Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
1 heat or hot-water complaints in the last three years (winter 2024–25: 1).
No bedbug-infested units reported in the last three years of filings.
$21,250 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
42 service requests in the last three years. Most common: Vendor Enforcement (8) · Homeless Person Assistance (6) · Noise (5) · Taxi Complaint (4) · Illegal Parking (3) · Street Condition (2).
Filed construction activity
$32,837,332 in permitted construction work filed since
2016 (238 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$168,555,600
$75,850,000
2026
$171,000,000
$76,950,000
2027
$170,000,000
$76,500,000
The city's market estimate has risen
1% between tax years 2025 and 2027.
Building systems
Energy grade (LL33)
B — ENERGY STAR score 77/100 (2022 disclosure cycle)
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
5 Av/53 St — E F · 900 ft straight-line (about a 4-minute walk) · station accessibility: none 51 St — 6 E F · 1,050 ft straight-line (about a 5-minute walk) · station accessibility: full
Bus
Nearest boarding stop: E 49 St / Madison Av — M50 · 100 ft
Citi Bike
Madison Ave & E 51 St · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
42 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Most recent mortgage recorded against this lot: $30,000,000 on
2013-01-22 (lender: Wells Fargo Bank, N.A.), covering 2 lots — the amount covers all of them. Face amount at recording — it may have since been paid
down, refinanced or satisfied. View the recorded
document.
Date
Record
Amount
Per res. unit
2025-10-06
ASSTO $41,700,000 — from VII 444 MADISON LESSEE LLC to 444 MADISON AVE, LLC
$41,700,000
2018-01-02
RPTT $28,050,000 — from LEVEL 3 COMMUNICATIONS LLC to CENTURY LINK INC.
$28,050,000
2013-01-22
Agreement $165,000 — from V11 444 MADISON LESSEE LLC to WELLS FARGO BANK, N.A.
$165,000
2013-01-22
Mortgage $30,000,000 — from V11 444 MADISON LESSEE LLC to WELLS FARGO BANK, N.A.
$30,000,000
2010-04-02
CERR $135,000,000 — from VII 444 MADISON LESSEE LLC to MUNCHENER HYPOTHEKENBANK EG
$135,000,000
2009-01-30
RPTT $48,016,000 — from MERRILL LYNCH & CO., INC to BANK OF AMERICA CORPORATION
$48,016,000
2008-11-14
Agreement $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC.
$150,000,000
2008-11-14
AL&R $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC.
$150,000,000
2007-12-20
AL&R $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC
$150,000,000
2007-12-20
ASSTO $54,763,715 — from 49-50 ASSOCIATES; KMF HOLDING CORPORATION to VII 444 MADISON LESSEE LLC
$54,763,715
2007-12-20
Agreement $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC
$150,000,000
2007-12-20
Mortgage $96,847,921 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC
$96,847,921
2007-12-20
ASSTO $258,986,285 — from 444 MADISON, LLC to VII 444 MADISON LESSEE LLC
$258,986,285
2001-06-19
Mortgage $27,200,000 — from KMF HOLDING CORPORATION; KAY MADISON CORPORATION; 49-50 ASSOCIATES to METROPOLITAN LIFE INSURANCE COMPANY
$27,200,000
1996-01-02
Mortgage $32,800,000 — from 444 MADISON, LLC to PRINCIPAL MUTUAL LIFE INSURANCE COMPANY
$32,800,000
Ten-year activity
2001000
2017
109
2018
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Ownership & money
Health & systems
Total
2017
41
14
10
0
6
71
2018
87
11
8
1
2
109
2019
74
5
15
0
10
104
2020
38
1
6
1
3
49
2021
37
2
10
0
0
49
2022
75
0
16
0
2
93
2023
21
1
13
1
1
37
2024
3
3
16
0
1
23
2025
4
2
14
2
4
26
2026
28
7
8
0
1
44
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Suspended Scaffolding for Facade Restoration and Inspection as Shown on Plans
2026-09-08
Permit Plumbing — Permit Issued
2026-09-08
Permit Plumbing — Permit Issued
2026-09-08
Permit Plumbing — Permit Issued
2026-09-08
Permit Sprinklers — Permit Issued
2026-09-08
Permit Sprinklers — Permit Issued
2026-09-08
Permit Sprinklers — Permit Issued
2026-09-08
Permit Sprinklers — Permit Issued
2026-09-08
Permit Plumbing — Permit Issued
2026-08-31
Permit General Construction — Permit Issued
2026-08-28
Permit General Construction — Permit Issued
2026-08-20
Job filed: General Construction of office build out on 20th floor for Commodore.
2026-08-20
Job filed: Plumbing and Sprinkler work for office rebuild
2026-08-20
Job filed: Mechanical work to refurbish work and duct work and piping for future HVAC installation.
2026-08-20
Job filed: Refurbish mechanical equipment as per plans for office build out. No HVAC equipment installed.
2026-08-20
Job filed: General Construction for prebuild office renovation. Plumbing, mechanical, sprinkler filed as subsequent applications. No change to use, egress, or oc
2026-08-20
Job filed: Plumbing and Sprinkler work for office renovation.
2026-08-14
Permit Sidewalk Shed — Permit Issued
2026-08-03
311: Sewer Maintenance — Backup
2026-07-16
311: Consumer Complaint — Clothing, Shoe, or Accessories Store
2026-07-16
ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED TWO SUSPENDED SCAFFOLD INSTALLED AND READY TO USE. ON MULTIPLE LOCATIONS OBSERVED LIFE LINES NOT PR
2026-07-16
ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE. COMPETENT PERSON ON SITE UPON REQUESTING INITIAL INSTALLATION FOR SWS IT
2026-07-16
ECB CLASS - 1 violation: UPON REVIEWING PRE- SHIFTS OBSERVED MULTIPLE WORKERS NAMES RECORDED ON DIFFERENT DAYS. UPON REQUESTING SITE SPECIFIC SAFETY ORIENT
2026-07-16
ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. UPON REQUESTING THE FOLLOWING DOCUMENT RIGGING FOREMAN COULD NOT PR
2026-09-17Job filed: Suspended Scaffolding for Facade Restoration and Inspection as Shown on Plans
2026-09-08Permit Plumbing — Permit Issued
2026-09-08Permit Plumbing — Permit Issued
2026-09-08Permit Plumbing — Permit Issued
2026-09-08Permit Sprinklers — Permit Issued
2026-09-08Permit Sprinklers — Permit Issued
2026-09-08Permit Sprinklers — Permit Issued
2026-09-08Permit Sprinklers — Permit Issued
2026-09-08Permit Plumbing — Permit Issued
2026-08-31Permit General Construction — Permit Issued
2026-08-28Permit General Construction — Permit Issued
2026-08-20Job filed: General Construction of office build out on 20th floor for Commodore.$715,000
2026-08-20Job filed: Plumbing and Sprinkler work for office rebuild$25,000
2026-08-20Job filed: Mechanical work to refurbish work and duct work and piping for future HVAC installation.$130,000
2026-08-20Job filed: Refurbish mechanical equipment as per plans for office build out. No HVAC equipment installed.$290,000
2026-08-20Job filed: General Construction for prebuild office renovation. Plumbing, mechanical, sprinkler filed as subsequent applications. No change to use, egress, or oc$418,000
2026-08-20Job filed: Plumbing and Sprinkler work for office renovation.$122,000
2026-08-14Permit Sidewalk Shed — Permit Issued
2026-08-03311: Sewer Maintenance — Backup
2026-07-16311: Consumer Complaint — Clothing, Shoe, or Accessories Store
2026-07-16ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED TWO SUSPENDED SCAFFOLD INSTALLED AND READY TO USE. ON MULTIPLE LOCATIONS OBSERVED LIFE LINES NOT PR$2,500
2026-07-16ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE. COMPETENT PERSON ON SITE UPON REQUESTING INITIAL INSTALLATION FOR SWS IT $1,250
2026-07-16ECB CLASS - 1 violation: UPON REVIEWING PRE- SHIFTS OBSERVED MULTIPLE WORKERS NAMES RECORDED ON DIFFERENT DAYS. UPON REQUESTING SITE SPECIFIC SAFETY ORIENT$5,000
2026-07-16ECB CLASS - 2 violation: AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. UPON REQUESTING THE FOLLOWING DOCUMENT RIGGING FOREMAN COULD NOT PR$1,250
2025-10-06Mortgage satisfied — from V11 444 MADISON LESSEE LLC to WELLS FARGO BANK, N.A.
2025-10-06ASSTO $41,700,000 — from VII 444 MADISON LESSEE LLC to 444 MADISON AVE, LLC$41,700,000
2025-09-24Facade (LL11) filing, cycle 10: UNSAFE
2025-08-27ECB CLASS - 1 violation: FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BUILDING FACADE AS PER UNSAFE NOTIFICATION.$10,000
2025-08-25311: Homeless Person Assistance — Non-Chronic
2025-08-15Permit Sidewalk Shed — Permit Issued
2025-08-14Job filed: INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT MADISON AVENUE, EAST 5
2025-07-24Permit Suspended Scaffold — Signed-off
2025-07-21Job filed: FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervi
2025-07-04311: Vendor Enforcement — Food Vendor
2025-07-03311: Special Projects Inspection Team (SPIT) — Privately Owned Public Space/Non-Compliance
2025-07-03DOB complaint, category ?
2025-06-23311: Homeless Person Assistance — Non-Chronic
2025-06-16Restaurant inspection: STARBUCKS — grade A
2025-06-03311: Encampment — N/A
2025-05-26311: Vendor Enforcement — Food Vendor
2025-05-14311: Vendor Enforcement — Food Vendor
2025-04-23311: Vendor Enforcement — Food Vendor
2025-03-13311: Homeless Person Assistance
2025-02-04311: Blocked Driveway — Partial Access
2025-01-25311: Vendor Enforcement — Food Vendor
2025-01-16Cooling tower inspection
2025-01-16Cooling tower inspection
2025-01-10311: Non-Residential Heat — Inadequate or No Heat
2024
2024-12-28311: Lost Property — Bag/Wallet
2024-12-18311: Taxi Complaint — Driver Complaint - Non Passenger
2024-11-23311: Illegal Parking — Blocked Hydrant
2024-11-06Permit Plumbing — Signed-off
2024-11-01Job filed: Plumbing modifications at cellar level as per plans filed herewith. No change to use, egress or occupancy.$58,750
2024-09-22311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-09-19311: Taxi Complaint — Vehicle Complaint
2024-09-04311: Vendor Enforcement — Food Vendor
2024-08-16311: Mobile Food Vendor — Food Worker Activity
2024-08-06311: Maintenance or Facility — Structure - Outdoors
2023-10-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2023-10-11DOB complaint, category ?
2023-08-22311: Missed Collection — Recycling - Paper
2023-08-02Job filed: Sprinkler modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.$53,000
2023-06-16Permit General Construction — Signed-off
2023-06-16Permit Mechanical Systems — Signed-off
2023-06-01Job filed: Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$398,941
2023-05-02311: Street Condition — Plate Condition - Noisy
2023-05-01Elevator permit: DEACTIVATING 10th FLOOR-All work to comply with ASME A17.1-2013, Part 2, Safety Code for Elevators and Escalators as modified by C$7,000
2023-05-01Permit Structural — Signed-off
2023-04-28Job filed: Structural modifications taking place on the 13th and 14th floors as per plans filed herewith. No change in use, egress or occupancy.$50,010
2023-04-12Permit General Construction — Signed-off
2023-04-10Job filed: Mechanical modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.$924,955
2023-03-07Agreement — from VI 444 MADISON LESSEE LLC; DORIS DUKE MANAGEMENT FOUNDATION to WELLS FARGO BANK, N.A
2023-03-05311: Panhandling — N/A
2023-02-23Permit Plumbing — Signed-off
2023-02-21Permit Sprinklers — Signed-off
2023-02-14Job filed: General construction on 14th floor for minor refresh. No change in use, egress or occupancy.$1,000
2023-02-05311: Illegal Parking — Parking Permit Improper Use
2023-02-03Permit Plumbing — Signed-off
2023-01-27Permit Sprinklers — Signed-off
2023-01-27Permit General Construction — Signed-off
2023-01-27Permit Mechanical Systems — Signed-off
2023-01-26Job filed: Mechanical modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.$221,634
2023-01-25Job filed: Sprinkler modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.$17,442
2023-01-25Job filed: General construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.$295,177
2023-01-25Job filed: Plumbing modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.$11,662
2022-12-19Job filed: Structural modifications taking place in the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.$120,000
2022-12-01Permit General Construction — Signed-off
2022-11-30Permit Mechanical Systems — Signed-off
2022-11-29Job filed: Mechanical modifications taking place on 7th floor as per plans filed herewith. No change in use, egress or occupancy.$450,000
2022-11-29Job filed: Sprinkler modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.$53,000
2022-11-29Job filed: Plumbing modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy.$55,000
2022-11-29Job filed: General construction modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.$961,000
2022-11-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-04Permit Sprinklers — Signed-off
2022-10-10311: Consumer Complaint — Mobile Food Vendor
2022-09-27Permit Plumbing — Signed-off
2022-09-27Permit Sprinklers — Signed-off
2022-09-20Permit Mechanical Systems — Signed-off
2022-09-20Permit General Construction — Signed-off
2022-09-16Job filed: Plumbing modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$18,000
2022-09-16Job filed: General construction modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$174,409
2022-09-16Job filed: Mechanical modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$65,509
2022-09-16Job filed: Sprinkler modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$16,002
2022-08-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-05Permit Sprinklers — Signed-off
2022-08-03Permit Plumbing — Signed-off
2022-08-02Permit General Construction — Signed-off
2022-07-29Job filed: General construction taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$2,827,646
2022-07-28Permit Mechanical Systems — Signed-off
2022-07-28Job filed: Sprinkler modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$49,031
2022-07-28Job filed: Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$398,941
2022-07-28Job filed: Plumbing modifications on 10th floor as per plans filed herewith. No change in use, egress or occupancy.$76,947
2022-07-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-21311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-09Permit Structural — Signed-off
2022-05-26Permit Mechanical Systems — Signed-off
2022-05-20Permit Sign — Signed-off
2022-05-20Permit Plumbing — Signed-off
2022-05-20Permit Sign — Signed-off
2022-05-20Permit Sign — Signed-off
2022-05-20Permit Sprinklers — Signed-off
2022-05-20Permit Sign — Signed-off
2022-05-20Permit Sprinklers — Signed-off
2022-05-19Job filed: ERECT ACCESSORY BUSINESS WINDOW SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$700
2022-05-19Job filed: ERECT ACCESSORY BUSINESS WINDOW SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$700
2022-05-19Job filed: ERECT ACCESSORY BUSINESS WINDOW SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-05-19Job filed: ERECT ACCESSORY BUSINESS WINDOW SIGN FOR STARBUCKS, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,000
2022-05-18Permit Mechanical Systems — Signed-off
2022-05-17Permit General Construction — Signed-off
2022-05-17Permit Structural — Signed-off
2022-05-11Job filed: Sprinkler modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.$74,948
2022-05-11Job filed: Structural modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.$75,000
2022-05-11Job filed: Plumbing modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.$49,997
2022-05-11Job filed: Mechanical modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.$924,955
2022-05-11Job filed: General construction taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.$875,034
2022-05-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-13Permit General Construction — Signed-off
2022-04-13Permit Mechanical Systems — Signed-off
2022-04-09Permit Mechanical Systems — Signed-off
2022-04-07Job filed: Sprinkler modifications on the 36th floor as per plans filed herewith. No change in use, egress or occupancy.$23,249
2022-04-06Job filed: Mechanical modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy.$8,000
2022-04-05Permit EW — ISSUED
2022-03-31Permit Sprinklers — Signed-off
2022-03-31Permit Sprinklers — Signed-off
2022-03-31Permit Plumbing — Signed-off
2022-03-25Permit General Construction — Signed-off
2022-03-21Permit General Construction — Signed-off
2022-03-17Permit Mechanical Systems — Signed-off
2022-03-17Job filed: Construction modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$158,060
2022-03-17Job filed: General construction modifications taking place on the 40th floor as per plans filed herewith. No change in use, egress or occupancy.$100,000
2022-03-15Job filed: Plumbing modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$46,992
2022-03-15Job filed: Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress oroccupancy.$112,000
2022-03-15Job filed: Sprinkler modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy.$9,751
2022-03-15Job filed: Sprinkler modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.$15,000
2022-02-10Permit Plumbing — Signed-off
2022-02-10Permit Sprinklers — Signed-off
2022-02-09Cooling tower inspection
2022-02-09Cooling tower inspection
2022-02-04Permit General Construction — Signed-off
2022-02-04Permit Mechanical Systems — Signed-off
2022-01-25Job filed: Mechanical modifications taking place on 1st floor and MEZ as per plans filed herewith. No change in use, egress or occupancy.$100,000
2022-01-24Job filed: Plumbing modifications taking place on the 1st, MEZ and CEL as per plans filed herewith. No change in use, egress or occupancy.$75,000
2022-01-24Job filed: Sprinkler modifications taking place on the 1st floor and MEZ per plans filed herewith. No change in use, egress or occupancy.$20,000
2022-01-24Job filed: General construction taking place on the 1st floor and MEZ as per drawings filed herewith. No change in use, egress or occupancy.$620,000
2021
2021-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2021-11-26311: Lost Property — Clothing/Glasses
2021-11-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-11-08Permit Sprinklers — Signed-off
2021-11-05Permit Plumbing — Signed-off
2021-11-03Permit General Construction — Signed-off
2021-11-03Permit Mechanical Systems — Signed-off
2021-11-01311: Illegal Parking — Blocked Hydrant
2021-11-01Job filed: General construction taking place on the 36th floor as per drawings filed herewith. No change in use, egress or occupancy.$380,868
2021-10-29Job filed: Mechanical modifications taking place on the 36th floor as per plans filed herewith. No change in use, egress or occupancy.$112,809
2021-10-29Job filed: Plumbing modifications on the 36th floor as per plans filed herewith. No change in use, egress or occupancy.$46,250
2021-10-29Job filed: Sprinkler modifications on the 36th floor as per plans filed herewith. No change in use, egress or occupancy.$23,249
2021-10-12311: Drug Activity — Use Indoor
2021-10-06Permit General Construction — Signed-off
2021-09-29Permit Sprinklers — Signed-off
2021-09-28Permit Mechanical Systems — Signed-off
2021-09-27Job filed: Minor general construction including partition removal and relocation for tenant layout as per plans filed herewith. No change to use egress or occupa$25,200
2021-09-22Job filed: modifications of existing sprinkler system including relocation of existing connections to meet coverage requirements of new office layout. No change $3,200
2021-09-22Job filed: Minor mechanical modifications for new tenant layout as per plans filed here with. No change to use egress or occupancy$12,005
2021-09-15DOB complaint, category ?
2021-09-10Permit Sprinklers — Signed-off
2021-09-08Permit General Construction — Signed-off
2021-09-08Permit Mechanical Systems — Signed-off
2021-09-02Job filed: Sprinkler changes on 38th floor as per plans filed herewith. No change in use, egress or occupancy.$7,200
2021-09-02Job filed: General construction on 38th floor as per plans filed herewith. No change in use, egress or occupancy.$60,000
2021-09-02Job filed: Mechanical changes on 38th floor as per plans filed herewith. No change in use, egress or occupancy.$16,000
2021-08-03Job filed: Modifications to mechanical ductwork and piping on 23rd floor, as per plans filed herewith. PAA to include replacing of outdoor rooftop heat pump outd$45,000
2021-07-16Permit Plumbing — Signed-off
2021-07-07Job filed: Mechanical modifications taking place for ventilation system as per plans filed herewith. No change to use, egress or occupancy.$29,998
2021-07-01Job filed: Structural modifications taking place on GRD and CEL as per plans filed herewith. No change to use, egress or occupancy.$345,000
2021-05-26Job filed: Sprinkler modifications as per plans filed herewith. no change to use egress$35,000
2021-05-20311: Mobile Food Vendor — Food Worker Activity
2021-05-15311: Mobile Food Vendor — Smoke/Odor
2021-04-28311: Mobile Food Vendor — Equipment
2021-04-23311: Mobile Food Vendor — Food Worker Activity
2021-04-08Permit Sprinklers — Signed-off
2021-03-24Permit Sprinklers — Signed-off
2021-03-22Permit Mechanical Systems — Signed-off
2021-03-22Permit General Construction — Signed-off
2021-03-09Permit Plumbing — Signed-off
2021-03-02Job filed: Sprinkler changes taking place on the 14th floor (temp loop installation) as per plans filed herewith. No change in use, egress or occupancy.$10,000
2021-02-17Job filed: General sprinkler modifications on the 9th floor as per plans filed herewith. No change is use, egress or occupancy.$8,010
2021-02-17Job filed: Mechanical modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy.$35,008
2021-02-17Job filed: General construction taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy.$79,990
2021-01-15Permit Sprinklers — Signed-off
2021-01-12Permit Mechanical Systems — Signed-off
2021-01-07Job filed: Modifications to mechanical ductwork and piping on 23rd floor, as per plans filed herewith. PAA to include replacing of outdoor rooftop heat pump outd$45,000
2021-01-01311: Non-Emergency Police Matter — Other (complaint details)
2020
2020-12-22Permit Plumbing — Signed-off
2020-12-11Job filed: Sprinkler modifications as per plans filed herewith. no change to use egress$35,000
2020-12-11Job filed: Plumbing modifications tot he 23rd floor as per plans filedherewith. No change in use, egress or occupancy$50,000
2020-12-09Permit EW — ISSUED
2020-12-04Permit Sprinklers — Signed-off
2020-11-04311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-28Permit Plumbing — Signed-off
2020-10-12Permit EW — ISSUED
2020-10-09Permit Plumbing — Signed-off
2020-10-09Permit Mechanical Systems — Signed-off
2020-10-06Permit Sprinklers — Signed-off
2020-09-18Job filed: Sprinkler modifications taking place on 42nd floor per tenant fit out, including 33 new sp heads and 1 gravity tank, and removal of 7 existing sp head$30,000
2020-09-18Job filed: PLUMBING MODIFICATIONS FOR TENANT FIT OUT TAKING PLACE ON 42ND FLOOR, INCLUDNIG OFFICE ADDITIONS AND ALTERATIONS, PROVIDE NEW HOT WATER HEATER, CONNE$4,980
2020-09-18Job filed: Tenant Interior fit out as per plans filed herewith, including duct work and installation of two AC units. No change to use egress or occupancy.,$65,070
2020-09-16Permit EW — ISSUED
2020-09-11Permit Mechanical Systems — Signed-off
2020-09-08Job filed: GENERAL CONSTRUCTION, INCLUDING INTERIOR BUILD OUT TO TAKE PLACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$55,000
2020-09-08Job filed: GENERAL CONSTRUCTION, INCLUDING INTERIOR BUILD OUT TO TAKE PLACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$55,000
2020-08-11Facade (LL11) filing, cycle 9: SWARMP
2020-07-20Job filed: Plumbing modifications to take place on roof, including CT water pump upgrades. No change of use egress or occupancy.$20,000
2020-07-13ECB CLASS - 2 violation: SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRIKLERS & FILE A FINAL SPRINKLER REPORT PREPA$3,125
2020-07-01Permit Plumbing — Signed-off
2020-06-22Permit AL — ISSUED
2020-06-17Permit Sprinklers — Signed-off
2020-06-12Job filed: Mechanical modifications and build out taking place on 38th floor, as per plan filed herewith.$44,986
2020-06-11Job filed: Plumbing Modifications taking on 38th floor as plans filed herewith.$4,502
2020-06-11Job filed: Modifcations to existing sprinkler system taking place throughout 38th floor, including removal and new installation of sprinkler heads.$14,995
2020-06-08Job filed: Plumbing modifications to take place on roof, including CT water pump upgrades. No change of use egress or occupancy.$20,000
2020-06-05Permit EW — ISSUED
2020-06-02Job filed: TEMPORARY REMOVAL OF LETTERS "B" AND "U" TO ALLOW FACADE REPAIR PER LOCAL LAW 11. FOLLOWED BY REIINSTALLATION OF LETTERS. NO CHANGE OF USE, EGRESS OR $10,000
2020-05-26Job filed: GENERAL CONSTRUCTION, INCLUDING INTERIOR BUILD OUT TO TAKE PLACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$55,000
2020-05-26Job filed: GENERAL CONSTRUCTION, INCLUDING INTERIOR BUILD OUT TO TAKE PLACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$55,000
2020-05-26Job filed: GENERAL CONSTRUCTION, INCLUDING INTERIOR BUILD OUT TO TAKE PLACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$55,000
2020-03-09Job filed: Sprinkler modifications to the 17th floor as per plans filed herewith. No change in use, egress or occupancy.(Post-Approval Amendment to show the upda$14,000
2020-02-14Job filed: MINOR CONSTRUCTION TO TAKE PLACE FOR MINOR RENOVATIONS ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.$1,000
2020-02-11Cooling tower inspection
2020-02-11Cooling tower inspection
2020-01-10Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$300,000
2019
2019-12-31Permit Sidewalk Shed — Signed-off
2019-12-31Permit EW — ISSUED
2019-12-26Permit Supported Scaffold — Signed-off
2019-12-23Job filed: MINOR CONSTRUCTION MODIFICATIONS TO THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,969
2019-12-23Job filed: MINOR CONSTRUCTION MODIFICATIONS TO THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,969
2019-12-23Job filed: MINOR CONSTRUCTION MODIFICATIONS TO THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$400,969
2019-12-19Permit Mechanical Systems — Permit Issued
2019-12-12Job filed: PLUMBING MODIFICATIONS TO THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2019-12-12Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
2019-12-12Job filed: SPRINKLER MODIFICATION TO THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2019-12-11Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$16,000
2019-12-09Permit Sprinklers — Signed-off
2019-12-09Permit Sprinklers — Permit Issued
2019-12-06Job filed: Installation of sprinkler temp loop for the 13th floor. No change in use, egress or occupancy.$20,000
2019-12-05311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-17Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$64,000
2019-11-17Elevator permit: -Modification to the existing controller to install Door Position Monitoring System (DPM) as per requirements of ASME A17.3 of 200$128,000
2019-11-15311: Homeless Person Assistance — N/A
2019-11-15ECB CLASS - 2 violation: 27-929.1 A.C. 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER RE$625
2019-11-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-18Job filed: General mechanical changes taking place on GRD floor and MEZ as per plans filed herewith. No change is use, egress or occupancy.$50,000
2019-10-18Job filed: ARCHITECTURAL MODIFICATIONS TO THE 23RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2019-10-17Job filed: Sprinkler changes taking place on the GRD floor and MEZ as per drawings filed herewith. No change in use, egress or occupancy.$12,600
2019-10-17Job filed: Plumbing changes taking place on the GRD floor and MEZ as per plans filed herewith. No change in use, egress or occupancy.$15,000
2019-10-17Permit EW — ISSUED
2019-10-08Job filed: Sprinkler modification to the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$15,000
2019-10-08Job filed: Mechanical modifications to the 23rd floor as per plans filed herewith. no change in use, egress or occupancy.$45,000
2019-10-08Job filed: Plumbing modification to the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$4,500
2019-10-08Job filed: Plumbing modifications to the 23rd floor as per plans filed herewith. No change in use, egress or occupancy.$50,000
2019-10-08Job filed: Mechanical modifications to the 27th floor as per plans filed herewith. No change in use, egress or occupancy.$45,000
2019-10-08Job filed: Sprinkler modifications to the 23rd floor as per plans filed herewith. No change in use, egress or occupancy.$34,999
2019-10-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-03Job filed: SITE SAFETY PLAN IN CONJUNCTION WITH APPLICATION NO. 123765381$500
2019-09-26Job filed: sprinkler modification to the 42nd floor as per plans filed herewith. no change in use, egress or occupancy.$31,000
2019-09-23Job filed: Sprinkler modifications to the 17th floor as per plans filed herewith. No change in use, egress or occupancy.(Post-Approval Amendment to show the upda$14,000
2019-09-19Job filed: FACADE WORK TO THE 3RD THRU 42ND AND ROF FLOORS AS PER PLANS FILE HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2019-09-19Job filed: FACADE WORK TO THE 3RD THRU 42ND AND ROF FLOORS AS PER PLANS FILE HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2019-09-12Job filed: ARCHITECTURAL MODIFICATIONS TO THE 38TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2019-09-12Permit EW — ISSUED
2019-09-03DOB violation LL2604S: FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
2019-08-29Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2019-08-29Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2019-08-29DOB complaint, category ?
2019-08-29Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2019-08-27Job filed: STRUCTURAL MODIFICATIONS TO THE 14th and 15TH FLOOR SLAB INFILL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$28,000
2019-08-21Job filed: GENERAL CONSTRUCTION TAKING PLACE ON GRD FLOOR AND MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$90,000
2019-08-21Job filed: GENERAL CONSTRUCTION TAKING PLACE ON GRD FLOOR AND MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$90,000
2019-08-19311: Urinating in Public — N/A
2019-08-16Permit EW — ISSUED
2019-08-16Job filed: ARCHITECTURAL MODIFICATIONS TO THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$35,000
2019-08-13Permit PL — ISSUED
2019-08-07Permit EW — ISSUED
2019-07-30Permit EW — ISSUED
2019-07-30Job filed: GENERAL CONSTRUCTION ON THE 23RD FLOOR INCLUDING REMOVAL OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$138,000
2019-07-30Job filed: GENERAL CONSTRUCTION ON THE 23RD FLOOR INCLUDING REMOVAL OF NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$138,000
2019-07-12311: Broken Parking Meter — Timer Defect - Fast/Fail
2019-07-11311: Noise - Residential — Loud Talking
2019-07-11311: Noise - Residential — Loud Talking
2019-06-10Permit EW — ISSUED
2019-06-10Permit EW — ISSUED
2019-06-06Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 7TH FLOOR (WHITEBOX) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$55,000
2019-06-06Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH FLOOR (WHITEBOX) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$55,000
2019-05-20Permit EW — ISSUED
2019-05-20Job filed: MINOR INTERIOR DEMOLITION TO TAKE PLACE ON THE 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY$85,000
2019-02-28311: Water System — Leak (Use Comments) (WA2)
2019-02-12Permit EW — ISSUED
2019-02-11Permit PL — ISSUED
2019-02-07Permit EW — ISSUED
2019-02-07Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$90,000
2019-02-07Job filed: SPRINKLER MODIFICATION TO THE 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,400
2019-02-07Job filed: FIRE ALARM MODIFICATION TO THE 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,100
2019-01-15Permit EW — ISSUED
2019-01-15Job filed: ARCHITECTURAL MODIFICATION TO THE 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$84,000
2019-01-03Permit Sidewalk Shed — Signed-off
2018
2018-12-28Permit Supported Scaffold — Signed-off
2018-12-27DOB violation E:
2018-12-27DOB violation E:
2018-12-27DOB violation E:
2018-12-27DOB violation E:
2018-12-21DOB violation E:
2018-12-21DOB violation E:
2018-12-21DOB violation E:
2018-12-21Permit EW — ISSUED
2018-12-21Permit EW — ISSUED
2018-12-21Permit EW — ISSUED
2018-11-20Job filed: SPRINKLER MODIFICATIONS TO THE SUBCELLAR AND CELLAR FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$166,600
2018-11-12311: Indoor Sewage — Sewage Odor
2018-11-08311: For Hire Vehicle Complaint — Driver Complaint
2018-11-07311: Indoor Sewage — Sewage Odor
2018-11-07Permit EW — ISSUED
2018-10-26311: New Tree Request — For One Address
2018-10-26Permit PL — ISSUED
2018-10-25Permit Supported Scaffold — Signed-off
2018-10-24Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-10-19Permit EW — ISSUED
2018-10-19Permit EW — ISSUED
2018-10-19Permit EW — ISSUED
2018-10-16Permit Sidewalk Shed — Signed-off
2018-10-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-10-10Job filed: SPRINKLER MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$145,000
2018-10-10Job filed: SPRINKLER MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$145,000
2018-10-10Job filed: FIRE ALARM MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$42,000
2018-10-09Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$899,000
2018-10-09Job filed: STRUCTURAL MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$63,000
2018-10-09Job filed: ARCHITECTURAL MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$665,000
2018-10-09Job filed: ARCHITECTURAL MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$665,000
2018-10-09Job filed: STRUCTURAL MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$63,000
2018-10-09Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$899,000
2018-10-09Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$899,000
2018-08-31Permit EW — ISSUED
2018-08-31Permit EW — ISSUED
2018-08-24Permit EW — ISSUED
2018-08-24Permit EW — ISSUED
2018-08-24Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2018-08-24Job filed: STRUCTURAL MODIFICATION TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$30,000
2018-08-24Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 5TH & 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2018-08-21Permit EW — ISSUED
2018-08-14Permit EW — ISSUED
2018-08-14Permit EW — ISSUED
2018-08-03Permit EW — ISSUED
2018-08-03Job filed: FIRE ALARM MODIFICATIONS TO THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$7,500
2018-08-03Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$7,700
2018-08-03Job filed: SPRINKLER MODIFICATIONS TO THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$22,100
2018-08-03Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$59,000
2018-08-03Permit EW — ISSUED
2018-08-03Job filed: FIRE ALARM MODIFICATIONS TO THE 12TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$7,500
2018-07-31Job filed: SPRINKLER MODIFICATIONS TO THE 18TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$81,000
2018-07-31Job filed: SPRINKLER MODIFICATIONS TO THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,500
2018-07-20Permit EW — ISSUED
2018-07-17Permit EW — ISSUED
2018-07-10Permit PL — ISSUED
2018-07-06Permit EW — ISSUED
2018-07-06Permit EW — ISSUED
2018-06-13Job filed: SPRINKLER MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,000
2018-06-13Job filed: FIRE ALARM MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,000
2018-06-13Job filed: SPRINKLER MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,000
2018-06-13Job filed: FIRE ALARM MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,000
2018-06-13Job filed: FIRE ALARM MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,000
2018-06-07311: Special Projects Inspection Team (SPIT) — Illegal Hotel Rooms In Residential Building
2018-06-07DOB complaint, category ?
2018-06-07Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$164,500
2018-06-07Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$392,500
2018-06-07Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$392,500
2018-06-07Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 34TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$164,500
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-18ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES RE$1,250
2018-05-17311: Street Sign - Damaged — No Parking, Standing, Stopping
2018-05-17Permit EW — ISSUED
2018-05-17Job filed: INTERIOR RENOVATIONS OF NON LOAD BEARING PARTITIONS AND FINISHES TO THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$31,600
2018-05-17Job filed: INTERIOR RENOVATIONS OF NON LOAD BEARING PARTITIONS AND FINISHES TO THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$31,600
2018-05-01Permit EW — ISSUED
2018-05-01Job filed: INTERIOR RENOVATIONS OF NON LOAD BEARING PARTITIONS AND FINISHES TO THE 34TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANC$39,000
2018-05-01Job filed: INTERIOR RENOVATIONS OF NON LOAD BEARING PARTITIONS AND FINISHES TO THE 34TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANC$39,000
2018-04-25Permit EW — ISSUED
2018-04-25Job filed: ARCHITECTURAL MODIFICATIONS TO THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$37,015
2018-03-29311: Elevator — Elevator - Multiple Devices On Property
2018-03-09Job filed: FIRE ALARM MODIFICATIONS TO THE 8TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$25,000
2018-03-09Job filed: FIRE ALARM MODIFICATIONS TO THE 8TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$25,000
2018-03-08Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 8TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,800
2018-03-08Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 8TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$150,700
2018-03-08Job filed: SPRINKLER MODIFICATIONS TO THE 8TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$19,500
2018-02-23Permit PL — ISSUED
2018-02-22Permit EW — ISSUED
2018-02-22Permit EW — ISSUED
2018-02-21Job filed: FIRE ALARM MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$23,000
2018-02-20Job filed: SPRINKLER MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$20,000
2018-02-20Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$372,700
2018-02-20Job filed: SPRINKLER MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$20,000
2018-02-20Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$372,700
2018-02-20Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$157,000
2018-01-16Permit EW — ISSUED
2018-01-16Job filed: CONSTRUCTION MODIFICATIONS TO THE 8TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,875
2018-01-02RPTT $28,050,000 — from LEVEL 3 COMMUNICATIONS LLC to CENTURY LINK INC.$28,050,000
2018-01-02Permit EW — ISSUED
2017
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-11-29DOB violation E:
2017-10-21311: Broken Muni Meter — Out of Order
2017-10-20311: Homeless Person Assistance — N/A
2017-10-04Permit EW — ISSUED
2017-09-14311: Homeless Encampment — N/A
2017-08-30Job filed: FIRE ALARM MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$1,500
2017-08-28Permit PL — ISSUED
2017-08-28Permit EW — ISSUED
2017-08-28Permit EW — ISSUED
2017-08-28Permit EW — ISSUED
2017-08-25Permit EW — ISSUED
2017-08-25Permit EW — ISSUED
2017-08-25Permit PL — ISSUED
2017-08-25Job filed: FIRE ALARM MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2017-08-25Job filed: ARCHITECTURAL AND PLUMBING MODIFICATIONS TO THE 1ST AND MEZZ FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$10,000
2017-08-24Permit PL — ISSUED
2017-08-24Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$67,000
2017-08-24Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$71,500
2017-08-24Job filed: SPRINKLER MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$3,500
2017-08-24Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$71,500
2017-08-24Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$86,000
2017-08-24Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$86,000
2017-08-24Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 6TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$71,500
2017-08-24Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 30TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$54,000
2017-08-22Permit EW — ISSUED
2017-08-15Permit EW — ISSUED
2017-08-15Permit EW — ISSUED
2017-08-14Job filed: SPRINKLER MODIFICATIONS TO THE 39TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$31,000
2017-08-11Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 39TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$325,500
2017-08-11Job filed: FIRE ALARM MODIFICATIONS TO THE 39TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,000
2017-08-11Job filed: GENERAL CONSTRUCTION MODIFICATIONS TO THE 39TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$325,500
2017-08-11Job filed: MECHANICAL AND PLUMBING MODIFICATIONS IN ACCORDANCE WITH THE DRAWINGS SUBMITTED HEREWITH FOR THE 39TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$224,000
2017-06-09311: For Hire Vehicle Complaint — Driver Complaint
2017-06-08Permit EW — ISSUED
2017-06-08Job filed: GENERAL CONSTRUCTION TO THE 19TH FLOOR WHICH INCLUDES THE REMOVAL AND INSTALLATION OF INTERIOR, NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS P$35,000
2017-06-08Job filed: GENERAL CONSTRUCTION TO THE 19TH FLOOR WHICH INCLUDES THE REMOVAL AND INSTALLATION OF INTERIOR, NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS P$35,000
2017-05-18Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 12TH FLOOR (UNISEX TOILET) AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$50,836
2017-05-18Job filed: GENERAL CONSTRUCTION TO THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$125,000
2017-05-18Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 12TH FLOOR (UNISEX TOILET) AS PER PLANS SUBMITTED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.$50,836
2017-05-08311: General Construction/Plumbing — Failure To Maintain
2017-05-08DOB complaint, category ?
2017-04-29311: Homeless Person Assistance — N/A
2017-04-13311: Asbestos — Asbestos Complaint (B1)
2017-04-11311: Street Condition — Pothole
2017-04-06Job filed: FIRE ALARM MODIFICATIONS TO THE 12TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,500
2017-03-10FDNY inspection (ABATE)
2017-03-01Job filed: FIRE ALARM MODIFICATIONS TO THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,700
2017-02-27Permit EW — ISSUED
2017-02-27Job filed: ARCHITECTURAL MODIFICATIONS TO THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$106,600
2017-02-24Job filed: ARCHITECTURAL MODIFICATIONS TO THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$106,600
2017-02-20FDNY inspection (ABATE)
2017-02-19311: Street Condition — Pothole
2017-01-20DOB complaint, category ?
2016
2016-12-27Permit EW — ISSUED
2016-12-27Permit EW — ISSUED
2016-12-27Permit EW — ISSUED
2016-12-03311: Broken Muni Meter — No Receipt
2016-11-28Permit EW — ISSUED
2016-11-28Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE CELLAR FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$75,855
2016-11-28Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE CELLAR FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$75,855
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-17DOB violation E:
2016-11-14311: Taxi Complaint — Driver Complaint
2016-11-14311: Taxi Complaint — Driver Complaint
2016-11-14311: Taxi Report — Driver Report
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-09-28Permit EW — ISSUED
2016-09-26Permit EW — ISSUED
2016-09-26Job filed: ARCHITECTURAL MODIFICATION TO THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$91,319
2016-09-26Job filed: ARCHITECTURAL MODIFICATION TO THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$91,319
2016-09-21Permit PL — ISSUED
2016-09-20Permit EW — ISSUED
2016-09-20Permit EW — ISSUED
2016-08-18Job filed: MECHANICAL AND PLUMBING MODIFICATIONS ON THE 25TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$272,750
2016-08-18Job filed: ARCHITECTURAL MODIFICATIONS TO THE 25TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$409,205
2016-08-18Job filed: SPRINKLER MODIFICATIONS ON THE 25TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$45,458
2016-08-18Job filed: SPRINKLER MODIFICATIONS ON THE 25TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$45,458
2016-08-17Job filed: FIRE ALARM MODIFICATIONS ON THE 25TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$17,500
2016-07-22Permit PL — ISSUED
2016-06-16Permit EW — ISSUED
2016-06-15Permit PL — ISSUED
2016-06-14Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL OF INTERIOR, NON-LOAD-BEARING PARTITIONS IN ACCORDANCE WITH THE DRAWINGS SUBMITTED HEREWITH FOR THE 42 FLOOR. N$32,270
2016-06-14Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL OF INTERIOR, NON-LOAD-BEARING PARTITIONS IN ACCORDANCE WITH THE DRAWINGS SUBMITTED HEREWITH FOR THE 42 FLOOR. N$32,270
2016-06-02Permit EW — ISSUED
2016-06-02Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL OF INTERIOR, NON-LOAD-BEARING PARTITIONS IN ACCORDANCE WITH THE DRAWINGS SUBMITTED HEREWITH FOR THE 39TH FLOOR.$40,885
2016-05-19Permit EW — ISSUED
2016-05-19Permit EW — ISSUED
2016-05-12Permit EW — ISSUED
2016-04-26Permit EW — ISSUED
2016-04-26Permit PL — ISSUED
2016-04-25Permit EW — ISSUED
2016-04-25Permit EW — ISSUED
2016-04-25Permit EW — ISSUED
2016-04-25Permit EW — ISSUED
2016-04-25Permit PL — ISSUED
2016-04-25Job filed: MECHANICAL MODIFICATION TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$33,000
2016-04-25Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$50,000
2016-04-25Job filed: SPRINKLER MODIFICATION TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$6,000
2016-04-25Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$50,000
2016-04-25Job filed: MECHANICAL MODIFICATION TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$33,000
2016-04-21Job filed: FIRE ALARM MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2016-04-21Job filed: FIRE ALARM MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2016-04-20Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$325,000
2016-04-20Job filed: SPRINKLER MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2016-04-20Job filed: SPRINKLER MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2016-04-20Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$450,000
2016-04-20Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$325,000
2016-04-12Job filed: SPRINKLER MODIFICATION TO THE 28TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$75,000
2016-04-12Job filed: SPRINKLER MODIFICATION TO THE 28TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$75,000
2016-04-12Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 28TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$300,000
2016-04-12Job filed: FIRE ALARM MODIFICATION TO THE 28TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2016-04-12Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 28TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$173,000
2016-01-19Job filed: ARCHITECTURAL MODIFICATIONS TO THE 14TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2016-01-19Job filed: ARCHITECTURAL MODIFICATIONS TO THE 13TH,15TH,16TH AND 17TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$398,000
2016-01-19Permit EW — ISSUED
2016-01-14Permit EW — ISSUED
2016-01-14Permit EW — ISSUED
2016-01-14Permit EW — ISSUED
2015
2015-12-15Job filed: ARCHITECTURAL MODIFICATION TO THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$90,920
2015-12-07Permit EW — ISSUED
2015-11-19Permit EW — ISSUED
2015-11-19Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL OF INTERIOR, NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE,$22,730
2015-11-19Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL OF INTERIOR, NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE,$22,730
2015-11-16Permit EW — ISSUED
2015-11-16Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 30TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$22,730
2015-11-16Permit EW — ISSUED
2015-11-13Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 28TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$22,730
2015-11-05Permit EW — ISSUED
2015-11-05Permit EW — ISSUED
2015-11-04Permit PL — ISSUED
2015-10-29DOB violation E:
2015-10-29DOB violation E:
2015-10-29DOB violation E:
2015-10-29DOB violation E:
2015-10-26311: Water System — Leak (Use Comments) (WA2)
2015-10-22Permit EW — ISSUED
2015-10-21Permit EW — ISSUED
2015-10-20Permit EW — ISSUED
2015-10-20Permit EW — ISSUED
2015-10-08Permit EW — ISSUED
2015-10-05Job filed: SPRINKLER MODIFICATION TO THE 24TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$41,492
2015-10-05Job filed: FIRE ALARM MODIFICATION TO THE 24TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,850
2015-10-05Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 24TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$219,000
2015-10-05Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 24TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$206,000
2015-10-05Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 24TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$219,000
2015-09-30Permit EW — ISSUED
2015-08-31Job filed: FIRE ALARM MODIFICATION TO THE 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2015-08-31Permit EW — ISSUED
2015-08-31Job filed: FIRE ALARM MODIFICATION TO THE 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,000
2015-08-31Permit EW — ISSUED
2015-08-28Job filed: MECHANICAL MODIFICATION TO THE 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2015-08-28Job filed: SPRINKLER MODIFICATION TO THE 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$15,000
2015-08-28Job filed: SPRINKLER MODIFICATION TO THE 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$15,000
2015-08-28Job filed: ARCHITECTURAL MODIFICATION TO THE 19TH FLOOR AS PER PLANS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$70,000
2015-08-14Permit EW — ISSUED
2015-08-11Job filed: FIRE ALARM MODIFICATIONS TO 32ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,500
2015-08-11Job filed: FIRE ALARM MODIFICATIONS TO 32ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,500
2015-08-11Job filed: GENERAL CONSTRUCTION AND ARCHITECTURAL MODIFICATION TO THE 32ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,500
2015-07-30Job filed: REMOVAL OF 3 EXISTING CONDENSER WATER COOLING TOWERS AND PUMPING SYSTEM AND INSTALLATION OF 2 NEW CONDENSER COOLING TOWERS AND ASSOCIATED PIPING AS PE$600,000
2015-07-30Job filed: STRUCTURAL MODIFICATIONS TO THE EXISTING ROOF DUNNAGE TO SUPPORT THE NEW CONDENSER WATER COOLING TOWERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2015-07-30Job filed: STRUCTURAL MODIFICATIONS TO THE EXISTING ROOF DUNNAGE TO SUPPORT THE NEW CONDENSER WATER COOLING TOWERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2015-07-30Job filed: STRUCTURAL MODIFICATIONS TO THE EXISTING ROOF DUNNAGE TO SUPPORT THE NEW CONDENSER WATER COOLING TOWERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$75,000
2015-07-02Permit EW — ISSUED
2015-07-01Permit EW — ISSUED
2015-07-01Job filed: GENERAL CONSTRUCTION INCLUDING REMOVAL OF INTERIOR, NON-LOAD BEARING PARTITIONS IN ACCORDANCE WITH THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, $22,730
2015-07-01Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 40TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$55,000
2015-06-02Permit EW — ISSUED
2015-06-02Permit EW — ISSUED
2015-05-19FDNY inspection (STRUC_INT)
2015-05-19311: Homeless Person Assistance — No Status Call
2015-04-27Job filed: SPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$98,000
2015-04-27Job filed: SPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$98,000
2015-04-27Job filed: MECHANICAL MODIFICATION TO THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$7,500
2015-04-27Job filed: SPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$98,000
2015-04-27Job filed: MECHANICAL MODIFICATION TO THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$7,500
2015-04-27Job filed: GENERAL CONSTRUCTION MODIFICATIONS ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$51,000
2015-04-24Job filed: SPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$38,181
2015-04-24Job filed: SPRINKLER MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$98,879
2015-04-24Job filed: FIRE ALARM MODIFICATION TO THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,850
2015-04-20Job filed: STRUCTURAL MODIFICATION TO THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2015-04-20Permit EW — ISSUED
2015-04-20Job filed: STRUCTURAL MODIFICATION TO THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2015-04-20Job filed: STRUCTURAL MODIFICATION TO THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$20,000
2015-04-14311: Street Condition — Rough, Pitted or Cracked Roads
2015-04-06Permit EW — ISSUED
2015-04-06Permit EW — ISSUED
2015-04-06Permit EW — ISSUED
2015-04-03Permit PL — ISSUED
2015-04-03Permit PL — ISSUED
2015-04-01Permit EW — ISSUED
2015-04-01Permit EW — ISSUED
2015-04-01Permit EW — ISSUED
2015-04-01Permit EW — ISSUED
2015-03-27Permit EW — ISSUED
2015-03-27Permit EW — ISSUED
2015-03-27Permit EW — ISSUED
2015-03-27Job filed: REPLACING EXISTING ACCESS PANEL WITH NEW LARGER ACCESS PANEL WITH ALL ASSOCIATED HARDWARE AND FINISHES AS SHOWN ON THE DRAWINGS. NO CHANGE IN USE, E$20,000
2015-03-27Job filed: FIRE ALARM MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$14,000
2015-03-27Job filed: GENERAL STRUCTURAL CHANGES TAKING PLACE ON THE 2ND FLOOR AND ROOF. PROVIDE STEEL SUPPORTS AT THE EXISTING STEEL DUNNAGE, AS INDICATED ON DRAWINGS SUBM$10,000
2015-03-27Permit EW — ISSUED
2015-03-27Job filed: REPLACING EXISTING ACCESS PANEL WITH NEW LARGER ACCESS PANEL WITH ALL ASSOCIATED HARDWARE AND FINISHES AS SHOWN ON THE DRAWINGS. NO CHANGE IN USE, E$20,000
2015-03-27Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 2ND FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$75,000
2015-03-27Job filed: GENERAL STRUCTURAL CHANGES TAKING PLACE ON THE 2ND FLOOR AND ROOF. PROVIDE STEEL SUPPORTS AT THE EXISTING STEEL DUNNAGE, AS INDICATED ON DRAWINGS SUBM$10,000
2015-03-27Job filed: FIRE ALARM MODIFICATION TO THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,000
2015-03-27Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 2ND FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$75,000
2015-03-27Job filed: FIRE ALARM MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$24,000
2015-03-26Job filed: ARCHITECTURAL RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$314,000
2015-03-26Job filed: ARCHITECTURAL RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$314,000
2015-03-26Job filed: ARCHITECTURAL RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$219,000
2015-03-26Job filed: MECHANICAL AND PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$274,000
2015-03-26Job filed: MECHANICAL AND PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$206,000
2015-03-26Job filed: MECHANICAL AND PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$274,000
2015-03-02Permit EW — ISSUED
2015-02-24Job filed: STRUCTURAL MODIFICATION TO THE 23RD FLOOR AS PER PLANS FILED HEREWITH. WORK INCLUDES COMPONENTS FOR THE INSTALLATION OF A NEW MOVABLE PARTITION. NO CH$20,000
2015-02-13Permit EQ — ISSUED
2015-02-12Permit EQ — ISSUED
2015-01-29Permit EW — ISSUED
2015-01-26Job filed: SPRINKLER MODIFICATION TO THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$5,013
2015-01-21Permit PL — ISSUED
2015-01-17311: Broken Muni Meter — Out of Order
2015-01-15Permit EW — ISSUED
2015-01-14Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 25TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$22,730
2015-01-14Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 25TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$22,730
2015-01-08Permit EW — ISSUED
2015-01-08Permit EW — ISSUED
2015-01-07311: For Hire Vehicle Complaint — Driver Complaint
2014
2014-12-23Job filed: ARCHITECTURAL MODIFICATION TO THE 3RD FLOOR AS PER PLANS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$79,400
2014-12-23Job filed: SPRINKLER MODIFICATION TO THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$16,990
2014-12-23Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$30,080
2014-12-23Job filed: FIRE ALARM MODIFICATION TO THE THIRD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,125
2014-11-24Permit PL — ISSUED
2014-11-05DOB violation E:
2014-11-05DOB violation E:
2014-11-05DOB violation E:
2014-11-04311: Asbestos — Asbestos Complaint (B1)
2014-10-30Facade (LL11) filing, cycle 7: SWARMP
2014-10-07Permit EW — ISSUED
2014-10-07Job filed: REMOVAL OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 33RD FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$22,730
2014-10-03Permit PL — ISSUED
2014-10-02Permit EW — ISSUED
2014-10-02Permit EW — ISSUED
2014-10-01Job filed: MECHANICAL & PLUMBING MODIFICATION TO THE 22ND & 23RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$99,775
2014-10-01Job filed: ARCHITECTURAL MODIFICATION TO THE 22ND & 23RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$155,010
2014-09-30Job filed: FIRE ALARM MODIFICATION TO THE 23RD & 22ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$9,965
2014-09-30Job filed: SPRINKLER MODIFICATION TO THE 22ND & 23RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$38,181
2014-09-30Job filed: SPRINKLER MODIFICATION TO THE 22ND & 23RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$38,181
2014-09-30Job filed: FIRE ALARM MODIFICATION TO THE 23RD & 22ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$9,965
2014-09-25Permit EW — ISSUED
2014-09-25Permit EW — ISSUED
2014-09-25Job filed: ARCHITECTURAL MODIFICATION TO THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$119,700
2014-09-25Job filed: MECHANICAL AND PLUMBING MODIFICATION TO THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,500
2014-09-25Job filed: FIRE ALARM MODIFICATION TO THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,350
2014-08-09311: Broken Muni Meter — Coin or Card Did Not Register
2014-07-26311: Broken Muni Meter — Out of Order
2014-06-10Permit EW — ISSUED
2014-06-10Permit PL — ISSUED
2014-05-31311: Taxi Complaint — Insurance Information Requested
2014-05-30Permit EW — ISSUED
2014-05-30Permit EW — ISSUED
2014-05-22Job filed: CONSTRUCTION OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$375,000
2014-05-22Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEMS ON THE 3RD FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,706
2014-05-22Job filed: GENERAL MECHANICAL AND PLUMBING CHANGES TAKING PLACE ON 3RD FLOOR AS INDICATED ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$30,000
2014-05-22Job filed: GENERAL MECHANICAL AND PLUMBING CHANGES TAKING PLACE ON 3RD FLOOR AS INDICATED ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$30,000
2014-05-22Job filed: MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 3RD FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS AND OCCUPANCY$4,000
2014-04-24311: Street Condition — Plate Condition - Noisy
2014-03-28Permit EW — ISSUED
2014-03-19Permit EW — ISSUED
2014-03-07FDNY inspection (FORTH)
2014-02-26Permit EQ — ISSUED
2014-02-20Permit EQ — ISSUED
2014-02-14FDNY inspection (RISK)
2014-02-13Permit PL — ISSUED
2014-02-11Permit EW — ISSUED
2014-02-11Permit EW — ISSUED
2014-02-11Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS INDICATED ON PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$165,250
2014-02-11Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEMS ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2014-02-11Job filed: MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 31ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS AND OCCUPANCY$31,000
2014-02-11Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS INDICATED ON PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$165,250
2014-02-11Job filed: GENERAL CONSTRUCTION CHANGES TAKING PLACE ON THE 31ST FLOOR, AS INDICATED ON PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$283,335
2014-02-11Job filed: GENERAL CONSTRUCTION CHANGES TAKING PLACE ON THE 31ST FLOOR, AS INDICATED ON PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$283,335
2014-02-11Job filed: MODIFICATION TO EXISTING SPRINKLER SYSTEMS ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2014-02-11Job filed: MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 31ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS AND OCCUPANCY$31,000
2014-02-04Permit EW — ISSUED
2014-01-15Permit EW — ISSUED
2014-01-02311: For Hire Vehicle Complaint — Car Service Company Complaint
2013
2013-12-31Permit EW — ISSUED
2013-12-31Permit EW — ISSUED
2013-12-27Permit EW — ISSUED
2013-12-27Job filed: MINOR INTERIOR DEMOLITION OF THE 22ND FLOOR AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$36,035
2013-12-27Job filed: MINOR INTERIOR DEMOLITION OF THE 22ND FLOOR AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$36,035
2013-12-04311: Water System — Dirty Water (WE)
2013-11-07Permit EW — ISSUED
2013-11-06Job filed: MINOR INTERIOR DEMOLITION OF THE 31ST FLOOR AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$22,730
2013-09-24Permit EW — ISSUED
2013-09-17Permit EW — ISSUED
2013-09-11Permit EW — ISSUED
2013-09-11Job filed: MINOR ARCHITECTURAL MODIFICATIONS TO TENANT SPACE ON THE 10TH FLOOR AS INDICATED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$30,000
2013-08-29Permit EW — ISSUED
2013-08-29Permit EW — ISSUED
2013-08-27311: Street Condition — Blocked - Construction
2013-08-26311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2013-08-26311: General Construction/Plumbing — Sidewalk Shed/Pipe Scafford - Inadequate Defective/None
2013-08-26DOB violation C: FAILURE TO MAINTAIN BUILDING DUE TO VEHICLE HIT SIDEWALK SHED
2013-08-26DOB complaint, category ?
2013-08-26DOB complaint, category ?
2013-08-02Job filed: FIRE ALARM MODIFICATIONS TO EXISTING CLASS 'E' SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$25,000
2013-07-30Permit PL — ISSUED
2013-07-29Permit EW — ISSUED
2013-07-29Permit EW — ISSUED
2013-07-29Job filed: MINOR INTERIOR ARCHITECTURAL MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT (TD BANK) AS REFLECTED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$1,726,000
2013-07-29Job filed: MINOR INTERIOR ARCHITECTURAL MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT (TD BANK) AS REFLECTED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$1,726,000
2013-07-29Job filed: MINOR MECHANICAL AND PLUMBING MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT (TD BANK)ON THE 20TH FLOOR AS REFLECTED ON PLANS FILED HEREWITH. NO CHANG$480,000
2013-07-29Job filed: MINOR MECHANICAL AND PLUMBING MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT (TD BANK)ON THE 20TH FLOOR AS REFLECTED ON PLANS FILED HEREWITH. NO CHANG$480,000
2013-07-29Job filed: SPRINKLER MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT (TD BANK) ON THE 20TH FLOOR AS REFLECTED ON DRAWINGS FILED HEREWITH.$83,700
2013-06-25Permit EW — ISSUED
2013-06-20Permit EW — ISSUED
2013-06-20Permit EW — ISSUED
2013-06-20Job filed: MINOR INTERIOR STRUCTURAL MODIFICATIONS IN THE TENANT SPACE ON THE 40TH FLOOR AS REFLECTED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$29,700
2013-06-20Job filed: MINOR INTERIOR STRUCTURAL MODIFICATIONS IN THE TENANT SPACE ON THE 40TH FLOOR AS REFLECTED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$29,700
2013-06-13Permit PL — ISSUED
2013-06-07Permit EW — ISSUED
2013-06-07Job filed: MECHANICAL MODIFICATION TO THE TENANT SPACE ON THE 20TH FLOOR AS PER THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,345
2013-06-07Job filed: MECHANICAL MODIFICATION TO THE TENANT SPACE ON THE 20TH FLOOR AS PER THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,345
2013-06-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2013-05-15Permit EW — ISSUED
2013-05-15Permit EW — ISSUED
2013-05-15Permit EW — ISSUED
2013-05-15Job filed: MINOR INTERIOR DEMOLITION ON THE 41ST FLOOR AS INDICATED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,035
2013-05-14Job filed: SPRINKLER MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 40TH FLOOR TO INCLUDE THE INSTALLATION OF 48 SPRINKLER HEADS AND ASSOCIATED PIPING. NO$48,000
2013-05-14Job filed: MECHANICAL AND PLUMBING MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 40TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$69,222
2013-05-14Job filed: FIRE ALARM MODIFICATIONS TO EXISTING CLASS 'E' SYSTEM AS REFLECTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$8,325
2013-05-14Job filed: MECHANICAL AND PLUMBING MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 40TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$69,222
2013-05-14Job filed: MINOR INTERIOR ARCHITECTURAL RENOVATIONS AS INDICATED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$327,293
2013-05-14Job filed: MINOR INTERIOR ARCHITECTURAL RENOVATIONS AS INDICATED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$327,293
2013-04-25Permit EW — ISSUED
2013-04-25Job filed: MINOR INTERIOR DEMOLITION OF 23RD AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,695
2013-04-23Permit EW — ISSUED
2013-03-29Permit EW — ISSUED
2013-03-29Permit EW — ISSUED
2013-03-29Permit EW — ISSUED
2013-03-29Permit EW — ISSUED
2013-03-22Job filed: FILED HEREWITH IS AN OT FACADE REPAIR FOR LL11 CYCLE 7 REPORT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$822,115
2013-03-18311: Taxi Complaint — Driver Complaint
2013-03-15Permit EQ — ISSUED
2013-03-15Permit PL — ISSUED
2013-03-14Job filed: ERECT HEAVY DUTY SIDEWALK SHED PER DRAWINGS.INSTALLATION SHALL COMPLY WITH BSA-351-74-SM, LL-33/91, CHAPTER 33, SECTION 3307 OF 2008 NYC BC AND TPPN#9
2013-03-13Permit EW — ISSUED
2013-03-13Permit EW — ISSUED
2013-03-12DOB complaint, category ?
2013-03-11Job filed: SPRINKLER MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT TO INCLUDE THE INSTALLATION OF 102 SPRINKLER HEADS AND ASSOCIATED PIPING. NO CHANGE IN USE, $102,000
2013-03-11Job filed: FIRE ALARM MODIFICATIONS TO EXISTING CLASS 'E' SYSTEM AS REFLECTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,800
2013-03-11Job filed: FIRE ALARM MODIFICATIONS TO EXISTING CLASS 'E' SYSTEM AS REFLECTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,800
2013-03-08Job filed: MECHANICAL AND PLUMBING MODIFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 21ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$316,520
2013-03-08Job filed: MINOR CONSTRUCTION MODFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 21ST FLOOR AS REFLECTED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $624,687
2013-03-08Job filed: MINOR CONSTRUCTION MODFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 21ST FLOOR AS REFLECTED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $624,687
2013-03-08Job filed: MINOR CONSTRUCTION MODFICATIONS ASSOCIATED WITH TENANT BUILD OUT ON THE 21ST FLOOR AS REFLECTED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS $624,687
2013-03-07311: Taxi Complaint — Driver Complaint
2013-03-07DOB violation E:
2013-03-06Permit EQ — ISSUED
2013-03-05Job filed: MINOR INTERIOR CONSTRUCTION MODIFICATIONS TO 21ST FLOOR TENANT SP ACE AS INDICATED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$624,687
2013-03-05Job filed: MINOR INTERIOR CONSTRUCTION MODIFICATIONS TO 21ST FLOOR TENANT SP ACE AS INDICATED ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$624,687
2013-03-05Job filed: ERECT TUBULAR STEEL SCAFFOLD STRUCTURE PER DRAWINGS. INSTALLATION SHALL COMPLY WITH BSA-362-44-SM, LL-52/05, CHAPTER 33, SECTION 3314 OF 2008 NYC BC A
2013-02-12TL&R — from MUNCHENER HYPOTHEKENBANK EG to VII 444 MADISON LESSEE LLC
2013-01-22Agreement — from WELLS FARGO BANK, NATIONAL ASSOCIATION to V11 444 MADISON LESSEE LLC
2013-01-22Agreement — from BURBERRY WHOLESALE LIMITED; V11 444 MADISON LESSEE LLC to WELLS FARGO BANK, NATIONAL ASSOCIATION
2013-01-22Agreement $165,000 — from V11 444 MADISON LESSEE LLC to WELLS FARGO BANK, N.A.$165,000
2013-01-22Mortgage $30,000,000 — from V11 444 MADISON LESSEE LLC to WELLS FARGO BANK, N.A.$30,000,000
2013-01-22Mortgage assigned — from MUNCHENER HYPOTHEKENBANK EG to WELLS FARGO BANK, NATIONA L ASSOCIATION
2013-01-15Permit EW — ISSUED
2013-01-14Job filed: INSTALLATION OF PARTITION AND DOOR ON 27TH FLOOR OFFICE SPACE. SCOPE OF WORK DOES NOT REQUIRE CHANGE OF OCCUPANCY, USE, OR EGRESS.$5,000
2013-01-04Permit EW — ISSUED
2012
2012-12-27Permit EW — ISSUED
2012-12-27Permit EW — ISSUED
2012-12-06Rodent inspection: Passed
2012-12-05Permit EW — ISSUED
2012-12-05Permit EW — ISSUED
2012-12-04Job filed: INTERIOR MECHANICAL MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2012-12-04Job filed: FIRE ALARM MODIFICATIONS TO THE CELLAR AND 26TH FLOOR AS INDICATED ON THE DRAW INGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500
2012-12-04Job filed: FIRE ALARM MODIFICATIONS TO THE CELLAR AND 26TH FLOOR AS INDICATED ON THE DRAW INGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500
2012-12-04Job filed: INTERIOR ARCHITECTURAL MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.$13,500
2012-12-04Job filed: FIRE ALARM MODIFICATIONS TO THE CELLAR AND 26TH FLOOR AS INDICATED ON THE DRAW INGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,500
2012-12-04Job filed: INTERIOR ARCHITECTURAL MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.$13,500
2012-11-28Permit EW — ISSUED
2012-10-24Permit PL — ISSUED
2012-10-03DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-10-03DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-09-27Permit EW — ISSUED
2012-09-27Permit EW — ISSUED
2012-09-27Permit EW — ISSUED
2012-09-26Job filed: INSTALLATION OF 96 NEW SPRINKLER HEADS AND ASSOCIATED PIPING AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$97,000
2012-09-26Job filed: FIRE ALARM MODIFICATIONS TO THE 14TH & 17TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2012-09-26Job filed: STRUCTURAL MODIFICATIONS TO THE 17TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,500
2012-09-26Job filed: ARCHITECTURAL MODIFICATIONS TO THE 17TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$700,000
2012-09-26Job filed: INSTALLATION OF 96 NEW SPRINKLER HEADS AND ASSOCIATED PIPING AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$97,000
2012-09-26Job filed: MECHANICAL & PLUMBING MODIFICATIONS TO THE 17TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$375,000
2012-09-25Permit EW — ISSUED
2012-09-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-09-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-09-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-09-05DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012-08-13DOB complaint, category ?
2012-08-03Job filed: INTERIOR CONSTRUCTION MODIFICATIONS TO THE 19TH FLOOR AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGES IN USE. EGRESS OR OCCUPANCY.$23,864
2012-08-03Permit EW — ISSUED
2012-07-27Permit EW — ISSUED
2012-07-25Permit EW — ISSUED
2012-07-24Permit EW — ISSUED
2012-07-16Permit EW — ISSUED
2012-07-12Permit PL — ISSUED
2012-07-06ECB CLASS - 1 violation: SEC. 28-116.4.1. 97R07- OPERATING DEVICE W/O A C/COMPLIANCE. NO REPORT OF INSPECTION SUBMITTED TO DOB AND NO WITNESS OF TEST BY D$1,600
2012-07-06ECB CLASS - 1 violation: SEC. 28-116.4.1. 97R07- OPERATION DEVICE W/O A C/COMPLIANCE. NO REPORTOF INSPECTION SUBMITTED TO DOB & NO WITNESS OF TEST BY DOB. $1,600
2012-07-06Permit EW — ISSUED
2012-07-06Permit EW — ISSUED
2012-06-19Job filed: MODIFICATIONS TO THE CLASS "E" SYSTEM ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$950
2012-06-19Job filed: MODIFICATIONS TO THE CLASS 'E' SYSTEM ON THE 4TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$950
2012-06-14DOB complaint, category ?
2012-06-13Job filed: FIRE ALARM MODIFICATIONS TO THE 17TH FLOOR PUBLIC CORRIDORS, TOILETS & MER ROOM AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE$7,350
2012-06-13Job filed: MECHANICAL & PLUMBING MODIFICATIONS TO THE 17TH FLOOR PUBLIC CORRIDORS, TOILETS & MER ROOM AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGES IN $66,415
2012-06-13Job filed: INSTALLATION OF 20 NEW SPRINKLER HEADS & ASSOCIATED PIPING AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$40,000
2012-06-13Job filed: FIRE ALARM MODIFICATIONS TO THE 17TH FLOOR PUBLIC CORRIDORS, TOILETS & MER ROOM AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE$7,350
2012-06-13Job filed: MECHANICAL & PLUMBING MODIFICATIONS TO THE 17TH FLOOR PUBLIC CORRIDORS, TOILETS & MER ROOM AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGES IN $66,415
2012-06-13Job filed: INSTALLATION OF 20 NEW SPRINKLER HEADS & ASSOCIATED PIPING AS INDICATED ON THE DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY$40,000
2012-06-13Job filed: CONSTRUCTION MODIFICATIONS TO THE PUBLIC CORRIDORS & TOILETS ON THE 17TH FLOOR AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OC$277,560
2012-06-11ECB CLASS - 1 violation: SEC. 28-116.4.1. 97R07- DISCONTINUED ELEVATOR SERVICE TO 9TH AND 10TH FLRS. OPERATING DEVICE W/O THE C/C. NO REPORT OF INSPECTION $1,600
2012-06-11ECB CLASS - 1 violation: 28-116.4.1: 97R07;DISCONTINUED ELEVATOR SERVICE TO 9TH & 10TH FLRS. OPERATING DEVICE WITHOUT CERT OF COMPLIANCE. NO REPORT OF INSP$1,600
2012-06-11ECB CLASS - 1 violation: 28-116.4.1: 97R07;DISCONTINUED ELEVATOR SERVICE TO THE 9TH & 10TH FLRSOPERATING DEVICE WITHOUT THE CERT OF COMPLIANCE. NO REPORT O$1,600
2012-06-11ECB CLASS - 1 violation: 28-116.4.1: 97R07;DISCONTINUE ELEVATOR SERVICE TO 9TH TO 10TH FLRS. OPERATING DEVICE WITHOUT THE CERT OF COMPLIANCE. NO REPORT OF $1,600
2012-05-10Permit EW — ISSUED
2012-05-07Permit EW — ISSUED
2012-05-07Permit PL — ISSUED
2012-05-04Job filed: INTERIOR MODIFICATIONS TO THE GROUND FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$308,317
2012-05-03DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2012-05-01311: Broken Muni Meter — No Receipt
2012-04-27DOB violation E:
2012-04-27DOB violation E:
2012-04-27DOB violation E:
2012-04-26Agreement to VII 444 MADISON LESSEE, LLC; FIRST TENNESSEE BANK, NATIONAL BANK
2012-04-25Permit EW — ISSUED
2012-04-25Permit EW — ISSUED
2012-04-21311: Taxi Complaint — Driver Complaint
2012-04-03Job filed: MODIFICATIONS TO A CLASS 'E' SYSTEM ON THE 35TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,380
2012-04-03Job filed: CONSTRUCTION MODIFICATIONS TO THE 35TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$247,400
2012-04-03Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 35TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,105
2012-04-03Job filed: MODIFICATIONS TO A CLASS "E" SYSTEM ON THE 35TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,380
2012-04-03Job filed: CONSTRUCTION MODIFICATIONS TO THE 35TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$247,400
2012-04-03Job filed: INSTALLATION OF SPRINKLER HEADS & ASSOCIATED PIPING ON THE 35TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$58,000
2012-04-03Job filed: INSTALLATION OF SPRINKLER HEADS & ASSOCIATED PIPING ON THE 35TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$58,000
2012-03-08DOB complaint, category ?
2012-02-21Facade (LL11) filing, cycle 7: SWARMP
2012-02-21DOB violation LL11/98: UNSAFE LOCAL LAW REPORT FILED
2012-02-10Permit PL — ISSUED
2012-02-07Permit EW — ISSUED
2012-02-07Permit EW — ISSUED
2012-02-07Permit EW — ISSUED
2012-02-01Permit EW — ISSUED
2012-02-01Permit EW — ISSUED
2012-01-30Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 10TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$382,865
2012-01-30Job filed: CONSTRUCTION MODIFICATIONS TO THE 10TH FLOOR AS SHOWN ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,163,970
2012-01-30Job filed: INSTALLATION OF 172 NEW SPRINKLER HEADS AND ASSOCIATED PIPING ON THE 10TH FLOO R AS INDICATED ON TH E DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$172,000
2012-01-30Job filed: FIRE ALARM MODIFICATIONS TO THE 10TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,886
2012-01-27DOB complaint, category ?
2012-01-27Permit EW — ISSUED
2012-01-26Permit EW — ISSUED
2012-01-26Permit EW — ISSUED
2012-01-25Permit EW — ISSUED
2012-01-25DOB complaint, category ?
2012-01-18Job filed: FIRE ALARM MODIFICATIONS TO THE 10TH FLOOR MER ROOM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,607
2012-01-18Job filed: CONSTRUCTION MODIFICATIONS TO THE 10TH FLOOR MER ROOM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$83,877
2012-01-18Job filed: MECHANICAL MODIFICATIONS TO THE 10TH FLOOR MER ROOM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$112,996
2012-01-18Job filed: FIRE ALARM MODIFICATIONS TO THE 10TH FLOOR MER ROOM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,607
2012-01-18Job filed: MECHANICAL MODIFICATIONS TO THE 10TH FLOOR MER ROOM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$112,996
2012-01-17DOB complaint, category ?
2012-01-13DOB complaint, category ?
2012-01-12Permit EW — ISSUED
2012-01-04DOB complaint, category ?
2011
2011-12-16311: Smoking — Smoking Violation
2011-12-10Permit EW — ISSUED
2011-12-10Permit EW — ISSUED
2011-12-10Permit EW — ISSUED
2011-12-10Permit EW — ISSUED
2011-12-01Permit PL — ISSUED
2011-12-01Permit PL — ISSUED
2011-11-21311: Noise — Noise: Construction Equipment (NC1)
2011-11-18311: Noise — Noise: Construction Equipment (NC1)
2011-11-18Permit EW — ISSUED
2011-11-09Permit EW — ISSUED
2011-11-09Permit EW — ISSUED
2011-11-09Permit EW — ISSUED
2011-11-09Permit EW — ISSUED
2011-11-09Permit EW — ISSUED
2011-11-03Job filed: MECHANICAL MODIFICATIONS OF MISCELLANEOUS STEAM PIPING AND RADIATOR RELOCATIONS ON FLOORS 22 THRU 40 AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGR$32,000
2011-11-03Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON THE PLANS INVOLVING SECONDARY FRAMING AT SLAB OPENINGS ON FLOORS CEL, 15 THRU 26 ALLOWING FOR ENLARGEMENT AND$46,500
2011-11-03Job filed: MECHANICAL MODIFICATIONS OF MISCELLANEOUS STEAM PIPING AND RADIATOR RELOCATIONS ON FLOORS 22 THRU 40 AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGR$32,000
2011-11-03Job filed: ARCHITECTURAL MODIFICATIONS TO EXTEND EXISTING CONDUIT SHAFTWAY FROM FLOORS 18-43 AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$128,312
2011-11-03Job filed: STRUCTURAL MODIFICATIONS AS INDICATED ON THE PLANS INVOLVING SECONDARY FRAMING AT SLAB OPENINGS ON FLOORS CEL, 15 THRU 26 ALLOWING FOR ENLARGEMENT AND$46,500
2011-10-21Permit EW — ISSUED
2011-10-20Permit EW — ISSUED
2011-10-20Permit EW — ISSUED
2011-10-20Permit EW — ISSUED
2011-10-20Permit EW — ISSUED
2011-10-14Job filed: SPRINKLER MODIFICATIONS TO THE 32ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$57,000
2011-10-14Job filed: ARCHITECTURAL MODIFICATIONS TO THE 32ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$195,926
2011-10-14Job filed: FIRE ALARM MODIFICATIONS TO THE 32ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$24,000
2011-10-14Job filed: ARCHITECTURAL MODIFICATIONS TO THE 32ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$195,926
2011-10-14Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 32ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$81,132
2011-10-14Job filed: SPRINKLER MODIFICATIONS TO THE 32ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$57,000
2011-09-29Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,105
2011-09-29Job filed: CONSTRUCTION MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$247,400
2011-09-29Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,105
2011-09-29Job filed: SPRINKLER MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE PLANS. NO NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,000
2011-09-29Job filed: MODIFICATIONS TO A CLASS "E" SYSTEM ON THE 26TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,380
2011-09-29Job filed: CONSTRUCTION MODIFICATIONS TO THE 26TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$247,400
2011-09-29Job filed: MODIFICATIONS TO A CLASS 'E' SYSTEM ON THE 26TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,380
2011-09-27Permit PL — ISSUED
2011-09-22Permit EW — ISSUED
2011-09-12Permit EW — ISSUED
2011-09-12Permit EW — ISSUED
2011-09-09Job filed: MINOR DEMOLITION MODIFICATIONS TO THE 20TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$38,010
2011-09-09Job filed: MINOR DEMOLITION MODIFICATIONS TO THE 20TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$38,010
2011-09-09Job filed: MINOR DEMOLITION MODIFICATIONS TO THE 21ST FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$37,270
2011-08-19Permit EW — ISSUED
2011-08-18Job filed: SPRINKLER MODIFICATIONS TO THE GROUND AND 2ND FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,000
2011-08-15Permit EW — ISSUED
2011-08-15Permit EW — ISSUED
2011-08-11Job filed: ARCHITECTURAL MODIFICATIONS TO THE 2ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$604,065
2011-08-11Job filed: FIRE ALARM MODIFICATIONS TO THE 2ND FLOOR AS INDICATE ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2011-08-11Job filed: SPRINKLER MODIFICATIONS TO THE 2ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$136,500
2011-08-11Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 2ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$302,600
2011-08-11Job filed: ARCHITECTURAL MODIFICATIONS TO THE 2ND FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$604,065
2011-08-11Job filed: FIRE ALARM MODIFICATIONS TO AN EXISTING CLASS "E" FIRE ALARM ON THE 36TH FLOOR AS INDICATE ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2011-08-04Permit EW — ISSUED
2011-08-02Permit EW — ISSUED
2011-08-02Permit EW — ISSUED
2011-08-02Permit EW — ISSUED
2011-08-02Permit EW — ISSUED
2011-07-27Job filed: SPRINKLER MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$165,000
2011-07-27Job filed: SPRINKLER MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$165,000
2011-07-27Job filed: SPRINKLER MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$165,000
2011-07-14Permit EW — ISSUED
2011-07-11Rodent inspection: Passed
2011-07-07311: Noise — Noise: Construction Equipment (NC1)
2011-07-07DOB violation E:
2011-07-07DOB violation E:
2011-07-07DOB violation E:
2011-07-07DOB violation E:
2011-07-07DOB violation E:
2011-07-07Permit EW — ISSUED
2011-07-06Permit PL — ISSUED
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22DOB violation E:
2011-06-22Permit EW — ISSUED
2011-06-22Permit EW — ISSUED
2011-06-22Permit EW — ISSUED
2011-06-21DOB violation E:
2011-06-21DOB violation E:
2011-06-21DOB violation E:
2011-06-20Permit PL — ISSUED
2011-06-17Permit EW — ISSUED
2011-06-15Permit EW — ISSUED
2011-06-15Job filed: RENOVATION OF EXISTING OFFICE SPACE, INTERIOR PARTITION AND NEW GWB CEILING AND CEILING GRID. NO CHANGE TO USE OCCUPANCY OR EGRESS$15,000
2011-06-09Permit EW — ISSUED
2011-06-09Permit EW — ISSUED
2011-06-08Permit PL — ISSUED
2011-06-08Permit EW — ISSUED
2011-06-08Permit EW — ISSUED
2011-06-08Job filed: ARCHITECTURAL MODIFICATIONS TO THE 35TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,312
2011-06-08Job filed: ARCHITECTURAL MODIFICATIONS TO THE 40TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,890
2011-06-08Job filed: ARCHITECTURAL MODIFICATIONS TO THE 35TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$22,312
2011-06-07Permit EW — ISSUED
2011-06-07Permit EW — ISSUED
2011-06-06Job filed: MODIFICATION TO EXISTING CLASS "E" FIRE ALARM SYSTEM ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2011-06-06Job filed: MODIFICATION TO EXISTING CLASS 'E' FIRE ALARM SYSTEM ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$6,000
2011-06-06Job filed: ARCHITECTURAL MODIFICATIONS TO THE GROUND & 2ND FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$193,000
2011-06-06Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE GROUND & 2ND FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$302,000
2011-06-06Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE GROUND & 2ND FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$302,000
2011-06-06Job filed: ARCHITECTURAL MODIFICATIONS TO THE GROUND & 2ND FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$193,000
2011-06-06Job filed: SPRINKLER MODIFICATIONS TO THE GROUND AND 2ND FLOOR AS INDICATED ON THE PLANS NO CHANGE IN USE, EGRESS OR OCCUPANCY$19,000
2011-06-06Job filed: SPRINKLER MODIFICATIONS TO THE GROUND AND 2ND FLOOR AS INDICATED ON THE PLANS NO CHANGE IN USE, EGRESS OR OCCUPANCY$19,000
2011-06-06Job filed: SPRINKLER MODIFICATIONS TO THE GROUND AND 2ND FLOOR AS INDICATED ON THE PLANS NO CHANGE IN USE, EGRESS OR OCCUPANCY$19,000
2011-06-06Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE GROUND & 2ND FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$302,000
2011-06-04Permit PL — ISSUED
2011-06-04Permit PL — ISSUED
2011-06-03Job filed: ARCHITECTURAL MODIFICATIONS TO THE 2ND & 11TH FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$973,675
2011-06-03Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$290,500
2011-06-03Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$290,500
2011-06-03Job filed: ARCHITECTURAL MODIFICATIONS TO THE 2ND & 11TH FLOORS AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$973,675
2011-06-03Job filed: FIRE ALARM MODIFICATIONS TO AN EXISTING CLASS "E" FIRE ALARM ON THE 11TH FLOOR AS INDICATE ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$20,000
2011-06-03Job filed: SPRINKLER MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$165,000
2011-06-03Job filed: MECHANICAL AND PLUMBING MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS NO CHANGE IN USE EGRESS OR OCCUPANCY$290,500
2011-05-24Job filed: PLUMBING MODIFICATIONS TO THE 8TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$6,000
2011-05-23Permit EW — ISSUED
2011-05-23Permit EW — ISSUED
2011-05-16Permit EW — ISSUED
2011-05-13Permit EW — ISSUED
2011-05-11Permit EW — ISSUED
2011-04-28Permit EW — ISSUED
2011-04-13Permit EW — ISSUED
2011-04-13Permit EW — ISSUED
2011-04-06SMIS — from MUNCHENER HYPOTHEKENBAK EG to TD BANK, N.A.; VII 444 MADISON LESSEE LLC
2011-04-05Job filed: MECHANICAL MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$161,021
2011-04-05Job filed: CONSTRUCTION MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$66,971
2011-04-05Job filed: SPRINKLER MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,971
2011-04-05Job filed: MECHANICAL MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$161,021
2011-04-05Job filed: CONSTRUCTION MODIFICATIONS TO THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$66,971
2011-04-05Job filed: MODIFICATIONS TO A CLASS "E" FIRE ALARM SYSTEM ON THE 11TH FLOOR AS INDICATED ON THE PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,510
2011-03-18Job filed: MODIFICATION TO EXISTING CLASS 'E' FIRE ALARM SYSTEM ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2011-03-18Job filed: MODIFICATION TO EXISTING CLASS "E" FIRE ALARM SYSTEM ON THE 8TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2011-02-10Permit PL — ISSUED
2011-02-04Permit EW — ISSUED
2011-02-02Permit EW — ISSUED
2011-02-01Permit EW — ISSUED
2011-01-31Permit PL — ISSUED
2011-01-26Job filed: MODIFICATION TO EXISTING CLASS "E" FIRE ALARM SYSTEM ON THE 11TH FLOOR. NO CHA NGE IN USE, EGRESS OR OCCUPANCY.$8,000
2011-01-26Job filed: ARCHITECTURAL CHANGES TO THE 11TH FLOOR BATHROOMS AND CORRIDORS AS PER PLANS F ILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2011-01-26Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 11TH FLOOR BATHROOMS AND CORRIDORS AS P ER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$160,000
2011-01-26Job filed: SPRINKLER MODIFICATIONS IN THE 7TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE I N USE, EGRESS OR OCCUPANCY.$166,000
2011-01-26Job filed: SPRINKLER MODIFICATIONS IN THE 11TH FLOOR BATHROOMS AND CORRIDORS PER PLANS FI LED HEREWITH. NO CHANGE UN USE, EGRESS OR OCCUPANCY.$9,000
2010-12-15Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 10TH FLOOR BATHROOMS AND CORRIDORS AS P ER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$160,000
2010-12-15Job filed: MODIFICATION TO EXISTING CLASS E FIRE ALARM SYSTEM ON THE 10TH FLOOR. NO CHANG E IN USE, EGRESS OR OCCUPANCY.$8,000
2010-12-15Job filed: SPRINKLER MODIFICATIONS IN THE 10TH FLOOR BATHROOM AND CORRIDORS PER PLANS FIL ED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2010-12-15Job filed: ARCHITECTURAL CHANGES TO THE 10TH FLOOR BATHROOMS AND CORRIDORS AS PER PLANS F ILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2010-12-15Job filed: SPRINKLER MODIFICATIONS IN THE 10TH FLOOR BATHROOM AND CORRIDORS PER PLANS FIL ED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2010-12-06Permit EW — ISSUED
2010-12-02Permit EW — ISSUED
2010-12-02Permit EW — ISSUED
2010-12-02Permit EW — ISSUED
2010-12-01Job filed: SPRINKLER MODIFICATIONS TO THE 9TH FLOOR TENANT SPACE PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$173,000
2010-12-01Job filed: SPRINKLER MODIFICATIONS TO THE 9TH FLOOR TENANT SPACE PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS OR OCCUPANCY.$173,000
2010-12-01Job filed: MODIFICATION TO EXISTING CLASS "E" FIRE ALARM SYSTEM IN THE 9TH FLOOR TENANT S PACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2010-12-01Job filed: MODIFICATION TO EXISTING CLASS 'E' FIRE ALARM SYSTEM IN THE 9TH FLOOR TENANT S PACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2010-12-01Job filed: MODIFICATION TO EXISTING CLASS 'E' FIRE ALARM SYSTEM IN THE 9TH FLOOR TENANT S PACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,000
2010-11-30Job filed: MECHANICAL AND PLUMBING MODIFICATIONS IN THE 9TH FLOOR TENANT SPACE PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$352,200
2010-11-30Job filed: MODIFICATION TO EXISTING CLASS "E" FIRE ALARM SYSTEM ON THE 9TH FLOOR. NO CHAN GE IN USE, EGRESS OR OCCUPANCY.$8,000
2010-11-30Job filed: ARCHITECTURAL CHANGES TO THE 9TH FLOOR BATHROOMS AND CORRIDORS AS PER PLANS FI LED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2010-11-30Job filed: GENERAL CONSTRUCTIO MODIFICATIONS TO THE 9TH FLOOR TENANT SPACE PER PLANS FILE D HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$515,370
2010-11-30Job filed: SPRINKLER MODIFICATIONS TO THE 9TH FLOOR BATHROOMS AND CORRIDORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,000
2010-11-30Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 9TH FLOOR BATHROOMS AND CORRIDORS AS PE R PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$160,000
2010-11-19Job filed: MECHANICAL MODIFICATIONS TO MER ROOM IN 9TH FLOOR TENANT SPACE. NO CHANGE IN U SE, EGRESS OR OCCUPANCY.$85,000
2010-11-19Job filed: MECHANICAL MODIFICATIONS TO MER ROOM IN 9TH FLOOR TENANT SPACE. NO CHANGE IN U SE, EGRESS OR OCCUPANCY.$85,000
2010-11-19Job filed: MECHANICAL MODIFICATIONS TO MER ROOM IN 9TH FLOOR TENANT SPACE. NO CHANGE IN U SE, EGRESS OR OCCUPANCY.$85,000
2010-10-26Permit EW — ISSUED
2010-10-25Permit EW — ISSUED
2010-10-25Permit EW — ISSUED
2010-10-21311: Street Condition — Failed Street Repair
2010-10-06Permit EW — ISSUED
2010-10-06Permit EW — ISSUED
2010-10-05Job filed: MODIFICATION TO EXISTING CLASS E FIRE ALARM SYSTEM ON THE 12TH FLOOR NO CHANGE IN USE EGRESS OR OCCUPANCY$3,000
2010-10-05Job filed: SPRINKLER CHANGES ON THE 12TH FLOOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2010-10-05Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,000
2010-10-05Job filed: MECHANICAL CHANGES ON THE 12TH FLOOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$50,000
2010-10-05Job filed: SPRINKLER CHANGES ON THE 12TH FLOOR TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,000
2010-10-05Permit PL — ISSUED
2010-10-04Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$65,597
2010-10-04Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$65,595
2010-10-04Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$65,595
2010-09-29Permit EW — ISSUED
2010-09-17DOB violation E:
2010-09-17DOB violation E:
2010-09-17DOB violation E:
2010-09-13Permit EW — ISSUED
2010-09-01Permit EW — ISSUED
2010-08-30Permit PL — ISSUED
2010-08-26Job filed: STRUCTURAL CHANGES ON THE 9TH & 10TH FLOORS AS SHOWN ON DRAWINGS. NO CHANGES I N USE, EGRESS OR OCCUPANCY.$20,344
2010-08-17Permit EW — ISSUED
2010-08-13Permit PL — ISSUED
2010-08-11Permit EW — ISSUED
2010-08-11Permit EW — ISSUED
2010-08-10Job filed: MODIFICATIONS TO EXISTING CLASS "E" FIRE ALARM SYSTEM ON THE 4TH FLOOR AS SHOW N ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,275
2010-08-10Job filed: SPRINKLER INSTALLATION ON THE 19TH FLOOR AS REFLECTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$59,575
2010-08-06Job filed: SPRINKLER MODIFICATIONS ON THE 4TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE IN US E, EGRESS OR OCCUPANCY.$58,000
2010-08-06Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 4TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$139,500
2010-08-06Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 4TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$139,500
2010-08-06Job filed: SPRINKLER MODIFICATIONS ON THE 4TH FLOOR AS SHOWN ON DRAWINGS. NO CHANGE IN US E, EGRESS OR OCCUPANCY.$58,000
2010-08-06Job filed: ARCHITECTURAL CHANGES ON THE 4TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$338,000
2010-08-02Permit EW — RE-ISSUED
2010-07-27Permit SG — ISSUED
2010-07-27Permit SG — ISSUED
2010-07-27Permit SG — ISSUED
2010-07-27Job filed: SPRINKLER CHANGES TO THE 8TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$64,250
2010-07-27Permit SG — ISSUED
2010-07-27Permit SG — ISSUED
2010-07-27Job filed: FIRE ALARM CHANGES ON THE 8TH FLOOR TENANT SPACE, CORRIDORS AND BATHROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MODIFICATIONS TO EXISTING CLASS (E) $19,500
2010-07-27Job filed: FIRE ALARM CHANGES ON THE 8TH FLOOR TENANT SPACE, CORRIDORS AND BATHROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MODIFICATIONS TO EXISTING CLASS (E) $19,500
2010-07-27Permit SG — ISSUED
2010-07-20Permit PL — ISSUED
2010-07-16Job filed: NON-STRUCTURAL DEMOLITION TAKING PLACE ON THE 6TH FLOOR AS PER PLANS FILED HER EWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,610
2010-07-16Job filed: NON-STRUCTURAL DEMOLITION TAKING PLACE ON THE 32ND FLOOR AS PER PLANS FILED HE REWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$27,275
2010-07-06Rodent inspection: Passed
2010-06-23311: Taxi Complaint — Driver Complaint
2010-06-23Permit EW — ISSUED
2010-06-23Job filed: STRUCTURAL CHANGES ON THE 1ST FLOOR AS SHOWN DRAWINGS. NO CHANGE IN USE, EGRES S OR OCCUPANCY.$95,000
2010-06-23Permit EW — ISSUED
2010-06-23Permit PL — ISSUED
2010-06-21DOB violation E:
2010-06-21Job filed: SPRINKLER CHANGES ON THE 19TH FLOOR AS REFLECTED ON PLANS FILED HEREWITH. NO C HANGE IN USE, EGRESS OR OCCUPANCY.$59,575
2010-06-21Job filed: FIRE ALARM CHANGES ON THE 19TH FLOOR AS REFLECTED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MODIFICATIONS TO EXISTING CLASS (E) $34,010
2010-06-21Job filed: SPRINKLER CHANGES ON THE 19TH FLOOR AS REFLECTED ON PLANS FILED HEREWITH. NO C HANGE IN USE, EGRESS OR OCCUPANCY.$59,575
2010-06-18Permit EW — ISSUED
2010-06-18Job filed: MECHANICAL AND PLUMBING MODIFICATIONS ON THE 19TH FLOOR AS INDICATED ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$361,300
2010-06-18Job filed: DEMOLITION AND GENERAL CONSTRUCTION TO TAKE PLACE ON THE 19TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$815,259
2010-06-18Permit EW — ISSUED
2010-06-17Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 8TH FLOOR TENANT SPACE, CORRIDORS, AND BATHROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,500
2010-06-17Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 8TH FLOOR TENANT SPACE, CORRIDORS, AND BATHROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,500
2010-06-17Job filed: ARCHITECTURAL CHANGES ON THE 8TH FLOOR, CORRIDORS AND BATHROOMS PER PLANS FILE D HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$418,547
2010-06-02Permit EW — ISSUED
2010-06-02Job filed: SPRINKLER CHANGES TO THE 27TH AND 29TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$81,000
2010-06-02Job filed: SPRINKLER CHANGES TO THE 27TH AND 29TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$81,000
2010-05-24Permit EW — ISSUED
2010-05-21Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000
2010-05-11Permit PL — ISSUED
2010-05-07Permit EW — ISSUED
2010-05-05Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$51,440
2010-05-05Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$51,440
2010-05-05Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$51,440
2010-05-04Permit EW — ISSUED
2010-05-04Permit EW — ISSUED
2010-05-04Permit EW — ISSUED
2010-04-23REL — from 49-50 ASSOCIATES to METROPOLITAN LIFE INSURANCE COMPANY
2010-04-02CERR $135,000,000 — from VII 444 MADISON LESSEE LLC to MUNCHENER HYPOTHEKENBANK EG$135,000,000
2010-03-24Permit EW — ISSUED
2010-03-22Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$27,275
2010-03-22Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 26TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$27,275
2010-03-19Permit EW — ISSUED
2010-03-18Permit EW — ISSUED
2010-03-18Permit EW — ISSUED
2010-03-18Permit EW — ISSUED
2010-03-15Permit EW — ISSUED
2010-03-15Permit EW — ISSUED
2010-03-15Permit EW — ISSUED
2010-03-15Permit EW — ISSUED
2010-03-11Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$101,760
2010-03-11Job filed: ARCHITECTURAL CHANGES ON THE 24TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$153,950
2010-03-11Job filed: PARTIAL DEMOLITION TAKING PLACE ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$101,760
2010-03-11Job filed: ARCHITECTURAL CHANGES ON THE 24TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$153,950
2010-03-10Permit EW — ISSUED
2010-03-10Permit PL — ISSUED
2010-03-10Permit EW — ISSUED
2010-03-08Permit EQ — ISSUED
2010-02-25Permit EW — ISSUED
2010-02-25Permit EW — ISSUED
2010-02-23Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$220,000
2010-02-23Job filed: SPRINKLER MODIFICATION ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$20,000
2010-02-23Job filed: CONSTRUCTION CHANGES ON THE 1ST FLOOR AS INDICATED ON DRRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$325,000
2010-02-23Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$220,000
2010-02-23Job filed: STRUCTURAL CHANGES ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE , EGRESS OR OCCUPANCY.$60,000
2010-02-23Job filed: CONSTRUCTION CHANGES ON THE 1ST FLOOR AS INDICATED ON DRRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$325,000
2010-02-23Job filed: SPRINKLER MODIFICATION ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$20,000
2010-02-23Job filed: INSTALLATION OF MANUAL & AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM ON THE 1ST FLOOR AS INDICATED ON THE DRAWINGS NO CHANGE IN USE EGRESS OR OCCU$25,000
2010-02-17Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 4TH FLOOR BATHROOMS AND CORRIDORS NO CHANGE OF USE EGRESS OR OCCUPANCY$51,250
2010-02-17Job filed: SPRINKLER CHANGES TO THE 4TH FLOOR BATHROOMS AND CORRIDORS. NO CHANGE OF USE, EGRESS OR OCCUPACY$17,000
2010-02-17Job filed: FIRE ALARM MODIFICATION TO THE 4TH FLOOR BATHROOMS AND CORRIDORS. NO CHANGE OF USE, EGRESS OR OCCUPANCY$4,900
2010-02-17Job filed: SPRINKLER CHANGES TO THE 4TH FLOOR BATHROOMS AND CORRIDORS. NO CHANGE OF USE, EGRESS OR OCCUPACY$17,000
2010-02-17Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 4TH FLOOR BATHROOMS AND CORRIDORS NO CHANGE OF USE EGRESS OR OCCUPANCY$51,250
2010-02-17Job filed: ARCHITECTURAL CHANGES TO THE 4TH FLOOR BATHROOMS AND CORRIDORS NO CHANGE OF USE EGRESS OR OCCUPANCY$88,967
2010-02-12Permit EQ — ISSUED
2010-02-11Permit PL — ISSUED
2010-02-04DOB complaint, category ?
2010-01-22Job filed: SPRINKLER CHANGES ON THE 36TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE , EGRESS OR OCCUPANCY.$19,000
2010-01-15Permit PL — ISSUED
2010-01-14Permit EW — ISSUED
2010-01-13Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 36TH FLOOR AS INDICATED ON DRAWINGS NO CHANGE OF USE EGRESS OR OCCUPANCY$69,200
2009
2009-12-21Permit EW — ISSUED
2009-12-21Permit EW — ISSUED
2009-12-21Permit EW — ISSUED
2009-12-18Job filed: ARCHITECTURAL CHANGES ON THE 4TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$522,920
2009-12-18Job filed: FIRE ALARM CHANGES ON THE 4TH FLOOR AS INDICATED ON DRAWINGS NO CHANGE OF USE EGRESS OR OCCUPANCY$26,580
2009-12-18Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 4TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$139,909
2009-12-18Job filed: SPRINKLER CHANGES ON THE 4TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$35,500
2009-12-18Job filed: FIRE ALARM CHANGES ON THE 4TH FLOOR AS INDICATED ON DRAWINGS NO CHANGE OF USE EGRESS OR OCCUPANCY$26,580
2009-12-18Job filed: SPRINKLER CHANGES ON THE 4TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$35,500
2009-12-16Job filed: ARCHITECTURAL CHANGES ON THE 36TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$259,792
2009-12-16Job filed: ARCHITECTURAL CHANGES ON THE 36TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$259,792
2009-12-09Permit EW — ISSUED
2009-12-08Job filed: A2$30,000
2009-11-24Permit EW — ISSUED
2009-11-18Job filed: REMOVAL OF NON-BEARING PARTITIONS AND RELATED FINISHES ON THE 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2009-11-18Job filed: REMOVAL OF NON-BEARING PARTITIONS AND RELATED FINISHES ON THE 4TH FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2009-11-06Permit EW — ISSUED
2009-11-06Permit EQ — ISSUED
2009-11-06Permit EW — ISSUED
2009-11-06Permit EW — ISSUED
2009-11-06Job filed: INSTALLATION OF AN INSULATED PLYWOOD ENCLOSURE @ THE EXISTING SCAFFOLD AS PER PLANS DURING MASONRY REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2009-11-06Job filed: INSTALLATION OF AN INSULATED PLYWOOD ENCLOSURE @ THE EXISTING SCAFFOLD AS PER PLANS DURING MASONRY REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2009-10-29Permit PL — ISSUED
2009-09-30Permit EW — ISSUED
2009-09-25Permit EW — ISSUED
2009-09-25Permit EW — ISSUED
2009-09-24Job filed: MECHANICAL AND PLUMBING CHANGES IN THE 3RD FLOOR AS PER PLANS FILED HEREWITH N O CHANGE IN USE EGRESS OR OCCUPANCY$33,000
2009-09-24Job filed: SPRINKLER CHNAGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH NO CHANGE IN US E EGRESS OR OCCUPANCY$8,000
2009-09-24Job filed: FIRE ALARM CHANGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$13,356
2009-09-24Job filed: MECHANICAL AND PLUMBING CHANGES IN THE 3RD FLOOR AS PER PLANS FILED HEREWITH N O CHANGE IN USE EGRESS OR OCCUPANCY$33,000
2009-09-24Job filed: SPRINKLER CHNAGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH NO CHANGE IN US E EGRESS OR OCCUPANCY$8,000
2009-09-24Job filed: FIRE ALARM CHANGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$13,356
2009-09-24Job filed: SPRINKLER CHNAGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH NO CHANGE IN US E EGRESS OR OCCUPANCY$8,000
2009-09-24Job filed: ARCHITECTURAL CHANGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH NO CHANGE IN USE EGRESS OR OCCUPANCY$106,380
2009-09-24Job filed: ARCHITECTURAL CHANGES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH NO CHANGE IN USE EGRESS OR OCCUPANCY$106,380
2009-09-17Permit PL — ISSUED
2009-09-04DOB complaint, category ?
2009-09-01DOB complaint, category ?
2009-09-01DOB complaint, category ?
2009-08-25Permit EW — ISSUED
2009-08-24Job filed: PARTIAL NON STRUCTURAL DEMOLITION ON THE 9TH FLOOR AS INDICATED ON DRAWINGS. N O CHANGE OF USE, EGRESS OR OCCUPANCY.$50,700
2009-08-24Job filed: PARTIAL NON STRUCTURAL DEMOLITION ON THE 9TH FLOOR AS INDICATED ON DRAWINGS. N O CHANGE OF USE, EGRESS OR OCCUPANCY.$50,700
2009-08-24Permit EQ — ISSUED
2009-08-24DOB complaint, category ?
2009-08-21Permit EW — ISSUED
2009-08-21Permit EW — ISSUED
2009-08-21Permit EW — ISSUED
2009-08-19DOB violation E:
2009-08-19DOB violation E:
2009-08-19DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-18DOB violation E:
2009-08-17DOB violation E:
2009-08-17DOB violation E:
2009-08-17DOB violation E:
2009-08-17DOB violation E:
2009-08-17DOB violation E:
2009-08-12ECB CLASS - 2 violation: WORK CONTRARY TO APPROVED DOB PLAN AND APPLICATIONS. NOTED: 1) INSTALLED SUPPORTED SCAFFOLD AT EXP #1 AND #2 APPROX 48'HIGH. 2) IN
2009-08-12DOB complaint, category ?
2009-08-06Permit PL — ISSUED
2009-08-06Permit PL — ISSUED
2009-08-04DOB complaint, category ?
2009-07-28Permit EW — ISSUED
2009-07-28Permit EW — ISSUED
2009-07-22Job filed: SPRINKLER CHANGES ON THE 12TH FLOOR CORRIDOR AS INDICATED ON DRAWINGS. NO CHAN GES IN USE, EGRESS OR OCCUPANCY.$24,000
2009-07-22Job filed: SPRINKLER CHANGES ON THE 12TH FLOOR CORRIDOR AS INDICATED ON DRAWINGS. NO CHAN GES IN USE, EGRESS OR OCCUPANCY.$24,000
2009-07-21Permit EW — ISSUED
2009-07-20Permit EW — ISSUED
2009-07-17Permit PL — ISSUED
2009-07-09Job filed: STRUCTURAL WORK FOR REMOVAL OF EXISTING STAIR AND INFILL OF CONCRETE SLAB AS SHOWN ON DRAWINGS FIELD HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2009-07-09Job filed: CONSTRUCTION CHANGES ON THE 12TH FLOOR CORRIDORS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.$68,882
2009-07-09Job filed: CONSTRUCTION CHANGES ON THE 12TH FLOOR CORRIDORS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.$68,882
2009-07-09Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR GROUND FLOOR TENANT SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,000
2009-07-09Job filed: FILING FOR RENOVATION OF EXISTING GROUND FLOOR TENANT AT THE NORTH AND SOUTH SPACE. INCLUDING NEW PARTITIONS, FLOORING, CEILINGS AND FINISHES AS SHOWN$645,000
2009-07-09Job filed: MODIFICATION OF EXISTING SPRINKLER SYSTEM FOR GROUND FLOOR TENANT SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$18,000
2009-07-09Job filed: MODIFICATION OF EXISING FIRE ALARM SYSTEM FOR THE 1ST FLOOR & BASEMENT SPACE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGREES OR OCC$5,000
2009-07-09Job filed: STRUCTURAL WORK FOR REMOVAL OF EXISTING STAIR AND INFILL OF CONCRETE SLAB AS SHOWN ON DRAWINGS FIELD HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2009-07-09Job filed: MECHANICAL WORK. PLUMBING WORK RELATED TO BATHROOM FOR GROUND FLOOR TENANT AS SHOWN ON DRAWINGS FILED HERWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$102,000
2009-07-09Job filed: CONSTRUCTION CHANGES ON THE 12TH FLOOR CORRIDORS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.$68,882
2009-07-07Permit EW — ISSUED
2009-07-07Permit EW — ISSUED
2009-07-07Permit EW — ISSUED
2009-07-07Permit EW — ISSUED
2009-06-30Permit EW — ISSUED
2009-06-30Permit EW — ISSUED
2009-06-19Permit EW — ISSUED
2009-06-17Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 3RD FLOOR CORRIDOS AND BATHROOMS AS IND ICATED ON DRAWINGS NO CHANGE OF USE EGRESS OR OCCUPANCY$51,250
2009-06-17Job filed: GENERAL SPRINKLER CHANGES TAKING PLACE ON THE 37TH FLOOR AS INDICATED ON DRAWI NG PLANS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$16,400
2009-06-17Job filed: SPRINKLER CHANGES TO THE 3RD FLOOR BATHROOMS AND CORRIDOR AS INDICATED ON DRAW INGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2009-06-17Job filed: ARCHITECTURAL CHANGES ON THE 37TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$127,165
2009-06-17Job filed: SPRINKLER CHANGES TO THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY$63,000
2009-06-17Job filed: ARCHITECTURAL CHANGES ON THE 37TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$127,165
2009-06-17Job filed: ARCHITECTURAL CHANGES ON THE 37TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$127,165
2009-06-17Job filed: ARCHITECTURAL CHANGES TO THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$439,440
2009-06-17Job filed: MECHANICAL AND PLUMBING CHANGES TO THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$323,000
2009-06-17Job filed: ARCHITECTURAL CHANGES TO THE 3RD FLOOR CORRIDOS AND BATHROOMS AS INDICATED ON DRAWINGS NO CHANGE OF USE EGRESS OR OCCUPANCY$88,967
2009-06-17Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 37TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$61,700
2009-06-17Job filed: ARCHITECTURAL CHANGES TO THE 3RD FLOOR CORRIDOS AND BATHROOMS AS INDICATED ON DRAWINGS NO CHANGE OF USE EGRESS OR OCCUPANCY$88,967
2009-06-17Job filed: FIRE ALARM CHANGES TAKING PLACE ON THE 37TH FLOOR AS INDICATED ON DRAWING PLAN S. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$17,000
2009-06-17Job filed: FIRE ALARM CHANGES TO THE 3RD FLOOR AS INDICATED ON DRAWINGS. NO CHANGE OF USE , EGRESS OR OCCUPANCY.$20,000
2009-06-17Job filed: FIRE ALARM CHANGES TO THE 3RD FLOOR BATHROOMS AND CORRIDOR AS INDICATED ON DRA WINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$4,900
2009-06-05Agreement — from MUNCHENER HYPOYHEKENBANK, EG; VII 44 MADISON LESSEE LLC to QUAD-C MANAGEMENT INC
2009-05-29Permit PL — ISSUED
2009-05-29Permit PL — ISSUED
2009-05-29Permit PL — ISSUED
2009-05-28ECB CLASS - 1 violation: WORK W/O A PERMIT. PLUMBING IN BOTH WOMENS & MENS BATHROOM'S ON 12FL IOBSERVED NEW PLUMBING FIXTURES & STUBOUTS FOR WASTE & WATER($400
2009-05-27DOB complaint, category ?
2009-05-27Permit AL — ISSUED
2009-05-26Job filed: STRUCTURAL CHANGES TO THE 1ST FLOOR AS INDICATED ON DRAWINGS. ADDITIONAL WORK FILE DUNDER APPLICATION NUMBER 110211226. NO CHANGE IN USE, EGRESS OR O$130,000
2009-05-12Job filed: GENERAL SPRINKLER CHANGES TAKING PLACE ON THE 38TH FLOOR AS INDICATED ON DRAWI NG PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,350
2009-05-12Job filed: FIRE ALARM CHANGES TAKING PLACE ON THE 38TH FLOOR AS INDICATED ON DRAWING PLAN S. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$13,000
2009-05-06Permit PL — ISSUED
2009-04-20Permit EW — ISSUED
2009-04-20Permit PL — ISSUED
2009-04-15Permit EW — ISSUED
2009-04-15Permit EW — ISSUED
2009-04-13Permit EW — ISSUED
2009-04-13Permit EW — ISSUED
2009-04-13Job filed: ARCHITECTURAL CHANGES ON THE 38TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANG E IN USE, EGRESS OR OCCUPANCY.$154,725
2009-04-13Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 38TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$204,400
2009-04-13Job filed: ARCHITECTURAL CHANGES ON THE 38TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANG E IN USE, EGRESS OR OCCUPANCY.$154,725
2009-04-13Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 38TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$204,400
2009-03-31Job filed: FIRE ALARM CHANGES TAKING PLACE ON THE 12TH FLOOR AS INDICATED ON DRAWING PLAN S. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2009-03-31Job filed: FIRE ALARM CHANGES TAKING PLACE ON THE 12TH FLOOR AS INDICATED ON DRAWING PLAN S. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2009-03-31Job filed: GENERAL SPRINKLER CHANGES TAKING PLACE ON THE 12TH FLOOR AS INDICATED ON DRAWI NG PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2009-03-31Job filed: MECHANICAL AND PLUMBING CHANGES ON THE 12TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2009-03-10DOB complaint, category ?
2009-03-05Permit EW — ISSUED
2009-03-02Permit EW — ISSUED
2009-02-27Permit EW — ISSUED
2009-02-25Job filed: ARCHITECTUAL CHANGES ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$126,551
2009-02-25Job filed: ARCHITECTUAL CHANGES ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$126,551
2009-02-25Job filed: ARCHITECTUAL CHANGES ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$126,551
2009-02-20DOB complaint, category ?
2009-02-13Permit AL — ISSUED
2009-02-13Permit AL — ISSUED
2009-02-13Permit AL — ISSUED
2009-02-12Permit EW — ISSUED
2009-02-12Permit EW — ISSUED
2009-02-12Permit EW — ISSUED
2009-02-12Permit EW — ISSUED
2009-02-11Permit SG — ISSUED
2009-02-11Permit SG — ISSUED
2009-02-11Permit SG — ISSUED
2009-02-10Job filed: STRUCTUAL CHANGES FOR THE SWITCHOARD REPLACEMENT ON CELLAR, MEZZANINE AND 1ST FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,112
2009-02-10Job filed: ARCHITECTUAL CHANGES FOR THE SWITCHBOARD REPLACEMENT ON CELLAR, MEZZANINE AND 1ST FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPAN$37,682
2009-02-10Job filed: ARCHITECTUAL CHANGES FOR THE SWITCHBOARD REPLACEMENT ON CELLAR, MEZZANINE AND 1ST FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPAN$37,682
2009-02-10Job filed: STRUCTUAL CHANGES FOR THE SWITCHOARD REPLACEMENT ON CELLAR, MEZZANINE AND 1ST FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$12,112
2009-02-09Permit EW — ISSUED
2009-02-06Permit EW — ISSUED
2009-02-06Permit EW — ISSUED
2009-02-06Permit EW — ISSUED
2009-02-06Permit EW — ISSUED
2009-02-05Permit EW — ISSUED
2009-02-02Permit EW — ISSUED
2009-01-30RPTT $48,016,000 — from MERRILL LYNCH & CO., INC to BANK OF AMERICA CORPORATION$48,016,000
2009-01-27Job filed: A2$27,500
2009-01-27Job filed: A2$27,500
2009-01-27Job filed: A2$27,500
2009-01-27Permit PL — ISSUED
2009-01-27Permit PL — ISSUED
2009-01-27Permit PL — ISSUED
2009-01-27Permit PL — ISSUED
2009-01-26Permit EW — ISSUED
2009-01-26Permit EW — ISSUED
2009-01-23Permit EW — ISSUED
2009-01-23Permit EW — ISSUED
2009-01-23Permit EW — ISSUED
2009-01-14Permit PL — ISSUED
2009-01-13Job filed: ERECT SIGN STRUCTURE FOR SOUTH FACE BURBERRY SIGN, JOB #110393093. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2009-01-13Job filed: ERECT SIGN STRUCTURE FOR SOUTH FACE BURBERRY SIGN, JOB #110393093. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2009-01-13Job filed: ERECT SIGN STRUCTURE FOR EAST FACE BURBERRY SIGN, JOB #110393048. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2009-01-13Job filed: ERECT SIGN STRUCTURE FOR NORTH FACE BURBERRY SIGN, JOB #110393084. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2009-01-13Job filed: ERECT SIGN STRUCTURE FOR EAST FACE BURBERRY SIGN, JOB #110393048. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2009-01-09Permit PL — ISSUED
2009-01-05Job filed: CHANGE USE ON FLOORS 13,14,15,16AS PER PLANS ALL WORK FILED UNDER SEPRT APPLIC ATIONS.$1,000
2009-01-05Job filed: CHANGE USE ON FLOORS 13,14,15,16AS PER PLANS ALL WORK FILED UNDER SEPRT APPLIC ATIONS.$1,000
2008
2008-12-30Permit EW — ISSUED
2008-12-30Permit EW — ISSUED
2008-12-24Job filed: ARCHITECTURAL CHANGES FOR THE RENOVATIONS OF BATHROOMS ON THE 13TH, 14TH AND 15TH FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPA$211,650
2008-12-24Job filed: MECHANICAL AND PLUMBING CHANGES FOR THE RENOVATIONS OF THE BATHROOMS ON THE 13TH, 14TH AND 15TH FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGR$123,350
2008-12-24Job filed: MECHANICAL AND PLUMBING CHANGES FOR THE RENOVATIONS OF THE BATHROOMS ON THE 13TH, 14TH AND 15TH FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGR$123,350
2008-12-17Job filed: GENERAL ARCHITECTURAL CHANGES FOR THE INTERIOR GUARDRAIL RENOVATION ON THE 14T H FLOOR TERRACE AS INDICATED ON DRAWING PLANS. NO CHANGE TO USE, EGRESS$92,627
2008-12-16Job filed: GNERAL ARCHITECT CHANGES FOR INSTALLATION OF AN ART WALL IN LOBBY AS DRAWINGS$9,700
2008-12-16Job filed: GNERAL ARCHITECT CHANGES FOR INSTALLATION OF AN ART WALL IN LOBBY AS DRAWINGS$9,700
2008-12-16Job filed: STRUCTURAL CHANGESTO INSTALL ART WALL IN LOBBY AS PER DRAWINGS$19,633
2008-12-11Job filed: ADDITITONS TO EXISTING CLASS 'E' SYSTEM OF SPRINKLER WATER FLOW AND TAMPER SWI TCHES, GAVITY TANK HI-LO ALARM AS PER PLANS SUBMITTED HEREWITH. NO CHAN$115,025
2008-12-11Job filed: ADDITITONS TO EXISTING CLASS 'E' SYSTEM OF SPRINKLER WATER FLOW AND TAMPER SWI TCHES, GAVITY TANK HI-LO ALARM AS PER PLANS SUBMITTED HEREWITH. NO CHAN$115,025
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-10Permit EW — ISSUED
2008-12-09Job filed: FIRE ALARM CHANGES TAKING PLACE ON 15TH FLR AS PER DRAWINGS$293,944
2008-12-09Job filed: GEN SP CHANGES TAKING PLACE ON THE 13TH FL AS INIDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$86,172
2008-12-09Job filed: FIRE ALARM CHANGES TAKIN GPLACE ON THE 14TH FL AS INDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$293,944
2008-12-09Job filed: GENERAL SPRINKLER CHANGES TAKING PLACE ON THE 15TH FLOOR AS INDICATED ON DRAWI NG PLANS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$72,943
2008-12-09Job filed: GENERAL SPRINKLER CHANGES TAKING PLACE ON THE 15TH FLOOR AS INDICATED ON DRAWI NG PLANS. NO CHANGE IN USE, EGRESS OF OCCUPANCY.$72,943
2008-12-09Job filed: SPRINKLER CHANGES ON 14TH FLR AS PER DRAWINGS$72,943
2008-12-09Job filed: FIRE ALARM CHANGES TAKING PLPACE ON THE 13TH FL AS INDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$347,131
2008-12-09Job filed: FIRE ALARM CHANGES TAKING PLACE ON 15TH FLR AS PER DRAWINGS$293,944
2008-12-09Job filed: FIRE ALARM CHANGES TAKING PLACE ON 15TH FLR AS PER DRAWINGS$293,944
2008-12-09Job filed: GEN SP CHANGES TAKING PLACE ON THE 13TH FL AS INIDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$86,172
2008-12-09Job filed: GEN SP CHANGES TAKING PLACE ON 16TH FL AS INDICATED ON DRAWING PLANS. NO CHANG E IN USE, EGRESS OR OCCUPANCY$67,871
2008-12-09Job filed: SPRINKLER CHANGES ON 14TH FLR AS PER DRAWINGS$72,943
2008-12-09Job filed: GEN SP CHANGES TAKING PLACE ON 16TH FL AS INDICATED ON DRAWING PLANS. NO CHANG E IN USE, EGRESS OR OCCUPANCY$67,871
2008-12-09Job filed: GEN SP CHANGES TAKING PLACE ON THE 13TH FL AS INIDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$86,172
2008-12-09Job filed: FIRE ALARM CHANGES TAKING PLACE ON THE 16TH FL AS INDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$273,503
2008-12-09Job filed: FIRE ALARM CHANGES TAKING PLACE ON THE 16TH FL AS INDICATED ON DRAWING PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$273,503
2008-12-08Job filed: STRUCTURAL CHANGES ON THE 13TH FL AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$69,522
2008-12-05Job filed: INTERIOR CONST CHANGES ON THE 15TH FL AS INDICATED ON DRAWING SPLANS. NO CHANG E IN USE, EGRESS OR OCCUPANCY$1,064,270
2008-12-05Job filed: INTERIOR MECHANICAL CHANGE SON THE 13TH FL AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$401,941
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 14 FLR AS PER PLANS$340,355
2008-12-05Job filed: INTERIOR CONST.CHANGES ON 14TH FLR AS PER PLANS$1,064,270
2008-12-05Job filed: STRUCTURAL CHANGES ON 14TH FLR AS PER PLANS$58,871
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 16TH FL AS INDICATED ON PLANS. NO CHANGE IN USE , EGRESS OR OCCUPANCY$340,355
2008-12-05Job filed: INTERIOR CONST.CHANGES ON 14TH FLR AS PER PLANS$1,064,270
2008-12-05Job filed: INTERIOR CONST CHANGES ON THE 15TH FL AS INDICATED ON DRAWING SPLANS. NO CHANG E IN USE, EGRESS OR OCCUPANCY$1,064,270
2008-12-05Job filed: STRUCTURAL CHANGES ON 16TH FL AS INDICATE DON DRAWINGS. NO CHANGE IN USE, EGRE SS OR OCCUPANCY$54,776
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 16TH FL AS INDICATE DON PLANS. NO CHANEG IN USE , EGRESS OR OCCUPANCY$316,688
2008-12-05Job filed: STRUCTURAL CHANGES ON 14TH FLR AS PER PLANS$58,871
2008-12-05Job filed: INTERIOR MECHANICAL CHANGE SON THE 13TH FL AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$401,941
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 16TH FL AS INDICATED ON PLANS. NO CHANGE IN USE , EGRESS OR OCCUPANCY$340,355
2008-12-05Job filed: STRUCTURAL CHANGES ON THE 15TH FL AS INDICATE DON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$58,871
2008-12-05Job filed: INTERIOR CONST CHANGES ON THE 13TH FL AS INDICATED ON DRAWINGS PLANS. NO CHANG E IN USE, EGRESS OR OCCUPANCY$1,256,841
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 16TH FL AS INDICATE DON PLANS. NO CHANEG IN USE , EGRESS OR OCCUPANCY$316,688
2008-12-05Job filed: STRUCTURAL CHANGES ON 16TH FL AS INDICATE DON DRAWINGS. NO CHANGE IN USE, EGRE SS OR OCCUPANCY$54,776
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 14 FLR AS PER PLANS$340,355
2008-12-05Job filed: INTERIOR CONSTRUCTION CHANGES ON THE 16TH FL AS INIDCATE DON DRAWINGS. NO CHAN GE IN USE, EGRESS OR OCCUPANCY$990,260
2008-12-05Job filed: STRUCTURAL CHANGES ON THE 15TH FL AS INDICATE DON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$58,871
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 16TH FL AS INDICATED ON PLANS. NO CHANGE IN USE , EGRESS OR OCCUPANCY$340,355
2008-12-05Job filed: INTERIOR CONST.CHANGES ON 14TH FLR AS PER PLANS$1,064,270
2008-12-05Job filed: STRUCTURAL CHANGES ON 14TH FLR AS PER PLANS$58,871
2008-12-05Job filed: INTERIOR MECHANICAL CHANGES ON 14 FLR AS PER PLANS$340,355
2008-11-20Permit EW — ISSUED
2008-11-20Permit EW — ISSUED
2008-11-18Job filed: SHEETROCK LAMINATION THROUGHOUT WALL PERIMETER ON THE 13TH, 14TH, 15TH AND 16TH FLOORS AND CONSTRUCTION OF 2 MECHANICAL ROOMS PER FLOOR FOR MECHANICAL$250,000
2008-11-18Job filed: SHEETROCK LAMINATION THROUGHOUT WALL PERIMETER ON THE 13TH, 14TH, 15TH AND 16TH FLOORS AND CONSTRUCTION OF 2 MECHANICAL ROOMS PER FLOOR FOR MECHANICAL$250,000
2008-11-18Job filed: CONSTRUCT MECHANICAL ROOMS AS PER PLANS$845,000
2008-11-14TL&R — from BARCLAYS CAPITAL REAL ESTATE INC.
2008-11-14Agreement $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC.$150,000,000
2008-11-14AALR — from BARCLAYS CAPITAL REAL ESTATE INC. to MUNCHENER HYPOTHEKENBANK EG
2008-11-14AL&R $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC.$150,000,000
2008-11-14Mortgage assigned — from BARCLAYS CAPITAL REAL ESTATE INC. to MUNCHENER HYPOTHEKENBANK EG
2008-11-10DOB complaint, category ?
2008-11-07DOB complaint, category ?
2008-10-31Job filed: REPAIR EXISTING MANUAL FIRE PUMP FOR STANDPIPE SYSTEM ON THE 22ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2008-10-31Job filed: PROPOSE TO REPAIR EXISTING MANUAL FIRE PUMP FOR STANDPIPE SYSTEM IN THE SUB-CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2008-10-31Job filed: REPAIR EXISTING MANUAL FIRE PUMP FOR STANDPIPE SYSTEM ON THE 22ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2008-10-30ECB CLASS - 2 violation: SUSPENDED SCAFFOLD WORKERS DO NOT HAVE CERTIFICATE OF FITNESS. REMEDY:COMPLY WITH CODE.
2008-10-30ECB CLASS - 2 violation: FOR ALL BLDG 100FT OR MORE IN HEIGHT THE SHED SHALL BE EXTENDED 20FT BEYOND BLDG STRUCTURE. SHED IS 16 FOOT BEYOND BLDG STRUCTURE,$10,000
2008-10-23DOB complaint, category ?
2008-10-21Agreement — from BARCLAYS CAPITAL REAL ESTATE INC. to ROGGE GLOBAL PARTNERS PLC; VII 444 MADISON LESSEE LLC
2008-10-20DOB complaint, category ?
2008-10-17Permit EW — ISSUED
2008-10-16Tenant complaint: GENERAL — DOORS
2008-10-08Permit EW — ISSUED
2008-10-08Permit EW — ISSUED
2008-10-08Permit EW — RE-ISSUED
2008-10-08Permit EW — ISSUED
2008-10-03Job filed: PARTIAL NON STRUCTURAL DEMO ON THE 37TH FLOOR AS INDICATED ON DRAWINGS. NO CHA NGE IN USE, EGRESS OR OCCUPANCY.$15,000
2008-10-03Job filed: STRUCTURAL CHANGES FOR THE SWITCHBOARD REPLACEMENT ON 2-17TH FLOORS AS INDICAT E ON DRAWINGS NO CHANGE IN USE EGRES OR OCCUAPANCY$365,587
2008-10-03Permit EW — ISSUED
2008-10-03Job filed: PARTIAL NON STRUCTURAL DEMO ON THE 12TH FL AS INDICATED. NO CHANGE IN USE, EGR ESS OR OCCUPANCY.$17,475
2008-10-03Job filed: ARCHITECTURAL CHANGES FOR THE SWITCHBOARD REPLACEMENT ON 2-17TH FLOORS AS INDI CATE ON DRAWINGS NO CHANGE IN USE EGRESS OR OCCUAPANCY$231,732
2008-10-03Job filed: PARTIAL NON STRUCTURAL DEMO ON THE 37TH FLOOR AS INDICATED ON DRAWINGS. NO CHA NGE IN USE, EGRESS OR OCCUPANCY.$15,000
2008-10-03Permit EW — ISSUED
2008-10-01DOB complaint, category ?
2008-09-19ECB CLASS - 1 violation: NO PROTECTION OF ROPES & OR CABLES AROUND SHARP BENDS CORNERS ETC ROPES OR CABLES SHALL NOT BE PROTECTED ON STEEL BEAM ON ROOF$1,600
2008-09-19ECB CLASS - 1 violation: FAILURE TO PERFORM SAFE AND PROPER INSPECTION OF SUSPENDED SCAFFOLD (NO DAILY MAINTENANCE LOG AVAILABLE ON SITE)$2,400
2008-09-19ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT AND/OR APPROVED AMENDMENTS. REMEDY: CONFORM TO APPROVED DOCUMENTS OR AMEND$250
2008-09-19ECB CLASS - 1 violation: LICENSED RIGGER FAILED TO ENSURE SCAFFOLD WORKER MET MINIMUM REQUIREMENTS. (WORKERS ON SCAFFOLD WITH NO CERTIFICATE OF FITTNESS.)
2008-09-18DOB complaint, category ?
2008-09-17ECB CLASS - 2 violation: FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INSTALLATION. OFF C-HOOKS/OUTRIGGER BEAMS IN CONNECTION WITH SUSPENDED SCAF$400
2008-09-10Permit EW — ISSUED
2008-09-04DOB violation E:
2008-09-04DOB violation E:
2008-09-04DOB violation E:
2008-09-04DOB violation E:
2008-09-04DOB violation E:
2008-09-04DOB violation E:
2008-09-03DOB violation E:
2008-09-03DOB violation E:
2008-09-03DOB violation E:
2008-09-03DOB violation E:
2008-08-29Permit EW — ISSUED
2008-08-29Permit EW — ISSUED
2008-08-29Permit EW — ISSUED
2008-08-29Permit EW — ISSUED
2008-08-28Permit EQ — ISSUED
2008-08-26Permit EQ — ISSUED
2008-08-22Job filed: GENERAL CONSTRUCTION CHANGES TO THE 27TH & 29TH FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$352,000
2008-08-22Job filed: INSTALLATION OF A PIPE SCAFFOLD DURING EXTERIOR MASONRY REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2008-08-22Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 410'LONG X 12' HIGH DURING EXTERIOR MASONRY REPAIRS AS PER PLANS. SIDEWALK SHED TO COMPLY WITH LL 33/91 AND T
2008-08-22Job filed: MECHANICAL & PLUMBING CHANGES TO THE 27TH & 29TH FLOORS AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$108,000
2008-08-22Job filed: DEMOLITION OF NON-LOAD BEARING PARTITIONS ON THE 3RD AND 19TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY$90,350
2008-08-22Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED 410'LONG X 12' HIGH DURING EXTERIOR MASONRY REPAIRS AS PER PLANS. SIDEWALK SHED TO COMPLY WITH LL 33/91 AND T
2008-08-21Permit EW — ISSUED
2008-08-20Agreement — from BARCLAYS CAPITAL REAL ESTATE INC. to BURBERRY LIMITED; BURBERRY WHOLESALE LIMITED; VII 444 MADISON LESSEE LLC
2008-08-20Permit EW — ISSUED
2008-08-20Permit EW — ISSUED
2008-08-19Job filed: SPRINKLER MODIFICATIONS ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$24,000
2008-08-19Job filed: MECHANICAL AND PLUMBING MODIFCATIONS ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$90,000
2008-08-19Job filed: MECHANICAL AND PLUMBING MODIFCATIONS ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$90,000
2008-08-19Job filed: CONSTRUCTION MODIFICATIONS ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$170,000
2008-08-18Job filed: PARTIAL NON STRUCTURAL DEMOLITION ON THE 4TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$27,249
2008-08-16ECB CLASS - 1 violation: FAILRUE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. (FACADE REPAIR OVER 40 FT) REM: PROVIDE SIDEWALK SHED.$4,800
2008-08-14DOB complaint, category ?
2008-08-12Job filed: FIRE ALARM CHANGES ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
2008-08-12Job filed: FIRE ALARM CHANGES ON THE 7TH FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,000
2008-08-12Job filed: NEW SP RISER & SP PIPING CHANGES ON 1ST THRU 43RD FL AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$200,000
2008-08-12DOB complaint, category ?
2008-08-06Permit EQ — ISSUED
2008-08-01Job filed: INSTALLATION OF MARQUEE AS INDICATED ON DRAWINGS, NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2008-08-01Job filed: INSTALLATION OF MARQUEE AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,000
2008-08-01Job filed: INSTALLATION OF MARQUEE AS INDICATED ON DRAWINGS, NO CHANGE IN USE, EGRESS OR OCCUPANCY$15,000
2008-08-01Job filed: ADDITION /MODIFICATION TO EXISTING CLASS E FIRE ALARM SYSTEM ON FLOORS 27 AND 29 NOCHANGE IN USE EGRESS OR OCCUPANCY.$12,000
2008-07-30Job filed: MODIFICATIONS TO HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLAN S FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$170,000
2008-07-30Job filed: MODIFICATIONS TO HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLAN S FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$170,000
2008-07-30Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED F INISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPAN$180,000
2008-07-29DOB complaint, category ?
2008-07-24DOB violation C:
2008-07-23DOB complaint, category ?
2008-07-22Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION$5,000
2008-07-19DOB complaint, category ?
2008-07-18DOB complaint, category ?
2008-06-04Permit PL — ISSUED
2008-06-02ECB Hazardous violation: 59B07.85BB05.86BB05.38M16.83M07.08B01.59B07 PROVIDE LIGHTING IN MR 85BB05 PROVIDE CURRENT 5YR TESTTSAG 86BB05 PROVIDE CURRENT 2YR
2008-06-02ECB Hazardous violation: 59B07.85BB86BB05.38M16.83B07.08B01. 59B07 PROVIDE MR LIGHTING 85BB05 PROVIDE CURRENT 5YR TEST TAG 86BB05 PROVIDE CURRENT 2YR TEST
2008-06-02ECB Hazardous violation: 59B07.85BB05.86BB05.38M16.83B07. 59B07. LIGHTING IN MR INSUFFICIENT REPLACE BULBS 85BB05. PROVIDE CURRENT 5YR TEST TAGS 86BB05 PRO
2008-06-02ECB Hazardous violation: 59B07.85BB05.86BB05.83B07.38M16. 54B07 LIGHTS IN MR NOT WORKING REPLACE BULBS 85BB05 PROVIDE CURRENT 5YR TEST TAG 86BB05 PROVIDE C
2008-05-29DOB complaint, category ?
2008-05-29DOB complaint, category ?
2008-05-14Permit EW — ISSUED
2008-05-06Job filed: INSTALLATION OF HEAVY DUTY (300 PSF) PROTECTION PLATFORM DURING RENOVATION WORK, IN BUILDING LOBBY IN CONJUNCTION WITH BIS #110211217. PROTECTIN PLAT
2008-05-05Permit EW — ISSUED
2008-05-05Permit EW — ISSUED
2008-05-05Permit EQ — ISSUED
2008-05-05Permit EW — ISSUED
2008-05-01Job filed: INSTALLATION OF TEMPORARY PLYWOOD FENCE AS INDICATED ON DRAWINGS. ALL DEMO WORK FOR MAIN LOBBY WAS APPROVED ON APPLICATION #110211217 & TEMP LOBBY
2008-04-11Permit EW — ISSUED
2008-04-11Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-04-01Permit EW — ISSUED
2008-03-24Job filed: MECHANICAL CHANGES ON THE 1ST FLOOR LOBBY AS INDICATED ON DRAWINGS. NO CHANGE IN USE OR OCCUPANCY.$90,000
2008-03-24Job filed: SPRINKLER CHANGES ON THE 1ST FLOOR LOBBY AS INDICATED ON DRAWINGS. NO CHANGE I N USE OR OCCUPANCY.$10,000
2008-03-24Job filed: MECHANICAL CHANGES TO THE CELLAR,LOBBY,MEZZANINE, & 2ND FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$500,000
2008-03-24Job filed: REPLACEMENT AND RELOCATION OF FCS AND ADDITION TO EXISTING FIRE ALARM SYSTEM ON CELLAR, 1ST (LOBBY), & 2ND FLOORS AS INDICATED ON DRAWINGS. NO CH$75,000
2008-03-24Job filed: LOBBY RENOVATIONS ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE OR OCCUPANCY.$30,000
2008-03-24Job filed: LOBBY RENOVATIONS ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE OR OCCUPANCY.$30,000
2008-03-24Job filed: CONSTRUCTION CHANGES TO THE CELLAR, LOBBY,MEZZANINE & 2ND FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.$3,000,000
2008-03-24Job filed: FIRE ALARM CHANGES ON THE 1ST FLOOR LOBBY AS INDICATED ON DRAWINGS. NO CHANGE IN USE OR OCCUPANCY.$10,000
2008-03-24Job filed: SPRINKLER CHANGES ON THE 1ST FLOOR LOBBY AS INDICATED ON DRAWINGS. NO CHANGE I N USE OR OCCUPANCY.$10,000
2008-03-24Job filed: MECHANICAL CHANGES ON THE 1ST FLOOR LOBBY AS INDICATED ON DRAWINGS. NO CHANGE IN USE OR OCCUPANCY.$90,000
2008-03-24Job filed: STRUCTURAL CHANGES TO THE CELLAR,LOBBY,MEZZANINE & 2ND FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$150,000
2008-03-24Job filed: SPRINKLER CHANGES TO THE CELLAR, LOBBY, MEZZANINE & 2ND FLOOR AS INDICATED ON DRAWING. NO CHANGE IN USE EGRESS OR OCCUPANCY.$100,000
2008-03-21DOB violation LL1081:
2008-03-10Permit EW — ISSUED
2008-03-10Permit EW — ISSUED
2008-02-25Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CH ANGE IN USE, EGRESS OR OCCUPANCY$5,000
2008-02-22Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, ERGRESS OR OCCUPA$170,000
2008-02-22Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$180,000
2008-02-22Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, ERGRESS OR OCCUPA$170,000
2008-02-22Job filed: MODIFICATIONS TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$180,000
2008-02-19Permit EW — ISSUED
2008-02-19Permit EW — ISSUED
2008-02-19Permit EW — ISSUED
2008-02-19Permit EW — ISSUED
2008-02-15Job filed: Removal of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.$20,000
2008-02-15Job filed: Removal of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.$20,000
2008-02-15Job filed: Removal of HVAC ductwork as per plans filed herewith. No change in use, egress or occupancy.$20,000
2008-02-15Job filed: Removal of existing HVAC ductwork and related piping as per plans filed herewith. No change in use, egress or occupancy.$20,000
2008-02-06Permit EW — ISSUED
2008-02-06Permit EW — ISSUED
2008-02-06Permit EW — ISSUED
2008-02-01Job filed: Structural Modifications as per plans filed herewith. No change in use, egress or occupancy.$150,000
2008-02-01Job filed: Modifications to existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.$900,000
2008-01-31Job filed: Removal and installation of interior non-load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupan$500,000
2008-01-31Job filed: Modifications to existing Sprinkler heads as per plans filed herewith. No change in use, egress or occupancy.$50,000
2008-01-28Permit PL — ISSUED
2008-01-08Permit EW — ISSUED
2007
2007-12-20MLEA — from 38 COMPANY, L.L.C. to VII 444 MADISON LESSEE LLC
2007-12-20AL&R $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC$150,000,000
2007-12-20REL — from KAY MADISON CORPORATION; KMF HOLDING CORPORATION
2007-12-20MLEA — from VII 444 MADISON LESSEE LLC to THE REALEX CAPITAL CORPORATION
2007-12-20Mortgage assigned — from METROPOLITAN LIFE INSURANCE COMPANY to BARCLAYS CAPITAL REAL ESTATE INC
2007-12-20Agreement — from THE REALEX CAPITAL CORPORATION; VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC.,
2007-12-20TERL — from VII 444 MADISON LESSEE LLC to VII 444 MADISON LESSEE LLC
2007-12-20ASSTO $54,763,715 — from 49-50 ASSOCIATES; KMF HOLDING CORPORATION to VII 444 MADISON LESSEE LLC$54,763,715
2007-12-20Agreement $150,000,000 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC$150,000,000
2007-12-20Mortgage $96,847,921 — from VII 444 MADISON LESSEE LLC to BARCLAYS CAPITAL REAL ESTATE INC$96,847,921
2007-12-20ASSTO $258,986,285 — from 444 MADISON, LLC to VII 444 MADISON LESSEE LLC$258,986,285
2007-12-20REL — from 444 MADISON LLC to THE METROPOLITAN LIFE INSURANCE COMPANY
2007-12-18Job filed: Removal and installation of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupan$8,000
2007-11-27Permit EW — ISSUED
2007-11-27Permit EW — ISSUED
2007-11-27Permit EW — ISSUED
2007-11-27Permit EW — ISSUED
2007-11-14Permit EW — ISSUED
2007-11-14Permit EW — ISSUED
2007-10-25Job filed: Modifications to existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.$10,000
2007-10-23Job filed: Removal and installation of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupan$25,000
2007-10-19Permit EW — ISSUED
2007-10-19Permit EW — ISSUED
2007-10-09Job filed: Modifications to existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.$95,000
2007-10-09Job filed: Removal of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.$150,000
2007-10-09Job filed: MODIFICATIONS TO EXISTING FIREALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USEEGRESS OR OCCUPANCY$3,000
2007-10-09Job filed: Modifications to existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.$95,000
2007-09-12Permit EW — ISSUED
2007-09-12Permit EW — ISSUED
2007-09-10Job filed: Modifications to existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.$10,000
2007-09-10Job filed: Removal of non load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.$25,000
2007-09-10Job filed: Modifications to existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.$10,000
2007-08-27ECB Non-Hazardous violation: 84B07.84B07-INTERCOM PROVIDE ADJUST FOR BETTER & PROPER COMMUNICATION.(SOUNDS VERY VERY LOW).
2007-06-26DOB violation E:
2007-06-26DOB violation E:
2007-06-25DOB violation E:
2007-06-25DOB violation E:
2007-06-25DOB violation E:
2007-06-25DOB violation E:
2007-06-25DOB violation E:
2007-06-07Job filed: Propose to modify the existing class E system on this floor as per plans filed. No change to use,egress or occupancy.$7,500
2007-06-06Permit EW — ISSUED
2007-06-06Permit EW — ISSUED
2007-06-04Job filed: Demolish & construct partitions, ceiling & doors on the 4th floor as per plans filed. No change to use,egress or occupancy.$60,000
2007-06-04Job filed: Demolish & construct partitions, ceiling & doors on the 4th floor as per plans filed. No change to use,egress or occupancy.$60,000
2007-06-04Job filed: Relocation of mechanical diffusers & ductwork on the 4th floor. Removal of plumbing fixture as per plans filed. No change to use,egress or occupan$23,000
2007-04-10Permit EW — ISSUED
2007-03-07Job filed: INSTALLATION OF NEW DRY PIPE SPRINKLER SYSTEM FOR LOADING DOCK CONNECT T O EXISTING SPRINKLER MAIN IN CELLAR.$3,000
2007-02-14Facade (LL11) filing, cycle 6: SWARMP
2006
2006-11-24Permit EQ — ISSUED
2006-11-21Job filed: INSTALLATION OF A HEAVY DUTY SHED 85' LONG DURING FACADE REPAIR. NO CHANGE IN USE EGRESS OR OCCUPANCY. SHED TO COMPLY WITH LL33/91 AND TPPN 9/99.
2006-08-30Permit SG — ISSUED
2006-08-30Permit SG — ISSUED
2006-08-29Permit SG — ISSUED
2006-08-28Permit SG — ISSUED
2006-07-26Permit EW — ISSUED
2006-07-26Permit EW — ISSUED
2006-07-10ECB Non-Hazardous violation: 39-L-04,59-Q-03,60-T-07,83-Q-03,84-M-07/39-PATCH HOLES IN MOTOR ROOM FLR/59-MOTOR ROOM LIGHTS UNGUARDED/60-PROVIDE COMPANY NAME & $350
2006-07-10ECB Non-Hazardous violation: 39-L-04,59-Q-03,60-T-07,84-Q-03/39-PATCH HOLES IN MOTOR ROOM FLR/59-MOTOR ROOM LIGHTS UNGUARDED/60-COMPANY NAME & PHONE # MAIN LIN$350
2006-07-10ECB Non-Hazardous violation: 39-I-04,59-Q-02,60-T-07,84-Q-03,51-O-02,39-PATCH HOLES MOTOR ROOM FLR 59-MOTOR ROOM LIGHTS UNGUARDED/60-COMPANY NAME & PHONE # MAI$350
2006-07-10ECB Non-Hazardous violation: 39-L-04,59-Q-03,60-T-07,84-Q-03,59-M-07/39-PATCH HOLES MOTOR ROOM FLR/59-MOTOR ROOM LIGHTS UNGUARDED/60-COMPANY NAME & PHONE # MAI$350
2006-07-10ECB Non-Hazardous violation: 63-M-07,60-T-07,59-Q-03,84-Q-03,87-D-06,55-O-02,39-O-02/63-NYC DEVICE # MAIN LINE/60-COMPANY NAME & PHONE #/59-MOTOR ROOM LIGHTS U
2006-07-06Job filed: Propose to perform minor interior demo.Install new finishes, new partitions, ceilings & doors. Install a/c units & ductwork on the 1st floor a$85,000
2006-06-07DOB violation E:
2006-06-07DOB violation E:
2006-06-07DOB violation E:
2006-06-07DOB violation E:
2006-06-06DOB violation E:
2006-06-06DOB violation E:
2006-06-06DOB violation E:
2006-06-06DOB violation E:
2006-06-06DOB violation E:
2006-06-06DOB violation E:
2006-06-06DOB violation E:
2006-05-08Permit PL — ISSUED
2006-02-02Job filed: Modifications to existing fire alarm system as per plans filed herewith. No change in use, egress or occupancy.$5,000
2005
2005-11-07Permit EW — ISSUED
2005-09-23Job filed: Modifications to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy.$8,000
2005-09-23Job filed: Modifications to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy.$8,000
2005-09-16Permit EW — ISSUED
2005-09-16Permit EW — ISSUED
2005-09-02Job filed: Removal and installation of interior non load bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupan$130,000
2005-09-02Job filed: Modifications to the existing HVAC system and installation of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy$37,800
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2005-02-15DOB violation E:
2004
2004-08-16Permit PL — ISSUED
2004-08-04Permit EW — ISSUED
2004-08-04Permit EW — ISSUED
2004-07-20Job filed: Install new mechanical ductwork and new air handler & condenser as indicated on plans filed. Install new plumbing fixtures with related piping. No$43,000
2004-07-20Job filed: Install new mechanical ductwork and new air handler & condenser as indicated on plans filed. Install new plumbing fixtures with related piping. No$43,000
2004-07-20Job filed: Demolish & construct interior partitions,ceiling & doors as per plans filed. No change to use,egress or occupancy.$43,000
2004-07-16Job filed: Propose to modify the existing class E system as per plans filed herewith. No change to use,egress or occupancy.$5,000
2004-06-29Job filed: Remove & install glass & portion of existing storefront to be relocated.Install temporary construction fence as per plans filed herewith. No$87,000
2004-06-29Job filed: Remove & install glass & portion of existing storefront to be relocated.Install temporary construction fence as per plans filed herewith. No$87,000
2004-04-23Job filed: Install speaker strobes smoke detection to existing approved modified class "E" as shown on drawings filed herewith. No change in use, egress or occup$8,500
2004-03-29Permit PL — ISSUED
2004-03-18Permit EW — ISSUED
2004-03-18Permit EW — ISSUED
2004-03-03Job filed: File mechanical and plumbing plans in conjunction with general construction for office on 21st floor. No change to use, egress or occupancy.$110,000
2004-03-03Job filed: Renovate 21st floor office space. Work to include general construction. No change to use, egress or occupancy.$100,000
2004-03-03Job filed: File mechanical and plumbing plans in conjunction with general construction for office on 21st floor. No change to use, egress or occupancy.$110,000
2004-03-03Job filed: Renovate 21st floor office space. Work to include general construction. No change to use, egress or occupancy.$100,000
2003
2003-12-04DOB complaint, category ?
2003-12-03CERT — from NYC DEPARTMENT OF FINANCE
2003-10-16DOB violation E:
2003-06-04ECB Non-Hazardous violation: 58,B,07 03, L,10 58 PROVIDE PROPERLY COTTER PINS FOR BROKE ARMATURE JOIST POINTED 03 REPAIR DEFECTIVE COMMUNICATION CAB
2003-05-19ECB Non-Hazardous violation: FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED LOCAL LAW 11
2002
2002-12-10Permit EW — ISSUED
2002-11-22DOB violation E: 1P23734
2002-11-22DOB violation E: 1P19298
2002-11-22DOB violation E: 1P19297
2002-11-22DOB violation E: 1P19300
2002-11-22DOB violation E: 1P19299
2002-11-21DOB violation E: 1P19290
2002-11-21DOB violation E: 1P19296
2002-11-21DOB violation E: 1P19291
2002-11-21DOB violation E: 1P19295
2002-11-21DOB violation E: 1P19294
2002-11-21DOB violation E: 1P19293
2002-11-21DOB violation E: 1P19292
2002-11-21DOB violation E: 1P19289
2002-10-25Permit EW — ISSUED
2002-10-25Permit EW — ISSUED
2002-09-10Job filed: INSTALL MECH/HVAC DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$1,500
2002-09-10Job filed: INSTALL MECH/HVAC DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$1,500
2002-09-10Job filed: MODIFICATION TO EXISITNG FIRE ALARM SYST EM AD PER PLANS FILED HEREWITH O CHANGE IN OCCUPANCY,USE OR EGRESS.$1,500
2002-09-10Job filed: INSTALL INTERIOR PARTITIONS AND HUNG CEILINGS AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$25,000
2002-08-08DOB violation L1198:
2001
2001-11-13Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYS TEM SA PER PLANS FILED HEREWIT NO CHANGE IN USE EGRESS OR OCCUPANCY$10,000
2001-11-13Job filed: CONSTRUCT INTERIOR PARTITIONS AND HUNG CEILINGS AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$60,000
2001-11-13Job filed: MODIFICATIONS TO EXISTING FIRE ALARM SYS TEM SA PER PLANS FILED HEREWIT NO CHANGE IN USE EGRESS OR OCCUPANCY$10,000
2001-11-13Job filed: REMOVE AND INSTALL MECH/HVAC DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$10,000
2001-11-13Job filed: CONSTRUCT INTERIOR PARTITIONS AND HUNG CEILINGS AS PER PLANS FILED HEREWITH. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$60,000
2001-11-08Permit PL — ISSUED
2001-10-11Permit PL — ISSUED
2001-08-08Permit EQ — ISSUED
2001-08-08Permit EW — ISSUED
2001-07-16Permit EW — ISSUED
2001-07-16Permit EW — ISSUED
2001-06-19Agreement — from 444 MADISON, LLC to METROPOLITAN LIFE INSURANCE COMPANY
2001-06-19Mortgage satisfied — from 444 MADISON, LLC to PRINCIPAL LIFE INSURANCE COMPANY
2001-06-19Mortgage assigned — from KAY MADISON CORPORATION; KMF HOLDING CORPORATION; 49-50 ASSOCIATES to METROPOLITAN LIFE INSURANCE COMPANY
2001-06-19Mortgage assigned — from 444 MADISON, LLC to METROPOLITAN LIE INSURANCE COMPANY
2001-06-19SAGE — from PRINCIPAL MUTUAL LIFE INSURANCE COMPANY; PRINCIPAL LIFE INSURANCE COMPANY
2001-06-19Mortgage $27,200,000 — from KMF HOLDING CORPORATION; KAY MADISON CORPORATION; 49-50 ASSOCIATES to METROPOLITAN LIFE INSURANCE COMPANY$27,200,000
2001-06-19Mortgage assigned — from PRINCIPAL LIFE INSURANCE COMPANY; PRINCIPAL MUTUAL LIFE INSURANCE COMPANY to METROPOLITAN LIFE INSURANCE COMPANY
2001-06-19Agreement — from KAY MADISON CORPORATION; 49-50 ASSOCIATES; KMF HOLDING CORPORATION to METROPOLITAN LIFE INSURANCE COMPANY
2001-05-17Job filed: MODIFCATION TO EXISTING FFIRE ALARM SYSTEM. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2001-05-17Job filed: MODIFICATION TO HVAC SYSTEM AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY.$10,000
2001-05-17Job filed: REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES, AS PER PLANS FILED HEREWITH.$120,000
2001-05-09Permit EW — ISSUED
2001-05-09Permit EW — ISSUED
2001-04-30Permit EW — ISSUED
2001-04-30Job filed: PROPOSE TO INSTALL NEW MECHANICAL UNITS ON THE 2,5,9,10,15,20,21,22,26 & 31ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$220,000
2001-04-30Job filed: PROPOSE TO INSTALL NEW MECHANICAL UNITS ON THE 2,5,9,10,15,20,21,22,26 & 31ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$220,000
2001-04-30Job filed: PROPOSE TO INSTALL NEW MECHANICAL UNITS ON THE 2,5,9,10,15,20,21,22,26 & 31ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$220,000
2001-04-30Permit EW — ISSUED
2001-04-26Job filed: CREATING A TELECOMMUNICATIONS ROOM IN MEZ WITH HVAC. ANTENNAS MOUNTED TO FACADE. ALL IN CONFORMANCE WITH TPPN#5/98. NO CHANGE IN USE, EGRESS OR OC$40,000
2001-04-26Job filed: CREATING A TELECOMMUNICATIONS ROOM IN MEZ WITH HVAC. ANTENNAS MOUNTED TO FACADE. ALL IN CONFORMANCE WITH TPPN#5/98. NO CHANGE IN USE, EGRESS OR OC$40,000
2001-04-26Job filed: CREATING A TELECOMMUNICATIONS ROOM IN MEZ WITH HVAC. ANTENNAS MOUNTED TO FACADE. ALL IN CONFORMANCE WITH TPPN#5/98. NO CHANGE IN USE, EGRESS OR OC$40,000
2001-04-12Job filed: Minor demolition. Installation of partitions, doors and ceilings as per plans. No change to use, egress or occupancy.$138,000
2001-04-12Job filed: Modification to existing HVAC system and installation of plumbing fixtures as per plans. No change to use, egress or occupancy.$66,000
2001-04-12Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$18,000
2001-04-12Job filed: Modification to existing HVAC system and installation of plumbing fixtures as per plans. No change to use, egress or occupancy.$66,000
2001-04-12Job filed: Minor demolition. Installation of partitions, doors and ceilings as per plans. No change to use, egress or occupancy.$138,000
2001-04-12Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$18,000
2001-03-08DOB violation LL1081:
2001-02-02Job filed: modifications to existing fire alarm, no change to use, egress or occupancy$4,000
2001-02-02Job filed: modifications to existing fire alarm, no change to use, egress or occupancy$4,000
2001-01-29Permit EW — ISSUED
2001-01-22Job filed: partial partition and plumbing fixture removal, no change to use, egress or occu pancy$8,000
2001-01-03Job filed: ADDITIONS TO APPROVED CALSS "E" SYSTEM/ ON VAROUS FLOORS, 4,5,10,11, 10,19,20,24,25,26,31,32,35,37,39,40 TO 42. NO CHANGE OF USE, OCCUPANCY OR EGRESS$150,000
2001-01-03Job filed: ADDITIONS TO APPROVED CALSS 'E' SYSTEM/ ON VAROUS FLOORS, 4,5,10,11, 10,19,20,24,25,26,31,32,35,37,39,40 TO 42. NO CHANGE OF USE, OCCUPANCY OR EGRESS$150,000
2000
2000-11-28DOB complaint, category ?
2000-10-24Permit EW — ISSUED
2000-10-12Permit EQ — ISSUED
2000-08-03Permit EW — ISSUED
2000-08-03Permit EW — ISSUED
2000-08-02Permit EW — RE-ISSUED
2000-07-12Job filed: Propose to demo existing interior partitions, ceilings and doors, in the Cellar. Some minor partition demo on the 1st and mezzanine. No change in us$20,000
2000-07-12Job filed: Propose to demo existing interior partitions, ceilings and doors, in the Cellar. Some minor partition demo on the 1st and mezzanine. No change in us$20,000
2000-07-11ECB Non-Hazardous violation: FAILURE TO PROVIDE EMERGENCY LIGHTS ON STAIR CASES A AND B. ALSO ON CORRIDORS AND TENANT SPACE 8,12,16,32,36,37,38 FLOORS. FAILURE$750
2000-07-11ECB Non-Hazardous violation: FAILURE TO PROVIDE ADEQUATE EXIT AND DIRECTIONAL SIGNS IN TENANT SPACEON FLOORS 14,15,26,31. FAILURE TO PROVIDE EMERGENCY POWER TO$650
2000-07-06Job filed: Minor demolition. Installation of partitions, doors and ceilings as per plans. No change to use, egress, or occupancy.$85,000
2000-07-06Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTURES AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.$48,000
2000-07-06Job filed: MODIFICATION TO EXISTING HVAC SYSTEM AND INSTALLATION OF PLUMBING FIXTU ES AS PER PLANS. NO CHANGE TO USE, EGRES S, OR OCCUPANCY.$55,000
2000-06-26Permit EW — ISSUED
2000-06-26Permit EW — ISSUED
2000-06-26Permit EW — ISSUED
2000-06-15Job filed: PROPOSE TO INSTALL NEW MECHANICAL DUCTWO RK AND NEW AIR CONDITIONING UNI S ON THE 24TH FLOOR. NO CHANGE TI USE EG RESS OR OCCUPANCY.$51,000
2000-06-15Job filed: INSTALL PARTITIONS AND CEILINGS. NO CHANGE TO USE EGRESS OR OCCUPANCY.$43,000
2000-05-17Permit EW — ISSUED
2000-05-17Permit EW — ISSUED
2000-05-05Job filed: INSTALL NEW PLUMBING FIXTURES WITH RELATED PIPING.$30,000
2000-05-05Job filed: Demo existing interior partitions, ceilings and doors. Install new partitions, ceilings and doors. No change to use, egress or occupancy.$300,000
2000-05-05Job filed: INSTALL NEW MECHANICAL DUCTWORK.$70,000
2000-04-07Permit EW — ISSUED
2000-04-07Permit EW — ISSUED
2000-03-10DOB violation LL1081:
2000-02-29Permit EW — ISSUED
2000-02-29Permit EW — ISSUED
2000-02-23Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2000-02-23Job filed: MINOR DEMOLITION, INSTALLATION OF PARTITIONS & DOORS. NO CHANGE TO USE EGRESS O R OCCUPANCY.$4,000
2000-02-23Job filed: MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2000-02-23Job filed: MODIFICATION TO EXISTING HVAC SYSTEM, AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$6,000
2000-02-23Job filed: MODIFICATION TO EXISTING HVAC SYSTEM, AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$6,000
2000-02-23Job filed: MINOR DEMOLITION, INSTALLATION OF PARTITIONS & DOORS. NO CHANGE TO USE EGRESS O R OCCUPANCY.$4,000