Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

242 West 76 Street · Manhattan · BBL 1011670055 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

24 service requests in the last three years. Most common: Illegal Parking (11) · Noise (8) · Blocked Driveway (2) · Taxi Complaint (1) · Lost Property (1) · Obstruction (1).

Filed construction activity

$6,086,900 in permitted construction work filed since 2016 (36 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Registered with HPD — the names behind the building

Registered owner(s)242 WEST 76 REALTY LLC
Head officerRONALD DOMB
Managing agentYARON BURKO
Last registered2025-09-09

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$29,088,000 $13,089,600
2026$32,055,000 $14,424,750
2027$37,796,000 $17,008,200

The city's market estimate has risen 30% between tax years 2025 and 2027.

Building systems

Energy grade (LL33)A — ENERGY STAR score 94/100 (2022 disclosure cycle)
Heating fuelNATURALGAS
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
The Wallace LoungeItalianA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway79 St — 1 · 850 ft straight-line (about a 4-minute walk) · station accessibility: none
72 St — 1 2 3 · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full
BusNearest boarding stop: Broadway / W 76 St — M104 · 150 ft
Citi BikeW 78 St & Broadway · 650 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 087 William Sherman. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

242 West 76 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

24 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $12,360,015 on 2007-06-19 (lender: CIBC INC.). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2022-02-28M&CON $36,000,000 — from 242 WEST 76 REALTY LLC to ISRAELI DISCOUNT BANK OF NEW YORK $36,000,000
2016-04-05M&CON $32,000,000 — from 242 WEST 76 REALTY LLC to ISRAEL DISCOUNT BANK OF NEW YORK $32,000,000
2016-04-05Deed $69,420,000 — from THE MILBURN HOTEL, LLC to 242 WEST 76 REALTY LLC $69,420,000
2016-03-24Sold for $69,420,000 $69,420,000 $69,420,000
2007-06-19Agreement $25,000,000 — from THE MILBURN HOTEL, LLC to CIBC INC. $25,000,000
2007-06-19Mortgage $12,360,015 — from THE MILBURN HOTEL, LLC to CIBC INC. $12,360,015
1998-10-23Mortgage $9,843,485 — from MILBURN HOTEL, LLC to LEHMAN BROTHERS HODLINGS INC.; LEHMAN CAPITAL $9,843,485
1995-08-23Mortgage $54,750 — from NEW MILBURN ASSOCIATES to EMIGRANT SAVINGS BANK $54,750
1986-02-25Mortgage $500,000 — from NEW MILBURN ASSOC. to BANK HAPOALIM B.M. $500,000
1985-01-31Mortgage $3,557,732 — from NEW MILBURN ASSOCIATES to BANK HAPOALIM B.M. $3,557,732
1985-01-31Mortgage $1,800,000 — from NEW MILBURN ASSOCIATES to BANK HAPOALIM B.M. $1,800,000
1983-10-20Mortgage $1,000,000 — from JEDDRO, INC. to 242 W 76 STREET ASSOC. $1,000,000

Ten-year activity

100500
2017
2018
96
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017178110339
2018183280150
2019303610296
2020198111140
2021224160042
2022111181334
202341120320
202400110314
2025015028
20262070110
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 12 records

DateRecord
2026-09-25311: Noise - Street/Sidewalk — Loud Talking
2026-09-25311: Noise - Street/Sidewalk — Loud Talking
2026-09-09Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang
2026-08-05Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang
2026-07-14311: Illegal Parking — Double Parked Blocking Traffic
2026-06-16311: Illegal Parking — Posted Parking Sign Violation
2026-05-13Restaurant inspection: THE WALLACE LOUNGE — grade A
2026-05-09311: Illegal Parking — Double Parked Blocking Traffic
2026-05-09311: Illegal Parking — Double Parked Blocking Traffic
2026-05-07311: Obstruction — Cone
2025-12-01Bedbug filing: 0 infested units
2025-11-07Air permit (REGISTRATION), fuel: NATURALGAS

The full timeline

2026
2026-09-25311: Noise - Street/Sidewalk — Loud Talking
2026-09-25311: Noise - Street/Sidewalk — Loud Talking
2026-09-09Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2026-08-05Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2026-07-14311: Illegal Parking — Double Parked Blocking Traffic
2026-06-16311: Illegal Parking — Posted Parking Sign Violation
2026-05-13Restaurant inspection: THE WALLACE LOUNGE — grade A
2026-05-09311: Illegal Parking — Double Parked Blocking Traffic
2026-05-09311: Illegal Parking — Double Parked Blocking Traffic
2026-05-07311: Obstruction — Cone
2025
2025-12-01Bedbug filing: 0 infested units
2025-11-07Air permit (REGISTRATION), fuel: NATURALGAS
2025-08-29Rodent inspection: Passed
2025-02-22311: Noise — Noise: lawn care equipment (NCL)
2025-01-18311: Illegal Parking — Posted Parking Sign Violation
2025-01-17311: Illegal Parking — Double Parked Blocking Vehicle
2025-01-09311: Illegal Parking — Posted Parking Sign Violation
2025-01-03FDNY inspection (RISK)
2024
2024-12-30311: Noise - Street/Sidewalk — Loud Music/Party
2024-12-13311: Lost Property — Bag/Wallet
2024-12-04Bedbug filing: 0 infested units
2024-11-03311: Noise — Noise: lawn care equipment (NCL)
2024-10-31311: Noise — Noise: lawn care equipment (NCL)
2024-10-24Rodent inspection: Passed
2024-09-10311: Noise - Street/Sidewalk — Loud Talking
2024-08-30Rodent inspection: Failed for Rat Activity
2024-08-14311: Noise - Residential — Loud Music/Party
2024-06-14311: Illegal Parking — Blocked Sidewalk
2024-04-19311: Illegal Parking — Parking Permit Improper Use
2024-04-17Restaurant inspection: THE WALLACE LOUNGE — grade A
2024-03-12311: Illegal Parking — Posted Parking Sign Violation
2024-03-11311: Illegal Parking — Posted Parking Sign Violation
2023
2023-12-12Bedbug filing: 0 infested units
2023-12-12311: Blocked Driveway — No Access
2023-12-12311: Blocked Driveway — No Access
2023-11-29Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2023-11-15HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2023-10-30311: Taxi Complaint — Driver Complaint - Passenger
2023-10-05311: Noise - Residential — Banging/Pounding
2023-09-23311: Noise - Residential — Loud Music/Party
2023-09-11Rodent inspection: Passed
2023-08-29Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2023-07-05Rodent inspection: Passed
2023-07-01311: Rodent — Rat Sighting
2023-06-20Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2023-06-16311: Blocked Driveway — No Access
2023-06-14311: Illegal Parking — Posted Parking Sign Violation
2023-04-15311: Lost Property — Jewelry
2023-02-21Facade (LL11) filing, cycle 9: SWARMP
2023-01-08311: Boilers — Boiler - Defective/Inoperative/No Permit
2023-01-08DOB complaint, category ?
2023-01-04Permit Mechanical Systems — Signed-off
2022
2022-12-21Job filed: FILING OF ROOFTOP/OUTDOOR SPLIT HVAC CONDENSING UNITS TO OBTAIN PERMIT AND CERTIFICATE OF COMPLIANCE, NO CHANGE INUSE EGRESS OR OCCUPANCY$42,000
2022-12-20Bedbug filing: 0 infested units
2022-11-24311: Street Sign - Damaged — No Parking, Standing, Stopping
2022-10-11Permit EW — ISSUED
2022-10-07311: Noise - Helicopter — Other
2022-09-26311: Noise - Residential — Banging/Pounding
2022-09-06Job filed: Plumbing work for accessory kitchen in the cellar and for a new lounge room in the first floor as per plans in conjunction with alteration CO applica$32,500
2022-08-25311: HEAT/HOT WATER — APARTMENT ONLY
2022-08-25Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2022-08-18Permit Plumbing — Signed-off
2022-08-10Permit General Construction — Permit Issued
2022-08-05Job filed: Plumbing work for accessory kitchen in the cellar and for a new lounge room in the first floor as per plans in conjunction with alteration CO applica$32,500
2022-08-02311: Noise - Helicopter — Other
2022-07-19Permit PL — ISSUED
2022-07-15311: Noise - Residential — Banging/Pounding
2022-07-13Elevator permit: "Furnish and install one new incline wheelchair lift. All work will comply with ASME A18.1-2005,Section 3 for incline wheelchair l$25,100
2022-06-24Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2022-06-09Facade (LL11) filing, cycle 8: SWARMP
2022-05-09311: Noise - Residential — Banging/Pounding
2022-05-02Permit General Construction — Permit Issued
2022-04-13Rodent inspection: Passed
2022-04-11311: Noise - Residential — Banging/Pounding
2022-04-05311: Noise - Residential — Banging/Pounding
2022-03-28Permit EW — ISSUED
2022-03-24311: Illegal Parking — Posted Parking Sign Violation
2022-03-24311: Street Light Condition — Lamppost Leaning
2022-03-24311: Blocked Driveway — No Access
2022-03-20311: Noise - Helicopter — Other
2022-03-10Job filed: Propose change of use at the Cellar level to add a multipurpose room and a accessory kitchen to serve the new lounge room at the First floor. No chang$120,000
2022-02-28M&CON $36,000,000 — from 242 WEST 76 REALTY LLC to ISRAELI DISCOUNT BANK OF NEW YORK$36,000,000
2022-02-01311: Illegal Parking — Posted Parking Sign Violation
2022-01-20311: Illegal Parking — Posted Parking Sign Violation
2022-01-05DOB complaint, category ?
2022-01-04311: Noise - Helicopter — Other
2021
2021-12-16311: Noise - Helicopter — Other
2021-12-13311: Illegal Parking — Posted Parking Sign Violation
2021-12-09311: Illegal Parking — Posted Parking Sign Violation
2021-12-07Bedbug filing: 0 infested units
2021-12-07Bedbug filing: 0 infested units
2021-12-02311: Illegal Parking — Posted Parking Sign Violation
2021-11-24311: Illegal Parking — Posted Parking Sign Violation
2021-09-27DOB violation E:
2021-08-17Permit EW — ISSUED
2021-08-17Permit EW — ISSUED
2021-08-17Permit EW — ISSUED
2021-08-17Permit EW — ISSUED
2021-08-17Permit EW — ISSUED
2021-08-17Permit EW — ISSUED
2021-08-04Permit Sidewalk Shed — Signed-off
2021-04-16Permit EW — ISSUED
2021-04-16Permit EW — ISSUED
2021-04-10311: Indoor Air Quality — Dust from Construction
2021-04-01Permit PL — ISSUED
2021-04-01Permit PL — ISSUED
2021-03-22Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2021-03-11DOB complaint, category ?
2021-03-10ECB CLASS - 2 violation: WORK CONTRARY TO CONSTRUCTION DRAWINGS.AT THE TIME OF MY INSPECTION,I OBSERVED THAT THE SUPPORTING SHED BUILT UNDER PERMIT NO.M004
2021-03-08Permit PL — ISSUED
2021-03-06311: HEAT/HOT WATER — ENTIRE BUILDING
2021-03-06311: ELECTRIC — POWER OUTAGE
2021-03-06Tenant complaint: ELECTRIC — POWER OUTAGE
2021-03-06Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2021-03-03Permit EW — ISSUED
2021-02-26Bedbug filing: 0 infested units
2021-02-22Permit Plumbing — Signed-off
2021-02-22Permit Plumbing — Signed-off
2021-02-09311: HEAT/HOT WATER — APARTMENT ONLY
2021-02-09Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2021-01-14Permit EW — ISSUED
2021-01-14Permit EW — ISSUED
2021-01-14Permit EW — ISSUED
2021-01-14Permit EW — ISSUED
2021-01-14Permit EW — ISSUED
2021-01-14Permit EW — ISSUED
2021-01-05311: COVID-19 Non-essential Construction — Construction
2021-01-05DOB complaint, category ?
2020
2020-12-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-12-09DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-11-30311: PLUMBING — TOILET
2020-11-30Tenant complaint: PLUMBING — TOILET
2020-10-27LDMK — from NYC LANDMARKS PRESERVATION COMMISSION
2020-10-22Permit Sidewalk Shed — Signed-off
2020-10-12Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF$1,000
2020-09-23Rodent inspection: Passed
2020-09-21DOB complaint, category ?
2020-09-21DOB complaint, category ?
2020-09-18ECB CLASS - 2 violation: SEC. BC 3307.6.5.8 NO PERIODIC INSPECTION LETTER AT SITE OR PROVIDED. AT TIME OF INSPECTION ON AN 15 STY BLDG. I OBSERVED ACTIVE S$625
2020-09-18ECB CLASS - 1 violation: SEC. BC 3309.10 FAIL TO PROTECT ADJOINING PROPERTY. AT TIME OF INSPECTION ON AN 15 STY BLDG. I OBSERVED ACTIVE SITE W/A SSM PRESEN$625
2020-09-18ECB CLASS - 1 violation: SEC. BC 3314.4.3.1 INSPECTION PRIOR TO THE INSTALLATION OF SUSPENDED SCAFFOLD. NOTE: AT TIME OF INSPECTION ON AN 15 STY BLDG WORK $2,500
2020-08-21Permit EW — ISSUED
2020-08-09Permit Sidewalk Shed — Signed-off
2020-07-29Permit Plumbing — Signed-off
2020-07-13311: Street Sign - Missing — Other/Unknown
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit PL — ISSUED
2020-06-29DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
2020-06-04311: WATER LEAK — HEAVY FLOW
2020-06-04Tenant complaint: WATER LEAK — HEAVY FLOW
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-28Permit EW — ISSUED
2020-05-05311: UNSANITARY CONDITION — PESTS
2020-05-05311: Rodent — Mouse Sighting
2020-05-05Tenant complaint: UNSANITARY CONDITION — PESTS
2020-03-30Permit PL — ISSUED
2020-03-20Permit Plumbing — Signed-off
2020-03-17Job filed: REPLACE PLUMBING FIXTURES.$56,000
2020-01-24311: HEAT/HOT WATER — APARTMENT ONLY
2020-01-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2020-01-22311: Non-Residential Heat — Inadequate or No Heat
2019
2019-12-24311: Asbestos — Asbestos Complaint (B1)
2019-12-11Permit PL — ISSUED
2019-12-11Permit PL — ISSUED
2019-12-05ECB CLASS - 1 violation: BC 3314.10.9 TIE BACK @TIME OF INSPECTION FOR AN EXISTING 15 STY BUILDING, I OBSERVED AN OUTRIGGERS SUSPENDED SCAFFOLD @EXP (1). H
2019-12-05DOB complaint, category ?
2019-12-04Permit EW — ISSUED
2019-12-03Permit Plumbing — Signed-off
2019-12-02Job filed: Install new plumbing fixtures for two restrooms at cellar.$10,000
2019-12-02Job filed: PROPOSED RENOVATION AND MODIFICATION OF EXISTING HOTEL LOBBY AT FIRST FLOOR AS PER PLANS FILED HEREWITH AND, TO ADD NEW PARTITIONS. NO CHANGE OF USE, $20,000
2019-12-02Job filed: PROPOSED RENOVATION AND MODIFICATION OF EXISTING HOTEL LOBBY AT FIRST FLOOR AS PER PLANS FILED HEREWITH AND, TO ADD NEW PARTITIONS. NO CHANGE OF USE, $20,000
2019-12-02Job filed: PROPOSED RENOVATION AND MODIFICATION OF EXISTING HOTEL LOBBY AT FIRST FLOOR AS PER PLANS FILED HEREWITH AND, TO ADD NEW PARTITIONS. NO CHANGE OF USE, $20,000
2019-12-02Job filed: PROPOSED RENOVATION AND MODIFICATION OF EXISTING HOTEL LOBBY AT FIRST FLOOR AS PER PLANS FILED HEREWITH AND, TO ADD NEW PARTITIONS. NO CHANGE OF USE, $350,000
2019-11-27Permit EW — ISSUED
2019-11-25Job filed: PROPOSED INTERIOR WORK TO ADD NON STRUCTURAL WALLS IN ORDER TO ADD BATHROOMS AT CELLAR AS PER PLANS FILED HEREWITH.PLUMBING WORK TO BE FILED SEPARATEL$15,000
2019-11-25Job filed: PROPOSED INTERIOR WORK TO ADD NON STRUCTURAL WALLS IN ORDER TO ADD BATHROOMS AT CELLAR AS PER PLANS FILED HEREWITH.PLUMBING WORK TO BE FILED SEPARATEL$15,000
2019-10-28Elevator permit: Modernize 1P15184 and 1P15185 per Device Job Description. All work to comply with ASME A17.1-2000/03, Chapter 30 of 2014 BC, Appen$310,000
2019-10-24Permit EW — ISSUED
2019-10-18Permit PL — ISSUED
2019-09-04Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000
2019-08-07Permit Sidewalk Shed — Signed-off
2019-07-02Permit PL — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-20Permit EW — ISSUED
2019-06-20Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-05-17Rodent inspection: Passed
2019-04-22HPD class A: § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS AT PUBLIC HALL, 12th STORY
2019-04-22HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 1
2019-04-22HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AND WALLS AT PUBLIC HAL
2019-04-22HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH AND EAST WALLS IN THE BATHROOM LOCAT
2019-04-22HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1207, 12th STORY, 1st APARTMENT FROM
2019-04-22HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET ON WEST WALL IN THE KITCHENETTE LOCATED AT APT 1207, 12th STORY
2019-04-22HPD class A: § 27-2005 ADM CODE REFIT DOORS ON BASE CABINET AT EAST AND NORTH IN THE KITCHENETTE LOCATED AT APT 1207, 12th STORY, 1st APARTMENT FROM EAST
2019-04-22HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 1
2019-04-22HPD class A: § 27-2005 ADM CODE REFIT DOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 1207, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
2019-04-22HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 2nd ROOM FROM
2019-04-22HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1
2019-04-22HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 3rd ROOM FROM
2019-04-22HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE BATHROOM LOCA
2019-04-17Tenant complaint: FLOORING/STAIRS — FLOOR
2019-04-17Tenant complaint: ELECTRIC — OUTLET/SWITCH
2019-04-17Tenant complaint: PLUMBING — RADIATOR
2019-04-17Tenant complaint: WATER LEAK — HEAVY FLOW
2019-04-17Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2019-04-17Tenant complaint: PAINT/PLASTER — WALL
2019-04-17Tenant complaint: PAINT/PLASTER — WALL
2019-04-17Tenant complaint: PLUMBING — BATHTUB/SHOWER
2019-04-17Tenant complaint: PAINT/PLASTER — WALL
2019-04-17Tenant complaint: PAINT/PLASTER — CEILING
2019-04-17Tenant complaint: DOOR/WINDOW — DOOR
2019-04-17Tenant complaint: GENERAL — CABINET
2019-04-17Tenant complaint: PLUMBING — BASIN/SINK
2019-04-10Permit PL — ISSUED
2019-04-09HPD litigation: Tenant Action/Harrassment
2019-04-04311: Noise — Noise: Construction Equipment (NC1)
2019-03-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 2nd ROOM FROM
2019-03-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE 3rd ROOM FROM
2019-03-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE KITCHEN LOCAT
2019-03-18HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE BATHROOM LOCA
2019-03-18HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1207, 12th STORY, 1st APARTMENT FRO
2019-03-18HPD class B: § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1207, 12th STOR
2019-03-11311: Indoor Air Quality — Dust from Construction
2019-03-11311: UNSANITARY CONDITION — MOLD
2019-03-11311: PAINT/PLASTER — WALL
2019-03-11311: PAINT/PLASTER — WALL
2019-03-11311: UNSANITARY CONDITION — MOLD
2019-03-11311: PAINT/PLASTER — CEILING
2019-03-11311: PAINT/PLASTER — CEILING
2019-03-11311: HEAT/HOT WATER — APARTMENT ONLY
2019-03-11Tenant complaint: UNSANITARY CONDITION — MOLD
2019-03-11Tenant complaint: PAINT/PLASTER — WALL
2019-03-11Tenant complaint: PAINT/PLASTER — CEILING
2019-03-11Tenant complaint: UNSANITARY CONDITION — MOLD
2019-03-11Tenant complaint: PAINT/PLASTER — WALL
2019-03-11Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2019-03-11Tenant complaint: PAINT/PLASTER — CEILING
2019-02-20Permit EW — ISSUED
2019-02-20Permit EW — ISSUED
2019-02-15311: PAINT/PLASTER — CEILING
2019-02-15311: PAINT/PLASTER — WALL
2019-02-15311: PAINT/PLASTER — WALL
2019-02-15311: PAINT/PLASTER — WALL
2019-02-15311: UNSANITARY CONDITION — MOLD
2019-02-15311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2019-02-15Tenant complaint: PAINT/PLASTER — WALL
2019-02-15Tenant complaint: PAINT/PLASTER — WALL
2019-02-15Tenant complaint: PAINT/PLASTER — WALL
2019-02-15Tenant complaint: PAINT/PLASTER — CEILING
2019-02-15Tenant complaint: UNSANITARY CONDITION — MOLD
2019-02-15DOB complaint, category ?
2019-01-24Job filed: SUBSEQUENT FILING OF STRUCTURAL SUPPORT FOR NEW MECHANICAL UNITS AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$18,000
2019-01-24Job filed: IT IS PROPOSED TO REPLACE EXISTING MECHANICAL EQUIPMENT ON EXISTING DUCTWORK AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$300,000
2018
2018-12-11HPD class B: § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 1
2018-12-11HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING ALL WALLS IN THE 3rd ROOM FROM EAS
2018-12-11HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT AP
2018-12-11HPD class B: § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT AP
2018-12-11HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING ALL WALLS IN THE 2nd ROOM FROM EAS
2018-12-11HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 1207, 12th STORY, 1st APARTM
2018-12-10311: ELECTRIC — WIRING
2018-12-10311: WATER LEAK — SLOW LEAK
2018-12-10311: PAINT/PLASTER — CEILING
2018-12-10311: DOOR/WINDOW — WINDOW PANE
2018-12-10311: DOOR/WINDOW — WINDOW FRAME
2018-12-10311: HEAT/HOT WATER — APARTMENT ONLY
2018-12-10311: GENERAL — CABINET
2018-12-10311: GENERAL — VENTILATION SYSTEM
2018-12-10311: PAINT/PLASTER — WALL
2018-12-10Tenant complaint: PAINT/PLASTER — CEILING
2018-12-10Tenant complaint: ELECTRIC — WIRING
2018-12-10Tenant complaint: DOOR/WINDOW — WINDOW FRAME
2018-12-10Tenant complaint: WATER LEAK — SLOW LEAK
2018-12-10Tenant complaint: DOOR/WINDOW — WINDOW PANE
2018-12-10Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2018-12-10Tenant complaint: PAINT/PLASTER — WALL
2018-12-10Tenant complaint: GENERAL — VENTILATION SYSTEM
2018-12-10Tenant complaint: GENERAL — CABINET
2018-12-05311: Noise - Residential — Banging/Pounding
2018-12-05Permit PL — ISSUED
2018-12-05Permit PL — ISSUED
2018-11-18Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2018-11-01Permit Sidewalk Shed — Signed-off
2018-10-26Permit Sidewalk Shed — Signed-off
2018-10-17Permit PL — ISSUED
2018-09-12Job filed: FILING FOR LIMITED EXTERIOR REPAIRS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.$758,500
2018-08-30Rodent inspection: Passed
2018-06-14Permit PL — ISSUED
2018-06-08Permit EW — ISSUED
2018-06-07Permit EW — ISSUED
2018-06-07Permit EW — ISSUED
2018-06-07Permit EW — ISSUED
2018-06-02DOB violation E:
2018-05-11311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-11311: Noise - Vehicle — Engine Idling
2018-05-03Permit EW — ISSUED
2018-05-03Permit EW — ISSUED
2018-04-19Permit PL — ISSUED
2018-03-13Permit Sidewalk Shed — Signed-off
2018-03-07DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2018-02-27Job filed: IT IS PROPOSED TO INSTALL NEW HOT WATER HEATER, PUMP AND REPLACE WATER RISER SYSTEM AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$280,000
2018-02-27Job filed: IT IS PROPOSED TO MODIFY EXISTING SPRINKLER AND STANDPIPE SYSTEMS AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$320,000
2018-02-27Job filed: IT IS PROPOSED TO INSTALL NEW HOT WATER HEATER, PUMP AND REPLACE WATER RISER SYSTEM AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$280,000
2018-02-21DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017
2017-12-29Facade (LL11) filing, cycle 8: SWARMP
2017-12-29DOB violation FISP:
2017-12-21311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2017-12-21DOB complaint, category ?
2017-12-19Permit Sidewalk Shed — Signed-off
2017-12-17311: Street Condition — Plate Condition - Noisy
2017-12-15Job filed: INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $1,000
2017-12-13Permit PL — ISSUED
2017-11-24ECB CLASS - 1 violation: FAILURE TO TAKE AND PROVIDE SAFETY MEASURES(SIDE WALK SHED NETTING ETC)WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM DOC$2,400
2017-11-24ECB CLASS - 1 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NORTH ELEVATION EXPOSURE 1 OBSERVED VERTICAL CRACK ON MASONRY BRICK$1,000
2017-11-16Job filed: INSTALLATION OF A MANUAL, AUTOMATIC SMOKE/HEAT/C.O. DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH ONE-WAY & TWO-WAY VOICE COMMUNICATION SYSTEM $360,000
2017-11-15311: Facades — Facade (LL11/98)- Unsafe Notification
2017-11-02Rodent inspection: Passed
2017-10-17Permit PL — ISSUED
2017-10-12Permit EW — ISSUED
2017-10-12Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING CLASS HOTEL-CLASS "B" UNIT APTS FROM THE 2ND TO THE 8TH FLOOR. PROPOSED RENOVATION DOES NOT INCLUDE EXISTING $486,000
2017-10-12Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING CLASS HOTEL-CLASS 'B' UNIT APTS FROM THE 2ND TO THE 8TH FLOOR. PROPOSED RENOVATION DOES NOT INCLUDE EXISTING $486,000
2017-08-15DOB complaint, category ?
2017-06-18311: Noise - Residential — Loud Music/Party
2017-06-17311: Noise - Vehicle — Engine Idling
2017-06-15Permit PL — ISSUED
2017-06-12Permit EW — RE-ISSUED
2017-06-12Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING CELLAR LEVEL ACCESSORY TO EXISTING COMMERCIAL USE. PROPOSED CELLAR RENOVATION INCLUDES REMOVAL OF INTERIOR PA$155,000
2017-05-18311: Emergency Response Team (ERT) — After Hours Work - Illegal
2017-05-18DOB complaint, category ?
2017-05-17311: Noise - Commercial — Banging/Pounding
2017-04-11311: Derelict Vehicle — With License Plate
2017-02-28311: Noise — Noise: Construction Before/After Hours (NM1)
2017-02-27Rodent inspection: Passed
2017-02-24DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2017-01-30311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2017-01-30311: Noise - Commercial — Banging/Pounding
2017-01-25Permit EW — RE-ISSUED
2017-01-25Permit EW — RE-ISSUED
2017-01-24Permit PL — RE-ISSUED
2017-01-20Permit EW — ISSUED
2017-01-20Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING CLASS "A" AND HOTEL-CLASS "B" UNIT APTS FROM THE 10TH TO THE 16TH FLOOR. PROPOSED RENOVATION DOES NOT INCLUDE$445,200
2017-01-20Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING CLASS 'A' AND HOTEL-CLASS 'B' UNIT APTS FROM THE 10TH TO THE 16TH FLOOR. PROPOSED RENOVATION DOES NOT INCLUDE$445,200
2017-01-10ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES AS PER 1RCNY-203-04.NOTED:AT TIME OF INSPECTION NORTH ELEVATION EXP
2016
2016-12-23Permit PL — ISSUED
2016-11-11311: Curb Condition — Defacement
2016-11-08311: Curb Condition — Defacement
2016-10-26HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2016-09-28311: Street Condition — Blocked - Construction
2016-09-16DOB complaint, category ?
2016-09-10311: Dead/Dying Tree — Planted More Than 2 Years Ago
2016-08-10Permit EW — ISSUED
2016-08-10Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING HOTEL-CLASS 'B' UNIT APTS ON LEVEL NINE ONLY. PROPOSED RENOVATION DOES NOT INCLUDE UNITS 903, 906 AND 909. T$148,000
2016-08-10Job filed: PROPOSED INTERIOR RENOVATION OF EXISTING HOTEL-CLASS "B" UNIT APTS ON LEVEL NINE ONLY. PROPOSED RENOVATION DOES NOT INCLUDE UNITS 903, 906 AND 909. T$148,000
2016-08-09311: Sidewalk Condition — Broken Sidewalk
2016-07-06311: Noise - Vehicle — Engine Idling
2016-07-05311: Noise - Vehicle — Car/Truck Horn
2016-07-05311: Noise - Vehicle — Engine Idling
2016-06-24311: Noise - Vehicle — Engine Idling
2016-06-20311: Noise - Vehicle — Engine Idling
2016-05-04DOB violation E:
2016-05-04DOB violation E:
2016-04-11Rodent inspection: Passed
2016-04-05M&CON $32,000,000 — from 242 WEST 76 REALTY LLC to ISRAEL DISCOUNT BANK OF NEW YORK$32,000,000
2016-04-05Mortgage assigned — from WELLS FARGO BANK, N.A., AS TRUSTEE to ISRAEL DISCOUNT BANK OF NEW YORK
2016-04-05Deed $69,420,000 — from THE MILBURN HOTEL, LLC to 242 WEST 76 REALTY LLC$69,420,000
2016-04-05REL — from WELLS FARGO BANK, N.A., AS TRUSTEE
2016-04-05PAT — from WELLS FARGO BANK, N.A., AS TRUSTEE to PNC BANK, NATIONAL ASSOCIATION; MIDLAND LOAN SERVICES
2016-03-24Sold for $69,420,000$69,420,000
2015
2015-10-24311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2015-10-24DOB complaint, category ?
2015-09-16311: Noise — Noise: Construction Before/After Hours (NM1)
2015-09-16311: Noise — Noise: Construction Before/After Hours (NM1)
2015-09-01Certificate of occupancy Final
2015-07-24Certificate of occupancy Temporary
2015-07-08311: Taxi Complaint — Vehicle Complaint
2015-05-18Rodent inspection: Passed
2015-04-27Certificate of occupancy Temporary
2015-04-23311: Electrical — Electrical Wiring Defective/Exposed
2015-04-23DOB complaint, category ?
2015-04-16Job filed: FIRE PROTECTION PLAN$1,000
2015-03-16Permit PL — ISSUED
2015-02-24311: HEAT/HOT WATER — APARTMENT ONLY
2015-02-24Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2015-01-13Permit AL — ISSUED
2014
2014-09-10311: Illegal Parking — Commercial Overnight Parking
2014-05-22Rodent inspection: Passed
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-01-27Permit EW — ISSUED
2014-01-27Permit EW — ISSUED
2013
2013-12-14311: Noise - Residential — Banging/Pounding
2013-09-25Job filed: ADDITIONS TO MODIFIED CLASS J.AUTOMATIC SPRINKLER WATERFLOW SWITCHES AND TAMPER FLOW SWITCH PER PLANS FILED HEREWITH. BASE BUILDING FA APPLICATION 12$24,000
2013-09-25Job filed: ADDITIONS TO MODIFIED CLASS J.AUTOMATIC SPRINKLER WATERFLOW SWITCHES AND TAMPER FLOW SWITCH PER PLANS FILED HEREWITH. BASE BUILDING FA APPLICATION 12$24,000
2013-08-30DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
2013-07-18Job filed: HEREWITH FILING THE INSTALLATION OF TWO NEW 6" WATER SERVICE AS PER PLANS SUBMITTED, ALSO IN CONJUNCTION WITH ALT#121093823. NO CHANGE IN USE,EGRESS O$30,000
2013-07-18Job filed: HEREWITH FILING THE INSTALLATION OF TWO NEW 6' WATER SERVICE AS PER PLANS SUBMITTED, ALSO IN CONJUNCTION WITH ALT#121093823. NO CHANGE IN USE,EGRESS O$30,000
2013-06-18Rodent inspection: Passed
2013-06-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2013-04-02DOB violation E:
2013-03-12311: Illegal Parking — Double Parked Blocking Traffic
2013-02-25Permit EQ — ISSUED
2013-02-19Permit EQ — ISSUED
2013-01-21FDNY inspection (SURV)
2013-01-08Permit EQ — ISSUED
2013-01-08Permit EQ — ISSUED
2013-01-08Job filed: INSTALL SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-01-08Job filed: INSTALL SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-01-08Job filed: INSTALL PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-01-08Job filed: INSTALL PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
2013-01-05311: HEATING — HEAT
2013-01-05Tenant complaint: HEATING — HEAT RELATED
2012
2012-12-28Permit EW — ISSUED
2012-12-28Permit EW — ISSUED
2012-11-07Job filed: LEGALIZATION OF EXISTING MODIFIED CLASS J FIRE ALARM SYSTEM IN COMPLIANCE WITH FDNY LETTER (FPIM#1209068) DATED SEPTEMBER 18, 2012. NO CHANGE EGRESS O$360,000
2012-11-07Job filed: LEGALIZATION OF EXISTING MODIFIED CLASS J FIRE ALARM SYSTEM IN COMPLIANCE WITH FDNY LETTER (FPIM#1209068) DATED SEPTEMBER 18, 2012. NO CHANGE EGRESS O$360,000
2012-11-07Job filed: LEGALIZATION OF EXISTING MODIFIED CLASS J FIRE ALARM SYSTEM IN COMPLIANCE WITH FDNY LETTER (FPIM#1209068) DATED SEPTEMBER 18, 2012. NO CHANGE EGRESS O$360,000
2012-10-11Facade (LL11) filing, cycle 7: SWARMP
2012-07-24DOB violation E:
2012-07-24DOB violation E:
2012-06-25Job filed: .$27,500
2012-06-20Job filed: FILING TO INSTALL NEW SPRINKLER HEADS AND FIRE PUMP ON AN EXISTING SPRINKLER & STANDPIPE SYSTEM AS PER PLANS SUBMITTED . NO CHANGE IN USE,EGRESS O$127,200
2012-06-20Job filed: FILING TO INSTALL NEW SPRINKLER HEADS AND FIRE PUMP ON AN EXISTING SPRINKLER & STANDPIPE SYSTEM AS PER PLANS SUBMITTED . NO CHANGE IN USE,EGRESS O$127,200
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-04-19Job filed: FILING HEREWITH TO AMEND EXISTING C OF O. CHANGE FROM RESIDENTIAL APARTMENTS TO HOTEL ROOMS. ALL AS PER PLANS.$1,000
2012-03-29Rodent inspection: Passed
2012-03-21311: Noise - Residential — Loud Music/Party
2012-03-20DOB violation E:
2011
2011-11-01311: NONCONST — VERMIN
2011-11-01311: NONCONST — VERMIN
2011-11-01Tenant complaint: NONCONST — VERMIN
2011-11-01Tenant complaint: NONCONST — VERMIN
2011-10-20Rodent inspection: Passed
2011-09-19Job filed: FILING FOR REGISTRATION PER MDL 67/120
2011-09-19Job filed: FILING FOR REGISTRATION PER MDL 67/120
2011-08-19Permit EW — ISSUED
2011-05-16DOB violation E:
2011-05-16DOB violation E:
2011-04-05311: Building/Use — Illegal Conversion Of Residential Building/Space
2011-04-05DOB complaint, category ?
2011-01-26Permit EW — ISSUED
2011-01-26Permit EW — ISSUED
2010
2010-11-23Job filed: INSTALLATION OF CONDENSING UNITS ON 2ND LOW ROOF & ROOF ALONG WITH AIR CONDITIONING UNITS IN ROOMS & STEEL DUNNAGE SUPPORT AS PER PLANS FILED $750,000
2010-09-30Rodent inspection: Passed
2010-09-06311: Noise - Residential — Loud Music/Party
2010-08-17DOB violation E:
2010-08-17DOB violation E:
2009
2009-07-06DOB violation E:
2009-07-06DOB violation E:
2009-04-16DOB complaint, category ?
2008
2008-10-15ECB CLASS - 1 violation: 52H11.56Y13.56O02.44H08.73O02.74O02.34O02.52B14.10H11.17H11.98BB05.99BB05.95H10.37T07.26D02.52H11 REPLACE WORN HOIST ROPES WORN & $500
2008-10-15ECB CLASS - 2 violation: 62H11.16I10.40O02.16J01.73O02.74O02.34O2.10H11.32H10.29M11.98BB05.99BB05.62H11 COMMUTAR IS WORN REPAIR OR REPLACE 16I10 BSMT SHAFT
2008-05-06DOB violation E:
2008-05-06DOB violation E:
2008-04-16Mortgage assigned — from CIBC INC. to WELLS FARGO BANK, N.A., AS TRUSTEE
2008-04-16AALR — from CIBC INC. to WELLS FARGO BANK, N.A., AS TRUSTEE
2008-03-31DOB violation LL2604E:
2007
2007-06-19Agreement $25,000,000 — from THE MILBURN HOTEL, LLC to CIBC INC.$25,000,000
2007-06-19AL&R — from THE MILBURN HOTEL, LLC to CIBC INC.
2007-06-19Mortgage assigned — from LASALLE NATIONAL BANK; LASALLE BANK NATIONAL ASSOCIATION, F/K/A to CIBC INC.
2007-06-19TL&R — from LASALLE NATIONAL BANK to THE MILBURN HOTEL, LLC
2007-06-19Mortgage $12,360,015 — from THE MILBURN HOTEL, LLC to CIBC INC.$12,360,015
2007-04-25Permit EW — ISSUED
2007-03-14DOB complaint, category ?
2007-03-05DOB complaint, category ?
2007-01-17Facade (LL11) filing, cycle 6: SWARMP
2006
2006-12-20Tenant complaint: PLUMBING — WATER SUPPLY
2006-12-20Tenant complaint: NONCONST — VERMIN
2006-12-20HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT DOOR IN THE ENTRANCE LOCATED AT APT 604
2006-12-19Permit EW — ISSUED
2006-11-14Job filed: It is proposed to install 1-AC Unit as shown on plans. No change to use, egress or occupancy.$15,000
2006-11-14Job filed: It is proposed to install 1-AC Unit as shown on plans. No change to use, egress or occupancy.$15,000
2006-09-14Permit PL — RE-ISSUED
2006-09-06Permit EW — ISSUED
2006-07-14Job filed: It is proposed to do minor renovations to the existing hotel lobby as shown on plans. No change to use, egress or occupancy.$45,000
2006-06-23Permit EQ — ISSUED
2006-06-22Job filed: PROPOSED INSTALLATION OF 75 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL 33/91. NO CHANGE IN USE,
2006-04-06Permit EW — ISSUED
2006-02-14Tenant complaint: HEATING — HEAT RELATED
2006-02-14Tenant complaint: PLUMBING — WATER SUPPLY
2005
2005-09-16Permit EQ — ISSUED
2005-09-16Tenant complaint: PLUMBING — WATER SUPPLY
2005-09-16Tenant complaint: PLUMBING — WATER SUPPLY
2005-09-14Job filed: PROPOSED INSTALLATION OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AT THE NORTH EAST ALLEY-WAY. SIDEWALK SHED SHALL COMPLY WITH
2005-07-27Tenant complaint: NONCONST — VERMIN
2004
2004-12-07Permit EW — ISSUED
2004-11-12Job filed: MISCELLANEOUS FACADE REPAIRS AND BRICK REPLACEMENT, ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHE FILED $35,000
2004-11-05Permit EQ — ISSUED
2004-10-29Job filed: WE SHALL INSTALL 40 LINEAR FT OF HEAVY DUTY SIDEWALK SHED. THIS SHALL BE USED FOR EXTERIOR FACADE RESTORATION. THERE SHALL BE NO CHANGE IN EGRESS, U
2004-10-29Job filed: WE SHALL INSTALL 40 LINEAR FT OF HEAVY DUTY SIDEWALK SHED. THIS SHALL BE USED FOR EXTERIOR FACADE RESTORATION. THERE SHALL BE NO CHANGE IN EGRESS, U
2004-09-17DOB violation E:
2004-09-17DOB violation E:
2004-02-13DOB violation LL6291:
2004-01-05DOB violation E:
2004-01-05DOB violation E:
2003
2003-07-14Mortgage assigned — from LEHMAN BROTHERS HOLDINGS INC. to LASALLE NATIONAL BANK AS TRUSTEE
2003-06-04AALR — from LEHMAN BROTHERS HOLDINGS INC. to LA SALLE NATIONAL BANK
2001
2001-07-26Permit PL — ISSUED
2001-05-18Permit AL — ISSUED
2001-01-04DOB violation E: 1P15784
2001-01-04DOB violation E: 1P15185
2000
2000-10-23Job filed: CONVERT PART OF DOCTORS OFFICE TO APARTM ENTS AND REC. ROOM, CONSTRUCT NEW PARTITONS, INSTALL NEW PLU MBING FIXTURES, MINOR MECHANICAL WORK AT FIRST F$70,000
2000-10-23Job filed: CONVERT PART OF DOCTORS OFFICE TO APARTM ENTS AND REC. ROOM, CONSTRUCT NEW PARTITONS, INSTALL NEW PLU MBING FIXTURES, MINOR MECHANICAL WORK AT FIRST F$70,000
2000-09-07DOB complaint, category ?
1999
1999-11-23ECB Non-Hazardous violation: 40L.
1999-10-06DOB violation E: 1P15184
1999-01-07HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING OF BATHROOM 10 STY APT 104
1999-01-07HPD class C: § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT ENTRANCE DOOR TO 6 STY NORTHWEST APT 604. , SECTI
1999-01-04HPD class B: § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE 4 STY 2 FROM WEST AT NORTH APT 402. LOCATED AT APT 402
1999-01-04HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASHBASIN BATHROOM 10 STY EAST AT NORTH APT 100. LOCATED AT APT 100
1999-01-04HPD class B: § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE VENTILATING SYSTEM 2 STY NORTH SECTION WEST APT 204 BATHROOM. , SECTION '' ''
1999-01-04HPD class C: § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO H
1999-01-04HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BATHROOM TILE NORTH WALL 10 STY EAST AT NORTH APT 100. LOCATED AT APT 100
1999-01-04HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE KITCHEN GASKET REFRIGERATOR 10 STY EAST AT NORTH APT 100. LOCATED AT APT 100
1998
1998-10-23Mortgage $9,843,485 — from MILBURN HOTEL, LLC to LEHMAN BROTHERS HODLINGS INC.; LEHMAN CAPITAL$9,843,485
1998-10-23Mortgage assigned — from EMIGRANT SAVINGS BANK to LEHMAN BROTHERS HOLDINGS INC.; LEHMAN CAPITAL
1998-10-23Mortgage assigned — from MILBURN HOTEL, LLC to LEHMAN CAPITAL; LEHMAN BROTHERS HOLDINGS INC.
1998-10-23Agreement — from MILBURN HOTEL, LLC to LEHMAN BROTHERS HOLDINGS INC.; LEHMAN CAPITAL
1998-10-23Deed — from NEW MILBURN ASSOCIATES to MILBURN HOTEL, LLC
1998-08-11Permit EW — ISSUED
1997
1997-12-08HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB BATHROOM 9 STY WEST APT906
1997-12-08HPD class B: § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE PRIVATE HALL 9 STY WEST APT 906 LOCATED AT APT 906
1997-12-08HPD class B: § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF EAST WALL WEST ROOM 9 STY WEST APT 906
1997-12-08HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS BATHROOM 9 STY WEST APT 90
1997-12-08HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF MILDEW WALLS & CEILINGS THRU OUT 9 STY WEST APT 906 LOCATED AT APT 906
1997-09-16DOB violation LL6291:
1997-06-02DOB violation ES:
1996
1996-05-29Permit EQ — ISSUED
1996-05-22Permit EW — ISSUED
1995
1995-10-25ECB Hazardous violation: FAILURE TO MAINTAIN ADEQAUTE HOUSEKEEPING.NOTE:EXCESSIVE CONSTRUCTION MATERIALS STORED ON THE ROOF.DEMOLITION MATERIALS.LOCATION.S
1995-10-25ECB Hazardous violation: FAILURE TO MAINTAIN ADEQUATE PROTECTION FOR SIDEWALK AND WALKWAY DURI-NG CONSTRUCTION OPERATION.NOTE:HOISTWAY MATERIALS FROM THE W
1995-08-23SAGE — from BANK HAPOALIM, B.M.
1995-08-23Agreement — from EMIGRANT SAVINGS BANK to NEW MILBURN ASSOCIATES
1995-08-23Mortgage assigned — from BANK HAPOALIM B.M. to EMIGRANT SAVINGS BANK
1995-08-23Mortgage $54,750 — from NEW MILBURN ASSOCIATES to EMIGRANT SAVINGS BANK$54,750
1995-07-25Permit EW — ISSUED
1994
1994-09-01DOB violation LL6291:
1993
1993-09-15HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASHBASIN BATHROOM 9 STY SOUTHWEST APT 906 , SECTION '' ''
1992
1992-08-13HPD class B: § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES KITCHEN SINK 6 STY SOUTH APT 606 CENTER SECTION. , SECTION '' ''
1992-08-13HPD class B: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF TOP SOUTH WINDOW SASH NAILED SHUT CENTER ROOM 6 STY SOUTH APT 606 CENTER S
1992-08-13HPD class B: § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DRAIN PIPE & TRAP WASHBASIN SINK BATHROOM 6 STY SOUTH APT 606 CENTER SECTION. , SECTION '' '
1992-08-13HPD class B: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALL UNDER WASHBASIN SINK BATHRO
1992-08-13HPD class B: § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BATHROOM 6 STY SOUTH APT 606
1992-08-13HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING 6 STY SOUTH APT 606 CENTER SECTION MONORLEF. , SECTION '' ''
1992-08-13HPD class B: § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES THRU OUT 6 STY SOUTH APT 606 CENTER SECTION. , SECTION '' ''
1992-08-13HPD class B: § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION DRAIN KITCHEN 6 STY SOUTH APT 606 CENTER SECTION. , SECTION '' ''
1992-06-08HPD class C: § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CASCADING COLD WATER BATHTUB BATHROOM 10 STY SOUTH APT 109 2 FROM EAST ER1
1991
1991-10-09HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASHBASIN & BATHTUB BATHROOM 6 STY ROOM 606.
1991-10-09HPD class B: § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE 6 STY ROOM 606 MONCRIEF
1991-10-09HPD class B: § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE UNDER KITCHEN SINK 6 STY ROOM 606
1991-07-16HPD class C: § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL OF FOYER AT 15 STY 2 FROM NORTH
1991-04-26ECB Non-Hazardous violation: 05J 08V 21X 50F
1990
1990-02-21DOB violation E:
1989
1989-09-18Agreement — from BANK HAPOLIM B.M. to NEW MILBURN ASSOCIATES
1989-09-18Agreement — from BANK HAPOLIM B.M. to NEW MILBURN ASSOCIATES
1989-09-18Agreement — from BANK HAPOALIM B M to NEW MILBURN ASSOCIATES
1989-07-20DOB violation E:
1989-07-20DOB violation E:
1988
1988-09-08Air permit (CERTIFICATE TO OPERATE), fuel: NO4FUEL
1988-07-18ECB Unknown violation: WORK WITHOUT A PERMIT. INTERIOR NON BEARING PARTIONS AND BATHROOM FIXTURES REMOVED. REMEDY: FILE PLANS AND OBTAIN APPROVALS $1,000
1987
1987-04-29Agreement — from BANK HAPOALIM to NEW MILBURN ASSOCIATES
1987-04-29Agreement — from BANK HAPOALIM to NEW MILBURN ASSOCIATES
1987-04-29Agreement — from BANK HAPOALIM to NEW MILBURN ASSOCS
1986
1986-02-25Mortgage $500,000 — from NEW MILBURN ASSOC. to BANK HAPOALIM B.M.$500,000
1986-02-25Mortgage assigned — from NEW MILBURN ASSOC. to BANK HAPOALIM B.M.
1985
1985-01-31Mortgage assigned — from 242 W 76TH ST ASSOCIATES to BANK HAPOALIM B.M.
1985-01-31Deed — from JEDDRO INC to NEW MILBURN ASSOCIATES
1985-01-31Mortgage $3,557,732 — from NEW MILBURN ASSOCIATES to BANK HAPOALIM B.M.$3,557,732
1985-01-31Mortgage $1,800,000 — from NEW MILBURN ASSOCIATES to BANK HAPOALIM B.M.$1,800,000
1985-01-31Agreement — from BANK HAPOALIM, B.M. to NEW MILBURN ASSOCIATES
1985-01-31Mortgage assigned — from NEW MILBURN ASSOCIATES to BANK HAPOALIM, B.M.
1983
1983-10-20Deed — from 242 W.76TH ST.ASSOC. to JEDDRO, INC.
1983-10-20Mortgage $1,000,000 — from JEDDRO, INC. to 242 W 76 STREET ASSOC.$1,000,000
1983-10-20Mortgage satisfied — from RUTHEISER, ELIZABETH; SUDAN REALTY CORP. to DRY DOCK SV.INSTITUTION; EAST RIVER SAVINGS BANK
1983-07-29Agreement — from 242 W 76TH ST. ASSOC. to JEDDRO, INC.
1982
1982-08-23Agreement — from 242 W.76 ST.ASSOCIATES to JEDDRO, INC.
1976
1976-09-29Deed — from GOLDBERG, E DECD TREX; GREENBERG, IRMA TR; RUTHEISER, PAUL TR; STILLMAN, S DECD TREX; STIL to 242 WEST 76TH STRT SSCTS
1976-09-16Agreement — from GOLDBERG, ESTHER; STILLMAN, STELLA DECD EX; RUTHEISER, MINNIE TR to K Z K HOTEL CORP
1976-09-02LEAS — from CLAREMONT HOTEL INC to JEDDRO INC
1973
1973-11-01Mortgage assigned — from K Z K HOTEL CORP to CLAREMONT HOTEL INC
1969
1969-12-22Mortgage assigned — from EAST RIVER SAVINGS BANK to STILLMAN,ROBERT I
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NATURALGAS

Support this site Back to the building page