Building Biography

The MapLandlordsNeighborhoodsZIP CodesGradesThe Mice MapAboutWhat's new

Building report

1011 Madison Avenue · Manhattan · BBL 1013930023 · generated 2026-10-20 · FREE

Free while in beta — every NYC building gets a report like this, updated weekly from city records. If it's useful, chip in to keep it free

Where the penalty points come from

ComponentWhat it coversPoints
Housing codeHPD violations by class, complaints, emergency repairs, litigation, vacate orders, AEP3
Structural & safetyDOB violations, ECB/OATH violations by class0
PestsBedbug filings, failed rodent inspections, rodent 311s0
DisplacementMarshal evictions executed0
GRADE B

A modest record — below the level that usually signals systemic problems. More recorded distress than 82% of 1-5-unit residential buildings citywide. The citywide median for 1-5-unit residential buildings is 0 penalty points per 10 units; this building carries 10. In ZIP 10075, 82% of residential buildings hold an A and 2% grade D or F. How grades work

this building
A
C

Among 699,345 1-5-unit residential buildings citywide · left is less recorded distress, right is more

Open with the city right now

No current HPD flags in the latest weekly snapshot: no open violations, no pending litigation, no active vacate orders, and not in the Alternative Enforcement Program.

Patterns

No heat or hot-water complaints in the last three years.

No bedbug-infested units reported in the last three years of filings.

What 311 hears from this address

86 service requests in the last three years. Most common: Vendor Enforcement (77) · Sewer (2) · Noise (1) · Street Condition (1) · Encampment (1) · Illegal Tree Damage (1).

Filed construction activity

$2,593,226 in permitted construction work filed since 2016 (31 filings with a declared cost) — a rough measure of how actively the owner maintains the building. Permit costs cover filed construction work only — they do not capture routine maintenance or repairs done without a permit.

Rent-stabilization signals

YesBuilt before 1974 (1929)
NoSix or more residential units (2)
No421-a / J-51 tax benefit on the current tax roll

1 of 3 signals present. Only a partial profile — stabilization is possible but less likely. The definitive answer for any unit: request its rent history from NYS Homes & Community Renewal (free, at hcr.ny.gov).

Registered with HPD — the names behind the building

Registered owner(s)S & S Madison Associates
Head officerRozita Shay
Managing agentRozita Shay
Last registered2025-12-10

as filed by the owner in the building's HPD registration

What the city thinks it's worth

Tax yearCity market valueAssessed value
2025$17,307,000 $7,788,150
2026$18,717,000 $8,422,650
2027$18,850,000 $8,482,500

The city's market estimate has risen 9% between tax years 2025 and 2027.

Building systems

Heating fuelNATURALGAS

Restaurants in this building

RestaurantCuisineGradeNotes
Lady M ConfectionsBakery Products/DessertsA—

Report to 311: Food poisoning · Food safety complaint

1 restaurant · 0 with mice evidence · See them on the Mice Map

Flood exposure

Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).

Not in a hurricane evacuation zone.

Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.

2 street-flooding or sewer-backup complaints at this address since 2025 (2 in the last three years).

Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps (cloudburst), NYC hurricane evacuation zones, and 311 records for this address.

Getting around

Subway77 St — 6 · 900 ft straight-line (about a 4-minute walk) · station accessibility: none
86 St — 4 5 6 · 0.4 mi straight-line (about an 11-minute walk) · station accessibility: partial (Uptown local only)
BusNearest boarding stop: Madison Av / E 77 St — M1 M2 M3 M4 · 200 ft
Citi Bike5 Ave & E 78 St · 600 ft · station location as of 2026-09-23; live availability
Bike facilityPainted bike lane mapped within 75 ft
School zones (2024–25 map)Elementary: P.S. 006 Lillie D. Blake
Middle: J.H.S. 167 Robert F. Wagner. Confirm with the DOE's school search.

Distances are straight-line, not walking routes. Transit locations from the MTA and Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.

Report a problem to 311

1011 Madison Avenue

Heat or hot waterHeat or hot water
Apartment maintenanceApartment maintenance
Bed bugsBed bugs
Residential pestsResidential pests
Rats or miceRats or mice
Food poisoningFood poisoning
Food safety complaintFood safety complaint
Anything elseAnything else

86 311 service requests from this address in the last three years.

311 will ask for the address, the apartment if the problem is inside, and what's wrong. Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box on this page.

Sales, deeds & mortgages

Most recent mortgage recorded against this lot: $3,088,555 on 2022-03-29 (lender: TD Bank, N.A.). Face amount at recording — it may have since been paid down, refinanced or satisfied. View the recorded document.

DateRecordAmountPer res. unit
2022-03-29AL&R $9,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $9,500,000
2022-03-29Mortgage $3,088,555 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $3,088,555
2022-03-29Agreement $9,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $9,500,000
2019-03-19AL&R $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $3,500,000
2019-03-19Mortgage $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $3,500,000
2018-05-17AL&R $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $3,500,000
2018-05-17Agreement $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $3,500,000
2018-05-17Mortgage $843,170 — from S & S MADISON ASSOCIATES to TD BANK, N.A. $843,170
2013-05-20Mortgage $916,439 — from S & S MADISON ASSOCIATES to FIRST REPUBLIC BANK $916,439
2013-05-20AL&R $3,000,000 — from S & S MADISON ASSOCIATES to FIRST REPUBLIC BANK $3,000,000
2013-05-20Agreement $3,000,000 — from S & S MADISON ASSOCIATES to FIRST REPUBLIC BANK $3,000,000
2008-05-29Agreement $2,242,789 — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to S & S MADISON ASSOCIATES $2,242,789
2003-07-11Mortgage $409,930 — from S & S MADISON ASSOCIATES to THE DIME SAVINGS BANK OF WILLIAMSBURGH $409,930
1994-07-08Mortgage $250,005 — from SOUFER & SHAYANI ASSOCIATES to APPLE BANK FOR SAVINGS $250,005
1984-11-19Mortgage $499,995 — from SOUFER & SHAYANI ASSOC. to ROYAL BANK & TRUST CO. $499,995

Ten-year activity

100500
2017
2018
2019
2020
2021
2022
2023
64
2024
2025
2026
ConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systems
Show as table
YearConstructionEnforcementHousing & tenantsOwnership & moneyHealth & systemsTotal
2017301026
20182165317
201910342322
2020015017
202110020113
20223033110
202310150218
202400620264
2025120190233
2026701019
This record is free. Keeping it free costs money.
Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Chip in

The last 12 months — 15 records

DateRecord
2026-05-20Permit Mechanical Systems — Permit Issued
2026-05-20Permit Mechanical Systems — Signed-off
2026-05-15Permit Plumbing — Permit Issued
2026-05-12Permit General Construction — Permit Issued
2026-05-04Job filed: Modification of existing plumbing fixtures
2026-05-04Job filed: INTERIOR RENOVATION OF THE EXISTING 2ND FLOOR SPACE IN 39 EAST 78TH IN MANHATTAN. RENOVATION OF THE FLOOR TO INCLUDE BUT NOT LIMITED TO SOME NEW WALLS
2026-05-04Job filed: Modification of existing ductwork.
2026-04-17Boiler inspection
2026-01-27311: Snow or Ice — Pedestrian Feature
2025-12-24311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2025-12-14311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2025-12-05Permit General Construction — Signed-off
2025-11-25Permit Construction Fence — Signed-off
2025-11-24Job filed: Installation of construction fence for duration of construction
2025-11-20Job filed: STORE RENOVATION (DOEN) WORK TO INCLUDE PARTITION, CEILING, DOOR AND MINOR STOREFRONT MODIFICATIONS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OC

The full timeline

2026
2026-05-20Permit Mechanical Systems — Permit Issued
2026-05-20Permit Mechanical Systems — Signed-off
2026-05-15Permit Plumbing — Permit Issued
2026-05-12Permit General Construction — Permit Issued
2026-05-04Job filed: Modification of existing plumbing fixtures$30,000
2026-05-04Job filed: INTERIOR RENOVATION OF THE EXISTING 2ND FLOOR SPACE IN 39 EAST 78TH IN MANHATTAN. RENOVATION OF THE FLOOR TO INCLUDE BUT NOT LIMITED TO SOME NEW WALLS$475,000
2026-05-04Job filed: Modification of existing ductwork.$30,000
2026-04-17Boiler inspection
2026-01-27311: Snow or Ice — Pedestrian Feature
2025
2025-12-24311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2025-12-14311: Sewer — Catch Basin Clogged/Flooding (Use Comments) (SC)
2025-12-05Permit General Construction — Signed-off
2025-11-25Permit Construction Fence — Signed-off
2025-11-24Job filed: Installation of construction fence for duration of construction$7,000
2025-11-20Job filed: STORE RENOVATION (DOEN) WORK TO INCLUDE PARTITION, CEILING, DOOR AND MINOR STOREFRONT MODIFICATIONS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OC$300,000
2025-10-08311: Vendor Enforcement — Food Vendor
2025-09-05311: Abandoned Bike — Chained to Public Property
2025-08-28Restaurant inspection: LADY M CONFECTIONS — grade A
2025-08-27Boiler inspection
2025-08-22311: Bike Rack — Abandoned Bike
2025-07-03311: Vendor Enforcement — Food Vendor
2025-06-04311: Illegal Tree Damage — Branches Damaged
2025-05-16311: Vendor Enforcement — Food Vendor
2025-04-28311: Vendor Enforcement — Food Vendor
2025-04-15Permit Mechanical Systems — Signed-off
2025-04-15Permit General Construction — Signed-off
2025-04-07Job filed: STORE RENOVATION (STAUD) WORK TO INCLUDE PARTITION, CEILING, DOOR AND MINOR STOREFRONT MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS O$80,000
2025-04-07Job filed: STORE RENOVATION (STAUD) WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2025-03-21311: Vendor Enforcement — Food Vendor
2025-03-20311: Vendor Enforcement — Food Vendor
2025-03-17311: Vendor Enforcement — Food Vendor
2025-03-06311: Vendor Enforcement — Food Vendor
2025-02-26311: Vendor Enforcement — Food Vendor
2025-02-19311: Vendor Enforcement — Food Vendor
2025-02-07311: Vendor Enforcement — Food Vendor
2025-01-31Permit General Construction — Signed-off
2025-01-31Permit Mechanical Systems — Signed-off
2025-01-22Job filed: STORE RENOVATION (STAUD) WORK TO INCLUDE PARTITION, CEILING, DOOR AND MINOR STOREFRONT MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS O$80,000
2025-01-22Job filed: STORE RENOVATION (STAUD) WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$17,000
2025-01-17311: Vendor Enforcement — Food Vendor
2025-01-16311: Vendor Enforcement — Food Vendor
2025-01-02311: Vendor Enforcement — Food Vendor
2024
2024-12-30311: Vendor Enforcement — Food Vendor
2024-12-18311: Vendor Enforcement — Food Vendor
2024-12-17311: Vendor Enforcement — Food Vendor
2024-12-11311: Vendor Enforcement — Food Vendor
2024-12-06311: Vendor Enforcement — Food Vendor
2024-12-04311: Vendor Enforcement — Food Vendor
2024-12-03HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2024-11-21311: Vendor Enforcement — Food Vendor
2024-11-15311: Vendor Enforcement — Food Vendor
2024-11-12311: Vendor Enforcement — Food Vendor
2024-10-30311: Vendor Enforcement — Food Vendor
2024-10-29311: Vendor Enforcement — Food Vendor
2024-10-25311: Vendor Enforcement — Food Vendor
2024-10-21311: Vendor Enforcement — Food Vendor
2024-10-11311: Vendor Enforcement — Food Vendor
2024-10-07311: Vendor Enforcement — Food Vendor
2024-09-27311: Vendor Enforcement — Food Vendor
2024-09-25311: Vendor Enforcement — Food Vendor
2024-09-19311: Vendor Enforcement — Food Vendor
2024-09-18311: Vendor Enforcement — Food Vendor
2024-09-13311: Vendor Enforcement — Food Vendor
2024-09-06311: Vendor Enforcement — Food Vendor
2024-09-06311: Vendor Enforcement — Food Vendor
2024-08-20311: Vendor Enforcement — Food Vendor
2024-08-19311: Vendor Enforcement — Food Vendor
2024-08-13Air permit (REGISTRATION), fuel: NATURALGAS
2024-08-09311: Vendor Enforcement — Food Vendor
2024-07-25311: Vendor Enforcement — Food Vendor
2024-07-12311: Vendor Enforcement — Food Vendor
2024-07-11311: Vendor Enforcement — Food Vendor
2024-07-01311: Vendor Enforcement — Food Vendor
2024-06-26Boiler inspection
2024-06-26311: Vendor Enforcement — Food Vendor
2024-06-21311: Vendor Enforcement — Food Vendor
2024-06-19311: Vendor Enforcement — Food Vendor
2024-06-14311: Vendor Enforcement — Food Vendor
2024-06-13311: Vendor Enforcement — Food Vendor
2024-06-05311: Vendor Enforcement — Food Vendor
2024-05-28311: Vendor Enforcement — Food Vendor
2024-05-23311: Vendor Enforcement — Food Vendor
2024-05-17311: Vendor Enforcement — Food Vendor
2024-05-16311: Vendor Enforcement — Food Vendor
2024-05-14311: Vendor Enforcement — Food Vendor
2024-05-03311: Vendor Enforcement — Food Vendor
2024-04-24311: Vendor Enforcement — Food Vendor
2024-04-23311: Vendor Enforcement — Food Vendor
2024-04-19311: Vendor Enforcement — Food Vendor
2024-04-16311: Vendor Enforcement — Food Vendor
2024-04-12311: Vendor Enforcement — Food Vendor
2024-04-11311: Vendor Enforcement — Food Vendor
2024-04-10311: Vendor Enforcement — Food Vendor
2024-04-05311: Vendor Enforcement — Food Vendor
2024-03-29311: Vendor Enforcement — Food Vendor
2024-03-28311: Vendor Enforcement — Food Vendor
2024-03-15311: Vendor Enforcement — Food Vendor
2024-03-14311: Vendor Enforcement — Food Vendor
2024-03-08311: Vendor Enforcement — Food Vendor
2024-03-07311: Vendor Enforcement — Food Vendor
2024-02-23311: Vendor Enforcement — Food Vendor
2024-02-22311: Vendor Enforcement — Food Vendor
2024-02-21311: Vendor Enforcement — Food Vendor
2024-02-16311: Vendor Enforcement — Food Vendor
2024-02-14311: Vendor Enforcement — Food Vendor
2024-01-25311: Vendor Enforcement — Food Vendor
2023
2023-12-14Boiler inspection
2023-11-14311: Encampment — N/A
2023-11-09311: Vendor Enforcement — Food Vendor
2023-11-01311: Vendor Enforcement — Food Vendor
2023-11-01311: Street Condition — Plate Condition - Noisy
2023-11-01311: Noise - Street/Sidewalk — Loud Music/Party
2023-10-12Restaurant inspection: LADY M CONFECTIONS — grade A
2023-10-11311: Vendor Enforcement — Food Vendor
2023-10-06311: Vendor Enforcement — Food Vendor
2023-10-05311: Vendor Enforcement — Food Vendor
2023-09-27311: Vendor Enforcement — Food Vendor
2023-08-15311: Illegal Parking — Blocked Hydrant
2023-08-14311: Illegal Parking — Blocked Hydrant
2023-07-25311: Dead Animal — Bird
2023-05-26311: Curb Condition — Broken Curb
2023-04-10311: UNSANITARY CONDITION — PESTS
2023-04-10Tenant complaint: UNSANITARY CONDITION — PESTS
2023-01-20Permit Sprinklers — Signed-off
2022
2022-12-08Boiler inspection
2022-10-26Job filed: Installation of the existing sprinkler system as per the filed plans. This application is superseding the LAA application # M00581253. No change to $45,000
2022-08-03311: Illegal Parking — Posted Parking Sign Violation
2022-08-02311: Illegal Parking — Blocked Bike Lane
2022-03-29AL&R $9,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$9,500,000
2022-03-29Mortgage $3,088,555 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$3,088,555
2022-03-29Agreement $9,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$9,500,000
2022-03-16HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2022-02-17Permit Sprinklers — Signed-off
2022-02-17Job filed: Installation of the existing sprinkler system as per the filed plans. This application is superseding the LAA application # M00581253. No change to $45,000
2021
2021-12-28Boiler inspection
2021-10-12311: Litter Basket Request — New Basket
2021-09-27Permit Sign — Signed-off
2021-09-27Permit Sign — Signed-off
2021-09-27Job filed: ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$176
2021-09-27Job filed: ERECT A NON-ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$88
2021-09-23Permit Plumbing — Signed-off
2021-09-15Permit Mechanical Systems — Signed-off
2021-09-15Permit General Construction — Signed-off
2021-09-10Job filed: Minor mechanical work to include one AC unit to accommodate new tenant layout for STUDS per plans filed herewith. No change in egress, use or occupan$14,000
2021-09-10Job filed: Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures to accommodate new tenant layout for STUDS as per plans filed wh$25,200
2021-09-08Job filed: Minor plumbing work to accommodate new tenant layout for STUDS. No change in egress, use or occupancy.$2,500
2021-08-20311: Illegal Parking — Blocked Hydrant
2020
2020-12-31Boiler inspection
2020-08-08311: NonCompliance with Phased Reopening — Business not in compliance
2020-07-02311: Elevator — Elevator - Single Device On Property/No Alternate Service
2020-07-02DOB complaint, category ?
2020-06-18311: Sidewalk Condition — Broken Sidewalk
2020-06-15311: New Tree Request — For One Address
2020-04-27311: Non-Emergency Police Matter — Social Distancing
2019
2019-12-09Elevator permit: Alteration to (1) One Passenger Elevator City ID #1P12134. All work to comply with ANSI/ASME A17.1/2000 with A17.1B/2003 with Sup$293,916
2019-11-13Permit Sign — Signed-off
2019-11-08Job filed: NON ILLUMINATED NON ADVERTISING DOUBLE SIDED PROJECTING ACCESSORY SIGN - GMURZYNSKA GALERIE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$200
2019-11-08DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2019-10-30Rodent inspection: Passed
2019-10-29FDNY inspection (RISK)
2019-10-24FDNY inspection (COM_OCPCY)
2019-10-24Permit Supported Scaffold — Permit Issued
2019-10-09311: Homeless Person Assistance — N/A
2019-10-04Permit EW — ISSUED
2019-09-26311: Homeless Person Assistance — N/A
2019-08-21311: Homeless Person Assistance — N/A
2019-08-02311: Water System — Hydrant Running (WC3)
2019-07-11Permit EW — ISSUED
2019-06-20Permit Supported Scaffold — Permit Issued
2019-06-20Job filed: INSTALLATION OF SCAFFOLD$10,000
2019-06-11Permit Sidewalk Shed — Signed-off
2019-06-10Job filed: INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019-06-06Job filed: EXTERIOR MASONRY REPAIR ALONG EXTERIOR ELEVATIONS AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.$55,000
2019-05-14Boiler inspection
2019-03-19AL&R $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$3,500,000
2019-03-19Mortgage $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$3,500,000
2018
2018-12-07Rodent inspection: Passed
2018-11-16311: Damaged Tree — Branch or Limb Has Fallen Down
2018-10-30HPD class I: §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE
2018-06-22311: Noise — Noise: Construction Equipment (NC1)
2018-06-15311: Sidewalk Condition — Broken Sidewalk
2018-06-06311: Derelict Bicycle — 14B Derelict Bicycle
2018-05-29Boiler inspection
2018-05-17TL&R — from FIRST REPUBLIC BANK
2018-05-17AL&R $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$3,500,000
2018-05-17Agreement $3,500,000 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$3,500,000
2018-05-17Mortgage $843,170 — from S & S MADISON ASSOCIATES to TD BANK, N.A.$843,170
2018-05-17Mortgage assigned — from FIRST REPUBLIC BANK to TD BANK, N.A.
2018-05-08311: Illegal Parking — Blocked Hydrant
2018-05-02Rodent inspection: Passed
2018-03-26FDNY inspection (RISK)
2018-02-27Permit Sign — Signed-off
2018-02-05Permit PL — ISSUED
2017
2017-10-29Job filed: This application is being filed for the installation of 2 exterior non-illuminated wall signs accessory to gallery on the 2nd floor. No change to use,$5,950
2017-09-25Rodent inspection: Passed
2017-07-06311: Dirty Conditions — E2 Receptacle Violation
2017-04-11Rodent inspection: Passed
2017-03-10Permit EW — ISSUED
2017-01-17Permit EW — ISSUED
2016
2016-10-10311: Standing Water — Puddle in Ground
2016-09-28Permit EW — ISSUED
2016-09-08Permit EW — ISSUED
2016-07-12Rodent inspection: Passed
2016-06-16Permit PL — ISSUED
2016-06-13Permit EW — ISSUED
2016-06-08Job filed: THIS ALT 2 APPLICATION IS BEING FILED HEREWITH FOR MECHANICAL WORK AT THE EXISTING 2ND FLOOR COMMERCIAL ART GALLERY. INSTALLATION OF 12 TON CENTRAL AI$30,000
2016-05-27Permit PL — ISSUED
2016-05-27Job filed: SISTER APPROXIMATELY 15 DEFECTIVE CEILING WOOD JOISTS WITH 3X10 WOOD JOISTS AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
2016-05-19DOB complaint, category ?
2016-05-06Permit SG — ISSUED
2016-05-06Job filed: THIS ALT 2 IS BEING FILED HEREWITH FOR THE RENOVATION OF THE EXISTING 2ND FLOOR COMMERCIAL ART GALLERY. WORK TO INCLUDE REPLACED FINISH FLOOR, PARTIT$245,600
2016-05-06Job filed: THIS ALT 2 IS BEING FILED HEREWITH FOR THE RENOVATION OF THE EXISTING 2ND FLOOR COMMERCIAL ART GALLERY. WORK TO INCLUDE REPLACED FINISH FLOOR, PARTIT$245,600
2016-05-04311: Noise — Noise: Construction Equipment (NC1)
2016-05-04Job filed: PROPOSED INTERIOR RENOVATION TO EXISTING COMM SPACE AT THE 2ND FLOOR. WORK TO INCLUDE THE REMOVAL OF INTERIOR NON-BEARING PARTITIONS, FLOOR AND WALL F$33,000
2016-05-04Job filed: PROPOSED INTERIOR RENOVATION TO EXISTING COMM SPACE AT THE 2ND FLOOR. WORK TO INCLUDE THE REMOVAL OF INTERIOR NON-BEARING PARTITIONS, FLOOR AND WALL F$33,000
2016-04-27Job filed: PROPOSED INTERIOR RENOVATION TO EXISTING COMM SPACE AT THE 2ND FLOOR. WORK TO INCLUDE THE REMOVAL OF INTERIOR NON-BEARING PARTITIONS, FLOOR AND WALL F$35,000
2016-03-05311: Water System — LOW WATER PRESSURE - WLWP
2016-03-05311: Water System — LOW WATER PRESSURE - WLWP
2016-03-01311: Homeless Person Assistance — Status Call
2016-02-21311: Noise - Residential — Banging/Pounding
2016-02-15311: Water System — NO WATER - WNW
2016-02-15311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-15Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-14311: Building/Use — Illegal Conversion Of Residential Building/Space
2016-02-14311: Non-Residential Heat — Inadequate or No Heat
2016-02-14311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-14DOB complaint, category ?
2016-02-14Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-13311: Non-Residential Heat — Inadequate or No Heat
2016-02-13311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-13311: HEAT/HOT WATER — APARTMENT ONLY
2016-02-13Tenant complaint: HEAT/HOT WATER — APARTMENT ONLY
2016-02-13Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-12311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2016-02-12311: General Construction/Plumbing — Failure To Maintain
2016-02-12311: Plumbing — Plumbing-Defective/Leaking/Not Maintained
2016-02-12311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-12311: Non-Residential Heat — Inadequate or No Heat
2016-02-12311: Non-Residential Heat — Inadequate or No Heat
2016-02-12311: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-12DOB complaint, category ?
2016-02-12DOB complaint, category ?
2016-02-12DOB complaint, category ?
2016-02-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-02-12Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-30311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-30Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-21Permit EQ — ISSUED
2016-01-21Permit EW — ISSUED
2016-01-07311: Non-Residential Heat — Inadequate or No Heat
2016-01-07311: Noise — Noise: Construction Before/After Hours (NM1)
2016-01-07311: Noise — Noise: Construction Before/After Hours (NM1)
2016-01-07Job filed: RENOVATE EXISTING STORE.(U.G.6). NO CHANGE TO USE,EGRESS OR OCCUPANCY.$340,000
2016-01-07Job filed: SUBSEQUENT APPLICANT FILING FOR MECHANICAL AND PLUMBING WORK.$27,000
2016-01-07Job filed: SUBSEQUENT APPLICANT FILING FOR STRUCTURAL WORK.$10,000
2016-01-07Job filed: SUBSEQUENT APPLICANT FILING FOR STRUCTURAL WORK.$10,000
2016-01-07Job filed: RENOVATE EXISTING STORE.(U.G.6). NO CHANGE TO USE,EGRESS OR OCCUPANCY.$340,000
2016-01-05311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2016-01-05311: Non-Residential Heat — Inadequate or No Heat
2016-01-05311: Non-Residential Heat — Inadequate or No Heat
2016-01-05311: HEAT/HOT WATER — ENTIRE BUILDING
2016-01-05DOB complaint, category ?
2016-01-05Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2015
2015-12-28Permit EQ — ISSUED
2015-12-22Job filed: CONSTRUCTION OF TEMPORARY CONSTRUCTION FENCE DURING STOREFRONT RENOVATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
2015-07-09Permit EW — ISSUED
2015-07-08Job filed: PROPOSED INTERIOR RENOVATION TO EXISTING RETAIL SPACE AT THE 1ST FLOOR AND CELLAR LEVEL. WORK TO INCLUDE THE REMOVAL OF INTERIOR NON-BEARING PARTITION$21,750
2015-06-09ECB CLASS - 3 violation: WORK W/O PERMIT. NOTED: 3 ACCESSORY BUSINESS SIGNS,AWNING BANNER W/TEXT INCLUDING "ISSELBACHER GALLERY;LADY M;CYNTHIS ROWLEY". APP$100
2015-05-13Permit PL — ISSUED
2015-05-01311: Noise — Noise: Construction Before/After Hours (NM1)
2015-04-24Permit EW — ISSUED
2015-04-24Job filed: PROPOSED REMOVAL & INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FLOOR AND WALL FINISHES, PLUMBING FIXTURES, CABINETRY, CASEWORK, LIGHTING, DUC$38,000
2015-03-20311: Noise - Commercial — Loud Music/Party
2015-03-13Permit EW — ISSUED
2015-03-10Job filed: PROPOSED REMOVAL & INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FLOOR AND WALL FINISHES, CABINETRY, CASEWORK, LIGHTING, DUCT WORK, & FIXTU$15,000
2015-03-10Job filed: PROPOSED REMOVAL & INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FLOOR AND WALL FINISHES, CABINETRY, CASEWORK, LIGHTING, DUCT WORK, & FIXTU$15,000
2015-03-03DOB violation LBLVIO: VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2015-02-12311: Street Sign - Dangling — No Parking, Standing, Stopping
2014
2014-10-23311: Damaged Tree — Branch or Limb Has Fallen Down
2014-08-12DOB violation E:
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-01311: Special Projects Inspection Team (SPIT) — Sign/Awning/Marquee - Illegal/No Permit
2014-05-01DOB complaint, category ?
2013
2013-11-21FDNY inspection (SPECIAL-OTH)
2013-11-21FDNY inspection (SPECIAL-OTH)
2013-08-16311: Air Quality — Air: Dust, Construction/Demolition (AE4)
2013-06-20DOB violation E:
2013-05-20Mortgage assigned — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to FIRST REPUBLIC BANK
2013-05-20TL&R — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to S & S MADISON ASSOCIATES
2013-05-20Mortgage $916,439 — from S & S MADISON ASSOCIATES to FIRST REPUBLIC BANK$916,439
2013-05-20AL&R $3,000,000 — from S & S MADISON ASSOCIATES to FIRST REPUBLIC BANK$3,000,000
2013-05-20Agreement $3,000,000 — from S & S MADISON ASSOCIATES to FIRST REPUBLIC BANK$3,000,000
2012
2012-10-04DOB complaint, category ?
2012-10-02DOB complaint, category ?
2012-08-29311: Sidewalk Condition — Unsafe Worksite
2012-08-23Permit SG — ISSUED
2012-08-22Permit SG — ISSUED
2012-08-08DOB complaint, category ?
2012-08-03Permit EW — ISSUED
2012-08-02Job filed: RENOVATION OF COMMERCIAL SPACE, GENERAL CONSTRUCTION ON 3RD FLOOR, IN SUITE # 301.$75,000
2012-08-02Job filed: RENOVATION OF COMMERCIAL SPACE, GENERAL CONSTRUCTION ON 3RD FLOOR, IN SUITE # 301.$75,000
2012-07-18Permit EQ — ISSUED
2012-07-18Permit EW — ISSUED
2012-07-17Job filed: RENOVATION OF COMMERCIAL SPACE, GENERAL CONSTRUCTION & TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$40,000
2012-07-05Rodent inspection: Passed
2012-06-22311: Homeless Encampment — N/A
2011
2011-12-07Rodent inspection: Passed
2011-06-24Permit PL — ISSUED
2011-06-10Permit EW — ISSUED
2011-06-10Permit EW — ISSUED
2011-05-06Job filed: FILING SUBSEQUENT DOCUMENT FOR PLUMBING AND MECHANICAL. WORK TO INCLUDE INSTALLATION OF MECHANICAL DUCT WORK AND INSTALLATION OF PLUMBING FIXTURES. AL$10,000
2011-05-06Job filed: FILING FOR INTERIOR RENOVATION OF 4TH FLOOR. OFFICE SPACE, WORK TO INCLUDE INSTALLATION OF PARTITIONS AND FINISHES. ALL WORK AS PER PLANS SUBMITTED. N$40,000
2011-05-06Job filed: FILING FOR INTERIOR RENOVATION OF 4TH FLOOR. OFFICE SPACE, WORK TO INCLUDE INSTALLATION OF PARTITIONS AND FINISHES. ALL WORK AS PER PLANS SUBMITTED. N$40,000
2011-04-07311: Water System — Hydrant Knocked Over/Missing (WC)
2011-03-25311: Water System — Hydrant Defective (WC2)
2011-02-28311: Dirty Conditions — E1 Improper Disposal
2010
2010-12-31DOB violation E:
2010-12-10311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-12-10311: Dirty Conditions — E5 Loose Rubbish
2010-12-08Rodent inspection: Passed
2010-11-15311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-10-14311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-10-05311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-09-30311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-08-30311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-08-25Rodent inspection: Passed
2010-08-25311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-08-23311: Food Establishment — Rodents/Insects/Garbage
2010-08-20311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-08-20311: Rodent — Condition Attracting Rodents
2010-08-10311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-08-05311: Other Enforcement — E2A Storage Of Receptacles
2010-07-30Rodent inspection: Passed
2010-07-30311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-07-22311: Other Enforcement — E6 Commercial Waste Disposal
2010-07-17311: Rodent — Condition Attracting Rodents
2010-07-08311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2010-07-08311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-07-08DOB complaint, category ?
2010-07-06311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-06-18311: Other Enforcement — E6 Commercial Waste Disposal
2010-06-14311: Air Quality — Air: Other Air Problem (Use Comments) (AZZ)
2010-06-10311: Noise — Noise: Alarms (NR3)
2010-06-02311: Air Quality — Air: Odor/Fumes, Restaurant (AD2)
2010-05-25Permit EQ — ISSUED
2010-05-24Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPARIS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
2010-05-22311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2010-05-22DOB complaint, category ?
2010-05-10311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2010-05-10DOB complaint, category ?
2010-05-06ECB CLASS - 2 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O OR BLDG DEPT RECORDS. DEFECTS NOTED: AT TIME OF INSPECTION 3RD & 4TH FLRS OCCUPIED B$3,000
2010-03-08DOB violation E:
2010-02-05311: Building/Use — No Certificate Of Occupancy/Illegal/Contrary To CO
2010-02-05DOB complaint, category ?
2010-02-04ECB CLASS - 3 violation: OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O. NOTED: 4 STY BLDG USED FOR COMMERCIAL SPACE. COMMERCIAL SPACE SHOWS ROOMS AT 3RD & $400
2010-01-15311: Miscellaneous Categories — FDNY Referral - Pilot
2010-01-15DOB complaint, category ?
2009
2009-10-16DOB violation E:
2009-01-01DOB violation LL6291:
2008
2008-12-01DOB complaint, category ?
2008-10-28ECB CLASS - 2 violation: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER NOTED: EXHAUST VENT FROM RESTAURANT LOCATED AT THE ROOF DOES NOT COMPLY WIT$500
2008-10-22DOB complaint, category ?
2008-09-03DOB violation E:
2008-05-29Agreement $2,242,789 — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to S & S MADISON ASSOCIATES$2,242,789
2008-01-03DOB violation LL6291:
2007
2007-08-16DOB violation E:
2007-06-25Permit PL — ISSUED
2007-06-01Permit EW — ISSUED
2007-06-01Permit EW — ISSUED
2007-05-04Job filed: Mechanical and plumbing work in conjunction with the renovation of an existing office space on the 4th floor. No change of use, occupancy, or egress.$10,000
2007-05-04Job filed: Renovation of existing office space at the 4th floor. Architectural work. No change of use, occupancy,or egress.$35,000
2006
2006-05-26DOB complaint, category ?
2006-01-03Permit EQ — ISSUED
2005
2005-12-13DOB violation C:
2005-12-12DOB complaint, category ?
2005-11-15Permit EW — ISSUED
2005-11-04Job filed: FACADE REPAIR AS PER PLANS; THISAPPLICATION FILED INCONJUNCTION WITH SIDEWALK SHED PERMIT #104268604. NOCHANGE IN USE,EGRESS OR OCCUPANCY.$25,000
2005-11-04Job filed: FACADE REPAIR AS PER PLANS; THISAPPLICATION FILED INCONJUNCTION WITH SIDEWALK SHED PERMIT #104268604. NOCHANGE IN USE,EGRESS OR OCCUPANCY.$25,000
2005-10-27Permit EQ — ISSUED
2005-10-24Job filed: TAMPORARY SIDEWALK SHED, ERECT 137'FEETOF HEAVY DUTY SIDEWALK SHED FOR FACADE REPAIR, SHED TO COMPLY WITH LL33/91. AND TPPN 9/99. NO CHANGE IN USE, EG
2005-06-14DOB violation E:
2005-06-13Permit EW — ISSUED
2005-06-10Job filed: ALTERATION TYPE 2 APPLICATION BEING FILE D TO RENOVATE EXISTING PROFESSI NAL SPACE. WORK TO INCLUDE MINOR NON-BEA RING PARTITIONS AND PLUMBING AS PER $47,000
2004
2004-07-30Permit PL — ISSUED
2004-06-08Permit EW — ISSUED
2004-06-08Permit EW — ISSUED
2004-06-08Permit EW — ISSUED
2004-06-08Permit EQ — ISSUED
2004-05-03Job filed: Install remote AC & Refrigeration condenser units in cellar. Installation of plumbing fixtures. No change to use, occupancy or egress.$16,000
2004-05-03Job filed: Structural work in conjuction with renovation of 1st floor space. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$10,000
2004-05-03Job filed: Install remote AC & Refrigeration condenser units in cellar. Installation of plumbing fixtures. No change to use, occupancy or egress.$16,000
2004-05-03Job filed: Filed in conjunction with the interior renovation of ground floor retail space:interior partitions. Installation of construction fence. No change to u$20,000
2003
2003-11-25Permit EW — ISSUED
2003-11-24Job filed: INTERIOR RENOVATION OF EXISTING RETAIL SPACE. WORK INCLUDES INSTALLATION OF NEW CEILING AND MINOR PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$20,000
2003-07-11DEEDO — from SOUFER & SHAYANI ASSOCIATES to S & S MADISON ASSOCIATES
2003-07-11Agreement — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to S & S MADISON ASSOCIATES
2003-07-11Mortgage $409,930 — from S & S MADISON ASSOCIATES to THE DIME SAVINGS BANK OF WILLIAMSBURGH$409,930
2003-07-11TL&R — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to SOUFER & SHAYANI ASSOCIATES
2003-07-11AL&R — from THE DIME SAVINGS BANK OF WILLIAMSBURGH to S & S MADISON ASSOCIATES
2002
2002-12-03Permit PL — ISSUED
2002-12-03Permit EW — ISSUED
2002-12-03Permit EW — ISSUED
2002-10-24Job filed: REPLACE BOILER AND BURNER (GAS AND OIL).$2,000
2002-10-24Job filed: REPLACE BOILER AND BURNER (GAS AND OIL).$2,000
2002-06-28DOB violation E: 1P12134
2001
2001-06-21DOB violation E: 1P12134
2000
2000-10-20Permit PL —
2000-09-27Job filed: NEW SPLIT HVAC SYSTEM AIR HANDLING UNIT AHU-1 IN POWDER ROOM CEILING. AIR COOLE D CONDENSING UNIT ON STEEL DUNAGE ON ROOF. NO CHANGE IN USE OCCUPANC$20,000
2000-09-11Permit EW — ISSUED
2000-07-19Job filed: A2$50,000
2000-01-28Mortgage assigned — from SOUFER & SHAYANI ASSOCIATES to DIME SAVINGS BANK OFWILLIAMSBURGH
2000-01-28Agreement — from SOUFER & SHAYANI ASSOCIATES to DIME SAVINGS BANK OFWILLIAMSBURGH
2000-01-28Mortgage assigned — from APPLE BANK FOR SAVINGS to DIME SAVINGS BANK OFWILLIAMSBURGH
1999
1999-09-27ECB Non-Hazardous violation: 37B,40E,17T. ADJUST SELECTIVE CONTROLLER FOR CAR. QUIET GOV TENSION FRAME. REPLACE BROKEN VISION GLASS IN BASMIT DOOR.
1999-09-15ECB Non-Hazardous violation: 37B11,40E11,17I12. -37 ADJ. SELECTIVE COLLECTIVE CONTROLS FOR CAB CALLPREFERANCE, -40 QUIET GOV. TEN. FRAME, -17 REPLACE BROKEN VI
1997
1997-02-10DOB violation LL6291:
1996
1996-06-25ECB Non-Hazardous violation: INSTALLATION OF MECHANICAL EQUIPTMENT WITHOUT FIRST OBTAINING AN EQUIPMENT WORK PERMIT. AIR CONDITIONER " CARRIER" 7.5 TONS PLIT S$350
1996-06-21DOB complaint, category ?
1996-04-17Permit EW — ISSUED
1995
1995-08-23Permit PL — ISSUED
1995-06-20Permit EW — ISSUED
1995-06-20Permit EW — ISSUED
1995-03-09Permit EW — ISSUED
1995-03-07Permit PL — ISSUED
1995-01-10Permit EW — ISSUED
1995-01-10Permit EW — ISSUED
1994
1994-12-08Permit EW — ISSUED
1994-07-29Permit PL — ISSUED
1994-07-08Agreement — from SOUFER & SHAYANI ASSOCIATES to APPLE BANK FOR SAVINGS
1994-07-08Mortgage $250,005 — from SOUFER & SHAYANI ASSOCIATES to APPLE BANK FOR SAVINGS$250,005
1994-05-25ECB Hazardous violation: EXIT PASSAGEWAY OR CORRIDOR: TOTAL DESTRUCTION: EXIT PASSAGEWAY FROM CELLAR TO EAST 78TH STREET, STAIR TO SIDEWALK, EXIT TUNNEL BL$475
1994-05-17Permit EW — ISSUED
1993
1993-07-01ECB Hazardous violation: FAILURE TO SAFELY & PROPERLY REMOVE DEBRIS FROM CONSTRUCTION SITE. NOTE- 3 FLOOR (UNDER ALT#100385593.) HAS EXCESSIVE AMOUNT OF DE$500
1993-06-30DOB complaint, category ?
1993-06-14Permit AL — ISSUED
1993-03-18DOB violation LL6291:
1992
1992-05-27DOB violation ES:
1991
1991-11-27Permit EW — ISSUED
1991-11-27Permit EW — ISSUED
1991-11-27Permit EQ — ISSUED
1991-05-21DOB complaint, category ?
1990
1990-05-16ECB Non-Hazardous violation: FAILURE TO PROVIDE APPPROVED PLANS AT PREMISES FOR CONSTRUCTION WORK AT SECOND STY (SOUTHSIDE) AT TIME OF INSPECTION. REMEDY: PR
1990-01-22DOB violation P:
1989
1989-03-28DOB violation E: (51)RESTORE LIGHT IN OVERHEAD (52)CLEAN OVERHEAD
1989-01-31Agreement — from SOUFER & SHAYANI ASSOCS to APPLE BANK SVGS
1989-01-31Mortgage assigned — from ROYAL BANK CANADA to APPLE BANK SVGS
1989-01-31PAT — from ROYAL BANK CANADA to LIGHTEN, JANIFER
1989-01-11Mortgage assigned — from ROYAL BANK & TRUST CO to ROYAL BANK OF CANADA
1988
1988-12-15DOB violation E: (51)COVER LIGHT SWITCH IN MOTOR ROOM . (52) REPAIR WATER FALLING OVER CONTROLLER IN MOTOR ROOM
1984
1984-11-19Agreement — from SOUFER & SHAYANI ASSOC. to ROYAL BK & TR CO.
1984-11-19Mortgage $499,995 — from SOUFER & SHAYANI ASSOC. to ROYAL BANK & TRUST CO.$499,995
1982
1982-09-17Deed — from SOUFER & SHAYANI, INC. to SOUFER & SHAYANI ASSOC.
1982-03-17Agreement — from SOUFER AND SHAYANI,INC to ROYAL BANK & TRUST CO.
1982-03-17Mortgage assigned — from ROSENFELD, MICHAEL EXEC; SCLAR, MAXINE EXEC; ROSENFELD,MORTON M.LWT; LEHMANN, SUZANNE EXEC to ROYAL BANK & TRUST CO.
1981
1981-09-29Deed — from LEHMANN, SUZANNE; ROSENFELD, MICHAEL; SCLAR, MAXINE EX; ROSENFELD, MORTON MEST to SYW CORP
1981-09-29Deed — from WONG, SUSAN S; WONG, SZE YIU to SOUFER & SHAYAMI INC
1981-09-29Deed — from SCLAR, MAXINE EX; LEHMANN, SUZANNE; ROSENFELD, MICHAEL; ROSENFELD, MORTON MEST to SYW CORP
1981-09-29Mortgage — from SYW CORP to SCLAR, MAXINE EX; ROSENFELD, MICHAEL; LEHMANN, SUZANNE; ROSENFELD, MORTON MDECD
1981-09-29Deed — from ROSENFELD, MICHAEL; LEHMANN, SUZANNE; SCLAR, MAXINE EX; ROSENFELD, MORTON MEST to SYW CORP
1981-09-29Deed — from SYW CORP to WONG, SZE YIU; WONG, SUSAN S
1971
1971-08-04Agreement — from EMMAR PRP INC to TROY SAV BNK
1971-06-16Mortgage assigned — from CHASE MANH BNK to TROY SAV BNK
1971-06-16Deed — from EMMAR PRP INC to ROENFELD MORTON M
1971-06-16Deed — from ROSENFELD MORTON M to EMMAR PRP INC
1970
1970-04-02Mortgage assigned — from EMPIRE CTY SAV BNK; EMPIRE SAV BNK; EXCELSIOR EMPIRE SAVBNK to CHASE MANH BNK
1970-04-02Deed — from ROSENFELD MORTON M to EMMAR PROP INC
1970-04-02Deed — from EMMAR PRP INC to ROSENFELD MORTON M
1970-04-02Agreement — from EMMAR PRP INC to CHASE MANH BNK
1970-04-02Mortgage — from EMMAR PRP INC to CHASE MANH BNK

Support this site Back to the building page