Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

47 West 44 Street · Manhattan · BBL 1012600012 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

32 service requests in the last three years. Most common: Illegal Parking (18) · Taxi Complaint (7) · Commercial Disposal Complaint (1) · For Hire Vehicle Complaint (1) · Electrical (1) · Residential Disposal Complaint (1).

Filed construction activity

$2,952,420 in permitted construction work filed since 2016 (24 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Registered with HPD — the names behind the building

Registered owner(s)IROQUOIS HOTEL LLC
Head officerShimmie Horn
Managing agentIroquois Hotel
Last registered2025-08-15

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$18,793,000 $8,456,850
2026$21,368,000 $9,615,600
2027$25,772,000 $11,597,400

The city's market estimate has risen 37% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS
Facade (Local Law 11)SAFE (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
Iroquois HotelAmericanA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

1 street-flooding or sewer-backup complaints at this address since 2011 (0 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway42 St-Bryant Pk — 7 B D F M · 600 ft straight-line (about a 3-minute walk) · station accessibility: none
BusNearest boarding stop: W 44 St / 6 Av — M55 · 250 ft
Citi BikeW 43 St & 6 Ave · 400 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 051 Elias Howe
Middle: M.S. 297. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

47 West 44 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

32 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $4,100,000 on 2022-11-17 (lender: Popular Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2022-11-17Mortgage $4,100,000 — from IROQUOIS HOTEL L.L.C.,; IROQUOIS HOTEL HOLDINGS LLC to POPULAR BANK $4,100,000
2022-11-17AL&R $31,100,000 — from IROQUOIS HOTEL L.L.C.,; IROQUOIS HOTEL HOLDINGS LLC to POPULAR BANK $31,100,000
2022-11-17Agreement $31,100,000 — from IROQUOIS HOTEL L.L.C.,; IROQUOIS HOTEL HOLDINGS LLC to POPULAR BANK $31,100,000
2015-12-18Deed $17,800,000 — from PISCOPO IROQUOIS LLC to IROQUOIS HOTEL HOLDINGS LLC $17,800,000
2014-10-18Agreement $250,000 — from PISCOPO WASHINGTON JEFFERSON LLC; PISCOPO IROQUOIS LLC to IROQUOIS HOTEL HOLDINGS LLC; WASHINGTON JEFFERSON HOLDINGS LLC; WASHINGTON JEFFERSON HOTEL $250,000
2014-09-26Mortgage $27,000,000 — from PISCOPO IROQUOIS LLC; IROQUOIS HOTEL HOLDINGS LLC to INVESTORS BANK $27,000,000
2014-09-26Mortgage $27,000,000 to INVESTORS BANK $27,000,000
2014-09-26AL&R $27,000,000 — from PISCOPO IROQUOIS LLC; IROQUOIS HOTEL HOLDINGS LLC to INVESTORS BANK $27,000,000
2014-09-26Deed $16,857,750 — from IROQUOIS HOTEL OWNERS, LLC to IROQUOIS HOTEL HOLDINGS LLC $16,857,750

Ten-year activity

100500
2017
2018
2019
2020
2021
63
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
201714180730
2018195101035
201911310823
202029200132
202122140734
2022335126763
2023276601251
2024114130836
20256190521
202640110520
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 25 records

DateRecord
2026-09-16311: Illegal Parking — Posted Parking Sign Violation
2026-09-12311: Illegal Parking — Posted Parking Sign Violation
2026-09-08Job filed: Replace existing vault in kind as per attached plans. Obtain GC/ST permit. No change in use, egress or occupancy. Contractor must obtain required DOT
2026-05-20311: Illegal Parking — Posted Parking Sign Violation
2026-05-14311: Illegal Parking — Posted Parking Sign Violation
2026-04-26311: Illegal Parking — Posted Parking Sign Violation
2026-04-17311: Illegal Parking — Posted Parking Sign Violation
2026-04-09Restaurant inspection: IROQUOIS HOTEL — grade A
2026-04-07Boiler inspection
2026-04-07Boiler inspection
2026-04-07Boiler inspection
2026-04-07Boiler inspection
2026-04-01311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2026-04-01Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2026-04-01Permit AL — ISSUED
2026-03-16Certificate of occupancy Renewal With Change
2026-02-11311: Illegal Parking — Posted Parking Sign Violation
2026-02-10311: Illegal Parking — Posted Parking Sign Violation
2026-01-15Job filed: Replace existing vault in kind as per attached plans. Obtain GC/ST permit. No change in use, egress or occupancy. Contractor must obtain required DOT
2026-01-01311: Illegal Parking — Posted Parking Sign Violation
2025-12-22311: Taxi Complaint — Driver Complaint - Passenger
2025-12-19311: Taxi Complaint — Driver Complaint - Passenger
2025-12-03Bedbug filing: 0 infested units
2025-11-25Permit AL — ISSUED
2025-10-23311: Taxi Complaint — Driver Complaint - Passenger

The full timeline

2026
2026-09-16311: Illegal Parking — Posted Parking Sign Violation
2026-09-12311: Illegal Parking — Posted Parking Sign Violation
2026-09-08Job filed: Replace existing vault in kind as per attached plans. Obtain GC/ST permit. No change in use, egress or occupancy. Contractor must obtain required DOT $18,000
2026-05-20311: Illegal Parking — Posted Parking Sign Violation
2026-05-14311: Illegal Parking — Posted Parking Sign Violation
2026-04-26311: Illegal Parking — Posted Parking Sign Violation
2026-04-17311: Illegal Parking — Posted Parking Sign Violation
2026-04-09Restaurant inspection: IROQUOIS HOTEL — grade A
2026-04-07Boiler inspection
2026-04-07Boiler inspection
2026-04-07Boiler inspection
2026-04-07Boiler inspection
2026-04-01311: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2026-04-01Tenant complaint: UNSANITARY CONDITION — GARBAGE/RECYCLING STORAGE
2026-04-01Permit AL — ISSUED
2026-03-16Certificate of occupancy Renewal With Change
2026-02-11311: Illegal Parking — Posted Parking Sign Violation
2026-02-10311: Illegal Parking — Posted Parking Sign Violation
2026-01-15Job filed: Replace existing vault in kind as per attached plans. Obtain GC/ST permit. No change in use, egress or occupancy. Contractor must obtain required DOT $15,000
2026-01-01311: Illegal Parking — Posted Parking Sign Violation
2025
2025-12-22311: Taxi Complaint — Driver Complaint - Passenger
2025-12-19311: Taxi Complaint — Driver Complaint - Passenger
2025-12-03Bedbug filing: 0 infested units
2025-11-25Permit AL — ISSUED
2025-10-23311: Taxi Complaint — Driver Complaint - Passenger
2025-09-30Permit General Construction — Signed-off
2025-09-30Permit Structural — Permit Issued
2025-09-30Permit Structural — Signed-off
2025-09-30Permit General Construction — Permit Issued
2025-09-19Job filed: Replace existing vault in kind as per attached plans. Obtain GC/ST permit. No change in use, egress or occupancy. Contractor must obtain required DOT $15,000
2025-07-12311: Taxi Report — Driver Report - Non Passenger
2025-06-11311: Illegal Parking — Posted Parking Sign Violation
2025-06-04FDNY inspection (RISK)
2025-06-02311: Noise — Noise: Alarms (NR3)
2025-04-28311: Taxi Complaint — Driver Complaint - Passenger
2025-03-21Air permit (REGISTRATION INSPECTION), fuel: NATURALGAS
2025-03-14Boiler inspection
2025-03-14Boiler inspection
2025-03-14Boiler inspection
2025-03-14Boiler inspection
2025-02-07311: Illegal Parking — Posted Parking Sign Violation
2024
2024-12-18Permit EW — ISSUED
2024-12-18Permit EW — RE-ISSUED
2024-12-05Restaurant inspection: IROQUOIS HOTEL — grade A
2024-12-02Bedbug filing: 0 infested units
2024-12-02Permit AL — ISSUED
2024-11-27Permit AL — ISSUED
2024-11-27Permit EQ — ISSUED
2024-11-27Permit EW — ISSUED
2024-11-22Job filed: Replace existing vault in kind as per attached plans. Obtain GC/ST permit. No change in use, egress or occupancy. Contractor must obtain required DOT $18,000
2024-11-21FDNY inspection (COM_OCPCY)
2024-11-20FDNY inspection (COM_OCPCY)
2024-11-13Cooling tower inspection
2024-11-05311: Illegal Parking — Posted Parking Sign Violation
2024-10-18Air permit (REGISTRATION), fuel: NATURALGAS
2024-10-08311: Residential Disposal Complaint — Trash or Recycling Not Secure
2024-09-22311: Taxi Complaint — Driver Complaint - Passenger
2024-09-19311: Electrical — Electrical Wiring Defective/Exposed
2024-09-19DOB complaint, category ?
2024-09-07311: Taxi Complaint — Driver Complaint - Passenger
2024-08-07Restaurant inspection: IROQUOIS HOTEL
2024-06-23311: Illegal Parking — Posted Parking Sign Violation
2024-06-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-06-14311: Illegal Parking — Posted Parking Sign Violation
2024-06-09311: Illegal Parking — Posted Parking Sign Violation
2024-06-08311: Illegal Parking — Posted Parking Sign Violation
2024-06-05Permit AL — ISSUED
2024-04-15Job filed: IT IS PROPOSED TO REPLACE THE METAL CLADDING ON EXISTING MARQUEE AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.$25,000
2024-04-14311: Taxi Complaint — Driver Complaint - Passenger
2024-03-21DOB complaint, category ?
2024-03-16311: Illegal Parking — Posted Parking Sign Violation
2024-02-12Boiler inspection
2024-02-12Boiler inspection
2024-02-12Boiler inspection
2024-02-12Boiler inspection
2024-01-22Permit EW — ISSUED
2024-01-22Permit PL — ISSUED
2023
2023-12-29Bedbug filing: 0 infested units
2023-12-26Facade (LL11) filing, cycle 9: SAFE
2023-12-08311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2023-12-02311: Illegal Parking — Posted Parking Sign Violation
2023-11-21Rodent inspection: Passed
2023-11-16Cooling tower inspection
2023-11-15Job filed: Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2023-11-15Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2023-10-31Permit Supported Scaffold — Signed-off
2023-10-30Permit EW — ISSUED
2023-10-30Permit EW — ISSUED
2023-10-30Permit EQ — ISSUED
2023-10-30Permit EW — ISSUED
2023-10-30Permit EW — ISSUED
2023-10-30Permit EW — ISSUED
2023-10-30DOB complaint, category ?
2023-10-27Permit EW — ISSUED
2023-10-27Permit AL — ISSUED
2023-10-27Permit EW — ISSUED
2023-09-14Rodent inspection: Failed for Rat Activity
2023-09-12Permit Structural — Signed-off
2023-08-17Rodent inspection: Passed
2023-08-08311: Rodent — Rat Sighting
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-30DOB violation LBLVIO: VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2023-06-20Permit EW — ISSUED
2023-06-13Permit Construction Fence — Signed-off
2023-06-05Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2023-05-30311: Taxi Complaint — Driver Complaint - Non Passenger
2023-05-25Permit EW — ISSUED
2023-05-25Permit EW — ISSUED
2023-05-25Permit EW — ISSUED
2023-05-25Permit EW — ISSUED
2023-05-22Permit General Construction — Signed-off
2023-05-19Permit Sidewalk Shed — Signed-off
2023-04-27Permit EW — ISSUED
2023-04-27Permit AL — ISSUED
2023-04-27Permit EW — ISSUED
2023-04-03Asbestos abatement: Removal — Anboj Group Inc.
2023-03-09Boiler inspection
2023-03-09Boiler inspection
2023-03-09Boiler inspection
2023-03-09Boiler inspection
2023-03-08Job filed: Limited Exterior Repairs at the South facade. no change to use egress or occupancy$37,470
2023-03-03Elevator permit: All work to comply with ASME A17.1-2013, Part 2, Safety Code for Elevators and Escalators as modified by Chapter K1 of Appendix K $9,250
2023-02-27Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2023-02-23311: Illegal Parking — Posted Parking Sign Violation
2023-02-17Facade (LL11) filing, cycle 9: SAFE
2023-02-17DOB violation FISPHAZ: CYCLE 9B UNSAFE REPORT FILED
2022
2022-12-20Permit EW — ISSUED
2022-12-20Permit PL — ISSUED
2022-12-18FDNY inspection (STRUC_INT_3)
2022-12-07Bedbug filing: 0 infested units
2022-11-29Permit EW — ISSUED
2022-11-29Permit EW — ISSUED
2022-11-29Permit EW — ISSUED
2022-11-29Permit EW — ISSUED
2022-11-25Permit EW — ISSUED
2022-11-17Mortgage assigned — from INVESTORS BANK to POPULAR BANK
2022-11-17TL&R — from INVESTORS BANK to IROQUOIS HOTEL HOLDINGS LLC; PISCOPO IROQUOIS LLC
2022-11-17Mortgage $4,100,000 — from IROQUOIS HOTEL L.L.C.,; IROQUOIS HOTEL HOLDINGS LLC to POPULAR BANK$4,100,000
2022-11-17AL&R $31,100,000 — from IROQUOIS HOTEL L.L.C.,; IROQUOIS HOTEL HOLDINGS LLC to POPULAR BANK$31,100,000
2022-11-17Mortgage assigned — from INVESTORS BANK to POPULAR BANK
2022-11-17Agreement $31,100,000 — from IROQUOIS HOTEL L.L.C.,; IROQUOIS HOTEL HOLDINGS LLC to POPULAR BANK$31,100,000
2022-11-02Permit EQ — ISSUED
2022-11-02Permit EW — ISSUED
2022-11-02Permit EW — ISSUED
2022-10-19FDNY inspection (COM_OCPCY)
2022-09-26Permit PL — ISSUED
2022-09-20Permit Structural — Signed-off
2022-09-12Cooling tower inspection
2022-09-07DOB complaint, category ?
2022-09-06ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION, I OBSERVED PIPE SCAFFOLD INSTALLED ON TOP OF THE SIDEWALK SHED; UPON REQUEST, NO LOAD IMPOSED LETTER
2022-09-06ECB CLASS - 2 violation: AT THE TIME OF INSPECTION, I OBSERVED THAT WINDOWS OF THE OCCUPIED ADJOINING BUILDING ON EXPO# 2 WERE NOT PROTECTED DURING ACTIVE
2022-08-19Cooling tower inspection — violation AH8Q
2022-08-19Cooling tower inspection — violation AH8T
2022-06-28Permit Construction Fence — Signed-off
2022-06-22Permit EW — ISSUED
2022-06-22Permit EW — ISSUED
2022-06-22Permit EW — ISSUED
2022-06-22Permit EW — ISSUED
2022-05-25Permit Mechanical Systems — Signed-off
2022-05-24Boiler inspection
2022-05-24Boiler inspection
2022-05-24Boiler inspection
2022-05-24Boiler inspection
2022-05-24Permit EW — ISSUED
2022-05-24Permit AL — ISSUED
2022-05-17Permit Supported Scaffold — Signed-off
2022-05-17Permit Sidewalk Shed — Signed-off
2022-05-17Permit Sidewalk Shed — Signed-off
2022-05-10Permit EW — ISSUED
2022-05-10Permit EW — ISSUED
2022-05-10Permit EW — ISSUED
2022-05-10Permit EW — ISSUED
2022-05-02Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2022-03-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-03-10311: Illegal Parking — Blocked Bike Lane
2022-03-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-03-10311: Illegal Parking — Blocked Bike Lane
2022-03-08Permit Mechanical Systems — Signed-off
2022-03-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-03-05311: Illegal Parking — Blocked Bike Lane
2022-02-17Bedbug filing: 0 infested units
2022-02-16HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2022-02-09311: Illegal Parking — Blocked Bike Lane
2022-02-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-02-09311: Illegal Parking — Blocked Bike Lane
2022-02-01Permit EW — ISSUED
2022-02-01Permit EW — ISSUED
2022-02-01Permit EW — ISSUED
2022-02-01Permit EW — ISSUED
2021
2021-12-23Job filed: IT IS PROPOSED TO REPLACE EXISTING COOLING TOWER IN KIND AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$40,000
2021-12-09Job filed: Installation of temporary sidewalk shed for skylight/overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No
2021-12-08DOB complaint, category ?
2021-11-09Permit EW — ISSUED
2021-11-09Permit EQ — ISSUED
2021-11-09Permit EW — ISSUED
2021-11-09Permit EW — ISSUED
2021-11-09Permit EW — ISSUED
2021-11-09Permit EW — ISSUED
2021-11-01Permit EW — ISSUED
2021-10-29Boiler inspection
2021-10-29Boiler inspection
2021-10-29Boiler inspection
2021-10-29Boiler inspection
2021-10-04Permit EW — ISSUED
2021-10-04Permit EW — ISSUED
2021-09-27Permit EW — ISSUED
2021-09-27Permit EW — ISSUED
2021-09-27Permit EW — ISSUED
2021-09-21Permit Sidewalk Shed — Signed-off
2021-09-21Permit Sidewalk Shed — Signed-off
2021-09-20Permit Supported Scaffold — Signed-off
2021-09-20Permit EQ — ISSUED
2021-09-20Permit Construction Fence — Signed-off
2021-09-10Cooling tower inspection — violation AH8F
2021-09-10Cooling tower inspection — violation AH8X
2021-09-10Cooling tower inspection — violation AH8W
2021-06-23Bedbug filing: 0 infested units
2021-04-30Permit EW — ISSUED
2021-04-30Permit EW — ISSUED
2021-04-30Permit AL — ISSUED
2021-04-01HPD class A: (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPD
2021-03-14311: Derelict Bicycle — 14B Derelict Bicycle
2021-02-24311: Sanitation Condition — 15N Needle/Syringe on Street/Sidewalk
2020
2020-11-09Permit Structural — Signed-off
2020-11-09Permit EQ — ISSUED
2020-11-03Permit EW — ISSUED
2020-06-25Job filed: IT IS PROPOSED TO INSTALL A NEW SKYLIGHT AS SHOWN ON PLANS. AND WIDEN AN EXISTING INTERIOR MASONRY WALL OPENING. NO CHANGE TO USE, EGRESS OR OCCUPANC$60,000
2020-04-09Elevator permit: Modernize elevators per Device Job Description.$91,000
2020-04-09Permit AL — ISSUED
2020-04-09Permit EW — ISSUED
2020-04-09Permit Sidewalk Shed — Signed-off
2020-04-09Permit EW — ISSUED
2020-04-08Permit Construction Fence — Signed-off
2020-04-08Permit Structural — Signed-off
2020-04-08Permit Sidewalk Shed — Signed-off
2020-04-08Permit Supported Scaffold — Signed-off
2020-03-26Permit Sidewalk Shed — Signed-off
2020-03-26Permit Sidewalk Shed — Signed-off
2020-03-25Permit Construction Fence — Signed-off
2020-03-25Permit Supported Scaffold — Signed-off
2020-03-17Permit Structural — Signed-off
2020-03-04Permit Sidewalk Shed — Signed-off
2020-03-03Job filed: Installation of temporary sidewalk shed for skylight/overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No
2020-02-27Permit Supported Scaffold — Signed-off
2020-02-27Permit EQ — ISSUED
2020-02-26Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2020-02-26Job filed: INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUP
2020-02-26Job filed: INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUP
2020-02-26Job filed: INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUP
2020-02-25Permit Construction Fence — Signed-off
2020-02-24Permit Sidewalk Shed — Signed-off
2020-02-21Job filed: Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2020-02-21Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2020-02-07DOB complaint, category ?
2020-01-31FDNY inspection (E-CIDS)
2019
2019-11-27Permit EW — ISSUED
2019-11-21Elevator permit: DOOR LOCK MONITOR UPGRADE$3,500
2019-11-18Permit Structural — Signed-off
2019-11-06Cooling tower inspection — violation AH8E
2019-10-24Job filed: IT IS PROPOSED TO INSTALL A NEW SKYLIGHT AS SHOWN ON PLANS. AND WIDEN AN EXISTING INTERIOR MASONRY WALL OPENING. NO CHANGE TO USE, EGRESS OR OCCUPANC$60,000
2019-10-16FDNY inspection (COMPLAINT)
2019-10-15Permit EQ — ISSUED
2019-10-14Permit EW — ISSUED
2019-10-14Permit EW — ISSUED
2019-10-05FDNY inspection (COMPLAINT)
2019-10-01Asbestos abatement: Removal — Anboj Group Inc.
2019-04-30Boiler inspection
2019-04-30Boiler inspection
2019-04-30Boiler inspection
2019-04-30Boiler inspection
2019-04-29Permit AL — ISSUED
2019-04-09Permit EW — ISSUED
2019-04-09Permit EW — ISSUED
2019-03-12ECB CLASS - 2 violation: REMOVAL OF SAFETY MEASURE,SUCH AS SIDEWALK SHED'S W/O DEPT APPROVAL. AT THE TIME OF INSPECTION BUILDING FACADE WAS STILL DESIGNATE$1,250
2019-03-04311: Taxi Complaint — Driver Complaint
2019-02-28Facade (LL11) filing, cycle 8: SAFE
2019-02-12Permit EW — ISSUED
2019-02-12Permit EW — ISSUED
2018
2018-12-03Permit EW — ISSUED
2018-11-08Job filed: IT IS PROPOSED TO MODIFY EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCC$129,000
2018-11-01Permit EW — ISSUED
2018-10-22Permit EW — ISSUED
2018-08-29311: General Construction/Plumbing — Adjacent Buildings Not Protected
2018-08-29DOB complaint, category ?
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-19Boiler inspection
2018-07-10Permit EQ — ISSUED
2018-06-06Cooling tower inspection
2018-04-26Permit AL — ISSUED
2018-04-17Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK AS SHOWN ON PLANS.$105,000
2018-04-17Job filed: SUBSEQUENT FILING FOR MECHANICAL, PLUMBING AND SPRINKLER WORK AS SHOWN ON PLANS.$34,000
2018-04-17Job filed: PROPOSED TO CONSTRUCT A NEW LOUNGE & EGRESS STAIR ENCLOSURE AT REAR EXIST TRANSIENT HOTEL IN CONJ WITH ALT 1 APPL 121773982 AND ALT II 123211522. $168,100
2018-04-17Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK AS SHOWN ON PLANS.$105,000
2018-04-17Job filed: SUBSEQUENT FILING FOR MECHANICAL, PLUMBING AND SPRINKLER WORK AS SHOWN ON PLANS.$34,000
2018-03-23Permit AL — ISSUED
2018-03-19Job filed: SUBSEQUENT FILING FOR STRUCTURAL WORK AS SHOWN ON PLANS.$150,000
2018-03-19Job filed: SUBSEQUENT FILING FOR MECHANICAL, PLUMBING AND SPRINKLER WORK AS SHOWN ON PLANS.$173,000
2018-03-19Job filed: IT IS PROPOSED TO ENLARGE EXISTING TRANSIENT HOTEL AS SHOWN ON PLANS. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALT I APPLICATION 121773982.AS IN$812,100
2018-02-23FDNY inspection (RISK)
2018-02-21Facade (LL11) filing, cycle 8: SAFE
2018-02-21DOB violation FISP:
2018-02-14Permit EW — ISSUED
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-26DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2018-01-18Permit EQ — ISSUED
2018-01-17Permit EQ — ISSUED
2018-01-05Permit PL — ISSUED
2017
2017-12-04Job filed: ADDITION/MODIFICATION TO EXISTING MODIFIED CLASS 'J' FIRE ALARM SYSTEM.$1,000
2017-12-04Job filed: ADDITION/MODIFICATION TO EXISTING MODIFIED CLASS 'J' FIRE ALARM SYSTEM.$1,000
2017-11-09Permit EW — ISSUED
2017-11-09Permit EW — ISSUED
2017-10-20311: Taxi Complaint — Driver Complaint
2017-09-07311: Taxi Complaint — Driver Complaint
2017-09-05311: Taxi Complaint — Driver Complaint
2017-08-31Permit EQ — ISSUED
2017-06-12311: Illegal Parking — Posted Parking Sign Violation
2017-06-12311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2017-06-12311: Illegal Parking — Posted Parking Sign Violation
2017-05-05Job filed: REPAIR/REPLACE FIRE COMMAND STATION OF MODIFIED CLASS'J' FIRE ALARM SYSTEM$1,000
2017-05-05Job filed: REPAIR/REPLACE FIRE COMMAND STATION OF MODIFIED CLASS'J' FIRE ALARM SYSTEM$1,000
2017-03-24Permit AL — ISSUED
2017-02-28DOB complaint, category ?
2017-02-01311: Taxi Complaint — Driver Complaint
2017-01-24Permit PL — ISSUED
2017-01-23Cooling tower inspection — violation AH9C
2017-01-23Cooling tower inspection — violation AH8C
2017-01-23Cooling tower inspection — violation AH8E
2017-01-23Cooling tower inspection — violation AH8R
2017-01-23Cooling tower inspection — violation AH8D
2017-01-23Cooling tower inspection — violation AH8B
2017-01-23Cooling tower inspection — violation AH8L
2017-01-20Permit EW — ISSUED
2017-01-20Permit EW — ISSUED
2017-01-09Permit EW — ISSUED
2017-01-09Job filed: IT IS PROPOSED TO RENOVATE EXISTING TRANSIENT HOTEL AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. THIS APPLICATION IS FILED IN CONJUNCTIO$399,750
2017-01-05Permit EW — ISSUED
2017-01-04311: Illegal Parking — Blocked Bike Lane
2016
2016-11-14311: Taxi Complaint — Driver Complaint
2016-11-03Job filed: IT IS PROPOSED TO RENOVATE EXISTING TRANSIENT HOTEL AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$550,000
2016-09-27311: Taxi Report — Driver Report
2016-09-21DOB violation E:
2016-09-01Permit EQ — ISSUED
2016-08-29Permit EQ — ISSUED
2016-08-29Permit EQ — ISSUED
2016-08-26Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-26Job filed: PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-26Job filed: PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-26Job filed: PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-08-26Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-06-23Permit EQ — ISSUED
2016-06-05311: Taxi Complaint — Vehicle Complaint
2016-03-28Permit AL — ISSUED
2016-03-07311: Homeless Person Assistance — No Status Call
2015
2015-12-18PREL — from INVESTORS BANK to PISCOPO IROQUOIS LLC
2015-12-18Deed $17,800,000 — from PISCOPO IROQUOIS LLC to IROQUOIS HOTEL HOLDINGS LLC$17,800,000
2015-11-22311: UNSANITARY CONDITION — PESTS
2015-11-22Tenant complaint: UNSANITARY CONDITION — PESTS
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-10-01DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2015-09-07311: Taxi Complaint — Driver Complaint
2015-07-10Permit EQ — ISSUED
2015-07-08Job filed: SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
2015-06-25Job filed: FILING FOR LIMITED EXTERIOR REPAIRS; NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$150,000
2015-06-25Job filed: FILING FOR LIMITED EXTERIOR REPAIRS; NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$150,000
2015-05-12Job filed: FULL DEMOLITION OF A TWO STORY STRUCTURE, USING MECHANICAL MEANS.
2015-05-12Job filed: MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AT THE TIME OF DEMOLITION.
2015-05-12Job filed: FULL DEMOLITION OF A TWO STORY STRUCTURE, USING MECHANICAL MEANS.
2015-05-12Job filed: MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AT THE TIME OF DEMOLITION.
2015-03-25Permit AL — ISSUED
2015-03-06Job filed: SUBSEQUENT FILING FOR MECHANICAL, PLUMBING, SPRINKLER AND STANDPIPE WORK AS SHOWN ON PLANS
2015-03-03Job filed: SUBSEQUENT FILING FOR STRUCTURAL AND FOUNDATION WORK AS SHOWN ON PLANS
2014
2014-11-19Permit AL — ISSUED
2014-11-02FDNY inspection (RISK)
2014-10-27FDNY inspection (RISK)
2014-10-18Agreement $250,000 — from PISCOPO WASHINGTON JEFFERSON LLC; PISCOPO IROQUOIS LLC to IROQUOIS HOTEL HOLDINGS LLC; WASHINGTON JEFFERSON HOLDINGS LLC; WASHINGTON JEFFERSON HOTEL$250,000
2014-09-26SMIS — from PISCOPO IROQUOIS LLC to IROQUOIS HOTEL HOLDINGS LLC
2014-09-26MLEA — from PISCOPO IROQUOIS LLC; IROQUOIS HOTEL HOLDINGS LLC to IROQUOIS HOTEL LLC
2014-09-26Mortgage $27,000,000 — from PISCOPO IROQUOIS LLC; IROQUOIS HOTEL HOLDINGS LLC to INVESTORS BANK$27,000,000
2014-09-26Mortgage satisfied — from JUSTIN PISCOPO; LEO ROSNER to IROQUOIS OPERATING CORP
2014-09-26Mortgage $27,000,000 to INVESTORS BANK$27,000,000
2014-09-26AL&R $27,000,000 — from PISCOPO IROQUOIS LLC; IROQUOIS HOTEL HOLDINGS LLC to INVESTORS BANK$27,000,000
2014-09-26Deed $16,857,750 — from IROQUOIS HOTEL OWNERS, LLC to IROQUOIS HOTEL HOLDINGS LLC$16,857,750
2014-08-07Permit PL — ISSUED
2014-07-25Permit EW — ISSUED
2014-07-16Permit EW — ISSUED
2014-07-12Permit EW — ISSUED
2014-05-20Job filed: A1$1,844,500
2014-05-20Job filed: A1$1,844,500
2014-05-09CERT — from OLD REPUBLIC NATIONAL TITLE INSURANCE CO
2014-05-09ZONE — from IROQUOIS HOTEL OWNERS LLC; PISCOPO IROQUOIS LLC
2014-02-10Permit AL — ISSUED
2013
2013-12-12Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS.
2013-12-12Job filed: SUBSEQUENT FILING FOR MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS.
2013-12-09Job filed: A1$200,000
2013-09-23Permit EW — ISSUED
2013-08-10Permit EW — ISSUED
2013-06-26311: Illegal Parking — Blocked Sidewalk
2013-06-10Deed — from PISCOPO, RITA to IROQUOIS HOTEL OWNERS, LLC
2013-04-11DOB violation E:
2013-04-11DOB violation E:
2013-02-11Permit EW — ISSUED
2012
2012-12-21Permit EW — ISSUED
2012-12-21Permit PL — ISSUED
2012-12-20Permit EW — ISSUED
2012-12-18Job filed: IT IS PROPOSED TO INSTALL A BOOSTER PUMP TO EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$20,000
2012-12-18Job filed: IT IS PROPOSED TO INSTALL A BOOSTER PUMP TO EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$20,000
2012-12-10Deed — from PISCOPO RODGERS , IRENE to PISCOPO IROQUOIS LLC
2012-12-10Deed — from IRENE PISCOPO RODGERS AS EXECUTOR; THE ESTATE OF HELEN PISCOPO to PISCOPO RODGERS, IRENE; PISCOPO, RITA
2012-11-30Rodent inspection: Passed
2012-09-13DOB violation E:
2012-09-13DOB violation E:
2012-08-21Facade (LL11) filing, cycle 7: SWARMP
2012-07-25Permit EW — ISSUED
2012-04-18Job filed: INSTALLATION OF ONE(1) NEW 30KW GAS EMERGENCY POWER GENERATOR FOR EXISTING SERVERS AND RELATED MECHANICAL EXHAUST, GAS PLUMBING AND ELECTRICAL WORK. N$31,500
2012-04-18Job filed: INSTALLATION OF ONE(1) NEW 30KW GAS EMERGENCY POWER GENERATOR FOR EXISTING SERVERS AND RELATED MECHANICAL EXHAUST, GAS PLUMBING AND ELECTRICAL WORK. N$31,500
2012-04-18Job filed: INSTALLATION OF ONE(1) NEW 30KW GAS EMERGENCY POWER GENERATOR FOR EXISTING SERVERS AND RELATED MECHANICAL EXHAUST, GAS PLUMBING AND ELECTRICAL WORK. N$31,500
2012-04-17Permit EW — ISSUED
2012-03-16Job filed: IT IS PROPOSED TO DEMO EXISTING ABOVE GROUND OIL STORAGE TANK AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$18,750
2012-03-16Job filed: IT IS PROPOSED TO DEMO EXISTING ABOVE GROUND OIL STORAGE TANK AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$18,750
2012-02-14Permit EW — ISSUED
2012-01-27Permit EW — ISSUED
2012-01-26Permit EW — ISSUED
2012-01-12311: Taxi Complaint — Driver Complaint
2011
2011-12-06311: Illegal Parking — Posted Parking Sign Violation
2011-09-29311: Sewer — Sewer Backup (Use Comments) (SA)
2011-09-26311: Taxi Complaint — Driver Complaint
2011-07-14Permit EW — ISSUED
2011-06-27Job filed: MODIFYING EXISTING ELEVATOR PIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2011-06-27Job filed: MODIFYING EXISTING ELEVATOR PIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$15,000
2011-06-23311: Taxi Complaint — Driver Complaint
2011-06-08DOB violation E:
2011-06-08DOB violation E:
2011-05-27311: Sewer — Catch Basin Search (SC2)
2011-03-17311: Taxi Complaint — Vehicle Complaint
2010
2010-11-14311: Blocked Driveway — No Access
2010-10-29311: For Hire Vehicle Complaint — Driver Complaint
2010-07-09Rodent inspection: Passed
2010-05-23311: Taxi Complaint — Driver Complaint
2010-03-29311: For Hire Vehicle Complaint — Driver Complaint
2009
2009-07-29DOB violation E:
2009-07-29DOB violation E:
2009-06-23Permit AL — ISSUED
2009-06-23Permit PL — ISSUED
2009-01-06Permit EQ — ISSUED
2008
2008-12-22Permit EQ — ISSUED
2008-12-02Permit EQ — ISSUED
2008-12-02Permit EQ — ISSUED
2008-11-17Job filed: ERECT PIPE SCAFFOLD AS PER PLAN AT 49 WEST 44 STREET. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-11-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 40 L.F AS PER PLAN AT 49 WEST 44 STREET. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO
2008-11-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 40 L.F AS PER PLAN AT 49 WEST 44 STREET. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO
2008-11-17Job filed: ERECT PIPE SCAFFOLD AS PER PLAN AT 49 WEST 44 STREET. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-11-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 40 L.F AS PER PLAN AT 49 WEST 44 STREET. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO
2008-09-18Deed — from THE TRUST FBO HELEN PISCOPO U/W/O JUSTIN; JOHN S. DORF, AS CO-TRUSTEE; IRENE PISCOPO RODGE to PISCOPO, RITA; PISCOPO RODGERS, IRENE
2008-09-03DOB complaint, category ?
2008-08-19DOB violation E:
2008-06-04Permit AL — ISSUED
2008-03-31DOB violation LL2604E:
2008-01-26Permit PL — ISSUED
2007
2007-12-03DOB violation E:
2007-12-03DOB violation E:
2007-10-04Permit EW — ISSUED
2007-10-04Permit EW — ISSUED
2007-09-27Job filed: It is proposed to install new steel chimney lining to the existing chimney as shown on plans. No change to use, egress or occupancy.$40,000
2007-09-27Job filed: It is proposed to install new steel chimney lining to the existing chimney as shown on plans. No change to use, egress or occupancy.$40,000
2007-07-18ECB Hazardous violation: B4B-50.50-BOILER CONNECTED TO UNLINED MASONRY CHIMNEY.$800
2007-07-03DOB complaint, category ?
2007-05-31Permit AL — ISSUED
2006
2006-12-07Permit EW — ISSUED
2006-12-05Facade (LL11) filing, cycle 6: SAFE
2006-05-23Permit AL — ISSUED
2006-01-09Job filed: Fire Safety Plan. No change to use egress or occupancy under this application.$1,000
2005
2005-12-30Permit EQ — ISSUED
2005-12-09Permit EW — ISSUED
2005-12-07DOB complaint, category ?
2005-11-09Permit EW — ISSUED
2005-06-13Permit AL — ISSUED
2005-06-08Permit EQ — ISSUED
2005-06-08Permit EQ — ISSUED
2005-06-07Job filed: INSTALL HEAVY DUTY SIDEWALK SHED 92 FT AT 49 WEST 44 STREET. - DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. LL33/91. NO CHANGE IN OCCUPANCY
2005-06-07Job filed: INSTALL HEAVY DUTY SIDEWALK SHED 92 FT AT 49 WEST 44 STREET. - DURING REMEDIAL REPAIRS. WORK TO COMPLY WITH LL33/91. LL33/91. NO CHANGE IN OCCUPANCY
2005-04-15DOB violation CMQ:
2005-04-12Permit EQ — ISSUED
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2004
2004-10-04Permit PL — ISSUED
2004-10-04Permit EW — ISSUED
2004-09-24Job filed: TO INSTALL THREE HOT WATER BOILERS AS SHOWN ON PLANS. NO CHANGE TO USE , EGRESS OR OCCUPANCY.$40,000
2004-09-13Permit EQ — ISSUED
2004-09-08Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED, 90' , DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91.
2004-09-08Job filed: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED, 90' , DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91.
2003
2003-10-06Permit AL — ISSUED
2003-05-16Permit EW — ISSUED
2003-05-16Permit EW — ISSUED
2003-05-09Job filed: STRUCTURAL WORK FOR COOLING TOWER AND CO NDENSING UNITS ROOF$20,000
2003-05-09Job filed: STRUCTURAL WORK FOR COOLING TOWER AND CO NDENSING UNITS ROOF$20,000
2003-05-09Job filed: INSTALL COOLING TOWER AND CONDESING UNIT S AS SHOWN ON PLANS NO CHANGE T USE EGRESS OR OCCUPANCY.$180,000
2003-05-09Job filed: INSTALL COOLING TOWER AND CONDESING UNIT S AS SHOWN ON PLANS NO CHANGE T USE EGRESS OR OCCUPANCY.$180,000
2003-04-25Permit EW — ISSUED
2003-04-25Permit EW — ISSUED
2003-01-30DOB violation CMQ:
2002
2002-11-14DOB violation E: 1P6881
2002-09-04Permit AL — ISSUED
2002-07-03Permit EW — ISSUED
2002-06-28Permit AL — ISSUED
2002-06-20Job filed: IT IS PROPOSED TO INSTALL NEW ACCESS AND DOOR AT REAR OF BUILDING AS SHO ON PLANS$10,000
2002-06-17Job filed: INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY$2,000
2002-01-16DOB violation CMQ:
2002-01-04Permit EW — ISSUED
2001
2001-07-25DOB violation E: 1P6881
2001-05-22Permit AL — ISSUED
2001-04-11DOB violation CMQ:
2000
2000-12-27Permit EW — ISSUED
2000-10-16Permit AL — ISSUED
2000-10-06Job filed: It is proposed to install canopy as shown on plans. No change in use, egress or occupancy.$5,000
2000-10-06Job filed: It is proposed to install canopy as shown on plans. No change in use, egress or occupancy.$5,000
2000-09-28Permit PL — ISSUED
2000-08-18Job filed: SPRINKLER SYSTEM AS PERPLAN. NO CHANGE I N USE, EGRESS, OR OCCUPANCY UND R THIS APPLICATION.$60,000
2000-08-15Permit PL — ISSUED
2000-08-15Permit EW — ISSUED
2000-08-07Job filed: REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. INSTALL NEW GAS SERVICE, METER AND PIPIN G. CHANGE GRADE OF FUEL OIL FROM #6 T$4,000
2000-07-27Permit EW — ISSUED
2000-07-20Permit PL — ISSUED
2000-07-17Permit EW — ISSUED
2000-07-14Job filed: It is proposed to modify the existing sprinkler system as shown on plans. No change in use, egress or occuapncy.$5,000
2000-07-06Permit EW — ISSUED
2000-07-06Permit EW — ISSUED
2000-06-20Permit AL — ISSUED
2000-06-20Job filed: Install fire suppression system, as shown on plan. No change in use, occupancy, or egress.$2,000
2000-04-14Job filed: It is proposed to renovate existing resturant,including interior partitions, plu mbing & mechanical work as shown on plans. No change in use, egre$18,000
2000-04-14Job filed: It is proposed to renovate existing resturant,including interior partitions, plu mbing & mechanical work as shown on plans. No change in use, egre$18,000
2000-01-13DOB violation CMQ:
1999
1999-08-04Permit AL — ISSUED
1999-07-30Permit EW — ISSUED
1999-03-17Permit AL — ISSUED
1999-02-19DOB violation CMQ:
1998
1998-11-06Permit EW — ISSUED
1998-05-04DOB violation LL6291:
1998-03-06Permit EQ — ISSUED
1998-02-11Deed — from RODGERS, IRENE PISCOPO F/B/O; RODGERS, IRENE PISCOPO TRUSTEE; PISCOPO, HELEN TRUSTEE to RODGERS, IRENE PISCOPO
1998-02-11Deed — from PISCOPO, HELEN TRUSTEE; RODGERS, IRENE PISCOPO TRUSTEE; PISCOPO, RITA F/B/O to PISCOPO, RITA
1997
1997-12-02Deed — from PISCOPO, HELEN to PISCOPO, RITA; RODGERS, IRENE PISCOPO
1997-11-17Permit AL — ISSUED
1997-07-10Permit PL — ISSUED
1997-07-01DOB violation P:
1997-06-30DOB complaint, category ?
1997-05-23DOB violation P:
1997-05-22DOB complaint, category ?
1997-03-31Permit AL — ISSUED
1997-02-14Deed — from PISCOPO, HELEN; CHASE MANHATTAN BANK to PISCOPO, HELEN
1997-02-14Deed — from BERG, DAVID AS EXECUTOR; CHASE MANHATTAN BANKAS EXECUTOR; PISCOPO, HELEN AS EXECUTOR; PISC to CHASE MANHATTAN BANK; PISCOPO, HELEN; BERG, DAVID
1996
1996-12-31Deed — from PISCOPO, HELEN EXEC.; PISCOPO, JUSTIN L/W/T; CHASE MANHATTAN BANKEXEC. to PISCOPO, HELEN/; CHASE MANHATTAN BANK; PISCOPO, HELEN; PISCOPO, JUSTIN O/W/O; BERG, DAVID
1996-12-31Deed — from PISCOPO, JUSTIN O/W/O; CHASE MANHATTAN BANKTRUSTEE; PISCOPO, HELEN TRUSTEE; PISCOPO, HELEN to PISCOPO, HELEN
1994
1994-09-01DOB violation LL6291:
1994-05-13ECB Hazardous violation: FAILURE TO SUBMIT A THIRD ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALL AND APPURTENANCES AS REQUIRED BY LOCAL LAW $400
1992
1992-08-12Permit EW — ISSUED
1992-07-01DOB violation LL1080:
1992-02-28Permit EW — ISSUED
1990
1990-04-24ECB Unknown violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REMEDY: PROVIDE APPROVED PA PLANS.$250
1989
1989-09-19ECB Unknown violation: OPERATION OF PA WITHOUT A CURRENT PERMIT REMEDY PROVIDE APPROVED PA PLANS. FAILURE TO PROVIDE APPROVED PA POLANS FOR INSPECTION RE$650
1989-06-20ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLANS AVAILABLE FOR INSPECTION. REMEDY: PROVIDE APPROVED PA PLANS FOR INSPECTION.$250
1989-04-20ECB Hazardous violation: FAILURE TO HAVE APPROVED PA PLAN AVAILABLE FOR INSPECTION REMEDY PROVIDE APPROVED PA PLANS OPERATION OF P A FILIN TO OBTAIN A SIGN
1969
1969-05-21Mortgage assigned — from BDWAY SVS BNK to PISCOPP JUSTIN
1900
1900-01-01Air permit (CERTIFICATE TO OPERATE), fuel: NO6FUEL

Support this site Back to the building page