Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
32 service requests in the last three years. Most common: Noise (6) · Illegal Parking (5) · Homeless Person Assistance (3) · Panhandling (2) · Encampment (2) · Commercial Disposal Complaint (1).
Filed construction activity
$30,734,531 in permitted construction work filed since
2016 (174 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$177,777,800
$80,000,000
2026
$176,806,000
$79,562,700
2027
$182,057,000
$81,925,650
The city's market estimate has risen
2% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
B — ENERGY STAR score 80/100 (2022 disclosure cycle)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
1 street-flooding or sewer-backup complaints at this address since
2018 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
47-50 Sts-Rockefeller Ctr — B D F M · 800 ft straight-line (about a 4-minute walk) · station accessibility: full Grand Central-42 St — 4 5 6 7 S · 0.3 mi straight-line (about a 7-minute walk) · station accessibility: full
Bus
Nearest boarding stop: 5 Av / W 47 St — M1 M2 M3 Q32 · 200 ft
Citi Bike
E 48 St & 5 Ave · 250 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
32 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $65,000,000 on
2016-07-20 (lender: Principal Life Insurance Company). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2016-07-20
Agreement $125,000,000 — from FORTY SEVENTH FIFTH COMPANY LLC to PRINCIPAL LIFE INSURANCE COMPANY
$125,000,000
2016-07-20
Mortgage $65,000,000 — from FORTY SEVENTH FIFTH COMPANY LLC to PRINCIPAL LIFE INSURANCE COMPANY
$65,000,000
2015-03-16
RPTT&RET $725,936 — from CHOCONYZ INC. to FORTY SEVENTH FIFTH COMPANY, LLC
$725,936
2007-05-09
Agreement $60,000,000 — from FOURTY SEVENTH FIFTH COMPANY LLC to THE PRUDENCIA INSURANCE COMPANY OF AMERI
$60,000,000
2007-05-09
Mortgage $19,185,619 — from FOURTY SEVENTH FIFTH COMPANY LLC to THE PRUDENCIA INSURANCE COMPANY OF AMERI
$19,185,619
1998-08-12
Mortgage $2,000,000 — from FORTY SEVENTH FIFTHCOMPANY LLC to GMAC COMMERCIAL MORTGAGE CORPORATION
$2,000,000
1996-01-19
Mortgage $1,669,092 — from FORTY-SEVENTH-FIFTHCOMPANY to GMAC COMMERCIAL MORTGAGE CORPORATION
$1,669,092
1986-11-18
Mortgage $20,406,032 — from FORTY-SEVENTH-FIFTHCO to PRINCIPAL MTL LFE INS CO
$20,406,032
1983-09-01
Mortgage $24,997,135 — from FORTY-SEVENTH-FIFTHCO to AMERICAN SAVINGS BANK
$24,997,135
1983-09-01
Agreement $24,997,135 — from FORTY-SEVENTH-FIFTHCO. to AMERICAN SAVINGS BANK
$24,997,135
Ten-year activity
2001000
144
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
38
22
8
76
144
2018
11
7
19
17
54
2019
34
22
17
10
83
2020
44
4
13
10
71
2021
29
3
12
9
53
2022
23
3
10
7
43
2023
31
1
15
4
51
2024
69
2
4
13
88
2025
77
0
13
11
101
2026
65
4
9
13
91
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: MINOR INTERIOR RENOVATION OF SUITE 1136. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-09-24
311: Blocked Driveway — No Access
2026-09-24
Permit General Construction — Permit Issued
2026-09-22
Job filed: PROPOSE TO INSTALL A 3-TON WATER SOURCE HEAT PUMP ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.
2026-09-22
Job filed: PROPOSE TO INSTALL A FUNNEL DRAIN AND SINK ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.
2026-09-22
Job filed: PROPOSE TO MODIFY THE SP HEADS ON THE 12TH FLOOR (UNIFICATION OF SUITES 1215,1217,1219) AS PER PLANS SUBMITTED HEREWITH.
2026-09-21
Job filed: PROPOSED INTERIOR BUILD-OUT TO COMBINE THREE (3) EXISTING SUITES ON THE 12TH FLOOR, AS PER THE PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, MEANS OF EG
2026-09-10
Job filed: MINOR INTERIOR RENOVATION OF DGA OFFICE IN CELLAR . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-08-26
311: Panhandling — N/A
2026-08-17
Job filed: SP WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-08-06
Boiler inspection
2026-08-06
Boiler inspection
2026-08-04
Permit General Construction — Permit Issued
2026-08-04
Permit General Construction — Permit Issued
2026-08-04
Permit Structural — Permit Issued
2026-08-04
Permit Structural — Permit Issued
2026-07-28
Permit General Construction — Permit Issued
2026-07-28
Permit Mechanical Systems — Permit Issued
2026-07-20
Permit General Construction — Permit Issued
2026-07-20
Job filed: Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
2026-07-15
DOB complaint, category ?
2026-07-07
Job filed: MINOR INTERIOR RENOVATION OF SUITE 1510 . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-06-29
Job filed: PROPOSED INTERIOR RENOVATION WORK AT SUIE 610, GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, MINOR PLUMBING WORK, AND THE REPLACEMENT OF FINISHES AND S
2026-06-18
Job filed: proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy
2026-06-16
Asbestos abatement: Removal — All Restoration Inc.
2026-05-29
FDNY inspection (ALT)
2026-05-19
Job filed: NEW HEAT PUMP AIR-CONDITIONING SYSTEM FOR 8TH FLOOR COMMON CORRIDOR
2026-05-08
Permit General Construction — Permit Issued
2026-05-05
Permit Supported Scaffold — Permit Issued
2026-05-05
Permit Supported Scaffold — Permit Issued
2026-05-01
Job filed: PROPOSED GUT RENOVATION TO COMBINE 3 SUITES ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, MEANS OF EGRESS, OR BULK.
2026-04-28
Permit Structural — Permit Issued
2026-04-28
Permit Structural — Permit Issued
2026-04-27
Permit General Construction — Permit Issued
2026-04-23
Job filed: proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy
2026-04-21
Restaurant inspection: BLAKE & TODD — grade A
2026-04-21
Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2026-04-15
Permit General Construction — Signed-off
2026-04-10
Asbestos abatement: Removal — All Restoration Inc.
2026-04-10
Asbestos abatement: Removal — All Restoration Inc.
2026-04-07
Permit Plumbing — Signed-off
2026-04-06
Permit Sprinklers — Permit Issued
2026-04-06
Permit Sprinklers — Signed-off
2026-03-30
Permit General Construction — Signed-off
2026-03-30
Permit Mechanical Systems — Signed-off
2026-03-30
Permit Mechanical Systems — Permit Issued
2026-03-30
Job filed: MINOR INTERIOR RENOVATION OF SUITE 711. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-27
Permit General Construction — Signed-off
2026-03-27
Permit General Construction — Permit Issued
2026-03-27
Job filed: MINOR INTERIOR RENOVATION OF SUITE 909. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-25
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-25
DOB complaint, category ?
2026-03-20
Restaurant inspection: BLAKE & TODD
2026-03-19
Job filed: MH WORK FILED IN CONJUNCTION WITH DOB NOW GC, SP, AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-18
Job filed: PROPOSED GUT RENOVATION TO COMBINE 3 SUITES ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, MEANS OF EGRESS, OR BULK.
2026-03-17
Job filed: SP WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-17
Job filed: PL WORK IN SUITE 1100B FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-16
Job filed: MINOR INTERIOR RENOVATION OF SUITE 1100B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-14
Job filed: MINOR INTERIOR RENOVATION OF SUITE 1136. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-11
311: Sidewalk Condition — Broken Sidewalk
2026-03-10
Job filed: General construction alterations on the 14th floor for proposed commercial tenant alterations and increase to the occupant load on the floor; related
2026-03-06
Elevator permit: MODERNIZATION OF 2 TRACTION ELEVATORS AS DESCRIBED IN THE DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8,
2026-03-06
DOB violation C: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED BROKEN WINDOW PANE ON 4TH FLOOR OF EXP 1 ABOVE MAIN ENTRANCE
2026-03-04
Permit General Construction — Permit Issued
2026-03-04
Permit Structural — Permit Issued
2026-03-04
Permit Structural — Permit Issued
2026-03-04
Permit General Construction — Permit Issued
2026-03-03
Job filed: Mechanical systems alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans.
2026-10-01Permit Mechanical Systems — Permit Issued
2026-09-30Job filed: MINOR INTERIOR RENOVATION OF SUITE 1136. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$103,500
2026-09-24311: Blocked Driveway — No Access
2026-09-24Permit General Construction — Permit Issued
2026-09-22Job filed: PROPOSE TO INSTALL A 3-TON WATER SOURCE HEAT PUMP ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$22,500
2026-09-22Job filed: PROPOSE TO INSTALL A FUNNEL DRAIN AND SINK ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH.$8,500
2026-09-22Job filed: PROPOSE TO MODIFY THE SP HEADS ON THE 12TH FLOOR (UNIFICATION OF SUITES 1215,1217,1219) AS PER PLANS SUBMITTED HEREWITH.$19,200
2026-09-21Job filed: PROPOSED INTERIOR BUILD-OUT TO COMBINE THREE (3) EXISTING SUITES ON THE 12TH FLOOR, AS PER THE PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, MEANS OF EG$79,100
2026-09-10Job filed: MINOR INTERIOR RENOVATION OF DGA OFFICE IN CELLAR . NO CHANGE TO USE, OCCUPANCY OR EGRESS.$30,000
2026-08-26311: Panhandling — N/A
2026-08-17Job filed: SP WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-08-06Boiler inspection
2026-08-06Boiler inspection
2026-08-04Permit General Construction — Permit Issued
2026-08-04Permit General Construction — Permit Issued
2026-08-04Permit Structural — Permit Issued
2026-08-04Permit Structural — Permit Issued
2026-07-28Permit General Construction — Permit Issued
2026-07-28Permit Mechanical Systems — Permit Issued
2026-07-20Permit General Construction — Permit Issued
2026-07-20Job filed: Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.$35,000
2026-07-15DOB complaint, category ?
2026-07-07Job filed: MINOR INTERIOR RENOVATION OF SUITE 1510 . NO CHANGE TO USE, OCCUPANCY OR EGRESS.$50,000
2026-06-29Job filed: PROPOSED INTERIOR RENOVATION WORK AT SUIE 610, GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, MINOR PLUMBING WORK, AND THE REPLACEMENT OF FINISHES AND S$49,875
2026-06-18Job filed: proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy$1,123,510
2026-06-16Asbestos abatement: Removal — All Restoration Inc.
2026-05-29FDNY inspection (ALT)
2026-05-19Job filed: NEW HEAT PUMP AIR-CONDITIONING SYSTEM FOR 8TH FLOOR COMMON CORRIDOR$30,000
2026-05-08Permit General Construction — Permit Issued
2026-05-01Job filed: PROPOSED GUT RENOVATION TO COMBINE 3 SUITES ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, MEANS OF EGRESS, OR BULK.$80,040
2026-04-28Permit Structural — Permit Issued
2026-04-28Permit Structural — Permit Issued
2026-04-27Permit General Construction — Permit Issued
2026-04-23Job filed: proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy$1,123,510
2026-04-21Restaurant inspection: BLAKE & TODD — grade A
2026-04-21Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2026-04-15Permit General Construction — Signed-off
2026-04-10Asbestos abatement: Removal — All Restoration Inc.
2026-04-10Asbestos abatement: Removal — All Restoration Inc.
2026-04-07Permit Plumbing — Signed-off
2026-04-06Permit Sprinklers — Permit Issued
2026-04-06Permit Sprinklers — Signed-off
2026-03-30Permit General Construction — Signed-off
2026-03-30Permit Mechanical Systems — Signed-off
2026-03-30Permit Mechanical Systems — Permit Issued
2026-03-30Job filed: MINOR INTERIOR RENOVATION OF SUITE 711. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$25,000
2026-03-27Permit General Construction — Signed-off
2026-03-27Permit General Construction — Permit Issued
2026-03-27Job filed: MINOR INTERIOR RENOVATION OF SUITE 909. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$50,000
2026-03-25311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-25DOB complaint, category ?
2026-03-20Restaurant inspection: BLAKE & TODD
2026-03-19Job filed: MH WORK FILED IN CONJUNCTION WITH DOB NOW GC, SP, AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-18Job filed: PROPOSED GUT RENOVATION TO COMBINE 3 SUITES ON THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, MEANS OF EGRESS, OR BULK.$80,040
2026-03-17Job filed: SP WORK FILED IN CONJUNCTION WITH DOB NOW GC, PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
2026-03-17Job filed: PL WORK IN SUITE 1100B FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$21,000
2026-03-16Job filed: MINOR INTERIOR RENOVATION OF SUITE 1100B. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$158,000
2026-03-14Job filed: MINOR INTERIOR RENOVATION OF SUITE 1136. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$103,500
2026-03-10Job filed: General construction alterations on the 14th floor for proposed commercial tenant alterations and increase to the occupant load on the floor; related $200,000
2026-03-06Elevator permit: MODERNIZATION OF 2 TRACTION ELEVATORS AS DESCRIBED IN THE DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8,$832,813
2026-03-06DOB violation C: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED BROKEN WINDOW PANE ON 4TH FLOOR OF EXP 1 ABOVE MAIN ENTRANCE
2026-03-04Permit General Construction — Permit Issued
2026-03-04Permit Structural — Permit Issued
2026-03-04Permit Structural — Permit Issued
2026-03-04Permit General Construction — Permit Issued
2026-03-03Job filed: Mechanical systems alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans.$399,000
2026-02-18Job filed: proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy$1,123,510
2026-02-09Elevator permit: MODERNIZATION OF 4 TRACTION ELEVATORS AS DESCRIBED IN THE DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8,$1,290,290
2026-02-09Elevator permit: MODERNIZATION OF 3 TRACTION ELEVATORS AS DESCRIBED IN THE DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8,$720,097
2026-02-09Elevator permit: MODERNIZATION OF 3 TRACTION ELEVATORS AS DESCRIBED IN THE DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8,$1,412,355
2026-02-09Elevator permit: MODERNIZATION OF 3 TRACTION ELEVATORS AS DESCRIBED IN THE DEVICE JOB DESCRIPTION. ALL WORK TO COMPLY WITH ASME A17.1-2013, PART 8,$1,018,196
2026-02-09Permit EW — ISSUED
2026-02-04311: Animal-Abuse — Other (complaint details)
2025-12-12Permit General Construction — Signed-off
2025-12-03Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$200,000
2025-11-24Job filed: RENOVATION OF EXISTING OFFICE SPACE. NEW GYPSUM BOARD AND GLASS PARTITIONS, FINISH/LIGHTING UPGRADES AND NEW DROPPED CEILINGS. NO CHANGE TO USE, EGRES$49,000
2025-11-24Job filed: Modifications to existing sprinkler system in existing office space. Installation of new plumbing fixtures per schedule.$25,000
2025-11-24Job filed: Modifications to mechanical systems in existing office suite.$10,500
2025-11-22311: Dirty Condition — Trash
2025-11-20Job filed: NEW HEAT PUMP AIR-CONDITIONING SYSTEM FOR 9TH FLOOR COMMON CORRIDOR$30,000
2025-10-15Job filed: MINOR INTERIOR RENOVATION OF SUITE 1720. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$15,930
2025-10-07Job filed: SUPPORTED SCAFFOLD ACCESS FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$20,000
2025-10-03Permit Structural — Signed-off
2025-10-03Job filed: INSTALL NEW PEDESTAL FOR FLAG POST ON ROOF OF 34TH FLOOR.$21,600
2025-09-30Job filed: Plumbing alterations on the 14th floor for proposed renovation to existing commercial tenant space; related work as per plans.$50,000
2025-09-25311: Obstruction — Trash or Recycling
2025-09-12Permit General Construction — Signed-off
2025-09-09Permit Sprinklers — Signed-off
2025-09-03Elevator permit: REACTIVATE FLOORS 19,22,23,24,25,26,28,29, and 30 ON ELEVATOR 1P16431-All work to comply with ASME A17.1-2013, Part 8, Section 8.7$10,000
2025-08-29Job filed: Mechanical systems alterations to Suite 403 for proposed tenant improvements as per plans.$125,000
2025-08-26Permit Plumbing — Permit Issued
2025-08-25Permit Structural — Permit Issued
2025-08-25Permit Structural — Permit Issued
2025-08-25Permit General Construction — Signed-off
2025-08-25Permit Mechanical Systems — Signed-off
2025-08-22Job filed: Install New Catwalk maintenance platform over existing dunnage.$70,000
2025-08-21Job filed: General construction alterations on the 22nd floor for proposed connection of two existing sweets sharing single entry door; related work as per plans$19,998
2025-07-21Job filed: Structural alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans. No proposed change in building use, egress,$70,780
2025-07-18Job filed: Plumbing alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans.$29,000
2025-07-18Job filed: Mechanical systems alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans.$399,000
2025-07-18Job filed: Sprinkler alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans.$34,900
2025-07-17Job filed: General construction alterations on the 3rd floor for proposed commercial tenant fit-out; related work as per plans. No proposed change in building us$731,610
2025-06-26311: Noise — Noise: Jack Hammering (NC2)
2025-06-25Permit Sprinklers — Signed-off
2025-06-25Permit Plumbing — Signed-off
2025-06-24Permit General Construction — Permit Issued
2025-06-24Permit Mechanical Systems — Permit Issued
2025-06-18Permit General Construction — Signed-off
2025-06-16Permit Mechanical Systems — Signed-off
2025-06-11Job filed: Sprinkler modifications to Suite 403 for proposed tenant improvements as per plans$66,500
2025-06-11Job filed: Mechanical systems alterations to Suite 403 for proposed tenant improvements as per plans.$125,000
2025-06-11Job filed: Plumbing alteration to Suite 403 for proposed sink with associated piping as per plans.$20,000
2025-06-10Job filed: General construction alterations on the 4th floor for proposed tenant improvements; related work as per plans. No proposed change to existing use, egr$75,000
2025-06-09Elevator permit: REACTIVATE FLOORS 19,22,23,24,25,26,28,29, and 30 ON ELEVATORS 1P16429 and 1P16430- All work will comply with ASME B20.1-2015, Sa$15,000
2025-06-09Boiler inspection
2025-06-09Boiler inspection
2025-05-23Permit EW — ISSUED
2025-05-22Permit Sprinklers — Signed-off
2025-05-22Permit Plumbing — Signed-off
2025-05-18311: Homeless Person Assistance — Non-Chronic
2025-05-15311: Homeless Person Assistance — Chronic
2025-05-05Job filed: SUPPORTED SCAFFOLD ACCESS FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$20,000
2025-04-25Job filed: Installation of a water-cooled air conditioning unit, including all associated ductwork, piping, and necessary mechanical connections at 15th Floor.$30,000
2025-04-23Job filed: NEW HEAT PUMP AIR-CONDITIONING SYSTEM FOR 31ST FL CORRIDOR$30,000
2025-04-17Permit General Construction — Permit Issued
2025-04-16Restaurant inspection: BLAKE & TODD — grade B
2025-04-14Permit Supported Scaffold — Signed-off
2025-04-10Permit Plumbing — Signed-off
2025-04-10Permit Mechanical Systems — Permit Issued
2025-04-10Permit Sprinklers — Signed-off
2025-04-04Elevator permit: REACTIVATE FLOORS 19,22,23,24,25,26,28,29, and 30 ON ELEVATOR 1P16431-All work to comply with ASME A17.1-2013, Part 8, Section 8.7$10,000
2025-04-02Job filed: Mechanical systems alterations at the 14th floor for proposed renovation of existing commercial tenant space; related work as per plans.$250,000
2025-03-18Facade (LL11) filing, cycle 9: SAFE
2025-03-18Elevator permit: REACTIVATE FLOORS 19,22,23,24,25,26,28,29, and 30 ON ELEVATORS 1P16429 and 1P16430- All work will comply with ASME B20.1-2015, Sa$15,000
2025-03-18311: Encampment — N/A
2025-03-18311: Encampment — N/A
2025-03-18Job filed: Plumbing alterations on the 14th floor for proposed renovation to existing commercial tenant space; related work as per plans.$50,000
2025-03-18Job filed: Mechanical systems alterations at the 14th floor for proposed renovation of existing commercial tenant space; related work as per plans.$250,000
2025-03-18Job filed: Sprinkler alterations on the 14th floor for proposed renovation to existing commercial tenant space; related work as per plans.$30,000
2025-03-17Permit Supported Scaffold — Signed-off
2025-03-17Job filed: SUPPORTED SCAFFOLD ACCESS FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$20,000
2025-03-14Job filed: RENOVATION OF 4TH FLOOR FOR TENANT FIT-OUT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$387,350
2025-03-13311: Street Condition — Pothole
2025-03-08Job filed: General construction alterations on the 14th floor for proposed commercial tenant alterations and increase to the occupant load on the floor; related $200,000
2025-03-05Permit Structural — Permit Issued
2025-03-05Permit General Construction — Permit Issued
2025-03-04Permit General Construction — Signed-off
2025-03-04Permit Structural — Signed-off
2025-02-28Restaurant inspection: BLAKE & TODD
2025-02-24Permit Sprinklers — Signed-off
2025-02-18Facade (LL11) filing, cycle 9: SAFE
2025-02-18Permit General Construction — Permit Issued
2025-02-13Job filed: HEREWITH FILING FOR AN INTERIOR RENOVATION FOR SUITE 521. INSTALLATION OF NEW NON-BEARING FRAMED AND GLASS PARTITIONS. FILING FOR INSTALLATION OF SUSP$87,500
2025-02-10Permit Structural — Signed-off
2025-02-10Permit Structural — Signed-off
2025-02-10Permit Structural — Permit Issued
2025-02-10Permit General Construction — Signed-off
2025-02-10Permit General Construction — Permit Issued
2025-02-10Permit General Construction — Signed-off
2025-01-29Job filed: REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS AND ASSOCIATED PIPING AND CAPPED BACK TO EXISTING RISERS. SPRINKLER HEADS AND ASSOCIATED BRANCHES TO B$9,100
2025-01-29Job filed: REMOVE EXISTING MECHANICAL EQUIPMENT, ASSOCIATED DUCTWORK, REGISTERS, AND CONTROLS. 3" COLD WATER SUPPLY AND RETURN PIPING CAPPED AND VALVED FOR FUTUR$4,200
2025-01-22Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$800,000
2025-01-16311: Street Sign - Damaged — Other/Unknown
2025-01-14Job filed: RENOVATION ON 3RD FLOOR FOR TENANT-FIT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$85,000
2024
2024-12-30Permit Sidewalk Shed — Signed-off
2024-12-19Permit Plumbing — Signed-off
2024-12-19Permit Sprinklers — Signed-off
2024-12-17Permit Sprinklers — Signed-off
2024-12-17Permit Plumbing — Signed-off
2024-12-16Permit General Construction — Signed-off
2024-12-02Asbestos abatement: Removal — All Restoration Inc.
2024-12-02Asbestos abatement: Removal — All Restoration Inc.
2024-12-02Job filed: RENOVATION TO 4TH FLOOR FOR TENANT FIT-OUT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE TO USE, OCCUPANCY, AND EGRESS.$9,111
2024-12-02Job filed: RENOVATION OF 4TH FLOOR FOR TENANT FIT-OUT, INCLUDING DEMOLITION OF EXISTING PLUMBING AND SPRINKLERS. RECONFIGURATION OF SPRINKLER SYSTEM. NO CHANGE T$53,400
2024-11-27Asbestos abatement: Removal — All Restoration Inc.
2024-11-26Job filed: RENOVATION OF 4TH FLOOR FOR TENANT FIT-OUT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$387,350
2024-10-30Job filed: FACADE INSPECTION AND MINOR RESTORATION
2024-10-29Permit Sprinklers — Signed-off
2024-10-29Permit Plumbing — Signed-off
2024-10-28Permit Plumbing — Signed-off
2024-10-28Permit Sprinklers — Signed-off
2024-10-25Permit Mechanical Systems — Signed-off
2024-10-21Permit General Construction — Signed-off
2024-10-16Job filed: REMOVE EXISTING MECHANICAL EQUIPMENT, ASSOCIATED DUCTWORK, REGISTERS, AND CONTROLS. 3" COLD WATER SUPPLY AND RETURN PIPING CAPPED AND VALVED FOR FUTUR$4,200
2024-10-11Job filed: REMOVE ALL EXISTING PLUMBING FIXTURES, FITTINGS AND ASSOCIATED PIPING AND CAPPED BACK TO EXISTING RISERS. SPRINKLER HEADS AND ASSOCIATED BRANCHES TO B$9,100
2024-10-03Job filed: RENOVATION ON 3RD FLOOR FOR TENANT-FIT, INCLUDING DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$85,000
2024-09-26Permit Structural — Signed-off
2024-09-26Permit General Construction — Signed-off
2024-09-05Job filed: Structural alterations on the 11th thru 14th floors and roof for the removal and replacement of existing cooling towers; related work as per plans.$175,000
2024-07-31Permit General Construction — Permit Issued
2024-07-30Job filed: Facade Restoration
2024-07-15Permit General Construction — Signed-off
2024-06-25Job filed: Roofing replacement above structural deck as per plans filed herewith.$284,500
2024-06-20Boiler inspection
2024-06-20Boiler inspection
2024-06-17ECB CLASS - 2 violation: A.C. 27.929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PRE
2024-06-14Permit Sprinklers — Signed-off
2024-06-14Permit Plumbing — Signed-off
2024-06-11Permit Plumbing — Signed-off
2024-06-11Permit Sprinklers — Signed-off
2024-05-31311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2024-05-31Permit Protection and Mechanical Methods — Permit Issued
2024-05-31DOB complaint, category ?
2024-05-30Permit Supported Scaffold — Signed-off
2024-05-28Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2024-05-24Permit General Construction — Signed-off
2024-05-21Cooling tower inspection
2024-05-21Cooling tower inspection
2024-05-21Cooling tower inspection
2024-05-21Cooling tower inspection
2024-05-21Job filed: FILING FOR AN INTERIOR RENOVATION FOR SUITE 619. INSTALLATION OF NEW NON BEARING FRAMED AND GLASS PARTITIONS. FILING FOR INSTALLATION OF SUSPENDED TIL$49,980
2024-04-30Job filed: PROVIDE SINK ON EXISTING ROUGHING AND RELOCATE EXISTING SPRINKLER HEADS CONNECTED TO EXISTING SPRINKLER RISER FOR 15TH FLOOR OFFICE SPACE. NO CHANGE T$10,500
2024-04-30Job filed: PROVIDE NON-LOAD BEARING PARTITIONS, DOORS, CEILINGS, LIGHTS AND DUCTS TO 15TH FLOOR OFFICE SPACE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, $59,620
2024-01-31311: Indoor Air Quality — Dust from Construction
2024-01-31311: Noise — Noise: Construction Equipment (NC1)
2024-01-29Permit General Construction — Signed-off
2024-01-24Job filed: SP WORK FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$31,750
2024-01-15Job filed: INTERIOR RENOVATION ON THE 34TH AND 35TH FL PH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$30,000
2024-01-11Job filed: FACADE INSPECTION AND MINOR RESTORATION
2024-01-11Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$200,000
2024-01-10Job filed: The design of indoor packaged water source heat pumps with fully ducted distribution, mechanical piping systems and ventilation systems to serve the p$17,200
2024-01-10Job filed: Maintain existing temporary loop during construction of tenant fit-out. New full sprinkler system throughout space tied in to existing tenant valve. N$9,600
2024-01-10Job filed: Demolition of existing interior partitions in commercial space. Removal of one door and fill in with partition.$78,800
2024-01-09Permit Sidewalk Shed — Signed-off
2023
2023-12-27Air permit (CERTIFICATE TO OPERATE), fuel: NONE
2023-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2023-11-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-11-01311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2023-10-31Job filed: SUSPENDED SCAFFOLD AS SHOWN ON PLANS$5,000
2023-10-27Permit General Construction — Signed-off
2023-10-24311: Panhandling — N/A
2023-10-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-09-23311: Panhandling — N/A
2023-08-24Permit Sprinklers — Signed-off
2023-08-22Permit Plumbing — Signed-off
2023-08-22Permit Sprinklers — Signed-off
2023-08-09Eviction executed (SUITE 3400)
2023-07-31Permit Protection and Mechanical Methods — Permit Issued
2023-07-31Job filed: SUSPENDED SCAFFOLD AS SHOWN ON PLANS$5,000
2023-07-26Job filed: Sprinkler alterations at the 1st floor; related work as per plans. No proposed change in building use, egress, or occupancy.$20,000
2023-07-19Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY $5,000
2023-07-17Job filed: SUSPENDED SCAFFOLD AS SHOWN ON PLANS$5,000
2023-06-22Job filed: HEREWITH FILING FOR INSTALLATION OF AC UNITS AND DUCT WORK RELATED TO 10TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$150,000
2023-06-20Permit Mechanical Systems — Signed-off
2023-06-19311: Street Condition — Cave-in
2023-06-08Permit Mechanical Systems — Signed-off
2023-06-08Permit Structural — Signed-off
2023-06-06Job filed: Structural alterations on the 11th thru 14th floors and roof for the removal and replacement of existing cooling towers; related work as per plans.$175,000
2023-06-06Job filed: Plumbing alterations on the 14th thru 16th, 35th thru 36th floors, & roof, and sprinkler alteration on the 14th thru 15th floors for proposed removal $81,500
2023-06-06Job filed: Mechanical systems alterations at the 14th thru 16th, 35th thru 36th floors, & roof level for proposed removal & replacement of cooling towers and rel$2,450,000
2023-06-06Job filed: HEREWITH FILING FOR INSTALLATION OF AC UNITS AND DUCT WORK RELATED TO 10TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$150,000
2023-05-25Permit General Construction — Signed-off
2023-05-25Permit Structural — Signed-off
2023-05-22Facade (LL11) filing, cycle 9: SAFE
2023-05-19Permit Sidewalk Shed — Signed-off
2023-05-13311: Panhandling — N/A
2023-04-25Boiler inspection
2023-04-25Boiler inspection
2023-04-25Permit Protection and Mechanical Methods — Permit Issued
2023-04-25Job filed: SUSPENDED SCAFFOLD AS SHOWN ON PLANS$5,000
2023-04-07Permit Supported Scaffold — Signed-off
2023-04-06Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY $5,000
2023-03-27Job filed: PLUMBING AND SPRINKLER MODIFICATIONS RELATED TO OFFICE RENOVATION FILED UNDER DOB NOW APPLICATION #M00589813. NO CHANGE IN USE EGRESS OR OCCUPANCY$165,000
2023-03-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-03-11Permit Structural — Signed-off
2023-03-11Permit General Construction — Signed-off
2023-03-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-02-17311: Panhandling — N/A
2023-02-17311: Consumer Complaint — Retail Store
2023-01-13Permit Mechanical Systems — Signed-off
2022
2022-12-28Permit General Construction — Signed-off
2022-12-07Permit EW — ISSUED
2022-12-06Job filed: PROPOSE TO INSTALL 22 SPRINKLER HEADS (2ND FLOOR SUITE 210) ON AN EXISTING SPRINKLER SYSTEM AS PER PLANS SUBMITTED HEREWITH.$18,000
2022-12-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022-11-29Job filed: HEREWITH FILE ALTERATION IN ORDER TO DO AN INTERIOR RENOVATION TO AN EXISTING COMMERCIAL SPACE ON UNIT NUMBER 810. TO ERECT INTERIOR PARTITIONS AND T$153,500
2022-11-28Job filed: RENOVATION OF EXISTING OFFICE SPACE. NEW GYPSUM BOARD AND GLASS PARTITIONS. REPLACEMENT OF (1) NEW WINDOW. NEW DROPPED CEILINGS. NO CHANGE TO USE, EGR$277,200
2022-11-23Job filed: PROPOSE TO REPLACE DUCTS, INTAKE FAN, PLENUM, AND LOUVERS TO EXISTING HVAC UNITS ON THE 2ND FLOOR AS PER PLANS SUBMITTED HEREWITH.$25,000
2022-11-16Job filed: FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY$800,000
2022-10-13Eviction executed (SUITE 2903)
2022-10-08Asbestos abatement: Removal — B & G Restoration, Inc.
2022-10-03311: Water System — Hydrant Leaking (WC1)
2022-08-02DOB complaint, category ?
2022-07-20Job filed: RENOVATION TO OFFICE SPACE - MINOR ROOM LAYOUT MODIFICATIONS WITH LIGHTING CHANGES. NO CHANGE IN USE, OCCUPANCY OR EGRESS IN THIS APPLICATION.$84,432
2022-07-12Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2022-06-23311: Indoor Air Quality — Dust from Construction
2022-06-21311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2022-06-15Permit Sidewalk Shed — Signed-off
2022-06-15Job filed: INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.$1,000
2022-05-19311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2022-04-14Job filed: The installation of a new metal railing on the 33rd floor's terrace.$18,000
2022-04-11Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2022-03-29Job filed: Sprinkler system installation in 10th floor office space in connection with existing riser.$24,000
2022-03-28Permit Mechanical Systems — Permit Issued
2022-03-03Cooling tower inspection
2022-03-03Cooling tower inspection
2022-03-03Cooling tower inspection
2022-02-22Permit Sprinklers — Signed-off
2022-02-15Job filed: Sprinkler system installation in 10th floor office space in connection with existing riser.$24,000
2022-02-14Job filed: Mechanical system installation work including 5-ton water cooled heat pump, duct work, condensing water piping, terminal units' installation for compl$25,000
2022-02-11Permit Sprinklers — Signed-off
2022-02-11Permit Plumbing — Signed-off
2022-02-11Permit Sprinklers — Signed-off
2022-02-11Permit Plumbing — Signed-off
2022-02-10Job filed: PLUMBING AND SPRINKLER MODIFICATIONS RELATED TO OFFICE RENOVATION FILED UNDER DOB NOW APPLICATION #M00589813. NO CHANGE IN USE EGRESS OR OCCUPANCY$165,000
2022-01-22Permit General Construction — Signed-off
2021
2021-12-21311: Face Covering Violation — Mandate Not Enforced
2021-10-26Job filed: RENOVATION TO OFFICE SPACE - MINOR ROOM LAYOUT MODIFICATIONS WITH LIGHTING CHANGES. NO CHANGE IN USE, OCCUPANCY OR EGRESS IN THIS APPLICATION.$84,432
2021-10-25Permit Mechanical Systems — Signed-off
2021-10-22Job filed: PLUMBING AND SPRINKLER MODIFICATIONS RELATED TO OFFICE RENOVATION FILED UNDER DOB NOW APPLICATION #M00589813. NO CHANGE IN USE EGRESS OR OCCUPANCY$165,000
2021-10-21Job filed: HEREWITH FILING FOR INSTALLATION OF AC UNITS AND DUCT WORK RELATED TO 10TH FLOOR OFFICE RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY$150,000
2021-10-20311: Noise - Helicopter — Other
2021-10-20Job filed: GENERAL CONSTRUCTION RELATED TO 10 FLOOR OFFICE RENOVATION AND PROVIDE NEW DUNNAGE FOR MECHANICAL UNITS INSTALLED UNDER DOB NOW APPLICATION #M00596747$375,000
2021-08-13Job filed: PROVIDE NEW EXHAUST FANS FOR BATHROOM AND PANTRY FOR OFFICE RENOVATION IN CONJUCTION TO ALT 2 APPLICATION #140974747, M00421694-I1(SP), M00421766-I1 ($65,000
2021-08-02311: Food Poisoning — 1 or 2
2021-07-27Permit EW — ISSUED
2021-07-21Elevator permit: DISMANTLE DUMBWAITERS AS PER SECTION 8.11.1.4.1.2OF ASME A17.1/2000 WITH SUPPLEMENTS A17.1a-2002 and A17.1b 2003 ADDENDUM AS MODIF$9,000
2021-07-09Job filed: Plumbing modifications as per plans. No change in use, egress and occupancy.$34,000
2021-06-24Job filed: INSTALL NEW LP GAS SERVICE, NEW LP GAS LINE, NEW GAS METER, NEW GAS BOOSTER (2) NEW GAS TRAINS. RECONNECT EXISTING HOUSE SERVICE. EXISTING BOILERS/BUR$100,000
2021-06-21Permit EW — ISSUED
2021-06-14Permit Sprinklers — Signed-off
2021-06-14Permit Plumbing — Signed-off
2021-06-14Permit Plumbing — Signed-off
2021-06-14Permit Sprinklers — Signed-off
2021-05-20311: Taxi Complaint — Driver Complaint - Non Passenger
2021-05-17Job filed: 85 NEW PROPOSED SPRINKLER HEADS TO BE CONNECTED TO EXISTING SPRINKLER RISER FOR A RENOVATED OFFICE SPACE, IN CONJUCTION TO ALT 2 APPLICATION #14097474$39,500
2021-05-06Job filed: INSTALL NEW LP GAS SERVICE, NEW LP GAS LINE, NEW GAS METER, NEW GAS BOOSTER (2) NEW GAS TRAINS. RECONNECT EXISTING HOUSE SERVICE. EXISTING BOILERS/BUR$100,000
2021-04-13Permit Mechanical Systems — Signed-off
2021-04-05Boiler inspection
2021-04-05Boiler inspection
2021-03-26Job filed: MECHANICAL WORK FOR OFFICE RENOVATIONS AS PER PLANS FILED HEREWITH.$250,002
2021-03-26Job filed: PLUMBING AND SPRINKLER WORK FOR OFFICE RENOVATIONS.$53,300
2021-03-24Permit EW — ISSUED
2021-03-22311: Homeless Person Assistance
2021-03-19Asbestos abatement: Removal — ESG, Inc.
2021-03-19Asbestos abatement: Removal — ESG, Inc.
2021-03-19Asbestos abatement: Removal — ESG, Inc.
2021-03-19Asbestos abatement: Removal — ESG, Inc.
2021-03-19Asbestos abatement: Removal — ESG, Inc.
2021-03-19Asbestos abatement: Removal — ESG, Inc.
2021-03-09311: Homeless Person Assistance
2021-03-09Permit Sidewalk Shed — Signed-off
2021-03-08Permit EW — ISSUED
2021-02-08Permit Plumbing — Signed-off
2021-02-01311: Water System — Possible Water Main Break (Use Comments) (WA1)
2021-01-30311: Water System — Leak (Use Comments) (WA2)
2021-01-22Permit EW — ISSUED
2021-01-15Permit Sprinklers — Signed-off
2021-01-14Permit Mechanical Systems — Signed-off
2020
2020-12-29Asbestos abatement: Removal — ESG, Inc.
2020-12-29Asbestos abatement: Removal — ESG, Inc.
2020-12-29Asbestos abatement: Removal — ESG, Inc.
2020-12-24311: NonCompliance with Phased Reopening — Business not in compliance
2020-12-16Certificate of occupancy Temporary
2020-12-08Job filed: Plumbing modifications as per plans. No change in use, egress and occupancy.$34,000
2020-12-03Job filed: MODIFY EXISTING SPRINKLER SYSTEM AS PER PLANS.$28,600
2020-12-03Job filed: RENOVATIONS TO 14TH FL OFFICE ON THE 13TH STORY, INTERIOR PARTITIONS AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$250,000
2020-12-03Job filed: RENOVATIONS TO 14TH FL OFFICE ON THE 13TH STORY, INTERIOR PARTITIONS AND CEILINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$250,000
2020-11-24Job filed: RENOVATION OF A PREVIOUSLY GUTTED OFFICE SPACE ON THE 10TH FLOOR. WORK TO INCLUDE PARTITIONS, WALLS AND RELATED FINISHES,HVAC MODIFICATIONS AS REQUIRE$118,600
2020-11-24Job filed: RENOVATION OF A PREVIOUSLY GUTTED OFFICE SPACE ON THE 10TH FLOOR. WORK TO INCLUDE PARTITIONS, WALLS AND RELATED FINISHES,HVAC MODIFICATIONS AS REQUIRE$118,600
2020-11-13Permit Sprinklers — Signed-off
2020-11-13Permit Plumbing — Signed-off
2020-11-10Permit EW — ISSUED
2020-11-06Permit Mechanical Systems — Signed-off
2020-11-05DOB violation E:
2020-11-05DOB violation E:
2020-11-05DOB violation E:
2020-11-04Job filed: new plumbing fixtures and piping for office renovation on 10 floor in conjunction to Alt 2 filing 140974747, M00421767-I1 (MH) work type, andM00421694$10,000
2020-11-04Job filed: PROVIDE NEW EXHAUST FANS FOR BATHROOM AND PANTRY FOR OFFICE RENOVATION IN CONJUCTION TO ALT 2 APPLICATION #140974747, M00421694-I1(SP), M00421766-I1 ($65,000
2020-11-04Job filed: 85 NEW PROPOSED SPRINKLER HEADS TO BE CONNECTED TO EXISTING SPRINKLER RISER FOR A RENOVATED OFFICE SPACE, IN CONJUCTION TO ALT 2 APPLICATION #14097474$39,500
2020-11-03Job filed: GENERAL CONSTRUCTION MODIFICATION OF 10TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH M00421766$551,000
2020-09-30311: NonCompliance with Phased Reopening — Business not in compliance
2020-09-29Permit EW — ISSUED
2020-09-25Permit Plumbing — Signed-off
2020-09-24Permit EW — ISSUED
2020-09-24Job filed: INSTALL NEW LP GAS SERVICE, NEW LP GAS LINE, NEW GAS METER, NEW GAS BOOSTER (2) NEW GAS TRAINS. RECONNECT EXISTING HOUSE SERVICE. EXISTING BOILERS/BUR$100,000
2020-09-23Permit Sidewalk Shed — Signed-off
2020-09-23Job filed: INSTALL NEW CHIMNEY LINER. EXISTING BOILERS/BURNERS PREVIOUSLY FILED UNDER DOB 122890185. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.$155,000
2020-09-23Job filed: INSTALL NEW CHIMNEY LINER. EXISTING BOILERS/BURNERS PREVIOUSLY FILED UNDER DOB 122890185. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.$155,000
2020-09-22Certificate of occupancy Temporary
2020-09-22Job filed: PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, $15,000
2020-07-28Asbestos abatement: Removal — ETS Contracting, Inc.
2020-07-20Certificate of occupancy Temporary
2020-07-13ECB CLASS - 2 violation: AC 27-929 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINLERS AND FILE A FINAL SPRINKLER REPORT PREPARED
2020-06-29Permit Mechanical Systems — Signed-off
2020-06-29Permit Mechanical Systems — Signed-off
2020-06-18311: NonCompliance with Phased Reopening — Business not in compliance
2020-06-15311: Non-Emergency Police Matter — Face Covering Violation
2020-06-08311: NonCompliance with Phased Reopening — Business not allowed to be open
2020-06-05Permit EW — ISSUED
2020-06-05Job filed: REMOVAL OF HVAC EQUIPMENT, ROOF REPLACEMENT, STRUCTURAL INFILL OF SLABS, STAIR CLOSURE, WORK TO INCLUDE MISCELLANEOUS MASONRY REPAIRS AND INTERIOR PAR$162,300
2020-06-01Certificate of occupancy Temporary
2020-05-21311: Non-Emergency Police Matter — Social Distancing
2020-05-19311: Non-Emergency Police Matter — Face Covering Violation
2020-04-28311: Non-Emergency Police Matter — Face Covering Violation
2020-04-16Boiler inspection
2020-04-16Boiler inspection
2020-04-01311: Street Light Condition — Lamppost Base Door/Cover Open
2020-03-29Permit Mechanical Systems — Signed-off
2020-03-25Job filed: Job filed to replace the existing duct work of the existing range hood exhaust system at the rear side of the building (North East Facade), no change $40,000
2020-03-18Certificate of occupancy Temporary
2020-03-17Job filed: INTERIOR DEMOLITION - REMOVAL OF NON LOAD BEARING INTERIOR WALLS, FINISHES AND RELATED CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN$46,800
2020-03-17Job filed: INTERIOR DEMOLITION - REMOVAL OF NON LOAD BEARING INTERIOR WALLS, FINISHES AND RELATED CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN$46,800
2020-03-04Certificate of occupancy Temporary
2020-02-14311: Water Conservation — Water Meter Stolen/Missing - Other (CLO)
2020-02-14Permit EW — ISSUED
2020-02-03Permit Sprinklers — Signed-off
2020-02-03Permit Plumbing — Signed-off
2020-01-31Permit Plumbing — Signed-off
2020-01-31Permit Sprinklers — Signed-off
2020-01-24Job filed: HEREWITH FILING FOR THE INSTALLATION OF 2 NEW CONDENSING UNITS ON THE ROOF AND 14 NEW AIR HANDLING UNITS ON THE 32ND FLOOR. NO CHANGE IN USE, EGRESS, $99,688
2020-01-22Cooling tower inspection
2020-01-22Cooling tower inspection
2020-01-22Cooling tower inspection
2020-01-22311: Water System — Possible Water Main Break (Use Comments) (WA1)
2020-01-14Permit EW — ISSUED
2020-01-08Certificate of occupancy Temporary
2019
2019-12-31Permit Sprinklers — Permit Issued
2019-12-30Job filed: Mechanical work filed in conjunction with office renovation as per plans filed herewith.$40,000
2019-12-30Job filed: plumbing and sprinkler work filed in conjunction with office renovation as per plans filed herewith$49,494
2019-12-20Job filed: RENOVATION OF EXISTING OFFICE SPACE ON THE 31ST FLOOR. WORK TO INCLUDE NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION AND WINDOW REPLACEMENT. NO CHAN$291,000
2019-12-05Certificate of occupancy Temporary
2019-11-25Permit Sprinklers — Permit Issued
2019-11-22311: Homeless Person Assistance — N/A
2019-11-20311: Lost Property — Bag/Wallet
2019-11-20Permit EW — ISSUED
2019-11-19311: Homeless Person Assistance — N/A
2019-11-15ECB CLASS - 2 violation: AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED $1,250
2019-11-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-23DOB violation E:
2019-10-23DOB violation E:
2019-10-23DOB violation E:
2019-10-17Permit EW — ISSUED
2019-10-17Permit EW — ISSUED
2019-10-16Permit EW — ISSUED
2019-10-16Permit Mechanical Systems — Permit Issued
2019-10-15311: Homeless Person Assistance — N/A
2019-10-10Job filed: GENERAL CONSTRUCTION ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$1,900,000
2019-10-10Job filed: GENERAL CONSTRUCTION ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$1,900,000
2019-10-09Permit Mechanical Systems — Signed-off
2019-10-08Permit PL — ISSUED
2019-09-27Permit EW — ISSUED
2019-09-27Permit EW — ISSUED
2019-09-23Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $14,400
2019-09-23Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $7,200
2019-09-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-06Job filed: HEREWITH FILING FOR THE INSTALLATION OF 2 NEW CONDENSING UNITS ON THE ROOF AND 14 NEW AIR HANDLING UNITS ON THE 32ND FLOOR. NO CHANGE IN USE, EGRESS, $99,688
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-21Certificate of occupancy Temporary
2019-08-21Job filed: sprinkler modifications on the 10th floor per plans filed herewith. no changes in use, egress or occupancy.$84,795
2019-08-21Job filed: plumbing modifications on the 10th floor per plans filed herewith. no changes in use, egress or occupancy.$83,858
2019-08-21Job filed: mechanical changes on the 10th floor as per plans filed herewith. no changes in use, egress or occupancy.$179,896
2019-08-19Eviction executed (* ##)
2019-08-10311: Homeless Person Assistance — N/A
2019-07-24Permit EW — ISSUED
2019-07-22Facade (LL11) filing, cycle 8: SAFE
2019-07-05311: Homeless Person Assistance — N/A
2019-06-28Permit EW — ISSUED
2019-06-27Job filed: INSTALLATION OF NEW SPRINKLER PIPING AND HEAD IN COMPLIANCE OF LOCAL LAW 22 OF 2004 AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND$822,250
2019-06-11311: Homeless Person Assistance
2019-06-11Job filed: MODIFICATIONS TO EXISTING PUBLIC BATHROOMS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$310,000
2019-05-24Job filed: FILING FOR 10TH FLOOR A/C SYSTEM INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$365,000
2019-05-22Certificate of occupancy Temporary
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-20DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2019-05-09311: Homeless Person Assistance
2019-05-08Certificate of occupancy Temporary
2019-05-07311: Homeless Person Assistance
2019-04-29311: Homeless Person Assistance
2019-04-23Boiler inspection
2019-04-23Boiler inspection
2019-04-05DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
2019-01-29Elevator permit: Filing PAA Installing new Cwt buffers. The new CWT buffers is a reduce stroke buffers 22 with an engaging speed of 600 fpm. New $410,000
2019-01-22Cooling tower inspection
2019-01-22Cooling tower inspection
2019-01-22Cooling tower inspection
2018
2018-12-18DOB violation E:
2018-12-18DOB violation E:
2018-12-18DOB violation E:
2018-12-18DOB violation E:
2018-12-18DOB violation E:
2018-12-17311: Vending — In Prohibited Area
2018-12-06311: Other Enforcement — E3B Sidewalk Obstruction
2018-05-08Elevator permit: Filing PAA Installing new Cwt buffers. The new CWT buffers is a reduce stroke buffers 22 with an engaging speed of 600 fpm. New $410,000
2018-04-19Permit EW — ISSUED
2018-04-19Permit EW — ISSUED
2018-04-04Elevator permit: INSTALLING SYSTEM TO MONITOR AND PREVENT AUTOMATIC OPERATION OF ELEVATOR WITH FAULTY DOOR CONTACTS CIRCUIT AS PER APPENDIX K3-3.1$16,000
2018-02-26311: Street Condition — Plate Condition - Shifted
2018-02-25311: Street Condition — Pothole
2018-02-25311: Street Condition — Pothole
2018-02-16311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2018-02-16ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING EXTERIOR BUILDING WALLS AND APPURTENANCES.NOTED:AT W 47 ST SIDE EXTERIOR WALL,OBSERVED MISSING SECTIO$250
2018-01-01311: Sanitation Condition — 15 Street Cond/Dump-Out/Drop-Off
2017
2017-12-15Certificate of occupancy Temporary
2017-11-16Permit EW — ISSUED
2017-11-06Certificate of occupancy Temporary
2017-10-13Job filed: REMOVAL AND INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,500
2017-10-13Job filed: REMOVAL AND INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,500
2017-09-15DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2017-08-16311: Illegal Parking — Unauthorized Bus Layover
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-14Permit EW — ISSUED
2017-08-14Job filed: REPLACEMENT (1) NEW 8,000 GALLON FUEL OIL STORAGE TANK IN SAME 3HR ENCLOSURE AS PREVIOUSLY EXISTING. REMOVE EXISTING 10,000 AND 5,000 GALLON STORAGE T$146,000
2017-08-10Boiler inspection
2017-08-10Boiler inspection
2017-08-10311: Other Enforcement — E10 Street Obstruction
2017-08-09Permit PL — ISSUED
2017-08-09Permit EW — ISSUED
2017-08-03Permit EW — ISSUED
2017-08-02Certificate of occupancy Temporary
2017-07-25Certificate of occupancy Temporary
2017-07-14Job filed: REMOVAL OF INTERIOR PARTITIONS. CAP AND REMOVAL OF FIXTURES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$186,696
2017-07-14Job filed: REMOVAL OF INTERIOR PARTITIONS. CAP AND REMOVAL OF FIXTURES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$186,696
2017-07-05Permit EW — ISSUED
2017-06-22311: Water System — Hydrant Leaking (WC1)
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005153 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$1,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005152 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$2,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005148 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$1,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005150 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$1,000
2017-06-20ECB CLASS - 2 violation: FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005151 HASBEEN INSPECTED,TESTED,AND DISINFECTED AND THAT A MAINTENANCE$1,000
2017-06-12311: Noise — Noise: Construction Equipment (NC1)
2017-02-06Job filed: INSTALLATION OF A TEMPORARY FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHAPTER 3
2017-01-31Permit EW — ISSUED
2017-01-31Permit EW — ISSUED
2017-01-30Permit AL — RE-ISSUED
2017-01-19Job filed: INSTALLATION OF MANUAL AND AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION.$22,200
2017-01-17FDNY inspection (STRUC_INT)
2017-01-14FDNY inspection (CDA-90-DRILL)
2017-01-12Eviction executed (*)
2017-01-12Eviction executed (*)
2017-01-05Permit EQ — ISSUED
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-06Permit EW — ISSUED
2016-12-06Permit EW — ISSUED
2016-12-02Permit EW — ISSUED
2016-11-23Permit EW — ISSUED
2016-11-23Permit EW — ISSUED
2016-11-23Permit EW — ISSUED
2016-11-21Job filed: MODIFY EXISTING SPRINKLER SYSTEM FOR NEW TENANT SEPHORE ON 1 & 2ND FLOORS AND CONNECT TO EXISTING SYSTEM.$146,400
2016-11-21Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY__FLOORS 1-12 & 13 CONSTRUCTION / 14 $50,000
2016-11-21Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY__FLOORS 1-12 & 13 CONSTRUCTION / 14 $50,000
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-02Permit EQ — ISSUED
2016-11-02Permit EQ — ISSUED
2016-11-01Job filed: PROPOSED INSTALLATION OF BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-11-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. HOIST WILL BE ATTACHED TO THE SCAFFOLD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-11-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. HOIST WILL BE ATTACHED TO THE SCAFFOLD. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-11-01Job filed: PROPOSED INSTALLATION OF BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-28Permit EQ — ISSUED
2016-10-28Permit EQ — ISSUED
2016-10-27Job filed: PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-27Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-27Job filed: PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-27Job filed: PROPOSED INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-27Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016-10-17Permit PL — ISSUED
2016-10-12Permit EW — ISSUED
2016-10-11Permit EW — ISSUED
2016-10-07Rodent inspection: Passed
2016-09-28Permit EW — ISSUED
2016-09-28Permit EQ — ISSUED
2016-09-28Permit EW — ISSUED
2016-09-16311: Homeless Person Assistance — N/A
2016-09-16311: Homeless Person Assistance — N/A
2016-09-16Permit EW — ISSUED
2016-09-16Permit EW — ISSUED
2016-09-16Permit EW — ISSUED
2016-09-16Job filed: FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$222,200
2016-09-15Job filed: REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) NEW LP BOILERS. OIL ONLY AT THIS TIME. RAISE CONCRETE BLOCK WALL IN OIL TANK ROOM UP TO CEILING$33,000
2016-09-14Rodent inspection: Failed for Other Reason
2016-08-19Job filed: MECHANICAL AND PLUMBING WORK ASSOCAITED NEW TENANT BUILD OUT FOR SEPHORA. APPLICATION FILED IN CONJUNTION WITH BUILD OUT APPLICATION 122830981$140,000
2016-08-18Job filed: INSTALL AWNING FOR NEW TENANT "SEPHORA". NO CHANGE IN EGRESS, USE OR OCCUPANCY.$15,000
2016-08-18DOB complaint, category ?
2016-08-18Job filed: STRUCTURAL WORK ASSOCIATED WITH INSTALLATION OF AWNING FOR NEW TENANT SEPHORA. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$5,000
2016-08-15Job filed: REMOVE/INSTALL NON LOAD BEARING PARTITIONS, FLOORING, CEILINGS, FINISHES AND MODIFY EXISTING STOREFRONT, OPENING FOR ELEVATOR TO ACCOMMODATE NEW TENAN$574,280
2016-08-15Job filed: STRUCTURAL WORK ASSOCIATED WITH TENANT BUILD OUT FOR SEPHORA. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$50,000
2016-08-15Job filed: REMOVE/INSTALL NON LOAD BEARING PARTITIONS, FLOORING, CEILINGS, FINISHES AND MODIFY EXISTING STOREFRONT, OPENING FOR ELEVATOR TO ACCOMMODATE NEW TENAN$574,280
2016-08-15Job filed: REMOVE/INSTALL NON LOAD BEARING PARTITIONS, FLOORING, CEILINGS, FINISHES AND MODIFY EXISTING STOREFRONT, OPENING FOR ELEVATOR TO ACCOMMODATE NEW TENAN$574,280
2016-07-20Agreement — from PRINCIPAL LIFE INSURANCE COMPANY to SEPHORA USA, INC.
2016-07-20Agreement $125,000,000 — from FORTY SEVENTH FIFTH COMPANY LLC to PRINCIPAL LIFE INSURANCE COMPANY$125,000,000
2016-07-20Mortgage $65,000,000 — from FORTY SEVENTH FIFTH COMPANY LLC to PRINCIPAL LIFE INSURANCE COMPANY$65,000,000
2016-07-20Mortgage assigned — from THE PRUDENTIAL INSURANCE COMPANY OF AMER to PRINCIPAL LIFE INSURANCE COMPANY
2016-07-20TL&R — from THE PRUDENTIAL INSURANCE COMPANY OF AMER to FOURTY SEVENTH FIFTH COMPANY LLC
2016-07-11311: Indoor Air Quality — Dust from Construction
2016-07-11311: Indoor Air Quality — Dust from Construction
2016-07-11311: Homeless Person Assistance — N/A
2016-07-08311: Homeless Person Assistance — N/A
2016-07-08ECB CLASS - 2 violation: FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE.AT TIME OF INS PECTION OBSERVED WORKERS WORKING OUTSIDE BUILDING.NO PLANS O
2016-07-07311: Homeless Person Assistance — N/A
2016-07-01311: Homeless Person Assistance — N/A
2016-06-30311: Homeless Person Assistance — N/A
2016-06-29311: Homeless Person Assistance — N/A
2016-06-28Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AS PER PLANS (HARRY WINSTON) NO CHANGE TO USE EGRESS OR OCCUPANCY.$21,500
2016-06-28Job filed: INSTALLATION OF GAS DETECTION SYSTEM AS PER PLANS (HARRY WINSTON). NO CHANGE TPUSE EGRESS OR OCCUPANCY.$20,000
2016-06-28Job filed: INSTALLATION OF GAS DETECTION SYSTEM AS PER PLANS (HARRY WINSTON). NO CHANGE TPUSE EGRESS OR OCCUPANCY.$20,000
2016-06-28Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AS PER PLANS (HARRY WINSTON) NO CHANGE TO USE EGRESS OR OCCUPANCY.$21,500
2016-06-25311: Homeless Person Assistance — N/A
2016-06-24311: Homeless Person Assistance — N/A
2016-06-24Permit EW — ISSUED
2016-06-24Permit EW — ISSUED
2016-06-24Permit EW — ISSUED
2016-06-23311: Homeless Person Assistance — N/A
2016-06-20311: Noise — Noise: Construction Before/After Hours (NM1)
2016-06-16DOB complaint, category ?
2016-06-10311: Homeless Person Assistance — N/A
2016-06-09311: Homeless Person Assistance — N/A
2016-06-07311: Homeless Person Assistance — N/A
2016-06-07Permit EW — ISSUED
2016-06-06311: Homeless Person Assistance — N/A
2016-06-03FDNY inspection (COMPLAINT)
2016-06-03FDNY inspection (COMPLAINT)
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-05-31Permit PL — ISSUED
2016-05-31Permit EW — ISSUED
2016-05-29311: Homeless Person Assistance — N/A
2016-05-28311: Sidewalk Condition — Blocked - Construction
2016-05-25Permit EW — ISSUED
2016-05-25Permit EW — RE-ISSUED
2016-05-25Permit EW — ISSUED
2016-05-23311: Homeless Person Assistance — N/A
2016-05-13311: Homeless Person Assistance — N/A
2016-05-13Permit PL — ISSUED
2016-05-06311: Non-Emergency Police Matter — Other (complaint details)
2016-05-05311: Indoor Air Quality — Dust from Construction
2016-05-04FDNY inspection (CDA-90-DRILL)
2016-04-28311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2016-04-26311: Homeless Person Assistance — N/A
2016-04-22311: Homeless Person Assistance — N/A
2016-04-22311: Homeless Person Assistance — N/A
2016-04-16311: Homeless Person Assistance — N/A
2016-04-08Permit EW — ISSUED
2016-04-08Permit EW — ISSUED
2016-04-07311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2016-04-04FDNY inspection (CDA-90-DRILL)
2016-04-04311: Homeless Encampment — N/A
2016-03-31311: Homeless Person Assistance — N/A
2016-03-29Permit PL — ISSUED
2016-03-29Permit EW — ISSUED
2016-03-25Permit EW — ISSUED
2016-03-25Permit PL — ISSUED
2016-03-23311: Noise — Noise: Construction Before/After Hours (NM1)
2016-03-23Permit PL — ISSUED
2016-03-22311: Noise — Noise: Jack Hammering (NC2)
2016-03-09311: Street Condition — Plate Condition - Shifted
2016-03-09Permit EW — ISSUED
2016-02-25Permit EW — ISSUED
2016-02-23Permit EW — ISSUED
2016-02-23Permit EW — ISSUED
2016-02-23Permit EW — ISSUED
2016-02-09Permit EQ — ISSUED
2016-02-09Permit AL — ISSUED
2016-02-04Permit EW — ISSUED
2016-02-04Permit EW — ISSUED
2016-02-04Permit EW — ISSUED
2016-01-28DOB violation C:
2016-01-09FDNY inspection (CDA-90-DRILL)
2016-01-06311: Water System — NO WATER - WNW
2016-01-06311: Non-Residential Heat — Inadequate or No Heat
2016-01-05311: Non-Residential Heat — Inadequate or No Heat
2016-01-05311: Non-Residential Heat — Inadequate or No Heat
2015
2015-12-16ECB CLASS - 1 violation: BC3303.8.1.5 STANDPIPE DUAL SYSTEM.@ TIME OF INSPECTION STANDPIPE CONNECTION TO SPRINKLER SYSTEM IS BEING MODIFIED.NO LOGS,NO WRIT$1,600
2015-12-16Permit EQ — ISSUED
2015-12-16Job filed: PROPOSED FENCE INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015-12-03Permit EW — ISSUED
2015-11-25311: For Hire Vehicle Complaint — Driver Complaint
2015-11-16Permit AL — ISSUED
2015-11-10Permit EW — ISSUED
2015-11-10Permit EW — ISSUED
2015-11-10Permit EW — ISSUED
2015-11-06Permit EQ — ISSUED
2015-11-05Permit EW — ISSUED
2015-11-05Permit EW — ISSUED
2015-10-31DOB violation C: BORTO-COMM
2015-10-29Permit EW — ISSUED
2015-10-29Permit EW — ISSUED
2015-10-29Permit EW — ISSUED
2015-10-29Permit EW — ISSUED
2015-10-27DOB complaint, category ?
2015-10-19311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-10-19ECB CLASS - 1 violation: WORK WITHOUT A PERMIT EXPIRED PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED WORK IN PROGRESS RENOVATION OF LOBBY AND PERMIT #12192480$800
2015-10-19DOB complaint, category ?
2015-10-06Permit PL — ISSUED
2015-10-05DOB violation E:
2015-10-05DOB violation E:
2015-10-05DOB violation E:
2015-10-03DOB violation E:
2015-10-03DOB violation E:
2015-10-02DOB violation E:
2015-10-02DOB violation E:
2015-09-21ECB CLASS - 2 violation: 28-317.3 FAILURE TO REGISTER COOLING TOWER. RMDY:COMPLY W/CODE
2015-09-18DOB complaint, category ?
2015-09-16311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-09-16311: Construction Safety Enforcement — Interior Demo Tracking Complaint
2015-09-16ECB CLASS - 1 violation: FAILURE TO COMPLY W/NYC FIRE CODE. NO PERMIT FOR STORAGE OF OXYGEN & ACETYLENE OBSERVED ON MEZZENINE LEVEL AT JOB SITE. NOTE BLDG $2,400
2015-09-16ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED PLANS & APPLICATION. DEMO IN PROGRESS CHIPPING SLAB OF 2ND FL SEQUENCE PROVIDED BY ENGINEER ON T$1,000
2015-09-16ECB CLASS - 2 violation: SEC. 28-105.1 WORK W/O PERMITS-EXPIRED PERMIT NOTE WORK IN PROGRESS UNDER PERMIT #122135796 EXPIRED 9/9/15 DEMO OF 2ND FL IN PROGR$400
2015-09-16ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS & PRPERTY AFFECTED BY CONSTRUCTION OPERATION USE OF TEMPORARY SAFETY EQUIPMENT & SAFETY LANYARDS-$1,200
2015-09-16DOB complaint, category ?
2015-09-16DOB complaint, category ?
2015-07-27FDNY inspection (CDA-90-DRILL)
2015-06-23311: Construction Safety Enforcement — SST Tracking Complaint
2015-06-23DOB complaint, category ?
2015-06-19ECB CLASS - 1 violation: 3314.8 THE OPEN SIDES AND ENDS OF SCAFFOLD PLATFORMS SHALL BE PROVIDED WITH A GUARDRAIL SYSTEM.NOTED:@ THE TIME OF INSP.THE SCAFFO$1,600
2015-06-19ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO CD5.NOTED:AT TIME OF INSP.ANCHOR PLATE ON CD5 SHOW 10"LONG THE ANCHOR PLATE IS ABOUT 24"LONG SHOULD BE 8"
2015-06-19ECB CLASS - 2 violation: PSWO ALL EXTERIOR WORK.WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.NOTED:AT TIME OF INSP.THERE ARE NO DETAIL SHOW 3"S
2015-06-15Permit EW — ISSUED
2015-06-15Permit EW — ISSUED
2015-06-15Permit PL — ISSUED
2015-06-12Permit EW — ISSUED
2015-06-10DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
2015-06-09Permit EW — ISSUED
2015-06-09Permit EW — ISSUED
2015-06-05Permit EW — ISSUED
2015-06-05Job filed: CLASS E MODIFICATION OF 21ST FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2015-06-05Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS (HARRY WINSTON.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,250,000
2015-06-05Job filed: MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM AS PER PLANS (HARRY WINSTON.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$57,592
2015-06-05Job filed: MINOR DEMOLITION. INSTALLATION OF NEW PARTITIONS, DOORS, SUSPENDED CEILINGS, FLOORING AND FINISHES AS PER PLANS (HARRY WINSTON.) NO CHANGE TO USE, EGR$1,122,000
2015-06-05Job filed: GENERAL CONSTRUCTION MODIFICATION OF 21ST FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$297,900
2015-06-05Job filed: MODIFICATIONS TO THE EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS (HARRY WINSTON.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$2,250,000
2015-06-05Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS (HARRY WINSTON.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2015-06-05Job filed: MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM AND INSTALLATION OF PREACTION SYSTEM DRY VALVE AS PER PLANS (HARRY WINSTON) NO CHAGE TO USE, EGRESS OR $100,000
2015-06-05Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS (HARRY WINSTON.) NO CHANGE TO USE, EGRESS OR OCCUPANCY.$25,000
2015-06-05Job filed: GENERAL MECHANICAL AND SPRINKLER MODIFICATIONS ON 21ST FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$164,000
2015-06-01Permit AL — ISSUED
2015-05-29311: Food Establishment — Food Temperature
2015-05-07Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SITE: FLAGSHIP RETAIL$15,000
2015-05-06Permit EQ — ISSUED
2015-04-24Permit EW — ISSUED
2015-04-24Permit EW — ISSUED
2015-04-20FDNY inspection (ALT)
2015-04-20Job filed: CLASS E MODIFICATION OF 22ND FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,500
2015-04-17Permit EW — ISSUED
2015-04-17Permit EQ — ISSUED
2015-04-17Permit EW — ISSUED
2015-04-17Job filed: GENERAL MECHANICAL AND SPRINKLER MODIFICATIONS ON 22ND FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$119,260
2015-04-17Job filed: GENERAL CONSTRUCTION MODIFICATION OF 22ND FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$143,080
2015-04-13311: Smoking — Smoking Violation
2015-04-13Permit EQ — ISSUED
2015-04-13Permit AL — ISSUED
2015-03-20311: Food Establishment — Ventilation
2015-03-16RPTT&RET $725,936 — from CHOCONYZ INC. to FORTY SEVENTH FIFTH COMPANY, LLC$725,936
2015-03-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-03-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-03-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-03-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-03-11DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015-03-06Agreement — from PRUDENTIAL INSURANCE COMPANY OF AMERICA to SEPHORA USA, INC
2015-03-02311: Water System — Excessive Water In Basement (WEFB)
2015-02-27311: Water System — Excessive Water In Basement (WEFB)
2015-02-24311: Water System — Leak (Use Comments) (WA2)
2015-02-20311: Water System — Leak (Use Comments) (WA2)
2015-02-18311: Water System — Hydrant Leaking (WC1)
2015-02-17311: Water System — Leak (Use Comments) (WA2)
2015-01-21Permit EW — ISSUED
2015-01-20311: Smoking — Smoking Violation
2015-01-13311: Consumer Complaint — Unlicensed
2015-01-12Job filed: INSTALLATION OF NEW TEMPORARY FACADE ENCLOSURE
2014
2014-12-30Permit EW — ISSUED
2014-12-30Permit EW — ISSUED
2014-12-29311: Construction Safety Enforcement — SST Tracking Complaint
2014-12-29Permit EW — ISSUED
2014-12-29Permit EW — ISSUED
2014-12-29Permit EW — ISSUED
2014-12-29Permit EW — ISSUED
2014-12-29DOB complaint, category ?
2014-12-17311: Construction Safety Enforcement — SST Tracking Complaint
2014-12-17ECB CLASS - 1 violation: 3314.PARTIAL STOP WORK ODER FOR SUPPORTED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED @ PREMISES UNSAFE CONDITIONS.NOTE:PIPE S$1,630
2014-12-17ECB CLASS - 1 violation: 3314.15.2 PARTIAL WORK ORDER FOR SUSPENDED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED @ PREMISES STIRRUPS LOCATION.NOTE:SUSPE$1,630
2014-12-17ECB CLASS - 2 violation: PARTIAL STOP WORK ORDER FOR SUSPENDED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED @ PREMISES WORK DOES NOT CONFORM TO APPROVE $530
2014-12-17DOB complaint, category ?
2014-12-09Job filed: FIRE PROTECTION PLAN.$1,000
2014-12-09Job filed: FIRE PROTECTION PLAN.$1,000
2014-12-08311: Construction Safety Enforcement — Best - Low-Rise Tracking Complaint
2014-12-08ECB CLASS - 1 violation: SEC. 3301.7 DESIGN DRAWING REQUIRED BY CHAPTER 33. AT TIME OF INSPECTION OBSERVED,PLATFORM CONSTRUCTED ON THE 30TH FL AT EXPOSURES$1,600
2014-12-08ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AT TIME OF INSPECTION OBSERVED,WORK DOES NOT CON$1,030
2014-12-08ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION OBSERVED SIDEWALK SHED AT E$2,430
2014-12-08DOB complaint, category ?
2014-12-03Job filed: PROPOSED FENCE INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-11-07Job filed: PROPOSED INSTALLATION OF FENCE AND SIDEWALK SHED AS PER PLANS NO CHANGE IN USE, EGRESS OR OCCUPANCY
2014-11-05Job filed: MODIFICATION TO EXISTING MODIFIED CLASS 'E' SYSTEM AS PER PLANS FILED HEREWITH .$50,000
2014-11-03Job filed: GENERAL STRUCTURAL MODIFICATION OF CELLAR, 1ST, MEZZANINE, 2ND, AND 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH TO ESTABLISH RETAIL AND OFFICE USES.
2014-11-03Job filed: GENERAL CONSTRUCTION MODIFICATION OF CELLAR, 1ST, MEZZANINE, 2ND, AND 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH TO ESTABLISH RETAIL AND OFFICE USES.$2,780,000
2014-11-03Job filed: GENERAL CONSTRUCTION MODIFICATION OF 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$40,000
2014-11-03Job filed: GENERAL MECHANICAL AND PLUMBING MODIFICATION OF CELLAR, 1ST, MEZZANINE, 2ND, AND 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH TO ESTABLISH RETAIL AND OF
2014-11-03Job filed: GENERAL MECHANICAL AND PLUMBING MODIFICATION OF CELLAR, 1ST, MEZZANINE, 2ND, AND 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH TO ESTABLISH RETAIL AND OF
2014-11-03Job filed: GENERAL CONSTRUCTION MODIFICATION OF 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$40,000
2014-11-03Job filed: GENERAL MECHANICAL AND PLUMBING MODIFICATION OF CELLAR, 1ST, MEZZANINE, 2ND, AND 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH TO ESTABLISH RETAIL AND OF
2014-11-03Job filed: GENERAL MECHANICAL, PLUMBING, AND SPRINKLER MODIFICATION ON 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$52,000
2014-11-03Job filed: SPRINKLER MODIFICATION ON CELLAR, 1ST, MEZZANINE, 2ND, AND 3RD FLOOR AS SHOWN ON PLANS FILED HEREWITH.$185,000
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
2014-10-24Permit EW — ISSUED
2014-10-24Permit EW — ISSUED
2014-10-21Job filed: RENOVATION OF 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. (NO CHANGE IN SUE, EGRESS OR OCCUPANCY)$116,000
2014-10-21Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. (NO CHANGE IN USE, EGRESS OR OCCUPANCY)$16,200
2014-10-21Job filed: MODIFICATION TO CLASS E FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$7,500
2014-10-21Job filed: MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2014-10-15Permit PL — ISSUED
2014-10-14Permit PL — ISSUED
2014-10-07DOB violation E:
2014-10-07DOB violation E:
2014-10-07DOB violation E:
2014-10-07DOB violation E:
2014-10-07DOB violation E:
2014-10-07DOB violation E:
2014-10-01Permit EQ — ISSUED
2014-10-01Permit EQ — ISSUED
2014-09-29Job filed: MODIFICATIONS TO EXISTING MODIFIED CLASS E SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2014-09-26Job filed: MECHANICAL, PLUMBING, AND SPRINKLER WORK OF 2ND FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$483,000
2014-09-25Job filed: GENERAL CONSTRUCTION MODIFICATION OF 2ND FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$600,000
2014-09-23Job filed: PROPOSED INSTALLATION OF SCAFFOLD PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-09-23Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-09-23Job filed: PROPOSED INSTALLATION OF SCAFFOLD PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-09-17311: Indoor Air Quality — Dust from Construction
2014-07-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014-06-26Job filed: PROTECTION OF MECHANICAL EQUIPMENT AT GROUND LEVEL AND ROOF PROTECTION DURING THE CONSTRUCTION WORK AS PER PLAN THERE IS NO CHANGE IN USE, EGRESS OR O$4,000
2014-06-26Job filed: PROTECTION OF MECHANICAL EQUIPMENT AT GROUND LEVEL AND ROOF PROTECTION DURING THE CONSTRUCTION WORK AS PER PLAN THERE IS NO CHANGE IN USE, EGRESS OR O$4,000
2014-06-13ECB CLASS - 2 violation: 16B03,34B03.16B03 HOISTWAY DOOR EXCESSIVE GAP 4&1/2"OPENING STRIKE POST TO CAR INSTALL GUARDS.34B03 HOISTWAY SHAFT BEVEL LEDGES OV
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-19Permit EQ — ISSUED
2014-05-17311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2014-05-17DOB complaint, category ?
2014-05-16Permit EW — ISSUED
2014-05-05Permit EW — ISSUED
2014-05-05Permit EW — ISSUED
2014-05-05Permit EW — ISSUED
2014-05-01Job filed: GENERAL CONSTRUCTION MODIFICATION FOR REMOVAL OF NON-LOADING PARTITIONS AS SHOWN ON PLANS FILED HEREWITH.$35,000
2014-05-01Job filed: GENERAL CONSTRUCTION MODIFICATION OF LOBBY AS SHOWN ON PLANS FILED HEREWITH.$35,000
2014-05-01Job filed: PLUMBING & SPRINKLER MODIFICATION FOR REMOVAL OF FIXTURES AS SHOWN ON PLANS FILED HEREWITH.$99,500
2014-05-01Job filed: GENERAL CONSTRUCTION MODIFICATION FOR REMOVAL OF NON-LOADING PARTITIONS AS SHOWN ON PLANS FILED HEREWITH.$99,500
2014-05-01Job filed: GENERAL CONSTRUCTION MODIFICATION FOR REMOVAL OF NON-LOADING PARTITIONS AS SHOWN ON PLANS FILED HEREWITH.$99,500
2014-04-11311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2014-04-10Permit EQ — ISSUED
2014-04-09311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2014-04-09ECB CLASS - 1 violation: FAIL TO HAVE SITE SAFETY MANAGER.NOTE:OBS SUSPENDED RIGS SET-UP @EXP #1(AVE 5) & EXP #2(W11 W 47 ST) W/WORKERS INSIDE.FOREMAN & 3 $1,200
2014-04-09ECB CLASS - 2 violation: EXPIRED PERMIT.NOTE:OBSERVED SIDEWALK SHED ERECTED @EXP #1(5 AVE) & 2(W 47).PERMIT #121413283 EXPIRED 6/28/13.DOB RECORDS SHOW NO
2014-04-09DOB complaint, category ?
2014-04-07311: Food Poisoning — 1 or 2
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-31DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
2014-03-27Permit EW — ISSUED
2014-03-13311: Smoking — Smoking Violation
2014-02-26Job filed: ADDITIONS/MODIFICATION TO AN EXISTING SPRINKLER AND STANDPIPE SYSTEM AS SHOWN ON PLANS FILED HEREWITH.$42,500
2014-02-26Job filed: ADDITIONS/MODIFICATION TO AN EXISTING SPRINKLER AND STANDPIPE SYSTEM AS SHOWN ON PLANS FILED HEREWITH.$42,500
2014-02-26Job filed: MECHANICAL AND PLUMBING WORK OF LOBBY AS SHOWN ON PLANS FILED HEREWITH.$301,500
2014-02-26Job filed: STRUCTURAL WORK OF LOBBY AS SHOWN ON PLANS FILED HEREWITH.$130,000
2014-02-26Job filed: GENERAL CONSTRUCTION MODIFICATION OF LOBBY AS SHOWN ON PLANS FILED HEREWITH.$2,000,000
2014-02-26Job filed: ADDITIONS/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AS SHOWN ON PLANS FILED HEREWITH.$26,000
2014-02-19Permit EW — ISSUED
2014-02-19Permit EW — ISSUED
2014-02-13311: Water System — Leak (Use Comments) (WA2)
2014-02-07Job filed: INSTALLING A SLAB INFILL$56,000
2014-02-07Job filed: DEMOLITION OF PARTITIONS, CEILINGS AND DOORS. REMOVING TWO INTERCONNECTING STAIRS BETWEEN THE FLOORS AND INSTALLING A SLAB INFILL. AS SHOWN ON DRA$48,000
2014-02-07Job filed: INSTALLING A SLAB INFILL$56,000
2014-02-07Job filed: DEMOLITION OF PARTITIONS, CEILINGS AND DOORS. REMOVING TWO INTERCONNECTING STAIRS BETWEEN THE FLOORS AND INSTALLING A SLAB INFILL. AS SHOWN ON DRA$48,000
2014-02-07Job filed: INSTALLING A SLAB INFILL$56,000
2014-02-07Job filed: INSTALL AND RELOCATE SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2014-01-22311: Smoking — Smoking Violation
2013
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-12-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
2013-12-06Permit EW — ISSUED
2013-11-25Job filed: RENOVATION OF EXISTING OFFICE ON THE 21ST AND 22ND FLOORS. .SCOPE OF WORK TO INCLUDE THE REMOVAL OF PARTITIONS, DOORS, CEILINGS, AND FINISHES AS PE$73,800
2013-11-12311: Consumer Complaint — Unlicensed
2013-10-21Permit EQ — ISSUED
2013-10-18Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2013-10-18Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2013-10-18Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2013-10-06311: Water System — Leak (Use Comments) (WA2)
2013-10-01Permit PL — ISSUED
2013-10-01Permit PL — ISSUED
2013-09-15311: Taxi Complaint — Driver Complaint
2013-09-13311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-04-09311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2013-04-09ECB CLASS - 2 violation: SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS. NOTED: NO ACCURATE EMERGENCY CONTACT INFO ON SIGNATE FOR SHED #121413283-01-EQ-SH$2,400
2013-01-08Job filed: RENOVATION OF EXISTING OFFICE ON THE 32ND FLOOR.SCOPE OF WORK TO INCLUDE THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, CEILINGS, AND FINISHES AND$331,500
2012
2012-12-20Rodent inspection: Passed
2012-12-20Job filed: RENOVATION OF EXISTING OFFICE ON THE 32ND FLOOR. SCOPE OF WORK IS FOR THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS,CEILINGS AND PLUMBING WORK AS $48,000
2012-12-20Job filed: RENOVATION OF EXISTING OFFICE ON THE 32ND FLOOR. SCOPE OF WORK IS FOR THE REMOVAL AND INSTALLATION OF PARTITIONS, DOORS,CEILINGS AND PLUMBING WORK AS $48,000
2012-11-07Certificate of occupancy Temporary
2012-10-19Permit EQ — ISSUED
2012-10-17Job filed: INSTALLATION OF 256 L.F HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-27DOB violation E:
2012-09-27DOB violation E:
2012-09-27DOB violation E:
2012-09-26DOB violation E:
2012-09-26DOB violation E:
2012-09-26DOB violation E:
2012-09-17Permit PL — ISSUED
2012-09-17Job filed: INSTALLATION OF 256 L.F HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE
2012-02-02311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2012-01-06Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS SHOWN ON SUBMITTED PLANS$64,200
2012-01-06Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM AS SHOWN ON SUBMITTED PLANS$64,200
2011
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-12-13DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2011-12-12Permit PL — ISSUED
2011-11-25Permit EW — ISSUED
2011-11-17DOB violation E:
2011-11-17DOB violation E:
2011-11-17DOB violation E:
2011-10-18Permit AL — ISSUED
2011-10-18Job filed: ADDITION OF NEW DEVICES TO AN EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM ON THE FIFTH FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS$34,200
2011-10-18Job filed: ADDITION OF NEW DEVICES TO AN EXISTING MODIFIED CLASS E FIRE ALARM SYSTEM ON THE FIFTH FLOOR AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS$34,200
2011-10-11Job filed: INTERIOR RENOVATION FOR EXISTING STORE AT FIRST FLOOR. REMOVE INTERIOR SHEETROCK PARTITIONS. INSTALL CARPET, CUSTOM MADE SHELVING, DISPLAY CASES AND F$19,710
2011-10-11Job filed: INTERIOR RENOVATION FOR EXISTING STORE AT FIRST FLOOR. REMOVE INTERIOR SHEETROCK PARTITIONS. INSTALL CARPET, CUSTOM MADE SHELVING, DISPLAY CASES AND F$19,710
2011-05-25Job filed: INSTALL GAS APPLIANCES PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS.$9,000
2011-05-24311: Other Enforcement — E10 Obstruction (Street/Sidewalk)
2011-05-18Permit EW — ISSUED
2011-04-11311: Air Quality — Air: Smoke, Commercial (AA2)
2011-03-25Job filed: ADDITIONS/ MODIFICATIONS TO EXISTING CLASS 'E' SYSTEM AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED.$41,000
2011-03-18Permit EW — ISSUED
2011-03-08311: Indoor Air Quality — Ventilation
2011-02-23311: Water System — Hydrant Leaking (WC1)
2011-01-25311: Water System — Hydrant Leaking (WC1)
2011-01-21Permit EW — ISSUED
2011-01-21Permit PL — ISSUED
2011-01-21Permit EW — ISSUED
2011-01-20Permit EW — ISSUED
2011-01-20Job filed: INTERIOR RENOVATION ON 11TH FLOOR TO INCLUDE REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, DOORS, SPRINKLER AND PLUMBING MODIFICATIONS. NO CHANGE $245,450
2011-01-20Job filed: INSTALLATION OF NEW MECHANICAL HVAC SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$164,000
2011-01-13311: Water System — Hydrant Leaking (WC1)
2010
2010-12-21DOB violation E:
2010-12-21DOB violation E:
2010-12-11DOB violation E:
2010-12-09Job filed: A2$452,000
2010-12-09Job filed: (SEQUENCE 1): IT IS REQUIRED TO PERFORM LL 11/98 WORK INCLUDING BRICK REPLACEM ENT, POINTING, CRACK REPAIRS, LINTEL REPLACEMENT, AND PARAPET WALL REPA$180,000
2010-12-06Permit EW — ISSUED
2010-11-10Job filed: INSTALL NEW SPRINKLER HEADS AND BRANCH PIPING FROM EXISTING BUILDING RISER AND ADJUST LOCATION OF EXISTING SPRINKLER HEADS$50,000
2010-11-10Job filed: INSTALL NEW PLUMBING FIXTURES,AND MECHANICAL SYSTEMS IN CONJUCTION WITH INTERIOR OFFICE ALTERATION$350,000
2010-11-10Job filed: INSTALL NEW PLUMBING FIXTURES,AND MECHANICAL SYSTEMS IN CONJUCTION WITH INTERIOR OFFICE ALTERATION$350,000
2010-11-05Job filed: INTERIOR ALTERATION OF EXISTING OFFICE SPACE, NO CHANGE IN USE EGRESS OR OCCUPANCY$1,000,000
2010-10-08DOB violation VCAT1:
2010-09-29Permit EW — ISSUED
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E:
2010-09-10DOB violation E: ILLEGAL REMOVAL
2010-09-10DOB violation E:
2010-09-09DOB violation E:
2010-09-01Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH OFFICE TENANT FITOUT AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$38,000
2010-09-01Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH OFFICE TENANT FITOUT AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$38,000
2010-07-30Job filed: REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATD FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED U$195,000
2010-07-30Job filed: REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATD FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED U$195,000
2010-07-06Rodent inspection: Passed
2010-05-18Permit PL — ISSUED
2010-05-18Permit EW — ISSUED
2010-05-14311: Street Condition — Defective Hardware
2010-05-04311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2010-04-23Permit EW — ISSUED
2010-04-19Job filed: INTERIOR ALTERATION TO OFFICE SPACE AS INDICATED ON DRAWINGS, INCLUDING CONSTRUCTION OF RAISED PLATFORM FOR MECHANICAL EQUIPMENT WHICH WILL BE FILED U$183,000
2010-04-09311: Street Condition — Plate Condition - Open
2010-03-30311: Water System — Leak (Use Comments) (WA2)
2010-03-24311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2010-02-03Permit EW — ISSUED
2009
2009-12-21Job filed: 7TH FLOOR UNIT 712: ADDITION OF 31 NEW SPRINKLER HEADS TO EXISTING SPRINKLER PLUMBING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$10,000
2009-12-11Permit EW — ISSUED
2009-11-23Job filed: INTERIOR RENOVATION OF SUITE 712 - NEW PARTITIONS, WALL & FLOOR FINISHES & CUSTOM MILLWORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$300,000
2009-11-23Job filed: INTERIOR RENOVATION OF SUITE 712 - NEW PARTITIONS, WALL & FLOOR FINISHES & CUSTOM MILLWORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$300,000
2009-10-14Permit PL — ISSUED
2009-10-02Permit EW — ISSUED
2009-10-01Job filed: INTERIOR RENOVATION TO EXISTING STORE REMOVE AND CONSTRUCT PARTTITIONS IN ADDITION INSTALL HUNG CIELING AND INSTALL NEW PLUMBING FIXTURES , ALL AS PER$50,000
2009-10-01Job filed: INTERIOR RENOVATION TO EXISTING STORE REMOVE AND CONSTRUCT PARTTITIONS IN ADDITION INSTALL HUNG CIELING AND INSTALL NEW PLUMBING FIXTURES , ALL AS PER$50,000
2009-08-21DOB violation E:
2009-08-21DOB violation E:
2009-08-21DOB violation E:
2009-08-21DOB violation E:
2009-08-21DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-08-20DOB violation E:
2009-06-29Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH STORE FRONT AS PER PLANS FILED HEREWITH N O CHANGE IN USE EGRESS OR OCCUPANCY$32,100
2009-06-09Permit EW — ISSUED
2009-06-09Permit PL — ISSUED
2009-04-23Permit EW — ISSUED
2009-04-16Permit EW — ISSUED
2009-03-31Job filed: INSTALL FIRE SUPPRESSIIN SYSTEM ONLY NO CHANGE IN USE EGRESS OR OCCUPANCY$3,000
2009-02-27DOB violation LL1081:
2009-02-06Permit PL — ISSUED
2009-02-05Permit EW — ISSUED
2009-02-05Permit EW — ISSUED
2009-02-05Permit EW — ISSUED
2009-01-09Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND PIPING. THERE IS NO CHANGE IN OCCUPANCY, USE OR EGRESS.$28,000
2009-01-09Job filed: MECHANICAL AND PLUMBING MODIFICATIONS AS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY, USE OR EGRESS.$230,000
2009-01-09Job filed: TO PROVIDE STRUCTURAL REINFORCEMENTS AS PER PLANS$12,000
2009-01-09Job filed: REMOVAL OF EXISTING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW. THERE IS NO CHANGE IN OCCUPANCY, USE OR EGRESS.$530,000
2009-01-09Job filed: TO PROVIDE STRUCTURAL REINFORCEMENTS AS PER PLANS$12,000
2009-01-09Job filed: INSTALLATION OF NEW SPRINKLER HEADS AND PIPING. THERE IS NO CHANGE IN OCCUPANCY, USE OR EGRESS.$28,000
2009-01-09Job filed: REMOVAL OF EXISTING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW. THERE IS NO CHANGE IN OCCUPANCY, USE OR EGRESS.$530,000
2008
2008-12-04DOB violation E:
2008-12-04DOB violation E:
2008-08-20DOB violation E:
2008-08-20DOB violation E:
2008-08-20DOB violation E:
2008-08-20DOB violation E:
2008-08-19DOB violation E:
2008-08-19DOB violation E:
2008-08-19DOB violation E:
2008-08-19DOB violation E:
2008-08-19DOB violation E:
2008-08-19DOB violation E:
2008-08-19DOB violation E:
2008-05-20ECB Non-Hazardous violation: 38P16.66P16.60M07.02X10.59X10.86BB05. 38P PROVIDE ACCESS TO TOP OF CAR 66P PROVIDE ACCESS TO PITY 60M PROVIDE EMERGENCY # ON MAIN $350
2008-05-13Permit EW — ISSUED
2008-04-02Job filed: REMOVE AND INSTALL INTERIOR PARTITIONS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$81,000
2008-04-02Job filed: REMOVE AND INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2008-04-02Job filed: MODIFY HVAC DUCTWORK AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,000
2008-04-02Job filed: MODIFY HVAC DUCTWORK AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,000
2008-04-02Job filed: REMOVE AND INSTALL INTERIOR PARTITIONS AND DOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$81,000
2008-04-02Job filed: MODIFY HVAC DUCTWORK AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,000
2008-04-02Job filed: REMOVE AND INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,000
2008-04-02Job filed: REMOVE AND INSTALL SPRINKLER HEADS AND PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2008-04-02DOB complaint, category ?
2008-03-31DOB complaint, category ?
2008-03-21DOB violation LL1081:
2008-03-03Job filed: INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$15,000
2008-03-03Job filed: INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$15,000
2008-03-03Job filed: INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$15,000
2008-01-16DOB complaint, category ?
2007
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-21DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-20DOB violation E:
2007-12-11Permit EW — ISSUED
2007-12-10Permit EW — RE-ISSUED
2007-11-30DOB violation LL1198:
2007-11-30DOB violation LL1198:
2007-10-18Permit EW — ISSUED
2007-10-15Job filed: Upgrade existing kitchen fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2007-10-15Job filed: Upgrade existing kitchen fire suppression system, as shown on plan. No change in use, occupancy, or egress.$3,000
2007-09-24Permit PL — ISSUED
2007-06-08Permit EW — ISSUED
2007-06-06Permit EW — ISSUED
2007-06-01Permit PL — ISSUED
2007-05-29Permit EW — ISSUED
2007-05-29Permit EW — ISSUED
2007-05-29Permit EW — ISSUED
2007-05-24Permit EW — ISSUED
2007-05-21Job filed: modification to the 14th floor Fire Alarm. No change to change of use or egree.$6,000
2007-05-21Job filed: interior renovation to include minor plumbing and mechanical no change in use of egree or occupancy.$38,000
2007-05-18Job filed: Modification to the 14th floor sprinklers, no to to use and or egress.$10,000
2007-05-18Job filed: interior renovation to include minor plumbing and mechanical no change in use of egree or occupancy.$20,000
2007-05-18Job filed: interior renovation to include minor plumbing and mechanical no change in use of egree or occupancy.$20,000
2007-05-09AL&R — from FOURTY SEVENTH FIFTH COMPANY LLC to THE PRUDENCIA INSURANCE COMPANY OF AMERI
2007-05-09Agreement $60,000,000 — from FOURTY SEVENTH FIFTH COMPANY LLC to THE PRUDENCIA INSURANCE COMPANY OF AMERI$60,000,000
2007-05-09Mortgage $19,185,619 — from FOURTY SEVENTH FIFTH COMPANY LLC to THE PRUDENCIA INSURANCE COMPANY OF AMERI$19,185,619
2007-05-09Mortgage assigned — from LASALLE NATIONAL BANK to THE PRUDENCIA INSURANCE COMPANY OF AMERI
2007-05-09TL&R — from LASALLE NATIONAL BANK
2007-05-02Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TENANT FITOUT ON CEL 1ST & 4TH FLS AS PER PLANS FILED HERWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$500,000
2007-05-02Job filed: STRUCTURAL WORK ASSOCIATED WITH TENANT FITOUT ON CEL, 1ST 7 4TH FLOORS, AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$42,000
2007-05-02Job filed: MECHANICAL WORK ASSOCIATED WITH TENANT FITOUT ON CEL 1ST & 4TH FLOORS, A S PER PLANS FILED HEREWITH.. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$91,000
2007-05-02Job filed: PLUMBING WORK ASSOCIATED WITH TENANT FITOUT ON CEL,1ST & 4TH FLOORS, AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$49,000
2007-05-02Job filed: REMOVE AND INSTALL SPRINKLER HEADS ANDPIPING AS PER DRAWINGS FILED NO CHANGE IN USE EGRESS OR OCCUPANCY$32,000
2007-04-02DOB violation LL1081:
2007-02-22Facade (LL11) filing, cycle 6: SAFE
2007-02-22Facade (LL11) filing, cycle 6: SAFE
2007-01-19DOB violation LL6291:
2007-01-19DOB violation LL6291:
2006
2006-11-20Job filed: FIRE PROTECTION PLAN$1,000
2006-11-20Job filed: FIRE PROTECTION PLAN$1,000
2006-10-24Permit PL — ISSUED
2006-08-17Job filed: MODIFICATION OF EXISTING SPRINKLERSYSTEM ASSOICATED WITH TENANT FITOUT ON THE 1ST. FLOOR. NO CHANGE INUSE,EGRESS OR OCCUPANCY.$18,000
2006-08-16Permit EW — ISSUED
2006-08-16Permit EW — ISSUED
2006-08-16Permit EQ — ISSUED
2006-08-10Job filed: Mechanical work associated with tenant fitout for 5th Avenue shops. No change in occupany, use or egress.$30,000
2006-08-10Job filed: General construction associated with tenant fitout for 5th Avenue shops. Work includes installation of additional mezzanines to be used as mechanical $210,000
2006-08-10Job filed: Plumbing work associaed with tenant fitout for 5th Avenue shops. No change in occupancy, use or egress.$20,000
2006-08-09Job filed: PROPOSE TO FILE FOR THE ADDITIONS TOTHE EXISTING MODIFIED CLASS "E" COMMUNICATION AND ALARM SYSTEM AS PERPLAN SUBMITTED HEREWITH. NO CHANGE IN OCCUPAN$20,000
2006-07-12Permit PL — ISSUED
2006-07-05Permit EW — ISSUED
2006-07-05Permit EW — ISSUED
2006-06-21Job filed: Interior renovation of 27th floor - new partitions, electrical and ductwork as per plans filed herewith No change in use, egress or occupancy$95,000
2006-06-21Job filed: Interior renovation of 27th floor - new partitions, electrical and ductwork as per plans filed herewith No change in use, egress or occupancy$95,000
2006-06-02DOB violation E:
2006-02-15Permit AL — ISSUED
2005
2005-11-18ECB Non-Hazardous violation: 55M11. 55- INSTALL ROPE GUARDS ON MACHINE.$180
2005-11-18ECB Non-Hazardous violation: 55M11. 55- INSTALL ROPE GUARDS ON MACHINE.$180
2005-11-18ECB Non-Hazardous violation: 55M11. 55- INSTALL ROPE GUARDS. ON MACHINE.$180
2005-10-01DOB violation LL1081:
2005-09-29Permit EQ — RE-ISSUED
2005-09-29DOB complaint, category ?
2005-09-21Permit PL — ISSUED
2005-08-30DOB complaint, category ?
2005-08-08DOB complaint, category ?
2005-07-05DOB violation E:
2005-07-05DOB violation E:
2005-06-07Permit EW — ISSUED
2005-06-07Permit EW — ISSUED
2005-05-26Permit EQ — ISSUED
2005-05-17Job filed: Erect temporary roof protection for work under 18 W. 48th St, appl. NB 1004005746. No change in use, egress or occupancy under this appl.
2005-04-28DOB complaint, category ?
2005-04-06Permit EW — ISSUED
2005-03-15Permit EW — ISSUED
2005-02-08Permit AL — ISSUED
2005-02-04DOB complaint, category ?
2005-01-07Permit EW — ISSUED
2005-01-07Permit EW — ISSUED
2005-01-07Permit EW — ISSUED
2005-01-05Permit EQ — ISSUED
2004
2004-12-29Job filed: Install new mechanical ductwork, return grilles and diffusers and connect with existing A/C unit on the 1st floor. No change to occupancy, use or egre$5,000
2004-12-29Job filed: General construction including drywall partitions, new ceilings and new light fixtures on the 1st floor. No change to occupancy, use or egress.$60,000
2004-12-27Permit PL — ISSUED
2004-12-17Permit EW — ISSUED
2004-12-17Permit EW — ISSUED
2004-12-17Permit EW — ISSUED
2004-12-15Job filed: HVAC WORK ON THE 2 & 3RD FLOORS. PLUMBING WORK ON THE 2ND FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOORS ARE SPRINK$470,000
2004-12-15Job filed: FIRE ALARM MODIFICATIONS ON THE 2ND & 3R D FLOORS. NO CHANGE IN USE, EGR SS OR OCCUPANCY.$10,000
2004-12-15Job filed: FIRE ALARM MODIFICATIONS ON THE 2ND & 3R D FLOORS. NO CHANGE IN USE, EGR SS OR OCCUPANCY.$10,000
2004-12-15Job filed: PARTITIONS AND CEILING CHANGES ON THE 2 & 3RD FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOORS ARE SPRINKLERED.$250,000
2004-12-15Job filed: HVAC WORK ON THE 2 & 3RD FLOORS. PLUMBING WORK ON THE 2ND FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOORS ARE SPRINK$470,000
2004-12-15Job filed: STRUCTURAL WORK ON THE 2ND & 3RD FLOORS. NO CHANGE IN OCCUPSNCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOORS ARE SPRINKLERED.$25,000
2004-12-15Job filed: SPRINKLER MODIFICATIONS ON THE 2ND & 3RD FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$55,000
2004-12-02DOB complaint, category ?
2004-10-21Permit AL — ISSUED
2004-10-13Permit EW — ISSUED
2004-10-13Permit EW — ISSUED
2004-10-07Permit EQ — ISSUED
2004-10-04Job filed: FILING HEREWITH APPLICATION FOR CHILLER UPGRADE. NO CHANGE TO USE, EGRES S, OR OCCUPANCY UNDER THIS APPLICATION.$450,000
2004-10-04Job filed: STRUCTURAL MODIFICATION AS PER PLANS FIL ED HEREWITH. NO CHANGE TO USE, GRESS, OR OCCUPANCY UNDER THIS APPLICATI ON.$20,000
2004-09-22Job filed: LEGALIZATION OF EXISTING AIR CONDITION- ING SYSTEM. AIR HANDLING UNIT ON 11TH FLOOR CHILLER ON THE ROOF. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$25,000
2004-09-21Permit PL — ISSUED
2004-09-17Permit AL — ISSUED
2004-08-25Permit EQ — ISSUED
2004-08-24Job filed: Filing herewith for installation of 270 ft long by 20 ft high sidewalk shed. No change in occupancy, use, or egress.
2004-07-29Permit EW — ISSUED
2004-07-29Permit EW — ISSUED
2004-07-23Permit EQ — ISSUED
2004-07-23Permit EQ — ISSUED
2004-07-13Job filed: APPLICATION FILED TO SHOW REPLACEMENT OF A STORE FRONT. THERE IS NO CHANGE TO BULK, EGRESS, FLOOR AREAR OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.$5,000
2004-07-13Job filed: APPLICATION FILED TO SHOW REPLACEMENT OF A STORE FRONT.THERE IS NO CHANGE TO BULK,EGRESS,FLOOR AREA OR OCCUPANCY PROPOSED UNDER THIS APPLICATION$5,000
2004-07-13Job filed: APPLICATION FILED TO SHOW REPLACEMENT OF A STORE FRONT. THERE IS NO CHANGE TO BULK, EGRESS, FLOOR AREAR OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.$5,000
2004-05-05Permit EW — ISSUED
2004-05-05Permit EW — ISSUED
2004-05-03Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TENANT FITOUT FOR SPACE #619 ON 6TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$29,000
2004-05-03Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TEN ANT FOR SPACE # 621 ON 6TH FL. NO CHANGE IN OCCUPANCY, USE OR EGRESS$33,000
2004-05-03Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TEN ANT FOR SPACE # 621 ON 6TH FL. NO CHANGE IN OCCUPANCY, USE OR EGRESS$33,000
2004-05-03Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TENANT FITOUT IN CELLAR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$22,000
2004-05-03Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TEN ANT FITOUT ON FIRST FLOOR. NO C ANGE IN OCCUPANCY, USE OR EGRESS$10,000
2004-05-03Job filed: GENERAL CONSTRUCTION ASSOCIATED WITH TENANT FITOUT IN CELLAR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$22,000
2004-04-21Job filed: Remove and erect partitions, replace suspended ceiling, modify AC system on 4th floor. No change to egress, use or occupancy.$57,000
2004-04-01Permit PL — ISSUED
2004-03-02Permit EW — ISSUED
2004-02-09Permit PL — ISSUED
2004-02-06Job filed: MECHANICAL & PLUMBING WORK ASSOCIATED WI TH INSTALLATION OF NEW ELEVATOR AND CORE.
2004-02-06Job filed: STRUCTURAL WORK ASSOCIATED WITH INSTALLA TION OF NEW ELEVATORS & CARE.
2004-02-06Job filed: MECHANICAL & PLUMBING WORK ASSOCIATED WI TH INSTALLATION OF NEW ELEVATOR AND CORE.
2004-02-06Job filed: STRUCTURAL WORK ASSOCIATED WITH INSTALLA TION OF NEW ELEVATORS & CARE.
2004-02-06Job filed: STRUCTURAL WORK ASSOCIATED WITH INSTALLA TION OF NEW ELEVATORS & CARE.
2004-02-06Job filed: MECHANICAL & PLUMBING WORK ASSOCIATED WI TH INSTALLATION OF NEW ELEVATOR AND CORE.
2004-01-27Job filed: MODIFICATION OF EXISTING FIRE ALARM SYST EM,10TH FLR RISER ONLY NO CHANGE IN USE EGRESS OR OCCUPANCY$200,000
2004-01-27Job filed: MODIFICATION OF EXISTING FIRE ALARM SYST EM,10TH FLR RISER ONLY NO CHANGE IN USE EGRESS OR OCCUPANCY$200,000
2004-01-26Job filed: APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS SHO WN ON PLANS FILED HEREWITH. WORK ASSOCIA TED WITH BUILDING UPGRADE FOR INSTALLA$450,000
2004-01-26Job filed: APPLICATION FILED FOR MODIFICATION OF EXISTING SPRINKLER SYSTEM AS SHO WN ON PLANS FILED HEREWITH. WORK ASSOCIA TED WITH BUILDING UPGRADE FOR INSTALLA$450,000
2004-01-21DOB violation E:
2004-01-21DOB violation E:
2004-01-21DOB violation E:
2004-01-21DOB violation E:
2003
2003-07-22DOB violation E:
2003-07-14Permit EW — ISSUED
2003-07-11Job filed: Miscellaneous interior constuction to include partition work, HVAC relocation on roof, finishes and plumbing. There will be no change to use, egress o$225,000
2003-07-11Job filed: Miscellaneous interior constuction to include partition work, HVAC relocation on roof, finishes and plumbing. There will be no change to use, egress o$225,000
2003-05-22Permit EQ — ISSUED
2003-05-22Permit EW — ISSUED
2003-05-21ECB Non-Hazardous violation: 01#11 06A12 (01) EMERGAENCY STOP SWITCH IN CAR HAS NO SOUND ON ACTIVATION (06) CAR GATE ROTTER IS DEFECTIVE - REPLACE.$350
2003-05-19Job filed: Install fencefor the store front application No. 103424572 filed previously.
2003-04-21DOB complaint, category ?
2003-04-17ECB Non-Hazardous violation: 2E11-52M07-36O02. 42-MADE REPAIR TO GOVERNOR TO REMOVE RILIRATIOR. 52-PROVIDE CARE GOVERNOR ON MAIN MACHINE 36-CLEAN CAR TOP.
2003-04-15Permit PL — ISSUED
2003-03-31Job filed: Install store front, partitions and hung ceiling.$15,000
2003-03-28DOB violation E: 1S3006
2003-03-27DOB violation E: 1P13562
2003-03-21DOB violation LL1081:
2003-02-27Permit EW — ISSUED
2003-02-27Permit EW — ISSUED
2003-02-27Permit EQ — ISSUED
2003-02-03Job filed: Renovate interior of store .Replace existing heating/cooling unit with 2 new heating/cooling units as per plans and Schedule on sheet 2. Replace exist$34,000
2002
2002-08-08DOB violation L1198:
2002-08-08DOB violation L1198:
2002-05-23ECB Non-Hazardous violation: 37M07-40F11-41M12. 37-M-07 MISSING ID TAG PROVIDE CITY ID TAG ON CONTROLLER 40-F-11 GOVENOR WOBBLES DURING MOTION REPAIR THIS COND$350
2002-05-23ECB Non-Hazardous violation: 37U16/54U16/50U16/44U16/ 37-54-50-44 ALL ARE NOT TAGED PROPERLY TAG ALL DEVICES WITH CITY ID TAG AND NUMBER 1P16430$180
2002-05-23ECB Non-Hazardous violation: 35I12/35B04/ 35I12=REPLACE BROKEN WINDOWS IN MACHINE ROOM 35B04=PATCH UP 6"HOLE ON MOTOR ROOM FLOOR$180
2002-02-19DOB violation LL1081:
2002-02-15Job filed: ADDITION TO CLASS E SYSTEM PANEL, FUSE CUTOUT, BELL, SPEAKER/STROBES, SMOKE DETECTORS, MER SMOKE/HEAT DETECTORS, DUCT DETECTORS, AC FAN RELAYS NO CHAN$14,000
2002-02-15Job filed: ADDITION TO CLASS E SYSTEM PANEL, FUSE CUTOUT, BELL, SPEAKER/STROBES, SMOKE DETECTORS, MER SMOKE/HEAT DETECTORS, DUCT DETECTORS, AC FAN RELAYS NO CHAN$14,000
2002-01-02ECB Non-Hazardous violation: 73X11/ 57U05/ 35O02/ RETURN TO SERVICE SO THAT A COMPLTE INSP. MAY BE MADE BY THIS DEPT. 57 - U - 05 PERFORM FOR 5YR GOV. TEST$350
2001
2001-11-29ECB Non-Hazardous violation: 53X11-35B07-50O02-35I11-35O02-73U16-22D06-62X11-55X11. 53-X-11 REPAIR LIGHTING 35-B-07 PROVIDE SAFE ACCESS TO MACH ROOM LADDR 35-I
2001-11-02Permit EW — ISSUED
2001-10-25DOB violation E: 1P41090
2001-08-29Permit EW — ISSUED
2001-08-17Job filed: Interior renovation of existing space to include demolition, drywall,plumbing, electrical, HVAC and finish owrk. No change to egress occupancy or use$90,000
2001-05-04Permit PL — ISSUED
2001-04-20Permit EQ — ISSUED
2001-04-20Permit EW — ISSUED
2001-02-05Permit PL — ISSUED
2001-01-26Permit EW — ISSUED
2001-01-26Permit EW — ISSUED
2001-01-18Job filed: Interior renovations of existing space to include demolition, Drywall, Plumbing HVAC, and finish work. No change in egress, occupancy or use involved$96,000
2001-01-15DOB violation E: 1P16430
2001-01-15DOB violation E: 1P13563
2001-01-15DOB violation E: 1P2789
2001-01-15DOB violation E: 1P16429
2001-01-15DOB violation E: 1P16434
2001-01-12DOB violation E: 1P13562
2001-01-12DOB violation E: 1P13561
2001-01-11Permit PL — ISSUED
2000
2000-10-18Permit EW — ISSUED
2000-10-18Permit EW — ISSUED
2000-10-18Permit EW — ISSUED
2000-09-25DOB complaint, category ?
2000-09-21Job filed: STRUCTURAL WORK ON THE MEZZANINE AND 2ND FLOORS INSTALLATION OF STAIR NO CHANGE IN OCCUPANCY FLOOR IS SPRINKLERED.$20,000
2000-09-21Job filed: HVAC AND PLUMBING WORK ON THE MEZZANINE NO CHANGE IN OCCUPANCY USE EGRESS L.L.#5 COMPLIANCE FLOOR IS SPRINKLERED.$57,000
2000-09-21Job filed: PARTITIONS/CEILING WORK ON THE MEZZANINE & 2ND FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. L.L. #5 COMPLIANCE - FLOOR IS SPRINKLERED.$20,000
2000-09-21Job filed: SPRINKLER MODIFICATIONS ON THE MEZZANINE.$15,000
2000-08-08Permit EW — ISSUED
2000-07-31Job filed: REPLACE EXIISTING AC UNIT AS PER PLAN ATTACHED NO CHANGE IN USE ,OCCUPANCY,EGRESS$6,000
2000-07-21Permit EQ — ISSUED
2000-07-19Permit EW — ISSUED
2000-07-19Permit EW — ISSUED
2000-07-18Job filed: INSTALLATION OF A SHED 260' DURING FACAD E REPAIR SHED TO COMPLY WITH L 33/91 NO CHANGE IN USE EGRESS OR OCCUPAN CY
2000-07-18Job filed: INSTALLATION OF A SHED 260' DURING FACAD E REPAIR SHED TO COMPLY WITH L 33/91 NO CHANGE IN USE EGRESS OR OCCUPAN CY
2000-06-15Job filed: Install split 3 ton AC unit with condenser on low roof (6th floor) and associate d ducts and air handler. No change to egress occupancy or use involv$6,000
2000-04-18DOB complaint, category ?
2000-04-11Permit PL — ISSUED
2000-03-23Permit AL — ISSUED
2000-03-23Job filed: Create additional floor area of 458 square feet on Penthouse level. Changel arrangement of secondary stair. Install HVAC system, partitions,plumbing $450,000
2000-03-10DOB violation LL1081:
2000-03-06Permit AL — ISSUED
2000-03-06Job filed: Create additional floor area of 825 square feet on 1st Mezzanine level$100,000
2000-03-06Job filed: Create additional floor area of 825 square feet on 1st Mezzanine level$100,000
2000-03-02Permit EW — ISSUED
2000-03-02Permit EQ — ISSUED
2000-03-02Permit EW — ISSUED
2000-02-25DOB violation E: 1P13558
2000-02-25DOB violation E: 1P16429
2000-02-25DOB violation E: 1P16430
2000-02-25DOB violation E: 1P13561
2000-02-25DOB violation E: 1P13562
2000-02-25DOB violation E: 1P16428
2000-02-23DOB violation E: 1P16434
2000-02-23DOB violation E: 1P2789
2000-02-23DOB violation E: 1P2789
2000-01-28Job filed: Construct new mezzanine floor for existing store.partition and plumbing work. New A/C unit and new store front as per plans filed herewith. No change $48,000
2000-01-11Job filed: INSTALLATION OF PARTITION WALL, CEILING TILE. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.$26,000
2000-01-11Job filed: INSTALLATION OF PARTITION WALL, CEILING TILE. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.$26,000
1999
1999-12-16Permit EW — ISSUED
1999-07-06Permit EW — ISSUED
1999-07-06Permit EW — ISSUED
1999-05-04Permit AL — ISSUED
1999-03-29Permit EW — ISSUED
1999-03-22Mortgage assigned — from GMAC COMEMRCIAL MORTGAGE CORPORATION to LA SALLE NATIONAL BANK AS TRUSTEE
1999-03-22Mortgage assigned — from GMAC COMMERCIAL MORTGAGE CORPORATION to LA SALLE NATIONAL BANK AS TRUSTEE
1998
1998-12-14Permit EW — ISSUED
1998-12-14Permit EW — ISSUED
1998-08-21Permit EW — ISSUED
1998-08-12Mortgage assigned — from FORTY SEVENTH FIFTHCOMPANY LLC to GMAC COMMERCIAL MOTRGAGE CORP.
1998-08-12Mortgage $2,000,000 — from FORTY SEVENTH FIFTHCOMPANY LLC to GMAC COMMERCIAL MORTGAGE CORPORATION$2,000,000
1998-07-14Permit EW — ISSUED
1998-07-14Permit PL — ISSUED
1998-06-24Permit EW — ISSUED
1998-06-24Permit EW — ISSUED
1998-06-03Permit EW — ISSUED
1998-06-03Permit EW — ISSUED
1998-05-04DOB complaint, category ?
1998-04-22Permit EQ — ISSUED
1998-04-22Permit EQ — ISSUED
1998-04-08ECB Non-Hazardous violation: 39H73U 39-TRACTION SHEAVE WORN DOWN 73-HATCH CITY ID TAG CONTROLLER MACHINE & GENERATOR.$180
1997
1997-12-08Permit EW — ISSUED
1997-12-08Permit EW — ISSUED
1997-09-16DOB violation LL6291:
1997-09-16DOB violation LL6291:
1997-06-04Permit EW — ISSUED
1997-03-20Permit EW — ISSUED
1997-03-11Permit EQ — ISSUED
1996
1996-11-26ECB Non-Hazardous violation: FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW 16/84 CERTIFICATE TO THE INSTALLATION OF REQUIRED FIRE PROTECTIN SYSTEMS REM$500
1996-08-14Permit PL — ISSUED
1996-08-02Permit EW — ISSUED
1996-08-02Permit EW — ISSUED
1996-06-28Permit EW — ISSUED
1996-05-02Permit EW — ISSUED
1996-04-26DOB complaint, category ?
1996-04-24Permit PL — ISSUED
1996-04-11Permit EQ — ISSUED
1996-04-09Permit PL — ISSUED
1996-04-08Permit EW — ISSUED
1996-04-08Permit EW — ISSUED
1996-04-02Permit EW — ISSUED
1996-04-02Permit EW — ISSUED
1996-04-02Permit AL — ISSUED
1996-03-22Permit EW — ISSUED
1996-03-08DOB violation LL1081:
1996-02-26Permit PL — ISSUED
1996-02-09Permit EW — ISSUED
1996-02-08Permit EW — ISSUED
1996-01-26Permit EW — ISSUED
1996-01-26Permit EW — ISSUED
1996-01-26Permit EW — ISSUED
1996-01-19Mortgage $1,669,092 — from FORTY-SEVENTH-FIFTHCOMPANY to GMAC COMMERCIAL MORTGAGE CORPORATION$1,669,092
1996-01-19Mortgage assigned — from FORTY-SEVENTH-FIFTHCOMPANY to GMAC COMMERCIAL MORTGAGE CORPORATION
1996-01-19Mortgage assigned — from PRINCIPAL MUTUAL LIFE INSURANCE COMPANY to GMAC COMMERCIAL MORTGAGE CORPORATION
1995
1995-12-28Permit PL — ISSUED
1995-12-21Permit EW — ISSUED
1995-12-21Permit EW — ISSUED
1995-11-27Permit EW — ISSUED
1995-11-08Permit EW — ISSUED
1995-09-20Permit EW — ISSUED
1995-09-20Permit AL — ISSUED
1995-09-05Permit EW — ISSUED
1995-09-05Permit EW — ISSUED
1995-08-29DOB violation LL6291:
1995-08-29DOB violation LL6291:
1995-07-13Permit AL — ISSUED
1995-06-27Permit EW — ISSUED
1995-05-04Permit AL — ISSUED
1995-03-22Permit PL — ISSUED
1995-03-01Permit EW — ISSUED
1995-03-01Permit EQ — ISSUED
1995-02-22Permit EW — ISSUED
1995-02-17Permit PL — ISSUED
1995-02-01Permit EW — ISSUED
1995-01-25Permit EW — ISSUED
1995-01-25Permit EQ — ISSUED
1994
1994-12-28Permit EQ — ISSUED
1994-12-28Permit EW — ISSUED
1994-12-12Permit SG — ISSUED
1994-11-10Permit PL — ISSUED
1994-11-09ECB Hazardous violation: WHILE USING A TWO POINT SUSPENSION SCAFFOLD . USE OF A TWO POINT "" WITHOUT PROPER DANGER SIGNS. FAILURE TO USE SAFETY BELTS WH
1994-11-09ECB Hazardous violation: WHILE USING A TWO POINT SUSPANSION NO PROPER DANGER SIGNS NOT USIING SAFTY BELTS NO RIGGERS LOCENCE USING 4 TWO POINT SUSPENSION S$5,000
1994-10-14Permit EW — ISSUED
1994-10-14Permit EW — ISSUED
1994-09-26DOB complaint, category ?
1994-09-26DOB complaint, category ?
1994-09-07Permit EW — ISSUED
1994-09-07Permit EQ — ISSUED
1994-08-29Permit PL — ISSUED
1994-06-17LEAS — from FORTY-SEVENTH-FIFTHCOMPANY to UNITED STATES POSTALSERVICE
1994-05-03Permit EW — ISSUED
1994-05-03Permit EQ — ISSUED
1994-04-12Permit PL — ISSUED
1994-03-18DOB violation LL6291:
1994-03-18DOB violation LL6291:
1994-03-18DOB violation LL6291:
1994-03-18DOB violation LL6291:
1994-03-15Permit AL — ISSUED
1993
1993-09-21Permit EW — ISSUED
1993-09-10Permit EW — ISSUED
1993-06-28DOB violation LL1081: 1
1993-05-28Permit EW — ISSUED
1993-05-03Permit PL — ISSUED
1993-04-27Permit EW — ISSUED
1993-04-27Permit EW — ISSUED
1993-04-21Permit EW — ISSUED
1993-04-21Permit EW — ISSUED
1993-03-19Permit PL — ISSUED
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-03-18DOB violation LL6291:
1993-01-15Permit EW — ISSUED
1993-01-15Permit EW — ISSUED
1992
1992-11-27Mortgage assigned — from FORTY-SEVENTH-FIFTHCO to PRINCIPAL MUTUAL ETC
1992-11-27Agreement — from PRINCIPAL MUTUAL ETC to FORTY-SEVENTH-FIFTHCO
1992-08-19Permit EW — ISSUED
1992-08-19Permit EW — ISSUED
1992-08-14Permit PL — ISSUED
1992-08-14Permit EQ — ISSUED
1992-07-10Permit PL — ISSUED
1992-06-02Permit EW — ISSUED
1992-06-02Permit EW — ISSUED
1992-04-21DOB violation Z:
1992-01-09Agreement — from FORTY-SEVENTH FIFTHETC to PRUDENTIAL MUTUAL ETC
1991
1991-12-10Permit PL — ISSUED
1991-11-04Permit EW — ISSUED
1991-11-04Permit EW — ISSUED
1991-10-15Permit EW — ISSUED
1991-07-19Permit EW — ISSUED
1991-07-19Permit AL — ISSUED
1991-07-09Permit EW — ISSUED
1991-05-10Permit EW — ISSUED
1991-05-10Permit EW — ISSUED
1991-04-19Permit EW — ISSUED
1991-04-19Permit EW — ISSUED
1991-04-19Permit EW — ISSUED
1991-04-04Permit PL — ISSUED
1991-03-14Permit EW — ISSUED
1990
1990-11-15Permit SG — ISSUED
1990-11-15Permit SG — ISSUED
1990-11-15Permit SG — ISSUED
1990-11-15Permit SG — ISSUED
1990-08-15Permit EW — ISSUED
1990-07-31Permit PL — ISSUED
1990-07-31Permit PL — ISSUED
1990-07-18Permit EW — ISSUED
1990-07-18Permit EW — ISSUED
1990-01-10DOB complaint, category ?
1989
1989-12-28DOB violation P:
1989-12-06ECB Non-Hazardous violation: FAILURE TO PROVIDE FIRE PROOF, SELF CLOSING DOORS AT OPENINGS BETWEEN BUIDLINGS NUMBER 1-11 WEST 47 STREET AND 580 5 AVENU$50
1989-12-06ECB Non-Hazardous violation: FAILURE TO PROVIDE FIREPROOF, SELF CLOSING DOORS AT OPENINGS BETWEEN BUILDINGS NUMBER 1-11 WEST 47 STREET AND 580 5 AVENUE, EAST $50
1989-11-13DOB violation E: (74)MARK MAIN LINE SWITCH (40)TEST AND TAG (74A)POST NAME OF ELEVATOR CO
1989-11-13DOB violation P:
1989-11-13DOB violation E: (73)RESTORE TO SERVICE OR FILE FOR DISMANTLE OR REMOVE
1989-11-13DOB violation E: (73)RESTORE TO SERVICE OR FILE FOR DISMANTLE OR REMOVE
1989-11-13DOB violation E: (73)RESTORE TO SERVICE ON FILE FOR DISMANTLED OR REMOVE
1989-11-13DOB violation E: (40)TEST AND TAG (74)POST NAME OF ELEV CO (35)MARK MAIN
1989-11-13DOB violation E: (73)RESTORE TO SERVICE OR FILE FOR DISMANTLE OR REMOVE
1989-11-13DOB violation E: (40)TEST AND TAG (74)PROVIDE LIGHT IN SECONDARY
1989-11-13DOB violation P:
1989-10-17DOB complaint, category ?
1987
1987-12-23Air permit (CERTIFICATE TO OPERATE), fuel: ?
1986
1986-11-18Agreement — from PRINCIPAL MUTUAL ETAL to FORTY-SEVENTH FIFTHCO
1986-11-18Mortgage assigned — from FORTY-SEVENTH FIFTHCO to PRINCIPAL MUTUL LIFEETC
1986-11-18Mortgage assigned — from AMERICAN SAVINGS BK to PRINCIPAL MTL LFE INS CO
1986-11-18Mortgage $20,406,032 — from FORTY-SEVENTH-FIFTHCO to PRINCIPAL MTL LFE INS CO$20,406,032
1985
1985-02-07LEAS — from FORTY-SEVENTH-FIFTHCO. to DIAMOND DEALERS CLUBINC
1983
1983-09-01Mortgage $24,997,135 — from FORTY-SEVENTH-FIFTHCO to AMERICAN SAVINGS BANK$24,997,135
1983-09-01Agreement $24,997,135 — from FORTY-SEVENTH-FIFTHCO. to AMERICAN SAVINGS BANK$24,997,135
1983-09-01Mortgage assigned — from CHEMICAL BANK to AMERICAN SAVINGS BANK
1983-09-01LEAS — from FORTY-SEVENTH-FIFTHCO to BRENTANO'S, INC.
1981
1981-09-29Mortgage — from FORTY SEVENTH FIFTHCO to CHEMICAL BANK
1981-09-29Agreement — from FORTY SEVENTH FIFTHCO to ROSENTHAL USA, LTD; ROSENTHAL, A G
1981-09-29SMIS — from 580 OWNERS HOLDING CO to FORTY SEVEN FIFTH CO
1981-09-29Deed — from 580 OWNERS HOLDING CO to FORTY SEVENTH FIFTHCO
1981-09-29Agreement — from FORTY SEVENTH FIFTHCO to CHEMICAL BANK
1978
1978-08-29LEAS — from FORTY SEVENTH FIFTHCO to BRENTANOS INC
1975
1975-08-04Mortgage — from FORTY SEVENTH FIFTHCO to CHEMICAL BANK
1975-08-04Deed — from JOHN HANCOCK MTL LFINS to FORTY SEVENTH FIFTHCO
1975-08-04LEAS — from 580 OWNERS HOLDING CO to FORTY SEVENTH FIFTHCO
1968
1968-07-03Agreement — from JOHN HANCOCK MUT INSCO to BRUNS NORDEMAN CO.
1968-07-03Agreement — from 580 QUEENS HOLDING CO. to BRUNS NORDEMAN CO
1968-07-03Agreement — from MASACHUSSETTS MUT LFINS to BRUNS NORDEMAN CO.
1967
1967-05-05LEAS — from 40-7TH-5TH CO. to ROSENTHAL STUDIO ETAL
1967-04-10SAGE — from MASS.MUT LIF INS.CO.; ROSENTHAL CHINA CORP; ROSENTHAL STUDIO ETAL
1967-04-05Agreement — from 580OWNERS HOLDING CO. to ROSENTHAL CHINA CORPET
1967-04-05Agreement — from JOHN HANCOCK MUT LIFIN to ROSENTHAL STUDIO ETAL