Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

10 East 41 Street · Manhattan · BBL 1012750064 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

8 service requests in the last three years. Most common: Encampment (2) · Consumer Complaint (2) · Homeless Person Assistance (2) · Panhandling (1) · Water System (1).

Filed construction activity

$3,443,460 in permitted construction work filed since 2016 (28 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$38,224,000 $17,200,800
2026$38,778,000 $17,450,100
2027$30,264,000 $13,618,800

The city's market estimate has fallen 21% between tax years 2025 and 2027.

Building systems

Facade (Local Law 11)SAFE (cycle 9)

Restaurants in this building

RestaurantCuisineGradeNotes
Sunrise MartAsian/Asian FusionA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

SubwayGrand Central-42 St — 4 5 6 7 S · 350 ft straight-line (about a 2-minute walk) · station accessibility: full
42 St-Bryant Pk — 7 B D F M · 500 ft straight-line (about a 2-minute walk) · station accessibility: none
BusNearest boarding stop: 5 Av / W 41 St — M4 M5 Q32 · 300 ft
Citi BikeE 40 St & 5 Ave · 250 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 116 Mary Lindley Murray
Middle: J.H.S. 104 Simon Baruch. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

10 East 41 Street

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

8 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $12,000,000 on 2015-10-30 (lender: Sussex Bank). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2015-10-30Mortgage $12,000,000 — from BERKELEY 12 EAST 41ST STREET LLC to SUSSEX BANK $12,000,000
2015-10-30AL&R $12,000,000 — from BERKELEY 12 EAST 41ST STREET LLC to SUSSEX BANK $12,000,000
2005-11-22AL&R $18,500,000 — from JPMORGAN CHASE BANK, N.A. to BERKELEY REALTY COMPANY, L.L.C. $18,500,000
2005-11-22M&CON $28,000,000 — from BERKELEY REALTY COMPANY, L.L.C. to JPMORGAN CHASE BANK, N.A. $28,000,000
2005-11-22Deed $34,300,000 — from ARTF - NEW YORK, INC. to BERKELEY REALTY COMPANY, L.L.C. $34,300,000
2002-09-05Mortgage $4,258,537 — from ARTF-NEW YORK, INC. to MERRILL LYNCH MORTGAGE LENDING, INC. $4,258,537
1997-02-05Mortgage $500,000 — from TREELINE EAST 41ST STREET ASSOCIATES to EMIGRANT SAVINGS BANK $500,000
1997-02-05Mortgage $5,700,000 — from TREELINE EAST 41ST STREET ASSOCIATES to EMIGRANT SAVINGS BANK $5,700,000
1985-12-17Mortgage $2,850,000 — from HARLEIGH 41 ASSOCIATES to EMIGRANT SAVINGS BANK $2,850,000
1982-12-17Mortgage $1,650,000 — from HARLEIGH 41 ASSOCIATES to ALLIED IRISH BK LTD. $1,650,000
1982-08-09Mortgage $4,500,000 — from HARLEIGH 41 ASSOCIATES to ALLIED IRISH BANKS LTD $4,500,000

Ten-year activity

50250
2017
2018
32
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20173520919
20189140822
201921530332
202019110122
20217300010
202211230218
20237110110
20244230312
20255231112
2026302016
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 9 records

DateRecord
2026-08-14Certificate of occupancy Renewal Without Change
2026-06-04311: Water System — Leak (Use Comments) (WA2)
2026-05-27Certificate of occupancy Renewal Without Change
2026-03-04Certificate of occupancy Renewal Without Change
2026-02-16311: Homeless Person Assistance — Non-Chronic
2026-01-30Restaurant inspection: SUNRISE MART — grade A
2025-12-16311: Consumer Complaint — Supermarket or Grocery Store
2025-12-08Certificate of occupancy Renewal Without Change
2025-11-26Mortgage satisfied — from BERKELEY 12 EAST 41ST STREET LLC to SB ONE BANK; PROVIDENT BANK; EMIGRANT SAVINGS BANK; MERRILL LYNCH MORTGAGE LENDING, INC.;

The full timeline

2026
2026-08-14Certificate of occupancy Renewal Without Change
2026-06-04311: Water System — Leak (Use Comments) (WA2)
2026-05-27Certificate of occupancy Renewal Without Change
2026-03-04Certificate of occupancy Renewal Without Change
2026-02-16311: Homeless Person Assistance — Non-Chronic
2026-01-30Restaurant inspection: SUNRISE MART — grade A
2025
2025-12-16311: Consumer Complaint — Supermarket or Grocery Store
2025-12-08Certificate of occupancy Renewal Without Change
2025-11-26Mortgage satisfied — from BERKELEY 12 EAST 41ST STREET LLC to SB ONE BANK; PROVIDENT BANK; EMIGRANT SAVINGS BANK; MERRILL LYNCH MORTGAGE LENDING, INC.;
2025-09-24Certificate of occupancy Renewal Without Change
2025-09-01311: Homeless Person Assistance — Non-Chronic
2025-07-29311: Consumer Complaint — Supermarket or Grocery Store
2025-07-09Restaurant inspection: SUNRISE MART
2025-07-02Certificate of occupancy Renewal Without Change
2025-06-27FDNY inspection (ANNUL-COL-UNI)
2025-06-17FDNY inspection (ANNUL-COL-UNI)
2025-04-07Certificate of occupancy Renewal Without Change
2025-01-13Certificate of occupancy Renewal Without Change
2024
2024-12-17311: Panhandling — N/A
2024-10-23Certificate of occupancy Renewal Without Change
2024-09-19Restaurant inspection: SUNRISE MART
2024-09-05Restaurant inspection: SUNRISE MART — grade C
2024-07-30Certificate of occupancy Renewal Without Change
2024-05-08FDNY inspection (ANNUL-COL-UNI)
2024-04-10Certificate of occupancy Renewal Without Change
2024-01-31Restaurant inspection: SUNRISE MART
2024-01-23FDNY inspection (RISK)
2024-01-17Certificate of occupancy Renewal Without Change
2024-01-03311: Encampment — N/A
2024-01-03311: Encampment — N/A
2023
2023-10-20Certificate of occupancy Renewal Without Change
2023-07-20Certificate of occupancy Renewal Without Change
2023-07-12Permit Plumbing — Permit Issued
2023-06-06Facade (LL11) filing, cycle 9: SAFE
2023-05-05Job filed: Remove two toilets and two lavatories per plan. Extisting bathroom to be used for storage.$2,000
2023-05-02Certificate of occupancy Renewal Without Change
2023-04-18Job filed: APPLICATION HEREBY FILED TO REPAIR BUILDING FACADE, NACHAGE IN USE EGRESS OR OCCUPANCY.$50,000
2023-02-02Certificate of occupancy Renewal Without Change
2023-02-01FDNY inspection (ANNUL-COL-UNI)
2023-01-04311: Non-Residential Heat — Inadequate or No Heat
2022
2022-12-15Permit Sidewalk Shed — Signed-off
2022-12-13Permit Sidewalk Shed — Signed-off
2022-12-10311: Broken Parking Meter — Coin or Card Did Not Register
2022-12-10311: Air Quality — Air: Dust, Other (Use Comments) (AE5)
2022-11-30Facade (LL11) filing, cycle 9: SAFE
2022-11-07Certificate of occupancy Renewal Without Change
2022-08-18Certificate of occupancy Renewal Without Change
2022-06-09Permit Structural — Signed-off
2022-06-09Permit General Construction — Signed-off
2022-06-08Permit General Construction — Signed-off
2022-06-08Permit Structural — Signed-off
2022-05-13Certificate of occupancy Renewal Without Change
2022-04-21Job filed: APPLICATION HEREBY FILED TO REPAIR BUILDING FACADE, NACHAGE IN USE EGRESS OR OCCUPANCY.$50,000
2022-03-16311: Consumer Complaint — For-profit College
2022-02-15Certificate of occupancy Renewal Without Change
2022-02-14Facade (LL11) filing, cycle 9: SAFE
2022-02-14DOB violation FISPHAZ: CYCLE 9A UNSAFE REPORT FILED
2022-02-14DOB complaint, category ?
2021
2021-12-29Permit Sidewalk Shed — Signed-off
2021-12-28Job filed: Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress
2021-11-30Certificate of occupancy Renewal Without Change
2021-10-19FDNY inspection (ANNUL-COL-UNI)
2021-10-15FDNY inspection (ANNUL-COL-UNI)
2021-08-20Permit Mechanical Systems — Signed-off
2021-08-19Job filed: REPLACEMENT OF PACKAGED UNIT ON THE 12TH FLOOR MER WITH 3 UNITS ON THE 12TH FLOOR MER AND ROOFTOP WITH A TOTAL CAPACITY OF 16 TONS. NO CHANGE TO EGRES$56,000
2021-03-30FDNY inspection (ANNUL-COL-UNI)
2021-03-25Certificate of occupancy Temporary
2021-02-19Job filed: Installation mechanical ductwork and a/c units$199,950
2020
2020-11-17311: Consumer Complaint — For-profit College
2020-10-07Certificate of occupancy Temporary
2020-08-10Job filed: Modifications to existing sprinkler system per plans.$45,030
2020-07-21Job filed: Remove one restroom. Install two sinks, one lavatory and two floor drains.$10,500
2020-07-18Permit Mechanical Systems — Signed-off
2020-07-16Certificate of occupancy Temporary
2020-07-13Permit Sprinklers — Signed-off
2020-07-08Job filed: Modifications to existing sprinkler system per plans.$45,030
2020-07-06Permit EW — ISSUED
2020-06-26Job filed: INTERIOR NON-STRUCTURAL ALTERATION TO EXISTING RETAIL STORE. MECHANICAL, PLUMBING AND SPRINKLER TO BE FILED SEPARATELY ON DOB NOW BUILD. NO CHANGE TO $202,500
2020-06-26Job filed: INTERIOR NON-STRUCTURAL ALTERATIONS TO EXISTING RETAIL STORE. MECHANICAL, PLUMBING AND SPRINKLER WORK TO BE FILED SEPARATELY IN DOB NOW BUILD. NO CHAN$202,500
2020-05-21Job filed: Installation mechanical ductwork and a/c units$199,950
2020-05-15Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter $66,000
2020-04-30Permit Mechanical Systems — Signed-off
2020-04-24Certificate of occupancy Temporary
2020-04-08Job filed: Installation of mechanical ductwork and a/c units$45,000
2020-02-28FDNY inspection (ANNUL-COL-UNI)
2020-02-27Permit Mechanical Systems — Signed-off
2020-02-19Job filed: Install two new eight ton DX air conditioning systems. Install one new approx. four ton DX refrigeration system for retail market at first floor level$256,000
2020-01-27Certificate of occupancy Temporary
2020-01-15Permit Plumbing — Signed-off
2020-01-02Job filed: Remove one restroom. Install two sinks, one lavatory and two floor drains.$10,500
2019
2019-12-10Cooling tower inspection — violation AH8U
2019-12-10Cooling tower inspection — violation AH8U
2019-12-10Cooling tower inspection
2019-11-14DOB violation E:
2019-11-14DOB violation E:
2019-11-01311: Consumer Complaint — For-profit College
2019-10-10Permit EW — ISSUED
2019-10-08311: Food Establishment — Food Protection
2019-09-06DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-20Permit EW — ISSUED
2019-08-16Job filed: REMOVE EXISTING NON-STRUCTURAL PARTITIONS, CEILINGS, DOORS, EQUIPMENT, FIXTURES AND FINISHES PER PLANS. INSTALL NEW NON-STRUCTURAL PARTITIONS, CEILIN$305,000
2019-08-16Job filed: REMOVE EXISTING NON-STRUCTURAL PARTITIONS, CEILINGS, DOORS, EQUIPMENT, FIXTURES AND FINISHES PER PLANS. INSTALL NEW NON-STRUCTURAL PARTITIONS, CEILIN$305,000
2019-08-13Certificate of occupancy Temporary
2019-07-10Permit EW — ISSUED
2019-06-28Job filed: INSTALL SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$62,000
2019-06-27Job filed: INSTALL SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2019-05-16Certificate of occupancy Temporary
2019-04-24Certificate of occupancy Temporary
2019-04-02Permit EW — ISSUED
2019-03-28Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$120,000
2019-03-12DOB complaint, category ?
2019-02-08Permit EW — ISSUED
2019-02-08Permit PL — ISSUED
2019-01-25Permit EW — ISSUED
2019-01-25Permit EW — ISSUED
2019-01-18311: Consumer Complaint — High Pressure to Take on Loan/Debt
2019-01-15Job filed: INSTALLATION OF NEW PARTITIONS, DOORS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$320,000
2019-01-15Job filed: INSTALLATION OF MECHANICAL EQUIPMENT AND RELATED DUCTWORK. INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY$580,000
2019-01-11Job filed: INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$70,000
2019-01-11Job filed: MODIFY EXISTING FIRE ALARM SYSTEM.$65,000
2019-01-11Job filed: INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$70,000
2018
2018-12-14Asbestos abatement: Removal — P.A.L. Environmental Safety Corp.
2018-12-07Job filed: REMOVAL AND DISPOSAL OF INTERIOR PARTITIONING, SUSPENDED CEILINGS, CARPETING AND FAUX WOOD FLOOR FINISHES ON THE 5TH FLOOR AS SHOWN ON DRAWINGS FILED $30,000
2018-12-07Permit EW — ISSUED
2018-11-29Cooling tower inspection — violation AH8S
2018-11-29Cooling tower inspection — violation AH8S
2018-11-29Cooling tower inspection — violation AH8S
2018-11-29Cooling tower inspection — violation AH8D
2018-11-29Cooling tower inspection — violation AH8D
2018-11-29Cooling tower inspection — violation AH8V
2018-11-29Cooling tower inspection — violation AH8D
2018-11-12311: Consumer Complaint — High Pressure to Take on Loan/Debt
2018-10-27311: Consumer Complaint — High Pressure to Take on Loan/Debt
2018-10-18Certificate of occupancy Temporary
2018-10-16FDNY inspection (ANNUL-COL-UNI)
2018-10-12Permit EW — ISSUED
2018-10-05Permit EW — ISSUED
2018-09-25311: Food Establishment — Food Contaminated
2018-09-05Job filed: INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2018-09-05Job filed: REMOVE INTERIOR PARTITIONS, DOORS AND FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN SUE, EGRESS OR OCCUPANCY.$12,000
2018-07-20Certificate of occupancy Temporary
2018-01-26311: Food Poisoning — 1 or 2
2018-01-11Certificate of occupancy Temporary
2017
2017-10-27FDNY inspection (ANNUL-COL-UNI)
2017-10-24Certificate of occupancy Temporary
2017-10-04Cooling tower inspection — violation AH8S
2017-10-04Cooling tower inspection — violation AH8S
2017-10-04Cooling tower inspection — violation AH8T
2017-10-04Cooling tower inspection — violation AH8M
2017-10-04Cooling tower inspection — violation AH8M
2017-10-04Cooling tower inspection — violation AH8T
2017-10-04Cooling tower inspection — violation AH8M
2017-10-04Cooling tower inspection — violation AH8S
2017-10-04Cooling tower inspection — violation AH8T
2017-07-30311: Noise - Commercial — Loud Music/Party
2017-07-28Certificate of occupancy Temporary
2017-07-19311: Food Poisoning — 1 or 2
2017-03-07Certificate of occupancy Temporary
2017-02-03FDNY inspection (ANNUL-COL-UNI)
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2017-01-03DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
2016-12-13Certificate of occupancy Temporary
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-10-11DOB violation E:
2016-09-14Certificate of occupancy Temporary
2016-09-10311: Consumer Complaint — High Pressure to Take on Loan/Debt
2016-08-09311: Homeless Person Assistance — N/A
2016-07-06Job filed: HEREWITH FILING MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$7,500
2016-06-21Certificate of occupancy Temporary
2016-03-23Certificate of occupancy Temporary
2016-03-10311: Sewer — Manhole Cover Broken/Making Noise (SB)
2016-02-03FDNY inspection (ANNUL-COL-UNI)
2015
2015-12-24Certificate of occupancy Temporary
2015-12-22311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2015-10-30Mortgage $12,000,000 — from BERKELEY 12 EAST 41ST STREET LLC to SUSSEX BANK$12,000,000
2015-10-30AL&R $12,000,000 — from BERKELEY 12 EAST 41ST STREET LLC to SUSSEX BANK$12,000,000
2015-10-30TL&R — from JPMORGAN CHSE BANK, N.A. to BERKELEY REALTY COMPANY, L.L.C.
2015-10-30Deed — from BERKELEY REALTY COMPANY, L.L.C. to BERKELEY 12 EAST 41ST STREET LLC
2015-10-30Mortgage assigned — from JPMORGAN CHASE BANK, N.A. to SUSSEX BANK
2015-10-19DOB violation E:
2015-10-19DOB violation E:
2015-10-19DOB violation E:
2015-10-19DOB violation E:
2015-09-30Certificate of occupancy Temporary
2015-09-23Certificate of occupancy Temporary
2015-08-21FDNY inspection (OTHER)
2015-08-20Facade (LL11) filing, cycle 8: SAFE
2015-06-23Permit AL — ISSUED
2015-06-11Permit PL — ISSUED
2015-06-11Permit EW — ISSUED
2015-06-11Permit PL — ISSUED
2015-05-22311: Air Quality — Air: Smoke, Vehicular (AA4)
2015-05-12Facade (LL11) filing, cycle 7: SAFE
2015-05-05311: Illegal Parking — Blocked Hydrant
2015-05-01311: Illegal Parking — Blocked Sidewalk
2015-03-31Permit EQ — ISSUED
2015-02-02311: Water System — Leak (Use Comments) (WA2)
2014
2014-11-25Permit EW — ISSUED
2014-11-06FDNY inspection (ANNUL-COL-UNI)
2014-10-17Job filed: INSTALL NEW DEVICES IN EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$10,000
2014-10-17Job filed: INSTALL NEW DEVICES IN EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$10,000
2014-10-17Permit EW — ISSUED
2014-09-18Job filed: FILING FOR THE REMOVAL OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $18,000
2014-09-18Permit EW — ISSUED
2014-09-12Permit EQ — ISSUED
2014-09-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-09-10Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2014-08-27Permit EW — ISSUED
2014-08-12Job filed: INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$32,000
2014-08-12Job filed: INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2014-08-12Job filed: INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2014-08-11Job filed: INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2014-08-11Job filed: INSTALL MECHANICAL EQUIPMENT AND RELATED DUCTWORK . INSTALL PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE$160,000
2014-08-11Job filed: INSTALL NEW DEVICES IN EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$12,000
2014-08-11Job filed: A2$210,000
2014-08-11Job filed: INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2014-08-11Job filed: A2$210,000
2014-08-11Job filed: INSTALL NEW DEVICES IN EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH.$10,000
2014-08-11Permit AL — ISSUED
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-13Permit EW — ISSUED
2014-05-13Permit EQ — ISSUED
2014-05-09311: Construction Safety Enforcement — SST Tracking Complaint
2014-05-09DOB violation C:
2014-05-09DOB complaint, category ?
2014-05-01DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2014-03-25Permit EQ — ISSUED
2013
2013-12-20FDNY inspection (ANNUL-COL-UNI)
2013-10-07311: Noise — Noise: Construction Before/After Hours (NM1)
2013-08-12311: Broken Muni Meter — No Receipt
2013-08-01Permit EQ — ISSUED
2013-07-23Permit EQ — ISSUED
2013-06-28311: Consumer Complaint — False Advertising
2013-06-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2013-05-08Job filed: APPLICATION HEREBY FILED TO INSTALL NEW PIPE SCAFFOLD ON THE NORTH ELEVATION AS SHOWN ON DRAWINGS S-100. NO CHANGE TO USE, EGRESS OR OCCUPANCY. VIOLA
2013-05-08Job filed: APPLICATION HEREBY FILED TO INSTALL NEW PIPE SCAFFOLD ON THE NORTH ELEVATION AS SHOWN ON DRAWINGS S-100. NO CHANGE TO USE, EGRESS OR OCCUPANCY. VIOLA
2013-05-08Job filed: APPLICATION HEREBY FILED TO INSTALL NEW PIPE SCAFFOLD ON THE NORTH ELEVATION AS SHOWN ON DRAWINGS S-100. NO CHANGE TO USE, EGRESS OR OCCUPANCY. VIOLA
2013-03-30DOB violation E:
2013-03-15311: Construction Safety Enforcement — SST Tracking Complaint
2013-03-15ECB CLASS - 1 violation: INSTALLED SUPPORTED SCAFFOLD 40 FEET OR HIGHER W/O A PERMIT. NOTED: SUPPORTED SCAFFOLD INSTALLED ON SET BACK AT 14TH FL LEVEL W/O $1,200
2013-03-15DOB complaint, category ?
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2012
2012-11-23Rodent inspection: Passed
2012-10-23Permit EW — ISSUED
2012-10-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
2012-09-16311: Water System — Hydrant Running (WC3)
2012-08-15DOB violation E:
2012-06-18Permit EW — ISSUED
2012-04-25DOB violation E:
2012-04-09DOB complaint, category ?
2012-04-09Permit EQ — ISSUED
2012-04-09Permit EQ — ISSUED
2012-04-06Job filed: PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012-03-21DOB violation LL11/98: UNSAFE LOCAL LAW FILED
2012-03-21DOB violation LL11/98: UNSAFE LOCAL LAW REPORT FILED
2012-03-13311: Sewer — Manhole Cover Broken/Making Noise (SB)
2012-02-03Facade (LL11) filing, cycle 7: SAFE
2012-01-06Permit EW — ISSUED
2011
2011-12-29Permit EW — ISSUED
2011-12-29Permit EW — ISSUED
2011-12-22311: Food Poisoning — 1 or 2
2011-12-22Permit EW — ISSUED
2011-12-19Permit EW — ISSUED
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-11-15Permit PL — ISSUED
2011-11-07Permit EW — ISSUED
2011-11-02311: Elevator — Elevator - Dangerous Condition/Shaft Open/Unguarded
2011-11-02311: Elevator — Elevator - Defective/Not Working
2011-11-02DOB complaint, category ?
2011-11-02DOB complaint, category ?
2011-10-25Permit EW — ISSUED
2011-10-24Permit EW — ISSUED
2011-08-29Job filed: FILING FOR THE MODIFICATION TO THE EXISTING SPRINKLER SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2011-08-29Job filed: FILING FOR THE MODIFICATION TO THE EXISTING SPRINKLER SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2011-08-24Job filed: FILING FOR THE INSTALLATION OF NEW LOAD BEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2011-08-24Job filed: FILING FOR THE MODIFICATION TO THE EXISTING CLASS E FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2011-08-24Job filed: FILING FOR THE INSTALLATION OF A MODIFICATION OF THE MECHANICAL SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2011-08-24Job filed: FILING FOR THE INSTALLATION OF NEW LOAD BEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$60,000
2011-08-24Job filed: FILING FOR THE INSTALLATION OF A MODIFICATION OF THE MECHANICAL SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2011-08-03Permit EW — ISSUED
2011-07-22Job filed: FILING FOR THE MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANG IN USE, EGRESS OR OCCUPANCY.$20,000
2011-07-21Job filed: FILING FOR THE MODIFCIATION TO THE EXISTING SPRINKLER SYSTEMS AS SHOWN ON DRAWIGNS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$45,000
2011-07-19Rodent inspection: Passed
2011-07-15Job filed: FILING FOR THE INSTALLATION OF NEW LOAD BEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$125,000
2011-07-15Job filed: FILING FOR THE INSTALLATION OF NEW LOAD BEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$125,000
2011-07-15Job filed: FILING FOR THE INSTALLATION OF A NEW MECHANICAL SYSTEM. FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS F$100,000
2011-06-28Job filed: FILING FOR THE REMOVAL OF INTERIOR NON-LOAD BEARING WALLS AND RELATED FINISHES ON THE 12TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE$25,000
2011-06-14DOB violation E:
2011-06-14DOB violation E:
2011-06-14DOB violation E:
2011-06-14DOB violation E:
2011-06-14DOB violation E:
2011-06-14DOB violation E:
2011-06-08Permit PL — ISSUED
2011-05-20Permit AL — ISSUED
2011-05-10Permit EQ — ISSUED
2011-05-05Job filed: FILING FOR THE REMOVAL OF INTERIOR NON-LOADBEARING WALLS AND RELATED FINISHES ON THE 10TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE,$20,000
2011-05-03Job filed: APPLICATION HEREBY FILE TO REPAIR BUILDING FACADE. NO CHANGE TO USE, OCCUPANCY OF EGRESS.$150,000
2011-02-02Job filed: FILING FOR THE INSTALLATION OF A TEMPORARY CONSTRUCITON FENCE. NO CHANGE IN USE. EGRESS OR OCCUPANCY.
2010
2010-12-21Permit EW — ISSUED
2010-12-02Permit PL — ISSUED
2010-11-24Permit AL — ISSUED
2010-11-18Job filed: FILING FOR THE INSTALLATION OF A TWO NEW 5 TON UNITS AND RELATED DUCTWORK. FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES AND RELATED PIPING AS $80,000
2010-11-18Job filed: FILING FOR THE INSTALLATION OF NEW STEEL BEAMS TO CREATE A NEW STAIR OPENING ON THE 1ST FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH . NO CHANGE IN USE, $45,000
2010-11-18Job filed: FILING FOR THE INSTALLATION OF NEW STEEL BEAMS TO CREATE A NEW STAIR OPENING ON THE 1ST FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH . NO CHANGE IN USE, $45,000
2010-11-18Permit EW — ISSUED
2010-11-18Permit EW — ISSUED
2010-11-17Job filed: FILING FOR THE MODIFICIATIONS TO THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$33,000
2010-11-17Job filed: FILING FOR THE MODIFICIATIONS TO THE EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$33,000
2010-11-17Job filed: FILING FOR THE MODIFCIATION TO THE EXISTING SPRINKLER SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWTIH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2010-11-10Job filed: MODIFICATIONS TO EXISTING CLASS E FIRE ALARM SYSTEM.$8,010
2010-11-10Job filed: MODIFICATIONS TO EXISTING CLASS E FIRE ALARM SYSTEM.$8,010
2010-09-15DOB violation E:
2010-09-15DOB violation E:
2010-09-15DOB violation E:
2010-09-13Job filed: INSTALL COMMERCIAL RANGE HOOD AND EXHAUST SYSTEM. RANGE HOOD FIRE SUPPRESSION SYSTEM FILED SEPARATELY AS APPLICATION #120447515. NO CHANGE TO USE, OC$22,350
2010-09-13Job filed: INSTALL COMMERCIAL RANGE HOOD AND EXHAUST SYSTEM. RANGE HOOD FIRE SUPPRESSION SYSTEM FILED SEPARATELY AS APPLICATION #120447515. NO CHANGE TO USE, OC$22,350
2010-09-13Permit EW — ISSUED
2010-08-19Job filed: INSTALL RANGE HOOD AND AUTOMATIC WET CHEMICAL FIRE SUPPRESSION SYSTEM. RANGE HOOD EXHAUST SYSTEM TO BE FILED SEPARATELY.$7,665
2010-08-19Permit EW — ISSUED
2010-08-19Permit EW — ISSUED
2010-08-11Job filed: MODIFY EXISTING FIRE ALARM STSTEM PER DRAWINGS.$8,240
2010-07-22Job filed: FILING FOR THE REMOVAL OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE. EGRESS OR O$22,000
2010-07-16Rodent inspection: Passed
2010-06-30Permit PL — ISSUED
2010-06-28Job filed: PLUMBING WORK PER ATTACHED DRAWINGS. NO CHANGE TO USE, OCCUPANCY OR MEANS OF EGRESS.$58,000
2010-06-28Job filed: PLUMBING WORK PER ATTACHED DRAWINGS. NO CHANGE TO USE, OCCUPANCY OR MEANS OF EGRESS.$58,000
2010-05-24Job filed: ROUGH FRAMING AND STRUCTURAL REPAIRS AND IMPROVEMENTS INCLUDING FURRING OUT OF EXISTING WALLS, RELOCATION OF MEZZANINE STAIR, PATCHING OF SLAB OPENING$29,000
2010-05-24Permit EW — ISSUED
2010-04-09Job filed: DEMOLISH AND REMOVE EXISTING NON-STRUCTURAL CEILINGS, PARTITIONS, SOFFITS, STAIRS, DOORS, EQUIPMENT, FIXTURES AND FINISHES PER DRAWINGS. NO WORK IN M$35,250
2010-04-09Permit EW — ISSUED
2009
2009-09-08ECB CLASS - 2 violation: 59Y10-BRAKE DRUM PADS OIL SOAKED 52Y02
2009-08-11DOB violation E:
2008
2008-08-18DOB violation E:
2008-08-18DOB violation E:
2008-08-18DOB violation E:
2008-08-18DOB violation E:
2008-08-18DOB violation E:
2008-08-18DOB violation E:
2008-06-09Permit AL — ISSUED
2008-06-09Permit EW — ISSUED
2008-03-31DOB violation LL2604E:
2008-03-07Permit EW — ISSUED
2008-02-07Job filed: FILING FOR THE INSTALLATION OF A NEW FIRE ALARM SYSTEM AT THE 7TH, 9TH A ND 13TH FLOORS TO BE TIED INTO THE BASEBUILDINGS EXISTING SYSTEM AS SHOWN ON $36,000
2008-01-24Permit AL — ISSUED
2008-01-18Job filed: FILING FOR THE INSTALLATION OF A NEW FIRE ALARM SYSTEM AT THE 4TH & PENT HOUSE FLOORS TO BE TIED INTO THE BASE BUILDINGS SYSTEM AS SHOWN ON DRAWIN$10,000
2008-01-04Permit EW — ISSUED
2008-01-02Permit EW — ISSUED
2007
2007-12-31Permit PL — ISSUED
2007-11-30DOB violation LL1198:
2007-11-08Job filed: Filing for the modification to the mechanical system. Modification to the plumbing system. Modification to the sprinkler system as shown on drawings$285,000
2007-11-07Job filed: Filing for the installation of new non-load bearing partitions and related general construction work on the 13th floor as shown on drawings filed here$33,000
2007-10-26Job filed: PROPOSE TO FILE FOR THE REPLACEMENT OF THE EXISTING MODIFIED CLASS E FIR E COMMAND STATION AS PER PLAN SUBMITTEDHEREWITH DUE TO UNAVALIABILTY OF SPARE$5,000
2007-10-24Permit EW — ISSUED
2007-10-22Job filed: A2$18,000
2007-09-28Permit EW — ISSUED
2007-09-20DOB violation E:
2007-09-20DOB violation E:
2007-09-20DOB violation E:
2007-09-20DOB violation E:
2007-09-20DOB violation E:
2007-08-22Job filed: Filing for the issuance of equipment use cards for existing HVAC units as shown on drawings filed herewith. No change in use, egress or occupancy.$1,000
2007-05-18Facade (LL11) filing, cycle 6: SWARMP
2007-02-26Permit EW — ISSUED
2007-02-26Permit EW — ISSUED
2007-02-20Job filed: MODIFICATION TO THE EXISTING FIRE ALARMSYSTEM ON THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NOCHANGE IN USE, EGRESS OR OCCUPANCY$10,000
2007-02-20Job filed: MODIFICATION TO THE EXISTING FIRE ALARMSYSTEM ON THE 16TH FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NOCHANGE IN USE, EGRESS OR OCCUPANCY$10,000
2007-02-08Job filed: Filing for the installation of new A/C unit and modification to the existing ductwork on the 16th floor as shown on drawings filed herewith. No chang$30,000
2007-02-08Job filed: Filing for the installation of new non-load bearing partitions and related general construction work on the 16th floor as shown on drawings filed here$25,000
2007-01-08Permit EW — ISSUED
2006
2006-12-05Job filed: Interior Demolition and construction of non-load bearing walls as shown on drawings filed herewith. No change in use, egress or occupancy.$40,000
2006-08-23Permit PL — ISSUED
2006-07-26DOB violation E:
2006-07-26DOB violation E:
2006-07-26DOB violation E:
2006-07-26DOB violation E:
2006-07-26DOB violation E:
2006-07-13Permit EW — ISSUED
2006-07-13Permit EW — ISSUED
2006-07-13Permit PL — ISSUED
2006-07-13Permit EW — ISSUED
2006-07-10Job filed: Filing for the adjustment of existing gravity tank as shown on drawings filed herewith. No change in use, egress or occupancy.$1,000
2006-07-10Job filed: Filing for the adjustment of existing gravity tank as shown on drawings filed herewith. No change in use, egress or occupancy.$1,000
2006-07-06Permit EW — ISSUED
2006-07-05Permit PL — ISSUED
2006-06-28Permit AL — ISSUED
2006-06-19Job filed: Filing for the installation of mechanical equipment and ductwork on the 14th floor as shown drawings filed herewith. No change in use, egress or occu$30,000
2006-06-19Job filed: Filing for the installation of mechanical equipment and ductwork on the 14th floor as shown drawings filed herewith. No change in use, egress or occu$30,000
2006-06-14Job filed: Filing to modify an existing sprinkler system to add partial aprinkler protection on the 14th floor as shown on drawings filed herewith. No change in $15,000
2006-06-14Job filed: FILING FOR TO MODIFY EXISTING FIRE ALARMSYSTEM ON 14TH FLOOR AS PER PLNS FILED NO CHANGES$10,000
2006-06-14Job filed: FILING FOR TO MODIFY EXISTING FIRE ALARMSYSTEM ON 14TH FLOOR AS PER PLNS FILED NO CHANGES$10,000
2006-06-09Job filed: Filing for the removal of non-loadbearing partitions, installation of new non-loadbearing partitions and realted work on the 14th floor as shown on dr$25,000
2006-05-30Job filed: Filing to modify an existing sprinkler system to add full sprinkler protection on the 2nd , 3rd and 8th floor as per drawings filed herewith. No chan$30,000
2006-05-16Job filed: FILING FOR INTERIOR RENOVATION AND CHANGE IN OCCUPANCY ON FLOORS CEL,MEZ, 1 THRU 4,6, 7 THRU 9 AND 15 AS SHOWN ON PLANS FILED HEREWTIH$560,000
2006-05-16Job filed: Filing for mechanical and plumbing work related to the interior renovation on the 2nd, 3rd, & 8th floors as shown on drawings filed herewith.
2006-05-16Job filed: Filing for mechanical and plumbing work related to the interior renovation on the 2nd, 3rd, & 8th floors as shown on drawings filed herewith.
2006-05-10Job filed: FILING FOR THE MODIFICATION TO ANEXISTING FIRE ALARM SYSTEM ON THE 2ND, 3RD AND 8TH FLOOR AS SHOWN ONDRAWINGS FILED HEREWITH. NOCHANGE IN USE,EGRESS O$10,000
2006-05-02Permit EW — ISSUED
2006-04-25Job filed: Filing for interior demolition as shown on drawings filed herewith. No change in use, egress or occupancy.$120,000
2006-04-25Job filed: Filing for interior demolition as shown on drawings filed herewith. No change in use, egress or occupancy.$120,000
2006-02-07Permit PL — ISSUED
2006-02-07Permit PL — ISSUED
2006-01-12Permit PL — ISSUED
2005
2005-12-07Permit EW — ISSUED
2005-12-07Permit EW — ISSUED
2005-12-07Permit EW — ISSUED
2005-12-07Permit EW — ISSUED
2005-12-07Permit EW — ISSUED
2005-12-07Permit EW — ISSUED
2005-11-22TL&R — from MERRILL LYNCH MORTGAGE LENDING, INC. to ARTF-NEW YORK, INC.
2005-11-22AL&R $18,500,000 — from JPMORGAN CHASE BANK, N.A. to BERKELEY REALTY COMPANY, L.L.C.$18,500,000
2005-11-22M&CON $28,000,000 — from BERKELEY REALTY COMPANY, L.L.C. to JPMORGAN CHASE BANK, N.A.$28,000,000
2005-11-22Mortgage assigned — from MERRILL LYNCH MORTGAGE LENDING, INC. to JPMORGAN CHASE BANK
2005-11-22Deed $34,300,000 — from ARTF - NEW YORK, INC. to BERKELEY REALTY COMPANY, L.L.C.$34,300,000
2005-11-15Job filed: MODIFICATION OF EXISTING H.V.A.C.SYSTEM AND INSTALLATION OF NEWP PLUMBING FIXTURES ALL AS SHOWN ONDRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR $70,000
2005-11-15Job filed: DEMOLITION AND CONSTRUCTION OF INTERIORPARTITIONS AND INSTALLATION OF SUSPENDED CEILING ALL AS SHOWN ONDRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRES$110,000
2005-11-15Job filed: DEMOLITION AND CONSTRUCTION OF INTERIORPARTITIONS AND INSTALLATION OF SUSPENDED CEILING ALL AS SHOWN ON DRAW-INGS FILED HEREWITH. NO CHANGE IN USE, EG$120,000
2005-11-15Job filed: DEMOLITION AND CONSTRUCTION OF INTERIORPARTITIONS AND INSTALLATION OF SUSPENDED CEILING ALL AS SHOWN ONDRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRES$140,000
2005-11-15Job filed: MODIFICATION OF EXISTING H.V.A.C. SYSTEMAND INSTALLATION OF NEW PLUMBING FIXTURES ALL AS SHOWN ON DRAWINGS FILEDHEREWITH. NO CHANGE IN USE,EGRESS OR O$65,000
2005-11-15Job filed: MODIFICATION OF EXISTING H.V.A.C.SYSTEM AND INSTALLATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$60,000
2005-11-15Job filed: MODIFICATION OF EXISTING H.V.A.C.SYSTEM AND INSTALLATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$60,000
2005-11-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM TO ACCOMODATE NEW LAYOUT ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NOCHANGE IN USE,EGRESS OR OCCUPANCY UNDER$8,500
2005-11-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE NEW LAYOUT ALL AS SHOWN ON DRAWINGS FILED HEREWITH.NO CHANGE IN USE EGRESS OR OCCUPANCY UND$6,000
2005-11-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM TO ACCOMODATE NEW LAYOUT ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NOCHANGE IN USE,EGRESS OR OCCUPANCY UNDER$8,500
2005-11-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE NEW LAYOUT ALL AS SHOWN ON DRAWINGS FILED HEREWITH.NO CHANGE IN USE EGRESS OR OCCUPANCY UND$6,000
2005-11-09Job filed: MODIFICATION OF EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE NEW LAYOUT ALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY U$8,000
2005-10-31ECB Hazardous violation: FILING A FALSE CERTIFICATE, FORM, AFFIDAVIT OR STATEMENT OF CORRECTION W/THE NYC DEPT. OF BLDG. NOTED: CERTIFICATE OF CORRECTION F$2,500
2005-10-31ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG. WALL NOTED: FOUR WINDOW MOUNTED A/C UNITS AT 13TH FLR OF NORTH ELEVATION INSTALLATION TOP OF WI$2,500
2005-10-03Permit PL — ISSUED
2005-07-29Permit EW — ISSUED
2005-07-29Permit EW — ISSUED
2005-07-28Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2005-07-28Job filed: MECHANICAL AND PLUMBING MODIFICATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$60,000
2005-07-28Job filed: MECHANICAL AND PLUMBING MODIFICATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$60,000
2005-07-28Job filed: MECHANICAL AND PLUMBING MODIFICATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$60,000
2005-07-28Job filed: OFFICE RENOVATION AT 6TH FLOOR. PARTITION, CEILING MODIFICATIONS AND RELATED CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$188,000
2005-07-28Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,000
2005-02-10Permit PL — ISSUED
2005-01-13Permit EW — ISSUED
2005-01-11Job filed: MINOR PARTITION WORK AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2004
2004-12-08ECB Non-Hazardous violation: 59Q03/83O02/66O02/73O02/67O02/68O02/33O02/71Q03/38O02/51O02/52O02 59) MOTOR ROOM LIGHTS UNGUARDED 83) CLEAN SECONDARY AND PROVIDE $180
2004-12-08ECB Non-Hazardous violation: 59Q03/83O02/51O02/52O02/73O02/64L07/38O02/05O02/67O02/68O02/33O02 59) MOTOR ROOM LIGHTS UNGUARDED 83) CLEAN SECONDARY AND PROVIDE $180
2004-12-08ECB Non-Hazardous violation: 59Q03/83O02/51O02/52O02/73O02/38Y09/64L07/05O02/67O02/68O02/33O02 59) MOTOR ROOM LIGHTS UNGUARDED 83) CLEAN SECONDARY AND PROVIDE
2004-12-08ECB Non-Hazardous violation: 59Q03/83O02/64Q03/66M07/51O02/52O02/73O02/38O02/05O02/67O02/68O02/71O02/33O02/84O02 64) PIT LIGHT UNGUARDED 66) PROVIDE MISSING CO$180
2004-06-24DOB violation E:
2004-05-28Permit EW — ISSUED
2004-04-21DOB violation LL1081:
2004-04-12Job filed: Replace Steam PRV station in basement as per plans submitted herewith. No change in use, egress or occupancy.$60,000
2004-04-12Job filed: Replace Steam PRV station in basement as per plans submitted herewith. No change in use, egress or occupancy.$60,000
2004-04-09Permit PL — ISSUED
2004-02-04Job filed: Replace existing domestic riser pipings and install back-flow preventer. No change to Use, Egress and Occpancy.$77,000
2004-02-04Job filed: Replace existing domestic riser pipings and install back-flow preventer. No change to Use, Egress and Occpancy.$77,000
2004-01-08DOB violation E:
2004-01-08DOB violation E:
2004-01-08DOB violation E:
2004-01-08DOB violation E:
2004-01-08DOB violation E:
2004-01-08DOB violation E:
2003
2003-07-29ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG WALL.NOTED:UNSUPPORTED OR IMPROPERLY SUPPORTD WINDOW MOUNTED A/C UNITS AT UPPER FLOOR OF BLDG AT$800
2003-04-16Agreement — from NYC DEPT OF TRANSPORTATION to GRAND CENTRAL DISTRICT MANAGEMENT ASSOCI
2003-04-04DOB violation E: 1P14729
2002
2002-09-06Permit EW — ISSUED
2002-09-05Agreement — from ARTF-NEW YORK, INC. to MERRILL LYNCH MORTGAGE LENDING, INC.
2002-09-05SAGE — from EMIGRANT SAVINGS BANK
2002-09-05Mortgage assigned — from EMIGRANT SAVINGS BANK to MERRILL LYNCH MORTGAGE LENDING, INC.
2002-09-05Mortgage assigned — from ARTF-NEW YORK, INC. to MERRILL LYNCH MORTGAGE LENDING, INC.
2002-09-05Mortgage $4,258,537 — from ARTF-NEW YORK, INC. to MERRILL LYNCH MORTGAGE LENDING, INC.$4,258,537
2002-08-16Job filed: MODIFICATIONS TO HVAC SYSTEM INVOLVING T HE INSTALLATION OF (1) 7 1/2 TO SPLIT SYSTEM A/C UNIT AS PER PLANS FILE D HEREWITH. NO CHANGE TO USE, EGRESS$14,000
2002-08-16Job filed: MODIFICATIONS TO HVAC SYSTEM INVOLVING T HE INSTALLATION OF (1) 7 1/2 TO SPLIT SYSTEM A/C UNIT AS PER PLANS FILE D HEREWITH. NO CHANGE TO USE, EGRESS$14,000
2002-02-13DOB violation E: 1P14729
2002-02-13DOB violation E: 1S3075
2002-02-13DOB violation E: 1P14728
2002-02-13DOB violation E: 1P14730
2002-02-13DOB violation E: 1P14727
2001
2001-07-30DOB complaint, category ?
2001-07-26ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL HAZARDOUS DEFECT IS:AIR CONDITIONERS MOUNTED IN WINDOW IMPROPERLY ON NORTH EAST AND WES$800
2001-01-24DOB violation E: 1P14730
2001-01-24DOB violation E: 1P14727
2001-01-24DOB violation E: 1P14728
2001-01-08Permit EW — ISSUED
2000
2000-12-18Job filed: Facade repair as per plans filed herewith. No change to use, egress or occupancy$15,000
2000-12-18Job filed: Facade repair as per plans filed herewith. No change to use, egress or occupancy$15,000
2000-11-24ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDICATING CORRECT$400
2000-10-19Permit EQ — ISSUED
2000-10-19Permit EQ — ISSUED
2000-07-19Permit PL — ISSUED
2000-05-19Permit EW — ISSUED
2000-05-19Permit EW — ISSUED
2000-05-18Job filed: PARTITIONS AND CEILING CHANGES ON THE 13TH FLOOR. NO CHANGE IN OCCUPANCY,. USE OR EGRESS. L.L. #5 COMPLIANCE - SEPARATE A/C UNITS.$29,000
2000-05-18Job filed: HVAC WORK ON THE 16TH FLOOR. NO CHANGE IN OCCUPANCY, USE EGRESS. L.L. #5 COMPLIANCE - SEPARATE A/C UNITS.$10,000
2000-03-22Permit EW — ISSUED
2000-03-22Permit EW — ISSUED
2000-03-20Job filed: To install non-bearing partitions, hung ceiling, plumbing fixtures and A/C units and renovate retail store. No change of use, egress or occupancy.$5,500
2000-03-20Job filed: To install non-bearing partitions, hung ceiling, plumbing fixtures and A/C units and renovate retail store. No change of use, egress or occupancy.$5,500
2000-03-17DOB violation E: 1P14728
2000-03-17DOB violation E: 1P14727
2000-03-17DOB violation E: 1S3075
2000-03-17DOB violation E: 1P14730
2000-02-25DOB violation LL10/80:
2000-01-13Permit EQ — ISSUED
2000-01-06Job filed: INSTALLATION OF A HEAVY DUTY SHED 102' DURING FACADE REPAIR. SHED TO COMPLY WITH LL33/91. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
1999
1999-11-22Permit PL — ISSUED
1999-02-26DOB violation E: 1P14729
1999-02-26DOB violation E: 1P14728
1999-02-26DOB violation E: 1P14727
1999-02-26DOB violation E: 1P14730
1999-02-26DOB violation E: 1S3075
1999-01-04Permit PL — ISSUED
1999-01-04Permit PL — ISSUED
1998
1998-11-16Permit PL — ISSUED
1998-11-16Permit EW — ISSUED
1998-11-16Permit EW — ISSUED
1998-10-13Permit EW — ISSUED
1998-10-13Permit EW — ISSUED
1998-09-14Permit EW — ISSUED
1998-09-14Permit EW — ISSUED
1998-07-10Deed — from TREELINE EAST 41ST STREET ASSOCIATES to ARTF-NEW YORK INC
1998-07-10Mortgage satisfied — from TREELINE EAST 41ST STREET ASSOCIATES to EMIGRANT SAVINGS BANK
1998-05-29DOB complaint, category ?
1998-03-30ECB Non-Hazardous violation: 02M 02-PROVIDE INTERCOM FROM CAR TO LOBBY.$350
1998-03-30ECB Non-Hazardous violation: 02M 02-PROVIDE INTERCOM SYSTEM FORM CAR TO LOBBY.$350
1997
1997-09-22Permit EW — RE-ISSUED
1997-09-22Permit EW — RE-ISSUED
1997-02-21Permit EW — ISSUED
1997-02-05Deed — from AILEE WORLD CO., LTD. DEF.; BROADBELT, PATRICIAREFEREE; HARLEIGH 41 ASSOCIATES DEF.; EMIGR to TREELINE EAST 41ST STREET ASSOCIATES
1997-02-05Mortgage $500,000 — from TREELINE EAST 41ST STREET ASSOCIATES to EMIGRANT SAVINGS BANK$500,000
1997-02-05Mortgage assigned — from TREELINE EAST 41ST STREET ASSOCIATES to EMIGRANT SAVINGS BANK
1997-02-05Mortgage $5,700,000 — from TREELINE EAST 41ST STREET ASSOCIATES to EMIGRANT SAVINGS BANK$5,700,000
1996
1996-10-04Permit EQ — ISSUED
1995
1995-11-22Permit EW — ISSUED
1995-04-17DOB violation LL1081:
1995-01-17Permit PL — ISSUED
1994
1994-12-23Permit EW — ISSUED
1994-12-23Permit EW — ISSUED
1993
1993-09-09DOB complaint, category ?
1993-07-07Permit AL — ISSUED
1993-03-26Permit PL — ISSUED
1993-03-26Permit PL — ISSUED
1992
1992-10-27Permit AL — ISSUED
1991
1991-11-04Permit EW — ISSUED
1991-10-23Permit PL — ISSUED
1991-10-23Permit PL — ISSUED
1991-08-19Permit AL — ISSUED
1991-08-08Permit EW — ISSUED
1991-03-05ECB Non-Hazardous violation: 73X RESTORE TO SERVICE SO PROPER INSPECTION CANBE MADE OR FILE FOR DISMANTLE
1988
1988-08-18DOB violation E: TAG GOVERNOR FOR ALL TEST
1988-08-18DOB violation E: TAG GOVERNOR FOR ALL TEST
1988-08-18DOB violation E: TAG GOVERNOR FOR ALL TESTS
1988-08-18DOB violation E: (51) TAG GOVERNOR FOR ALL TEST
1985
1985-12-17Mortgage $2,850,000 — from HARLEIGH 41 ASSOCIATES to EMIGRANT SAVINGS BANK$2,850,000
1985-12-11Mortgage assigned — from ALLIED IRISH BANKS to EMIGRANT SAVINGS BANK
1985-12-11Mortgage assigned — from ALLIED IRISH BANKS to EMIGRANT SAVINGS BANK
1985-12-06DECL — from HARLEIGH 41 ASSOCIATES
1982
1982-12-17Mortgage $1,650,000 — from HARLEIGH 41 ASSOCIATES to ALLIED IRISH BK LTD.$1,650,000
1982-08-09Mortgage $4,500,000 — from HARLEIGH 41 ASSOCIATES to ALLIED IRISH BANKS LTD$4,500,000
1982-08-05Mortgage satisfied — from VESTREAL CORP. to EMIGRANT INDUST/SAV'S BK
1982-08-05Deed — from VESTREAL CORPORATION to HARLEIGH 41 ASSOCIATES
1982-06-21Agreement — from VESTREAL CORP. to EMIGRANT SAVNGS BANK; EMIGRANT INDL SAV BKFKA
1981
1981-05-11Agreement — from VESTREAL CORP to EMIGRANT SAVINGS BANK

Support this site Back to the building page