621 West 46 Street · Manhattan · BBL 1010940018
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$2,500 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
153 service requests in the last three years. Most common: Noise (47) · Illegal Parking (36) · Encampment (26) · Blocked Driveway (11) · Obstruction (5) · Dirty Condition (5).
Filed construction activity
$1,970,635 in permitted construction work filed since
2016 (22 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$15,529,000
$6,988,050
2026
$16,080,000
$7,236,000
2027
$17,524,000
$7,885,800
The city's market estimate has risen
13% between tax years 2025 and 2027.
1 Food Establishment complaint to 311 at this address in the last three years (most often: Kitchen/Food Prep Area), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
50 St — C E · 0.6 mi straight-line (about a 15-minute walk) · station accessibility: partial (Downtown only) Times Sq-42 St — 1 2 3 7 A C E N Q R S W · 0.6 mi straight-line (about a 15-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 12 Av / W 46 St — M12 M50 · 250 ft
Citi Bike
W 46 St & 11 Ave · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
153 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $6,750,000 on
2019-07-17 (lender: Cantor Commercial Real Estate Lending, L.P.). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2024-09-30
RPTT $2,501,585 — from RCG TOWER GROUP I, LLC to DCHSCU ACQUISITION HOLDINGS, LLC
$2,501,585
2019-07-17
SPRD $5,500,000 — from 619W46 LLC; WEST END DEVELOPMENT CORPORATION; 621 W55 LLC; ACI EQUITIES LLC to 621 WEST 55TH STREET FUNDING LLC
$5,500,000
2019-07-17
Mortgage $6,750,000 — from 617-625 W 46TH STREET OWNER LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
$6,750,000
2019-07-17
Agreement $28,000,000 — from 617-625 W 46TH STREET OWNER LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
$28,000,000
2019-07-17
AL&R $28,000,000 — from 617-625 W 46TH STREET OWNER LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
$28,000,000
2019-01-30
CMTG $3,710,000 — from ACI EQUITIES LLC; 619W46LLC; WEST END DEVELOPMENT CORPORATION to 321-323 EAST 58TH STREET FUNDING LLC
$3,710,000
2018-10-10
Mortgage $1,000,000 — from ACI EQUITIES LLC; 619W46 LLC; WEST END DEVELOPMENT CORPORATION to 617-21 WEST 46TH STREET FUNDING LLC
$1,000,000
2018-10-10
AL&R $1,000,000 — from ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION; 619W46 LLC to 617-21 WEST 46TH STREET FUNDING LLC
$1,000,000
2018-08-22
CMTG $1,000,000 — from WEST END DEVELOPMENT CORPORATION; 619W46 LLC; ACI EQUITIES LLC to 621 WEST 55TH STREET FUNDING LLC
$1,000,000
2018-05-24
CMTG $5,500,000 — from ACI EQUITIES LLC; 619W46 LLC; WEST END DEVELOPMENT CORPORATION to 621 WEST 55TH STREET FUNDING LLC
$5,500,000
2018-04-09
AL&R $2,000,000 — from WEST END DEVELOPMENT CORPORATION; ACI EQUITIES LLC; 619W46 LLC to 617-21 WEST 46TH STREET FUNDING LLC
$2,000,000
2018-04-09
Mortgage $2,000,000 — from WEST END DEVELOPMENT CORPORATION; 619W46 LLC; ACI EQUITIES LLC to 617-21 WEST 46TH STREET FUNDING LLC
$2,000,000
2017-06-30
AL&R $12,750,000 — from ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION; 619W46 LLC to ENCLAVE COMMERCIAL CAPITAL LLC
$12,750,000
2017-06-30
Mortgage $3,598,094 — from ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION; 619W46 LLC to ENCLAVE COMMERCIAL CAPITAL LLC
$3,598,094
2017-06-30
Agreement $12,750,000 — from WEST END DEVELOPMENT CORPORATION; 619W46 LLC; ACI EQUITIES LLC to ENCLAVE COMMERCIAL CAPITAL LLC
$12,750,000
Ten-year activity
2001000
128
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
21
20
76
7
4
128
2018
15
24
18
10
6
73
2019
25
40
8
25
7
105
2020
24
8
1
2
4
39
2021
9
4
65
0
3
81
2022
3
0
56
0
6
65
2023
8
1
40
0
4
53
2024
0
0
57
2
4
63
2025
3
3
53
0
4
63
2026
1
0
41
0
1
43
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
311: Non-Emergency Police Matter — Other (complaint details)
2026-03-10
311: Dirty Condition — Broken Glass
2026-03-04
311: Illegal Parking — Blocked Sidewalk
2026-02-27
311: Consumer Complaint — Other Store (Non-Food)
2026-02-18
311: Taxi Complaint — Driver Complaint - Non Passenger
2026-02-13
311: Blocked Driveway — No Access
2026-02-06
311: Taxi Complaint — Driver Complaint - Non Passenger
2026-01-11
311: Derelict Vehicles — Derelict Vehicles
2026-01-07
311: Illegal Parking — Blocked Sidewalk
2025-12-28
Restaurant inspection: HARBOR NYC — grade N · mice evidence
2025-12-27
ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. 4 STORY, FP COMMERCIAL BUILDING EMERGENCY EXIT DOOR TO STAIRCASE A. EXIT FR
2025-12-24
Boiler inspection
2025-12-24
Boiler inspection
2025-12-24
Boiler inspection
2025-12-19
311: Illegal Parking — Blocked Sidewalk
2025-12-15
DOB complaint, category ?
2025-11-06
Job filed: AS PER COMMISSIONER'S REQUEST ALT 1 NO WORK APPLICATION TO COMBINE BUILDINGS 617-619 WEST 46TH STREET AND 621-625 WEST 46TH STREET BIN FOR 621 HAS BEE
2025-12-28Restaurant inspection: HARBOR NYC — grade N · mice evidence
2025-12-27ECB CLASS - 1 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. 4 STORY, FP COMMERCIAL BUILDING EMERGENCY EXIT DOOR TO STAIRCASE A. EXIT FR$2,500
2025-12-24Boiler inspection
2025-12-24Boiler inspection
2025-12-24Boiler inspection
2025-12-19311: Illegal Parking — Blocked Sidewalk
2025-12-15DOB complaint, category ?
2025-11-06Job filed: AS PER COMMISSIONER'S REQUEST ALT 1 NO WORK APPLICATION TO COMBINE BUILDINGS 617-619 WEST 46TH STREET AND 621-625 WEST 46TH STREET BIN FOR 621 HAS BEE$41,561
2023-12-26Certificate of occupancy Renewal Without Change
2023-11-28311: Illegal Parking — Blocked Sidewalk
2023-11-18311: Drinking — Underage - Licensed Est
2023-11-16Boiler inspection
2023-11-16Boiler inspection
2023-11-16Boiler inspection
2023-10-08311: Illegal Parking — Blocked Sidewalk
2023-10-06Job filed: No Work
2023-09-28Certificate of occupancy Renewal Without Change
2023-09-23Restaurant inspection: HARBOR NYC
2023-09-19Job filed: AS PER COMMISSIONER'S REQUEST ALT 1 NO WORK APPLICATION TO COMBINE BUILDINGS 617-619 WEST 46TH AND 621-625 WEST 46TH ST. BIN FOR 621 HAS BEEN DEEMED O$5,000
2023-09-10311: Illegal Parking — Blocked Sidewalk
2023-08-20311: Illegal Parking — Blocked Sidewalk
2023-08-19311: Consumer Complaint — Other Store (Non-Food)
2023-08-06311: Obstruction — Sign
2023-08-06311: Illegal Parking — Blocked Sidewalk
2023-08-06311: Illegal Parking — Blocked Sidewalk
2023-07-25311: Consumer Complaint — Garage or Parking Lot
2023-06-28311: Street Condition — Blocked - Construction
2023-06-25311: Obstruction — Cone
2023-06-24311: Illegal Parking — Blocked Sidewalk
2023-06-24311: Obstruction — Cone
2023-06-24311: Illegal Parking — Blocked Sidewalk
2023-06-24311: Obstruction — Cone
2023-06-19311: Illegal Parking — Blocked Sidewalk
2023-06-18311: Illegal Parking — Blocked Sidewalk
2023-06-17311: Non-Emergency Police Matter — Other (complaint details)
2023-06-17311: Non-Emergency Police Matter — Other (complaint details)
2023-02-06Job filed: Carrier: Next Wave. New Antenna Installation. Install (2) sectors of antennas (3 antennas per sector) on new antenna masts on the roof. Install (6) RR$20,000
2022-10-29311: Mobile Food Vendor — Permit/License/Certificate
2022-10-27Rodent inspection: Passed
2022-10-27Certificate of occupancy Initial
2022-10-25311: Consumer Complaint — Retail Store
2022-10-21311: New Tree Request — For One Address
2022-10-21311: New Tree Request — For One Address
2022-10-12311: Homeless Person Assistance
2022-10-09311: Illegal Parking — Blocked Sidewalk
2022-10-07311: Illegal Parking — Blocked Sidewalk
2022-09-26311: Rodent — Rat Sighting
2022-09-13Boiler inspection
2022-09-13Boiler inspection
2022-09-13Boiler inspection
2022-09-04311: Obstruction — Merchandise
2022-09-04311: Obstruction — Cone
2022-09-04311: Obstruction — Sign
2022-09-02311: Non-Emergency Police Matter — Other (complaint details)
2022-08-26311: Illegal Parking — Blocked Sidewalk
2022-08-05Elevator permit: Modernize passenger elevator, device # 1P44276 as per attached drawings. All work to conform to Safety Code for Elevators and Esc$130,000
2022-03-17Elevator permit: Modernize passenger elevator, device # 1P44276 as per attached drawings. All work to conform to Safety Code for Elevators and Esc$130,000
2022-03-14311: Drinking — After Hours - Licensed Est
2021-05-04ECB CLASS - 2 violation: MANUAL RESET L.W.C.O IS LOCATED CONTARY TO MFR INSTALLATION INSTRUCTIONS,MC-1007.2 VENTING MATERIAL MUST BE LISTED AND LABELED FOR
2021-04-21Permit EW — ISSUED
2021-04-19Permit EW — ISSUED
2021-04-12Permit PL — ISSUED
2021-04-06FDNY inspection (ALT)
2021-03-23Permit PL — ISSUED
2021-03-23Permit EW — ISSUED
2021-01-15Permit PL — ISSUED
2021-01-14Permit AL — ISSUED
2021-01-08Permit EW — ISSUED
2020
2020-12-31Permit EW — ISSUED
2020-09-24DOB complaint, category ?
2020-09-22ECB CLASS - 2 violation: WORK WITHOUT A PERMIT I OBSERVED RPZ MODEL NUMBER LFOO9M2QT WAS INSTALLED IN 619 WEST 46 STREET NEW YORK NEW YORK ON THE FIRST FLO
2020-09-22DOB complaint, category ?
2020-08-07Permit EW — ISSUED
2020-07-30Permit PL — ISSUED
2020-06-18Permit Plumbing — Signed-off
2020-06-18Permit Plumbing — Signed-off
2020-06-18Permit Mechanical Systems — Signed-off
2020-06-18Permit Sprinklers — Signed-off
2020-06-18Permit Sprinklers — Signed-off
2020-06-17Permit EW — ISSUED
2020-06-03EASE — from WEST END DEVELOPMENT CORP. to 619 W 46 LLC
2020-06-03EASE — from WEST END DEVELOPMENT CORP. to 619 W 46 LLC
2020-05-14DOB complaint, category ?
2020-04-20Permit EW — ISSUED
2020-04-20Permit EW — ISSUED
2020-04-14Permit PL — ISSUED
2020-04-02ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ONGOING CONSTRUCTION ACTIVITIES CONTRARY TO GOVERNORS EXECUTIVE ORDER #202.6,202.8,202.11,202.13 AN
2020-04-01Boiler inspection
2020-04-01Boiler inspection
2020-04-01Boiler inspection
2020-03-24Job filed: No Work
2020-03-02Eviction executed (ENTIRE 6TH)
2020-02-26Job filed: relocate and install new sprinkler heads. install new plumbing fixtures.$92,950
2020-02-26Job filed: revisions, alterations and extensions to be the existing air conditioning system presently serving the tenant space. install new exhaust system for t$45,000
2020-02-26Job filed: GENERAL RENOVATION OF EXISTING SPACE. INSTALL ACCESS PANELS, LOUVRES, NON BEARING PARTITIONS, FINISHES, COUNTERS AND SHELVING. NO CHANGE IN USE EGRES$25,000
2020-02-20FDNY inspection (ALT)
2020-02-19DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-01-24Permit EW — ISSUED
2020-01-24Permit PL — ISSUED
2020-01-24Permit EW — ISSUED
2020-01-24Permit AL — ISSUED
2020-01-24Permit EW — ISSUED
2020-01-24Permit EW — ISSUED
2020-01-23FDNY inspection (ALT)
2020-01-18Permit PL — ISSUED
2020-01-18Permit EW — ISSUED
2020-01-15Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $11,500
2019
2019-12-26FDNY inspection (ALT)
2019-12-10311: Consumer Complaint — Retail Store
2019-12-06DOB complaint, category ?
2019-11-29Job filed: No Work
2019-11-27FDNY inspection (ALT)
2019-11-22311: General Construction/Plumbing — Working Contrary To Stop Work Order
2019-11-22DOB complaint, category ?
2019-11-20DOB complaint, category ?
2019-11-19ECB CLASS - 2 violation: SEC. 3301.02(C) CONSTRUCTION SUPER FAILED TO PERFORM DUTIES AS PER RULE. NOTE: THE FOLLOWING HAZARDOUS CONDITIONS WERE OBSERVED &
2019-11-19ECB CLASS - 1 violation: SEC. 3314.3 DESIGN(SCAFFOLDS). NOTE: AT TIME OF INSPECTION ON ALT-1 ACTIVE JOBSITE I OBSERVED SUPPORTED PIPE SCAFFOLD ERECTED AT E
2019-11-19ECB CLASS - 1 violation: SEC. 3314.8 GUARDRAIL SYSTEM(SUPPORTED SCAFFOLD). NOTE: AT TIME OF ALT1 INSPECTION I OBSERVED ACTIVE INTERIOR CONSTRUCTION WORK IN
2019-11-19ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES OOPERATION OF CRANE IN AN UNSAFE MANNER RESPODEN T USE KNUCKLE BOOM CRANA TRINCHESE BOOM SERVICE LIC#21
2019-11-19ECB CLASS - 1 violation: SEC. 3301.2(D)INADEQUATE SUPER LOGBOOK. NOTE: AT TIME OF ALT-1 INSPECTION ACTIVE JOBSITE W/WORK INPROGRESS. I OBSERVED THE SUPER H$2,500
2019-11-19ECB CLASS - 1 violation: SEC. 3315.1.6 NETTING REQUIRED(SUPPORTED SCAFFOLD)AT TIME OF ALT-1 INSPECTION I OBSERVED ACTIVE JOBSITE W/ERECTED SUPPORTED PIPE S
2019-11-19ECB CLASS - 1 violation: SEC. 3303.10.1 TENANT PROPECTION PLAN. NOTE: AT TIME OF ALT-1 INSPECTION OF 6 STY COMMERCIAL BLDG ACTIVE JOBSITE I OBSERVED WORK I
2019-11-19DOB complaint, category ?
2019-10-31FDNY inspection (ALT)
2019-10-31Elevator permit: Filing this application to Furnish and Install New Door Lock Monitoring. All work to conform to Safety Code for Elevators and Esc$6,130
2019-10-04Permit Supported Scaffold — Signed-off
2019-10-03Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-10-03Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-10-03Permit Sidewalk Shed — Signed-off
2019-10-02FDNY inspection (ALT)
2019-09-27Permit EW — ISSUED
2019-09-27Permit EW — ISSUED
2019-09-20ECB CLASS - 1 violation: FAILURE TO HAVE OR MAINTAIN THE REQUIRED DAILY LOG.AT TIME OF INSPECTION I OBSERVED PROPOSED ALTERATION OF AN EXISTING 4 STORY BUI
2019-09-20ECB CLASS - 2 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT TIME OF INSPECTION I OBSERVED PROPOSED ALTERATION OF AN EXIS
2019-08-29AALR — from CANTOR COMMERCIAL REAL ESTATE LENDING, L to CCRE LOAN SELLER IV, LLC
2019-08-29AALR — from CANTOR COMMERCIAL REAL ESTATE LENDING, L to WELLS FARGO BANK, NATIONAL ASSOCIATION,
2019-08-29Mortgage assigned — from CANTOR COMMERCIAL REAL ESTATE LENDING, L to WELLS FARGO BANK, NATIONAL ASSOCIATION,
2019-08-29AALR — from CCRE LOAN SELLER IV, LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
2019-08-29Mortgage assigned — from CCRE LOAN SELLER IV, LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
2019-08-29Mortgage assigned — from CANTOR COMMERCIAL REAL ESTATE LENDING, L to CCRE LOAN SELLER IV, LLC
2019-08-07FDNY inspection (ALT)
2019-07-31Boiler inspection
2019-07-25Boiler inspection
2019-07-25Boiler inspection
2019-07-25Boiler inspection
2019-07-23311: Non-Emergency Police Matter — Other (complaint details)
2019-07-17Mortgage assigned — from 617-21 WEST 46TH STREET FUNDING LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
2019-07-17REL — from 621 WEST 55TH STREET FUNDING LLC to WEST END DEVELOPMENT CORPORATION; 619W46 LLC; ACI EQUITIES LLC
2019-07-17SPRD $5,500,000 — from 619W46 LLC; WEST END DEVELOPMENT CORPORATION; 621 W55 LLC; ACI EQUITIES LLC to 621 WEST 55TH STREET FUNDING LLC$5,500,000
2019-07-17Mortgage assigned — from 621 WEST 55TH STREET FUNDING LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
2019-07-17Mortgage assigned — from 617-21 WEST 46TH STREET FUNDING LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
2019-07-17REL — from 621 WEST 55TH STREET FUNDING LLC to WEST END DEVELOPMENT CORPORATION; ACI EQUITIES LLC; 619W46 LLC
2019-07-17REL — from CONNECTONE BANK to 617-21 WEST 46TH STREET FUNDING LLC
2019-07-17Mortgage $6,750,000 — from 617-625 W 46TH STREET OWNER LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L$6,750,000
2019-07-17REL — from 321-323 EAST 58TH STREET FUNDING LLC to 619W46 LLC; ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION
2019-07-17Agreement $28,000,000 — from 617-625 W 46TH STREET OWNER LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L$28,000,000
2019-07-17AL&R $28,000,000 — from 617-625 W 46TH STREET OWNER LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L$28,000,000
2019-07-17TL&R — from 617-21 WEST 46TH STREET FUNDING LLC to 619W46 LLC; WEST END DEVELOPMENT CORPORATION; ACI EQUITIES LLC
2019-07-17TL&R — from 617-21 WEST 46TH STREET FUNDING LLC to 619W46 LLC; ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION
2019-07-17Deed — from 619W46 LLC; ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION to 617-625 W 46TH STREET OWNER LLC
2019-07-17REL — from CONNECTONE BANK to 617-21 WEST 46TH STREET FUNDING LLC
2019-07-17Mortgage assigned — from 617-21 WEST 46TH STREET FUNDING LLC to CANTOR COMMERCIAL REAL ESTATE LENDING, L
2019-07-17TL&R — from 617-21 WEST 46TH STREET FUNDING LLC to ACI EQUITIES LLC; 619W46 LLC; WEST END DEVELOPMENT CORPORATION
2019-07-15311: Lost Property — Clothing/Glasses
2019-07-09FDNY inspection (RISK)
2019-07-09FDNY inspection (ALT)
2019-06-14Deed transfer (nominal price)
2019-06-11FDNY inspection (ALT)
2019-05-17311: Illegal Parking — Blocked Sidewalk
2019-05-12FDNY inspection (ALT)
2019-04-24Permit EW — ISSUED
2019-04-23311: Construction Safety Enforcement — Construction Safety Compliance Action
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING.AT THE TIMEOF MY INSPECTION ON AN ACTIVE JOBSITE OF A 6 STORY BUILDING PERMIT HOLDER FAILED TO EN
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING.AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBISTE OF A 6 STORY BUILDING OWNER FAILED TO ENSURE EA
2019-04-23ECB CLASS - 1 violation: FAILURE TO DESIGNATE AND/OR CONSTRUCTION SUPERINTENDENT PRESENT AT SITE AS REQUIRED.AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBS
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING.AT THE TIME OF MY INSPECTION ON AN ACTIEV JOBSITE OF A 6 STORY BUILDING OWNER FAILED TO ENSURE EA
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING.AT THE TIME OF MY INSPECTION ON AN ACTIVE JOBISTE OF A 6 STORY BUILDING PERMIT HOLDER FAILED TO E
2019-04-23ECB CLASS - 1 violation: FAILURE TO HAVE OR MAINTAIN THE DAILY REQUIRED LOG (INADEQUATE LOG BOOK)AT THE TIME OF MY INSPECTION ON AN ACTIVE JOB SITE OF A 6
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING AT THE TIME OF MY INSPECTION ON AN ACTIVE JOB ISTE OF A 6 STORY BUILDING PERMIT HOLDER FAILED TO
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING.AT THE TIME OF MY INSPECTION ONAN ACTIVE JOB SITE OF A 6 STORY BUILDING OWNER FAILED TO ENSURE EA
2019-04-23ECB CLASS - 1 violation: FAILURE TO PROVIDE OSHA TRAINING AT THE TIME OF MY INSPECTION ONAN ACTIVE JOBSIE OF A 6 STORY BUILDING MASTER PLUMBER FAILED TO EN
2019-04-23DOB complaint, category ?
2019-04-22311: Building Marshals office — Illegal Activity
2019-04-22DOB complaint, category ?
2019-04-19Permit EW — ISSUED
2019-04-19Permit EW — ISSUED
2019-04-16FDNY inspection (ALT)
2019-04-15Job filed: INSTALL NEW NON BEARING PARTITIONS FOR NEW BATHROOM, KITCHEN . INSTALL NEW COUNTERS, FINISHES, CABINETRY, AND MILLWORK . FLOOR AND PLUMBING WORK WI$380,000
2019-04-15Permit EW — ISSUED
2019-04-15Permit PL — ISSUED
2019-04-12Job filed: REPLACING TEMPORARY ROOF STRUCTURE AT 4TH FLOOR ROOF. BUILDING UP PARAPET, WATERPROOFING AND ADDING ADDITIONAL STRUCTURAL ELEMENTS TO SUSTAIN THE WEI$25,000
2019-04-12Job filed: INTERIOR RENOVATION INSTALL NON BEARING PARTITIONS, CABINETRY, FINISHES, MILLWORK, PLATFORM WORK ALSO INCLUDE PLUMBING FIXTURES. NO CHANGE IN USE, EGR$385,750
2019-04-12Job filed: STRUCTURAL WORK RELATED TO REPLACING RETRACTABLE ROOF AT 4TH FLOOR$100,000
2019-04-01Rodent inspection: Passed
2019-04-01Rodent inspection: Passed
2019-03-22Permit AL — ISSUED
2019-03-22Permit EW — ISSUED
2019-03-18FDNY inspection (ALT)
2019-02-20FDNY inspection (ALT)
2019-02-19311: Construction Safety Enforcement — CSC - Monitoring Tracking
2019-02-05Job filed: MANUAL,AUTOMATIC SMOKE/HEAT/DUCT/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH CENTRAL STATION CONNECTION FOR 617-621 WEST 46TH STREET$40,000
2019-02-01FDNY inspection (ALT)
2019-01-30CMTG $3,710,000 — from ACI EQUITIES LLC; 619W46LLC; WEST END DEVELOPMENT CORPORATION to 321-323 EAST 58TH STREET FUNDING LLC$3,710,000
2019-01-11Permit EW — ISSUED
2019-01-11Permit PL — ISSUED
2019-01-10Job filed: REMOVAL OF NON BEARING PARTITIONS, REMOVAL OF PLATFORM, WALLS, GLASS, REMOVAL OF STAIRS, REMOVE BAR AND FINISHES. CAP AND REMOVE PLUMBING FIXTURES. N$151,750
2019-01-09FDNY inspection (ALT)
2018
2018-12-20FDNY inspection (ALT)
2018-12-18Boiler inspection
2018-12-18Boiler inspection
2018-12-18Boiler inspection
2018-12-11Permit PL — ISSUED
2018-11-29FDNY inspection (ALT)
2018-11-07FDNY inspection (RISK)
2018-10-10Mortgage $1,000,000 — from ACI EQUITIES LLC; 619W46 LLC; WEST END DEVELOPMENT CORPORATION to 617-21 WEST 46TH STREET FUNDING LLC$1,000,000
2018-10-10AL&R $1,000,000 — from ACI EQUITIES LLC; WEST END DEVELOPMENT CORPORATION; 619W46 LLC to 617-21 WEST 46TH STREET FUNDING LLC$1,000,000
2018-04-12311: Indoor Air Quality — Dust from Construction
2018-04-11FDNY inspection (ALT)
2018-04-10Job filed: INSTALL NEW SPRINKLER HEADS AT CELLAR,FIRST,MEZZANINE,2ND,2ND FLOOR ROOF DECK,3RD,4TH,5TH,6TH AND ROOF AT FIRE EGRESS STAIRS.COMBINING WATERMAIN TOGET$97,650
2018-04-09AL&R $2,000,000 — from WEST END DEVELOPMENT CORPORATION; ACI EQUITIES LLC; 619W46 LLC to 617-21 WEST 46TH STREET FUNDING LLC$2,000,000
2018-04-09Mortgage $2,000,000 — from WEST END DEVELOPMENT CORPORATION; 619W46 LLC; ACI EQUITIES LLC to 617-21 WEST 46TH STREET FUNDING LLC$2,000,000
2018-04-03AALR — from ENCLAVE COMMERCIAL CAPITAL LLC to 617-21 WEST 46TH STREET FUNDING LLC
2018-04-03Mortgage assigned — from 617-21 WEST 46TH STREET FUNDING LLC to CONNECTONE BANK
2018-04-03AALR — from 617-21 WEST 46TH STREET FUNDING LLC to CONNECTONE BANK
2018-04-03Mortgage assigned — from ENCLAVE COMMERCIAL CAPITAL LLC to 617-21 WEST 46TH STREET FUNDING LLC
2018-03-28FDNY inspection (ALT)
2018-03-14FDNY inspection (ALT)
2018-03-07FDNY inspection (ALT)
2018-03-06FDNY inspection (ALT)
2018-03-05DOB violation E:
2018-03-05DOB violation E:
2018-02-06FDNY inspection (ALT)
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-22Permit Supported Scaffold — Signed-off
2018-01-19Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-01-19Permit Sidewalk Shed — Signed-off
2018-01-18Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017-11-08ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT THE TIME OF INSPECTION AT THE 4TH FLOOR I O$250
2017-11-08Permit EW — ISSUED
2017-11-08Permit EW — ISSUED
2017-11-02311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2017-11-02Permit PL — ISSUED
2017-11-02Permit EW — ISSUED
2017-11-02Permit PL — ISSUED
2017-11-02Permit EW — ISSUED
2017-11-02DOB complaint, category ?
2017-11-01FDNY inspection (ALT)
2017-10-22311: Noise - Commercial — Loud Talking
2017-10-20Job filed: GENERAL CONSTRUCTION: WORK TO BE COMPLETED AT MEZZANINE. INCLUDES REMOVAL OF NON BEARING PARTITIONS, FINISHES AND FURNISHINGS AT MEZZANINE. PLUMBING $38,620
2017-10-20Job filed: RELOCATE AND CAP OFF PLUMBING FIXTURES. RELOCATE EXHAUST FANS FOR RELOCATED BATHROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,500
2017-10-18Job filed: MECHANICAL WORK: EXISTING AIR HANDLER UNIT AND ASSOCIATED SERVICES TO RELOCATE, REPLACE INDOOR EVAPORATOR COIL COMPATIBLE WITH NEW THAT IS R410A REFRI$32,700
2017-10-18Job filed: INTERIOR RENOVATION OF EXISTING MEZZANINE LEVEL OFFICES. INSTALL NON BEARING PARTITIONS, FINISHES, DOOR AND FURNISHING CREATING NEW OFFICE SPACE, CONF$328,350
2017-10-18Job filed: MECHANICAL WORK: EXISTING AIR HANDLER UNIT AND ASSOCIATED SERVICES TO RELOCATE, REPLACE INDOOR EVAPORATOR COIL COMPATIBLE WITH NEW THAT IS R410A REFRI$32,700
2015-01-13Job filed: NEW NON-STRUCTURAL PARTITIONS; NEW FLOOR, WALL AND CEILING FINISHES AND LIGHTING; HVAC AND PLUMBING WORK. INSTALL HEATING BOILER (<350K) WITH INDI$104,000
2015-01-05ZONE — from 619W46 LLC; WEST END DEVELOPMENT CORPORATION
2015-01-05CERT — from ROYAL ABSTRACT OF NEW YORK
2014
2014-09-17Job filed: THERE IS NO WORK AND NO CHANGE IN ZONING UNDER THIS APPLICATION. LOT MERGER WILL NOT CREATE A NEW NON COMPLIANCE ZR-12-0; LOT MERGER WILL NOT INCREAS
2013-05-28Job filed: INSTALL NEW STAIRS FROM FIRST TO ROOF. ALSO, INSTALL ELEVATOR PIT FOR NEW ELEV ATOR TO BE FILED UNDER SEPARATE APPLICATION. ADDITIONAL STRUCTURAL WORK$145,000
2013-05-28Job filed: INSTALL NEW STAIRS FROM FIRST TO ROOF. ALSO, INSTALL ELEVATOR PIT FOR NEW ELEV ATOR TO BE FILED UNDER SEPARATE APPLICATION. ADDITIONAL STRUCTURAL WORK$145,000
2012-04-10Job filed: HEREBY SUBMITTING APPLICATION FOR EXTERIOR WALL RENOVATION AND REPAIR ANY MISSING OR BROKEN BRICKS. INSTALL NEW DROP GATE, SET BACK STORE FRONT, AS PE$39,000
2012-04-10Job filed: HEREBY SUBMITTING APPLICATION FOR EXTERIOR WALL RENOVATION AND REPAIR ANY MISSING OR BROKEN BRICKS. INSTALL NEW DROP GATE, SET BACK STORE FRONT, AS PE$39,000
2012-04-09311: Noise Survey — People Created Noise
2009-11-23Job filed: THIS APPLICATION FILED FOR PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.$6,000
2009-11-23Job filed: THIS APPLICATION FILED FOR PLUMBING WORK AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.$6,000
2009-11-10DOB complaint, category ?
2009-11-09DOB complaint, category ?
2009-11-05DOB complaint, category ?
2009-09-29Permit EW — ISSUED
2009-09-11Job filed: APPLICATION FILED FOR INSTALLATION OF RETRACTABLE ROOF FILED IN CONJUNCTION WITH ALTERATION TYPE 1# 104881898. THERE IS NO CHANGE IN USE, EGRESS OR OC$137,000
2009-06-19DOB violation E:
2009-06-10DOB violation E:
2009-05-01DOB complaint, category ?
2009-05-01DOB complaint, category ?
2009-03-06DOB complaint, category ?
2009-03-03Mortgage satisfied — from WEST END DEVELOPMENT CORPORATION to GIWNER, MORRIS
2008
2008-10-06DOB complaint, category ?
2008-09-27DOB complaint, category ?
2008-09-20DOB complaint, category ?
2008-09-20DOB complaint, category ?
2008-08-19ECB CLASS - 2 violation: OPERATION OF A PLACE OF ASSEMBLY W/O A CURRENT CERT OF OPERATIONS. NOTED: C OF O PERMISSIBLE USE OF THE 2ND FLR OF THIS BLDG INDIC
2008-08-19ECB CLASS - 3 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS. NOTEDC OF O PERMISSIBLE USE OF THE 2ND FLR OF THIS BLDG INDICATES$400
2008-07-21Job filed: INSTALLATION OF FIRE ALARM IN COMJUNCTION WITH NB 103300116. NO CHANGE OF USE EGRESS OR OCCUPANCY.$49,000
2008-07-10Permit EW — ISSUED
2008-07-09Permit EW — ISSUED
2008-07-01Job filed: ADD AND RELOCATE SPRINKLER HRADS WORK EXECUTED UNDER 104881898$5,000
2008-06-25Permit PL — ISSUED
2008-06-23Job filed: INSTALL RANGEHOOD FIRE SUPPRESSION SYSTEM AS SHOWN ON PLAN. NO CHANGE IN USE OCCUPANCY OR EGRESS.$3,000
2008-06-19DOB complaint, category ?
2008-06-18DOB complaint, category ?
2008-05-21Permit PL — ISSUED
2008-04-15DOB violation E:
2008-03-21DOB violation LL1081:
2008-02-28Job filed: INSTALL INTERIOR FIREALARM SYSTEM IN CONJUNCTION WITH NB 103300116$49,000
2008-02-21Permit AL — ISSUED
2007
2007-12-05TL&R — from WEST END DEVELOPMENT CORPORATION to HUDSON VALLEY BANK
2007-12-05Job filed: 621 EVENTS, LLC
2007-11-29ECB Non-Hazardous violation: 39D06,39B10,59Q03,39O02,39B04.39D06-PROPERLY SECURE(TROUGHT) PIPE OVERCONTROLLER IN MOTOR ROOM.39B10-TAPE & SPACKLE SHEETROCK IN M$180
2007-11-13Job filed: 621 EVENTS, LLC
2007-11-08Permit EW — ISSUED
2007-10-25Job filed: INSTALL RANGEHOOD FIRE SUPPRESSION SYSTEM AS SHOWN ON PLAN. NO CHANGE IN USE OCUPANCY OR EGRESS.$3,000
2007-10-15Mortgage assigned — from HUDSON VALLEY BANK to NORTHEAST COMMUNITY BANK
2007-10-15Agreement $5,500,000 — from WEST END DEVELOPMENT CORPORATION to NORTHEAST COMMUNITY BANK$5,500,000
2007-10-15AL&R $5,500,000 — from WEST END DEVELOPMENT CORPORATION to NORTHEAST COMMUNITY BANK$5,500,000
2007-10-15SUBM — from GIWNER, MORRIS to NORTHEAST COMMUNITY BANK
2007-10-15Mortgage $4,306,596 — from WEST END DEVELOPMENT CORPORATION to NORTHEAST COMMUNITY BANK$4,306,596
2007-09-07Permit PL — ISSUED
2007-08-28Permit AL — ISSUED
2007-08-24Job filed: A1$1,008,000
2007-05-18Permit AL — ISSUED
2007-05-18Permit AL — ISSUED
2007-04-11Permit PL — ISSUED
2007-04-11Permit EW — ISSUED
2007-04-11Permit EW — ISSUED
2007-02-16Job filed: INSTALL NEW GAS FIRED HEATING & AIR CONDITIONING SYSTEM IN BUILDING CONS TUCTED UNDER NB APPLICATION 103300116.SET ON ROOF DUNNAGE. INSTALL THREE $270,000
2007-02-16Job filed: INSTALL NEW GAS FIRED HEATING & AIR CONDITIONING SYSTEM IN BUILDING CONS TUCTED UNDER NB APPLICATION 103300116.SET ON ROOF DUNNAGE. INSTALL THREE $270,000
2007-01-25Job filed: A3
2007-01-25Job filed: A3
2006
2006-12-29Permit EQ — ISSUED
2006-12-28Permit NB — ISSUED
2006-12-15AL&R $1,305,000 — from HUDSON VALLEY BANK to WEST END DEVELOPMENT CORPORATION$1,305,000
2006-12-15Mortgage $1,305,000 — from WEST END DEVELOPMENT CORPORATION to HUDSON VALLEY BANK$1,305,000
2006-10-16Permit PL — ISSUED
2006-10-16Permit EW — ISSUED
2006-10-11DOB complaint, category ?
2006-08-24DOB complaint, category ?
2006-08-24DOB complaint, category ?
2006-08-23DOB complaint, category ?
2006-06-02Permit PL — ISSUED
2006-05-12DOB complaint, category ?
2006-02-13Permit PL — ISSUED
2006-02-10Permit NB — ISSUED
2006-02-10Permit EQ — ISSUED
2006-02-10Permit NB — ISSUED
2006-01-30ZONE — from WEST END DEVELOPMENT CORPORATION
2006-01-30CERT — from OLD REPUBLIC NATIONAL TITLE INSURANCE CO
2005
2005-09-07Job filed: INSTALL NEW SPRINKLER SYSTEM IN BUILDINGCONSTRUCTED UNDER NB APPLICATION #103300116.$88,750
2005-06-06Permit NB — ISSUED
2005-06-03Permit EQ — ISSUED
2004
2004-12-13Permit PL — ISSUED
2004-04-28ECB Non-Hazardous violation: NEW BLDG OCCUPIED WITHOUT A VALID COFO.NEW BLDG #103300116 ENTIRE PARKING LOT.REMEDY:OBTAIN A VALID COFO OR DISCONTINUE USE$2,500
2004-04-20Permit NB — ISSUED
2004-04-19Permit EQ — ISSUED
2003
2003-11-05Permit PL — ISSUED
2003-10-31Job filed: INSTALL SINGLE YARD DRAIN, ONE WAS BASIN & WATER CLOSET. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2003-09-24Permit EQ — ISSUED
2003-09-24Permit NB — ISSUED
2003-08-12ECB Hazardous violation: STAGNANT WATER ACCUMULATION.AT TIME OF INSPECTION SITE WAS NOT GRADED (LEVELED)AN EXCAVATION @ S/W CORNER ACCUMULATED WATER(WATER $500
2003-05-23Permit NB — ISSUED
2002
2002-12-23Permit NB — ISSUED
2002-12-13Job filed: INSTALL NEW BUILDERS PAVEMENT PLAN. FILED IN CONJUNCTION WITH NEW BUILDING #103300116.
2002-12-13Job filed: INSTALL NEW BUILDERS PAVEMENT PLAN. FILED IN CONJUNCTION WITH NEW BUILDING #103300116.
2002-10-29Job filed: RESUMISSION OF AREAWAY PLANS & CROSS SECTIONS CONSTRUCTION AS REQUIRE D NY DEPARTMENT OF TRANSPORTATION FOR APPROVAL.
2002-10-21Permit AL — ISSUED
2002-09-11ECB Hazardous violation: EXCAVATED, STAGNANT WATER. ACCUMULATION (WEST NILE VIOLATION) WATER HAD ACCUMULATED AT ABOVE ADDRESS IN LOW AREA OF UNGRADED LOT 3$500
2002-09-11ECB Hazardous violation: NO 24 HR NOTICE PRIOR TO DEMO. AT ABOVE ADDRESS BLDG IS DOWN TO GRADE AND DOB RECORDS SHOW THAT NO 24 HR NOTICE HAD BEEN GIVEN PRI
2002-08-30Permit PL — ISSUED
2002-08-28Permit AL — ISSUED
2002-06-07Permit DM — ISSUED
2002-05-31Permit EQ — ISSUED
2002-05-21Job filed: DM
2002-04-26Job filed: PROPOSE TO INSTALL A TEMPORARY FENCE AS SHOWN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2002-04-25ECB Non-Hazardous violation: WORK WITHOUT A PERMIT NEW BUILDING AT TIME OF INSPECTION PART 1 OF FOUNDATION FOR NEW BUILDING NEXT TO ADJACENT BUILDING AT 636 W
2002-04-25ECB Non-Hazardous violation: DEMOLITION WORK WITHOUT A PERMIT VIOLATION NOTED AT TIME OF INSPECTION BUILDING AT THE ABOVE ADDRESS WAS COMPLETLY DEMOLISHED AND
2002-04-16Job filed: INSTALL NEW STRUCTURAL FRAMING AND FOUNDATION FOR NEW BUILDING.
2002-04-16Job filed: INSTALL NEW STRUCTURAL FRAMING AND FOUNDATION FOR NEW BUILDING.
2002-03-11ECB Hazardous violation: FAILURE TO SAFEGUARD PUBLIC AND PROPERTY: UPON ISPECTION OF SITE, HOLES AT SITE FENCE DOWN DEBRIS ON SITE. BLDG DOWN (ALL). FENCE
2002-03-11ECB Hazardous violation: WORK WITHOUT A PERMIT (HAZARDOUS) DEMOLITION DONE WITHOUT A PERMIT BRING DOWN/ GONE. REMEDY: STOP ALL WORK; OBTAIN DEMOLITION PERM$800
2002-03-11ECB Hazardous violation: FAILURE TO SAFELY AND PROPERLY REMOVE MATERIAL DEBRIS FROM DEMOLITION SITE. UPON INSPECTION DEBRIS LEFT ON SITE G L DID NOT REMOVE
2002-03-11ECB Hazardous violation: NO PERMIT FOR FENCE: UPON INSPECTION OF ILLEGAL DEMOLITION JOB HAD NO FENCE PERMIT. REMEDY: STOP ALL WORK APPLY FOR FENCE PERMIT.$500
2002-03-11ECB Hazardous violation: NO CONTRACTORS SIGN @ JOB SITE UPON INSPECTION, NO GL FOR DEMOLITION JOB WAS POSTED. REMEDY:PROVIDE SIGN.$250
2002-03-11DOB complaint, category ?
2002-01-24Job filed: General construction to include new partitions and storefront for retail space.$40,000
2002-01-14Job filed: RENOVATE 2ND FLOOR OFFICE AND ADD GREEN HOUSE TO ROOF. CONSTRUCT INTERIOR PARTITIONS, INSTALL PLUMBING FIXTURES ,MECHANICAL/HVAC DUCTWORK AND STRUCT$29,000
2001
2001-12-17Permit EQ — ISSUED
2001-12-17Permit AL — ISSUED
2001-12-12Job filed: A1$1,000
2001-06-29Job filed: Renovation of an existing commercial space, including new rooftop addition, partition work, minor plumbing and HVAC work. There will be change in use$120,000
2001-06-29Job filed: Renovation of an existing commercial space, including new rooftop addition, partition work, minor plumbing and HVAC work. There will be change in use$120,000
2001-05-30Permit EW — ISSUED
2001-05-04Job filed: NB
2001-05-04Job filed: NB
2001-04-23Job filed: Interior demolition of an exisitng comme rcial space, including partitio There will be no change to use, egress o r occupancy under this application.$5,000
2001-04-23Job filed: Interior demolition of an exisitng comme rcial space, including partitio There will be no change to use, egress o r occupancy under this application.$5,000
2001-04-09Permit EW — ISSUED
2001-04-09Permit EW — ISSUED
2001-04-06Job filed: REMOVE INTERIOR PARTITIONS, EQUIPMENT, SYSTEMS, & FINISHES.$7,000
2001-04-06Job filed: REMOVE INTERIOR PARTITIONS, EQUIPMENT, SYSTEMS, & FINISHES.$7,000
2001-04-06Job filed: REMOVE INTERIOR PARTITIONS, EQUIPMENT, SYSTEMS, & FINISHES.$7,000
2001-02-07Mortgage $2,100,000 — from WEST END DEVELOPMENTCORPORATION to GIWNER, MORRIS$2,100,000
2001-02-07Mortgage assigned — from FRALDO AUTO REALTY CORP. to LELLA, FRANK; PISCITELLO, ALDO
2001-02-07Deed — from GIWNER, MORRIS to WEST END DEVELOPMENTCORPORATION
2000
2000-11-22Deed — from LEBEWOHL, JACOB J. DEF.; RIVERA, LILLIAN REFEREE to GINWNER, MORRIS
1999
1999-04-06DOB complaint, category ?
1999-03-24Mortgage satisfied — from FRALDO REALTY AUTO REALTY CORP. to CHEMICAL BANK
1999-03-24Mortgage satisfied — from T.A.F. AUTO CENTER INC. to 1460 BROADWAY CORP.
1999-01-11ECB Hazardous violation: FAILURE TO OBTAIN EQUIPMENT USE PERMIT. NOTED: TRANE A/C UNIT ON ROOFTOP LOCATION ROOF. REMEDY: OBTAIN AN EQUIPMENT USE PERMIT F$150
1999-01-07DOB complaint, category ?
1998
1998-03-04Permit EQ — ISSUED
1996
1996-09-30Deed — from PISCITELLO, ALDO to GIWNER, MORRIS
1993
1993-12-02Permit AL — ISSUED
1993-12-02Permit SG — ISSUED
1991
1991-12-02DOB complaint, category ?
1991-11-29DOB complaint, category ?
1991-08-13Permit SG — ISSUED
1991-08-08Permit SG — ISSUED
1991-04-02DOB violation ES:
1991-04-02DOB violation ES:
1988
1988-06-23Mortgage assigned — from 1465 BROADWAY CORP to MAIDMAN, ROBERT M
1986
1986-11-20Deed — from FRALDO AUTO SUPLY CORP. to 621 WEST 46 ASSOCIATES
1986-11-20Mortgage $800,270 — from 621 WEST 46 ASSOCS to FRALDO AUTO RLTY CP$800,270
1985
1985-10-02Mortgage $200,000 — from FRALDO AUTO REALTY CP to CHEMICAL BANK$200,000
1981
1981-05-26Deed — from T A F AUTO CENTER INC to FRALDO AUTO REALTY CORP
1981-01-20Deed — from 1465 BROADWAY CORP to T A F AUTO CENTER INC
1981-01-20Mortgage — from T A F AUTO CENTER INC to 1465 BROADWAY CORP
1979
1979-08-08Agreement — from CROW, ROM & MCDUCK ETAL to 1465 BROADWAY CORP
1978
1978-09-21Deed — from MAIDMOR RLTY CORP to 1465 BROADWAY CORP
1974
1974-12-05Deed — from MAIDMAN, IRVING to MAIDMORE REALTY CORP
1973
1973-03-28Deed — from MAIDMOR REALTY CORP to MAIDMAN, IRVING
1973-03-02Deed — from MAIDMOR REALTY CORP to MAIDMAN, IRVING
1973-02-09Agreement — from MAIDMOR REALTY CORP to ATLANTIC CONTINENTALCO
1973-02-09Mortgage — from MAIDMOR REALTY CORP to ATLANTIC CONTINENTALCO
1972
1972-02-08Agreement — from MAIDMOR REALTY CORP to ATLANTIC CONTINENTALCO
1972-02-08Mortgage — from MAIDMOR REALTY CORP to ATLANTIC CONTINENTALCO
1972-02-08Deed — from MAIDMAN, IRVING to MAIDMOR REALTY CORP
1972-01-14Mortgage assigned — from ATLANTIC COMPANY to ATLANTIC CONTINENTALCO
1971
1971-04-05Deed — from MAIDMOR REALTY CORP to MAIDMAN, IRVING
1971-01-29Mortgage — from MAIDMOR REALTY CORP to ATLANTIC COMPANY