 ft of arterial highway or public park o$5,148
2017-11-06Job filed: ERECT ILLUMINATED ACCESSORY PROJECTING BUSINESS SIGN ON EXISTING STRUCTURE. COPY READING "HERSHEY'S KITCHEN". NOT WITHIN VIEW/200 FT OF ARTERIAL HIGHW$5,265
2017-11-03ECB CLASS - 1 violation: SEC. 3310.10.2 TRAINING. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG UNDER ALTERATION,CONSTRUCTION WORK IN PROGRESS. UPON $1,600
2017-11-03ECB CLASS - 1 violation: SEC. 3310.10.2 TRAINING. NOTE: AT THE TIME OF MY INSPECTION OF AN INTEIROR FIT OUT IN A MAJOR BLDG,CONSTRUCTION WORK IN PROGRESS,U$1,600
2017-11-03ECB CLASS - 2 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY MEASURES & TEMPORARY CONSTRUCTION EQUIPMENT. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY$5,000
2017-11-01Permit EW — ISSUED
2017-11-01Permit EW — ISSUED
2017-10-31311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-10-31DOB complaint, category ?
2017-10-31Permit EQ — ISSUED
2017-10-18DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017-10-13Job filed: CREATION OF A NEW FIRE PROTECTION PLAN FOR ENTIRE BUILDING, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2017-10-13Job filed: CREATION OF A NEW FIRE PROTECTION PLAN FOR ENTIRE BUILDING, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2017-10-12Job filed: FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH ALT1 121324343$1,000
2017-10-11Permit PL — ISSUED
2017-10-04Permit EQ — ISSUED
2017-09-26Permit EW — ISSUED
2017-09-20Permit EW — ISSUED
2017-09-20Permit EW — ISSUED
2017-09-16311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-09-16DOB complaint, category ?
2017-09-14311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-09-14DOB complaint, category ?
2017-09-12Permit EW — ISSUED
2017-09-12Permit EW — ISSUED
2017-09-12Permit EW — ISSUED
2017-09-07Job filed: INSTALLATION OF TWO (2) AUTOMATIC SMOKE DETECTION FOR CLEAN AGENT FIRE SUPPRESSION SYSTEMS. 1. HERSHEY'S SPACE FIRST FL STORAGE ROOM 2. HERSHEY'S S$1,000
2017-09-07Job filed: INSTALLATION OF TWO (2) CLEAN AGENT FIRE SUPPRESSION SYSTEMS. 1. HERSHEY'S SPACE FIRST FL STORAGE ROOM 2. HERSHEY'S SPACE FIFTH FL DATA RM.$1,000
2017-09-06Permit EW — ISSUED
2017-09-05Permit EW — ISSUED
2017-08-28311: General Construction/Plumbing — Accident - Construction/Plumbing
2017-08-28DOB complaint, category ?
2017-08-16311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-08-16DOB complaint, category ?
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-10Job filed: INSTALLATION OF NEW, MANUAL AND AUTOMATIC, SMOKE DETECTION SPRINKLER ALARM SYSTEM W/COC (HERSHEY'S).$24,600
2017-08-09Permit EW — ISSUED
2017-08-09Permit EW — ISSUED
2017-08-07Permit EW — ISSUED
2017-08-07Permit EW — ISSUED
2017-08-01Job filed: INSTALLATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY$100,000
2017-08-01Job filed: INSTALLATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY$100,000
2017-08-01Job filed: INSTALLATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2017-07-31311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-07-31311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-07-31DOB complaint, category ?
2017-07-31DOB complaint, category ?
2017-07-28FDNY inspection (STRUC_INT_3)
2017-07-28FDNY inspection (STRUC_INT_6)
2017-07-28FDNY inspection (CDA-90-DRILL)
2017-07-28ECB CLASS - 1 violation: SEC: BC3310.3. SITE SAFETY PLANS. NOTE: @ TIME OF INSP OF A 42 STORY BLDG @ ROOF LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED CO
2017-07-28ECB CLASS - 2 violation: SEC: BC3310.3. SITE SAFETY PLANS. NOTE: @ THE TIME OF INSP OF A 42 STORY BLDG @ ROOF LEVEL, CONSTRUCTION WORK IN PROGRESS. I OBSER$400
2017-07-28ECB CLASS - 1 violation: SEC: SITE SAFETY PLAN. NOTE: @ TIME OF INSP OF A 42 STORY BLDG @ ROOF LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED CONSTRUCTION $1,630
2017-07-27ECB CLASS - 1 violation: SEC: BC 3308.5.6. TEMPORARY REMOVAL. NOTE: @ TIME OF INSP OF A 42 STORY BLDG @ ROOF LEVEL, CONSTRUCTION WORK IN PROGRESS. OBSERVED$1,600
2017-07-18Job filed: APPLICATION FILED TO RECORD CONDO SUBDIVISION FOR LOTS 1001-1003 AS TENTATIVELY ASSIGNED BY THE DEPARTMENT OF FINANCE. NO CHANGE TO THE ZONING LOT UND
2017-06-23311: Homeless Person Assistance — N/A
2017-06-20FDNY inspection (STRUC_INT)
2017-06-20Permit EW — ISSUED
2017-06-20Permit EW — ISSUED
2017-06-20Permit EW — ISSUED
2017-06-20Permit EW — ISSUED
2017-06-20Permit AL — RE-ISSUED
2017-06-20Permit EW — ISSUED
2017-06-14Permit AL — RE-ISSUED
2017-06-12Permit PL — ISSUED
2017-06-07Job filed: PA
2017-06-06Permit EQ — ISSUED
2017-06-05Job filed: RESPECTFULLY SUBMITTING HEREWITH APPLICATION FOR THE INSTALLATION OF AN EMERGECNY GENERATOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2017-05-25Permit PL — ISSUED
2017-05-25Permit PL — ISSUED
2017-05-24Permit EW — ISSUED
2017-05-24Permit EW — ISSUED
2017-05-24Permit EW — ISSUED
2017-05-24Permit EW — ISSUED
2017-05-24Permit EW — ISSUED
2017-05-16Permit EW — ISSUED
2017-05-05Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$60,000
2017-05-05Job filed: ADDITION OF NEW STOREFRONT,ENTRY CANOPY AND SUSPENSION OF NEW MECHANICAL EQUIPMENT FROM THE FLOOR STRUCTURE ABOVE AS PER PLANS FILED HEREWITH. NO CHAN$108,200
2017-05-05Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$765,000
2017-05-05Job filed: REMOVAL AMD INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY UND$1,057,400
2017-05-05Job filed: INSTALLATION OF NEW BOILERS.$1,000
2017-05-05Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$60,000
2017-05-05Job filed: REMOVAL AMD INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY UND$94,000
2017-05-02311: Noise — Noise: Construction Before/After Hours (NM1)
2017-03-23311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-03-23311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-03-23ECB CLASS - 1 violation: HOUSEKEEPING;OBSERVED DURING INSPECTION OF 42 STORY BUILDING WITH CONSTRUCTION ACTIVITY IN PROGRESS,THAT THERE WAS DEBRIS ON THE L$2,400
2017-03-23ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY DURING CONSTRUCTION OPERATIONS,IS RESPONSE TO AN INCIDENT WHERE IT WAS REPORTED BY THE SSM,$10,000
2017-03-23ECB CLASS - 2 violation: BC3308.3/VERTICAL SAFETY NETTING.AT TIME OF INSPECTION OF 42 STORY BLDG WITH CONSTRUCTION OPERATIONS IN PROGRESS,OBSERVED THAT THE$400
2017-03-23DOB complaint, category ?
2017-03-23DOB complaint, category ?
2017-03-10311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-03-10DOB complaint, category ?
2017-03-09311: General Construction/Plumbing — Site Conditions Endangering Workers
2017-03-09DOB complaint, category ?
2017-02-16Permit EW — ISSUED
2017-02-10Permit EW — ISSUED
2017-02-10Permit EW — ISSUED
2017-02-10Permit EW — ISSUED
2017-02-09Permit EW — ISSUED
2017-02-07Permit EQ — ISSUED
2017-02-06Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2017-02-06Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2017-02-03Permit EQ — ISSUED
2017-02-01Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2017-02-01Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2017-01-30311: Industrial Waste — Concrete In Catch Basin (IEA)
2017-01-30Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN$6,000,000
2017-01-30Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$3,280,000
2017-01-30Permit EQ — ISSUED
2017-01-27Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$312,000
2017-01-27Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE AL ARM SYSTEM & POST FIRE SMOKE PURGE SYSTEM & COC. (NFL E$230,000
2017-01-23Permit PL — ISSUED
2017-01-15311: Homeless Person Assistance — N/A
2016
2016-12-23Permit AL — RE-ISSUED
2016-12-22Job filed: INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2016-12-22Permit AL — ISSUED
2016-12-20Permit EQ — ISSUED
2016-12-10FDNY inspection (CDA-90-DRILL)
2016-12-08Permit EQ — ISSUED
2016-12-08Permit EQ — ISSUED
2016-12-08Permit EQ — ISSUED
2016-12-07Job filed: FRAMING OF THE ACOUSTIC ISOLATION WALLS AND THE BUILT-UP RAKE OF THE THEATER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$817,855
2016-11-18311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-11-18DOB complaint, category ?
2016-11-18Job filed: INSTALLATION OF OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCC
2016-11-18Job filed: INSTALLATION OF OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCC
2016-11-18Permit AL — ISSUED
2016-11-18Permit EQ — ISSUED
2016-11-17Permit EQ — ISSUED
2016-11-17Permit EQ — ISSUED
2016-11-17Permit EQ — ISSUED
2016-11-17Permit EQ — ISSUED
2016-11-17Permit AL — ISSUED
2016-11-16Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 14TH THRU 41ST FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2016-11-16Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 14TH THRU 41ST FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2016-11-16Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 14TH THRU 41ST FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2016-11-16Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 14TH THRU 41ST FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2016-11-16Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 14TH THRU 41ST FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2016-11-16Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 14TH THRU 41ST FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2016-11-16Permit EQ — ISSUED
2016-11-16Permit EQ — ISSUED
2016-11-15Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-15Job filed: USE OF MINI-CRANE AS PER DRAWINGS. MINI-CRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-15Job filed: USE OF MINI CRANE AS PER DRAWINGS. MINICRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-15Permit EQ — ISSUED
2016-11-14Mortgage assigned — from STARWOOD PROPERTY MORTGAGE, L.L.C. to JPMORGAN CHASE BANK, NATIONAL ASSOCATION
2016-11-14Mortgage assigned — from STARWOOD PROPERTY MORTGAGE, L.L.C. to JPMORGAN CHASE BANK, NATIONAL ASSOCATION
2016-11-14TL&R — from STARWOOD PROPERTY MORTGAGE, L.L.C.
2016-11-14Mortgage assigned — from STARWOOD PROPERTY MORTGAGE, L.L.C. to JPMORGAN CHASE BANK, NATIONAL ASSOCATION
2016-11-14Mortgage assigned — from STARWOOD PROPERTY MORTGAGE, L.L.C. to JPMORGAN CHASE BANK, NATIONAL ASSOCATION
2016-11-14Mortgage assigned — from STARWOOD PROPERTY MORTGAGE, L.L.C. to JPMORGAN CHASE BANK, NATIONAL ASSOCATION
2016-11-14TL&R — from STARWOOD PROPERTY MORTGAGE, L.L.C.
2016-11-14Agreement $237,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO$237,500,000
2016-11-14M&CON $125,000,000 — from 701 SEVENTH PROPERTY OWNER LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO$125,000,000
2016-11-14M&CON $147,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO$147,500,000
2016-11-14Agreement — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to MARRIOTT HOTEL SERVICES, INC.; 701 SEVENTH PROPERTY OWNER LLC
2016-11-14Mortgage assigned — from STARWOOD PROPERTY MORTGAGE, L.L.C. to JPMORGAN CHASE BANK, NATIONAL ASSOCATION
2016-11-10311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-11-10311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-11-10DOB complaint, category ?
2016-11-10DOB complaint, category ?
2016-11-09ECB CLASS - 1 violation: FAIL TO PERFORM HYDROSTATIC TEST-STANDPIPE. NOTE: AT THE TIME OF MY INSPECTON OF A 42 STY BLDG AT 19TH FL LEVEL APPROX 240 FEET IN$2,400
2016-11-09DOB violation C:
2016-11-09ECB CLASS - 1 violation: SEC. 3314.4.4.5 DISLODGEMENT NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG AT 19TH FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I$1,600
2016-11-09ECB CLASS - 1 violation: SEC. 3301.1.1 RESPONSIBILITY FOR SAFETY. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG AT 19TH FL LEVEL CONSTRUCTION WORK IN
2016-11-09ECB CLASS - 1 violation: WORK W/O A PERMTI. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG AT 19TH FL LEVEL,CONSTRUCTION WORK IN PROGRESS. I OBSERVED $800
2016-11-09ECB CLASS - 1 violation: WORK W/O A PERMIT. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG AT 19TH FL LEVEL,CONSTRUCTION WOKR IN PRGRESS. I OBSERVED A$800
2016-11-09DOB violation C:
2016-11-09ECB CLASS - 1 violation: SEC. 3301.8 ACCIDENTS. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG AT 19 FL LEVEL,CONSTRUCTION WORK IN PROGRESS. REVIEW OF
2016-11-09ECB CLASS - 1 violation: SEC. 3303.11 STAIRS DURING CONSTRUCTION OR DEMOLITION. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG AT 19TH FL LEVEL,CONSTR$1,600
2016-11-09Permit EQ — ISSUED
2016-11-09Permit EQ — ISSUED
2016-11-09Permit EQ — ISSUED
2016-11-08311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-11-08DOB complaint, category ?
2016-11-07Job filed: USE OF MINI CRANE AS PER DRAWINGS. MINICRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-07Job filed: USE OF MINI CRANE AS PER DRAWINGS. MINICRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-07Job filed: INSTALLATION OF MONORAIL AS PER DRAWINGS. MONORAIL SHALL COMPLY WORK ON FLOORS 9TH THRU 12TH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICA
2016-11-07Job filed: USE OF MINI CRANE AS PER DRAWINGS. MINICRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-07Job filed: INSTALLATION OF MONORAIL AS PER DRAWINGS. MONORAIL SHALL COMPLY WORK ON FLOORS 9TH THRU 12TH. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICA
2016-11-07Job filed: USE OF MINI CRANE AS PER DRAWINGS. MINICRANE SHALL COMPLY WORK ON 8TH THRU 14TH FLOORS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2016-11-07Permit EQ — ISSUED
2016-11-03Permit EW — ISSUED
2016-11-02Permit SG — ISSUED
2016-11-02Permit AL — ISSUED
2016-11-02Permit EQ — ISSUED
2016-11-01Job filed: REMOVAL OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES FOR EARLY INFRASTRUCTURE WORK AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR $1,025,000
2016-11-01Job filed: STRUCTURAL ALTERATION AS PER PLANS FILED. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$505,000
2016-11-01Job filed: STRUCTURAL ALTERATION AS PER PLANS FILED. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$505,000
2016-10-25Permit PL — ISSUED
2016-10-20Permit EQ — ISSUED
2016-10-18311: Noise — Noise: Construction Before/After Hours (NM1)
2016-10-14311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-10-14DOB complaint, category ?
2016-10-13311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-10-13DOB complaint, category ?
2016-10-03Permit EQ — ISSUED
2016-09-30Permit EW — ISSUED
2016-09-30Permit EW — ISSUED
2016-09-29Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE
2016-09-29Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE
2016-09-14Permit EQ — ISSUED
2016-09-14Permit EW — ISSUED
2016-09-03FDNY inspection (CDA-90-DRILL)
2016-09-02311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-09-02311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-09-02DOB complaint, category ?
2016-09-02DOB complaint, category ?
2016-08-31FDNY inspection (CDA-90-DRILL)
2016-08-30311: Water System — Leak (Use Comments) (WA2)
2016-08-22Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
2016-08-19Job filed: INSTALLATION OF PERI CLIMBING FORMWORK SYSTEM AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALT1-121324343.
2016-08-19Job filed: INSTALLATION OF PERI CLIMBING FORMWORK SYSTEM AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALT1-121324343.
2016-08-05Job filed: REMOVAL OF PILECAP AND CAISSONS FROM GROUND FLOOR TO CELLAR 3 USING MECHANICAL CONSTRUCTION EQUIPMENT AS PER PLANS FILED HEREWITH.$500,000
2016-07-29FDNY inspection (STRUC_INT)
2016-06-30311: Water System — Hydrant Defective (WC2)
2016-06-28311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-06-28DOB complaint, category ?
2016-06-22Permit EQ — ISSUED
2016-06-08Permit SG — ISSUED
2016-06-08Permit AL — ISSUED
2016-05-31311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2016-05-31311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-05-31DOB complaint, category ?
2016-05-31DOB complaint, category ?
2016-05-24Permit EQ — ISSUED
2016-05-16Permit FO — ISSUED
2016-05-16Permit FO — ISSUED
2016-05-16Permit EW — ISSUED
2016-05-12Job filed: TO ERECT TEMPORARY SCAFFOLD AS PER THE ATTACHED PLANS. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
2016-05-12Job filed: TO ERECT TEMPORARY SCAFFOLD AS PER THE ATTACHED PLANS. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
2016-05-12Permit EQ — ISSUED
2016-04-21311: General Construction/Plumbing — Site Conditions Endangering Workers
2016-04-18Job filed: INSTALLATION OF URW295-1 MINI CRANE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-04-08311: Homeless Person Assistance — N/A
2016-04-04FDNY inspection (CDA-90-DRILL)
2016-03-22311: Street Condition — Blocked - Construction
2016-03-04Job filed: FILING HEREWITH INSTALLATION OF COMBINATION SPRINKLER/STANDPIPE SYSTEM AS PER PLANS. ALL WORK FILED IN CONJUNCTION WITH ALTERATION TYPE I APPLICATION $2,000
2016-03-04Job filed: FILING HEREWITH INSTALLATION OF COMBINATION SPRINKLER/STANDPIPE SYSTEM AS PER PLANS. ALL WORK FILED IN CONJUNCTION WITH ALTERATION TYPE I APPLICATION $2,000
2016-02-26Permit EQ — ISSUED
2016-02-26Permit EW — ISSUED
2016-02-26Permit EW — ISSUED
2016-02-24Job filed: TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. $5,000
2016-02-24Job filed: TEMPORARY DRY STANDPIPE WITH AIR COMPRESSOR AND SUPERVISORY ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. $5,000
2016-02-03Job filed: INSTALLATION OF A DUAL 8000LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING BUILDING ALTERATION FILED SEPARATELY. DUAL HOIST SHALL COMPLY WITH CHAPTER #33
2016-02-03Permit EQ — ISSUED
2016-02-01Permit EQ — ISSUED
2016-01-29Permit EQ — ISSUED
2016-01-29Permit EW — ISSUED
2016-01-29Permit EQ — ISSUED
2016-01-27311: Noise — Noise: Construction Before/After Hours (NM1)
2016-01-19Job filed: STORAGE OF MATERIAL/EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. SHED DESIGNED FOR 300-450 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL
2016-01-19Job filed: INSTALLATION OF A PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR
2016-01-19Permit EQ — ISSUED
2016-01-19Permit EQ — ISSUED
2016-01-11311: General Construction/Plumbing — Accident - Construction/Plumbing
2016-01-11DOB complaint, category ?
2016-01-09FDNY inspection (CDA-90-DRILL)
2016-01-07Job filed: MODIFICATION OF LATERAL BRACING AND EXISTING STEEL FRAMING AND REMOVAL OF SELECT COLUMNS AND SPANDREL BEAMS AS PER PLANS FILED HEREWITH.$400,000
2015-11-10Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2015-11-10Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2015-11-10Permit EQ — ISSUED
2015-11-06Job filed: INSTALLATION OF 198 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33
2015-11-06Job filed: INSTALLATION OF 198 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33
2015-11-06Permit EQ — ISSUED
2015-11-05Permit PL — ISSUED
2015-10-20Permit EW — ISSUED
2015-10-19Permit AL — ISSUED
2015-10-01311: Other Enforcement — E10 Obstruction (Street/Sidewalk)
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-09-17311: Miscellaneous Categories — Inspection Work Order (DOB)
2015-09-17DOB complaint, category ?
2015-09-16Permit EQ — ISSUED
2015-09-15ECB CLASS - 2 violation: BC1704.1.1 FAILURE TO FILE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT ISSUANCE AND PRIOR TO START OF WORKUND
2015-09-14311: General Construction/Plumbing — Adjacent Buildings Not Protected
2015-09-14DOB complaint, category ?
2015-09-08Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2015-09-03Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2015-09-02ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS.NOTE 42 STORY BLDG UNDER CONSTRUCTION.EXCAVATION/$250
2015-09-01FDNY inspection (CDA-90-DRILL)
2015-09-01311: Noise — Noise: Construction Before/After Hours (NM1)
2015-09-01311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-31311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-31311: Noise — Noise: Construction Equipment (NC1)
2015-08-28311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-27311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-27311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-26311: Noise — Noise: Construction Equipment (NC1)
2015-08-21311: Noise — Noise: Construction Before/After Hours (NM1)
2015-08-20311: Noise — Noise: Construction Equipment (NC1)
2015-08-20311: Noise — Noise: Construction Equipment (NC1)
2015-07-15311: Noise — Noise: Construction Before/After Hours (NM1)
2015-07-15311: Noise — Noise: Construction Before/After Hours (NM1)
2015-07-10Job filed: INSTALLATION OF 192 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33
2015-07-10Permit EQ — ISSUED
2015-06-13311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-06-13DOB complaint, category ?
2015-06-12Permit EW — ISSUED
2015-06-12Permit EW — ISSUED
2015-06-10Permit AL — RE-ISSUED
2015-06-10Permit EW — ISSUED
2015-05-21Job filed: MODIFICATION OF STANDPIPE SYSTEM, RELOCATE EXISTING FIRE DEPARTMENT CONNECTION TO NEW LOCATION AS PER PLANS.$3,000
2015-05-21Permit EW — ISSUED
2015-05-21Permit FO — ISSUED
2015-05-21Permit FO — ISSUED
2015-05-14Permit EW — ISSUED
2015-04-28FDNY inspection (CDA-90-DRILL)
2015-04-02Permit EW — ISSUED
2015-03-24Permit AL — ISSUED
2015-03-21311: Noise — Noise: Construction Before/After Hours (NM1)
2015-03-19Permit FO — ISSUED
2015-03-19Permit EQ — ISSUED
2015-03-19Permit FO — ISSUED
2015-03-12Permit EQ — ISSUED
2015-03-03Permit EW — ISSUED
2015-02-26311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-02-26ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS-NOTED: WORKER WAS INURED WHEN A PC OF CONCRETE FE$2,400
2015-02-26DOB complaint, category ?
2015-02-26Permit EW — ISSUED
2015-02-24Permit EW — ISSUED
2015-02-24Permit EW — ISSUED
2015-02-02Permit EW — ISSUED
2015-02-01FDNY inspection (CDA-90-DRILL)
2015-01-07Permit EQ — ISSUED
2015-01-07Permit EQ — ISSUED
2015-01-07Permit EQ — ISSUED
2014
2014-12-30Permit EQ — ISSUED
2014-12-30Permit EQ — ISSUED
2014-12-30Permit EQ — ISSUED
2014-12-26Permit EQ — ISSUED
2014-12-22311: General Construction/Plumbing — Site Conditions Endangering Workers
2014-12-22DOB complaint, category ?
2014-12-21311: Homeless Person Assistance — No Status Call
2014-12-02Permit AL — ISSUED
2014-12-02Permit SG — ISSUED
2014-10-25FDNY inspection (CDA-90-DRILL)
2014-10-14Rodent inspection: Passed
2014-09-23311: Noise — Noise: Construction Before/After Hours (NM1)
2014-09-12Permit EW — ISSUED
2014-09-12Permit EW — ISSUED
2014-09-12Permit EW — ISSUED
2014-09-12Permit EW — ISSUED
2014-09-08311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2014-08-28Mortgage $50,000,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.$50,000,000
2014-08-28AL&R $50,000,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.$50,000,000
2014-08-28Mortgage $27,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.$27,500,000
2014-08-28AL&R $27,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.$27,500,000
2014-07-23ECB CLASS - 1 violation: WORK CONTRARY TO APPROVED PLANS & DOCUMENTS. AT THE TIME OF INSPECTIONCONSTRUCTION DEMOLITION WORK IN PROGRESS. AS REPORTED BY SSM
2014-07-23DOB complaint, category ?
2014-07-14ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &
2014-06-27Permit EW — ISSUED
2014-06-25Permit EW — ISSUED
2014-06-16Permit EW — ISSUED
2014-06-16Permit EW — ISSUED
2014-06-13Permit EW — ISSUED
2014-06-13Permit EW — ISSUED
2014-06-09Permit DM — RE-ISSUED
2014-06-09Permit EQ — ISSUED
2014-06-06Permit PL — ISSUED
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-22Permit EW — ISSUED
2014-05-09Job filed: FILING HEREWITH MECHANICAL WORK, PLUMBING WORK AND BOILER INSTALLATION IN CONJUNCTION WITH THE ENLARGEMENT OF AN EXISTING BUILDING AS PER PLANS.
2014-05-09Job filed: FILING HEREWITH MECHANICAL WORK, PLUMBING WORK AND BOILER INSTALLATION IN CONJUNCTION WITH THE ENLARGEMENT OF AN EXISTING BUILDING AS PER PLANS.
2014-05-08Permit EW — ISSUED
2014-05-08Permit EW — ISSUED
2014-04-22FDNY inspection (ABATE)
2014-04-17Job filed: INSTALLATION OF A DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UND
2014-04-17Job filed: INSTALLATION OF A DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UND
2014-04-17Job filed: INSTALLATION OF A DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UND
2014-04-17Permit EQ — ISSUED
2014-04-09SMIS $4,210,640 — from SHUBERT AND BOOTH THEATRE, LLC to 701 SEVENTH PROPERTY OWNER LLC$4,210,640
2014-04-09SMIS $14,180,863 — from SCHOENFELD THEATRE LLC to 701 SEVENTH PROPERTY OWNER LLC$14,180,863
2014-04-03Job filed: FILING HEREWITH INSTALLATION OF COMBINATION SPRINKLER/STANDPIPE SYSTEM AS PER PLANS. ALL WORK FILED IN CONJUNCTION WITH ALTERATION TYPE I APPLICATION $3,335,000
2014-03-31Job filed: FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH THE ENLARGEMENT OF AN EXISTING BUILDING AS PER PLANS.
2014-03-27Job filed: FILING HEREWITH CURB CUT AS PER PLANS.
2014-03-26Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION/CO DETECTION/SPRINKLER ALARM/VOICE COMMUNICATION/SMOKE PURGE/STAIR PRESSURIZATION/AUTOMATI$1,200,000
2014-03-26Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT DETECTION/CO DETECTION/SPRINKLER ALARM/VOICE COMMUNICATION/SMOKE PURGE/STAIR PRESSURIZATION/AUTOMATI$1,200,000
2014-03-11FDNY inspection (ABATE)
2014-03-10Job filed: FILING FOR TEMPORARY SHORING AND BRACING REQUIRED FOR PARTIAL DEMOLITION OF 10 STORY BUILDING (121829959) AS PER PLANS FILED HEREWITH.$1,270,000
2014-03-10Job filed: FILING FOR TEMPORARY SHORING AND BRACING REQUIRED FOR PARTIAL DEMOLITION OF 10 STORY BUILDING (121829959) AS PER PLANS FILED HEREWITH.$1,270,000
2014-02-27Permit EW — ISSUED
2014-02-27Permit EW — ISSUED
2014-02-24311: BEST/Site Safety — Demolition Notification Received
2014-02-24DOB complaint, category ?
2014-02-24Permit DM — ISSUED
2014-02-24Permit EQ — ISSUED
2014-02-14Job filed: FILING HEREWITH STRUCTURAL FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000,000
2014-02-14Job filed: FILING HEREWITH STRUCTURAL FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,700,000
2014-02-11Job filed: FILING HEREWITH STRUCTURAL FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,500
2014-02-11Job filed: FILING HEREWITH STRUCTURAL FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,500
2014-02-11Job filed: FILING HEREWITH STRUCTURAL FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,500
2014-02-11Job filed: FILING HEREWITH STRUCTURAL FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,500,000
2014-02-10Permit EW — ISSUED
2014-02-04FDNY inspection (ABATE)
2014-02-04FDNY inspection (ALT)
2014-02-04FDNY inspection (DEMO)
2014-01-27SMIS — from 701 SEVENTH PROPERTY OWNER LLC to MARRIOTT HOTEL SERVICES, INC.
2014-01-27Mortgage assigned — from BERKADIA PROPRIETARY LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.
2014-01-27Agreement $237,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.$237,500,000
2014-01-27AL&R $237,500,000 — from 701 SEVENTH PROPERTY OWNER LLC to STARWOOD PROPERTY MORTGAGE, L.L.C.$237,500,000
2014-01-27TL&R — from BERKADIA PROPRIETARY LLC to 701 SEVENTH PROPERTY OWNER LLC
2014-01-27SMIS — from STARWOOD PROPERTY MORTGAGE, L.L.C.; MARRIOTT HOTEL SERVICES, INC. to 701 SEVENTH PROPERTY OWNER LLC
2014-01-25311: Construction Safety Enforcement — Excavation Tracking Complaint
2014-01-16Job filed: FILING HEREWITH SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000,000
2014-01-15Job filed: FILING HEREWITH SUPPORT OF EXCAVATION FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000,000
2014-01-14Job filed: MAINTAIN TEMPORARY STAND PIPE FIRE PROTECTION DURING CONSTRUCTION ON SOUTH SIDE OF THE BUILDING ON 7TH AVE. REMOVE EXISTING STANDPIPE ON NORTH SIDE OF$20,000
2014-01-14Job filed: MAINTAIN TEMPORARY STAND PIPE FIRE PROTECTION DURING CONSTRUCTION ON SOUTH SIDE OF THE BUILDING ON 7TH AVE. REMOVE EXISTING STANDPIPE ON NORTH SIDE OF$20,000
2014-01-14Job filed: MAINTAIN TEMPORARY STAND PIPE FIRE PROTECTION DURING CONSTRUCTION ON SOUTH SIDE OF THE BUILDING ON 7TH AVE. REMOVE EXISTING STANDPIPE ON NORTH SIDE OF$20,000
2013
2013-12-31Permit AL — ISSUED
2013-12-27FDNY inspection (ABATE)
2013-12-27Permit EQ — ISSUED
2013-12-27Permit EQ — ISSUED
2013-12-27Permit EQ — ISSUED
2013-12-27Permit EQ — ISSUED
2013-12-27Permit EQ — ISSUED
2013-12-26Permit EQ — ISSUED
2013-12-26Permit EQ — ISSUED
2013-12-11Job filed: INSTALLATION OF A SINGLE 2000 LB CAPACITY FIRE READINESS HOIST DURING BUILDING ALTERATION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33 OF TH
2013-10-31Job filed: MEANS AND METHODS FOR PARTIAL DEMOLITION OF 10 STORY BUILDING AND THEATER AS PER PLANS FILED HEREWITH.$1,270,000
2013-10-25Job filed: FILING HEREWITH FOR MECHANICAL MEANS & METHODS OF DEMOLITION. USE OF MINI EXCAVATOR, COMPACT EXCAVATOR, SKID-STEER, AND MANLIFT. FILED IN CONJUNCT
2013-10-25Job filed: FILING HEREWITH FOR MECHANICAL MEANS & METHODS OF DEMOLITION. USE OF MINI EXCAVATOR, COMPACT EXCAVATOR, SKID-STEER, AND MANLIFT. FILED IN CONJUNCT
2013-10-23Permit EW — ISSUED
2013-10-22Permit EW — ISSUED
2013-10-17Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP
2013-10-17Permit EQ — ISSUED
2013-10-09FDNY inspection (ABATE)
2013-10-09Job filed: USE OF MECHANICAL EQUIPMENT TO REMOVE RAISED FLOOR AT GROUND LEVEL, PORTION OF MEZZ., AND PLASTER CEILING AS PER PLANS FILED HEREWITH.$100,000
2013-10-02Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2013-10-02Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE DURING BUILDING DEMOLITION, FILED SEARATELY. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. N
2013-10-02Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE DURING BUILDING DEMOLITION, FILED SEARATELY. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. N
2013-10-02Job filed: INSTALLATION OF 57 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING DEMOLITION, FILED SEARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF
2013-10-02Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2013-10-02Job filed: INSTALLATION OF 57 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING DEMOLITION, FILED SEARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF
2013-10-02Permit EQ — ISSUED
2013-10-02Permit EQ — ISSUED
2013-10-02Permit EQ — ISSUED
2013-09-27Job filed: INSTALLATION OF 332 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPL
2013-09-27Job filed: INSTALLATION OF 332 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPL
2013-09-27Permit EQ — ISSUED
2013-09-25Job filed: INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UN
2013-09-25Permit EQ — ISSUED
2013-09-20Job filed: DEMOLTION OF A 4 STORY PARTIAL MECHANCIAL DEMOLITION
2013-08-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
2013-08-20311: Water System — Hydrant Defective (WC2)
2013-08-16DOB complaint, category ?
2013-07-31FDNY inspection (ABATE)
2013-06-05RPTT&RET $6,750,000 — from R&J RESTAURANT CORP. to 701 SEVENTH PROPERTY OWNER LLC$6,750,000
2013-05-22FDNY inspection (ABATE)
2013-05-21DOB violation E:
2013-04-17AALR — from SPT-IX 701 LOAN HOLDINGS, L.P. to BERKADIA PROPRIETARY LLC
2013-04-17Mortgage assigned — from SPT-IX 701 LOAN HOLDINGS, L.P. to BERKADIA PROPRIETARY LLC
2013-04-08Job filed: FILING HEREWITH PARTIAL DEMOLITION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,149,380
2013-04-08Job filed: FILING HEREWITH PARTIAL DEMOLITION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,149,380
2013-04-08Job filed: FILING HEREWITH SELECTIVE REMOVALS AS PER PLANS FILED IN CONJUNCTION WITH ALT I APPLICATION #121324343. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$289,855
2011-02-18Job filed: REPOSITION WALL STRUCTURE FOR ILLIMINATED ADVERTISING SIGN, SIGN FACE FILED SEPARATELY. NO CHANGE IN USE$50,000
2011-02-18Permit EW — ISSUED
2011-02-18Permit SG — ISSUED
2011-02-15Job filed: INSTALLATION OF 48 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERNATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY W
2010-01-27ECB CLASS - 2 violation: FAIL TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTEDD TO EMERGENCY POWER SOURCE/STORAGE BATTE$800
2010-01-24311: HEATING — HEAT
2010-01-24Tenant complaint: HEATING — HEAT RELATED
2010-01-14Job filed: JOB FILED TO REMOVE NO-CONSTRUCTION PARTITION WALL AS PLANE SHOWS AS NEW OFFICE SPACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$15,000
2010-01-14Job filed: JOB FILED TO REMOVE NO-CONSTRUCTION PARTITION WALL AS PLANE SHOWS AS NEW OFFICE SPACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$15,000
2009
2009-10-23Rodent inspection: Passed
2009-10-20Job filed: PA
2009-09-21Permit SG — ISSUED
2009-09-15Permit EW — ISSUED
2009-09-01Job filed: UPGRADE EXISITING FIRE SUPPRESSION SYSTEM APPROVED UNDER APPL#120073400. ANSUL SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2009-09-01Job filed: UPGRADE EXISITING FIRE SUPPRESSION SYSTEM APPROVED UNDER APPL#120073400. ANSUL SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2009-07-16Permit PL — ISSUED
2009-07-10Permit EQ — ISSUED
2009-07-10Permit EW — ISSUED
2009-07-10Permit EW — ISSUED
2009-07-10Permit EW — ISSUED
2009-06-12Job filed: INSTALL STEEL BEAMS AND PROVIDE STAIR OPENINGS PER PLANS HEREWITH SUBMITTED. NO CHANGE IN USE,EGRESS, OCCUPANCY UNDER THIS APPLICATION$25,000
2009-06-12Job filed: INSTALL STEEL BEAMS AND PROVIDE STAIR OPENINGS PER PLANS HEREWITH SUBMITTED. NO CHANGE IN USE,EGRESS, OCCUPANCY UNDER THIS APPLICATION$25,000
2009-06-12Job filed: FILING THIS APPLICATION TO RENOVATE EXISTING EATING AND DRINKIKING ESTABLISHMENT ON CELLAR, 1ST AND 2ND FLOORS, PER CONSTRUCTION, MECHANICAL AND PLUMB$249,820
2009-05-29DOB violation E:
2009-05-28DOB complaint, category ?
2009-04-08Permit PL — ISSUED
2009-04-06Permit EW — ISSUED
2009-03-04Job filed: PA
2009-03-04Job filed: PA
2009-03-04Job filed: PA
2009-02-17Job filed: MODIFICATION OF EXISTING PARTITIONS AND PLUMBING FIXTURES TO INCLUDE NEW OFFICE SPACE. NO CHANGE IN USE EGRESS, OR OCCUPANCY.$7,900
2009-02-17Job filed: MODIFICATION OF EXISTING PARTITIONS AND PLUMBING FIXTURES TO INCLUDE NEW OFFICE SPACE. NO CHANGE IN USE EGRESS, OR OCCUPANCY.$7,900
2009-02-04Permit SG — ISSUED
2009-01-26Permit EW — ISSUED
2008
2008-12-29Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#110313535, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$6,000
2008-12-29Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#110313535, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$6,000
2008-12-29Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#110313535, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.$6,000
2008-12-01DOB violation E:
2008-10-15DOB complaint, category ?
2008-10-08Permit PL — ISSUED
2008-09-02Job filed: INSTALLATION OF A NEW FIRE ALARM SYSTEM ON THE CELLAR, 1ST, AND 2ND FLOORS OF A RETAIL SPACE. NO CHANGE OF USE OCCUPANCY OR EGRESS.$15,000
2008-08-20Permit EW — ISSUED
2008-08-18Permit EW — ISSUED
2008-08-18Permit EW — ISSUED
2008-08-14Job filed: GENERAL CONSTRUCTION TO INCLUDE NEW PARTITIONS AND PLUMBING. NO CHANGE IN USE EGRESS, OR OCCUPANCY$105,000
2008-07-14Permit EW — ISSUED
2008-07-14Permit EW — ISSUED
2008-07-07Permit AL — ISSUED
2008-07-07Permit EW — ISSUED
2008-07-07Permit EW — ISSUED
2008-05-20Permit AL — ISSUED
2008-05-16Permit EW — ISSUED
2008-05-16Permit SG — ISSUED
2008-04-10Permit SG — ISSUED
2008-03-31DOB violation LL2604E:
2008-03-31DOB complaint, category ?
2008-03-10Job filed: INSTALLATION OF A SPRINKLER SYSTEM AT THE CELLAR AND 1ST FLOOR, ALONG WITH MECHANICAL WORK ON THE 1ST AND 2ND FLOORS. NO CHANGE IN USE, OCCUPANCY, OR $250,000
2008-02-21Permit PL — ISSUED
2007
2007-11-01Job filed: Installation of a temporary construction fence. No change of use, occupancy, or egress.
2007-10-01Permit EW — ISSUED
2007-10-01Permit EW — ISSUED
2007-09-05Job filed: Structural work in conjunction with convERSION AND RENOVATION OF AN EXISTING THEATRE TO A RETAIL SPACE ANDAN EATING AND DRINKING ESTABLISHMENT ON THE
2007-09-04Job filed: Conversion and renovation of an existing THEATRE TO A RETAIL SPACE AND A N EATING AND DRINKING ESTABLISHMENT ON THE 1ST AND 2ND FLOORS. ARCHITECTURAL $225,000
2007-08-30Job filed: Structural work in conjunction with conversion and renovation of an existing theatre to a retail space. An amended C of O to be obtained.
2007-08-30Job filed: Conversion and renovation of an existing theatre to a retail space. Architectural work. An amended C of O to be obtained.$100,000
2007-08-30Job filed: Structural work in conjunction with conversion and renovation of an existing theatre to a retail space. An amended C of O to be obtained.
2007-08-28Job filed: Structural work in conjunction with the renovation of an existing retail space at the first floor with related building repairs on the Cellar, 2nd thr$125,000
2007-08-28Job filed: Renovation of existing retail space at the first floor with related building repairs on the Cellar, 2nd thru 10th floors, and roof. Architectural and $108,000
2007-06-29Mortgage assigned — from GMAC COMMERICAL MORTGAGE CORPORATION; CAPMARK FINANCE INC.,; REGISTERED HOLDER OF CITIGROU to SAFRA NATIONAL BANK OF NEW YORK
2007-06-29TL&R — from CAPMARK FINANCE INC.,; GMAC COMMERICAL MORTGAGE CORPORATION; REGISTERED HOLDER OF CITIGROU to VIMAR REALTY CORP
2007-06-29Agreement $800,000 — from VIMAR REALTY CORP to SAFRA NATIONAL BANK OF NEW YORK$800,000
2007-06-29AL&R — from VIMAR REALTY CORP to SAFRA NATIONAL BANK OF NEW YORK
2007-06-29PREL — from SAFRA NATIONAL BANK OF NEW YORK to VIMAR REALTY CORP
2007-06-29Mortgage $3,160,489 — from VIMAR REALTY CORP to SAFRA NATIONAL BANK OF NEW YORK$3,160,489
2007-05-30Permit EW — ISSUED
2007-05-22Job filed: REMOVE NON BEARING PARTIONS, MECHANICAL EQUIPMENT AND PLUMBING FIXTURES. NO CHANGE IN USE , EGRESS OR OCCUPANCY$36,000
2007-05-22Job filed: REMOVE NON BEARING PARTIONS, MECHANICAL EQUIPMENT AND PLUMBING FIXTURES. NO CHANGE IN USE , EGRESS OR OCCUPANCY$36,000
2007-04-18Permit EW — ISSUED
2007-04-18Permit EW — ISSUED
2007-04-11Job filed: INSTALL HVAC IN BASEMENT EQUIPMENT ROOM WITH RELATED A/C MOUNTED TO FAC ADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. RELATEDN DUNNAGE.$25,000
2007-03-15Permit AL — ISSUED
2007-03-14Permit SG — ISSUED
2007-02-22Permit EQ — ISSUED
2007-02-13Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 48' ON WEST 47 STREET SIDE DURING SIGN INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SHED TO COMPLY
2007-02-07DOB violation E:
2006
2006-12-29Job filed: ERECT WALL STRUCTURE FOR ADVERTISING SIGN FACING SOUTH. SIGN FILED SEPARATELY #. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2006-03-23Permit AL — ISSUED
2006-03-22Job filed: INSTALLATION OF PARTITION WALL AND REPLACEMENT OF WOOD FLOORING AND GYP,BD, CEILING. NO CHANGE IN USE OCCUPANCY AND AN EGRESS IS INVOLVED UNDER THIS A$22,000
2006-03-10AALR — from EMIGRANT SAVINGS BANK to LASALLE BANK, N.A., AS TRUSTEE
2006-03-10Mortgage assigned — from EMIGRANT SAVINGS BANK to LASALLE BANK, N.A., AS TRUSTEE
2006-02-03PREL — from LASALLE BANK NA ASSOC. TRUSTEE REGIST.HO to ALGM LEASEHOLD II LLC; ALGM LEASEHOLD X LLC; ALGM LEASEHOLD XII LLC; ALGM LEASEHOLD III LL
2006-01-19Facade (LL11) filing, cycle 6: SWARMP
2005
2005-12-16TL&R — from LASALLE BANK NA, AS TRUSTEE REGIST. HOL. to ALGM LEASEHOLD VI LLC
2005-08-22DOB complaint, category ?
2005-07-19Agreement $43,000,000 — from AS SERVICER OF LASALLE BANK, N.A.; WACHOVIA BANK, N.A.; COMMERCIAL MORTGAGE TRUST 2003-FL1 to ALGM LEASEHOLD II LLC; ALGM LEASEHOLD XII LLC; ALGM LEASEHOLD VI LLC; 1552 LO$43,000,000
2005-06-17ECB Non-Hazardous violation: FAILURE TO SUBMIT A 5TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTEN$1,750
2005-06-07RPTT $74,119,171 — from ALGM I EQUITY, LLC; NORTHSTAR REALTY FINANCE, LP; NORTHSTAR CAPITAL INVESTMENT CORP; NORT to NRFC SUB-REIT CORP; NRFC NNN HOLDINGS, LLC; NORTHSTAR REALTY FINANCE, LP$74,119,171
2005-04-29ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APP$700
2005-01-14Permit EQ — ISSUED
2004
2004-11-12ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISION:PERIODIC INSPECTION OF EXTERIOR WALLS & APPUREN$700
2004-09-08Permit EQ — ISSUED
2004-09-07Job filed: Install heavy duty sidewalk shed a total of 35 ft long at 701 7th Avenue - during remedial repairs. Work shall comply with LL33/91. No change in use e
2004-09-02Mortgage assigned — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NA, AS TRUSTEE FOR THE REGI
2004-09-01AALR — from GREENWICH CAPITAL FINANCIAL PRODUCTS, IN to LASALLE BANK NA, AS TRUSTEE FOR THE REGI
2004-08-11Permit EW — ISSUED
2004-07-27Permit EW — ISSUED
2004-07-27Permit EW — ISSUED
2004-07-21Job filed: INSTALLATION OF A/C UNIT. NO CHANGE IN USE, OCCUPANCY AND AN EGRESS IS INVOLVED UNDER THIS APPLICATION.$23,000
2004-07-21Job filed: INSTALLATION OF A/C UNIT. NO CHANGE IN USE, OCCUPANCY AND AN EGRESS IS INVOLVED UNDER THIS APPLICATION.$23,000
2004-06-11ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW
2004-03-31Permit SG — ISSUED
2004-03-10Permit SG — ISSUED
2004-01-30ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LOCAL LAW 11
2004-01-05Permit AL — ISSUED
2003
2003-12-26Job filed: RENOVATION OF STORE INCLUDING GYP. BOARD WORK. NO CHANGE IN USE OCCUPANCY AND EGRESS IS INVOLVED.$9,000
2003-11-24Permit EW — ISSUED
2003-11-13Job filed: Erect Wall Structure for illuminated advertising sign. Sign face filed for separately. No change in use, egress, or occupancy.$54,750
2003-10-01DOB violation E:
2003-08-25Permit SG — ISSUED
2003-08-25Permit SG — ISSUED
2003-05-13Job filed: Install Storefront Business Awning. Wording:"Times Square Gifts & Souvenirs"$3,000
2003-03-28Permit EW — ISSUED
2003-03-28Permit EQ — ISSUED
2003-03-26Job filed: To modify existing store front & interior layout at retail store. No change in use, egress or occupancy.$10,000
2003-03-24CALR — from VIMAR REALTY CORP. to EMIGRANT FUNDING CORPORATION
2003-03-24Mortgage assigned — from EMIGRANT FUNDING CORPORATION to EMIGRANT SAVINGS BANK
2003-03-24Mortgage $4,326,819 — from VIMAR REALTY CORP. to EMIGRANT SAVINGS BANK$4,326,819
2003-03-24Agreement — from VIMAR REALTY CORP. to EMIGRANT SAVINGS BANK
2003-03-24AL&R — from EMIGRANT SAVINGS BANK
2003-02-25Mortgage $12,728,557 — from ALGM LEASEHOLD VI LLC; ALGM LEASEHOLD XII LLC; 729 DEMI-TASSE LLC; ALGM LEASEHOLD IX LLC; to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN$12,728,557
2003-02-25AL&R — from ALGM LEASEHOLD VI LLC to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN
2003-02-25CALR — from ALGM LEASEHOLD VI LLC to SALOMON BROTHERS REALTY CORP.
2003-02-25Agreement — from 1552 LONSDALE LLC; ALGM LEASEHOLD X LLC; 729 DEMI-TASSE LLC; ALGM LEASEHOLD II LLC; ALGM L to GREENWICH CAPITAL FINANCIAL PRODUCTS, IN
2003-02-25CALR — from ALGM LEASEHOLD VI LLC; ALGM LEASEHOLD VIII LLC; ALGM LEASEHOLD X LLC; ALGM LEASEHOLD XI LL
2003-02-24Permit EQ — ISSUED
2003-02-24Permit EW — ISSUED
2003-02-24Permit EW — ISSUED
2003-02-21Job filed: EXISTING RETAIL STORE RENOVATION. WORK INCLUDES INSTALLATION OF NEW STORE FRONT AND EXISTING DUCT RELOCATION. NO CHANGE IN EGRESS OR OCCUPANCY.$20,000
2003-02-21Job filed: EXISTING RETAIL STORE RENOVATION. WORK INCLUDES INSTALLATION OF NEW STORE FRONT AND EXISTING DUCT RELOCATION. NO CHANGE IN EGRESS OR OCCUPANCY.$20,000
2003-02-21Job filed: EXISTING RETAIL STORE RENOVATION. WORK INCLUDES INSTALLATION OF NEW STORE FRONT AND EXISTING DUCT RELOCATION. NO CHANGE IN EGRESS OR OCCUPANCY.$20,000
2002
2002-10-10Agreement — from VIMAR REALTY CORP. to EMIGRANT FUNDING CORP
2002-10-10Agreement — from ROCKEFELLER GROUP INTERNATIONAL, INC. to VIMAR REALTY CORP.; 157 WEST 49TH ST. REALTY CORP.
2002-10-10Agreement — from ROCKEFELLER GROUP INTERNATIONAL, INC. to 157 WEST 49TH ST. REALTY CORP.; VIMAR REALTY CORP.
2002-10-10Mortgage assigned — from VIMAR REALTY CORP to EMIGRANT FUNDING CORPORATION
2002-10-10Agreement — from VIMAR REALTY CORP. to EMIGRANT FUNDING CORP
2002-10-10Mortgage assigned — from ROCKEFELLER GROUP, INC to ROCKEFELLER GROUP INTERNATIONAL INC.
2002-10-10Mortgage assigned — from ROCKEFELLER GROUP INTERNATIONAL INC. to EMIGRANT FUNDING CORPORATION
2002-10-10Mortgage assigned — from ROCK-FORTY-NINTH INC. to ROCKEFELLER GROUP, INC.
2002-10-10Mortgage assigned — from ROCKEFELLER GROUP, INC. to ROCKEFELLER GROUP INTERNATIONAL INC.
2002-10-10Mortgage satisfied — from 157 WEST 47TH ST REALTY CORP to ROCKEFELLER GROUP, INC.
2002-10-10Mortgage assigned — from ROCK-FORTY-NINTH INC. to ROCKEFELLER GROUP INC.
2002-10-10Agreement — from VIMAR REALTY CORP. to EMIGRANT FUNDING CORP
2002-10-10Mortgage assigned — from ROCKEFELLER GROUP INTERNATIONAL INC. to EMIGRANT FUNDING CORPORATION
2002-08-08DOB violation L1198:
2002-06-03Permit EW — ISSUED
2002-06-03Permit EW — ISSUED
2002-05-14Job filed: Installation of rooftop structural dunnage. Project complies with Department Of Buildings PPN 5/98 dated July 1, 1998. No change to Use, Occupancy Gr$10,000
2002-05-14Job filed: Installation of new rooftop Communications antennae,Equiptment platform, and conduit to run from antennae to platform as per plans submitted herewith.$50,000
2002-05-14Job filed: Installation of rooftop structural dunnage. Project complies with Department Of Buildings PPN 5/98 dated July 1, 1998. No change to Use, Occupancy Gr$10,000
2002-05-14Job filed: Installation of new rooftop Communications antennae,Equiptment platform, and conduit to run from antennae to platform as per plans submitted herewith.$50,000
2002-03-28DOB complaint, category ?
2002-01-25Permit EW — ISSUED
2002-01-23Job filed: Application filed to install new handicapped toilet and renovate existing by rep lacing toilet fixtures on the first floor. No change in use, egress o$12,000
2001
2001-12-03Permit AL — ISSUED
2001-08-07Permit EW — ISSUED
2001-08-07Permit EW — ISSUED
2001-07-27Job filed: REPLACEMENT 1 NEW L.P.BOILER/BURNER NO CHANGE IN USE EGRESSOR OCCUPA NCYOR GROUP
2001-03-08DOB violation LL1081:
2001-02-09Permit EW — ISSUED
2001-01-30Job filed: REMOVE AND REPLACE EXISTING TELECOMMUNIC ATIONS CABINETS IN BASEMENT IN CONFORMANCE WITH TPPN #5/98. INITIAL INS TALLATION APPROVED UNDER APPLICATION $15,000
2001-01-30Job filed: REMOVE AND REPLACE EXISTING TELECOMMUNIC ATIONS CABINETS IN BASEMENT IN CONFORMANCE WITH TPPN #5/98. INITIAL INS TALLATION APPROVED UNDER APPLICATION $15,000
2000
2000-10-04Permit AL — ISSUED
2000-07-13Permit SG — ISSUED
2000-06-21DOB violation E: 1P8162
2000-05-25Permit AL — ISSUED
2000-04-21Job filed: ERECT INDIRECTLY ILLUMINATED ADVERTISING SIGN STRUCTURE, CHANGEABLE COPY PERMITTED, 200 FT BEYOND THE APPROACH TO ANY ARTERIAL HIGHWAY OR PUBLIC PARK $60,000
2000-04-21Job filed: ERECT INDIRECTLY ILLUMINATED ADVERTISING SIGN STRUCTURE, CHANGEABLE COPY PERMITTED, 200 FT BEYOND THE APPROACH TO ANY ARTERIAL HIGHWAY OR PUBLIC PARK $60,000
2000-04-19LEAS — from 157 WEST 49TH ST. REALTY CORP.; VIMAR REALTY CORP. to INTERVINE, INC.
2000-03-03Mortgage assigned — from ALGM LEASEHOLD VI LLC to SALOMON BROTHERS REALTY CORP.
2000-03-03LEAS to ALGM LEASEHOLD VI LLC
2000-03-03Mortgage assigned — from NATREST FUNDING I, INC. to ALGM I LLC
2000-03-03REL — from ALGM I LLC to ALGM LEASEHOLD VI LLC
2000-03-03Mortgage assigned — from ALGM LEASEHOLD IX LLC; ALGM LEASEHOLD X LLC; ALGM LEASEHOLD VI LLC; ALGM LEASEHOLD VIIILLC to SALOMON BROTHERS REALTY CORP.
1999
1999-10-04Permit EQ — ISSUED
1999-08-25ECB Non-Hazardous violation: 35O2,36D6,36I11,35I11,54I11,37G12,50O2,57O2. -35 DIRTY MOTOR ROOM WITHSOLID RAGS ON FLOOR & PLYWOOD, CLEAN, -36 NO LOCKING DEVICE,
1999-06-16Permit EW — ISSUED
1999-06-16Permit EW — ISSUED
1999-05-20REL — from 701 OPERATING INC. to NATREST FUNDING I, INC.
1999-05-20Mortgage assigned — from ALGM I LLC to NATREST FUNDING INC.
1999-04-28Mortgage assigned — from ALGM I LLC to NATREST FUNDING I, INC.
1999-01-30DOB violation E: 1P8162
1998
1998-12-15Permit EW — ISSUED
1998-09-17Mortgage assigned — from BANK OF TOKYO-MITSUBISHI TRUST COMPANY to ALGM I LLC
1998-08-05Permit AL — ISSUED
1998-06-19Permit PL — ISSUED
1998-06-19Permit EW — ISSUED
1998-06-19Permit EW — ISSUED
1998-06-11DOB complaint, category ?
1997
1997-11-18Permit EW — ISSUED
1997-07-01DOB complaint, category ?
1997-06-20Permit EW — ISSUED
1997-06-20Permit PL — ISSUED
1997-06-20Permit EW — ISSUED
1997-02-26ECB Non-Hazardous violation: INSTALLATION OF MECHANICAL EQUIPMENT WITHOUT FIRST OBTAINING A EQUIPMENT USE WORK PERMIT FOR A/C UNITS. LOCATIONS 6 FLOOR NAME KAM$350
1996
1996-11-14Permit EW — ISSUED
1996-11-14Permit EW — ISSUED
1996-04-25DOB complaint, category ?
1996-03-26ECB Non-Hazardous violation: LOCATION: KITCHEN 1ST FLOOR ANSUL SYSTEM IN PLACE REQUIRED PERMIT TO INSTALL GAS ANSUL VALUE. VIOLATION PLUMBING WORK WITHOUT A PE
1996-03-26ECB Non-Hazardous violation: LOCATION IN BASEMENT SLOP SINK RECIEVING INDIRECT WASTE FROM BAR SINKS AND ICE BINS NOT VENTED. VIOLATION PLUMBING FIXTURE NOT PRO
1996-03-26ECB Non-Hazardous violation: LOCATION BASEMENT AND 1ST FLOOR KITCHEN IN BASEMENT 2' OVERHEAD GAS PIPING WITH 2"X1" TEE REDUCED WITH BUSHING, KITCHEN PIZZA OVER
1995
1995-11-03DOB complaint, category ?
1995-07-27DOB complaint, category ?
1995-07-20LEAS — from VIMAR REALTY CORP.; 157 WEST 49TH ST. REALTY CORP. to 701 SEVENTH AVENUE SIGN CORP.
1995-01-13Permit EW — ISSUED
1994
1994-10-27Permit EQ — ISSUED
1994-09-01DOB violation LL6291:
1994-02-14Permit SG — ISSUED
1993
1993-07-23Mortgage $3,350,000 — from 569 OPERATING INC; 701 OPERATING INC to BANK/TOKYO TRUST CO$3,350,000
1993-07-23Mortgage $670,000 — from 569 OPERATING INC.; 701 OPERATING INC to BANK/TOKYO TRUST CO$670,000
1993-04-13Permit EW — ISSUED
1992
1992-07-01DOB violation LL1080:
1992-06-03Permit EW — ISSUED
1992-05-07ECB Non-Hazardous violation: 74P, 74-PROVIDE ACCESS TO ELV. MACHINE ROOM
1991
1991-03-27Permit SG — ISSUED
1991-03-27Permit SG — ISSUED
1991-03-25Permit AL — ISSUED
1991-02-22ECB Non-Hazardous violation: OPERATION OF PA WITHOUT A CURRENT PERMITE: SPACE AT CELLAR ARRANGE AND SET UP FOR 140 PERSONS. REMEDY: OBTAIN A PUBLIC ASSEMBLY P$400
1990
1990-10-17ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REMEDY:PROVIDE APPROVED PA PLANS.$250
1990-10-17ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOF INSPECTION REMEDY:PROVIDE APPROVED PA PLANS.$250
1990-04-23ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REMEDY: PROVIDE APPROVE PA PLANS FOR INSPECTION.$115
1990-04-23ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION FOR INSPECTION. REMEDY: PROVIDE APPROVED PLAN FOR INSPECTION.$115
1989
1989-01-04DOB violation E: (34)SUPPLY NEW GIBBS AND ADJUST (51)SECURE LADDER TO MACHINE ROOM (52)PROVIDE LIGHT TO SECONDARY
1987
1987-01-21Mortgage $1,000,000 — from 157 WEST 49 ST RLTYCP to ROCKEFELLER GROUP INC$1,000,000
1987-01-21Agreement — from ROCK-FORTY-NINTH INC to 157 WEST 49 ST RTY CORP
1987-01-21Mortgage assigned — from MANUFACTURERS HANO TR CO to ROCK-FORTY-NINTH INC
1987-01-21LEAS — from 157 WEST 49 ST RTY CORP to WALHEJ ASSOCIATES
1987-01-21SAGE — from ROCK-FORTY-NINTH INC
1987-01-21Deed — from WALHEJ ASSOCIATES to 157 WEST 49 ST RLTYCORP
1987-01-21Mortgage $1,670,000 — from 157 WEST 49 ST RLTYCP to ROCK-FORTY-NINTH INC$1,670,000
1977
1977-12-01LEAS — from WALHEJ ASSOC to 720 LEXINGTON AVE HOLDG
1977-11-01CONS — from WALHEJ ASSOC
1976
1976-02-18Deed — from LEVINE, PHILIP; KOPPEL, NAT to WALHEJ ASSOC
1976-02-18Agreement — from KOPPEL, NAT; LEVINE, PHILIP to MANUFACTURERS HNVR TRUST
1974
1974-11-07Mortgage assigned — from TIMES SQUARE ASSOC; SANKS, IRA J to 701 REALTY INC
1971
1971-05-25Deed — from KOEPPEL ARTHUR S. to KOEPPEL NAT
1971-05-25Deed — from OFFERBERG ELLEN to KOEPPEL NAT
1971-05-25Deed — from PAPEL BARBARA to KOEPPEL NAT
1971-05-14Mortgage — from SLIMAK INC to MANUFACTURES HNVER TRUS
1971-05-14Deed — from SLIMAK INC to LEVINE PHILIP
1971-05-13LEAS — from TIMES SQUARE ASSOCIATES to MANUFACTURES HNVER TRUS
1971-05-13Mortgage — from SLIMAK INC to MANUFACTURES HNVER TRUS
1971-05-13Mortgage assigned — from LOEW'S THEATRES INC to MANUFACTURES HNVER TRUS
1971-05-13Mortgage assigned — from GREENWICH SAVINGS BANK to MANUFACTURES HNVER TRUS
1971-05-03Deed — from KOEPPEL NAT; LEVINE PHILIP to SLIMAK INC
1968
1968-12-04Mortgage assigned — from MAYFAIR BUILDING INC to LOEW'S THEATRES INC
1967
1967-11-29Deed — from KOEPPEL SADIE to KOEPPEL NAT
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL