Free while in beta — every NYC building gets a report
like this, updated weekly from city records. If it's useful,
chip in to keep it free
This building is not graded (non-residential or no residential units
on record) — the report below covers its full public record.
Patterns
No heat or hot-water complaints in the last three years.
No bedbug-infested units reported in the last three years of filings.
$31,250 in enforcement penalties imposed (ECB/OATH) in the last three years.
What 311 hears from this address
48 service requests in the last three years. Most common: Illegal Parking (13) · Noise (8) · Homeless Person Assistance (5) · For Hire Vehicle Complaint (4) · Dirty Condition (3) · Food Establishment (3).
Filed construction activity
$471,333,699 in permitted construction work filed since
2016 (125 filings with a declared cost) — a rough measure of how actively
the owner maintains the building. Permit costs cover filed construction work only — they do not
capture routine maintenance or repairs done without a permit.
What the city thinks it's worth
Tax year
City market value
Assessed value
2025
$299,247,000
$134,661,150
2026
$303,697,000
$136,663,650
2027
$311,189,000
$140,035,050
The city's market estimate has risen
4% between tax years 2025 and 2027.
Tax exemptions on the roll: HEALTH & HOSPITALS C
Building systems
Energy grade (LL33)
A — ENERGY STAR score 88/100 (2022 disclosure cycle)
Heating fuel
NO2FUEL
Facade (Local Law 11)
SWARMP — "Safe With A Repair and Maintenance Program": known facade conditions that must be repaired (cycle 9)
3 Food Establishment complaints to 311 at this address in the last three years (most often: Food Temperature, No Permit or License, Rodents/Insects/Garbage) · complaints filed by the public; DOHMH investigates, outcomes aren't published.
Flood exposure
In the FEMA 1%-annual-chance floodplain (2015 preliminary flood
maps) — lenders typically require flood insurance here.
Hurricane evacuation zone 2 of 6 — zone 1 evacuates first.
Not in the city's stormwater (cloudburst) flood maps under any modeled scenario.
2 street-flooding or sewer-backup complaints at this address since
2019 (0 in the last three years).
Sources: FEMA flood maps (coastal), NYC DEP Stormwater Flood Maps
(cloudburst), NYC hurricane evacuation zones, and 311 records for this address.
Getting around
Subway
96 St — Q · 750 ft straight-line (about a 4-minute walk) · station accessibility: full 96 St — 6 · 0.3 mi straight-line (about an 8-minute walk) · station accessibility: none
Bus
Nearest boarding stop: E 97 St / 1 Av — M96 · 250 ft
Citi Bike
2 Ave & E 99 St · 450 ft · station location as of 2026-09-23; live availability
Distances are straight-line, not walking routes. Transit locations from the MTA and
Citi Bike, bike facilities from NYC DOT, school zones from the DOE's 2024–25 maps.
48 311 service requests from this address in the last three years.
311 will ask for the address, the apartment if the problem is inside, and what's wrong.
Contact details are optional for most complaints; food-poisoning reports can be anonymous. Complaints
appear in the city's public 311 data, usually within a day or two, and then in the Live from 311 box
on this page.
Sales, deeds & mortgages
Date
Record
Amount
Per res. unit
2004-08-17
RPTT $349,000 — from DEY, BRUCE to MCMURTRY, KIRK A
$349,000
Ten-year activity
2001000
2017
2018
2019
2020
2021
2022
120
2023
2024
2025
2026
ConstructionEnforcementHousing & tenantsHealth & systems
Show as table
Year
Construction
Enforcement
Housing & tenants
Health & systems
Total
2017
10
2
17
14
43
2018
15
4
21
27
67
2019
10
4
28
17
59
2020
20
2
28
15
65
2021
28
17
21
21
87
2022
39
10
43
21
113
2023
55
1
12
52
120
2024
55
4
14
22
95
2025
15
1
16
19
51
2026
25
0
18
11
54
This record is free. Keeping it free costs money. Servers, data pipelines, weekends. Pay what you want — a dollar helps.
Job filed: Legalization of two (2) existing centrifugal chillers
2026-09-14
Permit Mechanical Systems — Permit Issued
2026-08-29
311: Noise - Residential — Loud Music/Party
2026-08-22
311: Noise - Residential — Banging/Pounding
2026-08-20
311: Noise - Street/Sidewalk — Loud Music/Party
2026-08-19
311: Consumer Complaint — Drug Store or Pharmacy
2026-08-13
Job filed: Provide new steel & gratings for platforms in shaft. Provide new steel for riser pipe support PAA in comments
2026-08-09
311: Elevator — Elevator - Single Device On Property/No Alternate Service
2026-08-09
311: Noise - Residential — Banging/Pounding
2026-08-03
Cooling tower inspection
2026-08-03
Cooling tower inspection — violation AHK0
2026-07-28
Job filed: Electrical switchboards replacement modifications to ductwork and replace (3) exhaust fans and install (1) new exhaust fan
2026-07-28
Job filed: REMOVAL OF EXISTING WALL TO ACCOMMODATE INSTALLATION OF DOOR AND TO FACILTATE MECHANICAL AND ELECTRICAL WORK. INSTALLATION OF WALLS & DOORS IN (1) ONE
2026-07-23
Permit Sprinklers — Permit Issued
2026-07-22
Permit Mechanical Systems — Permit Issued
2026-07-21
Restaurant inspection: TASTY PICKS #3 — grade N
2026-07-20
Permit General Construction — Permit Issued
2026-07-13
Permit General Construction — Permit Issued
2026-06-30
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2026-06-24
Permit Standpipe — Permit Issued
2026-06-24
Permit Sprinklers — Permit Issued
2026-06-09
Permit General Construction — Permit Issued
2026-06-09
Permit Mechanical Systems — Permit Issued
2026-06-09
Permit Mechanical Systems — Permit Issued
2026-06-09
Permit General Construction — Permit Issued
2026-06-08
311: Homeless Person Assistance — Non-Chronic
2026-06-03
311: Noise - Street/Sidewalk — Loud Music/Party
2026-05-11
Job filed: Removal of existing walls, ceilings & doors to facilitate mechanical work & reinstallation of ceiling, walls & doors around (1) one shaft on selected
2026-05-07
Cooling tower inspection
2026-05-07
Cooling tower inspection
2026-05-07
Job filed: Med pressure steam condensate return replacement. Ex 4"medium pressure steam condensate riser will be abandoned in place. New riser will be installed
2026-05-07
Job filed: Provide new steel & gratings for platforms in shaft. Provide new steel for riser pipe support PAA in comments
Job filed: INTERIOR RENOVATON TO NON LOAD BEARING PARTITIONS, FLOORING, CEILING, DOOR MODIFICATIONS AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHAN
2026-02-03
Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH NEW STEEL BEAMS, NEW STEEL DUNNAGE BEAMS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC
2026-01-29
311: Snow or Ice — Sidewalk
2026-01-28
Permit Plumbing — Permit Issued
2026-01-15
311: For Hire Vehicle Complaint — Car Service Company Complaint
2026-01-05
Permit Plumbing — Permit Issued
2025-11-19
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-11-19
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-11-19
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-11-05
Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-10-31
311: Construction Safety Enforcement — CSC - Monitoring Tracking
2026-07-28Job filed: Electrical switchboards replacement modifications to ductwork and replace (3) exhaust fans and install (1) new exhaust fan$66,024
2026-07-28Job filed: REMOVAL OF EXISTING WALL TO ACCOMMODATE INSTALLATION OF DOOR AND TO FACILTATE MECHANICAL AND ELECTRICAL WORK. INSTALLATION OF WALLS & DOORS IN (1) ONE$252,000
2026-07-23Permit Sprinklers — Permit Issued
2026-07-22Permit Mechanical Systems — Permit Issued
2026-07-21Restaurant inspection: TASTY PICKS #3 — grade N
2026-07-20Permit General Construction — Permit Issued
2026-07-13Permit General Construction — Permit Issued
2026-06-30Asbestos abatement: Removal — Empire Control Abatement, Inc.
2026-06-24Permit Standpipe — Permit Issued
2026-06-24Permit Sprinklers — Permit Issued
2026-06-09Permit General Construction — Permit Issued
2026-06-09Permit Mechanical Systems — Permit Issued
2026-06-09Permit Mechanical Systems — Permit Issued
2026-06-09Permit General Construction — Permit Issued
2026-06-08311: Homeless Person Assistance — Non-Chronic
2026-05-11Job filed: Removal of existing walls, ceilings & doors to facilitate mechanical work & reinstallation of ceiling, walls & doors around (1) one shaft on selected $250,001
2026-05-07Cooling tower inspection
2026-05-07Cooling tower inspection
2026-05-07Job filed: Med pressure steam condensate return replacement. Ex 4"medium pressure steam condensate riser will be abandoned in place. New riser will be installed $350,455
2026-05-07Job filed: Provide new steel & gratings for platforms in shaft. Provide new steel for riser pipe support PAA in comments$253,000
2026-04-24311: Illegal Parking — Unauthorized Bus Layover
2026-02-11Job filed: INTERIOR RENOVATON TO NON LOAD BEARING PARTITIONS, FLOORING, CEILING, DOOR MODIFICATIONS AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHAN$640,700
2026-02-03Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH NEW STEEL BEAMS, NEW STEEL DUNNAGE BEAMS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC$81,700
2026-01-29311: Snow or Ice — Sidewalk
2026-01-28Permit Plumbing — Permit Issued
2026-01-15311: For Hire Vehicle Complaint — Car Service Company Complaint
2026-01-05Permit Plumbing — Permit Issued
2025
2025-11-19Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-11-19Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-11-19Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-11-05Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-10-31311: Construction Safety Enforcement — CSC - Monitoring Tracking
2025-10-23Boiler inspection
2025-10-23Boiler inspection
2025-10-09Rodent inspection: Failed for Rat Activity
2025-06-17Permit General Construction — Permit Issued
2025-06-17Permit Mechanical Systems — Permit Issued
2025-06-12Permit General Construction — Permit Issued
2025-05-21Permit Sprinklers — Permit Issued
2025-05-01Job filed: Removal of existing walls, ceilings & doors to facilitate mechanical work & reinstallation of ceiling, walls & doors around (1) one shaft on selected $250,001
2025-04-29Permit General Construction — Permit Issued
2025-04-28Asbestos abatement: Removal — Empire Control Abatement, Inc.
2025-03-10311: Elevator — Elevator - Single Device On Property/No Alternate Service
2025-02-27311: Illegal Parking — Blocked Sidewalk
2025-02-10Boiler inspection
2025-02-10Boiler inspection
2025-02-10Boiler inspection
2025-01-31Permit Plumbing — Permit Issued
2025-01-29ECB CLASS - 2 violation: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39086598R ISSUED ON 05/18/2023, AND FAILURE TO FILE A CERTIFICAT$6,250
2025-01-28311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2025-01-28311: Illegal Parking — Blocked Bike Lane
2025-01-23311: Homeless Person Assistance
2025-01-23311: Homeless Person Assistance
2025-01-22311: Dirty Condition — Trash
2025-01-17Job filed: PROPOSED SIGNS (TOTAL 5 SIGNS) ON 2ND AVENUE FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1.) 1 $68,200
2025-01-13311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2024-11-22Permit Plumbing — Permit Issued
2024-11-22Permit Plumbing — Signed-off
2024-11-22Permit Structural — Permit Issued
2024-11-15311: Noise — Noise: Construction Before/After Hours (NM1)
2024-11-14Job filed: INTERIOR RENOVATON TO NON LOAD BEARING PARTITIONS, FLOORING, CEILING, DOOR MODIFICATIONS AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHAN$640,700
2024-11-14Job filed: Sprinklers modification as per plans filed herewith. no change in use, egress or occupancy.$51,600
2024-11-14Job filed: MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$698,320
2024-11-14Job filed: PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$363,780
2024-10-31Job filed: SITE WALL$60,000,000
2024-10-10Boiler inspection
2024-10-10Boiler inspection
2024-10-10Boiler inspection
2024-10-07Permit General Construction — Permit Issued
2024-10-07Permit Mechanical Systems — Permit Issued
2024-09-12Permit General Construction — Permit Issued
2024-09-12Permit Mechanical Systems — Permit Issued
2024-09-11Job filed: Filed herewith civil work as shown on drawings. Underground plumbing filed separately under DOB NOW # M00476136. No change in use, egress or occupancy$34,999,860
2024-09-06Job filed: INSTALLATION OF NEW COOLING TOWER FILTRATION SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$295,000
2024-08-22Job filed: Architectural finishes to the flood wall; reinstallation and waterproofing of the MHB facade; Modification of 1st flr room for Chempack Room relocatio$11,000,000
2024-08-15311: Dirty Condition — Trash
2024-08-09Permit Mechanical Systems — Permit Issued
2024-08-06Job filed: Additions & modifications to existing HVAC system and related piping. (1) existing window unit to be demoed. Filed in conjunction with Alteration CO #$26,100
2024-07-23311: Homeless Person Assistance
2024-07-17311: Food Establishment — Food Temperature
2024-07-12Permit Sprinklers — Permit Issued
2024-07-01Job filed: Filing herewith for the modifications to existing sprinkler systems . NO change to use, egress, or occupancy.$102,300
2024-06-28Permit Structural — Signed-off
2024-06-23DOB violation EARCX: FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
2024-06-10Job filed: Additions & modifications to existing plumbing system and related piping. Related ALT I (NW) filed under BIS # . No change in use, egress or occupancy$1,560,000
2024-06-03311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2024-05-15Permit General Construction — Permit Issued
2024-05-13Permit Structural — Permit Issued
2024-05-13Permit Mechanical Systems — Permit Issued
2024-05-13Permit General Construction — Permit Issued
2024-05-08Permit Sprinklers — Permit Issued
2024-05-07Job filed: Construction fence as per plans filed herewith. No change to use, egress, or occupancy.
2024-05-06311: Noise — Noise: Construction Before/After Hours (NM1)
2024-04-22Job filed: Filed herewith underground plumbing as shown on drawings. Related civil application filed under DOBNOW #M00476128$6,786,000
2024-04-19311: Street Condition — Blocked - Construction
2024-04-15Permit Sprinklers — Permit Issued
2024-04-11Cooling tower inspection
2024-04-11Cooling tower inspection
2024-03-27Rodent inspection: Passed
2024-03-26Permit General Construction — Signed-off
2024-03-22Job filed: Remove 4 sprinkler heads and reroute wet sprinkler piping outside the electrical room$7,500
2024-03-11Job filed: Removal of existing walls, ceilings and doors to facilitate electrical works. Reinstallation of ceilings(existing/new) after completion of electrical $3,175,580
2024-03-11ECB CLASS - 1 violation: AT TIME OF INSPECTION RESPOND TO AN INCIDENT WHERE 4 PEDESTRIAN WAS INJURED WHEN THE JOB SITE FENCE CAME DOWN AND HIT(4) PEDESTRIA$25,000
2024-03-11DOB complaint, category ?
2024-03-08Job filed: A mechanical ventilation sys. for the elec. room is provided including exterior air intake & relief louvers, a make-up air intake ductwork & an exhaus$23,240
2024-03-08Job filed: Remove select plumbing fixtures & relocate piping as indicated on the plans. Provide drip pan in electrical room in Cellar$33,200
2024-03-06Permit Mechanical Systems — Permit Issued
2024-03-04Permit General Construction — Signed-off
2024-01-19Job filed: PROPOSED SIGNS (TOTAL 2 SIGNS) ON 1ST AVENUE FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1.) 1 $135,000
2024-01-19Job filed: PROPOSED SIGNS (TOTAL 12 SIGNS) ON E. 97TH STREET FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1$70,000
2024-01-19Job filed: PROPOSED SIGNS (TOTAL 5 SIGNS) ON 2ND AVENUE FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1.) 1 $80,200
2024-01-12311: Illegal Parking — Blocked Sidewalk
2024-01-11Permit General Construction — Signed-off
2024-01-09311: Illegal Parking — Blocked Sidewalk
2024-01-08311: Illegal Parking — Blocked Sidewalk
2023
2023-12-27Permit Plumbing — Signed-off
2023-12-14Permit Support of Excavation — Signed-off
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-11Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-12-04Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-11-27Permit Sprinklers — Permit Issued
2023-11-24Permit Mechanical Systems — Permit Issued
2023-11-22Permit General Construction — Signed-off
2023-10-25Job filed: INTERIOR RENOVATON TO NON LOAD BEARING PARTITIONS, FLOORING, CEILING, DOOR MODIFICATIONS AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHAN$640,700
2023-10-24Job filed: STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH NEW STEEL BEAMS, NEW STEEL DUNNAGE BEAMS AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC$81,700
2023-10-24Job filed: PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$363,780
2023-10-24Job filed: MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$698,320
2023-10-24Job filed: Sprinklers modification as per plans filed herewith. no change in use, egress or occupancy.$51,600
2023-10-10Job filed: Architectural finishes to the flood wall; reinstallation and waterproofing of the MHB facade; Modification of 1st flr room for Chempack Room relocatio$11,000,000
2023-10-06311: For Hire Vehicle Report — Car Service Company Report
2023-10-03311: General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
2023-10-03Job filed: Filed herewith underground plumbing as shown on drawings. Related civil application filed under DOBNOW #M00476128$6,786,000
2023-10-03DOB complaint, category ?
2023-09-27Facade (LL11) filing, cycle 9: SWARMP
2023-09-22Permit Structural — Signed-off
2023-09-22Permit General Construction — Signed-off
2023-09-21Rodent inspection: Passed
2023-09-20311: Lost Property — Bag/Wallet
2023-09-18Job filed: Additions & modifications to existing HVAC system and related piping. (1) existing window unit to be demoed. Filed in conjunction with Alteration CO #$26,100
2023-09-17Asbestos abatement: Removal — Empire Control Abatement, Inc.
2023-09-14Job filed: Converting the existing system into a combined system. Replacement of existing manual fire pump with new automatic fire pump is standpipe work. Instal$1,220,000
2023-09-13Job filed: Architectural finishes to the flood wall; reinstallation and waterproofing of the MHB facade; Modification of 1st flr room for Chempack Room relocatio$11,000,000
2023-08-29Permit Support of Excavation — Signed-off
2023-08-18Permit Sprinklers — Signed-off
2023-08-18Permit Plumbing — Signed-off
2023-08-17Permit Structural — Permit Issued
2023-08-15Job filed: INSTALLATION OF SOE FOR DRAINAGE STRUCTURES$3,000,000
2023-08-11Job filed: Construction fence as per plans filed herewith. No change to use, egress, or occupancy.
2023-08-10311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2023-08-10Job filed: SITE WALL$60,000,000
2023-08-02Job filed: Filing herewith to reinforce the 7th floor to safely support AHU-1 and Ahu-2 .$50,000
2023-07-31Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-31Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-31Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-31Asbestos abatement: Removal — New York Environmental Systems, Inc.
2023-07-28Job filed: Filed herewith civil work as shown on drawings. Underground plumbing filed separately under DOB NOW # M00476136. No change in use, egress or occupancy$34,999,860
2023-07-26Job filed: Filed herewith underground plumbing as shown on drawings. Related civil application filed under DOBNOW #M00476128$6,786,000
2023-07-20Permit Mechanical Systems — Permit Issued
2023-07-20Permit General Construction — Permit Issued
2023-07-14Job filed: This application is being filed for the sprinkler work on the 5th floor. There are no change in use, egress or occupancy.$45,000
2023-07-14Job filed: This Alteration is being filed for the plumbing work on 5th floor. There are no change in use, egress or occupancy.$10,000
2023-07-05Job filed: Interior renovation of waiting room on 5th floor. There is no change in use, egress or occupancy.$474,994
2023-07-01311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-07-01311: Illegal Parking — Blocked Bike Lane
2023-06-28Permit Structural — Signed-off
2023-06-26Facade (LL11) filing, cycle 9: SWARMP
2023-06-26Facade (LL11) filing, cycle 9: SWARMP
2023-06-26Job filed: Filing herewith for the installation of mechanical systems and associated ducts & piping .$1,700,000
2023-06-19311: Water System — Hydrant Defective (WC2)
2023-06-14Permit Sidewalk Shed — Signed-off
2023-06-08Job filed: Filing herewith for the modifications to existing sprinkler systems . NO change to use, egress, or occupancy.$102,300
2023-06-07Job filed: FILING HEREWITH FOR PLUMBING MODIFICATIONS TO EXISTING PLUMBING SYSTEM$172,500
2023-06-07Job filed: Construction fence as per plans filed herewith. No change to use, egress, or occupancy.
2023-06-06Job filed: Filing herewith to reinforce the 7th floor to safely support AHU-1 and Ahu-2 .$50,000
2023-05-31Job filed: FILING HEREWITH FOR THE ALTERATION AND RENOVATION OF THE INTERIOR PREMISES, INCLUDING DEMOLITION, INTERIOR RENOVATIONS, FIRE ALARM, PLUMBING, MECHANI$500,000
2023-05-26311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2023-05-26311: Illegal Parking — Blocked Bike Lane
2023-05-04Permit Mechanical Systems — Signed-off
2023-04-14Permit Support of Excavation — Signed-off
2023-03-29Permit Mechanical Systems — Permit Issued
2023-03-28Permit General Construction — Signed-off
2023-03-28Job filed: Additions & modifications to existing HVAC system and related piping. (1) existing window unit to be demoed. Filed in conjunction with Alteration CO #$26,100
2023-03-20Cooling tower inspection
2023-03-20Cooling tower inspection
2023-03-20Rodent inspection: Failed for Rat Activity
2023-03-03Job filed: NYC HHC Metropolitan Hospital Center, Main, MH & OPD Bldgs, Phase II Roof repairs as per the plans filed including: Removal & replacement of roofing s$3,138,076
2023-02-15Asbestos abatement: Removal — Green Island Group Corp.
2023-02-15Asbestos abatement: Removal — Green Island Group Corp.
2023-02-15Asbestos abatement: Removal — Green Island Group Corp.
2023-02-15Asbestos abatement: Removal — Green Island Group Corp.
2023-02-15Asbestos abatement: Removal — Green Island Group Corp.
2023-02-14311: Illegal Parking — Blocked Bike Lane
2023-02-08Job filed: INSTALLATION OF SOE FOR DRAINAGE STRUCTURES$3,000,000
2023-02-03Permit Plumbing — Signed-off
2023-02-01Boiler inspection
2023-02-01Boiler inspection
2023-02-01Boiler inspection
2023-01-31Permit General Construction — Permit Issued
2023-01-25Job filed: Herewith filing for associated ducts and piping work as per the plans. No change in egress, occupancy or use.$100,000
2023-01-19Permit General Construction — Signed-off
2023-01-18Job filed: NYC HHC Metropolitan Hospital Center, Main, MH & OPD Bldgs, Phase II Roof repairs as per the plans filed including: Removal & replacement of roofing s$2,786,076
2023-01-05Permit Standpipe — Signed-off
2022
2022-12-29Permit Mechanical Systems — Permit Issued
2022-12-28Job filed: Herewith filing to Remove and replace the ceiling on the 9th floor to accommodate structural work. Provide a new ceiling in the 10th floor operating $100,000
2022-12-20Job filed: Construction fence as per plans filed herewith. No change to use, egress, or occupancy.
2022-12-07Permit Plumbing — Signed-off
2022-12-03311: Homeless Person Assistance
2022-12-02ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8A&9A REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQU$1,250
2022-12-02ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE REQD CYCLE 6,7A,8A,9A REPORT OF CRITICAL EXAM DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES RE$1,250
2022-12-02ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURT$1,250
2022-11-30Permit Mechanical Systems — Permit Issued
2022-11-15Permit Support of Excavation — Signed-off
2022-11-01311: Homeless Person Assistance
2022-10-13Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2022-09-02Job filed: INSTALLATION OF SOE FOR DRAINAGE STRUCTURES$3,000,000
2022-09-01Permit Construction Fence — Signed-off
2022-08-31Permit Support of Excavation — Signed-off
2022-08-30Boiler inspection
2022-08-19311: Broken Parking Meter — No Receipt
2022-08-19311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-08-19311: Illegal Parking — Blocked Bike Lane
2022-08-19311: Noise — Noise: Construction Equipment (NC1)
2022-08-18311: Noise — Noise: Construction Equipment (NC1)
2022-08-18Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2022-08-18Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2022-08-18Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2022-08-15311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2022-08-15DOB complaint, category ?
2022-08-15ECB CLASS - 1 violation: OBSERVED ACTIVE JOBSITE AT EXCAVATION / FOUNDATION PHASE WITH NO SIGN OF MONITORING SYSTEM ( MISSING ) IN PLACE AS REQUIRED TO MON
2022-08-15ECB CLASS - 1 violation: OBSERVED ACTIVE JOBSITE AT EXCAVATION / FOUNDATION PHASE UPON SEARCH IN DOB NOW AND BIS SYSTEM BOTH REVEALED THAT NO NOTIFICATION $2,500
2022-08-01311: General Construction/Plumbing — Building Shaking/Vibrating/Structural Stability
2022-08-01DOB complaint, category ?
2022-07-26311: Illegal Parking — Blocked Bike Lane
2022-07-19Permit Plumbing — Signed-off
2022-07-16311: Water System — Hydrant Running (WC3)
2022-07-15311: Illegal Parking — Blocked Bike Lane
2022-07-15311: Illegal Parking — Blocked Bike Lane
2022-07-12311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-07-12311: Illegal Parking — Blocked Bike Lane
2022-07-11Job filed: Filed herein amendment to capture updated plans$3,000,000
2022-06-24Job filed: PROPOSED SIGNS (TOTAL 12 SIGNS) ON E. 97TH STREET FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1$70,000
2022-06-24Job filed: PROPOSED SIGNS (TOTAL 5 SIGNS) ON 2ND AVENUE FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1.) 1 $68,200
2022-06-24Job filed: PROPOSED SIGNS (TOTAL 2 SIGNS) ON 1ST AVENUE FRONTAGE FOR THE FEMA FLOOD RESILIENCY PROJECT NYC HEALTH + HOSPITALS/ METROPOLITAN, LISTED BELOW: 1.) 1 $135,000
2022-06-21Permit Structural — Signed-off
2022-06-21Permit Support of Excavation — Signed-off
2022-06-16Rodent inspection: Failed for Rat Activity
2022-06-14Permit Sidewalk Shed — Signed-off
2022-06-13Job filed: INSTALLATION OF SIDEWALK SHED AS INDICATED ON THE ATTACHED DRAWINGS. THERE ARE NO CHANGES IN USE, EGRESS OR OCCUPANCY.$1,000
2022-06-07Job filed: SITE WALL$60,000,000
2022-05-26Job filed: INSTALLATION OF SOE FOR DRAINAGE STRUCTURES$3,000,000
2022-05-23311: Sanitation Worker or Vehicle Complaint — Noise
2022-05-23311: Consumer Complaint — Garage/Parking Lot
2022-05-21311: Noise — Noise: air condition/ventilation equipment (NV1)
2022-05-18Job filed: Patch, repair changes to fire pump room in Basement$329,620
2022-05-18Job filed: Med pressure steam condensate return replacement. Ex 4"medium pressure steam condensate riser will be abandoned in place. New riser will be installed $350,455
2022-05-16311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-16311: Illegal Parking — Blocked Bike Lane
2022-05-12311: Street Condition — Blocked - Construction
2022-05-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-06311: Illegal Parking — Blocked Bike Lane
2022-05-04311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-05-04311: Illegal Parking — Blocked Bike Lane
2022-05-04311: Noise — Noise: Alarms (NR3)
2022-05-03Job filed: Converting the existing system into a combined system. Replacement of existing manual fire pump with new automatic fire pump is standpipe work. Instal$1,220,000
2022-05-02311: Illegal Parking — Blocked Sidewalk
2022-04-28311: Illegal Parking — Blocked Bike Lane
2022-04-27Permit Construction Fence — Signed-off
2022-04-27Permit General Construction — Signed-off
2022-04-26311: Homeless Person Assistance
2022-04-25Cooling tower inspection
2022-04-25Cooling tower inspection
2022-04-15Asbestos abatement: Removal — Empire Control Abatement, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-11Asbestos abatement: Removal — New York Environmental Systems, Inc.
2022-04-08311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2022-04-08311: Illegal Parking — Blocked Bike Lane
2022-04-06Permit Mechanical Systems — Permit Issued
2022-04-06Permit Mechanical Systems — Permit Issued
2022-04-02Job filed: Construction fence as per plans filed herewith. No change to use, egress, or occupancy.
2022-03-31311: Illegal Parking — Blocked Bike Lane
2022-03-31311: Illegal Parking — Blocked Bike Lane
2022-03-30Permit Mechanical Systems — Permit Issued
2022-03-29Job filed: Installation of Interim Flood Protection Measures along 1st Avenue. No change in use, egress or occupancy.$280,000
2022-03-24311: Illegal Parking — Blocked Bike Lane
2022-03-18311: Lost Property — Electronics/Phones
2022-03-11Job filed: NYC HHC Metropolitan Hospital Center, Main, MH & OPD Bldgs, Phase II Roof repairs as per the plans filed including: Removal & replacement of roofing s$3,138,076
2021-07-21Permit Mechanical Systems — Permit Issued
2021-07-20Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2021-07-20Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2021-07-20Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2021-07-20Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2021-07-20Job filed: Proposed curb cuts due to relocation of existing hospital driveways/ curb cuts.$6,600
2021-07-15Job filed: FLOOD WALL INSTALLATION ALONG PROPERTY LINE/ NEW CURB CUTS
2021-07-15Job filed: FLOOD WALL INSTALLATION ALONG PROPERTY LINE/ NEW CURB CUTS
2021-07-06311: For Hire Vehicle Complaint — Driver Complaint - Non Passenger
2021-07-06311: Illegal Parking — Blocked Bike Lane
2021-06-28Job filed: Modifications to existing standpipe system and related piping. No change in use, egress or occupancy.$112,000
2021-06-17Job filed: Replace two Carrier Chillers, one new Condenser Pump, one new Chilled Water Pump, replace Cooling Tower cell with freeze protection, 25 IT Closet Fan $6,523,476
2021-06-10Job filed: Additions & modifications to existing plumbing system and related piping. Related ALT I (NW) filed under BIS # . No change in use, egress or occupancy$1,560,000
2021-06-08311: Water Conservation — Rooftank Leak Or Overflow (CKO)
2021-05-29Asbestos abatement: Removal — New York Environmental Systems, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-21Asbestos abatement: Removal — Empire Control Abatement, Inc.
2021-05-18Job filed: Additions & modifications to existing HVAC system and related piping. (1) existing window unit to be demoed. Filed in conjunction with Alteration CO #$26,100
2021-05-17Job filed: SITE WALL$60,000,000
2021-05-13Job filed: Filed herewith underground plumbing as shown on drawings. Related civil application filed under DOBNOW #M00476128$6,786,000
2021-05-12Air permit (CERTIFICATE TO OPERATE), fuel: NO2FUEL
2021-05-11Permit General Construction — Signed-off
2021-05-10Permit General Construction — Signed-off
2021-05-09Job filed: Filed herewith civil work as shown on drawings. Underground plumbing filed separately under DOB NOW # M00476136. No change in use, egress or occupancy$34,999,860
2021-05-05Permit Mechanical Systems — Signed-off
2021-04-28Job filed: Installing low return air duct as part of COVID Emergency Air Quality Improvements. No change in use egress or occupancy.$1,753,840
2021-04-28Job filed: Filing to modify existing suspended ceiling system to accommodate above ceiling mounted HEPA filter unit. No change to use, egress or occupancy under $776,800
2021-04-27ECB CLASS - 1 violation: CLASS 1 VIOLATION ISSUED NO DLM INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. REMEDY; FILE$1,250
2021-04-27ECB CLASS - 1 violation: CLASS 1 VIOLATION ISSUED NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER,AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NY$1,250
2021-04-27ECB CLASS - 1 violation: CLASS 1 VIOLATION ISSUED, NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 N$1,250
2021-04-27ECB CLASS - 1 violation: CLASS 1 VIOLATION ISSUED NO DLM INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014NYCBC REMEDY; FILE A$1,250
2021-04-27DOB complaint, category ?
2021-04-27ECB CLASS - 1 violation: CLASS 1 VIOLATION ISSUED NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12. OF APPENDIX K3 OF THE 2014 N$1,250
2021-04-27ECB CLASS - 1 violation: CLASS 1 VIOLATION ISSUED NO DOOR LOCK INSTALLED IN THIS CONTROLLER AS MANDATED BY 2.10.12 OF APPENDIX K3 OF THE 2014 NYCBC, REMEDY$1,250
2021-04-26311: Elevator — Elevator - Multiple Devices On Property
2021-04-26ECB CLASS - 1 violation: UPON INSPECTION OF DEVICE DEVICE WAS FOUND OUT-OF- SERVICE REMEDY. REPAIR DEVICE THEN NOTIFY NYCDOB OF REPAIR WORK COMPLETED AND D$1,250
2021-04-26DOB complaint, category ?
2021-04-26ECB CLASS - 1 violation: CEASE USE VIOLATION ISSUED, CAR DOOR RESTRICTOR NOT WORKING REMEDY. REPAIR THEN NOTIFY NYCDOB FOR RE-INSPECTION ON DEVICE CLASS 2 $1,250
2021-04-26ECB CLASS - 1 violation: CEASE USE VIOLATION ISSUED CAR DOOR RESTRICTOR NOT WORKING REMEDY, REPAIR THEN NOTIFY NYCDOB FOR RE-INSPECTION, CLASS 2 VIOLATION $1,250
2021-04-26ECB CLASS - 1 violation: CEASE USE ITEM, CAR DOOR RESTRICTOR NOT WORKING REMEDY; REPAIR THEN NOTIFY NYCDOB OF DEVICE REPAIR, CLASS 1 VIOLATION, NO DOOR LOC$1,250
2021-04-26ECB CLASS - 1 violation: CEASE USE VIOLATION ISSUED, CAR DOOR RESTRICTOR NOT WORKING REMEDY, REPAIR THEN NOTIFY NYCDOB FOR RE-INSPECTION. CLASS 2 VIOLATION$1,250
2021-04-26ECB CLASS - 1 violation: RTS, UPON INSPECTION OF DEVICE IT WAS FOUND TO BE OUT-OF-SERVICE REMEDY. REPAIR AND NOTIFY NYCDOB OF REPAIR COMPLETED AND DEVICE R$1,250
2021-04-26ECB CLASS - 1 violation: DLM, NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. REMEDY; FILE AP$1,250
2021-04-23Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter K3$100,825
2021-04-23Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter K $161,032
2021-04-23Elevator permit: Provide door lock monitoring system to meet NYC Code requirements. All work to comply with A17.3 of 2002 as modified by Chapter K3$100,825
2021-04-22DOB complaint, category ?
2021-04-22ECB CLASS - 1 violation: UPON INSPECTION OF DEVICE IT WAS FOUND TO BE OUT-OF- SERVICE REMEDY; REPAIR AND RESTORE DEVICE TO SERVICE THEN NOTIFY NYCDOB OF SE$1,250
2021-04-14Job filed: ERECT NEW AWNING AND CANOPY WITH COPY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.$24,465
2021-04-01Permit Mechanical Systems — Permit Issued
2020-11-19Job filed: MODIFICATIONS TO HVAC EQUIPMENT, DUCTWORK AND PIPING TO ACCOMMODATE THE LGBT HEALTH CENTER IN THE EXISTING COMMUNITY FACILITY.$786,000
2020-11-19Job filed: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE LGBT HEALTH CENTER IN THE EXISTING COMMUNITY FACILITY.$189,000
2020-10-30Job filed: MODIFICATIONS TO PARTITIONS AND FINISHES ON PARTIAL 1ST FLOOR TO ACCOMMODATE THE LGBT HEALTH CENTER IN THE EXISTING COMMUNITY FACILITY AS PER PLANS FI$550,000
2020-10-30Job filed: MODIFICATIONS TO PARTITIONS AND FINISHES ON PARTIAL 1ST FLOOR TO ACCOMMODATE THE LGBT HEALTH CENTER IN THE EXISTING COMMUNITY FACILITY AS PER PLANS FI$550,000
2020-10-29311: NonCompliance with Phased Reopening — Business not in compliance
2020-10-28Asbestos abatement: Removal — Empire Control Abatement, Inc.
2020-10-23Permit EW — ISSUED
2020-10-21Permit Mechanical Systems — Signed-off
2020-10-19Asbestos abatement: Removal — Green Island Group Corp.
2020-04-07311: COVID-19 Non-essential Construction — Construction
2020-04-07DOB complaint, category ?
2020-02-29311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2020-02-16311: Taxi Complaint — Driver Complaint - Non Passenger
2020-02-14Job filed: STRUCTURAL WORK:INSTALL PLATFORMS & CONCRETE PADS FOR EQUIPMENT FOR METROPOLITAN HOSPITAL EMERGENCY POWER & CHILLER SYSTEMS QUICK CONNECT PROJ$200,000
2020-01-30311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2020-01-23Boiler inspection
2020-01-23Boiler inspection
2020-01-23Boiler inspection
2020-01-17Tenant complaint: HEAT/HOT WATER — ENTIRE BUILDING
2020-01-17311: HEAT/HOT WATER — ENTIRE BUILDING
2019
2019-12-26311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2019-12-19311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2019-12-16DOB complaint, category ?
2019-12-16ECB CLASS - 2 violation: PARTIAL SW ON SUSPENDED SCAFFOLD ON C-HOOKS.NOTE A TIME OF INSPECTION I OBSERVED SUSPENDED SCAFFOLD IN PLACE AND NO NOTIFICATION G$1,250
2019-12-13311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2019-12-13DOB complaint, category ?
2019-12-13DOB violation C: SIDEWALK SHED WAS STRUCK BY A VEHILCE DISPLACING SEVERAL SECTIONS
2019-12-12311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2019-12-01311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2019-11-14Job filed: Install platforms and concrete pads for equipment for Metropolitan Hospital emergency power & chiller systems quick connect project$200,000
2019-11-08311: Smoking — Smoking Violation
2019-11-07Job filed: Metropolitan Hospital installation of new emergency power and chiller quick connects project for electric and chiller services. Exterior electtical ho$400,000
2019-11-04Job filed: REMOVE PORTION OF EXT. AREA WAY, MASONRY WALL, RESTORE BOTH ENDS OF MASONRY WALL, MODIFY COPING STONE & TOP RAILING TO MATCH EXT WALL ASSEMBLY PRO$400,000
2019-11-04Job filed: REMOVE PORTION OF EXT. AREA WAY, MASONRY WALL, RESTORE BOTH ENDS OF MASONRY WALL, MODIFY COPING STONE & TOP RAILING TO MATCH EXT WALL ASSEMBLY PRO$400,000
2019-06-27Rodent inspection: Failed for Rat Activity and Other Reason
2019-06-24311: Illegal Parking — Blocked Bike Lane
2019-06-21Permit EW — ISSUED
2019-06-17311: Lost Property — Other
2019-05-23311: For Hire Vehicle Complaint — Driver Complaint - Passenger
2019-05-23311: Illegal Parking — Blocked Bike Lane
2019-05-20Job filed: METROPOLITAN HOSPITAL CENTER, MAIN, MENTAL HEALTH & OPD BUILDINGS, VARIOUS ROOF & RAILING REPLACEMENTS AS PER THE PLANS FILED.$1,860,000
2019-04-18311: Illegal Parking — Blocked Bike Lane
2018-12-01Job filed: PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION$20,000
2018-11-30Job filed: INSTALLATION OF TEMPORARY SITE WORKS TO MITIGATE POTENTIAL FLOODING AS PER PLANS FILED HEREWITH.$107,920
2018-11-29Job filed: PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE$45,000
2018-11-27Rodent inspection: Passed
2018-11-21Job filed: INSTALLATION OF TEMPORARY SITE WORKS TO MITIGATE POTENTIAL FLOODING AS PER PLANS FILED HEREWITH.$107,920
2018-09-22Asbestos abatement: Removal — Empire Control Abatement, Inc.
2018-09-22Asbestos abatement: Removal — Empire Control Abatement, Inc.
2018-09-22Asbestos abatement: Removal — Empire Control Abatement, Inc.
2018-09-18311: Homeless Person Assistance
2018-09-09311: Homeless Person Assistance
2018-08-07Boiler inspection
2018-08-03311: Consumer Complaint — Overcharge
2018-08-02Job filed: MODIFICATIONS TO THE EXISTING GAS SERVICE IN THE BASEMENT OF THE MENTAL HEALTH BUILDING. THERE WILL BE NO CHANGE IN USAGE, OCCUPANCY OR MEANS OF EG$20,000
2018-08-02Job filed: MODIFICATIONS TO THE EXISTING GAS SERVICE IN THE BASEMENT OF THE MENTAL HEALTH BUILDING. THERE WILL BE NO CHANGE IN USAGE, OCCUPANCY OR MEANS OF EG$20,000
2018-07-26Job filed: METROPOLITAN HOSPITAL CENTER, MAIN, MENTAL HEALTH & OPD BUILDINGS, EXTERIOR FACADE REPAIRS AS PER THE PLANS FILED.$745,000
2018-07-26Job filed: METROPOLITAN HOSPITAL CENTER, MAIN, MENTAL HEALTH & OPD BUILDINGS, EXTERIOR FACADE REPAIRS AS PER THE PLANS FILED.$745,000
2018-07-09Job filed: MODIFICATIONS & ADDITIONS TO AN EXISTING APPROVED FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY U$6,000
2018-07-09Job filed: MODIFICATIONS & ADDITIONS TO AN EXISTING APPROVED FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY U$6,000
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2018-05-29311: Homeless Person Assistance
2018-05-29311: Homeless Person Assistance
2018-05-25311: Homeless Person Assistance
2018-05-25311: Homeless Person Assistance
2018-05-18ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQU
2018-05-18ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQU
2018-05-02311: Street Sign - Damaged — Other/Unknown
2018-04-19311: Homeless Person Assistance
2018-04-16Job filed: MODIFICATIONS TO THE EXISTING GAS SERVICE IN THE BASEMENT OF THE MENTAL HEALTH BUILDING. THERE WILL BE NO CHANGE IN USAGE, OCCUPANCY OR MEANS OF EG$20,000
2018-04-13Job filed: MODIFICATIONS TO THE EXISTING GAS SERVICE IN THE BASEMENT OF THE MENTAL HEALTH BUILDING. THERE WILL BE NO CHANGE IN USAGE, OCCUPANCY OR MEANS OF EG$20,000
2018-03-01311: Illegal Parking — Blocked Sidewalk
2018-02-25311: Homeless Person Assistance
2018-02-25311: Homeless Person Assistance
2018-02-13Rodent inspection: Failed for Rat Activity
2017-05-30311: Derelict Vehicle — With License Plate
2017-05-18Boiler inspection
2017-05-18Boiler inspection
2017-05-07311: Homeless Person Assistance — N/A
2017-05-07311: Homeless Person Assistance — N/A
2017-05-07311: Homeless Person Assistance — N/A
2017-05-07311: Homeless Person Assistance — N/A
2017-05-01Rodent inspection: Passed
2017-04-24Job filed: MODIFICATIONS & ADDITIONS TO AN EXISTING APPROVED FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY U$12,000
2017-04-22311: Homeless Person Assistance — N/A
2017-04-22311: Homeless Person Assistance — N/A
2017-04-20Boiler inspection
2017-04-20Boiler inspection
2017-04-20Boiler inspection
2017-04-18FDNY inspection (RISK)
2017-03-07311: Non-Residential Heat — Inadequate or No Heat
2017-02-24Job filed: MEDIUM PRESSURE STEAM CONDENSATE RETURN RISER REPLACEMENT. EXISTING 4' MEDIUM PRESSURE STEAM CONDENSATE RISER WILL BE ABANDONED IN PLACE. NEW RISER WI$425,000
2017-02-24Job filed: FIRE ALARM MODIFICATION$25,000
2017-02-24Job filed: MEDIUM PRESSURE STEAM CONDENSATE RETURN RISER REPLACEMENT. EXISTING 4" MEDIUM PRESSURE STEAM CONDENSATE RISER WILL BE ABANDONED IN PLACE. NEW RISER WI$425,000
2017-02-24Job filed: FIRE ALARM MODIFICATION$25,000
2017-02-17Permit EW — ISSUED
2017-02-17Permit PL — ISSUED
2017-02-17Permit EW — ISSUED
2016
2016-11-11311: Non-Residential Heat — Inadequate or No Heat
2016-10-06Rodent inspection: Bait applied
2016-09-22ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG EAST ELEV EXP#1 @ EAST ENTRANCE-DRIVE THRU STONE FACIA CRACKED, LIGHT FIXTURES MISS LENS,CEILING
2016-09-20Rodent inspection: Bait applied
2016-09-02Rodent inspection: Passed
2016-08-18Rodent inspection: Bait applied
2016-08-11ECB CLASS - 2 violation: FAILURE TO SUBMIT ACCEPTALBLE 7TH ROUND REPORT OF CRITICAL EXAMINATIONDOCUMENTING CONDITON OF EXTERIOR WALLS AND APPURTENANCES REQ
2016-08-03311: Vending — In Prohibited Area
2016-06-15Rodent inspection: Bait applied
2016-06-10ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG EAST ELEV. EXP#1-N.E CRACK PANEL 3RDFLR 10 FLR. BROKEN GLASS BLOCK E CRACKS 1TO2FLR WINDOW SCREE
2016-06-04311: Homeless Person Assistance — N/A
2016-05-23Permit EW — ISSUED
2016-05-23Permit EW — ISSUED
2016-05-23Permit EW — ISSUED
2016-05-13Job filed: REMOVAL OF PLUMBING FIXTURE, INSTALLATION OF NEW PLUMBING FIXTURE AS PER PLANS FILED HER WITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL$100,000
2016-05-13Job filed: REMOVAL OF PLUMBING FIXTURE, INSTALLATION OF NEW PLUMBING FIXTURE AS PER PLANS FILED HER WITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPL$100,000
2016-05-12311: Taxi Complaint — Driver Complaint
2016-05-04Job filed: REMOVAL OF EXISTING PLUMBING FIXTURE, INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILLED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$200,000
2016-05-04Job filed: REMOVAL OF EXISTING PLUMBING FIXTURE, INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILLED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDE$200,000
2016-04-12FDNY inspection (RISK)
2016-04-06Permit EW — ISSUED
2016-04-01311: Homeless Person Assistance — N/A
2016-03-29311: Street Condition — Defective Hardware
2016-03-22Air permit (WORK PERMIT), fuel: NO2FUEL
2016-03-22311: Street Condition — Pothole
2016-03-16Job filed: HEREWITH FILING FOR TEMPORARY FUEL OIL PIPING TO TEST OUT THE BOILER AS PER ATTACHED PLANS.NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2016-03-16Job filed: HEREWITH FILING FOR TEMPORARY FUEL OIL PIPING TO TEST OUT THE BOILER AS PER ATTACHED PLANS.NO CHANGE IN USE EGRESS OR OCCUPANCY.$5,000
2016-03-15ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE W. CODE PROVIDIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & AP
2016-03-09311: Homeless Person Assistance — Status Call
2016-02-04311: Water System — Hydrant Knocked Over/Missing (WC)
2015-12-02311: Noise — Noise: Jack Hammering (NC2)
2015-11-25Permit EW — ISSUED
2015-09-21ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS
2015-09-08ECB CLASS - 2 violation: FAILURE TO MAINTAIN EXTERIOR BLDG WEST ELEVATION EXP#1 (DEBERATING) MASONRY ABOVE MAIN ENTRANCE,SPALLING (DEBERATING) MASONRY,CRAC
2015-07-13Job filed: FILING SUPPORT OF EXCAVATION PLANS TO FACILITATE THE CONSTRUCTION OF (3) NEW FUEL OIL UNDERGROUND STORAGE TANKS. NO CHANGE TO USE, EGRESS OR OCCUPANC$100,000
2015-03-13ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &
2014-12-11311: Plumbing — Plumbing Work - Illegal/No Permit/Standpipe/Sprinkler
2014-12-11DOB complaint, category ?
2014-12-10ECB CLASS - 1 violation: WORK WITHOUT A PERMIT. TIME: 10:45AM. FIRE DEPT CONNECTION WAS RELOCATED FROM ORIGINAL LOCATION DUE TO INSTALLATION OF TEMP BOILER
2014-12-02ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS &
2014-11-26311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2014-10-15Job filed: MODIFICATION OF EXISTING FIRE ALARM FOR 2ND AND 3RD FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$25,825
2014-10-07Permit EW — ISSUED
2014-10-07Permit PL — ISSUED
2014-10-05311: Water System — Hydrant Running (WC3)
2014-10-03311: Indoor Air Quality — Other (Explain Below)
2014-09-27311: General Construction/Plumbing — Vent/Exhaust - Illegal/Improper
2014-09-27DOB complaint, category ?
2014-09-26FDNY inspection (ABATE)
2014-09-26FDNY inspection (ABATE)
2014-09-26Job filed: FILING HEREWITH INTERIOR ALTERATIONS TO 2ND AND 3RD FLOOR CONFERENCE AND TRAINING CENTER SPACES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCC$862,975
2014-09-26Job filed: FILING HEREWITH STRUCTURAL MODIFICATIONS TO EXISTING 2ND AND 3RD FLOOR SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$32,570
2014-09-26Job filed: MODIFICATIONS TO EXISTING MECHANICAL AND PLUMBING SYSTEM IN 2ND AND 3RD FLOOR SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EG$779,219
2014-09-19Permit EW — ISSUED
2014-09-19Permit EW — ISSUED
2014-09-15311: Found Property — Other
2014-09-09FDNY inspection (ABATE)
2014-09-09FDNY inspection (ABATE)
2014-09-02FDNY inspection (ABATE)
2014-09-02Permit EW — ISSUED
2014-09-02Permit EW — ISSUED
2014-09-02Permit EW — ISSUED
2014-09-02Permit EW — ISSUED
2014-08-22Job filed: INSTALL (2) TEMP HP BOILERS/2 NEW COMBINATION GAS/OIL BURNERS OUTSIDE IN PARKING AREA.INSTALL (2) NEW TEMP 20000 GAL #2 OIL DOUBLEWALL TANKS. ABANDON $100,000
2014-08-22Job filed: INSTALL (2) TEMP HP BOILERS/2 NEW COMBINATION GAS/OIL BURNERS OUTSIDE IN PARKING AREA.INSTALL (2) NEW TEMP 20000 GAL #2 OIL DOUBLEWALL TANKS. ABANDON $100,000
2014-08-19FDNY inspection (ABATE)
2014-08-13Permit EW — ISSUED
2014-08-01FDNY inspection (ABATE)
2014-07-11FDNY inspection (ABATE)
2014-06-10Permit EQ — ISSUED
2014-06-10Permit EW — ISSUED
2014-06-09Permit EW — ISSUED
2014-06-09Permit EW — ISSUED
2014-06-05Job filed: HEREWITH FILING FOR THE EXCAVATION WORK AS PER PLANS. REPLACEMENT AND INSTALLATION OF THE TANK WORK HAS BEEN FILED AND APPROVED UNNDER DOB APPLICATION$300,000
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-30DOB violation ACC1: VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
2014-05-13311: Taxi Complaint — Driver Complaint
2014-05-08Permit EW — ISSUED
2014-04-30Job filed: FILING HEREWITH DEMOLITION OF EXISTING CONFERENCE AND TRAINING CENTER IN HOSPITAL BUILDING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANC$56,300
2014-04-29Permit EW — ISSUED
2014-04-02Permit EQ — ISSUED
2014-03-31Job filed: HEREWITH FILING FOR EXCAVATION WORK AND TEMPORARY CONSTRUCTION FENCE AS PER PLANS. INSTALLATION AND APPROVAL OF TANK ARE UNDER DOB APPLICATION# 121482$500,000
2014-03-25Permit EW — ISSUED
2014-03-06311: Graffiti — Graffiti
2014-03-01311: Taxi Complaint — Driver Complaint
2013
2013-12-13Permit EW — ISSUED
2013-12-13Permit EW — ISSUED
2013-11-26Rodent inspection: Passed
2013-11-20Permit EW — ISSUED
2013-11-20Permit EW — ISSUED
2013-11-20Permit EW — ISSUED
2013-11-20Permit PL — ISSUED
2013-11-20Permit EW — ISSUED
2013-11-20Permit EW — ISSUED
2013-11-14Job filed: STRUCTURAL MODIFICATIONS ASSOCIATED WITH MECHANICAL WORK AT HOSPITAL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$500,000
2013-11-14Job filed: MECHANICAL MODIFICATIONS TO EXISTING HOSPITAL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$1,000,000
2013-11-14Job filed: MECHANICAL MODIFICATIONS TO EXISTING HOSPITAL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$1,000,000
2013-11-05311: Air Quality — Air: Smoke, Chimney or vent (AS1)
2013-10-09311: Street Condition — Defective Hardware
2013-09-09311: Other Enforcement — E2A Storage Of Receptacles
2013-08-27311: For Hire Vehicle Complaint — Driver Complaint
2013-06-26Facade (LL11) filing, cycle 7: SWARMP
2013-05-17Rodent inspection: Passed
2013-04-10Permit PL — ISSUED
2013-02-08Permit EW — ISSUED
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2013-01-31DOB violation FISPNRF: FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2013-01-18Permit EQ — ISSUED
2013-01-15Job filed: INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS,OR OCCUPANCY
2013-01-15Job filed: INSTALLATION OF BOILERS IN BASEMENT BOILER ROOM AS PER PLANS SUBMITTED HEREWITH. STRUCTURAL, MECHANICAL AND PLUMBING WORK ASSOCIATED WITH BOILER INSTA$8,250,000
2013-01-15Job filed: INSTALLATION OF BOILERS IN BASEMENT BOILER ROOM AS PER PLANS SUBMITTED HEREWITH. STRUCTURAL, MECHANICAL AND PLUMBING WORK ASSOCIATED WITH BOILER INSTA$8,250,000
2013-01-15Job filed: INSTALLATION OF BOILERS IN BASEMENT BOILER ROOM AS PER PLANS SUBMITTED HEREWITH. STRUCTURAL, MECHANICAL AND PLUMBING WORK ASSOCIATED WITH BOILER INSTA$8,250,000
2012
2012-11-19Job filed: MENTAL HEALTH BLDG, FACADE REPAIRS AS PER THE FILED PLANS.$50,000
2012-11-19Job filed: MENTAL HEALTH BLDG, FACADE REPAIRS AS PER THE FILED PLANS.$50,000
2012-11-07Job filed: ADDITIONS TO AN EXISTING APPROVED FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH.THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION$19,200
2012-10-25311: Construction Safety Enforcement — Excavation Tracking Complaint
2012-10-25DOB complaint, category ?
2012-10-19Permit EW — ISSUED
2012-09-12311: Water System — Possible Water Main Break (Use Comments) (WA1)
2012-08-31DOB violation E:
2012-08-31DOB violation E:
2012-08-31DOB violation E:
2012-08-31DOB violation E:
2012-08-31DOB violation E:
2012-08-30DOB violation E:
2012-08-30DOB violation E:
2012-08-30DOB violation E:
2012-08-30DOB violation E:
2012-08-30DOB violation E:
2012-08-30DOB violation E:
2012-08-30DOB violation E:
2012-08-01Permit EW — ISSUED
2012-08-01Permit EW — ISSUED
2012-07-25Job filed: PLUMBING, MECHANICAL, AND SPRINKLER WORK TO ACCOMMODATE 1ST FLOOR OFFICE ALTERATIONS IN THE EXISTING HOSPTIAL AS PER PLANS FILED HEREWITH ONLY; CONNEC$242,724
2012-07-25Job filed: INTERIOR DEMOLITION AND INSTALLATIO OF NEW PARTITIONS ON PARTIAL 1ST FLOOR TO ACCOMMODATE ACCESSORY OFFICES FOR PATIENT CARE MANAGEMENT IN THE EXISTIN$114,090
2012-07-25Job filed: INTERIOR DEMOLITION AND INSTALLATIO OF NEW PARTITIONS ON PARTIAL 1ST FLOOR TO ACCOMMODATE ACCESSORY OFFICES FOR PATIENT CARE MANAGEMENT IN THE EXISTIN$114,090
2012-07-25Job filed: PLUMBING, MECHANICAL, AND SPRINKLER WORK TO ACCOMMODATE 1ST FLOOR OFFICE ALTERATIONS IN THE EXISTING HOSPTIAL AS PER PLANS FILED HEREWITH ONLY; CONNEC$242,724
2012-07-18Job filed: INTERIOR DEMOLITION AND INSTALLATIO OF NEW PARTITIONS ON PARTIAL 1ST FLOOR TO ACCOMMODATE ACCESSORY OFFICES FOR PATIENT CARE MANAGEMENT IN THE EXISTIN$114,090
2012-07-18Job filed: FIRE ALARM MODIFICATIONS ON PARTIAL 1ST FLOOR THE EXISTING HOSPTIAL BUILDING ONLY AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS, OR O$26,594
2012-07-18Job filed: INTERIOR DEMOLITION AND INSTALLATIO OF NEW PARTITIONS ON PARTIAL 1ST FLOOR TO ACCOMMODATE ACCESSORY OFFICES FOR PATIENT CARE MANAGEMENT IN THE EXISTIN$114,090
2012-07-18Job filed: INTERIOR DEMOLITION AND INSTALLATIO OF NEW PARTITIONS ON PARTIAL 1ST FLOOR TO ACCOMMODATE ACCESSORY OFFICES FOR PATIENT CARE MANAGEMENT IN THE EXISTIN$114,090
2012-07-18Job filed: FIRE ALARM MODIFICATIONS ON PARTIAL 1ST FLOOR THE EXISTING HOSPTIAL BUILDING ONLY AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS, OR O$26,594
2012-05-16Rodent inspection: Passed
2012-04-27Permit EW — ISSUED
2012-04-20Job filed: INSTALLATION OF SPLIT AIR CONDITIONING SYSTEM AND ASSOCIATED DUCTWORK. NO CHANGE IN USE EGRESS OR OCCUPANCY.$60,000
2012-04-18ECB CLASS - 2 violation: FAILURE TO MAINTAIN BLDG WALLS & APPURTENANCES.(I)SPALLED MASONRY WAS FOUND @ MARBLE FILLS & CRACK OBSERVED BY BOLT & NUT ANCHORAG$2,500
2012-03-15311: Asbestos — Asbestos Complaint (B1)
2012-03-15311: Indoor Air Quality — Dust from Construction
2012-03-15DOB complaint, category ?
2012-03-09Permit EW — ISSUED
2012-03-06311: Indoor Air Quality — Dust from Construction
2012-03-06DOB complaint, category ?
2012-02-21Job filed: INSTALL TWO NEW STRUCTURAL BEAMS AND TWO SPREADER PLATES IN EXISTING HOSPITAL ROOM #2021, BRIGHTVIEW X. NO CHANGE IN USE, OCCUPANCY OR EGRESS$13,100
2012-02-07311: Air Quality — Air: Soot, Other (Use Comments) (AB4)
2012-01-23Permit EW — ISSUED
2012-01-03311: Air Quality — Air: Smoke, Commercial (AA2)
2011
2011-12-14311: Consumer Complaint — Rates Not Posted
2011-12-13DOB violation EVCAT1: VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2011-10-13Job filed: MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM ON THE 14TH FLOOR (MAIN BUILDIN G/RENAL DIALYSIS AREA). NO CHANGE IN EGRESS OR OCCUPANCY.$50,000
2011-08-24311: General Construction/Plumbing — Failure To Maintain
2011-08-24DOB complaint, category ?
2011-08-23DOB violation E:
2011-08-23DOB violation E:
2011-08-23DOB violation E:
2011-08-23DOB violation E:
2011-08-23DOB violation E:
2011-08-23DOB violation E:
2011-08-23DOB violation E:
2011-08-22DOB violation E:
2011-08-22DOB violation E:
2011-08-22DOB violation E:
2011-08-22DOB violation E:
2011-08-22DOB violation E:
2011-08-19Permit EW — ISSUED
2011-08-03Permit EW — ISSUED
2011-06-27Job filed: ADDING NEW SPRINKLER SYSTEM TO THE SPACE> NO CHANGE IN EGRESS OR OCCUPANCY.$40,000
2011-06-27Job filed: ADDING NEW SPRINKLER SYSTEM TO THE SPACE> NO CHANGE IN EGRESS OR OCCUPANCY.$40,000
2011-06-15Job filed: REMOVE 2 BURIED 1000 GAL. CAPACITY MOTOR FUEL TANKS & PUMPS AND CONTROLS AS SHOWN ON PLANS. REMOVE OVERHEAD METAL CANOPY AND POSTS. NO CHANGE IN U$160,000
2011-06-15Job filed: REMOVE 2 BURIED 1000 GAL. CAPACITY MOTOR FUEL TANKS & PUMPS AND CONTROLS AS SHOWN ON PLANS. REMOVE OVERHEAD METAL CANOPY AND POSTS. NO CHANGE IN U$160,000
2011-05-18Rodent inspection: Passed
2011-04-07311: Blocked Driveway — No Access
2011-04-02311: Air Quality — Air: Smoke, Commercial (AA2)
2011-02-09311: Air Quality — Air: Smoke, Other (Use Comments) (AA5)
2011-01-25ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEWITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS
2011-01-25ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEWITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS
2011-01-06311: For Hire Vehicle Complaint — Driver Complaint
2010-11-13311: Noise — Noise: Construction Equipment (NC1)
2010-11-10Permit PL — ISSUED
2010-11-10Job filed: THIS APPLICATION IS FILED FOR THE LEGALIZATION OF ONE EXISTING 1000 GALLON TANK. THIS IS ALSO FILED TO ADDRESS FIRE DEPARTMENT VIOLATION # NOV 1119470$40,000
2010-11-03Tenant complaint: ELECTRIC — WIRING
2010-11-03311: ELECTRIC — ELECTRIC-WIRING
2010-10-29Permit PL — ISSUED
2010-10-18Permit EW — ISSUED
2010-10-08DOB violation VCAT1:
2010-10-06DOB violation E:
2010-10-06DOB violation E:
2010-10-06DOB violation E:
2010-10-06DOB violation E:
2010-10-06DOB violation E:
2010-10-06DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-05DOB violation E:
2010-10-04DOB violation E:
2010-10-04DOB violation E:
2010-10-04DOB violation E:
2010-10-04DOB violation E:
2010-10-04DOB violation E:
2010-08-23Permit EW — ISSUED
2010-08-04311: Air Quality — Air: Smoke, Commercial (AA2)
2010-07-20311: Water System — Leak (Use Comments) (WA2)
2010-07-12Job filed: STRUCTURAL STEEL SUPPORT FOR NEW AIR HANDLING UNIT NO CHANGE IN OCCUPANCE OR MEANS OF EGGRESS$20,000
2010-07-12Job filed: STRUCTURAL STEEL SUPPORT FOR NEW AIR HANDLING UNIT NO CHANGE IN OCCUPANCE OR MEANS OF EGGRESS$20,000
2010-07-12Job filed: STRUCTURAL STEEL SUPPORT FOR NEW AIR HANDLING UNIT NO CHANGE IN OCCUPANCE OR MEANS OF EGGRESS$20,000
2010-06-29311: Water System — Leak (Use Comments) (WA2)
2010-06-28Permit EW — ISSUED
2010-06-04ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS : PERIODIC INSPECTION OF EXTERIOR WALL
2010-06-04ECB CLASS - 2 violation: FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS : PERIODIC INSPECTION OF EXTERIOR WALL
2010-05-12311: Water System — Leak (Use Comments) (WA2)
2010-04-29Permit EW — ISSUED
2010-04-28Rodent inspection: Passed
2010-04-07DOB violation E:
2010-04-07DOB violation E:
2010-04-07DOB violation E:
2010-04-07DOB violation E:
2010-04-07DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-04-06DOB violation E:
2010-03-02Permit EW — ISSUED
2010-01-08Permit EW — ISSUED
2009
2009-12-11Job filed: INSTALLATION OF SUPPORT BEAMS AT CEILING OF 13TH FLOOR TO SUPPORT ADDITIONAL LOAD FROM NEW DIALYSIS UNIT ON 14TH FLOOR.NO CHANGE IN USE, EGRESS OR OCC$9,000
2009-11-05Permit PL — ISSUED
2009-11-02Permit EW — ISSUED
2009-10-22Permit EW — ISSUED
2009-10-16Permit EW — ISSUED
2009-09-22DOB complaint, category ?
2009-08-12Job filed: REMOVING EXISTING PARTITION, ADDING NEW PARTITION, ADDING SPRINKLER SYSTEM ADDING NEW MECHANICAL SYSTEM, ADDING NEW PLUMBING FIXTURE. NO CHANGE IN AC$1,900,000
2009-05-27Permit PL — ISSUED
2009-05-27Permit EW — ISSUED
2009-05-07Job filed: REPLACING EXISTING AHU. NO CHANGE IN ACCUPANCY OR EGRESS$100,000
2009-05-07Job filed: REPLACING EXISTING AHU. NO CHANGE IN ACCUPANCY OR EGRESS$100,000
2009-01-15DOB violation E:
2009-01-15DOB violation E:
2009-01-15DOB violation E:
2009-01-15DOB violation E:
2009-01-15DOB violation E:
2009-01-15DOB violation E:
2009-01-14DOB violation E:
2009-01-14DOB violation E:
2009-01-14DOB violation E:
2009-01-14DOB violation E:
2008
2008-12-29Job filed: MODIFY EXISTING OXYGEN TANK ALARM IN CONJUNCTION WITH REPLACEMENT OF OXYGEN TA NKS FILED UNDER APPL# 104663017. NO CHANGE IN USE, OCCUPANCY OR MEANS O$10,000
2008-12-19ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WAL
2008-12-19ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WAL
2008-12-19ECB CLASS - 2 violation: FAILURE TO SUBMIT AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WAL
2008-09-19Job filed: PROPOSE TO ALTER EXISTING 14TH FLOOR 'D' WING RENAL DIALYSIS WITH NEW PARTITIONS, HUNG CEILINGS, FINISHES, PLUMBING, SPRINKLER HEADS AND H.V.A.C. DUCT$400,000
2008-09-19Job filed: PROPOSE TO ALTER EXISTING SPRINKLER SYSTEM WITH 62 NEW HEADS. THERE IS NO CHANGE TO USE EGRESS OR OCCUPANCY.$50,000
2008-09-19Job filed: PROPOSE TO ALTER EXISTING 14TH FLOOR 'D' WING RENAL DIALYSIS WITH NEW PARTITIONS, HUNG CEILINGS, FINISHES, PLUMBING, SPRINKLER HEADS AND H.V.A.C. DUCT$400,000
2008-09-19Job filed: PROPOSE TO ALTER EXISTING SPRINKLER SYSTEM WITH 62 NEW HEADS. THERE IS NO CHANGE TO USE EGRESS OR OCCUPANCY.$50,000
2008-08-25Facade (LL11) filing, cycle 6: SAFE
2008-07-08ECB CLASS - 3 violation: 98BB05.52K11.52Q03. 98BB PERFORM & FILE CURRENT 5YR TEST 52K REPLACE RUSTED HOIST ROPES 52Q PROVIDE GUARD ON HOIST MACHINE$200
2008-05-15Permit EW — ISSUED
2008-05-15Permit PL — ISSUED
2008-03-31DOB violation LL2604E:
2008-03-04Job filed: MODIFY SPRINKLER AND PLUMBING ON 6 FLR AS PER PLANS$100,000
2008-02-04Permit EW — ISSUED
2008-02-04Permit EW — ISSUED
2008-02-04Permit EW — ISSUED
2008-02-04Permit EW — ISSUED
2008-01-31Permit PL — ISSUED
2007
2007-12-26Permit EW — ISSUED
2007-11-30DOB violation LL1198:
2007-11-30DOB violation LL1198:
2007-11-30DOB violation LL1198:
2007-11-01Permit EW — ISSUED
2007-11-01Permit EW — ISSUED
2007-10-15Permit EW — ISSUED
2007-10-15Permit PL — ISSUED
2007-10-04Job filed: PROPOSED TO ALTER EXISTING DEPARTMENT OF MEDICINE TO GERIATRIC CENTER WITH NEW PARTITIONS, FINISHES, HUNG CEILING, HVAC DUCTWORK, , PLUMBING AND SP$400,000
2007-09-07DOB violation E:
2007-09-07DOB violation E:
2007-09-05DOB violation E:
2007-09-05DOB violation E:
2007-08-02Permit EW — ISSUED
2007-05-04Permit EW — ISSUED
2007-05-02Job filed: REPLACING COOLING TOWER ON ROOF. NO CHANGE IN OCCUPANCY, USE OR EGRESS.$609,000
2007-04-26Permit EQ — ISSUED
2007-04-20Job filed: Installation of medical gas alarm panel and associated devices. There is no change in use,occupancy or egress.$10,000
2007-04-02DOB violation LL1081:
2007-03-28Permit EW — ISSUED
2007-03-08Job filed: INSTALL FIRE SUPPRESSION SYSETM ONLY.NOCHANGE IN USE, EGRESS OR OCCUPAN CY.$4,000
2007-03-01Job filed: Modify existing fire alarm as shown on drawings filed herewith. No change in use, egress or occupancy.$5,000
2007-02-21Job filed: Modification of Sprinkler on the 9th floor as per plans filed herewith. No change in use, egress or occupancy.$41,535
2007-02-06Permit EQ — ISSUED
2007-01-30Job filed: REMOVE AND RECONSTRUCT CONCRETE PAD, CONSTRUCT NEW FENCE AND REPLACE EXISTING OXYGEN VAPORIZORS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.$70,000
2007-01-23Job filed: PROPOSE TO ALTER EXISTING WOMEN'S IMAGING CENTER WITH NEW PARTITIONS, HUNG CEILINGS, FINISHES, PLUMBING FIXTURES AND HVAC DUCTWORK. NO CHANGE TO USE, $400,000
2007-01-23Job filed: PROPOSE TO ALTER EXISTING WOMEN'S IMAGING CENTER WITH NEW PARTITIONS, HUNG CEILINGS, FINISHES, PLUMBING FIXTURES AND HVAC DUCTWORK. NO CHANGE TO USE, $400,000
2007-01-19Permit EW — ISSUED
2007-01-10Permit EW — ISSUED
2007-01-03Job filed: INSTALLATION OF ADDITIONAL SPRINKLER HEADS TIE INTO EXISTING MAIN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$12,800
2007-01-03Job filed: INSTALLATION OF ADDITIONAL SPRINKLER HEADS TIE INTO EXISTING MAIN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$12,800
2006
2006-11-14Permit PL — ISSUED
2006-10-05Permit EW — ISSUED
2006-10-05Permit EW — ISSUED
2006-10-03Job filed: Mechanical and plumbing work on the 9th floor medical offices for the Center for Comprehensive Health Practive (CCHP) as per plans filed herewith. No $123,000
2006-10-02Job filed: Propose to install partitions to alter an existing patient room on the 9th floor medical offices for the Center for Comprehensive Health Practice (CCH$425,000
2006-09-26DOB violation E:
2006-09-26DOB violation E:
2006-09-26DOB violation E:
2006-09-26DOB violation E:
2006-09-26DOB violation E:
2006-09-26DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-25DOB violation E:
2006-09-22DOB violation E:
2006-09-22DOB violation E:
2006-09-22DOB violation E:
2006-09-22DOB violation E:
2006-09-22DOB violation E:
2006-09-22DOB violation E:
2006-08-08Permit EW — ISSUED
2006-06-13Permit EW — ISSUED
2006-05-23ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED FIFTH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED I
2006-04-20Permit EQ — ISSUED
2006-03-22ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED FIFTH ROUND REPORT ACCEPTABLE TO THIS DEPT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBLED IN INI
2006-01-30Air permit (CERTIFICATE TO OPERATE), fuel: ?
2006-01-05Permit EW — ISSUED
2005
2005-12-30Permit EW — ISSUED
2005-12-30Permit EW — ISSUED
2005-12-23Job filed: Application herewith filed remove interior partitions. Some minor plumbing work to be done. No change in use, egress or occupancy.$80,000
2005-11-10Job filed: INSTALLATION OF TWO ANDERSON STERILIZERS MODEL (AN 333) AND ONE ABATOR M ODEL (AN 1412) NO CHANGE TO EGRESS$83,095
2005-09-16Permit EW — ISSUED
2005-09-16Permit EW — ISSUED
2005-07-20Permit EW — ISSUED
2005-07-06Permit EW — ISSUED
2005-07-06Permit EW — ISSUED
2005-06-29Job filed: Modify/install HVAC and plumbing fixtures with associated piping as shown on plans filed herewith.$111,000
2005-06-28Job filed: Interior renovation to include demolition of interior partitions/ceilings as needed, construction of new partitions and hung ceiling as required as sh$65,000
2005-06-28Job filed: Relocate sprinkler heads with associated piping as shown on plans filed herewith as it pertains to the existing sprinkler system in the building. Thi$9,000
2005-06-28Job filed: Interior renovation to include demolition of interior partitions/ceilings as needed, construction of new partitions and hung ceiling as required as sh$65,000
2005-04-28DOB violation E:
2005-04-26DOB violation E:
2005-04-26DOB violation E:
2005-03-11Permit EQ — ISSUED
2005-02-22Permit EW — ISSUED
2005-02-08Job filed: INSTALLATION OF PARTIAL SPRINKLER SYSTEM . NO CHANGE IN EGRESS, USE AND CCUPANCY.$13,000
2005-02-08Job filed: INSTALLATION OF PARTIAL SPRINKLER SYSTEM . NO CHANGE IN EGRESS, USE AND CCUPANCY.$13,000
2005-02-08Job filed: INSTALLATION OF PARTIAL SPRINKLER SYSTEM . NO CHANGE IN EGRESS, USE AND CCUPANCY.$13,000
2005-02-07Permit EQ — ISSUED
2005-01-19ECB Non-Hazardous violation: EXPIRED WORK PERMITS.SHED AROUND 1901 1ST AVE W/EXPIRED PERMITS #103864329-EXPIRED 12/31/04.#103740061 " " 12/31/04.REMEDY:STOP AL
2004
2004-11-22Permit EW — ISSUED
2004-11-22Permit PL — ISSUED
2004-11-22Permit EW — ISSUED
2004-11-16Permit PL — ISSUED
2004-11-16Job filed: PROPOSE TO ALTER EXISTING HOSPITAL ON THIRD FLOOR (3A-IN-PATIENT REHAB) WITH NEW PARTITIONS, HUNG CEILING, HANDICAP TOILETS, PLUMBING, SPRINKLER HEADS$350,000
2004-10-07Permit EW — ISSUED
2004-09-23Job filed: PROPOSE TO REMOVE INTERIOR PARTITIONS, CEILINGS, FINISHES, HVAC DUCTWORK AND PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$55,000
2004-08-23Permit EQ — ISSUED
2004-08-17RPTT $349,000 — from DEY, BRUCE to MCMURTRY, KIRK A$349,000
2004-08-16Job filed: Install sidewalk shed 1200ft long at 1901 1 Avenue -during remedial repairs. Work shall comply with LL33/91.No change in use egress or occupancy. No s
2004-07-01Permit PL — ISSUED
2004-06-29Job filed: REPLACE MEDICAL GAS PIPING ON 11TH FLOOR, WING A & D. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.$15,000
2004-05-07Job filed: INSTALL ELECTRO-MAGNETIC DOOR LOCK FAIL SAFE SYSTEM IN BASEMENT AS SHOWN ON ATTACHED RISER DIAGRAM. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$15,000
2004-04-28DOB complaint, category ?
2004-04-23Permit EW — ISSUED
2004-04-06Permit EQ — ISSUED
2004-03-31DOB complaint, category ?
2004-03-25Job filed: WE SHALL INSTALL 1000 LINEAR FEET OF HEAVY-DUTY SIDEWALK SHED AT 1901 1ST AVE. IT WILL BE USED FOR FACADE REPAIR. THERE WILL BE NO CHANGE IN USE, EGR
2004-03-12ECB Non-Hazardous violation: 83## OPERATING WITHOUT EQUIPMENT USE PERMIT "SIGN OFF CERTIFICATE"REM CALL 212 566 5524 TO ARRANGED APPIONTMENT TO FINALIZE EBN 12$500
2004-03-12ECB Non-Hazardous violation: 83## 83 OPERATING ELEVATOR WITHOUT EQUIPMENT USE PERMIT "SIGN OFF CERTIFICATE"M CALL 212 566 5524 TO ARRANGE APPIONTMENT TO FINALA$500
2004-03-12ECB Non-Hazardous violation: 83## OPERATING ELEVATOR WITHOUT EQUIPMENT USE PERMIT "SIGN OFF CERTIFICATE"REM CALL 212 566 5524 TO ARRANGE APPIONTMENT TO FINALIZ$500
2004-03-12ECB Non-Hazardous violation: 83## 863 OPERATING ELEVATOR WITHEQUIPMENT USE PERMIT "SIGN OFF CERTIFICATE"REM CALL 212 566 5524 TO ARANGE APPOINTMENT TO FINALIZE$500
2004-03-12ECB Non-Hazardous violation: 83## 83 OPERATING ELEVATOR WITHOUT EQUIPMENT USE PERMIT "SIGN OFF CERTIFICATE"REM CALL 212 566 5524 TO ARRANGE APPOINTMENT TO FINA$500
2004-03-12ECB Non-Hazardous violation: 83## 83 OPERATING ELEVATOR WITHOUT USE PERMIT "SIGN OFF CERTIFICATE"REM CALL 212 566 5524 TO ARRANGE APPIONTMENT TO FINALIZE EBN 1$500
2003
2003-12-30ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED FIFTH ROUND REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DECRIBED IN
2003-12-19Permit EW — ISSUED
2003-12-19Permit EW — ISSUED
2003-12-18Job filed: PROPOSE TO ALTER EXISTING CT. SCANNER UNIT WITH NEW PARTITIONS, HUNG CEILING, FINISHES, HVAC UNIT AND PLUMBING. THERE IS NO CHANGE IN USE EGRESS OR OC$250,000
2003-10-24DOB complaint, category ?
2003-10-10Permit EW — ISSUED
2003-09-23ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN
2003-07-23Permit EW — ISSUED
2003-07-14ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT,INDICATING,CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN
2003-05-19ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED ROUND 5 REPORT ACCEPTABLE TO THIS DEPT.INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL
2003-04-07Permit EW — ISSUED
2003-04-07Permit EW — ISSUED
2003-03-24Job filed: PROPOSE TO INSTALL EXHUST FAN, STEAM SPACE HEATER IN EXISTING OXYGEN STORAGE ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$14,000
2003-03-21ECB Non-Hazardous violation: USE OR INSTALLATION OF PLUMBING MATERIALS OR EQUIPMENT WHICH DO NOT COMPLY WITH RS-16. LOCATION: 11 FLOOR JUM CAPS INSTALLED THROU
2003-03-14ECB Non-Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDICATING CORRECT
2003-03-03DOB complaint, category ?
2003-02-24ECB Non-Hazardous violation: 16H12-17H12-55B07-65U5-80I11-81U5. 16-H-12 NOT SELF CLOSING C & 13 FLOOR 17-H-12 1 & BSMT FLOOR 65-U-5 CAR & CWT 80-I-11 DROP DOOR$350
2003-02-24ECB Non-Hazardous violation: 3X11-10H12-16L11-43Q3-55B7-62O2-65U5-80I11-81U5. 3-X-11 OUTSIDE COMMUNICATION 16-L-11 NOT SELF CLOSING 6,8,&11 FLOOR 80-I-11 DROP $350
2003-01-28ECB Non-Hazardous violation: 03X11-16L11-16M07. 30X11 - OUTSIDE COMMUNICATION. 16L11 - NOT SELF CLOSING 1ST FLOOR. 16M07 - ACCESS HOLE FOR DROP KEY 1ST FL.
2003-01-28ECB Non-Hazardous violation: 01R12-16J11-16L11-17H12-31O02. 01R12 - CONSTANT PRESSURE NOT ALLOWED. 16J11 - ADJUST GAP BETWEEN HOISTWAY DOORS WHERE NECESSARY. 1
2003-01-28ECB Non-Hazardous violation: 16L11-17H12-60X11. 16L11 - TOO MUCH GAP BETWEEN HOISTWAY DOOR AND BUCK BASEMENT AND 3RD FLOOR. 17H12 - 5TH FLOOR.
2003-01-28ECB Non-Hazardous violation: 16L11-16J11-01L12-17H12. 16L11 - NOT SELF CLOSING 6 FL. 16J11 - ADJUST GAP BETWEEN HOISTWAY DOORS 6,7,8 & WHERE NECESSARY. 01L12 -
2003-01-28ECB Non-Hazardous violation: 79X11 - MAKE REPAIRS AND RESTORE TO SERVICE FOR A FULL INSPECTION BY THIS DEPARTMENT.
2003-01-17ECB Non-Hazardous violation: 1R12-4P17-10H12-16L11-17H12-24U16-16L11-65U5-81U5. 1-R-12 CONSTANT PRESURE NOT ALLOWED 16-L-11 TOO MUCH GAP BETWEEN HOISTWAY DOORS
2003-01-17ECB Non-Hazardous violation: 1R12-5E11-16L11-17H12-16L1-65U5-81U5-24U16. 1-R-12 CONSTANT PREASURE NOT ALLOWED 16-L-11 NOT SELF CLOSING 5,7,&13 FLOORS. 17-H-12
2003-01-17ECB Non-Hazardous violation: 1R12-3X11-10H12-16L11-16L11-17H12-65U5-81U5. 1-R-12 CONSTANT PRESURE NOT ALLOWED 3-X-11 OUTSIDE COMMUNICATION 16-L-11 ADJUST GAP B
2003-01-17ECB Non-Hazardous violation: 1R12-10H12-16L1-17H12-16L11-24U16-65U5-81U5. 1-R-12 CONSTANT PRESURE NOT ALLOWED 16-L-1 ADJUST GAP BETWEEN DOORS WHERE REQUIRED 17
2003-01-17ECB Non-Hazardous violation: 1R12-16L11-17H12-16L1-23X11-23Y2-65U5-81U5. 1-R-12 CONSTANT PRESURE NOT ALLOWED 16-L-11 NOT SELF CLOSING 7,12 & 15 FLOORS. 17-H-12
2003-01-17ECB Non-Hazardous violation: 16L11-17H12-26H12-65U5-81U5. 16-L-11 NOT SELF CLOSING 3,5,6 & 14 17-H-12 1,2 & 9 FLOORS. 26-H-12 BELT 65-U-5 CAR & CWT.
2003-01-13ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDICATING CORRECT
2002
2002-11-13Permit EW — ISSUED
2002-11-13Permit EW — ISSUED
2002-11-08ECB Hazardous violation: FAILURE TO FILE AN AMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDICATING CORRECT
2002-10-18Permit EW — ISSUED
2002-10-03Permit EW — ISSUED
2002-09-19Job filed: INSTALLATION OF ADDITIONAL SPRINKLER HEADS TIE INTO EXISTING MAIN. NO CHANGE IN EGRESS, USE AND OCCUPANCY.$38,000
2002-07-08Permit PL — ISSUED
2002-07-08Permit EW — ISSUED
2002-07-08Permit EW — ISSUED
2002-06-14Job filed: INSTALL NEW LOW PRESSURE EMERGENCY OXYGEN FILL BOX AND CONCRETE PARKING PAD FOR OXYGEN TRAILER. NO CHANGE IN EGRESS, USE OR OCCUPANCY.$15,000
2002-05-24Permit EW — ISSUED
2002-05-14Permit EW — ISSUED
2002-05-03ECB Hazardous violation: FAILURE TO FILE ANMENDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y 32-03B(5), INDICATING CEOORCTION$2,500
2002-04-29Permit EW — ISSUED
2002-04-17Permit PL — ISSUED
2002-04-15Job filed: INSTALLATION OF ADDITIONAL SPRINKLER HEA DS TIE IN TO EXISTING MAIN. NO HANGE IN EGRESS, USE AND OCCUPANCY.$9,800
2002-04-12Job filed: Removal / replacement of cracked masonry units and existing steel lintels at spandrel beams. Parapet replacement. There is no change in use, egress or$1,484,000
2002-04-12Job filed: Removal / replacement of cracked masonry units and existing steel lintels at spandrel beams. Parapet replacement. There is no change in use, egress or$1,484,000
2002-03-01ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL NOTED: FACADES OF DIFFERENT ELEVATION BUILDINGS AT VARIOUS LOCATIONS AS PER ATTACHED DI$2,500
2002-03-01ECB Non-Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECTS ARE: EAST SIDE OF 14 STORY FACADE HAS HORIZONTAL AND VERTICAL DISPLACED MASONA$2,500
2002-02-28DOB violation LL10/80:
2002-02-28DOB complaint, category ?
2002-02-19DOB violation LL1081:
2001
2001-12-05DOB violation E: 1P28896
2001-12-04DOB violation E: 1P23128
2001-12-04DOB violation E: 1P23131
2001-12-04DOB violation E: 1P23135
2001-11-19Permit PL — ISSUED
2001-11-05Permit EW — ISSUED
2001-11-02Permit EW — ISSUED
2001-11-02Permit EW — ISSUED
2001-11-02Permit PL — ISSUED
2001-11-02Permit EW — ISSUED
2001-10-31Permit EW — ISSUED
2001-10-17Permit EW — ISSUED
2001-10-17Job filed: INSTALLATION OF SPRINKLER SYSTEM IN THE BASEMENT. NO CHANGE IN EGRESS, USE AND OCCUPANCY.$48,000
2001-10-12Job filed: PROPOSE TO ALTER EXISTING 4TH FLOOR OB/GYN OPD CLINIC WITH NEW PARTITIONS HUNG CEILINGS, PLUMBING, LIGHTING. FINISHES, AND MODIFY HVAC DUCTWORK. NO CH$220,000
2001-10-11Permit EW — ISSUED
2001-10-11Permit EW — ISSUED
2001-09-18Job filed: RENOVATION OF A SMALL PART OF THE 2ND FLOOR KNOW AS THE ANGIO SUITE NO CHANGE IN USE, EGRESS OR OCCUPANCY$18,000
2001-09-18Job filed: MINOR PLUMBING, MECHANICAL AND STRUCTURA L WORK ASSOCIATED WITH RENOVATI NS OF THE ANGIO SUITE OCCUPYING PART OF THE SECOND FLOOR. SEE COMMENTS SEC #$15,000
2001-09-05Permit PL — ISSUED
2001-08-20Job filed: PROPOSE TO ALTER EXISTING 4TH FLOOR OB/G YN OPD CLINIC WITH NEW PARTI TIONS HUNG CEILINGS, PLUMBING, LIGHTING, FINISHES, AND MODIFY HVAC DUCTWORK. $220,000
2001-07-25Job filed: PA
2001-07-25Job filed: PA
2001-07-05Job filed: propose to alter existing 11th floor with new partitions, hung ceiling, plumbing , lighting, finishes, modify hvac ductwork, fire alarm system and spr$285,000
2001-07-05Job filed: propose to alter existing 11th floor with new partitions, hung ceiling, plumbing , lighting, finishes, modify hvac ductwork, fire alarm system and spr$285,000
2001-06-15Permit EW — ISSUED
2001-06-13Job filed: Install dry chemical fire suppression system to replace existing in first floor canteen. No change to use, egress or occupancy.$5,000
2001-06-05Permit EW — ISSUED
2001-06-04Permit PL — ISSUED
2001-05-24Permit PL — ISSUED
2001-05-21Job filed: INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS. SEE COMMENTS #16.$18,000
2001-05-21Job filed: INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS. SEE COMMENTS #16.$18,000
2001-05-14Permit EW — ISSUED
2001-05-14Permit EQ — ISSUED
2001-04-30Job filed: MINOR PARTITION DEMOLITION CONSTRUCT NEW PARTIONS,RELATED PLUMBING AND FINISH WORK AS PER PLANS.NEW EXTERIOR RAMP.OBTAIN TEMPORARY FENCE PERMIT NO CH$60,000
2001-04-30Job filed: MINOR PARTITION DEMOLITION CONSTRUCT NEW PARTIONS,RELATED PLUMBING AND FINISH WORK AS PER PLANS.NEW EXTERIOR RAMP.OBTAIN TEMPORARY FENCE PERMIT NO CH$60,000
2001-04-30Job filed: MINOR PARTITION DEMOLITION CONSTRUCT NEW PARTIONS,RELATED PLUMBING AND FINISH WORK AS PER PLANS.NEW EXTERIOR RAMP.OBTAIN TEMPORARY FENCE PERMIT NO CH$60,000
2001-04-30ECB Non-Hazardous violation: WORK WITHOUT A PERMIT ILLEGAL WORK NOTED:1ST FLOOR COFFEE SHOP.DEMOLITION IS BEING DONE,NEW PARTITIONS,NEW ELECTRIC,ACOUSTICAL CEI
2001-04-30DOB violation C:
2001-04-25DOB complaint, category ?
2001-04-19Permit EW — ISSUED
2001-04-10Permit EW — ISSUED
2001-04-10Permit EW — ISSUED
2001-03-14Permit PL — ISSUED
2001-02-27Permit EW — ISSUED
2001-02-15Permit EW — ISSUED
2001-02-13Permit EW — ISSUED
2001-02-13Permit EW — ISSUED
2001-02-09ECB Hazardous violation: FAILURE TO MAINTAIN EXTERIOR BLDG. WALL EAST FACADE STEP CRACK AT 3RD FLR. AT 5 FACADE, STEP CRACK AT 8 FLR; WEST FACADE, STEP CRA
2001-02-02Job filed: PROPOSE TO ALTER EXISTING 13TH FLOOR WITH NEW PARTITIONS, HUNG CEILING, PLUMBING , KIGHTING, FINISHES AND MODIFY HVAC DUCTWORK. NO CHANGE IN USE EGRES$145,000
2001-02-02Job filed: PROPOSE TO ALTER EXISTING 13TH FLOOR WITH NEW PARTITIONS, HUNG CEILING, PLUMBING , KIGHTING, FINISHES AND MODIFY HVAC DUCTWORK. NO CHANGE IN USE EGRES$145,000
2001-02-01Permit EW — ISSUED
2001-01-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW
2001-01-22Job filed: Demolition of interior partitions as per plans filed herewith. No change to use , egress or occupancy.$80,000
2001-01-12Job filed: PROPOSE TO RENOVATE EXISTING 4TH FLOOR WOMEN HEALTH CENTER WITH NEW PARTITIONS, HUNG CEILING, PLUMBING LIGHTING, FINISHES AND MODIFY EXISTING DUCTWORK$200,000
2001-01-05Job filed: Installation of partial sprinkler system as per plan filed. No change in egress, use and occupancy.$48,600
2001-01-05Job filed: Installation of partial sprinkler system as per plan filed. No change in egress, use and occupancy.$48,600
2000
2000-12-22ECB Non-Hazardous violation: FAILURE TO SUBMIT ROUND 4 TECHNICAL REPORT: PERIORDIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 10/1
2000-12-15Permit EQ — ISSUED
2000-11-20DOB violation E: 1P23138
2000-11-20DOB violation E: 1P28891
2000-11-20DOB violation E: 1P23139
2000-11-20DOB violation E: 1P28895
2000-11-20DOB violation E: 1P28896
2000-11-20DOB violation E: 1P28894
2000-11-20DOB violation E: 1P23137
2000-11-20DOB violation E: 1P28893
2000-11-20DOB violation E: 1P28892
2000-11-17DOB violation E: 1P23128
2000-11-17DOB violation E: 1P23136
2000-11-17DOB violation E: 1P23131
2000-11-17DOB violation E: 1P23130
2000-11-17ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REOPRT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW
2000-11-17DOB violation E: 1P23132
2000-11-17DOB violation E: 1P23129
2000-11-08Permit EQ — ISSUED
2000-10-31Job filed: INSTALLATION OF A HEAVY DUTY SHED 40' AT EMERGENCY ROOM ENTRANCE DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2000-10-31Job filed: INSTALLATION OF A HEAVY DUTY SHED 40' AT EMERGENCY ROOM ENTRANCE DURING FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2000-10-17DOB violation C:
2000-10-17ECB Non-Hazardous violation: WORK WITHOUT PERMIT. WORK NOTED:PERMIT#102222364-01 ISSUEDTO LOD CONTRACTOR WHICH WAS WITHDRAWN. NEW CONTRACTOR HAS NO PERMIT. STO
2000-10-16DOB complaint, category ?
2000-10-16DOB complaint, category ?
2000-10-04Permit EW — ISSUED
2000-09-29DOB complaint, category ?
2000-09-29DOB complaint, category ?
2000-09-18Permit AL — RE-ISSUED
2000-09-01DOB complaint, category ?
2000-07-31Permit AL — RE-ISSUED
2000-07-31ECB Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LA
2000-07-17Permit EW — ISSUED
2000-06-30ECB Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LA$2,500
2000-05-15ECB Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT; PERIODIC INSPECTION OF EXTERIRO WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LA
2000-03-13ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT; PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LA
2000-01-31ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT : PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL L
2000-01-04Permit EW — ISSUED
2000-01-04Permit EW — ISSUED
2000-01-03ECB Non-Hazardous violation: 60J,55B,57O. PROVIDE PROPER COUNTER WEIGHT CLEARANCE BETWEEN CWT BUFFER. PROVIDE, CLEAN,
2000-01-03ECB Non-Hazardous violation: 60J,55B,57O. PROVIDE PROPER COUNTER WEIGHT CLEARENCE BETWEEN COUNTER WEIGHT AND BUTTER, PROVIDE, CLEAN .
1999-10-08ECB Non-Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 10
1999-09-30Permit EW — ISSUED
1999-09-30Permit EW — ISSUED
1999-09-20Permit EW — ISSUED
1999-09-20Permit EW — ISSUED
1999-07-22Permit PL — ISSUED
1999-06-04Permit AL — ISSUED
1999-05-17ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTIONOF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW$2,500
1999-05-13ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 10 OF 19
1999-04-26ECB Non-Hazardous violation: FAILUER TO PROVIDE APPROVED PLANS ATPREMISES AT TIME OF INSPECTION REMEDY PROVIDE APPROVED PLANS$2,500
1999-04-26ECB Non-Hazardous violation: PLUMBING WORK WITHOUT A PERMIT NEW DRAIN LINES HAVE BEEN RUN IN CELLAR EVERGREEN CHILLER NEW REFRIGEATION MACHINE HAVE BEEN INSTAL$2,500
1999-04-26DOB violation C:
1999-04-26DOB violation P:
1999-04-23DOB complaint, category ?
1999-04-19ECB Non-Hazardous violation: 14B7,10I4,15D2. 14-PROVIDE CERTIFICATE FRAME W/ CERTIFICATE ON LOCATION NOTICE. 10-ELIMINATE HOLES & BROKEN BUTTONS IN CAR
1999-04-19ECB Non-Hazardous violation: 37D6,37A9,46#12,14B7. 37D-REMOVE TEMP WIRING AT CONTROLLER TERMINALS.37A-REMOVE EXPOSED WIRING FROM SELECTOR TO CONTROLLER. 46-R
1999-04-14ECB Hazardous violation: 46D,46,37D,21X,10A,39H,07I,14M. REPLACE RUSTED HOIST ROPES BEFORE RETURNING CAR TO OPERATION NOTIFY DEPARTMENT OF BUILDINGS, REMOV$2,500
1999-04-14ECB Non-Hazardous violation: 37D,53B,35B,14M. REMOVE ALL TEMP WIRING, COMPONENTS AND CLIP JUMPER FROM CONTROLLER, REPAIR AND PROVIDE ADEGUATE LIGHTING FOR SE$2,500
1999-04-14ECB Non-Hazardous violation: 37D,3H,14M. REMOVE ALL TEMP WIRING, COMPONENTS CLIP FROM CONTROLLER, REPLACE CAR SHOLD PLATE (SADDLE WORN EXTESSIVELY), LEFT FRAME$2,500
1999-02-24ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHICAL REPORT. PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW$2,500
1999-02-24ECB Non-Hazardous violation: FAILURE TO SUBMIT A FOURTH ROUND TECHICAL REPORT. PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW$2,500
1998
1998-12-07ECB Non-Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980
1998-12-07ECB Non-Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980
1998-12-07ECB Non-Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980
1998-04-27ECB Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980
1998-04-27ECB Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980
1998-04-27ECB Hazardous violation: FAILURE TO SUBMIT A 4TH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OFEXTERIOR WALLS & APPURTENANCES AS REQUIRED BY LL 10 OF 1980
1998-04-20Permit EW — ISSUED
1998-04-03Permit EW — ISSUED
1998-03-24Permit PL — ISSUED
1998-03-10ECB Non-Hazardous violation: 73X11. RETURN DEVICE TO SERVICE OR DISMANTLE
1998-03-10ECB Non-Hazardous violation: 73X11. RETURN DEVICE TO SERVICE OR DISMANTLE.
1998-03-02Permit EW — ISSUED
1998-02-03Permit PL — ISSUED
1997
1997-12-12Permit EW — ISSUED
1997-10-23Permit EW — ISSUED
1997-07-01DOB violation LL1080:
1997-07-01DOB violation LL1080:
1997-07-01DOB violation LL1080:
1997-05-22Permit EW — ISSUED
1997-04-09Permit EW — ISSUED
1997-03-03Permit EW — ISSUED
1997-01-23Permit PL — ISSUED
1997-01-13Permit EW — ISSUED
1997-01-13Permit EW — ISSUED
1996
1996-11-06Permit PL — ISSUED
1996-10-17Permit EW — ISSUED
1996-09-26DOB complaint, category ?
1996-09-05Permit PL — ISSUED
1996-07-23Permit EW — ISSUED
1996-06-18Permit PL — ISSUED
1996-05-16Permit EW — ISSUED
1996-05-01Permit PL — ISSUED
1996-04-30Permit EW — ISSUED
1996-03-08DOB violation LL1081:
1996-02-02Permit EW — ISSUED
1995
1995-10-17Permit EW — ISSUED
1995-10-17Permit EW — ISSUED
1995-10-02Permit EQ — ISSUED
1995-10-02Permit DM — ISSUED
1995-10-02Permit DM — ISSUED
1995-10-02Permit DM — ISSUED
1995-10-02Permit EQ — ISSUED
1995-10-02Permit EQ — ISSUED
1995-06-23ECB Non-Hazardous violation: OPERATION OF A CRAME WITHOUT ON SITE INSPECTION (NO GN OR PERMIT)CD2087 REMEDY OBTAIN CERTIFICATE OF ON SITE INSPECTION #3856$1,500
1994-08-05Air permit (CERTIFICATE TO OPERATE), fuel: ?
1994-07-13Permit EW — ISSUED
1994-07-13Permit EW — ISSUED
1994-06-16Permit PL — ISSUED
1994-06-13Permit EW — ISSUED
1994-04-28Permit EW — ISSUED
1994-03-09Permit EW — ISSUED
1993
1993-12-16Permit EW — ISSUED
1993-11-24Permit EW — ISSUED
1993-11-24Permit EW — ISSUED
1993-11-24Permit PL — ISSUED
1993-11-15Permit EW — ISSUED
1993-09-15Permit PL — ISSUED
1993-08-16Permit EW — ISSUED
1993-07-28Permit EW — ISSUED
1993-06-29Permit PL — ISSUED
1993-06-03Permit EW — ISSUED
1993-02-22Permit EW — ISSUED
1993-02-03Permit PL — ISSUED
1993-01-22Permit EW — ISSUED
1992
1992-10-23Permit EW — ISSUED
1992-08-28Permit EW — ISSUED
1992-08-20Permit PL — ISSUED
1992-08-13Permit EW — ISSUED
1992-07-09Permit AL — ISSUED
1992-06-18DOB complaint, category ?
1991
1991-10-03Permit EW — ISSUED
1991-07-15Permit EQ — ISSUED
1991-07-11Permit AL — ISSUED
1991-06-11Permit AL — ISSUED
1991-05-28ECB Non-Hazardous violation: 46H.
1991-05-07Permit EW — ISSUED
1991-03-26Permit EW — ISSUED
1991-01-29Permit EW — ISSUED
1990
1990-12-27Permit PL — ISSUED
1990-12-21Permit EW — ISSUED
1990-11-09Permit EW — RE-ISSUED
1990-10-31Permit PL — ISSUED
1990-10-24Permit EW — ISSUED
1990-10-16Permit EW — ISSUED
1990-08-30Permit EQ — ISSUED
1990-06-29DOB violation LL1081: 18
1989
1989-10-26ECB Non-Hazardous violation: WORK WITHOUT A PERMIT EXPIRED PERMIT WORK NOTED COMPLETE ALTERATION OF CAFETERIA IN BASEMENT UNDER BN #6024 PERMIT EXPIRED 8/11/89
1989-10-20DOB complaint, category ?
1989-08-25DOB complaint, category ?
1989-04-13DOB violation LL16:
1989-04-13DOB violation LL16:
1989-02-22DOB violation E: 51-PROPERLY TAG AND OR PERFORM 5YR TEST
1989-02-22DOB violation E: 51-REPAIR HALL INDICATOR 52-PROPERLY TAG AND OR PERFORM 5YR TEST
1989-02-22DOB violation E: 51-PROPERLY TAG AND OR PERFORM 5YR TEST
1989-02-22DOB violation E: 51-REPAIR HALL INDICATORS 52-PROPERLY TAG AND OR PERFORM 5YR TEST