Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

222 West 45 Street · Manhattan · BBL 1010160015 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

50 service requests in the last three years. Most common: Homeless Person Assistance (25) · Illegal Parking (6) · Noise (4) · For Hire Vehicle Complaint (4) · Taxi Complaint (4) · Rodent (2).

Filed construction activity

$2,835,068 in permitted construction work filed since 2016 (51 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$12,521,000 $5,634,450
2026$12,802,000 $5,760,900
2027$13,107,000 $5,898,150

The city's market estimate has risen 5% between tax years 2025 and 2027.

Building systems

Heating fuelNO2FUEL

Restaurants in this building

RestaurantCuisineGradeNotes
Booth TheatreAmericanA—
Shubert TheatreAmericanAMice evidence

Report to 311: Food poisoning · Food safety complaint

2 restaurants · 1 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayTimes Sq-42 St — 1 2 3 7 A C E N Q R S W · 400 ft straight-line (about a 2-minute walk) · station accessibility: full
BusNearest boarding stop: 7 Av / W 44 St — M7 M20 M104 · 450 ft
Citi BikeW 45 St & 8 Ave · 550 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 051 Elias Howe
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

222 West 45 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

50 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

DateRecordAmountPer res. unit
2014-04-09SMIS $4,210,640 — from SHUBERT AND BOOTH THEATRE, LLC to 701 SEVENTH PROPERTY OWNER LLC $4,210,640
2012-02-29DEVR $5,420,500 — from SHUBERT AND BOOTH THEATRE, LLC to 237 WEST 54 OWNER, L.L.C. $5,420,500
2008-05-22DEVR $33,310,560 — from SHUBERT AND BOOTH THEATER, LLC to GLADDEN PROPERTIES LLC $33,310,560

Ten-year activity

100500
2017
2018
2019
2020
2021
2022
52
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20177630824
201811660225
20197740220
202071120020
202118480131
2022201090241
2023124320452
20244590220
2025136221042
202600140317
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 23 records

DateRecord
2026-09-28311: Illegal Parking — Double Parked Blocking Traffic
2026-09-07311: Homeless Person Assistance — Non-Chronic
2026-09-06311: Taxi Complaint — Driver Complaint - Non Passenger
2026-09-01311: Homeless Person Assistance — Non-Chronic
2026-08-30311: Homeless Person Assistance — Non-Chronic
2026-08-19311: Homeless Person Assistance — Non-Chronic
2026-08-02311: Homeless Person Assistance — Non-Chronic
2026-07-21311: Homeless Person Assistance — Non-Chronic
2026-07-03311: Illegal Parking — Posted Parking Sign Violation
2026-06-21311: Illegal Parking — Posted Parking Sign Violation
2026-06-17311: Taxi Complaint — Driver Complaint - Non Passenger
2026-06-03311: Panhandling — N/A
2026-04-18311: Illegal Parking — Posted Parking Sign Violation
2026-04-17Air permit (REGISTRATION), fuel: NO2FUEL
2026-02-06Cooling tower inspection
2026-02-06Cooling tower inspection
2026-01-23311: Illegal Parking — Double Parked Blocking Traffic
2025-12-19311: Blocked Driveway — Partial Access
2025-12-09311: Street Condition — Pothole
2025-11-26Job filed: Mechanical scope associated with a new ADA Restroom at the Booth Theater ground floor. No change of use, egress or occupancy
2025-11-19311: Homeless Person Assistance — Non-Chronic
2025-11-13Agreement — from NYC DEPARTMENT OF TRANSPORTATION to THE SHUBERT ORGANIZATION INC
2025-11-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger

The full timeline

2026
2026-09-28311: Illegal Parking — Double Parked Blocking Traffic
2026-09-07311: Homeless Person Assistance — Non-Chronic
2026-09-06311: Taxi Complaint — Driver Complaint - Non Passenger
2026-09-01311: Homeless Person Assistance — Non-Chronic
2026-08-30311: Homeless Person Assistance — Non-Chronic
2026-08-19311: Homeless Person Assistance — Non-Chronic
2026-08-02311: Homeless Person Assistance — Non-Chronic
2026-07-21311: Homeless Person Assistance — Non-Chronic
2026-07-03311: Illegal Parking — Posted Parking Sign Violation
2026-06-21311: Illegal Parking — Posted Parking Sign Violation
2026-06-17311: Taxi Complaint — Driver Complaint - Non Passenger
2026-06-03311: Panhandling — N/A
2026-04-18311: Illegal Parking — Posted Parking Sign Violation
2026-04-17Air permit (REGISTRATION), fuel: NO2FUEL
2026-02-06Cooling tower inspection
2026-02-06Cooling tower inspection
2026-01-23311: Illegal Parking — Double Parked Blocking Traffic
2025
2025-12-19311: Blocked Driveway — Partial Access
2025-12-09311: Street Condition — Pothole
2025-11-26Job filed: Mechanical scope associated with a new ADA Restroom at the Booth Theater ground floor. No change of use, egress or occupancy$30,000
2025-11-19311: Homeless Person Assistance — Non-Chronic
2025-11-13Agreement — from NYC DEPARTMENT OF TRANSPORTATION to THE SHUBERT ORGANIZATION INC
2025-11-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-05311: Homeless Person Assistance — Non-Chronic
2025-10-02311: Homeless Person Assistance — Non-Chronic
2025-09-30Permit Mechanical Systems — Signed-off
2025-09-22Job filed: Mechanical scope associated with a new ADA Restroom at the Booth Theater ground floor. No change of use, egress or occupancy$30,000
2025-09-19Permit Antenna — Signed-off
2025-09-15Permit Plumbing — Signed-off
2025-09-15Permit Plumbing — Signed-off
2025-09-15Permit Sprinklers — Signed-off
2025-09-15Permit Sprinklers — Signed-off
2025-09-11Permit General Construction — Signed-off
2025-09-10Job filed: Plumbing and Sprinkler scope associated with a new ADA Restroom at the Booth Theater ground floor. No change of use, egress or occupancy.$16,000
2025-09-09Permit General Construction — Signed-off
2025-09-07311: Taxi Complaint — Driver Complaint - Passenger
2025-09-07311: Homeless Person Assistance — Non-Chronic
2025-09-04Job filed: Architectural scope associated with the renovation of the existing Theater accessory space and installation of a new ADA Restroom at the Booth Theater$45,000
2025-09-02Job filed: Modification to existing Verizon site. Relocate 4 antennas. No change in use, egress, or occupancy.$9,200
2025-08-19FDNY inspection (THEATER)
2025-08-19FDNY inspection (COM_OCPCY)
2025-08-15FDNY inspection (COM_OCPCY)
2025-08-15FDNY inspection (THEATER)
2025-07-21311: Taxi Complaint — Driver Complaint - Non Passenger
2025-07-20311: Illegal Parking — Posted Parking Sign Violation
2025-07-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-07-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-07-20311: Homeless Person Assistance — Non-Chronic
2025-07-20311: Homeless Person Assistance — Non-Chronic
2025-07-16311: Homeless Person Assistance — Non-Chronic
2025-07-13311: Homeless Person Assistance — Non-Chronic
2025-07-11311: Homeless Person Assistance — Non-Chronic
2025-07-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-05-22311: Homeless Person Assistance — Non-Chronic
2025-05-08311: Homeless Person Assistance — Non-Chronic
2025-03-19FDNY inspection (RISK)
2025-03-19FDNY inspection (COM_OCPCY)
2025-03-14311: Homeless Person Assistance
2025-01-30311: Consumer Complaint — Garage or Parking Lot
2024
2024-12-03FDNY inspection (THEATER_SUP)
2024-11-30311: Rodent — Signs of Rodents
2024-11-19Permit Mechanical Systems — Signed-off
2024-11-18Job filed: INSTALLATION OF SPLIT HVAC SYSTEM ON FLOOR 001 AND THE CELLAR WITH A TOTAL CAPACITY OF 2 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$7,000
2024-11-14Rodent inspection: Passed
2024-11-09311: Rodent — Signs of Rodents
2024-11-08FDNY inspection (THEATER_SUP)
2024-08-27FDNY inspection (THEATER)
2024-08-07FDNY inspection (THEATER)
2024-08-07311: Homeless Person Assistance
2024-07-28311: Noise - Residential — Loud Talking
2024-07-28311: Noise - Residential — Loud Talking
2024-07-23311: Homeless Person Assistance
2024-06-28Permit Structural — Signed-off
2024-05-30Job filed: IMPROVE STRUCTURAL ATTACHMENT OF EXISTING BLADE SIGN (IS0014992 CHANGEABLE TEXT) AT THE BOOTH THEATER AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO US$5,000
2024-05-29311: Homeless Person Assistance
2024-05-08311: Noise - Residential — Loud Talking
2024-05-08311: Noise - Residential — Loud Talking
2024-05-07Restaurant inspection: SHUBERT THEATRE — grade A
2024-04-16FDNY inspection (RISK)
2023
2023-11-25311: Found Property — Bag/Wallet
2023-11-23311: Homeless Person Assistance
2023-11-18311: Homeless Person Assistance
2023-11-15FDNY inspection (THEATER)
2023-11-15FDNY inspection (THEATER)
2023-11-01Restaurant inspection: BOOTH THEATRE — grade A
2023-10-30311: Homeless Person Assistance
2023-10-30311: Homeless Person Assistance
2023-10-19311: Homeless Person Assistance
2023-10-18FDNY inspection (THEATER_SUP)
2023-10-18311: Homeless Person Assistance
2023-10-16Permit General Construction — Signed-off
2023-10-06311: Homeless Person Assistance
2023-09-27FDNY inspection (THEATER_SUP)
2023-09-27311: Homeless Person Assistance
2023-09-27311: Homeless Person Assistance
2023-09-26Permit General Construction — Signed-off
2023-09-16311: Homeless Person Assistance
2023-09-13311: Homeless Person Assistance
2023-09-13311: Homeless Person Assistance
2023-09-11311: Homeless Person Assistance
2023-09-10311: Homeless Person Assistance
2023-09-02311: Homeless Person Assistance
2023-09-01311: Homeless Person Assistance
2023-08-14311: Homeless Person Assistance
2023-08-14311: Homeless Person Assistance
2023-08-14311: Homeless Person Assistance
2023-08-08311: Homeless Person Assistance
2023-08-03311: Homeless Person Assistance
2023-08-02311: Homeless Person Assistance
2023-07-30311: Homeless Person Assistance
2023-07-19Permit Mechanical Systems — Signed-off
2023-07-19Job filed: REPLACEMENT OF 2 SPLIT SYSTEMS ON MEZ, BSMT, OSP, AND ROOF WITH A TOTAL CAPACITY OF 5.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$19,500
2023-07-13311: Homeless Person Assistance
2023-07-10311: Homeless Person Assistance
2023-06-08311: Homeless Person Assistance
2023-06-02311: Homeless Person Assistance
2023-05-21311: Homeless Person Assistance
2023-05-18311: Homeless Person Assistance
2023-04-25311: Homeless Person Assistance
2023-04-13311: Homeless Person Assistance
2023-04-11Permit Supported Scaffold — Signed-off
2023-03-30Permit Supported Scaffold — Signed-off
2023-03-30Permit Sidewalk Shed — Signed-off
2023-03-30Job filed: ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2023-03-30Job filed: ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2023-03-30Job filed: Erect, maintain and dismantle sidewalk shed as per plans filed herewith. No change in use, egress or occupancy.$5,000
2023-03-29Permit Sidewalk Shed — Signed-off
2023-03-28Job filed: ERECT, MAINTAIN & DISMANTLE OF SIDEWALK SHED FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.$5,000
2023-02-28Cooling tower inspection
2023-02-28Cooling tower inspection
2023-02-01Restaurant inspection: SHUBERT THEATRE — grade A · mice evidence
2022
2022-12-09Permit Structural — Signed-off
2022-12-05FDNY inspection (THEATER_SUP)
2022-12-03FDNY inspection (THEATER_SUP)
2022-12-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-30Permit Mechanical Systems — Signed-off
2022-11-25Permit Sign — Signed-off
2022-11-18Job filed: ERECT (3) LED SIGNS ON EXISTING MARQUEE WITH CHANGEABLE COPY ACCESSORY TO THEATRE USE$17,828
2022-11-18Job filed: INSTALLATION OF SPLIT SYSTEM ON THE ROOF AND 2ND FLOOR WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$14,000
2022-11-18Job filed: Erect steel angle on existing marquee for sign installation - signs filed under separate application$35,000
2022-11-02FDNY inspection (THEATER)
2022-11-02FDNY inspection (RISK)
2022-10-25Permit Sign — Permit Issued
2022-10-24Permit General Construction — Signed-off
2022-10-14Permit General Construction — Signed-off
2022-10-14Permit Structural — Signed-off
2022-10-07FDNY inspection (THEATER)
2022-10-07Job filed: ERECT (2) LED ACCESSORY BUSINESS PRODUCTION SIGNS ON STRUCTURE FOR THE SHUBERT THEATRE WITH CHANGEABLE COPY$32,040
2022-10-07Job filed: ERECT STRUCTURE SUPPORTING TWO VIDEO SIGNS$25,000
2022-09-27Permit Supported Scaffold — Signed-off
2022-09-27Permit Sidewalk Shed — Signed-off
2022-09-26Permit Protection and Mechanical Methods — Signed-off
2022-09-26Permit Protection and Mechanical Methods — Signed-off
2022-09-21Permit General Construction — Signed-off
2022-08-14311: Homeless Person Assistance
2022-08-04311: Taxi Complaint — Driver Complaint - Passenger
2022-07-31311: Homeless Person Assistance
2022-07-19Permit Sidewalk Shed — Signed-off
2022-07-09311: Taxi Complaint — Driver Complaint - Passenger
2022-07-07Permit Protection and Mechanical Methods — Signed-off
2022-05-10311: Homeless Person Assistance
2022-03-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-03-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-03-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-02-22ECB CLASS - 2 violation: SIDEWALK SHED INFORMATION PANEL NOT PROVIDED.AT THE TIME OF INSPECTIONOF SIDEWALK SHED OBSERVED,SIDEWALK SHED ERECTED IN PLACE AT
2022-02-22ECB CLASS - 2 violation: BC3307.4.6 PROHIBITED SIGNS ON SIDEWALK SHED.AT THE TIME OF INSPECTIONOF SIDEWALK SHED OBSERVED,COMMERCIAL ADVERTISEMENT ON THE SI
2022-02-22DOB complaint, category ?
2022-02-20DOB complaint, category ?
2022-02-19ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT TIME OFINSPECTION APPROX 40' OF SIDEWALK SHED PARAPET FELL APPROX 1$6,250
2022-02-11Permit Supported Scaffold — Signed-off
2022-01-13Cooling tower inspection
2022-01-13Cooling tower inspection
2021
2021-12-20Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLAN$4,500
2021-12-14Permit Protection and Mechanical Methods — Signed-off
2021-12-13Job filed: Temporary Storage of Materials as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy$3,000
2021-12-01FDNY inspection (THEATER_SUP)
2021-11-29FDNY inspection (THEATER_SUP)
2021-10-29311: Homeless Person Assistance
2021-10-13Permit General Construction — Signed-off
2021-10-13Permit General Construction — Signed-off
2021-10-05FDNY inspection (THEATER)
2021-09-30311: Illegal Parking — Posted Parking Sign Violation
2021-09-25311: Noise - Commercial — Loud Music/Party
2021-09-24FDNY inspection (THEATER)
2021-09-14Permit Sidewalk Shed — Signed-off
2021-09-10Job filed: Renewal of existing Broadway show "To Kill a Mockingbird" previously approved under TPA permit#M00127476-I1 and #M00180304-I1. PERFORMANCE SCHEDULE: 1
2021-08-29311: Homeless Person Assistance
2021-08-02Permit Protection and Mechanical Methods — Signed-off
2021-06-29Permit Mechanical Systems — Signed-off
2021-06-29Job filed: UPGRADE HOUSE FAN SYSTEM TO INCLUDE FULL ECONOMIZER SYSTEM. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$78,000
2021-06-23Permit Protection and Mechanical Methods — Signed-off
2021-06-22Job filed: Installation of a temporarily shoring per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occup$13,000
2021-06-21Job filed: Repair, replace, patch facade surfaces as per plans. No change in use, egress, or occupancy under this application.$500,000
2021-06-21Job filed: Filing to repair, replace facade surfaces as needed as per plans. No change in use, egress, or occupancy under this application.$500,000
2021-06-19Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLAN$9,500
2021-05-20Permit Mechanical Systems — Signed-off
2021-05-18Job filed: Herewith in filing packaged unit air conditioning system. No change to use, egress occupancy.$43,000
2021-03-24Asbestos abatement: Removal — Incinia Contracting Inc
2021-01-21311: Homeless Street Condition — N/A
2021-01-21311: Homeless Street Condition — N/A
2021-01-20311: Homeless Street Condition — N/A
2021-01-20311: Homeless Street Condition — N/A
2021-01-11Permit Supported Scaffold — Signed-off
2020
2020-12-19311: HEAT/HOT WATER — ENTIRE BUILDING
2020-12-19Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-11-13311: Homeless Street Condition — N/A
2020-11-13311: Homeless Street Condition — N/A
2020-10-29311: HEAT/HOT WATER — APARTMENT ONLY
2020-10-29311: Homeless Street Condition — N/A
2020-10-29311: Homeless Street Condition — N/A
2020-10-29Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-10-17311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-07DOB violation E:
2020-09-17311: Homeless Street Condition — N/A
2020-09-17311: Homeless Street Condition — N/A
2020-08-18311: Homeless Person Assistance — N/A
2020-07-28Permit EW — ISSUED
2020-07-16Permit Sidewalk Shed — Signed-off
2020-06-23Job filed: IMPROVE ACCESS TO AND IMPROVE ATTACHMENT OF EXISTING BLADE SIGN (IS0014992 CHANGEABLE TEXT) AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE OCCUPANC$1,000
2020-06-23Job filed: IMPROVE ACCESS TO AND IMPROVE ATTACHMENT OF EXISTING BLADE SIGN (IS0014992 CHANGEABLE TEXT) AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE OCCUPANC$1,000
2020-06-22Job filed: IMPROVE ACCESS TO AND IMPROVE ATTACHMENT OF EXISTING BLADE SIGN (IS0014992 CHANGEABLE TEXT) AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE OCCUPANC$1,000
2020-01-22Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLAN$4,500
2020-01-02Permit Supported Scaffold — Signed-off
2019
2019-12-15311: Lost Property — Bag/Wallet
2019-11-26311: Lost Property — Other
2019-09-20DOB violation E:
2019-08-28Permit EW — ISSUED
2019-08-22FDNY inspection (THEATER)
2019-08-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2019-08-06Cooling tower inspection
2019-08-06Cooling tower inspection
2019-06-19Job filed: Renewal of existing Broadway show "To Kill a Mockingbird" previously approved under TPA permit#M00127476-I1. PERFORMANCE SCHEDULE: 07/09/2019- 04/19/2
2019-06-07311: Standing Water — Other - Explain Below
2019-06-04FDNY inspection (RISK)
2019-06-04FDNY inspection (THEATER)
2019-06-03Permit Sidewalk Shed — Signed-off
2019-06-03Permit Supported Scaffold — Signed-off
2019-06-03Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLAN$4,500
2019-06-03Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLAN$9,500
2019-05-15311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2019-05-15ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLD.WALLS OR APPURTENANCES.NOTED:IT WAS OBSERVED AT EXP#1 OF FACADE A PIECE OF MASONRY STUCCO APPROX.10' X 8" $12,500
2019-05-15DOB complaint, category ?
2019-02-12Job filed: "Mockingbird" PERFORMANCE SCHEDULE: Monday: no performance; except 7/01- 7:00pm; Tuesday: 7:00pm; except 5/14- no performance;Wednesday: 1:00pm & 7:00
2018
2018-12-13Permit EW — ISSUED
2018-12-12311: Taxi Complaint — Driver Complaint
2018-12-04Job filed: APPLICATION IS FILED FOR NEW 3-TON SPLIT HEAT-PUMP SYSTEM INSTALLATION FOR A SECURITY LOCKER ROOM SPACE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO$20,000
2018-11-21FDNY inspection (THEATER_SUP)
2018-11-20FDNY inspection (THEATER_SUP)
2018-10-30Permit EW — ISSUED
2018-10-30Job filed: APPLICATION IS FILED FOR A SEATING PLATFORM INSTALLATION AND APRON MODIFICATION FOR THE RUN OF BROADWAY PRODUCTION SHOW "TO KILL A MOCKINGBIRD" AS SHO$14,000
2018-10-30Job filed: APPLICATION IS FILED FOR A SEATING PLATFORM INSTALLATION AND APRON MODIFICATION FOR THE RUN OF BROADWAY PRODUCTION SHOW 'TO KILL A MOCKINGBIRD' AS SHO$14,000
2018-10-26311: Sidewalk Condition — Broken Sidewalk
2018-09-28Job filed: MAINTENANCE AND IN KIND REPLACEMENT OF CHANNEL LETTER SIGN STRUCTURE(IS6300635 CHANGEABLE TEXT)- AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EG$31,000
2018-08-19311: Illegal Parking — Blocked Hydrant
2018-08-13FDNY inspection (RISK)
2018-08-13FDNY inspection (THEATER)
2018-08-09FDNY inspection (RISK)
2018-08-09FDNY inspection (THEATER)
2018-07-25Cooling tower inspection
2018-07-25Cooling tower inspection — violation AH8S
2018-07-25311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2018-07-18Permit EW — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-06Job filed: NO WORK APPLICATION FOR SEATING PLAN SUBMISSION AT ORCHESTRA, BALCONY AND MEZZANINE UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE AS PER THE DOB'S $3,000
2018-06-26Job filed: FILING TO RENOVATE 3RD FLOOR OFFICE SPACE. WORK INCLUDES DOORS, PARTITIONS, AND CREATE CLOSETS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGR$35,000
2018-04-27Job filed: IMPROVE ACCESS TO AND IMPROVE ATTACHMENT OF EXISTING BLADE SIGN (IS0014992 CHANGEABLE TEXT) AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE OCCUPANC$45,000
2018-03-29311: Street Sign - Missing — St Name - Attached to Pole
2018-03-29311: Street Sign - Missing — St Name - Attached to Pole
2017
2017-12-15311: Taxi Complaint — Driver Complaint
2017-12-14311: Taxi Report — Driver Report
2017-11-20FDNY inspection (THEATER_SUP)
2017-11-19FDNY inspection (THEATER_SUP)
2017-10-18Permit AL — ISSUED
2017-09-14FDNY inspection (RISK)
2017-09-12FDNY inspection (THEATER)
2017-08-22Cooling tower inspection — violation AH8T
2017-08-22Cooling tower inspection — violation AH8X
2017-08-22Cooling tower inspection — violation AH8W
2017-08-22Cooling tower inspection — violation AH8D
2017-08-22Cooling tower inspection — violation AH8U
2017-08-22Cooling tower inspection — violation AH8S
2017-08-22Cooling tower inspection — violation AH8E
2017-08-22Cooling tower inspection — violation AH8C
2017-08-16Permit EW — ISSUED
2017-08-15Job filed: DISCONNECTION AND REMOVAL OF MECHANICAL EQUIPMENT IN THE MECHANICAL PUMP ROOM IN THE CELLAR OF THE THEATER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$80,000
2017-06-29311: Consumer Complaint — Damaged Vehicle
2017-03-27Permit EW — ISSUED
2017-03-17Job filed: APPLICATION IS FILED FOR THE STAGE APRON EXTENSION AND SEATING PLATFORMS INSTALLATION FOR THE RUN OF BROADWAY PRODUCTION SHOW 'HELLO DOLLY' AS SHOWN O$53,000
2017-03-17Job filed: APPLICATION IS FILED FOR THE STAGE APRON EXTENSION AND SEATING PLATFORMS INSTALLATION FOR THE RUN OF BROADWAY PRODUCTION SHOW 'HELLO DOLLY' AS SHOWN O$53,000
2017-03-17Job filed: APPLICATION IS FILED FOR THE STAGE APRON EXTENSION AND SEATING PLATFORMS INSTALLATION FOR THE RUN OF BROADWAY PRODUCTION SHOW "HELLO DOLLY" AS SHOWN O$53,000
2017-03-10FDNY inspection (THEATER)
2017-02-16DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016
2016
2016-12-29Permit EW — ISSUED
2016-12-29Job filed: NO WORK APPLICATION FOR SEATING PLAN SUBMISSION UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE IN COMPLIANCE WITH 27-528 CODE SECTION. NO CHANGE TO $3,000
2016-12-29Job filed: NO WORK APPLICATION FOR SEATING PLAN SUBMISSION UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE IN COMPLIANCE WITH 27-528 CODE SECTION. NO CHANGE TO $3,000
2016-12-22Permit EW — ISSUED
2016-12-21FDNY inspection (THEATER_SUP)
2016-12-21FDNY inspection (THEATER)
2016-12-21FDNY inspection (THEATER_SUP)
2016-12-21FDNY inspection (RISK)
2016-12-03FDNY inspection (THEATER_SUP)
2016-09-12DOB violation E:
2016-08-07311: Homeless Person Assistance — N/A
2016-06-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2016-04-05Permit EW — ISSUED
2016-04-04Agreement — from NYC DEPARTMENT OF TRANSPORTATION to THE SHUBERT ORGANIZATION INC
2016-03-02Permit EW — ISSUED
2016-02-19Permit EW — ISSUED
2016-02-19Permit EW — ISSUED
2016-02-19Permit EW — ISSUED
2016-02-19Permit EW — ISSUED
2016-02-05FDNY inspection (THEATER)
2016-02-03Job filed: CENTRAL CHILLER PLANT REPLACEMENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2016-02-03Job filed: CENTRAL CHILLER PLANT REPLACEMENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$400,000
2016-02-03Job filed: STRUCTURAL WORK ASSOCIATED WITH CENTRAL CHILLER PLANT REPLACEMENT ON THE ROOF AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TOP USE, EGRESS OR OCCUPANCY$28,000
2016-02-03Job filed: CENTRAL CHILLER PLANT REPLACEMENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$100,000
2016-02-03Job filed: STRUCTURAL WORK ASSOCIATED WITH CENTRAL CHILLER PLANT REPLACEMENT ON THE ROOF AS SHOWN ON PLANES FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$112,000
2016-02-03Job filed: STRUCTURAL WORK ASSOCIATED WITH CENTRAL CHILLER PLANT REPLACEMENT ON THE ROOF AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TOP USE, EGRESS OR OCCUPANCY$28,000
2016-01-19Job filed: REPLACEMENT OF FASCIA ON THE EXISTING MARQUEE STRUCTURE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$182,000
2015
2015-11-01FDNY inspection (THEATER)
2015-10-14FDNY inspection (THEATER_SUP)
2015-10-14FDNY inspection (THEATER_SUP)
2015-09-03Permit AL — ISSUED
2015-07-14FDNY inspection (RISK)
2015-07-14FDNY inspection (THEATER)
2015-02-27311: Street Condition — Pothole
2015-02-25Permit AL — ISSUED
2015-02-13311: Street Condition — Rough, Pitted or Cracked Roads
2015-02-03Permit EW — ISSUED
2014
2014-09-24DOB violation E:
2014-08-08311: Street Condition — Pothole
2014-08-05FDNY inspection (THEATER)
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-07Permit EW — ISSUED
2014-05-07Permit EW — ISSUED
2014-05-05Job filed: APPLICATION IS FILED FOR CONNECTION TO THE EXISTING FIRE SERVICE & SD PIPING IN THE THEATRE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EG$45,000
2014-05-05Job filed: APPLICATION IS FILED FOR LOWER LOUNGE EXPANSION AT THE SHOENFELD THEATRE AND TO CREATE A NEW OPENING BETWEEN THE THEATRES AS SHOWN ON PLANS FILED HERE$65,000
2014-05-05Job filed: STRUCTURAL WORK ASSOCIATED WITH THE LOUNGE EXTENSION FOR THE SCHOENFELD THEATRE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANC$70,000
2014-04-09CERT — from FIDELITY NATIONAL TITLE INSURANCE COMPAN
2014-04-09SAGE — from SHUBERT AND BOOTH THEATRE, LLC
2014-04-09SMIS $4,210,640 — from SHUBERT AND BOOTH THEATRE, LLC to 701 SEVENTH PROPERTY OWNER LLC$4,210,640
2014-04-03Job filed: ADDITIONS TO EXISTING INTERIOR FIRE ALARM SYSTEM.$5,000
2014-04-03Job filed: ADDITIONS TO EXISTING INTERIOR FIRE ALARM SYSTEM.$5,000
2014-03-27FDNY inspection (THEATER)
2014-03-25311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2014-03-25DOB complaint, category ?
2014-03-14Rodent inspection: Passed
2014-02-18311: Street Condition — Pothole
2013
2013-10-22Permit EQ — ISSUED
2013-10-21Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMP
2013-09-20Permit AL — ISSUED
2013-08-21Permit EW — ISSUED
2013-08-20Permit EQ — ISSUED
2013-08-20Job filed: REPAIRS TO THE EXTERIOR WALL AT THE PROSCENIUM WALL LEVEL OF THE BOOTH THEATRE.NO CHANGE IN USE EGRESS OR OCCUPANCY.$8,000
2013-08-19Job filed: INSTALLATION OF A ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH
2013-08-01Permit EQ — ISSUED
2013-08-01Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 110' LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANC
2013-07-16Job filed: INSTALLING NEW ANTENNAS AND REPLACE TELECOMMUNICATIONS ANTENNAS ON THE ROOF.ALL IN CONFORMANCE WITH TPPN# 5/98.NO CHANGE IN USE,EGRESS OR OCCUPANCY.$9,600
2013-07-16Job filed: INSTALLING NEW ANTENNAS AND REPLACE TELECOMMUNICATIONS ANTENNAS ON THE ROOF.ALL IN CONFORMANCE WITH TPPN# 5/98.NO CHANGE IN USE,EGRESS OR OCCUPANCY.$9,600
2013-07-16Job filed: INSTALLING NEW ANTENNAS AND REPLACE TELECOMMUNICATIONS ANTENNAS ON THE ROOF.ALL IN CONFORMANCE WITH TPPN# 5/98.NO CHANGE IN USE,EGRESS OR OCCUPANCY.$9,600
2013-06-01311: Noise — Noise: Private Carting Noise (NQ1)
2013-03-29Permit EW — ISSUED
2013-03-28Permit PL — ISSUED
2013-03-14Permit EW — ISSUED
2013-02-19Job filed: APPLICATION IS FILED FOR THE INSTALLATION OF SCENIC ELEMENTS AT THE PROSCENIUM OPENING FOR THE RUN OF BROADWAY PRODUCTION SHOW 'MATILDA' AS SHOWN ON P$250,000
2013-02-19Job filed: APPLICATION IS FILED FOR THE INSTALLATION OF SCENIC ELEMENTS AT THE PROSCENIUM OPENING FOR THE RUN OF BROADWAY PRODUCTION SHOW "MATILDA" AS SHOWN ON P$250,000
2013-02-05311: Damaged Tree — Branch Cracked and Will Fall
2012
2012-12-19Permit PL — ISSUED
2012-12-03Job filed: MECHANICAL WORK ASSOCIATED WITH THE LOUNGE RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$7,500
2012-11-27Rodent inspection: Passed
2012-11-19Permit PL — ISSUED
2012-11-16Permit EW — ISSUED
2012-11-16Permit EW — ISSUED
2012-11-16Job filed: PLUMBING WORK ASSOCIATED WITH LOUNGE RENOVATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$57,500
2012-11-16Job filed: APPLICATION IS FILED FOR INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$125,000
2012-11-08Job filed: DIRECTIVE 2 APPLICATION IS FILED FOR RUN-OF-SHOW CHANGES TO THE SEATING LAYOUT TO ACCOMMODATE THE NEW BROADWAY SHOW MATILDA. NO CHANGES TO USE OR OCCU$10,000
2012-10-12Permit EW — ISSUED
2012-10-05Job filed: APPLICATION IS FILED FOR INTERIOR REMOVALS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$50,000
2012-10-05Job filed: APPLICATION IS FILED FOR REMOVAL OF PLUMBING FIXTURES AND ASSOCIATED PIPING AS SHOWN ON PLAN FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$20,000
2012-09-17Permit PL — ISSUED
2012-09-03311: Asbestos — Asbestos Complaint (B1)
2012-07-20311: Street Condition — Pothole
2012-06-14Permit EW — ISSUED
2012-05-29Job filed: MODIFY FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE EGRESS OR OCCUPANCY.$3,000
2012-05-29Job filed: MODIFY FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE EGRESS OR OCCUPANCY.$3,000
2012-02-29DEVR $5,420,500 — from SHUBERT AND BOOTH THEATRE, LLC to 237 WEST 54 OWNER, L.L.C.$5,420,500
2012-02-29SMIS — from SHUBERT AND BOOTH THEATRE, LLC
2012-02-29CERT — from ROYAL ABSTRACT OF NEW YORK LLC
2012-01-27311: Street Condition — Defective Hardware
2012-01-24DOB complaint, category ?
2012-01-04DOB complaint, category ?
2012-01-03DOB complaint, category ?
2011
2011-12-12DOB complaint, category ?
2011-07-28Rodent inspection: Passed
2011-07-22Permit PL — ISSUED
2011-07-21Permit EW — ISSUED
2011-07-20Job filed: REPLACEMENT OF PLUMBING FIXTURES IN RESTROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2011-07-20Job filed: REPLACEMENT OF PLUMBING FIXTURES IN RESTROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$60,000
2011-07-20Job filed: REPLACEMENT OF THE DOORS AND MODIFICATION OF AN EXISTING SEATING LAYOUT AT THE ORCHESTRA LEVEL AS PER PLANS FILED HEREWITH.THIS IS A DIRECTIVE 2 APPLI$217,000
2011-07-20Job filed: REPLACEMENT OF THE DOORS AND MODIFICATION OF AN EXISTING SEATING LAYOUT AT THE ORCHESTRA LEVEL AS PER PLANS FILED HEREWITH.THIS IS A DIRECTIVE 2 APPLI$217,000
2011-05-26Permit EW — ISSUED
2011-05-26Permit EW — ISSUED
2011-05-26Permit EQ — ISSUED
2011-05-20Job filed: REMOVAL AND DISPOSAL OF EXIT DOORS, NON STRUCTURAL PARTITIONS,AND PLUMBING FIXTURES IN PUBLIC RESTROOMS. ERECTION OF CONSTRUCTION FENCE. NEW DOOR WORK$12,500
2011-05-09Job filed: REPLACE TWO 3-TON SPLIT AIR CONDITIONING UNITS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO OCCUPANCY,USE OR EGRESS.$60,000
2011-05-06Permit EW — ISSUED
2011-04-28Permit EQ — ISSUED
2011-04-27Job filed: INSTALLATION OF A PLYWOOD FENCE 8' HIGH AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHA
2011-03-01311: Food Establishment — Food Protection
2010
2010-12-06Permit AL — ISSUED
2010-11-01Job filed: INSTALL TELECOMMUNICATIONS CABINET ON EXISTING ROOFTOP DUNNAGE IN CONFORMANCE WITH TPPN# 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2010-11-01Job filed: INSTALL TELECOMMUNICATIONS CABINET ON EXISTING ROOFTOP DUNNAGE IN CONFORMANCE WITH TPPN# 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2010-09-09311: Noise - Street/Sidewalk — Loud Music/Party
2010-07-23Job filed: REPLACEMENT OF FACP AND FIRE ALARM DEVICES SMOKE DETECTORS PULL STATIONS, WATERFLOW$5,000
2010-07-23Job filed: REPLACEMENT OF FACP AND FIRE ALARM DEVICES SMOKE DETECTORS PULL STATIONS, WATERFLOW$5,000
2010-04-17311: Taxi Complaint — Driver Complaint
2010-01-20ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES DEFECTS NOTED BROKENDEFECTIVE DISLODGED CRACKED PARAPET WALL @ SW SECTION ABOVE $1,000
2010-01-20ECB CLASS - 1 violation: FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER ; USE OF PROHIBITED HARDWARE PER BC 1008.1.8! PROHIBITED HARDWARE NOTED: @ THEAT
2010-01-19DOB complaint, category ?
2009
2009-09-15Permit EW — ISSUED
2009-08-25Job filed: INSTALLATION OF NEW WINDOW, AND FILL-IN OF EXISTING WINDOW OPENINGS, ALL AT SE COND FLOOR. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$16,000
2009-06-11Permit EW — ISSUED
2009-06-11Permit EW — ISSUED
2009-05-22Permit EW — ISSUED
2009-05-15Job filed: RELATED STRUCTURAL WORK$60,000
2009-05-15Job filed: MODIFICATION TO EXISTING DUCTWORK TO SERVICE NEWLY-CONFIGURED OFFICE SPACE ON THE 3RD FLOOR$8,000
2009-05-15Job filed: MODIFICATION TO EXISTING DUCTWORK TO SERVICE NEWLY-CONFIGURED OFFICE SPACE ON THE 3RD FLOOR$8,000
2009-05-15Job filed: RENOVATION OF OFFICE SPACESS AT 3RD FLOOR RELOCATION OD SKYLITH AT ROOF NO CHA NGE IN USE OCCUPANCY OR EGRESS$138,000
2009-04-30Permit EW — ISSUED
2009-04-29Job filed: REMOVAL OF EXISTING ROOF TOP EQUIPMENT TO BE REPLACED BY NEW SPLIT SYSTEMS TO SERVICE SECOND FLOOR OFFICES$65,000
2009-04-29Job filed: REMOVAL OF EXISTING ROOF TOP EQUIPMENT TO BE REPLACED BY NEW SPLIT SYSTEMS TO SERVICE SECOND FLOOR OFFICES$65,000
2008
2008-05-22DEVR $33,310,560 — from SHUBERT AND BOOTH THEATER, LLC to GLADDEN PROPERTIES LLC$33,310,560
2008-05-22SAGE — from SHUBERT AND BOOTH THEATER, LLC
2008-05-22SAGE — from SHUBERT AND BOOTH THEATER, LLC
2007
2007-10-29Permit EQ — RE-ISSUED
2007-10-25Permit EQ — ISSUED
2007-10-18Job filed: INSTALLATION OF 2 SECTIONS OF SCAFFOLD 18' LONG X 55' ON TOP OF THE SIDEWALK SHED DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2007-10-18Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 36' DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2007-02-28DOB violation E:
2007-01-29Deed — from THE SHUBERT ORGANIZATION, INC to SHUBERT AND BOOTH THEATRE, LLC
2006
2006-11-02Permit AL — ISSUED
2006-10-27Permit AL — ISSUED
2006-08-01Job filed: INSTALLING TELECOMMUNICATIONS CABINETSON STEEL PLATFORMS WITH RELATED DUNNAGE AND ANTENNAS ON ROOF.ALL IN CONFORMANCE WITH TPPN#5/98. NO CHANGE IN USE$25,000
2006-02-02Permit SG — ISSUED
2006-02-02Permit SG — ISSUED
2005
2005-09-17DOB complaint, category ?
2005-05-27Agreement — from NYCDOT DIV. OF FRANCHISES, CONCESSIONS, to THE SHUBERT ORGANIZATION, INC.
2005-05-11DOB violation E:
2005-04-13Permit EW — ISSUED
2005-04-08Job filed: Construct temporary proscenium towers for production of Spamalot as per plans. No change to use, egress or occupancy.$49,000
2005-04-08Job filed: Construct temporary proscenium towers for production of Spamalot as per plans. No change to use, egress or occupancy.$49,000
2004
2004-06-09Permit EW — ISSUED
2004-03-16Job filed: REPAVING OF SHUBERT ALLEY AND REPLACEMEN T OF ACCESS HATCHES. WORK ON SI EWALK OUTSIDE OF THE BUILDING LINE WILL BE FILED WITH D.O.T$30,000
2004-03-16Job filed: REPAVING OF SHUBERT ALLEY AND REPLACEMEN T OF ACCESS HATCHES. WORK ON SI EWALK OUTSIDE OF THE BUILDING LINE WILL BE FILED WITH D.O.T$30,000
2003
2003-04-29Permit EW — ISSUED
2002
2002-08-01Permit EW — ISSUED
2002-07-17Job filed: Modify thresholds and egress courts at specific emergency egress doors to make them accessible for people in wheelchairs, per noted drawings. No chang$40,000
2001
2001-08-07Permit EW — ISSUED
2001-07-16Job filed: NO WORK TO BE PERFORMED UNDER THIS APPLICATION THIS APPLICATION IS FOR THE REPLACEMENT OF AN EQUIPMENT USE PERMIT WHICH HAS BEEN LOST DEPARTMENT RECOR$100
2001-07-16Job filed: NO WORK TO BE PERFORMED UNDER THIS APPLICATION THIS APPLICATION IS FOR THE REPLACEMENT OF AN EQUIPMENT USE PERMIT WHICH HAS BEEN LOST DEPARTMENT RECOR$100
2001-07-16Job filed: NO WORK TO BE PERFORMED UNDER THIS APPLICATION THIS APPLICATION IS FOR THE REPLACEMENT OF AN EQUIPMENT USE PERMIT WHICH HAS BEEN LOST DEPARTMENT RECOR$100
2000
2000-12-07Permit EW — ISSUED
2000-11-03Job filed: ZNSTALLATION OF CEILING-HUNG TRUSS FOR SHOW'S SOUND/LIGHGT EQUIPMENT$2,500
2000-11-03Job filed: ZNSTALLATION OF CEILING-HUNG TRUSS FOR SHOW'S SOUND/LIGHGT EQUIPMENT$2,500
2000-08-30DOB violation E: 1P6820
2000-03-09Permit EW — ISSUED
2000-03-02Job filed: Installation of five wheelchair-accessible viewing locations at five different sites on the orchestra level and a designated companion seat immediatel$10,000
2000-03-02Job filed: Installation of five wheelchair-accessible viewing locations at five different sites on the orchestra level and a designated companion seat immediatel$10,000
1999
1999-01-11Permit EW — ISSUED
1998
1998-09-23Permit PL — ISSUED
1998-07-08Permit EW — ISSUED
1998-07-08Permit EW — ISSUED
1997
1997-01-10DOB violation ES:
1997-01-08DOB violation ES:
1996
1996-07-16Permit EW — ISSUED
1996-07-16Permit EW — ISSUED
1996-06-06DOB complaint, category ?
1996-03-14Permit EW — ISSUED
1996-03-14Permit EW — ISSUED
1996-03-14Permit EW — ISSUED
1994
1994-12-21Permit EW — ISSUED
1991
1991-11-01Permit EW — ISSUED
1991-10-30Permit PL — ISSUED
1991-10-25Permit EW — ISSUED
1991-10-24Permit PL — ISSUED
1991-10-16Permit EW — ISSUED
1991-10-16Permit EW — ISSUED
1991-09-12Permit EW — ISSUED
1991-06-27Permit EW — ISSUED
1990
1990-09-05Permit EW — ISSUED
1990-09-05Permit EW — ISSUED
1990-09-05Permit EW — ISSUED
1990-08-31Permit PL — ISSUED
1990-08-31Permit PL — ISSUED
1989
1989-06-07DOB violation E: (47)REMOVE OIL FROM FLOOR-PROVIDE LIGHT (51)PROVIDE ACCESS TO OVERHEAD
1989-05-25LDMK — from LANDMARKS PRESERV/CMMSSN to CITY OF NEW YORK
1988
1988-10-20DOB violation E: 51)RESHACKLE HACKLE HOIST CABLES DATE AND TAG 52)RENEW BRATE LINING'S
1987
1987-11-04DOB violation E:

Support this site Back to the building page