243 West 52 Street · Manhattan · BBL 1010240007
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
48 service requests in the last three years. Most common: Noise (24) · Illegal Parking (10) · Food Establishment (3) · Consumer Complaint (2) · Taxi Complaint (2) · Obstruction (2).
Filed construction activity
$12,263,674 in permitted construction work filed since
2016 (36 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$6,477,000
$2,914,650
2026
$6,622,000
$2,979,900
2027
$6,780,000
$3,051,000
The city's market estimate has risen
5% between tax years 2025 and 2027.
3 Food Establishment complaints to 311 at this address in the last three years (most often: Food Temperature, Letter Grading, No Permit or License) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2018 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
50 St — C E · 400 ft straight-line (about a 2-minute walk) · station accessibility: partial (Downtown only) 7 Av — B D E · 450 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: 8 Av / W 52 St — M20 M104 · 250 ft
Citi Bike
8 Ave & W 52 St · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
48 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $95,723,710 on
2019-10-01 (lender: Capital One, National Association), covering 5 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2023-07-19
RPTT $308,400,000 — from JEFFERSON JV CO LP to JUJAMCYN MIDCO, LLC
$308,400,000
2019-10-01
Mortgage $95,723,711 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$95,723,711
2019-10-01
AL&R $2,999,999 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$2,999,999
2019-10-01
AL&R $200,000,000 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$200,000,000
2019-10-01
Agreement $200,000,000 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$200,000,000
2019-10-01
AL&R $2,999,999 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$2,999,999
2013-01-23
RPTT&RET $115,057,065 — from JUJAMCYN INVESTMENTS LLC to JUJAMYCN THEATERS LLC
$115,057,065
2013-01-11
SPRD $115,000,000 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$115,000,000
2013-01-11
Mortgage $102,545,275 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$102,545,275
2013-01-11
Mortgage $2,999,999 — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
$2,999,999
2009-05-22
Agreement $15,000,000 — from JUJAMCYN THEATERS LLC to THE SHUBERT ORGANIZATION, INC.
$15,000,000
2009-05-22
Mortgage $3,500,017 to THE SHUBERT ORGANIZATION, INC.
$3,500,017
2009-05-22
Mortgage $3,000,000 — from JUJAMCYN THEATERS LLC to THE SHUBERT ORGANIZATION, INC.
$3,000,000
2005-04-05
Mortgage $3,000,000 — from JUJAMCYN THEATERS LLC to U.S. BANK NATIONAL ASSOCIATION
$3,000,000
2005-04-05
Mortgage $20,000,000 — from JUJAMCYN THEATERS LLC to U.S. BANK NATIONAL ASSOCIATION
$20,000,000
Ten-year activity
50250
2017
2018
2019
2020
2021
2022
2023
46
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
4
3
0
1
8
2018
2
4
2
0
1
9
2019
4
3
6
5
2
20
2020
0
0
1
0
1
2
2021
2
6
3
0
1
12
2022
2
2
5
0
2
11
2023
20
2
4
7
3
36
2024
29
2
11
0
4
46
2025
19
2
20
0
2
43
2026
1
2
16
0
1
20
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-11-28Permit General Construction — Signed-off
2025-11-24Job filed: Mechanical scope associated with the August Wilson Theater renovation and restoration. No change of use, egress or occupancy.$64,788
2025-11-21Permit General Construction — Signed-off
2025-11-20Job filed: Structural and Foundation work associated with August Wilson Theater interior renovation. No change of use, egress or occupancy.$276,000
2025-11-18Job filed: Architectural scope associated with the August Wilson Theater renovation and restoration. No change of use, egress or occupancy.$2,176,886
2025-11-04Elevator permit: Remove #1W0999170 Vertical platform lift and permanently discontinued as detailed in the attached drawings. All work will comply w$2,500
2025-10-24Permit General Construction — Signed-off
2025-10-16311: Homeless Person Assistance — Non-Chronic
2025-10-16Permit General Construction — Signed-off
2025-03-13Job filed: Broadway show "The Cabaret" at August Wilson Theater. The performance schedule for 4/01/2025-3/31/2026: Monday-no performances. Tuesday- 7 pm. Wednesd
2024-11-19Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS
2024-11-14FDNY inspection (THEATER_SUP)
2024-10-30311: Noise - Vehicle — Engine Idling
2024-10-20311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2024-10-19311: Food Establishment — Food Temperature
2024-10-09311: Food Establishment — Letter Grading
2024-09-18Permit General Construction — Signed-off
2024-08-29Job filed: Mechanical scope associated with the renovation of the Theater ancillary spaces on the 002 and 003 floors. No change of use, egress, or occupancy.$255,000
2024-08-27Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 245 WEST 52ND STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY U$20,000
2024-08-23Job filed: FACADE REPAIRS PROJECT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,000
2024-08-13Job filed: Roofing System Replacement project. No change in use, egress or occupancy.$500,000
2024-07-30Job filed: INSTALLATION OF NEW SIDEWALK SHED AT 245 WEST 52ND STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY U$20,000
2024-07-30Job filed: INSTALLATION OF PIPE SCAFFOLD AT 245 WEST 52ND STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER$20,000
2024-07-30Permit Supported Scaffold — Signed-off
2024-05-21Job filed: Structural scope details associated with the cold-form steel framing installations at Orchestra level in connection with "Cabaret" TPA for the run of $1,000
2024-04-09Permit General Construction — Signed-off
2024-04-01Job filed: FILING FOR INSTALL OF TEMP MODULAR TENT AS PER PLANS SUBMITTED HEREWITH.$5,000
2024-03-28FDNY inspection (THEATER)
2024-03-19Job filed: Plumbing scope associated with the "Cabaret" TPA for the run of the Broadway show. Will be restored to existing conditions. No change of use, egress o$50,000
2024-03-18Job filed: Architectural scope associated with the construction of temp. seating & performance platforms, stairs, ramps, doors, and partitions in connection with$1,800,000
2024-03-12Boiler inspection
2024-03-04Job filed: Broadway show "The Cabaret" at August Wilson Theater. The performance schedule for 4/01/24-3/31/25: Monday-no performances. Tuesday- 7 pm. Wednesday-
2024-03-04Job filed: Structural scope associated with the construction of temporary seating & performance platforms in connection with "Cabaret" TPA for the run of the Bro$1,400,000
2024-03-01Job filed: Foundation scope associated with the construction of temporary seating & performance platforms in connection with "Cabaret" TPA for the run of the Bro$75,000
2024-03-01Job filed: Structural scope associated with the renovation of the Theater ancillary spaces on the 002, 003, and 004 floors, including new door openings, as well $120,000
2024-03-01Permit General Construction — Signed-off
2024-02-21Job filed: Interior renovation of the August Wilson Theater accessory spaces on the 002 and 003 floors. No change of use, egress or occupancy.$361,000
2024-02-12Job filed: Broadway show "The Cabaret" at August Wilson Theater. The performance schedule for 4/01/24-3/31/25: Monday-no performances. Tuesday- 7 pm. Wednesday-
2024-01-17Permit Plumbing — Signed-off
2024-01-16Permit Structural — Signed-off
2024-01-16Permit Mechanical Systems — Signed-off
2024-01-10Job filed: Interior renovation of the August Wilson Theater accessory spaces on the 002 and 003 floors. No change of use, egress or occupancy.$361,000
2024-01-10Job filed: Plumbing scope associated with the renovation of the Theater ancillary spaces on the 002 and 003 floors. No change of use, egress or occupancy.$262,000
2024-01-10Job filed: Structural scope associated with the renovation of the Theater ancillary spaces on the 002, 003, and 004 floors, including new door openings, as well $120,000
2024-01-10Job filed: Mechanical scope associated with the renovation of the Theater ancillary spaces on the 002 and 003 floors. No change of use, egress, or occupancy.$255,000
2024-01-02Permit Structural — Signed-off
2023
2023-12-27Job filed: Structural scope details associated with the cold-form steel framing installations at Orchestra level in connection with "Cabaret" TPA for the run of $1,000
2023-12-21Elevator permit: Furnish and Install 1 Vertical Platform Lift as detailed in the attached drawings. All work will comply with ASME A18.1-2017,Secti$24,168
2023-12-20Permit Structural — Signed-off
2023-12-08Permit Plumbing — Signed-off
2023-12-05Permit General Construction — Signed-off
2023-12-05Permit Mechanical Systems — Signed-off
2023-12-05Job filed: Structural scope associated with the construction of temporary seating & performance platforms in connection with "Cabaret" TPA for the run of the Bro$1,400,000
2023-12-05Permit Foundation — Signed-off
2023-11-29Job filed: Plumbing scope associated with the "Cabaret" TPA for the run of the Broadway show. Will be restored to existing conditions. No change of use, egress o$50,000
2023-11-29Job filed: Foundation scope associated with the construction of temporary seating & performance platforms in connection with "Cabaret" TPA for the run of the Bro$75,000
2023-11-29Job filed: Mechanical scope associated with the "Cabaret" TPA for the run of the Broadway show. Will be restored to existing conditions. No change of use, egress$75,000
2023-11-28Job filed: Broadway show "The Cabaret" at August Wilson Theater. The performance schedule for 4/01/24-3/31/25: Monday-no performances. Tuesday- 7 pm. Wednesday-
2023-11-28Job filed: new changeable copy sign, 3M scotchcal graphic film on west wall as shown on plans filed herewith. no change to use, egress, or occupancy$7,500
2023-11-28Job filed: Architectural scope associated with the construction of temp. seating & performance platforms, stairs, ramps, doors, and partitions in connection with$1,800,000
2023-11-06Asbestos abatement: Removal — New York Insulation, Inc.
2023-10-29FDNY inspection (THEATER_SUP)
2023-10-29311: Consumer Complaint — Pedicab
2023-10-07311: Taxi Complaint — Driver Complaint - Non Passenger
2023-10-06311: Homeless Person Assistance
2023-08-14Job filed: Broadway show "The Cabaret" at August Wilson Theater. The performance schedule for 4/01/24-3/31/25: Monday-no performances. Tuesday- 7 pm. Wednesday-
2023-07-27Boiler inspection
2023-07-19RPTT $308,400,000 — from JEFFERSON JV CO LP to JUJAMCYN MIDCO, LLC$308,400,000
2023-07-03FDNY inspection (THEATER)
2023-06-29Permit Sign — Signed-off
2023-06-21RPTT&RET — from JR30 LLC to NH JEFFERSON HOLDCO LLC
2023-06-12TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to JUJAMCYN THEATERS LLC
2023-06-12Mortgage satisfied — from JUJAMCYN THEATERS LLC to CAPITAL ONE, NATIONAL ASSOCIATION
2023-06-12Mortgage satisfied — from CAPITAL ONE, NATIONAL ASSOCIATION; JUJAMCYN THEATERS LLC to U.S. BANK NATIONAL ASSOCIATION.
2023-06-12TL&R — from CAPITAL ONE, NATIONAL ASSOCIATION to JUJAMCYN THEATERS LLC
2023-05-16Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2023-04-06Permit Supported Scaffold — Signed-off
2023-04-06Permit Sidewalk Shed — Signed-off
2023-04-06Job filed: PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCC$1,000
2023-04-06Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2023-03-12311: Street Sign - Damaged — No Parking, Standing, Stopping
2023-01-20RPTT&RET — from JR30 LLC to JEFFERSON JVCO LP
2022
2022-12-02FDNY inspection (THEATER_SUP)
2022-11-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-08311: Illegal Parking — Blocked Bike Lane
2022-11-01Boiler inspection
2022-10-05311: Consumer Complaint — Ticket Broker
2022-09-29Boiler inspection — defects found
2022-09-05Job filed: new changeable copy sign, 3M scotchcal graphic film on west wall as shown on plans filed herewith. no change to use, egress, or occupancy$7,500
2022-04-06Job filed: NO WORK APPLICATION SHOWING ADA VIEWING POSITIONS IN THE THEATRE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY$1,000
2022-03-25FDNY inspection (THEATER)
2021
2021-12-26FDNY inspection (THEATER_SUP)
2021-12-20Permit General Construction — Signed-off
2021-11-03Job filed: NO WORK APPLICATION SHOWING ADA VIEWING POSITIONS IN THE THEATRE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY$1,000
2015-05-13Job filed: INSTALLATION OF PARTY WALL BRACING AS PER PLANS FILED HEREWITH. THIS APPLICATION IS IN CONJUNCTION WITH THE FULL DEMOLITION AT THE ADJACENT PROPERTY, $50,000
2015-05-13Job filed: INSTALLATION OF PARTY WALL BRACING AS PER PLANS FILED HEREWITH. THIS APPLICATION IS IN CONJUNCTION WITH THE FULL DEMOLITION AT THE ADJACENT PROPERTY, $50,000
2015-01-29FDNY inspection (THEATER)
2014
2014-11-19FDNY inspection (SPECIAL-OTH)
2014-10-21ZONE — from ROSELAND DEVELOPMENT ASSOCIATES LLC
2010-05-16311: Derelict Vehicle — With License Plate
2010-04-17311: Broken Muni Meter — No Receipt
2010-01-16311: Broken Muni Meter — No Receipt
2009
2009-05-22Mortgage satisfied — from JUJAMCYN THEATERS LLC to U.S. BANK NATIONAL ASSOCIATION
2009-05-22Agreement $15,000,000 — from JUJAMCYN THEATERS LLC to THE SHUBERT ORGANIZATION, INC.$15,000,000
2009-05-22Mortgage $3,500,017 to THE SHUBERT ORGANIZATION, INC.$3,500,017
2009-05-22Mortgage assigned — from U.S. BANK NATIONAL ASSOCIATION to THE SHUBERT ORGANIZATION, INC.
2009-05-22Mortgage $3,000,000 — from JUJAMCYN THEATERS LLC to THE SHUBERT ORGANIZATION, INC.$3,000,000
2008
2008-05-06Permit EW — ISSUED
2008-05-06Permit EW — ISSUED
2008-04-10Permit EW — ISSUED
2008-04-10Permit PL — ISSUED
2008-04-03DOB violation E:
2008-02-27Job filed: REPLACE OIL BURNER WITH GAS BURNER ON EXISTING BOILER NO. 83410-01 AND REMOVE OIL TANK. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.$42,000
2008-02-05Job filed: INSTALL ONE (1) LIQUID CHILLER PER PLANS ON STEEL DUNNAGE$120,000
2007
2007-09-21DOB complaint, category ?
2005
2005-04-25Mortgage satisfied — from GUILD THEATRE CO., INC. to THE BOWERY SAVINGS BANK
2005-04-25Mortgage satisfied — from MARTIN BECK THEATER CORPORATION to F/K/A CHEMICAL BANK; F/K/A JPMORGAN CHASE BANK; JPMORGAN CHASE BANK, N.A.; F/K/A THE CHASE
2005-04-05Mortgage $3,000,000 — from JUJAMCYN THEATERS LLC to U.S. BANK NATIONAL ASSOCIATION$3,000,000
2005-04-05Mortgage $20,000,000 — from JUJAMCYN THEATERS LLC to U.S. BANK NATIONAL ASSOCIATION$20,000,000
2005-03-11RPTT&RET $4,530,100 — from JUJAMCYN THEATERS CORPORATION to JUJAMCYN THEATERS LLC$4,530,100
2004
2004-01-14Tenant complaint: HEATING — HEAT RELATED
2004-01-14Tenant complaint: APPLIANCE — ELECTRIC/GAS RANGE
2003
2003-10-01Permit EW — ISSUED
2003-09-10Job filed: Extention of stage. No change in use egress or occupancy.$15,000
2003-06-18Permit EW — ISSUED
2003-05-19Job filed: Facade restoration and roofing repairs. No change to use, egress, or occupancy.$50,000
2002
2002-10-08Job filed: install front of house masking for 'Flower Drum Song,' no change to use, egress or occupancy$48,000
2002-10-08Job filed: install front of house masking for "Flower Drum Song," no change to use, egress or occupancy$48,000
2002-05-06ECB Non-Hazardous violation: 49A/ 49B/ (49A) PIPE DOWN SAFTEY VALUES TO THE FLOOR (49B) EXPOSE DURING AT JUNCTION BOX ON BOILER
2002-03-29Permit EW — ISSUED
2002-02-26Job filed: General construction to upgrade partitions and doors as per plans. No change in use, egress or occupancy.$10,000
1999
1999-03-16DOB violation LL6291:
1999-02-19DOB violation CMQ:
1998
1998-04-28DOB violation CMQ:
1995
1995-10-18Permit EW — ISSUED
1995-08-29DOB violation LL6291:
1993
1993-10-08Permit PL — ISSUED
1993-10-04Permit EW — ISSUED
1993-07-22Permit EW — ISSUED
1993-02-23Permit SG — ISSUED
1993-02-18Permit AL — ISSUED
1993-02-18Permit SG — ISSUED
1993-02-18Permit SG — ISSUED
1992
1992-09-04Permit EW — ISSUED
1992-08-17Permit EQ — ISSUED
1989
1989-05-25LDMK — from LANDMARKS PRESERV/CMMSSN to CITY OF NEW YORK
1983
1983-07-15Deed — from MARTIN BECK THEATERCORP to ROSELAND AMUSEMENT ETC.
1983-07-15DECL — from ROSELAND AMUSEMENT ETC.; MARTIN BECK THEATRECORP
1983-07-15REL — from GOLDOME BANK/SAVINGS to MARTIN BECK THEATERCORP
1983-07-15REL — from CHEMICAL BANK to MARTIN BECK THEATERCORP
1983-07-15Agreement — from MARTIN BECK THEATERCORP to ROSELAND AMUSEMENT ETC.
1981
1981-09-21Mortgage — from MARTIN BECK THEATERCORP to CHEMICAL BANK
1981-08-28Deed — from AMERICAN NATL THTR ACDMY to MARTIN BECK THEATERCORP
1975
1975-07-01Agreement — from UNITED STATES OF AMERICA to AMERICAN NATL THEATRE&AC
1970
1970-12-18Agreement — from UNITED STATES OF AMERICA to AMERICAN NATIONAL; THEATRE AND ACADEMY.
1969
1969-05-23Mortgage assigned — from MCCABE EUGENE J (TR); IRVING TRUST COMPANY(TR to CITY INVESTING COMPANY
1969-01-08SAGE — from UNITED STATES OF; ENDOWMENT FOR THE ARTS; AMERICAN NATIONAL; THEATRE AND ACADEMY; AMERICA
1966
1966-04-27Mortgage assigned — from CITY INVESTING CO. to IRVING TRUST CO.
1966-01-27SAGE — from CITY INVESTING CO.
1966-01-18Mortgage — from AMERICAN NATIONAL; THEATRE AND ACADEMY to CITY INVESTING CO.
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL