Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$74,100 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
77 service requests in the last three years. Most common: Noise (13) · Vendor Enforcement (11) · Homeless Person Assistance (8) · For Hire Vehicle Complaint (7) · Lost Property (6) · Special Projects Inspection Team (SPIT) (5).
Filed construction activity
$1,466,994,158 in permitted construction work filed since
2016 (562 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$96,400,000
$43,380,000
2026
$797,676,000
$358,954,200
2027
$1,528,652,000
$687,893,400
The city's market estimate has risen
1486% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2011 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
51 St — 6 E F · 1,000 ft straight-line (about a 5-minute walk) · station accessibility: full Grand Central-42 St — 4 5 6 7 S · 0.2 mi straight-line (about a 6-minute walk) · station accessibility: full
Bus
Nearest boarding stop: Madison Av / E 47 St — M1 M2 Q32 · 200 ft
Citi Bike
E 47 St & Park Ave · 400 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
77 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $250,000 on
2008-12-05 (lender: PNC Bank, NA). Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2020-05-13
Deed $33,072,265 — from MIDTOWN TRACKAGE VENTURES LLC to METROPOLITAN TRANSPORTATION AUTHORITY
$33,072,265
2020-03-04
Deed $33,072,265 — from MIDTOWN TRACKAGE VENTURES LLC to METROPOLITAN TRANSPORTATION AUTHORITY
$33,072,265
2020-02-28
Sold for $33,072,265
$33,072,265
$33,072,265
2018-12-12
DEVR $208,364,375 — from MIDTOWN GCT VENTURES LLC to JPMORGAN CHASE BANK, N.A.
$208,364,375
2013-08-30
Mortgage $500,000 — from LIVERIS, PAULA A; LIVERIS, ANDREW N to WELLS FARGO BANK NA
$500,000
2013-08-30
Mortgage $607,000 — from LIVERIS, ANDREW N; LIVERIS, PAULA A to WELLS FARGO BANK NA
$607,000
2008-12-05
Mortgage $250,000 — from SARABANCHONG, ALVIN to PNC BANK, NA
$250,000
2007-02-27
Agreement $308,500 — from DANN, ERIC R to JPMORGAN CHASE BANK, N.A.
$308,500
Ten-year activity
1,0005000
2017
2018
566
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
30
3
10
1
4
48
2018
182
2
13
4
7
208
2019
231
23
19
0
293
566
2020
144
21
13
3
279
460
2021
96
25
21
4
2
148
2022
97
34
5
0
2
138
2023
200
56
15
0
0
271
2024
272
32
15
1
0
320
2025
191
40
35
0
2
268
2026
35
7
25
1
17
85
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
ECB CLASS - 1 violation: I OBSERVED IN APT #6G UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, ALL EQUIPMENT GROUNDING CONDUCTORS IN PANEL #G NOT TERMINATED. APP
2026-10-02
DOB complaint, category ?
2026-09-28
Restaurant inspection: GRACE FARMS KIOSK — grade A
2026-09-25
Certificate of occupancy Renewal Without Change
2026-09-21
Permit Sidewalk Shed — Permit Issued
2026-09-21
Permit NB — ISSUED
2026-09-18
Permit Construction Fence — Permit Issued
2026-09-17
Permit Protection and Mechanical Methods — Permit Issued
2026-09-17
Permit Protection and Mechanical Methods — Permit Issued
2026-09-17
Permit Protection and Mechanical Methods — Permit Issued
2026-09-17
Permit Protection and Mechanical Methods — Signed-off
2026-09-17
Permit Protection and Mechanical Methods — Permit Issued
311: Taxi Complaint — Driver Complaint - Non Passenger
2026-07-21
DOB complaint, category ?
2026-07-08
311: Illegal Parking — Blocked Sidewalk
2026-07-08
311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-01
311: Consumer Complaint — General Vendor
2026-06-29
311: Street Condition — Pothole
2026-06-25
311: Lost Property — Electronics/Phones
2026-06-18
311: Lost Property — Bag/Wallet
2026-06-18
Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER
2026-06-17
Permit NB — ISSUED
2026-06-11
311: Homeless Person Assistance — Non-Chronic
2026-06-10
Restaurant inspection: GRACE FARMS KIOSK
2026-06-05
311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2026-06-05
311: Vendor Enforcement — Non-Food Vendor
2026-06-05
311: Vendor Enforcement — Non-Food Vendor
2026-06-05
311: Vendor Enforcement — Non-Food Vendor
2026-06-05
DOB complaint, category ?
2026-06-04
Permit General Construction — Permit Issued
2026-06-04
Permit General Construction — Permit Issued
2026-06-02
DOB complaint, category ?
2026-05-26
311: Lost Property — Jewelry
2026-05-14
Certificate of occupancy Renewal With Change
2026-05-14
Permit General Construction — Permit Issued
2026-05-14
Permit General Construction — Permit Issued
2026-05-08
311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-04-29
Restaurant inspection: Client Center — grade A
2026-04-20
Job filed: No Work
2026-04-16
311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-04-08
Permit Plumbing — Signed-off
2026-04-01
Restaurant inspection: DENKI SUSHI — grade A
2026-04-01
Restaurant inspection: THE CORNER — grade A
2026-04-01
Restaurant inspection: BROAD STREET DELI — grade A
2026-04-01
Restaurant inspection: UMAMI ASIAN WOK AND NOODLE — grade A
2026-04-01
Restaurant inspection: MORGAN'S — grade A
2026-04-01
Restaurant inspection: Fuel Bar, Kiosks Pop Up Bars and Market Bar — grade A
2026-04-01
Restaurant inspection: PIZZA/RIO BRONCO/AIR STREEMS/SOUP — grade A
2026-04-01
Restaurant inspection: MADISON KITCHEN (HEARTH/MEZZE/SIZZLE) — grade A
2026-04-01
Restaurant inspection: LITTLE DIRT CANDY — grade A
2026-04-01
Restaurant inspection: STARBUCKS — grade A
2026-04-01
Restaurant inspection: SWEETGREEN — grade A
2026-04-01
Restaurant inspection: DAILY PROVISIONS — grade A
2026-04-01
Restaurant inspection: COFFEE BAR — grade A
2026-03-25
Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans
2026-03-25
Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans
2026-03-25
Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans
2026-03-25
Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans
2026-03-25
Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f
2026-03-12
311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-12
Permit Protection and Mechanical Methods — Permit Issued
2026-03-12
Permit Protection and Mechanical Methods — Permit Issued
2026-03-12
Permit Protection and Mechanical Methods — Permit Issued
2026-03-12
Permit Protection and Mechanical Methods — Permit Issued
2026-03-11
Job filed: Use of Building Maintenance Unit (BMU) #3, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
2026-03-11
Job filed: Use of Building Maintenance Unit (BMU) #1, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
2026-03-11
Job filed: Use of Building Maintenance Unit (BMU) #2, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
2026-03-11
Job filed: Use of Building Maintenance Unit (BMU) #4, as per plans filed herewith. This application is filed in conjunction with NB-121205604.
2026-02-25
FDNY inspection (DEMO)
2026-02-18
Certificate of occupancy Renewal With Change
showing the 80 most recent
The full timeline
showing the 2,000 most recent of
4,768 events
2026
2026-10-02ECB CLASS - 1 violation: I OBSERVED IN APT #6G UNSAFE UNSUITABLE ELECTRICAL CONDITIONS, ALL EQUIPMENT GROUNDING CONDUCTORS IN PANEL #G NOT TERMINATED. APP $1,600
2026-10-02DOB complaint, category ?
2026-09-28Restaurant inspection: GRACE FARMS KIOSK — grade A
2026-09-25Certificate of occupancy Renewal Without Change
2026-09-21Permit Sidewalk Shed — Permit Issued
2026-09-21Permit NB — ISSUED
2026-09-18Permit Construction Fence — Permit Issued
2026-09-17Permit Protection and Mechanical Methods — Permit Issued
2026-09-17Permit Protection and Mechanical Methods — Permit Issued
2026-09-17Permit Protection and Mechanical Methods — Permit Issued
2026-09-17Permit Protection and Mechanical Methods — Signed-off
2026-09-17Permit Protection and Mechanical Methods — Permit Issued
2026-07-26311: Taxi Complaint — Driver Complaint - Non Passenger
2026-07-21DOB complaint, category ?
2026-07-08311: Illegal Parking — Blocked Sidewalk
2026-07-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-01311: Consumer Complaint — General Vendor
2026-06-29311: Street Condition — Pothole
2026-06-25311: Lost Property — Electronics/Phones
2026-06-18311: Lost Property — Bag/Wallet
2026-06-18Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$2,000
2026-06-17Permit NB — ISSUED
2026-06-11311: Homeless Person Assistance — Non-Chronic
2026-06-04Permit General Construction — Permit Issued
2026-06-04Permit General Construction — Permit Issued
2026-06-02DOB complaint, category ?
2026-05-26311: Lost Property — Jewelry
2026-05-14Certificate of occupancy Renewal With Change
2026-05-14Permit General Construction — Permit Issued
2026-05-14Permit General Construction — Permit Issued
2026-05-08311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-04-29Restaurant inspection: Client Center — grade A
2026-04-20Job filed: No Work
2026-04-16311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2026-04-08Permit Plumbing — Signed-off
2026-04-01Restaurant inspection: DENKI SUSHI — grade A
2026-04-01Restaurant inspection: THE CORNER — grade A
2026-04-01Restaurant inspection: BROAD STREET DELI — grade A
2026-04-01Restaurant inspection: UMAMI ASIAN WOK AND NOODLE — grade A
2026-04-01Restaurant inspection: MORGAN'S — grade A
2026-04-01Restaurant inspection: Fuel Bar, Kiosks Pop Up Bars and Market Bar — grade A
2026-04-01Restaurant inspection: PIZZA/RIO BRONCO/AIR STREEMS/SOUP — grade A
2026-04-01Restaurant inspection: MADISON KITCHEN (HEARTH/MEZZE/SIZZLE) — grade A
2026-04-01Restaurant inspection: LITTLE DIRT CANDY — grade A
2026-04-01Restaurant inspection: STARBUCKS — grade A
2026-04-01Restaurant inspection: SWEETGREEN — grade A
2026-04-01Restaurant inspection: DAILY PROVISIONS — grade A
2026-04-01Restaurant inspection: COFFEE BAR — grade A
2026-03-25Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $17,025,242
2026-03-25Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $10,963,477
2026-03-25Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $8,411,009
2026-03-25Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $9,341,162
2026-03-25Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$6,471,369
2026-03-12311: Noise — Noise: Construction Before/After Hours (NM1)
2026-03-12Permit Protection and Mechanical Methods — Permit Issued
2026-03-12Permit Protection and Mechanical Methods — Permit Issued
2026-03-12Permit Protection and Mechanical Methods — Permit Issued
2026-03-12Permit Protection and Mechanical Methods — Permit Issued
2026-03-11Job filed: Use of Building Maintenance Unit (BMU) #3, as per plans filed herewith. This application is filed in conjunction with NB-121205604.$1,000
2026-03-11Job filed: Use of Building Maintenance Unit (BMU) #1, as per plans filed herewith. This application is filed in conjunction with NB-121205604.$1,000
2026-03-11Job filed: Use of Building Maintenance Unit (BMU) #2, as per plans filed herewith. This application is filed in conjunction with NB-121205604.$1,000
2026-03-11Job filed: Use of Building Maintenance Unit (BMU) #4, as per plans filed herewith. This application is filed in conjunction with NB-121205604.$1,000
2026-02-25FDNY inspection (DEMO)
2026-02-18Certificate of occupancy Renewal With Change
2026-01-26Certificate of occupancy Renewal With Change
2026-01-16Job filed: No Work
2026-01-11311: Lost Property — Electronics/Phones
2025
2025-12-24FDNY inspection (CONSTR)
2025-12-24Permit Sidewalk Shed — Permit Issued
2025-12-24Permit Sidewalk Shed — Permit Issued
2025-12-22Job filed: HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$2,000
2025-12-20311: Street Sign - Missing — No Parking, Standing, Stopping
2025-12-18311: Borough Office — Restroom Non-Complaince With Local Law 79/16
2025-12-18DOB complaint, category ?
2025-12-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-12-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-12-15Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$361,179
2025-12-05Certificate of occupancy Renewal With Change
2025-12-03311: Elevator — Elevator - Multiple Devices On Property
2025-12-03ECB CLASS - 1 violation: CEASE USE ITEM: PERFORM ALL NECESSARY ADJUSTMENTS TO THE COUNTER WEIGHT SAFETIES AND PERFORM CATEGORY 1 SAFETY TEST. REMEDY: RESTO$1,250
2025-12-03DOB complaint, category ?
2025-11-22311: Building/Use — Illegal Conversion Of Residential Building/Space
2025-11-22DOB complaint, category ?
2025-11-20Certificate of occupancy Renewal With Change
2025-11-13311: Street Sign - Missing — No Parking, Standing, Stopping
2025-11-12311: Lost Property — Electronics/Phones
2025-11-12Certificate of occupancy Renewal With Change
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-10-27Job filed: No Work
2025-10-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-10-22Certificate of occupancy Renewal With Change
2025-10-20Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$680,958
2025-10-18DOB complaint, category ?
2025-10-16Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$717,585
2025-10-09Certificate of occupancy Renewal With Change
2025-10-08Permit Construction Fence — Permit Issued
2025-10-08Permit Construction Fence — Permit Issued
2025-10-07Permit Structural — Signed-off
2025-10-06DOB complaint, category ?
2025-10-03Permit Protection and Mechanical Methods — Permit Issued
2025-10-03Permit Protection and Mechanical Methods — Permit Issued
2025-10-03Permit Protection and Mechanical Methods — Signed-off
2025-10-03Permit Supported Scaffold — Signed-off
2025-10-03Permit Protection and Mechanical Methods — Signed-off
2025-10-03Permit Protection and Mechanical Methods — Signed-off
2025-10-03Permit Protection and Mechanical Methods — Signed-off
2025-10-03Permit Sidewalk Shed — Signed-off
2025-10-03Permit Protection and Mechanical Methods — Signed-off
2025-10-02Cooling tower inspection
2025-10-01Permit General Construction — Permit Issued
2025-10-01Permit Mechanical Systems — Signed-off
2025-09-30FDNY inspection (SPECIAL-OTH)
2025-09-30FDNY inspection (SPECIAL-OTH)
2025-09-26Permit Protection and Mechanical Methods — Permit Issued
2025-09-26Permit Supported Scaffold — Signed-off
2025-09-26Permit Protection and Mechanical Methods — Signed-off
2025-09-26Permit Protection and Mechanical Methods — Permit Issued
2025-09-26Permit Protection and Mechanical Methods — Signed-off
2025-09-25Permit Protection and Mechanical Methods — Signed-off
2025-09-25Permit Protection and Mechanical Methods — Permit Issued
2025-09-25Permit Protection and Mechanical Methods — Permit Issued
2025-09-25Permit Protection and Mechanical Methods — Permit Issued
2025-09-25Permit Sidewalk Shed — Permit Issued
2025-09-25Permit Protection and Mechanical Methods — Permit Issued
2025-09-25Permit Protection and Mechanical Methods — Signed-off
2025-09-18ECB CLASS - 1 violation: AT TIME OF INSPECTION, OBSERVED TRUCK BACKING INTO LOADING DOCK IN CLOSE PROXIMITY TO BOOM WHILE FACADE WORK WAS IN PROGRESS. THE $2,500
2025-09-18Certificate of occupancy Renewal With Change
2025-09-18DOB complaint, category ?
2025-09-11311: Bus Stop Shelter Complaint — Sign Missing or Defective
2025-09-11Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler and Standpipe system as per plans filed herewith. No cha$734,000
2025-09-08Permit NB — RE-ISSUED
2025-08-28Permit Standpipe — Permit Issued
2025-08-27Permit Standpipe — Signed-off
2025-08-27Permit Standpipe — Permit Issued
2025-08-27Permit Sprinklers — Signed-off
2025-08-27Permit Sprinklers — Permit Issued
2025-08-26Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$717,585
2025-08-26Permit Structural — Permit Issued
2025-08-25Certificate of occupancy Renewal With Change
2025-08-19311: Consumer Complaint — Pedicab
2025-08-19Permit General Construction — Permit Issued
2025-08-11Job filed: TEMPORARY QUIK DECK PLATFORM SYSTEM AS PER DRAWINGS. QUIK DECK PLATFORM SYSTEM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN US$10,000
2025-08-07Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2025-08-07Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2025-08-06Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$31,199,320
2025-08-04311: Homeless Person Assistance — Non-Chronic
2025-08-04311: Homeless Person Assistance — Non-Chronic
2025-07-28DOB complaint, category ?
2025-07-28Permit General Construction — Permit Issued
2025-07-28Permit General Construction — Permit Issued
2025-07-23Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$361,179
2025-07-22Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$1,089,790
2025-07-21311: Vendor Enforcement — Food Vendor
2025-07-21311: Vendor Enforcement — Food Vendor
2025-07-21311: Vendor Enforcement — Food Vendor
2025-07-19DOB complaint, category ?
2025-07-18Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 Modification to existing Sprinkler system as per plans filed herewith. No change in u$385,600
2025-07-14FDNY inspection (CDA-90-DRILL)
2025-07-11Certificate of occupancy Renewal With Change
2025-07-10311: Vendor Enforcement — Food Vendor
2025-07-07311: Homeless Person Assistance — Non-Chronic
2025-07-07Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$8,737,568
2025-07-07Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FITOUT WORK$11,757,606
2025-07-07Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Partition Wall Support. General Construction. No change in egress, use, or o$1,956,025
2025-07-07Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$6,471,369
2025-07-07Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Partition Wall Support. General Construction. No change in egress, use, or o$1,956,025
2025-07-07Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Partition Wall Support. General Construction. No change in egress, use, or o$2,912,885
2025-07-03Job filed: TEMPORARY HAKI SYSTEM SCAFFOLD AS PER DRAWINGS. HAKI SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UND$4,000
2025-07-03Permit Supported Scaffold — Signed-off
2025-07-02Job filed: AS PER HUB CONSULTATION THIS INTERIOR OT APPLICATION IS FILED IN CONJUNCTION WITH NB 121205604 FOR CONSTRUCTION OF NON INTERIOR PARTITIONS AND RELAT$5,100,385
2025-07-01Certificate of occupancy Initial
2025-06-30Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $9,341,162
2025-06-30Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change $461,450
2025-06-25311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2025-06-25DOB complaint, category ?
2025-06-22311: Homeless Person Assistance — Non-Chronic
2025-06-18Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for interior construction of non-load bearing interior partitions, related finishes an$31,198,721
2025-06-17Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2025-06-16Job filed: No Work
2025-06-16Job filed: No Work
2025-06-16Job filed: No Work
2025-06-13Permit Protection and Mechanical Methods — Permit Issued
2025-06-13Permit Protection and Mechanical Methods — Permit Issued
2025-06-13Permit Protection and Mechanical Methods — Permit Issued
2025-06-13Permit Protection and Mechanical Methods — Permit Issued
2025-06-13Permit Protection and Mechanical Methods — Permit Issued
2025-06-10Permit Plumbing — Signed-off
2025-06-10Permit Protection and Mechanical Methods — Signed-off
2025-06-09Permit Mechanical Systems — Permit Issued
2025-06-08311: Homeless Person Assistance — Non-Chronic
2025-06-06Job filed: Mini-Crane$5,000
2025-06-06Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans f$1,712,499
2025-06-06Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans f$1,712,499
2025-06-04Permit Protection and Mechanical Methods — Signed-off
2025-06-04Permit Mechanical Systems — Permit Issued
2025-05-15311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2025-05-15DOB complaint, category ?
2025-05-08Permit Plumbing — Signed-off
2025-05-05ECB CLASS - 1 violation: OBSERVED MISSING SECTION OF SWS CORNER EXP3,2. APP.SSP INDICATES SWS PROVIDED AT LOCATION AT CORNER OF EXP3,4.NOTE BC3307.6.3 AREA$2,500
2025-05-05DOB complaint, category ?
2025-05-02Permit Structural — Permit Issued
2025-04-28DOB complaint, category ?
2025-04-25Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. INTERIOR FIT-OUT, FLOORS 7-10$78,458,378
2025-04-25Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. INTERIOR FIT-OUT, FLOORS 3-6$78,458,378
2025-04-21Permit Standpipe — Signed-off
2025-04-17Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$346,327
2025-04-16Job filed: TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS A$3,000
2025-04-15Permit Structural — Signed-off
2025-04-15Permit Structural — Signed-off
2025-04-14Job filed: No Work
2025-04-12Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$680,928
2025-04-12Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$1,305,610
2025-04-12Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$959,867
2025-04-12Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 Modification to existing Sprinkler system as per plans filed herewith. No change in u$963,207
2025-04-12Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$463,065
2025-04-10311: Noise - Vehicle — Car/Truck Horn
2025-04-10ECB CLASS - 1 violation: AT TIME OF INSPECTION IN RESPONSE TO AN INCIDENT WHERE A WORKER FELL FROM JLG AERIAL LIFT PLATFORM BASKET DURING CURTAIN WALL INST$2,500
2025-04-10DOB complaint, category ?
2025-04-10Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system as per plans filed herewith.$781,675
2025-04-10Permit Sprinklers — Permit Issued
2025-04-07Permit Plumbing — Signed-off
2025-04-07Permit Plumbing — Permit Issued
2025-04-04311: Street Condition — Pothole
2025-04-04ECB CLASS - 1 violation: AT TIME OF INSPECTION, RESPONDING TO AN INCIDENT WERE A WORKER WAS MOVING A DRYWALL CART LOADED WITH STONE PANELS WHEN THE CART FE
2025-04-04ECB CLASS - 1 violation: AT TIME OF INSPECTION, RESPONDING TO AN INCIDENT WERE A WORKER WAS MOVING A DRYWALL CART LOADED WITH STONE PANELS WHEN THE CART FE$2,500
2025-03-24Job filed: TEMPORARY SUPPORTED SCAFFOLD PLATFORM AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER TH$5,000
2025-03-24Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2025-03-23Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$673,005
2025-03-23Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$1,356,783
2025-03-23Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans f$1,712,499
2025-03-23Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans f$1,712,499
2025-03-21Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Removal and installation of interior nonbearing partitions as per plans filed$35,365,614
2025-03-20Job filed: No Work
2025-03-20Permit Protection and Mechanical Methods — Permit Issued
2025-03-19ECB CLASS - 2 violation: 57 STORY NEW BUILDING ACTIVE SITE. OBSERVED TEMPORARY CONSTRUCTION IN USE. BUILDING MAINTENANCE UNIT/DAVID SYSTEM OR SUSPENDED SCA
2025-03-19ECB CLASS - 2 violation: 57 STORY NEW BUILDING ACTIVE SITE.OBSERVED TEMPORARY CONSTRUCTION IN USE. BUILDING MAINTENANCE UNIT/DAVID SYSTEM OR SUSPENDED SCAF
2025-03-19DOB complaint, category ?
2025-03-18Permit Sprinklers — Permit Issued
2025-03-18Permit Standpipe — Signed-off
2025-03-18Permit Standpipe — Permit Issued
2025-03-18Permit Sprinklers — Signed-off
2025-03-13311: Vendor Enforcement — Food Vendor
2025-03-12DOB complaint, category ?
2025-03-12Permit Curb Cut — Permit Issued
2025-03-10Permit Plumbing — Permit Issued
2025-03-10Permit Plumbing — Permit Issued
2025-03-10Permit Plumbing — Permit Issued
2025-03-08Permit Mechanical Systems — Permit Issued
2025-03-06DOB complaint, category ?
2025-03-05Job filed: INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE 1ST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO$10,000
2025-03-05Permit Sprinklers — Permit Issued
2025-03-05Permit Standpipe — Permit Issued
2025-03-05Permit Sprinklers — Permit Issued
2025-03-05Permit Standpipe — Signed-off
2025-03-05Permit Sprinklers — Signed-off
2025-03-05Permit Sprinklers — Signed-off
2025-03-04ECB CLASS - 1 violation: FAILURE TO COMPLY WITH BC-3303.4.2. OBSERVED FULL SIZE OF DUMPSTER DEBRIS, "OVER RIM" IT WAS FULL OF WOOD DEBRIS AND LOCATED AT ST$2,500
2025-03-04ECB CLASS - 1 violation: FAILURE TO ENSURE WORKER FOLLOWS MANUFACTURER SPECIFICATIONS WHILE USING A-FRAME LADDERS, ELECTRICIAN WORKER SET UP LADDER ON UNST
2025-03-04ECB CLASS - 1 violation: FAILURE TO INSTITUTE SAFETY MEASURES, MISSING GUARDRAILS ON LOADING DOCK AREA 6 FEET HIGH, NO CONTROL ACCESS ZONE, NO TRUCKS, CREA
2025-02-26Job filed: INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE 1ST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO$10,000
2025-02-26Permit Protection and Mechanical Methods — Permit Issued
2025-02-25Permit Sprinklers — Signed-off
2025-02-20Permit Plumbing — Signed-off
2025-02-20Permit Sprinklers — Signed-off
2025-02-14Permit Plumbing — Permit Issued
2025-02-13FDNY inspection (CDA-90-DRILL)
2025-02-12311: Noise — Noise: Construction Equipment (NC1)
2025-02-12311: Vendor Enforcement — Food Vendor
2025-02-10Permit PL — ISSUED
2025-02-07DOB complaint, category ?
2025-02-07Permit Plumbing — Signed-off
2025-02-07Permit Plumbing — Signed-off
2025-02-06Permit Mechanical Systems — Permit Issued
2025-02-06Permit General Construction — Signed-off
2025-02-06Permit General Construction — Permit Issued
2025-02-06Permit Mechanical Systems — Permit Issued
2025-02-06Permit Mechanical Systems — Permit Issued
2025-02-06Permit Protection and Mechanical Methods — Signed-off
2025-02-05DOB complaint, category ?
2025-02-05Job filed: TEMPORARY QUIK DECK PLATFORM SYSTEM AS PER DRAWINGS. QUIK DECK PLATFORM SYSTEM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN US$10,000
2025-02-05Permit Sprinklers — Signed-off
2025-02-04Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2025-01-31Permit Sprinklers — Signed-off
2025-01-31Permit Sprinklers — Permit Issued
2025-01-30Permit Sprinklers — Signed-off
2025-01-30Permit General Construction — Signed-off
2025-01-24Permit Protection and Mechanical Methods — Permit Issued
2025-01-23Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$4,590
2025-01-21Permit Sprinklers — Signed-off
2025-01-16Job filed: AS PER HUB CONSULTATION THIS MH APPLICATION IS TO EXTEND EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED/HOT WATER PIPING, COLD CONDENSATE PIPING$3,200,000
2025-01-16Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $10,963,477
2025-01-15Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Tenant fitout of office space pantries, mothers rooms, and hydration stations$984,029
2025-01-13Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM SHALL C$5,000
2025-01-13Permit Protection and Mechanical Methods — Signed-off
2025-01-10Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Tenant fitout of office space pantries, mothers rooms, and hydration stations$984,029
2025-01-10Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $17,025,242
2025-01-10Job filed: installation of new sprinkler and standpipe system in conjunction to new building application 121205604.$2,000
2025-01-10Permit EQ — ISSUED
2025-01-08Permit Plumbing — Signed-off
2025-01-06Permit General Construction — Permit Issued
2025-01-03Permit Sprinklers — Permit Issued
2025-01-03Permit Sprinklers — Signed-off
2025-01-03Permit Standpipe — Permit Issued
2025-01-03Permit Standpipe — Signed-off
2025-01-02Permit Sprinklers — Signed-off
2025-01-02Permit Standpipe — Signed-off
2025-01-02Permit Standpipe — Permit Issued
2025-01-02Permit Sprinklers — Permit Issued
2024
2024-12-23Permit Plumbing — Signed-off
2024-12-20Permit Plumbing — Signed-off
2024-12-20Permit Plumbing — Signed-off
2024-12-18Permit Plumbing — Permit Issued
2024-12-17Permit EW — ISSUED
2024-12-12Permit Mechanical Systems — Permit Issued
2024-12-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE$3,000
2024-12-10Permit Mechanical Systems — Signed-off
2024-12-10Permit Mechanical Systems — Permit Issued
2024-12-09Permit Supported Scaffold — Signed-off
2024-12-06Permit Protection and Mechanical Methods — Signed-off
2024-12-06Permit Protection and Mechanical Methods — Signed-off
2024-12-05Permit Mechanical Systems — Signed-off
2024-12-05Permit Mechanical Systems — Signed-off
2024-12-05Permit General Construction — Signed-off
2024-12-05Permit General Construction — Signed-off
2024-12-05Permit Mechanical Systems — Signed-off
2024-12-04Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$2,817,054
2024-12-04Permit General Construction — Signed-off
2024-12-03Permit General Construction — Permit Issued
2024-12-03Permit General Construction — Permit Issued
2024-12-03Permit General Construction — Permit Issued
2024-12-03Permit General Construction — Signed-off
2024-12-03Permit General Construction — Signed-off
2024-12-02Job filed: No Work
2024-12-02Job filed: No Work
2024-12-02Job filed: INSTALLATION OF MULTIPLE SHANTIES AND TEMPORARY BATHROOM STRUCTURES WITHIN BUILDING FOR USE DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY UNDER 12$1,067,000
2024-11-19311: Vendor Enforcement — Food Vendor
2024-11-19Job filed: As per HUB consultation in conjunction with NB #121205604 (Slab Removal, Interconnecting Stair Structure and Stair Support, Interconnecting Stair Deta$573,630
2024-11-15Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2024-11-15Job filed: installation of new sprinkler and standpipe system in conjunction to new building application 121205604.$2,000
2024-11-15Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2024-11-14Permit Structural — Signed-off
2024-10-30Permit Structural — Signed-off
2024-10-23Permit General Construction — Permit Issued
2024-10-18Job filed: installation of new sprinkler and standpipe system in conjunction to new building application 121205604.$2,000
2024-10-18Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$5,000
2024-10-18Permit General Construction — Permit Issued
2024-10-17DOB complaint, category ?
2024-10-17DOB complaint, category ?
2024-10-17Job filed: REMOVAL OF EXISTING INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION: INSTALLATION OF TEMPORARY FIELD O$1,000
2024-10-16Job filed: TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST, FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, O
2024-10-15Permit Plumbing — Permit Issued
2024-10-15Permit Plumbing — Signed-off
2024-10-10Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FITOUT WORK$11,757,606
2024-10-09Permit Boiler Equipment — Permit Issued
2024-10-08Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for Structural Modifications (Feature Stair Structure, Feature Stair Support (Steel an$1,094,430
2024-10-08Permit Boiler Equipment — Permit Issued
2024-10-07Job filed: Miscellaneous structural support steel related to POPS Art Walls on Madison Avenue related to New Building 121205604$2,898,074
2024-10-04Job filed: Use of Building Maintenance Unit as per plans filed herewith. This application is filed in conjunction with NB-121205604.$1,000
2024-10-04Permit Mechanical Systems — Signed-off
2024-10-02Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$190,000
2024-10-02Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change $577,250
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Supported Scaffold — Signed-off
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Sidewalk Shed — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Construction Fence — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Sidewalk Shed — Signed-off
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-02Permit Protection and Mechanical Methods — Signed-off
2024-10-02Permit Protection and Mechanical Methods — Permit Issued
2024-10-01Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$27,586,775
2024-09-27Permit Sprinklers — Permit Issued
2024-09-27Permit Structural — Signed-off
2024-09-27Permit Sprinklers — Signed-off
2024-09-27Permit Standpipe — Signed-off
2024-09-27Permit Standpipe — Permit Issued
2024-09-25Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$8,737,568
2024-09-23Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change $461,450
2024-09-23Permit General Construction — Permit Issued
2024-09-23Permit Standpipe — Permit Issued
2024-09-20Permit Sprinklers — Permit Issued
2024-09-20Permit Plumbing — Signed-off
2024-09-20Permit Mechanical Systems — Permit Issued
2024-09-19Permit PL — ISSUED
2024-09-18ECB CLASS - 2 violation: AT THE TIME OF MY INSPECTION OF 57 STORY NEW BUILDING OBSERVED JECKO MINI CRANE INSTALLED AT 52ND FLOOR EXP#3 INSTALLED CONTRARY T
2024-09-18ECB CLASS - 1 violation: OBSERVED 6 WORKERS ON 52ND FLOOR AT EXP#3 REMOVING/UNINSTALLING MONORAIL SUSPENDED SCAFFOLD SYSTEM-WITH GUARDRAIL SYSTEM REMOVED/L$5,000
2024-09-18DOB complaint, category ?
2024-09-18DOB complaint, category ?
2024-09-18Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$290,500
2024-09-18Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler and Standpipe system as per plans filed herewith. No cha$734,000
2024-09-16Job filed: As per HUB consultation in conjunction with NB #121205604 (Slab Removal, Interconnecting Stair Structure and Stair Support, Interconnecting Stair Deta$573,630
2024-09-16Permit NB — ISSUED
2024-09-11Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for interior construction of non-load bearing interior partitions, related finishes an$31,198,721
2024-09-10Job filed: AS PER HUB CONSULTATION IN CONJUNCTION WITH NB #121205604 THE WORK IS TO EXTENDS EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED AND HOT WATER PI$3,485,685
2024-09-10Job filed: As per HUB consultation in conjunction with NB #121205604. Modification to existing plumbing fixtures as per plans filed herewith. No change in use, $168,350
2024-09-10Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 Modification to existing Sprinkler system as per plans filed herewith. No change in u$385,600
2024-09-03FDNY inspection (CDA-90-DRILL)
2024-08-29Permit General Construction — Signed-off
2024-08-26Job filed: Installation of temporary sprinkler loops as per the filed drawings. No change to use, occupancy or egress.$46,500
2024-08-26Permit Protection and Mechanical Methods — Signed-off
2024-08-23Job filed: TEMPORARY SUSPENDED WORK PLATFORM AS PER DRAWINGS. SUSPENDED WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRE$5,000
2024-08-22Job filed: As per HUB Consultation filed in conjunction to NB 121205604. Modification to existing SD system (Scope of work submitted under this application exten$14,000
2024-08-20Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2024-08-16Permit General Construction — Permit Issued
2024-08-15Job filed: AS PER HUB CONSULTATION THIS INTERIOR OT APPLICATION IS FILED IN CONJUNCTION WITH NB 121205604 FOR CONSTRUCTION OF NON INTERIOR PARTITIONS AND RELAT$5,100,385
2024-08-12Permit Structural — Signed-off
2024-08-12Permit Structural — Permit Issued
2024-08-12Permit Structural — Permit Issued
2024-08-12Permit Structural — Permit Issued
2024-08-12Permit Structural — Permit Issued
2024-08-12Permit Structural — Permit Issued
2024-08-12Permit Structural — Permit Issued
2024-08-09Job filed: INSTALLATION OF MULTIPLE SHANTIES AND TEMPORARY BATHROOM STRUCTURES WITHIN BUILDING FOR USE DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY UNDER 12$1,067,000
2024-08-09Permit Supported Scaffold — Signed-off
2024-08-08Job filed: TEMPORARY SUPPORTED SCAFFOLD PLATFORM AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER TH$5,000
2024-08-07Permit Structural — Permit Issued
2024-08-07Permit Structural — Permit Issued
2024-08-07Permit Structural — Permit Issued
2024-08-07Permit Structural — Permit Issued
2024-08-07Permit Structural — Permit Issued
2024-07-23Job filed: CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC$3,000
2024-07-22Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2024-07-22Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2024-07-17Job filed: INSTALLATION OF FUEL OIL STORAGE TANKS SERVING NEW EMERGENCY GENERATOR FILING IN CONJUNCTION TO NEW BUILDING 121205604. FUEL OIL STORAGE TANKS ARE LOC$1,000
2024-07-11CERT — from JPMORGAN CHASE BANK, N.A.
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$13,888
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith. No change in use, egress or occupa$130,998
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$116,850
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$217,840
2024-07-03Job filed: As per HUB consultation this Structural application is for modifications as per plans filed herewith. No change in use, egress or occupancy under this$130,998
2024-07-03Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for Structural Modifications as per plans filed herewith. No change in use, egress or $114,150
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$261,995
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$795,897
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$310,900
2024-07-03Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$9,188
2024-07-03Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for Structural Modifications as per plans filed (Cast-in-place isolated topping slab, $218,912
2024-07-02Job filed: 48TH ST HOIST CARS 13&14: INSTALLATION OF DUAL 10250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2024-07-02Permit Protection and Mechanical Methods — Signed-off
2024-07-01Job filed: USE OF TEMPORARY MINI CRANE CONSTRUCTION EQUIPMENT DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$7,650
2024-06-28311: Special Projects Inspection Team (SPIT) — Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal
2024-06-28DOB complaint, category ?
2024-06-28Job filed: 48TH ST HOIST CARS 9&10: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF$20,000
2024-06-28Job filed: 48TH ST HOIST CARS 7&8: INSTALLATION OF DUAL 7500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF $20,000
2024-06-28Job filed: 48TH ST HOIST CARS 11&12: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2024-06-24Permit General Construction — Signed-off
2024-06-23DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
2024-06-20Permit Protection and Mechanical Methods — Permit Issued
2024-06-20Permit Protection and Mechanical Methods — Permit Issued
2024-06-20Permit Protection and Mechanical Methods — Permit Issued
2024-06-19Job filed: INSTALLATION OF NONLOAD BEARING PARTITIONS & RELATED FINISHES IN SUPPORT OF A TEMPORARY CONSTRUCTION FIELD OFFICE; ALL TEMPORARY PARTITIONS ERECTED SH$199,980
2024-06-18Permit Protection and Mechanical Methods — Permit Issued
2024-06-18Permit Protection and Mechanical Methods — Permit Issued
2024-06-18Permit Protection and Mechanical Methods — Permit Issued
2024-06-11Permit Mechanical Systems — Permit Issued
2024-06-11Permit Mechanical Systems — Permit Issued
2024-06-07Permit Plumbing — Signed-off
2024-06-07Permit Sprinklers — Signed-off
2024-06-07Permit Sprinklers — Signed-off
2024-06-07Permit Sprinklers — Permit Issued
2024-06-07Permit Plumbing — Signed-off
2024-06-06Permit General Construction — Signed-off
2024-06-05Permit Protection and Mechanical Methods — Permit Issued
2024-06-05Permit Protection and Mechanical Methods — Permit Issued
2024-06-05Permit Protection and Mechanical Methods — Permit Issued
2024-06-05Permit Protection and Mechanical Methods — Permit Issued
2024-06-05Permit Protection and Mechanical Methods — Signed-off
2024-06-05Permit Protection and Mechanical Methods — Permit Issued
2024-06-05Permit Protection and Mechanical Methods — Permit Issued
2024-06-04Permit General Construction — Permit Issued
2024-06-03FDNY inspection (CDA-90-DRILL)
2024-05-31Job filed: INSTALLATION OF MULTIPLE SHANTIES WITHIN BUILDING FOR USE DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY UNDER 121205604.$20,000
2024-05-28Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$1,293,998
2024-05-28Permit Standpipe — Signed-off
2024-05-22DOB complaint, category ?
2024-05-21Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$1,089,790
2024-05-20Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change $2,196,712
2024-05-14Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$346,327
2024-05-13Job filed: Concrete construction loads imposed during the construction sequence. All other required permits will be filed as part of the New Building (NB) applic$5,000
2024-05-12Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change $519,925
2024-05-12Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$361,179
2024-05-07Permit Plumbing — Permit Issued
2024-05-07Permit Plumbing — Signed-off
2024-05-06ECB CLASS - 1 violation: AT TIME OF INSPECTION NB 60 STORY OBSERVE INADEQUATE HOUSEKEEPING CONSTRUCTION MATERIALS AND STANDING WATER FROM THE 48TH FLOOR $1,250
2024-05-06ECB CLASS - 1 violation: BC 3308.5.3.1 ZERO CABLE : AT TIME OF INSPECTION I OBSERVED VERTICAL/ ZERO CABLE INADEQUATELY MAINTAINED WITH ZERO CABLE NOT PRO$5,000
2024-05-06DOB complaint, category ?
2024-05-06DOB complaint, category ?
2024-05-03311: AHV Inspection Unit — After Hours Work - With An AHV Permit
2024-05-03ECB CLASS - 2 violation: OBSERVED 3 ADT ACCESS SYSTEM SCAFFOLDS AT EXPS# 2 & 4 ON THE 32ND FLOOR & 1 AT EXP# 3 ON THE 57TH FL. THE OUTRIGGERS WERE TIED BAC$1,250
2024-05-03DOB complaint, category ?
2024-05-03DOB complaint, category ?
2024-05-03DOB complaint, category ?
2024-05-02ECB CLASS - 2 violation: BC 3301.1.1 RESPONSIBILITY FOR SAFETY. INADEQUATE EGRESS. OBSERVED INADEQUATE/UNSAFE EGRESS AT THE 54FL THRU RF- STAIRCASE PLYWOOD$1,250
2024-05-02ECB CLASS - 2 violation: 3308.5 VERTICAL SAFETY NETTING SYSTEMS. OBSERVED THE VERTICAL SAFETY CABLE/NETTING SYSTEM WAS INADEQUATE ON MULTIPLE FLOORS - 54FL$2,500
2024-04-30311: Noise — Noise: Construction Equipment (NC1)
2024-04-29Permit Sprinklers — Permit Issued
2024-04-29Permit Sprinklers — Signed-off
2024-04-26Permit Plumbing — Permit Issued
2024-04-23Permit Structural — Signed-off
2024-04-23Permit Structural — Signed-off
2024-04-22Permit Standpipe — Signed-off
2024-04-17311: Water System — Hydrant Running Full (WA4)
2024-04-09Permit Supported Scaffold — Signed-off
2024-04-07DOB complaint, category ?
2024-04-06ECB CLASS - 1 violation: INCIDENT WHERE A MAGNI TELESCOPIC HANDLER WAS TILTED OVER WHILE LIFTING A WOODEN PALLET. THE INSPECTION REVEALED THAT THE MANIPULA$12,500
2024-04-06ECB CLASS - 1 violation: INSPECTION REVEALED, MAGNI HANDLER (HOISTING EQUIPMENT) WITH A MANIPULATOR CONNECTION FOR GLASS INSTALLATION WAS USED TO PERFORM A$10,000
2024-04-05Permit EW — ISSUED
2024-04-02Permit Supported Scaffold — Signed-off
2024-03-21Job filed: INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$3,000
2024-03-21Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2024-03-21Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Partition Wall Support. General Construction. No change in egress, use, or o$1,956,025
2024-03-21Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Partition Wall Support. General Construction. No change in egress, use, or o$1,956,025
2024-03-20Permit General Construction — Signed-off
2024-03-19311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-19311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2024-03-19DOB complaint, category ?
2024-03-19Job filed: No Work
2024-03-19Job filed: No Work
2024-03-19Job filed: No Work
2024-03-19Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Standpipe system as per plans filed herewith.$14,100
2024-03-19Job filed: No Work
2024-03-19Job filed: As per HUB Consultation filed in conjunction to NB 121205604. Modification to existing Standpipe system as per plans filed herewith.$15,057
2024-03-19Job filed: No Work
2024-03-19Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$116,850
2024-03-19Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$217,840
2024-03-19Job filed: No Work
2024-03-19Job filed: No Work
2024-03-19Job filed: No Work
2024-03-19Permit Standpipe — Signed-off
2024-03-19Permit Standpipe — Permit Issued
2024-03-19Permit Sprinklers — Signed-off
2024-03-19Permit Sprinklers — Permit Issued
2024-03-18311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-15Permit Mechanical Systems — Permit Issued
2024-03-15Permit Plumbing — Permit Issued
2024-03-15Permit Plumbing — Permit Issued
2024-03-15Permit Plumbing — Permit Issued
2024-03-14Permit Mechanical Systems — Permit Issued
2024-03-11Permit Protection and Mechanical Methods — Signed-off
2024-03-08Job filed: TEMPORARY SUSPENDED QUIK DECK PLATFORM AS PER DRAWINGS. QUICK DECK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, $15,000
2024-03-07311: Noise — Noise: Construction Before/After Hours (NM1)
2024-03-07Permit Sprinklers — Signed-off
2024-03-07Permit Sprinklers — Signed-off
2024-03-07Permit Sprinklers — Permit Issued
2024-03-07Permit Sprinklers — Signed-off
2024-03-07Permit General Construction — Permit Issued
2024-03-07Permit General Construction — Signed-off
2024-03-06311: Noise — Noise: Construction Before/After Hours (NM1)
2024-02-28Permit Mechanical Systems — Permit Issued
2024-02-27Permit Protection and Mechanical Methods — Signed-off
2024-02-27Permit Sprinklers — Signed-off
2024-02-26Job filed: TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS A$3,000
2024-02-23311: Noise — Noise: Construction Before/After Hours (NM1)
2024-02-22DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2024-02-21Permit Boiler Equipment — Signed-off
2024-02-20Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for Structural Modifications as per plans filed herewith. No change in use, egress or $114,150
2024-02-14311: Noise — Noise: Construction Equipment (NC1)
2024-02-14Job filed: Use of Building Maintenance Unit as per plans filed herewith. This application is filed in conjunction with NB-121205604.$1,000
2024-02-14Permit Protection and Mechanical Methods — Permit Issued
2024-02-13Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$13,888
2024-02-13Permit Plumbing — Signed-off
2024-02-13Permit Plumbing — Signed-off
2024-02-09FDNY inspection (CDA-90-DRILL)
2024-02-07Permit Plumbing — Signed-off
2024-02-01Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for Structural Modifications as per plans filed (Cast-in-place isolated topping slab, $218,912
2024-02-01Permit Sprinklers — Signed-off
2024-02-01Permit Sprinklers — Permit Issued
2024-01-31Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$6,553,014
2024-01-31Permit Sprinklers — Signed-off
2024-01-31Permit Standpipe — Signed-off
2024-01-31Permit Standpipe — Permit Issued
2024-01-31Permit Sprinklers — Permit Issued
2024-01-31Permit Sprinklers — Signed-off
2024-01-30Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$680,928
2024-01-30Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$6,471,369
2024-01-30Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$194,125
2024-01-29Permit Sprinklers — Signed-off
2024-01-29Permit Sprinklers — Permit Issued
2024-01-29Permit Standpipe — Signed-off
2024-01-29Permit Standpipe — Permit Issued
2024-01-26Permit Sprinklers — Signed-off
2024-01-24Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith. No change in use, egress or occupa$130,998
2024-01-24Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$8,657,943
2024-01-24Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$310,900
2024-01-24Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$795,897
2024-01-24Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$9,188
2024-01-24Job filed: As per HUB consultation this Structural application is for modifications as per plans filed herewith. No change in use, egress or occupancy under this$130,998
2024-01-24Job filed: As per HUB consultation in conjunction with NB #121205604 for Structural modifications as per plans filed herewith (Connecting steel stairs between f$261,995
2024-01-19Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $9,341,162
2024-01-19Permit Sprinklers — Permit Issued
2024-01-19Permit Sprinklers — Signed-off
2024-01-19Permit Standpipe — Permit Issued
2024-01-19Permit Standpipe — Signed-off
2024-01-18Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$147,553
2024-01-18Permit Sprinklers — Signed-off
2024-01-18Permit Plumbing — Signed-off
2024-01-18Permit Plumbing — Signed-off
2024-01-18Permit Plumbing — Signed-off
2024-01-17Job filed: AS PER HUB CONSULTATION IN CONJUNCTION WITH NB #121205604 THE WORK IS TO EXTENDS EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED AND HOT WATER PI$5,798,163
2024-01-12Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$14,142,395
2024-01-10Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$463,065
2024-01-10Permit Structural — Permit Issued
2024-01-10Permit Mechanical Systems — Permit Issued
2024-01-09ECB CLASS - 1 violation: FAILURE TO PROVIDE SAFETY MEASURES AS PER-CODE REQUIREMENTS. I OBSERVED REINFORCING STEEL DOWELS WITH SHARP EDGES, AND NOT PROTECT$10,000
2024-01-09ECB CLASS - 1 violation: FAILURE TO MAINTAIN VERTICAL NETTING AS PER-CODE REQUIREMENTS 3308.5 AND 3308.5.1. I OBSERVED VERTICAL NETTING HAD LARGE OPENINGS $5,000
2024-01-09Permit Mechanical Systems — Signed-off
2024-01-08311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2024-01-08ECB CLASS - 2 violation: AN INCIDENT WHERE 19 PIECES OF GALVANIZE SHEET STACK ON A FRAME CART AND FELL ON A WORKER LEG INJURED HIS ANKLE AMBULANCE WAS CALL$5,000
2024-01-08DOB complaint, category ?
2024-01-08DOB complaint, category ?
2024-01-08Permit Mechanical Systems — Signed-off
2024-01-08Permit Mechanical Systems — Permit Issued
2024-01-03Permit Protection and Mechanical Methods — Signed-off
2024-01-02Job filed: TEMPORARY ACCESS PLATFORM FOR PARK AVE HOISTS AS PER DRAWINGS, HOISTS FILED UNDER SEPARATE APPLICATION. ACCESS PLATFORM SHALL COMPLY WITH CH #33 OF TH$4,000
2024-01-02Permit EW — ISSUED
2024-01-02Permit EQ — ISSUED
2023
2023-12-28311: Street Condition — Failed Street Repair
2023-12-20Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$1,305,610
2023-12-20Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$7,173,768
2023-12-20Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$959,867
2023-12-20Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$10,536,637
2023-12-20Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$673,005
2023-12-20Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$7,147,400
2023-12-20Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change i$680,958
2023-12-20Permit General Construction — Signed-off
2023-12-19Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$269,522
2023-12-19Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$347,582
2023-12-19Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$164,646
2023-12-19Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$152,731
2023-12-19Permit Mechanical Systems — Signed-off
2023-12-19Permit General Construction — Signed-off
2023-12-18Permit Mechanical Systems — Signed-off
2023-12-15Permit General Construction — Permit Issued
2023-12-14Permit Plumbing — Signed-off
2023-12-14Permit Mechanical Systems — Permit Issued
2023-12-13Permit General Construction — Signed-off
2023-12-12Permit Mechanical Systems — Signed-off
2023-12-11Permit General Construction — Permit Issued
2023-12-05Permit General Construction — Permit Issued
2023-12-05Permit General Construction — Signed-off
2023-12-05Permit Mechanical Systems — Permit Issued
2023-12-05Permit General Construction — Signed-off
2023-12-05Permit Mechanical Systems — Signed-off
2023-12-05Permit Mechanical Systems — Signed-off
2023-12-05Permit General Construction — Signed-off
2023-12-05Permit General Construction — Signed-off
2023-12-04Job filed: AS PER HUB CONSULTATION THIS INTERIOR TENANT RENOVATION OF NON INTERIOR PARTITIONS AND RELATED FINISHES OT APPLICATION IS FILED IN CONJUNCTION WITH N$6,589,977
2023-11-29Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FITOUT WORK$11,757,606
2023-11-22Job filed: AS PER HUB CONSULTATION FILED IN CONJUNCTION WITH NB #121205604 FOR THE MECHANICAL SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS INTERIOR FIT$14,388,276
2023-11-21311: Consumer Complaint — Travel Agency
2023-11-21Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change$323,972
2023-11-21Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$1,356,783
2023-11-21Job filed: Installation of underground plumbing in conjunction to new building application 121205604.$1,000
2023-11-21Permit Protection and Mechanical Methods — Signed-off
2023-11-16Job filed: TEMPORARY WORK PLATFORMS AS PER DRAWINGS. WORK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL$10,000
2023-11-15Job filed: Shoring system on 56th floor to support formwork for 58th floor concrete beams. All other required permits will be filed as part of the New Building $5,000
2023-11-08Job filed: As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change $1,622,678
2023-11-08Job filed: As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, eg$717,585
2023-11-01DOB complaint, category ?
2023-11-01DOB complaint, category ?
2023-10-30Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans f$31,199,320
2023-10-24FDNY inspection (CDA-90-DRILL)
2023-10-24Permit PL — ISSUED
2023-10-23ECB CLASS - 1 violation: RESPOND TO AN INCIDENT WHERE A WORKER FELL OFF THE CONCRETE TRUCK .WHEN PUMPING CONCRETE BACK INTO THE TRUCK. THE HOSE BECAME LO
2023-10-23DOB complaint, category ?
2023-10-23Permit Protection and Mechanical Methods — Signed-off
2023-10-20Job filed: TEMPORARY PIPE SCAFFOLD AT TRUCK HOISTWAY AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDE$25,000
2023-10-20Permit Supported Scaffold — Signed-off
2023-10-17Job filed: 48TH ST HOIST CARS 11&12: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2023-10-16Permit Protection and Mechanical Methods — Signed-off
2023-10-15311: Noise - Residential — Loud Talking
2023-10-11Job filed: Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.$1,000,000
2023-10-04311: Street Condition — Cave-in
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2023-10-04Job filed: INSTALLATION OF SUSPENDED QUIK DECK ACCESS PLATFORM AS PER DRAWINGS. QUIK DECK ACCESS PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.$50,000
2023-10-04Job filed: TRUCK ELEVATOR SCAFFOLD: INSTALLATION OF TEMPORARY TRUCK ELEVATOR SCAFFOLD AS PER DRAWINGS. TRUCK ELEVATOR SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NY$10,000
2023-10-04Permit Protection and Mechanical Methods — Permit Issued
2023-10-04Permit Protection and Mechanical Methods — Permit Issued
2023-10-04Permit Protection and Mechanical Methods — Signed-off
2023-10-04Permit Sidewalk Shed — Signed-off
2023-10-03Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Plumbing fixtures as per plans filed herewith$3,009,725
2023-10-03Permit Sidewalk Shed — Signed-off
2023-10-03Permit Sidewalk Shed — Permit Issued
2023-10-03Permit Sidewalk Shed — Signed-off
2023-10-02ECB CLASS - 2 violation: AT TIME OF INSPECTION NB OBSERVED FIRE EXTINGUISHERS WHERE MISSING ON FLOOR 42 & 43 LACK OF FIRE EXTINGUISHERS CREATES A HAZARD CO
2023-09-29DOB complaint, category ?
2023-09-28Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing HVAC system as per plans filed herewith. No change i$7,367,846
2023-09-28Job filed: AS PER HUB CONSULTATION IN CONJUNCTION WITH NB #121205604 THE WORK IS TO EXTENDS EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED AND HOT WATER PI$9,481,720
2023-09-28Job filed: Installation of underground plumbing in conjunction to new building application 121205604.$1,000
2023-09-28Permit NB — ISSUED
2023-09-28Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Construction Fence — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Supported Scaffold — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system as per plans filed herewith.$781,675
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Signed-off
2023-09-27Permit Supported Scaffold — Signed-off
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-27Permit Protection and Mechanical Methods — Permit Issued
2023-09-25Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Partition Wall Support. General Construction. No change in egress, use, or o$2,912,885
2023-09-25Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER $50,000
2023-09-20Job filed: As per HUB consultation in conjunction with NB #121205604. Modification to existing plumbing fixtures as per plans filed herewith. No change in use, $560,123
2023-09-18DOB complaint, category ?
2023-09-11Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Removal and installation of interior nonbearing partitions as per plans filed$35,365,614
2023-09-11Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 Modification to existing Sprinkler system as per plans filed herewith. No change in u$963,207
2023-09-05DOB complaint, category ?
2023-09-05Job filed: INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2023-08-30Job filed: PARK AVE HOIST, SOUTH CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #$20,000
2023-08-29Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2023-08-25Permit Supported Scaffold — Signed-off
2023-08-22Permit Protection and Mechanical Methods — Signed-off
2023-08-22Job filed: TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC$2,000
2023-08-16311: Damaged Tree — Entire Tree Has Fallen Down
2023-08-16Permit Protection and Mechanical Methods — Permit Issued
2023-08-15Job filed: USE OF TELEHANDLER DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$350,000
2023-08-14DOB complaint, category ?
2023-08-09Permit EQ — ISSUED
2023-08-09Permit EQ — ISSUED
2023-08-07Job filed: installation of new sprinkler and standpipe system in conjunction to new building application 121205604.$2,000
2023-08-03Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Tenant fitout of office space pantries, mothers rooms, and hydration stations$984,029
2023-08-03Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Tenant fitout of office space pantries, mothers rooms, and hydration stations$984,029
2023-08-02DOB complaint, category ?
2023-08-02Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans f$1,712,499
2023-08-02Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans f$1,712,499
2023-07-28Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing HVAC system as per plans filed herewith. No change i$6,279,206
2023-07-28Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $17,025,242
2023-07-28Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $10,963,477
2023-07-28Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $8,463,073
2023-07-28Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing HVAC system as per plans filed herewith. No change i$6,279,206
2023-07-28Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $8,411,009
2023-07-28Job filed: As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans $15,442,445
2023-07-27Permit Protection and Mechanical Methods — Signed-off
2023-07-26Job filed: AS PER HUB CONSULTATION THIS INTERIOR OT APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION 121205604 FOR CONSTRUCTION OF NON INTERIOR PARTITION$20,514,570
2023-07-26Job filed: 48TH ST HOIST CARS 11&12: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2023-07-26Job filed: 48TH ST HOIST CARS 9&10: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF$20,000
2023-07-25Permit Supported Scaffold — Signed-off
2023-07-24Job filed: TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP$50,000
2023-07-21311: Noise — Noise: Construction Before/After Hours (NM1)
2023-07-21311: Noise — Noise: Construction Before/After Hours (NM1)
2023-07-20311: Investigations and Discipline (IAD) — Plumbing Work - Unlicensed/Illegal/Improper Work In Progress
2023-07-20311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2023-07-20311: Real Time Enforcement — Work Without A Permit - Occupied Multiple Dwelling
2023-07-20DOB complaint, category ?
2023-07-20DOB complaint, category ?
2023-07-10DOB complaint, category ?
2023-07-10Permit Mechanical Systems — Permit Issued
2023-07-10Job filed: Installation of interior partitions and raised floor related to temporary mock-up offices space. All construction to be removed after the mock-up peri$730,000
2023-07-07Job filed: (PHASE 4: MADISON AVENUE): INSTALLATION OF HEAVY DUTY SIDEWALK SHED ON MADISON AVENUE AS PER DRAWINGS. NO CHANGE IN USE, OCCUPACY OR EGRESS UNDER THIS$3,000
2023-07-07Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$10,000
2023-07-06FDNY inspection (CDA-90-DRILL)
2023-06-30Permit Protection and Mechanical Methods — Signed-off
2023-06-28Permit Protection and Mechanical Methods — Signed-off
2023-06-28DOB complaint, category ?
2023-06-27Job filed: PARK AVENUE LOADING DOCK: TEMPORARY LOADING DOCK AS PER DRAWINGS. LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR $10,000
2023-06-27Job filed: SOUTH LOADING DOCK @ PARK AVE: TEMPORARY LOADING DOCK AS PER DRAWINGS. LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANC$6,000
2023-06-20Job filed: Concrete construction loads imposed during the construction sequence. All other required permits will be filed as part of the New Building (NB) applic$5,000
2023-06-20Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. INTERIOR FIT-OUT, FLOORS 7-10$78,458,378
2023-06-13Job filed: AS PER HUB CONSULTATION THIS MH APPLICATION IS TO EXTEND EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED/HOT WATER PIPING, COLD CONDENSATE PIPING$3,200,000
2023-06-10Permit Protection and Mechanical Methods — Permit Issued
2023-06-09Permit EQ — ISSUED
2023-06-06Job filed: To be assigned to Development HUB; filed in conjunction to NB 121205604. INTERIOR FIT-OUT, FLOORS 3-6$78,458,378
2023-06-06Job filed: CARS 7, 8, 9, 10, 11, 12, 13 & 14: TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF$25,000
2023-05-31Permit General Construction — Signed-off
2023-05-27311: Consumer Complaint — Other Store (Non-Food)
2023-05-25311: Smoking — Smoking Violation
2023-05-19Permit Protection and Mechanical Methods — Permit Issued
2023-05-19Permit Protection and Mechanical Methods — Permit Issued
2023-05-19Permit Protection and Mechanical Methods — Permit Issued
2023-05-19Permit Protection and Mechanical Methods — Permit Issued
2023-05-19Permit Protection and Mechanical Methods — Permit Issued
2023-05-19Permit Protection and Mechanical Methods — Signed-off
2023-05-18Permit Protection and Mechanical Methods — Permit Issued
2023-05-12ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT OF AN ACCIDENT INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. A WORKER FELL FROM THE 35 FL TO THE 3$2,500
2023-05-11Job filed: Installation of interior partitions and raised floor related to temporary mock-up offices space. All construction to be removed after the mock-up peri$730,000
2023-05-09Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2023-05-08Job filed: THE MH SCOPE OF WORK EXTENDS EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED WATER PIPING, HOT WATER PIPING AND COLD CONDENSATE PIPING TO NEW TE$18,500,000
2023-05-08Job filed: AS PER HUB CONSULTATION IN CONJUNCTION WITH NB #121205604 THE WORK IS TO EXTENDS EXISTING CORE AND SHELL OUTSIDE AIRDUCTWORK, CHILLED AND HOT WATER PI$15,750,000
2023-05-05Permit Protection and Mechanical Methods — Permit Issued
2023-05-05Permit Protection and Mechanical Methods — Permit Issued
2023-05-05Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-05-05Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-05-05Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-05-05Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-05-05Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-05-05Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-05-04Permit Supported Scaffold — Signed-off
2023-05-03ECB CLASS - 1 violation: 60 STORY NB, CURRENTLY ON 36FL, ACTIVE SITE, WITH WORKING DECKS FROM 30 UP TO 36FL. UPON WALKING THOSE FLOORS I OBSERVED 1/4INCH D$2,500
2023-05-03ECB CLASS - 2 violation: 60 STORY NB, CURRENTLY AT 36FL(778FEET6''). I OBSERVED ACTIVE SITE, WITH LAST POURED CONCRETE SLAB AT 29FL(654FEET6''). AS PER BC3
2023-05-03ECB CLASS - 2 violation: 60 STORY NB, CURRENTLY ON 36FL, I OBSERVED CURTAIN WALL INSTALLATION OPERATIONS USING MONORAIL SYSTEM AT EXP4 NEAR EXP1. ON THE GR
2023-05-03DOB complaint, category ?
2023-05-03Job filed: TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION$9,000
2023-04-27Job filed: 48TH ST HOIST CARS 7&8: INSTALLATION OF DUAL 7500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF $20,000
2023-04-19ECB CLASS - 1 violation: AT TIME OF INSPECTION OF A PROPOSED 57 STOREYS BUILDING I OBSERVED AN UNCAPPED REBARS ON THE 1ST FLOOR, THIS CREATES UNSAFE CONDI
2023-04-19ECB CLASS - 1 violation: IN RESPONSE TO AN INCIDENT WHERE A WORKER FELL FROM 34TH FLOOR DURING STEEL ERECTION OPERATION INJURED HIS LEG AMBULANCE WAS CALLE$5,000
2023-04-19DOB complaint, category ?
2023-04-11Permit Supported Scaffold — Signed-off
2023-04-11Permit Supported Scaffold — Signed-off
2023-04-07Permit Supported Scaffold — Signed-off
2023-04-04Permit Protection and Mechanical Methods — Permit Issued
2023-04-04Permit Protection and Mechanical Methods — Signed-off
2023-04-04Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-04-03DOB complaint, category ?
2023-04-03DOB complaint, category ?
2023-04-03DOB complaint, category ?
2023-04-03DOB complaint, category ?
2023-04-03Permit Protection and Mechanical Methods — Signed-off
2023-03-30Job filed: PARK AVENUE LOADING DOCK: TEMPORARY LOADING DOCK AS PER DRAWINGS. LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR $10,000
2023-03-29Permit Protection and Mechanical Methods — Permit Issued
2023-03-28FDNY inspection (CDA-90-DRILL)
2023-03-27Permit Protection and Mechanical Methods — Permit Issued
2023-03-27Permit Protection and Mechanical Methods — Permit Issued
2023-03-24ECB CLASS - 1 violation: ELECTRICAL WORK WITHOUT A PERMIT. AT TIME OF INSPECTION ON AN ACTIVE JOB SITE AT 34TH STORY OBSERVED AIR PRESSURIZED ALARM SYSTEM $800
2023-03-24ECB CLASS - 1 violation: RESPONDING TO AN INCIDENT WHERE A WORKER HAD A FATAL FALL FROM A BAKER SCAFFOLD FALLING THROUGH AN UNPROTECTED SHAFT FROM THE 12TH
2023-03-24ECB CLASS - 1 violation: FAILURE TO PERFORM REQUIRED INSPECTIONS OF SAFETY NET SYSTEM, GUARDRAIL SYSTEMS AND ALTERNATIVE SYSTEMS AUTHORIZED UNDER SECTION 3
2023-03-24ECB CLASS - 1 violation: UPON INSPECTION OF AN ACTIVE JOBSITE CURRENTLY AT THE 34TH STORY OBSERVED THE 17TH FLOOR SET BACK AREA IS ACCESSIBLE TO WORKERS AN
2023-03-24ECB CLASS - 1 violation: RESPONDING TO INCIDENT WHERE A WORKER HAD A FATAL FALL FROM A BAKER SCAFFOLDING FALLING THROUGH AN UNPROTECTED SHAFT OPENING FROM $12,500
2023-03-24ECB CLASS - 1 violation: WORKER HAD A FATAL FALL FROM A BAKER SCAFFOLDING, FALLING THROUGH AN UNPROTECTED SHAFT OPENING FROM THE 12TH FLOOR TO 11TH FLOOR. $25,000
2023-03-24ECB CLASS - 1 violation: VERTICAL SAFETY NETTING NOT MAINTAINED AS PER CODE. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE CURRENTLY AT 34TH STORY, OBSERVED $2,500
2023-03-24ECB CLASS - 1 violation: SITE LOGISTICS NOT CONFORMING TO APPROVED SITE SAFETY PLAN AT TIME OF INSPECTION OF AN ACTIVE CONSTRUCTION SITE OBSERVED MONORAIL $2,500
2023-03-24DOB violation C: VIO23-50206
2023-03-24DOB violation C: VIO23-50207
2023-03-24ECB CLASS - 1 violation: WORKER HAD A FATAL FALL FROM A BAKER SCAFFOLDING,FALLING THROUGH AN UNPROTECTED SHAFT OPENING FROM THE 12TH FLOOR TO 11TH FLOOR. I$25,000
2023-03-24ECB CLASS - 1 violation: AT TIME OF INSPECTION OF AN ACTIVE JOBSITE CURRENTLY AT 34TH FLOOR OBSERVED, TARP BEING USED FOR CONTAINMENT OF FIRE PROOFING OPER$1,250
2023-03-24ECB CLASS - 1 violation: STAIRS DURING BUILDING CONSTRUCTION AT TIME OF INSPECTION ON A NB CURRENTLY AT THE 34TH FLOOR OBSERVED, PERMANENT STAIRS HAVE BEEN
2023-03-24DOB complaint, category ?
2023-03-22ECB CLASS - 2 violation: NO TAG LINES WERE PROVIDED IN CONTRARY WITH BC-3305.2.5. WHILE STEEL MEMBERS ARE BEING LOWERED DOWN ON 20 FLOOR LEVEL BY THE ELEVA
2023-03-22DOB complaint, category ?
2023-03-22Permit Protection and Mechanical Methods — Permit Issued
2023-03-22Permit General Construction — Signed-off
2023-03-22Job filed: INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2023-03-22Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2023-03-20Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$68,580
2023-03-17DOB complaint, category ?
2023-03-13Permit Protection and Mechanical Methods — Signed-off
2023-03-13Permit Protection and Mechanical Methods — Signed-off
2023-03-01ECB CLASS - 1 violation: IN RESPONSE TO INCIDENT WHERE A SOCKET TOOL CAME DOWN FROM THE BUILDING ON 12TH FLOOR APPROXIMATELY 140 FEET HEIGHT DURING CURTAI$10,000
2023-03-01DOB complaint, category ?
2023-03-01Job filed: 48TH ST HOIST CARS 13&14: INSTALLATION OF DUAL 10250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2023-02-27Permit General Construction — Permit Issued
2023-02-20Permit Supported Scaffold — Signed-off
2023-02-17Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER $15,000
2023-02-15Permit NB — ISSUED
2023-02-06311: Street Sign - Missing — Other/Unknown
2023-02-06311: Street Sign - Missing — Other/Unknown
2023-02-01Permit Supported Scaffold — Signed-off
2023-01-31Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER $50,000
2023-01-27Permit Sprinklers — Signed-off
2023-01-27Permit Standpipe — Signed-off
2023-01-27Permit Standpipe — Permit Issued
2023-01-27Permit Sprinklers — Permit Issued
2023-01-26Permit Standpipe — Permit Issued
2023-01-26Permit Standpipe — Signed-off
2023-01-26Permit Sprinklers — Permit Issued
2023-01-26Permit Sprinklers — Signed-off
2023-01-24Permit Protection and Mechanical Methods — Permit Issued
2023-01-24Permit Protection and Mechanical Methods — Permit Issued
2023-01-24Permit Protection and Mechanical Methods — Permit Issued
2023-01-23Job filed: PHASE 3B: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $3,000
2023-01-23Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-01-23Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-01-23Job filed: USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$74,340
2023-01-10Permit General Construction — Signed-off
2023-01-10Job filed: INSTALLATION OF MULTIPLE SHANTIES AND TEMPORARY BATHROOM STRUCTURES WITHIN BUILDING FOR USE DURING NEW BUILDING CONSTRUCTION FILED SEPARATELY UNDER 12$1,067,000
2023-01-05FDNY inspection (CDA-90-DRILL)
2023-01-05Permit Supported Scaffold — Signed-off
2023-01-04Permit Mechanical Systems — Signed-off
2023-01-04Job filed: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER $15,000
2023-01-03Job filed: Shoring system on 14th floor to support formwork for 17th floor concrete beams between gridlines TJ & TK. All other required permits will be filed as$5,000
2023-01-01311: Taxi Complaint — Driver Complaint - Non Passenger
2022
2022-12-30311: Water System — Leak (Use Comments) (WA2)
2022-12-22Asbestos abatement: Removal — ETS Contracting, Inc.
2022-12-22Asbestos abatement: Removal — ETS Contracting, Inc.
2022-12-21Permit EQ — ISSUED
2022-12-21Permit Protection and Mechanical Methods — Signed-off
2022-12-21Permit Protection and Mechanical Methods — Permit Issued
2022-12-21Permit Protection and Mechanical Methods — Signed-off
2022-12-20Permit Sidewalk Shed — Signed-off
2022-12-20Permit Sidewalk Shed — Permit Issued
2022-12-20Permit Sidewalk Shed — Signed-off
2022-12-20Permit Protection and Mechanical Methods — Signed-off
2022-12-20Permit Sidewalk Shed — Signed-off
2022-12-20Permit Protection and Mechanical Methods — Signed-off
2022-12-20Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF
2022-12-20Permit Construction Fence — Permit Issued
2022-12-15DOB complaint, category ?
2022-12-14Job filed: REPLACEMENT OF 2 UNITS IN THE BEDROOM AND LIVING ROOM WITH A TOTAL CAPACITY OF 39000 BTU. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$11,375
2022-12-13ECB CLASS - 2 violation: TOWER CRANE CN#989/20 CD#5456 WAS ERECTED & IN OPERATION RESPONDENT(LIFT DIRECTOR) PERMITTED EVAN LEPOSKI TO PERFROM RIGGING DUTIE$5,000
2022-12-13ECB CLASS - 2 violation: RESPONDENT PERMITTED THE USE OF TOWER CRANE CN#989/20 CD#5456 TO PERFROM HOISTING OPERATIONS THOUGH A MEMBER OF THE RIGGING CREW H
2022-12-13ECB CLASS - 2 violation: RESPONDENT PERMITTED THE USE OF TOWER CRANE CN#989/20 CD#5456 THOUGH A MEMBER IN THE RIGGING CREW WORKED WITH AN EXPIRED RIGGING C$5,000
2022-12-07Permit Protection and Mechanical Methods — Permit Issued
2022-12-07Job filed: USE OF TELEHANDLER DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121205604.$10,120
2022-12-05Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2022-12-02Job filed: Installation of the temporary scaffold on the Sub.Cel-2, Sub.Cel-1 and Ground Floor. No change in use, egress, or occupancy under this application.$8,000
2022-11-30Job filed: PARK AVE HOIST, SOUTH CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #$20,000
2022-11-23Permit EW — ISSUED
2022-11-18Permit Boiler Equipment — Signed-off
2022-11-09Permit Plumbing — Signed-off
2022-11-02ECB CLASS - 1 violation: GUARDRAIL SYSTEM;AT TIME OF INSPECTION RESPOND TO AN INCIDENT WHERE A WORKER FELL OFF A SCAFFOLD APPROXIMATELY 8' ON THE 11 FLOOR $2,500
2022-11-02DOB complaint, category ?
2022-11-01Job filed: INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$3,000
2022-10-26DOB complaint, category ?
2022-10-25Permit EQ — ISSUED
2022-10-25Permit PL — ISSUED
2022-10-20311: Lost Property — Bag/Wallet
2022-10-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT (STAIR O) AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BLDG COD$180,000
2022-10-07Permit Supported Scaffold — Signed-off
2022-10-06Permit Protection and Mechanical Methods — Permit Issued
2022-10-05Permit Protection and Mechanical Methods — Permit Issued
2022-10-04Permit Protection and Mechanical Methods — Permit Issued
2022-10-04Permit Protection and Mechanical Methods — Signed-off
2022-10-04Permit Protection and Mechanical Methods — Signed-off
2022-10-04Permit Protection and Mechanical Methods — Permit Issued
2022-10-04Permit Protection and Mechanical Methods — Signed-off
2022-10-04Permit Protection and Mechanical Methods — Signed-off
2022-10-04Permit Protection and Mechanical Methods — Permit Issued
2022-10-04Permit Protection and Mechanical Methods — Permit Issued
2022-10-04Permit Supported Scaffold — Signed-off
2022-10-04Job filed: Installation of temporary folding scaffolding approximately 45 feet in height within building of lobby floor slab.$5,000
2022-10-01DOB complaint, category ?
2022-09-28Permit EW — ISSUED
2022-09-23Job filed: USE of MINI CRANE at 270 PARK AVENUE DURING MAJOR ALTERATION, FILED SEPARATELY UNDER 123656640$10,400
2022-09-19Permit NB — ISSUED
2022-09-11FDNY inspection (CDA-90-DRILL)
2022-08-31Job filed: 48TH ST HOIST CARS 13&14: INSTALLATION OF DUAL 10250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2022-08-29Permit Protection and Mechanical Methods — Signed-off
2022-08-26Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$8,000
2022-08-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-09Job filed: INSTALLATION OF TEMPORARY LOADING DOCK AS PER DRAWINGS. TEMPORARY LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR $20,000
2022-07-27Permit Protection and Mechanical Methods — Signed-off
2022-07-27Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$20,000
2022-07-19Job filed: 48TH ST HOIST CARS 13&14: INSTALLATION OF DUAL 10250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2022-07-13Permit Boiler Equipment — Signed-off
2022-07-08Job filed: 48TH ST HOIST CARS 7&8: INSTALLATION OF DUAL 7500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF $20,000
2022-07-08Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2022-07-08Job filed: PARK AVE HOIST, SOUTH CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #$20,000
2022-07-07Job filed: INSTALLATION OF TEMPORARY LOADING DOCK AS PER DRAWINGS. TEMPORARY LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR $20,000
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-30Permit EW — RE-ISSUED
2022-06-28Permit EW — ISSUED
2022-06-26FDNY inspection (CDA-90-DRILL)
2022-06-24DOB complaint, category ?
2022-06-21DOB complaint, category ?
2022-06-16DOB complaint, category ?
2022-06-15Permit EQ — ISSUED
2022-06-15Permit EW — ISSUED
2022-06-07Permit EQ — ISSUED
2022-05-17Permit Supported Scaffold — Signed-off
2022-05-16Job filed: INSTALLATION OF TEMPORARY SCAFFOLD FOR HOIST ERECTION ONLY. HOIST FILED SEPARATELY. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,$1,500
2022-05-03Permit NB — ISSUED
2022-04-13Permit General Construction — Signed-off
2022-03-30Job filed: Concrete construction loads imposed during the construction sequence. All other required permits will be filed as part of the New Building (NB) applic$5,000
2022-03-23Permit Protection and Mechanical Methods — Signed-off
2022-03-23Permit Protection and Mechanical Methods — Signed-off
2022-03-16FDNY inspection (CONSTR)
2022-03-16Permit Structural — Signed-off
2022-02-28DOB complaint, category ?
2022-02-24Permit Protection and Mechanical Methods — Permit Issued
2022-02-24Permit Protection and Mechanical Methods — Signed-off
2022-02-23ECB CLASS - 1 violation: FAILURE TO INSTITUTE SAFETY EQUIPMENT MEASURES (NO HANDRAILS) ATOI OF ACTIVE JOBSITE OBSERVED,STAIRCASE FROM LEVEL4&ABOVE MISSING $2,500
2022-02-23ECB CLASS - 1 violation: BC3307.4 FAILURE TO CONTAIN WORK OPERATION ON STREET.AT THE TIME OF INSPECTION OF AN ACTIVE JOB SITE OBSERVED AT EXP.#4 ON EAST 48$625
2022-02-23ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING ATOI OF ACTIVE JOBSITE OBSERVED POOR HOUSEKEEPING THRUOUT SITE,BLDG MATERIALS ON FLS INS$625
2022-02-23ECB CLASS - 1 violation: BC3301.1.2 COMPLY W/FIRE CODE (NO FIREGUARD) ATOI@ACTIVE JOBSITE OBSERVED HOT WORK IN PROGRESS@LEVEL4&5 (TORCHING&BURNING STEEL) U
2022-02-23ECB CLASS - 1 violation: BC3314.1 INADEQUATE SUPPORTED SCF ATOI OF ACTIVE JOBSITE OBSERVED INADEQUATE SUPPORTED SCF THRUOUT SITE,SUPPORTED SCF MISSING (GUA$2,500
2022-02-23DOB complaint, category ?
2022-02-23Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE$3,000
2022-02-22DOB complaint, category ?
2022-02-22Job filed: in conjunction with NB 121205604; Temporary material delivery truck access to existing building & plaza after partial demolition. Steel ramps span fr$1,020
2022-02-18Permit Protection and Mechanical Methods — Signed-off
2022-02-17Permit Protection and Mechanical Methods — Signed-off
2022-02-17Permit Sidewalk Shed — Signed-off
2022-02-15ECB CLASS - 1 violation: FAILURE TO NOTIFY DEPT OF ACCIDENT OR INCIDENT RESULTING IN FATALITY OR INJURY.WORKER WAS INJURED WHEN FELL OFF A LADDER INTO 6 FT$2,500
2022-02-14Job filed: installation of new sprinkler and standpipe system in conjunction to new building application 121205604.$2,000
2022-02-11DOB complaint, category ?
2022-02-10Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2022-02-10Job filed: PARK AVE HOIST, SOUTH CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #$20,000
2022-02-09Permit Protection and Mechanical Methods — Signed-off
2022-02-09Job filed: INSTALLATION OF TEMPORARY SUSPENDED QUIKDECK PLATFORMS AS PER DRAWINGS. SUSPENDED QUIKDECK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE$2,000
2022-01-25Job filed: 48TH ST HOIST CARS 13&14: INSTALLATION OF DUAL 10250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2022-01-24Job filed: in conjunction with NB 121205604; Temporary material delivery truck access to existing building & plaza after partial demolition. Steel ramps span fr$1,020
2022-01-20ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PERSON&PROPERTY.NOTE:IN RESPONSE TO INCIDENT ON ACTIVE JOBSITE OF 57STYNB.WORKER MR.ANTONIO M.RODRIGUES WAS S$5,000
2022-01-20ECB CLASS - 1 violation: BC3301.7 WORKING PLATFORM NOTE;IN RESPONDING TO INCIDENT OF ACTIVE JOBSITE OF 57STYB WORKER MR ANTONIO M.RODRIGUES WAS STRIPPING S$625
2022-01-20DOB complaint, category ?
2022-01-16FDNY inspection (CONSTR)
2022-01-11Permit NB — ISSUED
2022-01-07Permit Sidewalk Shed — Permit Issued
2022-01-07Permit Construction Fence — Permit Issued
2022-01-07Permit Sidewalk Shed — Signed-off
2022-01-06FDNY inspection (CDA-90-DRILL)
2022-01-06311: Vaccine Mandate Non-Compliance — Employee Proof of Vaccination Not Checked
2022-01-06ECB CLASS - 1 violation: FAILURE TO INSTITUTE&MAINTAIN SAFETY EQUIPMENT MEASURE&TEMP CONST EQUIPMENT NOTE:ATOI RESPONDING TO INCIDENT WHERE WORKER WAS INJU$5,000
2022-01-06ECB CLASS - 1 violation: 3301.8.1 USE&TAMPERING PROHIBITED ATOI RESPONDING TO INCIDENT WHERE WORKER WAS INJURE WHEN HE FELL OFF LADDER&INJURED HIS LEFT SHO$1,250
2022-01-06DOB complaint, category ?
2022-01-06Job filed: (PHASE 4: MADISON AVENUE): INSTALLATION OF HEAVY DUTY SIDEWALK SHED ON MADISON AVENUE AS PER DRAWINGS. NO CHANGE IN USE, OCCUPACY OR EGRESS UNDER THIS$3,000
2022-01-06Job filed: CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC$3,000
2021
2021-12-30Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2021-12-28Permit Supported Scaffold — Signed-off
2021-12-28Permit Sidewalk Shed — Signed-off
2021-12-20Permit Protection and Mechanical Methods — Permit Issued
2021-12-20Permit Protection and Mechanical Methods — Permit Issued
2021-12-20Permit Protection and Mechanical Methods — Signed-off
2021-12-20Permit Protection and Mechanical Methods — Permit Issued
2021-12-20Permit Protection and Mechanical Methods — Signed-off
2021-12-20Permit Protection and Mechanical Methods — Signed-off
2021-12-20Permit Protection and Mechanical Methods — Permit Issued
2021-12-17Job filed: 48TH ST HOIST CARS 13&14: INSTALLATION OF DUAL 10250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2021-12-17Job filed: 48TH ST HOIST CARS 11&12: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 O$20,000
2021-12-17Job filed: 48TH ST HOIST CARS 7&8: INSTALLATION OF DUAL 7500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF $20,000
2021-12-17Job filed: 48TH ST HOIST CARS 9&10: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF$20,000
2021-12-13Permit EW — ISSUED
2021-12-10Permit EW — ISSUED
2021-12-06Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT (STAIR O) AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BLDG COD$180,000
2021-11-30Permit PL — ISSUED
2021-11-22Permit EW — ISSUED
2021-11-22Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2021-11-22Job filed: PHASE 3B: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $3,000
2021-11-17Permit Standpipe — Signed-off
2021-11-17Permit Sprinklers — Permit Issued
2021-11-17Permit Sprinklers — Signed-off
2021-11-17Job filed: INSTALLATION OF TEMPORARY LOADING DOCK AS PER DRAWINGS. TEMPORARY LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR $20,000
2021-11-17Permit Standpipe — Permit Issued
2021-11-17Job filed: NEW INSTALLATION OF NEW ELECTRIC BOILERS AS PER PLANS FILED HEREWITH IN CONJUCTION WITH NEW BUILDING 121205604.$1,000
2021-11-17Job filed: INSTALLATION OF FUEL OIL STORAGE TANKS SERVING NEW EMERGENCY GENERATOR FILING IN CONJUNCTION TO NEW BUILDING 121205604. FUEL OIL STORAGE TANKS ARE LOC$1,000
2021-11-11Job filed: HEREWITH FILING ALTERATION-II FOR TEMPORARY EGRESS FOR 270 PARK AVENUE.$85,000
2021-11-08Permit Plumbing — Signed-off
2021-11-04Permit Protection and Mechanical Methods — Signed-off
2021-11-03Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U$10,000
2021-11-01Permit Supported Scaffold — Signed-off
2021-10-29Job filed: TRUCK ELEVATOR SCAFFOLD: INSTALLATION OF TEMPORARY TRUCK ELEVATOR SCAFFOLD AS PER DRAWINGS. TRUCK ELEVATOR SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NY$10,000
2021-10-27Job filed: PARK AVE HOIST, SOUTH CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #$20,000
2021-10-26Permit EQ — ISSUED
2021-10-19Job filed: Installation of underground plumbing in conjunction to new building application 121205604.$1,000
2021-10-18Permit EQ — ISSUED
2021-10-15Job filed: HEREWITH FIELD FOR A FORK LIFT FOR WORK ON 270 PARK AVE.
2021-10-15Job filed: HEREWITH FIELD FOR A MAN LIFT FOR WORK ON 270 PARK AVE.
2021-10-15Job filed: HEREWITH FIELD FOR A FORK LIFT FOR WORK ON 270 PARK AVE.
2021-10-15Job filed: HEREWITH FIELD FOR A MAN LIFT FOR WORK ON 270 PARK AVE.
2021-10-14Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2021-10-08Permit Plumbing — Signed-off
2021-10-01Permit NB — ISSUED
2021-10-01Permit EW — ISSUED
2021-09-22Permit Construction Fence — Signed-off
2021-09-08Permit NB — ISSUED
2021-09-04311: Homeless Person Assistance
2021-09-01Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2021-08-25311: General Construction/Plumbing — Site Conditions Endangering Workers
2021-08-25DOB complaint, category ?
2021-08-24Permit Protection and Mechanical Methods — Permit Issued
2021-08-24Job filed: INSTALLATION OF TEMPORARY LOADING DOCK AS PER DRAWINGS. TEMPORARY LOADING DOCK SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR $20,000
2021-08-19Permit EQ — ISSUED
2021-08-17311: General Construction/Plumbing — Building Permit - None
2021-08-17311: General Construction/Plumbing — Building Permit - None
2021-08-17311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2021-08-17311: General Construction/Plumbing — Building Permit - None
2021-08-17Permit EQ — ISSUED
2021-08-17DOB complaint, category ?
2021-08-17DOB complaint, category ?
2021-08-17DOB complaint, category ?
2021-07-30FDNY inspection (CDA-90-DRILL)
2021-07-08ZONE — from JPMORGAN CHASE BANK, N.A.
2021-07-08CERT — from FIDELITY NATIONAL TITLE INSURANCE COMPAN
2021-07-06Permit EW — ISSUED
2021-07-06Permit EW — RE-ISSUED
2021-07-06Permit EW — ISSUED
2021-07-06Permit EW — ISSUED
2021-07-06Permit EW — ISSUED
2021-07-06Permit EW — ISSUED
2021-07-06Permit EW — ISSUED
2021-07-06Permit EW — ISSUED
2021-07-01SMIS — from JPMORGAN CHASE BANK, N.A.
2021-06-30Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2021-06-25ECB CLASS - 1 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRICTION EQUIPMENT.NOTE AT TIME OF INSPECTION RESPON$5,000
2021-06-25ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKER RECEIVE SITE SAFETY ORIENTATION.NOTE AT TIME OF INSPECTION ON A DEMO OPERATION SITE ACTIVE J$2,500
2021-06-24DOB complaint, category ?
2021-06-22311: NonCompliance with Phased Reopening — Business not in compliance
2021-06-21Permit EQ — ISSUED
2021-06-18Permit EQ — ISSUED
2021-06-09Permit EW — ISSUED
2021-05-26Job filed: WE HERE ARE FILING A TEMPORARY STANDPIPE SYSTEM AS PER PLANS SUBMITTED.$15,000
2021-05-26Job filed: WE HERE ARE FILING A TEMPORARY STANDPIPE SYSTEM AS PER PLANS SUBMITTED.$15,000
2021-04-25311: Street Condition — Pothole
2021-04-20311: Noise — Noise: Construction Before/After Hours (NM1)
2021-04-16311: AHV Inspection Unit — After Hours Work - With An AHV Permit
2021-04-16Permit Protection and Mechanical Methods — Signed-off
2021-04-16Permit Protection and Mechanical Methods — Signed-off
2021-04-16DOB complaint, category ?
2021-04-15311: Noise — Noise: Construction Before/After Hours (NM1)
2021-04-15311: Noise — Noise: Jack Hammering (NC2)
2021-04-15Permit Supported Scaffold — Signed-off
2021-04-15Job filed: Park Ave Hoist, North cars 3&4: Installation of dual 7500# capacity personnel/material hoists during NB const filed sep. Hoists shall comply with Ch #$20,000
2021-04-15Job filed: PARK AVE HOIST, SOUTH CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST FILED SEP. HOISTS SHALL COMPLY WITH CH #$20,000
2021-04-09Job filed: INSTALLATION OF SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRE$10,000
2021-04-07FDNY inspection (CDA-90-DRILL)
2021-04-07FDNY inspection (RISK)
2021-04-02311: Emergency Response Team (ERT) — After Hours Work - Illegal
2021-04-02DOB complaint, category ?
2021-03-31ECB CLASS - 2 violation: AT TIME OF INSPECTION, JOHN CIVETTA & SONS INC(EQUIPMENT USER) COULD NOT PROVIDE A MONTHLY INSPECTION LOG FOR MARCH 2021. THE LAST
2021-03-31DOB complaint, category ?
2021-03-30ECB CLASS - 2 violation: 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED
2021-03-16Permit Protection and Mechanical Methods — Signed-off
2021-03-15Permit Sidewalk Shed — Signed-off
2021-03-15DOB complaint, category ?
2021-03-15DOB complaint, category ?
2021-03-15Job filed: TEMPORARY SHORING AT CELLAR LEVEL AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRE$5,000
2021-03-15Job filed: PHASE 3B: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF $3,000
2021-03-12ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS NOTED AT THE TIME OF AN INSPECTION OF AN ACTIV$625
2021-03-12Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2021-03-11311: Noise — Noise: Construction Before/After Hours (NM1)
2021-03-10311: Noise — Noise: Construction Equipment (NC1)
2021-03-09Permit EQ — ISSUED
2021-03-09Permit EQ — ISSUED
2021-03-08Permit Protection and Mechanical Methods — Signed-off
2021-03-04Permit EW — RE-ISSUED
2021-03-04Permit EW — ISSUED
2021-03-03CORRD — from MIDTOWN TRACKAGE VENTURES LLC to METROPOLITAN TRANSPORTATION AUTHORITY
2021-03-03Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT (STAIR O) AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BLDG COD$180,000
2021-02-26ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG FACADE/WALLS&APPURTENANCES.NOTE:@TIME OF INSP OBSERVED@ROOF LEVEL:RUSTED METAL BULKHEAD DOORS,AL
2021-02-17Job filed: Installation of heavy duty shed for phase 3B. Sidewalk bridge shall comply with chapter #33 of the NYC building code. No change in use, occupancy or e$3,000
2021-02-17Job filed: Installation of heavy duty sidewalk shed on Madison Avenue as per plans filed herewith. (Phase 4) No change in use, occupancy or egress under this app$3,000
2021-02-16311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-15Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2021-02-15Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2021-02-11Permit Sidewalk Shed — Permit Issued
2021-02-11Permit EW — ISSUED
2021-02-10311: Noise — Noise: Construction Before/After Hours (NM1)
2021-02-10Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NB CONSTRUCTION, FILED SEP UNDER APP # 121205604. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO$65,000
2021-01-14Permit Supported Scaffold — Signed-off
2021-01-13ECB CLASS - 1 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY.NOTE:-AT TIME OF MY INSPECTION IN RESPONSE TO AN INCIDENT WHERE A PIECE OF WOOD APPROX (2X6$10,000
2021-01-13ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFORMATION DURING PRE-SHIFT #SAFETY MEETING NOTE:AT TIME OF MY INSPECTION IN RESPONSE TO INCIDEN$5,000
2021-01-13DOB complaint, category ?
2021-01-12ECB CLASS - 2 violation: AT TIME OF INSPECTION, INDIVIUALS WORKING IN THE RIGGING CREW DID NOT POSSES VALID CERTIFICATIONS REQUIRED BY BC 3316.9.2(CERTS WE
2021-01-12ECB CLASS - 2 violation: AT TIME OF INSPECTION, INDIVIUALS WORKING IN THE RIGGING CREW DID NOT POSSES VALID CERTIFICATIONS REQUIRED BY BC 3316.9.2(CERTS WE
2021-01-12DOB complaint, category ?
2021-01-12Job filed: INSTALLATION OF PIPE SCAFFOLD IN ELEVATOR PIT AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCU$10,000
2021-01-11Permit Sidewalk Shed — Signed-off
2021-01-07Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2021-01-07Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2020
2020-12-23Permit Construction Fence — Signed-off
2020-12-21Permit Sidewalk Shed — Signed-off
2020-12-21Permit Supported Scaffold — Signed-off
2020-12-18311: AHV Inspection Unit — After Hours Work - With An AHV Permit
2020-12-18311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2020-12-18311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2020-12-18DOB complaint, category ?
2020-12-18Permit Construction Fence — Signed-off
2020-12-18Permit Sidewalk Shed — Signed-off
2020-12-18Permit Sidewalk Shed — Signed-off
2020-12-16Job filed: Installation of heavy duty sidewalk shed on Madison Avenue as per plans filed herewith. (Phase 4) No change in use, occupancy or egress under this app$3,000
2020-12-02DOB complaint, category ?
2020-11-30Job filed: INSTALLATION OF COCOON PROTECTION SYSTEM FOR FLOORS 007-057 IN CONJUNCTION WITH NB 121205604
2020-11-30Job filed: INSTALLATION OF COCOON PROTECTION SYSTEM FOR FLOORS 007-057 IN CONJUNCTION WITH NB 121205604
2020-11-25Permit EW — ISSUED
2020-11-24Job filed: INSTALLATION OF COCOON PROTECTION SYSTEM FOR FLOORS 007-057 IN CONJUNCTION WITH NB 121205604
2020-11-24Job filed: INSTALLATION OF COCOON PROTECTION SYSTEM FOR FLOORS 007-057 IN CONJUNCTION WITH NB 121205604
2020-11-19Permit EQ — ISSUED
2020-11-19Job filed: FOUNDATION ENHANCEMENT TO THE NORTH ,WEST AND SOUTH WALLS IN THE TERRAFORM PORTION OF THE BUILDING OF THE D-1 LINE. NO CHANGE IN USE, EGRESS OR OCCUPA$1,000
2020-11-18Permit EQ — ISSUED
2020-11-17Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2020-11-13Permit EW — ISSUED
2020-11-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. N
2020-11-10Permit Plumbing — Signed-off
2020-11-02Permit EQ — ISSUED
2020-10-29Job filed: Installation of underground plumbing in conjunction to new building application 121205604.$1,000
2020-10-19311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2020-10-19DOB complaint, category ?
2020-10-19Job filed: installation of new sprinkler and standpipe system in conjunction to new building application 121205604.$2,000
2020-10-05Job filed: filing temporary plumbing application as shown on drawings filed herewith.$1,176,205
2020-10-02Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2020-10-02Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2020-10-01FDNY inspection (CDA-90-DRILL)
2020-09-28ECB CLASS - 1 violation: PRE SHIFT SAFETY MEETING CONTENTS;NOTE AT THE TIME OF INSPECTION(INCIDENT TYPE)AS PER SSM WORKER ALEX ARIAS CLEANING DISCARDED POW
2020-09-28DOB complaint, category ?
2020-09-25Permit AL — ISSUED
2020-09-25Permit EQ — ISSUED
2020-09-25Job filed: ALT III FOR CONSTRUCTION EQUIPMENT, MANITOU TELEHANDLER, AS PER PLANS FILED
2020-09-25Job filed: ALT III FOR CONSTRUCTION EQUIPMENT, GENIE TELEHANDLER, AS PER PLANS FILED.
2020-09-24311: For Hire Vehicle Complaint — Driver Report - Non Passenger
2020-09-23Permit Construction Fence — Signed-off
2020-09-23Job filed: FOUNDATION ENHANCEMENT TO THE NORTH ,WEST AND SOUTH WALLS IN THE TERRAFORM PORTION OF THE BUILDING WEST OF THE D-1 LINE. NO CHANGE IN USE, EGRESS OR O$1,000
2020-09-23Job filed: FOUNDATION ENHANCEMENT TO THE NORTH ,WEST AND SOUTH WALLS IN THE TERRAFORM PORTION OF THE BUILDING WEST OF THE D-1 LINE. NO CHANGE IN USE, EGRESS OR O$1,000
2020-09-23Job filed: FOUNDATION ENHANCEMENT TO THE NORTH ,WEST AND SOUTH WALLS IN THE TERRAFORM PORTION OF THE BUILDING WEST OF THE D-1 LINE. NO CHANGE IN USE, EGRESS OR O$1,000
2020-09-21Permit EQ — ISSUED
2020-09-21Permit Sidewalk Shed — Signed-off
2020-09-21Permit Sidewalk Shed — Signed-off
2020-09-21Permit Supported Scaffold — Signed-off
2020-09-21Permit Sidewalk Shed — Signed-off
2020-09-21Permit Supported Scaffold — Signed-off
2020-09-21Permit Sidewalk Shed — Signed-off
2020-09-21Permit Supported Scaffold — Signed-off
2020-09-21Permit Supported Scaffold — Signed-off
2020-09-21Permit Supported Scaffold — Signed-off
2020-09-21Job filed: NORTHEAST HOIST (CARS 5 & 6): INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS INCLUDING LOADING DOCK DURING BLDG DEMOLITION, FILE
2020-09-21Job filed: NORTHEAST HOIST (CARS 5 & 6): INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS INCLUDING LOADING DOCK DURING BLDG DEMOLITION, FILE
2020-09-18Permit Sidewalk Shed — Signed-off
2020-09-18Permit Sidewalk Shed — Signed-off
2020-09-18Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. N
2020-09-17Permit Construction Fence — Signed-off
2020-09-16Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2020-09-04Permit EQ — ISSUED
2020-09-04Permit EQ — ISSUED
2020-08-27Permit EW — RE-ISSUED
2020-08-27Permit EW — RE-ISSUED
2020-08-27Permit Sprinklers — Signed-off
2020-08-27Permit EW — RE-ISSUED
2020-08-27Permit EW — RE-ISSUED
2020-08-27Permit EW — RE-ISSUED
2020-08-27Permit EW — ISSUED
2020-08-26311: COVID-19 Non-essential Construction — Construction
2020-08-26DOB complaint, category ?
2020-08-21Permit EQ — ISSUED
2020-08-17Job filed: A2$1,000
2020-08-14Permit EQ — ISSUED
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-08-10DOB complaint, category ?
2020-07-30311: Other Enforcement — E2A Storage Of Receptacles
2020-07-30Permit EQ — ISSUED
2020-07-30Permit EQ — ISSUED
2020-07-30Job filed: INSTALLATION OF MAN LIFTS BETWEEN GROUND AND 3RD FLOORS.
2020-07-29Job filed: ERECTING OF TABLE TOP STEEL IN CONJUNCTION TO NEW BUILDING #121205604$1,000
2020-07-27Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2020-07-27Job filed: INSTALLATION AND USE OF STEEL DEBRIS CHUTE FOR DEBRIS REMOVAL DURING TOWER DEMOLITION. FULL DM FILED SEPARATELY UNDER DM-123656640.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-07-16Job filed: SHAFT HOIST: INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG DEMOLITION, FILED SEPARATELY. DUAL HOIST SHALL COMPLY WITH C
2020-07-16Job filed: SHAFT HOIST: INSTALLATION OF DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG DEMOLITION, FILED SEPARATELY. DUAL HOIST SHALL COMPLY WITH C
2020-07-10Permit DM — ISSUED
2020-07-08Permit EQ — ISSUED
2020-07-01Permit Structural — Signed-off
2020-07-01Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-30Permit EW — ISSUED
2020-06-29Permit EW — ISSUED
2020-06-29Permit EW — ISSUED
2020-06-29Permit EW — ISSUED
2020-06-27FDNY inspection (CDA-90-DRILL)
2020-06-26Permit EQ — ISSUED
2020-06-25Permit EW — ISSUED
2020-06-25Permit EW — ISSUED
2020-06-25Permit EW — ISSUED
2020-06-25Permit EW — ISSUED
2020-06-19Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2020-05-28Job filed: Proposed curb cut for access to sub cellar parking and loading for a new office building.$1,000
2020-05-22Permit PL — ISSUED
2020-05-20311: Noise - Vehicle — Car/Truck Music
2020-05-13Deed $33,072,265 — from MIDTOWN TRACKAGE VENTURES LLC to METROPOLITAN TRANSPORTATION AUTHORITY$33,072,265
2020-05-13DOB complaint, category ?
2020-05-13Permit EQ — ISSUED
2020-05-06Job filed: ALT. 3 APPLICATION - INSTALLATION OF CONSTRUCTION STAIR
2020-05-06Job filed: FILING BUILDERS PAVEMENT PLAN IN CONJUNCTION TO NEW BUILDING APPLICATION 121205604 AS SHOWN ON PLANS FILED HEREWITH.
2020-05-06Job filed: FILING BUILDERS PAVEMENT PLAN FOR PARK AVENUE BETWEEN EAST 47TH STREET AND E.48TH STREET. MADISON AVENUE BETWEEN EAST 47TH STREET AND EAST 48TH STRE
2020-05-06Job filed: ALT. 3 APPLICATION - INSTALLATION OF CONSTRUCTION STAIR
2020-05-06Job filed: FILING BUILDERS PAVEMENT PLAN FOR PARK AVENUE BETWEEN EAST 47TH STREET AND E.48TH STREET. MADISON AVENUE BETWEEN EAST 47TH STREET AND EAST 48TH STRE
2020-05-04Job filed: INSTALLATION OF PROTECTION DECK, TRUCK RAMP, AND CRANE RUNWAY AS SHOWN PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2020-05-04Job filed: INSTALLATION OF PROTECTION DECK, TRUCK RAMP, AND CRANE RUNWAY AS SHOWN PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2020-04-27Permit Construction Fence — Signed-off
2020-04-27Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION (PARK AVE) AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILD
2020-04-24Job filed: INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS (PARK AVE EGRESS FENCE). PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE$35,000
2020-04-06311: COVID-19 Non-essential Construction — Construction
2020-04-06DOB complaint, category ?
2020-04-06DOB complaint, category ?
2020-04-02311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2020-04-02DOB complaint, category ?
2020-03-31Permit EQ — ISSUED
2020-03-31Permit EQ — ISSUED
2020-03-30ECB CLASS - 2 violation: A.C. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A SPRINKLER REPORT PREPARED B$3,125
2020-03-07FDNY inspection (CDA-90-DRILL)
2020-03-06Asbestos abatement: Removal — Project Solutions Development Group Inc.
2020-03-04Deed $33,072,265 — from MIDTOWN TRACKAGE VENTURES LLC to METROPOLITAN TRANSPORTATION AUTHORITY$33,072,265
2020-02-28Sold for $33,072,265$33,072,265
2020-02-27DOB complaint, category ?
2020-02-26Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2020-02-21Job filed: FILING BUILDERS PAVEMENT PLAN FOR PARK AVENUE BETWEEN EAST 47TH STREET AND E.48TH STREET. MADISON AVENUE BETWEEN EAST 47TH STREET AND EAST 48TH STREET
2020-02-21Job filed: FILING BUILDERS PAVEMENT PLAN FOR PARK AVENUE BETWEEN EAST 47TH STREET AND E.48TH STREET. MADISON AVENUE BETWEEN EAST 47TH STREET AND EAST 48TH STREET
2020-02-21Job filed: FILING BUILDERS PAVEMENT PLAN FOR PARK AVENUE BETWEEN EAST 47TH STREET AND E.48TH STREET. MADISON AVENUE BETWEEN EAST 47TH STREET AND EAST 48TH STREET
2020-02-18DOB complaint, category ?
2020-02-14Job filed: Installation of podium scaffolding on top of sidewalk bridge (level 2) to the roof of the Podium (level 14). Scaffolding shall comply with chapter #33$2,000,000
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-02-07Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2020-01-28Job filed: DEMOLISH PORTION OF CONCRETE SLAB AT CELLAR AND SUB-CELLAR LEVELS TO ALLOW FOR D-1 LINE CONSTRUCTION, FILED SEPARATELY UNDER DOB #121204810.$120,000
2020-01-28Permit EW — ISSUED
2020-01-28Permit EW — ISSUED
2020-01-28Permit EW — ISSUED
2020-01-28Permit EW — ISSUED
2020-01-28Permit EW — ISSUED
2020-01-28Permit EW — ISSUED
2020-01-22DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-01-22Permit PL — ISSUED
2020-01-20FDNY inspection (STRUC_INT_5)
2020-01-17Permit EQ — ISSUED
2020-01-17Permit EW — ISSUED
2020-01-16Job filed: DEMOLISH PORTIONS OF CONCRETE SLAB AT SUBCELLAR-2 LEVEL TO CREATE ACCESS FOR D1 LINE CONSTRUCTION, FILED SEPARATELY UNDER DOB #121204810. CONCRETE SLA$30,000
2020-01-16Job filed: DEMOLISH PORTIONS OF CONCRETE SLAB AT SUBCELLAR-2 LEVEL TO CREATE ACCESS FOR D1 LINE CONSTRUCTION, FILED SEPARATELY UNDER DOB #121204810. CONCRETE SLA$30,000
2020-01-10Job filed: FILING FOUNDATION SCOPE OF WORK FOR NEW BUILDING AS PER PLANS FILED HEREWITH
2020-01-10Job filed: FILING FOUNDATION SCOPE OF WORK FOR NEW BUILDING AS PER PLANS FILED HEREWITH
2020-01-09DOB complaint, category ?
2019
2019-12-30Permit Sprinklers — Signed-off
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-12-20Permit Sidewalk Shed — Signed-off
2019-12-20Permit Sidewalk Shed — Signed-off
2019-12-18Permit Sidewalk Shed — Signed-off
2019-12-18Permit Supported Scaffold — Signed-off
2019-12-18Permit Supported Scaffold — Signed-off
2019-12-17Permit Supported Scaffold — Signed-off
2019-12-17Permit Supported Scaffold — Signed-off
2019-12-17Permit Sidewalk Shed — Signed-off
2019-12-17Permit Sidewalk Shed — Signed-off
2019-12-17Permit Sidewalk Shed — Signed-off
2019-12-17Permit Supported Scaffold — Signed-off
2019-12-16Permit Construction Fence — Signed-off
2019-12-11Asbestos abatement: Removal — Project Solutions Development Group Inc.
2019-12-11Asbestos abatement: Removal — Project Solutions Development Group Inc.
2019-12-09Permit Sprinklers — Signed-off
2019-12-06Job filed: Installation of heavy duty sidewalk shed on Park Ave north of the main entrance as per plans filed herewith. (Phase 2) No change in use, occupancy or$3,000
2019-12-03Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2019-12-03Job filed: Removal of 144 sprinkler heads on the 51st floor. Removal of 73 sprinkler heads on the 52nd floor.$12,998
2019-12-03Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2019-12-03Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2019-12-03Job filed: Installation of podium scaffolding on top of sidewalk bridge (level 2) to the roof of the Podium (level 14). Scaffolding shall comply with chapter #33$2,000,000
2019-12-03Job filed: 272 heads to be removed on the 12th floor. 221 heads to be removed on the 13th floor. 141 heads to be removed on the 14th floor.$19,496
2019-12-03Job filed: Installation of needle beam platform and scaffolding as per drawings. Scaffold shall comply with Chapter 33 of the NYC Building Code. No change in use$500,000
2019-12-02FDNY inspection (CDA-90-DRILL)
2019-11-27Permit EW — ISSUED
2019-11-27Permit EW — ISSUED
2019-11-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-26Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-26Permit EW — ISSUED
2019-11-26Permit EW — ISSUED
2019-11-26Permit EW — ISSUED
2019-11-26Permit EW — ISSUED
2019-11-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-11-19Permit EW — ISSUED
2019-11-19Permit EW — ISSUED
2019-11-19Permit EW — ISSUED
2019-11-19Permit EW — ISSUED
2019-11-18Permit EQ — ISSUED
2019-11-15ECB CLASS - 2 violation: 27-929.1 A.C. 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER RE$3,125
2019-11-15Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. N
2019-11-15Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. N
2019-11-08Permit EW — ISSUED
2019-11-08Permit EW — ISSUED
2019-10-30311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-10-30DOB complaint, category ?
2019-10-25ECB CLASS - 1 violation: FAILURE TO MAINTAIN EXTERIOR BUILDINGS.1-NORTH AND EAST ELEV.EXP1 AND 2 SECOND FLOOR PARTIAL PENDANTS MISSING.PREVIOUS SUMMONS 352
2019-10-22311: Mobile Food Vendor — Permit/License/Certificate
2019-10-04Job filed: INSTALLATION AND USE OF TROLLEY BEAM AND 10K DRUM WINCH HOISTING EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH
2019-10-04Job filed: INSTALLATION AND USE OF TROLLEY BEAM AND 10K DRUM WINCH HOISTING EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH
2019-10-04Job filed: INSTALLATION AND USE OF TROLLEY BEAM AND 10K DRUM WINCH HOISTING EQUIPMENT AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH
2019-10-04Permit EQ — ISSUED
2019-10-04Permit EQ — ISSUED
2019-10-03Job filed: INSTALLATION AND USE OF 6-TON CHAIN HOIST AND ASSOCIATED RIGGING AND SHORING TO REMOVE ELEVATORS 25, 26, 27 DURING FULL DEMOLITION, FILED SEPARATELY U
2019-10-01311: Homeless Encampment — N/A
2019-09-26Permit Supported Scaffold — Signed-off
2019-09-26Permit EQ — ISSUED
2019-09-26Permit EQ — ISSUED
2019-09-26Permit EQ — ISSUED
2019-09-26Permit EQ — ISSUED
2019-09-26Permit EQ — ISSUED
2019-09-26Permit EQ — ISSUED
2019-09-24Permit AL — ISSUED
2019-09-24Permit Supported Scaffold — Signed-off
2019-09-24Permit Supported Scaffold — Signed-off
2019-09-23Permit Sidewalk Shed — Signed-off
2019-09-20311: Homeless Person Assistance — N/A
2019-09-20311: Homeless Person Assistance — N/A
2019-09-20Permit Supported Scaffold — Signed-off
2019-09-20Permit Sidewalk Shed — Signed-off
2019-09-20Permit Supported Scaffold — Signed-off
2019-09-19Permit Sidewalk Shed — Signed-off
2019-09-19Permit Sidewalk Shed — Signed-off
2019-09-19Permit Construction Fence — Signed-off
2019-09-19Permit Sidewalk Shed — Signed-off
2019-09-19Permit Sidewalk Shed — Signed-off
2019-09-17311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2019-09-17DOB complaint, category ?
2019-09-14311: Homeless Person Assistance — N/A
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-10Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-09-06FDNY inspection (DEMO)
2019-09-04Job filed: Installation of temporary bracing to provide stability for Tower Crane installation (CN #170/19), as per plans filed herewith.$800,000
2019-09-04Permit Structural — Signed-off
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-30Permit EW — ISSUED
2019-08-29Permit EQ — ISSUED
2019-08-23Job filed: EXPRESS SLAB MODIFICATIONS, RE FRAMING OF STEEL AT THE EXPRESS LEVEL, AND TRAIN PLATFORM REDESIGN. NOTE: THE CONSTRUCTION COST ASSOCIATED WITH THIS S$4,350,000
2019-08-21FDNY inspection (DEMO)
2019-08-19ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. AS A WORKER FELL FROM LADDER HURTING HIS FOOT
2019-08-19DOB complaint, category ?
2019-08-13Job filed: TEMPORARY CONSTRUCTION TRAILERS AS PER PLANS FILED HEREWITH. FOR USE DURING FULL DEMOLITION,FILED SEPARATELY UNDER DM-123656640.
2019-08-13Job filed: CONVERSION OF ELEVATOR SHAFTS TO DEBRIS SHAFTS IN PODIUM FOR USE DURING FULL DEMOLITION, FILED SEPARATELY UNDER DM-123656640.$300,495
2019-08-12Job filed: Installation of temporary construction fence. No change to use, egress or occupancy.$3,000
2019-08-09DOB complaint, category ?
2019-08-09Permit EQ — RE-ISSUED
2019-08-09Permit DM — ISSUED
2019-08-08ECB CLASS - 1 violation: FAILURE TO NOTIFY DEPT OF AN INCIDENT THAT RESULTED IN FATALITY OR INJURY. ONE WORKER SUFFERD AN INJURY TO HIS SIDE WHEN HE SLIPPE
2019-08-08DOB complaint, category ?
2019-08-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2019-08-01Permit EW — ISSUED
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Enclosure — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-25Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-07-18Permit EW — ISSUED
2019-07-05Job filed: FILING STRUCTURAL SCOPE FOR 57 STORY NEW BUILDING AS SHOWN ON PLANS FILED HEREWITH.
2019-07-03Permit PL — ISSUED
2019-06-28Job filed: FILING HVAC SYSTEM AND PLUMBING FIXTURES FOR 57 STORY BUILDING AS PER PLANS FILED HEREWITH.
2019-06-28Job filed: FILING SUPPORT OF EXCAVATION AND FOUNDATION FOR 57 STORY NEW BUILDING AS SHOWN ON PLANS FILED HEREWITH
2019-06-28Job filed: NB
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-28Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-27Permit EW — ISSUED
2019-06-26Job filed: NB
2019-06-26Job filed: TEMPORARY STORM WATER DISCHARGE DURING DEMO AS INDICATED ON ATTACHED PLANS. THERE IS NO CHANGE IN EGRESS, USE OR OCCUPANCY.$250,000
2019-06-26Job filed: TEMPORARY STORM WATER DISCHARGE DURING DEMO AS INDICATED ON ATTACHED PLANS. THERE IS NO CHANGE IN EGRESS, USE OR OCCUPANCY.$250,000
2019-06-26Job filed: NB
2019-06-26Job filed: NB
2019-06-26Permit EW — ISSUED
2019-06-26Permit EW — ISSUED
2019-06-24311: Construction Safety Enforcement — CSC - Monitoring Tracking
2019-06-21Permit EW — ISSUED
2019-06-21Permit EW — ISSUED
2019-06-20Permit EW — ISSUED
2019-06-20Permit EW — ISSUED
2019-06-13Permit EQ — ISSUED
2019-06-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT SOUTH ENTRANCE AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NY
2019-06-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT SOUTH ENTRANCE AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NY
2019-06-05Job filed: INSTALLATION OF TEMPORARY PLUMBING AS PART OF STRUCTURAL DEMO PROJECT$926,718
2019-06-05Permit PL — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-04Permit EW — ISSUED
2019-06-03Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-06-03Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-06-03Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-06-03Asbestos abatement: Removal — NorthStar Contracting Group, Inc.
2019-05-31Asbestos abatement: Removal — NorthStar Contracting Group, Inc.