36 West 44 Street · Manhattan · BBL 1012597501
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$9,405 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
27 service requests in the last three years. Most common: Illegal Parking (8) · For Hire Vehicle Complaint (6) · Special Projects Inspection Team (SPIT) (3) · Building/Use (1) · Commercial Disposal Complaint (1) · Street Sign (1).
Filed construction activity
$8,347,083 in permitted construction work filed since
2016 (127 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$5,100,874
$2,295,394
2026
$642,890
$289,300
2027
$621,348
$279,607
The city's market estimate has fallen
88% between tax years 2025 and 2027.
Tax exemptions on the roll: CHARITABLE
Building systems
Energy grade (LL33)
D — ENERGY STAR score 30/100, posted at the entrance by law (2022 disclosure cycle)
1 Food Establishment complaint to 311 at this address in the last three years (most often: Letter Grading), shared by 2 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2018 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
42 St-Bryant Pk — 7 B D F M · 450 ft straight-line (about a 2-minute walk) · station accessibility: none
Bus
Nearest boarding stop: W 44 St / 6 Av — M55 · 350 ft
Citi Bike
W 43 St & 6 Ave · 300 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
27 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2025-03-20
Deed $3,550,000 — from PISA INC.; KHORDIAN, AMINAGHA; MARDKHA, JOSEPH; MARDKHA, DAVID; BAR BUILDING HOLDING LLC; to SUITE 1400 LLC
$3,550,000
2025-03-20
Deed $3,550,000 — from PISA INC.; KHORDIAN, AMINAGHA; MARDKHA, JOSEPH; MARDKHA, DAVID; BAR BUILDING HOLDING LLC; to SUITE 1400 LLC
$3,550,000
2025-03-18
Sold for $3,550,000
$3,550,000
$75,532
2025-03-18
Sold for $3,550,000
$3,550,000
$75,532
2025-03-18
Sold for $3,550,000
$3,550,000
$75,532
2025-02-25
Deed $1,737,894 — from MARDKHA, DAVID; PISA INC.; MARDKHA, JOSEPH; BRB HOLDING GROUP LLC; BAR BUILDING HOLDING LL to SIDDHI NY LLC
$1,737,894
2025-02-25
Deed $1,737,894 — from MARDKHA, DAVID; PISA INC.; MARDKHA, JOSEPH; BRB HOLDING GROUP LLC; BAR BUILDING HOLDING LL to SIDDHI NY LLC
$1,737,894
2025-01-23
Sold for $1,737,894
$1,737,894
$36,976
2025-01-23
Sold for $1,737,894
$1,737,894
$36,976
2024-01-16
CORRM $1,600,000 — from 36W44 INC to SANTANDER BANK, N.A.
$1,600,000
2023-12-14
AL&R $3,200,000 — from O.P. DANGAYACH REALTY LLC to CITY NATIONAL BANK
$3,200,000
2023-12-14
Mortgage $79,592 — from O.P. DANGAYACH REALTY LLC to CITY NATIONAL BANK
$79,592
2023-12-14
Agreement $3,200,000 — from O.P. DANGAYACH REALTY LLC to CITY NATIONAL BANK
$3,200,000
2023-07-05
AL&R $2,437,500 — from 36 WEST 1215 INC. to WEBSTER BANK
$2,437,500
2023-07-05
Agreement $2,437,500 — from 36 WEST 1215 INC. to WEBSTER BANK
$2,437,500
Ten-year activity
100500
2017
2018
88
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
11
8
6
12
15
52
2018
39
3
7
15
16
80
2019
39
7
9
27
6
88
2020
28
2
5
5
3
43
2021
33
1
5
29
1
69
2022
37
1
4
23
5
70
2023
35
12
12
28
1
88
2024
11
3
10
10
6
40
2025
9
1
9
44
12
75
2026
23
2
6
6
3
40
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2025-04-11Job filed: STRUCTURAL FRAMING & NEW LIGHTWEIGHT CONCRETE SLAB FOR NEW PUMP ROOM ON ROOF. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$12,000
2025-04-09Job filed: CONSTRUCTION OF A NEW PUMP ROOM ON THE ROOF AS SHOWN ON PLANS. THE MECHANICAL AND STRUCTURAL PORTIONS WILL BE FILED UNDER SEPARATE APPLICATIONS. NO CH$163,000
2025-04-07TL&R — from SAR REAL INVEST LLC to HANMI BANK
2025-04-04Job filed: INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS.$21,000
2025-03-20PAT — from SUITE 1400 LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2025-03-20PAT — from KHORDIAN, AMINAGHA to MASHAAL, DAVID
2025-03-20PAT — from KHORDIAN, AMINAGHA to MASHAAL, DAVID
2025-03-20Deed $3,550,000 — from PISA INC.; KHORDIAN, AMINAGHA; MARDKHA, JOSEPH; MARDKHA, DAVID; BAR BUILDING HOLDING LLC; to SUITE 1400 LLC$3,550,000
2025-03-20PAT — from SUITE 1400 LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2025-03-20Deed $3,550,000 — from PISA INC.; KHORDIAN, AMINAGHA; MARDKHA, JOSEPH; MARDKHA, DAVID; BAR BUILDING HOLDING LLC; to SUITE 1400 LLC$3,550,000
2025-03-18Sold for $3,550,000$3,550,000
2025-03-18Sold for $3,550,000$3,550,000
2025-03-18Sold for $3,550,000$3,550,000
2025-03-17Mortgage satisfied — from SAR REAL INVEST LLC to HANMI BANK
2025-03-06311: Illegal Parking — Blocked Sidewalk
2025-02-25PAT — from MARDKHA, JOSEPH to MASHAAL, DAVID
2025-02-25PAT — from SIDDHI NY LLC to THE BAR BUILDING CONDOMINIUM
2025-02-25PAT — from SIDDHI NY LLC to THE BAR BUILDING CONDOMINIUM
2025-02-25Deed $1,737,894 — from MARDKHA, DAVID; PISA INC.; MARDKHA, JOSEPH; BRB HOLDING GROUP LLC; BAR BUILDING HOLDING LL to SIDDHI NY LLC$1,737,894
2025-02-25PAT — from MARDKHA, DAVID to MASHAAL, DAVID
2025-02-25Deed $1,737,894 — from MARDKHA, DAVID; PISA INC.; MARDKHA, JOSEPH; BRB HOLDING GROUP LLC; BAR BUILDING HOLDING LL to SIDDHI NY LLC$1,737,894
2025-02-25PAT — from KHORDIAN, AMINAGHA to MASHAAL, DAVID
2025-02-25PAT — from MARDKHA, JOSEPH to MASHAAL, DAVID
2025-02-25PAT — from MARDKHA, DAVID to MASHAAL, DAVID
2025-02-25PAT — from KHORDIAN, AMINAGHA to MASHAAL, DAVID
2025-02-18Certificate of occupancy Renewal Without Change
2025-02-11Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-02-03TL&R — from AMINACHA KORDIAN PISA INC,; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDI to VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-28Mortgage satisfied — from JDM BAR HOLDING LLC, BAR BUILDING HOLDIN; CHEYENNE ACQUISITIONS LLC; FARINELLA, PETER F to SOVEREIGN BANK; VALLEY NATIONAL BANK; BANK LEUMI USA
2025-01-23Sold for $1,737,894$1,737,894
2025-01-23Sold for $1,737,894$1,737,894
2025-01-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2025-01-13Deed — from JDM BAR HOLDINGS LLC to MARDKHA, DAVID; MARDKHA, JOSEPH
2025-01-13Deed — from JDM BAR HOLDINGS LLC to MARDKHA, DAVID; MARDKHA, JOSEPH
2025-01-13Deed — from JDM BAR HOLDINGS LLC to MARDKHA, DAVID; MARDKHA, JOSEPH
2025-01-13Deed — from JDM BAR HOLDINGS LLC to MARDKHA, DAVID; MARDKHA, JOSEPH
2025-01-13Deed — from JDM BAR HOLDINGS LLC to MARDKHA, DAVID; MARDKHA, JOSEPH
2025-01-13Deed — from JDM BAR HOLDINGS LLC to MARDKHA, DAVID; MARDKHA, JOSEPH
2024
2024-12-20Deed transfer (nominal price)
2024-12-20Deed transfer (nominal price)
2024-12-20Deed transfer (nominal price)
2024-12-20Deed transfer (nominal price)
2024-12-20Deed transfer (nominal price)
2024-12-20Deed transfer (nominal price)
2024-12-20Deed transfer (nominal price)
2024-11-27Certificate of occupancy Renewal Without Change
2024-11-07ECB CLASS - 1 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPARTMENT OF BUILDING(CERTIFICATE OF OCCUPANCY).ILLEGAL OCCUPANCY NOTED AT 2ND FLOOR LE$6,280
2024-10-24311: Street Sign - Dangling — No Parking, Standing, Stopping
2024-10-17Job filed: Install fire sprinkler system as per plans.$11,000
2024-09-27311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-08-01Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$70,000
2024-07-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-07-09311: Illegal Parking — Blocked Bike Lane
2024-07-03Certificate of occupancy Renewal Without Change
2024-06-21Boiler inspection
2024-06-17ECB CLASS - 2 violation: A.C. 27.929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PRE$3,125
2024-05-14Restaurant inspection: DON DON — grade A
2024-04-26Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$23,000
2024-04-26Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$14,000
2024-04-17Permit Boiler Equipment — Permit Issued
2024-04-10Certificate of occupancy Renewal Without Change
2024-04-04Restaurant inspection: DON DON
2024-04-02Mortgage satisfied — from PARAMOUNT SPB REALTY LLC to T.D.BANK, N.A.
2024-04-02TL&R — from M & T BANK to B.K. MOOKIM LLC
2024-03-26311: Special Projects Inspection Team (SPIT) — Adult Establishment
2024-03-26DOB complaint, category ?
2024-03-25Job filed: REPAIR EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$24,000
2024-03-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-03-12311: Illegal Parking — Blocked Bike Lane
2024-02-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-02-08311: Illegal Parking — Blocked Bike Lane
2024-01-19Certificate of occupancy Renewal Without Change
2024-01-16CORRM $1,600,000 — from 36W44 INC to SANTANDER BANK, N.A.$1,600,000
2024-01-09311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2024-01-03Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$300,000
2023
2023-12-28Permit Sprinklers — Permit Issued
2023-12-28Permit Sprinklers — Signed-off
2023-12-14Mortgage assigned — from M&T BANK to CITY NATIONAL BANK
2023-12-14TL&R — from O.P. DANGAYACH REALTY LLC to M&T BANK
2023-12-14AL&R $3,200,000 — from O.P. DANGAYACH REALTY LLC to CITY NATIONAL BANK$3,200,000
2023-12-14TL&R — from M&T BANK to O.P. DANGAYACH REALTY LLC
2023-12-14Mortgage $79,592 — from O.P. DANGAYACH REALTY LLC to CITY NATIONAL BANK$79,592
2023-12-14Mortgage satisfied — from O.P. DANGAYACH REALTY LLC to CHEYENNE ACQUISITIONS LLC
2023-12-14Agreement $3,200,000 — from O.P. DANGAYACH REALTY LLC to CITY NATIONAL BANK$3,200,000
2023-12-12Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$70,000
2023-12-11311: Special Projects Inspection Team (SPIT) — Adult Establishment
2023-12-11DOB complaint, category ?
2023-12-06AALR — from FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BANK; SIGNATURE BRIDGE BANK, N.A. to FLAGSTAR BANK, N.A.
2023-12-06Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORPORATION; SIGNATURE BRIDGE BANK, N.A.; SIGNATURE BANK to FLAGSTAR BANK, N.A.
2023-11-13PAT — from FEDERAL DEPOSIT INSURANCE CORPORATION to FLAGSTAR BANK NA
2023-11-07Job filed: INSTALLATION OF SPRINKLERS AT THE CELLAR AND ROOF, NEW 1-1/2" DRAIN RISER, AND NEW 4" RISER FROM 11TH FLOOR TO ROOF AS SHOWN ON PLANS FILED HEREWITH. $96,000
2023-11-01Certificate of occupancy Renewal Without Change
2023-10-28311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2023-10-11311: Building/Use — Illegal Conversion Of Residential Building/Space
2023-10-11Job filed: INSTALL FIRE SPRINKELR SYSTEM AS PER PLANS$22,500
2023-10-02Job filed: Installation of the kitchen exhaust and makeup system with new exhaust duct work. Water source Condensing unit and air handlers are modified. No chang$76,000
2023-10-02Job filed: install new plumbing fixutures and water, sanitary lines. Installation of new gascooking equipments$30,000
2023-09-14Permit Sprinklers — Signed-off
2023-09-12311: Special Projects Inspection Team (SPIT) — Adult Establishment
2023-09-12311: Special Projects Inspection Team (SPIT) — Adult Establishment
2023-08-10Permit General Construction — Signed-off
2023-08-04Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$19,000
2023-08-01Permit Mechanical Systems — Signed-off
2023-07-28311: Special Projects Inspection Team (SPIT) — Adult Establishment
2023-07-28DOB complaint, category ?
2023-07-27Permit General Construction — Permit Issued
2023-07-21ECB CLASS - 1 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPARTMENT OF BUILDINGS RECORDS. ILLEGAL OCCUPANCY NOTED: FACE 43 STREET MEZZANINE LEVEL$6,250
2023-07-21ECB CLASS - 2 violation: ILLEGAL USE IN A COMMERCIAL DISTRICT, UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT, A PROHIBITED USE PER ZR 12-10, OPERATING IN A C
2023-07-19Certificate of occupancy Renewal Without Change
2023-07-14Permit Plumbing — Permit Issued
2023-07-13Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$18,000
2023-07-12Permit Sprinklers — Signed-off
2023-07-06Permit Sprinklers — Signed-off
2023-07-05AL&R $2,437,500 — from 36 WEST 1215 INC. to WEBSTER BANK$2,437,500
2023-07-05Agreement $2,437,500 — from 36 WEST 1215 INC. to WEBSTER BANK$2,437,500
2023-07-05AL&R $2,437,500 — from 36 WEST 1215 INC. to WEBSTER BANK$2,437,500
2023-07-05PAT — from 36 WEST 1215 INC. to THE BAR BUILDING CONDOMINIUM
2023-07-05Mortgage $949,569 — from 36 WEST 1215 INC. to WEBSTER BANK$949,569
2023-07-05Agreement $2,437,500 — from 36 WEST 1215 INC. to WEBSTER BANK$2,437,500
2023-07-05Mortgage assigned — from FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION, A to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2023-07-05Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to WEBSTER BANK
2023-07-05TL&R — from FEDERAL DEPOSIT INSURANCE COROPRATION, A to TBF GROUP LLC
2023-07-05PAT — from 36 WEST 1215 INC. to THE BAR BUILDING CONDOMINIUM
2023-07-05Mortgage assigned — from JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO to WEBSTER BANK
2023-07-05TL&R — from FEDERAL DEPOSIT INSURANCE COROPRATION, A to TBF GROUP LLC
2023-07-05Deed $3,608,131 — from TBF GROUP LLC to 36 WEST 1215 INC.$3,608,131
2023-07-05Deed $3,608,131 — from TBF GROUP LLC to 36 WEST 1215 INC.$3,608,131
2023-07-05Mortgage assigned — from FIRST REPUBLIC BANK; FEDERAL DEPOSIT INSURANCE CORPORATION, A to JPMORGAN CHASE BANK, NATIONAL ASSOCIATIO
2023-07-05Mortgage $949,569 — from 36 WEST 1215 INC. to WEBSTER BANK$949,569
2023-06-22Job filed: Install fire sprinkler system as per plans.$18,000
2023-06-13Job filed: RENOVATION OF EXISTING STORE WITH COMMERCIAL KITCHEN, INCLUDING REMOVAL AND INSTALLATION OF PARTITION, REPLACEMENT OF CEILING AND FLOOR TILES. NO CHAN$50,505
2023-06-13Job filed: INSTALLATION OF PLUMBING FIXTURES AND GAS EQUIPMENTS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.$30,000
2023-06-12Permit Plumbing — Signed-off
2023-06-09311: Special Projects Inspection Team (SPIT) — Adult Establishment
2023-06-09Permit General Construction — Signed-off
2023-06-09DOB complaint, category ?
2023-06-07Job filed: INTERIOR RENOVATION ON THE MEZZANINE FLOOR OF THE COMMERCIAL BUILDING WITH THE REMOVAL OF FULL-HEIGHT PARTITION WALLS AND DOORS TO REMEDY ECB VIOLATIO$28,700
2023-06-07Job filed: INTERIOR RENOVATION WITH PLUMBING WORK AS PER PLAN TO ADDRESS ECB VIOLATION# 35669873L, ON THE MEZZANINE FLOOR OF A COMMERCIAL BUILDING. NO CHANGE IN $2,000
2023-05-31ECB CLASS - 2 violation: WORK WITHOUT A PERMIT. WORK NOTED:AT MEZZANINE LEVEL (FACE 43ST) HAS BEEN ERECTED FULL HEIGHT PARTITION WALLS TO CREATE 9 ROOMS (5
2023-05-31ECB CLASS - 2 violation: ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT A PROHIBITED USE PER ZR12-10, OPERATING IN A C6-
2023-05-31ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED: FACE 43 ST AT MEZZANINE LEVEL HAS BEE
2023-05-30Sold for $3,608,131$3,608,131
2023-05-30Sold for $3,608,131$3,608,131
2023-05-11Boiler inspection
2023-05-09Permit Sprinklers — Signed-off
2023-05-07Job filed: Install fire sprinkler system as per plans.$16,000
2023-05-03311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2023-05-03Permit Sprinklers — Signed-off
2023-05-03DOB complaint, category ?
2023-04-27Certificate of occupancy Renewal Without Change
2023-04-12Eviction executed (SUITE 707A)
2023-04-07Permit Sprinklers — Permit Issued
2023-03-22311: Consumer Complaint — Retail Store
2023-03-16311: Special Projects Inspection Team (SPIT) — Adult Establishment
2023-03-16DOB complaint, category ?
2023-03-15Job filed: Modify existing sprinkler system as per plans.$16,500
2023-03-10Permit Sprinklers — Signed-off
2023-02-28ECB CLASS - 2 violation: 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED $6,250
2023-02-28Job filed: Install fire sprinkler system as per plans.$11,000
2023-02-01Certificate of occupancy Renewal Without Change
2022
2022-12-30Agreement $4,235,000 — from S&B NYV REALTY LLC to JPMORGAN CHASE BANK NA$4,235,000
2022-12-30Mortgage $77,000 — from S&B NYV REALTY LLC to JPMORGAN CHASE BANK NA$77,000
2022-11-02Permit Mechanical Systems — Permit Issued
2022-10-31Job filed: Relocation of 26 Sprinkler heads and Installation 10 new heads.$17,350
2022-10-26Certificate of occupancy Renewal Without Change
2022-10-13Mortgage $1,000,000 — from JD BAR CONDO LLC to CONNECTONE BANK$1,000,000
2022-10-13AL&R $1,000,000 — from JD BAR CONDO LLC to CONNECTONE BANK$1,000,000
2022-10-05Job filed: Modify existing sprinkler system as per plans.$16,500
2022-09-09SMIS — from EMPIRE STATE CERTIFIED DEVELOPMENT CORPO
2022-09-09Mortgage $650,000 — from 1205 AT BAR BUILDING, LLC to EMPIRE STATE CERTIFIED DEVELOPMENT CORPO$650,000
2022-09-09Mortgage assigned — from EMPIRE STATE CERTIFIED DEVELOPMENT CORPO to U. S. SMALL BUSINESS ADMINISTRATION
2022-09-09SAGE — from FLUSHING BANK to EMPIRE STATE CERTIFIED DEVELOPMENT CORPO
2022-09-09Mortgage satisfied — from 1205 BAR BUILDING, LLC to FLUSHING BANK
2022-08-26Deed $749,905 — from TBF GROUP LLC to SAR REAL INTEREST LLC$749,905
2022-08-26PREL — from FIRST REPUBLIC BANK to TBF GROUP LLC
2022-08-26REL — from FIRST REPUBLIC BANK to TBF GROUP LLC
2022-08-25Job filed: Provide 1 new packaged AC unit and ductwork, piping, fire damper, and new thermostats for 12th-floor office space. No Change to use, egress, or occupa$3,000
2022-08-24Permit Sign — Signed-off
2022-08-18Sold for $749,905$749,905
2022-08-08Job filed: Installing new sink and dishwasher in the pantry for office on 12th floor; all connected to existing sanitary/soil line. No change to use, egress, or $2,000
2022-08-02Certificate of occupancy Renewal With Change
2022-07-27Permit Sprinklers — Signed-off
2022-07-25Permit General Construction — Permit Issued
2022-07-15Job filed: IINSTALL SPRINKLER SYSTEM AS PER PLANS.$18,000
2022-07-14Permit Sprinklers — Signed-off
2022-07-14Permit Sprinklers — Signed-off
2022-07-13Job filed: NEW PARTITIONS, NEW HUNG CEILING, DOORS & NEW LIGHTS AT EXISTING UNIT ON 12TH FLOOR. PL&SP AND MH FILINGS TO BE FILED SEPARATELY. NO CHANGE TO USE EG$70,920
2022-07-08TL&R — from M&T BANK to PANNA R REALTY LLC
2022-07-08TL&R — from M&T BANK to PANNA R REALTY LLC
2022-07-08Mortgage assigned — from M&T BANK to FLUSHING BANK
2022-07-08Agreement $3,150,000 — from PANNA R REALTY LLC to FLUSHING BANK$3,150,000
2022-07-07Permit Sprinklers — Signed-off
2022-07-05Job filed: install new plumbing fixutures and water, sanitary lines. Installation of new gascooking equipments$30,000
2022-06-27Job filed: NEW PARTITIONS, NEW HUNG CEILING, DOORS & NEW LIGHTS AT EXISTING UNIT ON 12TH FLOOR. PL&SP AND MH FILINGS TO BE FILED SEPARATELY. NO CHANGE TO USE EG$70,920
2022-06-23Job filed: PROPOSAL TO INSTALL (2) ILLUMINATED, NON-FLASHING, ACCESSORY BUSINESS SIGNS: WORDING (1) FOR ILLUMINATED, NON-FLASHING SIGN: TOASTIES (LOGO) humbowl; $3,978
2022-06-22Boiler inspection
2022-06-22311: Consumer Complaint — Other
2022-06-22Job filed: Install new sprinkler system as per plans$7,000
2022-06-17Permit Sprinklers — Signed-off
2022-06-17Permit Sprinklers — Signed-off
2022-06-15Permit Sprinklers — Signed-off
2022-06-15Permit Sprinklers — Signed-off
2022-06-15Permit Sprinklers — Signed-off
2022-05-19TL&R — from FLUSHING BANK to CHELSEA PARK GROUP LLC
2022-05-19Mortgage satisfied — from CHELSEA PARK GROUP LLC to FLUSHING BANK
2022-04-25Permit Sprinklers — Signed-off
2022-04-14Deed $1,458,583 — from TBF GROUP LLC to SAR REAL INVEST LLC$1,458,583
2022-04-14Mortgage $1,220,000 — from SAR REAL INVEST LLC to HANMI BANK$1,220,000
2022-04-14AL&R $1,220,000 — from SAR REAL INVEST LLC to HANMI BANK$1,220,000
2022-03-01Job filed: Install new sprinkler system as per plans$13,000
2022-02-26Job filed: Install new sprinkler system as per plans$17,000
2022-02-15Facade (LL11) filing, cycle 9: SAFE
2022-02-14Permit Sprinklers — Signed-off
2022-02-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-02-08311: Illegal Parking — Blocked Bike Lane
2022-02-02Permit General Construction — Signed-off
2022-01-26Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$8,000
2022-01-20Permit Mechanical Systems — Signed-off
2022-01-18Job filed: Installation of the kitchen exhaust and makeup system with new exhaust duct work. Water source Condensing unit and air handlers are modified. No chang$76,000
2022-01-18Job filed: Installatio of the new sprinkler head and sprinkler piping system for the new casual restaurant space in conjunction with M00604927. Alteration for in$38,000
2022-01-18Job filed: install new plumbing fixutures and water, sanitary lines. Installation of new gascooking equipments$30,000
2022-01-18Job filed: Installation of partition walls, new doors, and carpentry works under this application.$100,000
2022-01-11Job filed: Install new sprinkler system as per plans$122,000
2021
2021-12-20Job filed: Install new sprinkler system as per plans$147,000
2021-12-14Permit Sprinklers — Signed-off
2021-12-06Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$15,000
2021-12-03Job filed: MINOR FILE TO PLUMBING WORK AS PER PLAN, INSTALLATION OF A FLOOR DRAIN, REPLACE 1 SINK, AND CAP&REMOVE 1 SINK ON THE MEZZANINE FLOOR OF THE COMMERCIAL$2,500
2021-11-16Permit Plumbing — Signed-off
2021-11-15Job filed: FILING TO CHANGE USE OF PART OF MEZZANINE FROM STORE TO BEAUTY PARLOR. NO WORK WILL BE DONE UNDER THIS APPLICATION.$100
2021-11-15Job filed: FILING TO CHANGE USE OF PART OF MEZZANINE FROM STORE TO BEAUTY PARLOR. NO WORK WILL BE DONE UNDER THIS APPLICATION.$100
2021-11-15Job filed: FILING TO CHANGE USE OF PART OF MEZZANINE FROM STORE TO BEAUTY PARLOR. NO WORK WILL BE DONE UNDER THIS APPLICATION.$100
2021-11-12Job filed: MINOR FILE TO PLUMBING WORK AS PER PLAN, INSTALLATION OF A FLOOR DRAIN, REPLACE 1 SINK, AND CAP&REMOVE 1 SINK ON THE MEZZANINE FLOOR OF THE COMMERCIAL$2,500
2021-11-11Job filed: Application amended to include Post-Installed Anchors Special Inspection & Fire-Resistant Rated Construction Progress Inspection.$92,950
2021-11-10Job filed: PROPOSE MECHANICAL WORK INCONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,800
2021-11-05Boiler inspection
2021-10-15Agreement $3,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$3,000,000
2021-10-15Mortgage $166,962 — from BB RETAIL LLC to STERLING NATIONAL BANK$166,962
2021-10-15AL&R $3,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$3,000,000
2021-10-15Mortgage $166,962 — from BB RETAIL LLC to STERLING NATIONAL BANK$166,962
2021-10-15Agreement $3,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$3,000,000
2021-10-15AL&R $3,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$3,000,000
2021-10-14Job filed: FILING PAA TO ADD SPRINKLER RISER DIAGRAM ON DRAWING SP-107.00$148,000
2021-10-13Deed $1,116,250 — from ASHER GROUP TBF LLC to 3436 W44TH, LLC$1,116,250
2021-10-13PREL — from FIRST REPUBLIC BANK to TBF GROUP LLC
2021-10-13AL&R $1,700,000 — from 3436 W44TH, LLC to TD BANK, N.A.$1,700,000
2021-10-13Mortgage satisfied — from BAR 304 LLC, A NEW YORK LIMITED LIABILIT to JPMORGAN CHASE BANK, N.A.
2021-10-13REL — from TBF GROUP LLC to FIRST REPUBLIC BANK
2021-10-13Mortgage $1,700,000 — from 3436 W44TH, LLC to TD BANK, N.A.$1,700,000
2021-09-28Agreement $3,103,932 — from JDM BAR HOLDING LLC; BAR BUILDING GROUP LLC; AMINAGHA KHORDIAN; PISA, INC.; BRB HOLDING GR to BANK LEUMI USA$3,103,932
2021-09-28Agreement $3,103,932 — from JDM BAR HOLDING LLC; BAR BUILDING GROUP LLC; AMINAGHA KHORDIAN; PISA, INC.; BRB HOLDING GR to BANK LEUMI USA$3,103,932
2021-09-28Agreement $3,103,932 — from JDM BAR HOLDING LLC; BAR BUILDING GROUP LLC; AMINAGHA KHORDIAN; PISA, INC.; BRB HOLDING GR to BANK LEUMI USA$3,103,932
2021-09-28Agreement $3,103,932 — from JDM BAR HOLDING LLC; BAR BUILDING GROUP LLC; AMINAGHA KHORDIAN; PISA, INC.; BRB HOLDING GR to BANK LEUMI USA$3,103,932
2021-09-28Agreement $3,103,932 — from JDM BAR HOLDING LLC; BAR BUILDING GROUP LLC; AMINAGHA KHORDIAN; PISA, INC.; BRB HOLDING GR to BANK LEUMI USA$3,103,932
2021-09-28Agreement $3,103,932 — from JDM BAR HOLDING LLC; BAR BUILDING GROUP LLC; AMINAGHA KHORDIAN; PISA, INC.; BRB HOLDING GR to BANK LEUMI USA$3,103,932
2021-09-17Permit General Construction — Signed-off
2021-09-13Job filed: PROPOSE INTERIOR RENOVATION WITH MINOR PARTITIONS AND FINISH WORK AT OFFICE SPACE SUITE #1205 AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$46,550
2021-09-13Job filed: PROPOSE MECHANICAL WORK INCONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,800
2021-09-03Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$15,000
2021-08-27Sold for $1,116,250$1,116,250
2021-08-26Job filed: PROPOSE INTERIOR RENOVATION WITH MINOR PARTITIONS AND FINISH WORK AT OFFICE SPACE SUITE #1205 AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$46,550
2021-08-26Job filed: PROPOSE MECHANICAL WORK INCONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,800
2021-08-23Permit Sprinklers — Signed-off
2021-08-17ECB CLASS - 2 violation: 27-929.1 AC SEC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULLSYSTEMOF AUTOMATIC SPRINKLERS&FILE SPRINKLER REPORT PREPARED BY RE$1,250
2021-08-17Job filed: Install new sprinkler system as per plans$14,000
2021-08-16Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$18,000
2021-07-26311: Illegal Parking — Blocked Bike Lane
2021-07-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$300,000
2021-07-08Deed — from TBF GROUP LLC to ASHER GROUP TBF LLC
2021-07-01TL&R — from FIRST REPUBLIC BANK to TBF GROUP LLC
2021-07-01PREL — from FIRST REPUBLIC BANK to TBF GROUP LLC
2021-06-29Deed transfer (nominal price)
2021-06-24Mortgage assigned — from NYBDC LOCAL DEVELOPMENT CORPORATION to FLUSHING BANK
2021-06-24Mortgage $800,000 — from 1205 AT BAR BUILDING LLC to FLUSHING BANK$800,000
2021-06-24AL&R $800,000 — from 1205 AT BAR BUILDING LLC to FLUSHING BANK$800,000
2021-06-24Mortgage $640,000 — from 1205 AT BAR BUILDING LLC to NYBDC LOCAL DEVELOPMENT CORPORATION$640,000
2021-06-24Deed $1,550,000 — from TBF GROUP LLC to 1205 AT BAR BUILDING LLC$1,550,000
2021-06-16Permit Sprinklers — Signed-off
2021-06-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC.$300,000
2021-06-08Job filed: Install sprinkler system as per plans.$11,500
2021-06-03Sold for $1,550,000$1,550,000
2021-06-03311: Illegal Parking — Parking Permit Improper Use
2021-04-08Job filed: Install new sprinkler system as per plans$122,000
2021-04-06Permit Sprinklers — Permit Issued
2021-04-01Permit Sprinklers — Permit Issued
2021-03-16Permit Sprinklers — Signed-off
2021-03-10Job filed: Install new sprinkler system as per plans$147,000
2021-01-06Permit Sprinklers — Signed-off
2020
2020-11-27Job filed: install sprinkler heads in suite 302 as shown on drawings. no change to use, egress for occupancy.$9,000
2020-11-13Permit Sprinklers — Signed-off
2020-11-04311: Broken Parking Meter — No Receipt
2020-11-03311: Noise — Noise: air condition/ventilation equipment (NV1)
2020-10-23Job filed: Relocation of 26 Sprinkler heads and Installation 10 new heads.$17,350
2020-09-28Job filed: Application amended to include Post-Installed Anchors Special Inspection & Fire-Resistant Rated Construction Progress Inspection.$92,950
2020-09-09Permit Plumbing — Permit Issued
2020-09-01Permit Mechanical Systems — Signed-off
2020-08-28Permit EW — ISSUED
2020-08-21Job filed: FILING TO OBTAIN EUP CARDS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$9,000
2020-08-17Job filed: installation of toilet, lavatory, sink and all associated water & sewer piping.$45,000
2020-08-17Job filed: Installation of water source heat pump, fans, ducts,diffuser and registers.$62,000
2020-08-04Permit Sprinklers — Signed-off
2020-08-03Cooling tower inspection
2020-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-07-31Job filed: APPLICATION FILED FOR PLUMBING WORK ON PARTIAL 1ST FLOOR IN CONJUNCTION WITH ALT-2 APPLICATION #122909549. NO CHANGE IN USE GROUP, EGRESS, AND OCCUPAN$45,000
2020-07-30Job filed: MINOR SPRINKLER MODIFICATIONS AT PARTIAL 1ST FLOOR RETAIL UNIT IN CONJUNCTION WITH ALT-2 APPLICATION # 122909549. NO CHANGE IN USE GROUP, EGRESS AND O$18,000
2020-07-22Job filed: ALTERATION INTERIOR WORK ONLY (UNIT 600B).INSTALLATION OF NON-BEARING WALLS, OFFICES,TOILET,PANTRY, DOORS, FLOOR & CEILING FINISHES, AS PER SUBMI$109,750
2020-07-22Job filed: ALTERATION INTERIOR WORK ONLY (UNIT 600B).INSTALLATION OF NON-BEARING WALLS, OFFICES,TOILET,PANTRY, DOORS, FLOOR & CEILING FINISHES, AS PER SUBMI$109,750
2020-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020-03-25PREL — from CONNECTONE BANK to JD BAR CONDO LLC
2020-03-25REL — from CONNECTONE BANK to JD BAR CONDO LLC
2020-03-25Deed $4,000,000 — from DM BAR CONDO LLC; 1031 LKS EAT 18 LLC to DOOURO FAMILY REALTY LLC$4,000,000
2020-03-25Mortgage $4,000,000 — from DOOURO FAMILY REALTY LLC to JPMORGAN CHASE BANK, N.A.$4,000,000
2020-03-06Permit EW — ISSUED
2020-03-05Permit Sprinklers — Signed-off
2020-03-04Job filed: APPLICATION FILED FOR PLUMBING WORK ON PARTIAL 1ST FLOOR IN CONJUNCTION WITH ALT-2 APPLICATION #122909549. NO CHANGE IN USE GROUP, EGRESS, AND OCCUPAN$45,000
2020-02-26Sold for $4,000,000$4,000,000
2020-02-26Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$70,000
2020-02-20Job filed: FILING PAA TO ADD SPRINKLER RISER DIAGRAM ON DRAWING SP-107.00$148,000
2020-02-05Permit Sprinklers — Permit Issued
2020-02-04311: Broken Parking Meter — No Receipt
2020-01-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-01-21311: Illegal Parking — Blocked Bike Lane
2020-01-21Job filed: INSTALL SPRINKLER SYSTEM AS PER PLANS.$115,000
2019
2019-12-30Permit EW — ISSUED
2019-12-10Job filed: INSTALLATION OF NEW SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OF EGRESS.$101,400
2019-11-17Elevator permit: Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 2002$80,000
2019-11-15ECB CLASS - 2 violation: SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARE
2019-11-14Certificate of occupancy Temporary
2019-11-14Job filed: MODIFICATION TO EXISTING PLUMBING WORK AND RELATED PIPING. MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING . MODIFICATION AND INSTALLATIO$200,000
2019-11-06Boiler inspection — defects found
2019-10-31Permit Sprinklers — Signed-off
2019-10-17Deed — from DM BAR CONDO LLC; ASTOR PLACE 11C LLC to DM BAR CONDO LLC; 1031 LKS EAT 18 LLC
2019-10-09Deed — from JD BAR CONDO LLC to DM BAR CONDO LLC; ASTOR PLACE 11C LLC
2019-10-07Deed transfer (nominal price)
2019-10-04311: Broken Parking Meter — No Receipt
2019-10-01Deed transfer (nominal price)
2019-09-27Permit EW — ISSUED
2019-09-18FDNY inspection (RISK)
2019-09-11311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2019-09-10311: Broken Parking Meter — No Receipt
2019-09-10311: Other Enforcement — E3B Sidewalk Obstruction
2019-09-10Job filed: AT 13TH FLOOR - INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON-BEARING INTERIOR PARTITIONS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE EGR$106,140
2019-09-10Job filed: AT 13TH FLOOR - INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON-BEARING INTERIOR PARTITIONS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE EGR$106,140
2019-09-10Job filed: AT 13TH FLOOR - INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON-BEARING INTERIOR PARTITIONS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE EGR$106,140
2019-09-04Job filed: INSTALLATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$13,693
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-27Job filed: INSTALL 12' PIPE SCAFFOLD SYSTEM TO SUPPORT ONE MAN$8,570
2019-08-12Permit EW — ISSUED
2019-08-12Permit PL — ISSUED
2019-08-06Deed $1,927,800 — from MILIP COMPANY (USA) LLC to BAR 304 LLC$1,927,800
2019-08-06PAT — from BAR 304 LLC to THE BAR BUILDING CONDOMINIUM
2019-08-06Mortgage $1,100,000 — from BAR 304 LLC to JPMORGAN CHASE BANK, N.A.$1,100,000
2019-08-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-08-01311: Illegal Parking — Blocked Bike Lane
2019-08-01311: Consumer Complaint — Retail Store
2019-07-30Permit EW — ISSUED
2019-07-30Permit PL — ISSUED
2019-07-30Permit EW — ISSUED
2019-07-30Permit EW — ISSUED
2019-07-29DOB complaint, category ?
2019-07-25Permit Sprinklers — Signed-off
2019-07-25Permit EW — ISSUED
2019-07-25Permit PL — ISSUED
2019-07-23Sold for $1,927,800$1,927,800
2019-07-19Cooling tower inspection
2019-07-19Job filed: Application amended to include Post-Installed Anchors Special Inspection & Fire-Resistant Rated Construction Progress Inspection.$92,950
2019-07-18Permit EW — ISSUED
2019-07-18Permit EW — ISSUED
2019-07-16Certificate of occupancy Temporary
2019-07-15Asbestos abatement: Removal — ABF Environmental, Inc.
2019-07-15Asbestos abatement: Removal — ABF Environmental, Inc.
2019-07-15Asbestos abatement: Removal — ABF Environmental, Inc.
2019-07-15Permit EW — ISSUED
2019-07-15Permit EW — ISSUED
2019-07-08Permit EW — ISSUED
2019-06-28Job filed: INSTALLATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$13,000
2019-06-28Job filed: RENOVATIONS OF DENTAL OFFICE TO INCLUDE PARTITIONS AND FINISHES, MECHANICAL AND PLUMBING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCU$200,000
2019-06-27Job filed: RENOVATION EXISTING OFFICE ON 3RD FL AS PER PLANS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.$126,000
2019-06-27Job filed: RENOVATION EXISTING OFFICE ON 3RD FL AS PER PLANS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.$126,000
2019-06-19Job filed: INTERIOR RENOVATION OF EXISTING STORE WITH PARTITION, PLUMBING AND MECHANICAL WORK. MODIFICATION OF EXISTING SPRINKLER. FIRE SUPPRESSION WILL BE FILE $122,500
2019-06-06REL — from CONNECTONE BANK to JD BAR CONDO LLC
2019-06-06PREL — from CONNECTONE BANK to JD BAR CONDO LLC
2019-06-06REL — from CONNECTONE BANK to JD BAR CONDO LLC
2019-06-06PREL — from CONNECTONE BANK to JD BAR CONDO LLC
2019-05-18311: Broken Parking Meter — No Receipt
2019-05-10FDNY inspection (COM_OCPCY)
2019-05-10FDNY inspection (COM_OCPCY)
2019-05-10FDNY inspection (COM_OCPCY)
2019-04-24Mortgage $1,450,000 — from DREWLEXI LLC to TD BANK NA$1,450,000
2019-04-24AL&R $1,450,000 — from DREWLEXI LLC to TD BANK NA$1,450,000
2019-04-24Deed $1,820,597 — from MARDKHA, JOSEPH; DM BAR CONDO LLC to DREWLEXI LLC$1,820,597
2019-04-24PAT — from MARDKHA, JOSEPH to MARDKHA, DAVID
2019-04-24Deed — from JD BAR CONDO LLC to MARDKHA, JOSEPH; DM BAR CONDO LLC
2019-04-24PAT — from DREWLEXI, LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2019-04-18Certificate of occupancy Temporary
2019-04-17Sold for $1,820,597$1,820,597
2019-04-15Job filed: INSTALLATION OF SIDEWALK SHED AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2019-04-10311: Non-Emergency Police Matter — Other (complaint details)
2019-03-28Job filed: INSTALLATION OF TEMPORARY TUBULAR STEEL SCAFFOLD STRUCTURE, AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2019-03-26Permit EW — ISSUED
2019-03-26Permit EW — ISSUED
2019-02-18Job filed: INSTALLATION OF SIDEWALK SHED AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2019-02-05MAPS — from THE BAR BUILDING CONDOMINIUM
2019-02-05ADEC — from THE BAR BUILDING CONDOMINIUM
2019-02-05MAPS — from THE BAR BUILDING CONDOMINIUM
2019-02-05ADEC — from THE BAR BUILDING CONDOMINIUM
2019-02-05MAPS — from THE BAR BUILDING CONDOMINIUM
2019-02-05ADEC — from THE BAR BUILDING CONDOMINIUM
2019-02-05ADEC — from THE BAR BUILDING CONDOMINIUM
2019-02-05MAPS — from THE BAR BUILDING CONDOMINIUM
2019-01-28Certificate of occupancy Temporary
2018
2018-12-28311: Broken Parking Meter — Timer Defect - Fast/Fail
2018-12-27Agreement $1,000,000 — from B.K. MOOKIM LLC to M & T BANK$1,000,000
2018-12-27AL&R $1,000,000 — from B.K. MOOKIM LLC to M & T BANK$1,000,000
2018-12-06Job filed: SUBDIVISION OF 6TH FLOOR CONDOMINIUM CHANGE FROM 4 LOTS TO 5 TAX LOTS - EXISTING TAX LOT = 1007, 1008, 1039 & 1040 / NEW TAX LOT = 1057
2018-12-06Job filed: SUBDIVISION OF 6TH FLOOR CONDOMINIUM CHANGE FROM 4 LOTS TO 5 TAX LOTS - EXISTING TAX LOT = 1007, 1008, 1039 & 1040 / NEW TAX LOT = 1057
2018-12-05Permit Sidewalk Shed — Signed-off
2018-12-04Permit Supported Scaffold — Signed-off
2018-11-21Certificate of occupancy Temporary
2018-11-19Permit EW — ISSUED
2018-11-19Permit EW — ISSUED
2018-11-14Job filed: SUBDIVISION OF 6TH FLOOR CONDOMINIUM CHANGE FROM 4 LOTS TO 5 TAX LOTS - EXISTING TAX LOT = 1007, 1008, 1039 & 1040 / NEW TAX LOT = 1057
2018-11-14Job filed: SUBDIVISION OF 6TH FLOOR CONDOMINIUM CHANGE FROM 4 LOTS TO 5 TAX LOTS - EXISTING TAX LOT = 1007, 1008, 1039 & 1040 / NEW TAX LOT = 1057
2018-10-18Boiler inspection
2018-09-15311: Broken Parking Meter — No Receipt
2018-09-12Job filed: INSTALLATION OF SIDEWALK SHED AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2018-06-28Job filed: EXTERIOR RESTORATION AS PER PLANS. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$158,000
2018-06-28Job filed: EXTERIOR RESTORATION AS PER PLANS. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$158,000
2018-06-27311: Sidewalk Condition — Blocked - Construction
2018-06-26Certificate of occupancy Temporary
2018-06-12311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2018-06-12DOB complaint, category ?
2018-06-01Job filed: STRUCURAL MODIFICATIONS TO KITCHEN EXHAUST DUCT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$220,000
2018-06-01Job filed: STRUCURAL MODIFICATIONS TO KITCHEN EXHAUST DUCT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$220,000
2018-06-01Job filed: STRUCURAL MODIFICATIONS TO KITCHEN EXHAUST DUCT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$220,000
2018-05-10PREL — from BANK LEUMI USA
2018-05-10REL — from BANK LEUMI USA
2018-05-03Permit EW — ISSUED
2018-04-26Job filed: REMOVAL OF INTERIOR STAIR BETWEEN 5TH & 6TH FLOORS. REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS. CONSTRUCTION OF NEW NON-LOAD BEARING PARTITIO$25,000
2018-04-26Job filed: REMOVAL OF INTERIOR STAIR BETWEEN 5TH & 6TH FLOORS. REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS. CONSTRUCTION OF NEW NON-LOAD BEARING PARTITIO$25,000
2018-04-26Job filed: REMOVAL OF INTERIOR STAIR BETWEEN 5TH & 6TH FLOORS. REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS. CONSTRUCTION OF NEW NON-LOAD BEARING PARTITIO$25,000
2018-04-13FDNY inspection (RISK)
2018-04-13FDNY inspection (RISK)
2018-04-10Certificate of occupancy Temporary
2018-03-13Permit EW — ISSUED
2018-03-13Permit EW — ISSUED
2018-03-07Job filed: MECHANICAL AND PLUMBING SCOPE IN CONJUNCTION WITH COMMERCIAL RENOVATION.$36,750
2018-03-07Job filed: APPLICATION FILED FOR INTERIOR NON-STRUCTURAL DEMO AND GENERAL CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH FOR SUITE 1411.$60,000
2018-03-07Job filed: MINOR SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH AT SUITE 1411.$10,688
2018-03-07Job filed: MECHANICAL AND PLUMBING SCOPE IN CONJUNCTION WITH COMMERCIAL RENOVATION.$36,750
2018-03-07Job filed: ADDITIONS/MODIFICATIONS TO AN EXISTING FIRE ALARM SYSTEM.$22,500
2018-03-07Job filed: APPLICATION FILED FOR INTERIOR NON-STRUCTURAL DEMO AND GENERAL CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH FOR SUITE 1411.$60,000
2018-03-07Job filed: MINOR SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH AT SUITE 1411.$10,688
2018-02-22311: Broken Parking Meter — No Receipt
2018-02-21AL&R $300,000 — from OVERHILL BAR BLDG, LLC to BANK OF AMERICA, N.A.$300,000
2018-02-21PAT — from KHORDIAN, AMINAGHA to MARDKHA, DAVID
2018-02-21PAT — from OVERHILL BAR BLDG, LLC to CONDOMINIUM BOARD OF THE BAR BUILDING CO
2018-02-21Mortgage $1,150,000 — from OVERHILL BAR BLDG, LLC to BANK OF AMERICA, N.A.$1,150,000
2018-02-21AL&R $1,150,000 — from OVERHILL BAR BLDG, LLC to BANK OF AMERICA, N.A.$1,150,000
2018-02-21Mortgage $300,000 — from OVERHILL BAR BLDG, LLC to BANK OF AMERICA, N.A.$300,000
2018-02-21Deed $1,650,000 — from KHORDIAN , AMINAGHA; BRB HOLDING GROUP LLC; PISA, INC.; BAR BUILDING HOLDING LLC; JDM BAR to OVERHILL BAR BLDG, LLC$1,650,000
2018-02-20311: Graffiti — Graffiti
2018-02-12Sold for $1,650,000$1,650,000
2018-01-19Certificate of occupancy Temporary
2018-01-12Job filed: MECHANICAL MODIFICATIONS TO KITCHEN EXHAUST DUCT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$218,000
2018-01-12Job filed: MECHANICAL MODIFICATIONS TO KITCHEN EXHAUST DUCT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$218,000
2018-01-12Job filed: MECHANICAL MODIFICATIONS TO KITCHEN EXHAUST DUCT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$218,000
2017
2017-12-28AL&R $745,000 — from 36W44 INC. to SANTANDER BANK, N.A.$745,000
2017-12-28Mortgage $745,000 — from 36W44 INC. to SANTANDER BANK, N.A.$745,000
2017-11-30M&CON $3,600,000 — from O.P. DANGAYACH REALTY LLC to M&T BANK$3,600,000
2017-11-30AL&R $3,600,000 — from O.P. DANGAYACH REALTY LLC to M&T BANK$3,600,000
2017-11-30Mortgage satisfied — from O.P. DANGAYACH REALTY LLC to M&T BANK
2017-11-14Permit SG — ISSUED
2017-11-09311: Broken Parking Meter — No Receipt
2017-11-09311: Non-Residential Heat — Inadequate or No Heat
2017-09-12Job filed: DEMOLITION OF NON-LOAD BEARING INTERIOR PARTITIONS & PLUMBING FIXTURES IN EXISTING STORE, AS SHOWN ON PLANS. NO CHANGE IN USE (U.G.), OCCUPANCY OR$45,000
2017-09-12Job filed: DEMOLITION OF NON-LOAD BEARING INTERIOR PARTITIONS & PLUMBING FIXTURES IN EXISTING STORE, AS SHOWN ON PLANS. NO CHANGE IN USE (U.G.), OCCUPANCY OR$45,000
2017-08-15TLS — from CITY OF NEW YORK to BANK OF NEW YORK
2017-08-08Certificate of occupancy Temporary
2017-07-22311: Broken Muni Meter — Out of Order
2017-07-15311: Broken Muni Meter — Credit Card Stuck in Meter
2017-07-14Permit EW — ISSUED
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000002869 HAS BEEN INSPECTIED,TESTED,AND DISINFECTED AND THAT A MAINTENAN$1,000
2017-06-15Permit EW — ISSUED
2017-05-30Mortgage satisfied — from HDA HOLDINGS LLC to FEDERAL DEPOSIT INSURANCE CORPORATION; EAST WEST BANK; JPMORGAN CHASE BANK NA; UNITED COMM
2017-05-16Boiler inspection
2017-04-22DOB violation C: THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER FOR JOB#12290954 9. THE APPLICANT OF RECORD HAS WITHDRAWN. STOP ALL WORK AND
2017-04-18DOB complaint, category ?
2017-03-28Mortgage assigned — from HSBC BANK USA NA to CITY NATIONAL BANK
2017-03-28Mortgage $2,551,553 — from SPIN HOLDINGS LLC to CITY NATIONAL BANK$2,551,553
2017-03-28Agreement $5,000,000 — from SPIN HOLDINGS LLC to CITY NATIONAL BANK$5,000,000
2017-03-28AL&R $5,000,000 — from SPIN HOLDINGS LLC to CITY NATIONAL BANK$5,000,000
2017-03-28TL&R — from HSBC BANK USA NA to SPIN HOLDINGS LLC
2017-03-23Permit EW — ISSUED
2017-03-22Job filed: INTERIOR RENOVATION OF OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE USE OCCUPANCY OR EGRESS.$163,000
2017-01-21Job filed: REMOVAL OF EXIST CONVENIENCE SPIRAL STAIRS BETWEEN 5TH & 6TH FLOORS, REPAIR OF EXISTING FINISHES, NO OTHER WORK ASSOCIATED WITH THIS APPLICATION, $9,600
2017-01-05Job filed: INTERIOR RENOVATION OF EXISTING FRAMED RESIDENCE. NO CHANGE TO EXISTING USE, EGRESS,OCCUPANCY,ACCESSIBILITY,ADA, FIRE RATINGS OR ENERGY EFFICIENCY$9,600
2016
2016-12-16Certificate of occupancy Temporary
2016-12-08311: Homeless Person Assistance — N/A
2016-12-01Permit PL — ISSUED
2016-11-21Agreement $3,788,975 — from JD BAR CONDO, LLC to CONNECTONEBANK$3,788,975
2016-11-21Mortgage $4,711,025 — from JD BAR CONDO, LLC to CONNECTONEBANK$4,711,025
2016-11-21Mortgage assigned — from BANK OF AMERICA, N.A. to CONNECTONEBANK
2016-11-21TL&R — from BANK OF AMERICA, N.A.
2016-11-21Mortgage assigned — from BANK OF AMERICA, N.A. to CONNECTONEBANK
2016-11-21Mortgage $4,711,025 — from JD BAR CONDO, LLC to CONNECTONEBANK$4,711,025
2016-11-21TL&R — from BANK OF AMERICA, N.A.
2016-11-21Agreement $3,788,975 — from JD BAR CONDO, LLC to CONNECTONEBANK$3,788,975
2016-11-21AL&R $8,500,000 — from JD BAR CONDO, LLC to CONNECTONEBANK$8,500,000
2016-11-21AL&R $8,500,000 — from JD BAR CONDO, LLC to CONNECTONEBANK$8,500,000
2016-11-01Job filed: A2$137,790
2016-10-21Permit EW — ISSUED
2016-10-21Job filed: FILING FOR INTERIOR RENOVATION OF FIRST FLOOR RESTAURANT. WORK TO INCLUDE THE DEMOLITION OF EXISTING PARTITIONS, DOORS, CEILING AND FLOOR FINISHES AND$137,790
2016-09-13Job filed: INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS ON THE 12TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$28,000
2016-09-13Job filed: INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS ON THE 12TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$28,000
2016-07-08Certificate of occupancy Temporary
2016-07-05Agreement $1,750,000 — from AENYC HOLDING COMPANY LLC to JPMORGAN CHASE BANK, N.A.$1,750,000
2016-07-05Mortgage $1,112,098 — from AENYC HOLDING COMPANY LLC to JPMORGAN CHASE BANK, N.A.$1,112,098
2016-07-05Mortgage assigned — from CITIBANK, N.A. to JPMORGAN CHASE BANK, N.A.
2016-07-01AL&R $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01Mortgage $527,005 — from TBF GROUP LLC to FIRST REPUBLIC BANK$527,005
2016-07-01Mortgage assigned — from SANTANDER BANK, N.A. F/K/A SOVEREIGN BAN to FIRST REPUBLIC BANK
2016-07-01Agreement $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01TL&R — from SANTANDER BANK, N.A., F/K/A SOVEREIGN BA to TBF GROUP LLC
2016-07-01Mortgage $527,005 — from TBF GROUP LLC to FIRST REPUBLIC BANK$527,005
2016-07-01AL&R $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01TL&R — from SANTANDER BANK, N.A., F/K/A SOVEREIGN BA to TBF GROUP LLC
2016-07-01AL&R $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01Mortgage $527,005 — from TBF GROUP LLC to FIRST REPUBLIC BANK$527,005
2016-07-01Agreement $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01AL&R $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01TL&R — from SANTANDER BANK, N.A., F/K/A SOVEREIGN BA to TBF GROUP LLC
2016-07-01Agreement $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01AL&R $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01Mortgage assigned — from SANTANDER BANK, N.A. F/K/A SOVEREIGN BAN to FIRST REPUBLIC BANK
2016-07-01Mortgage $527,005 — from TBF GROUP LLC to FIRST REPUBLIC BANK$527,005
2016-07-01Mortgage assigned — from SANTANDER BANK, N.A. F/K/A SOVEREIGN BAN to FIRST REPUBLIC BANK
2016-07-01TL&R — from SANTANDER BANK, N.A., F/K/A SOVEREIGN BA to TBF GROUP LLC
2016-07-01Mortgage assigned — from SANTANDER BANK, N.A. F/K/A SOVEREIGN BAN to FIRST REPUBLIC BANK
2016-07-01Agreement $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01TL&R — from SANTANDER BANK, N.A., F/K/A SOVEREIGN BA to TBF GROUP LLC
2016-07-01Mortgage $527,005 — from TBF GROUP LLC to FIRST REPUBLIC BANK$527,005
2016-07-01Mortgage assigned — from SANTANDER BANK, N.A. F/K/A SOVEREIGN BAN to FIRST REPUBLIC BANK
2016-07-01Agreement $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01AL&R $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-07-01TL&R — from SANTANDER BANK, N.A., F/K/A SOVEREIGN BA to TBF GROUP LLC
2016-07-01Mortgage $527,005 — from TBF GROUP LLC to FIRST REPUBLIC BANK$527,005
2016-07-01Mortgage assigned — from SANTANDER BANK, N.A. F/K/A SOVEREIGN BAN to FIRST REPUBLIC BANK
2016-07-01Agreement $3,400,000 — from TBF GROUP LLC to FIRST REPUBLIC BANK$3,400,000
2016-06-30AL&R $1,600,000 — from 36W44 INC to SANTANDER BANK, N.A.$1,600,000
2016-06-30PREL — from SANTANDER BANK, N.A.; SOVEREIGN BANK, N.A. to TBF GROUP LLC
2016-06-30Mortgage $1,600,000 — from 36W44 INC to SANTANDER BANK, N.A.$1,600,000
2016-06-30Deed $2,334,788 — from TBF GROUP LLC to 36W44 INC$2,334,788
2016-06-15Sold for $2,334,787$2,334,787
2016-06-08Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$3,800
2016-04-28Mortgage $1,350,000 — from BAR-EL 15 CO, LLC to SIGNATURE BANK$1,350,000
2016-04-28Deed $2,842,350 — from TBF GROUP LLC to BAR-EL 15 CO.,LLC$2,842,350
2016-04-28AL&R $1,350,000 — from BAR-EL 15 CO, LLC to SIGNATURE BANK$1,350,000
2016-04-28PREL — from TBF GROUP LLC to SOVEREIGN BANK, N.A.; SANTANDER BANK, N.A.
2016-04-28REL — from TBF GROUP LLC to SOVEREIGN BANK, N.A.; SANTANDER BANK, N.A.
2016-04-25DEED COR — from JDM BAR HOLDING LLC; BAR BUILDING HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC to CLARIEL LLC
2016-04-25DEED COR — from BAR BUILDING HOLDING LLC; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC to SMB DREAM WORLD LLC
2016-04-25DEED COR — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to BLOSSOM REALTY ASSOCIATES, LLC
2016-04-25DEED COR — from BAR BUIDLING HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC to MHCA ASSOCIATES, LLC
2016-04-25DEED COR — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to BLOSSOM REALTY ASSOCIATES, LLC
2016-04-19Sold for $2,842,350$2,842,350
2016-04-18Certificate of occupancy Temporary
2016-03-11Permit EW — ISSUED
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17MAPS — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-02-17ADEC — from THE BAR BUILDING CONDOMINIUM
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27PREL — from SANTANDER BANK, N.A.
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27PREL — from SANTANDER BANK, N.A.
2016-01-27TL&R — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2016-01-27PREL — from SANTANDER BANK, N.A.
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27TL&R — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27AL&R $5,000,000 — from PISA, INC.; BAR BUILDING HOLDING LLC; BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN to BANK LEUMI USA$5,000,000
2016-01-27M&CON $5,000,000 — from PISA, INC.; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING H to BANK LEUMI USA$5,000,000
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27Mortgage assigned — from SANTANDER BANK, N.A. to BANK LEUMI USA
2016-01-27TL&R — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2016-01-13Job filed: SUBDIVISION OF 12TH FLOOR CONDOMINIUM CHANGE FROM 1 LOTS TO 7 TAX LOTS - EXISTING TAX LOT = 1014 / NEW TAX LOTS = 1014, 1050, 1051, 1052, 1053, 1054,
2016-01-04311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2016-01-04DOB complaint, category ?
2015
2015-12-30M&CON $5,775,000 — from S&B NY REALTY, LLC to JPMORGAN CHASE BANK, N.A.$5,775,000
2015-12-30TL&R — from JPMORGAN CHASE BANK, N.A. to S&B NY REALTY, LLC
2015-12-30AL&R $5,775,000 — from S&B NY REALTY, LLC to JPMORGAN CHASE BANK, N.A.$5,775,000
2015-12-28Mortgage satisfied — from MHCA Associates LLC to Bank of America, N.A.
2015-12-28Permit PL — ISSUED
2015-12-23Deed $2,250,000 — from SOLARI REAL ESTATE, INC. to CHELSEA PARK GROUP LLC$2,250,000
2015-12-23Mortgage $1,575,000 — from CHELSEA PARK GROUP LLC to FLUSHING BANK$1,575,000
2015-12-23AL&R $1,575,000 — from CHELSEA PARK GROUP LLC to FLUSHING BANK$1,575,000
2015-12-17Permit EW — ISSUED
2015-12-17Permit EW — ISSUED
2015-12-07Job filed: FILING HEREWITH MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$4,665
2015-12-07Job filed: FILING HEREWITH MODIFICATION TO AN EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$6,850
2015-11-10Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,000
2015-11-10Job filed: INTERIOR RENOVATION TO CONSTRUCT DENTAL OFFICE TO INCLUDE GENERAL CONSTRUCTION, PLUMBING & MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE $284,960
2015-11-09311: Street Condition — Cave-in
2015-11-06Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS NO CHANGE IN USE, EGRESS OR OCCUPANCY SITE: BARCLAY GALLERIES$3,500
2015-11-06Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS NO CHANGE IN USE, EGRESS OR OCCUPANCY SITE: BARCLAY GALLERIES$3,500
2015-10-15Permit PL — ISSUED
2015-10-14Permit PL — ISSUED
2015-10-05Certificate of occupancy Temporary
2015-10-02311: Broken Muni Meter — No Receipt
2015-07-30Permit EW — ISSUED
2015-07-30Permit EW — ISSUED
2015-07-17Job filed: ADDITIONS/MODIFICATIONS OF THE FIRE ALARM SYSTEM ON THE 11TH FLOOR AS INDICATED ON DRAWINGS.$10,000
2015-07-16Job filed: MECHANICAL AND PLUMBING WORK ON THE 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$180,000
2015-07-16Job filed: INTERIOR DEMOLITION AND CONSTRUCTION WORK ON THE 11TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.$400,000
2015-07-10Permit EW — ISSUED
2015-07-06Permit PL — ISSUED
2015-07-02Permit PL — ISSUED
2015-07-01Permit SG — ISSUED
2015-06-30Certificate of occupancy Temporary
2015-06-30Job filed: A2$10,000
2015-06-26Permit EW — ISSUED
2015-06-26Permit EW — ISSUED
2015-06-24Certificate of occupancy Temporary
2015-06-12Deed — from TSOI, LINDA FUNG YI; CHAN, KUNG TAK to MANHATTAN 302 LLC
2015-05-22Job filed: SUBSEQUENT APPLICATION FOR SPRINKLER WORK$18,000
2015-05-22Job filed: RENOVATION OF EXISTING STORES AT FIRST FLOOR AND MEZZANINE. MINOR PARTITION CHANGES, NEW PLUMBING FIXTURES AS SHOWN. NO CHANGE IN USE, OCCUPANCY OR ME$99,625
2015-05-22Job filed: SUBSEQUENT APPLICATION FOR SPRINKLER WORK$18,000
2015-05-22Job filed: RENOVATION OF EXISTING STORES AT FIRST FLOOR AND MEZZANINE. MINOR PARTITION CHANGES, NEW PLUMBING FIXTURES AS SHOWN. NO CHANGE IN USE, OCCUPANCY OR ME$99,625
2015-05-22Job filed: SUBSEQUENT APPLICATION FOR SPRINKLER WORK$18,000
2015-05-18Permit EW — ISSUED
2015-05-18Permit EW — RE-ISSUED
2015-04-07Deed — from AMINAGHA KHORDIAN AS NOMINEE FOR JONATHA; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2015-04-07Deed — from AMINAGHA KHORDIAN AS NOMINEE FOR JONATHA; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2015-04-07Deed — from AMINAGHA KHORDIAN AS NOMINEE FOR JONATHA; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2015-04-07Deed — from AMINAGHA KHORDIAN AS NOMINEE FOR JONATHA; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2015-04-07Deed — from AMINAGHA KHORDIAN AS NOMINEE FOR JONATHA; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2014-12-15311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2014-11-25Permit EW — ISSUED
2014-11-21Certificate of occupancy Temporary
2014-11-15Agreement $4,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$4,000,000
2014-11-15AL&R $4,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$4,000,000
2014-11-15TL&R — from BANK OF CHINA
2014-11-15Mortgage assigned — from BANK OF CHINA to STERLING NATIONAL BANK
2014-11-15AL&R $4,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$4,000,000
2014-11-15Agreement $4,000,000 — from BB RETAIL LLC to STERLING NATIONAL BANK$4,000,000
2014-10-22Permit PL — ISSUED
2014-09-30DOB violation E:
2014-08-22Permit PL — ISSUED
2014-08-20Job filed: REPLACE EXISTING DOOR WITH 2 HR RATED WALL PARTITION BETWEEN CONDO UNIT 704 & 707. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,500
2014-08-19AL&R — from PANNA R. REALTY LLC to M&T BANK
2014-08-19Mortgage $2,750,000 — from PANNA R. REALTY LLC to M&T BANK$2,750,000
2014-08-19Deed — from PANNA R. REALTY LLC to PANNA R. REALTY LLC
2014-07-29Permit EW — ISSUED
2014-07-29Permit EW — ISSUED
2014-07-01Job filed: REPLACE EXISTING DOOR WITH 2 HR RATED WALL PARTITION BETWEEN CONDO UNIT 704 & 707. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,500
2014-06-23311: Found Property — Electronics/Phones
2014-06-18Deed — from AMINAGHA KHORDIAN, AS NOMINEE FOR; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2014-06-18Deed — from AMINAGHA KHORDIAN, AS NOMINEE FOR; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2014-06-18Deed — from AMINAGHA KHORDIAN, AS NOMINEE FOR; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2014-06-18Deed — from AMINAGHA KHORDIAN, AS NOMINEE FOR; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2014-06-18Deed — from AMINAGHA KHORDIAN, AS NOMINEE FOR; KHORDIAN, AMINAGHA to PISA, INC.; KHORDIAN, AMINAGHA
2014-06-13Permit EW — ISSUED
2014-06-10Job filed: INSTALL NEW DEVICES TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2014-06-05311: Broken Muni Meter — No Receipt
2014-06-05Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2014-06-03Permit PL — ISSUED
2014-05-28Job filed: REPLACE EXISTING NON-FIRE RATED WALL PANEL WITH FIREPROOF SHEETROCK IN ORDER TO PROVIDED ONE HOUR RATED SEPARATION WALL PARTITION BETWEEN CONDO UNITS.$4,500
2014-05-22Permit EW — ISSUED
2014-05-15DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2014-04-08Job filed: FILING FOR SPRINKLER WORK TYPE ALL WORK WAS PERFORMED UNDER APPLICATION # 121095929 DOCUMENT 2.$10,500
2014-04-08Job filed: FILING FOR SPRINKLER WORK TYPE ALL WORK WAS PERFORMED UNDER APPLICATION # 121095929 DOCUMENT 2.$10,500
2014-03-26Permit EW — ISSUED
2014-03-07TL&R — from TISH ENTERPRISES LLC to TD BANK, NA
2014-03-07Mortgage satisfied — from TISH ENTERPRISES LLC to TD BANK, NA
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-02-28MAPS — from THE BAR BUILDING CONDOMINIUM
2014-02-28ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-14Job filed: OFFICE RENOVATION AS PLAN. NEW DUCT WORK ON EXISTING HVAC SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$41,000
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06Mortgage assigned — from TD BANK, N.A. to M&T BANK
2014-01-06Mortgage $38,782 — from B.K. MOOKIM LLC to M&T BANK$38,782
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06Agreement $1,250,000 — from B.K. MOOKIM LLC to M&T BANK$1,250,000
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06Deed — from PANNA R. REALTY LLC to PANNA R. REALTY LLC
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06AL&R $1,250,000 — from B.K. MOOKIM LLC to M&T BANK$1,250,000
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2014-01-06Deed — from B.K. MOOKIM LLC to B.K. MOOKIM LLC
2014-01-06ADEC — from THE BAR BUILDING CONDOMINIUM
2013
2013-12-24TL&R — from TD BANK, N.A. to B.K. MOOKIM LLC
2013-12-04Job filed: PROPOSED ALTERATION TYPE II FOR THE SPRINKLER WORK OF AN EXISTING COMMERCIAL UNIT AT 7TH FLOOR. NO CHANGE IN BULK, USE OR OCCUPANCY UNDER THIS APPLICA$35,000
2013-11-25Job filed: FILING TO RENOVATE OFFICE SPACE AS PER PLANS. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.$146,850
2013-11-25Job filed: FILING FOR INSTALLING NEW DEVICES TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.$10,000
2013-11-04Rodent inspection: Passed
2013-10-30Permit EW — ISSUED
2013-10-28Certificate of occupancy Temporary
2013-10-24Permit EW — ISSUED
2013-10-21Deed — from UNIQUE HOLDING (US) INC. to UNIQUE REALTY (US) LLC
2013-10-18311: Rodent — Rat Sighting
2013-10-10Permit PL — ISSUED
2013-10-10Job filed: FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#121095929, AS SHOWN ON PLAN. COOKING EQUIPMENT, COOKING EXHAUST SYSTEM AND FIRE SUP$3,000
2013-10-07Deed $2,836,000 — from TISH ENTERPRISES LLC to BAR BUILDING PROPERTIES LLC$2,836,000
2013-10-07PAT — from THE BUILDING PROPERTIES, LLC to THE BAR BUILDING CONDOMINIUM
2013-09-25Permit EW — ISSUED
2013-09-20Permit EW — ISSUED
2013-09-20Job filed: INSTALLATION OF TWO NEW FIRE ALARM DEVICES TO EXISTING BASE BUILDING FIRE ALAR M SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$3,000
2013-09-20Job filed: INSTALLATION OF TWO NEW FIRE ALARM DEVICES TO EXISTING BASE BUILDING FIRE ALAR M SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$3,000
2013-09-19Permit PL — ISSUED
2013-08-28Permit EW — ISSUED
2013-08-26Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$1,200
2013-08-22Deed — from KHORDIAN, AMINAGHA; AMINAGHA KHORDIAN, AS NOMINEE FOR JONATH to PISA, INC.; KHORDIAN, AMINAGHA
2013-08-22Deed — from KHORDIAN, AMINAGHA; AMINAGHA KHORDIAN, AS NOMINEE FOR JONATH to PISA, INC.; KHORDIAN, AMINAGHA
2013-08-22Deed — from KHORDIAN, AMINAGHA; AMINAGHA KHORDIAN, AS NOMINEE FOR JONATH to PISA, INC.; KHORDIAN, AMINAGHA
2013-08-22Deed — from KHORDIAN, AMINAGHA; AMINAGHA KHORDIAN, AS NOMINEE FOR JONATH to PISA, INC.; KHORDIAN, AMINAGHA
2013-08-22Deed — from KHORDIAN, AMINAGHA; AMINAGHA KHORDIAN, AS NOMINEE FOR JONATH to PISA, INC.; KHORDIAN, AMINAGHA
2013-08-12Permit EW — ISSUED
2013-07-27311: Broken Muni Meter — No Receipt
2013-07-26Permit EW — ISSUED
2013-07-08Job filed: RELOCATE EXIST. W.C. & INSTALL NEW SHOWER STALL IN EXIST. BATHROOM. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$13,000
2013-07-08Job filed: RELOCATE EXIST. W.C. & INSTALL NEW SHOWER STALL IN EXIST. BATHROOM. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$13,000
2013-07-02PAT — from BLOSSOM REALTY ASSOCIATES, LLC to CHEYENNE ACQUISTIONS LLC
2013-07-02Deed $550,000 — from SURAJ DIAMONDS AND JEWELRY USA, INC. to BLOSSOM REALTY ASSOCIATES, LLC$550,000
2013-07-02PAT — from CHEYENNE ACQUISITIONS LLC to BLOSSOM REALTY ASSOCIATES, LLC
2013-07-02Deed $450,000 — from SURAJ DIAMONDS AND JEWELRY USA, INC. to BLOSSOM REALTY ASSOCIATES, LLC$450,000
2013-06-21Permit PL — ISSUED
2013-06-20M&CON $7,000,000 — from JD BAR CONDO LLC to BANK OF AMERICA, N.A.$7,000,000
2013-06-20AL&R $7,000,000 — from JD BAR CONDO LLC to BANK OF AMERICA, N.A.$7,000,000
2013-06-20AL&R $7,000,000 — from JD BAR CONDO LLC to BANK OF AMERICA, N.A.$7,000,000
2013-06-20M&CON $7,000,000 — from JD BAR CONDO LLC to BANK OF AMERICA, N.A.$7,000,000
2013-06-13Permit EW — ISSUED
2013-05-28Permit EW — ISSUED
2013-05-21Permit AL — ISSUED
2013-05-13Job filed: REPLACEMENT OF TILE FLOORING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.$7,500
2013-04-23Job filed: INTERIOR RENOVATION OF EXISTING OFFICE SPACE INCLUSIVE OF NON LOAD BEARING PARTITION WORK AND PLUMBING WORK AS PER ATTACHED PLANS. NO CHANGE IN EGRES$81,192
2013-04-22Deed $2,400,000 — from AM BAR CONDO LLC to 168 MADISON AVENUE LLC$2,400,000
2013-04-17Job filed: SUBDIVISION OF 6TH FLOOR CONDOMINIUM CHANGE FROM 2 LOTS TO 4 TAX LOTS SUBDIVISION OF 14TH FLOOR CONDOMINIUM CHANGE FROM 1 LOT TO 8 TAX LOTS
2013-04-15DOB violation E:
2013-04-15DOB violation E:
2013-04-15DOB violation E:
2013-04-15DOB violation E:
2013-03-20MAPS — from THE BAR BUILDING CONDOMINIUM
2013-03-20ADEC — from THE BAR BUILDING CONDOMINIUM
2013-03-20MAPS — from THE BAR BUILDING CONDOMINIUM
2013-03-20MAPS — from THE BAR BUILDING CONDOMINIUM
2013-03-20ADEC — from THE BAR BUILDING CONDOMINIUM
2013-03-20ADEC — from THE BAR BUILDING CONDOMINIUM
2013-03-14Permit EW — ISSUED
2013-03-13Permit EW — ISSUED
2013-02-19Certificate of occupancy Temporary
2013-02-08TL&R — from SU-RAJ DIAMONDS & JEWERLY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION
2013-02-08Mortgage satisfied — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION
2013-02-08Mortgage satisfied — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION
2013-02-08TL&R — from SU-RAJ DIAMONDS & JEWERLY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION
2012
2012-12-17Permit PL — ISSUED
2012-12-15311: Broken Muni Meter — No Receipt
2012-12-10Job filed: PROPOSED ALTERATION TYPE II FOR THE RENOVATION OF AN EXISTING COMMERCIAL UNIT AT 7TH FLOOR. NO CHANGE IN BULK, USE OR OCCUPANCY UNDER THIS APPLICATION$409,350
2012-12-10Job filed: PROPOSED ALTERATION TYPE II FOR THE RENOVATION OF AN EXISTING COMMERCIAL UNIT AT 7TH FLOOR. NO CHANGE IN BULK, USE OR OCCUPANCY UNDER THIS APPLICATION$409,350
2012-12-04Mortgage satisfied — from MILIP COMPANY (USA) LLC to CITIBANK, N.A.
2012-11-30Rodent inspection: Passed
2012-11-21TL&R — from C&R EQUITIES, LLC to GTB CONSULTING CORPORATION
2012-11-16Mortgage satisfied — from COMPUTERS AND STRUCTURES INC. to BANK OF AMERICA, N.A.
2012-11-01Mortgage $375,000 — from AVL REALTY LLC to CITIBANK, N.A.$375,000
2012-11-01PAT — from AVL REALTY LLC to CONDOMINIUM BOARD OF THE BAR BUILDING CO
2012-11-01Deed $499,950 — from GTB CONSULTING CORPORATION to AVL REALTY LLC$499,950
2012-11-01Mortgage satisfied — from GTB CONSULTING CORPORATION to BECK, CHRISTOPHER M; MARTINO, ROBERT
2012-10-18DOB complaint, category ?
2012-10-01Mortgage satisfied — from COMPUTERS AND STRUCTURES, INC to BANK OF AMERICA, N.A.
2012-09-27Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2012-09-27Job filed: HEREWITH FILING FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2012-09-19Permit PL — ISSUED
2012-09-17311: Street Condition — Failed Street Repair
2012-09-11Permit EQ — ISSUED
2012-09-11Permit EW — ISSUED
2012-09-11Permit EW — ISSUED
2012-09-05Permit EW — ISSUED
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-09-04ADEC — from THE BAR BUILDING CONDOMINIUM
2012-08-23Permit EW — ISSUED
2012-08-20Mortgage assigned — from HSBC BANK USA, NATIONAL ASSOCIATION to SOVEREIGN BANK, N.A.
2012-08-20Mortgage $1,643,031 — from TBF GROUP LLC to SOVEREIGN BANK, N.A.$1,643,031
2012-08-20Agreement $3,200,000 — from TBF GROUP LLC to SOVEREIGN BANK, N.A.$3,200,000
2012-08-20AL&R $3,200,000 — from TBF GROUP LLC to SOVEREIGN BANK, N.A.$3,200,000
2012-08-20TL&R — from HSBC BANK USA, NATIONAL ASSOCIATION
2012-08-17Permit EW — ISSUED
2012-08-09Job filed: HEREWITH FILING FOR REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2012-08-09Job filed: HEREWITH FILING FOR REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2012-08-09Job filed: HEREWITH FILING FOR REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2012-08-02311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2012-07-27Permit EW — ISSUED
2012-07-18PAT — from AENYC HOLDING COMPANY LLC to CONDOMINIUM BOARD
2012-07-18Deed $2,025,000 — from TGG HOLDING, LLC to AENYC HOLDING COMPANY LLC$2,025,000
2012-07-18Mortgage $1,000,000 — from AENYC HOLDING COMPANY LLC to CITIBANK, N.A.$1,000,000
2012-05-30Job filed: PROPOSE TO RENOVATE EXISTING RETAIL SPACE FOR A EATING AND DRINKING ESTABLISHMENT FOR LESS THAN 74 OCCUPANTS. MODIDFICATIONS TO EXISTING SPRIKLER SYST$140,000
2012-05-30Job filed: PROVIDE MEP DOCUMENTS FOR THE INTERIOR RENOVATION$15,000
2012-05-30Job filed: PROPOSE TO RENOVATE EXISTING RETAIL SPACE FOR A EATING AND DRINKING ESTABLISHMENT FOR LESS THAN 74 OCCUPANTS. MODIDFICATIONS TO EXISTING SPRIKLER SYST$140,000
2012-05-25Job filed: INTERIOR RENOVATION OF EXISTING HALLWAY AND BATHROOM FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$61,650
2012-04-25Mortgage assigned — from EAST WEST BANK to JPMORGAN CHASE BANK, N.A.
2012-04-25TL&R — from EAST WEST BANK to HDA HOLDINGS, LLC
2012-04-25Agreement $700,000 — from HDA HOLDINGS, LLC to JPMORGAN CHASE BANK, N.A.$700,000
2012-04-25Mortgage $391,399 — from HDA HOLDINGS, LLC to JPMORGAN CHASE BANK, N.A.$391,399
2012-04-25Mortgage assigned — from CHEYENNE ACQUISITIONS LLC to M&T BANK
2012-04-25Agreement $2,500,000 — from O.P. DANGAYACH REALTY LLC to M&T BANK$2,500,000
2012-04-25AL&R — from O.P. DANGAYACH REALTY LLC to M&T BANK
2012-04-25Mortgage $200,000 — from O.P. DANGAYACH REALTY LLC to M&T BANK$200,000
2012-04-25TL&R — from CHEYENNE ACQUISITIONS LLC to O.P. DANGAYACH REALTY LLC
2012-04-25Mortgage assigned — from FEDERAL DEPOSIT INSURANCE CORP. to EAST WEST BANK
2012-03-22Job filed: PROPOSE TO RENOVATE EXISTING RETAIL SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$35,000
2012-03-09Permit PL — ISSUED
2012-02-29Permit EQ — ISSUED
2012-02-21Facade (LL11) filing, cycle 7: SAFE
2012-02-17Permit EQ — ISSUED
2012-02-10Permit EW — ISSUED
2012-01-23Permit PL — ISSUED
2012-01-16Permit EW — ISSUED
2011
2011-12-20Mortgage assigned — from C&R EQUITIES, LLC to MARTINO, ROBERT; BECK, CHRISTOPHER M
2011-12-12311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2011-12-12DOB complaint, category ?
2011-12-08Permit EW — ISSUED
2011-12-08Permit EW — ISSUED
2011-12-01311: Air Quality — Air: Smoke, Commercial (AA2)
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-28ADEC — from THE BAR BUILDING CONDOMINIUM
2011-11-04Permit EW — ISSUED
2011-11-04Permit EW — ISSUED
2011-11-04Job filed: INTERIOR RENOVATION WORK INCLUDING MINOR PARTITION, CARPENTRY WORK, PLUMBING AND MECHANICAL WORKS.$69,650
2011-11-04Job filed: INTERIOR RENOVATION WORK INCLUDING MINOR PARTITION, CARPENTRY WORK, PLUMBING AND MECHANICAL WORKS.$69,650
2011-09-28Job filed: INTERIOR RENOVATION WORK INCLUDING MINOR PARTITION, CARPENTRY WORK, PLUMBING AND MECHANICAL WORKS.$30,000
2011-09-07Deed $810,000 — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC to SU-RAJ DIAMONDS & JEWELRY USA, INC.$810,000
2011-09-07PAT — from CHEYENE ACQUISITIONS LLC to THE BAR BUILDING CONDOMINIUM
2011-09-07Mortgage $945,000 — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION$945,000
2011-09-07Mortgage $945,000 — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION$945,000
2011-09-07PAT — from THE BAR BUILDING CONDOMINIUM to SU-RAJ DIAMONDS & JEWELRY USA, INC.
2011-09-07PAT — from KHORDIAN, AMINAGHA to HAKIMIAN, RODNEY
2011-09-07PAT — from THE BAR BUILDING CONDOMINIUM to SMB DREAM WORLD, LLC
2011-09-07Deed $1,000,000 — from JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC to SMB DREAM WORLD LLC$1,000,000
2011-09-07Deed $775,000 — from KHORDIAN , AMINAGHA; BRB HOLDING GROUP LLC; BAR BUILDING HOLDING LLC; JDM BAR HOLDING LLC to SU-RAJ DIAMONDS & JEWERLY USA, INC.$775,000
2011-09-07AL&R — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION
2011-09-07AL&R — from SU-RAJ DIAMONDS & JEWELRY USA, INC. to HSBC BANK USA, NATIONAL ASSOCIATION
2011-08-25TOLCC — from THE BOARD OF MANAGERS OF THE BAR BUILDIN to TGG HOLDING, LLC
2011-08-25PAT — from XIAODA, ZHAO to TANG, AMY LEE
2011-08-25TOLCC — from THE BOARD OF MANAGERS OF THE BAR BUILDIN to TGG HOLDING, LLC
2011-08-25Deed $1,818,300 — from TGG HOLDING, LLC to JADE HOLDINGS GROUP, LLC; ZHAO, XIAODA$1,818,300
2011-08-25PAT — from ZHAO, XIAODA; JADE HOLDINGS GROUP, LLC to CONDOMINIUM BOARD OF THE BAR BUILDING CO
2011-08-25PAT — from XIAODA, ZHAO to TANG, AMY LEE
2011-08-25Deed $409,260 — from TGG HOLDING, LLC to ZHAO, XIAODA$409,260
2011-08-25TOLCC — from THE BOARD OF MANAGERS OF THE BAR BUILDIN to TGG HOLDING, LLC
2011-08-25PAT — from TANG, JENNIE to TANG, AMY LEE
2011-08-25TOLCC — from THE BOARD OF MANAGERS OF THE BAR BUILDIN to TGG HOLDING, LLC
2011-08-25PAT — from ZHAO, XIAODA to CONDOMINIUM BOARD OF THE BAR BUILDING CO
2011-08-25TOLCC — from THE BOARD OF MANAGERS OF THE BAR BUILDIN to TGG HOLDING, LLC
2011-08-22TL&R — from COMMERCE BANK, N.A.; TD BANK, N.A.; TD BANK, N.A.; COMMERCE BANK, N.A.
2011-08-22TL&R — from COMMERCE BANK, N.A.; TD BANK, N.A.; TD BANK, N.A.; COMMERCE BANK, N.A.
2011-08-22Mortgage $925,309 — from PARAMOUNT SPB REALTY LLC to TD BANK, N.A.$925,309
2011-08-22Agreement $2,282,459 — from PARAMOUNT SPB REALTY LLC to TD BANK, N.A.$2,282,459
2011-08-22Deed — from PARAMOUNT SPB REALTY LLC to PANNA R REALTY LLC
2011-08-22AL&R $925,309 — from PANNA R. REALTY LLC to TD BANK, N.A.$925,309
2011-08-22Deed — from PARAMOUNT SPB REALTY LLC to B.K. MOOKIM LLC
2011-08-22Mortgage $1,357,150 — from PARAMOUNT SPB REALTY LLC to TD BANK, N.A.$1,357,150
2011-08-22Mortgage $925,309 — from PANNA R. REALTY LLC to TD BANK, N.A.$925,309
2011-08-22Agreement $2,282,459 — from PARAMOUNT SPB REALTY LLC to TD BANK, N.A.$2,282,459
2011-08-22TL&R — from COMMERCE BANK, N.A.; TD BANK, N.A.; TD BANK, N.A.; COMMERCE BANK, N.A.
2011-08-22AL&R $1,357,150 — from B.K. MOOKIM LLC to TD BANK, N.A.$1,357,150
2011-08-22Mortgage $1,357,150 — from B.K. MOOKIM LLC to TD BANK, N.A.$1,357,150
2011-08-22RPTT&RET — from MOOKIM REALTY LLC to PANNA RAJNI REALTY LLC
2011-08-22RPTT&RET — from PANNA RAJNI REALTY LLC to MOOKIM REALTY LLC
2011-08-22TL&R — from COMMERCE BANK, N.A.; TD BANK, N.A.; TD BANK, N.A.; COMMERCE BANK, N.A.
2011-07-14Rodent inspection: Passed
2011-06-14Permit EQ — ISSUED
2011-06-02DOB violation E:
2011-06-02DOB violation E:
2011-06-02DOB violation E:
2011-06-02Job filed: ERECT PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-06-02Job filed: ERECT PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33.
2011-05-18Permit EW — ISSUED
2011-05-18Permit EW — ISSUED
2011-05-05311: Broken Muni Meter — No Receipt
2011-04-27Job filed: CONSTRUCTION OF 2HR RATED SHAFT WALL FOR PROPOSED KITCHEN EXHAUST VENT AS SHOWN ON PLANS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$23,900
2011-04-27Job filed: CONSTRUCTION OF 2HR RATED SHAFT WALL FOR PROPOSED KITCHEN EXHAUST VENT AS SHOWN ON PLANS. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$23,900
2011-04-27Job filed: INSTALLATION OF KITCHEN EXHAUST VENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$107,200
2011-04-27Job filed: INSTALLATION OF KITCHEN EXHAUST VENT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$107,200
2011-03-30Mortgage $45,000 — from GTB CONSULTING CORPORATION to C&R EQUITIES, LLC$45,000
2011-03-30Agreement $160,000 — from C&R EQUITIES, LLC to GTB CONSULTING CORPORATION$160,000
2011-03-11Permit EW — ISSUED
2011-03-03Permit EW — ISSUED
2011-02-15Permit EQ — ISSUED
2011-02-11Job filed: INSTALLATION OF 193 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERNATION, FILED SEPARATELY. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY
2011-02-01Job filed: INSTALLATION OF TAMPER SWITCH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$4,000
2011-02-01Job filed: INSTALLATION OF SPRINKLER HEADS IN RETAIL STORE.NO CHANGE IN USE, OCCUPANCY OR EGRESS.$12,600
2011-01-19Permit EW — ISSUED
2011-01-10Permit AL — ISSUED
2011-01-03Permit PL — ISSUED
2010
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08Agreement $3,875,000 — from KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC; JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC to SOVEREIGN BANK$3,875,000
2010-12-08PAT — from KHORDIAN, AMINAGHA to MARDKHA, DAVID
2010-12-08Mortgage $1,479,711 — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; BAR BUILDING HOLDING LLC; KHORDIAN, AMINAGHA to SOVEREIGN BANK$1,479,711
2010-12-08Agreement $3,875,000 — from KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC; JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC to SOVEREIGN BANK$3,875,000
2010-12-08PAT — from KHORDIAN, AMINAGHA to MARDKHA, DAVID
2010-12-08AL&R $3,875,000 — from JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC to SOVEREIGN BANK$3,875,000
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08Mortgage $1,479,711 — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; BAR BUILDING HOLDING LLC; KHORDIAN, AMINAGHA to SOVEREIGN BANK$1,479,711
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08Mortgage $1,479,711 — from BRB HOLDING GROUP LLC; JDM BAR HOLDING LLC; BAR BUILDING HOLDING LLC; KHORDIAN, AMINAGHA to SOVEREIGN BANK$1,479,711
2010-12-08PAT — from KHORDIAN, AMINAGHA to MARDKHA, DAVID
2010-12-08REL — from BAR CONDO 44TH STREET LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK
2010-12-08Agreement $3,875,000 — from KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC; JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC to SOVEREIGN BANK$3,875,000
2010-12-08AL&R $3,875,000 — from JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC to SOVEREIGN BANK$3,875,000
2010-12-08AL&R $3,875,000 — from JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC to SOVEREIGN BANK$3,875,000
2010-10-21311: Taxi Complaint — Driver Complaint
2010-10-08Permit EW — ISSUED
2010-09-03DOB violation E:
2010-08-30311: Street Condition — Pothole
2010-08-19Job filed: EXTERIOR REPAIR WHICH INCLUDES PARAPET RECONSTRUCTION AS PER PLANS. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$278,500
2010-08-19Job filed: EXTERIOR REPAIR WHICH INCLUDES PARAPET RECONSTRUCTION AS PER PLANS. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$278,500
2010-08-16Permit EW — ISSUED
2010-08-10311: Taxi Complaint — Driver Complaint
2010-08-03Job filed: HEREWITH FILING FOR CHANGE USE OF PART OF 11TH FLOOR TO A JEWELERY MANUFACTURE WITH MINOR PARTITIONS. ALL WORK PERFORMED UNDER ALTERATION #110324257.$3,000
2010-08-03Job filed: HEREWITH FILING FOR CHANGE USE OF PART OF 11TH FLOOR TO A JEWELERY MANUFACTURE WITH MINOR PARTITIONS. ALL WORK PERFORMED UNDER ALTERATION #110324257.$3,000
2010-08-03Job filed: HEREWITH FILING FOR CHANGE USE OF PART OF 11TH FLOOR TO A JEWELERY MANUFACTURE WITH MINOR PARTITIONS. ALL WORK PERFORMED UNDER ALTERATION #110324257.$3,000
2010-07-12Rodent inspection: Passed
2010-06-30Job filed: ADDITONS TO EXISTING FDNY APPROVED FIRE ALARM SYSTEM AS PER THE 1968 CODE FOR THE FLOORRS LISTED ABOVED IN SECTION 1 AS PER SUBMITTED DRAWINGS. NO CHA$3,000
2010-06-11311: Broken Muni Meter — Coin or Card Did Not Register
2010-06-11311: Broken Muni Meter — Coin or Card Did Not Register
2010-06-11Permit AL — ISSUED
2010-06-04Job filed: ADDITIONS TO EXISTING FDNY APPROVED FIRE ALARM SYSTEM AS PER THE 1968 CODE FOR THE FLOORS LISED ABOVE IN SECTION 1 AS PER SUBMITTED DRAWINGS. NO CHANG$5,000
2010-06-04Job filed: ADDITIONS TO EXISTING FDNY APPROVED FIRE ALARM SYSTEM AS PER THE 1968 CODE FOR THE FLOORS LISED ABOVE IN SECTION 1 AS PER SUBMITTED DRAWINGS. NO CHANG$5,000
2010-05-22311: Broken Muni Meter — No Receipt
2010-05-10311: Broken Muni Meter — No Receipt
2010-04-26Permit EW — ISSUED
2010-04-23Mortgage satisfied — from TGG HOLDING , LLC to CHEYENNE ACQUISITIONS LLC
2010-04-23Mortgage satisfied — from TGG HOLDING , LLC to CHEYENNE ACQUISITIONS LLC
2010-04-23AL&R $115,000 — from C&R EQUITIES, LLC to GTB CONSULTING CORPORATION$115,000
2010-04-23Mortgage $115,000 — from GTB CONSULTING CORPORATION to C&R EQUITIES, LLC$115,000
2010-04-23TL&R — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING , LLC
2010-04-23Mortgage satisfied — from TGG HOLDING , LLC to CHEYENNE ACQUISITIONS LLC
2010-04-23Deed $500,000 — from TGG HOLDING, LLC to GTB CONSULTING CORPORATION$500,000
2010-04-23TL&R — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING , LLC
2010-04-23PAT — from GTB CONSULTING CORPORATION to THE BAR BUILDING CONDOMINIUM
2010-04-23Mortgage satisfied — from TGG HOLDING , LLC to CHEYENNE ACQUISITIONS LLC
2010-04-23TL&R — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING , LLC
2010-04-23TL&R — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING , LLC
2010-04-12Job filed: INSTALL NEW PARTITION TO CREATE AIR CONDITIONING EQUIPMENT ROOM. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$15,000
2010-04-12Job filed: INSTALL NEW PARTITION TO CREATE AIR CONDITIONING EQUIPMENT ROOM. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$15,000
2010-03-26Job filed: APPLICATION FILED FOR MODIFICATION TO EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2010-03-20311: Broken Muni Meter — No Receipt
2010-03-19Permit EW — ISSUED
2010-03-08Permit EW — ISSUED
2010-03-08Job filed: REPLACE TWO (2) 3 TON AIR CONDITIONING UNITS IN SUITE 816 AND CONNECT TO EXISTING DUCTWORK.$33,000
2010-02-24Job filed: CREATE NEW ENTRANCE TO EX'G BATHROOM IN PUBLIC CORRIDOR AND INSTALL NEW DEMISING PARTITION TO CREATE ENTRANCE VESTIBULE FOR EX'G BATHROOM AND STORAGE $5,700
2010-02-24Job filed: CREATE NEW ENTRANCE TO EX'G BATHROOM IN PUBLIC CORRIDOR AND INSTALL NEW DEMISING PARTITION TO CREATE ENTRANCE VESTIBULE FOR EX'G BATHROOM AND STORAGE $5,700
2010-01-23311: Broken Muni Meter — No Receipt
2009
2009-12-22Job filed: SEE COMMENTS IN SECTION 24$1,500
2009-12-22Job filed: THE ALTERATION TYPE I APPLICATION IS BEING FILED FOR 5TH FLOOR ONLY. TO CHANGE THE USE ON 5TH FLOOR FROM THE OFFICE TO OFFICE, JEWELRY MANUFACTURING.$1,500
2009-12-14Permit EW — ISSUED
2009-12-08Permit EW — ISSUED
2009-11-24DOB complaint, category ?
2009-11-17Permit EW — ISSUED
2009-11-16Deed — from ASHRAF HABIBULLAH, TRUSTEE; THE HABIBULLAH REVOCABLE TRUST, UTD 10/3; SHAHIDA ASHRAF HABIB to COMPUTERS AND STRUCTURES HOLDINGS, LLC
2009-11-16Deed — from COMPUTERS AND STRUCTURES, INC. to THE HABIBULLAH REVOCABLE TRUST, UTD 10/3
2009-09-30Permit PL — ISSUED
2009-09-14Job filed: SUITE 711: FIRE ALARM INSTALLATION AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED.$3,000
2009-09-14Job filed: SUITE 711: FIRE ALARM INSTALLATION AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED.$3,000
2009-08-22DOB complaint, category ?
2009-08-06Permit EW — ISSUED
2009-08-06Permit EW — ISSUED
2009-08-06DOB violation E:
2009-08-06DOB violation E:
2009-08-06DOB violation E:
2009-08-06DOB violation E:
2009-08-06DOB violation E:
2009-07-24Permit EW — ISSUED
2009-07-17Job filed: REPLACE 12 TON AIR CONDITIONING UNIT WITH NEW LOUVER AND DAMPER.$60,752
2009-07-17Job filed: REPLACE 12 TON AIR CONDITIONING UNIT WITH NEW LOUVER AND DAMPER.$60,752
2009-07-09Job filed: SUITE 711: INSTALL NEW INTERIOR PARTITIONS, HUNG CEILINGS, FLOORING< DOORS AND FINISHES WITHIN EXISTING OFFICE SUITE. INTERIOR DEMOLITION WORK FILE$172,500
2009-07-09Job filed: SUITE 711: INSTALL NEW INTERIOR PARTITIONS, HUNG CEILINGS, FLOORING< DOORS AND FINISHES WITHIN EXISTING OFFICE SUITE. INTERIOR DEMOLITION WORK FILE$172,500
2009-07-09Job filed: SUITE #711: PLUMBING, SPRINKLER AND MECHANICAL INSTALLATIONS IN CONJUNCTION WITH RENOVATIONS TO EXISTING OFFICE SUITE #711. INSTALL NEW A/C EQUIPMENT$86,000
2009-07-09Job filed: SUITE #711: PLUMBING, SPRINKLER AND MECHANICAL INSTALLATIONS IN CONJUNCTION WITH RENOVATIONS TO EXISTING OFFICE SUITE #711. INSTALL NEW A/C EQUIPMENT$86,000
2009-07-09Job filed: SUITE 711: INSTALL NEW INTERIOR PARTITIONS, HUNG CEILINGS, FLOORING< DOORS AND FINISHES WITHIN EXISTING OFFICE SUITE. INTERIOR DEMOLITION WORK FILE$172,500
2009-07-02Job filed: ADDITIONS TO EXISITING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS NO CHANGE I N USE, EGRESS OR OCCUPANCY.$8,500
2009-05-14Permit PL — ISSUED
2009-05-06PREL — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING, LLC
2009-05-06PREL — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING, LLC
2009-05-06REL — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC
2009-05-06REL — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC
2009-04-28Permit EW — ISSUED
2009-04-23Job filed: HEREWITH FILING TO CHANGE THE USE ON THE 5TH & 6TH FLOOR TO INCLUDE USE GROUP 11 JEWLERY MANUFACTURE. NO WORK TO BE DONE UNDER THIS APPLICATION. A$100
2009-04-23Job filed: HEREWITH FILING TO CHANGE THE USE ON THE 5TH & 6TH FLOOR TO INCLUDE USE GROUP 11 JEWLERY MANUFACTURE. NO WORK TO BE DONE UNDER THIS APPLICATION. A$100
2009-04-07Permit PL — ISSUED
2009-04-03Permit EW — ISSUED
2009-04-03Permit EW — ISSUED
2009-02-05Permit EW — ISSUED
2009-01-14Job filed: SUITE 711: REMOVE INTERIOR NON-BEARING PARTITIONS, HUNG CEILINGS AND FINISHES THROUGHOUT. NEW PARTITIONS, ETC TO BE FILED SEPARATELY. NO CHANGE IN ZON$26,000
2008
2008-12-16CERR — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC
2008-12-16PAT — from THE NEW YORK GENEALOGICAL AND BIOGRAPHIC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2008-12-16Deed $3,037,100 — from TGG HOLDING, LLC to THE NEW YORK GENEALOGICAL AND BIOGRAPHIC$3,037,100
2008-12-16CERR — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC
2008-12-16CERR — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC
2008-12-16CERR — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC
2008-12-11Permit EW — ISSUED
2008-12-09Permit EW — ISSUED
2008-12-09Permit EW — ISSUED
2008-12-09Permit EW — ISSUED
2008-12-08Permit EW — ISSUED
2008-12-02Permit EW — ISSUED
2008-11-28PAT — from SOLARI REAL ESTATE, INC. to THE CONDOMINIUM BOARD OF
2008-11-28Deed $1,635,000 — from TGG HOLDING, LLC to SOLARI REAL ESTATE, INC.$1,635,000
2008-11-28PREL — from CHEYENNE ACQUISITIONS, LLC to TGG HOLDING, LLC
2008-11-21Agreement $4,800,000 — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC$4,800,000
2008-11-21Agreement $4,800,000 — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC$4,800,000
2008-11-21Agreement $4,800,000 — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC$4,800,000
2008-11-21Agreement $4,800,000 — from TGG HOLDING, LLC to CHEYENNE ACQUISITIONS LLC$4,800,000
2008-11-19Job filed: REPLACEMENT OF FCS & AMP RACK FOR THE PURPOSE OF A REPAIR TO AN EXISTING APPRO VED OBSOLETE SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY$36,000
2008-11-17DOB complaint, category ?
2008-11-13Mortgage satisfied — from MKGK 36 W 44 HOLDING COMPANY LLC to TD BANK NA SUCCESSOR TO COMMERCE BANK NA
2008-10-30Job filed: ADDITIONS TO EXISTING FIRE ALARM SYSTEMAS PER DRAWINGS FILED$7,000
2008-10-30Job filed: ADDITIONS TO EXISTING FIRE ALARM SYSTEMAS PER DRAWINGS FILED$7,000
2008-10-21Permit EW — ISSUED
2008-10-15ADEC — from THE BAR BUILDING CONDOMINIUM
2008-10-15MAPS — from THE BAR BUILDING CONDOMINIUM
2008-10-15MAPS — from THE BAR BUILDING CONDOMINIUM
2008-10-15ADEC — from THE BAR BUILDING CONDOMINIUM
2008-10-15MAPS — from THE BAR BUILDING CONDOMINIUM
2008-10-15ADEC — from THE BAR BUILDING CONDOMINIUM
2008-10-15ADEC — from THE BAR BUILDING CONDOMINIUM
2008-10-15ADEC — from THE BAR BUILDING CONDOMINIUM
2008-10-15MAPS — from THE BAR BUILDING CONDOMINIUM
2008-10-15ADEC — from THE BAR BUILDING CONDOMINIUM
2008-10-15MAPS — from THE BAR BUILDING CONDOMINIUM
2008-10-15MAPS — from THE BAR BUILDING CONDOMINIUM
2008-10-14TL&R — from RIDGEWOOD SAVINGS BANK
2008-10-14TL&R — from RIDGEWOOD SAVINGS BANK
2008-10-14Mortgage assigned — from RIDGEWOOD SAVINGS BANK to MERRILL LYNCH COMMERCIAL FINANCE CORP.
2008-10-14M&CON $8,500,000 — from JD BAR CONDO LLC to MERRILL LYNCH COMMERCIAL FINANCE CORP.$8,500,000
2008-10-14Mortgage assigned — from RIDGEWOOD SAVINGS BANK to MERRILL LYNCH COMMERCIAL FINANCE CORP.
2008-10-14M&CON $8,500,000 — from JD BAR CONDO LLC to MERRILL LYNCH COMMERCIAL FINANCE CORP.$8,500,000
2008-10-10Job filed: FILING FOR INTERIOR DEMOLITION TO INCLUDE PARTITIONS, CEILING, HVAC, DUCTWORK, ELECTRICAL OUTLETS AND SWITCHES. AS SHOWN ON DRAWINGS FILED HERWITH. NO$8,000
2008-10-10Job filed: FILING FOR INTERIOR DEMOLITION TO INCLUDE PARTITIONS, CEILING, HVAC, DUCTWORK, ELECTRICAL OUTLETS AND SWITCHES. AS SHOWN ON DRAWINGS FILED HERWITH. NO$8,000
2008-10-02Permit EW — ISSUED
2008-09-30AL&R $507,000 — from MKGK 36 W 44 HOLDING COMPANY LLC to LONG ISLAND DEVELOPMENT CORPORATION$507,000
2008-09-30AALR — from LONG ISLAND DEVELOPMENT CORPORATION to U.S. SMALL BUSINESS ADMINISTRATION
2008-09-30Mortgage assigned — from LONG ISLAND DEVELOPMENT CORPORATION to U.S. SMALL BUSINESS ADMINISTRATION
2008-09-30Mortgage $507,000 — from MKGK 36 W 44 HOLDING COMPANY LLC to LONG ISLAND DEVELOPMENT CORPORATION$507,000
2008-09-30AALR — from LONG ISLAND DEVELOPMENT CORPORATION to U.S. SMALL BUSINESS ADMINISTRATION
2008-09-30AL&R $507,000 — from MEIR KAHTAN PUBLIC RELATIONS, LLC to LONG ISLAND DEVELOPMENT CORPORATION$507,000
2008-09-30MLEA — from MKGK 36 W 44 HOLDING COMPANY LLC to MEIR KAHTAN PUBLIC RELATIONS, LLC
2008-09-30Agreement $507,000 — from COMMERCE BANK, N.A. to LONG ISLAND DEVELOPMENT CORPORATION$507,000
2008-09-29Job filed: TAX LOT SUBDIVISION FOR CONDOMINIUM PURPOSES ONLY. NO CHANGES TO METES AND BOUNDS.
2008-08-27DOB violation E:
2008-08-27DOB violation E:
2008-08-27DOB violation E:
2008-08-27DOB violation E:
2008-08-27DOB violation E:
2008-08-27Job filed: MODIFY FIRE ALARM SYSTEM AS PER PLANS FILED$6,000
2008-08-27Job filed: MODIFY FIRE ALARM SYSTEM AS PER PLANS FILED$6,000
2008-08-26Job filed: FILING TO RENOVATE EXISTING UG 6 SPACE WITH MINOR PLUMBING, MECHANICAL AND SPR INKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRE$134,000
2008-08-26Job filed: FILING TO RENOVATE EXISTING UG 6 SPACE WITH MINOR PLUMBING, MECHANICAL AND SPR INKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRE$134,000
2008-08-26Job filed: FILING TO RENOVATE EXISTING UG 6 SPACE WITH MINOR REMOVAL/INSTALLATION OF NON- LOAD BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CH$40,000
2008-08-26Job filed: FILING TO RENOVATE EXISTING UG 6 SPACE WITH MINOR REMOVAL/INSTALLATION OF NON- LOAD BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CH$40,000
2008-08-26Job filed: FILING TO RENOVATE EXISTING UG 6 SPACE WITH MINOR PLUMBING, MECHANICAL AND SPR INKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRE$134,000
2008-08-21Permit PL — ISSUED
2008-08-21Permit PL — ISSUED
2008-08-19Job filed: 25 NEW SPRINKLERS AT PARTIAL 3RD FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY$15,500
2008-08-19Job filed: 41 NEW SPRINKLERS AT PARTIAL 6TH FLOOR, RELOCATE 1 SPRINKLER & CAP 2 @ 5TH FLOOR - NO CHANGE TO EGRESS, USE OR OCCUPANCY$10,250
2008-08-11Permit EW — ISSUED
2008-08-07PAT — from CLARIEL LLC to THE BAR BUILDING CONDOMINIUM
2008-08-07Deed $765,000 — from KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC, AS TO A 25% IN; BRB HOLDING GROUP LLC, AS TO to CLARIEL LLC$765,000
2008-08-07PREL — from INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK, S/B/M TO to BAR CONDO 44TH STREET, LLC
2008-08-07REL — from BAR CONDO 44TH STREET, LLC to INDEPENDENCE COMMUNITY BANK; SOVEREIGN BANK, S/B/M TO
2008-07-23Permit EW — ISSUED
2008-07-17Permit EW — ISSUED
2008-06-25Permit EW — ISSUED
2008-06-25Permit EW — ISSUED
2008-06-23Mortgage $1,000,000 — from 36 WEST 44TH STREET, LLC to BANK LEUMI, USA$1,000,000
2008-06-23PREL — from SOVEREIGN BANK to BAR CONDO 44TH STREET, LLC
2008-06-23AL&R — from 36 WEST 44TH STREET, LLC to BANK LEUMI, USA
2008-06-23PAT — from 36 WEST 44TH STREET, LLC to THE BAR BUILDING CONDOMINIUM
2008-06-23Deed $2,221,450 — from BAR CONDO 44TH STREET, LLC to 36 WEST 44TH STREET, LLC$2,221,450
2008-06-23REL — from BAR CONDO 44TH STREET, LLC to SOVEREIGN BANK, USA
2008-06-23Job filed: DEMOLITION OF EXISTING NON LOAD BEARING PARTITIONS, NEW FLOOR CUT INSTALLATION OF NEW STRUCTURAL BEAMS AT NEW FLOOR CUT NO CHANGE TO EGRESS USE OR OCC$12,000
2008-06-12Permit EW — ISSUED
2008-06-03Job filed: REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND INSTALLATION OF PLUMBING FIXTURES AND MECHANICAL SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$230,000
2008-05-28Permit PL — ISSUED
2008-05-22LOCC — from TGG HOLDING, LLC to THE BAR BUILDING
2008-05-22Permit PL — ISSUED
2008-05-20Permit PL — ISSUED
2008-05-15Permit EW — ISSUED
2008-05-14Permit AL — ISSUED
2008-05-14Permit AL — ISSUED
2008-05-13Permit PL — ISSUED
2008-05-08Permit PL — ISSUED
2008-05-05Permit EW — ISSUED
2008-05-05Permit PL — ISSUED
2008-05-02Permit EW — ISSUED
2008-05-02Permit EW — ISSUED
2008-05-01Job filed: INSTALLATION OF AN AWNING OVER THE DOOR. WORDING: NO CHANGE IN USE, EGRESS OR OCCUPANCY.$800
2008-05-01Job filed: INSTALL AWNING OVER THE DOOR. WORDING:'37'. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$800
2008-05-01Job filed: INSTALL AWNING OVER THE DOOR. WORDING:"37". NO CHANGE IN USE, EGRESS OR OCCUPANCY.$800
2008-05-01Job filed: INSTALLATION OF AN AWNING OVER THE DOOR. WORDING: NO CHANGE IN USE, EGRESS OR OCCUPANCY.$800
2008-05-01Job filed: INSTALLATION OF AN AWNING OVER THE DOOR. WORDING: NO CHANGE IN USE, EGRESS OR OCCUPANCY.$800
2008-04-28Permit EW — ISSUED
2008-04-28Permit EW — ISSUED
2008-04-28Permit EW — ISSUED
2008-04-24Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM AS SHOWN ON PLANS HEREWITH NO CHANGE IN USE ( U.G.),OCCUPANCY OR EGRESS$10,000
2008-04-22Permit EW — ISSUED
2008-04-22Permit EW — ISSUED
2008-04-17Job filed: INSTALLATION OF NEW PLUMBING FIXTURES. INSTALLATION OF NEW HVAC UNITS AND RELATED DUCTWORK. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$50,000
2008-04-17Job filed: INSTALLATION OF NEW DEVICES TO AN EXITING CLASS E SYSTEM. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$3,000
2008-04-17Job filed: INSTALLATION OF STRUCTURAL COMPONENTS AS PER PLANS. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$10,000
2008-04-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHAN GE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$11,500
2008-04-16Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHAN GE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$11,500
2008-04-15Job filed: RENOVATION TO EXISTING OFFICE IN CONJUNCTION WITH APPLICATION # 110064947 TO INCLUDE: PLUMBING AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHA$80,000
2008-04-15Job filed: REMOVAL AND INSTALLATION OF NON BEARING PARTITIONS, AND RELATED FINISHED AS PE R PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THI$100,000
2008-04-15Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER FILED HEREWITH. NO CHNAGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS AP$45,000
2008-04-14Permit PL — ISSUED
2008-04-14Job filed: FILING TO REPLACE A/C UNITS AND MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. N O CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$15,000
2008-04-14Job filed: FILING TO REPLACE A/C UNITS AND MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. N O CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$15,000
2008-04-14Job filed: FILING TO REPLACE A/C UNITS AND MODIFY DUCTWORK AS PER PLANS FILED HEREWITH. N O CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.$15,000
2008-04-11MAPS — from THE BAR BUILDING CONDOMINIUM
2008-04-11ADEC — from THE BAR BUILDING CONDOMINIUM
2008-04-11MAPS — from THE BAR BUILDING CONDOMINIUM
2008-04-11ADEC — from THE BAR BUILDING CONDOMINIUM
2008-04-09Job filed: MODIFICATION OF EXISTING DUCTWORK,REPLACE EXISTING AC UNIT WITH NEW,MINOR PLUMBING WORK FOR SUITE# 1007 AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, $29,000
2008-04-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM FOR SUITE# 1007 AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,500
2008-04-09Job filed: MODIFICATION OF EXISTING DUCTWORK,REPLACE EXISTING AC UNIT WITH NEW,MINOR PLUMBING WORK FOR SUITE# 1007 AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, $29,000
2008-04-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM FOR SUITE# 1007 AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,500
2008-04-09Job filed: RENOVATION OF EXISTING OFFICE SUITE# 1007, MINOR PARTITION WORK AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2008-04-08Job filed: RENOVATION TO EXISTING OFFICE TO INCLUDE MINOR PARTITION WORK, ADDITION OF SPIRAL STAIR BETWEEN 5TH & 6TH FLOOR OFFICE SPACE, MECHANICAL WORK AT P$57,000
2008-04-08Job filed: RENOVATION TO EXISTING OFFICE TO INCLUDE MINOR PARTITION WORK, ADDITION OF SPIRAL STAIR BETWEEN 5TH & 6TH FLOOR OFFICE SPACE, MECHANICAL WORK AT P$57,000
2008-04-04Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-03-31Permit EW — ISSUED
2008-03-28Permit EW — ISSUED
2008-03-28Permit EW — ISSUED
2008-03-27Job filed: APPLICATION FILED FOR MINOR PARTITION WORK IN AN EXISTING RETAIL SPACE. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.$150,000
2008-03-20Job filed: GENERAL RENOVATION OF THE SKIN CARE SALON, FLOOR TILES AND OTHER FINISHING ELEMENTS REPLACEMENT, MODIFICATION OF EXISTING HVAC, PLUMBING WORK AS PER P$23,000
2008-03-20Job filed: GENERAL RENOVATION OF THE SKIN CARE SALON, FLOOR TILES AND OTHER FINISHING ELEMENTS REPLACEMENT, MODIFICATION OF EXISTING HVAC, PLUMBING WORK AS PER P$23,000
2008-03-14Job filed: RENOVATION TO EXISTING OFFICE TO INCLUDE: NEW PARTITIONS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2008-03-14Job filed: RENOVATION TO EXISTING OFFICE TO INCLUDE: NEW PARTITIONS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2008-03-14Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM FOR SUITE 302 AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$5,000
2008-03-14Job filed: RENOVATION TO EXISTING OFFICE TO INCLUDE: NEW PARTITIONS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$25,000
2008-03-14Job filed: GENERAL CONSTRUCTION TO INCLUDE NEW PARTITIONS, CEILING AND MECHANICAL SYSTEM ON THE 3RD FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUP$39,000
2008-03-07Permit EW — ISSUED
2008-03-06Permit EW — ISSUED
2008-03-06Permit EW — ISSUED
2008-03-06Permit EW — ISSUED
2008-03-06Permit EW — ISSUED
2008-03-04Permit PL — ISSUED
2008-02-25Deed $1,300,000 — from JDM BAR HOLDING LLC, AS TO A 25% INTERES; KHORDIAN, AS TO A 25% INTEREST, AMINAGHA; BRB HO to MHCA ASSOCIATES, LLC$1,300,000
2008-02-25PAT — from MHCA ASSOCIATES LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2008-02-25Mortgage $1,000,000 — from MHCA ASSOCIATES LLC to BANK OF AMERICA, N.A.$1,000,000
2008-02-12Permit EW — ISSUED
2008-02-08REL — from BAR CONDO 44TH STREET, LLC to SOVEREIGN BANK
2008-02-08PREL — from SOVEREIGN BANK to BAR CONDO 44TH STREET, LLC
2008-01-25Job filed: Partition changes as indicated on plans. No change in use, egress or occupancy.$20,000
2008-01-24Permit EW — ISSUED
2008-01-24Permit EW — ISSUED
2008-01-07Job filed: Renovation to existing Office to include: minor Plumbing and Mechanical work as per plans filed herewith. No change to use, egress, or occupancy.$15,000
2008-01-02Job filed: Renovation to existing Office to include: minor Plumbing and Mechanical work as per plans filed herewith. No change to use, egress, or occupancy.$15,000
2008-01-02Job filed: Renovation to an existing space to include New Partitions as per plans filed herewith. No change to use, egress, or occupancy.$20,000
2007
2007-12-31Tenant complaint: HEATING — HEAT RELATED
2007-12-24Job filed: MODIFICATION OF AN EXISTING FIRE ALARMCLASS E SYSTEM AS PER PLANS FILE D HEREWITH. NO CHANGE IN USE EGRESS OROCCUPANCY.$7,500
2007-12-18DOB violation E:
2007-12-18DOB violation E:
2007-12-18DOB violation E:
2007-12-18DOB violation E:
2007-12-18DOB violation E:
2007-12-12Job filed: Filing to modifiy fire alarm system for partial 11th floor buildout as per plans filed herewith. No change to use, egress, or occupancy under this ap$40,000
2007-12-12Job filed: Filing to modifiy fire alarm system for partial 11th floor buildout as per plans filed herewith. No change to use, egress, or occupancy under this ap$40,000
2007-12-10Deed — from BAR CONDO 44TH STREET LLC to TISH ENTERPRISES LLC
2007-12-10Job filed: Structural reinforcement for new convenience stair from first floor to ex. mezzanine. No change in use (u.g.), occupancy or egress.$30,000
2007-12-10Job filed: Installation of two 10 ton split A/C units. No change in use (u.g.), occupancy or egress.$40,000
2007-12-07Job filed: Demolition & construction of non-bearing partions and installation of new convenience stair. No change in use (u.g.), occupancy or egress.$10,000
2007-11-21Deed $1,730,000 — from CD 3 WEST 44 LLC to MILIP COMPANY (USA) LLC$1,730,000
2007-11-21AL&R $1,000,000 — from MILIP COMPANY (USA) LLC to CITIBANK, N.A.$1,000,000
2007-11-21PAT — from MILIP COMPANY (USA) LLC to THE BAR BUILDING CONDOMINIUM BOARD OF MA
2007-11-21Deed — from BAR CONDO 44TH STREET LLC to JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2007-11-21Deed — from BAR CONDO 44TH STREET LLC to JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2007-11-21Deed — from BAR CONDO 44TH STREET LLC to JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2007-11-21Deed — from BAR CONDO 44TH STREET LLC to JDM BAR HOLDING LLC; BRB HOLDING GROUP LLC; KHORDIAN, AMINAGHA; BAR BUILDING HOLDING LLC
2007-11-21Mortgage $1,000,000 — from MILIP COMPANY (USA) LLC to CITIBANK, N.A.$1,000,000
2007-11-20Permit PL — ISSUED
2007-11-15Permit EW — ISSUED
2007-11-14AL&R $3,500,000 — from SPIN HOLDINGS LLC to HSBC BANK USA, NATIONAL ASSOCIATION$3,500,000
2007-11-14Mortgage $3,500,000 — from SPIN HOLDINGS LLC to HSBC BANK USA, NATIONAL ASSOCIATION$3,500,000
2007-11-13Permit EW — ISSUED
2007-11-05PAT — from HDA HOLDINGS, LLC to BD OF MGRS OF THE BAR BUILDING CONDOMINI
2007-11-05AL&R $1,600,000 — from HDA HOLDINGS, LLC to UNITED COMMERCIAL BANK$1,600,000
2007-11-05Mortgage $1,600,000 — from HDA HOLDINGS, LLC to UNITED COMMERCIAL BANK$1,600,000
2007-11-05Deed $2,380,000 — from CD 3 WEST 44 LLC to HDA HOLDINGS, LLC$2,380,000
2007-11-05Permit EQ — ISSUED
2007-11-05Job filed: install wood fence in conjunction with Application # 104815489. No change in use, egress or occupancy.
2007-11-05Job filed: install wood fence in conjunction with Application # 104815489. No change in use, egress or occupancy.
2007-11-01MAPS — from THE BAR BUILDING CONDOMINIUM
2007-11-01MAPS — from THE BAR BUILDING CONDOMINIUM
2007-11-01ADEC — from THE BAR BUILDING CONDOMINIUM
2007-11-01ADEC — from THE BAR BUILDING CONDOMINIUM
2007-10-25Job filed: INSTALLATION OF NON LOAD BEARING PARTITIONS AND NEW ACOUSTIC CEILING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$150,000
2007-10-25Job filed: FILED HEREWITH MECHANICAL AND RELATED PLUMBING DRAWINGS. SEE ITEM 16.$50,000
2007-10-25Job filed: FILED HEREWITH MECHANICAL AND RELATED PLUMBING DRAWINGS. SEE ITEM 16.$50,000
2007-10-22PAT — from CHAN, KUNG TAK; TSOI, LINDA FUNG YI to THE BAR BUILDING CONDOMINIUM
2007-10-22Deed $960,000 — from CD 3 WEST 44 LLC to CHAN, KUNG TAK; TSOI, LINDA FUNG YI$960,000
2007-10-18TL&R — from CD WEST 44 LLC to CHEYENNE ACQUISITIONS LLC
2007-10-18Mortgage satisfied — from CD WEST 44 LLC to CHEYENNE ACQUISITIONS LLC
2007-10-18PAT — from COMPUTERS AND STRUCTURES, INC. to THE CONDOMINIUM BOARD OF
2007-10-18Mortgage $1,500,000 — from COMPUTERS AND STRUCTURES, INC. to BANK OF AMERICA, N.A.$1,500,000
2007-10-18Deed $2,518,906 — from CD 3 WEST 44 LLC to COMPUTERS AND STRUCTURES, INC.$2,518,906
2007-10-10ADEC — from BAR CONDO 44TH STREET LLC.
2007-09-27Mortgage $610,000 — from MKGK 36 W 44 HOLDING COMPANY LLC to COMMERCE BANK, N.A.$610,000
2007-09-27PAT — from MKGK 36 W 44 HOLDING COMPANY LLC to THE BAR BUILDING CONDOMINIUM BOARD
2007-09-27AL&R $610,000 — from MKGK 36 W 44 HOLDING COMPANY LLC to COMMERCE BANK, N.A.$610,000
2007-09-27Mortgage assigned — from LONG ISLAND DEVELOPMENT CORPORATION to COMMERCE BANK, N.A.
2007-09-27Mortgage $488,000 — from MKGK 36 W 44 HOLDING COMPANY LLC to LONG ISLAND DEVELOPMENT CORPORATION$488,000
2007-09-27Deed $1,050,000 — from CD 3 WEST 44 LLC to MKGK 36 W 44 HOLDING COMPANY LLC$1,050,000
2007-08-08Job filed: CONDO SUBDIVISION ONLY. NO NEW WORK.NO CHANGE IN USE, OCCUPANCY_OR EGRESS. NO CHANGE OF ZONING TO BEFILED UNDERNEATH THIS APPLICATION
2007-08-08Job filed: Installation of mechanical ducts and fans, and plumbing fixtures.$27,000
2007-08-08Job filed: CONSTRUCTION OF NON-BEARING PARTITIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$29,000
2007-08-03Permit EW — ISSUED
2007-07-27Mortgage $4,800,000 — from TGG HOLDING , LLC to CHEYENNE ACQUISITIONS LLC$4,800,000
2007-07-27AL&R $4,800,000 — from TGG HOLDING , LLC to CHEYENNE ACQUISITIONS LLC$4,800,000
2007-07-27Job filed: MODIFICATION OF KITCHEN FIRESUPPRESSION SYSTEM NO CHANGE IN USE EGRESS OR OCCUPANCY$3,000
2007-07-16Permit EW — ISSUED
2007-07-16Permit EW — ISSUED
2007-07-10PAT — from TGG HOLDING, LLC to THE BOARD OF MANAGERS OF
2007-07-10Deed $6,181,500 — from CHEYENNE ACQUISITIONS LLC to TGG HOLDING, LLC$6,181,500
2007-06-27Job filed: Modification of existing fire alarm system on 10th floor offices. No change in use, egress or occupancy.$10,000
2007-06-27Job filed: Modification of existing sprinkler system for 10th floor offices. No change in use, egress or occupancy.$22,000
2007-06-27Job filed: Renovation of existing office space on 10th floor. Interior partition and plumbing changes. Install new AC units. New ductwork. New reflected ceiling$200,000
2007-06-20Job filed: Repair existing sidewalk vault. No change in occupancy, use or egress.$10,000
2007-06-19Job filed: SC
2007-05-16Deed $1,099,350 — from BAR CONDO 44TH STREET LLC to TISH ENTERPRISES LLC$1,099,350
2007-05-16PREL — from SOVEREIGN BANK to BAR CONDO 44TH STREET, LLC
2007-05-16REL — from BAR CONDO 44TH STREET, LLC to SOVEREIGN BANK
2007-05-16PAT — from TISH ENTERPRISES LLC to CHEYENNE ACQUISITIONS LLC
2007-05-16Permit EW — ISSUED
2007-05-16Permit EW — ISSUED
2007-05-11AL&R $1,250,000 — from TISH ENTERPRISES to COMMERCE BANK, N.A.$1,250,000
2007-05-11Mortgage $1,250,000 — from TISH ENTERPRISES to COMMERCE BANK, N.A.$1,250,000
2007-05-03Permit EW — ISSUED
2007-04-30MAPS — from TTHE BAR BUILDING CONDOMINIUM
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30MAPS — from TTHE BAR BUILDING CONDOMINIUM
2007-04-30MAPS — from TTHE BAR BUILDING CONDOMINIUM
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30MAPS — from TTHE BAR BUILDING CONDOMINIUM
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30MAPS — from TTHE BAR BUILDING CONDOMINIUM
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-30ADEC — from CD 3 WEST 44 LLC
2007-04-11Job filed: SC
2007-04-11Job filed: SC
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-04-06MAPS — from THE BAR BUILDING CONDOMINIUM
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-04-06ADEC — from THE BAR BUILDING CONDOMINIUM
2007-03-28ECB Non-Hazardous violation: WORK W/O PERMIT APPL 104705160 HAS BEEN DISAPPROVED AS PER PROCESSINGDATE 3/16/07 IN BIS.STOP ALL WORK. REMEDY:FILE OBTAIN PERMITS$250
2007-03-22DOB complaint, category ?
2007-03-20Job filed: Filing to modify fire alarm system for partial 11th floor tenant buildout as per plans filed herewith. No change to use, egress, or occupancy under t$5,000
2007-03-16Job filed: Filing plumbing and mechanical modifications for tenant buildout of partial 11th floor space as per plans filed herewith. No change to use, egress, o$30,000
2007-03-16Job filed: Filing plumbing and mechanical modifications for tenant buildout of partial 11th floor space as per plans filed herewith. No change to use, egress, o$30,000
2007-03-16Job filed: Filing tenant buildout of partial 11th floor space with partition and ceiling changes as per plans filed herewith. No change to use, egress, or occup$150,000
2007-03-16Job filed: Filing sprinkler and standpipe modifications for tenant buildout of partial 11th floor space as per plans filed herewith. Noc hange to use, egress, o$16,000
2007-03-12PAT — from BB RETAIL LLC to CONDOMINIUM BOAD OF MAANGERS OF THE BAR
2007-02-22Job filed: SC
2007-02-22Job filed: SC
2007-02-15Facade (LL11) filing, cycle 6: SAFE
2007-02-13Deed — from BB MEZZ OWNER LLC to BB RETAIL LLC
2007-01-18Deed $5,497,002 — from CHEYENNE ACQUISITIONS LLC to O.P. DANGAYACH REALTY LLC$5,497,002
2007-01-18PAT — from O.P. DANGAYACH REALTY LLC to THE BAR BUILDING CONDOMINIUM
2007-01-18AL&R $4,268,480 — from CHEYENNE ACQUISTIIONS LLC to O.P. DANGAYACH REALTY LLC$4,268,480
2007-01-18Mortgage $4,268,480 — from O.P. DANGAYACH REALTY LLC to CHEYENNE ACQUISTIIONS LLC$4,268,480
2006
2006-11-22Permit PL — ISSUED
2006-10-11Permit EW — RE-ISSUED
2006-10-11Permit EW — ISSUED
2006-09-27Job filed: SUBSEQUENT APPLICATION FILED TO ADD THE "MH" WORK TYPE WHICH WAS INADVERTANTLY OMITTED. NO CHANGE IN USE (U.G.), OCCUPANCY OR EGRESS.$4,000
2006-09-11Job filed: New ADA toilet and replacement of fixtures in the Men's and Women's toilet on existing roughing. No change in use (u.g.), occupancy or egress.$14,000
2006-09-08Permit EQ — ISSUED
2006-09-08Job filed: Construction of non-bearing partitions and hung ceiling as shown on plans filed herewith. No change in use (u.g.), occupancy or egress.$179,775
2006-09-08Job filed: Construction of non-bearing partitions and hung ceiling as shown on plans filed herewith. No change in use (u.g.), occupancy or egress.$179,775
2006-09-08Job filed: Modification of existing fire alarm system as shown on plans filed herewith. No change in use (u.g.), occupancy or egress.$10,000
2006-09-01Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 110' DURING FACADE REPAIR.NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2006-08-29Permit EW — ISSUED
2006-08-25Job filed: FILING FOR THE INSTALLATION OF 1 NEWDUCT SMOKE DETECTOR ON 1 SMOKE, DETECTOR, TWO STROB LIGHTS AND 2 SPEAKERSTROBE LIGHTS ON THE FOURTH FLOOR AS SHOWN$3,000
2006-08-22Job filed: MISCELLANEOUS FIRE RATING WORK BETWEEN SEPARATE TENANTS ON 10TH FLOOR. SUBDIVIDE EXISTING TAX LOT INTO VARIES TAX LOTS. NO CHANGE IN USE, EGRESS, FIR$18,000
2006-08-21Permit EW — ISSUED
2006-08-10Job filed: Filing herewith for HVAC ducwork and plumbing modificatins as per plans. NO chanage to use, egress, or occupancy.$4,000
2006-08-10Job filed: Filing herewith for HVAC ducwork and plumbing modificatins as per plans. NO chanage to use, egress, or occupancy.$4,000
2006-08-10Job filed: Filing herewith for demolition and installation of interior non bearing partitions as per plans. No change to use, egress, or occupancy.$20,000
2006-08-07Permit EW — ISSUED
2006-07-21Job filed: FILING O REMOVE INTERIOR NON LOAD BEARINPARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$20,000
2006-07-13Permit EW — ISSUED
2006-07-11Mortgage $3,840,000 — from CD 3 WEST 44 LLC to CHEYENNE ACQUISITIONS LLC$3,840,000
2006-07-11AL&R — from CHEYENNE ACQUISITIONS LLC to CD 3 WEST 44 LLC
2006-07-11Deed $4,800,000 — from CHEYENNE ACQUISITIONS LLC to CD 3 WEST 44 LLC$4,800,000
2006-07-11PAT — from CD 3 WEST 44 LLC to CHEYENNE ACQUISITIONS LLC
2006-06-26Job filed: Demolition of interior partitions as indicated on plans filed herewith. No change in use (u.g.), occupancy or egress.$25,000
2006-06-26Job filed: Demolition of interior partitions as indicated on plans filed herewith. No change in use (u.g.), occupancy or egress.$25,000
2006-05-31Permit EW — ISSUED
2006-05-24DOB violation E:
2006-05-24DOB violation E:
2006-05-24DOB violation E:
2006-05-24DOB violation E:
2006-05-24DOB violation E:
2006-05-23Job filed: REPLACEMENT OF A 900,000 BTU STEAM-HOTWATER CONVERTOR. (STEAM COMPANY)$65,000
2006-05-17Job filed: Filing for the relocation of ductwork & defusers on the 4th floor as per plans. All general construction was filed under application # 104383285. $3,000
2006-05-17Job filed: Filing for the relocation of ductwork & defusers on the 4th floor as per plans. All general construction was filed under application # 104383285. $3,000
2006-05-16Job filed: RENOVATION OF AN EXISTING BUILDINGNO CHANGE IN USE EGRESS OR OCCPY$50,000
2006-05-16Job filed: RENOVATION OF AN EXISTING BUILDINGNO CHANGE IN USE EGRESS OR OCCPY$50,000
2006-05-12Permit PL — ISSUED
2006-03-28Permit EW — ISSUED
2006-03-28ECB Hazardous violation: FAILURE TO MAINTAIN PLUMBING AND/OR APPURTENANCES. WHILE DOING MY INSPECTION I SAW A 2 INCH GAS RISER IN A PUBLIC HALLWAY ALONG SI
2006-03-28DOB complaint, category ?
2006-03-20Job filed: Filing for minor demo, partition construction, patching and painting on the fourth (4th) floor as shown on drawings filed herewith. No change in use, $80,000
2006-03-01Permit PL — ISSUED
2006-02-28Permit EW — ISSUED
2006-02-24Permit EW — ISSUED
2006-02-22Permit EW — ISSUED
2006-02-22Permit EW — ISSUED
2006-02-21Job filed: Renovation of existing office space on 8th floor. Interior partition and plumbing changes. Install new AC units. New ductwork. No change in use, egre$200,000
2006-02-16Job filed: Alteration type II is being filed for sprinklers modifications as indicated on plans. No change in Occupancy, Use or Egress or LL5/73 compliance.$23,000
2006-02-09Permit EW — ISSUED
2006-02-03Job filed: EXTEND GAS SERVICE FROM RISER TO SHOP. ADD (1) SINK AND RELATED HOT WATE R, COLD WATER, VENT AND SANITARY PIPES.$19,000
2006-02-03Job filed: EXTEND GAS SERVICE FROM RISER TO SHOP. ADD (1) SINK AND RELATED HOT WATE R, COLD WATER, VENT AND SANITARY PIPES.$19,000
2006-02-02Deed $1,300,000 — from CHEYENNE ACQUISITIONS LLC to BB MEZZ OWNER LLC$1,300,000
2006-01-13Permit EW — ISSUED
2006-01-13Permit PL — ISSUED
2006-01-13Permit EW — ISSUED
2006-01-13Permit EW — ISSUED
2006-01-06Permit PL — ISSUED
2006-01-06Permit PL — ISSUED
2006-01-03AL&R $2,775,000 — from COMMERCE BANK N.A. to PARAMOUNT SPB REALTY LLC$2,775,000
2005
2005-10-31AL&R $3,040,000 — from S & B NY REALTY, LLC to JPMORGAN CHASE BANK, N.A.$3,040,000
2005-10-31Deed $3,916,614 — from CHEYENNE ACQUISITIONS LLC to S & B NY REALTY, LLC$3,916,614
2005-10-31PAT — from S & B NY REALTY, LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2005-10-31Mortgage $3,040,000 — from S & B NY REALTY, LLC to JPMORGAN CHASE BANK, N.A.$3,040,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27PAT — from TBF GROUP LLC to CHEYENNE ACQUISITIONS LLC
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27AL&R $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Deed $4,038,683 — from CHEYENNE ACQUISITIONS LLC to TBF GROUP LLC$4,038,683
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-27Mortgage $2,000,000 — from TBF GROUP LLC to HSBC BANK USA$2,000,000
2005-10-19PAT — from BOARD OF MANAGERS FOR THE BAR BUILDING C to CHEYENNE ACQUISITIONS LLC
2005-10-19Deed $4,122,751 — from CHEYENNE ACQUISITIONS LLC to SPIN HOLDINGS LLC$4,122,751
2005-10-13Deed $4,327,050 — from CHEYENNE ACQUISITIONS LLC to THE ASSOCIATION OF THE BAR OF THE CITY O$4,327,050
2005-10-13PAT — from THE ASSOCIATION OF THE BAR OF THE CITY O to THE BOARD OF MANAGERS OF THE BAR BUILDIN
2005-09-28Mortgage $2,775,000 — from PARAMOUNT SPB REALTY LLC, to COMMERCE BANK, N.A.$2,775,000
2005-09-28PAT — from CHEYENNE ACQUISITIONS LLC to THE BAR BUILDING CONDOMINIUM
2005-09-28Deed $4,122,751 — from CHEYENNE ACQUISITIONS LLC to PARAMOUNT SPB REALTY LLC$4,122,751
2005-09-27Permit EW — ISSUED
2005-09-19Job filed: Proposed removal of 1 1/2" gas riser and installation of new 2" gas riser extending from 5th floor through roof. Installation of new 8500 gallon house$85,000
2005-09-16Job filed: Proposed 2 1/2' valved and capped connection from existing water riser for air conditioning. No change to use, egress or occupancy.$2,000
2005-09-16Job filed: Proposed 2 1/2" valved and capped connection from existing water riser for air conditioning. No change to use, egress or occupancy.$2,000
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15ADEC — from THE BAR BUILDING CONDOMINIUM
2005-09-15Job filed: A2$350,000
2005-09-02Permit EW — ISSUED
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-18ADEC — from THE BAR BUILDING CONDOMINIUM
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-08-16Mortgage satisfied — from 1412 BROADWAY, INC to METROPOLITAN LIFE INSURANCE COMPANY
2005-07-22Job filed: LOBBY RENOVATION TO INCLUDE GENERAL CONSTRUCTION AS PER PLANS FILED NO CHANGS$40,000
2005-07-01Permit EW — ISSUED
2005-06-16Deed $5,192,139 — from CHEYENNE ACQUISITIONS LLC to JD BAR CONDO LLC$5,192,139
2005-06-16Agreement $5,550,000 — from BANK OF CHINA to BB RETAIL LLC$5,550,000
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16PAT — from MARDKHA, JOSEPH to MARDKHA, DAVID
2005-06-16Deed $5,192,139 — from CHEYENNE ACQUISITIONS LLC to JD BAR CONDO LLC$5,192,139
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16PAT — from JD BAR CONDO LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2005-06-16Agreement $3,750,000 — from JD BAR CONDO LLC to CITY & SUBURBAN FEDERAL SAVINGS BANK$3,750,000
2005-06-16Mortgage assigned — from WASHINGTON MUTUAL BANK to BANK OF CHINA
2005-06-16Mortgage assigned — from WASHINGTON MUTUAL BANK to CITY & SUBURBAN FEDERAL SAVINGS BANK
2005-06-16Mortgage $3,750,000 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$3,750,000
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16PAT — from BB RETAIL LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Deed — from CHEYENNE ACQUISITIONS LLC to BB RETAIL LLC
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Mortgage $3,750,000 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$3,750,000
2005-06-16Mortgage assigned — from WASHINGTON MUTUAL BANK to CITY & SUBURBAN FEDERAL SAVINGS BANK
2005-06-16PAT — from MARDKHA, JOSEPH to MARDKHA, DAVID
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16PAT — from JD BAR CONDO LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2005-06-16Agreement $3,750,000 — from JD BAR CONDO LLC to CITY & SUBURBAN FEDERAL SAVINGS BANK$3,750,000
2005-06-16AL&R $3,750,000 — from CITY & SUBURBAN FEDERAL SAVINGS BANK to JD BAR CONDO LLC$3,750,000
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Mortgage $5,550,000 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$5,550,000
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16AL&R $5,786,250 — from INDEPENDENCE COMMUNITY BANK to BAR CONDO 44TH STREET LLC$5,786,250
2005-06-16Agreement $5,786,250 — from INDEPENDENCE COMMUNITY BANK to BAR CONDO 44TH STREET LLC$5,786,250
2005-06-16PAT — from BAR CONDO 44TH STREET LLC to BOARD OF MANAGERS OF THE BAR BUILDING CO
2005-06-16Mortgage $2,084,919 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$2,084,919
2005-06-16Mortgage satisfied — from METROPOLITAN LIFE INSURANCE COMPANY to 1412 BROADWAY, INC.
2005-06-16Deed $7,949,100 — from CHEYENNE ACQUISITIONS LLC to BAR CONDO 44TH STREET LLC$7,949,100
2005-06-16Mortgage assigned — from WASHINGTON MUTUAL BANK, FA to INDEPENDENCE COMMUNITY BANK
2005-06-16Mortgage $5,786,250 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK, FA$5,786,250
2005-06-16Agreement $21,341,008 — from CHEYENNE ACQUISITIONS LLC to WASHINGTON MUTUAL BANK$21,341,008
2005-06-16AL&R $3,750,000 — from CITY & SUBURBAN FEDERAL SAVINGS BANK to JD BAR CONDO LLC$3,750,000
2005-06-16AL&R $5,550,000 — from BANK OF CHINA to BB RETAIL LLC$5,550,000
2005-06-16PAT — from MARDKHA, JOSEPH to MARDKHA, DAVID
2005-06-06DOB violation E:
2005-06-06DOB violation E:
2005-06-06DOB violation E:
2005-06-06DOB violation E:
2005-06-06DOB violation E:
2005-06-01Job filed: MINOR DEMOLITION TO INTERIOR PARITIONS, DOORS AND CEILINGS. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.$20,000
2005-05-26Permit EW — ISSUED
2005-05-26Permit EW — ISSUED
2005-05-23PAT — from UNIQUE HOLDING (US) INC. to CONDOMINIUM BOARD OF MANAGERS
2005-05-23Deed $3,933,598 — from CHEYENNE ACQUISITIONS LLC to UNIQUE HOLDING (US) INC.$3,933,598
2005-05-19Job filed: Renovation of existing office space on 13th floor. Interior partition and plumbing changes.New reflected ceiling. Install new air handler units. New d$250,000
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-04-25MAPS — from THE BAR BUILDING CONDOMINIUM
2005-04-25DECL — from THE BAR BUILDING CONDOMINIUM
2005-03-22Permit SG — ISSUED
2005-03-22Permit SG — ISSUED
2005-02-11Permit AL — ISSUED
2005-02-01Job filed: HEREWITH FILING TO CHANGE THE USE ON THE 5TH FLOOR TO INCLUDE USE GROUP 1 JEWLERY MANUFACTURE. NO WORK TO BE DON E UNDER THIS APPLICATION. ALL WORK TO$1,000
2004
2004-12-27Job filed: SC
2004-09-22Permit EW — ISSUED
2004-09-21Job filed: MODIFICATIONSTO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2004-09-16Permit EW — RE-ISSUED
2004-09-15Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$77,000
2004-09-15Job filed: REMOVAL AND INSTALLATION OF INRERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANC$219,000
2004-09-15Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$77,000
2004-08-09ECB Non-Hazardous violation: 66Z09 40D06 #D06 66 ELEVATOR HAS ACCUMULATED WATER 40 ELEVATOR MACHINE ROOM DOOR IS NOT SELF CLOSING/SELF-LOCKING #FIRE EXTIN UNIT
2004-06-10Permit EW — ISSUED
2004-06-09Permit PL — ISSUED
2004-06-04Permit EW — ISSUED
2004-06-04Permit EW — ISSUED
2004-06-04DOB complaint, category ?
2004-05-27Job filed: NEW INTERIOR PARTITIONS, HVAC,EQUIPMENT AND NEW PLUMBIND FIXTURES, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$130,000
2004-05-07Permit EW — ISSUED
2004-05-04Job filed: REPLACEMENT OF 200'-0" OF CHILLED WATER SUPPLY RETURN PIPING FROM MAIN S UPPLY TO EXISTING AC2-3.NO CHANGE IN USE , OCCUPANCY OR EGRESS.$30,000
2004-05-04Job filed: REPLACEMENT OF 200'-0" OF CHILLED WATER SUPPLY RETURN PIPING FROM MAIN S UPPLY TO EXISTING AC2-3.NO CHANGE IN USE , OCCUPANCY OR EGRESS.$30,000
2004-04-02Permit EW — ISSUED
2004-04-01Job filed: REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USNE, EGRESS OR OCCUPANCY.$15,000
2004-04-01Job filed: REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USNE, EGRESS OR OCCUPANCY.$15,000
2004-03-16ECB Non-Hazardous violation: 70L12 70-CHANGE CAR SAFETY TAIL ROPE
2003
2003-10-02DOB violation E:
2003-10-02DOB violation E:
2003-10-02DOB violation E:
2003-10-02DOB violation E:
2003-05-01ECB Hazardous violation: SIDEWALK SHED NOT ADEQUATELY MAINTAINED DEFECT NOTED : SEVERAL LIGHTS WERE OUT AT TIME OF INSPECTION REMEDY : MAINTAIN SIDEWALK SH
2003-04-15Permit AL — ISSUED
2003-04-03Permit EQ — ISSUED
2002
2002-10-22Permit EQ — ISSUED
2002-10-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 85'DURING FACADE REPAIR. NO CHANGE IN USE,EGRESS OR OCCUPANCY.HEAVY DUTY SHED =300 PSF LIVE LOAD. SHED TO COM
2002-10-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 85'DURING FACADE REPAIR. NO CHANGE IN USE,EGRESS OR OCCUPANCY.HEAVY DUTY SHED =300 PSF LIVE LOAD. SHED TO COM
2002-10-10Permit AL — ISSUED
2001
2001-10-26DOB violation E:
2001-10-26DOB violation E: 1P7599
2001-10-26DOB violation E: 1P7596
2001-10-26DOB violation E: 1P7598
2001-10-26DOB violation E: 1P22333
2000
2000-09-22Job filed: Facade repair. No change to use, occupancy abd egress.$20,000
2000-06-01Permit AL — ISSUED
2000-06-01Permit AL — ISSUED
2000-05-30Permit EW — ISSUED
2000-05-30Permit EW — ISSUED
2000-05-12Job filed: Install partitions, ceilings and doors. No change to use, egress or occupancy.$225,000
2000-05-12Job filed: INSTALL MECHANICAL DUCTWORK WITH AIR CONDITIONING UNITS.$225,000
2000-05-05Permit PL — ISSUED
2000-03-06Permit EW — ISSUED
2000-02-29Permit EW — ISSUED
2000-02-29Permit EW — ISSUED
2000-02-29Permit EW — ISSUED
2000-02-18Job filed: INSTALL COOLING TOWER AND CHILLED WATER PIPING PER PLANS. NO CHANGE IN USE,EGRESS OR OCUPANCY.$300,000
2000-02-18Job filed: Install fire suppression system under the kitchen hood. U.G.#6 No change in egress, occupancy or use is involved under this application.$1,600
2000-02-18Job filed: Install fire suppression system under the kitchen hood. U.G.#6 No change in egress, occupancy or use is involved under this application.$1,600
2000-02-18Job filed: INSTALL COOLING TOWER AND CHILLED WATER PIPING PER PLANS. NO CHANGE IN USE,EGRESS OR OCUPANCY.$300,000
2000-02-15Job filed: PA
2000-02-15Job filed: PA
2000-02-01Job filed: Propose to install new structural supports for new folding partitions. No change to use, egress or occupancy.$20,000
2000-01-31Job filed: Propose to create a training room on the 2nd floor. All work filed under separate application.$1,000
2000-01-31Job filed: Propose to create a training room on the 2nd floor. All work filed under separate application.$1,000
1999
1999-12-28Permit EW — ISSUED
1999-12-28Permit EW — ISSUED
1999-11-23Permit EW — ISSUED
1999-11-23Permit EW — ISSUED
1999-10-07DOB violation E: 1P7596
1999-10-07DOB violation E: 1P7597
1999-10-07DOB violation E: 1P7599
1999-10-07DOB violation E: 1P7598
1999-10-07DOB violation E: 1P22383
1998
1998-08-31Permit PL — ISSUED
1998-08-31Permit PL — ISSUED
1998-08-14Permit EW — ISSUED
1998-08-05Permit AL — ISSUED
1998-07-16DOB complaint, category ?
1998-07-15DOB complaint, category ?
1998-07-14Permit PL — ISSUED
1998-07-10Permit EW — ISSUED
1998-06-11DOB complaint, category ?
1998-06-10DOB complaint, category ?
1998-05-12Permit AL — ISSUED
1998-03-27Permit EW — ISSUED
1998-03-18Permit EW — ISSUED
1998-02-04Permit EW — ISSUED
1997
1997-12-15ECB Non-Hazardous violation: 52L35D37L37L 52-REPLACE OILY BRAKE PININGS 35-REMOVE OLD EQUIPT FROM SECONDARY (GOV CONTROL-) 37-REPALCE MISSING BURNED OFF CONTRO
1997-12-15ECB Non-Hazardous violation: 46O30O 46-CLEAN HEAVY LINT OFF ROPES 30-CLEAN DOWN HOISTWAY.
1997-12-15ECB Non-Hazardous violation: TIVE6# 3- ELIMINATE NOISE & LOST MOTION AT CAR SHOES 46# REPLACE WORN ADN DEFECTIVE HOIST ROPES.
1997-10-27DOB complaint, category ?
1997-10-17Permit EW — ISSUED
1997-09-30Permit EQ — ISSUED
1997-09-16DOB violation LL6291:
1997-02-25Permit EW — ISSUED
1997-02-25Permit EW — ISSUED
1997-02-10DOB violation LL6291:
1997-02-10DOB violation LL6291:
1996
1996-07-08Permit EW — ISSUED
1996-07-08Permit EW — ISSUED
1996-07-08Permit EW — ISSUED
1996-06-11Permit EW — ISSUED
1996-06-11Permit EW — ISSUED
1994
1994-04-15Permit PL — ISSUED
1994-03-18DOB violation LL6291:
1994-01-05Permit EW — ISSUED
1994-01-05Permit EW — ISSUED
1993
1993-10-12ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY UNDER ALTERATION #1290/87 FOR 10TH FLOOR RETAIL STORE. ROOM 101
1993-07-13Permit EW — ISSUED
1993-07-13Permit EW — ISSUED
1993-04-01ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY UNDER ALTERATION #1290/87 FOR 10TH FLOOR. RETAIL STORE AT DBA W$350
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-15DOB violation C:
1993-03-15DOB violation C:
1992
1992-06-25ECB Non-Hazardous violation: 73#,(73)RESTORE PASS ELEVATOR CITY #7598 TO PROPER SERVICE.
1991-11-06ECB Non-Hazardous violation: 09H,11L,14M,73I,10I,73 CAR FLOOR SILL 10 REPAIR CAR OPERATIONAL SWITCH
1991-11-06ECB Non-Hazardous violation: 73X,73 RESTOR TO PROPER OPERATION.
1991-10-30Permit AL — ISSUED
1991-03-07Permit EW — ISSUED
1991-02-28Permit EW — ISSUED
1991-02-28Permit EW — ISSUED
1991-02-28Permit EW — ISSUED
1991-01-18ECB Non-Hazardous violation: 74 FILE AND OBTAIN PERMIT FOR CLOSING OFF OF THE TOP TWO HATCH OPENINGS$285
1989
1989-10-31DOB violation LL5:
1989-04-17DOB violation E:
1989-02-08ECB Non-Hazardous violation: ALTERED BUILDING OCCUPIED WITHOUT A VALID C OF O. REMEDY: DISCONTINUE THE ILLEGAL OCCUPANCY UNTIL A NEW C OF O HAS BEE$250