128 East 63 Street · Manhattan · BBL 1013970060
· generated 2026-10-20 · FREE
Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
What 311 hears from this address
4 service requests in the last three years. Most common: Missed Collection (3) · Illegal Parking (1).
Filed construction activity
$13,000 in permitted construction work filed since
2016 (2 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$2,614,000
$1,176,300
2026
$2,673,000
$1,202,850
2027
$2,737,000
$1,231,650
The city's market estimate has risen
5% between tax years 2025 and 2027.
Not in the FEMA 1%-annual-chance floodplain (2015 preliminary maps).
Not in a hurricane evacuation zone.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
No street-flooding or sewer-backup complaints on record at this address.
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
Lexington Av/63 St — M Q · 100 ft straight-line (under a minute) · station accessibility: full 59 St — 4 5 6 N R W · 700 ft straight-line (about a 3-minute walk) · station accessibility: none
Bus
Nearest boarding stop: Lexington Av / E 64 St — M101 M102 M103 · 300 ft
Citi Bike
E 63 St & 3 Ave · 700 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
4 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Ten-year activity
1050
2017
2018
7
2019
2020
2021
2022
2023
2024
2025
2026
ConstructionHousing & tenantsHealth & systems
Show as table
Year
Construction
Housing & tenants
Health & systems
Total
2017
0
2
2
4
2018
0
1
4
5
2019
4
0
3
7
2020
2
2
3
7
2021
0
0
2
2
2022
0
1
2
3
2023
2
1
2
5
2024
0
1
3
4
2025
0
3
4
7
2026
0
0
2
2
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
2022-04-03311: Noise — Noise: Construction Before/After Hours (NM1)
2021
2021-09-21Boiler inspection
2021-09-21Boiler inspection
2020
2020-10-21Boiler inspection
2020-10-21Boiler inspection
2020-08-21311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-21311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2020-08-19Permit Mechanical Systems — Permit Issued
2020-08-16Job filed: INSTALLING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. WORK CONSIST OF NEW S/S HOOD, NEW EXHAUST DUCT, NEW UPBLAST FAN. NO CHANGE IN USE, EGRESS $10,000
2020-07-22Asbestos abatement: Removal — Dussan Inc. DBA AMCS Environmental
2019
2019-12-19Rodent inspection: Passed
2019-09-12Permit Sidewalk Shed — Signed-off
2019-09-12Permit Supported Scaffold — Signed-off
2019-09-11Job filed: Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/o
2019-09-11Job filed: Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occ
2019-08-19Boiler inspection
2019-08-19Boiler inspection
2018
2018-12-10Rodent inspection: Passed
2018-09-26Boiler inspection
2018-09-26Boiler inspection
2018-08-29311: Request Large Bulky Item Collection — Request Large Bulky Item Collection
2018-05-15Rodent inspection: Passed
2017
2017-09-06Rodent inspection: Passed
2017-07-18311: Noise — Noise: air condition/ventilation equipment (NV1)
2010-09-29Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 17 L.F. DURING REMEDIAL REPAIRS, WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE
2010-09-24Permit EQ — ISSUED
2010-09-24Permit EQ — ISSUED
2010-09-23Job filed: INSTALLATION OF PIPE SCAFFOLD AS PER PLANS AT 128 EAST 63 STREET. DURING REMEDIAL REPAIRS, WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CH
2010-07-15Job filed: APPLICATION FILED FOR MISC. ROOF/PARAPET REPAIRS, FACEBRICK REPLACEMENT, AND CHIMNEY RELINING AS PER DRAWINGS FILED HEREWITH. NO CHANGE TO USE, EGRESS$137,650
2009
2009-01-01DOB violation LL6291:
2009-01-01DOB violation LL6291:
2008
2008-01-03DOB violation LL6291:
2008-01-03DOB violation LL6291:
2006
2006-01-06DOB violation LL6291:
2005
2005-01-31DOB violation LL6291:
2005-01-31DOB violation LL6291:
2003
2003-08-07Permit EW — ISSUED
2003-07-18Job filed: Minor architectural work including installation of new entrance door as per plans filed herwith. No change to use, egress or occupancy.$3,000