Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
32 service requests in the last three years. Most common: Noise (28) · Sidewalk Condition (2) · Taxi Complaint (1) · Lost Property (1).
Filed construction activity
$10,255,037 in permitted construction work filed since
2016 (26 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$1,162,000
$522,900
2026
$1,185,000
$533,250
2027
$2,400,000
$1,080,000
The city's market estimate has risen
107% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
50 St — C E · 900 ft straight-line (about a 4-minute walk) · station accessibility: partial (Downtown only) Times Sq-42 St — 1 2 3 7 A C E N Q R S W · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 9 Av / W 46 St — M11 · 300 ft
Citi Bike
W 47 St & 9 Ave · 100 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
32 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $5,000,000 on
2024-06-12 (lender: Business Initiative Corporation Of New York). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-06-12
Mortgage $5,000,000 — from TRASK RADIO LLC to BUSINESS INITIATIVE CORPORATION OF NEW Y
$5,000,000
2024-06-12
AL&R $5,000,000 — from TRASK RADIO LLC to BUSINESS INITIATIVE CORPORATION OF NEW Y
$5,000,000
2023-04-03
Deed $7,229,250 — from PREMIER 674 NINTH, LLC to TRASK RADIO LLC
$7,229,250
2023-04-03
AL&R $4,863,000 — from TRASK RADIO LLC to BUSINESS INITIATIVE CORPORATION OF NEW Y
$4,863,000
2023-04-03
Mortgage $4,863,000 — from TRASK RADIO LLC to BUSINESS INITIATIVE CORPORATION OF NEW Y
$4,863,000
2023-04-03
AL&R $7,152,000 — from TRASK RADIO LLC to NEWTEK BANK, NATIONAL ASSOCIATION
$7,152,000
2023-04-03
Agreement $7,152,000 — from TRASK RADIO LLC to NEWTEK BANK, NATIONAL ASSOCIATION
$7,152,000
2023-04-03
Mortgage $4,316,378 — from TRASK RADIO LLC to NEWTEK BANK, NATIONAL ASSOCIATION
$4,316,378
2023-03-23
Sold for $7,229,250
$7,229,250
$3,614,625
2019-04-23
AL&R $3,000,000 — from PREMIER 674 NINTH, LLC to METROPOLITAN COMMERCIAL BANK
$3,000,000
2019-04-23
Mortgage $3,000,000 — from PREMIER 674 NINTH, LLC to METROPOLITAN COMMERCIAL BANK
$3,000,000
2019-04-23
Deed $4,000,000 — from LUCHOW LLC to PREMIER 674 NINTH, LLC
$4,000,000
2019-04-18
Sold for $4,000,000
$4,000,000
$2,000,000
Ten-year activity
100500
2017
2018
2019
2020
2021
2022
73
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
0
0
2
0
5
7
2018
0
0
2
0
2
4
2019
4
2
7
4
3
20
2020
1
1
0
0
0
2
2021
2
0
4
0
1
7
2022
27
9
17
0
7
60
2023
18
20
21
13
1
73
2024
2
0
12
7
2
23
2025
0
0
5
2
2
9
2026
0
0
2
2
1
5
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2023-04-17Job filed: Filing for Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.$273,482
2023-04-03Deed $7,229,250 — from PREMIER 674 NINTH, LLC to TRASK RADIO LLC$7,229,250
2023-04-03AALR — from BUSINESS INITIATIVE CORPORATION OF NEW Y to NEWTEK BUSINESS SERVICES HOLDCO 6, INC.
2023-04-03Mortgage assigned — from BUSINESS INITIATIVE CORPORATION OF NEW Y to NEWTEK BUSINESS SERVICES HOLDCO 6, INC.
2023-04-03AL&R $4,863,000 — from TRASK RADIO LLC to BUSINESS INITIATIVE CORPORATION OF NEW Y$4,863,000
2023-04-03Mortgage $4,863,000 — from TRASK RADIO LLC to BUSINESS INITIATIVE CORPORATION OF NEW Y$4,863,000
2023-04-03AL&R $7,152,000 — from TRASK RADIO LLC to NEWTEK BANK, NATIONAL ASSOCIATION$7,152,000
2023-04-03Agreement $7,152,000 — from TRASK RADIO LLC to NEWTEK BANK, NATIONAL ASSOCIATION$7,152,000
2023-04-03Mortgage $4,316,378 — from TRASK RADIO LLC to NEWTEK BANK, NATIONAL ASSOCIATION$4,316,378
2023-04-03TL&R — from METROPOLITAN COMMERCIAL BANK to PREMIER 674 NINTH, LLC
2023-04-03Mortgage assigned — from METROPOLITAN COMMERCIAL BANK to NEWTEK BANK, NATIONAL ASSOCIATION
2023-04-03Permit Plumbing — Signed-off
2023-04-01311: Noise — Noise: Construction Equipment (NC1)
2023-03-24Permit General Construction — Permit Issued
2023-03-23Sold for $7,229,250$7,229,250
2023-03-20Job filed: Filing for Foundation scope as per plans filed herewith.$63,924
2023-03-20Job filed: Filing for structural modifications as per plans filed herewith. No change in use, egress, or occupancy.$239,079
2023-03-19311: Noise — Noise: Construction Before/After Hours (NM1)
2023-03-14Permit Structural — Signed-off
2023-03-14Permit Foundation — Signed-off
2023-03-14Permit General Construction — Signed-off
2023-03-14Permit Mechanical Systems — Signed-off
2023-03-14Job filed: Filing for General construction modifications related to the change of use for the existing two story building and egress changes as per the enclosed $1,433,130
2023-03-04ECB CLASS - 2 violation: AT TIME OF INSPECTION , I OBSERVED THAT THE CONSTRUCTION SUPERINTENDENT FAILED TO PERFORMED DUTIES IN REFERENCE TO BUILDING CODE 3
2023-03-04ECB CLASS - 1 violation: AT THE TIME OF INSPECTION, I OBSERVED WORKERS ENGAGED IN CONSTRUCTION ACTIVITIES IN THE CELLAR LEVEL. IT WAS ALSO OBSERVED IN THE
2023-03-04ECB CLASS - 2 violation: AT TIME OF INSPECTION, I OBSERVED THAT THE JOB SITE FENCE AT EXPO #1 WAS NOT CONSTRUCTED AND MAINTAINED AS PER CODE WITH ADDED ATT
2023-03-04DOB complaint, category ?
2023-03-04DOB complaint, category ?
2023-03-04DOB complaint, category ?
2023-02-19311: Noise — Noise: Construction Equipment (NC1)
2022-10-19ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION, I OBSERVED A CONSTRUCTION FENCE INSTALLED AND IN PLACE AT EXPO#1. I OBSERVED FURTHER, THAT THE SAID
2022-10-19DOB complaint, category ?
2022-10-18Permit Foundation — Signed-off
2022-09-28Job filed: Filing for General construction modifications related to the change of use for the existing two story building and egress changes as per the enclosed $1,433,130
2022-09-26ECB CLASS - 1 violation: NOTE AT TIME OF INSPECTION I OBSERVED CONSTRUCTION IN PROCESS WITH OUT CONSTRUCTION SUPERINTENDENT FILED UNDER APPLICATION M006344
2022-09-26DOB complaint, category ?
2022-09-21ECB CLASS - 1 violation: AT TIME OF INSPECTION I OBSERVED MISSING HANDRAIL AT STAIRS CELLAR TOO FIRST STORY CREATING A FALL HAZARD TOO WORKERS AND PERSONS
2022-09-21DOB complaint, category ?
2022-09-20ECB CLASS - 1 violation: FDNY NOTIFIED A WORKER TRIPPED & INJURED ON SITE WHILE HE CARRYING CONSTRUCTION MATERIALS. IN RESPONSE TO INCIDENT, OBSERVED SITE
2022-09-20DOB complaint, category ?
2022-09-10Job filed: SUPPORT OF EXCAVATION AND UNDERPINNING WORK RELATED TO NEW ELEVATOR PIT FOR EXISTING BUILDING AS PER PLANS FILED HEREWITH.$50,000
2022-09-02Permit Support of Excavation — Signed-off
2022-07-20311: Noise — Noise: Construction Equipment (NC1)
2022-07-19Job filed: Filing for Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.$273,482
2022-07-19Job filed: Filing Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.$66,981
2022-07-18Rodent inspection: Passed
2022-06-30Job filed: Filing for Foundation scope as per plans filed herewith.$63,924
2022-06-16Job filed: SUPPORT OF EXCAVATION AND UNDERPINNING WORK RELATED TO NEW ELEVATOR PIT FOR EXISTING BUILDING AS PER PLANS FILED HEREWITH.$50,000
2022-06-09311: Noise — Noise: Construction Equipment (NC1)
2022-05-11Asbestos abatement: Removal — New York Insulation, Inc.
2022-05-11Asbestos abatement: Removal — New York Insulation, Inc.
2022-05-11Asbestos abatement: Removal — New York Insulation, Inc.
2022-05-11Asbestos abatement: Removal — New York Insulation, Inc.
2022-05-11311: Asbestos — Asbestos Complaint (B1)
2022-05-11Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED, PIPE SCAFFOLDING & PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. AL$10,000
2022-04-25Permit Sprinklers — Signed-off
2022-04-15311: Noise — Noise: Construction Equipment (NC1)
2022-04-14311: Noise — Noise: Jack Hammering (NC2)
2022-03-30Permit Mechanical Systems — Signed-off
2022-03-29311: General Construction/Plumbing — Debris - Excessive
2022-03-29DOB complaint, category ?
2022-03-28Permit Plumbing — Signed-off
2022-03-24Job filed: Filing Sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.$66,981
2022-03-24Job filed: Filing for Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.$273,482
2022-03-24Job filed: Filing for Mechanical modifications as per plans filed herewith.$474,986
2022-03-21Elevator permit: Furnish and install one new passenger hydraulic elevator to comply with ASME A17.1/2000 with supplements A17.1a-2002 and A17.1b-20$169,244
2022-03-17Permit General Construction — Signed-off
2022-03-17Permit Structural — Signed-off
2022-03-17Permit General Construction — Permit Issued
2022-03-15Permit Structural — Signed-off
2022-03-10Job filed: Filing for structural modifications as per plans filed herewith. No change in use, egress, or occupancy.$239,079
2022-03-03Permit General Construction — Permit Issued
2022-02-25Job filed: Filing for General construction modifications related to the change of use for the existing two story building and egress changes as per the enclosed $1,433,130
2022-02-10Job filed: Filing for General construction modifications related to the change of use for the existing two story building and egress changes as per the enclosed $1,433,130
2022-02-01Rodent inspection: Passed
2022-01-10Job filed: Filing for General construction modifications related to the change of use for the existing two story building and egress changes as per the enclosed $1,433,130
2021
2021-11-30Permit General Construction — Signed-off
2021-11-21Job filed: Filing for General construction modifications to include interior demo as per plans filed herewith. No change in use, egress or occupancy.$24,960
2020-03-16DOB violation HBLVIO: VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
2020-02-04Job filed: Filing for Mechanical work to install a Sub-Slab Depressurization System as shown on plans; no change to use, egress, or occupancy.$25,000
2019-07-23Job filed: Filing for Mechanical work to install a Sub-Slab Depressurization System as shown on plans; no change to use, egress, or occupancy.$25,000
2019-07-10Permit EW — ISSUED
2019-07-10Job filed: INTERIOR RENOVATION OF EXISTING RETAIL SPACE-REMOVAL OF PARTITIONS, COSMETIC FINISHES OF FLOOR, WALLS, AND CEILING. NO CHANGE IN EGRESS, OCCUPANCY OR $52,290
2016-08-01Air permit (CERTIFICATE TO OPERATE), fuel: ?
2016-02-18Rodent inspection: Passed
2015
2015-05-16311: Broken Muni Meter — No Receipt
2015-05-15311: Broken Muni Meter — No Receipt
2015-05-14311: Graffiti — Graffiti
2015-05-14311: Broken Muni Meter — No Receipt
2015-03-03DOB violation HBLVIO:
2015-03-03DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
2015-01-21FDNY inspection (RISK)
2014
2014-10-31311: Broken Muni Meter — Credit Card Stuck in Meter
2014-05-15DOB violation HBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION
2013
2013-06-06Permit AL — ISSUED
2012
2012-09-06Rodent inspection: Passed
2012-03-24311: New Tree Request — For One Address
2012-03-18311: New Tree Request — For One Address
2012-03-03311: New Tree Request — For One Address
2012-02-15Permit AL — ISSUED
2011
2011-05-19Rodent inspection: Passed
2010
2010-07-28311: New Tree Request — For One Address
2010-07-28311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2010-05-18Rodent inspection: Passed
2008
2008-09-18Job filed: TO CONVERT EXISTING STORAGE AREA AT SECOND FLOOR INTO OFFICE SPACE$20,000
2007
2007-09-05ECB Non-Hazardous violation: 18B, 48B, 50A,B,C. 50A. REARRANGE BLOW DOWN VALVE TO HAVE SLOW OPENINGVALVE TERMINATE LAST. 50B. VALVE ON WATER COLUMN DEFECTIVE L$180
2006
2006-02-10Deed — from BOHLMAN, NADIA N; ECKSTEIN, GUIDO L; BRADY , VICTORIA M to LUCHOW LLC
2003
2003-10-21ECB Non-Hazardous violation: 34A
2003-08-12DEEDO — from ECKSTEIN, GUIDO L to ECKSTEIN, DOROTHEA L
2003-08-12DEEDO — from ECKSTEIN, DOROTHEA L to ECKSTEIN, GUIDO L; ECKSTEIN, DOROTHEA L
2002
2002-07-24ECB Non-Hazardous violation: 34A, 48A, 48B. 34A-BOILER ROOM FIRE DOOR NOT OPENING TO EGRESS. 48A/B DIRTY/LEAKING GAUGE GLASS.$180
2001
2001-02-27DOB violation LL6291:
2000
2000-02-22Permit EW — ISSUED
2000-02-04Job filed: INSTALL BOILER ENCLOSURE AND FRESH AIR DUCT. THIS APPLICATION FILED IN CONJUNCTION WITH 102091932. NO CHANGE IN EGRESS, OCCUPANCY, OR USE UNDER THIS A$1,000
2000-02-04Job filed: INSTALL BOILER ENCLOSURE AND FRESH AIR DUCT. THIS APPLICATION FILED IN CONJUNCTION WITH 102091932. NO CHANGE IN EGRESS, OCCUPANCY, OR USE UNDER THIS A$1,000
1999
1999-06-03Permit EW — ISSUED
1999-06-03Permit EW — ISSUED
1997
1997-09-16DOB violation LL6291:
1993
1993-03-18DOB violation LL6291:
1992
1992-03-11ECB Non-Hazardous violation: 32 LOW WATER CUT-OFF LEAKING FROM BASKET: TO OPEN CLEAN AND REPLACE GASKET$85
1992-03-11DOB violation B:
1991
1991-06-12DOB complaint, category ?
1991-05-13ECB Non-Hazardous violation: 31A, 20B, EXPOSED WIRING ON BACK OF THE BOILER.
1966
1966-01-17Agreement — from AREALTY CORP to KISSLING ANTHONY M.