Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

425 Park Avenue · Manhattan · BBL 1013100001 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

This building is not graded (non-residential or no residential units on record) — the report below covers its full public record.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

$5,342 in enforcement penalties imposed (ECB/OATH) in the last three years.

What 311 hears from this address

73 service requests in the last three years. Most common: Illegal Parking (26) · For Hire Vehicle Complaint (10) · Lost Property (6) · Noise (4) · Vendor Enforcement (4) · Sidewalk Condition (2).

Filed construction activity

$507,024,403 in permitted construction work filed since 2016 (377 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$335,708,000 $151,068,600
2026$345,804,000 $155,611,800
2027$547,701,000 $246,465,450

The city's market estimate has risen 63% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS
Facade (Local Law 11)SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 6)

Restaurants in this building

RestaurantCuisineGradeNotes
425 ParkAmericanA—
JG Midtown Amenities KitchenAmericanA—
JG Midtown Banquet KitchenFrenchA—
Restaurant Associates / CitadelAmericanA—

Report to 311: Food poisoning · Food safety complaint

4 restaurants · 0 with mice evidence · See them on the Mice Map

1 Food Establishment complaint to 311 at this address in the last three years (most often: Toxic Chemical/Material), shared by 4 restaurants · complaints filed by the public; DOHMH investigates, outcomes aren't published.

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

No street-flooding or sewer-backup complaints on record at this address.

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway51 St — 6 E F · 800 ft straight-line (about a 4-minute walk) · station accessibility: full
BusNearest boarding stop: Lexington Av / E 56 St — M101 M102 M103 · 350 ft
Citi BikeE 56 St & Madison Ave · 600 ft · station location as of 2026-09-23; live availability
School zones (2024–25 map)Elementary: P.S. 059 Beekman Hill International
Middle: J.H.S. 104 Simon Baruch. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

425 Park Avenue

Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

73 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $74,131,470 on 2022-01-07 (lender: Otera Capital Investment Ix INC.). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2024-04-12AL&R $484,000,000 — from 425 PARK OWNER LLC; 425 PARK F&B LLC to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW $484,000,000
2024-04-12M&CON $484,000,000 — from 425 PARK OWNER LLC; 425 PARK F&B LLC to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW $484,000,000
2023-04-25RPTT $27,948,000 — from SAFEHOLD INC. to ISTAR INC. $27,948,000
2022-02-28RPTT&RET $939,649 — from LEWIS, JONATHAN to SILVERSTEIN, JOYCE; SILVERSTEIN, BARRY $939,649
2022-02-17Sold for $939,649 $939,649
2022-01-07AL&R $467,520,000 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC. $467,520,000
2022-01-07Mortgage $74,131,470 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC. $74,131,470
2022-01-07Mortgage $65,352,185 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC. $65,352,185
2022-01-07Agreement $328,036,345 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC. $328,036,345
2021-08-31Agreement $104,900,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP $104,900,000
2021-08-31Agreement $351,500,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP $351,500,000
2021-08-31Agreement $100,000,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP $100,000,000
2020-07-31Agreement $100,000,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP $100,000,000
2020-07-31Agreement $104,900,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP $104,900,000
2020-07-31Agreement $351,500,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP $351,500,000

Ten-year activity

5002500
2017
2018
2019
2020
2021
367
2022
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
20173919100775
201884554014184
201972253846145
202077442252150
20211513387311285
202216626151159367
202310312136112264
2024104532912162
202598218111130
20263601401161
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 96 records

DateRecord
2026-10-08Restaurant inspection: JG MIDTOWN BANQUET KITCHEN — grade A
2026-09-23Permit Sprinklers — Permit Issued
2026-09-23Permit Plumbing — Permit Issued
2026-09-22Permit General Construction — Permit Issued
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-14311: Illegal Parking — Double Parked Blocking Traffic
2026-09-09Job filed: INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2026-09-09Permit Protection and Mechanical Methods — Permit Issued
2026-09-07311: Lost Property — Electronics/Phones
2026-09-03Certificate of occupancy Renewal Without Change
2026-08-23311: Illegal Parking — Blocked Bike Lane
2026-08-18Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-18Job filed: MECHANICAL WORK TAKING PLACE ON THE 32 CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-18Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU
2026-08-18Job filed: SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-08-13Permit General Construction — Signed-off
2026-08-13Permit General Construction — Permit Issued
2026-07-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-15311: Street Condition — Pothole
2026-06-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-06-10Job filed: GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP
2026-06-09Elevator permit: Furnish and install One (1) Dual Jack Passenger as per attached drawings. All work to comply with ASME A17.1-2013, Part 3, Safety
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-05-15Rodent inspection: Passed
2026-04-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-04-29Permit Plumbing — Signed-off
2026-04-29Permit Sprinklers — Signed-off
2026-04-29Permit Sprinklers — Signed-off
2026-04-23Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-04-21311: Street Sign - Damaged — St Name - Over Intersection
2026-04-06Rodent inspection: Failed for Other Reason
2026-03-27311: Illegal Parking — Blocked Bike Lane
2026-03-20Job filed: INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU
2026-03-16Job filed: MECHANICAL WORK ON THE 40TH AND 41ST CONSTRUCTION FLOORS (46TH AND 47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
2026-03-16Job filed: PLUMBING MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-03-13Job filed: GENERAL CONSTRUCTION ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-03-13Job filed: STRUCTURAL WORK ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-03-12311: Sidewalk Condition — Broken Sidewalk
2026-03-12311: Lost Property — Electronics/Phones
2026-03-10Permit Structural — Permit Issued
2026-02-26311: Food Establishment — Toxic Chemical/Material
2026-02-20Certificate of occupancy Renewal With Change
2026-02-19Permit Plumbing — Permit Issued
2026-02-19Permit Plumbing — Permit Issued
2026-02-10Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-02-10Job filed: MECHANICAL WORK TAKING PLACE ON THE 32 CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-02-10Job filed: SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2026-01-16311: Consumer Complaint — Hotel or Motel
2026-01-14Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO
2026-01-14Permit Sidewalk Shed — Permit Issued
2026-01-14Permit Sidewalk Shed — Permit Issued
2026-01-14Permit Supported Scaffold — Permit Issued
2026-01-14Permit Supported Scaffold — Permit Issued
2026-01-08311: Noise — Noise: Jack Hammering (NC2)
2026-01-02Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHA
2025-12-21311: Snow or Ice — Sidewalk
2025-12-16Permit Sprinklers — Permit Issued
2025-12-16Permit Mechanical Systems — Signed-off
2025-12-15Permit Structural — Signed-off
2025-12-15Permit General Construction — Signed-off
2025-12-12Job filed: Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egr
2025-12-10Restaurant inspection: 425 PARK — grade A
2025-11-24Permit Mechanical Systems — Permit Issued
2025-11-24Permit General Construction — Permit Issued
2025-11-20Permit Protection and Mechanical Methods — Permit Issued
2025-11-20Permit Protection and Mechanical Methods — Signed-off
2025-11-19Job filed: INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM IS ON THE 1ST AND 2ND FLOORS INSIDE
2025-11-17Permit Structural — Signed-off
2025-11-14Permit Mechanical Systems — Signed-off
2025-11-13Permit Structural — Signed-off
2025-11-12Job filed: Mechanical modifications taking place in the cellar and on the 1st and 2nd floor as per drawings filed herewith. No change in use, egress or occupancy
2025-11-12Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR
2025-11-12Permit Sprinklers — Signed-off
2025-11-11Job filed: SPRINKLER MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC

showing the 80 most recent

The full timeline

showing the 2,000 most recent of 2,819 events

2026
2026-10-08Restaurant inspection: JG MIDTOWN BANQUET KITCHEN — grade A
2026-09-23Permit Sprinklers — Permit Issued
2026-09-23Permit Plumbing — Permit Issued
2026-09-22Permit General Construction — Permit Issued
2026-09-22Permit Mechanical Systems — Permit Issued
2026-09-14311: Illegal Parking — Double Parked Blocking Traffic
2026-09-09Job filed: INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,000
2026-09-09Permit Protection and Mechanical Methods — Permit Issued
2026-09-07311: Lost Property — Electronics/Phones
2026-09-03Certificate of occupancy Renewal Without Change
2026-08-23311: Illegal Parking — Blocked Bike Lane
2026-08-18Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$100,000
2026-08-18Job filed: MECHANICAL WORK TAKING PLACE ON THE 32 CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$450,000
2026-08-18Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$1,350,000
2026-08-18Job filed: SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$100,000
2026-08-13Permit General Construction — Signed-off
2026-08-13Permit General Construction — Permit Issued
2026-07-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-07-15311: Street Condition — Pothole
2026-06-10311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-06-10Job filed: GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP$1,200,297
2026-06-09Elevator permit: Furnish and install One (1) Dual Jack Passenger as per attached drawings. All work to comply with ASME A17.1-2013, Part 3, Safety $399,000
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-06-08Boiler inspection
2026-05-15Rodent inspection: Passed
2026-04-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2026-04-29Permit Plumbing — Signed-off
2026-04-29Permit Sprinklers — Signed-off
2026-04-29Permit Sprinklers — Signed-off
2026-04-23Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$27,250
2026-04-21311: Street Sign - Damaged — St Name - Over Intersection
2026-04-06Rodent inspection: Failed for Other Reason
2026-03-27311: Illegal Parking — Blocked Bike Lane
2026-03-20Job filed: INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$94,547
2026-03-16Job filed: MECHANICAL WORK ON THE 40TH AND 41ST CONSTRUCTION FLOORS (46TH AND 47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$1,517,312
2026-03-16Job filed: PLUMBING MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$257,871
2026-03-13Job filed: GENERAL CONSTRUCTION ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,625,000
2026-03-13Job filed: STRUCTURAL WORK ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$600,000
2026-03-12311: Sidewalk Condition — Broken Sidewalk
2026-03-12311: Lost Property — Electronics/Phones
2026-03-10Permit Structural — Permit Issued
2026-02-26311: Food Establishment — Toxic Chemical/Material
2026-02-20Certificate of occupancy Renewal With Change
2026-02-19Permit Plumbing — Permit Issued
2026-02-19Permit Plumbing — Permit Issued
2026-02-10Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$57,000
2026-02-10Job filed: MECHANICAL WORK TAKING PLACE ON THE 32 CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$184,000
2026-02-10Job filed: SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$73,000
2026-01-16311: Consumer Complaint — Hotel or Motel
2026-01-14Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO$30,000
2026-01-14Permit Sidewalk Shed — Permit Issued
2026-01-14Permit Sidewalk Shed — Permit Issued
2026-01-14Permit Supported Scaffold — Permit Issued
2026-01-14Permit Supported Scaffold — Permit Issued
2026-01-08311: Noise — Noise: Jack Hammering (NC2)
2026-01-02Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHA$6,122,738
2025
2025-12-21311: Snow or Ice — Sidewalk
2025-12-16Permit Sprinklers — Permit Issued
2025-12-16Permit Mechanical Systems — Signed-off
2025-12-15Permit Structural — Signed-off
2025-12-15Permit General Construction — Signed-off
2025-12-12Job filed: Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egr$867,068
2025-12-10Restaurant inspection: 425 PARK — grade A
2025-11-24Permit Mechanical Systems — Permit Issued
2025-11-24Permit General Construction — Permit Issued
2025-11-20Permit Protection and Mechanical Methods — Permit Issued
2025-11-20Permit Protection and Mechanical Methods — Signed-off
2025-11-19Job filed: INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM IS ON THE 1ST AND 2ND FLOORS INSIDE $10,000
2025-11-17Permit Structural — Signed-off
2025-11-14Permit Mechanical Systems — Signed-off
2025-11-13Permit Structural — Signed-off
2025-11-12Job filed: Mechanical modifications taking place in the cellar and on the 1st and 2nd floor as per drawings filed herewith. No change in use, egress or occupancy$680,928
2025-11-12Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR$120,000
2025-11-12Permit Sprinklers — Signed-off
2025-11-11Job filed: SPRINKLER MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC$124,972
2025-11-10Job filed: PLUMBING MODIFICATIONS TAKING PLACE IN THE CELLAR, 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$181,948
2025-11-10Permit General Construction — Signed-off
2025-11-10Permit Plumbing — Signed-off
2025-11-07Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$57,000
2025-11-07Job filed: SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$73,000
2025-11-07Job filed: MECHANICAL WORK TAKING PLACE ON THE 32 CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$184,000
2025-11-06Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$270,000
2025-11-05Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O$3,423,871
2025-11-05Job filed: STRUCTURAL WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$40,000
2025-10-27311: Elevator — Elevator - Multiple Devices On Property
2025-10-27Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$559,358
2025-10-24311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-10-24DOB complaint, category ?
2025-10-24Certificate of occupancy Renewal With Change
2025-10-23311: Illegal Parking — Blocked Bike Lane
2025-10-22Job filed: Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egr$867,068
2025-10-17Permit General Construction — Signed-off
2025-10-15Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN U$75,075
2025-10-09Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH CONSTRUCTION FLOOR (17TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,$223,600
2025-10-08DOB complaint, category ?
2025-10-06311: Illegal Parking — Blocked Bike Lane
2025-10-02Job filed: Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egr$867,068
2025-09-29Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST FLOOR MARKETING AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED$2,800,005
2025-09-23311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-09-17Restaurant inspection: RESTAURANT ASSOCIATES / CITADEL — grade A
2025-09-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-09-02Permit Plumbing — Signed-off
2025-08-20Permit Sprinklers — Signed-off
2025-08-19Permit Plumbing — Signed-off
2025-08-19Permit Plumbing — Permit Issued
2025-08-05Permit General Construction — Signed-off
2025-08-04Job filed: INTERN TRAINING
2025-07-31Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $30,000
2025-07-30311: Lost Property — Bag/Wallet
2025-07-29Permit Structural — Signed-off
2025-07-24Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO$30,000
2025-07-24Permit Mechanical Systems — Permit Issued
2025-07-23Permit General Construction — Signed-off
2025-07-23Permit Plumbing — Signed-off
2025-07-22Job filed: SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,500
2025-07-22Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$172,255
2025-07-22Job filed: PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$27,250
2025-07-22Permit Sprinklers — Signed-off
2025-07-21Job filed: SPRINKLER WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH FLOOR CONSTRUCTIONS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN$303,000
2025-07-21Job filed: PLUMBING WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN $178,000
2025-07-21Job filed: MECHANICAL WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN $1,286,000
2025-07-21Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHA$6,122,738
2025-07-17Boiler inspection
2025-07-17Boiler inspection
2025-07-17Boiler inspection
2025-07-17Boiler inspection
2025-07-17Boiler inspection
2025-07-17Boiler inspection
2025-07-17Boiler inspection
2025-07-07Certificate of occupancy Renewal With Change
2025-07-03Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST FLOOR MARKETING AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED$2,800,005
2025-07-01Air permit (REGISTRATION INSPECTION), fuel: NATURALGAS
2025-06-26MLEA — from 425 PARK OWNER LLC to CITADEL ENTERPRISE AMERICAS LLC
2025-06-18Permit Mechanical Systems — Permit Issued
2025-06-16Restaurant inspection: JG MIDTOWN AMENITIES KITCHEN — grade A
2025-06-16311: Noise — Noise: air condition/ventilation equipment (NV1)
2025-06-12311: Lost Property — Electronics/Phones
2025-06-10Permit Plumbing — Signed-off
2025-06-05Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 35TH AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRE$140,010
2025-06-04Permit Sprinklers — Signed-off
2025-06-04Permit Plumbing — Signed-off
2025-06-04Permit Sprinklers — Signed-off
2025-05-29Permit General Construction — Signed-off
2025-05-27Job filed: GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH CONSTRUCTION FLOOR (33RD MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,319,588
2025-05-23Job filed: MECHANICAL WORK TAKING PLACE ON THE 27TH CONSTRUCTION FLOOR (33RD MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$330,000
2025-05-23Job filed: SPRINKLER WORK TAKING PLACE ON THE 27TH FLOOR CONSTRUCTION (33RD MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$103,500
2025-05-23Job filed: PLUMBING WORK TAKING PLACE ON THE 27TH CONSTRUCTION FLOOR (33RD MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$33,500
2025-05-21Permit Mechanical Systems — Signed-off
2025-05-21Permit Structural — Signed-off
2025-05-20Permit General Construction — Signed-off
2025-05-14Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN U$75,075
2025-05-14Job filed: Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egr$867,068
2025-05-14Job filed: Structural modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egr$600,015
2025-05-12Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST FLOOR MARKETING AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED$2,800,005
2025-05-08Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$42,460
2025-04-29Permit Plumbing — Signed-off
2025-04-29Permit Sprinklers — Signed-off
2025-04-29Permit Sprinklers — Signed-off
2025-04-29Permit General Construction — Signed-off
2025-04-29Permit General Construction — Signed-off
2025-04-28Job filed: INTERN TRAINING
2025-04-22Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR$120,000
2025-04-22Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH CONSTRUCTION FLOOR (17TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$250,000
2025-04-22Certificate of occupancy Renewal With Change
2025-04-11Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$8,250,000
2025-04-10311: Street Sign - Damaged — Other/Unknown
2025-04-01311: Illegal Parking — Blocked Bike Lane
2025-04-01311: Illegal Parking — Blocked Bike Lane
2025-03-11Permit Supported Scaffold — Permit Issued
2025-03-11Permit Sidewalk Shed — Permit Issued
2025-03-06311: Illegal Parking — License Plate Obscured
2025-02-28Job filed: No Work
2025-02-21311: Damaged Tree — Entire Tree Has Fallen Down
2025-02-21Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$6,774,351
2025-02-19Permit Mechanical Systems — Signed-off
2025-02-18Permit General Construction — Signed-off
2025-02-14Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $500,000
2025-02-14Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$252,170
2025-02-14Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,271,139
2025-02-08311: Water Conservation — Wasting Faucets,Sinks,Flushometer,Urinal,Etc. - Other (CWO)
2025-01-30Permit Sprinklers — Signed-off
2025-01-27311: Lost Property — Bag/Wallet
2025-01-27Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $500,000
2025-01-07Permit Plumbing — Permit Issued
2025-01-06Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$50,000
2025-01-03311: Non-Emergency Police Matter — Other (complaint details)
2024
2024-12-30Permit Sprinklers — Signed-off
2024-12-26Permit EW — ISSUED
2024-12-24Permit Sprinklers — Signed-off
2024-12-20Job filed: PLUMBING MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$257,871
2024-12-20Permit Structural — Signed-off
2024-12-19Permit General Construction — Signed-off
2024-12-19Permit Mechanical Systems — Signed-off
2024-12-18Job filed: INSTALLATION OF A TEMPORARY SPRINKLER SYSTEM FOR PROTECTION OF EGRESS ON THE 23RD CONSTRUCTION FLOOR (29TH MARKETING FLOOR) AS PER PLANS SUBMITTED HER$13,000
2024-12-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-10Certificate of occupancy Renewal With Change
2024-12-09311: Illegal Parking — Blocked Bike Lane
2024-12-09311: Illegal Parking — Blocked Bike Lane
2024-12-09311: Illegal Parking — Blocked Bike Lane
2024-12-09Permit Plumbing — Signed-off
2024-12-06Permit Mechanical Systems — Signed-off
2024-12-04Permit General Construction — Signed-off
2024-12-02Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $357,185
2024-12-02Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$42,460
2024-12-02Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$63,470
2024-12-01DOB violation EGRADE: FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2024-11-27Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$803,066
2024-11-27Job filed: TOWN HALL MEETING ON DECEMBER 13TH
2024-11-25Permit Sprinklers — Signed-off
2024-11-22Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING FLOOR) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPA$20,000
2024-11-22Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$116,354
2024-11-22Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$100,000
2024-11-14Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $345,789
2024-11-06Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$5,471,115
2024-11-04Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$304,100
2024-11-04Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 21ST AND 22ND CONSTRUCTION FLOORS (27TH AND 28TH MARKETING FLOORS) AS PER PLANS HEREWITH. NO CHANGE IN US$930,065
2024-10-29Job filed: Lecture event on Nov. 7
2024-10-23311: Illegal Parking — Blocked Bike Lane
2024-10-23311: Illegal Parking — Blocked Bike Lane
2024-10-23Permit Sprinklers — Signed-off
2024-10-21Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 39TH, 40TH FLOOR CONSTRUCTION (45TH, 46TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$285,000
2024-10-17311: Water System — Hydrant Defective (WC2)
2024-10-17311: Mobile Food Vendor — Plumbing
2024-10-17311: Vendor Enforcement — Food Vendor
2024-10-15Permit General Construction — Permit Issued
2024-10-09311: Vendor Enforcement — Food Vendor
2024-10-08Permit Plumbing — Signed-off
2024-10-04Permit Mechanical Systems — Permit Issued
2024-10-03311: Vendor Enforcement — Food Vendor
2024-10-03Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR$18,000
2024-09-30Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC$15,000
2024-09-30Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$15,000
2024-09-27Job filed: PLUMBING WORK ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$101,875
2024-09-20Air permit (REGISTRATION), fuel: NATURALGAS
2024-09-19Permit Mechanical Systems — Signed-off
2024-09-19Permit General Construction — Signed-off
2024-09-18Permit Plumbing — Signed-off
2024-09-13Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $500,000
2024-09-09Permit General Construction — Signed-off
2024-09-09Permit Mechanical Systems — Signed-off
2024-09-06Permit Structural — Signed-off
2024-09-05Job filed: No Work
2024-09-05Permit Sprinklers — Signed-off
2024-09-04Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $500,000
2024-09-04Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$1,400,000
2024-09-04Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $50,000
2024-09-04Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$60,000
2024-09-03Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$50,000
2024-08-28Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR CONSTRUCTION (11TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$15,000
2024-08-28Permit Sprinklers — Signed-off
2024-08-28Permit General Construction — Signed-off
2024-08-28Permit Mechanical Systems — Signed-off
2024-08-27Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 3RD CONSTRUCTION FLOOR (8TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$15,000
2024-08-27Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 3RD CONSTRUCTION FLOOR (8TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC$15,000
2024-08-26Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD CONSTRUCTION FLOOR (8TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR$43,000
2024-08-26Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$6,774,351
2024-08-24Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $17,500
2024-08-20Job filed: PLUMBING WORK ON THE 3RD-6TH FL CONSTRUCTION (8TH-11TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,460,997
2024-08-19Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$101,355
2024-08-19Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$252,170
2024-08-19Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,271,139
2024-08-14Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 6TH CONSTRUCTION FLOOR (11TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$666,000
2024-08-13Permit Plumbing — Signed-off
2024-08-07Restaurant inspection: 425 PARK — grade A
2024-08-02Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$285,000
2024-08-02Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR CONSTRUCTION (11TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$10,000
2024-08-01Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR CONSTRUCTION (21ST FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$118,000
2024-07-29311: Street Condition — Pothole
2024-07-18Permit General Construction — Signed-off
2024-07-03Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 37TH CONSTRUCTION FLOOR (43RD MARKETING FLOOR) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE$129,000
2024-06-27Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$6,774,351
2024-06-12311: Lost Property — Bag/Wallet
2024-06-03Certificate of occupancy Renewal Without Change
2024-05-31311: Noise - Commercial — Loud Music/Party
2024-05-28Restaurant inspection: JG MIDTOWN BANQUET KITCHEN — grade A
2024-05-23Permit Structural — Signed-off
2024-05-22Job filed: MECHANICAL WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,205,698
2024-05-15Permit Standpipe — Signed-off
2024-05-13Job filed: STANDPIPE MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$32,000
2024-05-13Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $500,000
2024-05-10Boiler inspection
2024-05-10Boiler inspection
2024-05-10Boiler inspection
2024-05-10Boiler inspection
2024-05-10Boiler inspection
2024-05-10Boiler inspection
2024-05-10Boiler inspection
2024-05-02311: Graffiti — Graffiti
2024-05-01Permit General Construction — Signed-off
2024-04-30Permit Sprinklers — Signed-off
2024-04-30Permit Plumbing — Signed-off
2024-04-29ECB CLASS - 2 violation: AT TIME OF INSPECTION RESPOND TO AN INCIDENT WHERE A WORKER WAS INJURED USING A GRINDING MACHINE PIECE OF THE METAL HIT THE WORK$5,030
2024-04-29DOB complaint, category ?
2024-04-26Permit Sprinklers — Signed-off
2024-04-24Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $500,000
2024-04-22311: Illegal Parking — Blocked Bike Lane
2024-04-22311: Dirty Condition — Dog Waste
2024-04-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-04-18311: Illegal Parking — Posted Parking Sign Violation
2024-04-15311: Illegal Parking — Parking Permit Improper Use
2024-04-15Permit EW — ISSUED
2024-04-15Permit EW — ISSUED
2024-04-12MLEA — from 425 PARK OWNER LLC to 425 PARK F&B LLC
2024-04-12Agreement — from 425 PARK OWNER LLC; SUMITOMO MITSUI TRUST BANK, LIMITED, NEW to CITADEL ENTERPRISE AMERICAS LLC
2024-04-12Agreement — from SUMITOMO MITSUI TRUST BANK, LIMITED, NEW to HELLMAN & FRIEDMAN LLC
2024-04-12AL&R $484,000,000 — from 425 PARK OWNER LLC; 425 PARK F&B LLC to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW$484,000,000
2024-04-12TL&R — from OTERA CAPITAL INVESTMENTS IX INC. to 425 PARK OWNER LLC
2024-04-12Mortgage assigned — from OTERA CAPITAL INVESTMENTS IX INC. to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW
2024-04-12Mortgage assigned — from OTERA CAPITAL INVESTMENTS IX INC. to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW
2024-04-12Mortgage assigned — from OTERA CAPITAL INVESTMENTS IX INC. to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW
2024-04-12M&CON $484,000,000 — from 425 PARK OWNER LLC; 425 PARK F&B LLC to SUMITOMO MITSUI TRUST BANK, LIMITED, NEW$484,000,000
2024-04-11Job filed: Structural modifications taking place in the sub cellar as per drawings filed herewith. No change in use, egress or occupancy.$30,002
2024-03-28311: Commercial Disposal Complaint — Private Carter Decal Not Posted
2024-03-26Cooling tower inspection
2024-03-23311: Encampment — N/A
2024-03-21Permit Structural — Signed-off
2024-03-21Permit Sprinklers — Signed-off
2024-03-18311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-03-15311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-03-15311: Illegal Parking — Posted Parking Sign Violation
2024-03-15Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 22ND FLOOR CONSTRUCTION (28TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $345,789
2024-03-07Restaurant inspection: JG MIDTOWN AMENITIES KITCHEN — grade A
2024-03-06311: Indoor Air Quality — Sewage Odor
2024-03-05Certificate of occupancy Renewal With Change
2024-03-04Permit Plumbing — Signed-off
2024-02-27311: Vendor Enforcement — Food Vendor
2024-02-26Job filed: Mechanical modifications taking place in the sub cellar as per drawings filed herewith. No change in use, egress or occupancy.$73,004
2024-02-26Job filed: Sprinkler modifications taking place in the sub cellar as per drawings filed herewith. No change in use, egress or occupancy.$19,012
2024-02-23Job filed: Plumbing modifications taking place in the sub cellar as per drawings filed herewith. No change in use, egress or occupancy.$25,005
2024-02-23Job filed: General construction modifications taking place in the sub cellar as per drawings filed herewith. No change in use, egress or occupancy.$232,012
2024-02-16Permit Structural — Signed-off
2024-02-14311: Illegal Parking — Blocked Bike Lane
2024-02-14311: Illegal Parking — Blocked Bike Lane
2024-02-07Permit General Construction — Signed-off
2024-02-07Permit Mechanical Systems — Signed-off
2024-02-01ECB CLASS - 2 violation: OBSERVED ON 17TH FLOOR IN THE PUBLIC MENS ROOM NONCOMMERCIAL TOILET INSTALLED THE TOILET SEATS ARE NOT HINGED OPEN FRONT WHICH IS $312
2024-01-31Permit Mechanical Systems — Signed-off
2024-01-30Permit General Construction — Signed-off
2024-01-26Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 21ST AND 22ND CONSTRUCTION FLOORS (27TH AND 28TH MARKETING FLOORS) AS PER PLANS HEREWITH. NO CHANGE IN US$930,065
2024-01-26Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$116,354
2024-01-26Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$5,471,115
2024-01-26Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$304,100
2024-01-24Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $345,789
2024-01-20311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2024-01-20DOB complaint, category ?
2024-01-17Job filed: GENERAL CONSTRUCTION ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,320,000
2024-01-05311: Illegal Parking — Posted Parking Sign Violation
2023
2023-12-27Permit EW — ISSUED
2023-12-27Permit Structural — Signed-off
2023-12-27Permit Mechanical Systems — Signed-off
2023-12-27Permit General Construction — Signed-off
2023-12-20311: Sidewalk Condition — Sidewalk Grating - Defective
2023-12-18311: Noise - Residential — Loud Music/Party
2023-12-15311: Illegal Parking — Blocked Bike Lane
2023-12-05Job filed: Mechanical modifications taking place on the 31st floor (37th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.$690,080
2023-12-05Permit Plumbing — Permit Issued
2023-11-16311: Illegal Parking — Blocked Bike Lane
2023-11-14Permit Plumbing — Permit Issued
2023-11-10311: Illegal Parking — Blocked Bike Lane
2023-11-08Permit General Construction — Signed-off
2023-11-07311: Illegal Parking — Blocked Bike Lane
2023-11-07311: Illegal Parking — Blocked Bike Lane
2023-11-07Job filed: Replace existing restaurant cooking fixtures on the first floor replace the hot water heater on the cellar floor and add a new gas meter at the cellar$8,000
2023-11-06311: Illegal Parking — Blocked Bike Lane
2023-11-02Permit NB — ISSUED
2023-11-02Permit Sprinklers — Permit Issued
2023-10-30Permit EW — ISSUED
2023-10-30Permit EW — ISSUED
2023-10-28311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2023-10-27Restaurant inspection: RESTAURANT ASSOCIATES / CITADEL — grade A
2023-10-26Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$260,000
2023-10-24Job filed: MECHANICAL WORK ON THE 3RD FLOOR CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,600,000
2023-10-24Job filed: SPRINKLER WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$180,002
2023-10-24Job filed: PLUMBING WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$340,000
2023-10-23Permit General Construction — Permit Issued
2023-10-23Permit Mechanical Systems — Permit Issued
2023-10-23Permit Structural — Signed-off
2023-10-20Job filed: GENERAL CONSTRUCTION ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,760,000
2023-10-16311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-10-16311: Lost Property — Electronics/Phones
2023-10-11Permit Standpipe — Signed-off
2023-10-08311: Encampment — N/A
2023-09-27Permit Supported Scaffold — Permit Issued
2023-09-25311: UNSANITARY CONDITION — MOLD
2023-09-25311: PAINT/PLASTER — CEILING
2023-09-25Tenant complaint: PAINT/PLASTER — CEILING
2023-09-25Tenant complaint: UNSANITARY CONDITION — MOLD
2023-09-25Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$50,000
2023-09-25Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 6TH AND 7TH FLOORS CONSTRUCTION (11TH & 12TH FLOORS MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN US$65,000
2023-09-25Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR $30,000
2023-09-25Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$15,000
2023-09-21Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$250,000
2023-09-21Permit General Construction — Permit Issued
2023-09-19311: Encampment — N/A
2023-09-18Permit Structural — Permit Issued
2023-09-15Permit Mechanical Systems — Permit Issued
2023-09-10311: Encampment — N/A
2023-09-10311: Encampment — N/A
2023-09-08Permit Sidewalk Shed — Permit Issued
2023-09-07Job filed: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRES$5,000
2023-09-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-09-06311: Illegal Parking — Blocked Bike Lane
2023-09-06Job filed: SPRINKLER WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$135,005
2023-09-06Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$135,005
2023-09-06Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,200,000
2023-09-06Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$255,000
2023-09-06Job filed: MECHANICAL WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,200,000
2023-09-06Job filed: PLUMBING WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$255,000
2023-09-06Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR CONSTRUCTION (21ST FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$118,000
2023-09-05DOB complaint, category ?
2023-09-04311: Taxi Report — Driver Report - Passenger
2023-08-29Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR CONSTRUCTION (21ST FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $8,000
2023-08-27311: Food Establishment — Food Contains Foreign Object
2023-08-27311: Food Establishment — Dishwashing/Utensils
2023-08-26311: Illegal Parking — License Plate Obscured
2023-08-25311: Food Establishment — Facility Construction
2023-08-25Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR CONSTRUCTION (21ST FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,000
2023-08-24311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-08-24Permit General Construction — Signed-off
2023-08-21Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$1,320,000
2023-08-21Job filed: GENERAL CONSTRUCTION ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,320,000
2023-08-17Certificate of occupancy Renewal With Change
2023-08-16ECB CLASS - 2 violation: RESPONDENT FAILED TO COMPLY WITH THE COMMISSIONER'S ORDER TO CORRECT THE VIOLATING CONDITION AND FILE A CERTIFICATE OF CORRECTIONS$625
2023-08-10311: Illegal Parking — Blocked Bike Lane
2023-08-10Job filed: TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP$7,000
2023-08-10Permit Supported Scaffold — Permit Issued
2023-08-09Permit Sprinklers — Signed-off
2023-08-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-07-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-07-25311: Illegal Parking — Blocked Bike Lane
2023-07-21Permit Sprinklers — Signed-off
2023-07-21Permit Mechanical Systems — Signed-off
2023-07-19Permit Mechanical Systems — Signed-off
2023-07-07Permit General Construction — Signed-off
2023-07-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-06-29Permit PL — ISSUED
2023-06-28Job filed: No Work
2023-06-21ECB CLASS - 1 violation: . AN ELECTRICIAN ON 16TH FLOOR IN A/C ROOM WAS STRIPPING WIRES AND WAS SHOCKED AND WENT TO AN OFFSITE MEDICAL FACILITY. PERMIT HOL$1,250
2023-06-21DOB complaint, category ?
2023-06-20Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$8,250,000
2023-06-16Elevator permit: INSTALLATION OF 1 ELEVATOR - All work to conform with ASME A17.1-2013, Part 3, Safety Code for Elevators and Escalators as modifie$168,400
2023-06-16Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $150,000
2023-06-15311: Illegal Parking — Blocked Bike Lane
2023-06-15Job filed: SPRINKLER WORK ON THE 40TH FL CONSTRUCTION (46TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.$102,915
2023-06-15Job filed: MECHANICAL WORK ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.$1,035,861
2023-06-15Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,250,000
2023-06-15Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$130,003
2023-06-15Job filed: PLUMBING WORK ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$101,875
2023-06-15Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$285,000
2023-06-14311: Illegal Parking — Blocked Bike Lane
2023-06-14311: Illegal Parking — Blocked Bike Lane
2023-06-14Certificate of occupancy Renewal With Change
2023-06-14Permit Plumbing — Signed-off
2023-06-13311: Illegal Parking — Blocked Bike Lane
2023-06-13311: Illegal Parking — Blocked Bike Lane
2023-06-13311: Illegal Parking — Blocked Bike Lane
2023-06-09311: Illegal Parking — Blocked Bike Lane
2023-06-09311: Illegal Parking — Blocked Bike Lane
2023-06-05Boiler inspection
2023-06-05Boiler inspection
2023-06-05Boiler inspection
2023-06-05Boiler inspection
2023-06-05Boiler inspection
2023-06-05Boiler inspection
2023-06-05Boiler inspection
2023-06-01311: Street Condition — Cave-in
2023-05-25311: Illegal Parking — Blocked Bike Lane
2023-05-25311: Illegal Parking — Blocked Bike Lane
2023-05-25Permit General Construction — Signed-off
2023-05-23Permit Mechanical Systems — Signed-off
2023-05-19311: Illegal Parking — Blocked Bike Lane
2023-05-19311: Illegal Parking — Blocked Bike Lane
2023-05-18311: Illegal Parking — Blocked Bike Lane
2023-05-17311: Illegal Parking — Blocked Bike Lane
2023-05-17311: Illegal Parking — Blocked Bike Lane
2023-05-17311: Illegal Parking — Blocked Bike Lane
2023-05-16311: Illegal Parking — Blocked Bike Lane
2023-05-16311: Illegal Parking — Blocked Bike Lane
2023-05-16Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,271,139
2023-05-16Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$252,170
2023-05-15Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$101,355
2023-05-12311: Illegal Parking — Blocked Bike Lane
2023-05-10311: Illegal Parking — Blocked Bike Lane
2023-05-10311: Illegal Parking — Blocked Bike Lane
2023-05-10Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$6,774,351
2023-05-09311: Illegal Parking — Blocked Bike Lane
2023-05-09311: Illegal Parking — Blocked Bike Lane
2023-05-08311: Illegal Parking — Blocked Bike Lane
2023-05-05311: Illegal Parking — Blocked Bike Lane
2023-05-05311: Illegal Parking — Blocked Bike Lane
2023-05-05Permit Plumbing — Signed-off
2023-05-03311: Illegal Parking — Blocked Bike Lane
2023-05-03Permit Sprinklers — Signed-off
2023-05-03Permit Sprinklers — Signed-off
2023-05-03Permit Sprinklers — Signed-off
2023-05-02DOB complaint, category ?
2023-05-02DOB complaint, category ?
2023-05-02Permit Mechanical Systems — Signed-off
2023-04-29311: Encampment — N/A
2023-04-28311: Illegal Parking — Blocked Bike Lane
2023-04-28311: Illegal Parking — Blocked Bike Lane
2023-04-28311: Illegal Parking — Blocked Bike Lane
2023-04-27Permit Plumbing — Signed-off
2023-04-25RPTT $27,948,000 — from SAFEHOLD INC. to ISTAR INC.$27,948,000
2023-04-20Permit Sprinklers — Permit Issued
2023-04-20Permit Sprinklers — Permit Issued
2023-04-19311: Illegal Parking — Blocked Bike Lane
2023-04-19311: Illegal Parking — Blocked Bike Lane
2023-04-19311: Illegal Parking — Blocked Bike Lane
2023-04-18Job filed: TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS AP$5,000
2023-04-18Permit Supported Scaffold — Signed-off
2023-04-13311: Illegal Parking — Blocked Bike Lane
2023-04-13311: Illegal Parking — Blocked Bike Lane
2023-04-12311: Illegal Parking — Blocked Bike Lane
2023-04-06311: Illegal Parking — Blocked Bike Lane
2023-04-06311: Illegal Parking — Blocked Bike Lane
2023-04-06Permit Mechanical Systems — Signed-off
2023-04-06Permit EW — ISSUED
2023-04-06Permit EW — ISSUED
2023-04-04Permit General Construction — Signed-off
2023-04-03Rodent inspection: Passed
2023-04-03Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANG$2,375,054
2023-03-31Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$157,605
2023-03-29311: Illegal Parking — Blocked Bike Lane
2023-03-29311: Illegal Parking — Blocked Bike Lane
2023-03-29311: Illegal Parking — Blocked Bike Lane
2023-03-28311: Illegal Parking — Blocked Bike Lane
2023-03-28311: Illegal Parking — Blocked Bike Lane
2023-03-27311: Illegal Parking — Blocked Bike Lane
2023-03-27311: Illegal Parking — Blocked Bike Lane
2023-03-21311: Illegal Parking — Blocked Bike Lane
2023-03-20Cooling tower inspection — violation AH8S
2023-03-17311: Illegal Parking — Blocked Bike Lane
2023-03-15311: Illegal Parking — Blocked Bike Lane
2023-03-06311: Illegal Parking — Blocked Bike Lane
2023-03-06311: Illegal Parking — Blocked Bike Lane
2023-03-06311: Illegal Parking — Blocked Bike Lane
2023-03-03Job filed: MECHANICAL WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,205,698
2023-03-03Job filed: PLUMBING WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$558,089
2023-03-03Job filed: SPRINKLER WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$369,000
2023-03-01311: Illegal Parking — Blocked Bike Lane
2023-03-01311: Illegal Parking — Blocked Bike Lane
2023-03-01311: Illegal Parking — Blocked Bike Lane
2023-02-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-02-22311: Illegal Parking — Blocked Bike Lane
2023-02-22311: Illegal Parking — Blocked Bike Lane
2023-02-22311: Illegal Parking — Blocked Bike Lane
2023-02-22311: Illegal Parking — Blocked Bike Lane
2023-02-22Job filed: MODIFICATIONS TAKINGPLACE ONTHE 28TH FLOOR (34THFLOOR MARKETING) AS PERDRAWINGS FILEDHEREWITH. NOCHANGE IN USE,EGRESS OROCCUPANCY.$140,004
2023-02-21311: Rodent — Rat Sighting
2023-02-21311: Illegal Parking — Blocked Bike Lane
2023-02-21311: Illegal Parking — Blocked Bike Lane
2023-02-16311: Illegal Parking — Blocked Bike Lane
2023-02-16311: Illegal Parking — Blocked Bike Lane
2023-02-15FDNY inspection (COM_OCPCY)
2023-02-14311: Illegal Parking — Blocked Bike Lane
2023-02-14311: Illegal Parking — Blocked Bike Lane
2023-02-14311: Illegal Parking — Blocked Bike Lane
2023-02-09Job filed: No Work
2023-02-08311: Illegal Parking — Blocked Bike Lane
2023-02-08311: Illegal Parking — Blocked Bike Lane
2023-02-08311: Illegal Parking — Blocked Bike Lane
2023-02-06Elevator permit: INSTALLATION OF 1 ELEVATOR - All work to conform with ASME A17.1-2013, Part 3, Safety Code for Elevators and Escalators as modifie$168,400
2023-02-06FDNY inspection (DEMO)
2023-02-06311: Illegal Parking — Blocked Bike Lane
2023-02-06311: Illegal Parking — Blocked Bike Lane
2023-02-06311: Illegal Parking — Blocked Bike Lane
2023-02-06311: Illegal Parking — Blocked Bike Lane
2023-02-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-02-04311: Illegal Parking — Blocked Bike Lane
2023-02-02311: Illegal Parking — Blocked Bike Lane
2023-02-02311: Illegal Parking — Blocked Bike Lane
2023-02-02311: Illegal Parking — Blocked Bike Lane
2023-02-01DOB complaint, category ?
2023-01-30311: Illegal Parking — Blocked Bike Lane
2023-01-27ECB CLASS - 1 violation: FAILED TO SUBMIT REPORT OF DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY OR INJURY.NOTE WORKER INJURED FACE.TAKEN TO OFF SITE ME$5,000
2023-01-27DOB complaint, category ?
2023-01-26311: Illegal Parking — Blocked Bike Lane
2023-01-26311: Illegal Parking — Blocked Bike Lane
2023-01-26311: Street Sign - Missing — Other/Unknown
2023-01-26311: Illegal Parking — Posted Parking Sign Violation
2023-01-26311: Illegal Parking — Blocked Bike Lane
2023-01-26311: Illegal Parking — Blocked Bike Lane
2023-01-25311: Illegal Parking — Blocked Bike Lane
2023-01-23FDNY inspection (DEMO)
2023-01-20311: Illegal Parking — Blocked Bike Lane
2023-01-20Job filed: MECHANICAL WORK ON FLOORS 10-17 CONSTRUCTION (16-23 MARKETING FLOORS) AS PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$12,371,257
2023-01-19311: Illegal Parking — Blocked Bike Lane
2023-01-19311: Illegal Parking — Blocked Bike Lane
2023-01-18311: Illegal Parking — Blocked Bike Lane
2023-01-18Job filed: PLUMBING WORK ON 10-17TH FLOORS CONSTRUCTION (16-23 FLOORS MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,484,150
2023-01-18Job filed: SPRINKLER WORK ON THE 10-17TH FLOORS CONSTRUCTION (16-23RD FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$889,601
2023-01-17311: Illegal Parking — Blocked Bike Lane
2023-01-13311: Illegal Parking — Blocked Bike Lane
2023-01-12Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE $350,928
2023-01-12Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE$185,501
2023-01-12Permit Plumbing — Signed-off
2023-01-12Permit Mechanical Systems — Signed-off
2023-01-12Permit Sprinklers — Permit Issued
2023-01-11311: Illegal Parking — Blocked Bike Lane
2023-01-11311: Illegal Parking — Blocked Bike Lane
2023-01-11311: Illegal Parking — Blocked Bike Lane
2023-01-11Job filed: Application filed on the 24th and 25th floors (30st and 31st Marketing floors) to obtain Equipment Certificate of compliance as per drawings filed h$1,000
2023-01-10311: Illegal Parking — Blocked Bike Lane
2023-01-10311: Illegal Parking — Blocked Bike Lane
2023-01-10311: Illegal Parking — Blocked Bike Lane
2023-01-09311: Illegal Parking — Blocked Bike Lane
2023-01-09311: Illegal Parking — Blocked Bike Lane
2023-01-09311: Illegal Parking — Blocked Bike Lane
2023-01-09Permit Structural — Signed-off
2023-01-05Permit General Construction — Signed-off
2022
2022-12-27Permit EW — ISSUED
2022-12-27Permit EW — ISSUED
2022-12-27Permit EW — ISSUED
2022-12-27Permit EW — ISSUED
2022-12-23ECB CLASS - 1 violation: RESPONDING TO AN INCIDENT WHERE A WORKER WAS HIT BY SCREW DRIVER. INSPECTION REVEAL THAT WORKER WAS REMOVING AN ATTACHMENT THAT WA$2,500
2022-12-23ECB CLASS - 1 violation: RESPONDING TO AN INCIDENT WHERE A WORKER WAS HIT BY SCREW DRIVER. INSPECTION REVEAL UPON REQUEST FOR OPERATION FOR THE WORKER NO R$5,000
2022-12-23DOB complaint, category ?
2022-12-22311: Illegal Parking — Blocked Bike Lane
2022-12-22311: Illegal Parking — Blocked Bike Lane
2022-12-21311: Illegal Parking — Blocked Bike Lane
2022-12-21Job filed: STRUCTURAL WORK ON THE 10-17TH FLOOR CONSTRUCTION (16-23TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$448,000
2022-12-21Permit Sprinklers — Signed-off
2022-12-20311: Illegal Parking — Blocked Bike Lane
2022-12-20Permit Plumbing — Signed-off
2022-12-19311: Illegal Parking — Blocked Bike Lane
2022-12-19Certificate of occupancy Renewal With Change
2022-12-15311: Illegal Parking — Blocked Bike Lane
2022-12-15Permit Mechanical Systems — Signed-off
2022-12-14311: Illegal Parking — Blocked Bike Lane
2022-12-12311: Street Sign - Missing — No Parking, Standing, Stopping
2022-12-09311: Illegal Parking — Blocked Bike Lane
2022-12-09311: Illegal Parking — Blocked Bike Lane
2022-12-09311: Illegal Parking — Blocked Bike Lane
2022-12-06311: Illegal Parking — Blocked Bike Lane
2022-12-06Job filed: Structural modifications taking place on the 37th and 38th floors (43rd and 44th Marketing floors) as per drawings filed herewith. No change in use, $389,490
2022-11-30311: Illegal Parking — Blocked Bike Lane
2022-11-30311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-30311: Illegal Parking — Blocked Bike Lane
2022-11-23311: Illegal Parking — Blocked Bike Lane
2022-11-23311: Illegal Parking — Blocked Bike Lane
2022-11-23311: Illegal Parking — Blocked Bike Lane
2022-11-18Permit Plumbing — Signed-off
2022-11-18Permit Plumbing — Signed-off
2022-11-17Permit Structural — Signed-off
2022-11-17Permit General Construction — Signed-off
2022-11-15Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 8TH FLOOR CONSTRUCTION (14TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$20,000
2022-11-15Permit Mechanical Systems — Signed-off
2022-11-15Permit Structural — Signed-off
2022-11-15Permit General Construction — Signed-off
2022-11-11311: Illegal Parking — Blocked Bike Lane
2022-11-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-04Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 39TH, 40TH FLOOR CONSTRUCTION (45TH, 46TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$285,000
2022-11-04Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,250,000
2022-11-04Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$130,003
2022-11-04Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$8,250,000
2022-11-03311: Illegal Parking — Blocked Bike Lane
2022-11-03311: Illegal Parking — Blocked Bike Lane
2022-11-03311: Illegal Parking — Blocked Bike Lane
2022-11-03Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $150,000
2022-11-03DOB complaint, category ?
2022-11-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-11-01311: Illegal Parking — Blocked Bike Lane
2022-11-01311: Illegal Parking — Blocked Bike Lane
2022-10-31Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 8TH FLOOR CONSTRUCTION (14TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EG$350,000
2022-10-31Job filed: SPRINKLER WORK ON THE 4TH-6TH FL CONSTRUCTION (9-11FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,104,403
2022-10-31Permit Plumbing — Signed-off
2022-10-31Permit EW — ISSUED
2022-10-31Permit EW — ISSUED
2022-10-31Permit EW — ISSUED
2022-10-28Permit Structural — Signed-off
2022-10-28Permit Structural — Signed-off
2022-10-28Permit Sprinklers — Signed-off
2022-10-28Permit Structural — Signed-off
2022-10-27Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$28,347
2022-10-26Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 8TH FLOOR CONSTRUCTION (14TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$20,000
2022-10-20Job filed: Opening Events w/ food and drinks
2022-10-19Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$856,050
2022-10-19Permit Structural — Signed-off
2022-10-18Permit Mechanical Systems — Signed-off
2022-10-18Permit General Construction — Signed-off
2022-10-17FDNY inspection (CDA-90-DRILL)
2022-10-16FDNY inspection (CDA-90-DRILL)
2022-10-15311: Illegal Parking — Blocked Bike Lane
2022-10-14311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-10-14311: Illegal Parking — Blocked Bike Lane
2022-10-14311: Illegal Parking — Blocked Bike Lane
2022-10-13311: Illegal Parking — Blocked Bike Lane
2022-10-13311: Illegal Parking — Blocked Bike Lane
2022-10-07Permit Structural — Permit Issued
2022-10-04Permit Construction Fence — Signed-off
2022-10-04Permit Protection and Mechanical Methods — Signed-off
2022-10-03Job filed: Structural modifications taking place on the 31st floor (37th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.$100,077
2022-09-30Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR (37TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$105,000
2022-09-30Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR (37TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
2022-09-30Job filed: Mechanical modifications taking place on the 31st floor (37th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.$690,080
2022-09-30Job filed: General construction modifications taking place on the 31st floor (37th floor marketing) as per drawings filed herewith. No change in use, egress or o$5,700,032
2022-09-29311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-09-29Permit Plumbing — Signed-off
2022-09-29Permit Plumbing — Signed-off
2022-09-28Job filed: Structural modifications taking place on 28th floor ( 34th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.$18,065
2022-09-26311: General Construction/Plumbing — Debris - Excessive
2022-09-26311: Illegal Parking — Blocked Bike Lane
2022-09-26311: Illegal Parking — Blocked Bike Lane
2022-09-26DOB complaint, category ?
2022-09-26Permit Protection and Mechanical Methods — Signed-off
2022-09-26Permit Sidewalk Shed — Signed-off
2022-09-23Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2022-09-23Job filed: MODIFICATIONS TAKINGPLACE ONTHE 28TH FLOOR (34THFLOOR MARKETING) AS PERDRAWINGS FILEDHEREWITH. NOCHANGE IN USE,EGRESS OROCCUPANCY.$140,004
2022-09-23Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $140,004
2022-09-23Job filed: PLUMBING MODIFICATIONS TAKING PLACE ONTHE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2022-09-21Permit General Construction — Signed-off
2022-09-21Permit NB — ISSUED
2022-09-21Permit EW — ISSUED
2022-09-19Permit General Construction — Signed-off
2022-09-19Permit General Construction — Signed-off
2022-09-19Permit Mechanical Systems — Signed-off
2022-09-16311: Illegal Parking — Blocked Bike Lane
2022-09-15311: Illegal Parking — Blocked Bike Lane
2022-09-14311: Illegal Parking — Blocked Bike Lane
2022-09-12311: Illegal Parking — Blocked Bike Lane
2022-09-12DOB complaint, category ?
2022-09-10311: Taxi Complaint — Driver Complaint - Passenger
2022-09-09311: Illegal Parking — Blocked Bike Lane
2022-09-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-09-08Job filed: STANDPIPE WORK ON THE 3RD FL , 18TH AND 19TH FLOOR CONSTRUCTION (8TH, 24TH AND 25TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, O$20,000
2022-09-07Job filed: GENERAL CONSTRUCTION MODIFICATION TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC$1,000
2022-09-06Job filed: GENERAL CONSTRUCTION ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,320,000
2022-09-06Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E$1,320,000
2022-09-02311: Illegal Parking — Blocked Bike Lane
2022-09-02311: Illegal Parking — Blocked Bike Lane
2022-09-02311: Illegal Parking — Blocked Bike Lane
2022-09-02Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $1,200,000
2022-09-02Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR O$135,005
2022-09-02Job filed: PLUMBING WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$255,000
2022-09-02Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$255,000
2022-08-31Job filed: MECHANICAL WORK ON THE 3RD FLOOR CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,600,000
2022-08-31Job filed: MECHANICAL WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,200,000
2022-08-31Job filed: SPRINKLER WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$135,005
2022-08-30Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 18TH FLOOR CONSTRUCTION (24TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $195,000
2022-08-30Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR $195,000
2022-08-25Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC$260,000
2022-08-25Certificate of occupancy Renewal With Change
2022-08-25Permit General Construction — Signed-off
2022-08-24Rodent inspection: Passed
2022-08-24Permit EQ — ISSUED
2022-08-23311: Illegal Parking — Blocked Bike Lane
2022-08-23Permit Sprinklers — Permit Issued
2022-08-23Permit EW — ISSUED
2022-08-23Permit EW — ISSUED
2022-08-22311: Illegal Parking — Blocked Bike Lane
2022-08-22311: Illegal Parking — Blocked Bike Lane
2022-08-19311: Illegal Parking — Blocked Bike Lane
2022-08-19311: Illegal Parking — Blocked Bike Lane
2022-08-19311: Illegal Parking — Blocked Bike Lane
2022-08-19311: Illegal Parking — Blocked Bike Lane
2022-08-19311: Illegal Parking — Blocked Bike Lane
2022-08-19Permit Structural — Signed-off
2022-08-19Permit General Construction — Signed-off
2022-08-19Permit Mechanical Systems — Signed-off
2022-08-18311: Illegal Parking — Blocked Bike Lane
2022-08-18Job filed: PLUMBING WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$340,000
2022-08-18Job filed: SPRINKLER WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$180,002
2022-08-17311: Illegal Parking — Blocked Bike Lane
2022-08-16311: Illegal Parking — Blocked Bike Lane
2022-08-16Job filed: GENERAL CONSTRUCTION ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,760,000
2022-08-15311: Illegal Parking — Blocked Bike Lane
2022-08-15ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT OR INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE ONE WORKER WAS INJURED W
2022-08-10311: Illegal Parking — Blocked Bike Lane
2022-08-10311: Illegal Parking — Blocked Bike Lane
2022-08-08Job filed: GENERAL CONSTRUCTION ON THE CEL (MARKETING B1), MEZZ 2, GROUND, 2ND FLOOR AND 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO$146,418
2022-08-05311: Illegal Parking — Blocked Bike Lane
2022-08-05DOB complaint, category ?
2022-07-29Job filed: STRUCTURAL WORK IN THE CELLAR (B1 MARKETING), GROUND FLOOR, MEZZANINE 2, 2ND FLOOR AND 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PLANS FILED HER$77,352
2022-07-28311: Illegal Parking — Blocked Bike Lane
2022-07-28Job filed: MECHANICAL WORK IN THE CELLAR (B1 MARKETING), GROUND FLOOR, MEZZANINE 2, 2ND FLOOR AND 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PLANS FILED HER$21,347
2022-07-27311: Illegal Parking — Blocked Bike Lane
2022-07-26Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2022-07-25311: Illegal Parking — Blocked Bike Lane
2022-07-24FDNY inspection (CDA-90-DRILL)
2022-07-22311: Illegal Parking — Blocked Bike Lane
2022-07-22311: Street Condition — Pothole
2022-07-22Permit Sprinklers — Signed-off
2022-07-22Permit Sprinklers — Signed-off
2022-07-22Permit Sprinklers — Signed-off
2022-07-21311: Illegal Parking — Blocked Bike Lane
2022-07-21311: Illegal Parking — Blocked Bike Lane
2022-07-21311: Illegal Parking — Blocked Bike Lane
2022-07-21Job filed: SPRINKLER WORK ON THE 4TH-6TH FL CONSTRUCTION (9-11FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,104,403
2022-07-21Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2022-07-21Job filed: MECHANICAL WORK FROM THE 3RD-6TH FLOOR CONSTRUCTION (8-11 FLOOR MARKETING) NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,739,406
2022-07-21Job filed: STRUCTURAL WORK ON THE 4TH-6TH FLOORS CONSTRUCTION (9-11TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,417,529
2022-07-21Permit Structural — Signed-off
2022-07-21Permit AL — ISSUED
2022-07-19311: Illegal Parking — Blocked Bike Lane
2022-07-19311: Illegal Parking — Blocked Bike Lane
2022-07-19311: Illegal Parking — Blocked Bike Lane
2022-07-19Permit Mechanical Systems — Signed-off
2022-07-18Permit AL — ISSUED
2022-07-15311: Illegal Parking — Blocked Bike Lane
2022-07-15311: Illegal Parking — Blocked Bike Lane
2022-07-15311: Illegal Parking — Blocked Bike Lane
2022-07-15Permit Mechanical Systems — Signed-off
2022-07-14Job filed: STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANG$100,016
2022-07-14Job filed: GENERAL CONSTRUCTION MODIFICATION TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC$415,050
2022-07-14Permit Sprinklers — Signed-off
2022-07-14Permit Plumbing — Signed-off
2022-07-13Job filed: MECHANICAL SYSTEMS MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANG EIN USE, EGRESS OR OCC$165,000
2022-07-13Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$71,000
2022-07-11311: Illegal Parking — Blocked Bike Lane
2022-07-11Permit Mechanical Systems — Signed-off
2022-07-08Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANG$2,375,054
2022-07-07311: Illegal Parking — Blocked Bike Lane
2022-07-06311: Illegal Parking — Blocked Bike Lane
2022-07-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-06311: Illegal Parking — Blocked Bike Lane
2022-07-06311: Illegal Parking — Blocked Bike Lane
2022-07-06ECB CLASS - 2 violation: A WORKER FELL THROUGH A 10' HOLE ON RAISED FLOOR ON 10 FLOOR DURING CONSTRUCTION ACTIVITIES INJURED HIS LEG AMBULANCE WAS CALLED I$5,000
2022-07-06Job filed: GENERAL CONSTRUCTION ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,320,000
2022-07-06Job filed: GENERAL CONSTRUCTION ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,760,000
2022-07-06DOB complaint, category ?
2022-07-05311: Illegal Parking — Blocked Bike Lane
2022-07-05Permit PL — ISSUED
2022-07-01311: Illegal Parking — Blocked Bike Lane
2022-07-01Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE$185,501
2022-07-01Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 36TH, 37TH AND 38TH FLOOR (42ND, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE $350,928
2022-07-01Permit General Construction — Signed-off
2022-06-29ECB CLASS - 1 violation: FAILURE TO NOTIFY DEPT OF ACCIDENT OR INCIDENT THAT RESULTED IN FATALITY OR INJURY.NOTE:WORKER INJURED WHEN HANGING ELECTRICIAN BO
2022-06-28311: Illegal Parking — Blocked Bike Lane
2022-06-28311: Illegal Parking — Blocked Bike Lane
2022-06-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-28311: Illegal Parking — Blocked Bike Lane
2022-06-28Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 36th, 37TH AND 38TH FLOOR (42nd, 43RD AND 44TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH.$9,305,252
2022-06-28Certificate of occupancy Renewal With Change
2022-06-27Job filed: MECHANICAL WORK ON THE 3RD FLOOR CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,600,000
2022-06-27Job filed: MECHANICAL WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,200,000
2022-06-27Permit EW — ISSUED
2022-06-24311: Food Establishment — Bare Hands in Contact w/ Food
2022-06-23Job filed: PLUMBING WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$340,000
2022-06-23Job filed: SPRINKLER WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$135,005
2022-06-23Job filed: SPRINKLER WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$180,002
2022-06-23Job filed: PLUMBING WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$255,000
2022-06-22Boiler inspection
2022-06-22Boiler inspection
2022-06-22Boiler inspection
2022-06-22Boiler inspection
2022-06-22Boiler inspection
2022-06-22Boiler inspection
2022-06-22Boiler inspection
2022-06-21Job filed: FILING HEREWITH OCCUPANT PROTECTION PLANS IN CONJUCTION WITH ALT 2 #123704081.$1,000
2022-06-16311: Consumer Complaint — Dry Cleaner
2022-06-15311: Illegal Parking — Blocked Bike Lane
2022-06-14311: Illegal Parking — Blocked Bike Lane
2022-06-08311: Illegal Parking — Blocked Bike Lane
2022-06-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-06-07311: Illegal Parking — Blocked Bike Lane
2022-06-06311: Illegal Parking — Blocked Bike Lane
2022-06-06311: Illegal Parking — Blocked Bike Lane
2022-06-01Job filed: PLUMBING WORK ON THE 3RD-6TH FL CONSTRUCTION (8TH-11TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,460,997
2022-06-01Permit Structural — Signed-off
2022-05-31311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-27311: Illegal Parking — Blocked Bike Lane
2022-05-26311: Water System — Hydrant Leaking (WC1)
2022-05-26311: Illegal Parking — Blocked Bike Lane
2022-05-26311: Illegal Parking — Blocked Bike Lane
2022-05-26Job filed: Structural modifications taking place on the 37th and 38th floors (43rd and 44th Marketing floors) as per drawings filed herewith. No change in use, $389,490
2022-05-23DOB complaint, category ?
2022-05-20Permit Mechanical Systems — Signed-off
2022-05-20Permit Mechanical Systems — Signed-off
2022-05-16311: Illegal Parking — Blocked Bike Lane
2022-05-16311: Illegal Parking — Blocked Bike Lane
2022-05-12311: Illegal Parking — Blocked Bike Lane
2022-05-11311: Illegal Parking — Blocked Bike Lane
2022-05-10311: Illegal Parking — Blocked Bike Lane
2022-05-06311: Illegal Parking — Blocked Bike Lane
2022-05-05311: Illegal Parking — Blocked Bike Lane
2022-05-02FDNY inspection (CDA-90-DRILL)
2022-05-02Permit Plumbing — Signed-off
2022-04-27311: Illegal Parking — Blocked Bike Lane
2022-04-27Job filed: PLUMBING WORK ON THE 3RD-6TH FL CONSTRUCTION (8TH-11TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,460,997
2022-04-25311: Illegal Parking — Blocked Bike Lane
2022-04-22311: Illegal Parking — Blocked Bike Lane
2022-04-22311: Illegal Parking — Blocked Bike Lane
2022-04-21311: Illegal Parking — Blocked Bike Lane
2022-04-20Cooling tower inspection
2022-04-20Permit Plumbing — Signed-off
2022-04-20Permit EW — ISSUED
2022-04-18ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT. OF AN ACCIDENT/INCIDENT THAT RESULTED IN AFATALITY OR AN INJURY.NOTE:A WORKER WERE INJURED WHEN INSTAL$2,500
2022-04-18Permit Mechanical Systems — Signed-off
2022-04-18Permit Mechanical Systems — Signed-off
2022-04-18Permit EW — ISSUED
2022-04-18Permit EW — ISSUED
2022-04-14311: Illegal Parking — Blocked Bike Lane
2022-04-14311: Illegal Parking — Blocked Bike Lane
2022-04-13311: Illegal Parking — Blocked Bike Lane
2022-04-13311: Illegal Parking — Blocked Bike Lane
2022-04-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-13311: Illegal Parking — Blocked Bike Lane
2022-04-13ECB CLASS - 1 violation: FAILED TO NOTIFY THE DEPT. OF AN INCIDENT THAT RESULTED IN A FATALITY OR INJURY.NOTE:A WORKER WERE INJURED WHEN OPENING HIS GANG B$5,000
2022-04-11Agreement — from 425 PARK OWNER LLC; HELLMAN & HELLMAN LLC to OTERA CAPITAL INVESTMENTS IX INC.
2022-04-11Agreement — from MPT OPERATING PARTNERSHIP, LP; 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENTS IX INC.
2022-04-07311: Illegal Parking — Blocked Bike Lane
2022-04-07Permit Structural — Signed-off
2022-04-07Permit Sprinklers — Signed-off
2022-04-06Permit Plumbing — Signed-off
2022-04-05311: Illegal Parking — Blocked Bike Lane
2022-04-05311: Illegal Parking — Blocked Bike Lane
2022-04-05311: Homeless Person Assistance
2022-04-04311: Illegal Parking — Blocked Bike Lane
2022-04-04311: Illegal Parking — Blocked Bike Lane
2022-04-04Job filed: INSTALLATION OF TEMPORARY WORK PLATFORMS AS PER DRAWINGS. WORK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS$35,000
2022-04-04Job filed: STRUCTURAL MODIFICATIONS TAKING PLACEON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,208
2022-04-03311: Homeless Person Assistance
2022-03-31DOB complaint, category ?
2022-03-30311: Illegal Parking — Blocked Bike Lane
2022-03-28311: Illegal Parking — Blocked Bike Lane
2022-03-28ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR AMENDMENTS.SUPPORTED SCAFFOLD 12TH FL(MARKETING).AT THE TIME OF INSP
2022-03-28ECB CLASS - 2 violation: FAILURE TO COMPLY W/MANUFACTURER SPECIFICATION-CUT & MODIFIED PIPE,SCAFFOLD FRAMES(12TH FL MARKETING).AT THE TIME OF INSPECTION OF
2022-03-28ECB CLASS - 2 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR AMENDMENTS.SHORING INTERIOR 8TH FL CONST./14TH FL MARKETING.AT THE T
2022-03-28DOB complaint, category ?
2022-03-22311: Illegal Parking — Blocked Bike Lane
2022-03-21311: Illegal Parking — Blocked Bike Lane
2022-03-18Agreement — from OTERA CAPITAL INVESTMENTS IX, INC.; CITADEL ENTERPRISE AMERCIAS LLC to 425 PARK OWNER LLC
2022-03-18311: Illegal Parking — Blocked Bike Lane
2022-03-14DOB complaint, category ?
2022-03-11Permit Mechanical Systems — Signed-off
2022-03-10Permit General Construction — Signed-off
2022-03-09311: Graffiti — Graffiti
2022-03-03311: Emergency Response Team (ERT) — After Hours Work - Illegal
2022-03-03DOB complaint, category ?
2022-03-02Permit Plumbing — Signed-off
2022-02-28RPTT&RET $939,649 — from LEWIS, JONATHAN to SILVERSTEIN, JOYCE; SILVERSTEIN, BARRY$939,649
2022-02-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-02-25311: Illegal Parking — Blocked Bike Lane
2022-02-24311: Illegal Parking — Blocked Bike Lane
2022-02-24311: Illegal Parking — Blocked Bike Lane
2022-02-23311: Illegal Parking — Blocked Bike Lane
2022-02-17Sold for $939,649$939,649
2022-02-17Permit Sprinklers — Signed-off
2022-02-16Permit Mechanical Systems — Signed-off
2022-02-10Certificate of occupancy Renewal With Change
2022-02-10Permit General Construction — Signed-off
2022-02-09Job filed: Structural work taking place on the 20th floors per plans filed herewith. No change in use, egress or occupancy.$771,825
2022-02-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-02-08311: Illegal Parking — Blocked Bike Lane
2022-02-08311: Illegal Parking — Blocked Bike Lane
2022-02-07311: Illegal Parking — Blocked Bike Lane
2022-02-03311: Illegal Parking — Blocked Bike Lane
2022-02-01Permit EW — ISSUED
2022-01-28Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$71,000
2022-01-28Job filed: MECHANICAL SYSTEMS MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANG EIN USE, EGRESS OR OCC$165,000
2022-01-28Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$62,000
2022-01-27FDNY inspection (CDA-90-DRILL)
2022-01-27Job filed: GENERAL CONSTRUCTION MODIFICATION TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC$415,050
2022-01-24311: Illegal Parking — Blocked Bike Lane
2022-01-21Permit EW — ISSUED
2022-01-21Permit EW — ISSUED
2022-01-21Permit EW — ISSUED
2022-01-18311: Illegal Parking — Blocked Bike Lane
2022-01-18311: Illegal Parking — Blocked Bike Lane
2022-01-18311: Illegal Parking — Blocked Bike Lane
2022-01-16311: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-16Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2022-01-13311: Illegal Parking — Blocked Bike Lane
2022-01-13311: Illegal Parking — Blocked Bike Lane
2022-01-07TL&R — from MASSACHUSETTS MUTUAL LIFE INSURANCE COMP to 425 PARK OWNER LLC
2022-01-07TL&R — from MASSACHUSETTS MUTUAL LIFE INSURANCE COMP to 425 PARK OWNER LLC
2022-01-07TL&R — from MASSACHUSETTS MUTUAL LIFE INSURANCE COMP to 425 PARK OWNER LLC
2022-01-07AL&R $467,520,000 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC.$467,520,000
2022-01-07Mortgage $74,131,470 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC.$74,131,470
2022-01-07Mortgage assigned — from MASSACHUSETTS MUTUAL LIFE INSURANCE COMP to OTERA CAPITAL INVESTMENT IX INC.
2022-01-07Mortgage assigned — from MASSACHUSETTS MUTUAL LIFE INSURANCE COMP to OTERA CAPITAL INVESTMENT IX INC.
2022-01-07Mortgage $65,352,185 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC.$65,352,185
2022-01-07Mortgage assigned — from MASSACHUSETTS MUTUAL LIFE INSURANCE COMP to OTERA CAPITAL INVESTMENT IX INC.
2022-01-07Agreement $328,036,345 — from 425 PARK OWNER LLC to OTERA CAPITAL INVESTMENT IX INC.$328,036,345
2022-01-07Permit Mechanical Systems — Signed-off
2022-01-05Job filed: STRUCTURAL MODIFICATIONS TAKING PLACEON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$19,208
2022-01-04Permit Plumbing — Signed-off
2021
2021-12-30Permit Protection and Mechanical Methods — Signed-off
2021-12-29Permit General Construction — Signed-off
2021-12-28Permit Mechanical Systems — Signed-off
2021-12-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$80,000
2021-12-23Job filed: Sprinkler modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use, $152,960
2021-12-23Permit Sprinklers — Signed-off
2021-12-22Job filed: MODIFICATIONS TAKINGPLACE ONTHE 28TH FLOOR (34THFLOOR MARKETING) AS PERDRAWINGS FILEDHEREWITH. NOCHANGE IN USE,EGRESS OROCCUPANCY.$140,004
2021-12-21Permit EW — ISSUED
2021-12-21Permit EW — ISSUED
2021-12-21Permit EW — ISSUED
2021-12-20Elevator permit: Request Temporary use of the elevator for Construction Tools, Materials, and Personnel during the final stages of construction. a$10,000
2021-12-17311: General Construction/Plumbing — Building Permit - None
2021-12-17Job filed: MECHANICAL MODIFICATIONS TAKING PLACE ON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$293,768
2021-12-17Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$11,000
2021-12-17Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$28,347
2021-12-17Job filed: PLUMBING MODIFICATIONS TAKING PLACE ON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$26,600
2021-12-17Job filed: PLUMBING MODIFICATIONS TAKING PLACE ONTHE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$3,000
2021-12-17Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 28TH FLOOR (34TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR $140,004
2021-12-17DOB complaint, category ?
2021-12-17Permit General Construction — Signed-off
2021-12-16Job filed: Mechanical work taking place on the 20th and 21st floors (26th and 27th floors marketing) as per plans filed herewith. No change in use, egress or occ$810,693
2021-12-16Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 29TH FLOOR (35TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O$856,050
2021-12-10311: Illegal Parking — Blocked Bike Lane
2021-12-09Permit EW — ISSUED
2021-12-09Permit EW — ISSUED
2021-12-08311: Illegal Parking — Blocked Bike Lane
2021-12-03Boiler inspection
2021-12-03Boiler inspection
2021-12-03Boiler inspection
2021-12-03Boiler inspection
2021-12-03Boiler inspection
2021-12-03Boiler inspection
2021-12-03Boiler inspection
2021-11-23311: Illegal Parking — Blocked Bike Lane
2021-11-22311: Illegal Parking — Blocked Bike Lane
2021-11-18311: Illegal Parking — Blocked Bike Lane
2021-11-17Elevator permit: All work to comply with ASME A17.1 2000-03 as amended by Chapter 30 and Appendix K 1 to 4 with 2014 changes. Furnish and install ($665,588
2021-11-17311: Illegal Parking — Blocked Bike Lane
2021-11-12Permit EW — ISSUED
2021-11-10311: Special Projects Inspection Team (SPIT) — Sign - In Danger Of Falling
2021-11-08311: Illegal Parking — Blocked Bike Lane
2021-11-08Certificate of occupancy Renewal With Change
2021-11-05311: Illegal Parking — Blocked Bike Lane
2021-11-04Permit Mechanical Systems — Signed-off
2021-11-03Permit EW — ISSUED
2021-11-01Permit EW — ISSUED
2021-11-01Permit EW — ISSUED
2021-11-01Permit EW — ISSUED
2021-10-29Permit Mechanical Systems — Signed-off
2021-10-28Permit EW — ISSUED
2021-10-28Permit EW — ISSUED
2021-10-27Permit Structural — Signed-off
2021-10-27Permit EW — ISSUED
2021-10-27Permit EW — ISSUED
2021-10-25Job filed: Mechanical modifications taking place in the cellar as per drawings filed herewith. No change in use, egress or occupancy.$275,000
2021-10-23FDNY inspection (CDA-90-DRILL)
2021-10-21ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AFFECTED BY CONSTRUCTION OPERATIONS.AT TIME OF INSPECTION OF INCIDENT AT 42 STORY BUILDING A WORK$10,000
2021-10-21ECB CLASS - 1 violation: FAILURE TO MAINTAIN RECORD OF ORIENTATIONS.AT TIME OF INSPECTION OF INCIDENT OF WORKER CUTTING WITH FINGER AT NEW 42 STORY BUILDIN$2,500
2021-10-21DOB complaint, category ?
2021-10-20Job filed: INSTALLATION OF TEMPORARY WORK PLATFORMS AS PER DRAWINGS. WORK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS$35,000
2021-10-20Permit Protection and Mechanical Methods — Signed-off
2021-10-14Permit EW — ISSUED
2021-10-14Permit EW — ISSUED
2021-10-13Permit General Construction — Signed-off
2021-10-12Permit Mechanical Systems — Signed-off
2021-10-12Permit EW — ISSUED
2021-10-12Permit EW — ISSUED
2021-10-12Permit EW — ISSUED
2021-10-07Job filed: INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS $12,000
2021-10-07Permit Construction Fence — Signed-off
2021-09-30Permit Protection and Mechanical Methods — Signed-off
2021-09-30Permit NB — ISSUED
2021-09-30Permit EW — ISSUED
2021-09-29Job filed: Application for the installation of suspended scaffold filed herein. No change in egress, use or occupancy..$1,000
2021-09-23Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$80,000
2021-09-22Permit Plumbing — Signed-off
2021-09-22Permit Sprinklers — Signed-off
2021-09-22Permit Sidewalk Shed — Signed-off
2021-09-21Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY$80,000
2021-09-20Permit Protection and Mechanical Methods — Signed-off
2021-09-16Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. TEMPORARY WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY O$4,998
2021-09-15311: Illegal Parking — Blocked Bike Lane
2021-09-15Permit EW — ISSUED
2021-09-15Permit EW — ISSUED
2021-09-14Permit Structural — Signed-off
2021-09-13Permit EQ — ISSUED
2021-09-09Job filed: STRUCTURAL WORK ON THE 10-17TH FLOOR CONSTRUCTION (16-23TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$448,000
2021-08-31Agreement $104,900,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP$104,900,000
2021-08-31Agreement $351,500,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP$351,500,000
2021-08-31Agreement $100,000,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP$100,000,000
2021-08-25Permit EQ — ISSUED
2021-08-25Permit PL — ISSUED
2021-08-17311: General Construction/Plumbing — Adjacent Buildings Not Protected
2021-08-17DOB complaint, category ?
2021-08-13Permit Standpipe — Signed-off
2021-08-11Permit General Construction — Signed-off
2021-08-11Permit Mechanical Systems — Signed-off
2021-08-10Job filed: PLUMBING MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$257,871
2021-08-10Job filed: SPRINKLER MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$95,000
2021-08-10Job filed: MECHANICAL WORK ON THE 40TH AND 41ST CONSTRUCTION FLOORS (46TH AND 47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY$1,517,312
2021-08-10Job filed: INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCU$94,547
2021-08-10Permit EW — ISSUED
2021-08-09Job filed: STRUCTURAL WORK ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$600,000
2021-08-06Job filed: Mechanical systems modifications taking place on the 30th floor (36th marketing) as per drawings filed herewith. No change in use, egress or occupanc$589,440
2021-08-04ECB CLASS - 2 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES.NOTE AT TIME OF INSPECTION IN RESPONSE TO AN INCIDENT WHERE ONE WORKER WAS PUSHI$5,000
2021-08-04ECB CLASS - 1 violation: 3310.4 FAILURE TO HAVE SITE SAFETY MONITORING PROGRAM.NOTE AT TIME OF INSPECTION OF A 42 STORY BUILDING,I OBSERVED INTERIOR CONSTR
2021-08-04ECB CLASS - 1 violation: 3310.4 FAILURE TO HAVE SITE SAFETY MONITORING PROGRAM.NOTE AT TIME OF INSPECTION OF A 42 STORY BUILDING,I OBSERVED INTERIOR CONSTR$2,500
2021-08-04ECB CLASS - 1 violation: 3310.4 FAILURE TO HAVE SITE SAFETY MONITORING PROGRAM.NOTE AT TIME OF INSPECTION I OBSERVED CONSTRUCTION ACTIVITIES GOING ON THE 1$2,500
2021-08-04Job filed: GENERAL CONSTRUCTION ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$2,625,000
2021-08-04DOB complaint, category ?
2021-08-03Job filed: Plumbing work taking place on floors 19, 20 and 21 as per plans filed herewith. No change in use, egress or occupancy.$316,725
2021-07-30311: Noise — Noise: Construction Before/After Hours (NM1)
2021-07-29Permit Structural — Signed-off
2021-07-22Job filed: Structural modifications taking place on the 30th floor (36th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.$48,000
2021-07-22Job filed: Plumbing modifications taking place on the 30th floor (36th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.$100,240
2021-07-22Permit EW — ISSUED
2021-07-21Job filed: SPRINKLER MODIFICATIONS TAKING PLACE ON THE 30TH FLOOR (36TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$86,000
2021-07-20Permit Sprinklers — Signed-off
2021-07-20Permit Sprinklers — Signed-off
2021-07-17FDNY inspection (CDA-90-DRILL)
2021-07-12Job filed: General construction modifications taking place on the 30th floor (36th marketing) as per drawings filed herewith. No change in use, egress or occupa$2,740,240
2021-07-08Permit EQ — ISSUED
2021-07-07Job filed: INSTALLATION OF A TEMPORARY SHORING SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SHORING SYSTEM TO C
2021-07-07Job filed: INSTALLATION OF A TEMPORARY SHORING SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SHORING SYSTEM TO C
2021-07-07Permit EW — RE-ISSUED
2021-07-02Job filed: No Work
2021-06-30Permit EQ — ISSUED
2021-06-25Permit Sprinklers — Signed-off
2021-06-24Permit Structural — Signed-off
2021-06-24Permit Plumbing — Signed-off
2021-06-23Job filed: STRUCTURAL WORK ON THE 4TH-6TH FLOORS CONSTRUCTION (9-11TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,417,529
2021-06-23Permit General Construction — Signed-off
2021-06-23Permit Mechanical Systems — Signed-off
2021-06-23Permit Protection and Mechanical Methods — Permit Issued
2021-06-22ECB CLASS - 1 violation: SITE SAFETY MONITORING.AT TIME OF INSPECTION NB UNDER CONSTRUCTION ACTIVE JOB SITE OBSERVED EXISTING STAIRS BEING REPLACED WITH NE
2021-06-22DOB complaint, category ?
2021-06-21Job filed: Sprinkler modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use, $152,960
2021-06-21Job filed: Mechanical modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use,$1,281,280
2021-06-21Job filed: Plumbing modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use, e$298,080
2021-06-20DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
2021-06-17Job filed: Structural modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use,$557,120
2021-06-17Job filed: General construction modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No chan$9,341,600
2021-06-15Job filed: USE OF BUILDING MAINTENANCE UNIT FOR EXTERIOR BUILDING MAINTENANCE.$49,980
2021-06-11311: Illegal Parking — Blocked Bike Lane
2021-06-10311: Illegal Parking — Blocked Bike Lane
2021-06-09311: Illegal Parking — Blocked Bike Lane
2021-06-09311: Illegal Parking — Blocked Bike Lane
2021-06-08311: Illegal Parking — Blocked Bike Lane
2021-06-08311: Illegal Parking — Blocked Bike Lane
2021-06-03DOB complaint, category ?
2021-06-03DOB complaint, category ?
2021-06-02311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-06-02311: Illegal Parking — Blocked Bike Lane
2021-06-02311: Illegal Parking — Blocked Bike Lane
2021-06-02ECB CLASS - 1 violation: BC3301.1 SAFEGUARDS DURING CONST/FAILURE TO COMPLY W/OSHA STANDARDS ATO MY INSP,I OBSERVED WORKER W/I 10' OF UNENCLOSED PERIMETER/
2021-06-02ECB CLASS - 1 violation: INADEQUATE SAFETY MEASURES&STANDARDS (GUARDRAILS) ATO MY INSP,I OBSERVED DAMAGED GUARDRAIL STANCHION&LOOSE CABLES ON UNENCLOSED PE$2,500
2021-06-02ECB CLASS - 2 violation: WORK CONTRARY TO CONSTRUCTION DOCUMENTS. AT THE TIME OF MY INSPECTION,I OBSERVED SEVERAL OF THE ANCHOR PLATES ATTACHING THE SIDEWA
2021-06-02ECB CLASS - 1 violation: FAILURE TO COMPLY W/MANUFACTURER SPECS ATO MY INSP,I OBSERVED 2WORKERSON 1&9 CONST LEVELS IMPROPERLY USING AFRAME LADDERS&2WORKERS$2,500
2021-06-01Permit Plumbing — Signed-off
2021-05-26311: Street Condition — Pothole
2021-05-26311: Illegal Parking — Blocked Bike Lane
2021-05-26311: Illegal Parking — Blocked Bike Lane
2021-05-25311: Illegal Parking — Blocked Bike Lane
2021-05-20311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-05-20311: Illegal Parking — Blocked Bike Lane
2021-05-20311: Illegal Parking — Blocked Bike Lane
2021-05-20311: Illegal Parking — Blocked Bike Lane
2021-05-19311: Illegal Parking — Blocked Bike Lane
2021-05-19311: Illegal Parking — Blocked Bike Lane
2021-05-18311: Illegal Parking — Blocked Bike Lane
2021-05-17311: Illegal Parking — Blocked Bike Lane
2021-05-17311: Illegal Parking — Blocked Bike Lane
2021-05-14311: Illegal Parking — Blocked Bike Lane
2021-05-14311: Illegal Parking — Blocked Bike Lane
2021-05-10Permit EW — ISSUED
2021-05-10Permit EW — ISSUED
2021-05-06ECB CLASS - 1 violation: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT THE TIME OF RESPONDING TO AN INCIDENT WHERE THE WORKER(ERIC $2,500
2021-05-06DOB complaint, category ?
2021-05-06DOB complaint, category ?
2021-05-06Permit Mechanical Systems — Signed-off
2021-05-06Permit Mechanical Systems — Signed-off
2021-05-05311: Illegal Parking — Blocked Bike Lane
2021-05-05311: Illegal Parking — Blocked Bike Lane
2021-05-03311: Illegal Parking — Blocked Bike Lane
2021-04-30Permit EW — ISSUED
2021-04-30Permit EW — ISSUED
2021-04-29311: Illegal Parking — Blocked Bike Lane
2021-04-29Permit Plumbing — Signed-off
2021-04-28311: Illegal Parking — Blocked Bike Lane
2021-04-28311: Illegal Parking — Blocked Bike Lane
2021-04-28311: Illegal Parking — Blocked Bike Lane
2021-04-28311: Illegal Parking — Blocked Bike Lane
2021-04-26311: Illegal Parking — Blocked Bike Lane
2021-04-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-04-26311: Illegal Parking — Blocked Bike Lane
2021-04-26311: Illegal Parking — Blocked Bike Lane
2021-04-26311: Illegal Parking — Blocked Bike Lane
2021-04-26Permit EQ — ISSUED
2021-04-23311: Illegal Parking — Blocked Bike Lane
2021-04-23311: Illegal Parking — Blocked Bike Lane
2021-04-22311: Illegal Parking — Blocked Bike Lane
2021-04-22311: Illegal Parking — Blocked Bike Lane
2021-04-21311: Illegal Parking — Blocked Bike Lane
2021-04-21311: Illegal Parking — Blocked Bike Lane
2021-04-20311: Illegal Parking — Blocked Bike Lane
2021-04-20311: Illegal Parking — Blocked Bike Lane
2021-04-20311: Illegal Parking — Blocked Bike Lane
2021-04-20Job filed: Plumbing work taking place on floors 19, 20 and 21 as per plans filed herewith. No change in use, egress or occupancy.$316,725
2021-04-20Job filed: INSTALLATION OF A TEMPORARY SHORING SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SHORING SYSTEM TO C
2021-04-20Job filed: INSTALLATION OF A TEMPORARY SHORING SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SHORING SYSTEM TO C
2021-04-20Job filed: INSTALLATION OF A TEMPORARY SHORING SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SHORING SYSTEM TO C
2021-04-19311: Illegal Parking — Blocked Bike Lane
2021-04-19Permit Structural — Signed-off
2021-04-19Permit Mechanical Systems — Signed-off
2021-04-19Permit Mechanical Systems — Signed-off
2021-04-16ECB CLASS - 2 violation: FAILRUE TO MAINTAIN SAFETY MEASURES ATOI I OBSERVED FLATBED TRUCK OF SAFEWAY ATLANTIC WHERE MIKE CHARON WAS WORKING&FELL FROM TRUC
2021-04-16DOB complaint, category ?
2021-04-16Permit EW — ISSUED
2021-04-16Permit EW — ISSUED
2021-04-16Permit EW — ISSUED
2021-04-15311: Illegal Parking — Blocked Bike Lane
2021-04-15Permit Sprinklers — Signed-off
2021-04-15Permit Sprinklers — Signed-off
2021-04-14Job filed: Plumbing work taking place on floors 19, 20 and 21 as per plans filed herewith. No change in use, egress or occupancy.$316,725
2021-04-13Permit Structural — Signed-off
2021-04-12311: Illegal Parking — Blocked Bike Lane
2021-04-09311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2021-04-09DOB complaint, category ?
2021-04-07Job filed: Structural modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use,$235,012
2021-03-31311: Illegal Parking — Blocked Bike Lane
2021-03-27ECB CLASS - 1 violation: FAILURE TO COMMUNICATE REQUIRED INFORMATION TO WORKERS DURING PRESHIFTSAFETY MEETING.NOTE AT THE TIME OF MY INSPECTION RESPONDING
2021-03-27ECB CLASS - 1 violation: FAILURE TO COMPLY WITH MANUFACTUER SPECIFICATIONS.NOTE AT THE TIME OF MY INSPECTION,RESPONDING TO AN INCIDENT WHERE SITE SAFETY MA
2021-03-27DOB complaint, category ?
2021-03-26311: Illegal Parking — Blocked Bike Lane
2021-03-26311: Illegal Parking — Blocked Bike Lane
2021-03-25311: Illegal Parking — Posted Parking Sign Violation
2021-03-25311: Illegal Parking — Blocked Bike Lane
2021-03-25311: Illegal Parking — Blocked Bike Lane
2021-03-25Job filed: STANDPIPE WORK FROM THE 4TH TO THE 17TH FLOOR CONSTRUCTION (9TH TO 23TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPAN$160,000
2021-03-23311: Illegal Parking — Blocked Bike Lane
2021-03-23311: Illegal Parking — Blocked Bike Lane
2021-03-23311: Illegal Parking — Blocked Bike Lane
2021-03-19311: Illegal Parking — Blocked Bike Lane
2021-03-19311: Illegal Parking — Blocked Bike Lane
2021-03-18Permit Plumbing — Signed-off
2021-03-16Permit Plumbing — Signed-off
2021-03-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-03-12311: Illegal Parking — Blocked Bike Lane
2021-03-10311: Illegal Parking — Blocked Bike Lane
2021-03-10Job filed: SPRINKLER WORK ON THE 4TH-6TH FL CONSTRUCTION (9-11FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,104,370
2021-03-10Job filed: MECHANICAL WORK FROM THE 3RD-6TH FLOOR CONSTRUCTION (8-11 FLOOR MARKETING) NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,739,406
2021-03-10Job filed: PLUMBING WORK ON THE 3RD-6TH FL CONSTRUCTION (8TH-11TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,460,997
2021-03-05311: Illegal Parking — Blocked Bike Lane
2021-03-05311: Illegal Parking — Blocked Bike Lane
2021-03-03311: Illegal Parking — Blocked Bike Lane
2021-03-03311: Illegal Parking — Blocked Bike Lane
2021-03-02Permit Mechanical Systems — Signed-off
2021-03-02Permit Mechanical Systems — Signed-off
2021-03-02Permit EQ — ISSUED
2021-02-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-02-26311: Illegal Parking — Blocked Bike Lane
2021-02-26311: Illegal Parking — Blocked Bike Lane
2021-02-26Permit Structural — Signed-off
2021-02-26Permit Structural — Signed-off
2021-02-25Permit EW — ISSUED
2021-02-24311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-02-24311: Illegal Parking — Blocked Bike Lane
2021-02-09Elevator permit: Request temporary use of the elevator for construction. Section 5.10-2000) Attendant running construction car w/ communications. A$5,000
2021-02-03Permit EW — ISSUED
2021-02-02Elevator permit: Furnish and install (1) gearless traction passenger elevators with Class C1 loading. All work to comply with ASME A17.1 2000-03 as$366,233
2021-01-29311: Illegal Parking — Blocked Bike Lane
2021-01-29ECB CLASS - 1 violation: FAILURE TO INSTITUTE&MAINTAIN SAFETY MEASURES.NOTE:@TIME OF INSPECTIONOF 42STY NEW BLDG CONSTRUCTION RESPONDING TO COMPLAINT OF WO$5,000
2021-01-29DOB complaint, category ?
2021-01-29Permit EW — ISSUED
2021-01-27DOB complaint, category ?
2021-01-26Permit Protection and Mechanical Methods — Signed-off
2021-01-25Job filed: INSTALLATION OF TEMPORARY ROOF PROTECTION AT THE ADJACENT PROPERTY. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. $26,400
2021-01-21Permit Structural — Signed-off
2021-01-21Permit Supported Scaffold — Permit Issued
2021-01-19Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD WORK PLATFORMS AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAF$5,000
2021-01-15Permit EQ — ISSUED
2021-01-15Permit EQ — ISSUED
2021-01-11Permit PL — ISSUED
2021-01-08Permit Mechanical Systems — Signed-off
2021-01-05Certificate of occupancy Temporary
2020
2020-12-28Permit EW — ISSUED
2020-12-28Permit EW — ISSUED
2020-12-28Permit EW — ISSUED
2020-12-23Permit Sprinklers — Signed-off
2020-12-23Permit Plumbing — Signed-off
2020-12-16Permit EW — ISSUED
2020-12-16Permit EW — ISSUED
2020-12-16Permit EW — ISSUED
2020-12-16Permit EW — ISSUED
2020-12-10DOB complaint, category ?
2020-12-10DOB complaint, category ?
2020-12-09311: Illegal Parking — Blocked Bike Lane
2020-12-09311: Illegal Parking — Blocked Bike Lane
2020-12-09ECB CLASS - 1 violation: FAILURE TO MAINTAIN/DISPLAY ON SITE DRAWINGS/DOCUMENTS REQUIRED BY CHAPTER 33. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 42
2020-12-09ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A$2,500
2020-12-09ECB CLASS - 1 violation: SEC. 3314.4.5.4 UNQUALIFIED PRESHIFT INSPECTOR/PERSON FOR SUSPENDED SCAFFOLD.. AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 42 $2,500
2020-12-02Permit EW — ISSUED
2020-12-02Permit EW — ISSUED
2020-12-01311: Illegal Parking — Blocked Bike Lane
2020-12-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-12-01311: Illegal Parking — Blocked Bike Lane
2020-11-30311: Illegal Parking — Blocked Bike Lane
2020-11-30311: Illegal Parking — Blocked Bike Lane
2020-11-30311: Illegal Parking — Blocked Bike Lane
2020-11-25Permit EQ — ISSUED
2020-11-20311: Illegal Parking — Blocked Bike Lane
2020-11-20311: Illegal Parking — Blocked Bike Lane
2020-11-18Permit EW — ISSUED
2020-11-09DOB complaint, category ?
2020-11-09Permit Mechanical Systems — Signed-off
2020-11-08Permit EW — ISSUED
2020-11-06311: Noise - Residential — Banging/Pounding
2020-11-03Elevator permit: All work to comply with ASME A17.1 2000-03 as amended by Chapter 30 and Appendix K 1 to 4 with 2014 changes. Furnish and install ($665,588
2020-10-31311: Non-Residential Heat — Inadequate or No Heat
2020-10-29311: Noise - Residential — Banging/Pounding
2020-10-22Job filed: OCCUPANT PROTECTION PLAN$1,000
2020-10-22Job filed: OCCUPANT PROTECTION PLAN$1,000
2020-10-21Permit EW — ISSUED
2020-10-15Job filed: TENANT PROTECTION PLAN AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121333921.$1,000
2020-10-15Job filed: TENANT PROTECTION PLAN AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH NB-121333921.$1,000
2020-10-10ECB CLASS - 1 violation: FAILURE TO INSTITUTE AND MAINTAIN SAFE OPERATIONS. NOTE-AT THE TIME OFMY INSPECTION,RESPONDING TO INCIDENT(COMPLAINT#1555300) WHER
2020-10-10ECB CLASS - 1 violation: PERMIT HOLDER FAILED TO ENSURE WORKER ATTEND PRESHIFT SAFETY MEETING PRIOR TO COMMENCEMENT OF WORK. NOTE=AT THE TIME OF MY INSPECT
2020-10-10DOB complaint, category ?
2020-10-08Permit EW — ISSUED
2020-10-07Permit EQ — ISSUED
2020-09-29ECB CLASS - 2 violation: SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARE
2020-09-29Permit EQ — ISSUED
2020-09-21Permit NB — ISSUED
2020-09-21Permit EW — ISSUED
2020-09-11Permit PL — ISSUED
2020-09-10Permit EW — ISSUED
2020-09-09Permit EW — ISSUED
2020-09-04Permit EW — ISSUED
2020-09-04Permit EW — ISSUED
2020-09-04Permit EW — ISSUED
2020-09-03Permit Sprinklers — Signed-off
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-09-02DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020-08-21Job filed: Structural work taking place on the 20th floors per plans filed herewith. No change in use, egress or occupancy.$771,825
2020-07-31Agreement $100,000,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP$100,000,000
2020-07-31Agreement $104,900,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP$104,900,000
2020-07-31Agreement $351,500,000 — from 425 PARK OWNER LLC to MASSACHUSETTS MUTUAL LIFE INSURANCE COMP$351,500,000
2020-07-30Permit EQ — ISSUED
2020-07-16311: Illegal Parking — Blocked Bike Lane
2020-07-14Job filed: PLUMBING WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$558,089
2020-07-14Job filed: PLUMBING WORK ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$101,875
2020-07-14Job filed: PLUMBING WORK ON 10-17TH FLOORS CONSTRUCTION (16-23 FLOORS MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$1,484,150
2020-07-14Job filed: SPRINKLER WORK ON THE 40TH FL CONSTRUCTION (46TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.$102,915
2020-07-14Job filed: STRUCTURAL WORK ON THE 4TH-6TH FLOORS CONSTRUCTION (9-11TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,417,529
2020-07-14Job filed: MECHANICAL WORK ON FLOORS 10-17 CONSTRUCTION (16-23 MARKETING FLOORS) AS PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$12,371,257
2020-07-14Job filed: SPRINKLER WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$369,000
2020-07-14Job filed: PLUMBING WORK ON THE 3RD-6TH FL CONSTRUCTION (8TH-11TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,460,997
2020-07-14Job filed: SPRINKLER WORK ON THE 10-17TH FLOORS CONSTRUCTION (16-23RD FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$889,601
2020-07-14Job filed: MECHANICAL WORK FROM THE 3RD-6TH FLOOR CONSTRUCTION (8-11 FLOOR MARKETING) NO CHANGE IN USE EGRESS OR OCCUPANCY.$10,739,406
2020-07-14Job filed: MECHANICAL WORK ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,OR OCCUPANCY.$1,035,861
2020-07-14Job filed: MECHANICAL WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$3,205,698
2020-07-14Job filed: STRUCTURAL WORK ON THE 10-17TH FLOOR CONSTRUCTION (16-23TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$448,000
2020-07-14Job filed: SPRINKLER WORK ON THE 4TH-6TH FL CONSTRUCTION (9-11FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.$1,104,403
2020-07-10Permit EQ — ISSUED
2020-07-10Permit EQ — ISSUED
2020-07-07ECB CLASS - 1 violation: USE AND TEMPERING PROHIBITED.NOTE:AT THE TIME OF INCIDENT/ACCIDENT TYPE INSPECTION.AS PER SSM(SITE SAFETY MANEGER)WOKER JACKSON MO$625
2020-07-07DOB complaint, category ?
2020-06-22DOB complaint, category ?
2020-06-16Job filed: INSTALLATION AND USE OF A SPYDER CRANE AS PER PLANS SUBMITTED. SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INV
2020-06-09311: Noise — Noise: Jack Hammering (NC2)
2020-06-09Job filed: INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU) CONSTRUCTION EQUIPMENT FOR GLASS AND METAL PANEL REPLACEMENT AND GENERAL REPAIR WORK, AS PER P
2020-06-09Job filed: INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU) CONSTRUCTION EQUIPMENT FOR GLASS AND METAL PANEL REPLACEMENT AND GENERAL REPAIR WORK, AS PER P
2020-06-04311: Consumer Complaint — Hotel
2020-06-04Job filed: GENERAL CONSTRUCTION ON 7TH THRU 9TH FL CONSTRUCTION (12,14,15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$15,181,240
2020-06-04Job filed: GENERAL CONSTRUCTION ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$4,101,231
2020-06-04Job filed: STRUCTURAL WORK ON THE 7TH-9TH FL CONSTRUCTION (12,14,15 MARKETING FLOORS) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$731,376
2020-06-04Job filed: STRUCTURAL WORK ON THE 40TH FL CONSTRUCTION (46TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$72,993
2020-06-02Permit EQ — ISSUED
2020-06-01Job filed: GENERAL CONSTRUCTION ON THE 3RD-18TH FLOORS. CONSTRUCTION (8TH-24TH FLOOR MAR KETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$39,197,259
2020-06-01Job filed: GENERAL CONSTRUCTION ON THE 10TH-17TH FLOOR CONSTRUCTION (16-23 FLOOR MARKETING)AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$32,927,375
2020-06-01Job filed: GENERAL CONSTRUCTION ON THE 3RD-18TH FLOORS. CONSTRUCTION (8TH-24TH FLOOR MAR KETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$39,197,259
2020-06-01Job filed: GENERAL CONSTRUCTION ON THE 10TH-17TH FLOOR CONSTRUCTION (16-23 FLOOR MARKETING)AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$32,927,375
2020-05-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2020-05-11DOB complaint, category ?
2020-04-29Permit EW — ISSUED
2020-04-14DOB violation C: .EMERGENCY WORK ORDER: EMERGENCY WORK ORDER TO ALLOWED THE REPAOR OF THE ROPE SECURING THE SUSPENDED SCAFFOLD ON THE ELEVATION ON
2020-04-14DOB complaint, category ?
2020-04-13ECB CLASS - 2 violation: FAIL TO MAINTAIN SAFE OPERATIONS. AT TIME OF COMP/INCIDENT INSPECTION I OBSERVED 42 STY BLDG TOPPED OFF W/MULTIPLE SUSPENDED SCAFF
2020-04-13DOB complaint, category ?
2020-03-18RPTT&RET $1,175,000 — from ORFANELLI SUVEYKE, SHIRA to HUTCHINSON, LUCY; ZHAO, CHENG$1,175,000
2020-03-18ECB CLASS - 1 violation: FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT.AT TIME OF MYINSPECTION OF AN NB AT 42 STY ACTIVE JOBSITE.IN RESPONSE TO
2020-03-18DOB complaint, category ?
2020-03-12Sold for $1,175,000$1,175,000
2020-03-12311: Noise — Noise: Construction Equipment (NC1)
2020-03-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2020-03-07ECB CLASS - 1 violation: FAILURE TO MAINTAIN SAFE OPERATIONS. NOTE: AT THE TIME OF MY INSPECTION RESPONDING TO AN INCIDENT(COMPLAINT#1538276)WHERE THE SITE$10,000
2020-03-07DOB complaint, category ?
2020-03-06311: Water System — Leak (Use Comments) (WA2)
2020-03-05311: Emergency Response Team (ERT) — After Hours Work - Illegal
2020-03-05DOB complaint, category ?
2020-03-05Permit EQ — ISSUED
2020-03-02ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.NOTE:AT TIME OF INSPECTION I OBSERVED YODOCK SYST
2020-03-02ECB CLASS - 1 violation: FAILURE TO COMPLY WITH MANUFACTURER SPECIFICATIONS.NOTE:AT TIME OF INSPECTION I OBSERVED YODOCKS ONSITE THAT DID NOT COMPLY WITH S
2020-03-02DOB complaint, category ?
2020-02-26DOB complaint, category ?
2020-02-26DOB complaint, category ?
2020-02-25DOB complaint, category ?
2020-02-14DOB complaint, category ?
2020-02-11DOB complaint, category ?
2020-02-10FDNY inspection (CDA-90-DRILL)
2020-02-10Job filed: Plumbing work taking place on floors 19, 20 and 21 as per plans filed herewith. No change in use, egress or occupancy.$316,725
2020-02-10Job filed: Sprinkler work as per plans filed herewith. No change in use, egress or occupancy.$53,150
2020-02-10Job filed: Mechanical work taking place on the 20th and 21st floors (26th and 27th floors marketing) as per plans filed herewith. No change in use, egress or occ$810,693
2020-02-10DOB complaint, category ?
2020-02-10DOB complaint, category ?
2020-02-03Job filed: ENERGY LIGHTING CALCULATIONS FOR ASSOCIATED GENERAL CONSTRUCTION.$1,000
2020-02-03Job filed: GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 19TH, 20TH AND 21ST FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$2,839,473
2020-02-03Job filed: ENERGY LIGHTING CALCULATIONS FOR ASSOCIATED GENERAL CONSTRUCTION.$1,000
2020-02-03Permit EQ — ISSUED
2020-01-28DOB complaint, category ?
2020-01-20Job filed: Sprinkler work taking place on the ground floor as per plans filed herewith. No change in use, egress or occupancy.$1,800
2020-01-20Permit PL — ISSUED
2020-01-18311: Illegal Parking — Blocked Bike Lane
2020-01-14Permit EW — ISSUED
2020-01-13Elevator permit: All work to comply with ASME A17.1 2000-03 as amended by Chapter 30 and Appendix K 1 to 4 with 2014 changes. Furnish and install ($665,588
2020-01-09Permit EW — ISSUED
2020-01-09Permit EW — ISSUED
2020-01-09Permit EW — ISSUED
2020-01-07ECB CLASS - 1 violation: SEC. 3301.8 FAILURE TO PROMPTLY NOTIFY THE DEPT OF AN ACCIDENT OR DAMAGE. NOTE: AT THE TIME OF MY INSPECTION OF 42 STY BLDG WHERE $2,500
2020-01-07ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSON & PROPERTY AFFECTED BY CONSTRUCTION OPERATION. NOTE: AT THE TIME OF MY INSPECTION OF AN ACTIVE CON$5,000
2020-01-07ECB CLASS - 1 violation: SITE SAFETY MANAGER/COORDINATOR FAILED TO IMMEDIATELY NOTIFY OF DEPT OF CONDITION NOTE: AT THE TIME OF MY INSPECTION RESPONDING TO
2020-01-07ECB CLASS - 1 violation: SEC. 3310.8.4.1 FAILURE TO MAINTAIN ADEQUATE LOGS. NOTE: AT THE TIME OF MY INSPECTION RESPONDING TO A COMPLAINT WHERE AN INDIVIDUA$6,250
2020-01-07ECB CLASS - 1 violation: BC33018-FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT AT CONSTRUCTION SITE.NOTE:AT THE TIME OF MY INSPECTION RESPONDING
2020-01-07ECB CLASS - 1 violation: SITE SAFETY MANAGER/COORDINATOR FAILED TO IMMEDIATELY NOTIFY THE DEPT OF CONDITIONS. NOTE: AT THE TIME OF MY INSPECTION RESPONDING$6,250
2020-01-07DOB complaint, category ?
2019
2019-12-17Permit Supported Scaffold — Signed-off
2019-12-16ECB CLASS - 1 violation: FAILURE TO NOTIFY THE DEPT OF AN ACCIDENT OR INCIDENT THAT RESULTED INA FATALITY OR INJURY. NOTE:A WORKER WAS MOVING A GANG BOX FR$1,250
2019-12-13311: Lost Property — Bag/Wallet
2019-12-11Job filed: GENERAL CONSTRUCTION WORK TAKING PLACE IN THE SUBCELLAR, CELLAR,LOBBY,3RD THRU 19TH FLS,20TH FL & 22ND THRU 41ST FLS AS PER PLANS FILED HEREWITH. $1,000,000
2019-12-09AL&R $201,500,000 — from 425 PARK AVE GROUND OWNER LLC to AMERICAN GENERAL LIFE INSURANCE COMPANY; UNITED STATES LIFE INSURANCE COMPANY IN ; VARIABL$201,500,000
2019-12-09Deed $616,755,253 — from T-C 425 PARK AVENUE, LLC to 425 PARK AVE GROUND OWNER LLC$616,755,253
2019-12-09Mortgage $201,500,000 — from 425 PARK AVE GROUND OWNER LLC to AMERICAN GENERAL LIFE INSURANCE COMPANY; UNITED STATES LIFE INSURANCE COMPANY IN ; VARIABL$201,500,000
2019-12-05DOB complaint, category ?
2019-12-03311: Non-Residential Heat — Inadequate or No Heat
2019-12-03Permit EQ — ISSUED
2019-11-25Sold for $616,755,253$616,755,253
2019-11-14Permit Supported Scaffold — Signed-off
2019-11-13Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD @ 40TH FLOOR AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO$5,000
2019-11-09311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-07311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-11-04Permit EW — ISSUED
2019-11-04Permit EW — ISSUED
2019-11-04Permit EW — ISSUED
2019-10-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-10-28311: Illegal Parking — Blocked Bike Lane
2019-10-23Permit EQ — ISSUED
2019-10-22Permit EQ — ISSUED
2019-10-21Permit EW — ISSUED
2019-10-21Permit EW — ISSUED
2019-10-16311: Street Condition — Blocked - Construction
2019-10-12FDNY inspection (CDA-90-DRILL)
2019-10-10Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL$5,000
2019-10-09311: Illegal Parking — Blocked Bike Lane
2019-10-08311: Illegal Parking — Blocked Bike Lane
2019-10-08311: Illegal Parking — Blocked Bike Lane
2019-10-08DOB complaint, category ?
2019-10-01311: Illegal Parking — Blocked Bike Lane
2019-09-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-28311: Illegal Parking — Blocked Bike Lane
2019-09-27311: Illegal Parking — Blocked Bike Lane
2019-09-27Permit NB — ISSUED
2019-09-25311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-09-24Permit Supported Scaffold — Signed-off
2019-09-20Elevator permit: Installation of a Single 2000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tes$10,000
2019-09-19ECB CLASS - 1 violation: FAILURE TO NITIFY DEPARTEMNT OF AN INCIDENT THAT RESULTED IN A FATALITY OR INJURY NOTE ONE WORKER FELL FROM A FRAME LADDER THE WOR
2019-09-19Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD @ FLOORS 038 THRU 041 AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SC$5,000
2019-09-19DOB complaint, category ?
2019-09-19Permit Supported Scaffold — Signed-off
2019-09-18Elevator permit: All work to comply with ASME A17.1 2000-03 as amended by Chapter 30 and Appendix K 1 to 4 with 2014 changes. Furnish and install ($366,233
2019-09-04Permit EW — ISSUED
2019-09-03311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2019-09-03Job filed: INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS DURING N.B CONSTRUCTION FILED SEPARATELY. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH C$12,000
2019-09-03DOB complaint, category ?
2019-09-03Permit Supported Scaffold — Signed-off
2019-08-30Job filed: INSTALL THREE (3) TEMPORARY ELECTRIC BOILERS PER PLANS.$70,000
2019-08-30Job filed: INSTALL THREE (3) TEMPORARY ELECTRIC BOILERS PER PLANS.$70,000
2019-08-23Elevator permit: Installation of a Single 2000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tes$10,000
2019-08-20311: Sidewalk Condition — Broken Sidewalk
2019-08-16Permit Supported Scaffold — Signed-off
2019-08-14Permit Supported Scaffold — Signed-off
2019-08-14Permit Supported Scaffold — Signed-off
2019-08-14Permit Supported Scaffold — Signed-off
2019-07-25Elevator permit: Installation of a Single 2000 LB Capacity Personnel/Material Hoist during NB Construction, filed separately. Installations and Tes$10,000
2019-07-25Permit Supported Scaffold — Signed-off
2019-07-24Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD @ 41st FLOOR AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SH$5,000
2019-07-17Permit Supported Scaffold — Signed-off
2019-07-09311: Air Quality — Air: Odor/Fumes, Vehicle Idling (AD3)
2019-07-09Permit Supported Scaffold — Signed-off
2019-07-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2019-07-04311: Illegal Parking — Posted Parking Sign Violation
2019-07-03Job filed: INSTALLATION OF PIPE SCAFFOLDING AS PER CHAPTER 33 OF 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$7,500
2019-07-01FDNY inspection (CDA-90-DRILL)
2019-06-29311: Homeless Encampment — N/A
2019-06-23Permit Supported Scaffold — Signed-off
2019-06-21Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL$5,000
2019-06-21Permit EQ — ISSUED
2019-06-20Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS (FOR PROTECTION OF ADJACENT PROPERTY). TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH C
2019-06-18Permit EQ — ISSUED
2019-06-17Permit Supported Scaffold — Signed-off
2019-06-13Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WI$5,000
2019-06-06Permit EQ — ISSUED
2019-06-04Job filed: INSTALLATION OF SINGLE 2000 LBS CAPACITY PERSONAL/MATERIAL HOIST DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33 O
2019-06-03311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-06-03DOB complaint, category ?
2019-06-03Permit EQ — ISSUED
2019-05-31Job filed: INSTALLATION OF TEMPORARY CANTILEVERED OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY CANTILEVERED OVERHEAD PROTECTION SHALL COMPLY WITH CHAPTER #33 O
2019-05-28311: General Construction/Plumbing — Cons - Contrary/Beyond Approved Plans/Permits
2019-05-28311: General Construction/Plumbing — Failure To Maintain
2019-05-28DOB complaint, category ?
2019-05-28DOB complaint, category ?
2019-05-23311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-05-23ECB CLASS - 1 violation: 3301.7;FAILURE TO PROVIDE PER DESIGN DRAWINGS FOR WORKER FALL PROTECTION.AS NOTED:AT TIME OF INSEPCTION REPSONDING TO A CONCRETE I$2,530
2019-05-23ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION -AS NOTED:AT TIME OF INSPECTION RESPONDONG TO A CONCRETE "BLO$10,000
2019-05-23DOB complaint, category ?
2019-05-22ECB CLASS - 2 violation: 28-104.7.11;ADDITIONAL INFORMATION AS NOTED:AT TIME OF INSPECTION RESPONDING TO A CONCRETE INCIDENT WHERE CONCRETE PUMP MOSE BURST
2019-05-22ECB CLASS - 1 violation: FAILURE TO PROVIDE CONTINUOUS SPECIAL INSPECTION DURING CONCRETE PLACEMENTS. AS NOTED AT TIME OF MY INSPECTION ACTIVE SITE. 4
2019-05-21Permit EW — ISSUED
2019-05-17311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-05-17311: Illegal Parking — Blocked Bike Lane
2019-05-02Elevator permit: Furnish and install (1) gearless traction passenger elevators with Class C1 loading. All work to comply with ASME A17.1 2000-03 as$366,233
2019-04-25311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2019-04-25311: Noise — Noise: Construction Equipment (NC1)
2019-04-24Elevator permit: All work to comply with ASME A17.1 2000-03 as amended by Chapter 30 and Appendix K 1 to 4 with 2014 changes. Furnish and install ($665,588
2019-04-11Permit EQ — ISSUED
2019-04-09Permit EW — ISSUED
2019-03-28311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2019-03-28ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSON AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AT THE TIME OF INSPECTION IT WAS OBSERVED THAT TH$12,500
2019-03-28ECB CLASS - 2 violation: OBSERVED RECENT SMOKING REFUSE WITHIN CONSTRUCTION /DEMO SITE IN VIOLATION OF NYC FIRE CODE. AT THE TIME OF INSPECTION IT WAS$6,250
2019-03-28DOB complaint, category ?
2019-03-23311: Illegal Parking — Blocked Bike Lane
2019-03-21Job filed: MODDIFICATION TO EXISTING FIRE ALARM SYSTEM IN THE SUB-CELLAR (B2 MARKETING) CELLAR (B1 MARKETING), GROUND FLOOR, AND 2ND FLOOR AS PER PLANS FILED HER$107,850
2019-03-21Job filed: MODDIFICATION TO EXISTING FIRE ALARM SYSTEM IN THE SUB-CELLAR (B2 MARKETING) CELLAR (B1 MARKETING), GROUND FLOOR, AND 2ND FLOOR AS PER PLANS FILED HER$107,850
2019-03-20Job filed: SPRINKLER AND STANDPIPE WORK TAKING PLACE IN THE SUBCELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$228,345
2019-03-20Job filed: STRUCTURAL WORK TAKING PLACE IN THE CELLAR, SUBCELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$912,550
2019-03-20Job filed: ARCHITECTURAL WORK TAKING PLACE IN THE SUBCELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$7,107,075
2019-03-20Job filed: MECHANICAL AND PLUMBING WORK TAKING PLACE IN THE SUBCELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$2,760,940
2019-03-20Job filed: STRUCTURAL WORK TAKING PLACE IN THE CELLAR, SUBCELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$912,550
2019-03-20Job filed: MECHANICAL AND PLUMBING WORK TAKING PLACE IN THE SUBCELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$2,760,940
2019-03-15Permit EW — ISSUED
2019-03-13Permit EW — ISSUED
2019-03-13Permit EW — ISSUED
2019-03-13Permit EQ — ISSUED
2019-03-11FDNY inspection (CDA-90-DRILL)
2019-03-11Job filed: INSTALL (2) EMERGENCY GENERATORS AND (3) FUEL STORAGE TANKS PER PLANS.$40,000
2019-03-11Job filed: INSTALL (2) EMERGENCY GENERATORS AND (3) FUEL STORAGE TANKS PER PLANS.$40,000
2019-03-05Permit Supported Scaffold — Signed-off
2019-03-04Job filed: INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH $6,000
2019-03-02311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-25Permit EQ — ISSUED
2019-02-22311: Taxi Complaint — Driver Complaint
2019-02-17311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-16311: Noise — Noise: Construction Before/After Hours (NM1)
2019-02-01Permit PL — ISSUED
2019-01-29Permit Supported Scaffold — Signed-off
2019-01-24311: General Construction/Plumbing — Site Conditions Endangering Workers
2019-01-24ECB CLASS - 1 violation: 3301.2 HOLES NOT COVERED . AT TIME OF INSPECTION OF NEW 42 STORY BUILDING ACTIVE JOBSITE. BUILDING TOPPED OFF WITH ACTIVE CON$2,500
2019-01-24ECB CLASS - 1 violation: 3308.5 VERTICAL SAFETY CABLES/NETTING. AT IME OF INSPECTION OF NEW 42 STORY BUILDING ACTIVE JOBSITE BUILDING TOPPED OFF WITH AC$2,500
2019-01-24ECB CLASS - 1 violation: HOUSEKEEPING. AT TIME OF INSPECTION OF NEW 42 STORY BUILDING ACTIVE JOBSITE. BLDGS TOPPED OFF WITH ACTIVE CONSTRUCTION WORK ON G
2019-01-24DOB complaint, category ?
2019-01-22311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2019-01-22DOB complaint, category ?
2019-01-17Permit EQ — ISSUED
2019-01-16Job filed: INSTALLATION OF SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, O$28,000
2019-01-16Job filed: INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY TROLLEY BEAM SYSTEM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. N
2019-01-16Job filed: INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY TROLLEY BEAM SYSTEM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. N
2019-01-16Permit Supported Scaffold — Signed-off
2019-01-10Permit EQ — ISSUED
2019-01-09Job filed: INSTALLATION OF SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUP
2019-01-03Permit EQ — ISSUED
2018
2018-12-28Permit Supported Scaffold — Signed-off
2018-12-24Permit EW — ISSUED
2018-12-24Permit EW — ISSUED
2018-12-12Permit Supported Scaffold — Signed-off
2018-12-10311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2018-12-10ECB CLASS - 1 violation: CRANE USER (ROGER & SONS CONCRETE INC.) FAILED TO RENEW THE CERTIFICATE OF OPERATION/APPROVAL AND LET THE CD FOR CRANE(CD#4595) EX$5,000
2018-12-10Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2018-12-06Permit EQ — ISSUED
2018-12-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-12-05ECB CLASS - 1 violation: 3308.5 FAILURE TO INSTALL OR MAINTAIN VERTICAL SAFETY NETTING SYSTEM. AT THE TIME OF INSPECTION THE VERTICAL NETTING SYSTEM WAS NO$625
2018-12-05ECB CLASS - 1 violation: FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONAT THE TIME OF INSPECTION WHILE RESPONDING TO AN INCIDENT IT$10,000
2018-12-05DOB complaint, category ?
2018-11-30FDNY inspection (CDA-90-DRILL)
2018-11-28Job filed: INSTALLATION OF A 2 TON CHAIN FALL HOIST DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. CHAIN FALL HOIST SHALL COMPLY WITH CHAPTER #33 OF THE NYC
2018-11-28Permit EQ — ISSUED
2018-11-27311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-11-27DOB complaint, category ?
2018-11-27Permit EQ — ISSUED
2018-11-19Permit EW — ISSUED
2018-11-05Permit EQ — ISSUED
2018-11-05Permit EQ — ISSUED
2018-11-02Job filed: INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. TEMPORARY WORK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN
2018-10-29311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2018-10-29DOB complaint, category ?
2018-10-27311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2018-10-27ECB CLASS - 1 violation: FAIL TO PERFORM HYDROSTATIC PRESSURE TEST STANDPIPE NOTE: AT THE TIME OF MY INSPECTION OF A 42 STORY BUILDING AT 42ND FLOOR LEVEL $2,500
2018-10-27ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS. NOTE AT THE TIME OF MY INSPECTION OF A 42 STO$625
2018-10-27DOB complaint, category ?
2018-10-26Permit EW — ISSUED
2018-10-25Permit EQ — ISSUED
2018-10-23Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$82,000
2018-10-23Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$82,000
2018-10-23Job filed: GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$82,000
2018-10-16Job filed: CONTRACTOR'S SHED BEING INSTALLED ON THE 4TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2018-10-16Job filed: CONTRACTOR'S SHED BEING INSTALLED ON THE 4TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2018-10-16Permit EQ — ISSUED
2018-10-15ECB CLASS - 2 violation: FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQU
2018-10-12Permit NB — ISSUED
2018-09-26Job filed: BL WORK TYPE FILED FOR BOILERS IN NEW BUILDING FILED UNDER 121333921. ALL PLUMBING AND GENERAL CONSTRUCTION FILED UNDER 121333921. ALL FILING FEES PA$10,000
2018-09-26Job filed: BL WORK TYPE FILED FOR BOILERS IN NEW BUILDING FILED UNDER 121333921. ALL PLUMBING AND GENERAL CONSTRUCTION FILED UNDER 121333921. ALL FILING FEES PA$10,000
2018-09-26Permit NB — ISSUED
2018-09-25Permit FO — ISSUED
2018-09-24ECB CLASS - 2 violation: RESPONDENT FAILED TO MAKE THE PROPER NOTIFICATION FOR MOBILE CRANE AFTER MAY 1,2018 TO THE DEPARTMENT.AT TIME OF INSPECTION NO MOB$5,000
2018-09-20Permit EQ — ISSUED
2018-09-20Permit EQ — ISSUED
2018-09-05311: Sidewalk Condition — Blocked - Construction
2018-09-05Job filed: Temporary Interior Contractor's Shanty/Shed on the 3rd and 4th Floors as per drawings filed herewith. No change in use, egress, or occupancy.$1,000
2018-08-29311: Blocked Driveway — No Access
2018-08-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-08-29DOB violation C:
2018-08-29DOB violation C:
2018-08-29ECB CLASS - 1 violation: FAILURE TO MAINTAIN SAFE OPERATIIONS. IN RESPONSE TO AN INCIDENT INVOLVING A WORKER STRIPPING CONCRETE FORM AND INJURING A WORKER$10,000
2018-08-29ECB CLASS - 1 violation: 3301.6 (DESIGN DRAWINGS)(PLATFORM)AT TIME OF INSPECTION I OBSERVED A TEMPORARY PLATFORM CONSISTING OF ( )BEAMS AND SHORING WIT
2018-08-29DOB complaint, category ?
2018-08-27FDNY inspection (CDA-90-DRILL)
2018-08-15311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-08-15DOB complaint, category ?
2018-08-13Permit EQ — ISSUED
2018-08-10Job filed: INSTALLATION OF SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUP
2018-08-10Job filed: INSTALLATION OF SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUP
2018-07-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
2018-07-30311: Street Condition — Pothole
2018-07-27Permit EQ — ISSUED
2018-07-24Job filed: INSTALLATION OF ONE MAN BASKET FOR SHAFT HOIST MODIFICATION AS PER DRAWING. HOIST FILED UNDER SEPARATE APPLICATION. HOIST SHALL COMPLY WITH CHAPTER #3
2018-07-24Job filed: INSTALLATION OF ONE MAN BASKET FOR SHAFT HOIST MODIFICATION AS PER DRAWING. HOIST FILED UNDER SEPARATE APPLICATION. HOIST SHALL COMPLY WITH CHAPTER #3
2018-07-24Job filed: INSTALLATION OF ONE MAN BASKET FOR SHAFT HOIST MODIFICATION AS PER DRAWING. HOIST FILED UNDER SEPARATE APPLICATION. HOIST SHALL COMPLY WITH CHAPTER #3
2018-07-18311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-07-18DOB complaint, category ?
2018-07-13Permit EQ — ISSUED
2018-07-11311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2018-07-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. TEMPORARY OVERHEAD PROTECTION SHALL
2018-07-11Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. TEMPORARY OVERHEAD PROTECTION SHALL
2018-07-11DOB complaint, category ?
2018-07-10ECB CLASS - 1 violation: BC 3304.7 REQUIRED MEANS OF EGRESS.@TIME OF INSP OF NEW 42 STORY BLDG ACTIVE JOBSITE BLDG @29 STORY.I OBSERVED EGRESS WAS BLOCKED $2,500
2018-07-10ECB CLASS - 1 violation: BC 3301.2 HOLES NOT COVERED @TIME OF INSP OF NEW 42 STORY BLDG ACTIVE JOBSITE I OBSERVED NUMEROUS HOLES ON NUMEROUS FLOORS @ DIFFE$2,500
2018-07-10ECB CLASS - 1 violation: GUARDRAILS (MISSING INADEQUATE) @TIME OF INSP OF NEW 42 STORY BLDG ACTIVE JOBSITE BLDG @29 STORY. I OBSERVED INADEQUATE GUARDRAIL $2,500
2018-07-10ECB CLASS - 1 violation: HOUSEKEEPING.@TIME OF INSP OF NEW 42 STORY BLDG ACTIVE JOBSITE BLDG @29 STORY I OBSERVED INADEQUATE HOUSEKEEPING @LEADING EDGE OF $2,500
2018-07-10ECB CLASS - 1 violation: BC 3308.5 VERTICAL SAFETY NETTING SYSTEMS @TIME OF INSP OF NEW 42 STORY BLDG ACTIVE JOBSITE.BLDG @ 29 STORY I OBSERVED VERTICAL NE$2,500
2018-07-10ECB CLASS - 1 violation: GUARDRAILS (MISING INADEQUATE) @TIME OF INSP OF 42 STORY NEW BLDG ACTIVE JOBSITE.BLDG @ 29 STORY I OBSERVED GUARDRAILS @VARIOUS LO
2018-07-10ECB CLASS - 1 violation: TOE BOARDS.@TIME OF INSP OF NEW 42 STORY BLDG ACTIVE JOBSITE BLDG @29 STORY I OBSERVED INADEQUATE GUARDRAIL SYSTEM MISSING TOE BOA$5,000
2018-07-07311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-07-07DOB violation C:
2018-07-07ECB CLASS - 1 violation: UNSAFE STORAGE OF MATERIALS @ CONSTRUCTION SITE OBSERVED, UNSAFE STORAGE OF BLDG MATERIALS @ LEADING EDGE OF BLDG THROUGHOUT SITE $2,500
2018-07-07ECB CLASS - 1 violation: SEC. 3301.2 FAILURED TO MAINTAIN(CONTROL ACCESS ZONE)OBSERVED ACTIVE CONSTRUCTION SITE NO (CAZ)IN PLACE AT FLOORS WHERE INSTALLATI$2,500
2018-07-07ECB CLASS - 1 violation: INADEQUATE HOUSEKEEPING. OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT SITE CONSISTING OF DEBRIS @ LEADING EDGE MATERIALS @ LEADING $2,500
2018-07-07DOB violation C:
2018-07-07DOB violation C:
2018-07-07DOB violation C:
2018-07-07ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PUBLIC & PROPERTY IN RESPONSE TO AN INCIDENT WHERE IT WAS REPORTED TO ME BY SSM THAT A WORKER HAD STEPPED ON $10,000
2018-07-07ECB CLASS - 1 violation: UNSECURED RESHORES @ LEADING EDGE, OBSERVED RESHORES @ LEADING EDGE @ EXP#4&1 WERE UNSECURED @ TIME OF INSP @ FLRS 25,26,27 ALSO O$2,500
2018-07-07DOB complaint, category ?
2018-07-02Job filed: INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM ON THE 5TH AND 9TH FLOORS (10TH FLOOR AND 15TH MARKETING FLOORS) AS PLANS FILED HEREWITH. NO CHANGE IN USE$120,000
2018-07-02Job filed: INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM ON THE 5TH AND 9TH FLOORS (10TH FLOOR AND 15TH MARKETING FLOORS) AS PLANS FILED HEREWITH. NO CHANGE IN USE$120,000
2018-06-29Job filed: NEW JOB DESCRIPTION: INSTALLATION OF AUTOMATIC SMOKE AND HEAT DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT 5TH AND 9TH FLOOR CONSTRUCTION ( 10T$15,000
2018-06-29Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PER PLANS FILED $3,750
2018-06-29Job filed: NEW JOB DESCRIPTION: MODIFICATIONS TO EXISTING CLASS E FIRE ALARM SYSTEM ON 4-7TH FLOORS CONSTRUCTION(9-12TH FL MARKETING) AND 8TH-17 TH FL CONSTRUCTI$110,000
2018-06-29Job filed: NEW JOB DESCRIPTION: MODIFICATIONS TO EXISTING CLASS E FIRE ALARM SYSTEM ON SUB-CELLAR, CELLAR, 4-7TH FLOORS CONSTRUCTION(9-12TH FL MARKETING) AND 8TH$110,000
2018-06-29Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PER PLANS FILED $3,750
2018-06-29Job filed: NEW JOB DESCRIPTION: INSTALLATION OF AUTOMATIC SMOKE AND HEAT DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT 5TH AND 9TH FLOOR CONSTRUCTION ( 10T$15,000
2018-06-29Job filed: INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER SYSTEM AT 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PER PLANS FILED $3,750
2018-06-28Job filed: GENERAL CONSTRUCTION ON THE 4-7TH FL CON (9-12 MARK)8-17TH FL CON (14-23 MARK) AND 40-41ST FL (46-47 MARK) AS PER PLANS FILED HEREWITH NO CHANGE IN US$910,000
2018-06-28Job filed: SPRINKLER WORK ON THE 4TH-17TH FLOOR CONSTRUCTION (9TH-23RD FLOOR MARKETING) PLANS FILED HEREWITH, NO CHANGE IN USE. EGRESS, OR OCCUPANANCY. UPANANCY$198,000
2018-06-28Job filed: STRUCTURAL WORK ON THE 4-7 FL CON (9-12 MARK), 8-17TH FL CON (14-23 MARK() AND 40-41TH MARK) AS PLANS FILED HEREWITH NO CHANGE I USE, EGRESS, OR OCCU$86,000
2018-06-28Job filed: MECHANICAL WORK ON THE 3RD-17TH FLOOR CONSTRUCTION (8FL-12FL, 14-23 MARKETING) AND PLUMBING WORK ON 3RD-7TH FL AND 8-17 (8-12TH AND 14-23 FLOORS MARK$7,485,000
2018-06-28Job filed: STRUCTURAL WORK ON THE 4-7 FL CON (9-12 MARK), 8-17TH FL CON (14-23 MARK() AND 40-41TH MARK) AS PLANS FILED HEREWITH NO CHANGE I USE, EGRESS, OR OCCU$86,000
2018-06-28Job filed: MECHANICAL WORK ON THE 3RD-17TH FLRS AND 40-41ST FLOORS CONSTRUCTION (8TH FL- 12FL, 14-23, 46-47 MARKETING) & PLUMBING WORK 3RD-7TH FLRS & 8-1$7,485,000
2018-06-28Job filed: SPRINKLER WORK ON THE CEL (B1 MARKETING FL) 4TH-17TH FLOOR CONSTRUCTION (9TH-2 3RD FLOOR MARKETING) AS PLANS FILED HEREWITH, NO CHANGE IN USE. EGRESS,$198,000
2018-06-15311: Sidewalk Condition — Blocked - Construction
2018-06-14Permit NB — ISSUED
2018-06-11Permit EQ — ISSUED
2018-06-11Permit FO — ISSUED
2018-06-11Permit EQ — ISSUED
2018-06-05Job filed: STORAGE OF MATERIAL/ EQUIPMENT ON TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION FILED UNDER SEPARATE APPLICATION. STORA
2018-06-05Job filed: INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. TEMPORARY OVERHEAD PROTECTION SHALL
2018-06-05DOB complaint, category ?
2018-05-29311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-27FDNY inspection (CDA-90-DRILL)
2018-05-21311: Plumbing — Gas Utility Referral
2018-05-21DOB complaint, category ?
2018-05-15Agreement — from NYC DEPARTMENT OF TRANSPORTATION to 425 PARK OWNER LLC
2018-05-11311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-05-11DOB complaint, category ?
2018-05-11Permit EW — ISSUED
2018-05-09311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-08311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-07Permit EQ — ISSUED
2018-05-04Permit EQ — ISSUED
2018-05-03311: Noise — Noise: Construction Before/After Hours (NM1)
2018-05-02311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2018-05-02Job filed: INSTALLATION OF HANGING RIGS (ONE MAN BASKETS) AS PER DRAWINGS. HANGING RIGS (ONE MAN BASKETS) SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
2018-05-02Job filed: INSTALLATION OF HANGING RIGS (ONE MAN BASKETS) AS PER DRAWINGS. HANGING RIGS (ONE MAN BASKETS) SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
2018-05-02DOB complaint, category ?
2018-05-02Permit FO — ISSUED
2018-04-30311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2018-04-30ECB CLASS - 1 violation: NO DESIGN DRAWING.AT THE TIME OF RESPONSE TO INCIDENT IN WHICH WORKER FELL THROUGH OPENING IN FLOOR FROM THE 16TH TO THE 1ST FLOOR$2,500
2018-04-30ECB CLASS - 1 violation: FAILURE TO MAINTAIN SAFETY MEASURES.AT THE TIME OF RESPONSE TO THE INCIDENT IN WHICH WORKER FELL THROUGH FLOOR OPENING FROM THE 16$10,000
2018-04-30DOB complaint, category ?
2018-04-29311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-26311: Noise — Noise: Construction Before/After Hours (NM1)
2018-04-18311: Cranes and Derricks — Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal
2018-04-18DOB complaint, category ?
2018-04-13311: Street Condition — Blocked - Construction
2018-04-09Permit EW — ISSUED
2018-04-03311: Noise — Noise: Construction Equipment (NC1)
2018-03-29Rodent inspection: Failed for Other Reason
2018-03-29311: Noise — Noise: Jack Hammering (NC2)
2018-03-27311: Noise - Residential — Banging/Pounding
2018-03-15Permit EQ — ISSUED
2018-03-12Permit NB — ISSUED
2018-03-10311: Noise — Noise: Construction Before/After Hours (NM1)
2018-03-09Air permit (REGISTRATION), fuel: NO2FUEL
2018-03-08311: Hazardous Materials — Chemical Odor (HD1)
2018-03-07FDNY inspection (CDA-90-DRILL)
2018-03-07Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2018-03-07Job filed: INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH C
2018-03-07Permit EQ — ISSUED
2018-03-07Permit EQ — ISSUED
2018-03-06311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-03-06DOB complaint, category ?
2018-03-05311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-03-05DOB complaint, category ?
2018-03-05Permit EQ — ISSUED
2018-03-05Permit EQ — ISSUED
2018-02-28Permit FO — ISSUED
2018-02-27FDNY inspection (STRUC_INT_3)
2018-02-27311: Noise — Noise: Construction Equipment (NC1)
2018-02-26311: Indoor Air Quality — Ventilation
2018-02-26311: Air Quality — Air: Smoke, Vehicular (AA4)
2018-02-24311: Noise — Noise: Construction Equipment (NC1)
2018-02-20311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-02-20DOB complaint, category ?
2018-02-12Rodent inspection: Failed for Other Reason
2018-02-05Permit PL — ISSUED
2018-01-31Permit EQ — ISSUED
2018-01-29311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2018-01-29311: General Construction/Plumbing — Site Conditions Endangering Workers
2018-01-29ECB CLASS - 1 violation: FAILURE TO MAINTAIN SAFETY MEASURES DURING CONSTRUCTION OPERATIONS. AT THE TIME OF RESPONSE TO INCIDENT/COMPLAINT #1471077 I OBSER$5,000
2018-01-29DOB complaint, category ?
2018-01-25Permit NB — ISSUED
2018-01-24Job filed: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER$32,000
2018-01-24Permit Supported Scaffold — Signed-off
2018-01-19Air permit (REGISTRATION), fuel: NO2FUEL
2018-01-08Permit EW — ISSUED
2018-01-08Permit EW — ISSUED
2017
2017-12-15Permit EW — ISSUED
2017-12-06Job filed: EAST HOISTS: INSTALLATION OF A DUAL 7000 LBS PERSONNEL/MATERIAL HOIST INCLUDING LOADING DOCK DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL
2017-12-06Job filed: EAST HOISTS: INSTALLATION OF A DUAL 7000 LBS PERSONNEL/MATERIAL HOIST INCLUDING LOADING DOCK DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. DUAL
2017-12-06Permit EQ — ISSUED
2017-12-05Permit EQ — ISSUED
2017-11-28Permit EQ — ISSUED
2017-11-16311: Taxi Complaint — Driver Complaint
2017-11-10FDNY inspection (CDA-90-DRILL)
2017-11-08Permit NB — RE-ISSUED
2017-11-03Job filed: SHAFT HOIST - INSTALLATION OF A SINGLE 5000 LBS CAPACITY PERSONAL / MATERIAL HOIST DURING NB CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH C
2017-11-03Job filed: SHAFT HOIST - INSTALLATION OF A SINGLE 5000 LBS CAPACITY PERSONAL / MATERIAL HOIST DURING NB CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH C
2017-11-03Permit EQ — ISSUED
2017-11-02Permit EW — ISSUED
2017-10-31Permit EQ — ISSUED
2017-10-30311: Food Establishment — Food Contains Foreign Object
2017-10-20311: Noise — Noise: Construction Before/After Hours (NM1)
2017-10-19311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-10-19DOB complaint, category ?
2017-10-18ECB CLASS - 1 violation: WOKR DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVEDAMENDMENTS. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY B$250
2017-10-18ECB CLASS - 1 violation: SEC. 3307.4.7 WORK & STORAGE ZONE. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY BLDG,CONSTRUCTION WORK IN PROGRESS. I OBSERVED W$1,600
2017-10-18ECB CLASS - 2 violation: FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES & TEMPORARY CONSTRUCTION. NOTE: AT THE TIME OF MY INSPECTION OF A 42 STY$5,000
2017-10-11Permit EW — ISSUED
2017-10-11Permit EQ — ISSUED
2017-10-03Permit EQ — ISSUED
2017-09-27Permit NB — ISSUED
2017-09-27Permit FO — ISSUED
2017-09-06311: Sustainability Enforcement — Sustainability Enforcement Work Order
2017-09-06DOB complaint, category ?
2017-09-06Permit NB — ISSUED
2017-08-08ECB CLASS - 1 violation: BC 3301.2 CONTRACTORS, SUBCONTRACTORS SHALL INSTITUTE AND MAINTAIN ALL SAFETY MEASURE DURING CONSTRUCTION: CAZ-NOTED-42 STORY BUIL
2017-08-08ECB CLASS - 2 violation: BC 3308.5 FAILURE TO MAINTAIN VERTICLE NETS. NOTED: 42 STORY BUILDING ERECTED TO THE 17TH FL THE VERTICLE NETTING AT EXPO #3 AT 4/$400
2017-08-08ECB CLASS - 2 violation: FAILURE TO SAFEGUARD PEOPLE, PROPERTY, THINGS. NOTE: 42 STORY BUILDING ERECTED TO THE 17TH FL. AT THE 17TH FL THERE ARE OPENING IN$5,000
2017-08-08ECB CLASS - 1 violation: FAILURE TO SAFEGUARD PERSONS, PROPERTY: LIFTING OPERATIONS NOTE: 42 STORY BUILDING ERECTED TO THE 17TH FL OBSERVED AT EXPO#1 AT PA$10,000
2017-08-06311: Noise - Commercial — Banging/Pounding
2017-07-18FDNY inspection (CDA-90-DRILL)
2017-07-18ECB CLASS - 2 violation: FAILURE TO MAITAIN EXTERIOR BLDG WALLS OR APPURTENANCES.NOTE:AT EXP#1 WEST ELEVATION SPALLED STUCCO MISSING STUCCO AT 2ND FL. SPAN
2017-06-19311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2017-06-19DOB complaint, category ?
2017-06-02Permit EQ — ISSUED
2017-05-27Rodent inspection: Bait applied
2017-05-20Rodent inspection: Bait applied
2017-05-14Rodent inspection: Bait applied
2017-05-06Rodent inspection: Bait applied
2017-05-02311: Noise — Noise: Construction Before/After Hours (NM1)
2017-05-02DOB violation BENCH: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2017-04-29Rodent inspection: Bait applied
2017-04-26Job filed: INSTALLATION OF DOKA PROTECTION SCREEN. THIS APPLICATION FILED IN CONJUNCTION WITH NB-121333921
2017-04-26Job filed: INSTALLATION OF DOKA PROTECTION SCREEN. THIS APPLICATION FILED IN CONJUNCTION WITH NB-121333921
2017-04-21Rodent inspection: Failed for Rat Activity and Other Reason
2017-04-20Permit NB — ISSUED
2017-04-12Permit EW — ISSUED
2017-04-05FDNY inspection (CDA-90-DRILL)
2017-04-04311: Street Condition — Pothole
2017-04-03Permit EW — ISSUED
2017-04-03Permit EW — ISSUED
2017-03-30Permit EQ — ISSUED
2017-03-30Permit EQ — ISSUED
2017-03-03Permit EQ — ISSUED
2017-03-03Permit EQ — ISSUED
2017-02-28Job filed: PARTIAL DEMOLITION OF EXISTING STRUCTURE FROM THE 17TH TO 1ST FLOOR AS PER PLANS FILED HEREWITH.$850,000
2017-02-28Job filed: PARTIAL DEMOLITION OF EXISTING STRUCTURE FROM THE 17TH TO 1ST FLOOR AS PER PLANS FILED HEREWITH.$850,000
2017-02-28Job filed: PARTIAL DEMOLITION OF EXISTING STRUCTURE FROM THE 17TH TO 1ST FLOOR AS PER PLANS FILED HEREWITH.$850,000
2017-02-27Rodent inspection: Failed for Rat Activity and Other Reason
2017-02-17311: Construction Safety Enforcement — Interior Demo Tracking Complaint
2017-02-17Job filed: INSTALLATION OF A 5000 LBS CAPACITY MATERIAL ONLY HOIST DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE
2017-02-17DOB complaint, category ?
2017-02-17Permit EQ — ISSUED
2017-02-17Permit NB — ISSUED
2017-02-07Permit EW — ISSUED
2017-02-07Permit EW — ISSUED
2017-02-03Permit PL — ISSUED
2017-01-25Permit EW — ISSUED
2017-01-04FDNY inspection (ABATE)
2017-01-02FDNY inspection (ABATE)
2017-01-02FDNY inspection (ABATE)
2016
2016-12-15FDNY inspection (ABATE)
2016-12-08Permit EQ — ISSUED
2016-12-06Permit DM — ISSUED
2016-12-04DOB violation C: BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR PARTIME DEMOLITI ON OF 31 STORY BUILDING APPLICATION #122144820. THE CONTRACT
2016-12-02DOB complaint, category ?
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
2016-12-01Permit EQ — ISSUED
2016-11-28Rodent inspection: Bait applied
2016-11-23Job filed: INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CH
2016-11-23Permit EQ — ISSUED
2016-11-22FDNY inspection (ABATE)
2016-11-22FDNY inspection (ABATE)
2016-11-17311: Sidewalk Condition — Blocked - Construction
2016-11-17311: Noise — Noise: Jack Hammering (NC2)
2016-11-16Permit EW — ISSUED
2016-11-14Rodent inspection: Bait applied
2016-11-14DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2016-11-11Job filed: POST DEMOLITION SHORING TO SHOW AS-BUILT CONDITIONS AND REQUIRED MODIFICATIONS FOR NEW BUILDING WORK, FILED SEPARATELY UNDER NB-121333921.$1,000
2016-11-09311: Noise — Noise: Jack Hammering (NC2)
2016-11-03311: Noise — Noise: Jack Hammering (NC2)
2016-11-02311: Noise — Noise: Construction Equipment (NC1)
2016-11-01Rodent inspection: Bait applied
2016-11-01311: Scaffold Safety — Suspended (Hanging) Scaffolds - No Pmt/Lic/Dangerous/Accident
2016-11-01ECB CLASS - 2 violation: SEC. 3307.6.4.11 SIDEWALK SHED DOES NOT MEET COLOR SPECIFICATION. NOTED: AT TIME OF INSPECTION SIDEWALK SHED PARAPET IS BLACK IN C$800
2016-11-01ECB CLASS - 2 violation: SEC. 3307.7.8 COLOR FENCES ERECTED ON OR AFTER 7/7/13 SHALL BE PAINTEDHUNTER GREEN. NOTED: AT TIME OF INSPECTON CONSTRUCTION FENCE$800
2016-11-01DOB complaint, category ?
2016-10-24Job filed: INSTALLATION OF A SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION, FILED SEPERATELY. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILD
2016-10-24Permit EQ — ISSUED
2016-10-21FDNY inspection (ABATE)
2016-10-19311: Noise - Commercial — Banging/Pounding
2016-10-19311: Noise - Commercial — Banging/Pounding
2016-10-18Rodent inspection: Failed for Rat Activity
2016-10-18311: Noise — Noise: Construction Equipment (NC1)
2016-10-14Permit FO — ISSUED
2016-10-06Permit FO — ISSUED
2016-10-05ECB CLASS - 1 violation: SEC: BC3301.1.2. FAILURE TO COMPLY W/ NYC FIRE CODE- GENERAL NO FIRE WATCH, FIRE GUARD, CERTIFICATE OF FITNESS. NOTE: @ TIME OF IN$1,600
2016-10-05ECB CLASS - 2 violation: FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTE: @ TIME OF INSP OF A 42 STORY BLDG @ DEMO PH$5,000
2016-10-05Permit NB — RE-ISSUED
2016-10-04311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-10-04DOB complaint, category ?
2016-09-26FDNY inspection (ABATE)
2016-09-13311: Asbestos — Asbestos Complaint (B1)
2016-09-09311: Noise — Noise: Construction Equipment (NC1)
2016-09-09311: Traffic — Congestion/Gridlock
2016-09-01FDNY inspection (ABATE)
2016-08-11311: Homeless Person Assistance — N/A
2016-08-05FDNY inspection (ABATE)
2016-07-30311: Illegal Parking — Double Parked Blocking Traffic
2016-07-22Rodent inspection: Failed for Rat Activity
2016-07-21311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-07-21DOB complaint, category ?
2016-07-19Job filed: GENERAL MODIFICATIONS TO CURB CUT #1 AS PER PLANS FILED HEREWITH.
2016-07-19Job filed: GENERAL MODIFICATIONS TO CURB CUT #1 AS PER PLANS FILED HEREWITH.
2016-07-19Job filed: GENERAL MODIFICATIONS TO CURB CUT #2 AS PER PLANS FILED HEREWITH.
2016-07-15311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2016-07-10FDNY inspection (ABATE)
2016-07-10FDNY inspection (ABATE)
2016-07-10FDNY inspection (ABATE)
2016-07-09311: Noise — Noise: Construction Before/After Hours (NM1)
2016-07-05FDNY inspection (ABATE)
2016-06-29FDNY inspection (ABATE)
2016-06-15FDNY inspection (ABATE)
2016-06-03FDNY inspection (ABATE)
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-06-01DOB violation EVCAT5: FAILURE TO PERFORM CATEGORY 5 INSPECTION
2016-05-19FDNY inspection (ABATE)
2016-05-19FDNY inspection (ABATE)
2016-05-19FDNY inspection (ABATE)
2016-05-19FDNY inspection (ABATE)
2016-05-18FDNY inspection (ABATE)
2016-05-04FDNY inspection (ABATE)
2016-05-02311: Street Condition — Pothole
2016-04-26Permit NB — ISSUED
2016-04-21Job filed: INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPERATELY. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WIT
2016-04-21Job filed: INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS DURING BUILDING ALTERATION, FILED SEPERATELY. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WIT
2016-04-21Permit EQ — ISSUED
2016-04-20311: Street Condition — Line/Marking - Faded
2016-04-20Permit EW — ISSUED
2016-04-15FDNY inspection (ABATE)
2016-04-15FDNY inspection (ABATE)
2016-04-13Permit EQ — ISSUED
2016-04-09311: Noise — Noise: Construction Equipment (NC1)
2016-04-09311: Emergency Response Team (ERT) — After Hours Work - Illegal
2016-04-09DOB complaint, category ?
2016-03-28Permit EQ — ISSUED
2016-03-24FDNY inspection (ABATE)
2016-03-24FDNY inspection (ABATE)
2016-03-24Permit EW — ISSUED
2016-03-21Permit EQ — ISSUED
2016-03-17FDNY inspection (STRUC_INT)
2016-03-08FDNY inspection (ABATE)
2016-03-08FDNY inspection (ABATE)
2016-03-08FDNY inspection (ABATE)
2016-03-01FDNY inspection (SPECIAL-OTH)
2016-02-25Permit EW — ISSUED
2016-02-11FDNY inspection (ABATE)
2016-02-11FDNY inspection (ABATE)
2016-02-11FDNY inspection (ABATE)
2016-02-10311: Homeless Person Assistance — No Status Call
2016-02-01311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-02-01DOB violation C:
2016-02-01ECB CLASS - 1 violation: 3301.2 SAFETY MEASURES & STANDARDS.NOT MAINTAINED.NOTE:OBSERVED ACTIVEDEMO SITE.@THE 20/21 FLS OBSERVED ACTIVE DEMO EHRE 2 MEANS O$1,600
2016-02-01ECB CLASS - 1 violation: 3308.7 FAILURE TO MAINTAIN:GUARDRAILS.NOTE:OBSERVED ACTIVE JOBSITE,DEMO IN PROGRESS (IT) 20/21 FLS.OBSERVED AIR TUGGER SYSTEM SET $1,600
2016-02-01ECB CLASS - 1 violation: WORK DOES NOT CONFORM TO APPROVED CONST DOCS &/OR APPROVED AMENDMENTS.NOTE:OBSERVED ACTIVE DEMO SITE @THE 20TH FL.OBSERVED("AIR TU$1,000
2016-02-01ECB CLASS - 2 violation: 3301.1.2 FAILURE TO COMPLY W/NYC FIRE CODE:GENERAL NO FIRE WATCH.NOTE:ACTIVE JOBSITE,DEMO IN PROGRESS @THE 5TH FL OBSERVED LOT WOR
2016-02-01DOB complaint, category ?
2016-01-29311: General Construction/Plumbing — Debris - Falling Or In Danger Of Falling
2016-01-29DOB complaint, category ?
2016-01-27311: Noise — Noise: Construction Before/After Hours (NM1)
2016-01-25Permit PL — ISSUED
2016-01-20311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2016-01-20DOB complaint, category ?
2016-01-20Permit EQ — ISSUED
2016-01-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-01-13DOB violation AEUHAZ1: FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016-01-07RPTT&RET $55,016,951 — from L & L 425 PARK INVESTORS LLC; GO 425 PARK INVESTORS, LP to L & L 425 PARK INVESTORS ALTERNATIVE LLC$55,016,951
2016-01-05FDNY inspection (ABATE)
2016-01-05FDNY inspection (ABATE)
2016-01-05FDNY inspection (ABATE)
2016-01-05311: Homeless Person Assistance — Status Call
2015
2015-12-31Permit EQ — ISSUED
2015-12-23Permit EQ — ISSUED
2015-12-23Permit EQ — ISSUED
2015-12-23Permit DM — ISSUED
2015-12-01Permit DM — ISSUED
2015-11-28DOB violation E:
2015-11-27FDNY inspection (ABATE)
2015-11-27FDNY inspection (ABATE)
2015-11-27FDNY inspection (ABATE)
2015-11-23311: Construction Safety Enforcement — Best - High-Rise Tracking Complaint
2015-11-23DOB complaint, category ?
2015-11-18DOB violation E:
2015-11-18DOB violation E:
2015-11-13FDNY inspection (STRUC_INT)
2015-11-11Job filed: USE OF EQUIPMENT AND ASSOCIATED SHORING AS PER PLANS FILED HEREWTIH.
2015-11-11Job filed: USE OF EQUIPMENT AND ASSOCIATED SHORING AS PER PLANS FILED HEREWTIH.
2015-11-09311: Homeless Encampment — N/A
2015-11-04ECB CLASS - 2 violation: COLOR OF SIDEWALK SHED NOTE:@THE TIME OF MY INSP OF A 31 STORY BLDG UNDER PARTIAL DEMO,I OBSERVED APPROX 277 LINEAR FT OF SIDEWALK$830
2015-11-04ECB CLASS - 2 violation: COLOR OF FENCE NOTE:@THE TIME OF MY INSP OF A 31 STORY BLDG UNDER DEMO,I OBSERVED APPROX 277 FT (LINEAR) OF FENCE PAINTED BLACK & $830
2015-11-04ECB CLASS - 1 violation: PROHIBITED OUTDOOR AD.CO.(OAC) SIGN ON SIDEWALK SHED.NOTE:@THE TIME OF MY INSP OF A 31 STORY BLDG UNDER DEMO,CONST WORK PROGRESS.I$10,000
2015-11-03311: Hazardous Materials — Chemical Odor (HD1)
2015-10-19311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2015-10-19DOB complaint, category ?
2015-10-17311: General Construction/Plumbing — Site Conditions Endangering Workers
2015-10-17ECB CLASS - 1 violation: HOLES/OPENING NOT COVERED UPON INSPECTION:AS NOTED AT ACTIVE DEMOLITION SITE.THERE ARE OPENINGS APPROX. 7" X 24" SURROUNDING A CHU$2,400
2015-10-17ECB CLASS - 1 violation: FAIURE TO PROVIDE(MANDATORY)TRAINING FOR EQUIPMENT.PARTIAL STOP WORK ORDER ON ALL EQUIPMENT ISSUED PURSUANT TO 28-207.2 AND POSTED$1,600
2015-10-17DOB complaint, category ?
2015-10-16FDNY inspection (DEMO)
2015-10-16FDNY inspection (ABATE)
2015-10-16FDNY inspection (ABATE)
2015-10-16FDNY inspection (ABATE)
2015-10-15FDNY inspection (ABATE)
2015-10-15FDNY inspection (DEMO)
2015-10-15FDNY inspection (ABATE)
2015-10-15FDNY inspection (ABATE)
2015-10-08Permit NB — RE-ISSUED
2015-10-07Permit FO — ISSUED

Support this site Back to the building page